Building permits — Horton, Ontario

Do I need a building permit? What does it cost?

In the Township of Horton, Ontario, building permit rules are set by By-law No. 2007-48 (The Building By-Law), verified 2026-09-25. Permit required for: construction/demolition/sewage system or change of use. Permit fees: Schedule "A", Section 1: .40/sq.ft. residential; .10/sq ft min $75.00 farm; .25/sq. ft commercial; .20/sq. ft industrial; flat fees for other permits. Administered by: Chief Building Official.

By-law No. 2007-48 (The Building By-Law) adopted bylaw
permit required for construction/demolition/sewage system or change of use s. 3.1
fee basis Schedule "A", Section 1: .40/sq.ft. residential; .10/sq ft min $75.00 farm; .25/sq. ft commercial; .20/sq. ft industrial; flat fees for other permits Schedule "A", Section 1
authority Chief Building Official s. 2.5
scout note

Enacted under Building Code Act 1992 s.7; regulates erection/safety of buildings, classes of building/demolition/change-of-use/sewage-system permits, inspections, plan approval, and a Schedule A fee schedule (accessory buildings, additions, pools, commercial/industrial, sewage systems). Scanned PDF, OCR'd.

Machine-readable: building-permits.json · Official website: http://www.hortontownship.ca/ · Last verified 2026-09-25 · Building permits across Ontario · Building permits in other municipalities