Development Charges Background Study as amended by Addendum 1 (2025)

Kawartha Lakes, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot e980dc597e91 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 November 7, 2025 [email protected] 2025 Development Charges Background Study City of Kawartha Lakes ________________________ Office Consolidation of September 17, 2025, Background Study and November 7, 2025, Addendum Watson & Associates Economists Ltd. Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the Development Charges Act, 1997 ................................... 1-3 1.3.1 COVID-19 Economic Recovery Act, 2020 (Bill 197) .................. 1-3 1.3.2 Better for People, Smarter for Business Act, 2020, (Bill 213) ............................................................................................ 1-6 1.3.3 More Homes for Everyone Act, 2022 (Bill 109) .......................... 1-6 1.3.4 More Homes Built Fast Act, 2022 (Bill 23) ................................. 1-6 1.3.5 Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) ... 1-10 1.3.6 Protect Ontario by Building Faster and Smarter Act, 2025 (Bill 17) ..................................................................................... 1-11 2. Current D.C. By-law ......................................................................................... 2-1 2.1 By-law Enactment ................................................................................... 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-3 2.4 Redevelopment Allowance ..................................................................... 2-4 2.5 Exemptions ............................................................................................. 2-4 3. Anticipated Development in the City of Kawartha Lakes ............................. 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Eligible Debt and Committed Excess Capacity ....................................... 4-7 4.8 Existing Reserve Funds .......................................................................... 4-8 4.9 Deductions .............................................................................................. 4-9 4.9.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.9.2 Reduction for Uncommitted Excess Capacity ............................ 4-9 4.9.3 Reduction for Benefit to Existing Development ........................ 4-10 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-11 4.10 Municipal-Wide vs. Area Rating ............................................................ 4-11 4.11 Allocation of Development .................................................................... 4-11 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and City-Wide 10-Year Capital Costs for D.C. Calculation .............................................................................................. 5-1 5.2.1 Parks and Recreation Services .................................................. 5-1 5.2.2 Library Services ......................................................................... 5-2 5.2.3 By-law Enforcement Services .................................................... 5-2 5.2.4 Growth Related Studies ............................................................. 5-3 5.3 Service Levels and City-Wide 15-Year Capital Costs for D.C. Calculation ............................................................................................ 5-12 5.3.1 Fire Protection Services (City-Wide) ........................................ 5-12 5.4 Service Levels and City-Wide 20-Year Capital Costs for D.C. Calculation ............................................................................................ 5-15 5.4.1 Paramedic Services ................................................................. 5-15 5.4.2 Public Health Services ............................................................. 5-15 5.5 Service Levels and City-Wide 26-Year Capital Costs for D.C. Calculation ............................................................................................ 5-19 5.5.1 Services Related to a Highway ................................................ 5-19 5.6 Service Levels and 10-Year Capital Costs for Area-Specific D.C. Calculation ............................................................................................ 5-27 5.6.1 Police Services ........................................................................ 5-27 5.6.2 Transit Services ....................................................................... 5-27 5.7 Service Levels and 15-Year Capital Costs for Area-Specific D.C. Calculation ............................................................................................ 5-32 5.7.1 Fire Protection Services (Rural) ............................................... 5-32 5.8 Area Specific Capital Costs of Buildout for D.C. Calculation ................. 5-34 5.8.1 Water Treatment Services ....................................................... 5-34 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 5.8.2 Water Distribution Services ...................................................... 5-34 5.8.3 Wastewater Treatment Services .............................................. 5-34 5.8.4 Wastewater Collection Services ............................................... 5-35 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. Policy Rules ................................. 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-4 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Transition ................................................................................... 7-5 7.3.6 Timing of Collection ................................................................... 7-6 7.3.7 Indexing ..................................................................................... 7-6 7.3.8 D.C Spatial Applicability ............................................................. 7-7 7.4 Other D.C. By-law Provisions ................................................................. 7-8 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-8 7.4.2 By-law In-force Date .................................................................. 7-8 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-8 7.5 Other Recommendations ........................................................................ 7-9 8. Asset Management Plan ................................................................................. 8-1 8.1 Introduction ............................................................................................. 8-1 8.2 Non-Transit Services Asset Management Plan ...................................... 8-3 8.3 Transit Services ...................................................................................... 8-4 9. By-law Implementation ................................................................................... 9-1 9.1 Public Consultation Process ................................................................... 9-1 9.1.1 Introduction ................................................................................ 9-1 9.1.2 Public Meeting of Council........................................................... 9-1 9.1.3 Other Consultation Activity ......................................................... 9-1 9.2 Anticipated Impact of the Charge on Development ................................. 9-2 9.3 Implementation Requirements ................................................................ 9-3 9.3.1 Introduction ................................................................................ 9-3 9.3.2 Notice of Passage ...................................................................... 9-3 9.3.3 By-law Pamphlet ........................................................................ 9-3 9.3.4 Appeals ...................................................................................... 9-4 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 9.3.5 Complaints ................................................................................. 9-4 9.3.6 Credits ....................................................................................... 9-5 9.3.7 Front-Ending Agreements .......................................................... 9-5 9.3.8 Severance and Subdivision Agreement Conditions ................... 9-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D Local Service Policy ............................................................................ D-1 Appendix E Proposed Development Charge By-law .............................................. E-1 Appendix F Asset Management Plan ....................................................................... F-1 Appendix G Development Charges Task Force .................................................... G-1 Watson & Associates Economists Ltd. List of Acronyms and Abbreviations Acronym Full Description of Acronym D.C. Development charge D.C.A. Development Charges Act, 1997 as amended G.F.A. Gross floor area N.F.P.O.W. No Fixed Place of Work OLT. Ontario Land Tribunal O.M.B. Ontario Municipal Board O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit sq.m. square metre sq.ft. square foot km kilometre Executive Summary Watson & Associates Economists Ltd. PAGE i Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for the City of Kawartha Lakes (City) required by the Development Charges Act, 1997 (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Introduction and overview of the legislative requirements of the D.C.A.; - Chapter 2 - Current City D.C. policy - Chapter 3 - Summary of the residential and non-residential growth forecasts for the City; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of D.C. recoverable capital costs to service growth; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and D.C. by-law rules; - Chapter 8 - Asset management plan requirements of the D.C.A.; and - Chapter 9 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below: 1) Identify amount, type and location of growth; 2) Identify servicing needs to accommodate growth; 3) Identify capital costs to provide services to meet the needs; 4) Deduct: a) Grants, subsidies and other contributions; b) Benefit to existing development; c) Amounts in excess of 15-year historical service calculation; d) D.C. reserve funds; 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs divided by growth to provide the D.C. calculation. Watson & Associates Economists Ltd. PAGE ii 3. Changes to the D.C.A. were introduced through eight bills passed in the Ontario legislature over the past five years: Bills 197, 213, 109, 23, 97, 134, 185 and 17. The following provides a brief summary of the recent changes: Bill 197, COVID-19 Economic Recovery Act, 2020 The COVID-19 Economic Recovery Act received Royal Assent on July 21, 2020 and was proclaimed on September 18, 2020. The following provides a summary of the additional changes to the D.C.A. that are now in effect: The D.C.A. previously defined ineligible services for D.C.s. The amendments to the D.C.A. now defined the services that are eligible for inclusion in a D.C. by-law. The following summarizes the D.C. eligible services: - Water supply services, including distribution and treatment services; - Wastewater services, including sewers and treatment services; - Storm water drainage and control services; - Services related to a highway; - Electrical power services; - Toronto-York subway extension, as defined in subsection 5.1 (1); - Transit services other than the Toronto-York subway extension; - Waste diversion services; - Policing services; - Fire protection services; - Ambulance services; - Library Services; - Long-term care services; - Parks and recreation services (excluding the acquisition of land for parks); - Public health services; - Childcare and early years services; - Housing services; - Provincial Offences Act services; - Services related to emergency preparedness; - Services related to airports, but only in the Regional Municipality of Waterloo; and - Additional services as prescribed. Watson & Associates Economists Ltd. PAGE iii Furthermore, Bill 197 removed the maditory 10% reductoin on soft services, allowed for the creation of classes of service and providing exemptions for additional residential dwelling units. Bill 213: Better for People, Smarter for Business Act, 2020 Bill 213 received Royal Assent on December 8, 2020. Bill 213 provided a statutory exemption to the payment of D.C.s. for Land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of post-secondary education and if the proposed development in respect of which development charges would otherwise be payable is intended to be occupied and used by the university. Bill 109: More Homes for Everyone Act, 2022 On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. Further information is provided in subsection 1.3.5. Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Act amends a number of pieces of legislation including the Planning Act and the D.C.A. Subsequently, further amendments to these provisions were made through Bills 97 and 134. The following provides a summary of the changes to the D.C.A. (further details are provided in subsection 1.3.6 of this report): - Additional residential unit exemption: Allowance of a third unit to be exempt from D.C.s in existing and new residential dwellings; - Removal of housing as an eligible D.C. service; - New statutory exemptions for affordable units, attainable units (to be in effect upon proclamation by the Lieutenant Governor); - New statutory exemptions for inclusionary zoning units, and non-profit housing developments; Watson & Associates Economists Ltd. PAGE iv - Historical level of service extended to 15-year period instead of the prior 10-year period; - Capital cost definition may be revised to prescribe services for which land or an interest in land will be restricted; - Capital cost definition has been revised to remove studies; - Mandatory reduction for new D.C. by-laws passed after November 28, 2022, as follows: o Year 1 - 80% of the maximum charge; o Year 2 - 85% of the maximum charge; o Year 3 - 90% of the maximum charge; o Year 4 - 95% of the maximum charge; and o Year 5 to expiry - 100% of the maximum charge. - D.C. by-law expiry will be 10 years after the date the by-law comes into force (unless repealed earlier); - D.C. for rental housing developments to receive a discount as follows: o Three or more bedrooms - 25% reduction; o Two bedrooms - 20% reduction; and o All other bedroom quantities - 15% reduction. - Maximum interest rate for installments and determination of charge for eligible site plan and zoning by-law amendment applications to be set at the average prime rate plus 1%; and - Requirement to allocate funds received- municipalities will be required to spend or allocate at least 60% of their reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Bill 185: Cutting Red Tap to Build More Homes Act, 2024 (Bill 185) On June, 6, 2024, Bill 185 received Royal Assent and includes the following changes to the D.C.A. - The removal of the Mandatory Phase-in for D.C. by-laws passed after Bill 185 comes into effect; - A reduction to the D.C. rate freeze timelines for developments proceeding though site plan and zoning by-law amendment applications under the Planning Act. Charges are currently held at rates in place on the date the application is made until building permit issuance, provided the building permit is issued within two (2) years of the approval of the application. This time period is proposed to be Watson & Associates Economists Ltd. PAGE v reduced to 18 months under Bill 185 (note that the two (2) year timeline will still apply to applications received prior to Bill 185 receiving Royal Assent); - Inclusion of growth-related studies, including the D.C. background study, as a D.C.-eligible costs; - Provide a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date; - To allow minor amendments related to the imposition of studies, removal of the mandatory phase-in, and extension of by-law expiry dates (subject to the 10-year limitations provided in the D.C.A.) to be undertaken for by-laws passed after November 28, 2022 and before Bill 185 takes effect; and - To modernize public notice requirements. Protect Ontario by Building Faster and Smarter Act, 2025 (Bill 17) The Protect Ontario by Building Faster and Smarter Act, 2025 was introduced on May 12, 2025 and received Royal Assent on June 5, 2025. The Act amends the D.C.A. as summarized below. Some of the changes took effect upon Royal Assent however, other provisions will come into force on a day to be named by order of the Lieutenant Governor in Council. No regulations have been filed to date under the new regulation- making powers granted to the Province through Bill 17. Amendments in Force Upon Royal Assent - Full exemption for long-term care homes as defined in subsection 2 (1) of the Fixing Long-Term Care Home Act, 2021, from the payment of D.C.s including future instalment payments. - Simplified process to amend D.C. by-laws to: o Repeal or change a D.C. by-law expiry date (consistent with current provisions); o Repeal a D.C. by-law provision for indexing or amend to provide for a D.C. not to be indexed; and o Decrease the amount of a D.C. for one or more types of development. - Impose the lower charge for developments subject to rate freeze i.e., those proceeding through a site plan or zoning by-law amendment application. D.C.s payable are the lower of the "frozen" rate plus interest, or the rate in force on the date D.C.s are payable. Watson & Associates Economists Ltd. PAGE vi - Provide Province the authority to file regulations to: o Define eligible capital costs; o Group services for the purposes of using credits; and o Define local services that would be direct developer responsibility. - Note: As of August 1, 2025, O. Reg. 82/98 has been amended to include the London series as one of the options for indexing development charge by-laws (section 7 of the regulation) and to require municipalities to spend or allocate 60%of reserve fund balances at the beginning of the year for all services. In Force on Future Date to be Named By Order of the Lieutenant Governor in Council - Defer payment of non-rental residential D.C.s to the time of occupancy. o Municipalities may require a financial security only in circumstances prescribed by regulation. At present, no regulation has been filed. o Municipalities will not be allowed to impose interest on the deferral of D.C. payment to occupancy. - Eliminate the requirement for an early payment agreement for residential and institutional development. - Remove the ability to charge interest on legislated instalments for rental housing and institutional development. This would also apply to future instalments for existing development that would accrue after June 5, 2025, when Bill 17 received Royal Assent. 4. The City undertook a D.C. public process and anticipates passing a new by-law for the eligible services. The mandatory public meeting was on October 21, 2025, with adoption of the by-law anticipated for November 18, 2025, with an effective date of January 1, 2026. 5. The growth forecast (Chapter 3) on which the D.C. is based, projects the following population, housing and non-residential floor area for the 10-year period (mid-2025 to mid-2035), 15-year period (mid-2025 to mid-2040), 20-year period (mid-2025 to mid-2045), 26-year period (mid-2025 to mid-2051), buildout period (mid-2025 to buildout). Watson & Associates Economists Ltd. PAGE vii Table ES-1 Summary of Growth Forecast by Planning Periods Planning Period (Net) Population Increase Residential Unit Increase Non- Residential - Gross Floor Area Increase (sq.ft.) 10-Year City-wide (2025 to 2035) 18,335 9,240 2,190,800 15-Year City-wide (2025 to 2040) 27,178 13,450 3,538,300 20-Year City-wide (2025 to 2045) 35,739 17,380 4,991,300 26-Year City-wide (2025 to 2051) 48,785 21,972 6,681,300 Buildout Water (2025 to Buildout) 58,699 31,934 8,689,700 Buildout Wastewater Collection (2025 to Buildout) 47,026 25,673 7,266,151 Buildout Wastewater Treatment (2025 to Buildout) 58,493 31,934 8,685,500 Source: Watson & Associates Economists Ltd. forecast 2025. 6. Chapter 5 herein provides, in detail and by service area, the gross capital costs for the increase in need to service new development and the respective deductions that have been made to arrive at the D.C. recoverable costs included in the calculation of the charge. The following services are calculated based on a 10-year forecast: - Police services; - Transit services; - Parks and recreation services; - Library services; - Municipal by-law enforcement services; and - Growth-related studies. Fire protection services, city-wide and rural, is calculated based on a 15-year forecast. Watson & Associates Economists Ltd. PAGE viii The following services are calculated based on a 20-year forecast: - Paramedic services; and - Public health services. Services related to a highway is calculated based on a 26-year forecast. The following services are calculated based on their respective buildout periods: - Water treatment services; - Water distribution services; - Wastewater treatment services; and - Wastewater collection services. A summary of the total growth-related costs is provided below in Table ES-2. Table ES-2 Summary of Expenditures Anticipated Over the Respective Forecast Periods Summary of Expenditures Anticipated Over the Life of the By-law Expenditure Amount Total Gross Capital Costs 2,060,000,000 Less: Benefit to Existing Development 456,000,000 Less: Other Deductions 55,000,000 Less: Post Period Benefit Deductions 10,000,000 Less: Grans, Subsidies and Other Dedcutions 463,000 Less: Reserve Fund Surplus 28,000,000 Net Costs to be Recovered from Development Charges 1,510,000,000 Based on the above table, the total growth related costs are $2.1 billion over the forecast periods of which $1.5 billion (73%) is recoverable from D.C.s. Of the net $1.5 billion included in the calculation, $1.2 billion is recoverable from residential development and $264 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. This suggests that non-D.C. costs over the forecast period will total $550 million. This report has undertaken a calculation of charges based on the anticipated development summarized in Table ES-1 and the future identified needs presented in Table ES-2. Charges have been provided on a City-wide basis for Watson & Associates Economists Ltd. PAGE ix fire protection services (city-wide), services related to a highway, parks and recreation services, library services, municipal by-law enforcement, paramedic services, public health services, and growth related studies. Charges have been provided on an area specific basis for fire protection services (rural), police services, transit services, water treatment services, water distribution services, wastewater treatment services, and wastewater collection services. The calculated schedule of charges is presented in Table ES-3. Watson & Associates Economists Ltd. PAGE x Table ES-3 Calculated Schedule of Development Charges Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Electricity Generation ($/500 KW of NGC) Other Non- Residential (Per Sq.M. of Gross Floor Area) Municipal Wide Services/Class of Service: Fire Protection Services (City-Wide) 3,403 2,523 2,477 1,548 3,403 20.13 Police Services 1 1,874 1,389 1,364 852 1,874 11.84 Services Related to a Highway 12,841 9,521 9,346 5,841 12,841 74.92 Transit Services 2 641 475 467 292 4.20 Parks and Recreation Services 3,924 2,909 2,856 1,785 7.75 Library Services 500 371 364 227 0.97 Municipal By-law Enforcement 41 30 30 19 0.22 Paramedic Services 811 601 590 369 811 4.63 Public Health Services 332 246 242 151 0.54 Growth-Related Studies 567 420 413 258 4.41 Total Municipal Wide Services/Class of Services 24,934 18,485 18,149 11,342 18,929 129.60 Urban Services Wastewater Treatment Services 11,079 8,214 8,064 5,040 68.57 Wastewater Collection Services 3 7,301 5,413 5,314 3,321 46.39 Water Treatment Services 20,625 15,292 15,012 9,382 127.98 Water Distribution Services 2,790 2,069 2,031 1,269 17.33 Total Urban Services 41,795 30,988 30,421 19,012 - 260.27 Rural Services Fire Protection Services (Rural) 4 737 546 536 335 737 2.26 Total Rural Services 737 546 536 335 737 2.26 Urban - Lindsay 66,729 49,473 48,570 30,354 18,929 389.87 Urban - NWT 59,428 44,060 43,256 27,033 18,929 343.48 Urban - Other 64,214 47,609 46,739 29,210 17,055 373.83 Rural - Ops 25,030 18,556 18,218 11,385 19,666 127.66 Rural - Other 23,156 17,167 16,854 10,533 17,792 115.82 1. Police Services only payable within Lindsay and the former Township of Ops 2. Transit Services only payable within Lindsay 3. Wastewater Collection Services only payble within municipal service area, outside of the Northwest Lindsay Development Area 4. Rural Fire Services are in addition to the City-Wide Services Service/Class of Service RESIDENTIAL NON-RESIDENTIAL Watson & Associates Economists Ltd. PAGE xi 7. Chapter 7 outlines the D.C. by-law policy recommendations and rules as summarized below: - Timing of Collection: o D.C.s to be calculated and payable at the time of building permit issuance o D.C.s for developments proceeding through Site Plan or Zoning By- law Amendment applications will be determined based on the charges in effect on the day of the application (charges to be frozen for a maximum period of 18 months after planning application approval) o Rental housing and institutional developments would pay D.C.s in six equal annual payments, commencing from the date of occupancy - Statutory D.C. Exemptions: o Upper/Lower Tier Governments and School Boards o Development of lands intended for use by a university that received operating funds from the Government o Existing industrial building expansions (may expand by 50% with no D.C.) o Additional residential units in existing and new residential buildings  May add up to two apartments for a single detached, semi- detached or row house (only one unit can be in an ancillary structure)  One additional unit or 1% of the units in an existing rental residential building with four or more residential units o Non-profit housing o Inclusionary zoning affordable units o Affordable housing o Long-term care homes - D.C. discounts for rental housing development based on dwelling unit type: o >2 bedrooms - 25% discount o 2 bedrooms - 20% discount o <2 bedrooms - 15% discount Watson & Associates Economists Ltd. PAGE xii - Non-Statutory Deductions:  a place of worship, non-profit hospice, public hospital, cemetery, burial site or crematorium, as defined in the Assessment Act  an agricultural building or structure  a park model trailer  Temporary buildings or structures - As a result of the redevelopment of land, a credit against D.C.s where a residential, non-residential or mixed-use building or structure was capable of being occupied within three years prior to the issuance of a building permit for redevelopment of the lands; and a demolition permit has been issued within three years prior to the issuance of a building permit for redevelopment of the lands. - Charges to be indexed annually on January 1st, in accordance with the D.C.A. 8. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-law which is appended in Appendix E. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; and - considering reductions in the charge by class of development (e.g., obtained by removing certain services on which the charge is based and/or by a general reduction in the charge). Report Watson & Associates Economists Ltd. Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the Development Charges Act 1997 (s.10), and accordingly, recommends new Development Charges (D.C.s) and policies for the City of Kawartha Lakes (City). The City retained Watson & Associates Economists Ltd. (Watson) to undertake the D.C. study process. Watson worked with senior staff of the City as well as consulting with the City's D.C. Task Force in preparing this D.C. analysis and the policy recommendations. This D.C. background study, containing the proposed D.C. by-law, will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the City's D.C. background study, as summarized in Chapter 4. It also addresses the forecast amount, type, and location of growth (Chapter 3), the requirement for "rules" governing the imposition of the charges (Chapter 7), and the proposed by-law to be made available as part of the approval process (Appendix E). In addition, the report is designed to set out sufficient background on the legislation and the policies underlying the proposed by-law, to make the exercise understandable to interested parties. Finally, the D.C. background study addresses post-adoption implementation requirements (Chapter 9) which are critical to the successful application of the new policy. Throughout the study process, City staff and Watson have been engaged with the City's D.C. Task Force to assist in the development of their recommendations which are included in Appendix G. The chapters in the report are supported by appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 1.2 Summary of the Process A public meeting required under Section 12 of the D.C.A. was held on October 21, 2025, at least two weeks after the posting of the D.C. background study and draft D.C. by-law on the City's website. Its purpose is to present the D.C. background study and draft D.C. by-law to the public and to solicit public input on the matter. The public meeting is also being held to answer any questions regarding the study's purpose, methodology and the proposed D.C. by-law for the City. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review at least 60 days prior to by-law passage. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at or immediately following the public meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Table 1-1 outlines the study process to date and the proposed schedule to be followed with respect to the D.C. by-law adoption process. Table 1-1 Schedule of Key D.C. Process Dates Process Steps Dates 1. Project initiation meeting with staff March 28, 2024 2. Data collection, staff interviews, D.C. Task Force Meetings, and review of draft findings with City staff April 2024 to August 2025 3. D.C. Background Study and draft D.C. by-law available to public September 17, 2025 4. Public Meeting of Council October 21, 2025 5. Addendum to D.C. Background Study November 7, 2025 Watson & Associates Economists Ltd. PAGE 1-3 Process Steps Dates 6. D.C. By-law passage (anticipated) November 18, 2025 7. D.C. By-Law effective date January 1, 2026 8. Newspaper notice given of by-law passage By 20 days after passage 9. Last day for by-law appeal 40 days after passage 10. Municipality makes available D.C. pamphlet by 60 days after in force date 1.3 Changes to the Development Charges Act, 1997 Since 2020, a number of changes to the Development Charges Act, 1997, have been introduced through various legislation including the following: - Covid-19 Economic Recovery Act, 2020 (Bill 197); - Better for People, Smarter for Business Act, 2020 (Bill 213); - More Homes for Everyone Act, 2022 (Bill 109); - More Homes Built Fast Act, 2022 (Bill 23); - Helping Homebuyers, Protecting Tenants Act, 2023 (Bill 97); - Affordable Homes and Good Jobs Act, 2023 (Bill 134); - Cutting Red Tape to Build More Homes Act, 2024 (Bill 185); and - Protect Ontario by Building Faster and Smarter Act, 2025 (Bill 17). The following provides an overview of the changes to the D.C.A. that each of these pieces of legislation provided. 1.3.1 COVID-19 Economic Recovery Act, 2020 (Bill 197) In early 2020, the Province released Bill 197 (COVID-19 Economic Recovery Act), an omnibus bill amending numerous statutes, including the D.C.A. and Planning Act. This Bill also revised some of the proposed amendments included in the More Homes, More Watson & Associates Economists Ltd. PAGE 1-4 Choice Act. The COVID-19 Economic Recovery Act received Royal Assent on July 21, 2020 and was proclaimed on September 18, 2020. The following provides a summary of the additional changes to the D.C.A. that are now in effect: List of D.C. Eligible Services The D.C.A. previously defined ineligible services for D.C.s. The amendments to the D.C.A. now defined the services that are eligible for inclusion in a D.C. by-law. The following summarizes the D.C. eligible services: - Water supply services, including distribution and treatment services; - Wastewater services, including sewers and treatment services; - Storm water drainage and control services; - Services related to a highway; - Electrical power services; - Toronto-York subway extension, as defined in subsection 5.1 (1); - Transit services other than the Toronto-York subway extension; - Waste diversion services; - Policing services; - Fire protection services; - Ambulance services; - Library Services; - Long-term care services; - Parks and recreation services (excluding the acquisition of land for parks); - Public health services; - Childcare and early years services; - Housing services; - Provincial Offences Act services; - Services related to emergency preparedness; - Services related to airports, but only in the Regional Municipality of Waterloo; and - Additional services as prescribed. Removal of 10% Statutory Deduction The D.C.A. previously required a 10% statutory deduction for all services not specifically identified in s.s. 5 (5) of the D.C.A. (i.e. soft services). This had the effect of Watson & Associates Economists Ltd. PAGE 1-5 categorizing D.C. eligible services into two groups, i.e. 90% D.C. recoverable services, and 100% D.C. recoverable services. The amendments to the D.C.A. remove the 10% statutory deduction for soft services. Classes of D.C. Services As noted above the D.C.A. categorized services generally into two categories. The amended D.C.A. repeals these provisions and provides the following: - A D.C. by-law may provide for any eligible service or capital cost related to any eligible service to be included in a class, set out in the by-law. - A class may be composed of any number or combination of services and may include parts or portions of the eligible services or parts or portions of the capital costs in respect of those services. - A D.C. by-law may provide for a class consisting of studies in respect of any eligible service whose capital costs are described in paragraphs 5 and 6 of s. 5 of the D.C.A. - A class of service set out in the D.C. by-law is deemed to be a single service with respect to reserve funds, use of monies, and credits. Statutory Exemptions The D.C.A. provides for statutory exemptions from payment of D.C.s where the development is creating additional residential dwelling units within prescribed classes of existing residential buildings or structures. This statutory exemption has been expanded to include secondary residential dwelling units, in prescribed classes, that are ancillary to existing residential buildings. Furthermore, additional statutory exemptions are provided for the creation of a second dwelling unit in prescribed classes of proposed new residential buildings, including structures ancillary to new dwellings. Transition Services, other than those described in paragraphs 1 to 10 of subsection 2 (4) of the D.C.A. (i.e. soft services) within an existing D.C. by-law can remain in effect, even if the by-law expires, until the earlier of the day the by-law is repealed, the day the municipality passes a Community Benefits Charge by-law under subsection 37 (2) of the Planning Act, or the specified date. The specified date was September 18, 2022. Watson & Associates Economists Ltd. PAGE 1-6 1.3.2 Better for People, Smarter for Business Act, 2020, (Bill 213) The Better for People, Smarter for Business Act (Bill 213) received Royal Assent on December 8, 2020. Bill 213 was introduced to reduce burdens on people and businesses by enacting, amending and repealing various Acts and revoking a regulation. Schedule 10 of the Bill 213 amends the Ministry of Training, Colleges and Universities Act R.S.O 1990 to provide for a statutory exemption to the payment of D.C.s. for Land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of post-secondary education and if the proposed development in respect of which development charges would otherwise be payable is intended to be occupied and used by the university. 1.3.3 More Homes for Everyone Act, 2022 (Bill 109) On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. The following additional information must be provided for each D.C. service being collected for during the year: a) whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law; b) if the answer to a) is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; and c) if no money was spent from the reserve fund during the year, a statement as to why there was no spending during the year. The changes to the D.C.A. has also been amended to now require that the annual Treasurer's statement be made available to the public on the website of the municipality or, if there is no such website, in the municipal office. 1.3.4 More Homes Built Fast Act, 2022 (Bill 23) On November 28, 2022, Bill 23 received Royal Assent. This Act amends a number of pieces of legislation including the Planning Act and the D.C.A. Subsequently the additional residential unit exemptions were amended through Bill 97 and exemptions for Watson & Associates Economists Ltd. PAGE 1-7 affordable units were further amended through Bill 134. The following provides a summary of the changes to the D.C.A.: 1.3.4.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the greater of one unit or 1% of the existing residential units will be exempt from D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no ancillary buildings or structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of land, if the detached, semi- detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. o Bill 97 (The Helping Homebuyers, Protecting Tenants Act), extended the mandatory exemption from payment of D.C.s for addition residential units new residential buildings or in existing houses to all lands versus just urban lands. 1.3.4.2 Removal of Housing as an Eligible D.C. Service Housing services is removed as an eligible service. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. 1.3.4.3 New Statutory Exemptions for Affordable Units, Attainable Units, and Inclusionary Zoning Units Affordable units, attainable units, inclusionary zoning units and non-profit housing developments will be exempt from the payment of D.C.s, as follows: Watson & Associates Economists Ltd. PAGE 1-8 - Affordable Rental Units: o The rent is no greater than the lesser of, o the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and o the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. - Affordable Owned Units: o The price of the residential unit is no greater than the lesser of,  the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and  90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. o Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Also exemptions for affordable and attainable units will come into effect on a day to be named by proclamation of the Lieutenant Governor. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.3.4.4 New Statutory Exemption for Non-Profit Housing Non-profit housing development has been removed from the instalment payment section of the Act (section 26.1), as these units are now exempt from the payment of D.C.s. 1.3.4.5 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and Watson & Associates Economists Ltd. PAGE 1-9 - All other bedroom quantities - 15% reduction. 1.3.4.6 Historical Level of Service extended to 15-year period instead of the historical 10-year period Prior to Royal Assent of Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average historical level of service is now extended to the historical 15-year period. 1.3.4.7 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act will prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed for this purpose. 1.3.4.8 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. 1.3.4.9 D.C. By-law Expiry A D.C. by-law now expires ten years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's maximum life from what was previously five years. 1.3.4.10 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications The Act allows interest to be charged on D.C.s calculated at the time of Site Plan or Zoning By-law Amendment applications (S.26.2 of the Act) and for mandatory installment payments (S. 26.1 of the Act). No maximum interest rate was previously Watson & Associates Economists Ltd. PAGE 1-10 prescribed, which allowed municipalities to choose the interest rate to impose. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by-law amendment applications occurring after November 28, 2022. 1.3.4.11 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities will be required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water services, wastewater services, and services related to a highway. Other services may be prescribed by the regulation. 1.3.5 Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) On June, 6, 2024, Bill 185 received Royal Assent and includes the following changes to the D.C.A. - The removal of the Mandatory Phase-in for D.C. by-laws passed after Bill 185 comes into effect; - A reduction to the D.C. rate freeze timelines for developments proceeding though site plan and zoning by-law amendment applications under the Planning Act. Charges are currently held at rates in place on the date the application is made until building permit issuance, provided the building permit is issued within two (2) years of the approval of the application. This time period is proposed to be reduced to 18 months under Bill 185 (note that the two (2) year timeline will still apply to applications received prior to Bill 185 receiving Royal Assent); - Inclusion of growth-related studies, including the D.C. background study, as a D.C.-eligible costs; - Provide a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date; - To allow minor amendments related to the imposition of studies, removal of the mandatory phase-in, and extension of by-law expiry dates (subject to the 10-year limitations provided in the D.C.A.) to be undertaken for by-laws passed after November 28, 2022 and before Bill 185 takes effect; and - To modernize public notice requirements. Watson & Associates Economists Ltd. PAGE 1-11 1.3.6 Protect Ontario by Building Faster and Smarter Act, 2025 (Bill 17) The Protect Ontario by Building Faster and Smarter Act, 2025 was introduced on May 12, 2025 and received Royal Assent on June 5, 2025. The Act amends the D.C.A. as summarized below. Some of the changes took effect upon Royal Assent however, other provisions will come into force on a day to be named by order of the Lieutenant Governor in Council. Amendments in Force Upon Royal Assent - Full exemption for long-term care homes as defined in subsection 2 (1) of the Fixing Long-Term Care Home Act, 2021, from the payment of D.C.s including future instalment payments. - Simplified process to amend D.C. by-laws to: o Repeal or change a D.C. by-law expiry date (consistent with current provisions); o Repeal a D.C. by-law provision for indexing or amend to provide for a D.C. not to be indexed; and o Decrease the amount of a D.C. for one or more types of development. - Impose the lower charge for developments subject to rate freeze i.e., those proceeding through a site plan or zoning by-law amendment application. D.C.s payable are the lower of the "frozen" rate plus interest, or the rate in force on the date D.C.s are payable. - Provide Province the authority to file regulations to: o Define eligible capital costs; o Group services for the purposes of using credits; and o Define local services that would be direct developer responsibility. Note: As of August 1, 2025, O. Reg. 82/98 has been amended to include the London series as one of the options for indexing development charge by-laws (section 7 of the regulation) and to require municipalities to spend or allocate 60% of reserve fund balances at the beginning of the year for all services. In Force on Future Date to be Named By Order of the Lieutenant Governor in Council - Defer payment of non-rental residential D.C.s to the time of occupancy. Watson & Associates Economists Ltd. PAGE 1-12 o Municipalities may require a financial security only in circumstances prescribed by regulation. At present, no regulation has been filed. o Municipalities will not be allowed to impose interest on the deferral of D.C. payment to occupancy. - Eliminate the requirement for an early payment agreement for residential and institutional development. - Remove the ability to charge interest on legislated instalments for rental housing and institutional development. This would also apply to future instalments for existing development that would accrue after June 5, 2025, when Bill 17 received Royal Assent. Watson & Associates Economists Ltd. Chapter 2 Current City D.C. Policy Watson & Associates Economists Ltd. PAGE 2-1 2. Current D.C. By-law 2.1 By-law Enactment The City passed D.C. By-law 2015-224 on November 24, 2015 under the statutory authority of the D.C.A. 2.2 Services Covered D.C. By-law 2015-224 imposes charges for the following services: Municipal-wide Services - By-law Enforcement; - Paramedic; - Fire; - Roads and Related; - Parks and Recreation; - Library; - Waste Diversion; - Administration Studies; Area-Specific Services - Police (Lindsay and former Township of Ops); - Transit (Lindsay); Urban Services - Water Treatment; - Water Distribution; - Wastewater Treatment; and - Wastewater Collection (Outside of the Northwest Lindsay Development Area). Tables 2-1 and 2-2 provide the charges for residential and non-residential development types as well as the breakdown of the charges by service as of January 1, 2019. Watson & Associates Economists Ltd. PAGE 2-2 Table 2-1 Schedule of Residential D.C.s by Service Municipal Service Single or Semi- Detached ($/Dwellin g Unit) Row or Multiple ($/Dwellin g Unit) Apartmen t - Two or More Bedroom s ($/Dwellin g Unit) Apartmen t - Other ($/Dwellin g Unit) By-Law Enforcement 22 19 13 9 Parks and 994 886 597 450 Library 511 454 307 231 Administration 543 484 325 246 Fire 484 432 290 219 Paramedic 284 254 171 130 Police 589 525 355 267 Transit 361 319 217 163 Waste Diversion 50 44 30 22 Roads and Related 9,077 8,074 5,444 4,104 Water Treatment 4,772 4,246 2,862 2,159 Water Distribution 4,956 4,408 2,974 2,240 Wastewater 6,087 5,414 3,652 2,751 Wastewater 8,851 7,873 5,309 3,999 Total 37,581 33,432 22,546 16,990 Service Area Single or Semi- Detached ($/Dwellin g Unit) Row or Multiple ($/Dwellin g Unit) Apartmen t - Two or More Bedroom s ($/Dwellin g Unit) Apartmen t - Other ($/Dwellin g Unit) Urban-Lindsay 37,581 33,432 22,546 16,990 Urban-NWT 28,730 25,559 17,237 12,991 Urban-Other 36,631 32,588 21,974 16,560 Rural-Ops 12,554 11,172 7,532 5,678 Rural-Other 11,965 10,647 7,177 5,411 Watson & Associates Economists Ltd. PAGE 2-3 Table 2-2 Schedule of Non-Residential D.C.s by Service 2.3 Timing of D.C. Calculation and Payment D.C.s for services related to a highway, water treatment services, water distribution services, wastewater treatment services, and wastewater collection services may be calculated and payable at the time of Subdivision or Consent agreement. All other D.C.s are calculated and payable at the time the first building permit is issued. The City may also allow for the payment of D.C.s either before or after they would otherwise be payable under S.27 of the D.C.A. Indexing Electricity Generation Other Non- Residential ($/500 KW of NGC) ($/m² of GFA) By-Law Enforcement - 0.17 Parks and Recreation - 2.86 Library - 1.47 Administration Studies 543 4.42 Fire 484 3.94 Paramedic 284 2.33 Police 589 4.02 Transit - 2.57 Waste Diversion - 0.40 Roads and Related 9,077 74.11 Water Treatment - 33.60 Water Distribution - 34.87 Wastewater Treatment - 42.39 Wastewater Collection - 77.98 Total 10,977 285.13 Electricity Generation Other Non- Residential ($/500 KW of NGC) ($/m² of GFA) Urban-Lindsay 10,977 285.13 Urban-NWT 10,977 207.15 Urban-Other 10,388 278.54 Rural-Ops 10,977 93.72 Rural-Other 10,388 89.70 Municipal Service Area Municipal Service Watson & Associates Economists Ltd. PAGE 2-4 The City's D.C.s are indexed on January 1 of each year, based on the percentage change recorded in the most recent Statistics Canada Non-Residential Building Construction Price Index. 2.4 Redevelopment Allowance As a result of the redevelopment of land, a credit against D.C.s where a residential, non-residential or mixed-use building or structure was capable of being occupied within three years prior to the issuance of a building permit for redevelopment of the lands; and a demolition permit has been issued within three years prior to the issuance of a building permit for redevelopment of the lands. 2.5 Exemptions The following non-statutory exemptions from the payment of D.C.s the City's D.C. By- law: - A place of worship; - A non-profit hospice; - A public hospital; - A cemetery, burial site, or crematorium as defined in the Assessment Act; - An agricultural development; - A municipal housing dwelling unit; - A park model trailer; - The first 2,500 sq.m. of G.F.A. for any single commercial development; and - Industrial development. Watson & Associates Economists Ltd. Chapter 3 Anticipated Development in the City Watson & Associates Economists Ltd. PAGE 3-1 3. Anticipated Development in the City of Kawartha Lakes 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the City will be required to provide services over a 10-year (2025 to 2035), 15-year (2025 to 2040), 20-year (2025 to 2045), longer-term (2025 to 2051) and buildout (2025 to buildout) time horizon.[1] Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the City over the forecast period, including: - City of Kawartha Lakes Growth Management Strategy, February 2025, by Watson & Associates Economists Ltd.; - City of Kawartha Lakes Water and Wastewater Servicing and Capacity Master Plan, January 2025; - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential building permit data over the 2015 to 2024 period; - Residential and non-residential supply opportunities as identified by City of Kawartha Lakes Staff; and [1] Build-out refers to the City's urban area, and has been assessed for designated urban lands, including lands subject to Minister's Zoning Orders (MZOs), and servicing capacity. Watson & Associates Economists Ltd. PAGE 3-2 - Discussions with City staff regarding anticipated residential and non-residential development in the City of Kawartha Lakes. 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the City and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, the permanent population in the City of Kawartha Lakes (excluding census undercount) is anticipated to reach approximately 100,020 by mid-2035, 108,310 by mid-2040, 116,320 by mid-2045, 125,380 by mid-2051 and 145,000 by buildout, resulting in an increase of approximately 17,220 persons over the 10-year forecast period, 25,510 persons over the 15-year forecast period, 33,520 persons over the 20-year forecast period, 42,580 persons over the 2025 to 2051 forecast period and 62,200 persons over the buildout forecast period. [1] The City's seasonal population is forecast to increase to 33,740 by mid-2035, 35,020 by mid-2040, 36,300 by mid-2045, 37,840 by mid-2051 and 40,880 by buildout. The City's total population (permanent and seasonal population) is forecast to reach 133,760 by mid-2035, 143,330 by mid-2040, 152,620 by mid-2045, 163,220 by mid-2051 and 185,880 by buildout. [1] The population figures used in the calculation of the 2024 D.C. exclude the net Census undercount, which is estimated at approximately 4.0%. Population figures presented herein have been rounded. Watson & Associates Economists Ltd. PAGE 3-3 Figure 2-1 Population and Household Forecast Model Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-4 Table 3-1 City of Kawartha Lakes Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 4% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units, and secondary units. Notes: - Build-out refers to the City's urban area, and has been assessed for designated urban lands, including lands subject to Minister's Zoning Orders (MZOs), and servicing capacity. - Numbers may not add due to rounding. Source: Derived from 2025 Growth Management Strategy and 2025 Water and Wastewater Servicing and Capacity Master Plan by Watson & Associates Economists Ltd. Permanent Population[1] Institutional Population Permanent Population Excluding Institutional[1] Seasonal Population Total Permanent and Seasonal Population Singles & Semi- Detached Singles & Semi Detached Family With Conversions Multiples[2] Apartments[3] Other Total Households Total w/ Conversions Seasonal Households Total Households w/ Conversions Including Seasonal Equivalent Institutional Households Mid 2011 75,911 73,214 1,764 71,450 27,375 100,589 25,470 25,470 1,215 2,820 176 29,681 29,681 7,480 37,161 1,604 2.467 2.707 Mid 2016 78,201 75,423 2,048 73,375 26,855 102,278 26,515 26,515 1,495 2,765 325 31,100 31,100 7,338 38,438 1,862 2.425 2.661 Mid 2021 82,166 79,247 2,017 77,230 30,150 109,397 27,955 27,955 1,495 2,950 310 32,710 32,710 8,238 40,948 1,834 2.423 2.672 Mid 2025 85,850 82,796 2,132 80,664 31,175 113,971 29,198 29,294 1,664 3,580 310 34,752 34,848 8,518 43,366 1,938 2.382 2.628 Mid 2035 103,700 100,020 2,305 97,715 33,740 133,760 34,000 34,328 3,870 4,880 310 43,060 43,388 9,218 52,606 2,095 2.323 2.543 Mid 2040 112,300 108,310 2,392 105,918 35,020 143,330 35,760 36,198 4,940 5,800 310 46,810 47,248 9,568 56,816 2,175 2.314 2.523 Mid 2045 120,600 116,320 2,483 113,837 36,300 152,620 37,150 37,698 6,010 6,810 310 50,280 50,828 9,918 60,746 2,257 2.313 2.512 Mid 2051 130,000 125,380 2,591 122,789 37,835 163,215 38,470 39,150 7,330 8,210 310 54,320 55,000 10,338 65,338 2,355 2.308 2.498 Buildout 150,300 145,000 2,664 142,336 40,880 185,880 42,670 43,620 9,890 10,310 310 63,180 64,130 11,170 75,300 2,422 2.295 2.469 Mid 2011 - Mid 2016 2,290 2,209 284 1,925 -520 1,689 1,045 1,045 280 -55 149 1,419 1,419 -142 1,277 258 Mid 2016 - Mid 2021 3,965 3,824 -31 3,855 3,295 7,119 1,440 1,440 0 185 -15 1,610 1,610 900 2,510 -28 Mid 2021 - Mid 2025 3,684 3,549 115 3,434 1,025 4,574 1,243 1,339 169 630 0 2,042 2,138 280 2,418 104 Mid 2025 - Mid 2035 17,850 17,224 173 17,051 2,565 19,789 4,802 5,034 2,206 1,300 0 8,308 8,540 700 9,240 157 Mid 2025 - Mid 2040 26,450 25,514 260 25,254 3,845 29,359 6,562 6,904 3,276 2,220 0 12,058 12,400 1,050 13,450 237 Mid 2025 - Mid 2045 34,750 33,524 351 33,173 5,125 38,649 7,952 8,404 4,346 3,230 0 15,528 15,980 1,400 17,380 319 Mid 2025 - Mid 2051 44,150 42,584 459 42,125 6,660 49,244 9,272 9,856 5,666 4,630 0 19,568 20,152 1,820 21,972 417 Mid 2025 - Buildout 64,450 62,204 532 61,672 9,705 71,909 13,472 14,326 8,226 6,730 0 28,428 29,282 2,652 31,934 484 Forecast Incremental Year Historical Excluding Census Undercount Permanent Person Per Unit (P.P.U.) Permanent + 100% Seasonal Person Per Unit (P.P.U.) Permanent Population (Including Census Undercount) Housing Units Watson & Associates Economists Ltd. PAGE 3-5 Provided below is a summary of the key assumptions and findings regarding the City of Kawartha Lakes D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, 6 and 7) - The housing unit mix for the City was derived from a detailed review of historical development activity (as per Schedule 7), as well as active residential development applications (as per Schedule 6) and discussions with City staff regarding anticipated development trends for the City of Kawartha Lakes - Based on the above indicators, the 2025 to 2051 household growth forecast for the City is comprised of a unit mix of 45% low density units (single detached and semi-detached), 26% medium density (multiples except apartments) and 21% high density (bachelor, 1-bedroom, and 2- bedroom apartments, and secondary units), and 8% seasonal units. 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the City of Kawartha Lakes - In accordance with forecast demand and available land supply, the amount and percentage of forecast housing growth between 2025 and 2051 by development location is summarized below. Watson & Associates Economists Ltd. PAGE 3-6 Table 3-2 City of Kawartha Lakes Geographic Location of Residential Development Development Location Amount of Permanent and Seasonal Housing Growth, 2025 to 2051 Percentage of Housing Growth, 2025 to 2051 Lindsay (Existing Urban Boundary incl. NW Trunk Area) 10,395 47% Lindsay M.Z.O. Flato 2,820 13% Lindsay M.Z.O. Bromont 1,920 9% Fenelon Falls 1,405 6% Bobcaygeon 1,685 8% Omemee 285 1% Other Water Serviced 140 1% Other Sewer Serviced 45 <1% Unserviced 3,275 15% City of Kawartha Lakes 21,970 100% Note: Figures may not sum precisely due to rounding. 