THE CORPORATION OF THE TOWNSHIP OF HORNEPAYNE
2026 COMPREHENSIVE USER FEES
SCHEDULE "A" To By-Law No. 2218-26
6.00 Solid Waste Tipping
FEE
HST
TOTAL
Household
Pick-up truck maximum of
per load
20.81
2.71
23.52
Larger than pick-up maximum of
per load
52.02
6.76
58.78
Trailer pulled by car maximum of
per load
52.02
6.76
58.78
Semi dump trailer
364.14
47.34
411.48
Commercial Waste
0.00
0.00
Truck per cubic yard (taken by owner)
per yard
10.40
1.35
11.75
Picked up by landfill contractor or private contractor rate to be negotiated between
contractor and owner
Semi dump trailer
364.14
47.34
411.48
White goods per unit (must be tagged)
per unit
10.40
1.35
11.75
Tires (does not include rims)
per unit
Batteries (automobile)
per unit
10.40
1.35
11.75
Contractors to bill a minimum of 4 times per year
Demolition (tipping fees to go to the Municipality)
2080.80
270.50
2351.30
Costs associated with disposal and burial are
included in tipping
Fee to Township
Note: All fees to be increased by 10% for non-resident users.
Contaminated Soil - Fees go to Township
Tandem Dump Truck
per load +
costs
550.00
550.00
Tri Axle Dump Truck
per load +
costs
650.00
650.00
Tri Axle Trailer
per load +
costs
750.00
750.00
Contractor Bins - Fees go to Township
40 Yard Bin
per bin
325.00
325.00
30 Yard Bin
per bin
250.00
250.00
20 Yard Bin
per bin
175.00
175.00
Page 9 of 19