Winter Operations Plan (PW-26-04)

Huron East, Ontario · No. PW-26-04 · adopted 2026-02-03 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 448c40844149 · verified 2026-10-17 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

1 | P a g e Winter Operations Plan Date Approved by Council: February 3, 2026 2 | P a g e Table of Contents Purpose 4 Definitions 5 1.0 Winter Operations Management - Objective 6 2.0 Policy Statement 6 3.0 Winter Maintenance Program 6 3.1.0 The System Maintained 6 3.2.0 Level of Service 8 3.3.0 Winter Maintenance Season 12 3.4.0 Winter Preparations 13 3.4.1 On or before October 20th 13 3.4.2 On or before November 1st 14 3.4.3 On or before November 10th 14 3.4.4 On or before November 20th 15 3.5.0 Winter Patrol 15 3.6.0 Operations 15 3.6.1 Staffing and Hours of Work 15 3.6.2 Winter Material Used Annually 15 3.6.3 Application Rates 16 3.6.4 Equipment 16 3.6.5 Yard Facilities 16 3.6.6 Snow Removal and Disposal 17 3.6.7 Sand, Salt, Iceblade and Plow Routes 17 3.6.8 Source Water Protection 18 3.6.9 Weather Monitoring 18 3.6.10 Communications 18 3.6.11 Call out Procedures 18 3.6.12 Road Closure Procedures 19 3.6.13 Declaration of Emergency 19 3.6.14 Towing 19 3 | P a g e 3.7 Decommissioning Winter Operations 19 3.7.1 On or before March 30th 20 3.7.2 On or before April 15th 20 3.8.0 Record Keeping 20 4.0 Plan Improvements 21 5.0 Monitoring and Updating 21 Appendix 1 - Route of Representative Roads 23 Appendix 2 - Sidewalk Plow Route 32 Appendix 3 - Winter Maintenance Equipment Overview 21 Appendix 4 - Record of Training 23 Appendix 5 - Winter Patrol and Maintenance Schedule Policy 25 Appendix 6 - Source Water Protection Maps 30 Brucefield - C Zone 30 Brussels - C Zone 31 Seaforth - C Zone 32 4 | P a g e Purpose The Winter Operations Plan sets out a policy and procedural framework for ensuring that the Municipality of Huron East continuously improves on the effective delivery of winter maintenance services as identified in O. Reg. 239/02: Minimum Maintenance Standards for Municipal Highways. Additionally, the Winter Operations Plan aids in the management of road salt used in winter maintenance operations, as outlined in Environment Canada's Code of Practice for the Environmental Management of Road Salts. The plan is meant to be dynamic, to allow the municipality to evaluate and phase-in any changes, new approaches and technologies in winter maintenance activities in a fiscally sound manner. At the same time, any modifications to municipal winter maintenance activities must ensure that roadway safety is not compromised. As specified in the Code of Practice for the Environmental Management of Road Salts, the Winter Operations Plan for The Municipality of Huron East was endorsed by Council on the 3rd day of February, 2026. 5 | P a g e Definitions Anti-icing means the application of liquid de-icers directly to the road surface in advance of a winter event. De-icing means the application of solids, liquids, pre-treated material to the road surface after the on-set of the winter event. Highway includes a common and public highway, street, avenue, parkway, driveway, square, place, bridge, viaduct or trestle, any part of which is intended for or used by the general public for the passage of vehicles and includes the area between the lateral property lines thereof. Paved Road is a road with an asphalt surface, concrete surface, composite pavement, or portland cement. Surface Treated Road is a road with bituminous surface treatment comprised of one or two applications of asphalt emulsion and stone chips over a gravel road. Unpaved Road is a graded road with a gravel, stone or other loose traveling surface. Winter Event is a weather condition affecting roads such as snowfall, wind-blown snow, freezing rain, frost, black ice, etc., to which a winter event response is required. Winter Event Response is a series of winter control activities performed in response to a winter event. Winter Season is the season when the Public Works normally performs winter roadway and sidewalk maintenance as identified in the Winter Operations Plan. Continuous Winter Event Response is a response to a winter event with full deployment of staff and equipment that plow/salt/sand the entire system. Spot Winter Event Response is a response to a winter event with only a part deployment of staff and equipment or with full deployment to only part of the system. Winter Event Response Hours are the total number of person-hours per year (plowing, salting/sanding, winging back, etc.) to respond to winter events. 6 | P a g e 1.0 Winter Operations Management - Objective The Municipality of Huron East is committed to improving winter maintenance operations while continuing to ensure public safety. Huron East will optimize the use of winter maintenance materials containing chlorides on all hard surface municipal roads while striving to minimize negative impacts to the environment. Municipality of Huron East public works staff will strive, insofar as reasonably practicable, to provide safe winter road conditions for vehicular and pedestrian traffic as set out in the level of service policies and within the resources established by the Council of the Municipality of Huron East. 2.0 Policy Statement The Municipality of Huron East will provide efficient and cost effective winter maintenance to ensure, insofar as reasonably practicable, the safety of users of the municipal road network in keeping with applicable provincial legislation and accepted standards while striving to minimize adverse impacts to the environment. These commitments will be met by: - adhering to the procedures contained within the Winter Operations Plan; - reviewing and upgrading the Winter Operations Plan on an annual basis to incorporate new technologies and new developments; - committing to ongoing winter maintenance staff training and education; and - monitoring, on an annual basis, the present conditions of the winter maintenance program, as well as the effectiveness of the Winter Operations Plan. 3.0 Winter Maintenance Program 3.1.0 The System Maintained The major activities related to winter maintenance are: - snow plowing - salt/sand application - ice scarifying - salt