This is the exact embedded text of the captured official document.
Snapshot 177923995f32 · verified 2026-10-19 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
91
Consolidation December 2022
SECTION 15 - EXTRACTIVE INDUSTRIAL
(M3) ZONE
15.1 Permitted Uses
Within any Extractive Industrial Zone, no person shall use any lot or erect, alter or use
any building or structure for any purpose except one or more of the following uses:
Accessory Use (Section 4.2)
Accessory Wholesale Outlet or Office
Aggregate Processing Facility
Agricultural Use
Conservation
Pit
Asphalt Plant
Quarry
Wayside Pit or Quarry
Notwithstanding the above list, permitted uses may be restricted through the General
Provisions (Section 4).
15.2 Regulations
Within any Extractive Industrial Zone, no person shall use any lot or erect, alter or use
any building or structure for any purpose except in accordance with the following
requirements:
15.2.1 Setbacks for Excavation
No excavation shall occur:
1.
within 15 m of any lot line;
2.
within 30 m from any part of the boundary of the site that abuts: a
public road or highway; or land Zoned or used for residential
purposes;
3.
within 30 m from any body of water that is not the result of excavation
below the water table.
92
Consolidation December 2022
15.2.2 Setbacks for Buildings, Structures and Stockpiles
No person shall pile aggregate, topsoil, subsoil or overburden, locate any
processing plant or place, build or extend any building or structure:
1.
within 30 m of any lot line (Section 4.19 & Section 4.20);
2.
within 90 m from any part of the boundary of the site that abuts land
Zoned or used for residential purposes.
15.2.3 Maximum Building Height
25 m
15.2.4 Restrictions on Lot Area for Accessory Uses
An accessory office and accessory wholesale outlet shall have a maximum
combined ground floor area of 10% of the lot area.