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the City has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2051 in the City of Kawartha Lakes over the forecast period is presented in Table 3-1. Over the 2025 to 2051 forecast period, the City is anticipated to average approximately 845 new permanent and seasonal housing units per year. Watson & Associates Economists Ltd. PAGE 3-7 - Institutional population [1] is anticipated to increase by approximately 460 people between 2025 to 2051. - Population in new units is derived from Schedules 3 through 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8 summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the City of Kawartha Lakes. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 2.572 o Medium density: 1.907 o High density: 1.467 o Seasonal: 3.660 5. Existing Units and Population Change (Appendix A - Schedules 3, 4 and 5) - Existing households for mid-2025 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.[2] The forecast population change in existing households over the 2025 to 2051 forecast period is forecast to increase by approximately 1,320. [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. [2] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Watson & Associates Economists Ltd. PAGE 3-8 6. Employment (Appendix A - Schedules 10a, 10b and 10c) - The employment forecast provided herein is based on the activity rate method, which is defined as the number of jobs in the City divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [1],[2] (place of work) for the City of Kawartha Lakes is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: o 450 primary (2%) o 3,165 work at home employment (15%); o 3,145 industrial (15%); o 7,520 commercial/population-related (37%); and o 6,305 institutional (31%). - The 2016 employment by usual place of work, including work at home, is 20,585. Total employment, including work at home, for the City of Kawartha Lakes is anticipated to reach approximately 26,910 by mid- 2035, 29,070 by mid-2040, 31,460 by mid-2045, 34,630 by mid-2051 and 40,640 by buildout.[3] This represents an employment increase of approximately 4,280 over the 10-year forecast period, 6,440 over the 15- year forecast period, 8,830 over the 20-year forecast period, 12,000 over the 2025 to 2051, and 18,010 over the buildout forecast period. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work at home employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. It is important to note that the need for municipal services related to N.F.P.O.W. employees has largely been included in the employment [1] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [2] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. [3] No fixed place of work (N.F.P.O.W.) employment is not included part of the total employment for the purposes of the forecast. Watson & Associates Economists Ltd. PAGE 3-9 forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the City of Kawartha Lakes (excluding work at home and N.F.P.O.W.) is anticipated to reach approximately 21,890 by mid- 2035, 23,540 by mid-2040, 25,470 by mid-2045, 27,950 by mid-2051, and 32,810 by buildout. This represents an employment increase of approximately 3,010 over the 10-year forecast period, 4,660 over the 15- year forecast period, 6,590 over the 20-year forecast period, 9,070 over the 2025 to 2051 forecast period, and 13,930 over the buildout forecast period. 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 10b) - Square footage estimates were calculated in Schedule 7b based on the following employee density assumptions: o 3,000 sq.ft. per primary employee; o 1,200 sq.ft. per employee for industrial; o 450 sq.ft. per employee for commercial/population-related; and o 700 sq.ft. per employee for institutional employment. - The City-wide incremental G.F.A. is anticipated to increase by approximately 2.2 million sq.ft. over the 10-year forecast period, 3.5 million sq.ft. over the 15-year forecast period, 5.0 million sq.ft. over the 20-year forecast period, 6.7 million sq.ft. over the 2025 to 2051 forecast period, and 10.1 million sq.ft. over the buildout forecast period. - In terms of percentage growth, the 2025 to 2051 incremental G.F.A. forecast by sector is broken down as follows: o Primary - 12%; o industrial - 27%; o commercial/population-related - 27%; and o institutional - 34%. Watson & Associates Economists Ltd. PAGE 3-10 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 10c) - Schedule 10c summarizes the anticipated amount, type and location of non-residential development by area for the City of Kawartha Lakes. - The amount and percentage of forecast total non-residential growth between 2025 and 2051 by development location is summarized below. Table 3-3 City of Kawartha Lakes Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2025 to 2051 Percentage of Non- Residential G.F.A., 2025 to 2051 Lindsay (Existing Urban Boundary incl. NW Trunk Area) 4,185,700 63% Lindsay M.Z.O. Flato 141,100 2% Lindsay M.Z.O. Bromont 105,100 2% Fenelon Falls 465,600 7% Bobcaygeon 461,600 7% Omemee 122,900 2% Other Water Serviced 83,200 1% Other Sewer Serviced 83,700 1% Unserviced 1,032,400 15% City of Kawartha Lakes 6,681,300 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-2 lists the full range of municipal services that are provided by a municipality. A number of these services are not listed as eligible services for inclusion in a D.C. by- law as per subsection 2 (4) of the D.C.A. These are shown as "ineligible" on Table 4-2. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services which are potentially eligible for inclusion in the Municipality's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 Figure 4-1 The Process of Calculating a Development Charge under the Act that must be followed Watson & Associates Economists Ltd. PAGE 4-3 Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation - Eligibility Legend Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Table 4-2 Categories of Municipal Services to be Addressed as Part of the Calculation Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 1. Water supply services, including distribution and treatment services Yes Yes No Yes 1.1 Treatment plants 1.2 Distribution systems 1.3 Local systems 1.4 Vehicles and equipment1 2. Wastewater services, including sewers and treatment services Yes Yes No Yes 2.1 Treatment plants 2.2 Sewage trunks 2.3 Local systems 2.4 Vehicles and equipment1 3. Stormwater Drainage and Control Services No No No 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-4 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 4. Services Related to a Highway Yes Yes Yes No Yes Yes Yes Yes Yes 4.1 Arterial roads 4.2 Collector roads 4.3 Bridges, Culverts and Roundabouts 4.4 Local municipal roads 4.5 Traffic signals 4.6 Sidewalks and streetlights 4.7 Active Transportation 4.8 Works Yard 4.9 Rolling stock1 5. Electrical Power Services n/a n/a n/a 5.1 Electrical substations 5.2 Electrical distribution system 5.3 Electrical system rolling stock1 6. Transit Services Yes Yes 6.1 Transit vehicles1 & facilities 6.2 Other transit infrastructure 7. Waste Diversion Services No No 7.1 Waste diversion facilities 7.2 Waste diversion vehicles and equipment1 8. Policing Services Yes Yes Yes 8.1 Police detachments 8.2 Police rolling stock1 8.3 Small equipment and gear 9. Fire Protection Services Yes Yes Yes 9.1 Fire stations 9.2 Fire Vehicles1 9.3 Fire Equipment and gear 10. Ambulance Services Yes Yes 10.1 Ambulance station space 10.2 Vehicles1 11. Services provided by a board within the meaning of the Public Libraries Act Yes Yes Yes 11.1 Public library space (excl. furniture and equipment) 11.2 Library vehicles1 11.3 Library materials 12. Services Related to Long- Term Care Ineligible Ineligible 12.1 Long-Term Care space 12.2 Vehicles1 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-5 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 13. Parks and Recreation Services Ineligible Yes Yes Yes Yes 13.1 Acquisition of land for parks, woodlots and E.S.A.s 13.2 Development of municipal parks 13.3 Parks rolling stock1 and yards 13.4 Facilities, such as arenas, indoor pools, fitness facilities, community centres, etc. 13.5 Recreation vehicles and equipment1 14. Services Related to Public Health Yes Yes 14.1 Public Health department space 14.2 Public Health department vehicles1 15. Child Care and Early Years Programs and Services within the meaning of Part VI of the Child Care and Early Years Act, 2014 and any related services. n/a n/a 15.1 Childcare space 15.2 Vehicles1 16. Services related to proceedings under the Provincial Offences Act, including by-law enforcement services and municipally administered court services Yes Yes 16.1 P.O.A. space, including by-law enforcement and municipally administered court services 16.2 Vehicles1 17. Services Related to Emergency Preparedness No No 17.1 Emergency Preparedness Space 17.2 Equipment 18. Services Related to Airports n/a Ineligible 18.1 Airports (in the Regional Municipality of Waterloo) 18.2 Other Airports 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-6 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 19. Other Yes 19.1 Interest on money borrowed to pay for growth-related capital 19.2 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land [2] and facilities, including the D.C. background study cost [2] same percentage as service component to which it pertains 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The City's Local Service Policy is included in Appendix D. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require potential cost reductions and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer Watson & Associates Economists Ltd. PAGE 4-7 equipment), materials acquired for library circulation, reference, or information purposes; e) interest on money borrowed to pay for the above-referenced costs; f) costs to undertake studies in connection with the above-referenced matters; and g) costs of the D.C. background study. In order for an increase in need for service to be included in the D.C. calculation, municipal Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the Municipality 's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that, "...the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. The City has accounted for outstanding D.C. credit obligations in the estimated D.C. reserve fund balances used in the calculation of the charge. 4.7 Eligible Debt and Committed Excess Capacity Section 66 of the D.C.A. states that for the purposes of developing a D.C. by-law, a debt incurred with respect to an eligible service may be included as a capital cost, subject to any limitations or reductions in the Act. Similarly, s.18 of O. Reg. 82/98 indicates that debt with respect to an ineligible service may be included as a capital cost, subject to several restrictions. In order for such costs to be eligible, two conditions must apply. First, they must have funded excess capacity which is able to meet service needs attributable to the anticipated development. Second, the excess capacity must be "committed," that is, Watson & Associates Economists Ltd. PAGE 4-8 either before or at the time it was created, Council must have expressed a clear intention that it would be paid for by D.C.s or other similar charges. For example, this may have been done as part of previous D.C. processes. 4.8 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 8 of subsection 5(1)." There is no explicit requirement under the D.C.A. calculation method set out in s.s.5(1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, s.35 does restrict the way in which the funds are used in future. The City's uncommitted D.C. Reserve Fund Balance by service as projected for year- end 2024 is presented in the table below. These balances have been applied against future spending requirements for all D.C. services. The adjusted reserve fund balances account for impacts on past funding of capital projects, potential D.C. refunds, and changes to revenue forgone as a result of D.C. exemptions as a result of the appeal to the City's 2014 D.C. by-law. Table 4-3 D.C. Reserve Fund Balances Service Dec 31, 2024 Balance Pre-2019 Reserve Fund Adjustments 2019-2024 Reserve Fund Adjustments Unfunded Exemptions Refunds (2014 Appeal) Reconciliation Interest Adjusted Balance Fire Services (1,747,600) 455,826 459,009 86,137 13,823 40,797 (692,006) Police Services 1,150,574 80,742 (401,099) 90,678 (17,551) 9,289 912,634 Services Related to a Highway 6,722,605 1,695,222 (22,684) 1,548,353 (1,175,611) 256,572 9,024,457 Transit Services (421,284) 23,567 (431,614) 57,291 (10,127) (65,531) (847,697) Parks and Recreation Services 274,900 (3,678,490) (1,740,201) 89,172 (4,993) (845,387) (5,904,998) Library Services (1,498,743) 2,554 1,597,250 39,109 (213,479) 28,310 (44,999) Paramedic Services 55,162 17,244 (202,584) 49,759 (5,421) (1,783) (87,623) Municipal By-law Enforcement Services 5,620 - 27,000 3,748 (93) 1,021 37,295 Growth-Related Studies (2,600,252) 328,270 (646,687) 94,613 (12,384) (270,385) (3,106,824) Wastewater Treatment Services (15,629,564) 21,438,046 (1,739,043) 900,159 (609,705) 4,955,433 9,315,326 Wastewater Collection Services 6,620,477 (12,990,577) (8,045,296) 1,572,444 (93,545) (3,677,244) (16,613,742) Water Treatment Services 5,460,377 538,631 545,031 738,301 (158,835) 281,589 7,405,093 Water Distribution Services 2,034,715 582,359 (1,398,465) 767,129 (147,835) (302,832) 1,535,070 Public Health Services - - - - - - - Total 426,988 8,493,393 (11,999,382) 6,036,893 (2,435,755) 409,849 931,986 Watson & Associates Economists Ltd. PAGE 4-9 4.9 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed as follows: 4.9.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in 4.3 does "...not include an increase that would result in the level of service (for the additional development increment) exceeding the average level of the service provided in the Municipality over the 15-year period immediately preceding the preparation of the background study..." O. Reg. 82.98 (s.4) goes further to indicate that, "...both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area or road length per capita, and a quality measure in terms of the average cost of providing such units based on replacement costs, engineering standards or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.9.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the municipality's "excess capacity," other than excess capacity which is "committed." Watson & Associates Economists Ltd. PAGE 4-10 "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.9.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. On the other hand, where a clear existing service problem is to be remedied, a deduction should be made accordingly. Watson & Associates Economists Ltd. PAGE 4-11 In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a Municipal-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.10 Municipal-Wide vs. Area Rating This step involves determining whether all the subject costs are to be recovered on a uniform Municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the D.C.A., it is now mandatory to "consider" area-rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area-rating. Further discussion is provided in section 7.3.8. 4.11 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential Watson & Associates Economists Ltd. PAGE 4-12 development and between one type of development and another, to arrive at a schedule of charges. Watson & Associates Economists Ltd. Chapter 5 D.C. Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform and area-specific basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4 was followed in determining D.C. eligible costs. The nature of the capital projects and timing identified in this chapter reflects Council's current intention. Over time, however, City projects and Council priorities change; and accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and City-Wide 10-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for City-wide services over the 10-year planning period (mid-2025 to mid-2035). Each service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.2.1 Parks and Recreation Services The City provides Parks and Recreation Services through 40,741 sq.ft. of parks facility space, various park related amenities, and 465,134 sq.ft. of recreation facility space. The parkland, trails and facilities are maintained and supported through 104 vehicles and items of equipment. This total historical level of investment results in an average level of service of $4,121 per capita over the past 15 years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 18,335 population including 50% seasonal growth), this allows for a maximum D.C. eligible amount of $75.6 million to be included in the charge calculation. To provide service for new development over the 10-year forecast period $45.8 million in gross capital costs have been identified primarily related to parks and facility needs. These capital needs are based on the City's capital budget, forecast and reports to Watson & Associates Economists Ltd. PAGE 5-2 Council, Trails Master Plan, and discussions with staff. $13.7 million has been deducted as a benefit to existing development and $331,000 has been deducted to account for the benefit of trails projects to growth outside the 10-year forecast period. Further, $5.9 million has been added to reflect the existing D.C. reserve fund deficit, plus an estimated $788,000 for the present value of the incremental financing costs on the deficit. This results in $31.7 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 95% to residential development as they are the primary uses of Parks and Recreation Services. These growth-related projects and costs are detailed in Table 5-1. 5.2.2 Library Services The City provides Library Services through 50,410 sq.ft. of facility space, 132,877 collection items, and a courier van that's utilized by the City 60% of the time. This total historical level of investment results in an average level of service of $515 per capita over the past 15 years. When applied against the anticipated population growth over the 10-year forecast period, this allows for a maximum D.C. eligible amount of $9.4 million to be included in the charge calculation. To provide service to new development over the 10-year forecast period, gross capital costs of $6.0 million have been identified from which $2.0 million has been deducted for the benefit to existing development. The future needs include an expansion to the Lindsay Library, expansion of the collection materials, and future studies. Further, $45,000 has been added to reflect the existing D.C. reserve fund deficit, plus an estimated $6,000 for the present value of the incremental financing costs on the deficit. This results in $4.0 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 95% to residential development as they are the primary users for Library Services. These growth-related projects and costs are detailed in Table 5-2. 5.2.3 By-law Enforcement Services The City provides By-law Enforcement Services through 2,500 sq.ft. of facility space, seven vans, two ATVs, and 15 equipped officers. This total historical level of investment results in an average level of service of $27 per capita over the past 15 years. When applied against the anticipated population and employee growth over the Watson & Associates Economists Ltd. PAGE 5-3 10-year forecast period (i.e. 18,335 population and 3,013 employment), this allows for a maximum D.C. eligible amount of $572,000 to be included in the charge calculation. To provide service to new development over the 10-year forecast period, gross capital costs of $645,000 have been identified for future facility, vehicle, and study costs, from which $245,000 has been deducted for the benefit to existing development. Further, $37,000 has been deducted to reflect the existing D.C. reserve fund surplus resulting in $362,000 being included in the calculation of the charge. These D.C. eligible costs are then attributed 86% to residential development and 14% to non-residential development based on the relationship of population (i.e., 18,335 population) to employment (i.e., 3,013 employment) growth anticipated over the 10-year forecast period. These growth-related projects and costs are detailed in Table 5-3. 5.2.4 Growth Related Studies Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible services. With respect to growth-related studies, Section 7 (3) of the D.C.A. states that: For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3). These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and draft by-law provided herein include a class for growth-related studies. This class is comprised of the following City-wide and area specific services: - Fire Protection Services (City-Wide); - Fire Protection Services (Rural); - Police Services; - Services Related to a Highway; - Transit Services; - Parks and Recreation Services; - Library Services; Watson & Associates Economists Ltd. PAGE 5-4 - Municipal By-law Enforcement; - Paramedic Services; - Public Health Services; - Wastewater Treatment Services; - Wastewater Collection Services; - Water Treatment Services; and - Water Distribution Services. The following provides a list of the studies that have been identified for the 2025 to 2035 forecast period: - Asset Management Plan (3) - D.C. Background Studies (4) - Growth Management Strategy (1) - Official Plan Review / Update (1) - Rural Zoning By-Law Review/Update (1) - Urban Zoning By-Law Review/Update (1) - Commercial Lands Supply Study (1) - Natural Heritage Systems Study (1) - Agricultural Land Evaluation and Area Review Study (1) - Flood Hazard Identification and Mapping (1) - Urban Design Guidelines Study (1) - Community Improvement Plan (1) For planning related studies, a deduction of 10% of the growth-related costs has been applied to recognize the extent to which the studies relate to non-D.C. eligible services. Planning related studies and future D.C. background studies have been allocated to the services in the following manner: - Fire Protection Services (City-Wide) - 2.9% - Fire Protection Services (Rural) - 0.1% - Police Services - 0.8% - Services Related to a Highway - 19.1% - Transit Services - 0.3% - Parks and Recreation Services - 2.1% - Library Services - 0.3% Watson & Associates Economists Ltd. PAGE 5-5 - Municipal By-law Enforcement - 0.02% - Paramedic Services - 0.9% - Public Health Services - 0.3% - Wastewater Treatment Services - 20.0% - Wastewater Collection Services - 10.7% - Water Treatment Services - 37.4% - Water Distribution Services - 5.1% The total cost of these studies is $6.5 million of which $1.0 million is a benefit to existing development. A deduction of $130,000 has been made to recognize the portion of planning studies related to D.C. ineligible services, and $38,000 has been deducted for grants. Further, $3.1 million has been added to reflect the existing D.C. reserve fund deficit, plus an estimated $415,000 for the present value of the incremental financing costs on the deficit. This results in $5.3 million being included in the calculation of the charge. The allocation of the net growth-related costs between residential and non-residential development is based on the residential and non-residential allocations for each service area and is presented in Table 5-5 below. Watson & Associates Economists Ltd. PAGE 5-6 Table 5-1 Infrastructure Costs Covered in the D.C. Calculation - Parks and Recreation Services Proj. No. Residential Share Non- Residential Share 2025 to 2035 95% 5% Facilities and Parkland Improvement - - - - - - - 1 Forbert Memorial Pool Upgrade and Expansion 2031 4,000,000 - 4,000,000 2,133,300 1,866,700 1,773,365 93,335 2 Jennings Creek Parkland Development - Sylvester Park 2025 2,542,000 - 2,542,000 254,200 2,287,800 2,173,410 114,390 Present Value of Incremental Financing Cost (Growth-Related Share) 305,411 - 305,411 - 305,411 290,140 15,271 3 Jennings Creek Parkland Development - Auden Park 2026 235,000 - 235,000 23,500 211,500 200,925 10,575 4 Lindsay Trail Development - Scugog River Trail Bridge 2029 4,428,000 - 4,428,000 2,214,000 2,214,000 2,103,300 110,700 5 Lindsay Trail Development - Scugog River Crossing to Rivera Park 2028 239,000 - 239,000 23,900 215,100 204,345 10,755 6 Lindsay Trail Development - Logie St. to Rainbow Bridge 2026 11,000 - 11,000 5,500 5,500 5,225 275 7 Lindsay Trail Development - Rotary Trail to Logie Park 2030 924,000 - 924,000 92,400 831,600 790,020 41,580 8 Pioneer Park 2028-2029 7,474,000 - 7,474,000 747,400 6,726,600 6,390,270 336,330 Present Value of Incremental Financing Cost (Growth-Related Share) 897,971 - 897,971 89,800 808,171 767,762 40,409 9 Manorview Park 2030 589,000 - 589,000 58,900 530,100 503,595 26,505 10 Marlene James Park 2028 470,000 - 470,000 47,000 423,000 401,850 21,150 11 George Street Park 2029 947,000 - 947,000 94,700 852,300 809,685 42,615 12 Dormer Park 2031 693,000 - 693,000 69,300 623,700 592,515 31,185 13 Hamilton Park 2032 673,000 - 673,000 67,300 605,700 575,415 30,285 14 Ops Park 2026 7,060,000 - 7,060,000 3,530,000 3,530,000 3,353,500 176,500 Present Value of Incremental Financing Cost (Growth-Related Share) 471,239 - 471,239 - 471,239 447,677 23,562 15 Arbour Park 2026 360,000 - 360,000 180,000 180,000 171,000 9,000 16 Wilson Fields West Parking Lot 2026 576,000 - 576,000 57,600 518,400 492,480 25,920 17 Emily Manor Park 2028 169,000 - 169,000 84,500 84,500 80,275 4,225 18 Joan Park Amenities 2025 22,400 - 22,400 - 22,400 21,280 1,120 19 Emily Forest Tract Trails and Rest Areas 2026 324,000 324,000 236,200 87,800 83,410 4,390 20 Pontypool Forest Track Pump Park 2027 480,000 480,000 350,000 130,000 123,500 6,500 21 Dobson Street Trail Intersection Staging Area 2028 360,000 360,000 262,500 97,500 92,625 4,875 22 Victoria Rail Trail / Ski Hill Road Intersection 2029 198,000 198,000 144,400 53,600 50,920 2,680 23 Trail Connecting Wilderness Park to Cedartree Lane 2030 96,000 96,000 70,000 26,000 24,700 1,300 24 Trail Connecting Riverview Park and Forbert Pool 2030 192,000 192,000 140,000 52,000 49,400 2,600 25 Somerville Forest Tract - Maconachie Trail 2031 1,275,000 77,821 1,197,179 929,600 267,579 254,200 13,379 26 Pontypool Forest Tract Staging Area 2032 180,000 48,800 131,200 131,200 - - - 27 Pontypool Forest Tract Trail 2033 450,000 121,900 328,100 328,100 - - - 28 Victoria Rail Trail / Somerville 3rd Concession Intersection 2034 108,000 29,300 78,700 78,700 - - - 29 Trans-Canada Trail / Angeline Street South Intersection 2034 198,000 53,600 144,400 144,400 - - - Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-7 Table 5-1 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Parks and Recreation Services Proj. No. Residential Share Non- Residential Share 2025 to 2035 95% 5% Fleet and Equipment - - - - - - - 30 Grass Cutting Unit 2029 53,100 - 53,100 26,600 26,500 25,175 1,325 31 Trailer 2029 15,200 - 15,200 7,600 7,600 7,220 380 32 Parks Forestry Crane Truck 2026 622,000 - 622,000 528,700 93,300 88,635 4,665 33 Parks Forestry Bucket Truck 2026 360,000 - 360,000 306,000 54,000 51,300 2,700 - - - - - - - Studies - - - - - - - 34 Parks Master Plan 2025 200,000 - 200,000 50,000 150,000 142,500 7,500 35 Parks Master Plan 2035 200,000 - 200,000 50,000 150,000 142,500 7,500 36 Trails Master Plan 2031 200,000 - 200,000 50,000 150,000 142,500 7,500 37 Recreation Facility Master Plan 2026 250,000 - 250,000 62,500 187,500 178,125 9,375 38 Parks and Recreation Strategic Plan 2034 225,000 - 225,000 56,300 168,700 160,265 8,435 - - - - - - - Reserve Fund Adjustment 5,904,998 - 5,904,998 - 5,904,998 5,609,748 295,250 Present Value of Incremental Reserve Fund Financing Costs 788,291 - 788,291 - 788,291 748,876 39,415 Total 45,766,609 331,421 45,435,188 13,726,100 - 31,709,088 30,123,634 1,585,454 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-8 Table 5-2 Infrastructure Costs Covered in the D.C. Calculation - Library Services Proj. No. Residential Share Non- Residential Share 2025 to 2035 95% 5% Facilities - - - - - - 1 Lindsay Library Expansion 2026 3,900,000 3,900,000 1,950,000 1,950,000 1,852,500 97,500 Present Value of Incremental Financing Cost (Growth- Related Share) 260,316 260,316 - 260,316 247,300 13,016 Library Materials - - - - - - 2 Collection Expansion 2025 146,230 146,230 - 146,230 138,918 7,311 2 Collection Expansion 2026 146,230 146,230 - 146,230 138,918 7,311 4 Collection Expansion 2027 146,230 146,230 - 146,230 138,918 7,311 5 Collection Expansion 2028 146,230 146,230 - 146,230 138,918 7,311 6 Collection Expansion 2029 146,230 146,230 - 146,230 138,918 7,311 7 Collection Expansion 2030 146,230 146,230 - 146,230 138,918 7,311 8 Collection Expansion 2031 146,230 146,230 - 146,230 138,918 7,311 9 Collection Expansion 2032 146,230 146,230 - 146,230 138,918 7,311 10 Collection Expansion 2033 146,230 146,230 - 146,230 138,918 7,311 11 Collection Expansion 2034 146,230 146,230 - 146,230 138,918 7,311 12 Collection Expansion 2035 146,230 146,230 - 146,230 138,918 7,311 Studies - - - - - - 13 Library Master Plan 2025 75,000 75,000 18,800 56,200 53,390 2,810 14 Library Master Plan 2030 75,000 75,000 18,800 56,200 53,390 2,810 15 Library Master Plan 2035 75,000 75,000 18,800 56,200 53,390 2,810 - - - - - - Reserve Fund Adjustment 44,999 44,999 - 44,999 44,999 - Present Value of Incremental Reserve Fund Financing Costs 6,007 6,007 - 6,007 5,707 300 Total 6,044,852 6,044,852 2,006,400 - 4,038,452 3,838,780 199,673 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contribution s Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-9 Table 5-3 Infrastructure Costs Covered in the D.C. Calculation - By-law Enforcement Services Proj. No. Residential Share Non- Residential Share 2025 to 2035 86% 14% Facilities - - - - - - 1 Present Value of Future Lease Costs 2025-2029 275,191 275,191 220,200 54,991 47,292 7,699 Equipment - - - - - - 2 Equipped Officers (7) 2025-2035 66,500 66,500 - 66,500 57,190 9,310 3 Vans (3) 2025-2035 203,083 203,083 - 203,083 174,652 28,432 Studies - - - - - - 4 By-Law Enforcement and Licensing Master Plan 2026 100,000 100,000 25,000 75,000 64,500 10,500 - - - - - - Reserve Fund Adjustment - - - (37,295) (32,074) (5,221) Total 644,774 644,774 245,200 - 362,278 311,559 50,719 Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contribution s Attributable to New Development Total Gross Capital Cost Estimate (2025$) Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-10 Table 5-4 Infrastructure Costs Covered in the D.C. Calculation - Growth-Related Studies 2025 to 2035 General Studies and Plans - - - - 1 Asset Management Plan 2025 150,000 2,350 147,650 126,500 21,150 2 Asset Management Plan 2029 150,000 2,350 147,650 126,500 21,150 3 Asset Management Plan 2033 150,000 2,350 147,650 126,500 21,150 4 Development Charge Background Study 2025 150,000 150,000 - 150,000 5 Development Charge Background Study 2027 150,000 150,000 - 150,000 6 Development Charge Background Study 2031 150,000 150,000 - 150,000 7 Development Charge Background Study 2035 150,000 150,000 - 150,000 8 Growth Management Strategy 2032 225,000 22,500 202,500 - 202,500 9 Official Plan Review / Update 2034 525,000 26,250 498,750 262,500 236,250 10 Rural Zoning By-Law Review / Update 2035 200,000 10,000 190,000 100,000 90,000 11 Urban Zoning By-Law Review / Update 2035 200,000 10,000 190,000 100,000 90,000 12 Commercial Lands Supply Study 2033 100,000 10,000 90,000 - 90,000 13 Natural Heritage Systems Study 2033 120,000 6,000 114,000 60,000 54,000 14 Agricultural Land Evaluation and Area Review Study 2033 120,000 6,000 114,000 60,000 54,000 15 Flood Hazard Identification and Mapping 2025 150,000 7,500 142,500 75,000 37,500 30,000 16 Urban Design Guidelines Study 2033 100,000 10,000 90,000 - 90,000 17 Community Improvement Plan 2028 150,000 15,000 135,000 - 135,000 - - - - Reserve Fund Adjustment 3,106,824 3,106,824 - 3,106,824 Present Value of Incremental Reserve Fund Financing Costs 414,747 414,747 - 414,747 Total 6,461,571 130,300 6,331,271 1,037,000 37,500 5,256,771 Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Other Deductions (to recognize benefit to non-D.C. services) Gross Capital Cost Estimate (2025$) Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Less: Watson & Associates Economists Ltd. PAGE 5-11 Table 5-5 Infrastructure Costs Covered in the D.C. Calculation - Growth-Related Studies - Residential/Non-Residential Shares Service Total Residential Share Non- Residential Share Fire Protection Services (City-Wide) 153,939 130,848 23,091 Fire Protection Services (Rural) 4,090 3,599 491 Police Services 41,321 35,949 5,372 Services Related to a Highway 1,001,768 841,485 160,283 Transit Services 14,345 12,481 1,865 Parks and Recreation Services 110,803 105,263 5,540 Library Services 14,112 13,406 706 Municipal By-law Enforcement 1,266 1,089 177 Paramedic Services 47,313 39,743 7,570 Public Health Services 17,092 16,237 855 Wastewater Treatment Services 1,052,814 863,307 189,506 Wastewater Collection Services 564,777 457,469 107,308 Water Treatment Services 1,967,034 1,612,968 354,066 Water Distribution Services 266,098 218,201 47,898 Total 5,256,771 4,352,044 904,727 Residential/Non-Residential Share 83% 17% Watson & Associates Economists Ltd. PAGE 5-12 5.3 Service Levels and City-Wide 15-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for City-wide services over the 15-year planning period (mid-2025 to mid-2040). Each service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.3.1 Fire Protection Services (City-Wide) Fire Protection Services are provided through 84,035 sq.ft. of facility space, 99 vehicles, and 2,911 equipment items. This historical level of investment results in an average level of service of $1,584 per capita and employee over the past 15 years. When applied against the anticipated City-wide population and employment growth over the 15-year forecast period (i.e., 27,178 population, including 50% seasonal growth and 4,663 employment), this allows for a maximum D.C. eligible amount of $50.4 million to be included in the charge calculation. To provide service to new development over the 15-year forecast period, $59.9 million in gross capital costs of growth-related projects have been identified, including facility, vehicle, equipment, and study costs. $15.9 million has been deducted as a benefit to existing development. Further, $692,000 has been added to reflect the existing D.C. reserve fund deficit, plus an estimated $92,000 for the present value of the incremental financing costs on the deficit. This results in $44.1 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 85% to residential development and 15% to non-residential development based on the relationship of population to employment growth anticipated over the 15-year forecast period. These growth-related projects and costs are detailed in Table 5-6. Watson & Associates Economists Ltd. PAGE 5-13 Table 5-6 Infrastructure Costs Covered in the D.C. Calculation - Fire Protection Services (City-Wide) Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2040 85% 15% Facilities - - - - - - 1 Fire Headquarters and Lindsay Fire Hall 2029 32,300,000 32,300,000 3,027,600 29,272,400 24,881,540 4,390,860 Present Value of Incremental Financing Cost (Growth-Related Share) 3,907,733 3,907,733 - 3,907,733 3,321,573 586,160 2 Regional Training Centre 2027 7,728,000 7,728,000 6,051,200 1,676,800 1,425,280 251,520 3 Training Equipment Storage Facility 2026 550,000 550,000 430,700 119,300 101,405 17,895 4 Fire Central Training Centre (Burn Tower) 2026 200,000 200,000 156,600 43,400 36,890 6,510 5 Fire Central Training Centre (Burn Tower) 2027 200,000 200,000 156,600 43,400 36,890 6,510 6 Fire Central Training Centre (Burn Tower) 2028 200,000 200,000 156,600 43,400 36,890 6,510 7 Fire Central Training Centre (Burn Tower) 2029 200,000 200,000 156,600 43,400 36,890 6,510 8 Fire Central Training Centre (Burn Tower) 2030 200,000 200,000 156,600 43,400 36,890 6,510 9 Bobcaygeon Fire Hall Addition 2030 4,365,911 4,365,911 - 4,365,911 3,711,025 654,887 10 Fenelon Falls Fire Hall Addition 2025 700,000 700,000 586,600 113,400 96,390 17,010 Fleet and Equipment - - - - - - 11 Extrication Equipment 2026 76,000 76,000 59,500 16,500 14,025 2,475 12 Extrication Equipment 2027 76,000 76,000 59,500 16,500 14,025 2,475 13 Extrication Equipment 2028 76,000 76,000 59,500 16,500 14,025 2,475 14 Extrication Equipment 2029 76,000 76,000 59,500 16,500 14,025 2,475 15 Extrication Equipment 2030 76,000 76,000 59,500 16,500 14,025 2,475 16 Extrication Equipment 2031 76,000 76,000 59,500 16,500 14,025 2,475 17 Extrication Equipment 2032 76,000 76,000 59,500 16,500 14,025 2,475 18 Extrication Equipment 2033 76,000 76,000 59,500 16,500 14,025 2,475 19 Extrication Equipment 2034 76,000 76,000 59,500 16,500 14,025 2,475 20 Extrication Equipment 2035 76,000 76,000 59,500 16,500 14,025 2,475 21 Extrication Equipment 2036 76,000 76,000 59,500 16,500 14,025 2,475 22 Extrication Equipment 2037 76,000 76,000 59,500 16,500 14,025 2,475 23 Extrication Equipment 2038 76,000 76,000 59,500 16,500 14,025 2,475 24 Extrication Equipment 2039 76,000 76,000 59,500 16,500 14,025 2,475 25 Extrication Equipment 2040 76,000 76,000 59,500 16,500 14,025 2,475 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-14 Table 5-6 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Fire Protection Services Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2040 85% 15% 26 Pumper Truck 2027 1,411,000 1,411,000 912,300 498,700 423,895 74,805 27 Pumper Truck 2029 1,411,000 1,411,000 912,300 498,700 423,895 74,805 28 Pumper Truck 2029 1,411,000 1,411,000 912,300 498,700 423,895 74,805 29 Pumper Truck 2030 1,411,000 1,411,000 912,300 498,700 423,895 74,805 30 Pickup Truck 2026 80,000 80,000 - 80,000 68,000 12,000 31 Pickup Truck 2027 80,000 80,000 - 80,000 68,000 12,000 32 Pickup Truck 2028 80,000 80,000 - 80,000 68,000 12,000 33 Pickup Truck 2029 80,000 80,000 - 80,000 68,000 12,000 34 Pickup Truck 2030 80,000 80,000 - 80,000 68,000 12,000 35 SUVs (2) 2026 100,000 100,000 - 100,000 85,000 15,000 36 Boat and Trailer 2027 80,000 80,000 62,600 17,400 14,790 2,610 37 Boat and Trailer 2028 80,000 80,000 62,600 17,400 14,790 2,610 38 ATV and Trailer 2027 80,000 80,000 62,600 17,400 14,790 2,610 39 ATV and Trailer 2028 80,000 80,000 62,600 17,400 14,790 2,610 40 Equipment for Additional Fire Fighters (10) 2025 65,460 65,460 - 65,460 55,641 9,819 41 Equipment for Additional Fire Fighters (4) 2026 16,360 16,360 - 16,360 13,906 2,454 42 Equipment for Additional Fire Fighters (6) 2027 36,820 36,820 - 36,820 31,297 5,523 43 Equipment for Additional Fire Fighters (4) 2028 28,640 28,640 - 28,640 24,344 4,296 Studies - - - - - - 44 Fire Master Plan and Station Location Study 2026 350,000 350,000 87,500 262,500 223,125 39,375 45 Radio Mapping Study 2026 100,000 100,000 25,000 75,000 63,750 11,250 46 Community Risk Assessment 2026 200,000 200,000 50,000 150,000 127,500 22,500 47 Fire Master Plan 2036 200,000 200,000 50,000 150,000 127,500 22,500 - - - - - - Reserve Fund Adjustment 692,006 692,006 - 692,006 588,205 103,801 Present Value of Incremental Reserve Fund Financing Costs 92,380 92,380 - 92,380 78,523 13,857 Total 59,937,310 59,937,310 15,883,700 - 44,053,610 37,445,568 6,608,041 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Watson & Associates Economists Ltd. PAGE 5-15 5.4 Service Levels and City-Wide 20-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for City-wide services over the 20-year planning period (mid-2025 to mid-2045). Each service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.4.1 Paramedic Services Paramedic Services are provided through 28,345 sq.ft. of facility space, 29 vehicles, and 218.3 equipment items. This historical level of investment results in an average level of service of $284 per capita and employee over the past 15 years. When applied against the anticipated population growth over the 20-year forecast period (i.e., 35,736 population including 50% seasonal growth and 6,593 employment), this allows for a maximum D.C. eligible amount of $12.0 million to be included in the charge calculation. To provide service to new development over the 20-year forecast period, $63.0 million in gross capital costs of growth-related projects have been identified, including facility (e.g., Paramedic Headquarters and Fleet Centre), vehicle, equipment, and study costs to meet the demand for service identified in the City's Paramedics Master Plan. $43.4 million has been deducted as a benefit to existing development, including the benefit of increase in calls for service from existing constituents and a further $6.1 million has been deducted to account for growth outside the 20-year planning horizon. Further, $88,000 has been added to reflect the existing D.C. reserve fund deficit, plus an estimated $12,000 for the present value of the incremental financing costs on the deficit. This results in $13.5 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 84% to residential development and 16% to non-residential development based on the relationship of population to employment growth anticipated over the 10-year forecast period. These growth-related projects and costs are detailed in Table 5-7. 5.4.2 Public Health Services Public Health Services are provided through 28,090 sq.ft. of facility space. This historical level of investment results in an average level of service of $376 per capita Watson & Associates Economists Ltd. PAGE 5-16 and employee over the past 15 years. When applied against the anticipated population growth over the 20-year forecast period, this allows for a maximum D.C. eligible amount of $13.4 million to be included in the charge calculation. To provide service for new development over the 20-year forecast period, $18.1 million in gross capital costs for growth-related projects have been identified, that relates to the Coboconk Wellness Centre. $12.8 million has been deducted as a benefit to existing development and a further $425,000 has been deducted to account for grants. This results in $4.9 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 95% to residential development as they are the primary users for Public Health Services. These growth-related projects and costs are detailed in Table 5-8. Watson & Associates Economists Ltd. PAGE 5-17 Table 5-7 Infrastructure Costs Covered in the D.C. Calculation - Paramedic Services Proj. No. Residential Share Non- Residential Share 2025 to 2045 84% 16% Facilities - - - - - - - 1 Paramedic Headquarters and Fleet Centre (inlcuding land) 2025 50,279,984 3,665,032 46,614,952 35,314,600 11,300,352 9,492,296 1,808,056 Present Value of Incremental Financing Cost (Growth-Related Share) 1,508,546 - 1,508,546 - 1,508,546 1,267,178 241,367 2 Coboconk Paramedic Base Addition 2030-2035 824,000 342,370 481,630 481,630 - - - 3 Fenelon Falls Paramedic Base 2030 5,561,000 647,000 4,914,000 4,914,000 - - - Fleet and Equipment - - - - - - - 4 Ambulance and Equipment 2025 570,000 - 570,000 333,200 236,800 198,912 37,888 5 Ambulance and Equipment 2027 570,000 - 570,000 333,200 236,800 198,912 37,888 6 Ambulance and Equipment 2029 570,000 236,800 333,200 333,200 - - - 7 Ambulance and Equipment 2031 570,000 236,800 333,200 333,200 - - - 8 Ambulance and Equipment 2033 570,000 236,800 333,200 333,200 - - - 9 Ambulance and Equipment 2035 570,000 236,800 333,200 333,200 - - - 10 Emergency Response Vehicle and Equipment 2026 230,000 - 230,000 134,400 95,600 80,304 15,296 11 Emergency Response Vehicle and Equipment 2028 230,000 95,600 134,400 134,400 - - - 12 Administrative Vehicle 2029 80,000 33,200 46,800 46,800 - - - 13 Administrative Vehicle 2033 80,000 33,200 46,800 46,800 - - - 14 Logistics Vehicle and Equipment 2027 150,000 150,000 87,700 62,300 52,332 9,968 15 Community Paramedic Response Vehicle 2028 80,000 33,200 46,800 46,800 - - - 16 Community Paramedic Response Vehicle 2030 80,000 33,200 46,800 46,800 - - - Studies - - - - - - - 17 Paramedic Master Plan 2028 200,000 150,000 50,000 50,000 - - - 18 Paramedic Master Plan 2038 200,000 150,000 50,000 50,000 - - - - - - - - - - Reserve Fund Adjustment 87,623 - 87,623 - 87,623 73,603 14,020 Present Value of Incremental Reserve Fund Financing Costs 11,697 - 11,697 - 11,697 9,826 1,872 Total 63,022,850 6,130,002 56,892,847 43,353,130 - 13,539,717 11,373,363 2,166,355 Benefit to Existing Development Grants, Subsidies and Other Contribution s Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-18 Table 5-8 Infrastructure Costs Covered in the D.C. Calculation - Public Health Services Proj. No. Residential Share Non- Residential Share 2025 to 2045 95% 5% 1 Coboconk Wellness Centre 2025 17,500,000 17,500,000 12,759,500 425,287 4,315,213 4,099,453 215,761 Present Value of Incremental Financing Cost (Growth-Related Share) 576,061 576,061 - 576,061 547,258 28,803 - - - - - - Total 18,076,061 18,076,061 12,759,500 425,287 4,891,275 4,646,711 244,564 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Benefit to Existing Development Grants, Subsidies and Other Contribution s Attributable to New Development Total Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-19 5.5 Service Levels and City-Wide 26-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for City-wide services over the 26-year planning period (mid-2025 to mid-2051). Each service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.5.1 Services Related to a Highway The City currently provides Services Related to a Highway utilizing an inventory of 5,697 km of roads and sidewalks, 364 bridges and culverts, 70 traffic signals, 5,068 streetlights, 149 storm drains, and 319 vehicles and equipment items. The vehicles, equipment, salt, and sand utilized to maintain the City's roads network is housed in 84,064 sq.ft. of depots, 25,936 sq.ft. of equipment storage structures, 13,363 of salt storage structures, and 35,025 cubic yards of sand storage structures. This historical level of investment results in an average level of service of $24,441 per capita and employee over the past 15 years. When applied against the anticipated population and employment growth (i.e., 48,785 population including 100% seasonal and 9,073 employment) over the 26-year forecast period, and accounting for the 1.4% incline in population in existing dwelling units, this allows for a maximum D.C. eligible amount of $1.4 billion to be included in the charge calculation. To provide service to new development over the 26-year forecast period, $601.8 million in gross capital costs of growth-related projects have been identified, including facility, vehicle, equipment, and study costs based on the City's 2025 Transportation Master Plan, staff updates, and capital budget and forecast. $290.6 million has been deducted as a benefit to existing development (including the benefit of the incline in existing housing) and a further $15.5 million has been deducted to account for boundary roads related to the rural arterial road resurfacing program. Further, $9.0 million has been deducted to reflect the existing D.C. reserve fund. This results in $286.7 million being included in the calculation of the charge. The benefit to existing development deductions of $290.6 million includes the following: - $30.5 million for the replacement of existing facility space Watson & Associates Economists Ltd. PAGE 5-20 - $238,000 for fleet - $42.4 million for the road widenings and bridges - $1.8 million for the intersection improvements and signalizations - $207.1 million for the replacement share of rural arterial road resurfacing (growth related costs are for a portion of new paved shoulders to address active transportation needs for new development) - $4.4 million for study costs These D.C. eligible costs are then attributed 84% to residential development and 16% to non-residential development based on the relationship of population to employment growth anticipated over the 26-year forecast period. These growth-related projects and costs are detailed in Table 5-9. Watson & Associates Economists Ltd. PAGE 5-21 Table 5-9 Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 84% 16% Land - - - - - - 1 Roads Operations Depots 2027-2031 1,133,600 1,133,600 583,600 550,000 462,000 88,000 Facilities - - - - - - North - - - - - - 2 Coboconk Roads and Fleet Operations Depot Addition 2028 4,035,000 4,035,000 1,681,300 2,353,700 1,977,108 376,592 3 Carden Roads Operations Depot Addition 2029 3,814,000 3,814,000 2,582,100 1,231,900 1,034,796 197,104 Central - - - - - - 4 Central Roads Operations Depot EA Study 2025 365,000 365,000 124,200 240,800 202,272 38,528 5 Central Roads Operations Depot 2028 20,374,000 20,374,000 6,930,200 13,443,800 11,292,792 2,151,008 Present Value of Incremental Financing Cost (Growth-Related Share) 1,794,686 1,794,686 - 1,794,686 1,507,537 287,150 6 Fenelon Roads Operations Depot Addition 2030 807,000 807,000 - 807,000 677,880 129,120 South - - - - - - 7 Manvers Roads Operations Depot Addition 2031 1,556,000 1,556,000 1,074,500 481,500 404,460 77,040 8 South Roads Operations Depot 2034 25,424,000 25,424,000 17,556,900 7,867,100 6,608,364 1,258,736 Fleet & Equipment - - - - - - 9 Backhoe 2025-2035 290,000 290,000 - 290,000 243,600 46,400 10 Loader 2025-2035 400,000 400,000 - 400,000 336,000 64,000 11 Trackless Tractor 2025-2035 235,000 235,000 - 235,000 197,400 37,600 12 Trackless Tractor 2025-2035 235,000 235,000 - 235,000 197,400 37,600 13 Trackless Tractor 2025-2035 235,000 235,000 - 235,000 197,400 37,600 14 Trackless Tractor 2025-2035 235,000 235,000 - 235,000 197,400 37,600 15 Trackless Tractor 2025-2035 235,000 235,000 - 235,000 197,400 37,600 16 Trackless Tractor 2025-2035 235,000 235,000 - 235,000 197,400 37,600 17 Truck - Single Axle 2025-2035 380,000 380,000 - 380,000 319,200 60,800 18 Truck - Single Axle 2025-2035 380,000 380,000 - 380,000 319,200 60,800 19 Truck - Single Axle 2025-2035 380,000 380,000 - 380,000 319,200 60,800 20 Sidewalk Machine Support Truck 2026 380,000 380,000 237,500 142,500 119,700 22,800 21 Provision for additional Fleet 2036-2051 5,792,000 5,792,000 - 5,792,000 4,865,280 926,720 Roads - - - - - - 22 Lindsay St. - Highway 7 to Russell St. 2040 11,375,000 11,375,000 2,275,000 9,100,000 7,644,000 1,456,000 23 Colborne St. - Highway 35 to Charles St. 2025 6,200,000 6,200,000 1,240,000 4,960,000 4,166,400 793,600 24 Colborne St. - Charles St. to Adelaide St. 2027 5,000,000 5,000,000 1,000,000 4,000,000 3,360,000 640,000 25 Colborne St. - Highway 35 to Highway 7 2031 3,150,000 3,150,000 630,000 2,520,000 2,116,800 403,200 26 Angeline St. - Kent St. to Highway 7 2040 11,250,000 11,250,000 2,250,000 9,000,000 7,560,000 1,440,000 27 Angeline St. - Colborne St. to Kent St. - Land 2026 2,690,000 2,690,000 538,000 2,152,000 1,807,680 344,320 28 Angeline St. - Colborne St. to Kent St. - Reconstruction 2028 5,000,000 5,000,000 1,000,000 4,000,000 3,360,000 640,000 29 Angeline St. and Thunder Bridge Rd. - Colborne St. to Highway 35 2040 12,000,000 12,000,000 2,400,000 9,600,000 8,064,000 1,536,000 30 Wellington St. and Queen St. - Victoria Ave. to Verulam Rd. 2045 11,200,000 11,200,000 2,240,000 8,960,000 7,526,400 1,433,600 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-22 Table 5-9 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 84% 16% 31 East St. - King St. to Duke St. 2040 5,100,000 5,100,000 1,020,000 4,080,000 3,427,200 652,800 32 North St. - Joseph St. to 500m West of West St. 2038 4,500,000 4,500,000 900,000 3,600,000 3,024,000 576,000 33 Colborne St. - Charles St. to Verulam Rd. 2051 22,300,000 22,300,000 4,460,000 17,840,000 14,985,600 2,854,400 34 Verulam Rd. - Parkside Dr. to Needham St. 2050 14,200,000 14,200,000 2,840,000 11,360,000 9,542,400 1,817,600 35 Kent St. - Victoria Ave. to Angeline St. - EA and Design 2025 500,000 500,000 100,000 400,000 336,000 64,000 36 Kent St. - Victoria Ave. to Angeline St. - Reconstruction 2029 11,375,000 11,375,000 2,275,000 9,100,000 7,644,000 1,456,000 37 Fieldside Rd. - 2Km South of Pigeon Lake Rd. to 2Km North of Pigeon Lake Rd. 2050 14,600,000 14,600,000 2,920,000 11,680,000 9,811,200 1,868,800 38 Pigeon Lake Rd. - Fieldside Rd. to Verulam Rd. 2048 5,500,000 5,500,000 1,100,000 4,400,000 3,696,000 704,000 39 Weldon Rd. - Verulam Rd. to Pigeon Lake Rd. 2048 3,700,000 3,700,000 740,000 2,960,000 2,486,400 473,600 40 Somerville 3rd Concession - Highway 35 to CKL Rd. 121 - EA and Design 2025 300,000 300,000 60,000 240,000 201,600 38,400 41 Somerville 3rd Concession - Highway 35 to CKL Rd. 121 - Reconstruction 2031 17,500,000 17,500,000 3,500,000 14,000,000 11,760,000 2,240,000 Bridges and Large Culverts - - - - - - 42 East Jennings Creek Culverts 2027 775,000 775,000 387,500 387,500 325,500 62,000 43 Fenelon River Bridge 2025 35,000,000 35,000,000 - 35,000,000 29,400,000 5,600,000 Present Value of Incremental Financing Cost (Growth-Related Share) 4,672,341 4,672,341 - 4,672,341 3,924,767 747,575 44 Colborne St. Bridge 2026 15,700,000 15,700,000 6,280,000 9,420,000 7,912,800 1,507,200 45 McKay Ave. / Storm Drain Twin Culverts 2027 2,000,000 2,000,000 - 2,000,000 1,680,000 320,000 46 McKay Ave. / Ops #1 Drain Culvert 2027 3,800,000 3,800,000 - 3,800,000 3,192,000 608,000 47 Somerville 3rd Concession Bridge - EA and Design 2025 1,400,000 1,400,000 140,000 1,260,000 1,058,400 201,600 48 Somerville 3rd Concession Bridge - Construction 2031 21,000,000 21,000,000 2,100,000 18,900,000 15,876,000 3,024,000 Present Value of Incremental Financing Cost (Growth-Related Share) 2,523,064 2,523,064 - 2,523,064 2,119,374 403,690 Intersections - - - - - - 49 Angeline St./Colborne St. Intersection - Land 2025 1,340,000 1,340,000 67,000 1,273,000 1,069,320 203,680 50 Angeline St./Colborne St. Intersection - Upgrade 2027 1,971,000 1,971,000 98,600 1,872,400 1,572,816 299,584 51 Colborne St./Lindsay St. Intersection 2026 2,660,000 2,660,000 133,000 2,527,000 2,122,680 404,320 52 Colborne St./William St. Intersection 2026 2,660,000 2,660,000 133,000 2,527,000 2,122,680 404,320 53 Kent St./Angeline St. Intersection - Land 2026 2,040,000 2,040,000 102,000 1,938,000 1,627,920 310,080 54 Kent St./Angeline St. Intersection - Upgrade 2028 2,575,000 2,575,000 128,800 2,446,200 2,054,808 391,392 55 King St./Sturgeon Rd. Intersection 2044 350,000 350,000 17,500 332,500 279,300 53,200 56 Colborne St./Adelaide St. Intersection 2027 700,000 700,000 35,000 665,000 558,600 106,400 57 Helen St./Duke St. Intersection 2025 300,000 300,000 15,000 285,000 239,400 45,600 58 Little Britian Rd./Elm Tree Rd. Intersection 2041 850,000 850,000 42,500 807,500 678,300 129,200 59 East St./Main St. Intersection 2051 700,000 700,000 35,000 665,000 558,600 106,400 60 West St./North St. Intersection 2039 1,250,000 1,250,000 62,500 1,187,500 997,500 190,000 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-23 Table 5-9 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 84% 16% Traffic Signals - - - - - - 61 Angeline St./Orchard Park Rd./Connolly Rd. Traffic Signal 2028 500,000 500,000 50,000 450,000 378,000 72,000 62 Colborne St./St. Joseph Rd. Traffic Signal 2025 500,000 500,000 50,000 450,000 378,000 72,000 63 Kent St./Whitney Town Centre Traffic Signal 2026 500,000 500,000 50,000 450,000 378,000 72,000 64 Queen St./St. David St. Traffic Signal 2032 500,000 500,000 50,000 450,000 378,000 72,000 65 East St./Boyd St./Canal St. Traffic Signal 2025 500,000 500,000 50,000 450,000 378,000 72,000 66 East St./Cedartree Lane/Duke St. Traffic Signal 2025 500,000 500,000 50,000 450,000 378,000 72,000 67 Main St./Duke St. Traffic Signal 2050 500,000 500,000 50,000 450,000 378,000 72,000 68 Bond St./Colborne St. Traffic Signal 2036 500,000 500,000 50,000 450,000 378,000 72,000 69 Lindsay St. / Green St. Pedestrian Signals 2027 170,000 170,000 17,000 153,000 128,520 24,480 70 King St. / Deane St. / Ski Hill Rd. Traffic Signal 2043 500,000 500,000 50,000 450,000 378,000 72,000 71 Angleine St./St. Joseph Rd./Northlin Park Rd. Traffic Signal 2028 500,000 500,000 50,000 450,000 378,000 72,000 72 Colborne St./McKay Ave. Traffic Signal 2025 500,000 500,000 50,000 450,000 378,000 72,000 73 Colborne St./Verulam Rd. Traffic Signal 2030 500,000 500,000 50,000 450,000 378,000 72,000 74 Verulam Rd./Weldon Rd./Riverview Rd. Traffic Signal 2030 500,000 500,000 50,000 450,000 378,000 72,000 75 Albert St./Fair Ave./Wellington St. Traffic Signal 2051 500,000 500,000 50,000 450,000 378,000 72,000 76 CKL Rd. 121/Northline Rd./CKL Rd. 8 Traffic Signal 2049 500,000 500,000 50,000 450,000 378,000 72,000 77 Angeline St./Exhibition Dr. Traffic Signal 2028 500,000 500,000 50,000 450,000 378,000 72,000 78 Traffic Signal Timing Optimization - 31 Signals 2028 93,000 93,000 46,500 46,500 39,060 7,440 79 Traffic Signal Timing Optimization - 35 Signals 2035 105,000 105,000 52,500 52,500 44,100 8,400 80 Traffic Signal Timing Optimization - 42 Signals 2045 