and sand storage - snow removal - snow storage 7 | P a g e - sidewalk plowing and de-icing The Municipality of Huron East is responsible for winter maintenance on: - Paved roads 221 Km - Unpaved roads 333 Km - Sidewalks 36 Km For the purposes of this winter operations plan, the highways under the jurisdiction of the Municipality of Huron East have been classified (Class 1, 2, 3, 4, 5, 6) as per the following table which is based on the Classification of Highways table included in O.Reg. 239/02. Table 1: MMS Classification of Highways Table (O. Reg. 366/18, s. 1 (5).) Column 1 Average Daily Traffic (number of motor vehicles) Column 2 91-100 km/h speed limit Column 3 81 - 90 km/h speed limit Column 4 71 - 80 km/h speed limit Column 5 61 - 70 km/h speed limit Column 6 51 - 60 km/h speed limit Column 7 41 - 50 km/h speed limit Column 8 1-40 km/h speed limit 53,000 - or more 1 1 1 1 1 1 1 23,000-52,999 1 1 1 2 2 2 2 15,000-22,999 1 1 2 2 2 3 3 12,000-14,999 1 1 2 2 2 3 3 10,000-11,999 1 1 2 2 3 3 3 8,000-9,999 1 1 2 3 3 3 3 6,000-7,999 1 2 2 3 3 4 4 5,000-5,999 1 2 2 3 3 4 4 4,000-4,999 1 2 3 3 3 4 4 3,000-3,999 1 2 3 3 3 4 4 2,000-2,999 1 2 3 3 4 5 5 1,000-1,999 1 3 3 3 4 5 5 500 - 999 1 3 4 4 4 5 5 200 - 499 1 3 4 4 5 5 6 50 - 199 1 3 4 5 5 6 6 0 - 49 1 3 6 6 6 6 6 8 | P a g e For the purposes of the table above to this section, the average daily traffic on a highway or part of a highway under the jurisdiction of the Municipality of Huron East shall be determined by: - counting and averaging the daily two-way traffic on the highway or part of the highway; or - estimating the average daily two-way traffic on the highway or part of the highway. The Municipality of Huron East asses that the majority of roads within its boundaries are Class 4 highways. 3.2.0 Level of Service The Municipality of Huron East provides the following level of service during the winter maintenance season, in response to a winter event. Weather monitoring 1.1 (1) From October 1st to April 30th the minimum standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once every shift or three times per calendar day, whichever is more frequent, at intervals determined by the municipality. (2) May 1st to September 30th, the minimum standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once every shift or three times per calendar day, whichever is more frequent, at intervals determined by the municipality. Snow Accumulation, Roadways 1. Subject to section 4.1 (MMS), the standard for addressing snow accumulation on roadways is: (a) after becoming aware of the fact that the snow accumulation on a roadway is greater than the depth set out in the Table to this section, to deploy resources as soon as practicable to address the snow accumulation; and (b) after the snow accumulation has ended, to address the snow accumulation so as to reduce the snow to a depth less than or equal to the depth set out in the Table within the time set out in the Table, (i) to provide a minimum lane width of the lesser of three metres for each lane or the actual lane width, or 9 | P a g e (ii) on a Class 4 or Class 5 highway with two lanes, to provide a total width of at least five metres. O. Reg. 47/13, s. 4; O.Reg. 366/18, s. 5 (1). 2. If the depth of snow accumulation on a roadway is less than or equal to the depth set out in the Table to this section, the roadway is deemed to be in a state of repair with respect to snow accumulation. O. Reg. 47/13, s. 4. 3. For the purposes of this section, the depth of snow accumulation on a roadway and, if applicable, lane width under clause (1) (b),may be determined in accordance with subsection (4) by a municipal employee, agent or contractor, whose duties or responsibilities include one or more of the following: (1) Patrolling highways. (2) Performing highway maintenance activities. (3) Supervising staff who perform activities described in paragraph 1 or 2. O. Reg. 47/13, s. 4; O. Reg. 366/18, s. 5 (2). (4) The depth of snow accumulation on a roadway and lane width may be determined by, (a) performing an actual measurement; (b) monitoring the weather; or (c) performing a visual estimate. O. Reg. 47/13, s. 4; O. Reg. 366/18, s. 5 4. For the purposes of this section, addressing snow accumulation on a roadway includes, (a) plowing the roadway; (b) salting the roadway; (c) applying abrasive materials to the roadway; (d) applying other chemical or organic agents to the roadway; (e) any combination of the methods described in clauses (a) to (d). O. Reg. 366/18, s. 5 (4). 5. This section does not apply to that portion of the roadway, (a) designated for parking; (b) consisting of a bicycle lane or other bicycle facility; or (c) used by a municipality for snow storage. O. Reg. 366/18, s. 5 (4). 10 | P a g e Table 2: Table Snow Accumulation The minimum standard for treating snow with respect to time on roadways is: Class of Depth Time 1 2.5 cm 4 Hours 2 5 cm 6 Hours 3 8 cm 12 Hours 4 8 cm 16 Hours 5 10 cm 24 Hours Ice formation on roadways and icy roadways 1. The standard for the prevention of ice formation on roadways is, in the 24- hour period preceding an alleged formation of ice on a roadway: (1) Monitor the weather in accordance with section 3.1 (MMS) and (2) Patrol in accordance with section 3 (MMS). (3) If the municipality determines, as a result of monitoring and patrolling (paragraph 1 or 2), that there is a substantial probability of ice forming on a roadway, treat the roadway if practicable, to prevent ice formation within the time set out in Table 1 to this section, starting from the time that the municipality determines is the appropriate time to deploy resources for that purpose. O. Reg.366/18, s. 8. 2. If the municipality meets the standard set out in subsection (1) and, despite such compliance, ice forms on a roadway, the roadway is deemed to be in a state of repair until the applicable time set out in Table 2 to this section expires after the municipality becomes aware of the fact that the roadway is icy. O. Reg. 366/18, s. 8. 3. Subject to section 5.1 (MMS), the standard for treating icy roadways is to treat the icy roadway within the time set out in Table 2 to this section, and an icy roadway is deemed to be in a state of repair until the applicable time set out in Table 2 to this section expires after the municipality becomes aware of the fact that a roadway is icy. O. Reg. 366/18, s. 8. 