2026-2027 Winter Maintenance Manual (Roads Division, updated Sept 2026)

Kirkland Lake, Ontario · No. 2026-2027 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 6c57504107da · verified 2026-10-17 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

2026-2027 Winter Maintenance Manual Roads Division Public Works Department Updated: September 2026 1 2026-2027 Winter Maintenance Manual September 2026 Contents Roads Division ................................................................................................................ 1 Purpose ........................................................................................................................... 3 Objective ......................................................................................................................... 3 Policy Statement ............................................................................................................. 5 Winter Service Philosophy .............................................................................................. 6 Road Classifications ........................................................................................................ 7 Classification of Highways ................................................................................................... 7 Corporate Organization Chart ......................................................................................... 8 Maintenance Standards .................................................................................................. 9 Patrolling ............................................................................................................................. 9 Weather Monitoring ............................................................................................................. 9 Level of Service for Roadways ...................................................................................... 10 Snow Accumulation............................................................................................................10 Snow Accumulation Table (Minimum Maintenance Standard) .....................................10 Ice Formation on Roadways .......................................................................................11 Ice Formation Prevention Table ..................................................................................11 Treatment of Icy Roadways Table ...............................................................................11 Snow Pull (Lifting and Hauling) ...................................................................................11 Controlling the snowpack layer ...................................................................................12 Significant Weather Events .........................................................................................13 Winter Operations Priorities During Significant Weather Events..................................14 Procedures .................................................................................................................... 14 Roads ................................................................................................................................14 Sidewalks...........................................................................................................................15 Municipal Parking Lots .......................................................................................................15 School Zones .....................................................................................................................16 Special Areas .....................................................................................................................16 Variable Weather Conditions ..............................................................................................16 Winter Preparation ........................................................................................................ 17 Sand Boxes .......................................................................................................................17 Responsibilities of Residents ......................................................................................... 17 Snowplow Safety ...............................................................................................................17 2 2026-2027 Winter Maintenance Manual September 2026 Garbage and Recycling Bins ..............................................................................................19 Managing Complaints and Requests for Services ..............................................................19 Repairing Property Damage ...............................................................................................21 By-Law Enforcement ..........................................................................................................21 Understanding Levels of Services ......................................................................................21 Frequently Asked Questions ......................................................................................... 23 Schedules ..................................................................................................................... 