126,000 126,000 63,000 63,000 52,920 10,080 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-24 Table 5-9 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 84% 16% Rural Arterial Road Resurfacing - - - - - - 81 CKL Rd. 14 - CKL Rd. 7 to CKL Rd. 10 (Emily Park Rd.) 2025 1,404,000 1,404,000 1,274,500 129,500 108,780 20,720 82 CKL Rd. 38 - Highway 7 to Highway 7A 2025 5,304,000 2,652,000 2,652,000 2,407,400 244,600 205,464 39,136 83 CKL Rd. 503 - Bobcaygeon Rd. to CKL Rd. 121 2025 62,000 62,000 56,300 5,700 4,788 912 84 CKL Rd. 121 - Ranchers Rd. to West St. 2026 2,430,000 2,430,000 2,205,900 224,100 188,244 35,856 85 CKL Rd. 121 - Boundary Road to North Limit of Kinmount 2026 293,000 293,000 266,000 27,000 22,680 4,320 86 CKL Rd. 121 - Kinmount Bridge to CKL Rd. 49 2026 4,365,000 2,182,500 2,182,500 1,981,200 201,300 169,092 32,208 87 CKL Rd. 57 - Highway 35 to Cartwright-Manvers Boundary Rd. 2027 2,835,000 2,835,000 2,573,500 261,500 219,660 41,840 88 CKL Rd. 57 - Cartwright-Manvers Boundary Rd. to 1.2Km South of View Lak 2027 675,000 337,500 337,500 306,400 31,100 26,124 4,976 89 CKL Rd. 5 - CKL Rd. 57 to Pigeon Creek Rd. 2027 675,000 675,000 612,700 62,300 52,332 9,968 90 CKL Rd. 35 - CKL Rd. 8 to CKL Rd. 48 2027 5,175,000 5,175,000 4,697,700 477,300 400,932 76,368 91 CKL Rd. 32 - Highway 7A to Highway 115 2027 3,420,000 3,420,000 3,104,600 315,400 264,936 50,464 92 CKL Rd. 18 - CKL Rd. 4 to Valentia Rd. 2027 4,410,000 4,410,000 4,003,300 406,700 341,628 65,072 93 CKL Rd. 2 - CKL Rd. 9 to CKL Rd. 8 2028 2,745,000 1,372,500 1,372,500 1,245,900 126,600 106,344 20,256 94 CKL Rd. 2 - Highway 7 to Durham Regional Rd. 6 2028 5,265,000 2,632,500 2,632,500 2,389,700 242,800 203,952 38,848 95 CKL Rd. 28 - CKL Rd. 2 to Valentia Rd. 2028 5,490,000 5,490,000 4,983,700 506,300 425,292 81,008 96 CKL Rd. 8 - Highway 35 to North St. 2029 1,575,000 1,575,000 1,429,700 145,300 122,052 23,248 97 CKL Rd. 48 - CKL 35 to Simcoe St. 2029 6,795,000 6,795,000 6,168,300 626,700 526,428 100,272 98 CKL Rd. 17 - Colony Rd. to CKL Rd. 36 2029 3,195,000 3,195,000 2,900,300 294,700 247,548 47,152 99 CKL Rd. 6 - CKL Rd. 9 to CKL Rd. 8 2030 2,880,000 2,880,000 2,614,400 265,600 223,104 42,496 100 CKL Rd. 10 (Emily Park Rd.) - CKL Rd. 14 to Hayes Line 2030 3,735,000 3,735,000 3,390,500 344,500 289,380 55,120 101 CKL Rd. 26 - CKL Rd. 14 to Highway 7 2030 2,835,000 2,835,000 2,573,500 261,500 219,660 41,840 102 CKL Rd. 121 - CKL Rd. 49 to Clifton St. 2030 10,530,000 10,530,000 9,558,800 971,200 815,808 155,392 103 CKL Rd. 14 - CKL Rd. 10 to Boundary Rd. 2030 3,465,000 3,465,000 3,145,400 319,600 268,464 51,136 104 Durham Regional Rd. 2 - CKL Rd. 9 to Highway 7 2031-2051 4,275,000 2,137,500 2,137,500 1,940,400 197,100 165,564 31,536 105 CKL Rd. 4 - CKL Rd. 2 to Highway 7 2031-2051 9,900,000 9,900,000 8,986,900 913,100 767,004 146,096 106 CKL Rd. 5 - Pigeon Creek Rd. to Highway 7A 2031-2051 2,610,000 2,610,000 2,369,300 240,700 202,188 38,512 107 CKL Rd. 6 - CKL Rd. 8 to Simcoe County Rd. 46 2031-2051 13,815,000 13,815,000 12,540,900 1,274,100 1,070,244 203,856 108 CKL Rd. 6 - Simcoe County Rd. 46 to CKL Rd. 45 2031-2051 2,610,000 1,305,000 1,305,000 1,184,600 120,400 101,136 19,264 109 CKL Rd. 7 - 450m North of Highway 7 to Kings Wharf Rd. 2031-2051 6,210,000 6,210,000 5,637,300 572,700 481,068 91,632 110 CKL Rd. 8 - CKL Rd. 2 to Highway 35 2031-2051 10,800,000 10,800,000 9,803,900 996,100 836,724 159,376 111 CKL Rd. 8 - CKL Rd. 121 to West St. 2031-2051 6,570,000 6,570,000 5,964,100 605,900 508,956 96,944 112 CKL Rd. 9 - CKL Rd. 2 to Maple Hills Dr. 2031-2051 900,000 900,000 817,000 83,000 69,720 13,280 113 CKL Rd. 9 - Kirkfield Rd. to Highway 35 2031-2051 5,580,000 5,580,000 5,065,400 514,600 432,264 82,336 114 CKL Rd. 11 - CKL Rd. 36 to Leslie Frost Lane 2031-2051 1,215,000 1,215,000 1,102,900 112,100 94,164 17,936 115 CKL Rd. 16 - CKL Rd. 28 to Cottage Rd. 2031-2051 1,260,000 1,260,000 1,143,800 116,200 97,608 18,592 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-25 Table 5-9 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 84% 16% 116 CKL Rd. 17 - Verulam Rd. to McGinnis Rd. 2031-2051 3,105,000 3,105,000 2,818,600 286,400 240,576 45,824 117 CKL Rd. 18 - CKL Rd. 4 to CKL Rd. 9 2031-2051 4,995,000 4,995,000 4,534,300 460,700 386,988 73,712 118 CKL Rd. 25 - CKL Rd. 8 to Irene Ave. 2031-2051 3,690,000 3,690,000 3,349,700 340,300 285,852 54,448 119 CKL Rd. 28 - Ramsey Rd. to CKL Rd. 18 2031-2051 630,000 630,000 571,900 58,100 48,804 9,296 120 CKL Rd. 31 - Highway 35 to Highway 7 2031-2051 5,130,000 5,130,000 4,656,900 473,100 397,404 75,696 121 CKL Rd. 33 - CKL Rd. 48 to CKL Rd. 6 2031-2051 3,015,000 3,015,000 2,736,900 278,100 233,604 44,496 122 CKL Rd. 34 - West Lake Ct. to CKL Rd. 8 2031-2051 3,330,000 3,330,000 3,022,900 307,100 257,964 49,136 123 CKL Rd. 34 - East Limit of Cameron to Jones Ave. 2031-2051 1,575,000 1,575,000 1,429,700 145,300 122,052 23,248 124 CKL Rd. 35 - CKL Rd. 48 to CKL Rd. 45 2031-2051 8,595,000 8,595,000 7,802,300 792,700 665,868 126,832 125 CKL Rd. 36 - Highway 7 to 600m North of Main St. 2031-2051 16,560,000 16,560,000 15,032,700 1,527,300 1,282,932 244,368 126 CKL Rd. 37 - CKL Rd. 49 to CKL Rd. 121 2031-2051 5,040,000 5,040,000 4,575,200 464,800 390,432 74,368 127 CKL Rd. 44 - CKL Rd. 121 to CKL Rd. 121 2031-2051 1,755,000 1,755,000 1,593,100 161,900 135,996 25,904 128 CKL Rd. 45 - CKL Rd. 2 to CKL Rd. 121 2031-2051 22,500,000 22,500,000 20,424,900 2,075,100 1,743,084 332,016 129 CKL Rd. 46 - Highway 7 to CKL Rd. 48 2031-2051 11,430,000 11,430,000 10,375,800 1,054,200 885,528 168,672 130 CKL Rd. 47 - Simcoe County Rd. 47 to Campbell Beach Rd. 2031-2051 2,295,000 1,147,500 1,147,500 1,041,700 105,800 88,872 16,928 131 CKL Rd. 47 - Campbell Beach Rd. to CKL Rd. 6 2031-2051 1,305,000 1,305,000 1,184,600 120,400 101,136 19,264 132 Durham Regional Rd. 20 - Darlington-Manvers Townline to Highway 115 2031-2051 3,375,000 1,687,500 1,687,500 1,531,900 155,600 130,704 24,896 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-26 Table 5-9 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2051 84% 16% Studies - - - - - - 133 Bridge and Culvert Structures Study 2026 240,000 240,000 166,200 73,800 61,992 11,808 134 Bridge and Culvert Structures Study 2028 240,000 240,000 166,200 73,800 61,992 11,808 135 Bridge and Culvert Structures Study 2030 240,000 240,000 166,200 73,800 61,992 11,808 136 Bridge and Culvert Structures Study 2032 240,000 240,000 166,200 73,800 61,992 11,808 137 Bridge and Culvert Structures Study 2034 240,000 240,000 166,200 73,800 61,992 11,808 138 Bridge and Culvert Structures Study 2036 240,000 240,000 166,200 73,800 61,992 11,808 139 Bridge and Culvert Structures Study 2038 240,000 240,000 166,200 73,800 61,992 11,808 140 Bridge and Culvert Structures Study 2040 240,000 240,000 166,200 73,800 61,992 11,808 141 Bridge and Culvert Structures Study 2042 240,000 240,000 166,200 73,800 61,992 11,808 142 Bridge and Culvert Structures Study 2044 240,000 240,000 166,200 73,800 61,992 11,808 143 Bridge and Culvert Structures Study 2046 240,000 240,000 166,200 73,800 61,992 11,808 144 Bridge and Culvert Structures Study 2048 240,000 240,000 166,200 73,800 61,992 11,808 145 Bridge and Culvert Structures Study 2050 240,000 240,000 166,200 73,800 61,992 11,808 146 Roads Needs Study 2026 270,000 270,000 187,000 83,000 69,720 13,280 147 Roads Needs Study 2031 270,000 270,000 187,000 83,000 69,720 13,280 148 Roads Needs Study 2036 270,000 270,000 187,000 83,000 69,720 13,280 149 Roads Needs Study 2041 270,000 270,000 187,000 83,000 69,720 13,280 150 Roads Needs Study 2046 270,000 270,000 187,000 83,000 69,720 13,280 151 Roads Needs Study 2051 270,000 270,000 187,000 83,000 69,720 13,280 152 Stormwater Master Plan 2025 1,000,000 1,000,000 250,000 750,000 630,000 120,000 153 Stormwater Master Plan 2035 1,000,000 1,000,000 250,000 750,000 630,000 120,000 154 Stormwater Master Plan 2045 1,000,000 1,000,000 250,000 750,000 630,000 120,000 155 Roads Operations Master Plan 2026 225,000 225,000 56,300 168,700 141,708 26,992 156 Roads Operations Master Plan 2036 225,000 225,000 56,300 168,700 141,708 26,992 157 Roads Operations Master Plan 2046 225,000 225,000 56,300 168,700 141,708 26,992 158 Transportation and Active Transportation Master Plan 2033 400,000 400,000 100,000 300,000 252,000 48,000 159 Transportation and Active Transportation Master Plan 2043 400,000 400,000 100,000 300,000 252,000 48,000 - - - - - - Adjustment Related to Existing Population Incline - - 4,052,460 (4,052,460) (4,052,460) - - - - - - - Reserve Fund Adjustments - - - (9,024,457) (7,580,544) (1,443,913) Total 601,758,692 15,454,500 586,304,192 290,597,960 - 286,681,774 240,164,297 46,517,478 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-27 5.6 Service Levels and 10-Year Capital Costs for Area- Specific D.C. Calculation This section evaluates the development-related capital requirements for area specific services over the 10-year planning period (mid 2025 to mid-2035) inside Lindsay and Ops for police services and inside Lindsay for transit services. The service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.6.1 Police Services Police Services are provided through 19,580 sq.ft. of facility space, 26 vehicles, and 59 equipment items. This historical level of investment results in an average level of service of $1,000 per capita and employee over the past 15 years. When applied against the anticipated population and employment growth over the 10-year forecast period, this allows for a maximum D.C. eligible amount of $14.1 million to be included in the charge calculation. To provide service to new development over the 10-year forecast period, $13.4 million in gross capital costs of growth-related projects have been identified, including the required Police Headquarters Expansion, vehicle, equipment, and study costs. $614,000 has been deducted as a benefit to existing development, primarily related to the new radio system. Further, $913,000 has been deducted to reflect the existing D.C. reserve fund surplus. This results in $11.8 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 87% to residential development and 13% to non-residential development based on the relationship of population to employment growth anticipated over the 10-year forecast period. These growth-related projects and costs are detailed in Table 5-10. 5.6.2 Transit Services Ontario Regulation 82/98 sets forth the requirements for transit services and the available capacity of capital costs to provide for the increase in need. Subsection 8(2) of the regulation states that for transit services the background study shall set out: Watson & Associates Economists Ltd. PAGE 5-28 1. "The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. 2. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, i. the anticipated development over the 10-year period immediately following the preparation of the background study, or ii. the anticipated development after the 10-year period immediately following the preparation of the background study. 3. An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. 4. An assessment of ridership forecasts for all modes of transit services proposed to be funded by the D.C. over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. 5. An assessment of the ridership capacity for all modes of transit services proposed to be funded by the D.C. over the 10-year period immediately following the preparation of the background study." Transit ridership is anticipated to increase based on the City's objective of providing 0.9 revenue hours per capita and 10 passengers per revenue hour. This increase in demand would result in the City's ridership to increase from their prior peak ridership of 125,000 to 339,200 by 2035. Based on the forecast ridership and the fact that transit improvements will be used by both new and existing residents, approximately 33% of the incremental ridership is attributed to new development. Anticipated needs of the system include a transit operations centre, transit stops, busses, and future study costs. The gross capital cost for these projects is $7.4 million from which $3.3 million has been deducted as a benefit to existing development. Further, $848,000 has been added to reflect the existing D.C. reserve fund deficit, plus an estimated $113,000 for the present value of the incremental financing costs on the deficit. This results in a total of $4.1 million of growth-related needs being included in the D.C. calculation. Watson & Associates Economists Ltd. PAGE 5-29 The net growth-related costs for transit services have been allocated between future residential and non-residential development on the basis of incremental population to employment growth over the 10-year forecast period (i.e., 87% residential to 13% non- residential). These growth-related projects and costs are detailed in Table 5-11. Watson & Associates Economists Ltd. PAGE 5-30 Table 5-10 Infrastructure Costs Covered in the D.C. Calculation - Police Services Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2035 87% 13% Facilities - - - - - - 1 Police Headquarters Expansion 2029 10,300,000 10,300,000 - 10,300,000 8,961,000 1,339,000 Present Value of Incremental Financing Cost (Growth-Related Share) 1,375,003 1,375,003 - 1,375,003 1,196,253 178,750 Fleet and Equipment - - - - - - 2 Special Constable Equipment (4) 2025 22,000 22,000 - 22,000 19,140 2,860 3 Police Officer Equipment (15) 2025-2035 187,950 187,950 - 187,950 163,517 24,434 4 Marked Uniform Vehicles (4) 2025 378,000 378,000 - 378,000 328,860 49,140 5 Radio System 2028 800,000 800,000 561,400 238,600 207,582 31,018 6 Drone Equipment 2025 3,320 3,320 2,300 1,020 887 133 Studies - - - - - 7 Strategic Plan 2026 200,000 200,000 50,000 150,000 130,500 19,500 8 Facility Expansion Feasibility Study 2026 85,000 85,000 - 85,000 73,950 11,050 - - - - - - Reserve Fund Adjustment - - - (912,634) (793,991) (118,642) Total 13,351,273 13,351,273 613,700 - 11,824,940 10,287,698 1,537,242 Net Capital Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-31 Table 5-11 Infrastructure Costs Covered in the D.C. Calculation - Transit Services Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2035 87% 13% Facilities - - - - - - 1 Transit Operations Centre 2027 4,500,000 4,500,000 2,721,200 1,778,800 1,547,556 231,244 Present Value of Incremental Financing Cost (Growth- Related Share) 237,462 237,462 - 237,462 206,592 30,870 2 Transit Stop 2029 130,000 130,000 42,900 87,100 75,777 11,323 3 Transit Stop 2034 130,000 130,000 42,900 87,100 75,777 11,323 Fleet and Equipment - - - - - - 4 Bus 2029 600,000 600,000 198,000 402,000 349,740 52,260 5 Bus 2034 600,000 600,000 198,000 402,000 349,740 52,260 Studies - - - - - - 6 Transit Master Plan 2029 200,000 200,000 50,000 150,000 130,500 19,500 - - - - - - Reserve Fund Adjustment 847,697 847,697 - 847,697 737,497 110,201 Present Value of Incremental Reserve Fund Financing Costs 113,164 113,164 113,164 98,452 14,711 Total 7,358,323 7,358,323 3,253,000 - 4,105,323 3,571,631 533,692 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to Total Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-32 5.7 Service Levels and 15-Year Capital Costs for Area- Specific D.C. Calculation This section evaluates the development-related capital requirements for Transportation Services over the 15-year planning period (mid 2025 to mid-2040) outside of the Seaton Lands. The service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.7.1 Fire Protection Services (Rural) Section 5.3.1. describes the City's average City-wide level of service over the past 15 years which results in an average level of service of $1,584 per capita and employee which equates to a maximum D.C. eligible amount of $50.4 million to be included in the charge calculation. The per capita and employee amount utilized by City-wide fire protection services is $1,259 resulting in a maximum of $324 that can be utilized by rural fire protection services. To provide service to new development, within rural areas, over the 15-year forecast period, $10.0 million in gross capital costs of growth-related projects have been identified, including facility and vehicle costs. $5.0 million has been deducted as a benefit to existing development and further $3.8 million has been deducted as a benefit to development outside the 15-year forecast period. This results in $1.2 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 88% to residential development and 12% to non-residential development based on the relationship of population to employment growth anticipated over the 15-year forecast period. These growth-related projects and costs are detailed in Table 5-12. Watson & Associates Economists Ltd. PAGE 5-33 Table 5-12 Infrastructure Costs Covered in the D.C. Calculation - Fire Protection Services (Rural) Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2025 to 2040 88% 12% Facilities - - - - - - - 1 Norland Fire Hall 2026-2027 4,921,000 2,613,100 2,307,900 2,307,900 - - - Fleet and Equipment - - - - - - - 2 Tanker Truck 2027 1,655,000 1,655,000 910,300 744,700 655,336 89,364 Present Value of Incremental Financing Cost (Growth-Related Share) 99,414 - 99,414 - 99,414 87,484 11,930 3 Tanker Truck 2028 1,655,000 581,568 1,073,432 910,300 163,132 143,557 19,576 4 Tanker Truck 2030 1,655,000 581,568 1,073,432 910,300 163,132 143,557 19,576 - - - - - - - Total 9,985,414 3,776,235 6,209,179 5,038,800 - 1,170,379 1,029,933 140,445 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-34 5.8 Area Specific Capital Costs of Buildout for D.C. Calculation This section evaluates the development-related capital requirements for area-specific water and wastewater services over the urban serviced area buildout planning period (2025-Buildout). Water and Wastewater Service needs and growth have been informed by the City's Water and Wastewater Master Plan with updated costing and project phasing where available as well as outstanding D.C. credits, study costs, and incremental interest costs associated with the capital program. 5.8.1 Water Treatment Services Capital needs of $581.5 million for Water Treatment Services have been identified including new treatment plants in Lindsay Bobcaygeon and Fenelon Falls. $11.1 million has been deducted as benefit to existing development (related to growth within existing housing) and a further $7.4 million has been deducted to account for the existing reserve fund surplus. The net growth-related costs of $563.0 million (as detailed in Table 5-13) have been allocated to residential and non-residential development based on the relationship of population to employment growth anticipated over the buildout period (i.e., 58,699 population and 12,891 employment). 5.8.2 Water Distribution Services Capital needs of $96.6 million for Water Distribution Services have been identified. $8.1 million has been deducted as benefit to existing development representing the replacement of existing water mains and the benefit to growth within existing housing, and a further $10.8 in other deductions has been deducted to account for the local service components on certain projects as per the City's local service policy. $1.5 million has been deducted to account for the existing reserve fund surplus. The net growth-related costs of $76.2 million (as detailed in Table 5-14) have been allocated to residential and non-residential development based on the relationship of population to employment growth anticipated over the buildout period (i.e., 58,699 population and 12,891 employment). 5.8.3 Wastewater Treatment Services Capital needs of $319.4 million for Wastewater Treatment Services have been identified, including water pollution control plant expansions in Lindsay, Bobcaygeon, Watson & Associates Economists Ltd. PAGE 5-35 and Fenelon Falls. $8.8 million has been deducted as benefit to existing development and a further $9.3 million has been deducted to account for the existing reserve fund surplus. The net growth-related costs of $301.3 million (as detailed in Table 5-15) have been allocated to residential and non-residential development based on the relationship of population to employment growth anticipated over the buildout period (i.e., 58,493 population and 12,965 employment). 5.8.4 Wastewater Collection Services Capital needs of $229.8 million for Wastewater Collection Services have been identified that are of a benefit to growth within the urban serviced area, excluding the North West Trunk Area of Lindsay. $39.2 million has been deducted as benefit to existing development (including the benefit to growth within existing housing) and a further $29.0 in other deductions has been deducted to account for the local service components on certain projects as per the City's local service policy. $16.6 million has been added to account for the existing reserve fund deficit, plus an estimated $2.2 million for the present value of the incremental financing costs on the deficit. The net growth-related costs of $161.6 million (as detailed in Table 5-16) have been allocated to residential and non-residential development based on the relationship of population to employment growth anticipated over the buildout period (i.e., 47,026 population and 10,868 employment). Watson & Associates Economists Ltd. PAGE 5-36 Table 5-13 Infrastructure Costs Covered in the D.C. Calculation - Water Treatment Services Project # Residential Share Non- Residential Share 2025 to Buildout 82% 18% Studies and Special Projects - - - - - 1 Omemee Water System Supply and Storage Assessment 2026 100,000 100,000 25,000 75,000 61,500 13,500 2 Water Master Plan 2033 550,000 550,000 - 550,000 451,000 99,000 3 Water Master Plan 2043 550,000 550,000 - 550,000 451,000 99,000 - - - - - - Treatment Facilities - - - - - - 4 2009 D.C. Growth Related Debt Payments (NPV of Principal and Interest) 2025-2028 393,330 393,330 - 393,330 322,530 70,799 5 Lindsay WTP WAT-LIN-11 - - - - - EA 2025 3,000,000 3,000,000 - 3,000,000 2,460,000 540,000 Phase 1 Design 2027 13,000,000 13,000,000 - 13,000,000 10,660,000 2,340,000 Phase 1 Construction 2030 250,000,000 250,000,000 - 250,000,000 205,000,000 45,000,000 Phase 2 Design 2036 8,000,000 8,000,000 - 8,000,000 6,560,000 1,440,000 Phase 2 Construction 2038 135,000,000 135,000,000 - 135,000,000 110,700,000 24,300,000 Present Value of Incremental Financing Cost (Growth-Related Share) 54,599,646 54,599,646 - 54,599,646 44,771,709 9,827,936 6 Bobcaygeon WTP WAT-BOB-10 - - - - - EA 2027 683,000 683,000 - 683,000 560,060 122,940 Design 2029 4,095,000 4,095,000 - 4,095,000 3,357,900 737,100 Construction 2031 63,473,000 63,473,000 - 63,473,000 52,047,860 11,425,140 7 Fenelon Falls WTP WAT-FF-05 - - - - - EA 2034 248,000 248,000 - 248,000 203,360 44,640 Design 2036 1,485,000 1,485,000 - 1,485,000 1,217,700 267,300 Construction 2039 23,018,000 23,018,000 - 23,018,000 18,874,760 4,143,240 8 Woodville WTP WAT-WV-01 - - - - - EA 2044 72,000 72,000 - 72,000 59,040 12,960 Design 2046 429,000 429,000 - 429,000 351,780 77,220 Construction 2048 6,650,000 6,650,000 - 6,650,000 5,453,000 1,197,000 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-37 Table 5-13 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Water Treatment Services Project # Residential Share Non- Residential Share 2025 to Buildout 82% 18% 9 Omemee Water System Supply and Storage 2030 1,100,000 1,100,000 - 1,100,000 902,000 198,000 10 Janetville Water System Supply and Storage 2028 1,500,000 1,500,000 - 1,500,000 1,230,000 270,000 11 Kinmount System Supply and Storage 2025-2051 4,711,000 4,711,000 - 4,711,000 3,863,020 847,980 12 Manilla System Supply and Storage 2025-2051 4,421,000 4,421,000 - 4,421,000 3,625,220 795,780 13 Pinewood System Supply and Storage 2025-2051 4,392,000 4,392,000 - 4,392,000 3,601,440 790,560 - - - - - - Adjustment Related to Existing Population Incline - - 11,122,481 (11,122,481) (11,122,481) - - - - - - - Reserve Fund Adjustment - - - (7,405,093) (6,072,177) (1,332,917) Total 581,469,975 581,469,975 11,147,481 - 562,917,401 459,590,222 103,327,179 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-38 Table 5-14 Infrastructure Costs Covered in the D.C. Calculation - Water Distribution Services Project # Residential Share Non- Residential Share 2025 to Buildout 82% 18% Vertical Distribution - - - - - - 1 Northwest Lindsay Water Tower WAT-LIN-12 - - - - - EA 2025 150,000 150,000 - 150,000 123,000 27,000 Design 2027 900,000 900,000 - 900,000 738,000 162,000 Construction 2030 13,950,000 13,950,000 - 13,950,000 11,439,000 2,511,000 Present Value of Incremental Financing Cost (Growth-Related Share) 2,002,432 2,002,432 - 2,002,432 1,641,994 360,438 2 Thornhill Rd. Reservoir WAT-LIN-13 - - - - - EA 2025 136,000 136,000 - 136,000 111,520 24,480 Design 2027 813,000 813,000 - 813,000 666,660 146,340 Construction 2031 12,602,000 12,602,000 - 12,602,000 10,333,640 2,268,360 Present Value of Incremental Financing Cost (Growth-Related Share) 1,808,997 1,808,997 - 1,808,997 1,483,378 325,619 3 Oakwood Reservoir WAT-OAK-02 - - - - - EA 2025 16,000 16,000 - 16,000 13,120 2,880 Design 2027 95,000 95,000 - 95,000 77,900 17,100 Construction 2030 1,479,000 1,479,000 - 1,479,000 1,212,780 266,220 4 Bobcaygeon Water Tower WAT-BOB-09 - - - - - EA 2042 38,000 38,000 - 38,000 31,160 6,840 Design 2044 226,000 226,000 - 226,000 185,320 40,680 Construction 2047 3,497,000 3,497,000 - 3,497,000 2,867,540 629,460 5 Fenelon Falls Booster WPS WAT-FF-08 - - - - - EA 2026 7,000 7,000 - 7,000 5,740 1,260 Design 2028 42,000 42,000 - 42,000 34,440 7,560 Construction 2030 651,000 651,000 - 651,000 533,820 117,180 6 Fenelon Falls Water Tower or Reservoir WAT-FF-06 - - - - - EA 2026 49,000 49,000 - 49,000 40,180 8,820 Design 2028 291,000 291,000 - 291,000 238,620 52,380 Construction 2030 4,511,000 4,511,000 - 4,511,000 3,699,020 811,980 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-39 Table 5-14 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Water Distribution Services Project # Residential Share Non- Residential Share 2025 to Buildout 82% 18% Horizontal Distribution - - - - - - 7 Thunderbridge Rd. and Angeline St. Watermains - Springdale Dr. to New Water Tower WAT-LIN-01 2029 1,530,000 1,530,000 - 1,530,000 1,254,600 275,400 8 St. Joseph Rd. Watermain - Colborne St. to Kent St. WAT-LIN-02A 2029 625,000 625,000 - 625,000 512,500 112,500 9 Kent St. Watermain - St. Joseph Rd. to Commerce Rd. WAT-LIN-02B 2029 145,000 145,000 - 145,000 118,900 26,100 10 Commerce Rd. Watermain - Kent St. to 275m South of Kent St. WAT-LIN-03 2030 370,000 370,000 106,305 263,695 216,230 47,465 11 Glenelg St. Watermain - Lindsay St. to Victoria Ave. WAT-LIN-04A 2025 1,067,000 1,067,000 249,105 817,895 670,674 147,221 12 Glenelg St./Victoria Ave. Intersection Watermain WAT-LIN-04B 2031 25,000 25,000 2,236 22,764 18,667 4,098 13 Glenelg St. Watermain - Victoria Ave. to Sussex St. WAT-LIN-04C 2031 200,000 200,000 59,922 140,078 114,864 25,214 14 Glenelg St. Watermain - Sussex St. to Albert St. WAT-LIN-04D 2031 280,000 280,000 65,370 214,630 175,997 38,633 15 Glenelg St. Watermain - Albert St. to Adelaide St. WAT-LIN-04E 2031 420,000 420,000 125,837 294,163 241,214 52,949 16 Mary St. Watermain - Lindsay St. to Albert St. WAT-LIN-06A 2029 2,224,000 2,224,000 472,021 1,751,979 1,436,623 315,356 17 Mary St. Watermain - Albert St. to Angeline St. WAT-LIN-06B 2029 1,696,000 1,696,000 170,620 1,525,380 1,250,811 274,568 18 Lindsay St. Watermain - Logie St. to Highway 7 WAT-LIN-10 2025 1,500,000 1,500,000 - 1,500,000 1,230,000 270,000 19 Lindsay Heights Development Watermain WAT-LIN-15 2031 2,570,000 1,751,400 818,600 - 818,600 671,252 147,348 20 Angeline St. Watermain - Mary St. to Kent St. WAT-LIN-05 2035 7,660,000 7,660,000 1,980,403 5,679,597 4,657,269 1,022,327 21 Dobson St. Watermain - Logie St. to Brock St. WAT-LIN-07A 2043 816,000 816,000 100,365 715,635 586,820 128,814 22 Dobson St. Watermain - Brock St. to Verulam Rd. WAT-LIN-07B 2028 574,000 268,800 305,200 - 305,200 250,264 54,936 23 Verulam Rd./Queen St. Intersection Watermain WAT-LIN-08A 2045 34,000 34,000 3,530 30,470 24,985 5,485 24 Verulam Rd. Watermain - Central East Correctional Centre to Parkside Dr. WAT-LIN-08B 2045 5,326,000 5,326,000 1,139,560 4,186,440 3,432,881 753,559 25 Verulam Rd. Watermain - Parkside Dr. to Dobson St. WAT-LIN-08C 2043 750,000 750,000 - 750,000 615,000 135,000 26 Verulam Rd. Watermain - Dobson St. to #57 County Rd. 36 WAT-LIN-09 2047 1,330,000 1,330,000 - 1,330,000 1,090,600 239,400 27 East Lindsay Watermain - Verulam Rd./Dobson St. to Verulam Rd./Walsh Rd. WAT-LIN-14 2047 11,070,000 5,829,600 5,240,400 - 5,240,400 4,297,128 943,272 28 North Bobcaygeon Watermain - North St./St. Joseph St. to Balaclava St./Hillview Dr. WAT-BOB-01 2031 1,240,000 1,240,000 325,148 914,852 750,179 164,673 29 Canal St. Watermain - Sherwood St. to East St. WAT-BOB-03A 2025 1,256,000 1,256,000 341,572 914,428 749,831 164,597 30 Boyd St., Navigators Tr., and Olde Forest Ln. Watermain - East St. to Island Bay Dr. WAT-BOB-03B 2033 681,000 681,000 157,311 523,689 429,425 94,264 31 King St. and Kingsway Dr. Watermain - Need St. to East St. WAT-BOB-04 2033 340,000 340,000 99,531 240,469 197,184 43,284 32 Trail Easement Watermain - Squires Row to 294m Northeast of Squires Row WAT-BOB-05 2033 360,000 360,000 54,250 305,750 250,715 55,035 33 Main St. and Boyd Island Twin Watermain - Bobcaygeon WTP to Front St. WAT-BOB-06 2033 400,000 400,000 - 400,000 328,000 72,000 34 Balaclava St. Watermain - Hillview Dr. to Dunn St. WAT-BOB-08 2033 290,000 290,000 - 290,000 237,800 52,200 35 Sherwood St. and Park St. Watermain - Canal St. to Lance St. WAT-BOB-02 2037 810,000 810,000 360,735 449,265 368,398 80,868 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-40 Table 5-14 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Water Distribution Services Project # Residential Share Non- Residential Share 2025 to Buildout 82% 18% 36 Birch Cres. Watermain - Cedartree Ln. to Riverside Dr. WAT-BOB-07 2038 210,000 210,000 - 210,000 172,200 37,800 37 Fenelon Trails Development Watermains WAT-FF-01-04 2030 2,400,000 2,400,000 - - - - - 38 #551 County Rd. 121 Development Watermain - #563 County Rd. 121 to Veteran's Way WAT-FF-07 2030 580,000 580,000 - - - - - 39 Colborne St. Watermain - Highway 35 to Highway 7 WAT-OAK-01A 2031 4,013,000 4,013,000 716,579 3,296,421 2,703,065 593,356 40 Highway 7 Watermain - Elm Tree Rd. to Chase Pl. WAT-OAK-01B 2031 377,000 377,000 52,456 324,544 266,126 58,418 41 Colborne St. Watermain - William St. to Scugog River 2026 200,000 200,000 30,200 169,800 139,236 30,564 - - - - - - Adjustment Related to Existing Population Incline - - 1,504,637 (1,504,637) (1,504,637) - - - - - - - Reserve Fund Adjustment - (1,535,070) (1,258,757) (276,313) - - - - - Total 96,633,429 10,829,800 85,803,629 8,117,693 - 76,150,866 62,172,875 13,977,991 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-41 Table 5-15 Infrastructure Costs Covered in the D.C. Calculation - Wastewater Treatment Services Project # Residential Share Non- Residential Share 2025 to Buildout 81% 19% Studies and Special Projects - - - - - - 1 Sewer Flow Monitoring Study 2026 400,000 400,000 100,000 300,000 243,000 57,000 2 Sewer Flow Monitoring Study 2031 400,000 400,000 100,000 300,000 243,000 57,000 3 Sewer Flow Monitoring Study 2036 400,000 400,000 100,000 300,000 243,000 57,000 4 Sewer Flow Monitoring Study 2041 400,000 400,000 100,000 300,000 243,000 57,000 5 Sewer Flow Monitoring Study 2046 400,000 400,000 100,000 300,000 243,000 57,000 6 Sewer Flow Monitoring Study 2051 400,000 400,000 100,000 300,000 243,000 57,000 7 Wastewater Master Plan 2033 550,000 550,000 - 550,000 445,500 104,500 8 Wastewater Master Plan 2043 550,000 550,000 - 550,000 445,500 104,500 - - - - - - Treatment Facilities - - - - - - 9 2009 D.C. Growth Related Debt Payments (NPV of Principal and Interest) 2025-2029 58,678 58,678 - 58,678 47,529 11,149 11 Lindsay WPCP WW-LIN-33 - - - - - EA 2025 2,000,000 2,000,000 - 2,000,000 1,620,000 380,000 Phase 1 Design 2027 8,000,000 8,000,000 - 8,000,000 6,480,000 1,520,000 Phase 1 Construction 2031-2035 120,000,000 120,000,000 - 120,000,000 97,200,000 22,800,000 Phase 2 Design 2036 6,000,000 6,000,000 - 6,000,000 4,860,000 1,140,000 Phase 2 Construction 2038-2041 70,000,000 70,000,000 - 70,000,000 56,700,000 13,300,000 Present Value of Incremental Financing Cost (Growth-Related Share) 27,500,066 27,500,066 - 27,500,066 22,275,054 5,225,013 12 Bobcaygeon WPCP WW-BOB-08 - - - - - EA 2027 465,000 465,000 - 465,000 376,650 88,350 Design 2029 2,790,000 2,790,000 - 2,790,000 2,259,900 530,100 Construction 2031 43,245,000 43,245,000 - 43,245,000 35,028,450 8,216,550 Present Value of Incremental Financing Cost (Growth-Related Share) 6,207,539 6,207,539 - 6,207,539 5,028,107 1,179,432 13 Fenelon Falls WPCP WW-FF-13 - - - - - EA 2027 204,000 204,000 - 204,000 165,240 38,760 Design 2029 1,224,000 1,224,000 - 1,224,000 991,440 232,560 Construction 2031 18,972,000 18,972,000 - 18,972,000 15,367,320 3,604,680 Present Value of Incremental Financing Cost (Growth-Related Share) 2,723,308 2,723,308 - 2,723,308 2,205,879 517,428 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-42 Table 5-15 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Wastewater Treatment Services Project # Residential Share Non- Residential Share 2025 to Buildout 82% 18% 14 Omemee WPCP 2025 6,500,000 6,500,000 2,210,000 4,290,000 3,517,800 772,200 - - - - - - Adjustment Related to Existing Population Incline - - 5,974,457 (5,974,457) (5,974,457) - - - - - - - Reserve Fund Adjustment - (9,315,326) (7,638,567) (1,676,759) - - - Total 319,389,590 319,389,590 8,784,457 - 301,289,807 245,982,240 55,307,568 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-43 Table 5-16 Infrastructure Costs Covered in the D.C. Calculation - Wastewater Collection Services Project # Residential Share Non- Residential Share 2025 to Buildout 81% 19% Vertical Collection - - - - - - 1 Ridout St. SPS WW-LIN-34 - - - - - EA 2025 16,000 16,000 14,000 2,000 1,620 380 Design 2025 94,000 94,000 82,300 11,700 9,477 2,223 Construction 2026 1,451,000 1,451,000 1,269,600 181,400 146,934 34,466 2 Riverview (Barron Blvd.) SPS WW-LIN-36 - - - - - EA 2029 5,000 5,000 1,300 3,700 2,997 703 Design 2030 28,000 28,000 7,500 20,500 16,605 3,895 Construction 2031 428,000 428,000 114,700 313,300 253,773 59,527 3 Mary St. SPS and Forcemain WW-LIN-43 - - - - - EA 2028 36,000 36,000 15,800 20,200 16,362 3,838 Design 2029 217,000 217,000 95,500 121,500 98,415 23,085 Construction 2030 3,357,000 3,357,000 1,477,100 1,879,900 1,522,719 357,181 4 Logie St. SPS and Forcemain WW-LIN-35A - - - - - EA 2025 78,000 78,000 7,200 70,800 57,348 13,452 Design 2025 465,000 465,000 42,800 422,200 341,982 80,218 Construction 2026 7,208,000 7,208,000 663,100 6,544,900 5,301,369 1,243,531 Present Value of Incremental Financing Cost (Growth-Related Share) 939,528 939,528 86,400 853,128 691,033 162,094 5 Logie St. SPS and Forcemain WW-LIN-35B - - - - - EA 2039 20,000 20,000 - 20,000 16,200 3,800 Design 2040 120,000 120,000 - 120,000 97,200 22,800 Construction 2041 1,860,000 1,860,000 - 1,860,000 1,506,600 353,400 Present Value of Incremental Financing Cost (Growth-Related Share) 266,991 266,991 - 266,991 216,263 50,728 6 Lindsay Fairgrounds SPS WW-LIN-37 - - - - - EA 2033 8,000 8,000 3,700 4,300 3,483 817 Design 2034 49,000 49,000 22,400 26,600 21,546 5,054 Construction 2035 753,000 753,000 344,100 408,900 331,209 77,691 7 Northeast Lindsay SPS and Forcemain WW-LIN-42A - - - - - EA 2038 132,000 132,000 - 132,000 106,920 25,080 Design 2039 795,000 795,000 - 795,000 643,950 151,050 Construction 2040 12,315,000 12,315,000 - 12,315,000 9,975,150 2,339,850 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-44 Table 5-16 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Wastewater Collection Services Project # Residential Share Non- Residential Share 2025 to Buildout 81% 19% 8 Southeast Lindsay SPS and Forcemain WW-LIN-42B - - - - - EA 2038 63,000 63,000 - 63,000 51,030 11,970 Design 2039 377,000 377,000 - 377,000 305,370 71,630 Construction 2040 5,839,000 5,839,000 - 5,839,000 4,729,590 1,109,410 9 Front St. SPS WW-BOB-10 - - - - - EA 2025 18,000 18,000 4,100 13,900 11,259 2,641 Design 2026 106,000 106,000 24,200 81,800 66,258 15,542 Construction 2027 1,646,000 1,646,000 375,300 1,270,700 1,029,267 241,433 10 Anne St. SPS and Forcemain WW-BOB-11 - - - - - EA 2025 105,000 105,000 28,900 76,100 61,641 14,459 Design 2026 627,000 627,000 172,400 454,600 368,226 86,374 Construction 2027 9,719,000 9,719,000 2,672,700 7,046,300 5,707,503 1,338,797 Present Value of Incremental Financing Cost (Growth-Related Share) 1,011,495 1,011,495 278,200 733,295 593,969 139,326 11 Little Bob Dr. SPS WW-BOB-12 - - - - - EA 2037 4,000 4,000 1,800 2,200 1,782 418 Design 2038 26,000 26,000 11,800 14,200 11,502 2,698 Construction 2039 409,000 409,000 184,900 224,100 181,521 42,579 12 Need St. SPS WW-BOB-09 - - - - - EA 2041 18,000 18,000 10,500 7,500 6,075 1,425 Design 2042 106,000 106,000 61,900 44,100 35,721 8,379 Construction 2043 1,646,000 1,646,000 961,300 684,700 554,607 130,093 13 Colborne St. SPS and Forcemain WW-FF-14 - - - - - EA 2027 52,000 52,000 14,100 37,900 30,699 7,201 Design 2029 313,000 313,000 85,100 227,900 184,599 43,301 Construction 2031 4,845,000 4,845,000 1,317,800 3,527,200 2,857,032 670,168 14 Ellice St. SPS and Forcemain WW-FF-15 - - - - - EA 2027 96,000 96,000 38,200 57,800 46,818 10,982 Design 2029 575,000 575,000 228,900 346,100 280,341 65,759 Construction 2031 8,909,000 8,909,000 3,545,800 5,363,200 4,344,192 1,019,008 Present Value of Incremental Financing Cost (Growth-Related Share) 769,882 769,882 306,400 463,482 375,420 88,062 15 Francis St. SPS WW-FF-16 - - - - - EA 2027 15,000 15,000 1,900 13,100 10,611 2,489 Design 2029 87,000 87,000 10,800 76,200 61,722 14,478 Construction 2031 1,349,000 1,349,000 167,300 1,181,700 957,177 224,523 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-45 Table 5-16 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Wastewater Collection Services Project # Residential Share Non- Residential Share 2025 to Buildout 81% 19% 16 Lindsay St. North SPS Fencing 2026 70,000 70,000 70,000 - - - 17 Lindsay St. North SPS Pump #4 2027 1,610,000 1,610,000 - - - - - 18 Rivera Park SPS Pumps #2 and #4 2030 1,000,000 1,000,000 800,000 200,000 162,000 38,000 19 Highway 7 SPS and Forcemain 2025 4,000,000 4,000,000 - 4,000,000 3,240,000 760,000 - - - - - - Horizontal Collection - - - - - - 20 McGibbon Blvd. Sewer - Laurent Blvd. to Angeline St. WW-LIN-02 2040 610,000 610,000 99,589 510,411 413,433 96,978 21 Angeline St. Sewer - #260 Angeline St. S. to Auk Trail WW-LIN-03 2040 3,270,000 3,270,000 272,581 2,997,419 2,427,910 569,510 22 Auk Trail Sewer - Angeline St. to Adelaide St. WW-LIN-04 2029 2,230,000 2,230,000 549,806 1,680,194 1,360,957 319,237 23 Adelaide St. Sewer - Auk Trail to Mary St. WW-LIN-05 2029 1,400,000 1,400,000 345,170 1,054,830 854,413 200,418 24 L.O.F. Dr. Sewer - #6 L.O.F. Dr. to Roundtree Rd. WW-LIN-17 2034 680,000 680,000 217,798 462,202 374,383 87,818 25 Lindsay St. Sewer - Russell St. to Glenelg St. WW-LIN-20B 2027 1,118,000 1,118,000 241,237 876,763 710,178 166,585 26 Lindsay Heights Development Sewer WW-LIN-40 2031 6,720,000 6,720,000 - - - - - 27 Lindsay St. Sewer - Logie St. to Riverside Cemetery WW-LIN-41 2025 1,500,000 1,500,000 - 1,500,000 1,215,000 285,000 28 Wolfe St. Sewer - George St. to Durham St. WW-LIN-44 2030 1,110,000 1,110,000 485,131 624,869 506,144 118,725 29 Durham St. Sewer - Wolfe St. to Huron St. WW-LIN-45 2029 860,000 860,000 357,108 502,892 407,343 95,550 30 Huron St. Sewer - Durham St. to Melbourne St. WW-LIN-46 2026 450,000 450,000 178,100 271,900 220,239 51,661 31 Laurent Blvd. Sewer - McGibbon Blvd. to McQuarrie Rd. WW-LIN-01 2037 5,180,000 5,180,000 1,255,785 3,924,215 3,178,615 745,601 32 Albert St. Sewer - Mary St. to Durham St. WW-LIN-06A 2034 2,784,000 2,784,000 846,577 1,937,423 1,569,312 368,110 33 Albert St./Durham St. Intersection Sewer WW-LIN-06B 2034 186,000 186,000 37,215 148,785 120,516 28,269 34 Durham St. Sewer - Albert St. to Sussex St. WW-LIN-07 2034 1,370,000 1,370,000 141,552 1,228,448 995,043 233,405 35 Sussex St. Sewer - Durham St. to Glenelg St. WW-LIN-08 2033 1,930,000 1,930,000 627,598 1,302,402 1,054,946 247,456 36 Sussex St. Sewer - Glenelg St. to Kent St. WW-LIN-09 2033 1,590,000 1,590,000 564,135 1,025,865 830,951 194,914 37 Kent St. Sewer - Sussex St. to Victoria Ave. WW-LIN-10 2029 880,000 880,000 220,931 659,069 533,846 125,223 38 Victoria Ave. Sewer - Kent St. to Peel St. WW-LIN-11A 2029 1,050,000 1,050,000 372,542 677,458 548,741 128,717 39 Victoria Ave. Sewer - Peel St. to Wellington St. WW-LIN-11B 2032 1,050,000 1,050,000 391,423 658,577 533,447 125,130 40 Wellington St. Sewer - Victoria Ave. to Cambridge St. WW-LIN-12 2032 920,000 920,000 188,342 731,658 592,643 139,015 41 Cambridge St. Sewer - Wellington St. to Bond St. WW-LIN-13 2031 930,000 930,000 324,177 605,823 490,717 115,106 42 Bond St. Sewer - Cambridge St. to William St. WW-LIN-14 2031 1,340,000 1,340,000 926,772 413,228 334,714 78,513 43 William St. Sewer - Bond St. to Francis St. WW-LIN-15 2030 1,040,000 1,040,000 170,471 869,529 704,319 165,211 44 Francis St. Sewer - William St. to Scugog River WW-LIN-16 2030 600,000 600,000 234,700 365,300 295,893 69,407 45 Logan Ln. Sewer - #53 Logan Ln. to Maguire St. WW-LIN-21 2038 640,000 640,000 46,991 593,009 480,337 112,672 46 Maguire St. Sewer - Logie St. to Logan Ln. WW-LIN-22 2038 1,550,000 1,550,000 92,300 1,457,700 1,180,737 276,963 47 Maguire St. Sewer - Logan Ln. to Victoria Rail Trail WW-LIN-23 2038 250,000 250,000 28,942 221,058 179,057 42,001 48 Logie St. Sewer - Dobson St. to Logie St. SPS WW-LIN-24A 2038 1,478,000 1,478,000 188,285 1,289,715 1,044,669 245,046 49 Logie St. Sewer - Maguire St. to Dobson St. WW-LIN-24B 2038 5,522,000 5,522,000 577,265 4,944,735 4,005,235 939,500 50 Logie St. Sewer (Easement) - Parkside Dr. to Hillside Dr. WW-LIN-25 2041 1,200,000 1,200,000 224,679 975,321 790,010 185,311 51 Logie St. Sewer - Hillside Dr. to Riverview Rd. WW-LIN-26 2041 3,520,000 3,520,000 622,642 2,897,358 2,346,860 550,498 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-46 Table 5-16 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Wastewater Collection Services Project # Residential Share Non- Residential Share 2025 to Buildout 81% 19% 52 Riverview Rd. Sewer - Logie St. to Ridout St. SPS WW-LIN-27 2041 1,570,000 1,570,000 341,025 1,228,975 995,469 233,505 53 County Rd. 36 Sewer - Needham St. to Wilson Rd. WW-LIN-28 2041 10,660,000 10,660,000 - 10,660,000 8,634,600 2,025,400 54 Wilson Rd. Sewer - County Rd. 36 to Lagoon Rd. WW-LIN-29 2041 930,000 930,000 - 930,000 753,300 176,700 55 Lagoon Rd. Sewer - Wilson Rd. to Lindsay WPCP Entrance WW-LIN-30 2041 3,080,000 3,080,000 - 3,080,000 2,494,800 585,200 56 Lagoon Rd. Sewer - Lindsay WPCP Entrance to Lindsay WPCP Headworks WW-LIN-31 2041 590,000 590,000 - 590,000 477,900 112,100 57 North Flato Development Sewers WW-LIN-38 2041 15,440,000 9,147,560 6,292,440 - 6,292,440 5,096,876 1,195,564 58 South Flato Development Sewers WW-LIN-39 2041 9,580,000 6,594,980 2,985,020 - 2,985,020 2,417,866 567,154 59 Heritage Way and Easement Sewer - Heritage Way South End to Chadwin Dr. WW-LIN-18 2048 3,060,000 3,060,000 987,723 2,072,277 1,678,544 393,733 60 Adelaide St. Sewer - Chadwin Dr. to Colborne St. WW-LIN-19A 2030 635,000 635,000 189,561 445,439 360,806 84,633 61 Adelaide St. Sewer - Colborne St. to Regent St. WW-LIN-19B 2048 635,000 635,000 238,305 396,695 321,323 75,372 62 Easement Sewer Between #338 and #334 William St. N. - William St. to Victoria Rail Trail WW-LIN-32 2048 580,000 580,000 387,275 192,725 156,107 36,618 63 Helen St. Sewer - Prince St. to #72 Helen St. WW-BOB-01 2034 600,000 600,000 36,539 563,461 456,403 107,058 64 West St. Sewer - Queen St. to Front St. WW-BOB-02 2038 330,000 330,000 65,421 264,579 214,309 50,270 65 Pinecrest Nursing Home Sewer - #3418 County Rd. 36 to Little Bob Dr. WW-BOB-03 2038 930,000 930,000 172,251 757,749 613,777 143,972 66 Helen St. Sewer - #72 Helen St. to East St./Cedartree Ln. Intersection WW-BOB-04 2048 1,210,000 1,210,000 201,053 1,008,947 817,247 191,700 67 Cedartree Ln. Sewer - East St. to #90 Cedartree Ln. WW-BOB-05 2048 3,640,000 3,640,000 642,002 2,997,998 2,428,378 569,620 68 Front St. Sewer - #444 Front St. W. to #359 Front St. W. WW-BOB-06 2048 2,070,000 2,070,000 505,459 1,564,541 1,267,279 297,263 69 Need St. Sewer - Boyd St. to Need St. SPS WW-BOB-07 2048 640,000 640,000 183,233 456,767 369,982 86,786 70 Bond St. Sewer - Clifton St. to Kennedy Dr. WW-FF-01 2034 770,000 770,000 179,254 590,746 478,504 112,242 71 Lindsay St. Sewer - Elliot St. to Victoria Rail Trail Easement WW-FF-02 2028 1,400,000 1,400,000 365,142 1,034,858 838,235 196,623 72 Bond St. Sewer - Kennedy Dr. to Elgin St. WW-FF-03 2040 550,000 550,000 140,391 409,609 331,783 77,826 73 Elgin St. Sewer - Bond St. to Concession Rd. WW-FF-04 2040 700,000 700,000 144,913 555,087 449,621 105,467 74 Clifton St. Sewer - Bond St. to Francis St. WW-FF-05 2040 860,000 860,000 261,440 598,560 484,834 113,726 75 Francis St. Sewer - Colborne St. to Clifton St. WW-FF-06 2040 2,050,000 2,050,000 982,590 1,067,410 864,602 202,808 76 Colborne St. Sewer - Francis St. to Colborne St. SPS WW-FF-07 2040 710,000 710,000 272,940 437,060 354,018 83,041 77 Lindsay St. Sewer - Helen St. to Elliot St. WW-FF-08 2040 480,000 480,000 230,267 249,733 202,284 47,449 78 Elliot St. Sewer - Lindsay St. to Clifton St. WW-FF-09A 2026 1,650,000 1,650,000 491,574 1,158,426 938,325 220,101 79 Ellice St. Sewer - Clifton St. to Ellice St. SPS WW-FF-09B 2040 2,690,000 2,690,000 223,752 2,466,248 1,997,661 468,587 80 Fenelon Trails Development Sewer WW-FF-10 2040 4,930,000 4,930,000 - - - - - Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-47 Table 5-16 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Wastewater Collection Services Project # Residential Share Non- Residential Share 2025 to Buildout 81% 19% 81 Short St. Sewer - 130m West of Clifton St. to 200m East of Clifton St. WW-FF-11 2040 1,300,000 1,300,000 - 1,300,000 1,053,000 247,000 82 Francis St. Sewer - #205 Francis St. E. to Francis St. SPS WW-FF-12 2047 520,000 520,000 224,860 295,140 239,063 56,077 83 Omemee WPCP Sewer - Beaver Rd. Forcemain Discharge to Omemee WPCP Headworks WW-OME-01 2047 4,960,000 4,960,000 2,169,755 2,790,245 2,260,099 530,147 84 Carew Park Sewer - MH100A to MH103 2026 250,000 250,000 4,400 245,600 198,936 46,664 - - - - - - Adjustment Related to Existing Population Incline - - 3,121,687 (3,121,687) (3,121,687) - - - - - - - Reserve Fund Adjustment 16,613,742 16,613,742 - 16,613,742 13,457,131 3,156,611 Present Value of Incremental Reserve Fund Financing Costs 2,217,859 2,217,859 - 2,217,859 1,796,466 421,393 Total 229,842,496 29,002,540 200,839,956 39,214,455 - 161,625,501 130,323,535 31,301,966 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2025$) Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 6. D.C. Calculation The calculation of the maximum D.C.s that could be imposed by Council has been undertaken for the growth-related capital costs identified in Chapter 5. The calculations are presented in Tables 6-1 to 6-10 for the following services, service areas, and forecast periods: - Table 6-1 - Water Treatment and Distribution Services imposed in the urban serviced area over the buildout period; - Table 6-2 - Wastewater Treatment Services imposed in the urban serviced area over the buildout period; - Table 6-3 - Wastewater Collection Services imposed in the urban serviced area, excluding the Northwest Development Area of Lindsay, over the buildout period; - Table 6-4 - Fire Protection Services (City-Wide) over the 15-year forecast period; - Table 6-5 - Fire Protection Services (Rural) over the 15-year forecast period; - Table 6-6 - City-wide Services Related to a Highway over the 26-year forecast period; - Table 6-6 - City-wide Paramedic Services and Public Health Services over the 20-year forecast period; - Table 6-8 - Police Services imposed in the Town of Lindsay and the former Township of Ops; - Table 6-9 - Transit Services imposed in the Town of Lindsay; and - Table 6-10 - City-wide services imposed over the 10-year period to 2035 (i.e., Parks and Recreation Services, Library Services, Municipal By-Law Enforcement, and Growth-Related Studies). The calculation for residential development is generated on a per capita basis and is based upon four forms of housing types (single and semi-detached, apartments 2+ bedrooms, apartment's bachelor and 1 bedroom, and rows or multiples). The non- residential D.C. has been calculated on a per sq.m. of G.F.A. basis for non-residential development. The non-residential charge is also calculated for electrical generation development (i.e., wind turbines and solar farms) on a residential equivalent basis (for fire protection services, police services, services related to a highway, paramedic services, and growth-related studies) for each 500 kW of nameplate generating capacity. Watson & Associates Economists Ltd. PAGE 6-2 With respect to non-residential development, the total costs are allocated to non- residential development based on need for service and have been divided by the anticipated development by type over the planning period to calculate a cost per sq.m of G.F.A. Table 6-11 summarizes the recommended schedule of charges, reflecting the maximum D.C.s by residential dwelling type, per sq.ft. of G.F.A. for non-residential development, and non-residential electrical generation development (per 500 kW nameplate generating capacity). Tables 6-12 and 6-13 compare the City's existing charges to the charges proposed herein (Table 6-11), for a single detached residential dwelling unit (S.D.U.), and per sq.m. of G.F.A. for uniform non-residential charges. Watson & Associates Economists Ltd. PAGE 6-3 Table 6-1 Area-Specific Water Treatment and Water Distribution Services D.C. Calculation 2025-Urban Buildout Table 6-2 Area-Specific Wastewater Treatment Services D.C. Calculation 2025-Urban Buildout Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 1. Water Treatment Services 459,590,222 103,327,179 20,625 11.89 2. Water Distribution Services 62,172,875 13,977,991 2,790 1.61 TOTAL $521,763,097 $117,305,169 $23,415 $13.50 D.C.-Eligible Capital Cost $521,763,097 $117,305,169 2025-Buildout Gross Population/GFA Growth (sq.ft.) 57,312 8,689,700 Cost Per Capita/Non-Residential GFA (sq.ft.) $9,103.91 $13.50 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $23,415 Other Multiples 1.907 $17,361 Apartments - 2 Bedrooms + 1.872 $17,043 Apartments - Bachelor and 1 Bedroom 1.170 $10,652 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 3. Wastewater Treatment Services 245,982,240 55,307,568 11,079 6.37 TOTAL $245,982,240 $55,307,568 $11,079 $6.37 D.C.-Eligible Capital Cost $245,982,240 $55,307,568 2025-Buildout Gross Population/GFA Growth (sq.ft.) 57,106 8,685,500 Cost Per Capita/Non-Residential GFA (sq.ft.) $4,307.47 $6.37 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $11,079 Other Multiples 1.907 $8,214 Apartments - 2 Bedrooms + 1.872 $8,064 Apartments - Bachelor and 1 Bedroom 1.170 $5,040 SERVICE/CLASS 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost Watson & Associates Economists Ltd. PAGE 6-4 Table 6-3 Area-Specific Wastewater Collection Services D.C. Calculation 2025-Urban Buildout (Excluding Lindsay Northwest Development Area) Table 6-4 City-Wide Fire Protection Services (City-Wide) D.C. Calculation 2025-2040 Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 4. Wastewater Collection Services 130,323,535 31,301,966 7,301 4.31 TOTAL $130,323,535 $31,301,966 $7,301 $4.31 D.C.-Eligible Capital Cost $130,323,535 $31,301,966 2025-Buildout Gross Population/GFA Growth (sq.ft.) 45,911 7,266,151 Cost Per Capita/Non-Residential GFA (sq.ft.) $2,838.64 $4.31 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $7,301 Other Multiples 1.907 $5,413 Apartments - 2 Bedrooms + 1.872 $5,314 Apartments - Bachelor and 1 Bedroom 1.170 $3,321 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 5. Fire Protection Services (City-Wide) 37,445,568 6,608,041 3,403 1.87 TOTAL $37,445,568 $6,608,041 $3,403 $1.87 D.C.-Eligible Capital Cost $37,445,568 $6,608,041 2025-Buildout Gross Population/GFA Growth (sq.ft.) 28,304 3,538,300 Cost Per Capita/Non-Residential GFA (sq.ft.) $1,322.98 $1.87 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $3,403 Other Multiples 1.907 $2,523 Apartments - 2 Bedrooms + 1.872 $2,477 Apartments - Bachelor and 1 Bedroom 1.170 $1,548 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Watson & Associates Economists Ltd. PAGE 6-5 Table 6-5 Area Specific Fire Protection Services (Rural) D.C. Calculation 2025-2040 Table 6-6 City-Wide Services Related to a Highway D.C. Calculation 2025-2051 Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 6. Fire Protection Services (Rural) 1,029,933 140,445 737 0.21 TOTAL $1,029,933 $140,445 $737 $0.21 D.C.-Eligible Capital Cost $1,029,933 $140,445 15-Year Gross Population/GFA Growth (sq.ft.) 3,592 664,900 Cost Per Capita/Non-Residential GFA (sq.ft.) $286.73 $0.21 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $737 Other Multiples 1.907 $547 Apartments - 2 Bedrooms + 1.872 $537 Apartments - Bachelor and 1 Bedroom 1.170 $335 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 7. Services Related to a Highway 240,164,297 46,517,478 12,841 6.96 TOTAL $240,164,297 $46,517,478 $12,841 $6.96 D.C.-Eligible Capital Cost $240,164,297 $46,517,478 26-Year Gross Population/GFA Growth (sq.ft.) 48,105 6,681,300 Cost Per Capita/Non-Residential GFA (sq.ft.) $4,992.50 $6.96 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $12,841 Other Multiples 1.907 $9,521 Apartments - 2 Bedrooms + 1.872 $9,346 Apartments - Bachelor and 1 Bedroom 1.170 $5,841 SERVICE/CLASS 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost Watson & Associates Economists Ltd. PAGE 6-6 Table 6-7 City-Wide Services D.C. Calculation 2025-2045 Table 6-8 Area Specific Police Services D.C. Calculation 2025-2035 Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 8. Paramedic Services 11,373,363 2,166,355 811 0.43 9. Public Health Services 4,646,711 244,564 332 0.05 TOTAL $16,020,074 $2,410,919 $1,143 $0.48 D.C.-Eligible Capital Cost $16,020,074 $2,410,919 20-Year Gross Population/GFA Growth (sq.ft.) 36,041 4,991,300 Cost Per Capita/Non-Residential GFA (sq.ft.) $444.50 $0.48 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $1,143 Other Multiples 1.907 $848 Apartments - 2 Bedrooms + 1.872 $832 Apartments - Bachelor and 1 Bedroom 1.170 $520 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 10. Policing Services 10,287,698 1,537,242 1,874 1.10 TOTAL $10,287,698 $1,537,242 $1,874 $1.10 D.C.-Eligible Capital Cost $10,287,698 $1,537,242 10-Year Gross Population/GFA Growth (sq.ft.) 14,121 1,396,971 Cost Per Capita/Non-Residential GFA (sq.ft.) $728.56 $1.10 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $1,874 Other Multiples 1.907 $1,389 Apartments - 2 Bedrooms + 1.872 $1,364 Apartments - Bachelor and 1 Bedroom 1.170 $852 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Watson & Associates Economists Ltd. PAGE 6-7 Table 6-9 Area Specific Transit Services D.C. Calculation 2025-2035 Table 6-10 City-Wide Services D.C. Calculation 2025-2035 Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 11. Transit Services 3,571,631 533,692 641 0.39 TOTAL $3,571,631 $533,692 $641 $0.39 D.C.-Eligible Capital Cost $3,571,631 $533,692 10-Year Gross Population/GFA Growth (sq.ft.) 14,323 1,355,700 Cost Per Capita/Non-Residential GFA (sq.ft.) $249.36 $0.39 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $641 Other Multiples 1.907 $476 Apartments - 2 Bedrooms + 1.872 $467 Apartments - Bachelor and 1 Bedroom 1.170 $292 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft $ $ $ $ 12. Parks and Recreation Services 30,123,634 1,585,454 3,924 0.72 13. Library Services 3,838,780 199,673 500 0.09 14. Municipal By-law Enforcement 311,559 50,719 41 0.02 15. Growth-Related Studies 4,352,044 904,727 567 0.41 TOTAL $38,626,017 $2,740,573 $5,032 $1.24 D.C.-Eligible Capital Cost $38,626,017 $2,740,573 10-Year Gross Population/GFA Growth (sq.ft.) 19,746 2,190,800 Cost Per Capita/Non-Residential GFA (sq.ft.) $1,956.14 $1.25 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.572 $5,031 Other Multiples 1.907 $3,730 Apartments - 2 Bedrooms + 1.872 $3,662 Apartments - Bachelor and 1 Bedroom 1.170 $2,289 SERVICE/CLASS 2025$ D.C.-Eligible Cost 2025$ D.C.