4. For the purposes of this section, treating a roadway means applying material to the roadway, including but not limited to, salt, sand or any combination of salt and sand. O. Reg. 366/18, s. 8. 11 | P a g e 5. For greater certainty, this section applies in respect of ice formation on bicycle lanes on a roadway, but does not apply to other types of bicycle facilities. O. Reg. 366/18, s. 8. Table 3: Ice Formation Prevention Class o Time 1 6 Hours 2 8 hours 3 16 Hours 4 24 hours 5 24 Hours Table 4: Treatment of Icy Roadways Class o Time 1 3 Hours 2 4 hours 3 8 Hours 4 12 hours 5 16 hours Snow accumulation on sidewalks 1. Subject to section 16.4 (MMS), the standard for addressing snow accumulation on a sidewalk after the snow accumulation has ended is, a) to reduce the snow to a depth less than or equal to 8 centimetres within 48 hours; and b) to provide a minimum sidewalk width of 1 metre. O. Reg. 366/18, s. 15. 2. If the depth of snow accumulation on a sidewalk is less than or equal to 8 centimetres, the sidewalk is deemed to be in a state of repair in respect of snow accumulation. O. Reg. 366/18, s. 15. 3. If the depth of snow accumulation on a sidewalk exceeds 8 centimetres while the snow continues to accumulate, the sidewalk is deemed to be in a state of repair with respect to snow accumulation, until 48 hours after the snow accumulation ends. O. Reg. 366/18, s. 15. 4. For the purposes of this section, the depth of snow accumulation on a sidewalk may be determined in the same manner as set out in subsection 4 (4) (MMS) and by the persons mentioned in subsection 4 (3) (MMS) with necessary modifications. O. Reg. 366/18, s. 15. 12 | P a g e 5. For the purposes of this section, addressing snow accumulation on a sidewalk includes, (a) plowing the sidewalk; (b) salting the sidewalk; (c) applying abrasive materials to the sidewalk; (d) applying other chemical or organic agents to the sidewalk; or (e) any combination of the methods described in clauses (a) to (d). O. Reg. 366/18, s. 15. Ice formation on sidewalks and icy sidewalks 1. Subject to section 16.6 (MMS), the standard for the prevention of ice formation on sidewalks is to, (a) monitor the weather in accordance with section 3.1 in the 24-hour period preceding an alleged formation of ice on a sidewalk; and (b) treat the sidewalk if practicable to prevent ice formation or improve traction within 48 hours if the municipality determines that there is a substantial probability of ice forming on a sidewalk, starting from the time that the municipality determines is the appropriate time to deploy resources for that purpose. O. Reg. 366/18, s. 15. 2. If ice forms on a sidewalk even though the municipality meets the standard set out in subsection (1), the sidewalk is deemed to be in a state of repair in respect of ice until 48 hours after the municipality first becomes aware of the fact that the sidewalk is icy. O. Reg. 366/18, s. 15. 3. The standard for treating icy sidewalks after the municipality becomes aware of the fact that a sidewalk is icy is to treat the icy sidewalk within 48 hours, and an icy sidewalk is deemed to be in a state of repair for 48 hours after it has been treated. O. Reg. 366/18, s. 15. 4. For the purposes of this section, treating a sidewalk means applying materials including salt, sand or any combination of salt and sand to the sidewalk. O. Reg. 366/18, s. 15. 3.3.0 Winter Maintenance Season The winter maintenance season within which the Municipality of Huron East will perform winter highway maintenance, shall commence as required based on the weather monitoring between October 1st to April 30th. 13 | P a g e In the event that winter conditions occur before or after the winter maintenance period, the Corporation of the Municipality of Huron East Director of Public Works may initiate or extend the winter maintenance period. 3.4.0 Winter Preparations In the months prior to the start of the winter maintenance season, as identified in Winter Maintenance Season, the Municipality of Huron East undertakes the following tasks to prepare for the upcoming winter season. 3.4.1 On or before October 20th On or before October 20th, if required, the Municipality of Huron East shall procure the supply of materials (salt, sand), replacement parts (for plows, solid application equipment), value added meteorological services (VAMS) and rental/contract equipment (plow trucks, spreader trucks, combination units, Motor Graders). Prior to the winter season the Municipality of Huron East will: 1. Conduct a mandatory training session for staff and contract operators where all policies, procedures, schedules, reporting procedures for callout, route maps, equipment training and safety precautions will be discussed. Any issues resulting from the meeting with regard to the policies, procedures, schedules, reporting procedures for callout, route maps, equipment training and safety precautions shall be resolved either at the meeting or prior to the winter season. Current Winter Operations Training includes: - Equipment Circle Check (Pre and Post Inspection) - Record Keeping - Health and Safety - Level of Service - policies, practices and procedures - Identification of Plow Routes - including variations for year to year and issues identified along routes - Yard and Equipment maintenance Staff, including contractor staff, will verify that training is completed by signing the "Record of Training" included in Appendix 4. 14 | P a g e 2. Train winter patrollers (or staff whose duties also include patrolling) on the route of representative roads to be patrolled between winter events, their duties during a winter event, record keeping requirements and callout procedures and the de-icing chemicals to be applied for the forecast weather conditions. 3. Inspect equipment to ensure proper working order. Schedule and complete any and all equipment repairs. 4. Arrange for the delivery of materials (salt, sand) and begin filling storage facilities. 5. Confirm that all guiderail, catch basin, hazard and fire hydrant markers, if any, are in place. Any missing markers will be replaced prior to the winter session. 