28 3 2026-2027 Winter Maintenance Manual September 2026 Overview The Winter Maintenance Manual serves as a foundational document aimed at ensuring that winter maintenance services in the Town of Kirkland Lake are delivered in a way that promotes safety, reliability, efficiency, and environmental responsibility. These services are carried out in alignment with the Town's approved level of service and established standards. The manual outlines how the Town responds to the unique challenges posed by winter weather, offering a structured approach to dealing with snow and ice in an efficient manner while keeping environmental concerns in mind. The objective of winter maintenance operations is to maintain safe and passable roadways, sidewalks, and municipal assets through a prioritized and risk-based approach to service delivery. Purpose The primary purpose of the manual is to safeguard the well-being of the public and ensure that the Town's infrastructure, including roadways and sidewalks, remains functional during winter storms and adverse weather conditions. The aim is to minimize disruptions to the community's daily life by maintaining roadways and sidewalks in a safe and passable condition, while recognizing the limitations imposed by weather, available resources, and operational priorities. Additionally, the manual emphasizes environmental stewardship by outlining winter maintenance practices that minimize potential impacts on the environment, including the responsible use of sand and salt. Objective The objective of this document is to clearly define a consistent and achievable level of service for winter maintenance operations. This includes specifying procedures for snow and ice control to mitigate hazards and maintain the safe movement of people, goods, and services within the community. Winter maintenance standards within the manual are crucial as they establish varying levels of service based on the classification and priority of roads and sidewalks. Higher- priority transportation routes, including arterial roads, emergency service routes, school zones, and designated pedestrian corridors, are generally serviced before lower-priority routes. This risk-based and prioritized approach allows the Town to make effective use of available resources while maintaining safe and passable transportation networks during winter weather events. 4 2026-2027 Winter Maintenance Manual September 2026 Winter Maintenance Standards and Priorities The standards set forth in the manual are designed to prioritize snow and ice control in a way that optimizes the use of available resources. This means that high-priority routes, such as arterial roads, emergency service routes, school zones, and designated pedestrian corridors, are serviced first. Residential streets, alleys, and secondary sidewalks are addressed once higher-priority areas have been restored to a safe and passable condition. During significant or prolonged winter weather events, available resources may remain focused on maintaining priority transportation routes until weather conditions improve and recovery operations can be completed. This system of prioritization helps ensure that the Town can provide essential services to residents and businesses in an orderly and efficient manner. The winter maintenance procedures detailed in this document serve as a guide for municipal staff, contractors, and other stakeholders involved in winter maintenance operations. These procedures outline the actions required to meet the Town's winter maintenance standards while accounting for the unique characteristics and operational needs of various roadways and pedestrian facilities. These activities include, but are not limited to, snow plowing, salting, sanding, grading, snow removal, and ice control. Managing Limited Resources One of the challenges faced with winter maintenance is that all roads and sidewalks cannot be serviced simultaneously. The manual acknowledges this limitation and offers a structured approach to ensure that the most critical areas are addressed first. By clearly defining priority classifications for roadways and sidewalks, the town can efficiently deploy resources like snowplows, salt trucks, and personnel where they are most needed during winter events. Risk Mitigation While the manual recognizes that it is impossible to fully eliminate the risks associated with winter weather, it underscores the importance of reducing those risks to a manageable level. Through proper planning, prioritization, and execution of winter maintenance activities, the Town can mitigate many of the negative impacts of winter storms, including hazardous driving and walking conditions. By adhering to a consistent and risk-based approach, the Town can deliver effective winter maintenance services while maintaining public safety as a primary objective. Ultimately, the Winter Maintenance Manual provides a framework that not only addresses the operational aspects of winter weather management but also promotes preparedness, resilience, and clear service expectations within the community. 5 2026-2027 Winter Maintenance Manual September 2026 Policy Statement The Corporation of the Town of Kirkland Lake is committed to coordinating winter maintenance activities in compliance with the Municipal Act, 2001, the Minimum Maintenance Standards for Municipal Highways (O. Reg. 239/02), and any subsequent amendments. The Town's objective is to maintain safe and passable transportation routes and provide reasonable access to residences, businesses, municipal facilities, and emergency services during winter conditions. Winter maintenance measures, including salting, sanding, snow plowing, grading, and snow removal, will be determined based on the type, severity, duration, and forecasted progression of each weather event. While this policy establishes service standards and operational priorities, the Town reserves the right to adjust operations as necessary to