-Eligible Cost Watson & Associates Economists Ltd. PAGE 6-8 Table 6-11 Calculated Schedule of Residential and Non-Residential Development Charges Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Electricity Generation ($/500 KW of NGC) Other Non- Residential (Per Sq.M. of Gross Floor Area) Municipal Wide Services/Class of Service: Fire Protection Services (City-Wide) 3,403 2,523 2,477 1,548 3,403 20.13 Police Services 1 1,874 1,389 1,364 852 1,874 11.84 Services Related to a Highway 12,841 9,521 9,346 5,841 12,841 74.92 Transit Services 2 641 475 467 292 4.20 Parks and Recreation Services 3,924 2,909 2,856 1,785 7.75 Library Services 500 371 364 227 0.97 Municipal By-law Enforcement 41 30 30 19 0.22 Paramedic Services 811 601 590 369 811 4.63 Public Health Services 332 246 242 151 0.54 Growth-Related Studies 567 420 413 258 4.41 Total Municipal Wide Services/Class of Services 24,934 18,485 18,149 11,342 18,929 129.60 Urban Services Wastewater Treatment Services 11,079 8,214 8,064 5,040 68.57 Wastewater Collection Services 3 7,301 5,413 5,314 3,321 46.39 Water Treatment Services 20,625 15,292 15,012 9,382 127.98 Water Distribution Services 2,790 2,069 2,031 1,269 17.33 Total Urban Services 41,795 30,988 30,421 19,012 - 260.27 Rural Services Fire Protection Services (Rural) 4 737 546 536 335 737 2.26 Total Rural Services 737 546 536 335 737 2.26 Urban - Lindsay 66,729 49,473 48,570 30,354 18,929 389.87 Urban - NWT 59,428 44,060 43,256 27,033 18,929 343.48 Urban - Other 64,214 47,609 46,739 29,210 17,055 373.83 Rural - Ops 25,030 18,556 18,218 11,385 19,666 127.66 Rural - Other 23,156 17,167 16,854 10,533 17,792 115.82 1. Police Services only payable within Lindsay and the former Township of Ops 2. Transit Services only payable within Lindsay 3. Wastewater Collection Services only payble within municipal service area, outside of the Northwest Lindsay Development Area 4. Rural Fire Services are in addition to the City-Wide Services Service/Class of Service RESIDENTIAL NON-RESIDENTIAL Watson & Associates Economists Ltd. PAGE 6-9 Table 6-12 Comparison of Current and Calculated Residential Development Charges Service/Class of Service Current Calculated Change ($) Change (%) City-Wide Services/Classes: Fire Protection Services (City-Wide) 484 3,403 2,919 603% Police Services 1 589 1,874 1,285 218% Services Related to a Highway 9,077 12,841 3,764 41% Transit Services 2 361 641 280 78% Parks and Recreation Services 994 3,924 2,930 295% Library Services 511 500 (11) -2% Municipal By-law Enforcement 22 41 19 86% Paramedic Services 284 811 527 186% Public Health Services - 332 332 0% Waste Diversion 50 (50) -100% Growth-Related Studies 543 567 24 4% Total City-Wide Services/Classes 12,915 24,934 12,019 93% Urban Services Wastewater Treatment Services 6,087 11,079 4,992 82% Wastewater Collection Services 3 8,851 7,301 (1,550) -18% Water Treatment Services 4,772 20,625 15,853 332% Water Distribution Services 4,956 2,790 (2,166) -44% Total Urban Services 24,666 41,795 17,129 69% Rural Services Fire Protection Services (Rural) 4 - 737 737 0% Total Rural Services - 737 737 0% Urban - Lindsay 37,581 66,729 29,148 78% Urban - NWT 28,730 59,428 30,698 107% Urban - Other 36,631 64,214 27,583 75% Rural - Ops 12,554 25,030 12,476 99% Rural - Other 11,965 23,156 11,191 94% 1. Police Services only payable within Lindsay and the former Township of Ops 2. Transit Services only payable within Lindsay 3. Wastewater Collection Services only payble within municipal service area, outside of the Northwest Lindsay Development Area 4. Rural Fire Services are in addition to the City-Wide Services Residential (Single Detached) Comparison Watson & Associates Economists Ltd. PAGE 6-10 Table 6-13 Comparison of Current and Calculated Non-Residential Development Charges Service/Class of Service Current Calculated Change ($) Change (%) City-Wide Services/Classes: Fire Protection Services (City-Wide) 3.94 20.13 16.19 411% Police Services 1 4.02 11.84 7.82 195% Services Related to a Highway 74.11 74.92 0.81 1% Transit Services 2 2.57 4.20 1.63 63% Parks and Recreation Services 2.86 7.75 4.89 171% Library Services 1.47 0.97 (0.50) -34% Municipal By-law Enforcement 0.17 0.22 0.05 27% Paramedic Services 2.33 4.63 2.30 99% Public Health Services - 0.54 0.54 0% Waste Diversion 0.40 (0.40) -100% Growth-Related Studies 4.42 4.41 (0.01) 0% Total City-Wide Services/Classes 96.29 129.60 33.31 35% Urban Services Wastewater Treatment Services 42.39 68.57 26.18 62% Wastewater Collection Services 3 77.98 46.39 (31.59) -41% Water Treatment Services 33.60 127.98 94.38 281% Water Distribution Services 34.87 17.33 (17.54) -50% Total Urban Services 188.84 260.27 71.43 38% Rural Services Fire Protection Services (Rural) 4 - 2.26 2.26 0% Total Area Specific Services 223.71 279.86 2.26 1% Urban - Lindsay 285.13 389.87 104.74 37% Urban - NWT 207.15 343.48 136.33 66% Urban - Other 278.54 373.83 95.29 34% Rural - Ops 93.72 127.66 33.94 36% Rural - Other 89.70 115.82 26.12 29% 1. Police Services only payable within Lindsay and the former Township of Ops 2. Transit Services only payable within Lindsay 3. Wastewater Collection Services only payble within municipal service area, outside of the Northwest Lindsay Development Area 4. Rural Fire Services are in addition to the City-Wide Services Non-Residential (per sq.m.) Comparison Watson & Associates Economists Ltd. Chapter 7 D.C. Policy Recommendations and D.C. Policy Rules Watson & Associates Economists Ltd. PAGE 7-1 7. D.C. Policy Recommendations and D.C. Policy Rules 7.1 Introduction This chapter outlines the D.C. policy recommendations and by-law rules. Subsection 5 (1) 9 of the D.C.A. states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection 6." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided give consideration for the recent changes to the D.C.A. resulting from Bills 197, 213, 109, 23, 97, 134, 185, and 17. However, these policies are provided for Council's consideration and may be refined prior to adoption of the by-law. Watson & Associates Economists Ltd. PAGE 7-2 7.2 D.C. By-law Structure It is recommended that: - The City uses a uniform City-wide D.C. calculation for Fire Protection Services (City-Wide), Parks and Recreation Services, Library Services, Paramedic Services, Public Health Services, Services Related to a Highway, and Growth- Related Studies. Area-specific D.C. calculations are to be used for Police Services, Transit Services, Fire Protection Services (Rural), Water Treatment Services, Water Distribution Services, Wastewater Treatment Services, and Wastewater Collection Services in the areas to which the services apply; and - one municipal D.C. by-law be used for all services. 7.3 D.C. By-law Rules The following sets out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with subsection 6 of the D.C.A. 7.3.1 Payment in any Particular Case In accordance with the D.C.A., s.2 (2), a D.C. be calculated, payable and collected where the development requires one or more of the following: (a) the passing of a zoning by-law or of an amendment to a zoning by-law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure. Watson & Associates Economists Ltd. PAGE 7-3 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous 25-year period. Costs allocated to non-residential uses will be assigned based on the amount of square feet of G.F.A. constructed for eligible uses (i.e., primary, industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, as follows: - For Parks and Recreation Services, Library Services, and Public Health Services, a 5% non-residential attribution has been made to recognize use by the non-residential sector over the 10-year forecast period; - For Services Related to a Highway, an 84% residential and 16% non- residential attribution has been made based on a population vs. employment growth ratio over the 26-year forecast period; - For Paramedic Services, an 84% residential and 16% non-residential attribution has been made based on a population vs. employment growth ratio over the 20-year forecast period; - For Transit Services and Police Services, an 87% residential and 13% non- residential attribution has been made based on a population vs. employment growth ratio over the 10-year forecast period; - For Municipal By-law Enforcement, an 86% residential and 14% non- residential attribution has been made based on a population vs. employment growth ratio over the 10-year forecast period; - For Wastewater Collection Services a 81% residential and 19% non- residential attribution has been made based on a population vs. employment growth ratio over the buildout forecast period; - For Wastewater Treatment Services, Water Treatment Services, and Water Distribution Services a 82% residential and 18% non-residential attribution has been made based on a population vs. employment growth ratio over the buildout forecast period; Watson & Associates Economists Ltd. PAGE 7-4 - For Fire Protection Services (City-Wide) an 85% residential and 15% non- residential attribution has been made based on a population vs. employment growth ratio over the 15-year forecast period; - For Fire Protection Services (Rural) an 88% residential and 12% non- residential attribution has been made based on a population vs. employment growth ratio over the 15-year forecast period; - For Growth-Related Studies, an 83% residential and 17% non-residential attribution has been made based on the allocations summarized in Table 5-5. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) If a development involves the demolition and replacement of a building or structure on the same site, or the conversion from one principal use to another, the developer shall be allowed a credit equivalent to: - the number of dwelling units demolished/converted multiplied by the applicable residential D.C. in place at the time the D.C. is payable; and/or - the G.F.A. of the building demolished/converted multiplied by the current non- residential D.C. in place at the time the D.C. is payable. The demolition credit is allowed only if the land was improved by occupied structures, and if the demolition permit related to the site was issued less than three years 60 months (5 years) prior to the issuance of a building permit. The credit can, in no case, exceed the amount of D.C.s that would otherwise be payable. 7.3.4 Exemptions (full or partial) Statutory - The municipality or local board thereof; - A board of education; - Industrial additions of up to and including 50% of the existing G.F.A. of the building - for industrial additions which exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s. Exemptions will only apply to 50% of the G.F.A. prior to the first expansion for which there was an exemption to the payment of D.C.s. Watson & Associates Economists Ltd. PAGE 7-5 - An enlargement to an existing dwelling unit; - Additional units in existing and new residential buildings: o May add up to two apartments for a single detached, semi-detached or row house (only one unit can be in an ancillary structure) o One additional unit or 1% of the units in an existing rental residential building with four or more residential units - Affordable Units, Attainable Units, and Inclusionary Zoning Units; - Non-Profit Housing; - Universities; and - Long-Term Care. Non-Statutory - a place of worship, non-profit hospice, public hospital, cemetery, burial site or crematorium, as defined in the Assessment Act - an agricultural building or structure - a park model trailer - Temporary buildings or structures For the purposes of funding the D.C. exemptions for agricultural development, the charge amounts are presented in Table 7-1 below for the respective development areas reflective of the lower density of development. Table 7-1 Agricultural Development Charge 7.3.5 Transition The by-law will come into effect on January 1, 2026. No additional transition measures are proposed. Description Agricutural Development (per sq.m. of G.F.A.) Urban - Lindsay 48.97 Urban - NWT 43.33 Urban - Other 47.08 Rural - Ops 17.36 Rural - Other 15.95 Watson & Associates Economists Ltd. PAGE 7-6 7.3.6 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the ship and an owner under s. 27 of the D.C.A. Rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Moreover, the D.C. amount for all developments occurring within two (2) years of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted and approved after January 1, 2020, and before June 5, 2024), shall be determined based on the D.C. in effect on the day of the applicable Site Plan or Zoning By-law Amendment application. The D.C. amount for all developments occurring within eighteen (18) months of a Site Plan or Zoning By-law Amendment planning approval (for applications received on or after January 1, 2020, that had not received approval prior to June 6, 2024), shall be determined based on the D.C. in effect on the day of the applicable Site Plan or Zoning By-law Amendment application. Installment payments and payments determined at the time of Site Plan or Zoning By- law Amendment application may be subject to annual interest charges. The maximum interest rate the Municipality can impose is the average prime rate plus 1% as defined in s.s. 26.3 (1) of the Act. 7.3.7 Indexing Indexing of the D.C.s shall be implemented on a mandatory basis annually on January 1st each year, commencing on January 1, 2026, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10- 0135-01)1 for the most recent 3rd quarter year-over-year change. 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 7.3.8 D.C Spatial Applicability The D.C.A. historically has provided the opportunity for a municipality to impose municipal-wide charges or area specific charges. Sections 2 (7) and 2 (8) of the D.C.A. provide that a D.C. by-law may apply to the entire municipality or only part of it and more than one D.C. by-law may apply to the same area. The D.C.A. now requires municipalities to consider the application of municipal-wide and area-specific D.C.s. s.10 (2) (c.1) requires Council to consider the use of more than one D.C. by-law to reflect different needs from services in different areas. Most municipalities in Ontario have established uniform, municipal-wide D.C.s. When area-specific charges are used, it is generally to underpin master servicing and front-end financing arrangements for more localized capital costs. The City is proposing to maintain its current approach of imposing City-wide and area- specific D.C.s as follows: - City-wide services: o Parks and recreation services o Library services o Municipal by-law enforcement services o Growth-related studies o Fire protection services o Paramedic services o Public health services - Area-Specific Services o Police services o Transit services o Fire protection services o Water treatment services; o Water distribution services; o Wastewater treatment services; and o Wastewater collection services. Watson & Associates Economists Ltd. PAGE 7-8 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes It is recommended that the Municipality's D.C. collections be contributed into 15 separate reserve funds, including: - Fire Protection Services (City-Wide); - Fire Protection Services (Rural); - Police Services; - Services Related to a Highway; - Transit Services; - Parks and Recreation Services; - Library Services; - Municipal By-law Enforcement; - Paramedic Services; - Public Health Services; - Wastewater Treatment Services; - Wastewater Collection Services; - Water Treatment Services; - Water Distribution Services; and - Growth-Related Studies. 7.4.2 By-law In-force Date The by-law will come into force on January 1, 2026. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-law come into force (as per s.11 of O. Reg. 82/98). Watson & Associates Economists Ltd. PAGE 7-9 7.5 Other Recommendations It is recommended that Council: "Approve the capital project listing set out in Chapter 5 of the D.C. Background Study dated September 17, 2025, as amended on November 7, 2025, subject to further annual review during the capital budget process". "Approve the D.C. Background Study dated September 17, 2025, as amended on November 7, 2025." "Determine that no further public meeting is required." And "Approve the D.C. By-law as set out in Appendix E, as amended". Watson & Associates Economists Ltd. Chapter 8 Asset Management Plan Watson & Associates Economists Ltd. PAGE 8-1 8. Asset Management Plan 8.1 Introduction The D.C.A. (new section 10(c.2)) requires that the background study must include an Asset Management Plan (A.M.P) related to new infrastructure. Section 10 (3) of the D.C.A. provides: The A.M.P. shall, a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; c) contain any other information that is prescribed; and d) be prepared in the prescribed manner. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset through its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. The Province's Infrastructure for Jobs and Prosperity Act, 2015 (IJPA) was proclaimed on May 1, 2016. This legislation detailed principles for evidence-based and sustainable long-term infrastructure planning. The IJPA also gave the Province the authority to guide municipal asset management planning by way of regulation. In late 2017, the Province introduced O. Reg. 588/17 under the IJPA. The intent of O. Reg. 588/17 is to establish standard content for municipal asset management plans. Specifically, the regulations require that asset management plans be developed that define the current levels of service, identify the lifecycle activities that would be undertaken to achieve these levels of service, and provide a financial strategy to support the levels of service and lifecycle activities. The requirements of O. Reg. 588/17 generally align with previous provincial AMP requirements, as follows: Watson & Associates Economists Ltd. PAGE 8-2 State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal Watson & Associates Economists Ltd. PAGE 8-3 The asset management requirement for this D.C. Background Study has been undertaken independently of any Municipality A.M.P.s. 8.2 Non-Transit Services Asset Management Plan In recognition to the schematic in Section 8.1, the following table has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. Furthermore, as only the present infrastructure gap has been considered at this time within the A.M.P., the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects which will require financing from City financial resources (i.e., taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 30-year financing. 2. Lifecycle costs for the 2025 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are $98.8 million. Of this total, $24.4 million relates the annual debt payment costs for benefit to existing development of growth-related needs. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are $76.2 million. This amount, totalled with the existing operating revenues of $300.6 million, provides annual revenues of $376.8 million by the end of the period. 6. In consideration of the above, the capital plan is deemed to be financially sustainable. Watson & Associates Economists Ltd. PAGE 8-4 Table 8-1 Asset Management - Future Expenditures and Associated Revenues (2025$) 8.3 Transit Services With respect to the D.C.A. requirements for an asset management plan for transit services, Ontario Regulation 82/98 (as amended) provides that: the asset management plan referred to in clause 10 (2) (c.2) of the Act shall include the information in respect of those services set out in the following provisions of Ontario Regulation 588/17 (Asset Management Planning for Municipal Infrastructure) made under the Infrastructure for Jobs and Prosperity Act, 2015: 1. Paragraphs 1, 2 and 3 of subsection 5 (2). Asset Management - Future Expenditures and Associated Revenues 2051 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 24,387,060 Annual Debt Payment on Post Period Capital2 574,696 Lifecycle: Annual Lifecycle - City-wide Services 16,919,490 Annual Lifecycle - Area-specific Services3 25,594,692 Sub-Total - Annual Lifecycle $42,514,181 Incremental Operating Costs (for D.C. Services) $31,362,451 Total Expenditures $98,838,389 Revenue (Annualized) Total Existing Revenue4 $300,603,737 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $76,243,717 Total Revenues $376,847,454 4 As per Sch. 10 of FIR 3 All infastructure costs included in Area Specifc by-laws have been included 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE 8-5 2. Paragraph 5 of subsection 5 (2), if that paragraph were read without reference to subparagraph ii. 3. Paragraph 6 of subsection 5 (2), if that paragraph were read without reference to subparagraph vi. 4. Subsection 5 (3). 5. Paragraphs 1 to 7 of subsection 6 (1). O. Reg. 589/17, s. 1. The City has prepared an Asset Management Plan dated, June 16, 2025 in accordance with the requirements outlined in O. Reg. 588.17 in includes all transit facility and fleet assets. The Asset Management Plan is attached as appendix F to this report. However, the City's asset management plan does not address the impacts of additional growth-related transit infrastructure, and as such, the impacts on the financial strategy of the additional transit infrastructure must be considered. The City's Asset Management Plan for tax supported services includes $811.5 million over the 2026 to 2035 forecast period. The D.C. eligible costs for Transit Services identified in section 5.6.2 are $4.1 million, or 0.5% of the total 10-year state of good repair capital needs. Based on the foregoing, these additional costs which are anticipated to be funded through D.C. revenues, will not have a meaningful impact on the financial plan presented in the Asset Management Plan in Appendix F. Watson & Associates Economists Ltd. PAGE 8-1 Chapter 9 By-law Implementation Watson & Associates Economists Ltd. PAGE 9-1 9. By-law Implementation 9.1 Public Consultation Process 9.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 9.1.2), as well as the optional, informal consultation process (section 9.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 9.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 9.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution). It is noted that Council's decision, once made, is final and not subject to review by a Court or the OLT. 9.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with a municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. Watson & Associates Economists Ltd. PAGE 9-2 policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional/primary development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, institutional buildings, and buildings on agricultural lands. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade and the Economic Development Agencies, who are all potentially interested in a municipality's D.C. policy. Their primary concern is frequently with the quantum of the charge, gross floor area exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 9.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 9-3 9.3 Implementation Requirements 9.3.1 Introduction Once the Municipality has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 9.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the Municipality's Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by-law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 9.3.3 By-law Pamphlet In addition to the "notice" information, the Municipality must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; Watson & Associates Economists Ltd. PAGE 9-4 - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The Municipality must give one copy of the most recent pamphlet without charge to any person who requests one. 9.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the Municipality Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The Municipality is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 9.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the Municipality Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of Municipality Council to the OLT. Watson & Associates Economists Ltd. PAGE 9-5 9.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work, which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 9.3.7 Front-Ending Agreements The Municipality and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the Municipality to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the Development Charges Act, 1989. Accordingly, the Municipality assesses whether this mechanism is appropriate for its use, as part of funding projects prior to Municipality funds being available. 9.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. PAGE 9-6 It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the Municipality is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 Schedule 1 City of Kawartha Lakes Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 4.0% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: - Build-out refers to the City's urban area, and has been assessed for designated urban lands, including lands subject to Minister's Zoning Orders (MZOs), and servicing capacity. - Numbers may not add due to rounding. Source: Derived from 2025 Growth Management Strategy Report and 2025 Water and Wastewater Servicing and Capacity Master Plan by Watson & Associates Economists Ltd. Permanent Population[1] Institutional Population Permanent Population Excluding Institutional[1] Seasonal Population Total Permanent and Seasonal Population Singles & Semi- Detached Singles & Semi Detached Family With Conversions Multiples[2] Apartments[3] Other Total Households Total w/ Conversions Seasonal Households Total Households w/ Conversions Including Seasonal Equivalent Institutional Households Mid 2011 75,911 73,214 1,764 71,450 27,375 100,589 25,470 25,470 1,215 2,820 176 29,681 29,681 7,480 37,161 1,604 2.467 2.707 Mid 2016 78,201 75,423 2,048 73,375 26,855 102,278 26,515 26,515 1,495 2,765 325 31,100 31,100 7,338 38,438 1,862 2.425 2.661 Mid 2021 82,166 79,247 2,017 77,230 30,150 109,397 27,955 27,955 1,495 2,950 310 32,710 32,710 8,238 40,948 1,834 2.423 2.672 Mid 2025 85,850 82,796 2,132 80,664 31,175 113,971 29,198 29,294 1,664 3,580 310 34,752 34,848 8,518 43,366 1,938 2.382 2.628 Mid 2035 103,700 100,020 2,305 97,715 33,740 133,760 34,000 34,328 3,870 4,880 310 43,060 43,388 9,218 52,606 2,095 2.323 2.543 Mid 2040 112,300 108,310 2,392 105,918 35,020 143,330 35,760 36,198 4,940 5,800 310 46,810 47,248 9,568 56,816 2,175 2.314 2.523 Mid 2045 120,600 116,320 2,483 113,837 36,300 152,620 37,150 37,698 6,010 6,810 310 50,280 50,828 9,918 60,746 2,257 2.313 2.512 Mid 2051 130,000 125,380 2,591 122,789 37,835 163,215 38,470 39,150 7,330 8,210 310 54,320 55,000 10,338 65,338 2,355 2.308 2.498 Buildout 150,300 145,000 2,664 142,336 40,880 185,880 42,670 43,620 9,890 10,310 310 63,180 64,130 11,170 75,300 2,422 2.295 2.469 Mid 2011 - Mid 2016 2,290 2,209 284 1,925 -520 1,689 1,045 1,045 280 -55 149 1,419 1,419 -142 1,277 258 Mid 2016 - Mid 2021 3,965 3,824 -31 3,855 3,295 7,119 1,440 1,440 0 185 -15 1,610 1,610 900 2,510 -28 Mid 2021 - Mid 2025 3,684 3,549 115 3,434 1,025 4,574 1,243 1,339 169 630 0 2,042 2,138 280 2,418 104 Mid 2025 - Mid 2035 17,850 17,224 173 17,051 2,565 19,789 4,802 5,034 2,206 1,300 0 8,308 8,540 700 9,240 157 Mid 2025 - Mid 2040 26,450 25,514 260 25,254 3,845 29,359 6,562 6,904 3,276 2,220 0 12,058 12,400 1,050 13,450 237 Mid 2025 - Mid 2045 34,750 33,524 351 33,173 5,125 38,649 7,952 8,404 4,346 3,230 0 15,528 15,980 1,400 17,380 319 Mid 2025 - Mid 2051 44,150 42,584 459 42,125 6,660 49,244 9,272 9,856 5,666 4,630 0 19,568 20,152 1,820 21,972 417 Mid 2025 - Buildout 64,450 62,204 532 61,672 9,705 71,909 13,472 14,326 8,226 6,730 0 28,428 29,282 2,652 31,934 484 Forecast Incremental Year Historical Excluding Census Undercount Permanent Person Per Unit (P.P.U.) Permanent + 100% Seasonal Person Per Unit (P.P.U.) Permanent Population (Including Census Undercount) Housing Units Watson & Associates Economists Ltd. PAGE A-3 Schedule 2 City of Kawartha Lakes Estimate of the Anticipated Amount, Type and Location of Development for Which Development Charges Can Be Imposed 1 Includes townhomes and apartments in duplexes. 2 Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Source: Derived from 2025 Growth Management Strategy and 2025 Water and Wastewater Servicing and Capacity Master Plan by Watson & Associates Economists Ltd. 2025-2035 2,498.00 866.00 1,066.00 4,430.00 4,430.00 2025 - 2040 2,854.00 1,482.00 1,755.00 6,091.00 6,091.00 2025-2045 3,459.00 1,967.00 2,553.00 7,979.00 7,979.00 2025 - 2051 3,901.00 2,763.00 3,733.00 10,397.00 10,397.00 2025 - Buildout 5,014.00 3,538.00 4,997.00 13,549.00 13,549.00 2025-2035 421.00 729.00 134.00 1,284.00 1,284.00 2025 - 2040 1,005.00 709.00 178.00 1,892.00 1,892.00 2025-2045 1,218.00 940.00 259.00 2,417.00 2,417.00 2025 - 2051 1,539.00 998.00 284.00 2,821.00 2,821.00 2025 - Buildout 4,013.00 2,508.00 1,035.00 7,556.00 7,556.00 2025-2035 463.00 410.00 30.00 903.00 903.00 2025 - 2040 511.00 524.00 116.00 1,151.00 1,151.00 2025-2045 619.00 695.00 169.00 1,483.00 1,483.00 2025 - 2051 718.00 946.00 256.00 1,920.00 1,920.00 2025 - Buildout 841.00 1,109.00 300.00 2,250.00 2,250.00 2025-2035 389.00 57.00 22.00 468.00 468.00 2025 - 2040 592.00 239.00 57.00 888.00 888.00 2025-2045 717.00 317.00 83.00 1,117.00 1,117.00 2025 - 2051 834.00 412.00 157.00 1,403.00 1,403.00 2025 - Buildout 844.00 417.00 159.00 1,420.00 1,420.00 2025-2035 444.00 97.00 35.00 576.00 576.00 2025 - 2040 735.00 260.00 92.00 1,087.00 1,087.00 2025-2045 891.00 345.00 134.00 1,370.00 1,370.00 2025 - 2051 1,074.00 451.00 160.00 1,685.00 1,685.00 2025 - Buildout 1,281.00 538.00 191.00 2,010.00 2,010.00 2025-2035 39.00 47.00 13.00 99.00 99.00 2025 - 2040 118.00 62.00 22.00 202.00 202.00 2025-2045 142.00 82.00 32.00 256.00 256.00 2025 - 2051 151.00 96.00 40.00 287.00 287.00 2025 - Buildout 182.00 116.00 48.00 346.00 346.00 2025-2035 72.00 - - 72.00 72.00 2025 - 2040 98.00 - - 98.00 98.00 2025-2045 119.00 - - 119.00 119.00 2025 - 2051 139.00 - - 139.00 139.00 2025 - Buildout 171.00 171.00 171.00 2025-2035 24.00 - - 24.00 24.00 2025 - 2040 33.00 - - 33.00 33.00 2025-2045 40.00 - - 40.00 40.00 2025 - 2051 46.00 - - 46.00 46.00 2025 - Buildout 91.00 91.00 91.00 2025-2035 452.00 - - 452.00 1,384.00 2025 - 2040 616.00 - - 616.00 2,008.00 2025-2045 747.00 - - 747.00 2,599.00 2025 - 2051 870.00 - - 870.00 3,274.00 2025 - Buildout 1,035.00 1,035.00 4,541.00 2025-2035 4,802 2,206 1,300 8,308 9,240 2025 - 2040 6,562 3,276 2,220 12,058 13,450 2025-2045 7,952 4,346 3,230 15,528 17,380 2025 - 2051 9,272 5,666 4,630 19,568 21,972 2025 - Buildout 13,472 8,226 6,730 28,428 31,934 Omemee City of Kawartha Lakes Fenelon Falls Bobcaygeon Lindsay M.Z.O. Flato Lindsay M.Z.O. Bromont Lindsay (Existing Urban Boundary incl. NW Trunk Area) Unserviced Development Location Timing Multiples1 Singles & Semi- Detached Total Units Including Gross Seasonal Total Residential Units Unadjusted for Conversions Apartments2 Other Water Serviced Other Sewer Serviced Watson & Associates Economists Ltd. PAGE A-4 Schedule 2 (Cont'd) City of Kawartha Lakes Estimate of the Anticipated Amount, Type and Location of Development for Which Development Charges Can Be Imposed [1] Includes townhomes and apartments in duplexes. [2] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Source: Derived from 2025 Growth Management Strategy and 2025 Water and Wastewater Servicing and Capacity Master Plan by Watson & Associates Economists Ltd. 9,640.00 (440.00) 9,200.00 110.00 - - 9,310.00 9,310.00 - 9,310.00 9,310.00 12,741.00 (287.00) 12,454.00 167.00 - - 12,621.00 12,621.00 - 12,621.00 12,621.00 16,391.00 70.00 16,461.00 223.00 - - 16,684.00 16,684.00 - 16,684.00 16,684.00 20,778.00 499.00 21,277.00 294.00 - - 21,571.00 21,571.00 - 21,571.00 21,571.00 26,971.00 908.00 27,879.00 340.00 - - 28,219.00 28,219.00 - 28,219.00 28,219.00 2,669.00 - 2,669.00 2,669.00 2,669.00 2,669.00 2,669.00 4,198.00 - 4,198.00 4,198.00 4,198.00 4,198.00 4,198.00 5,305.00 - 5,305.00 5,305.00 5,305.00 5,305.00 5,305.00 6,278.00 - 6,278.00 6,278.00 6,278.00 6,278.00 6,278.00 16,623.00 - 16,623.00 16,623.00 16,623.00 16,623.00 16,623.00 2,017.00 - 2,017.00 2,017.00 2,017.00 2,017.00 2,017.00 2,484.00 - 2,484.00 2,484.00 2,484.00 2,484.00 2,484.00 3,165.00 - 3,165.00 3,165.00 3,165.00 3,165.00 3,165.00 4,026.00 - 4,026.00 4,026.00 4,026.00 4,026.00 4,026.00 4,718.00 - 4,718.00 4,718.00 4,718.00 4,718.00 4,718.00 1,142.00 (35.00) 1,107.00 12.00 1,119.00 1,119.00 1,119.00 1,119.00 2,062.00 (23.00) 2,039.00 18.00 2,057.00 2,057.00 2,057.00 2,057.00 2,571.00 6.00 2,577.00 25.00 2,602.00 2,602.00 2,602.00 2,602.00 3,161.00 39.00 3,200.00 32.00 3,232.00 3,232.00 3,232.00 3,232.00 3,199.00 72.00 3,271.00 37.00 3,308.00 3,308.00 3,308.00 3,308.00 1,378.00 (58.00) 1,320.00 12.00 1,332.00 1,332.00 1,332.00 1,332.00 2,521.00 (38.00) 2,483.00 18.00 2,501.00 2,501.00 2,501.00 2,501.00 3,146.00 9.00 3,155.00 25.00 3,180.00 3,180.00 3,180.00 3,180.00 3,857.00 66.00 3,923.00 32.00 3,955.00 3,955.00 3,955.00 3,955.00 4,601.00 120.00 4,721.00 37.00 4,758.00 4,758.00 4,758.00 4,758.00 209.00 (23.00) 186.00 9.00 195.00 195.00 195.00 195.00 454.00 (15.00) 439.00 13.00 452.00 452.00 452.00 452.00 569.00 4.00 573.00 18.00 591.00 591.00 591.00 591.00 630.00 26.00 656.00 23.00 679.00 679.00 679.00 679.00 760.00 48.00 808.00 27.00 835.00 835.00 835.00 835.00 185.00 (116.00) 69.00 7.00 76.00 76.00 76.00 76.00 252.00 (75.00) 177.00 10.00 187.00 187.00 187.00 187.00 306.00 19.00 325.00 14.00 339.00 339.00 339.00 339.00 358.00 132.00 490.00 18.00 508.00 508.00 508.00 508.00 440.00 239.00 679.00 21.00 700.00 700.00 700.00 700.00 62.00 (116.00) (54.00) 9.00 (45.00) (45.00) (45.00) (45.00) 85.00 (75.00) 10.00 13.00 23.00 23.00 23.00 23.00 103.00 19.00 122.00 18.00 140.00 140.00 140.00 140.00 118.00 132.00 250.00 23.00 273.00 273.00 273.00 273.00 234.00 239.00 473.00 27.00 500.00 500.00 500.00 500.00 1,163.00 (371.00) 792.00 14.00 1,281.00 2,562.00 2,087.00 3,368.00 (252.00) 1,835.00 3,116.00 1,585.00 (241.00) 1,344.00 21.00 1,922.00 3,843.00 3,287.00 5,208.00 (372.00) 2,915.00 4,836.00 1,922.00 60.00 1,982.00 28.00 2,563.00 5,125.00 4,573.00 7,135.00 (492.00) 4,081.00 6,643.00 2,238.00 421.00 2,659.00 37.00 3,331.00 6,661.00 6,027.00 9,357.00 (635.00) 5,392.00 8,722.00 2,662.00 765.00 3,427.00 43.00 4,854.00 9,707.00 8,324.00 13,177.00 (929.00) 7,395.00 12,248.00 18,465 (1,159) 17,306 173 1,281 2,562 18,760 20,041 (252) 18,508 19,789 26,382 (754) 25,628 260 1,922 3,843 27,810 29,731 (372) 27,438 29,359 33,478 187 33,665 351 2,563 5,125 36,579 39,141 (492) 36,087 38,649 41,444 1,315 42,759 459 3,331 6,661 46,549 49,879 (635) 45,914 49,244 60,208 2,391 62,599 532 4,854 9,707 67,985 72,838 (929) 67,056 71,909 Omemee City of Kawartha Lakes Fenelon Falls Bobcaygeon Lindsay M.Z.O. Flato Lindsay M.Z.O. Bromont Lindsay (Existing Urban Boundary incl. NW Trunk Area) Unserviced Development Location Gross Permanent Population in New Units Existing Unit Population Change Permanent Net Population Increase 50% Seasonal Population Equivalent Excluding Conversion 100% Seasonal Population Equivalent Excluding Conversion Net Population Increase (including Institutional and 50% Seasonal Population Equivalent) Including Conversions Net Population Increase (including Institutional and 100% Seasonal Population Equivalent) Including Conversions Institutional Population Other Water Serviced Other Sewer Serviced Net Population Increase (including Institutional and 50% Seasonal Population Equivalent) Excluding Conversions Net Population Increase (including Institutional and 100% Seasonal Population Equivalent) Excluding Conversions Population Change From Conversion of Seasonal to Permanent Units Watson & Associates Economists Ltd. PAGE A-5 Schedule 3 City of Kawartha Lakes Current Year Growth Forecast Mid 2021 to Mid 2025 Mid 2021 Population 109,397 Occupants of Permanent Units (2) 2,042 New Housing Units, multiplied by P.P.U. (3) 2.299 Mid 2021 to Mid 2025 gross population increase 4,695 4,695 Occupants of Conversion Units (2) 96 Converted Units multiplied by P.P.U. (3) 2.744 Mid 2021 to Mid 2025 gross population increase 263 263 Occupants of Net Seasonal Units (2) 280 New Seasonal Units multiplied by P.P.U. (3) 3.660 Mid 2021 to Mid 2025 gross population increase 1,025 1,025 Occupants of New Units 104 Equivalent Institutional Units multiplied by P.P.U. (3) 1.100 Mid 2021 to Mid 2025 gross population increase 114 114 Total Units 2,418 Total gross population increase 6,097 Decline in Housing Units (4) 32,710 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.047 Mid 2021 to Mid 2025 total change in population -1,523 -1,523 Population Estimate to Mid 2025 113,971 Net Population Increase, Mid 2021 to Mid 2025 4,574 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.744 61% 1.670 Multiples (6) 1.909 8% 0.158 Apartments (7) 1.526 31% 0.471 Total 100% 2.299 ¹ Based on 2021 Census custom database ² Based on Building permit/completion acitivty (4) 2021 households taken from StatsCan Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhomes and apartments in duplexes. (7) Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Estimated residential units constructed, - to the beginning of the growth period assuming a six-month lag between construction and occupancy. Total Units (Permanent and Seasonal) Population Watson & Associates Economists Ltd. PAGE A-6 Schedule 4a City of Kawartha Lakes Growth Forecast to 2035 Mid-2025 to Mid-2035 Mid 2025 Population 113,971 Occupants of Permanent Units (2) 8,308 New Housing Units, multiplied by P.P.U. (3) 2.223 Mid 2025 to Mid 2035 gross population increase 18,465 18,465 Occupants of Conversion Units (2) 232 Converted Units multiplied by P.P.U. (3) 2.572 Mid 2025 to Mid 2035 gross population increase 597 597 Occupants of Net Seasonal Units (2) 468 New Seasonal Units multiplied by P.P.U. (3) 3.660 Mid 2025 to Mid 2035 gross population increase 1,713 1,713 Occupants of New Units 157 Equivalent Institutional Units multiplied by P.P.U. (3) 1.100 Mid 2025 to Mid 2035 gross population increase 173 173 Total Units 9,008 Total gross population increase 20,948 Decline in Housing Units (4) 34,752 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.033 Mid 2025 to Mid 2035 total change in population -1,159 -1,159 Population Estimate to Mid 2035 133,760 Net Population Increase, Mid 2025 to Mid 2035 19,789 (1) Mid 2025 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (ppu) is assumed to be: Singles & Semi Detached 2.572 58% 1.487 Multiples (6) 1.907 27% 0.506 Apartments (7) 1.467 16% 0.229 one bedroom or less 1.170 two bedrooms or more 1.872 Total 100% 2.223 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2025 households based upon 32,710 (2011 Census) + 2,042 (Mid 2011 to Mid 2025 unit estimate) = 34,752 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhomes and apartments in duplexes. (7) Includes bachelor, 1 bedroom and 2 bedroom+ apartments. 2021 Population (109,397) + Mid 2021 to Mid 2025 estimated housing units to beginning of forecast period (2,042 x 2.3 = 4,695) + (32,710 x -0.0466 = -1,523) + Seasonal population (280 x 3.66 = 1,025) + Conversions (96 x 2.3 = 263) = 113,971 Total Units (Permanent and Seasonal) Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-7 Schedule 4b City of Kawartha Lakes Growth Forecast to 2040 Mid-2025 to Mid-2040 Mid 2025 Population 113,971 Occupants of Permanent Units (2) 12,058 New Housing Units, multiplied by P.P.U. (3) 2.188 Mid 2025 to Mid 2040 gross population increase 26,382 26,382 Occupants of Conversion Units (2) 342 Converted Units multiplied by P.P.U. (3) 2.572 Mid 2025 to Mid 2040 gross population increase 880 880 Occupants of Net Seasonal Units (2) 708 New Seasonal Units multiplied by P.P.U. (3) 3.660 Mid 2025 to Mid 2040 gross population increase 2,591 2,591 Occupants of New Units 237 Equivalent Institutional Units multiplied by P.P.U. (3) 1.100 Mid 2025 to Mid 2040 gross population increase 261 261 Total Units 13,108 Total gross population increase 30,114 Decline in Housing Units (4) 34,752 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.022 Mid 2025 to Mid 2040 total change in population -754 -754 Population Estimate to Mid 2030 143,330 Net Population Increase, Mid 2025 to Mid 2040 29,359 (1) Mid 2025 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (ppu) is assumed to be: Singles & Semi Detached 2.572 54% 1.400 Multiples (6) 1.907 27% 0.518 Apartments (7) 1.467 18% 0.270 one bedroom or less 1.170 two bedrooms or more 1.872 Total 100% 2.188 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2025 households based upon 32,710 (2011 Census) + 2,042 (Mid 2011 to Mid 2025 unit estimate) = 34,752 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhomes and apartments in duplexes. (7) Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average 2021 Population (109,397) + Mid 2021 to Mid 2025 estimated housing units to beginning of forecast period (2,042 x 2.3 = 4,695) + (32,710 x -0.0466 = -1,523) + Seasonal population (280 x 3.66 = 1,025) + Conversions (96 x 2.3 = 263) = 113,971 Total Units (Permanent and Seasonal) Population Watson & Associates Economists Ltd. PAGE A-8 Schedule 4c City of Kawartha Lakes Growth Forecast to 2045 Mid-2025 to Mid-2045 Mid 2025 Population 113,971 Occupants of Permanent Units (2) 15,528 New Housing Units, multiplied by P.P.U. (3) 2.156 Mid 2025 to Mid 2045 gross population increase 33,478 33,478 Occupants of Conversion Units (2) 452 Converted Units multiplied by P.P.U. (3) 2.572 Mid 2025 to Mid 2045 gross population increase 1,163 1,163 Occupants of Net Seasonal Units (2) 948 New Seasonal Units multiplied by P.P.U. (3) 3.660 Mid 2025 to Mid 2045 gross population increase 3,470 3,470 Occupants of New Units 319 Equivalent Institutional Units multiplied by P.P.U. (3) 1.100 Mid 2025 to Mid 2045 gross population increase 351 351 Total Units 16,928 Total gross population increase 38,462 Decline in Housing Units (4) 34,752 Unit Occupancy, multiplied by P.P.U. change rate (5) 0.0054 Mid 2025 to Mid 2045 total change in population 187 187 Population Estimate to Mid 2045 152,620 Net Population Increase, Mid 2025 to Mid 2045 38,649 (1) Mid 2025 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (ppu) is assumed to be: Singles & Semi Detached 2.572 51% 1.317 Multiples (6) 1.907 28% 0.534 Apartments (7) 1.467 21% 0.305 one bedroom or less 1.170 two bedrooms or more 1.872 Total 100% 2.156 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2025 households based upon 32,710 (2011 Census) + 2,042 (Mid 2011 to Mid 2025 unit estimate) = 34,752 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhomes and apartments in duplexes. (7) Includes bachelor, 1 bedroom and 2 bedroom+ apartments. % Distribution of Estimated Units² Weighted Persons Per Unit Average 2021 Population (109,397) + Mid 2021 to Mid 2025 estimated housing units to beginning of forecast period (2,042 x 2.3 = 4,695) + (32,710 x -0.0466 = -1,523) + Seasonal population (280 x 3.66 = 1,025) + Conversions (96 x 2.3 = 263) = 113,971 Total Units (Permanent and Seasonal) Structural Type Persons Per Unit¹ (P.P.U.) Watson & Associates Economists Ltd. PAGE A-9 Schedule 4d City of Kawartha Lakes Growth Forecast to 2051 Mid-2025 to Mid-2051 Mid 2025 Population 113,971 Occupants of Permanent Units (2) 19,568 New Housing Units, multiplied by P.P.U. (3) 2.118 Mid 2025 to Mid 2051 gross population increase 41,444 41,444 Occupants of Conversion Units (2) 584 Converted Units multiplied by P.P.U. (3) 2.572 Mid 2025 to Mid 2051 gross population increase 1,502 1,502 Occupants of Net Seasonal Units (2) 1,236 New Seasonal Units multiplied by P.P.U. (3) 3.660 Mid 2025 to Mid 2051 gross population increase 4,524 4,524 Occupants of New Units 417 Equivalent Institutional Units multiplied by P.P.U. (3) 1.100 2025 to 2051 gross population increase 459 459 Total Units 21,388 Total gross population increase 47,929 Decline in Housing Units (4) 34,752 Unit Occupancy, multiplied by P.P.U. change rate (5) 0.0379 Mid 2025 to Mid 2051 total change in population 1,315 1,315 Population Estimate to 2051 163,215 Net Population Increase,Mid 2025 to Mid 2051 49,244 (1) Mid 2025 Population based on: (2) (3) Average number of persons per unit (ppu) is assumed to be: Singles & Semi Detached 2.572 47% 1.219 Multiples (6) 1.907 29% 0.552 Apartments (7) 1.467 24% 0.347 one bedroom or less 1.170 two bedrooms or more 1.872 Total 100% 2.118 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2025 households based upon 32,710 (2011 Census) + 2,042 (Mid 2011 to Mid 2025 unit estimate) = 34,752 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhomes and apartments in duplexes. (7) Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Total Units (Permanent and Seasonal) 2021 Population (109,397) + Mid 2021 to Mid 2025 estimated housing units to beginning of forecast period (2,042 x 2.3 = 4,695) + (32,710 x -0.0466 = -1,523) + Seasonal population (280 x 3.66 = 1,025) + Conversions (96 x 2.3 = 263) = 113,971 Structural Type Persons Per Unit¹ (P.P.U.) Based upon forecast building permits/completions assuming a lag between construction and occupancy. % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-10 Schedule 5 City of Kawartha Lakes Growth Forecast to Buildout Mid-2025 to Urban Buildout Mid 2025 Population 113,971 Occupants of Permanent Units (2) 28,428 New Housing Units, multiplied by P.P.U. (3) 2.118 Mid 2025 to Buildout gross population increase 60,208 60,208 Occupants of Conversion Units (2) 854 Converted Units multiplied by P.P.U. (3) 2.572 Mid 2025 to Buildout gross population increase 2,197 2,197 Occupants of Net Seasonal Units (2) 1,798 New Seasonal Units multiplied by P.P.U. (3) 3.660 2025 to Buildout gross population increase 6,581 6,581 Occupants of New Units 484 Equivalent Institutional Units multiplied by P.P.U. (3) 1.100 2025 to Buildout gross population increase 532 532 Total Units 31,080 Total gross population increase 69,518 Decline in Housing Units (4) 34,752 Unit Occupancy, multiplied by P.P.U. change rate (5) 0.0688 Mid 2025 to Buildout total change in population 2,391 2,391 Population Estimate to Buildout 185,880 Net Population Increase, Mid 2025 to Buildout 71,909 (1) Mid 2025 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (ppu) is assumed to be: Singles & Semi Detached 2.572 47% 1.219 Multiples (6) 1.907 29% 0.552 Apartments (7) 1.467 24% 0.347 one bedroom or less 1.170 two bedrooms or more 1.872 Total 100% 2.118 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2025 households based upon 32,710 (2011 Census) + 2,042 (Mid 2011 to Mid 2025 unit estimate) = 34,752 (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhomes and apartments in duplexes. (7) Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Population Total Units (Permanent and Seasonal) Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average 2021 Population (109,397) + Mid 2021 to Mid 2025 estimated housing units to beginning of forecast period (2,042 x 2.3 = 4,695) + (32,710 x -0.0466 = -1,523) + Seasonal population (280 x 3.66 = 1,025) + Conversions (96 x 2.3 = 263) = 113,971 Watson & Associates Economists Ltd. PAGE A-11 Schedule 6 City of Kawartha Lakes Summary of Housing Supply Potential [1] Includes townhomes and apartments in duplexes. [2] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: The above figure excludes 10,690 units proposed under M.Z.O.s. Source: Supply data presented in City of Kawartha Lakes Growth Management Strategy, 2025. Singles & Semi- Detached Multiples [2] Apartments [3] Total Final Approved 2,021 27 112 2,160 % Breakdown 94% 1% 5% 100% Draft Plans Approved 1,300 394 56 1,750 % Breakdown 74% 23% 3% 100% Application Under Review 2,613 558 57 3,228 % Breakdown 81% 17% 2% 100% Total 5,934 979 225 7,138 % Breakdown 83% 14% 3% 100% Stage of Development Density Type Watson & Associates Economists Ltd. PAGE A-12 Schedule 7 City of Kawartha Lakes Historical Residential Building Permits Years 2015 to 2024 [1] Includes townhomes and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Source: Historical housing activity derived from City of Kawartha Lakes building permit data, 2015 to 2024, by Watson & Associates Economists Ltd. Residential Building Permits Total 2015 213 30 5 248 2016 287 0 65 352 2017 168 12 0 180 2018 156 0 4 160 2019 150 0 1 151 Sub-total 974 42 75 1,091 Average (2015 - 2019) 195 8 15 218 % Breakdown 89.3% 3.8% 6.9% 100.0% 2020 217 0 0 217 2021 375 48 277 700 2022 397 52 140 589 2023 263 29 38 330 2024 208 40 175 423 Sub-total 1,460 169 630 2,259 Average ( - 2024) 292 34 126 452 % Breakdown 64.6% 7.5% 27.9% 100.0% 2015 - 2024 Total 2,434 211 705 3,350 Average 247 19 59 325 % Breakdown 72.7% 6.3% 21.0% 100.0% Year Singles & Semi Detached Multiples [1] Apartments [2] Watson & Associates Economists Ltd. PAGE A-13 Schedule 8 City of Kawartha Lakes Persons Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhomes and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 1-5 - - 2.026 2.829 4.045 2.744 6-10 - - 1.927 2.541 4.235 2.545 2.644 11-15 - - 2.049 2.601 3.100 2.538 2.609 16-20 - - 1.735 2.530 3.560 2.489 2.579 21-25 - - 1.861 2.548 3.538 2.546 2.572 26-30 - - 1.683 2.550 3.444 2.508 30+ 0.800 1.554 1.879 2.524 3.781 2.444 2.545 Total 0.682 1.568 1.880 2.543 3.709 2.475 Age of Multiples [1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 1-5 - - - - - 1.909 6-10 - - 1.750 - - 2.000 1.955 11-15 - - - - - 1.765 1.891 16-20 - - 1.769 - - 1.810 1.871 21-25 - - - - - 2.050 1.907 26-30 - - - - - 2.067 30+ 0.083 1.160 1.822 2.667 - 2.109 1.958 Total 0.400 1.353 1.790 2.673 3.824 2.049 Age of Apartments [2] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 1-5 - - - - - 1.526 6-10 - - - - - 1.429 1.477 11-15 - 1.071 - - - 1.500 1.485 16-20 - - - - - 1.455 1.477 21-25 - - 1.667 - - 1.423 1.467 26-30 - 1.077 1.538 - - 1.308 30+ 1.000 1.187 1.675 3.480 - 1.513 1.450 Total 0.833 1.173 1.650 3.515 - 1.497 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.250 1.893 2.797 4.045 2.597 6-10 - 1.400 1.814 2.547 4.235 2.410 11-15 - 1.235 1.922 2.582 2.939 2.437 16-20 - 1.417 1.686 2.502 3.429 2.397 21-25 - 1.313 1.850 2.539 3.538 2.417 25-30 - 1.211 1.623 2.508 3.500 2.383 30+ 1.077 1.291 1.834 2.526 3.750 2.333 Total 0.947 1.292 1.825 2.538 3.670 2.361 Watson & Associates Economists Ltd. PAGE A-14 Schedule 9 City of Kawartha Lakes Person Per Unit Structural Type and Age of Dwelling (2021 Census) 2.74 2.54 2.54 2.49 2.55 2.51 2.44 1.91 2.00 1.76 1.81 2.05 2.07 2.11 1.53 1.43 1.50 1.45 1.42 1.31 1.51 0.00 0.50 1.00 1.50 2.00 2.50 3.00 1-5 6-10 11-15 16-20 21-25 26-30 30+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Watson & Associates Economists Ltd. PAGE A-15 Schedule 10a City of Kawartha Lakes Employment Forecast, 2024 to Buildout Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source: Watson & Associates Economists Ltd. Employment Mid 2011 73,214 0.006 0.045 0.044 0.105 0.087 0.288 440 3,315 3,247 7,673 6,375 21,050 17,735 Mid 2016 75,423 0.006 0.042 0.042 0.100 0.084 0.273 450 3,165 3,145 7,520 6,305 20,585 17,420 Mid 2025 82,796 0.006 0.045 0.044 0.100 0.078 0.273 480 3,749 3,632 8,269 6,496 22,626 18,877 Mid 2035 100,020 0.006 0.050 0.040 0.098 0.075 0.269 590 5,020 4,050 9,790 7,460 26,910 21,890 Mid 2040 108,310 0.006 0.051 0.041 0.095 0.076 0.268 640 5,530 4,440 10,260 8,200 29,070 23,540 Mid 2045 116,320 0.006 0.051 0.042 0.095 0.077 0.270 680 5,990 4,840 11,020 8,930 31,460 25,470 Mid 2051 125,380 0.006 0.053 0.041 0.098 0.078 0.276 734 6,676 5,142 12,305 9,770 34,627 27,950 Buildout 145,000 0.005 0.054 0.042 0.100 0.079 0.280 764 7,830 6,132 14,457 11,455 40,638 32,808 Mid 2011 - Mid 2016 2,209 0.000 -0.003 -0.003 -0.005 -0.003 -0.015 10 -150 -102 -153 -70 -465 -315 Mid 2016 - Mid 2025 7,373 0.000 0.003 0.002 0.000 -0.005 0.000 30 584 487 749 191 2,041 1,457 Mid 2025 - Mid 2035 17,224 0.000 0.005 -0.003 -0.002 -0.004 -0.004 110 1,271 418 1,521 964 4,284 3,013 Mid 2025 - Mid 2040 25,514 0.000 0.006 -0.003 -0.005 -0.003 -0.005 160 1,781 808 1,991 1,704 6,444 4,663 Mid 2025 - Mid 2045 33,524 0.000 0.006 -0.002 -0.005 -0.002 -0.003 200 2,241 1,208 2,751 2,434 8,834 6,593 Mid 2025 - Mid 2051 42,584 0.000 0.008 -0.003 -0.002 -0.001 0.003 254 2,927 1,510 4,036 3,274 12,001 9,073 Mid 2025 - Buildout 62,204 -0.001 0.009 -0.002 0.000 0.001 0.007 284 4,081 2,500 6,188 4,959 18,012 13,931 Mid 2011 - Mid 2016 442 0.000 -0.001 -0.001 -0.001 -0.001 -0.003 2 -30 -20 -31 -14 -93 -63 Mid 2016 - Mid 2025 819 0.000 0.000 0.000 0.000 -0.001 0.000 3 65 54 83 21 227 162 Mid 2025 - Mid 2035 1,722 0.000 0.000 0.000 0.000 0.000 0.000 11 127 42 152 96 428 301 Mid 2025 - Mid 2040 1,701 0.000 0.000 0.000 0.000 0.000 0.000 11 119 54 133 114 430 311 Mid 2025 - Mid 2045 1,676 0.000 0.000 0.000 0.000 0.000 0.000 10 112 60 138 122 442 330 Mid 2025 - Mid 2051 1,638 0.000 0.000 0.000 0.000 0.000 0.000 10 113 58 155 126 462 349 Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Institutional Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Work at Home Industrial Commercial/ Population Related Watson & Associates Economists Ltd. PAGE A-16 Schedule 10b City of Kawartha Lakes Employment and Gross Floor Area (G.F.A.) Forecast, 2025 to Buildout [1] Square Foot Per Employee Assumptions Primary 3,000 Industrial 1,200 Commercial/Population-Related 450 Institutional 700 [2] Primary industry includes agriculture and resource related employment. *Reflects Mid-2025 to Buildout forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 73,214 440 3,247 7,673 6,375 17,735 1,320,000 3,896,400 3,452,900 4,462,500 13,131,800 Mid 2016 75,423 450 3,145 7,520 6,305 17,420 1,350,000 3,774,000 3,384,000 4,413,500 12,921,500 Mid 2025 82,796 480 3,632 8,269 6,496 18,877 1,440,000 4,358,400 3,721,100 4,547,200 14,066,700 Mid 2035 100,020 590 4,050 9,790 7,460 21,890 1,770,000 4,860,000 4,405,500 5,222,000 16,257,500 Mid 2040 108,310 640 4,440 10,260 8,200 23,540 1,920,000 5,328,000 4,617,000 5,740,000 17,605,000 Mid 2045 116,320 680 4,840 11,020 8,930 25,470 2,040,000 5,808,000 4,959,000 6,251,000 19,058,000 Mid 2051 125,380 734 5,142 12,305 9,770 27,950 2,202,000 6,169,900 5,537,400 6,838,700 20,748,000 Buildout 145,000 764 6,132 14,457 11,455 32,808 2,292,000 7,358,400 6,505,700 8,018,500 24,174,600 Mid 2011 - Mid 2016 2,209 10 -102 -153 -70 -315 Mid 2016 - Mid 2025 7,373 30 487 749 191 1,457 90,000 584,400 337,100 133,700 1,145,200 Mid 2025 - Mid 2035 17,224 110 418 1,521 964 3,013 330,000 501,600 684,400 674,800 2,190,800 Mid 2025 - Mid 2040 25,514 160 808 1,991 1,704 4,663 480,000 969,600 895,900 1,192,800 3,538,300 Mid 2025 - Mid 2045 33,524 200 1,208 2,751 2,434 6,593 600,000 1,449,600 1,237,900 1,703,800 4,991,300 Mid 2025 - Mid 2051 42,584 254 1,510 4,036 3,274 9,073 762,000 1,811,500 1,816,300 2,291,500 6,681,300 Mid 2025 - Buildout 62,204 284 2,500 6,188 4,959 13,931 852,000 3,000,000 2,784,600 3,471,300 10,107,900 Mid 2011 - Mid 2016 442 2 -20 -31 -14 -63 Mid 2016 - Mid 2025 819 3 54 83 21 162 10,000 64,933 37,456 14,856 127,244 Mid 2025 - Mid 2035 1,722 11 42 152 96 301 33,000 50,160 68,440 67,480 219,080 Mid 2025 - Mid 2040 1,701 11 54 133 114 311 32,000 64,640 59,727 79,520 235,887 Mid 2025 - Mid 2045 1,676 10 60 138 122 330 30,000 72,480 61,895 85,190 249,565 Mid 2025 - Mid 2051 1,638 10 58 155 126 349 29,308 69,673 69,858 88,135 256,973 Primary [2] Gross Floor Area in Square Feet (Estimated) [1] Incremental Change Commercial/ Population Related Institutional Industrial Commercial/ Population Related Period Population Employment Total Annual Average Primary Industrial Institutional Total Watson & Associates Economists Ltd. PAGE A-17 Schedule 10c City of Kawartha Lakes Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges can be Imposed [1] Square Foot Per Employee Assumptions Primary 3,000 Industrial 1,200 Commercial/Population-Related 450 Institutional 700 [2] Primary industry includes agriculture and resource related employment. *Reflects Mid-2025 to Buildout forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2025 - 2035 - 374,400 485,300 442,400 1,302,100 2,023 2025 - 2040 - 723,600 624,900 828,100 2,176,600 3,175 2025 - 2045 - 1,082,400 862,800 1,184,400 3,129,600 4,512 2025 - 2051 - 1,351,900 1,272,400 1,561,400 4,185,700 6,185 2025 - Buildout - 2,238,000 1,949,300 2,364,600 6,551,900 9,575 2025 - 2035 - - 13,500 13,300 26,800 49 2025 - 2040 - 27,000 30,100 57,100 103 2025 - 2045 - - 37,400 42,700 80,100 144 2025 - 2051 - - 72,500 68,600 141,100 259 2025 - Buildout - - 111,600 104,300 215,900 397 2025 - 2035 - - 13,500 13,300 26,800 49 2025 - 2040 - 27,000 35,700 62,700 111 2025 - 2045 - - 37,400 51,100 88,500 156 2025 - 2051 - - 36,500 68,600 105,100 179 2025 - Buildout - - 55,800 104,300 160,100 273 2025 - 2035 - 30,000 41,000 67,200 138,200 212 2025 - 2040 68,400 65,300 101,500 235,200 347 2025 - 2045 - 102,000 90,500 144,900 337,400 493 2025 - 2051 - 127,200 131,900 206,500 465,600 694 2025 - Buildout - 210,000 202,500 312,200 724,700 1,071 2025 - 2035 - 4,800 54,900 94,500 154,200 261 2025 - 2040 9,600 71,600 149,100 230,300 380 2025 - 2045 - 14,400 99,000 212,800 326,200 536 2025 - 2051 - 18,000 145,400 298,200 461,600 764 2025 - Buildout - 30,000 222,800 451,500 704,300 1,165 2025 - 2035 - 20,400 14,400 13,300 48,100 68 2025 - 2040 - 38,400 17,100 11,900 67,400 87 2025 - 2045 - 57,600 23,400 16,800 97,800 124 2025 - 2051 - 72,000 30,600 20,300 122,900 157 2025 - Buildout - 120,000 47,300 30,100 197,400 248 Primary G.F.A. S.F. [1],[2] Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Institutional G.F.A. S.F.