Roads Maintenance Policy ROADS-12 Winter Maintenance - Standards of Service

Grand Valley, Ontario · No. ROADS-12 · adopted 2012-02-14 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 34ef5d0fdbc2 · verified 2026-10-17 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

PoucY & PnocBDURE, Mmrn-ln SECTION SUB-SECTION SUBJECT ROADS MAINTENANCE WINTER MAINTENANCE STANDARDS OF SERVICE POLICY # ROADS-12- ool EFFECTIVE DATE Feb. 14,2012 APPROVAL Township of East Luther Grand Valley Motion # 2O12-02-12 PURPOSE The purpose of this policy is to provide operational guidelines for winter roads maintenance standards of service. STATEMENT Our Works Department objective is to provide the best winter maintenance possible while at the same time balancing available resources and the diverse range of winter weather conditions that may arise. We recognize Ontario Regulation 239102 under the Ontario Municipal Act entitled 'Minimum Maintenance Standards for Municipal Highways' as the basis for roads standards. lt is our wish to consistently provide a greater level of maintenance service to the roads network under our care and control. Understand that many factors play a role in the success of our winter roads maintenance program. These may include: amounts of types of precipitation, air and ground temperatures, wind speed and direction, sunlight, shade cover, topography, traff ic patterns and volumes, available manpower, equipment and materials. As you can see, the complexity and variety of conditions encountered can cause substantial variations in the levels of service provided. ROADWAY SURFACE CONDITIONS Considering the statement above, the surface objective on municipally controlled roads is this: Level of Service Surface Condition Road Classification Center Bare Attempt to attain bare 2,5m center section of pavement within 24 hrs. after conclusion of storm event Class4-6pavements Attempt to attain plowed, but snow packed condition within 24 hrs. after conclusion of storm event Snow Packed Class4-6gravel roads C ICY ROADS slDEwAtKs asives may be appried at caurionary f¡UII4IT/IARY