respond to significant weather events, changing conditions, emergencies, and other unique circumstances. In general, snow plowing operations will commence when snow accumulation reaches or exceeds 5 cm, exceeding the Minimum Maintenance Standards where operationally feasible. Salt and/or sand will be applied to slippery road surfaces as required to improve traction and enhance public safety. During significant, prolonged, or consecutive winter weather events, the Town's primary objective may shift from complete snow removal and cleanup activities to maintaining safe and passable conditions on priority transportation routes. Full restoration of roadway widths, snowbank reduction, and other recovery activities may be delayed until weather conditions improve and resources become available. The Roads Supervisor, or their designated representative, is responsible for the timely deployment of municipal personnel and equipment and for coordinating contractor resources, where required, to support winter maintenance operations. This manual outlines the standard operating procedures for the Town of Kirkland Lake's winter maintenance operations. However, certain conditions may impact the Town's ability to fully implement these procedures, including: - Emergencies or safety hazards - Equipment breakdowns - Snow accumulation exceeding 2.5 cm per hour - Freezing rain or severe ice conditions - Traffic congestion 6 2026-2027 Winter Maintenance Manual September 2026 - On-street parking - Personnel availability due to illness - Multiple or consecutive winter storm events - Contractor or resource availability - Restricted visibility or severe weather conditions The Town of Kirkland Lake is committed to the continuous improvement of its winter maintenance program. This manual will be reviewed annually and updated as required to ensure it remains effective, practical, and responsive to the needs of the community. Winter Service Philosophy The Town's winter maintenance program is designed to maintain safe and passable transportation routes throughout the municipality while making effective use of available resources. During active winter weather events, the Town's primary objective is to maintain mobility and emergency access across the transportation network. Priority routes, including arterial roads, emergency access routes, school zones, and designated pedestrian corridors, are serviced first. Winter maintenance operations occur in two phases: Storm Response - Maintaining safe and passable travel conditions. - Keeping priority transportation routes operational. - Addressing hazardous conditions and emergency access requirements. Recovery Operations - Widening roadways. - Snowbank reduction. - Snow removal and hauling. - Final cleanup activities. Weather conditions, traffic volumes, equipment availability, and operational priorities may influence the timing of winter maintenance activities. 7 2026-2027 Winter Maintenance Manual September 2026 Road Classifications Ontario Regulation 239/02, which came into effect on November 1, 2002, sets out the Minimum Maintenance Standards for Municipal Highways. This regulation was amended in May 2018 under O. Reg. 366/18. It provides clear guidelines for municipalities to ensure that road maintenance meets provincial standards. Under this regulation, roadways are classified into six categories, with Class 1 receiving the highest level of service and Class 6 the lowest. These classifications are based on two key factors: the Average Annual Daily Traffic (AADT) and the posted or statutory speed limit of the road. Higher-traffic roads with higher speed limits are given higher priority for maintenance, ensuring a proportional response to their importance in the transportation network. This system ensures that road maintenance efforts are efficiently allocated to support public safety and mobility, especially during adverse weather conditions. Classification of Highways AADT 91-100 km/h 81-90 km/h 71-80 km/h 61-70 km/h 51-60 km/h 41-50 km/h 1-40 km/h 53K + 1 1 1 1 1 1 1 23K - 52,999 1 1 1 2 2 2 2 15K - 22,999 1 1 2 2 2 3 3 12K - 14,999 1 1 2 2 2 3 3 10K - 11,999 1 1 2 2 3 3 3 8K - 9,999 1 1 2 3 3 3 3 6K - 7,999 1 2 2 3 3 4 4 5K - 5,999 1 2 2 3 3 4 4 4K - 4,999 1 2 3 3 3 4 4 3K - 3,999 1 2 3 3 3 4 4 2K - 2,999 1 2 3 3 4 5 5 1K - 1,999 1 3 3 3 4 5 5 500 - 900 1 3 4 4 4 5 5 200 - 499 1 3 4 4 5 5 6 8 2026-2027 Winter Maintenance Manual September 2026 AADT 91-100 km/h 81-90 km/h 71-80 km/h 61-70 km/h 51-60 km/h 41-50 km/h 1-40 km/h 50 - 199 1 3 4 5 5 6 6 0 - 49 1 3 6 6 6 6 6 MTO, O Reg. 366/18 The Town of Kirkland Lake is responsible for maintaining roads classified as Class 3, Class 4, and Class 5 within its jurisdiction. These classifications, as outlined in Schedule A, guide the level of winter maintenance provided to ensure safe and efficient travel based on the specific needs of each roadway. Corporate Organization Chart The Roads Supervisor reports directly to the Director of Public Works, as illustrated in the organizational chart below. Council Chief Administrative Officer Director of Public Works Roads Supervisor(s) The Roads Supervisor is responsible for executing the Winter Maintenance Manual, as adopted by Council. While the manual outlines general procedures, the Roads Supervisor has the discretion to adjust specific operational actions to implement the plan effectively. If the Director of Public Works, the Chief Administrative Officer, or Council requires actions beyond the standards set forth in the Winter Maintenance Manual, such requests must be submitted in writing and formally documented in Town records. 