3.4.2 On or before November 1st On or before November 1st, the Municipality of Huron East will: 1. Post the winter shift schedule. 2. Assign equipment to staff. 3. Calibrate material application equipment. 4. Allow operators (staff and contract) time to familiarize themselves with any new equipment, material application rates, material application equipment and their route (driving the route and noting obstacles along the route). 5. Assign staff to monitor weather forecasts on a daily basis. Assign night patrol shift if forecast indicates an overnight winter event is probable. The patrol person will be authorized to initiate a winter event response if conditions warrant a response. 6. Have 50% of the fleet ready to respond to a winter event. 7. Have sufficient staff available to operate the fleet if conditions warrant a winter event response. 3.4.3 On or before November 10th On or before November 10th, the Municipality of Huron East will 1. Have the required complement of the fleet ready to respond to a winter event. 2. Have staff available to operate the required complement of the fleet if 15 | P a g e conditions warrant a winter event response. 3.4.4 On or before November 20th On or before November 20th, the Municipality of Huron East will 1. Implement the winter shift schedule. 2. Begin patrolling representative roads in all maintenance classes. 3. Respond to winter events as per the winter operations plan. 3.5.0 Winter Patrol During the winter maintenance season the Municipality of Huron East carries out a winter patrol, on a route of representative roads, twice daily, 7 days a week. Between winter events, a patrol of representative roads will occur between 2:00AM-4:00AM and a second patrol will occur between 10:30AM-12:30PM, the patrol may be shortened or lengthened depending on the current weather. The purpose of the patrol is to monitor and record weather and road conditions and mobilize winter maintenance operators and equipment should a winter event be observed and a winter event response is required. On the approach of a winter event, or during a winter event, the route of representative roads may be modified, insofar as reasonably practicable, depending on the type and severity of winter event or the direction from which the storm approaches. The patrol person will be familiar with local conditions in their patrol area, and prepare a condition log of the road and weather conditions as well as any actions taken during the shift. The winter patrol schedule parallels the designated winter season. 3.6.0 Operations 3.6.1 Staffing and Hours of Work The Municipality of Huron East has employees assigned to each vehicle used for winter operations. Each vehicle is assigned a route for sanding/salting/scarifying and/or plowing The Municipality of Huron East adheres to the hours of service as set out in the Highway Traffic Act Reg. 555/06. 3.6.2 Winter Material Used Annually 16 | P a g e Table 5: Winter Material Used Annually Material 5 year Average Rock salt (NaCl) 408 tonnes Sand 2260 tonnes *Percentage of salt in sand/salt mix by volume 17% 3.6.3 Application Rates Table 6: Application Rates Solids Spreading Rates per 2 lane km Highway Class Salt Salt-Sand Mix CLASS 1 -- -- CLASS 2 -- -- CLASS 3 -- 180-400 kg CLASS 4 -- 180-400 kg CLASS 5 -- 180-400 kg CLASS 6 -- 180-400 kg 3.6.4 Equipment The municipality provides winter maintenance services on 19 Routes with the equipment listed in Appendix 3 which will be reviewed and updated annually. 3.6.5 Yard Facilities The Municipality provides winter maintenance services from the patrol yards listed below. Patrol yards outfitted with Salt and Sand Storage are equipped with a front- end loader capable of loading the winter maintenance fleet with sand or salt. 17 | P a g e Table 7: Yard Facilities and Locations Shop Location Storage Details Material Storage Details Tuckersmith Shop 42677 Front Rd, Egmondville ON Indoor/Outdoor Covered Salt/Sand Storage Seaforth Shop 35 Oak St, Seaforth ON Indoor Limited Salt Storage McKillop Shop 81549 North Line, Winthrop ON Indoor N/A Brussels Shop 240 Turnberry St, Brussels ON Indoor Limited Salt/Sand Storage Grey Shop 44264 Newry Rd, Brussels ON Indoor/Outdoor Covered Salt/Sand Storage Material Storage Details 450 tonnes of sand and 80 tonnes of salt storage maximum at each main yard. 3.6.6 Snow Removal and Disposal Currently, municipal staff remove and haul snow to the sites listed in the table below when the accumulation of piled snow impedes traffic on the road and/or sight lines at intersections. TABLE 8: SNOW DUMP LOCATIONS Name Location Surface Paved Run Off Controlled Drainage/ Run Off Surroundin g Land Seaforth Snow Railway St. W Seaforth Gravel Yes Open Ditch C Vanastra Snow 5th Ave. Vanastr Paved Yes Ope n C Brussels Snow Sports Drive Gravel Yes Open Area R C=Commercial; R=Residential 3.6.7 Sand, Salt, Iceblade and Plow Routes Appendix 1 contains image files of the sand/salt routes, ice blade routes and plow routes. Appendix 2 contains image files of the Sidewalk Plow and Sand Salt routes, and loader routes. 18 | P a g e 3.6.8 Source Water Protection The Municipality of Huron East falls under a Source Water Protection Region with the Ausable Bayfield Conservation Authority and the Maitland Valley Conservation Authority. The Municipality of Huron East recognizes the source water protection zones, as noted in Appendix 6, operator training is completed in order to ensure that staff are aware of this sensitive area and prepared to take appropriate action when necessary. 3.6.9 Weather Monitoring In order to determine an effective winter event response and allocate the appropriate resources, the Municipality of Huron East supplements road patrol information with weather information from various sources, which includes: - Observations from municipal staff, communication with staff of adjacent municipalities and MTO contractors - Monitoring websites www.weathernetwork.com - OGRA Winter Web App (Monitoring and Notifications) - Staff also monitor pavement temperatures by means of on-board infrared thermometers, which are mounted on the patrol truck and other trucks. 