| exemptions | Line fences, landscaping, eavestroughs, painting, demolition of detached accessory buildings ≤15 m², air conditioning, non-structural drywall/interior renovations, accessory structures ≤15 m², window/door replacements, same-material roof replacements, non-structural deck boards. | permits are not required for the following renovations/construction |
| fee basis | Category-based fees in Schedule A, e.g., Group 'C' Low Density Residential $600 up to 800 sq ft or $0.75/sq ft over 800; multiple residential min $850 up to 1000 sq ft or $0.85/sq ft over 1000; fees increase 3% annually as of January 1, 2027. | Schedule "A" |
scout note
Schedule A to Township of Jocelyn's Building Permit By-law No. 2026-1684: permit fee table by building group/size (e.g. $600 low-density residential to 800 sq ft), change-of-use, renewal and refund provisions, effective June 1, 2026.