9 2026-2027 Winter Maintenance Manual September 2026 Maintenance Standards Patrolling Patrolling is a key component of winter maintenance, ensuring road conditions are regularly assessed and necessary actions are taken to maintain safety. This responsibility falls to the Roads Supervisor or their designated representative. The frequency of patrolling is governed by provincial standards, as outlined in the table below: Class of Highway Patrolling Frequency Class 3 Once every 7 days Class 4 Once every 14 days Class 5 Once every 30 days However, during adverse weather conditions or when weather monitoring indicates a significant likelihood of snow accumulation or ice formation, patrolling frequency is determined at the discretion of the Roads Supervisor. In these cases, more frequent assessments may be necessary to ensure timely intervention and road safety. Regular patrolling allows for the early detection of hazardous conditions, enabling the municipality to deploy resources effectively and address emerging issues, such as snow buildup or ice formation, before they compromise road safety. Weather Monitoring Weather monitoring plays a crucial role in determining when to initiate patrolling and winter maintenance activities. The Roads Supervisor, or their designate, is responsible for monitoring weather conditions through reliable sources such as weather forecasting websites or by conducting road patrols. A combination of these methods may be used to ensure accurate and up-to-date information. From October 1st to May 30th, the Minimum Maintenance Standards Regulations requires that weather be monitored--both current conditions and the 24-hour forecast--three times per calendar day. This regular monitoring helps anticipate changing conditions, allowing the Roads Supervisor to make informed decisions about winter maintenance operations. By staying proactive in weather monitoring and adjusting patrol as necessary, the Town ensures that its roadways remain safe and passable, even under unpredictable winter conditions. 10 2024-2025 Winter Maintenance Manual September 2026 Level of Service for Roadways Snow Accumulation The minimum standard for addressing snow accumulation is as follows: 1. Upon becoming aware that snow accumulation on a roadway exceeds the depth specified in the "Snow Accumulation Table" below, the Town will deploy resources as soon as practicable to address the accumulation. 2. After the snow has stopped falling, the Town will reduce snow levels on the roadway to meet or fall below the specified depths in the "Snow Accumulation Table" within the designated timeframes. The depth of snow accumulation is determined by the Roads Supervisor or their designate, based on actual measurements, weather monitoring, or visual estimates. Addressing snow accumulation includes, but is not limited to: - Plowing the roadway - Removing snow - Salting the roadway - Applying abrasive materials (e.g., sand) - Or any combination of these methods Note: This section does not apply to areas designated for parking, sidewalks, or municipal snow storage. Snow Accumulation Table (Minimum Maintenance Standard) Class of Highway Depth Time Class 3 8 cm 12 hours Class 4 8 cm 16 hours Class 5 10 cm 24 hours The Town uses three beats for efficient snow plowing, identified in Schedule B. These beats are activated when snow accumulation exceeds 5 cm, exceeding the Minimum Maintenance Standards Regulations. If snow accumulation is less than 5 cm, Beat 1 will prioritize Class 3 highways and the downtown core, as shown in Schedule B. During significant, prolonged, or consecutive winter weather events, the Town's primary objective is to maintain safe and passable conditions on priority transportation routes. Under these circumstances, lower-priority routes may experience delays while 11 2024-2025 Winter Maintenance Manual September 2026 resources remain focused on maintaining critical transportation corridors and emergency access routes. Ice Formation on Roadways To prevent ice formation, the minimum standard is as follows: 1. Within the 24 hours prior to potential ice formation, the Town must: o Monitor the weather. o Patrol roadways. 2. If weather monitoring and patrolling suggest a high probability of ice formation, the Town will treat the affected roadways as soon as practicable. Ice Formation Prevention Table Class of Highway Time to Treat Class 3 16 hours Class 4 24 hours Class 5 24 hours Once ice has formed, the Town will treat the roadway within the time limits set below, applying materials such as salt, sand, or a combination to improve road safety. Treatment of Icy Roadways Table Class of Highway Time to Treat Class 3 8 hours Class 4 12 hours Class 5 16 hours Salting and sanding routes are outlined in Schedules C and D of this manual. Salting will only occur when temperatures are warmer than -8°C, and the forecast suggests it will remain mild for the rest of the day. Sanding is carried out at the discretion of the Roads Supervisor. Snow Pull (Lifting and Hauling) Priority List: 1. Class 3 Roads including Government Rd 2. All Designated School Zones** 12 2024-2025 Winter Maintenance Manual September 2026 3. Class 4 Roads 4. Class 5 Roads Snow removal within designated school zones will be prioritized to support pedestrian safety and maintain adequate space for school buses, parent drop-off areas, and associated parking requirements. Snow removal may occur considering one or more of the following factors: - Public safety - Snow storage capacity - Emergency access routes - Street parking requirements - Vehicle and pedestrian traffic volumes - Parking lot capacity - Roadway width