[1] Lindsay (Existing Urban Boundary incl. NW Trunk Area) Development Location Timing Total Non- Residential G.F.A. S.F. Employment Increase Bobcaygeon Lindsay M.Z.O. Bromont Fenelon Falls Omemee Lindsay M.Z.O. Flato Watson & Associates Economists Ltd. PAGE A-18 Schedule 10c (Cont'd) City of Kawartha Lakes Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges can be Imposed [1] Square Foot Per Employee Assumptions Primary 3,000 Industrial 1,200 Commercial/Population-Related 450 Institutional 700 [2] Primary industry includes agriculture and resource related employment. *Reflects Mid-2025 to Buildout forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2025 - 2035 - 20,400 6,800 3,500 30,700 37 2025 - 2040 - 28,800 9,000 6,300 44,100 53 2025 - 2045 - 43,200 12,600 8,400 64,200 76 2025 - 2051 - 54,000 18,000 11,200 83,200 101 2025 - Buildout - 90,000 27,900 17,500 135,400 162 2025 - 2035 - 4,800 27,500 7,000 39,300 75 - 9,600 27,000 6,300 42,900 77 2025 - 2045 - 14,400 37,400 8,400 60,200 107 2025 - 2051 - 18,000 54,500 11,200 83,700 152 2025 - Buildout - 30,000 83,700 17,500 131,200 236 2025 - 2035 330,000 46,800 27,500 20,300 424,600 239 2025 - 2040 480,000 91,200 27,000 23,800 622,000 330 2025 - 2045 600,000 135,600 37,400 34,300 807,300 445 2025 - 2051 762,000 170,400 54,500 45,500 1,032,400 582 2025 - Buildout 852,000 282,000 83,700 69,300 1,287,000 804 2025 - 2035 330,000 501,600 684,400 674,800 2,190,800 3,013 2025 - 2040 480,000 969,600 895,900 1,192,800 3,538,300 4,663 2025 - 2045 600,000 1,449,600 1,237,900 1,703,800 4,991,300 6,593 2025 - 2051 762,000 1,811,500 1,816,300 2,291,500 6,681,300 9,073 2025 - Buildout 852,000 3,000,000 2,784,600 3,471,300 10,107,900 13,931 Primary G.F.A. S.F. [1],[2] Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Institutional G.F.A. S.F.[1] Development Location Timing Total Non- Residential G.F.A. S.F. Employment Increase Other Water Serviced Other Sewer Serviced Unserviced City of Kawartha Lakes Watson & Associates Economists Ltd. PAGE A-19 Schedule 11 City of Kawartha Lakes Employment to Population Ratio by Major Employment Sector, 2006 to 2016 NAICS Employment by industry Comments Primary Industry Employment Categories which relate to local land-based resources 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment Categories which relate primarily to industrial land supply and demand 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment Categories which relate primarily to population growth within the municipality 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Note: 2006-2016 employment figures are classified by North American Industry Classification System (NAICS) Code. Source: Statistics Canada Employment by Place of Work. Watson & Associates Economists Ltd. PAGE B-1 Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 Table B-1 Service Standard Calculation - Fire Protection Services (City-Wide) - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Fire Hall - Lindsay (Station 1) 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 13,763 $984 $1,141 Fire Hall - Bobcaygeon (Station 3) 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 2,662 $984 $1,143 Fire Hall - Dunsford Division (Station 5) 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 $984 $1,139 Fire Hall - Fenelon Falls (Station 22) 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 6,104 $984 $1,143 Fire Hall - Cameron (Station 12) 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 2,532 $984 $1,139 Fire Hall - Omemee (Station 2) 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 $984 $1,143 Fire Hall - Emily (Station 6) 1,898 1,898 1,898 1,898 1,898 1,898 1,898 1,898 1,898 1,898 $984 $1,139 Fire Hall - Woodville (Station 14) 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 3,972 $984 $1,143 Fire Hall - Kirkfield (Station 15) 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 $984 $1,139 Fire Hall - Coboconk (Station 19) 5,478 5,478 5,478 5,478 5,478 5,478 5,478 5,478 5,478 4,478 4,478 4,478 4,478 4,478 4,478 $984 $1,140 Fire Hall - Carden (Station 16) 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 $984 $1,139 Fire Hall - Norland (Station 17) 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 2,814 $984 $1,139 Fire Hall - Pontypool (Station 8) 2,716 2,716 2,716 2,716 4,240 4,240 4,240 4,240 4,240 4,240 4,240 4,240 4,240 4,240 4,240 $984 $1,138 Fire Hall - Bethany (Station 7) 2,426 2,426 2,426 2,426 2,426 2,426 2,426 2,426 2,426 4,250 4,250 4,250 4,250 4,250 4,250 $984 $1,138 Fire Hall - Janetville (Station 9) 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 5,165 $984 $1,139 Fire Hall - Little Britain (Station 10) 2,648 2,648 2,648 2,648 2,648 2,648 2,648 2,648 2,648 2,648 2,648 2,648 $984 $1,139 Fire Hall - Oakwood (Station 11) 2,740 2,740 2,740 2,740 2,740 2,740 2,740 2,740 2,740 2,740 2,740 2,740 $984 $1,139 Fire Hall - Ops (Station 4) 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 2,812 $984 $1,139 Fire Hall - Kinmount (Station 18) 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 2,270 $984 $1,139 Fire Hall - Burnt River (Station 20) 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 5,315 $984 $1,139 Fire Hall - Baddow (Station 21) 1,440 1,440 1,440 1,440 1,440 1,440 1,440 $984 $1,139 Training and Storage Facility - Former Fenelon Township Office 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 2,484 $432 $505 EVT Building - Former Victoria County Roads Depot 2,810 2,810 2,810 2,810 2,810 2,810 2,810 2,810 2,810 2,810 2,810 2,810 $364 $423 Mariposa - New station 21 6,017 6,017 6,017 6,017 $984 $1,143 Total 81,586 81,586 81,586 84,396 85,920 85,920 85,920 84,480 84,480 85,304 83,406 89,423 84,035 84,035 84,035 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 103,232 102,724 102,928 103,088 103,228 103,846 104,074 105,621 106,816 107,965 109,094 110,385 112,174 113,822 114,903 Per Capita & Employee Standard 0.7903 0.7942 0.7927 0.8187 0.8323 0.8274 0.8256 0.7998 0.7909 0.7901 0.7645 0.8101 0.7491 0.7383 0.7314 15 Year Average 2010 to 2024 Quantity Standard 0.7904 Quality Standard $1,103 Service Standard $871 D.C. Amount (before deductions) 15-YEAR - Fire (City-Wide) Forecast Population & Employment 31,841 $ per Capita & Employee $871 Eligible Amount $27,748,158 D.C. Amount (before deductions) 15-YEAR - Fire (Rural) Forecast Population & Employment (Rural) 3,311 $ per Capita & Employee $871 Eligible Amount $2,885,404 Watson & Associates Economists Ltd. PAGE B-3 Table B-2 Service Standard Calculation - Fire Protection Services (City-Wide) - Vehicles City of Kawartha Lakes Service Standard Calculation Sheet Service: Fire Protection Services - Vehicles & Equipment Unit Measure: No. of vehicles Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Aerial Trucks 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 $3,100,000 Tanker Trucks - Low Capacity 15 13 11 9 8 6 6 5 5 5 5 5 5 5 5 $1,122,450 Tanker Trucks - High Capacity 7 9 11 12 14 16 16 17 17 17 17 17 17 17 17 $1,655,000 Pumper Trucks - Low Capacity 9 9 9 8 7 6 5 5 5 5 5 5 5 5 5 $912,284 Pumper Trucks - High Capacity 11 11 11 12 13 14 15 15 15 15 15 15 15 15 15 $1,411,000 Rescue Trucks 10 10 8 6 4 3 3 3 3 4 4 4 4 3 3 $309,100 Trailers 12 13 13 13 13 13 13 13 13 15 17 17 18 19 19 $25,100 ATVs 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 $60,000 UTVs 2 2 3 4 4 $60,000 Cars 4 3 3 3 2 2 2 - - - - - 4 $50,000 Vans/SUVs 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $45,800 Pick Up Tucks 5 5 5 5 6 6 6 7 7 8 9 9 9 11 11 $80,000 Air Light Support Rescue Vehicles 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $553,000 Boats 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $80,000 EVT Maintenance Trucks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $341,400 Rehabilitation Trucks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $341,400 Total 90 91 89 86 85 84 84 83 83 85 90 90 92 95 99 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 103,232 102,724 102,928 103,088 103,228 103,846 104,074 105,621 106,816 107,965 109,094 110,385 112,174 113,822 114,903 Per Capita & Employee Standard 0.0009 0.0009 0.0009 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0009 15 Year Average 2010 to 2024 Quantity Standard 0.0008 Quality Standard $786,313 Service Standard $629 D.C. Amount (before deductions) 15-YEAR - Fire (City-Wide) Forecast Population & Employment 31,841 $ per Capita & Employee $629 Eligible Amount $20,029,581 D.C. Amount (before deductions) 15-YEAR - Fire (Rural) Forecast Population & Employment (Rural) 3,311 $ per Capita & Employee $629 Eligible Amount $2,082,785 Watson & Associates Economists Ltd. PAGE B-4 Table B-3 Service Standard Calculation - Fire Services (City-Wide) - Small Equipment and Gear City of Kawartha Lakes Service Standard Calculation Sheet Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Fire Fighter Equipment Full Time Suppression (2 sets) 17 17 17 17 17 17 17 17 17 17 17 17 17 19 21 $6,240 Full Time Other 10 10 10 10 10 10 10 10 10 10 10 10 10 10 11 $3,170 Volunteer 333 333 333 333 333 333 333 333 336 323 289 299 308 334 358 $3,120 Face Pieces 402 402 402 402 402 402 402 402 405 390 352 364 374 405 435 $430 Helmets 333 333 333 333 333 333 333 333 336 323 289 299 308 334 435 $490 AEDs/Defibrillators 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 $2,800 Cylinders 449 449 449 449 449 449 449 449 449 449 449 449 449 449 449 $1,400 Rechargable Battery Packs 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 $610 RIT Packs 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 $3,700 Sandbaggers - - - - - - - - - - - - - 1 1 $35,900 SCBA 211 211 211 211 211 211 211 211 211 211 211 211 211 211 211 $6,420 Extrication Equipment 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 $76,000 Pagers 485 485 485 485 485 485 485 485 485 485 485 485 485 485 485 $400 Mobile Radios 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 $2,300 Radios 229 229 229 229 229 229 229 229 229 229 229 229 229 229 229 $1,500 Storage/Shipping Containers 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $47,500 Total 2,745 2,745 2,745 2,745 2,745 2,745 2,745 2,745 2,754 2,713 2,607 2,639 2,667 2,753 2,911 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 103,232 102,724 102,928 103,088 103,228 103,846 104,074 105,621 106,816 107,965 109,094 110,385 112,174 113,822 114,903 Per Capita & Employee Standard 0.0266 0.0267 0.0267 0.0266 0.0266 0.0264 0.0264 0.0260 0.0258 0.0251 0.0239 0.0239 0.0238 0.0242 0.0253 15 Year Average 2010 to 2024 Quantity Standard 0.0256 Quality Standard $3,272 Service Standard $84 D.C. Amount (before deductions) 15-YEAR - Fire (City-Wide) Forecast Population & Employment 31,841 $ per Capita & Employee $84 Eligible Amount $2,667,321 D.C. Amount (before deductions) 15-YEAR - Fire (Rural) Forecast Population & Employment (Rural) 3,311 $ per Capita & Employee $84 Eligible Amount $277,362 Watson & Associates Economists Ltd. PAGE B-5 Table B-4 Service Standard Calculation - Police Services - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Policing Services - Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Kawartha Lakes Police Service Headquarters 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 $1,315 $1,525 Total 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 19,580 Population 26,034 26,160 26,154 26,148 26,143 26,137 26,131 26,125 26,119 26,114 26,333 26,609 27,111 27,564 27,821 Employment 5,286 5,339 5,295 5,251 5,208 5,166 5,123 5,111 5,098 5,033 5,079 5,124 5,170 5,215 5,261 Population & Employment 31,320 31,499 31,449 31,400 31,351 31,302 31,254 31,236 31,217 31,147 31,412 31,733 32,280 32,779 33,082 Per Capita & Employee Standard 0.6252 0.6216 0.6226 0.6236 0.6245 0.6255 0.6265 0.6268 0.6272 0.6286 0.6233 0.6170 0.6066 0.5973 0.5919 15 Year Average 2010 to 2024 Quantity Standard 0.6192 Quality Standard 1,525 Service Standard $944 D.C. Amount (before deductions) 10-YEAR - POLICE (LINDSAY AND OPS) Forecast Population & Employment 14,060 $ per Capita & Employee $944 Eligible Amount $13,277,000 Watson & Associates Economists Ltd. PAGE B-6 Table B-5 Service Standard Calculation - Police Services - Vehicles City of Kawartha Lakes Service Standard Calculation Sheet Service: Policing Services - Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Marked Uniform Vehicles 5 5 5 5 5 5 5 5 6 6 8 8 8 10 10 $94,500 Community Service Vehicles 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,300 Canine Vehicles 1 1 1 1 1 1 1 1 1 $80,000 Court Security Vehicles 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $55,500 Central-East Corrections Centre Vehicles 2 2 2 2 2 2 2 2 2 2 $76,500 Unmarked Vehicles 6 6 6 6 6 6 6 6 6 6 7 7 7 10 10 $35,000 Forensic Identification Vehicles 1 1 1 1 1 1 1 1 1 1 1 1 $76,500 Trailer 1 $16,154 ATV 2 2 2 $17,350 Total 16 16 16 17 17 17 17 17 18 17 18 18 20 25 26 Population 26,034 26,160 26,154 26,148 26,143 26,137 26,131 26,125 26,119 26,114 26,333 26,609 27,111 27,564 27,821 Employment 5,286 5,339 5,295 5,251 5,208 5,166 5,123 5,111 5,098 5,033 5,079 5,124 5,170 5,215 5,261 Population & Employment 31,320 31,499 31,449 31,400 31,351 31,302 31,254 31,236 31,217 31,147 31,412 31,733 32,280 32,779 33,082 Per Capita & Employee Standard 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0006 0.0005 0.0006 0.0006 0.0006 0.0008 0.0008 15 Year Average 2010 to 2024 Quantity Standard 0.0006 Quality Standard $62,100 Service Standard $37 D.C. Amount (before deductions) 10-YEAR - POLICE (LINDSAY AND OPS) Forecast Population & Employment 14,060 $ per Capita & Employee $37 Eligible Amount $523,876 Watson & Associates Economists Ltd. PAGE B-7 Table B-6 Service Standard Calculation - Police Services - Small Equipment and Gear City of Kawartha Lakes Service Standard Calculation Sheet Service: Policing Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Police Officer Equipment 43 43 43 43 43 43 43 43 43 43 43 43 43 43 46 $12,530 Special Constable Equipment 8 8 8 8 8 8 8 8 8 8 8 8 8 8 12 $5,500 Drones 1 $16,000 Total 51 51 51 51 51 51 51 51 51 51 51 51 51 51 59 Population 26,034 26,160 26,154 26,148 26,143 26,137 26,131 26,125 26,119 26,114 26,333 26,609 27,111 27,564 27,821 Employment 5,286 5,339 5,295 5,251 5,208 5,166 5,123 5,111 5,098 5,033 5,079 5,124 5,170 5,215 5,261 Population 31,320 31,499 31,449 31,400 31,351 31,302 31,254 31,236 31,217 31,147 31,412 31,733 32,280 32,779 33,082 Per Capita Standard 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0018 15 Year Average 2010 to 2024 Quantity Standard 0.0016 Quality Standard $11,613 Service Standard $19 D.C. Amount (before deductions) 10-YEAR - POLICE (LINDSAY AND OPS) Forecast Population & Employment 14,060 $ per Capita & Employee $19 Eligible Amount $261,235 Watson & Associates Economists Ltd. PAGE B-8 Table B-7 Service Standard Calculation - Services Related to a Highway - Roads City of Kawartha Lakes Service Standard Calculation Sheet Service: Services Related to a Highway - Roads Unit Measure: Various Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/km) Roads and Sidewalks (Km) Road Base 2,693 2,695 2,696 2,697 2,698 2,698 2,698 2,698 2,698 2,698 2,700 2,703 2,704 2,710 2,716 $603,700 Gravel Roads 933 902 900 898 895 895 895 895 895 895 895 895 895 897 899 $26,003 Highfloat Roads (LCB) 933 960 956 952 949 949 949 949 949 949 952 956 957 958 959 $107,740 Asphalt Roads (HCB / LCB) 827 833 840 847 854 854 854 854 854 854 853 852 852 855 858 $544,023 Roadside Protection 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 $64,006 Sidewalks 169 169 169 170 173 173 173 173 173 173 178 181 186 189 191 $209,417 Bridges and Culverts (Item) Bridges 153 154 154 154 155 155 155 155 155 155 146 146 147 148 149 $1,930,356 Culverts (>1.2m Diameter) 165 166 167 168 169 169 169 169 169 169 170 172 176 196 215 $824,958 Traffic Signals (Intersection/Crossing) Traffic Lights - Full Set 26 26 26 26 27 28 30 30 31 31 29 29 29 29 30 $550,000 Traffic Lights - Half Set / Pedestrian 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $275,000 Flashers - All 24 24 24 25 26 27 27 27 27 27 30 30 34 38 38 $8,675 Streetlights (Item) City Standards 1,268 1,272 1,276 1,280 1,284 1,289 1,289 1,289 1,289 1,289 1,306 1,321 1,322 1,312 1,302 $6,800 Non-City Standards 3,491 3,503 3,515 3,527 3,539 3,547 3,547 3,547 3,547 3,547 3,638 3,729 3,729 3,748 3,766 $1,000 Storm and Municipal Drains (Km) Storm Drains 131 131 131 131 131 131 131 131 131 131 137 143 149 149 149 $651,658 Total 10,889 10,911 10,930 10,951 10,976 10,991 10,993 10,993 10,994 10,994 11,110 11,233 11,256 11,305 11,348 Population 98,934 98,527 98,742 98,913 99,064 99,693 99,932 101,647 103,010 104,326 105,623 107,082 108,880 110,537 111,627 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 116,771 116,262 116,414 116,522 116,610 117,176 117,352 119,229 120,754 122,232 123,691 125,311 127,271 129,090 130,342 Per Capita & Employee Standard 0.0932 0.0938 0.0939 0.0940 0.0941 0.0938 0.0937 0.0922 0.0910 0.0899 0.0898 0.0896 0.0884 0.0876 0.0871 15 Year Average 2010 to 2024 Quantity Standard 0.0915 Quality Standard $254,506 Service Standard $23,287 D.C. Amount (before deductions) 26 Year - Roads Forecast Population & Employment 57,858 $ per Capita & Employee $23,287 Eligible Amount $1,347,366,373 Watson & Associates Economists Ltd. PAGE B-9 Table B-8 Service Standard Calculation - Services Related to a Highway - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Class of Service: Public Works - Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Bobcaygeon Depot 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 5,760 $673 $748 Burnt River Depot 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 $673 $744 Carden Depot 4,800 4,800 4,800 4,800 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 $673 $744 Coboconk Depot 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $673 $744 Dalton Depot 1,024 1,024 1,024 1,024 $673 $744 Eldon Depot 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 8,858 $673 $744 Emily Depot 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 $673 $744 Fenelon Depot 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 10,514 $673 $744 Fleet Depot 8,829 8,829 8,829 8,829 8,829 8,829 8,829 8,829 8,829 7,739 385 385 385 385 385 $673 $744 Hartley Depot 2,884 2,884 2,884 2,884 $673 $744 Laxton-Digby-Longford Depot 2,500 2,500 2,500 2,500 $673 $744 Lindsay Operations Depot 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 12,171 $673 $748 Little Britain Depot 1,681 1,681 1,681 1,681 $673 $744 Manvers Depot 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 5,177 $673 $744 Oakwood Depot 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 8,210 $673 $744 Ops Depot 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 4,512 $673 $744 Roads Operations/Engineering Administrative Office 8,235 8,235 8,235 8,235 8,235 8,235 8,235 8,235 8,235 4,365 4,365 4,365 4,365 4,365 4,365 $673 $748 Sturgeon Point Depot 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 $673 $744 Victoria County Emily Depot 2,810 2,810 2,810 $673 $744 Total 106,558 106,558 106,558 103,748 96,379 96,379 96,379 96,379 96,379 91,418 84,064 84,064 84,064 84,064 84,064 Population 98,934 98,527 98,742 98,913 99,064 99,693 99,932 101,647 103,010 104,326 105,623 107,082 108,880 110,537 111,627 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 116,771 116,262 116,414 116,522 116,610 117,176 117,352 119,229 120,754 122,232 123,691 125,311 127,271 129,090 130,342 Per Capita & Employee Standard 0.9125 0.9165 0.9153 0.8904 0.8265 0.8225 0.8213 0.8084 0.7981 0.7479 0.6796 0.6708 0.6605 0.6512 0.6450 15 Year Average 2010 to 2024 Quantity Standard 0.7844 Quality Standard $745 Service Standard $584 D.C. Amount (before deductions) 26 Year - Roads Forecast Population & Employment 57,858 $ per Capita & Employee $584 Eligible Amount $33,814,731 Watson & Associates Economists Ltd. PAGE B-10 Table B-9 Service Standard Calculation - Services Related to a Highway - Storage Structures City of Kawartha Lakes Service Standard Calculation Sheet Class of Service: Public Works - Storage Structures Unit Measure: Various Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Equipment Storage Structures (GFA ft²) Burnt River Equipment Shed (Quonset Hut) 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 2,418 $130 $146 Carden Equipment Shed 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 2,667 $130 $146 Eldon Equipment Shed (Quonset Hut) 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 4,207 $130 $146 Emily Equipment Shed (Pole Barn) 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 4,291 $130 $146 Fenelon Falls Equipment Shed/Depot 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 $130 $149 Fleet Equipment Shed (Pole Barn) 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 4,175 $130 $149 Lindsay Equipment & Aggregate Shed 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 $130 $149 Manvers Equipment Shed (Pole Barn) 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 2,866 $130 $146 Oakwood Equipment Shed 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 $130 $149 Traffic Operations Shed 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 1,531 $130 $146 Salt Storage Structures (GFA ft²) Burnt River Salt Shed 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 $130 $146 Carden Salt Shed 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 $130 $146 Coboconk Salt Shed 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 $130 $146 Eldon Salt Shed 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 1,058 $130 $146 Emily Salt Shed 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 $130 $146 Fenelon Salt Shed 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 $130 $146 Hartley Salt Shed 1,008 1,008 1,008 1,008 $44 $51 Lindsay Salt Shed 625 625 625 625 625 625 625 625 625 625 625 625 625 625 625 $130 $149 Manvers Salt Shed 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 $130 $146 Oakwood Salt Shed 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 1,024 $130 $146 Ops Salt Shed 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 1,080 $130 $146 Sturgeon Point Salt Shed 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 1,008 $130 $146 Downeyville Equipment Storage Shed 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 2,360 $130 $146 Watson & Associates Economists Ltd. PAGE B-11 Table B-9 (cont'd) Service Standard Calculation - Services Related to a Highway - Storage Structures City of Kawartha Lakes Service Standard Calculation Sheet Class of Service: Public Works - Storage Structures Unit Measure: Various Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Sand Storage Structures (Capacity y³) Burnt River Sand Dome 4,040 4,040 4,040 4,040 4,040 4,040 $202 $225 Carden Sand Dome 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 $197 $220 Coboconk Sand Dome 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 $193 $215 Downeyville Sand Dome 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 $225 $250 Eldon Sand Dome 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 3,375 $202 $225 Emily Sand Dome 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 $225 $250 Fenelon Sand Dome 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 2,625 $225 $250 Lindsay Sand Fabric Structure 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 $161 $184 Manvers Sand Dome 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 2,250 $225 $250 Oakwood Sand Dome 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 $205 $228 Ops Sand Dome 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 $202 $225 Sturgeon Point Sand Dome 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 5,175 $205 $228 Verulam Sand Dome 3,340 3,340 - - - - - - - - - - - - - $191 $213 Verulam Sand Fabric Structure 750 750 750 750 750 750 750 750 750 750 750 750 750 $161 $180 Victoria County Emily Sand Dome 2,590 2,590 $225 $250 Total 83,472 83,472 78,292 79,372 78,364 78,364 74,324 74,324 74,324 74,324 74,324 74,324 74,324 74,324 74,324 Population 98,934 98,527 98,742 98,913 99,064 99,693 99,932 101,647 103,010 104,326 105,623 107,082 108,880 110,537 111,627 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 116,771 116,262 116,414 116,522 116,610 117,176 117,352 119,229 120,754 122,232 123,691 125,311 127,271 129,090 130,342 Per Capita & Employee Standard 0.7148 0.7180 0.6725 0.6812 0.6720 0.6688 0.6333 0.6234 0.6155 0.6081 0.6009 0.5931 0.5840 0.5758 0.5702 15 Year Average 2010 to 2024 Quantity Standard 0.6354 Quality Standard $187 Service Standard $119 D.C. Amount (before deductions) 26 Year - Roads Forecast Population & Employment 57,858 $ per Capita & Employee $119 Eligible Amount $6,873,571 Watson & Associates Economists Ltd. PAGE B-12 Table B-10 Service Standard Calculation - Services Related to a Highway - Vehicles and Equipment City of Kawartha Lakes Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Backhoes 10 11 11 12 12 12 12 12 12 12 10 10 10 11 13 $290,000 Chippers 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $168,600 Trailers 13 13 13 13 13 13 13 13 13 13 13 14 16 21 24 $20,000 Graders 12 12 12 12 12 12 12 12 12 12 12 12 12 12 13 $711,000 Standard Tractors 4 4 3 3 2 2 2 2 2 2 2 2 2 2 3 $58,200 Large Tractors 3 3 2 2 2 2 2 2 2 2 $214,400 Sidewalk Machines 6 6 7 7 7 7 7 7 8 9 9 9 9 10 10 $235,000 Trucks - 1-Ton 10 11 12 13 14 14 14 14 14 14 14 16 18 20 20 $118,000 Trucks - Pickup 36 36 37 37 37 37 37 37 37 37 40 44 48 52 53 $73,000 Aerial Truck 1 1 1 1 1 1 1 1 1 2 2 2 1 1 1 $235,900 Trucks - Single Axle 11 10 9 8 8 8 8 8 8 11 11 11 12 14 16 $380,000 Trucks - Tandem 48 48 48 49 49 54 54 54 54 54 55 55 56 56 57 $377,700 Trucks - Tri Axle 3 3 3 3 3 $377,700 Steamers 10 9 9 9 9 9 9 9 9 9 9 9 9 9 9 $21,500 Truck-Mounted Stripers 1 1 1 $12,300 Manual Stripers 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 $12,300 Loaders 10 10 11 12 12 12 12 13 13 13 13 13 13 14 14 $400,000 Cars 6 6 4 3 3 3 3 3 3 3 3 3 2 1 1 $49,000 Leased Cars 1 1 1 1 1 1 1 1 1 1 1 $49,000 SUVs 1 1 1 1 1 1 1 1 1 1 1 1 2 $49,000 Vans 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $103,000 Power Washers 2 2 2 2 2 3 4 4 4 4 3 2 1 1 1 $20,500 Single Road Rollers 1 1 $71,900 Double Road Roller 1 1 1 1 2 2 2 2 2 2 2 2 $119,700 Street Sweepers 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 $487,200 Vacuum Trucks (with Trailer) 1 1 1 1 1 1 1 1 1 1 $1,088,000 Weed Sprayers 1 1 1 $8,600 Generators 9 9 9 9 9 9 9 9 9 9 8 7 6 5 4 $59,000 Water Tanks 10 10 10 10 10 10 10 10 10 10 10 10 14 18 20 $45,000 Hot Asphalt Boxes 2 3 3 3 3 9 9 9 9 $88,400 Tanker 1 $126,000 Wheeled Excavators 1 1 2 2 $748,100 Lawn Tractor 2 $30,000 Watson & Associates Economists Ltd. PAGE B-13 Table B-10 (cont'd) Service Standard Calculation - Services Related to a Highway - Vehicles and Equipment City of Kawartha Lakes Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Brushing Arm 1 $215,400 Attachments (Mower, Trackless, Sweeper) 11 $41,000 Plow 4 4 $8,900 Snowblower 4 4 $23,700 Spreader 4 4 $11,900 Total 223 224 223 224 224 227 230 233 234 239 236 246 257 290 319 Population 98,934 98,527 98,742 98,913 99,064 99,693 99,932 101,647 103,010 104,326 105,623 107,082 108,880 110,537 111,627 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 116,771 116,262 116,414 116,522 116,610 117,176 117,352 119,229 120,754 122,232 123,691 125,311 127,271 129,090 130,342 Per Capita Standard 0.0019 0.0019 0.0019 0.0019 0.0019 0.0019 0.0020 0.0020 0.0019 0.0020 0.0019 0.0020 0.0020 0.0022 0.0024 15 Year Average 2010 to 2024 Quantity Standard 0.0020 Quality Standard $225,370 Service Standard $451 D.C. Amount (before deductions) 26 Year - Roads Forecast Population & Employment 57,858 $ per Capita & Employee $451 Eligible Amount $26,079,070 Watson & Associates Economists Ltd. PAGE B-14 Table B-11 Service Standard Calculation - Parks and Recreation Services - Parkland Amenities City of Kawartha Lakes Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: Various Description Unit 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Parks Facilities Carden Recreation Centre Small Pavillion ft² 1,500 1,500 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $195 Carden Recreation Centre Public Washroom ft² 215 215 215 215 215 215 215 215 215 215 215 215 215 215 215 $305 Carden Recreation Centre Concession Booth ft² 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 $305 Carden Recreation Centre Fairgrounds Washroom Building ft² 750 750 750 750 750 750 750 750 750 750 $455 Carden Recreation Centre Fairgrounds Pavillion ft² 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 $455 Wilson Fields Maintenance Building 1 ft² 877 877 877 877 877 877 877 877 877 877 877 877 877 877 877 $130 Wilson Fields Maintenance Building 2 ft² 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 $130 Wilson Fields Washroom Building ft² 1,296 1,296 1,296 1,296 1,296 1,296 1,296 $305 Bobcaygeon Beach Park Changehouse and Booth ft² 3,095 3,095 3,095 3,095 3,095 3,095 3,095 3,095 3,095 3,095 3,095 3,095 3,095 - - $455 Bobcaygeon Beach Park Gate House ft² 80 80 80 80 80 80 80 80 80 80 80 80 80 - - $432 Tommy Anderson Park Washroom/Storage Building ft² 560 560 560 560 560 560 560 560 560 560 560 560 560 560 560 $305 Burnt River Park Concession Booth ft² 480 480 480 480 480 480 480 480 480 480 480 480 480 480 480 $305 Burnt River Park Storage Building ft² 960 960 960 960 960 960 960 960 960 960 960 960 960 960 960 $130 Cameron Ballpark Booth/Washroom Building ft² 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 $305 Cameron Ballpark Storage Shed ft² 85 85 85 85 85 85 85 85 85 85 85 85 85 85 85 $241 Coboconk Club House ft² 646 646 646 646 646 646 646 646 646 646 646 646 646 646 646 $670 Centennial Trailer Park Pavilion West Side ft² 200 200 1,435 1,435 1,435 1,435 1,435 1,435 1,435 1,435 1,435 1,435 1,435 1,435 1,435 $455 Centennial Trailer Park Storage Shed West side ft² 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 $130 Centennial Trailer Park Washroom 1 West Side ft² 600 600 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 1,300 $271 Centennial Trailer Park Maintenance Building ft² 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $130 Centennial Trailer Park Washroom 2 East Side ft² 750 750 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 $234 Centennial Trailer Park Well House ft² 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 $305 Centennial Trailer Park Ticket Office ft² 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 $305 Centennial Trailer Park Community Hall ft² 411 411 411 411 411 411 411 411 411 411 411 411 411 411 411 $305 Garnet Graham Park Concession Booth and Washroom ft² 375 375 375 375 375 375 375 375 375 375 375 375 375 375 375 $1,846 Russ Baptiste Park Concession Stand ft² 829 829 829 829 829 829 829 829 829 829 829 829 829 829 829 $305 Russ Baptiste Park Storage Shed (Quonset Hut) ft² 775 775 775 775 775 775 775 775 775 775 775 775 775 775 775 $130 Janetville Park Refreshment Booth ft² 240 240 240 240 240 240 240 240 240 240 240 240 240 240 240 $305 Janetville Park Storage Shed ft² 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 $130 Austin Sawmill Park Storage Building ft² 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 $130 Austin Sawmill Park Train Station ft² 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 2,087 $308 Austin Sawmill Park Washroom ft² 256 256 256 256 256 256 256 256 256 256 256 256 256 256 256 $305 Memorial Park Washroom Building ft² 350 350 350 350 350 350 350 350 350 350 350 350 350 350 350 $1,809 Old Mill Park Washroom ft² 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 $305 Rivera Park Washroom/Shower Building ft² 837 837 837 837 837 837 837 837 837 837 837 837 837 837 837 $305 Omemee Beach Park Washrooms ft² 288 288 288 288 288 288 288 288 288 288 288 288 288 288 288 $931 Nimigon Park Storage Building ft² 384 384 384 384 384 384 384 384 384 384 384 384 384 384 384 $130 Nimigon Park Refreshment Building ft² 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 2,653 $305 Valentia Park Washroom/Storage Building ft² 300 300 300 300 300 300 300 300 $455 Woodville Park Concession Booth and Storage Building ft² 520 520 520 520 520 520 520 520 520 520 520 520 520 520 520 $130 Elgin Park Public Washroom ft² 100 100 100 100 100 100 100 100 100 100 100 1,600 1,600 1,600 1,600 $305 George St. Park Storage Shed ft² 237 237 237 237 237 237 237 237 237 237 237 237 237 237 237 $130 Nayoro Park Public Washroom ft² 108 108 108 108 108 108 108 108 108 108 108 108 108 108 108 $305 Victoria Road Ballpark Concession Booth ft² 517 517 517 517 517 517 517 517 517 517 517 517 517 517 517 $305 Victoria Road Park Washroom ft² 458 458 458 458 458 458 458 458 458 458 458 458 458 458 458 $305 Emily/Omemee Community Park Storage Shed ft² 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43 $130 Oakwood Baseball Park Storage Shed ft² 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 1,813 $175 Watson & Associates Economists Ltd. PAGE B-15 Table B-11 (cont'd) Service Standard Calculation - Parks and Recreation Services - Parkland Amenities City of Kawartha Lakes Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: Various Description Unit 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Oakwood Baseball Park Washrooms/Storage Building ft² 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 $455 Little Britain Community Park Washroom/Storage Building ft² 693 693 693 693 693 693 693 693 693 693 693 693 693 693 693 $305 Little Britain Community Park Storage Building ft² 118 118 118 118 118 118 118 118 118 118 118 118 118 118 118 $130 Dragon Flies Building ft² 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 1,149 $670 Parks and Rec Storage - Baddow ft² 2,426 2,426 2,426 2,426 2,426 2,426 2,426 2,426 $130 Optimist Soccer Park Storage Building ft² 2,051 2,051 2,051 2,051 2,051 2,051 $18 Woodville Park Washroom and Canteen ft² 943 943 943 943 943 943 943 943 943 943 943 943 943 943 943 $305 Coboconk Legion Park Washroom and Canteen ft² 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 $305 Amenities Trails - Natural (mixed natural and granular) m 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 41,000 $8 Trails - Granular m 82,567 82,567 82,567 82,567 82,567 82,567 82,567 82,567 82,567 82,997 82,997 82,997 82,997 82,997 82,997 $60 Trails - Paved m 4,183 4,183 4,183 4,183 4,183 4,183 4,183 4,183 4,183 4,183 5,100 5,100 5,100 5,100 5,100 $118 Natural m 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 $8 Roadways - Granular m² 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 3,238 $46 Roadways - Paved m² 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 4,781 $105 Pathways m² 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 19,609 $115 Artwork Each 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $58,037 Barriers/Walls m 480 480 480 480 480 480 480 480 480 480 480 480 480 480 480 $58,797 Baseball Diamonds Each 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 $54,816 Basketball Courts Each $41,372 Benches Each 617 617 617 617 617 617 617 617 617 617 617 617 617 617 617 $795 Bike Stands Each 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $653 Bins/Containers Each 265 265 265 265 265 265 265 265 265 265 275 285 295 305 315 $1,826 Bleachers Each 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 $19,599 Boardwalks m² 285 285 285 285 285 285 285 285 285 285 285 285 285 285 285 $76 Boat Launches Each 37 37 37 37 37 37 37 37 37 37 37 37 37 37 37 $47,131 Chess Tables Each 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $2,613 Columns/Posts Each 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 $15,679 Dams Each 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $275,217 Decorative Fleet Each 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $45,731 Docks/Piers Each 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 $38,648 Drinking Water Fountains/Taps Each 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,019 Fences/Gates Each 43 43 43 43 43 43 43 43 43 43 43 43 43 43 43 $3,584 Fountains Each 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $104,529 Horseshoe Pits Each 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $1,326 Lights Each 232 232 232 232 232 232 232 232 232 232 232 232 232 232 232 $12,993 Memorials/Plaques Each 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 $1,659 Parking Lots m² 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 62,696 $88 Picnic Tables Each 363 363 363 363 363 363 363 363 363 363 363 363 363 363 363 $784 Playgrounds Each 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 $171,341 Railings m 620 620 620 620 620 620 620 620 620 620 620 620 620 620 620 $183 Scoreboards Each 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $25,041 Shelters/Gazebos m² 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 2,735 $108 Signs Each 52 52 52 52 52 52 52 52 52 52 62 72 82 87 94 $2,395 Skateboarding Ramps-Parks Each 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $37,476 Watson & Associates Economists Ltd. PAGE B-16 Table B-11 (cont'd) Service Standard Calculation - Parks and Recreation Services - Parkland Amenities City of Kawartha Lakes Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Backhoes 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $261,034 Chippers 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 $168,562 Trailers 16 17 17 17 18 18 18 18 18 18 18 18 18 18 20 $15,200 Forklift 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $74,874 Tractors - Small 18 20 22 23 25 25 25 25 25 25 25 25 25 25 25 $76,119 Tractors - Standard 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 $110,926 Trucks - 1 Ton 3 3 3 3 3 3 3 3 3 3 6 6 6 7 8 $112,219 Trucks - Pickup 11 11 12 12 12 12 12 12 12 12 12 12 12 12 12 $80,958 Vans 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 $86,841 ATVs 1 1 1 1 1 1 1 1 1 1 1 1 - - - $17,350 Ice Resurfacers - Propane 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 $119,700 Ice Resurfacers - Electric 1 1 1 1 1 1 1 1 1 1 1 1 $119,700 Large Area Mower 1 1 1 $172,313 Lawn Tractor 12 12 12 12 12 12 12 12 12 12 12 12 12 12 8 $30,155 Forestry Aerial Truck 1 1 1 1 1 1 1 $500,000 Attachments (Mower, Trackless, Sweeper) 6 $26,026 Stump Grinder 1 $16,231 Total 81 84 87 89 94 94 94 94 95 95 98 98 98 100 104 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard 0.0009 0.0010 0.0010 0.0010 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0010 0.0010 0.0011 15 Year Average 2010 to 2024 Quantity Standard 0.0011 Quality Standard $69,809 Service Standard $77 D.C. Amount (before deductions) 10 Year - All Other Forecast Population 18,335 $ per Capita $77 Eligible Amount $1,407,945 Watson & Associates Economists Ltd. PAGE B-17 Table B-12 Service Standard Calculation - Parks and Recreation Services - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Lindsay Recreation Complex 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 99,950 $403 $450 Fenelon Falls Arena and Community Centre 25,556 25,556 44,552 44,552 44,552 44,552 44,552 44,552 44,552 44,552 44,552 44,552 44,552 44,552 44,552 $403 $450 Little Britain Arena and Community Centre 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 41,689 $403 $446 Oakwood Arena and Community Centre 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 34,465 $403 $446 Manvers Arena and Community Centre 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 34,050 $403 $446 Ops Arena and Community Centre 30,570 30,570 30,570 30,570 30,570 30,570 30,570 30,570 30,570 30,570 30,570 30,570 30,570 - - $379 $419 Bobcaygeon Arena and Community Centre 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 29,821 $403 $450 Victoria Park Armoury 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 29,796 $670 $741 Woodville/Eldon Arena and Community Centre 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 29,200 $403 $446 Emily/Omemee Arena and Community Centre 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 $403 $450 Norland Recreation Centre 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 $670 $741 Norland Community Centre and Library 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 9,020 $670 $741 Fenelon Community Centre and Library 7,196 7,196 7,196 7,196 7,196 7,196 8,696 8,696 8,696 8,696 8,696 8,696 6,075 6,075 6,075 $670 $741 Forbert Memorial Pool 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 7,213 $775 $857 Woodville Town Hall 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 8,590 $513 $567 Carden Recreation Centre 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 7,704 $670 $741 Kinmount Community Centre 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 6,342 $670 $740 Burnt River Recreation Centre 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $670 $741 Coboconk Train Station 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 4,446 $670 $740 Bolsover Community Hall 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 4,370 $670 $741 Community Services Garage and Work Shop 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 4,043 $673 $744 Community Services Administration Building 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 2,775 $513 $567 Janetville Community Hall 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 4,005 $670 $741 Lindsay Operations Depot 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 4,727 $673 $747 Dalton Community Centre and Library 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 3,416 $670 $741 Baddow Community Centre 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $670 $741 Palestine Community Hall 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 1,335 $432 $479 Coronation Community Hall 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 2,128 $432 $479 Mariposa Community Hall 8,044 8,044 8,044 8,044 8,044 8,044 8,044 8,044 8,044 8,044 8,044 8,044 8,044 $432 $482 Total 485,873 485,873 504,869 504,869 504,869 504,869 506,369 506,369 506,369 506,369 506,369 506,369 503,748 465,134 465,134 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard 5.6897 5.7169 5.9218 5.9064 5.8924 5.8459 5.8436 5.7516 5.6849 5.6226 5.5629 5.4947 5.3714 4.8823 4.8357 15 Year Average 2010 to 2024 Quantity Standard 5.6015 Quality Standard $518 Service Standard $2,904 D.C. Amount (before deductions) 10 Year - All Other Forecast Population 18,335 $ per Capita $2,904 Eligible Amount $53,239,706 Watson & Associates Economists Ltd. PAGE B-18 Table B-13 Service Standard Calculation - Parks and Recreation Services - Vehicles and Equipment City of Kawartha Lakes Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Vehicle) Backhoes 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $261,034 Chippers 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 $168,562 Trailers 16 17 17 17 18 18 18 18 18 18 18 18 18 18 20 $15,200 Forklift $74,874 Tractors - Small $76,119 Tractors - Standard $110,926 Trucks - 1 Ton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $112,219 Trucks - Pickup 18 20 22 23 25 25 25 25 25 25 25 25 25 25 25 $80,958 Vans 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 $86,841 ATVs 3 3 3 3 3 3 3 3 3 3 6 6 6 7 8 $17,350 Ice Resurfacers - Propane 11 11 12 12 12 12 12 12 12 12 12 12 12 12 12 $119,700 Ice Resurfacers - Electric 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 $119,700 Large Area Mower 1 1 1 $172,313 Lawn Tractor 12 12 12 12 12 12 12 12 12 12 12 12 12 12 8 $30,155 Forestry Aerial Truck 1 1 1 1 1 1 1 $500,000 Attachments (Mower, Trackless, Sweeper) 6 $26,026 Stump Grinder 1 $16,231 Total 70 73 76 77 82 82 82 82 83 83 86 86 87 89 93 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard 0.0008 0.0009 0.0009 0.0009 0.0010 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0010 15 Year Average 2010 to 2024 Quantity Standard 0.0009 Quality Standard $70,978 Service Standard $64 D.C. Amount (before deductions) 10 Year - All Other Forecast Population 18,335 $ per Capita $64 Eligible Amount $1,171,240 Watson & Associates Economists Ltd. PAGE B-19 Table B-14 Service Standard Calculation - Library Services - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Library Services - Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Bethany Branch 1,500 1,500 1,500 1,500 1,500 1,500 1,500 6,267 6,267 6,267 6,267 6,267 6,267 6,267 6,267 $825 $999 Bobcaygeon Branch 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 5,220 5,220 5,220 5,220 5,220 $825 $1,002 Burnt River Branch 776 776 776 776 776 776 $825 $999 Cambray Branch 1,500 1,500 1,500 1,500 1,500 1,500 $825 $999 Carden Branch 800 800 800 800 800 800 800 $825 $999 Coboconk Branch 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,340 1,520 $825 $999 Dalton Branch 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 $825 $999 Downeyville Branch 900 900 900 900 900 $825 $999 Dunsford Branch 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 1,237 $825 $999 Fenelon Falls Branch 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 2,160 $825 $999 Kinmount Branch 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 $825 $999 Kirkfield Branch 1,300 1,300 1,300 1,300 1,300 1,300 1,300 4,536 4,536 4,536 4,536 4,536 4,536 4,536 4,536 $825 $999 Lindsay Branch 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 19,500 19,500 19,500 19,500 19,500 $825 $998 Little Britain Branch 925 925 925 925 925 925 925 925 925 925 925 925 925 925 925 $825 $999 Norland Branch 980 980 980 980 980 980 980 980 980 980 980 980 980 980 980 $825 $999 Oakwood Branch 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 $825 $999 Omemee Branch 410 410 410 410 410 410 410 410 1,600 1,600 1,600 1,600 1,600 1,600 1,600 $825 $1,002 Woodville Branch 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,865 1,865 1,865 1,865 1,865 1,865 $825 $999 Total 31,228 31,228 31,228 31,228 31,228 30,328 28,052 35,255 36,445 37,310 50,230 50,230 50,230 50,230 50,410 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard 0.3657 0.3674 0.3663 0.3653 0.3645 0.3512 0.3237 0.4004 0.4092 0.4143 0.5518 0.5451 0.5356 0.5272 0.5241 15 Year Average 2010 to 2024 Quantity Standard 0.4275 Quality Standard $999 Service Standard $427 D.C. Amount (before deductions) 10 Year - All Other Forecast Population 18,335 $ per Capita $427 Eligible Amount $7,829,228 Watson & Associates Economists Ltd. PAGE B-20 Table B-15 Service Standard Calculation - Library Services - Collection Materials City of Kawartha Lakes Service Standard Calculation Sheet Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Refercence Materials 8,202 7,916 7,228 6,869 5,706 5,935 4,985 4,187 3,070 3,070 3,050 3,050 3,050 3,050 3,050 $86 Circulating Materials 153,752 168,638 152,658 152,205 154,801 178,245 171,745 160,217 153,086 153,086 139,420 129,592 119,764 106,186 106,473 $43 Periodicals 120 133 133 133 133 114 114 115 110 103 105 97 92 92 90 $71 Electronic Resources 8,202 9,005 13,826 14,960 14,960 14,960 14,725 15,439 15,450 15,450 15,759 16,074 16,109 16,431 16,889 $56 eBooks 1,357 1,306 5,798 5,876 3,809 2,855 2,159 1,278 2,849 2,849 3,935 4,085 4,234 4,909 5,130 $53 eAudiobooks 249 439 630 785 753 530 293 381 381 188 635 807 978 1,151 1,245 $114 Total 171,882 187,437 180,273 180,828 180,162 202,639 194,021 181,617 174,946 174,746 162,904 153,705 144,227 131,819 132,877 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard 2.0128 2.2054 2.1145 2.1155 2.1027 2.3464 2.2390 2.0629 1.9641 1.9404 1.7896 1.6679 1.5379 1.3837 1.3814 15 Year Average 2010 to 2024 Quantity Standard 1.9243 Quality Standard $46 Service Standard $88 D.C. Amount (before deductions) 10 Year - All Other Forecast Population 18,335 $ per Capita $88 Eligible Amount $1,608,530 Watson & Associates Economists Ltd. PAGE B-21 Table B-16 Service Standard Calculation - Library Services - Vehicles City of Kawartha Lakes Service Standard Calculation Sheet Service: Library Services - Vehicles Unit Measure: No. of library collection items Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/item) Library Courier Vans 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 $86,841 Total 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard (per 1,000) 0.0070 0.0071 0.0070 0.0070 0.0070 0.0069 0.0069 0.0068 0.0067 0.0067 0.0066 0.0065 0.0064 0.0063 0.0062 15 Year Average 2010 to 2024 Quantity Standard (per 1,000) 0.0067 Quality Standard $88 Service Standard $1 D.C. Amount (before deductions) 10 Year - All Other Forecast Population 18,335 $ per Capita $1 Eligible Amount $10,818 Watson & Associates Economists Ltd. PAGE B-22 Table B-17 Service Standard Calculation - By-law Enforcement Services - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Municipal By-law Enforcement Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. By-Law Enforcement Office 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 2,500 2,500 2,500 2,500 2,500 $683 $759 Lease space at Humane Society 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 1,057 $683 $759 Total 2,257 2,257 2,257 2,257 2,257 2,257 2,257 2,257 2,257 2,257 3,557 3,557 3,557 3,557 2,500 Population 71,857 71,450 71,769 72,044 72,299 73,032 73,375 74,431 75,135 75,792 76,430 77,230 78,686 80,001 80,749 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 89,694 89,185 89,441 89,653 89,845 90,515 90,795 92,013 92,879 93,698 94,498 95,459 97,077 98,554 99,464 Per Capita & Employee Standard 0.0252 0.0253 0.0252 0.0252 0.0251 0.0249 0.0249 0.0245 0.0243 0.0241 0.0376 0.0373 0.0366 0.0361 0.0251 15 Year Average 2010 to 2024 Quantity Standard 0.0281 Quality Standard $759 Service Standard $21 D.C. Amount (before deductions) 10 Year - All Other Forecast Population & Employment 21,348 $ per Capita & Employee $21 Eligible Amount $455,353 Watson & Associates Economists Ltd. PAGE B-23 Table B-18 Service Standard Calculation - By-law Enforcement Services - Vehicles and Equipment City of Kawartha Lakes Service Standard Calculation Sheet Service: Municipal By-law Enforcement Vehicles and Equipment Unit Measure: No. of Vehicles and Equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Vans 5 5 5 5 5 5 5 5 5 5 5 6 6 7 7 $67,694 ATVs 2 2 2 2 2 2 2 2 2 2 $17,350 Equipped Officers 12 12 12 12 12 12 12 12 12 12 12 13 13 15 15 $9,500 Total 17 17 17 17 17 19 19 19 19 19 19 21 21 24 24 Population 71,857 71,450 71,769 72,044 72,299 73,032 73,375 74,431 75,135 75,792 76,430 77,230 78,686 80,001 80,749 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 89,694 89,185 89,441 89,653 89,845 90,515 90,795 92,013 92,879 93,698 94,498 95,459 97,077 98,554 99,464 Per Capita & Employee Standard 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 15 Year Average 2010 to 2024 Quantity Standard 0.0002 Quality Standard $27,250 Service Standard $5 D.C. Amount (before deductions) 10 Year - All Other Forecast Population & Employment 21,348 $ per Capita & Employee $5 Eligible Amount $116,347 Watson & Associates Economists Ltd. PAGE B-24 Table B-19 Service Standard Calculation - Paramedic Services - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Paramedic Facilities Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Fenelon Falls Paramedic Station - Former Roads Depot 2,090 2,090 2,090 4,860 4,860 4,860 4,860 4,860 4,860 4,860 4,860 4,860 4,860 4,860 4,860 $824 $914 Fenelon Falls Quonset Hut Storage Unit 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 $170 $193 Paramedic Service Headquarters 500 500 500 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 $824 $914 Fire Hall - Bobcaygeon (Station 3) 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 1,774 $824 $914 Fire Hall - Pontypool (Station 8) 1,444 1,444 1,444 1,444 1,444 1,444 1,444 1,444 1,444 1,444 1,444 $824 $914 Coboconk Fire Hall 1,000 1,000 1,000 1,000 1,000 1,000 $824 $914 Training & Storage Facility - Former Fenelon Township Office 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 3,726 $824 $914 Lindsay Operations Depot 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 6,224 $824 $914 Lindsay-West Satellite Post (McLaughlin Rd. Lease) 800 800 800 800 800 800 800 800 800 800 800 800 800 800 $824 $914 Coboconk Satellite Post (OPP Station Lease) 250 250 250 250 250 250 250 $824 $914 Community Paramedic Program - Former Fire Hall - Oakwood (Station 11) 2,740 2,740 2,740 $824 $914 Fenelon Township Community Centre 1,677 1,677 1,677 1,677 1,677 1,677 1,677 $824 $914 Total 14,814 15,614 15,864 21,734 23,178 23,178 23,178 23,178 24,855 25,605 25,605 25,605 28,345 28,345 28,345 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 103,232 102,724 102,928 103,088 103,228 103,846 104,074 105,621 106,816 107,965 109,094 110,385 112,174 113,822 114,903 Per Capita & Employee Standard 0.1435 0.1520 0.1541 0.2108 0.2245 0.2232 0.2227 0.2194 0.2327 0.2372 0.2347 0.2320 0.2527 0.2490 0.2467 15 Year Average 2010 to 2024 Quantity Standard 0.2157 Quality Standard $898 Service Standard $194 D.C. Amount (before deductions) 20 Year - Paramedic Forecast Population & Employment 42,329 $ per Capita & Employee $194 Eligible Amount $8,201,667 Watson & Associates Economists Ltd. PAGE B-25 Table B-20 Service Standard Calculation - Paramedic Services - Vehicles and Equipment City of Kawartha Lakes Service Standard Calculation Sheet Service: Paramedic Vehicles Unit Measure: No. of vehicles and equipment Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Value ($/Item) General Equipment and Furnishings (Set) Paramedic Equipment (FT) 40.8 40.8 40.8 40.8 44.8 44.8 44.8 45.8 46.3 50.3 55.3 59.3 65.3 69.3 73.3 $6,800 Paramedic Equipment (PT) 40 40 40 40 44 44 44 44 44 44 53 56 60 64 68 $5,600 Public Access Defibrillators (PADs) 51 51 51 51 52 56 70 74 77 77 77 77 77 77 77 $2,600 Fleet (Item) Ambulances, Fully Equipped (incl. spares) 12 12 13 13 13 13 13 13 13 14 14 14 14 14 14 $570,000 Emergency Support Vehicles 1 1 1 1 1 1 $166,900 Pick-up - 1/2 ton 1 1 1 1 1 1 1 $78,019 Emergency Response Units, Fully Equipped 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4 $230,000 Cars 1 1 1 1 1 1 $65,300 SUV 1 1 1 1 1 1 1 1 1 $80,000 Logistics Trucks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Community Service Vehicles 1 1 1 $42,900 Trailers 1 1 1 1 1 1 $77,200 Community Paramedics Vehicles 8 8 8 $150,000 Total 149.8 150.8 152.8 151.8 160.8 164.8 177.8 182.8 186.3 191.3 205.3 213.3 231.3 239.3 247.3 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Employment 17,837 17,735 17,672 17,609 17,546 17,483 17,420 17,582 17,744 17,906 18,068 18,229 18,391 18,553 18,715 Population & Employment 103,232 102,724 102,928 103,088 103,228 103,846 104,074 105,621 106,816 107,965 109,094 110,385 112,174 113,822 114,903 Per Capita & Employee Standard 0.0015 0.0015 0.0015 0.0015 0.0016 0.0016 0.0017 0.0017 0.0017 0.0018 0.0019 0.0019 0.0021 0.0021 0.0022 15 Year Average 2010 to 2024 Quantity Standard 0.0018 Quality Standard $50,261 Service Standard $90 D.C. Amount (before deductions) 20 Year - Paramedic Forecast Population & Employment 42,329 $ per Capita & Employee $90 Eligible Amount $3,829,505 Watson & Associates Economists Ltd. PAGE B-26 Table B-21 Service Standard Calculation - Public Health Services - Facilities City of Kawartha Lakes Service Standard Calculation Sheet Service: Public Health Unit Measure: sq.ft. of building area Description 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Coboconk Medical Centre 4,936 4,936 4,936 4,936 4,936 4,936 4,936 4,936 $1,017 $1,128 Coboconk Medical Centre - Portable 2,100 2,100 2,100 2,100 2,100 2,100 2,100 $1,017 $1,128 Kirkfield Medical Centre 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 3,864 $1,017 $1,128 Kirkfield Nurse Practioner Office 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 4,612 $1,017 $1,128 1699 Kirkfield Rd 4,612 $1,017 $1,128 Omemee Medical Centre 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 3,035 $1,017 $1,128 HKPR District Health Unit Facility (Lindsay share) 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 14,479 $1,017 $1,128 Total 30,926 30,926 30,926 30,926 30,926 30,926 30,926 30,926 28,090 28,090 28,090 28,090 28,090 28,090 28,090 Population 85,395 84,989 85,256 85,479 85,682 86,363 86,654 88,039 89,073 90,059 91,027 92,156 93,783 95,269 96,188 Per Capita Standard 0.3622 0.3639 0.3627 0.3618 0.3609 0.3581 0.3569 0.3513 0.3154 0.3119 0.3086 0.3048 0.2995 0.2948 0.2920 15 Year Average 2010 to 2024 Quantity Standard 0.3337 Quality Standard $1,128 Service Standard $376 D.C. Amount (before deductions) Public Health Forecast Population 35,736 $ per Capita $376 Eligible Amount $13,449,601 Watson & Associates Economists Ltd. PAGE C-1 Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 Appendix C: Long-Term Capital and Operating Cost Examination As a requirement of the D.C.A. under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the D.C. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the City's 2023 Financial Information Return. In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. Table C-1 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while municipal program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Watson & Associates Economists Ltd. PAGE C-3 Table C-1 Operating and Capital Expenditure Impacts for Future Capital Expenditures ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES 1 Fire Protection Services (City-Wide) 1,616,995 2,384,094 4,001,090 2 Fire Protection Services (Rural) 116,791 - 116,791 3 Police Services 448,762 4,799,866 5,248,628 4 Services Related to a Highway 13,241,142 3,824,107 17,065,249 5 Transit Services 157,442 - 157,442 6 Parks and Recreation Services 1,054,119 1,161,146 2,215,265 7 Library Services 324,549 183,872 508,421 8 Municipal By-law Enforcement 40,814 193,559 234,373 9 Paramedic Services 472,532 7,881,709 8,354,241 10 Public Health Services 169,338 45,668 215,006 11 Wastewater Treatment Services 7,906,471 3,969,176 11,875,647 12 Wastewater Collection Services 3,560,648 - 3,560,648 13 Water Treatment Services 13,242,380 - 13,242,380 14 Water Distribution Services 162,198 6,919,252 7,081,450 Total 42,514,181 31,362,451 73,876,633 SERVICE/CLASS Watson & Associates Economists Ltd. PAGE D-1 Appendix D Local Service Policy Watson & Associates Economists Ltd. PAGE D-2 The guidelines outline, in general terms, the size and nature of infrastructure that is included in the study as a development charge project, versus infrastructure that is considered as a local service, to be emplaced separately by landowners, pursuant to a development agreement. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered, in the context of these policy guidelines and subsection 59(2) of the D.C.A., 1997, on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, as well as the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area. 1. Arterial and Collector Roads 1.1. Collector roads internal to development - direct developer responsibility under s.59 of the D.C.A. (as a local service). 1.2. Roads (collector and arterial) external to development - include in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. (dependent on local circumstances). 1.3. Stream crossing and rail crossing road works, excluding underground utilities but including all other works within lands to be dedicated to the City or rail corridors - include in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. (dependent on local circumstances). 2. Traffic Signals 2.1. Traffic signalization within or external to development - include in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. 3. Intersection Improvements 3.1. Intersection improvements on arterial and collector roads external to development - include in D.C. calculation (linked to arterial and collector road funding source in item 1). 3.2. Intersections improvements within specific developments and all works necessary to connect to entrances (private and specific subdivision, including auxiliary lanes) to the roadway - direct developer responsibility under s.59 of D.C.A. (as a local service). Watson & Associates Economists Ltd. PAGE D-3 3.3. Intersections with provincial highways - include in D.C. calculation to the extent that they are City responsibility. 4. Streetlights 4.1. Streetlights on arterial and collector roads external to development - include in D.C. calculation (linked to arterial and collector road funding source in item 1). 4.2. Streetlights within specific developments - direct developer responsibility under s.59 of D.C.A. (as a local service). 5. Sidewalks 5.1. Sidewalks on arterial and collector roads external to development (except where abutting development) - include in D.C. calculation (linked to arterial and collector road funding source in item 1). 5.2. Sidewalks on MTO roads - include in D.C. calculation or, in exceptional circumstances, may be local improvement or direct developer responsibility through local service provisions (s.59 of D.C.A.). 5.3. Sidewalks within developments or external to development (which are a local service within the area to which the plan relates) - direct developer responsibility as a local service provision (under s.59 of D.C.A.) 6. Bike Routes/Bike Lanes/Bike Paths/Multi-Use Trails/Naturalized Walkways 6.1. Bike routes and bike lanes, within road allowance, external to development - include in D.C. calculation, consistent with the service standard provisions of the D.C.A., s.5(1). 6.2. Bike paths/multi-use trails/naturalized walkways external to development - include in D.C. calculation consistent with the service standard provisions of the D.C.A., s.5(1). 6.3. Bike lanes, within road allowance, internal to development - direct developer responsibility through local service provisions (s.59 of D.C.A.). 6.4. Bike paths/multi-use trails/naturalized walkways internal to development - direct developer responsibility through local service provisions (s.59 of D.C.A.). 6.5. Trail Bridges/underpasses and associated works - include in D.C. calculation consistent with the service standard provisions of the D.C.A., s.5(1). Watson & Associates Economists Ltd. PAGE D-4 7. Noise Abatement Measures 7.1. External to which the plan relates - include in D.C. calculation. 8. Traffic Control Systems 8.1. Include in D.C. calculation. 9. Land Acquisition for Road Allowances 9.1. Land acquisition for arterial roads - Dedication under the Planning Act provisions (s.51, s.42) through development lands; in areas with limited or no development, include in D.C. calculation (to the extent eligible). 9.2. Land Acquisition for collector roads - Dedication under the Planning Act provisions (s.51, s.42) through development lands (up to 26 metre right-of-way); in areas with limited or no development, include in D.C. calculation (to the extent eligible). 9.3. Land Acquisition for grade separations (beyond normal dedication requirements) - include in the D.C. calculation (to the extent eligible). 10. Land Acquisition for Easements 10.1. Easement costs external to subdivisions - include in D.C. calculation or, in exceptional circumstances, may be local improvement or direct developer responsibility through local service provisions (s.59 of D.C.A.). 11. Storm Water Management 11.1. Quality and quantity works - direct developer responsibility through local service provisions (s. 59 of D.C.A.). 11.2. Oversizing of stormwater management works external to developments - subject to best efforts clauses within development agreements by the City. This however does not preclude the use of D.C.'s on an area specific basis for community systems. 12. Water 12.1. Water supply, treatment and related facilities - include in the City-Wide D.C. calculation for urban serviced area. Watson & Associates Economists Ltd. PAGE D-5 12.2. Watermains external to development, that are not required by a specific development - include in City-Wide D.C. calculations for urban service area. 12.3. Marginal costs of waterworks within development or within the area to which the plan relates, above 200 mm nominal diameter or the minimum size required by the development, whichever is larger - include in City-Wide D.C. calculations for urban service area. 12.4. Pumping Stations and connections to trunk mains and pumping stations to service a specific development exclusively - direct developer responsibility though local service provisions (s.59 of D.C.A.). 13. Wastewater 13.1. Wastewater discharge, treatment and related facilities - include in the City- Wide D.C. calculation for the urban serviced area. 13.2. Wastewater sewers external to development that are not required by a specific development - include in City-Wide D.C. calculation for the urban serviced area 13.3. Marginal costs of wastewater sewer works within development or within the area to which the plan relates, above 200mm nominal diameter or the minimum size required by the development, whichever is larger - City-Wide D.C. calculation for the urban serviced area. 13.4. Pumping Stations and connections to trunk mains and pumping stations to service specific development exclusively - direct developer responsibility through local service provisions (s.59 of D.C.A.). 14. Parkland 14.1. The following requirements are part of the conditions of s.51 and 53 Planning Act agreements. The City also requires the owner to dedicate parkland or provide cash-in-lieu, consistent with the Planning Act provisions. The costs of the following service are deemed a direct responsibility of the developer and have not been included in the D.C. calculation. 14.2. Preparation of the conceptual park design, including facility fit, grading and drainage. 14.3. Clearing, grubbing, rough grading, spreading of top soil, finished grading, seeding of site, and perimeter fencing. Watson & Associates Economists Ltd. PAGE D-6 14.4. Stormwater connection, sanitary sewer connection, and water service connection to the property line, including all appurtenances (consistent with the plan). 14.5. Other parkland development costs are included the D.C. calculation, including the necessary fields, diamonds, playground equipment, and park buildings. Watson & Associates Economists Ltd. PAGE E-1 Appendix E Proposed Development Charge By-law The Corporation of the City of Kawartha Lakes By-Law 2025-XXX A By-Law to Impose Development Charges in the City of Kawartha Lakes Recitals: 1. The City of Kawartha Lakes (hereinafter, the "City") will experience growth through development requiring the provision of capital assets and other capital-related services by the City, and intends to recover from development the costs of such services to the extent permitted by law or as otherwise considered advisable by Council. 2. Subsection 2(1) of the Development Charges Act, 1997, S.O. 1997, c. 27 (hereinafter, the "Act") provides that the council of a municipality may by by- law impose development charges against land to pay for increased capital costs required because of increased needs for services arising from the development of the area to which the by-law applies. 3. A report for public circulation entitled "2025 Development Charges Background Study" (hereinafter, the "study") prepared by Watson and Associates Economists Limited (hereinafter, "Watson") and a draft proposed development charges by-law (hereinafter, the "proposed by-law") prepared by the Manager of Corporate Assets, each prepared for the City pursuant to section 10 of the Act, were dated and made publicly available on September 17, 2025. 4. Council held a public meeting regarding the study and proposed by-law on October 21, 2025, and public notice of the meeting was given by the City, as required by section 12 of the Act. 5. On November 7, 2025, Watson issued an addendum to the study and the Manager of Corporate Assets revised the proposed by-law, and the resulting amended study, dated November 7, 2025, and revised proposed by-law were made publicly available on November 12, 2025. 6. Having reviewed the amended study and revised proposed by-law, Council has adopted the amended study and has determined, pursuant to section 12 of the Act, that no further public meetings are required on these documents. 7. Having adopted the amended study, including the growth-related capital forecast therein, Council has thereby indicated its intention to ensure the corresponding increase in need for services attributable to anticipated development is met, and has further indicated its intention to recover the costs of the committed and future excess capacity identified in the study through development charges or other similar charges. Accordingly, the Council of The Corporation of the City of Kawartha Lakes enacts this By-Law 2025-XXX. 1 Section 1: Definitions and Interpretation 1.01 Definitions: In this by-law: "accessory use" means a use of lands, buildings or structures that is naturally and normally incidental and subordinate in purpose and or gross floor area, and exclusively devoted to, the principal use of such lands, buildings or structures; "Act" means the Development Charges Act, 1997, S.O. 1997, c. 27; "agricultural" means non-residential lands, buildings or structures or any parts thereof used, designed or intended solely for farming, apiaries, fish farming, animal husbandry or the cultivation of trees, shrubs, flowers, grains, sod, fruits, vegetables and other crops or ornamental plants, or similar agrarian activity, on land of at least three (3) hectares in area, and includes barns, implement sheds, seasonal roadside stands and silos but does not include facilities principally used for processing, year-round wholesaling or year-round retailing; "agricultural development charges" means development charges pertaining to agricultural development, as determined in the Development Charges Background Study adopted by Council for the purposes of this by-law, subject to the same indexation applied to development charges set out in Schedules 1 and 2 to this by-law; "apartment dwelling unit" means a stacked dwelling unit or any dwelling unit within a dwelling: (a) containing three (3) or more dwelling units whereby access to each dwelling unit is obtained through one or more common entrances from the outside and the dwelling units are connected by one or more interior corridors; or (b) attached to a non-residential building or structure such that the dwelling unit is not a single-detached, semi-detached or row dwelling unit; "Assessment Act" means the Assessment Act, R.S.O. 1990, c. A.31; "bedroom" means a habitable room of more than seven (7) square metres of floor area, including a den, study or other similar area, within a dwelling unit, but does not include a bathroom, living room, dining room or kitchen; "benefitting area" means a geographically defined area in which lands, buildings or structures receive or will receive a benefit from the emplacement of capital assets facilitating a municipal service; "Building Code Act" means the Building Code Act, 1992, S.O. 1992, Chap. 23; "capital charge" means a charge or fee imposed on owners by the City, pursuant to sections 390 through 400 of the Municipal Act, for the purpose of recovering capital and related costs; "capital cost" means a cost defined in subsection 5(3) of the Act that is incurred or proposed to be incurred by the City or a local board thereof, directly or by others on behalf of and as authorized by the City or local board; "Chief Building Official" means the person appointed by Council to discharge the duties of the chief building official, pursuant to the Building Code Act; "City", "City of Kawartha Lakes" or "Kawartha Lakes" means The Corporation of the City of Kawartha Lakes and includes its entire geographic area; "City Treasurer" means the person appointed by Council to discharge the duties of the treasurer described in section 286 of the Municipal Act; "Condominium Act" means the Condominium Act, 1998, S.O. 1998, c.19; "Council" or "City Council" means the municipal council for the City; "demolition" means the deconstruction or removal of a building or structure or any material part thereof; "development" means the construction, erection, installation, placing, extension or expansion of a building or structure, or the material alteration or repair of a building or structure so as to increase or otherwise alter the size or useability thereof, and includes the installation of a building unit fabricated or moved from elsewhere such as a repurposed shipping container; "development charge" means a charge imposed by the City on development pursuant to the Act and this by-law or a predecessor thereof, as context requires; "Development Charges Background Study" means a study undertaken by or on behalf of the City, in accordance with section 10 of the Act, and that has been or is intended to be adopted by Council; "development charges reserve fund" means a fund or collection of funds of the City established pursuant to section 33 of the Act; "dwelling" means a residential building or structure or any parts thereof that are occupied or capable of being occupied as a home, residence or domestic establishment or habitat of some kind; "dwelling unit" means any part of a dwelling, which may include the entirety thereof, used exclusively, or designed or intended for exclusive use, by one person or two or more cohabitating persons; "electricity generation" means non-residential lands, buildings or structures or any parts thereof that are not of an accessory use and that: (a) form, support or accommodate a system or utility used, designed or intended to convert wind, solar, biomass, coal, natural gas, waste, water flow or other form of energy into electricity to be fed into the general electricity grid, and includes such systems or utilities that participate or are designed or intended to participate in the Independent Electricity System Operator's Feed-In Tariff Program, or successor thereof, or similar program; and (b) constitute development for which gross floor area is inapplicable, indeterminate or otherwise unrepresentative of the scale of the development, as determined by the Chief Building Official; "general service area" means all land within the corporate boundaries of the City; "gross floor area", as determined by the Chief Building Official, means: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential portion thereof, the total area of all building floors measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of party walls dividing residential and non-residential uses; and (b) in the case of a non-residential building or structure, or in the case of a mixed-use building or structure, the non-residential portion thereof, the total area of all building floors measured between the outside surfaces of the exterior walls, or between the outside surfaces of exterior walls and the centre line of party walls dividing residential and non- residential uses; "large apartment dwelling unit" means an apartment dwelling unit that contains two (2) or more bedrooms; "local board" means a board of education, public utility, commission, public library board, board of park management, local board of health, board of commissioners of police, planning board, or any other board, commission, committee, body or local authority established or exercising any power or authority under any legislation with respect to any of the affairs or purposes, including school purposes, of the City; "local services" means those services, facilities or things that are: (a) under the jurisdiction of the City and related to a plan of subdivision, or within the area to which the plan relates, to which sections 41, 51 or 53 of the Planning Act pertain; and (b) those services to which section 59 of the Act pertains; "Manager of Corporate Assets" means the person who holds that position with the City, and his or her delegate(s), or, in the event of organizational changes, another person designated by Council; "multiple dwelling unit" means a park model trailer or any dwelling unit that is not a single-detached, semi-detached, row or apartment dwelling unit; "Municipal Act" means the Municipal Act, 2001, S.O. 2001, c. 25; "municipal service" means a service set out in subsection 3(4) of the Act, including a class of service as defined in section 7 of the Act, provided by or on behalf of the City and designated in subsection 2.01; "nameplate generating capacity", "nameplate capacity" or "plated capacity" means, in respect of electricity generation, the maximum rated continuous load-carrying capability to generate electricity, expressed in kilowatts (KW), as verified, if applicable, by the Electrical Safety Authority or any successor thereof or similar regulating authority; "non-residential" means lands, buildings or structures or any parts thereof that are not residential; "Northwest Lindsay Development Area" means all lands to which the Northwest Sanitary Sewer Works Capital Charge applies, as indicated in Schedule 3 to this by-law; "Northwest Sanitary Sewer Works Capital Charge" means the capital charge imposed pursuant to City of Kawartha Lakes By-Law 2015-151 (Northwest Sanitary Sewer Capital Charge), as amended, or any successor thereof; "other non-residential" means non-residential lands, buildings or structures or any parts thereof that are not agricultural or electricity generation; "owner" means the owner of land, or successor thereof, or a person who has made application for an approval for the development of land upon which development charges are or are to be imposed; "park model trailer" means a CAN/CSA-Z241 Series-03 (R2013) recreational trailer, as defined by the Standards Council of Canada, or successor thereof, that is, in the determination of the Chief Building Official, constructed and certified in accordance with that standard, built on a single chassis, and designed exclusively for seasonal residential use through relocation from time to time; "Planning Act" means the Planning Act, R.S.O. 1990, c. P.13; "permit" means a written permission or authorization issued by the Chief Building Official for the development or occupancy of a building or structure, or part thereof, pursuant to the Building Code Act; "police service area" means the area serviced by the City of Kawartha Lakes Police Service, or any successor thereof, that being: (a) the union of all land within the former Township of Ops and the former Town of Lindsay, and all land that has been or may be appended thereto by the City to accommodate development, or in the alternative; (b) all land deemed to receive service by the City of Kawartha Lakes Police Service, or any successor thereof, as otherwise established by Council subsequent to the enactment of this by-law; "principal use" means a use of lands, buildings or structures by which development charges are, as indicated by Schedules 1 and 2 to this by- law, imposed pursuant to this by-law, or that is agricultural; "redevelopment" means development that involved, involves or will involve, on the same land as the development, the demolition or removal of an existing or former building or structure or the conversion of an existing building or structure from one principal use to another principal use, in whole or in part; "residential" means lands, buildings or structures or any parts thereof used, designed or intended to provide accommodation or quarters for living, sleeping, sanitary and culinary purposes, or otherwise to serve as a domestic residence, and includes park model trailers, but does not include motels, hotels, tents, truck campers, tourist trailers, mobile camper trailers, cottage establishments, boarding houses, lodging houses or rooming houses of any kind; "row dwelling unit" means a dwelling unit within a dwelling containing three (3) or more attached dwelling units in a single row, whereby each dwelling unit has an exclusive entrance from the outside and is vertically separated from any abutting dwelling unit; "rural-Ops service area" means all land within the police service area that does not form part of the water or wastewater service areas; "rural-other service area" means all land within the general service area that does not form part of the urban-Lindsay, urban-NWT, urban-other or rural-Ops service areas; "semi-detached dwelling unit" means a dwelling unit within a dwelling consisting of exactly two (2) attached dwelling units, whereby each dwelling unit has an exclusive entrance from the outside and is vertically separated from the abutting dwelling unit; "service area" means a benefitting area in respect of a municipal service or set of municipal services, and includes the police, transit, water, wastewater, wastewater-NWT, general, urban-Lindsay, urban-NWT, urban-other, rural-Ops and rural-other service areas; "single-detached dwelling unit" means a dwelling unit within a dwelling consisting of exactly one (1) dwelling unit that is not attached to another dwelling unit; "small apartment dwelling unit" means an apartment dwelling unit that is not a large apartment dwelling unit; "stacked dwelling unit" means a dwelling unit, other than a row dwelling unit, within a dwelling containing at least three (3) dwelling units, whereby each dwelling unit is separated from the others vertically and or horizontally and has an exclusive entrance from the outside; "temporary building or structure" means a former building or structure that, in the determination of the Chief Building Official, was created with the express intention of being used for a continuous period not to exceed six (6) months and had existed for a continuous period not exceeding six (6) months; "transit service area" means the area serviced by the City's public transit service, that being: (a) all land within the former Town of Lindsay, and all land that has been or may be appended thereto by the City to accommodate development, or in the alternative; (b) all land deemed to receive the City's public transit service as otherwise established by Council subsequent to the enactment of this by-law; "urban-Lindsay service area" means the intersection of all land within the transit, police, water and wastewater service areas outside the wastewater-NWT service area; "urban-NWT service area" means the intersection of all land within the transit, police, water and wastewater-NWT service areas; "urban-other service area" means the intersection of all land within the water and wastewater service areas outside the urban-Lindsay and urban- NWT service areas; "wastewater-NWT service area" means the intersection of all land within the Northwest Lindsay Development Area and the wastewater service area; "wastewater service area" means the union of all land serviced by a City wastewater system, that being all land on which buildings or structures are, as determined by the Chief Building Official, required, planned or expected to connect, or are capable of being connected in future, to a City wastewater system designed to service such lands, buildings or structures; "water service area" means the union of all land serviced by a City water system, that being all land on which buildings or structures are, as determined by the Chief Building Official, required, planned or expected to connect, or are capable of being connected in future, to a City water system designed to service such lands, buildings or structures; and "zoning by-law" means the zoning by-law or set of zoning by-laws of the City enacted pursuant to section 34 of the Planning Act. 1.02 Rules of Interpretation: For the purposes of interpretation of this by-law: (a) all word variations and derivatives of the terms defined in subsection 1.01 shall carry a corresponding meaning, and the words "include", "includes", "inclusive" and "including" are not to be read as limiting the meaning of any word, term, phrase or description that follows; (b) headings herein are used for reference only and shall not affect the interpretation of this by-law; and (c) references to laws in this by-law are meant to refer to the statutes, as amended from time to time, including the regulations made thereunder, that are applicable within the Province of Ontario. 2 Section 2: Development Charges Respecting Municipal Services 2.01 Designated Municipal Services: Development charges shall be imposed in respect of the following municipal services to pay for the increased capital costs required because of the increased needs for those services arising from development: (a) public health, being the service or services referred to by paragraph 15 of subsection 2(4) of the Act; (b) by-law enforcement, being part of the service or services referred to by paragraph 18 of subsection 2(4) of the Act; (c) parks and recreation, being the service or services referred to by paragraph 14 of subsection 2(4) of the Act; (d) library, being the service or services referred to by paragraph 12 of subsection 2(4) of the Act; (e) growth-related studies, being the service or services referred to by paragraphs 5 and 6 of subsection 5(3) of the Act and subsection 7(3) of the Act; (f) fire, being part of the service or services referred to by paragraph 10 of subsection 2(4) of the Act; (g) fire-rural, being part of the service or services referred to by paragraph 10 of subsection 2(4) of the Act; (h) paramedic, being the service or services referred to by paragraph 11 of subsection 2(4) of the Act; (i) police, being the service or services referred to by paragraph 9 of subsection 2(4) of the Act; (j) transit, being the service or services referred to by paragraph 7 of subsection 2(4) of the Act; (k) roads and related, being the service or services referred to by paragraph 4 of subsection 2(4) of the Act; (l) water treatment, being part of the service or services referred to by paragraph 1 of subsection 2(4) of the Act; (m)water distribution, being part of the service or services referred to by paragraph 1 of subsection 2(4) of the Act; (n) wastewater treatment, being part of the service or services referred to by paragraph 2 of subsection 2(4) of the Act; and (o) wastewater collection, being part of the service or services referred to by paragraph 2 of subsection 2(4) of the Act. 2.02 Geographic Application: Respecting the municipal services designated in subsection 2.01, the development charges set out in Schedules 1 and 2 to this by-law shall be imposed on development in the general service area, except that: (a) fire-rural development charges shall be imposed outside the water service area only; (b) police development charges shall be imposed in the police service area only; (c) transit development charges shall be imposed in the transit service area only; (d) water treatment and water distribution development charges shall be imposed in the water service area only; (e) wastewater treatment development charges shall be imposed in the wastewater service area only; and (f) wastewater collection development charges shall be imposed in the wastewater service area only, exclusive of the wastewater-NWT service area. 2.03 Aggregation for Administrative Convenience: For greater certainty, the aggregation of development charges across municipal services and by certain service areas in Schedules 1 and 2 to this by-law is for administrative convenience only and does not affect or override the geographic application of individual development charges by service area prescribed by subsection 2.02. 2.04 Independent of Specific Need or Benefit: Development charges shall be determined and imposed pursuant to this by-law without regard for the specific increase in need for municipal services that may be required by, or the specific municipal service benefits that may be conferred to, any individual or particular development. 3 Section 3: Nexus between Development Approvals and Development Charges 3.01 Designated Development Approvals: In accordance with subsection 2(2) of the Act, but subject to subsection 3.02, the development charges referred to by subsection 2.02 shall be imposed on development within the City only if such development requires any of the following approvals or actions: (a) the passing of a zoning by-law or of an amendment thereto under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act; or (g) the issuing of a permit under the Building Code Act in relation to a building or structure. 3.02 Treatment of Enlargement of an Existing Dwelling Unit: To qualify subsection 3.01 in respect of subsection 2(3) of the Act and to provide for greater certainty with respect to the application of this by-law to the enlargement of an existing dwelling unit: (a) the approvals and actions described in subsection 3.01, as required by subsection 2(3) of the Act, exclude those whose only effect is to permit the enlargement of an existing dwelling unit; (b) the enlargement of an existing dwelling unit is considered, for the purposes of subsection 2.01, development that does not increase the need for municipal services; and (c) by reason of paragraph (b) of this subsection and for the purposes of paragraph 9 of subsection 5(1) of the Act, paragraph 3 of subsection 5(6) of the Act and paragraphs 1 through 3 of section 6 of the Act, no inapplicability of development charges arising from subsection 2(3) of the Act shall be construed as any form of exemption, discount or similar measure designed to reduce development charges below the allowable quantum in any particular case. 3.03 Multiple Development Approvals: For any given development, only one development charge for each municipal service designated in subsection 2.01 shall be imposed, even though two or more of the approvals and actions described in subsection 3.01 may be required by the development. 3.04 Subsequent Development Approvals: Notwithstanding subsection 3.03, whereupon two or more of the approvals and actions described in subsection 3.01 occur at different times for a development, additional development charges shall be imposed in respect of any increased or additional development arising directly from such approvals or actions. 3.05 After Permit Issuance: Whereupon a development requires an approval or action described in subsection 3.01 after the issuance of a permit for the development, any unpaid portion of development charges pertaining to the development shall be paid prior to the granting of the approval or the execution of the action that is required. 3.06 Permit Not Required: Whereupon a development does not require a permit but does require one or more of the approvals or actions described in subsection 3.01, development charges shall nonetheless be imposed in respect of any increased or additional development arising directly from such approvals or actions. 3.07 Withholding of Permit Issuance: To the extent permitted by the Act, the Chief Building Official shall withhold issuance of a permit for a development for which any development charges remain unpaid. 3.08 Local Services and Other Conditions of Development: Nothing in this by-law prevents the City from requiring as a condition of development, through a development agreement or not, that an owner, at his or her own expense, install local services required by the City, or pay for local infrastructure connections or other local capital works, or administrative, processing, permit, inspection or other fees, or capital charges, community benefits charges or other levies required by the City. 4 Section 4: Calculation and Payment of Development Charges 4.01 General Basis of Calculation: Development charges imposed by this by- law shall be calculated: (a) in the case of residential development, or the residential portion of a mixed-use development, based upon the number and type of dwelling units comprising such development; and (b) in the case of non-residential development, or the non-residential portion of a mixed-use development, based upon the type of non- residential development and gross floor area or nameplate generating capacity of such development, whichever unit of measure is applicable. 4.02 Residential Calculation: The residential development charges per dwelling unit set out in Schedule 1 to this by-law shall be imposed on residential development, including dwelling units accessory to non- residential uses, and, in the case of a mixed-use building or structure, against the residential portion thereof, and calculated with respect to each of the applicable municipal services according to the type of dwelling unit. 4.03 Non-Residential Calculation: The non-residential development charges per unit of gross floor area or per 500 kilowatts of nameplate generating capacity, as the case may be, set out in Schedule 2 to this by-law shall be imposed on non-residential development, and, in the case of a mixed-use building or structure, against the non-residential portion thereof, and calculated with respect to each of the applicable municipal services according to the type of non-residential use. 4.04 Timing of Calculation and Payment: Development charges pertaining to a development shall, subject to the Act, be calculated as of, and be made payable on: (a) in the case that a permit for the development is or will be withheld pursuant to subsection 3.07, the date of issuance of the permit; otherwise (b) the date on which the first approval or action described in subsection 3.01 is granted or executed for the development. 4.05 Override by the Act: In the case of the Act rendering subsection 4.04 inoperable or inapplicable, the dates on which development charges pertaining to a development are calculated and made payable shall be determined by the Chief Building Official in accordance with the Act. 4.06 Override by Future Section 27 Agreement: Notwithstanding subsection 4.04 but only to the extent permitted by the Act, the dates on which development charges pertaining to a development are calculated and made payable may, pursuant to section 27 of the Act, be determined by an agreement between the City and the owner required to pay the development charges, whereby the City may, to the extent permitted by the Act, register the agreement against the title of the land to which the development charges apply. 4.07 Collection as Property Taxes: In accordance with subsection 32(1) of the Act, development charges that remain unpaid after they become payable by the subject owner pursuant to this by-law shall be added to the tax roll and shall be collected from the owner in the same manner as property taxes. 5 Section 5: Development Charges Exemptions, Refunds and Credits 5.01 Legislated Exemptions, Etcetera: Provisions of the Act, including subsections 2(3.1) through 2(3.3), sections 3 through 4.4 and sections 26.1 through 26.3 thereof, which override this by-law so as to limit the quantum or otherwise impair the collection of development charges the City may, in any particular case, impose and collect pursuant to this by- law are: (a) in a declaratory sense only, recognized by the City as rules for the purposes of paragraph 9 of subsection 5(1) of the Act and paragraphs 1 and 2 of section 6 of the Act; and (b) for greater certainty with respect to paragraph 3 of subsection 5(6) of the Act, not prescribed by this by-law. 5.02 Discretionary Exemptions: Notwithstanding any other provision of this by-law, development charges shall not be imposed in respect of the development of: (a) a place of worship, non-profit hospice, public hospital, cemetery, burial site or crematorium, as defined in the Assessment Act; (b) an agricultural building or structure; or (c) a park model trailer. 5.03 Refunds for Temporary Buildings or Structures: Notwithstanding any other provision of this by-law, a temporary building or structure shall, on a retroactive basis, be considered not to have been development, and, therefore, an owner who paid development charges pertaining to a temporary building or structure shall be entitled to a refund of the development charges, without interest, if the owner demonstrates to the satisfaction of the Chief Building Official that the building or structure was indeed temporary. 5.04 Redevelopment Credits: Subject to subsection 5.05 but notwithstanding any other provision of this by-law, respecting a redevelopment of land, whereupon a building or structure on the same land was demolished or is to be demolished or converted from one principal use to another principal use, in whole or in part, in order to facilitate the redevelopment, the development charges pertaining to such a redevelopment shall, as determined by the Chief Building Official based upon information he or she considers verifiable, be credited by: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential portion thereof, an amount calculated by multiplying the applicable development charge rates by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure, or in the case of mixed-use building or structure, the non-residential portion thereof, an amount calculated by multiplying the applicable development charge rates by the gross floor area or nameplate generating capacity, whichever unit of measure is applicable, that has been or will be demolished or converted to another principal use. 5.05 Restrictions on Redevelopment Credits: A credit set against development charges pursuant to subsection 5.04 shall: (a) be determined in accordance with development charge rates that would otherwise apply if the provisions referred to in subsection 5.01 and imposed by subsection 5.02 did not apply; (b) notwithstanding paragraph (a) of this subsection, not exceed the amount of development charges otherwise payable pursuant to this by- law; and (c) apply only if the building or structure or part thereof associated with the credit was, as determined by the Chief Building Official based upon information he or she considers verifiable, capable of being occupied within the 5-year period or such longer period, as may be established by Council subsequent to the enactment of this by-law, prior to the date on which the development charges are calculated pursuant to this by-law. 5.06 Credits Related to Expiration or Revocation of Permits: Whereupon a permit has been issued for a development on land for which development charges have been paid, in the case that the permit expires or is revoked, the development charges shall not be refunded but instead shall be credited against any subsequent development charges that may become payable as a result of any subsequent approvals or actions described in subsection 3.01 being granted or executed in respect of the same land. 5.07 Status of Credits and Refunds: For the purposes of paragraph 9 of subsection 5(1) of the Act, paragraph 3 of subsection 5(6) of the Act and paragraphs 1 through 3 of section 6 of the Act, and for greater certainty with respect to each of them, no credit against or refund of development charges provided for by subsections 5.03 through 5.06 shall be construed as any form of exemption, discount or similar measure designed to reduce development charges below the allowable quantum in any particular case. 5.08 Agreement Potentially Required: To the extent permitted by the Act, the City may require an owner liable for development charges to enter into an agreement with the City as a condition of obtaining the benefit of a provision referred to in subsection 5.01, whereby the City may, to the extent permitted by the Act, register the agreement against the title of the land to which the development charges apply. 5.09 Onus on Owner: The onus is on the owner liable for development charges to produce evidence to the satisfaction of the Chief Building Official that the owner is indeed entitled to any relief referred to in subsection 5.01 or any exemption, refund or credit provided for by subsections 5.02 through 5.06. 6 Section 6: Administrative Matters 6.01 By-Law Administration: The Chief Building Official and Manager of Corporate Assets are jointly responsible for the administration of this by- law, whereby the former position is responsible for day-to-day administration and the latter position is responsible for general administration and oversight. 6.02 Restructuring of Reserve Fund: For the purposes of section 33 of the Act, the City Treasurer shall, upon the coming into force of this by-law, restructure the consolidated development charges reserve fund as necessary into separate constituent reserve fund accounts bearing a one- to-one correspondence with the municipal services designated in subsection 2.01. 6.03 Replenishment of Reserve Fund: Respecting compliance with paragraph 3 of subsection 5(6) of the Act: (a) the City Treasurer shall, as much as financial records and resources will admit, ensure the development charges reserve fund is replenished annually from other City funds to correct for shortfalls in the development charges reserve fund arising from the provisions of subsection 5.02; and (b) for the purposes of paragraph (a) of this subsection, the shortfalls in the development charges reserve fund arising from paragraphs (a), (b) and (c) of subsection 5.02 shall, respectively, be determined in accordance with the applicable rates of other non-residential, agricultural and residential development charges. 6.04 Effect of Provisions Referred to in Subsection 5.01: As subsection 5.01 is not subject to paragraph 3 of subsection 5(6) of the Act, the development charges reserve fund reconciliation included in any Development Charges Background Study prepared after the coming into force of this by-law shall, as much as financial records will admit, carry forward into the determination of future rates of development charges the shortfalls in the development charges reserve fund arising from the provisions referred to in subsection 5.01. 6.05 No Phase-in of Development Charges: For greater certainty, the development charges set out in Schedules 1 and 2 to this by-law shall not be phased in, and, subject to indexation in accordance with subsection 6.06, shall take effect upon the coming into force of this by-law. 6.06 Indexation of Development Charges: Starting on January 1, 2026, the Manager of Corporate Assets shall, without amendment to this by-law and as permitted by paragraph 10 of subsection 5(1) of the Act, annually index the development charges set out in Schedules 1 and 2 to this by-law in accordance with the Statistics Canada Non-Residential Building Construction Price Index for Toronto, or any successor thereof, whereupon the indexed development charges shall take effect at 12:01am January 1 of the year during which they are to be in effect. 7 Section 7: Other Matters 7.01 Schedules: The following schedules to this by-law form part of this by- law: (a) Schedule 1: Residential Development Charges; (b) Schedule 2: Non-Residential Development Charges; and (c) Schedule 3: Northwest Lindsay Development Area. 7.02 Abbreviations and Symbols in Schedules: The following equivalences apply to abbreviations and symbols appearing in Schedules 1 and 2 to this by-law: (a) "$" stands for dollars in Canadian currency; (b) "/" stands for per; (c) "Unit" stands for dwelling unit; (d) "m2" stands for square metre or square metres, as context requires; (e) "GFA" stands for gross floor area, measured in square metres; (f) "NGC" stands for nameplate generating capacity, measured in kilowatts; and (g) "KW" stands for kilowatt or kilowatts, as context requires. 7.03 Override by Prior Section 27 Agreement: Notwithstanding any other provision of this by-law, the provisions of an agreement between the City and an owner, made pursuant to section 27 of the Act and setting out, based upon rates of development charges in effect prior to the coming into force of this by-law, the development charges to be paid and or services in lieu of development charges to be provided by the owner in respect of a particular development, shall override this by-law in respect of that development if the agreement: (a) was executed before the coming into force of this by-law; and (b) remains in effect at the time this subsection is invoked for the purposes of fulfilling the agreement. 7.04 Concurrent and Subsequent By-Laws: This by-law does not: (a) impair any concurrent by-law imposing development charges, capital charges or similar charges within the City; or (b) preclude the enactment of subsequent by-laws imposing development charges, capital charges or similar charges within the City. 7.05 Severability: If a court or tribunal of competent jurisdiction declares any portion of this by-law to be illegal or unenforceable, that portion of this by- law shall be considered to be severed from the balance of the by-law, which shall continue to operate in full force and effect. 7.06 Registration on Title: As permitted by section 42 of the Act, the City may register a certified copy of this by-law with the Land Registry Office, or any successor thereof, against title to any land to which this by-law applies. 7.07 Effective Date and Expiry: This by-law shall come into force at 12:01am January 1, 2026, and shall expire at 11:59pm December 31, 2035 unless it is repealed prior thereto. 7.08 Repeal: By-Law 2019-184 (A By-Law to Impose Development Charges in the City of Kawartha Lakes) is repealed at 12:01am January 1, 2026 upon the coming into force of this by-law. By-law passed this 18th day of November, 2025. ______________________________ Doug Elmslie, Mayor ______________________________ Cathie Ritchie, City Clerk Schedule 1: Residential Development Charges The residential development charges imposed by this by-law shall be those set out in the following table by type of dwelling unit, subject to indexation: Municipal Service Single- or Semi- Detached ($/Unit) Row or Multiple ($/Unit) Large Apartment ($/Unit) Small Apartment ($/Unit) Public Health 332 246 242 151 By-Law Enforcement 41 30 30 19 Parks and Recreation 3,924 2,909 2,856 1,785 Library 500 371 364 227 Growth-Related Studies 567 420 413 258 Fire 3,403 2,523 2,477 1,548 Fire-Rural 737 546 536 335 Paramedic 811 601 590 369 Police 1,874 1,389 1,364 852 Transit 641 475 467 292 Roads and Related 12,841 9,521 9,346 5,841 Water Treatment 20,625 15,292 15,012 9,382 Water Distribution 2,790 2,069 2,031 1,269 Wastewater Treatment 11,079 8,214 8,064 5,040 Wastewater Collection 7,301 5,413 5,314 3,321 Municipal Service Area Single- or Semi- Detached ($/Unit) Row or Multiple ($/Unit) Large Apartment ($/Unit) Small Apartment ($/Unit) Urban-Lindsay 66,729 49,473 48,570 30,354 Urban-NWT 59,428 44,060 43,256 27,033 Urban-Other 64,214 47,609 46,739 29,210 Rural-Ops 25,030 18,556 18,218 11,385 Rural-Other 23,156 17,167 16,854 10,533 Schedule 2: Non-Residential Development Charges The non-residential development charges imposed by this by-law shall be those set out in the following table by type of non-residential development, subject to indexation: Municipal Service Electricity Generation ($/500 KW of NGC) Other Non- Residential ($/m² of GFA) Public Health 0.54 By-Law Enforcement 0.22 Parks and Recreation 7.75 Library 0.97 Growth-Related Studies 4.41 Fire 3,403 20.13 Fire-Rural 737 2.26 Paramedic 811 4.63 Police 1,874 11.84 Transit 4.20 Roads and Related 12,841 74.92 Water Treatment 127.98 Water Distribution 17.33 Wastewater Treatment 68.57 Wastewater Collection 46.39 Municipal Service Area Electricity Generation ($/500 KW of NGC) Other Non- Residential ($/m² of GFA) Urban-Lindsay 18,929 389.87 Urban-NWT 18,929 343.48 Urban-Other 17,055 373.83 Rural-Ops 19,666 127.66 Rural-Other 17,792 115.82 Schedule 3: Northwest Lindsay Development Area Watson & Associates Economists Ltd. PAGE F-1 Appendix F Asset Management Plan Watson & Associates Economists Ltd. 905-272-3600 June 16, 2025 [email protected] Asset Management Plan City of Kawartha Lakes ________________________ Watson & Associates Economists Ltd. Table of Contents Page 1. Introduction ...................................................................................................... 1-1 1.1 Overview ................................................................................................. 1-1 1.2 Legislative Context for the Asset Management Plan .............................. 1-4 1.3 Asset Management Plan Development ................................................... 1-5 2. State of Local Infrastructure and Levels of Service ..................................... 2-2 2.1 Emergency Services ............................................................................... 2-2 2.1.1 State of Local Infrastructure ....................................................... 2-2 2.1.2 Condition .................................................................................... 2-3 2.1.3 Levels of Service ........................................................................ 2-6 2.2 Human Services ..................................................................................... 2-7 2.2.1 State of Local Infrastructure ....................................................... 2-7 2.2.2 Condition .................................................................................... 2-8 2.2.3 Levels of Service ...................................................................... 2-10 2.3 Parks and Recreation Services ............................................................. 2-11 2.3.1 State of Local Infrastructure ..................................................... 2-11 2.3.2 Condition .................................................................................. 2-12 2.3.3 Levels of Service ...................................................................... 2-14 2.4 Solid Waste Services ............................................................................ 2-15 2.4.1 State of Local Infrastructure ..................................................... 2-15 2.4.2 Condition .................................................................................. 2-16 2.4.3 Levels of Service ...................................................................... 2-18 2.5 Support and Other Services .................................................................. 2-19 2.5.1 State of Local Infrastructure ..................................................... 2-19 2.5.2 Condition .................................................................................. 2-21 2.5.3 Levels of Service ...................................................................... 2-23 2.6 Transportation Services ........................................................................ 2-24 2.6.1 State of Local Infrastructure ..................................................... 2-24 2.6.2 Condition .................................................................................. 2-35 2.6.3 Levels of Service ...................................................................... 2-45 2.7 Water and Wastewater Services ........................................................... 2-48 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 2.7.1 State of Local Infrastructure ..................................................... 2-48 2.7.2 Condition .................................................................................. 2-52 2.7.3 Levels of Service ...................................................................... 2-54 2.8 Uncategorized (Natural Assets) ............................................................ 2-56 2.9 Population and Employment Growth .................................................... 2-57 3. Lifecycle Management Strategy ..................................................................... 3-1 3.1 Introduction ............................................................................................. 3-1 3.2 Tax Supported Assets ............................................................................. 3-1 3.3 Rate Supported Assets (Water and Wastewater) ................................... 3-4 4. Financial Strategy ............................................................................................ 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Lifecycle Funding Target ......................................................................... 4-1 4.3 Capital Expenditure Forecast .................................................................. 4-2 4.4 Funding ................................................................................................... 4-3 4.5 Tax Levy Impact ..................................................................................... 4-4 4.6 Rate Revenue Impact ............................................................................. 4-4 5. Recommendations and Next Steps ................................................................ 5-1 5.1 Recommendations .................................................................................. 5-1 5.2 Next Steps .............................................................................................. 5-1 Appendix A Financial Strategy Tables ................................................................... A-1 Watson & Associates Economists Ltd. PAGE i List of Acronyms and Abbreviations IJPA Infrastructure for Jobs and Prosperity Act O. Reg. 588/17 Ontario Regulation 588/17 PSAB Public Sector Accounting Board ULC% Useful Life Consumed Percentage PCI Pavement Condition Index BCI Bridge Condition Index OSIM Ontario Structure Inspection Manual Report Watson & Associates Economists Ltd. Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 1. Introduction 1.1 Overview The main objective of an asset management plan is to use a municipality's best available information to develop a comprehensive long-term plan for capital assets. In addition, the plan should provide a sufficiently documented framework that will enable continual improvement and updates of the plan, to ensure its relevancy over the long term. The City of Kawartha Lakes (City) retained Watson & Associates Economists Ltd. (Watson) to develop a comprehensive asset management plan. The project has been completed in three phases. The first phase focused on complying with the July 1, 2022 requirements of Ontario Regulation 588/17 (O. Reg. 588/17) for core1 assets and was completed in June 2022. The second phase focused on complying with the July 1, 2024 requirements of O. Reg. 588/17 for non-core2 assets and was completed in May 2024. The third and final phase of the project built on the work completed through the previous phases, with a focus on identifying proposed levels of service and developing a financial strategy to support the asset management plan. This report is the outcome of the third phase and brings the City into full compliance with the 2025 requirements of O. Reg. 588/17. The asset management plan has been structured to align with the structure of the City's capital budget. The construction, rehabilitation, replacement and upgrade of the City's assets is budgeted through a total of 35 capital programs and the operating budget.3 The 35 programs are grouped together into seven service groups as defined in Table 1-1. 1 Core infrastructure assets are defined by O. Reg. 588/17 as being roads, bridges, culverts, and any asset that is utilized in the provision of water, wastewater, and stormwater services. 2 Non-core infrastructure assets are any other assets owned and managed by a municipality that are not included within the definition of core infrastructure assets. 3 Assets funded through the operating budget include signs, guiderails, and circulating library materials. They are funded through the operating budget because the replacement cost of individual assets is low. Watson & Associates Economists Ltd. PAGE 1-2 Table 1-1: Description of Service Groups Service Group Description Emergency Services Fire, police, and ambulance services Human Services Public housing and nursing care services Parks and Recreation Services Services provided by recreation centres and park amenities Solid Waste Services Landfill Services Support and Other Services Library and culture services and services provided by assets that are not public facing (e.g., information technology, fleet, etc.) Transportation Services Airport and transit services, along with services provided by assets that support the road network (e.g., sidewalks, streetlights, etc.) Water and Wastewater Services Water treatment, wastewater treatment facilities, horizontal distribution and collection (e.g., watermains, wastewater mains, etc.) and vertical distribution and collection (e.g., reservoir, elevated tank, etc.) Uncategorized Aggregate pits and quarries and forests The replacement costs of the assets included in this asset management plan has been estimated at $5.4 billion. A breakdown of the total replacement cost by service group and capital program is provided in Table 1-2 and is illustrated in Figure 1-1. Watson & Associates Economists Ltd. PAGE 1-3 Table 1-2: Asset Replacement Cost by Service Group and Capital Program Service Group Capital Program Name Replacement Cost (2025$) Emergency Services Fire Facilities $67,784,000 Fire Fleet and Equipment $48,604,000 Paramedic Facilities $10,284,000 Paramedic Fleet and Equipment $8,381,000 Police Fleet and Equipment $4,363,000 Human Services Housing Facilities $272,714,000 Housing Fleet $1,491,000 Victoria Manor $58,434,000 Parks and Recreation Services Cemetery Siteworks and Facilities $609,000 Parks and Recreation Equipment $58,434,000 Parks Siteworks and Facilities $42,423,000 Recreation Facilities $247,495,000 Solid Waste Services Landfill Equipment $6,704,000 Landfill Siteworks and Facilities $34,321,000 Support and Other Services Building and Property Equipment $775,000 Building and Property Facilities $148,934,000 Currently Funded through Operating $12,771,000 Information Technology Systems $3,656,000 Public Works Fleet Equipment $90,289,000 Transportation Services Airport Siteworks and Facilities $14,400,000 Bridges and Culverts $482,109,000 Gravel Resurfacing $463,456,000 Parking Lots $5,775,000 Paved Roads1 $1,561,946,000 Roads, Fleet and Transit Facilities $96,282,000 Sidewalks $40,053,000 Stormwater Siteworks $67,752,000 1 Storm Mains and culverts are included in the replacement cost of paved roads. Watson & Associates Economists Ltd. PAGE 1-4 Service Group Capital Program Name Replacement Cost (2025$) Traffic Signals and Streetlights $25,536,000 Transit Siteworks $628,000 Water and Wastewater Services Horizontal Distribution and Collection $645,417,000 Vertical Distribution and Collection $173,421,000 Wastewater Treatment $14,999,000 Water Treatment $27,113,000 Uncategorized Aggregate Pits and Quarries $171,654,000 Forests $424,448,000 Total $5,382,767,000 Figure 1-1: Distribution of Assets by Service Group Emergency Services, 136.4M, 3% Human Services, 384.8M, 7% Parks and Recreation Services, 349M, 6% Solid Waste Services, 41M, 1% Support and Other Services, 256.4M, 5% Transportation Services, 2.76B, 51% Water-Wastewater Services, 861M, 16% Uncategorized, 596.1M, 11% $5.38 billion 1.2 Legislative Context for the Asset Management Plan Asset management planning in Ontario has evolved significantly over the past decade. Before 2009, capital assets were recorded by municipalities as expenditures in the year of acquisition or construction. The long-term issue with this approach was the lack of a capital asset inventory, both in the municipality's accounting system and financial Watson & Associates Economists Ltd. PAGE 1-5 statements. As a result of revisions to section 3150 of the Public Sector Accounting Board (PSAB) handbook, effective for the 2009 fiscal year, municipalities were required to capitalize tangible capital assets, thus creating an inventory of assets. In 2012, the Province launched the municipal Infrastructure Strategy. As part of that initiative, municipalities and local service boards seeking provincial funding were required to demonstrate how any proposed project fits within a detailed asset management plan. In addition, asset management plans encompassing all municipal assets needed to be prepared by the end of 2016 to meet Federal Gas Tax (now the Canada Community-Building Fund) agreement requirements. To help define the components of an asset management plan, the Province produced a document entitled Building Together: Guide for Municipal Asset Management Plans. This guide documented the components, information, and analysis that were required to be included in municipal asset management plans under this initiative. The Province's Infrastructure for Jobs and Prosperity Act, 2015 (IJPA) was proclaimed on May 1, 2016. This legislation detailed principles for evidence-based and sustainable long-term infrastructure planning. The IJPA also gave the Province the authority to guide municipal asset management planning by way of regulation. In late 2017, the Province introduced O. Reg. 588/17 under the IJPA. The intent of O. Reg. 588/17 is to establish standard content for municipal asset management plans. Specifically, the regulation require that asset management plans be developed that define the current levels of service, identify the lifecycle activities that will be undertaken to achieve these levels of service, and provide a financial strategy to support the levels of service and lifecycle activities. As noted earlier, the asset management plan presented herein brings the City into full compliance with the 2025 requirements of O. Reg. 588/17. 1.3 Asset Management Plan Development This asset management plan was developed using an approach that leverages the City's asset management principles as identified within its strategic asset management policy, capital asset database information, and staff input. Watson & Associates Economists Ltd. PAGE 1-6 The development of the City's asset management plan is based on the steps summarized below: 1. Compile asset information into complete inventories that contain relevant asset attributes such as size, quantity, age, useful service life expectations, and replacement cost. 2. Define and assess the current condition of assets using a combination of staff input, existing background reports and studies (e.g. Road Needs Study, OSIM Bridge Inspections), and age-based condition analysis. 3. Define and document current levels of service based on the analysis of available data and consideration of various background reports. 4. Identify proposed levels of service for all performance measures. 5. Compile a forecast of lifecycle expenditures required to achieve these levels of service outcomes. 6. Develop a financial strategy to support the lifecycle management strategy. The financial strategy informs how the capital and operating expenses arising from the asset management strategy will be funded over the forecast period, and how any existing funding gaps will be managed. 7. Document the comprehensive asset management plan in a formal report to inform future decision-making and to communicate planning to municipal stakeholders. Watson & Associates Economists Ltd. Chapter 2 State of Local Infrastructure and Levels of Service Watson & Associates Economists Ltd. PAGE 2-2 2. State of Local Infrastructure and Levels of Service 2.1 Emergency Services 2.1.1 State of Local Infrastructure The City owns and manages a variety of assets that support the provision of Emergency Services. The estimated replacement cost of these assets is approximately $136 million. Fire facilities represent the largest share of replacement cost at $64.8 million (47%), followed by, fire fleet and equipment at $48.6 million (36%). Paramedic facilities at $10.3 million (8%), paramedic fleet and equipment at $8.4 million (6%). Lastly, police fleet and equipment at $4.4 million (3%). The average of emergency services assets is 33.0 years. Table 2-1 provides a breakdown of these assets by capital program, showing the average age, and replacement cost. A visual rendering of the data presented in Table 2-1 is provided in Figure 2-1. Table 2-1: Emergency Services Capital Programs - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (2025$) Fire Facilities 48.5 $64,784,000 Fire Fleet and Equipment 16.2 $48,604,000 Paramedic Facilities 49.1 $10,284,000 Paramedic Fleet and Equipment 5.4 $8,381,000 Police Fleet and Equipment 5.1 $4,363,000 Total 33.0 $136,416,000 Watson & Associates Economists Ltd. PAGE 2-3 Figure 2-1: Emergency Services Capital Programs - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 48.5 16.2 49.1 5.4 5.1 Fire Facilities Fire Fleet and Equipment Paramedic Facilities Paramedic Fleet and Equipment Police Fleet and Equipment Fire Facilities, 64.8M, 47% Fire Fleet and Equipment, 48.6M, 36% Paramedic Facilities, 10.3M, 8% Paramedic Fleet and Equipment, 8.4M, 6% Police Fleet and Equipment, 4.4M, 3% $136 million 2.1.2 Condition The condition of the City's Emergency Services assets has not been directly assessed through a physical condition assessment. When the age of an asset is known, the condition is evaluated based on age relative to the expected useful life (i.e., based on the percentage of useful life consumed (ULC%)). A brand-new asset would have a ULC% of 0%, indicating that zero percent of the asset's life expectancy has been utilized. On the other hand, an asset that has reached its life expectancy would have a ULC% of 100%. It is possible for assets to have a ULC% greater than 100%, which occurs if an asset has exceeded its typical life expectancy but continues to be in service. This is not necessarily a cause for concern; however, it must be recognized that assets that are near or beyond their typical life expectancy are likely to require replacement or rehabilitation in the near term. To better communicate the condition of Emergency Services assets and other assets where ULC% will be used, the ULC% ratings have been segmented into qualitative condition states as summarized in Table 2-2. The scale is set to show that if assets are replaced around the expected useful life, they would be in the Fair condition state. Beyond 100% of useful life, the probability of failure is assumed to have increased to a point where performance would be characterized as Poor or Very Poor. Watson & Associates Economists Ltd. PAGE 2-4 Table 2-2: Condition States Defined with Respect to ULC% ULC% Condition State 0% ≤ ULC% ≤ 45% Very Good 45% < ULC% ≤ 90% Good 90% < ULC% ≤ 100% Fair 100% < ULC% ≤ 125% Poor 125% > ULC% Very Poor Based on their current age profile, assets within the Emergency Services group are, on average, in a 'Good' condition state. The average ULC% rating of the City's fire facilities is 80.8%, which indicates that, on average, fire facilities are in a 'Good' condition state. Similarly, the average ULC% rating of the City's fire fleet and equipment is 87.1%, which indicates that, on average, fire fleet and equipment are in a 'Good' condition state. The average ULC% rating of the City's paramedic facilities is 81.8%, which indicates that, on average, paramedic facilities are in a 'Good' condition state. The average ULC% rating of the City's paramedic fleet and equipment is 96.8%, which indicates that, on average, paramedic fleet and equipment are in a 'Good' condition state. Lastly, the average ULC% rating of the City's police fleet and equipment is 66.1%, which indicates that, on average, police fleet and equipment are in a 'Good' condition state. Table 2-3 summarizes the average ULC% rating and associated condition states of the City's Emergency Services assets. Table 2-3: Condition Summary - Emergency Services Capital Program Average ULC% Average Condition State Fire Facilities 80.8% Good Fire Fleet and Equipment 87.1% Good Paramedic Facilities 81.8% Good Paramedic Fleet and Equipment 96.8% Fair Police Fleet and Equipment 66.1% Good Average 83.6% Good Watson & Associates Economists Ltd. PAGE 2-5 The distribution of the replacement cost of all Emergency Services assets by condition state is illustrated in Figure 2-2. The distribution of the replacement cost of Emergency Services assets by ULC% rating range is illustrated Figure 2-3. Figure 2-2: Distribution of Emergency Services Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Fire Facilities Fire Fleet and Equipment Paramedic Facilities Paramedic Fleet and Equipment Police Fleet and Equipment Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Figure 2-3: Distribution of Emergency Services Assets by ULC% Rating 3.3% 0.1% 2.3% 3.4% 0.1% 1.9% 0.1% 1.5% 0.5% 6.1% 8.1% 11.4% 10.6% 4.4% 3.8% 3.4% 5.2% 4.7% 1.0% 0.8% 2.5% 5.5% 1.5% 1.4% 3.4% 13.1% $0M $4M $8M $12M $16M $20M Replacement Cost ULC% Rating Range Watson & Associates Economists Ltd. PAGE 2-6 2.1.3 Levels of Service The levels of service currently provided by the City's Emergency Services are, in part, a result of the state of local infrastructure identified above. The levels of service framework presented in this subsection identifies both the levels of service that assets are currently providing as well as the proposed levels of service (target performance) that the City is striving for. The levels of service framework is presented as follows: - The Service Attribute headings and columns indicate the high-level attribute being addressed; - The Community Levels of Service column in Table 2-4 explains the City's intent in plain language and provides additional information about the service being provided; - The Performance Measure column in Table 2-5 describes the performance measure(s) connected to the identified service attribute; - The Current Performance column in Table 2-5 identifies the current level of service with respect to each performance measure based on the best available data; and - The Target Performance column in Table 2-5 identifies the proposed level of service with respect to each performance measure. It is noted that the performance measures included in Table 2-5 only include ones for which data is currently available. The City has identified several other performance measures of interest, as reported in the City's 2024 Asset Management Plan for Non- Core Assets. These additional performance measures will be incorporated into future iterations of this asset management plan once the City collects the required data. Watson & Associates Economists Ltd. PAGE 2-7 Table 2-4: Emergency Services - Community Levels of Service Service Attribute Community Levels of Service Quality The City maintains Emergency Services facilities such that they provide a pleasant experience to staff and visitors. Reliability/ Availability The City strives to ensure its Emergency Services vehicles and equipment are reliable and available for use. Table 2-5: Emergency Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Quality Average condition rating for Fire Facilities Good (ULC% of 81%) Good Average condition rating for Paramedic Facilities Good (ULC% of 82%) Good Reliability/ Availability Average condition rating for Fire Fleet and Equipment Good (ULC% of 87%) Good Average condition rating for Paramedic Fleet and Equipment Fair (ULC% of 97%) Fair Average condition rating for Police Fleet and Equipment Good (ULC% of 66%) Good 2.2 Human Services 2.2.1 State of Local Infrastructure The City owns and manages a variety of assets that support the provision of Human Services. The estimated replacement cost of these assets is approximately $384.8 million. Housing facilities represent the largest share of replacement cost at $272.7 million (70.9%), followed by Victoria Manor at $111 million (28.7%) and lastly, housing fleet at $2 million (0.4%). The average of human services assets is 36.0 years. Table 2-6 provides a breakdown of these assets by capital program, showing the average age and replacement cost. A visual rendering of the data presented in Table 2-6 is provided in Figure 2-4. Watson & Associates Economists Ltd. PAGE 2-8 Table 2-6: Human Services Capital Programs - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (202$) Housing Facilities 36.1 $272,714,000 Housing Fleet 9.1 $1,491,000 Victoria Manor 36.0 $110,579,000 Total 36.0 $384,784,000 Figure 2-4: Human Services Capital Programs - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 36.1 9.1 36.0 Housing Facilities Housing Fleet Victoria Manor Housing Facilities, 272.7M, 70.9% Housing Fleet, 1.5M, 0.4% Victoria Manor, 110.6M, 28.7% $385 million 2.2.2 Condition The condition of the City's Human Services assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of Human Services assets is assessed based on age relative to useful service life (i.e., based on the percentage of useful service life consumed - ULC%). To better communicate the condition of Human Services assets, ULC% ratings have been segmented into qualitative condition states as summarized previously in Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Based on their current age profile, assets within the Human Services group are, on average, in a 'Good' condition state. The average ULC% rating of the City's housing facilities is 57.5%, which indicates that, on average, housing facilities are in a 'Good' Watson & Associates Economists Ltd. PAGE 2-9 condition state. Similarly, the average ULC% rating of the City's housing fleet is 76.2%, which indicates that, on average, housing fleet assets are in a 'Good' condition state. Lastly, the average ULC% rating of the City's Victoria Manor is 90%, which indicates that, on average, Victoria Manor assets are in a 'Good' condition state. Table 2-7 summarizes the average ULC% rating and associated condition states of the City's Human Services assets. Table 2-7: Condition Summary - Human Services Capital Program Average ULC% Average Condition State Housing Facilities 57.5% Good Housing Fleet 76.2% Good Victoria Manor 60.0% Good Average 58.3% Good The distribution of the replacement cost of all Human Services assets by condition state is illustrated in Figure 2-5. The distribution of the replacement cost of Human Services assets by ULC% rating range is illustrated Figure 2-6 Figure 2-5: Distribution of Human Services Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Housing Facilities Housing Fleet Victoria Manor Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Watson & Associates Economists Ltd. PAGE 2-10 Figure 2-6: Distribution of Human Services Assets by ULC% Rating 4.0% 6.2% 3.9% 3.2% 0.0% 0.0% 0.0% 0.2% 34.8% 13.4% 5.0% 4.5% 6.7% 12.7% 4.1% 0.8% 0.0% 0.4% 0.0% 0.1% $0M $20M $40M $60M $80M $100M $120M $140M $160M Replacement Cost ULC% Rating Range 2.2.3 Levels of Service This subsection presents the City's levels of service framework for its Human Services assets. Table 2-8 presents the City's Service Attributes and Community Levels of Service for its Human Services assets while Table 2-9 presents the City's Technical Levels of Service (i.e., performance measures) for its Human Services assets, including their current and target performance. Please refer to Section 2.1.3 for further details on the City's levels of service framework. It is noted that the performance measures included in Table 2-9 only include ones for which data is currently available. The City has identified several other performance measures of interest, as reported in the City's 2024 Asset Management Plan for Non- Core Assets. These additional performance measures will be incorporated into future iterations of this asset management plan once the City collects the required data. Watson & Associates Economists Ltd. PAGE 2-11 Table 2-8: Human Services - Community Levels of Service Service Attribute Community Levels of Service Quality The City maintains Human Services facilities such that they provide a pleasant experience to staff, residents, and visitors. Reliability/ Availability The City strives to ensure its Human Services vehicles and equipment are reliable and available for use. Table 2-9: Human Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Quality Average condition rating for Housing Facilities Good (ULC% of 58%) Good Average condition rating for Victoria Manor Good (ULC% of 60%) Good Reliability/ Availability Average condition rating for Housing Fleet Good (ULC% of 76%) Good 2.3 Parks and Recreation Services 2.3.1 State of Local Infrastructure The City owns and manages a variety of assets that support the provision of Parks and Recreation Services. The estimated replacement cost of these assets is approximately $349 million. Recreation facilities represent the largest share of replacement cost at $247.5 million (70.9%), followed by, parks and recreation equipment at $58.4 million (16.7%), parks siteworks and facilities at $42.4 million (12.2%), and lastly cemetery siteworks and facilities at $609,000 (0.2%). The average age of parks and recreation services assets is 39.4 years. Table 2-10 provides a breakdown of the average age and replacement cost information of Parks and Recreations Services assets by capital program. A visual rendering of the data presented in Table 2-10 is provided in Figure 2-7. Watson & Associates Economists Ltd. PAGE 2-12 Table 2-10: Parks and Recreation Services Capital Programs - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (2025$) Cemetery Siteworks and Facilities 22.4 $609,000 Parks and Recreation Equipment 12.8 $58,434,000 Parks Siteworks and Facilities 19.6 $42,423,000 Recreation Facilities 49.1 $247,495,000 Total 39.4 $348,961,000 Figure 2-7: Parks and Recreation Services Capital Programs - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 22.4 12.8 19.6 49.1 Cemetery Siteworks and Facilities Parks and Recreation Equipment Parks Siteworks and Facilities Recreation Facilities Cemetery Siteworks and Facilities, 609k, 0.2% Parks and Recreation Equipment, 58.4M, 16.7% Parks Siteworks and Facilities, 42.4M, 12.2% Recreation Facilities, 247.5M, 70.9% $349 million 2.3.2 Condition The condition of the City's Parks and Recreation Services assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of Parks and Recreation Services assets is assessed based on age relative to useful service life (i.e. based on the percentage of useful service life consumed - ULC%). To better communicate the condition of Parks and Recreation Services assets, ULC% ratings have been segmented into qualitative condition states as summarized previously in the Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Watson & Associates Economists Ltd. PAGE 2-13 Based on their current age profile, assets within the Parks and Recreation Services group are, on average, in a 'Good' condition state. The average ULC% rating of the City's cemetery siteworks and facilities is 36.8%, which indicates that, on average, cemetery siteworks and facilities are in a 'Very Good' condition state. Similarly, the average ULC% rating of the City's parks and recreation equipment is 36.7%, which indicates that, on average, parks and recreation equipment are in a 'Very Good' condition state. The average ULC% rating of the City's parks siteworks and facilities is 55.3%, which indicates that, on average, parks siteworks and facilities are in a 'Good' condition state. Lastly, the average ULC% rating of the City's recreation facilities is 83.8%, which indicates that, on average, recreation facilities are in a 'Good' condition state. Table 2-11 summarizes the average ULC% rating and associated condition states of the City's Parks and Recreation Services assets. Table 2-11: Condition Summary - Parks and Recreation Services Capital Program Average ULC% Average Condition State Cemetery Siteworks and Facilities 36.8% Very Good Parks and Recreation Equipment 36.7% Very Good Parks Siteworks and Facilities 55.3% Good Recreation Facilities 83.8% Good Average 72.4% Good The distribution of the replacement cost of all Parks and Recreation assets by condition state is illustrated in Figure 2-8. The distribution of the replacement cost of Parks and Recreation assets by ULC% rating range is illustrated Figure 2-9. Watson & Associates Economists Ltd. PAGE 2-14 Figure 2-8: Distribution of Parks and Recreation Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Parks Siteworks and Facilities Recreation Facilities Parks and Recreation Equipment Cemetery Siteworks and Facilities Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Unknown Figure 2-9: Distribution of Parks and Recreation Assets by ULC% 3.1% 4.6% 0.4% 1.0% 17.5% 0.2% 0.3% 9.4% 0.3% 10.9% 0.9% 1.6% 0.4% 2.2% 4.4% 16.2% 3.7% 0.2% 2.3% 0.1% 0.1% 1.0% 0.1% 3.6% 2.0% 13.7% 0.1% $0M $10M $20M $30M $40M $50M $60M $70M Replacement Cost ULC% Rating Range 2.3.3 Levels of Service This subsection presents the City's levels of service framework for its Parks and Recreation assets. Table 2-12 presents the City's Service Attributes and Community Levels of Service for its Parks and Recreation assets while Table 2-13 presents the City's Technical Levels of Service (i.e., performance measures) for its Parks and Watson & Associates Economists Ltd. PAGE 2-15 Recreation assets, including their current and target performance. Please refer to Section 2.1.3 for further details on the City's levels of service framework. It is noted that the performance measures included in Table 2-13 only include ones for which data is currently available. The City has identified several other performance measures of interest, as reported in the City's 2024 Asset Management Plan for Non- Core Assets. These additional performance measures will be incorporated into future iterations of this asset management plan once the City collects the required data. Table 2-12: Parks and Recreation Services - Community Levels of Service Service Attribute Community Levels of Service Quality The City maintains Parks and Recreation Services facilities such that they provide a pleasant experience to staff and visitors. Reliability The City strives to ensure its Parks and Recreation Services vehicles and equipment are reliable and available for use. Table 2-13: Parks and Recreation Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Quality Average condition rating for Cemetery Siteworks and Facilities Very Good (ULC% of 37%) Very Good Average condition rating for Parks Siteworks and Facilities Good (ULC% of 55%) Good Average condition rating for Recreation Facilities Good (ULC% of 84%) Good Reliability Average condition rating for Parks and Recreation Equipment Very Good (ULC% of 37%) Very Good 2.4 Solid Waste Services 2.4.1 State of Local Infrastructure The City owns and manages a variety of assets that support the provision of Solid Waste Services. The estimated replacement cost of these assets is approximately $41 million. Landfill siteworks and facilities represent the largest share of replacement cost Watson & Associates Economists Ltd. PAGE 2-16 at $34.3 million (84%), followed by landfill equipment at $6.7 million (16%). The average age of solid waste services assets is 17.4 years. Table 2-14 provides a breakdown of the average age and replacement cost information for Solid Waste Services assets by capital program. A visual rendering of the data presented in Table 2-14 is provided in Figure 2-10. Table 2-14: Solid Waste Services Capital Programs - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (2025$) Landfill Equipment 17.6 $6,704,000 Landfill Siteworks and Facilities 16.6 $34,321,000 Total 17.4 $41,025,000 Figure 2-10: Solid Waste Services Capital Programs - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 16.6 17.6 Landfill Equipment Landfill Siteworks and Facilities Landfill Equipment, 6.7M, 16% Landfill Siteworks and Facilities, 34.3M, 84% $41 million 2.4.2 Condition The condition of the City's Solid Waste Services assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of Solid Waste Services assets is assessed based on age relative to useful service life (i.e., based on the percentage of useful service life consumed - ULC%). To better communicate the condition of Solid Waste Services assets, ULC% Watson & Associates Economists Ltd. PAGE 2-17 ratings have been segmented into qualitative condition states as summarized previously in the Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Based on their current age profile, assets within the Solid Waste Services group are, on average, in a 'Poor' condition state. The average ULC% rating of the City's landfill equipment is 114.3%, which indicates that, on average, landfill equipment are in a 'Poor' condition state. Similarly, the average ULC% rating of the City's landfill siteworks and facilities is 101.9%, which indicates that, on average, landfill siteworks and facilities are in a 'Poor' condition state. Table 2-15 summarizes the average ULC% rating and associated condition states of the City's Solid Waste Services assets. Table 2-15: Condition Summary - Solid Waste Services Capital Program Average ULC% Average Condition State Landfill Equipment 114.3% Poor Landfill Siteworks and Facilities 101.9% Poor Average 103.9% Poor The distribution of the replacement cost of all Solid Waste assets by condition state is illustrated in Figure 2-11. The distribution of the replacement cost of Solid Waste assets by ULC% rating range is illustrated Figure 2-12. Watson & Associates Economists Ltd. PAGE 2-18 Figure 2-11: Distribution of Solid Waste Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Landfill Equipment Landfill Siteworks and Facilities Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Unknown Figure 2-12: Distribution of Solid Waste Assets by ULC% 1.2% 0.2% 9.2% 0.0% 0.9% 26.7% 11.1% 0.9% 5.7% 15.6% 0.1% 0.1% 2.3% 6.6% 1.0% 0.4% 18.1% $0M $2M $4M $6M $8M $10M $12M Replacement Cost ULC% Rating Range 2.4.3 Levels of Service This subsection presents the City's levels of service framework for its Solid Waste assets. Table 2-16 presents the City's Service Attributes and Community Levels of Service for its Solid Waste assets while Table 2-17 presents the City's Technical Levels of Service (i.e., performance measures) for its Solid Waste assets, including their Watson & Associates Economists Ltd. PAGE 2-19 current and target performance. Please refer to Section 2.1.3 for further details on the City's levels of service framework. It is noted that the performance measures included in Table 2-17 only include ones for which data is currently available. The City has identified several other performance measures of interest, as reported in the City's 2024 Asset Management Plan for Non- Core Assets. These additional performance measures will be incorporated into future iterations of this asset management plan once the City collects the required data. Table 2-16: Solid Waste Services - Community Levels of Service Service Attribute Community Levels of Service Reliability The City strives to ensure its landfill assets are reliable and available for use. Table 2-17: Solid Waste Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Reliability Average condition rating for Landfill Equipment Poor (ULC% of 114%) Poor Average condition rating for Landfill Siteworks and Facilities Poor (ULC% of 102%) Poor 2.5 Support and Other Services 2.5.1 State of Local Infrastructure The City owns and manages a variety of assets that enable the provision of Support and Other Services. The estimated replacement cost of these assets is approximately $256 million. Building and property facilities represent the largest share of replacement cost at $148.9 million (58.1%), followed by public works fleet and equipment at $90.3 million (35.2%), assets currently funded through the operating budget1 at $12.8 million 1 Assets whose replacements are funded through the operating budget include signs, guiderails, and circulating library materials. Watson & Associates Economists Ltd. PAGE 2-20 (5.0%), information technology systems at $3.7 million (1.4%) and, lastly, building and property equipment at $775,000 (0.3%). The average age of assets within the Support and Other Services category is 51.2 years. Table 2-18 provides a breakdown of the average age and replacement cost information for Support and Other Services assets by capital program. A visual rendering of the data presented in Table 2-18 is provided in Figure 2-13. Table 2-18: Support and Other Services Capital Programs - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (2025$) Building and Property Equipment 4.6 $775,000 Building and Property Facilities 82.0 $148,934,000 Currently Funded through Operating 7.0 $12,771,000 Information Technology Systems 3.8 $3,656,000 Public Works Fleet and Equipment 9.1 $90,289,000 Total 51.2 $256,425,000 Figure 2-13: Support and Other Services Capital Programs - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 4.6 82.0 7.0 3.8 9.1 Building and Property Equipment Building and Property Facilities Currently Funded through Operating Information Technology Systems Public Works Fleet Equipment Building and Property Equipment, 775k, 0.3% Building and Property Facilities, 148.9M, 58.1% Currently Funded through Operating, 12.8M, 5% Information Technology Systems, 3.7M, 1.4% Public Works Fleet and Equipment, 90.3M, 35.2% $256 million Watson & Associates Economists Ltd. PAGE 2-21 2.5.2 Condition The condition of the City's Support and Other Services assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of Support and Other Services assets is assessed based on age relative to useful service life (i.e. based on the percentage of useful service life consumed - ULC%). To better communicate the condition of Support and Other Services assets, ULC% ratings have been segmented into qualitative condition states as summarized previously in the Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Based on their current age profile, assets within the Support and Other Services group are, on average, in a 'Poor' condition state. The average ULC% rating of the City's building and property equipment is 45.9%, which indicates that, on average, building and property equipment are in a 'Good' condition state. The average ULC% rating of the City's building and property facilities is 136.6%, which indicates that, on average, building and property facilities are in a 'Very Poor' condition state. The average ULC% rating of the assets currently funded through operating is 54.9%, which indicates that, on average, currently funded through operating are in a 'Good' condition state. The average ULC% rating of the City's information technology systems is 56.9%, which indicates that, on average, information technology systems are in a 'Good' condition state. Lastly, the average ULC% rating of the City's public works fleet and equipment is 67.4%, which indicates that, on average, public works fleet and equipment are in a 'Good' condition state. Table 2-19 summarizes the average ULC% rating and associated condition states of the City's Support and Other Services assets. It is noted that there are 11 facilities within the Building and Property Facilities capital program that were constructed prior to 1950. The ULC% of these assets is over 125% and therefore they are categorized as "Very Poor". However, the actual condition of these assets may be better than their age indicates. The City is planning to complete formal building condition assessments for all of it facilities over the coming years. These assessments will provide a more accurate picture of the current condition of the City's facilities. Watson & Associates Economists Ltd. PAGE 2-22 Table 2-19: Condition Summary - Support and Other Services Capital Program Average ULC% Average Condition State Building and Property Equipment 45.9% Good Building and Property Facilities 136.6% Very Poor Currently Funded through Operating 54.9% Good Information Technology Systems 56.9% Good Public Works Fleet Equipment 67.4% Good Average 106.8% Poor The distribution of the replacement cost of all Support and Other assets by condition state is illustrated in Figure 2-14. The distribution of the replacement cost of Support and Other assets by ULC% rating range is illustrated Figure 2-15. Figure 2-14: Distribution of Support and Other Services Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Public Works Fleet and Equipment Information Technology Systems Building and Property Facilities Building and Property Equipment Currently Funded through Operating Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Unknown Watson & Associates Economists Ltd. PAGE 2-23 Figure 2-15: Distribution of Support and Other Services Assets by ULC% 0.3% 9.8% 0.8% 1.7% 0.6% 2.0% 1.6% 1.7% 3.9% 8.9% 0.3% 7.6% 0.4% 1.1% 1.3% 7.6% 0.8% 0.8% 1.6% 2.5% 6.7% 0.3% 0.9% 5.3% 31.5% $0M $10M $20M $30M $40M $50M $60M $70M $80M $90M Replacement Cost ULC% Rating Range 2.5.3 Levels of Service This subsection presents the City's levels of service framework for its Support and Other assets. Table 2-20 presents the City's Service Attributes and Community Levels of Service for its Support and Other assets while Table 2-21 presents the City's Technical Levels of Service (i.e., performance measures) for its Support and Other assets, including their current and target performance. Please refer to Section 2.1.3 for further details on the City's levels of service framework. It is noted that the performance measures included in Table 2-21 only include ones for which data is currently available. The City has identified several other performance measures of interest, as reported in the City's 2024 Asset Management Plan for Non- Core Assets. These additional performance measures will be incorporated into future iterations of this asset management plan once the City collects the required data. Watson & Associates Economists Ltd. PAGE 2-24 Table 2-20: Support and Other Services - Community Levels of Service Service Attribute Community Levels of Service Quality The City maintains Support and Other Services facilities such that they provide a pleasant experience to staff and visitors. Reliability The City strives to ensure its Support and Other Services vehicles and equipment are reliable and available for use. Table 2-21: Support and Other Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Quality Average condition rating for Building and Property Facilities Very Poor (ULC% of 137%) Very Poor Reliability Average condition rating for Building and Property Equipment Good (ULC% of 46%) Good Average condition rating for Information Technology Systems Good (ULC% of 57%) Good Average condition rating for Public Works Fleet and Equipment Good (ULC% of 67%) Good 2.6 Transportation Services 2.6.1 State of Local Infrastructure The City owns and manages a variety of assets that support the provision of Transportation Services. Transportation services assets comprise roadways, bridges, stormwater mains and road-related assets (e.g., parking lots, transit siteworks, sidewalks, etc.). The estimated replacement cost of these assets is approximately $2.76 billion. The City's road network comprises road segments with three surface types: high-class bituminous (HCB), low-class bituminous (LCB), and gravel. The estimated current Watson & Associates Economists Ltd. PAGE 2-25 replacement cost of the City's roads is $1.9 billion1. HCB represent the largest share of replacement cost at $868.8 million (46%), followed by LCB at $572.1 million (30%) and lastly, gravel at $463.5 million (24%). The average age of roads is 20.3 years2. The City's paved roads are further segregated by roadside environment and class (i.e., urban, rural arterial and rural local/collector). Table 2-22 provides a breakdown of length, average age, and replacement cost information for roads by roadside environment and class. A visual rendering of the data presented in Table 2-22 is provided in Figure 2-16. A spatial illustration of the City's roads by surface type is provided in Map 2-1. 1 Storm mains and culverts are excluded from the replacement cost of paved roads, these will be presented separately within this section. 2 Average age of the road surface. Watson & Associates Economists Ltd. PAGE 2-26 Table 2-22: Roads - Quantity, Average Age and Replacement Cost by Surface Type and Roadside Environment and Class Surface Type Road Environment and Class Length (km) Average Age (years) Road Surface - Replacement Cost (2025$) Road Base - Replacement Cost (2025$) Replacement Cost (2025$) HCB Urban 232 32.3 $258,963,000 Rural Arterial 135 28.9 $43,204,000 Rural Local/Collector 491 23.6 $164,687,000 Sub-total HCB 858 29.0 $466,854,000 $419,974,000 $886,828,000 LCB Urban 165 18.7 $18,400,000 Rural Arterial 15 16.0 $1,943,000 Rural Local/Collector 779 17.1 $82,940,000 Sub-total LCB 959 17.4 $103,283,000 $468,553,000 $572,136,000 Gravel 899 7.2 $23,425,000 $440,031,000 $463,456,000 Total 2,716 20.3 $593,562,000 $1,328,858,000 $1,922,420,000 Watson & Associates Economists Ltd. PAGE 2-27 Figure 2-16: Roads - Quantity, Average Age and Replacement Cost Length Average Age (Years) Replacement Cost (2025$) 29.0 17.4 7.2 HCB LCB Gravel HCB, 886.8M, 46% LCB, 572.1M, 30% Gravel, 463.5M, 24% $1.9 billion 2,716 HCB (858km) LCB (959km) Gravel (899km) 2,716 kilometers Watson & Associates Economists Ltd. PAGE 2-28 Map 2-1: Roads by Surface Type Watson & Associates Economists Ltd. PAGE 2-29 The City owns and manages 148 vehicle bridges, 11 pedestrian bridges and 215 structural culverts. The estimated replacement cost of the City's structures is $482.1 million. Vehicle bridges represent the largest share of replacement cost at $289.4 million (60%), followed by structural culverts at $177.4 million (37%) and lastly, pedestrian bridges at $15.3 million (3%). The average age of structures is 60.0 years. Table 2-23 provides a breakdown of quantity, average age, and replacement cost information for structures by structure type. A visual rendering of the data presented in Table 2-23 is provided in Figure 2-17. A spatial illustration of the City's structures is provided in Map 2-2. Table 2-23: Structures - Quantity, Average Age and Replacement Cost Structure Type Quantity Average Age (years) Replacement Cost (2025$) Vehicle Bridges 148 62.1 $289,443,000 Pedestrian Bridges 11 101.9 $15,300,000 Structural Culverts 215 52.9 $177,366,000 Total 374 60.0 $482,109,000 Watson & Associates Economists Ltd. PAGE 2-30 Figure 2-17: Structures - Quantity, Average Age and Replacement Cost Quantity Average Age (Years) Replacement Cost (2025$) 62.1 101.9 52.9 Vehicle Bridges Pedestrian Bridges Structural Culverts Vehicle Bridges, 289.4M, 60% Pedestrian Bridges, 15.3M, 3% Structural Culverts, 177.4M, 37% $482 million Vehicle Bridges (148) Pedestrian Bridges (11) Structural Culverts (215) 374 structures Watson & Associates Economists Ltd. PAGE 2-31 Map 2-2: Structures Watson & Associates Economists Ltd. PAGE 2-32 The City's stormwater network supports the management of stormwater runoff within settlement areas. Stormwater assets comprise stormwater mains and stormwater culverts. The estimated replacement cost of the City's stormwater assets is $103 million. Stormwater mains represent the largest share of replacement cost at $97.2 million (94%) and stormwater culverts at $5.8 million (6%). The average age of stormwater mains is 70.1 years. Table 2-24 provides a breakdown of quantity, average age, and replacement cost information for stormwater assets by type. A visual rendering of the data presented in Table 2-24 is provided in Figure 2-18. A spatial illustration of the stormwater service area is provided in Map 2-3. Table 2-24: Stormwater - Quantity, Average Age and Replacement Cost Asset Category Quantity (km) Average Age (years) Replacement Cost (2025$) Stormwater Mains 149 70.1 $97,159,000 Stormwater Culverts 5 N/A1 $5,824,000 Total 154 $102,983,000 Figure 2-18: Stormwater - Quantity, Average Age and Replacement Cost Quantity Replacement Cost (2025$) Stormwater Mains, 97.2M, 94% Stormwater Culverts, 5.8M, 6% $103 million Stormwater Mains (149km) Stormwater Culverts (5km) 154 kilometers 1 Average age of stormwater culverts is not available because age information is currently not available for approximately 94% of these assets. Watson & Associates Economists Ltd. PAGE 2-33 Map 2-3: Stormwater Service Area Watson & Associates Economists Ltd. PAGE 2-34 The City also owns and manages a number of other assets that support the provision of Transportation Services. The estimated current replacement cost of the City's other Transportation Services assets is $250.6 million. Roads, fleet and transit facilities represent the largest share of replacement cost at $96.3 million (38.4%), followed by stormwater siteworks at $67.8 million (27.0%), sidewalks at $40.1 million (16.0%), traffic signals and streetlights at $25.5 million (10.2%), airport siteworks and facilities at $14.6 million (5.8%), parking lots at $5.8 million (2.3%) and lastly, transit siteworks at $628,000 (0.3%). The average age of these other Transportation Services assets is 28.4 years. Table 2-25 provides a breakdown of other Transportation Services assets showing the average age and replacement cost by capital program. A visual rendering of the data presented in Table 2-25 is provided in Figure 2-19. Table 2-25: Road-related Assets - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (2025$) Airport Siteworks and Facilities 40.3 $14,567,000 Parking Lots 15.3 $5,775,000 Roads, Fleet and Transit Facilities 52.2 $96,282,000 Traffic Signals and Streetlights 20.9 $25,536,000 Transit Siteworks 10.5 $628,000 Stormwater Siteworks N/A1 $67,752,000 Sidewalks 21.9 $40,053,000 Total 28.4 $250,593,000 1 Average age of stormwater siteworks is not available because age information is currently not available for approximately 96% of these assets. Watson & Associates Economists Ltd. PAGE 2-35 Figure 2-19: Road-related Assets - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 40.3 15.3 52.2 20.9 10.5 Unknown 21.9 Airport Siteworks and Facilities Parking Lots Roads, Fleet and Transit Facilities Traffic Signals and Streetlights Transit Siteworks Stormwater Siteworks Sidewalks Airport Siteworks and Facilities, 14.6M, 5.8% Parking Lots, 5.8M, 2.3% Roads, Fleet and Transit Facilities, 96.3M, 38.4% Traffic Signals and Streetlights, 25.5M, 10.2% Transit Siteworks, 628k, 0.3% Stormwater Siteworks, 67.8M, 27% Sidewalks, 40.1M, 16% $251 million 2.6.2 Condition The City assesses the condition of its paved roadways by assigning a Pavement Condition Index (PCI) rating to each road segment. PCI ratings are calculated by assigning weighted values to observed base-related distresses (e.g., rutting, fatigue cracking, etc.), surface-related distresses (e.g., raveling, shoving, etc.), and the overall ride condition of the segment. Thus, PCI ratings also provide an indication of the structural integrity of the road segment and an objective rationale for forecasting upcoming lifecycle requirements. To better communicate the condition of the City's paved roads, PCI ratings have been segmented into qualitative condition states as summarized in Table 2-26. Watson & Associates Economists Ltd. PAGE 2-36 Table 2-26: Road Condition States Defined with Respect to Pavement Condition Index Pavement Condition Index (PCI) Range Condition State Example Photos Description1 85 ≤ PCI ≤ 100 Excellent A very smooth ride. Pavement is in excellent condition with few cracks. 70 ≤ PCI < 85 Very Good A smooth ride with just a few bumps or depressions. The pavement is in good condition with frequent very slight or slight cracking. 55 ≤ PCI < 70 Good A comfortable ride with intermittent bumps or depressions. The pavement is in fair condition with intermittent moderate and frequent slight cracking, and with intermittent slight or moderate alligatoring and distortion. 40 ≤ PCI < 55 Fair An uncomfortable ride with frequent to extensive bumps or depressions. Cannot maintain the posted speed at lower end of the scale. The pavement is in poor to fair condition with frequent moderate cracking and distortion, and intermittent moderate alligatoring. 25 ≤ PCI < 40 Poor A very uncomfortable ride with constant jarring bumps and depressions. Cannot maintain the posted speed and must steer constantly to avoid bumps and depressions. The pavement is in poor condition with moderate alligatoring and extensive severe cracking and distortion. 10 ≤ PCI < 25 Very Poor The pavement is in poor to very poor condition with extensive severe cracking, alligatoring and distortion. 0 ≤ PCI < 10 Failed 1 Descriptions are from the SP-024 Manual for Condition Rating of Flexible Pavements (Ontario Ministry of Transportation, 2016). Watson & Associates Economists Ltd. PAGE 2-37 The City formally assessed the PCI ratings of its road segments through a Road Needs Study completed in 2021. The overall average PCI rating of all paved road segments in the City is estimated to be 81.0, indicating that the City's roadways are in an overall 'Very Good' condition state. The City's HCB roadways are estimated to have an average PCI rating of 83.7, indicating that they are in a 'Very Good' condition state. Similarly, the City's LCB roadways are estimated to have an average PCI rating of 78.5, indicating that they are also in a 'Very Good' condition state. The condition of gravel roads is estimated to be Fair to Good based on the expected outcomes of the gravel resurfacing program and ongoing maintenance activities. Maintenance activities include grading, ditching, brushing, and calcium chloride application multiple times per year. The gravel resurfacing program occurs on a 10- year cycle to bring each gravel road back to Very Good condition every 10 years. Table 2-27 summarizes the average PCI rating and associated condition states of the City's roadways by surface type. Table 2-27: Road Network - Average Condition Rating by Surface Type Surface Type Average PCI Rating1 Average Condition State HCB 83.7 Very Good LCB 78.5 Very Good Gravel N/A Fair to Good The distribution of road length of the City's paved roads by condition state and surface type is illustrated in Figure 2-20. The distribution of road length of the City's paved roads by PCI rating is illustrated in Figure 2-21. 1 Weighted average utilizing length of road segments as weights. Watson & Associates Economists Ltd. PAGE 2-38 Figure 2-20: Distribution of Paved Roads by Condition State and Surface Type 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% HCB LCB Percentage of Centreline-kilometres Surface Type Excellent Very Good Good Fair Poor Very Poor Failed Unknown Figure 2-21: Distribution of Paved Roads by PCI Rating 237 km 247 km 206 km 278 km 237 km 213 km 139 km 87 km 47 km 12 km 3 km 1 km 112 km 0 km 50 km 100 km 150 km 200 km 250 km 300 km Centreline-kilometres PCI Rating Range In accordance with Ontario Regulation 104/97: Standards for Bridges (O. Reg. 104/97), the City completes biennial inspections of its bridges and structural culverts based on the Ontario Structure Inspection Manual (OSIM). To provide an overall measure of the condition of bridges and structural culverts, Bridge Condition Index (BCI) ratings are calculated for each inspected structure. BCI ratings are calculated by assigning weighted values to the condition of various structural elements (e.g., deck, foundation, Watson & Associates Economists Ltd. PAGE 2-39 superstructure, substructure, girders/beams, bearings, etc.) and non-structural elements (e.g., sidewalks, curbs, handrails, barriers, signage, etc.) of the structure being assessed. BCI ratings are typically represented on a scale of 0 to 100, with 100 being a structure in new or as-new condition. To better communicate the condition of the City's structures, BCI ratings have been segmented into qualitative condition states as summarized in Table 2-28. Table 2-28: Descriptions of Structure Condition States Condition State Bridge Photos Culvert Photos Description Good 70 ≤ BCI < 100 Maintenance is not usually required within the next five years Fair 60 ≤ BCI < 70 Maintenance work is usually scheduled within the next five years. This is the ideal time to schedule major structure repairs to get the most out of bridge spending. Poor 0 ≤ BCI < 60 Maintenance work is usually scheduled within one year. Structure may be at increased risk of requiring a loading restriction to be posted. The City most recently assessed the BCI ratings of its structures through an OSIM report completed in 2024. The overall average BCI rating of all structures in the City is estimated to be 70.2, indicating that the City's structures are currently in an overall 'Good' condition state. The City's vehicle bridges are estimated to have an average BCI rating of 72.4, indicating that they are currently in a 'Good' condition state. Similarly, the City's pedestrian bridges are estimated to have an average BCI rating of 70.1, indicating Watson & Associates Economists Ltd. PAGE 2-40 that they are also currently in a 'Good' condition state. Lastly, City's structural culverts are estimated to have an average BCI rating of 66.5, indicating that they are currently in a 'Fair' condition state. Table 2-29 summarizes the average BCI rating and associated condition states of the City's structures by structure type. Table 2-29: Structures - Average BCI Rating by Structure Type Structure Type Average BCI Rating Average Condition State Vehicle Bridges 72.4 Good Pedestrian Bridges 70.1 Good Structural Culverts 66.5 Fair Total 70.2 Good The distribution of replacement cost of the City's structures by condition state and structure type is illustrated in Figure 2-22. The distribution of replacement cost of the City's structures by BCI rating is illustrated in Figure 2-23. Figure 2-22: Distribution of Structures by Condition State and Structure Type 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Vehicle Bridges Pedestrian Bridges Structural Culverts Percentage of Replacement Cost Structure Type Good Fair Poor Unknown Watson & Associates Economists Ltd. PAGE 2-41 Figure 2-23: Distribution of Structures by BCI Rating 12 bridges 1 culvert 4 bridges 5 culverts 5 bridges 3 culverts 4 bridges 3 culverts 7 bridges 2 culverts 29 bridges 40 culverts 48 bridges 55 culverts 22 bridges 22 culverts 13 bridges 19 culverts 6 bridges 7 culverts 3 bridges 5 culverts 3 bridges 7 culverts 3 culverts 1 bridge 1 culvert 3 culverts 2 culverts 1 bridge 1 culvert 1 culvert 1 bridge 35 culverts $0M $40M $80M $120M $160M $200M Replacement Cost BCI Rating Range The condition of the City's stormwater assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of stormwater assets is assessed based on age relative to useful service life (i.e., based on the percentage of useful service life consumed - ULC%). To better communicate the condition of stormwater assets, ULC% ratings have been segmented into qualitative condition states as summarized previously in the Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Based on their current age profile, the average ULC% rating of the City's stormwater mains is 92.6%, which indicates that, on average, stormwater mains are in a 'Fair' condition state. Average ULC% rating for the City's stormwater culverts is not reported because age information is currently not available for approximately 94% of these assets. Table 2-30 summarizes the average ULC% rating and associated condition states of the City's stormwater assets. Watson & Associates Economists Ltd. PAGE 2-42 Table 2-30: Condition Summary - Stormwater Asset Category Average ULC%1 Average Condition State Stormwater Mains 92.6% Fair Stormwater Culverts N/A Unknown The distribution of the mains length of stormwater mains by ULC% rating range is illustrated Figure 2-24. Figure 2-24: Distribution of Stormwater Mains by ULC% 0.4km 0.1km 4.3km 2.3km 76.3km 5.5km 2.6km 6.5km 19.2km 9.6km 22.3km 0 km 10 km 20 km 30 km 40 km 50 km 60 km 70 km 80 km 90 km Centreline-kilometres ULC% Rating Range The condition of the City's sidewalks was formally assessed through a condition assessment in 2021. To better communicate the condition of sidewalks, condition ratings have been segmented into qualitative condition states, generally aligned with PCI ratings as summarized previously in the Table 2-26. The overall average condition rating of sidewalks in the City is estimated to be 73.2, indicating that the City's sidewalks are in an overall 'Very Good' condition state. The distribution of length of sidewalks by condition rating range is illustrated Figure 2-25. 