3.6.10 Communications All winter maintenance vehicles are equipped with two-way communications. Municipal staff are responsible for reporting changing winter weather and/or road conditions as the changes are observed. The Municipality communicates important information to the public via: - Media press releases - Information posted on municipal website: www.huroneast.com - Social media (Facebook) 3.6.11 Call out Procedures Operational decisions will be made by the Patroller/designate with the aid of available forecasting, level of service policy, patrolling, etc. However, it should be emphasized that decisions will be subjective and external input, whether in this plan or elsewhere, merely acts as an aid in determining if a call out of staff and equipment by the Patroller to respond to a winter event is warranted. It is vital, therefore, that the Patroller records the prevalent conditions and relevant information when he/she makes a decision. 19 | P a g e The Patroller shall inform the Patroller/designate of changing road and weather conditions observed in the field. When a winter event response is required, the Patroller will contact staff as required. 3.6.12 Road Closure Procedures In the event a road must be closed due to a severe winter storm, Ontario Provincial Police will request signs be placed to close the road. ERC-2 or Rb-92 Road Closed Signs on portable stands, TC-54 flexible drums and barricades will be available at the patrol yard. Upon receiving a request from Ontario Provincial Police to close a road to traffic, the Patroller/designate will organize staff and equipment to place the signs and barricades. The Patroller/designate will contact the Director of Public Works/designate and request that a media release be sent to the local news and radio stations advising of the road closure. Roads will be deemed to be closed once the signs and barricades are set in place. When it is physically impossible to place signs and barricades to close a road, the Roads Foreman/designate will advise Ontario Provincial Police and request Ontario Provincial Police permission to send the media release. 3.6.13 Declaration of Emergency In the event that the Director of Public Works, Operations Manager and/or a delegate declares a significant weather event, the standards in regards to snow accumulation on roadways, sidewalks and bike lanes, and ice formation on roadways, sidewalks and bike lanes, are deemed to be in a state of repair as long as the municipality is: a) Monitoring the weather in accordance to MMS O. Reg. 239/02 section 3.1; and b) If deemed practicable by the municipality, to deploy resources to address identified standards starting from the time that the municipality deems appropriate to do so. If the municipality complies with a) and b) above all roadway sidewalks, and on road bike lanes are deemed to be in a state of repair, until 48 hours following the declaration of the end of the significant weather event by the municipality. The Public Works Department will communicate the declaration of a significant weather event to the public via the website and social media. 3.6.14 Towing Cars parked on the streets during a snow removal effort may be ticketed and/or towed away. A snow emergency parking ban may be declared by the Director of Public Works or Operations Manager or their designee. 3.7 Decommissioning Winter Operations 20 | P a g e After the winter season ends, the Municipality of Huron East undertakes tasks to decommission winter operations. 3.7.1 On or before March 30th Provided the winter season has ended on or before March 30th, the Municipality of Huron East undertakes to: - Cease regularly scheduled winter night patrols. - Monitor weather forecasts. - Assign night patrol shift if forecast indicates an overnight winter event is probable. - Decommission 50% of the fleet. 3.7.2 On or before April 15th Provided the winter season has ended on or before April 15th, the Municipality of Huron East undertakes to cease all winter highway maintenance operations and decommission the remainder of the equipment, providing weather forecasts warrant the decommissioning. 3.8.0 Record Keeping Full and accurate completion of the documents listed below, according to the applicable procedures, ensures that the municipality is protected from liability by providing solid documentation that procedures have been followed. Staff is responsible for keeping the following records: For Equipment Operators: - CVOR Time Card - Route Plowed and strategy used (plow only, sand/salt only, combination of plowing/sanding/salting/ice blading) For Patrollers: - Winter Patrol Record - Call out list on patrol notes For Operations Supervisors (Foremen): - Operations Diary 21 | P a g e - Incident/Collision Reports - Total materials used - Equipment Calibration Records The date will be recorded as Month/Day/Year. It will be written in the following format: Month/Day/Year. The time shall be documented using the 24 hour clock. Always retain the original copy of documents regardless of their appearance. Writing must legible for others to read and written in ink. Stains or dirt on the documents is not an issue. If a document requires correction, a line is to be placed through the incorrect information, without making it illegible, and continue writing on the original document. Initial corrections or change in the colour of ink in a case where you change writing pens. Records will be completed daily and forwarded weekly to the Patroller or their designate for retention. 4.0 Plan Improvements The current winter maintenance policies, practices and procedures form the baseline or benchmark upon which improvements are made to winter operations and/or the use and management of road salt. 5.0 Monitoring and Updating The purpose of monitoring and updating is to provide a basis for continuous improvement of the Winter Operations Plan and the winter maintenance policies, practices and procedures of the Municipality of Huron East. 22 | P a g e At the end of the winter season, as identified in 3.3.0, a meeting to review winter operations will be held each year with all winter operations staff to itemize issues that arose during the winter season and discuss how these issues may be resolved. Prior to the start of the next winter season and with sufficient lead-time to implement any changes, the Municipality of Huron East shall train staff on the changes to equipment and/or winter maintenance policies, practices, and procedures. 