restrictions - Visibility concerns at intersections and access points - Operational impacts on snow plowing and winter maintenance activities Snow removal operations are undertaken to maintain safe and passable transportation routes, preserve roadway width, improve visibility, and address situations where snow accumulation limits the effectiveness of standard winter maintenance activities. Snow removal priorities and scheduling will be determined by the Roads Supervisor or designate based on operational requirements, available resources, weather conditions, and community needs. For Class 4 and Class 5 roads, the minimum roadway width maintained during winter operations is 5.0 metres. Snow pulls, which involve lifting and hauling accumulated snow, are detailed in Schedule E. The Roads Supervisor, or their designate, may initiate snow removal operations when roadway width, visibility, snow storage capacity, pedestrian safety, or operational requirements warrant such action. Snow removal operations are intended to maintain safe and passable transportation routes, preserve roadway width, improve sightlines, and support the efficient delivery of winter maintenance services throughout the municipality. All snow pulls will be communicated in advance through the Town of Kirkland Lake's official communication channels, including the municipal website, social media platforms, and local media outlets where appropriate. Controlling the snowpack layer To maintain safe and passable roadways throughout the winter season, road graders may be used to manage the snowpack layer on municipal roads. Regular grading helps control snow accumulation, improve driving conditions, and reduce the need for more intensive corrective measures. Road grading may be undertaken for the following purposes: 13 2024-2025 Winter Maintenance Manual September 2026 Ongoing Maintenance: Road graders may be used to shave and manage accumulated snowpack, helping to maintain roadway conditions and improve surface traction. Snowpack Management: By controlling the depth and condition of the snowpack layer, grading operations help prevent excessive compaction, rutting, and deterioration of roadway conditions. Scarifying: Scarifying may be undertaken when the snowpack has become excessively compacted, rutted, polished, icy, or is otherwise creating safety concerns. Scarifying is generally considered a corrective measure and may be used when routine plowing, grading, sanding, or salting are no longer sufficient. Adaptability: The frequency and extent of grading operations will be determined by the Roads Supervisor or designate based on weather conditions, roadway conditions, traffic volumes, available resources, and operational priorities. Through the use of grading and other winter maintenance activities, the Town aims to maintain safe and passable transportation routes while making effective use of available resources. Significant Weather Events The Town may declare a Significant Weather Event in accordance with Ontario Regulation 239/02 when forecasts or observed conditions indicate that the relevant Minimum Maintenance Standards may not be met due to the severity of the weather event. Such declarations may be made in response to extreme snowfall, freezing rain, ice formation, reduced visibility, or other conditions that significantly impact winter maintenance operations. Notifications will be communicated through the Town of Kirkland Lake's official communication channels, including the municipal website, social media platforms, and local media outlets where appropriate. A Significant Weather Event declaration will remain in effect until the Town determines that conditions have improved sufficiently to allow winter maintenance activities to return to normal operating procedures. Once the declaration has been lifted, snow accumulation and ice control will continue in accordance with the standards outlined in this manual. It is acknowledged that extreme weather conditions may temporarily prevent the Town from achieving the prescribed levels of service outlined in this document. During these periods, all available resources will be directed toward maintaining safe and passable transportation routes, with priority given to arterial roads, emergency access routes, school zones, and other critical transportation corridors. 14 2024-2025 Winter Maintenance Manual September 2026 During significant, prolonged, or consecutive winter weather events, operational priorities may shift from full cleanup and snow removal activities to maintaining passable road conditions and preserving access throughout the transportation network. Restoration of roadway widths, snowbank reduction, snow removal operations, and other recovery activities may be delayed until weather conditions improve and operational resources become available. Winter maintenance activities will continue until prescribed service levels are achieved or until conditions permit recovery operations to proceed safely and effectively. Winter Operations Priorities During Significant Weather Events During significant, prolonged, or consecutive winter weather events, operational priorities may be adjusted to focus available resources on activities that have the greatest impact on public safety and mobility. Priority activities may include: 1. Emergency service access routes 2. Arterial and collector roads 3. School zones 4. Designated pedestrian corridors 5. Municipal facilities and critical infrastructure 6. Residential roadways 7. Snow removal and recovery activities Snow removal, roadway widening, snowbank reduction, and other recovery activities may be postponed until weather conditions improve. Procedures The Public Works Department is committed to adhering to Provincial Standards under the Highway Traffic Act, R.S.O. 1990 ensuring health, safety, and effective traffic control during winter maintenance operations. Roads The Town is divided into designated beats, which are mapped out in the attached documents. The primary goal during a storm is to maintain safe and passable transportation routes. Depending on storm conditions, resources may be redeployed or plow routes repeated as necessary to maintain safe travel conditions and support emergency access throughout the municipality. 