1 Weighted average utilizing length of stormwater mains as weights. Watson & Associates Economists Ltd. PAGE 2-43 Figure 2-25: Distribution of Sidewalks by Condition Rating 49 km 45 km 73 km 17 km 2 km 6 km 0 km 10 km 20 km 30 km 40 km 50 km 60 km 70 km 80 km Centreline-kilometres Condition Rating Range The condition of the City's other Transportation Services assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of other Transportation Services assets is assessed based on age relative to useful service life (i.e. based on the percentage of useful service life consumed - ULC%). To better communicate the condition of other road- related assets, ULC% ratings have been segmented into qualitative condition states as summarized previously in the Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Based on their current age profile, other Transportation Services assets are, on average, in a 'Good' condition state1. The average ULC% rating of the City's airport siteworks and facilities is 90.1%, which indicates that, on average, airport siteworks and facilities are in a 'Fair' condition state. The average ULC% rating of the City's parking lots is 55.0%, which indicates that, on average, parking lots are in a 'Good' condition state. The average ULC% rating of the City's roads, fleet and transit facilities is 87.2%, which indicates that, on average, roads, fleet and transit facilities is in a 'Good' condition state. The average ULC% rating of the City's traffic signals and streetlights is 70.3%, which indicates that, on average, traffic signals and streetlights is in a 'Good' condition 1 Average condition state of stormwater siteworks is not available because age information is currently not available for approximately 96% of these assets. Watson & Associates Economists Ltd. PAGE 2-44 state. Lastly, the average ULC% rating of the City's transit siteworks is 58.4%, which indicates that, on average, transit siteworks is in a 'Good' condition state. Table 2-31 summarizes the average ULC% rating and associated condition states of the City's other road-related assets. Table 2-31: Condition Summary - Other road-related assets Capital Program Average ULC% Average Condition State Airport Siteworks and Facilities 90.1% Fair Parking Lots 55.0% Good Roads, Fleet and Transit Facilities 87.2% Good Traffic Signals and Streetlights 70.3% Good Transit Siteworks 58.4% Good Stormwater Siteworks N/A Unknown Average 83.0% Good The distribution of the replacement cost of other Transportation Services assets by condition state is illustrated in Figure 2-26. The distribution of the replacement cost of other Transportation Services assets by ULC% rating range is illustrated Figure 2-27. Figure 2-26: Distribution of Other Transportation Services Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Airport Siteworks and Facilities Parking Lots Roads, Fleet and Transit Facilities Traffic Signals and Streetlights Transit Siteworks Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Watson & Associates Economists Ltd. PAGE 2-45 Figure 2-27: Distribution of Other Transportation Services Assets by ULC% 0.004% 0.1% 0.3% 6.4% 2.3% 0.3% 0.004% 1.2% 0.3% 3.6% 3.2% 2.0% 5.9% 7.8% 3.9% 2.9% 5.0% 3.6% 14.0% 23.9% 1.5% 3.5% 0.1% 1.2% 0.2% 6.8% $0M $5M $10M $15M $20M $25M $30M $35M $40M Replacement Cost ULC% Rating Range 2.6.3 Levels of Service This subsection presents the City's levels of service framework for its Transportation assets. Table 2-32 presents the City's Service Attributes and Community Levels of Service for its Transportation assets while Table 2-33 presents the City's Technical Levels of Service (i.e., performance measures) for its Transportation assets, including their current and target performance. Please refer to Section 2.1.3 for further details on the City's levels of service framework. Table 2-32: Transportation Services - Community Levels of Service Service Attribute Community Levels of Service Scope The City's transportation assets enable the movement of people and goods within the City and provide connectivity to regional roads. The City's transportation assets are used by pedestrians, cyclists, horse- drawn buggies, passenger vehicles, heavy transport vehicles, all- terrain vehicles, and emergency vehicles. The Victoria Rail Trail and its pedestrian bridges are used by pedestrians, cyclists, horse riders, all-terrain vehicles, and snowmobiles. The scope of the City's transportation network is illustrated by Map 2-1 and Map 2-2. The maps show the geographical distribution of the City's roads and identify locations of the City's structures. Watson & Associates Economists Ltd. PAGE 2-46 Service Attribute Community Levels of Service Stormwater service is provided in the following communities: Bethany (Manorview), Bethany (Woodfield), Birch Point, Bobcaygeon, Bolsover (Palmina), Bolsover (Western Trent), Canadiana Shores, Chambers Corner, Coboconk, Fenelon Falls, Janetville, Kings Bay, Kinmount, Lindsay, Manilla, Mariposa, Norland, Oakwood, Omemee (Victoria Glen), Pleasant Point, Pontypool (Pinewood), Sonya, Southview Estates, Victoria Place, and Woodville. Quality The City strives to maintain road and bridge surfaces to a level that supports comfortable passage of vehicles. The City keeps its Transportation Services facilities, equipment, and siteworks in a good state of repair. To aid in interpreting condition states, photos of roads, bridges, and culverts in different condition states are provided in Table 2-26 and Table 2-28. A general description of how each condition state may affect the use of these assets is also provided in these tables. Reliability/ Availability The City strives to ensure its Transportation Services assets are reliable and available for use. Table 2-33: Transportation Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Scope Number of lane-kilometres of arterial roads as a proportion of square kilometres of land area of the municipality. 0.147 km/km2 0.147 km/km2 Number of lane-kilometres of collector roads as a proportion of square kilometres of land area of the City. 0.026 km/km2 0.026 km/km2 Number of lane-kilometres of local roads as a proportion of square kilometres of land area of the City. 1.567 km/km2 1.567 km/km2 Percentage of bridges in the City with loading or dimensional restrictions. 6.1% (9 out of 148) 6.1% (9 out of 148) Watson & Associates Economists Ltd. PAGE 2-47 Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Percentage of properties in municipality resilient to a 100-year storm. Not Available Not Available Percentage of the municipal stormwater management system resilient to a 5-year storm. Not Available Not Available Quality For paved roads in the City, the average pavement condition index value. 81 81 For unpaved roads in the City, the average surface condition (e.g. excellent, good, fair or poor). Fair to Good Fair to Good For bridges in the City, the average bridge condition index value. 72.4 72.4 For structural culverts1 in the City, the average bridge condition index value. 66.5 66.5 Average condition rating for sidewalks 73.2 73.2 Average condition rating for Airport Siteworks and Facilities Fair (ULC% of 90%) Fair Average condition rating for Parking Lots Good (ULC% of 55%) Good Average condition rating for Roads, Fleet and Transit Facilities Good (ULC% of 87%) Good Average condition rating for Transit Siteworks Good (ULC% = 58%) Good Reliability/ Availability Average condition rating for Traffic Signals and Streetlights Good (ULC% of 70%) Good 1 Structural culverts are culverts with a diameter greater than or equal to three metres. Watson & Associates Economists Ltd. PAGE 2-48 2.7 Water and Wastewater Services 2.7.1 State of Local Infrastructure The City owns and manages a variety of assets that support the provision of Water and Wastewater Services. The estimated replacement cost of these assets is approximately $861 million. Horizontal distribution and collection (e.g., watermains, wastewater mains, hydrants, etc.) represent the largest share of replacement cost at $645.4 million (75%), followed by vertical distribution and collection (e.g., storage systems, process equipment, etc.) at $173.4 million (20%), water treatment at $27.1 million (3%) and, lastly, wastewater treatment at $15 million (2%). The average age of water and wastewater assets is 42.5 years. Table 2-34 provides a breakdown of these assets by capital program, showing the average age, and replacement cost. A visual rendering of the data presented in Table 2-34 is provided in Figure 2-28. A spatial illustration of the water service area and wastewater service area is provided in Map 2-4 and Map 2-5, respectively. Table 2-34: Water and Wastewater Services Capital Programs - Average Age and Replacement Cost Capital Program Average Age (years) Replacement Cost (2025$) Vertical Distribution and Collection 25.6 $173,421,000 Horizontal Distribution and Collection 48.2 $645,417,000 Water Treatment 26.5 $27,113,000 Wastewater Treatment 23.9 $14,999,000 Total 42.5 $860,951,000 Watson & Associates Economists Ltd. PAGE 2-49 Figure 2-28: Water and Wastewater Services Capital Programs - Average Age and Replacement Cost Average Age (Years) Replacement Cost (2025$) 25.6 48.2 26.5 23.9 Vertical Distribution and Collection Horizontal Distribution and Collection Water Treatment Wastewater Treatment Vertical Distribution and Collection, 173.4M, 20.1% Horizontal Distribution and Collection, 645.4M, 75% Water Treatment, 27.1M, 3.1% Wastewater Treatment, 15M, 1.7% $861 million Watson & Associates Economists Ltd. PAGE 2-50 Map 2-4: Water Service Area Watson & Associates Economists Ltd. PAGE 2-51 Map 2-5: Wastewater Service Area Watson & Associates Economists Ltd. PAGE 2-52 2.7.2 Condition The condition of the City's Water and Wastewater Services assets has not been directly assessed through a physical condition assessment. For the purposes of this asset management plan, the condition of Water and Wastewater Services assets is assessed based on age relative to useful service life (i.e., based on the percentage of useful service life consumed - ULC%). To better communicate the condition of Water and Wastewater assets, ULC% ratings have been segmented into qualitative condition states as summarized previously in the Table 2-2. Please refer to Section 2.1.2 for further information on this condition assessment methodology. Based on their current age profile, assets within the Water and Wastewater Services group are, on average, in a 'Good' condition state. The average ULC% rating of the City's vertical distribution and collection assets is 58.9%, which indicates that, on average, these assets are in a 'Good' condition state. Similarly, the average ULC% rating of the City's horizontal distribution and collection assets is 47.1%, which indicates that, on average, horizontal distribution and collection assets are in a 'Good' condition state. The average ULC% rating of the City's water treatment assets is 44.1%, which indicates that, on average, water treatment assets are in a 'Very Good' condition state. Lastly, the average ULC% rating of the City's wastewater treatment assets is 39.9%, which indicates that, on average, wastewater treatment assets are in a 'Very Good' condition state. Table 2-19 summarizes the average ULC% rating and associated condition states of the City's Water and Wastewater Services assets. Table 2-35: Condition Summary - Water and Wastewater Services Capital Program Average ULC% Average Condition State Vertical Distribution and Collection 58.9% Good Horizontal Distribution and Collection 47.1% Good Water Treatment 44.1% Very Good Wastewater Treatment 39.9% Very Good Average 49.3% Good Watson & Associates Economists Ltd. PAGE 2-53 The distribution of the replacement cost of all Water and Wastewater assets by condition state is illustrated in Figure 2-29. The distribution of the replacement cost of Water and Wastewater assets by ULC% rating range is illustrated Figure 2-30. Figure 2-29: Distribution of Water and Wastewater Services Assets by Condition State 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Vertical Distribution and Collection Horizontal Distribution and Collection Water Treatment Wastewater Treatment Percentage of Replacement Cost Capital Program Very Good Good Fair Poor Very Poor Unknown Figure 2-30: Distribution of Water and Wastewater Services Assets by ULC% 0.02% 1.65% 1.26% 2.33% 16.81% 6.78% 10.04% 4.05% 10.81% 1.98% 1.64% 3.20% 5.01% 1.67% 0.98% 2.87% 6.30% 8.30% 1.02% 2.56% 0.01% 0.01% 0.46% 0.27% 0.04% 0.86% 9.09% $0M $30M $60M $90M $120M $150M $180M Replacement Cost ULC% Rating Range Watson & Associates Economists Ltd. PAGE 2-54 2.7.3 Levels of Service This subsection presents the City's levels of service framework for its Water and Wastewater assets. Table 2-36 presents the City's Service Attributes and Community Levels of Service for its Water and Wastewater assets while Table 2-37 presents the City's Technical Levels of Service (i.e., performance measures) for its Water and Wastewater assets, including their current and target performance. Please refer to Section 2.1.3 for further details on the City's levels of service framework. Table 2-36: Water and Wastewater Services - Community Levels of Service Service Attribute Community Levels of Service Scope Water service is provided to customers in the following communities: Bethany (Manorview), Bethany (Woodfield), Birch Point, Bobcaygeon, Bolsover (Palmina), Bolsover (Western Trent), Canadiana Shores, Chambers Corner, Coboconk, Fenelon Falls, Janetville, Kings Bay, Kinmount, Lindsay, Manilla, Mariposa, Norland, Oakwood, Omemee (Victoria Glen), Pleasant Point, Pontypool (Pinewood), Sonya, Southview Estates, Victoria Place, and Woodville. Wastewater service is provided to customers in the following communities: Bobcaygeon, Coboconk, Fenelon Falls, Kings Bay, Kinmount, Lindsay, Omemee, and Western Trent / Palmina. Reliability The City strives to minimize disruptions to water service. Boil water advisories are triggered by adverse water quality reports from routine water testing or from ad hoc tests done after events, such as watermain breaks, that may have allowed contaminants into the system. The City has a standard operating procedure documented for handling boil water advisories (SOP RC 03). Service interruptions can be caused by routine municipal work, including watermain replacements, water distribution system repairs, service connection repairs, and maintenance of water system facilities. Customers are informed in advance when feasible of service interruptions, including details regarding the location and timeline of the interruption. Customers are instructed to ensure they have sufficient water supplies on hand, hot water tanks are turned off, and to run their water taps until any discolouration in the water clears once the interruption ends. If the period of interruption is prolonged, a temporary water service may be installed to minimize the impact on customers. Watson & Associates Economists Ltd. PAGE 2-55 Service Attribute Community Levels of Service Reliability (continued) The City strives to minimize disruption to wastewater service. Stormwater enters sanitary sewers by two routes: inflow and infiltration. Inflow refers to stormwater flows entering into sanitary sewers via manhole cover holes, connected foundation and roof drains, unsealed openings in construction sites, and cross- connections. Infiltration refers to groundwater entering sanitary mains through cracks, holes, failed joints, and incorrect or faulty connections. Wet weather events can significantly and rapidly increase stormwater flows into the wastewater systems through both inflow and infiltration pathways, leading to capacity related issues with sewer mains, pumping stations, and wastewater treatment plants. Several strategies are used to prevent sewage from overflowing into streets and backing up into homes when there are wet weather events. The system has capacity to handle flows significantly higher than average daily flows to help address peak flows. If a facility if overwhelmed by excess flows, detention tanks, partial or full bypasses, and/or overflow procedures are used to relieve pressure on overwhelmed facilities. This is done in accordance with the related Environmental Compliance Approval and the operating design of the affected facility. The City has a Backwater Valve Subsidy Program. It allows eligible property owners to apply for a 50% cost recovery on the purchase and installation of a backwater valve. Backwater valves can help prevent basements from flooding. Table 2-37: Water and Wastewater Services - Technical Levels of Service Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) Scope Percentage of properties connected to the municipal water system. 30% 30% Percentage of properties where fire flow is available. 24% 24% Percentage of properties connected to the municipal wastewater system. 26% 26% Reliability The number of connection-days per year where a boil water advisory notice is in place compared to the 0.0921 Minimize Watson & Associates Economists Ltd. PAGE 2-56 Service Attribute Performance Measure Current Performance (2025) Target Performance (2035) total number of properties connected to the municipal water system. The number of connection-days per year lost due to water main breaks compared to the total number of properties connected to the municipal water system. 0.0036 Minimize The number of connection-days per year lost due to wastewater backups compared to the total number of properties connected to the municipal wastewater system. 0.0025 Minimize The number of effluent violations per year due to wastewater discharge compared to the total number of properties connected to the municipal wastewater system. 0 0 2.8 Uncategorized (Natural Assets) In addition to the assets summarized in the preceding sections, the City owns and manages a variety of natural assets that are currently not categorized under a service group. These assets comprise aggregate pits and quarries, and forests. The estimated replacement cost of these assets is approximately $596 million. Forests represent the largest share of replacement cost at $424.4 million (71%), followed by aggregate pits and quarries at $171.7 million (29%). Additionally, the City also owns a significant amount of land. Because these assets generally do not require lifecycle rehabilitation or replacement, they are only noted here for information purposes. However, they are excluded from the levels of service and lifecycle management strategy aspects of this asset management plan. Watson & Associates Economists Ltd. PAGE 2-57 2.9 Population and Employment Growth The City is expected to grow to 117,000 people and 39,000 jobs by 2051. To plan for this growth, the City is preparing a Growth Management Strategy. The Growth Management Strategy will inform the incremental service demands arising from growth and the associated infrastructure investments to the year 2051. The City collects development charges to fund its growth-related capital expenditures. Currently, the most recent information on growth-related needs is summarized in the City's 2019 Development Charges Background Study which identifies growth-related capital expenditures to 2031. The City is currently undertaking a new Development Charges Background Study which will identify the anticipated capital expenditures to 2035 and beyond. Following the completion of the new Development Charges Study, the forecast of growth-related infrastructure expansion and upgrades will be incorporated into a future iteration of this asset management plan. . Watson & Associates Economists Ltd. Chapter 3 Lifecycle Management Strategies Watson & Associates Economists Ltd. PAGE 3-1 3. Lifecycle Management Strategy 3.1 Introduction The lifecycle management strategies in this asset management plan identify the lifecycle activities that would need to be undertaken to sustain the level of service targets identified in Chapter 2. Within the context of this asset management plan, lifecycle activities are the specified actions that can be performed on an asset in order to ensure it is performing at an appropriate level, and/or to extend its service life.F1 These actions can be carried out on a planned schedule in a prescriptive manner, or through a dynamic approach where the lifecycle activities are only carried out when specified conditions are met. O. Reg. 588/17 requires that all potential lifecycle activity options be assessed, with the aim of identifying the set of lifecycle activities that can be undertaken at the lowest cost to maintain current levels of service. Asset management plans must include a ten- year capital forecast, identifying the lifecycle activities resulting from the lifecycle management strategy. The following sections detail the ten-year forecasts of lifecycle activities and associated costs that would be required for the City to achieve and sustain the proposed levels of service identified in Chapter 2. 3.2 Tax Supported Assets This section presents an estimate of the costs associated with achieving and sustaining the proposed level of service for the City's tax supported assets. The ten-year lifecycle expenditure forecast is summarized in Figure 3-1. A further breakdown of the lifecycle expenditure forecast by service group is provided in Table 3-1. 1 The full lifecycle of an asset includes activities such as initial planning and maintenance which are typically addressed through master planning studies and maintenance management, respectively. Watson & Associates Economists Ltd. PAGE 3-2 Figure 3-1: Tax Supported - Lifecycle Expenditure Forecast (inflated $) $74.4M $79.2M $76.3M $82M $83.5M $78.4M $80.7M $83.1M $85.6M $88.2M $0M $20M $40M $60M $80M $100M 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Transportation Services Solid Waste Services Support and Other Services Emergency Services Human Services Parks and Recreation Services Watson & Associates Economists Ltd. PAGE 3-3 Table 3-1: Tax Supported - Lifecycle Expenditure Forecast (inflated $) Service Group 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Transportation Services $43,427,000 $49,484,000 $43,780,000 $60,861,000 $65,170,000 $49,175,000 $50,652,000 $52,171,000 $53,737,000 $55,348,000 Solid Waste Services $390,000 $6,356,000 $2,251,000 $1,717,000 $1,757,000 $1,850,000 $1,906,000 $1,963,000 $2,022,000 $2,083,000 Support and Other Services $9,404,000 $10,443,000 $9,268,000 $7,923,000 $6,998,000 $9,970,000 $10,577,000 $10,577,000 $10,894,000 $11,221,000 Emergency Services $6,925,000 $5,850,000 $12,332,000 $7,635,000 $7,400,000 $9,925,000 $10,529,000 $10,529,000 $10,844,000 $11,170,000 Human Services $542,000 $377,000 $549,000 $408,000 $520,000 $510,000 $526,000 $542,000 $558,000 $574,000 Parks and Recreation Services $13,743,000 $6,733,000 $8,124,000 $3,425,000 $1,653,000 $6,940,000 $7,148,000 $7,363,000 $7,583,000 $7,810,000 Total $74,431,000 $79,243,000 $76,304,000 $81,969,000 $83,498,000 $78,370,000 $80,723,000 $83,145,000 $85,638,000 $88,206,000 Watson & Associates Economists Ltd. PAGE 3-4 3.3 Rate Supported Assets (Water and Wastewater) This section presents an estimate of the costs associated with achieving and sustaining the proposed level of service for the City's rate supported assets (i.e., Water and Wastewater assets). The ten-year lifecycle expenditure forecast is summarized in Figure 3-2. A further breakdown of the lifecycle expenditure forecast by capital program is provided in Table 3-2. Watson & Associates Economists Ltd. PAGE 3-5 Figure 3-2: Rate Supported - Lifecycle Expenditure Forecast (inflated $) $19.6M $19.7M $19.8M $22.2M $20.3M $18.2M $19.1M $19.5M $19.7M $20.1M $0M $5M $10M $15M $20M $25M 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Water Treatment Wastewater Treatment Vertical Distribution and Collection Horizontal Distribution and Collection Studies and Special Projects Watson & Associates Economists Ltd. PAGE 3-6 Table 3-2: Rate Supported - Lifecycle Expenditure Forecast (inflated $) Capital Program 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Water Treatment $1,675,000 $940,000 $1,900,000 $2,055,000 $2,555,000 $2,000,000 $2,060,000 $2,122,000 $2,185,000 $2,251,000 Wastewater Treatment $2,095,000 $675,000 $1,955,000 $1,900,000 $2,443,000 $2,000,000 $2,060,000 $2,122,000 $2,185,000 $2,251,000 Vertical Distribution and Collection $1,130,000 $370,000 $400,000 $220,000 $1,500,000 $1,000,000 $1,030,000 $1,061,000 $1,093,000 $1,126,000 Horizontal Distribution and Collection $11,804,000 $16,214,000 $14,125,000 $16,484,000 $13,519,000 $13,132,000 $13,844,000 $14,057,000 $14,123,000 $14,300,000 Studies and Special Projects $2,945,000 $1,530,000 $1,455,000 $1,500,000 $260,000 $100,000 $100,000 $100,000 $100,000 $170,000 Total $19,649,000 $19,729,000 $19,835,000 $22,159,000 $20,277,000 $18,232,000 $19,094,000 $19,462,000 $19,686,000 $20,098,000 Watson & Associates Economists Ltd. Chapter 4 Financial Strategy Watson & Associates Economists Ltd. PAGE 4-1 4. Financial Strategy 4.1 Introduction This chapter outlines the financial strategy that would sustainably fund the lifecycle management strategies presented in Chapter 3. This financial strategy focuses on examining how the City can fund the lifecycle activities required to achieve the proposed levels of service, as identified in Chapter 2. The strategy presented is a suggested approach which should be examined and re-evaluated during the annual budgeting process to ensure the sustainability of the City's financial position as it relates to its assets. O. Reg. 588/17 requires, at minimum, a 10-year capital plan that forecasts the costs of implementing the lifecycle management strategy and the lifecycle activities required therein. The financial strategy in this asset management plan has been developed for a 10-year forecast period to be in compliance with this requirement. Various financing options, including reserve funds, debt, and grants, were considered during the process of developing the financial strategy and are described in more detail in section 4.4 below. 4.2 Lifecycle Funding Target An annual lifecycle funding target represents the amount of funding that would be required annually to fully fund a lifecycle management strategy over the long term. By planning to achieve this annual funding level, the City would theoretically be able to fully fund capital works as they arise. In practice, capital expenditures often fluctuate year- to-year based on the asset replacement and renewal/rehabilitation projects being undertaken in a particular year. By planning to achieve the lifecycle funding target over the long term, however, the periods of relatively low capital needs would allow for the building up of lifecycle reserve funds that could be drawn upon in times of relatively high capital needs. A breakdown of the lifecycle funding target for tax supported assets by service group is provided in Table 4-1. Watson & Associates Economists Ltd. PAGE 4-2 Table 4-1: Tax Supported - Average Annual Lifecycle Cost by Service Group Service Group Average Annual Lifecycle Cost (2025$) Transportation Services $48,727,000 Solid Waste Services $2,424,000 Support and Other Services $10,329,000 Emergency Services $6,099,000 Human Services $6,382,000 Parks and Recreation Services $7,564,000 Total $81,525,000 A breakdown of the lifecycle funding target for rate supported assets by capital program is provided in Table 4-2. Table 4-2: Rate Supported - Average Annual Lifecycle Cost by Capital Program Capital Program Average Annual Lifecycle Cost (2025$) Water Treatment $452,000 Wastewater Treatment $250,000 Vertical Distribution and Collection $4,164,000 Horizontal Distribution and Collection $6,134,000 Total $11,000,000 4.3 Capital Expenditure Forecast The 10-year (2026 to 2035) capital expenditure forecasts for the City's tax-supported and rate-supported assets are presented in Table 3-1 and Table 3-2, respectively. The expenditure forecasts include a capital inflation factor of 3%. Watson & Associates Economists Ltd. PAGE 4-3 4.4 Funding Table A-1 and Table A-7 in Appendix A summarize the capital expenditures and recommended strategy to finance those expenditures for tax-supported and rate- supported assets, respectively. The funding forecast was based on the funding sources identified in the City's Long-Term Financial Plan. The lifecycle costs required to sustain established level of service targets are being partially recovered through several external funding sources: - OCIF formula-based funding is maintained based on the City's 2025 allocation (i.e., approximately $6.7 million). It is noted that the Ministry of Infrastructure recently shifted from using historical costs to using replacement costs in the formula used for calculating annual OCIF funding allocations. As a result of this formula change, the City's OCIF allocation may continue to change in the coming years. The amount of OCIF funding will need to be monitored by City staff and, if a significant variance occurs relative to the estimate provided in this asset management plan, the financial strategy may need to be updated. - CCBF funding has been shown as a stable and long-term funding source for eligible capital projects. Annual funding estimates are based on the City's scheduled allocations for 2026-2028, and increasing by 4% for every two-year interval thereafter. - Ministry of HLTC Grant has been maintained at current levels (i.e., approximately $300,000 annually) until 2028, and subsequently increasing to $600,000 annually from 2029 onwards. The increase in funding coincides with the anticipated completion of the new Paramedic Headquarters and Fleet Centre. This financial strategy has been developed to be fully funded, and therefore no funding shortfall has been identified. This means, however, that if identified grants are not received at expected amounts, shortfalls may present themselves. In such an event, the difference could be made up through increases to the tax levy/user rates over and above those presented hereafter. It is noted that this fully funded financial strategy phases in annual contributions towards capital such that the City reaches full lifecycle funding levels by 2035. Watson & Associates Economists Ltd. PAGE 4-4 4.5 Tax Levy Impact As discussed in section 4.2, while the extent of capital expenditures will fluctuate from year to year, it is important for the City to implement a consistent, yet increasing, annual investment in capital so that the excess annual funds can accrue in capital reserves. In order to fund the recommended lifecycle management strategy using the City's own available funding sources (i.e., using taxation, CCBF funding, OCIF funding, Ministry of HLTC funding, and other stable and predictable funding sources1), the annual contribution to the Asset Management Reserve would need to increase from $17.4 million budgeted in 2025 to $65.8 million by 2035. The financial strategy projects higher increases at the beginning of the forecast period, in alignment with the City's Long Term Financial Plan. Additionally, annual contributions to the Public Works and Fire Service fleet reserves would need to increase from the 2025 budgeted amounts (i.e., $6.3 million and $2.0 million, respectively) by 3% annually over the forecast period. Consideration for cash flow and positive reserve fund balances has been included in setting the capital reserve transfer amounts. Detailed continuity schedules for the Asset Management Reserve, the Public Works Fleet Reserve, and the Fire Service Fleet Reserve can be found in tables A-3 through A-5 in Appendix A. It should be noted that the Fire Service Fleet Reserve is projected to be in a deficit position for most of the forecast period. However, given the projected balances of the Asset Management Reserve and the Public Works Fleet Reserve, these deficits could be mitigated through inter-fund borrowing. 4.6 Rate Revenue Impact As discussed in section 4.2, while the extent of capital expenditures will fluctuate from year to year, it is important for the City to implement a consistent, yet increasing, annual investment in capital so that the excess annual funds can accrue in capital reserves. In order to fund the recommended lifecycle management strategy for Water and Wastewater assets using the City's water and wastewater rate revenues, the amount of 1 Other sources of funding included in the financial strategy include the Haul Routes Reserve, Parkland Reserve, KLPS Capital reserve, Victoria Manor Reserve, Housing Reserve, Wilson Estate, and contributions from other municipalities for capital expenditures related to assets with shared funding arrangements. Watson & Associates Economists Ltd. PAGE 4-5 capital funding (including debt servicing and transfers to reserves) supported by the City's water and wastewater rates would need to increase by 3.27% annually between 2026 and 2035 (i.e., increasing from $10.7 million as of 2025 to $14.8 million by 2035). Consideration for cash flow and positive reserve fund balances has been included in setting the capital reserve transfer amounts. A detailed continuity schedule for water and sewer infrastructure renewal reserves can be found in Table A-9 in Appendix A. Watson & Associates Economists Ltd. Chapter 5 Recommendations and Next Steps Watson & Associates Economists Ltd. PAGE 5-1 5. Recommendations and Next Steps 5.1 Recommendations The following recommendations are provided for the City's consideration: - That the City of Kawartha Lakes Asset Management Plan be received and approved by Council; and - That consideration be made as part of the annual budgeting process to ensure sufficient capital funding is available to implement the asset management plan. 5.2 Next Steps Following the approval of this asset management plan by Council, the City's asset management journey will transition from developing the plan to its operationalization. The City will need to establish processes and implement systems to keep asset information (e.g., condition, replacement costs, etc.) updated and relevant, so that it can be relied on to identify capital priorities and inform the annual budget process. Furthermore, the City will need to establish a format and process for the annual updates to Council on asset management progress, as required by O. Reg. 588/17. The asset management plan should be updated as the strategic priorities and capital needs of the City change. This can be accomplished in conjunction with specific legislative requirements (i.e., five-year review of the asset management plan as required by O. Reg. 588/17), as well as the City's annual budget process. Watson & Associates Economists Ltd. PAGE A-1 Appendix A Financial Strategy Tables Watson & Associates Economists Ltd. PAGE A-2 Table A-1 City of Kawartha Lakes Tax-supported Assets State-of-Good-Repair Capital Forecast Summary Inflated $ 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Transportation Services Multiyear Capital Projects 4,765,000 3,165,000 400,000 400,000 400,000 400,000 - - - - - Bridges and Culverts 76,618,000 3,750,000 6,234,000 6,014,000 14,972,000 14,325,000 5,900,000 6,077,000 6,259,000 6,447,000 6,640,000 Urban/Rural Reconstruction 153,632,000 13,565,000 13,416,000 11,316,000 21,281,000 15,480,000 14,800,000 15,244,000 15,701,000 16,172,000 16,657,000 Urban/Arterial Resurfacing 142,242,000 9,495,000 15,616,000 12,736,000 11,750,000 20,441,000 13,600,000 14,008,000 14,428,000 14,861,000 15,307,000 Rural Resurfacing 77,880,000 7,195,000 7,824,000 6,930,000 6,190,000 7,800,000 7,900,000 8,137,000 8,381,000 8,632,000 8,891,000 Gravel Resurfacing 24,710,000 2,242,000 2,263,000 2,269,000 2,257,000 2,406,000 2,500,000 2,575,000 2,652,000 2,732,000 2,814,000 Lifecycle Management 27,154,000 2,362,000 2,435,000 2,509,000 2,584,000 2,661,000 2,750,000 2,833,000 2,918,000 3,006,000 3,096,000 Sidewalks 4,596,000 405,000 404,000 443,000 449,000 452,000 460,000 474,000 488,000 503,000 518,000 Traffic Signals and Streetlights 3,850,000 424,000 249,000 312,000 293,000 501,000 390,000 402,000 414,000 426,000 439,000 Parking Lots 866,000 150,000 - 186,000 - - 100,000 103,000 106,000 109,000 112,000 Airport Siteworks and Facilities 3,509,000 350,000 309,000 321,000 330,000 339,000 350,000 361,000 372,000 383,000 394,000 Roads, Fleet and Transit Facilities 3,713,000 324,000 334,000 344,000 355,000 365,000 375,000 386,000 398,000 410,000 422,000 Transit Siteworks 270,000 - - - - - 50,000 52,000 54,000 56,000 58,000 Solid Waste Services Landfill Siteworks and Facilities 22,295,000 390,000 6,356,000 2,251,000 1,717,000 1,757,000 1,850,000 1,906,000 1,963,000 2,022,000 2,083,000 Support and Other Services Information Technology Systems 6,637,000 819,000 514,000 361,000 652,000 734,000 670,000 690,000 711,000 732,000 754,000 Administrative Facilities and Libraries 36,232,000 1,830,000 3,400,000 3,504,000 3,608,000 3,716,000 3,800,000 3,914,000 4,031,000 4,152,000 4,277,000 Public Works Fleet 54,098,000 6,755,000 6,529,000 5,403,000 3,663,000 2,548,000 5,500,000 5,665,000 5,835,000 6,010,000 6,190,000 Emergency Services Fire Facilities 8,383,000 820,000 693,000 772,000 794,000 819,000 845,000 870,000 896,000 923,000 951,000 Fire Fleet and Equipment 43,370,000 5,272,000 3,209,000 7,674,000 1,899,000 1,956,000 4,400,000 4,532,000 4,668,000 4,808,000 4,952,000 Paramedic Facilities 6,535,000 220,000 618,000 642,000 660,000 678,000 700,000 721,000 743,000 765,000 788,000 Paramedic Fleet and Equipment 29,803,000 373,000 1,063,000 2,405,000 3,958,000 3,423,000 3,500,000 3,605,000 3,713,000 3,824,000 3,939,000 Police Fleet and Equipment 4,741,000 240,000 267,000 839,000 324,000 524,000 480,000 494,000 509,000 524,000 540,000 Human Services Victoria Manor 1,012,000 142,000 68,000 123,000 80,000 69,000 100,000 103,000 106,000 109,000 112,000 Housing Facilities 3,454,000 300,000 309,000 319,000 328,000 338,000 350,000 361,000 372,000 383,000 394,000 Housing Fleet 640,000 100,000 - 107,000 - 113,000 60,000 62,000 64,000 66,000 68,000 Parks and Recreation Services Parks Siteworks and Facilities 19,124,000 4,018,000 1,104,000 1,882,000 1,179,000 854,000 1,900,000 1,957,000 2,016,000 2,076,000 2,138,000 Recreation Facilities 47,135,000 9,410,000 5,181,000 5,865,000 1,856,000 402,000 4,600,000 4,738,000 4,880,000 5,026,000 5,177,000 Parks and Recreation Equipment 2,962,000 168,000 274,000 283,000 293,000 298,000 310,000 319,000 329,000 339,000 349,000 Cemetery Siteworks and Facilities 1,301,000 147,000 174,000 94,000 97,000 99,000 130,000 134,000 138,000 142,000 146,000 Total Capital Expenditures 811,527,000 74,431,000 79,243,000 76,304,000 81,969,000 83,498,000 78,370,000 80,723,000 83,145,000 85,638,000 88,206,000 Service Group/Capital Program Total Forecast Watson & Associates Economists Ltd. PAGE A-3 Table A-1 (continued) City of Kawartha Lakes Tax-supported Assets State-of-Good-Repair Capital Forecast Summary Inflated $ 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Financing Development Charges Reserve 15,363,200 1,356,500 1,341,600 1,131,600 2,128,100 1,548,000 1,480,000 1,524,400 1,570,100 1,617,200 1,665,700 CCBF Grant 57,355,000 5,191,000 5,398,000 5,398,000 5,614,000 5,614,000 5,839,000 5,839,000 6,073,000 6,073,000 6,316,000 OCIF Grant 66,870,000 6,687,000 6,687,000 6,687,000 6,687,000 6,687,000 6,687,000 6,687,000 6,687,000 6,687,000 6,687,000 Provincial Transit Grant - - - - - - - - - - - Ministry of HLTC Grant 5,100,000 300,000 300,000 300,000 600,000 600,000 600,000 600,000 600,000 600,000 600,000 Haul Routes Reserve 10,565,000 1,010,000 1,020,000 1,030,000 1,040,000 1,050,000 1,061,000 1,072,000 1,083,000 1,094,000 1,105,000 Library Reserve - - - - - - - - - - - Parkland Reserve 6,506,000 567,000 584,000 602,000 620,000 639,000 658,000 678,000 698,000 719,000 741,000 KLPS Capital Reserve 4,741,000 240,000 267,000 839,000 324,000 524,000 480,000 494,000 509,000 524,000 540,000 Victoria Manor Reserve 1,012,000 142,000 68,000 123,000 80,000 69,000 100,000 103,000 106,000 109,000 112,000 Housing Reserve 4,094,000 400,000 309,000 426,000 328,000 451,000 410,000 423,000 436,000 449,000 462,000 Wilson Estate 550,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 Other Municipality / Owner 6,185,500 2,545,000 82,500 3,558,000 - - - - - - - Asset Management Reserve 426,673,000 21,147,000 25,480,000 30,206,000 35,355,000 40,959,000 47,054,000 53,678,000 55,567,900 57,657,800 59,568,300 Fleet Reserve - Public Works 54,098,000 6,755,000 6,529,000 5,403,000 3,663,000 2,548,000 5,500,000 5,665,000 5,835,000 6,010,000 6,190,000 Fleet Reserve - Fire Service 30,257,000 3,226,000 1,030,000 6,000,000 176,000 182,000 3,700,000 3,811,000 3,925,000 4,043,000 4,164,000 Non-Growth Related Debenture Requirements 122,157,300 24,809,500 30,091,900 14,545,400 25,298,900 22,572,000 4,746,000 93,600 - - - Total Capital Financing 811,527,000 74,431,000 79,243,000 76,304,000 81,969,000 83,498,000 78,370,000 80,723,000 83,145,000 85,638,000 88,206,000 Service Group/Capital Program Total Forecast Watson & Associates Economists Ltd. PAGE A-4 Table A-2 City of Kawartha Lakes Tax-supported Assets Schedule of Non-Growth Related Debenture Repayments Inflated $ Debenture Principal Year (Inflated) 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2026 24,809,500 1,673,129 1,673,129 1,673,129 1,673,129 1,673,129 1,673,129 1,673,129 2027 30,091,900 2,029,368 2,029,368 2,029,368 2,029,368 2,029,368 2,029,368 2028 14,545,400 980,928 980,928 980,928 980,928 980,928 2029 25,298,900 1,706,133 1,706,133 1,706,133 1,706,133 2030 22,572,000 1,522,234 1,522,234 1,522,234 2031 4,746,000 320,066 320,066 2032 93,600 6,312 2033 - 2034 - 2035 - Total Annual Debt Charges 122,157,300 - - - 1,673,129 3,702,497 4,683,425 6,389,558 7,911,792 8,231,857 8,238,170 Forecast Table A-3 City of Kawartha Lakes Tax-supported Assets Asset Management Reserve Continuity Inflated $ Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Opening Balance 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 3,800,426 8,004,132 Transfer from Operating 21,147,000 25,480,000 30,206,000 35,355,000 40,959,000 47,054,000 53,678,000 58,202,000 61,861,506 65,751,106 Transfer to Capital 21,147,000 25,480,000 30,206,000 35,355,000 40,959,000 47,054,000 53,678,000 55,567,900 57,657,800 59,568,300 Transfer to Operating - - - - - - - - - - Closing Balance 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 1,166,326 3,800,426 8,004,132 14,186,937 Table A-4 City of Kawartha Lakes Tax-supported Assets Public Works Fleet Reserve Continuity Inflated $ Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Opening Balance 896,146 631,692 787,954 2,270,775 5,700,170 10,457,336 12,481,658 14,566,709 16,714,262 18,926,292 Transfer from Operating 6,490,546 6,685,262 6,885,820 7,092,395 7,305,167 7,524,322 7,750,051 7,982,553 8,222,030 8,468,690 Transfer to Capital 6,755,000 6,529,000 5,403,000 3,663,000 2,548,000 5,500,000 5,665,000 5,835,000 6,010,000 6,190,000 Transfer to Operating - - - - - - - - - - Closing Balance 631,692 787,954 2,270,775 5,700,170 10,457,336 12,481,658 14,566,709 16,714,262 18,926,292 21,204,982 Watson & Associates Economists Ltd. PAGE A-5 Table A-5 City of Kawartha Lakes Tax-supported Assets Fire Service Fleet Reserve Continuity Inflated $ Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Opening Balance 219,918 (946,082) 145,718 (3,668,828) (1,593,810) 542,738 (769,158) (2,120,410) (3,511,870) (4,945,323) Transfer from Operating 2,060,000 2,121,800 2,185,454 2,251,018 2,318,548 2,388,105 2,459,748 2,533,540 2,609,546 2,687,833 Transfer to Capital 3,226,000 1,030,000 6,000,000 176,000 182,000 3,700,000 3,811,000 3,925,000 4,043,000 4,164,000 Transfer to Operating - - - - - - - - - - Closing Balance (946,082) 145,718 (3,668,828) (1,593,810) 542,738 (769,158) (2,120,410) (3,511,870) (4,945,323) (6,421,491) Table A-6 City of Kawartha Lakes Tax-supported Assets Tax-Supported Capital Funding Forecast Inflated $ Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Existing Debt Servicing (P&I) - Non-Growth Related 10,746,012 9,128,945 10,876,863 10,496,428 10,381,604 9,454,934 9,187,338 9,086,347 8,761,263 7,799,630 New Debt Servicing (P&I) - Non-Growth Related - - - 1,673,129 3,702,497 4,683,425 6,389,558 7,911,792 8,231,857 8,238,170 Transfer to Asset Management Reserve 21,147,000 25,480,000 30,206,000 35,355,000 40,959,000 47,054,000 53,678,000 58,202,000 61,861,506 65,751,106 Transfer to Public Works Fleet Reserve 6,490,546 6,685,262 6,885,820 7,092,395 7,305,167 7,524,322 7,750,051 7,982,553 8,222,030 8,468,690 Transfer to Fire Service Fleet Reserve 2,060,000 2,121,800 2,185,454 2,251,018 2,318,548 2,388,105 2,459,748 2,533,540 2,609,546 2,687,833 Total Capital Related Funding 40,443,558 43,416,007 50,154,138 56,867,969 64,666,816 71,104,785 79,464,695 85,716,231 89,686,202 92,945,429 Forecast Watson & Associates Economists Ltd. PAGE A-6 Table A-7 City of Kawartha Lakes Water and Wastewater Assets State-of-Good-Repair Capital Forecast Summary Inflated $ 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Expenditures Water Treatment 19,743,000 1,675,000 940,000 1,900,000 2,055,000 2,555,000 2,000,000 2,060,000 2,122,000 2,185,000 2,251,000 Wastewater Treatment 19,686,000 2,095,000 675,000 1,955,000 1,900,000 2,443,000 2,000,000 2,060,000 2,122,000 2,185,000 2,251,000 Vertical Distribution and Collection 8,930,000 1,130,000 370,000 400,000 220,000 1,500,000 1,000,000 1,030,000 1,061,000 1,093,000 1,126,000 Horizontal Distribution and Collection 141,602,000 11,804,000 16,214,000 14,125,000 16,484,000 13,519,000 13,132,000 13,844,000 14,057,000 14,123,000 14,300,000 Studies and Special Projects 8,260,000 2,945,000 1,530,000 1,455,000 1,500,000 260,000 100,000 100,000 100,000 100,000 170,000 Total Capital Expenditures 198,221,000 19,649,000 19,729,000 19,835,000 22,159,000 20,277,000 18,232,000 19,094,000 19,462,000 19,686,000 20,098,000 Capital Financing Grants 2,536,000 2,536,000 - - - - - - - - - Water/Wastewater Reserves 75,573,634 15,962,601 5,931,715 6,448,286 7,291,790 7,075,389 6,989,685 6,607,645 6,446,216 6,433,239 6,387,068 Non-Growth Related Debenture Requirements 120,111,366 1,150,399 13,797,285 13,386,714 14,867,210 13,201,611 11,242,315 12,486,355 13,015,784 13,252,761 13,710,932 Total Capital Financing 198,221,000 19,649,000 19,729,000 19,835,000 22,159,000 20,277,000 18,232,000 19,094,000 19,462,000 19,686,000 20,098,000 Capital Program Total Forecast Table A-8 City of Kawartha Lakes Water and Wastewater Assets Schedule of Non-Growth Related Debenture Repayments Inflated $ Debenture Principal Year (Inflated) 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2026 1,150,399 77,582 77,582 77,582 77,582 77,582 77,582 77,582 2027 13,797,285 930,475 930,475 930,475 930,475 930,475 930,475 2028 13,386,714 902,787 902,787 902,787 902,787 902,787 2029 14,867,210 1,002,630 1,002,630 1,002,630 1,002,630 2030 13,201,611 890,304 890,304 890,304 2031 11,242,315 758,171 758,171 2032 12,486,355 842,068 2033 13,015,784 2034 13,252,761 2035 13,710,932 Total Annual Debt Charges 120,111,366 - - - 77,582 1,008,057 1,910,844 2,913,474 3,803,778 4,561,949 5,404,017 Forecast Watson & Associates Economists Ltd. PAGE A-7 Table A-9 City of Kawartha Lakes Water and Wastewater Assets Water and Sewer Infrastructure Renewal Reserve Continuity Inflated $ Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Opening Balance 10,790,596 - - - - - - - - - Transfer from Operating 5,172,005 5,931,715 6,448,286 7,291,790 7,075,389 6,989,685 6,607,645 6,446,216 6,433,239 6,387,068 Transfer to Capital 15,962,601 5,931,715 6,448,286 7,291,790 7,075,389 6,989,685 6,607,645 6,446,216 6,433,239 6,387,068 Transfer to Operating - - - - - - - - - - Closing Balance - - - - - - - - - - Table A-10 City of Kawartha Lakes Water and Wastewater Assets Water and Wastewater Rate-supported Capital Funding Forecast Inflated $ Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Existing Debt Servicing (P&I) - Non-Growth Related 5,893,180 5,495,474 5,352,749 4,817,741 4,502,374 4,097,042 3,901,675 3,611,933 3,320,240 2,992,681 New Debt Servicing (P&I) - Non-Growth Related - - - 77,582 1,008,057 1,910,844 2,913,474 3,803,778 4,561,949 5,404,017 Transfer to Water and Sewer Infrastructure Renewal Reserve 5,172,005 5,931,715 6,448,286 7,291,790 7,075,389 6,989,685 6,607,645 6,446,216 6,433,239 6,387,068 Total Capital Related Funding 11,065,185 11,427,189 11,801,035 12,187,112 12,585,820 12,997,572 13,422,794 13,861,928 14,315,428 14,783,765 Forecast Watson & Associates Economists Ltd. PAGE G-1 Appendix G Development Charges Task Force Watson & Associates Economists Ltd. PAGE G-2 The City's D.C. Task Force met 13 times from February 3, 2025 to October 1, 2025 with the objective of providing the City recommendations to be considered in the development of the D.C. background study and the ongoing implementation and administration of D.C.s. Watson met with the Task Force to provide background information on the D.C.A. and ongoing legislative changes, past City practices and industry best practices, and information on the growth-forecast, historical level of service, future capital needs and by-law policies being considered in the review. The following recommendations were prepared by the D.C. Task Force. Specific recommendations that Watson has been asked to address are included in this appendix, while the remaining recommendations will be addressed by City staff. Watson & Associates Economists Ltd. PAGE G-3 Table G-1 D.C. Task Force Recommendations No. Category or Issue Recommendation 1 Treasurer's Statements That the outstanding 2019-2024 Treasurer's statements respecting the DC reserve be presented to Council prior to adoption of the DC study, and that post-2024 statements be incorporated into the annual audit report to Council. 2 Capital Forecast That the 2025 DC study include a table illustrating cost inflation for a selection of capital projects carrying over from the 2019 DC study. 3 Capital Forecast That a long-term capital forecast, including a financial strategy for funding growth-related capital projects therein, be presented to Council for adoption annually. 4 Capital Forecast That the City consider the viability of consolidating police and fire headquarters into a single facility to realize potential cost efficiencies and operating synergies. 5 Local Service Policy That in absence of a regulation issued under Bill 17 defining local services, the City revise its local service policy as needed to align with master plans and to define the required condition of developer-dedicated park land. 6 DC Rate Calculation That the DC study clearly state the assumptions, inputs and methodologies underlying DC rate calculations. 7 DC Rate Calculation That, given the Growth Management Strategy identifies lands for post-2051 development, Watson and Associates review the Growth Management Strategy and master plans to ensure that post-period benefit deductions entering DC rate calculations are fair and appropriate. 8 Area-Specific DC Rates That for the next DC study, consideration be given to area-rating DCs for infill development. 9 DC Exemptions That discretionary DC exemptions respecting commercial and industrial development be discontinued. 10 DC Exemptions That should the City elect to provide incentives to development, such incentives be facilitated by the Community Improvement Plan or similar initiatives rather than DC by- laws. 11 DC Deferrals That the DC by-law enable timing of the calculation and payment of DCs to be determined by policy such that compliance with future regulations under Bill 17 can be achieved without amending the DC by-law. 12 DC Deferrals That the DC by-law be accompanied by a DC deferral policy permitting residential DC payments to occur at time of occupancy until such time the policy is made redundant by certain parts of Bill 17 coming into effect in future. 13 DC Deferrals That development agreements implementing the recommended DC deferral policy require developers to include in property transaction agreements a clause warning buyers to confirm prior to transaction closing that DCs in respect of the property have been paid by the developer. 14 DC Deferrals That development agreements implementing the recommended DC deferral policy enable the City to (i) require securities equal to the value required for engineering or DC deferral purposes, whichever is greater, and (ii) repurpose engineering securities, once they are no longer required for engineering purposes, as DC deferral securities. 15 DC Deferrals That the City consider the viability of bonds as an alternative to letters of credit as a form of engineering or DC deferral securities provided by developers. 16 Redevelopment Credits That the DC by-law enable the City to establish through policy a redevelopment credit system for DCs that accommodates strategic and long-term redevelopment schemes aligned with key objectives set out in the Official Plan or other Council-adopted plans or strategies. 17 DC Task Force Member Reports That the reports of Development Charges Task Force members be forwarded to Watson and Associates, Council and the next Development Charges Task Force should Council create such a task force 2025 Development Charges Task Force Recommendations Watson & Associates Economists Ltd. PAGE G-4 Recommendation #2 The Table G-2 illustrates the cost increase for a selection of projects included in the future capital needs where the project scope remains unchanged from the prior review and the cost increase is related to increased cost estimates. The projects included in the table have been chose to give a cross section by service area and project type (e.g., facilities vs. fleet). Table G-2 Project Cost Increases Recommendation #7 The City's D.C. growth forecast has been informed by the City's GMS. The growth forecast to 2051 in the D.C. background study has been used only for Services Related to a Highway and the projected growth aligns with the growth that was used in the City's Transportation Master Plan, which was the basis for the needs assessment and the cost. As such, no post period benefit deductions are warranted. Project Description Gross Capital Cost Estimate (2019$) Gross Capital Cost Estimate (2025$) Change ($) Change (%) Fire Protection Services Extrication Equipment 50,000 76,000 26,000 52% Pumper Truck 580,000 1,411,000 831,000 143% Tanker Truck 606,000 1,655,000 1,049,000 173% Police Services Police Headquarters Expansion 2,726,000 10,300,000 7,574,000 278% Police Officer Equipment (per officer) 6,600 12,530 5,930 90% Marked Uniform Vehicle (per vehicle) 50,400 94,500 44,100 88% Services Related to a Highway Roads Operations Depots 747,000 1,133,600 386,600 52% Trackless Tractor 200,000 235,000 35,000 18% Traffic Signals 271,000 500,000 229,000 85% Colborne St. Bridge 11,000,000 15,700,000 4,700,000 43% Parks and Recreation Services Lindsay Trail Development - Scugog River Crossing to Rivera Park 195,000 239,000 44,000 23% Library Services Lindsay Library Expansion 901,400 3,900,000 2,998,600 333% Ambulance Services Ambulance 250,000 570,000 320,000 128% Wastewater Collection Services Sussex St. Sewer - Glenelg St. to Kent St. 616,000 1,590,000 974,000 158% Water Distribution Services Northwest Lindsay Water Tower 10,242,000 15,000,000 4,758,000 46% Mary St. Watermain - Lindsay St. to Albert St. 1,850,600 2,224,000 373,400 20% Watson & Associates Economists Ltd. PAGE G-5 For Water and Wastewater services, the growth in the City's Water and Wastewater Master Plan (which was the basis of the needs assessment and capital costs included in the D.C. background study) include growth beyond the 2051 period. As such, the growth forecast for these services in the D.C. background study has been based on the buildout growth projections contained within the master plan. As with Services Related to a Highway, because the growth forecast is the D.C. background study is consistent with the growth contained with the mater plan, no post period benefit deductions are required.