23 | P a g e Appendix 1 - Route of Representative Roads Plow Schedule: Huron East South Rural (2026 ) False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 F No Winter Maint 0 1,100 2,200 3,300 4,400 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx 1:45,000 D E H G Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA SUMMERHILL ROAD BRIDGE ROAD HYDRO LINE ROAD HURON ROAD FRONT ROAD TILE ROAD CENTENNIAL ROAD ROAD STONE ROAD CHISELHURST ROAD OAK ROAD SANCTUARY LINE KINBURN LINE DIVISION LINE HANNAH ROXBORO LINE KIPPEN ROAD NORTH HENSALL ROAD MAPLE LINE BEECHWOOD LINE MANLEY LINE Plow Schedule: Huron East North Rural (2026 ) False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 L No Winter Maint 0 1,000 2,000 3,000 4,000 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx 1:40,000 K I J N O M Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA ACRE T ROAD JAMESTOWN ROAD BROWNTOWN ROAD CARDIFF ROAD BRANDON ROAD ROWLAND ROAD DAVIES STREET NEWRY ROAD FISCHER LINE CRANBROOK ROAD ST MICHAELS ROAD MONCRIEFF ROAD WALTON ROAD BLYTH ROAD BRUSSELS LINE McDONALD LINE TURNBULL LINE PERRIE LINE JOHNSTON LINE KENT LINE McNABB LINE ADAMS LINE GILLIS LINE MT PLEASANT LINE ETHEL LINE McTAGGART LINE McNAUGHT LINE KRAUTER LINE MOLESWORTH LINE LIVINGSTON LINE MAPLE KEYS LINE HENFRYN Plow Schedule: Walton (2026 ) False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx 1:3,000 K Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA PATRICK STREET BLYTH ROAD BRUSSELS LINE HUMPHRIES STREET Plow Schedule: Seaforth Urban (2026 ) L1 A B 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx BRIARHILL ROAD ALEXANDER ST DALY STREET BRANTF SILLS STREET HICKORY ROAD EAST WILLIAM STREET LINDA DRIVE WELSH STREET TREET ORTH STREE CENTRE STREET JAMES STREET GODERICH STREET WEST FRANKLIN STREET SID R GODERICH STREET EAST MARKET STREET HURON STREET JOHN STREET GEORGE STREET EAST CROMBIE STREET RAILWAY STREET ORD STREET LLOYD EISLER STREET OAK STREET BIRCH STREET HESTNUT ROAD ADAM STREET ANN STREET LING STREET HELEN STREET WILSON STREET LOUISA STREET MCLEAN STREET ORD STREET ISABELLA STREET WEST STREET JARVIS STREET SOUTH JARVIS STREET NORTH CHURCH STREET HIGH STREET WEST WILLIAM STREET KIPPEN ROAD NORTH LIN VICTORIA STREET SOUTH CHALK STREET NORTH COLEMAN STREET CENTENNIAL DRIVE L1 A B 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx Plow Schedule: Egmondville Urban (2026 ) NORTH STREET THOMPSON STREET NICHOLSON DRIVE STAPLETON AVENUE CRESCENT BAYFIELD STREET 2ND STREET 3RD STREET RODERICK COURT FAIRWAY ROAD FRONT STREET WILLIAM STREET VAN EGMOND STREET GEORGE STREET WATER STREET KIPPEN ROAD KRUSE DRIVE CARNOCHAN STREET MACPHERSON AVENUE Plow Schedule: Brussels Urban (2026 ) L2 Plow Route 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx AINLEY STREET PRINCESS STREET SPORTS DRIVE CN ROAD CYPRESS STREET ELM STREET TRAILER PARK QUEEN STREET NEWRY ROAD KING STREET HAWKES STREET DUNEDIN DRIVE MCCUTCHEON DRIVE ELLEN STREET GEORGE STREET KRAUTER COURT MC MECHANI FISHLEIGH REE ET ALEXANDER STREET STRETTON STREET ELIZABETH STREET BRUSSELS LINE ALBERT STREET BRYANS DRIVE MAPLE STREET INDUSTRIAL PARK DRIVE BURGESS STREET Plow Schedule: Vanastra (2026 ) and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 50 100 200 Meters 300 400 1:3,000 F L3 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA S 7TH AVENUE STH AVENUE REGINA ROAD 1ST AVENUE RAY COURT WINNIPEG ROAD TORIA BOULEVARD VANASTRA ROAD NT LONDON ROAD 2ND S 3RD STREET 4TH STREET 10TH STREET HALIFAX ROAD 12TH STREET ANNA COURT TORONTO BOULEVARD ST QUEBEC ROAD and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 50 100 200 Meters 300 400 Plow Schedule: Brucefield (2026) MILL ROAD EAST BRUCE STRE 1:3,000 F Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA LONDON ROAD MACLELLAN DRIVE MUNICIPALITY OF HURON EAST WINTER OPERATIONS PLAN Appendix 2 - Sidewalk Plow Route 20 | P a g e Plow Schedule: Seaforth Sidewalk Weekday (2026 ) Sidewalk Route 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx BRIARHILL ROAD ALEXANDER ST BRANTF SILLS STREET KIPPEN ROAD NORTH LIN HICKORY ROAD EAST WILLIAM STREET LINDA DRIVE ORTH STREE WELSH STREET TREET CENTRE STREET FRANKLIN STREET SID R JAMES STREET GODERICH STREET WEST GODERICH STREET EAST MARKET STREET HURON STREET JOHN STREET GEORGE STREET EAST CROMBIE STREET RAILWAY STREET ORD STREET LLOYD EISLER STREET OAK STREET BIRCH STREET DALY STREET HESTNUT ROAD WEST WILLIAM STREET VICTORIA STREET SOUTH CHALK STREET NORTH COLEMAN STREET CENTENNIAL DRIVE ADAM STREET ANN STREET LING STREET HELEN STREET WILSON STREET LOUISA STREET MCLEAN STREET ORD STREET ISABELLA STREET WEST STREET JARVIS STREET SOUTH JARVIS STREET NORTH CHURCH STREET HIGH STREET Sidewalk Route 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx Plow Schedule: Seaforth Sidewalk Weekend (2026 ) BRIARHILL ROAD ALEXANDER ST BRANTF SILLS STREET KIPPEN ROAD NORTH LIN HICKORY ROAD EAST WILLIAM STREET LINDA DRIVE ORTH STREE WELSH STREET TREET CENTRE STREET JAMES STREET GODERICH STREET WEST FRANKLIN STREET SID R GODERICH STREET EAST MARKET STREET HURON STREET JOHN STREET GEORGE STREET EAST CROMBIE STREET RAILWAY STREET ORD STREET LLOYD EISLER STREET OAK STREET BIRCH STREET DALY STREET HESTNUT ROAD ADAM STREET ANN STREET LING STREET HELEN STREET WILSON STREET LOUISA STREET MCLEAN STREET ORD STREET ISABELLA STREET WEST STREET JARVIS STREET SOUTH JARVIS STREET NORTH CHURCH STREET HIGH STREET WEST WILLIAM STREET VICTORIA STREET SOUTH CHALK STREET NORTH COLEMAN STREET CENTENNIAL DRIVE Sidewalk Route 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx Plow Schedule: Egmondville Sidewalk (2026 ) FRONT STREET NORTH STREET THOMPSON STREET NICHOLSON DRIVE STAPLETON AVENUE CRESCENT BAYFIELD STREET 2ND STREET 3RD STREET RODERICK COURT FAIRWAY ROAD WILLIAM STREET VAN EGMOND STREET GEORGE STREET WATER STREET KIPPEN ROAD KRUSE DRIVE CARNOCHAN STREET MACPHERSON AVENUE Sidewalk Route 1:3,000 Produced by the County of Huron GIS Services with data supplied under License by Members of the Ontario Geospatial Data Exchange, MVCA, ABCA, SVCA, UTRCA and MNR&F. This map is illustrative only. Do not rely on it as a precise indicator of routes, feature locations, nor as a guide to navigation. Copyright © Queen's Printer 2026. 