15 2024-2025 Winter Maintenance Manual September 2026 Winter control procedures are initiated by the Roads Supervisor, or their designate, based on current weather and road conditions. Monitoring weather forecasts, patrol reports, and other relevant information enables preparation and proactive action for winter control operations. During and after winter control operations, a daily record of maintenance activities is maintained. These records are updated daily and retained for a period of seven years. Record templates are provided in Schedule F. Sidewalks Sidewalks are maintained on various road classifications; however, not all sidewalks within the Town receive winter maintenance services. Sidewalks identified in Schedule G are serviced according to a priority system similar to roadway winter maintenance operations. Priority is given to heavily travelled pedestrian routes, including arterial and collector roads, school and bus routes, public buildings such as hospitals and churches, and commercial areas. Sidewalks are plowed when snow accumulation exceeds 5 cm, exceeding the Minimum Maintenance Standards Regulations. All maintained sidewalks shall be cleared within 48 hours following the end of a snowfall event. The minimum width of maintained sidewalks is 1 metre. Sanding shall occur on maintained sidewalks within 48 hours of detecting icy conditions. Once treated, sidewalks will be monitored and maintained as required to address changing conditions. No person shall deposit snow or ice from private property onto a roadway or sidewalk. Violators may be subject to penalties under the Town's Snow By-law 22-062. In the event of a Significant Weather Event affecting sidewalks, the Town may issue a declaration through its official communication channels. Such declarations will remain in effect until conditions have improved and winter maintenance operations can return to normal service levels. It is acknowledged that severe or prolonged winter weather events may temporarily impact the Town's ability to meet the prescribed levels of service outlined in this manual. During these periods, priority will be given to maintaining safe and passable pedestrian routes, with emphasis placed on school zones, transit routes, commercial areas, and access to public facilities. Full restoration of sidewalk conditions may be delayed until weather conditions improve and operational resources become available. Winter maintenance operations will continue until prescribed service levels are achieved or until the best possible conditions have been attained given the prevailing circumstances. Municipal Parking Lots 16 2024-2025 Winter Maintenance Manual September 2026 Municipal parking lots are plowed and sanded concurrently with roadway maintenance operations. These activities are incorporated into regular maintenance beats and are not treated as separate tasks. Additional applications of sand and salt may be undertaken as conditions require and at the discretion of the Roads Supervisor or Director of Public Works. The Roads Supervisor is responsible for procuring and managing the storage of winter maintenance materials. Snow shall be piled in designated areas to minimize impacts on parking availability and to prevent interference with sidewalks, roadways, entrances, and pedestrian access routes. Accessible parking spaces, access aisles, and designated walkways shall remain unobstructed whenever practicable. Snow removal and hauling may be undertaken as required to maintain safe access, preserve parking capacity, and support winter maintenance operations. Locations of all municipal parking lots are identified in Schedule H. School Zones School zones are prioritized for snow removal operations, subject to the following limitations: - Snow removal operations shall not occur within designated school zones during peak student travel periods, specifically one hour before and one hour after the start and end of the school day, including the Second Street crosswalk area (Churchill Drive, Second Street, and Station Road). - Exceptions may be made in emergency situations or where delaying snow removal would create a significant safety risk for students, pedestrians, motorists, or emergency services. Special Areas School Crossing Guard Locations: Snow removal and sanding at school crossings are performed at select locations. Canada Post Community Mailboxes: Snow removal around Canada Post Community Mailboxes is managed by Canada Post and is not a service provided by the Town of Kirkland Lake. Variable Weather Conditions During extreme snow and ice events, additional personnel, contractors, and equipment 17 2024-2025 Winter Maintenance Manual September 2026 may be deployed to support winter maintenance operations. In cases of prolonged snowfall, freezing rain, or consecutive storm events, operational efforts may be focused on maintaining safe and passable conditions on primary transportation routes, school zones, emergency service access routes, and other