2026-01-15 Coordinate System: NAD 1983 UTM Zone 17N Projection: Transverse Mercator Datum: North American 1983 False Easting: 500,000.0000 False Northing: 0.0000 Central Meridian: -81.0000 Scale Factor: 0.9996 Latitude Of Origin: 0.0000 Units: Meter Modification Date: 2026-01-15 0 80 160 240 320 Meters Path: N:\GISData\HC\HuE\Public Works\Projects\HuE_PlowSchedule\HuE_PlowSchedule.aprx Plow Schedule: Brussels Sidewalk (2026 ) AINLEY STREET PRINCESS STREET SPORTS DRIVE MAPLE STREET CN ROAD CYPRESS STREET ELM STREET TRAILER PARK QUEEN STREET NEWRY ROAD KING STREET HAWKES STREET DUNEDIN DRIVE MCCUTCHEON DRIVE ELLEN STREET GEORGE STREET KRAUTER COURT MC MECHANI FISHLEIGH REE ET ALEXANDER STREET STRETTON STREET ELIZABETH STREET BRUSSELS LINE ALBERT STREET BRYANS DRIVE INDUSTRIAL PARK DRIVE BURGESS STREET 21 | P a g e Appendix 3 - Winter Maintenance Equipment Overview 22 | P a g e Plow Routes Equipment Asset No. Tuckersmith G4-19, T8-09 Tuckersmith Contracted Contractor Grader and Plow Truck McKillop South G1-16, T3-23 McKillop North T6-13, G5-15 Grey G3-95, G2-05, G6-11, G7-02, (G5-15 PT.), T4-25 Brussels T5-17, W4-24 Seaforth T2-03, T8-09, W3-15 Patrol Route South L2-19, L5-16 Patrol Route North L8-19, L3-21 Sidewalk Plow South M3-19 Sidewalk Plow North M2-23 Asset No. Year Make Description Electronic Controller T1-04 2004 Sterling Tandem Plow/Sand T2-03 2003 Sterling Single Axle Plow/Sand T3-23 2023 Freightliner Tandem Plow/Sand Y T4-25 2025 Western Star Tandem Plow/Sand Y T5-17 2017 International Tandem Plow/Sand Y T6-13 2013 Western Star Tandem Plow/Sand Y T8-09 2009 Sterling Tandem Plow/Sand Y M2-23 2003 Trackless Sidewalk Plow Y M3-19 2019 Trackless Sidewalk Plow Y G1-16 2016 Deere Grader 770G G2-05 2005 Volvo Grader 740 G3-95 1995 Champion Grader 740 G4-19 2019 Cat Grader 140 G5-15 2015 Cat Grader 140 G6-11 2011 Cat Grader 140 G7-02 2002 Champion Grader 140 W2-15 2015 Cat Loader W4-24 2024 JCB Loader L2-19 2019 GMC ½ ton Patrol L5-16 2016 Chevy ½ ton Patrol L8-19 2019 GMC ½ ton Patrol L3-21 2021 Chevy 1 ton Patrol 23 | P a g e Appendix 4 - Record of Training 24 | P a g e Record of Training This statement certifies that the below-named individual has successfully completed the in-house Winter Operations Training program as required by the Municipality of Huron East Winter Operations Plan. The Winter Operations Training program is comprised of the following modules: - Equipment Circle Checks (Pre and Post inspection) - Record Keeping - Health and Safety - Level of Service- policies, practices and procedures - Identification of Plow Routes - including variations for year to year and issues identified along routes - Identification of road salt vulnerable areas and the procedures to follow in those areas - Yard and Equipment maintenance Employee Name: (print name) Employee Signature: Date: Trainer Signature: Supervisor Signature: 25 | P a g e Appendix 5 - Winter Patrol and Maintenance Schedule Policy 26 | P a g e Municipality of Huron East Public Works Department Winter Patrol and Maintenance Schedule Policy Approved By: Policy Number: Date Approved: Effective Date: Reviewed By: Revision Date: Statement: The Municipality of Huron East is committed to ensuring safe, efficient, and compliant winter road maintenance operations while supporting fair and consistent staffing, scheduling, and compensation practices for Public Works employees. This policy establishes guidelines for staffing, hours of work, overtime, scheduling, and operational requirements during the Winter Maintenance/Patrol Season. Purpose: To guide the Public Works Department in the consideration of staffing and operations during the Winter Maintenance/Patrol Season, from November 20 to March 20, ensuring regulatory compliance, operational readiness, and effective service delivery. Policy: Scope and Applicability This policy applies to regular full-time employees in the Huron East Roads Department and may extend to part-time and seasonal employees at the discretion of the Director of Public Works. It applies during the Winter Patrol/Maintenance Season from November 20 to March 20. Hours of Work Normal hours of work for full-time employees are shown in each position description or letter of employment. The Director of Public Works and Supervisors are responsible for scheduling and monitoring such hours. Overtime - It is expected and understood that overtime may be required to address workload demands, emergencies, and peak operational periods. Council PW-03 February 4, 2026 February 3, 2026 27 | P a g e - All overtime must be pre-authorized. - Overtime begins when an employee works beyond their normal work week hours. - Unless otherwise stated, a normal work week is 40 hours, Saturday to Sunday, with overtime commencing after 44 hours at a rate of 1.5 times regular wages. - Overtime will be recorded and used in minimum increments of one-half hour. Lieu Time (Banked Time) - Employees may bank up to a maximum of 80 hours annually. - Once the maximum is reached, time must be taken before additional hours can be banked. - Lieu time may not be booked in the negative. Unscheduled Call-Out A minimum of two (2) hours at time and a half will be allocated to employees called in during off hours, including employees who are not scheduled or who are asked to return after completing their normal workday. Timesheets - Employees shall complete weekly timesheets recording: o Time worked o Lieu time o Vacation o Sick time o Statutory holidays - Timesheets must be submitted bi-weekly to the Director of Public Works for approval no later than Monday at 8:00 a.m. following the end of a pay period. - Use of lieu time must be approved by the Director of Public Works and/or the Manager of Operations. - Falsification or non-compliance may result in disciplinary action. Special Operational Considerations - Winter Patrol Season The Winter Patrol Season is defined as November 20 to March 20. Winter Patrol Schedule 28 | P a g e - A Winter Patrol Schedule will be developed by November 1 each year. - The schedule will be prepared by the Road Supervisor and reflect staffing and operational needs. - The schedule will clearly identify regular hours and overtime assignments. Staff Scheduled for Patrol Duty - Weekends and Statutory Holidays - Two employees shall be scheduled for each Saturday, Sunday, and Statutory Holiday. - Each patrol day shall include both AM and PM patrol duties. Public Works Staffing Complement - Spring, Summer, and Fall staffing: 11 full-time employees. - Winter staffing requirements increase due to the need to operate 17 pieces of road and sidewalk clearing equipment, maintain equipment, and ensure spare operators are available. Mandatory Friday Off To comply with HTA Regulation 555/06: - An employee scheduled for weekend or statutory holiday patrol duty may be required to take the preceding Friday off. - Lieu time must be used (up to 8 hours) to maintain a normal 40-hour work week. - Any deviation due to special circumstances or employee requests must be approved by the Supervisor. Responsibility: The Director of Public Works is responsible for: - Overall administration and enforcement of this policy - Approval of overtime, time sheets, and use of lieu time - Ensuring compliance with legislative and regulatory requirements The Road Supervisor and Supervisors are responsible for: - Developing and maintaining the Winter Patrol Schedule - Scheduling staff and monitoring hours of work - Ensuring adequate staffing and equipment coverage 29 | P a g e - Approving deviations from mandatory scheduling requirements where necessary Employees are responsible for: - Accurately completing and submitting timesheets - Adhering to approved schedules and call-out requirements - Following all provisions of this policy Background: Winter maintenance is a critical municipal service that requires extended hours, rapid response, and adequate staffing to ensure public safety. The Municipality operates a large fleet of road and sidewalk clearing equipment and must comply with applicable legislation, including the Highway Traffic Act, Ontario Regulation 555/06 (Hours of Service). This policy provides structure and clarity around scheduling, overtime, and operational practices specific to the winter patrol season. Exemptions from Regulation 555/06 include: 3. (1) Subject to subsection (3), a driver and operator are exempt from this Regulation while driving a commercial motor vehicle in the following circumstances: 4. A vehicle engaged in providing relief in an emergency, being a situation or impending situation that constitutes a danger of major proportions to life, property or the environment, whether caused by forces of nature, an accident, an intentional act or otherwise. 4.1 A vehicle operated by or on behalf of a municipality, road authority or public utility while responding to a situation or impending situation that constitutes an imminent danger, though not one of major proportions, to life, property or the environment, whether caused by forces of nature, an accident, an intentional act or otherwise. Related Policies: HR-001 - Compensation Policy HE-002 - Vacation Policy HE-003 - Flexible Work Policy 30 | P a g e Appendix 6 - Source Water Protection Maps Brucefield - C Zone 0 250 500 Metres D - 2 D - 4 C - 6 C - 4 C - 6 C - 6 C - 6 B - 8 B - 10 B - 8 C - 6 D - 2 B - 6 A - 10 C - 6 © OpenStreetMap (and) contributors, CC-BY-SA, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Ausable Bayfield & Maitland Valley DWSP assessment report Document Path: Y:\GIS\Projects_Mxds\SWP\Mun_Planning\Plan_1.mxd approved by the Minister of the Environment on Jan 9, 2012 Printed: 03/04/2015. Copyright © Queens Printer 2015 Produced by ABCA GIS Services using ABCA data and data sublicensed from member municipalities. Property lines are for representation only and are not legal survey. Air photography flown Spring 2010 - Property of Ontario Ministry of Natural Resources The Well Head Protection Area (WHPA) was prepared for use in conjunction with the Clean Water Act based on available studies. For full description refer to the provincially approved local Assessment Report. Ü WHPA C Boundary Vulnerability 10 Parcel Brussels - C Zone 0 250 500 Metres A - 10 B - 10 C - 8 D - 6 D - 6 D - 6 D - 6 D - 4 D - 6 A - 10 D - 6 D - 6 D - 6 B - 10 D - 6 D - 4 C - 8 D - 4 © OpenStreetMap (and) contributors, CC-BY-SA, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Ausable Bayfield & Maitland Valley DWSP assessment report Document Path: Y:\GIS\Projects_Mxds\SWP\Mun_Planning\Plan_1.mxd approved by the Minister of the Environment on Jan 9, 2012 Printed: 03/04/2015. Copyright © Queens Printer 2015 Produced by ABCA GIS Services using ABCA data and data sublicensed from member municipalities. Property lines are for representation only and are not legal survey. Air photography flown Spring 2010 - Property of Ontario Ministry of Natural Resources The Well Head Protection Area (WHPA) was prepared for use in conjunction with the Clean Water Act based on available studies. For full description refer to the provincially approved local Assessment Report. Ü WHPA C Boundary Vulnerability 10 Parcel Seaforth - C Zone 0 250 500 Metres D - 4 C - 6 B - 8 B - 8 B - 10 A - 10 B - 10 B - 10 B - 10 C - 8 C - 8 D - 6 D - 6 C - 8 D - 6 C - 8 © OpenStreetMap (and) contributors, CC-BY-SA, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors Ausable Bayfield & Maitland Valley DWSP assessment report Document Path: Y:\GIS\Projects_Mxds\SWP\Mun_Planning\Plan_1.mxd approved by the Minister of the Environment on Jan 9, 2012 Printed: 03/04/2015. Copyright © Queens Printer 2015 Produced by ABCA GIS Services using ABCA data and data sublicensed from member municipalities. Property lines are for representation only and are not legal survey. Air photography flown Spring 2010 - Property of Ontario Ministry of Natural Resources The Well Head Protection Area (WHPA) was prepared for use in conjunction with the Clean Water Act based on available studies. For full description refer to the provincially approved local Assessment Report. Ü WHPA C Boundary Vulnerability 10 Parcel