critical municipal infrastructure. Snow and ice control operations will be conducted only when weather conditions permit the safe operation of equipment and personnel. Factors such as severe cold, strong winds, reduced visibility, freezing rain, and rapid snow or ice accumulation may impact operational effectiveness or delay certain winter maintenance activities. Staff will utilize weather monitoring, patrol observations, and forecast information to anticipate and proactively respond to winter weather events in accordance with the Minimum Maintenance Standards Regulations. Operational priorities and resource deployment may be adjusted as conditions change to maintain safe and passable transportation routes throughout the municipality. Winter Preparation Sand Boxes Sand boxes are strategically placed throughout the Town in late fall to aid in snow and ice control on both public and private properties. Staff regularly inspect the sand levels in these boxes and remove them in the spring. The locations of sand boxes are detailed in Schedule I. Responsibilities of Residents Effective winter maintenance relies on cooperation between the Town and its residents. Throughout the winter season, the Town will communicate information regarding winter maintenance activities, Significant Weather Events, snow removal operations, parking restrictions, and other operational updates through its official communication channels. Residents are encouraged to stay informed and take appropriate actions to support winter maintenance activities and public safety. Snowplow Safety To ensure safety around snowplows, residents should observe the following guidelines: Keep a Safe Distance: Maintain at least a 30-metre distance from working snowplows. If you cannot see the snowplow's mirrors, the operator likely cannot see 18 2024-2025 Winter Maintenance Manual September 2026 you. Snowplows travel slowly and may have equipment extending beyond the vehicle's width. Avoid Passing: Do not drive beside snowplows, as they may shift while clearing snow. Passing between snowplows working in tandem on multi-lane roads is especially dangerous. Move Aside: If approaching a snowplow from the opposite direction, move to the right when conditions permit to provide adequate space for the snowplow to operate safely. 19 2024-2025 Winter Maintenance Manual September 2026 Watch for Visibility Issues: Snowplows can create a cloud of snow that severely limits visibility, making passing risky. Be Cautious in All Conditions: Snowplows may continue clearing shoulders and cutting back snowbanks even on sunny days after a storm. Garbage and Recycling Bins Proper placement of garbage and recycling bins is important during winter months to support safe and efficient snow clearing operations. Residents are encouraged to place their bins as close to the roadway as possible, preferably within their driveway. Where a driveway is not available, bins may be placed on a cleared section of the boulevard, with the property owner responsible for maintaining access. Bins should not be placed within the travelled portion of the roadway and should be removed promptly following collection to facilitate winter maintenance operations and snow clearing activities. For questions regarding bin placement, residents are encouraged to contact the Waste Management Division at 705-567-9365. Managing Complaints and Requests for Services The Public Works Department receives numerous inquiries, complaints, and service requests during snow and ice control operations. Administrative staff will be kept informed of winter maintenance activities, anticipated schedules, service interruptions, and equipment breakdowns to assist in responding to public inquiries. Citizen inquiries and concerns will be recorded and managed through the Town's activity request tracking system. Requests will be categorized and addressed as follows: Safety Issues: Immediate action will be taken where warranted, and concerns will be forwarded to the Roads Supervisor for review. Non-Safety-Related Issues: These requests will be directed to the appropriate personnel and addressed in a timely manner, subject to operational priorities and available resources. Property Damage: Reports of property damage will be documented and forwarded to the Roads Supervisor for investigation and follow-up. Activity requests will be tracked to help identify trends, monitor service levels, and ensure timely and effective responses. While all requests and concerns will be 20 2024-2025 Winter Maintenance Manual September 2026 reviewed, winter maintenance operations will continue to be guided by established service levels, operational priorities, weather conditions, and public safety considerations. Any additional requests for plow beats or changes to service levels must be approved by Council. 21 2024-2025 Winter Maintenance Manual September 2026 Repairing Property Damage Winter maintenance activities may occasionally cause property damage, particularly to improvements in the road right-of-way. The Town is responsible for repairing damage to roadways and grass boulevards. Property owners are responsible for repairs to landscaping, trees, shrubs, and other features beyond the property line. Sod damaged by snowplows will be replaced if reported to the Roads Division by June 1st following the winter season. Damage from sand, salt, or other de-icing chemicals is not covered. By-Law Enforcement The Town's By-Law Enforcement Division will patrol streets and enforce Winter Parking and Snow By-Laws, detailed in Schedules K and L. Parking By-Law: Residents must avoid parking on boulevards and sidewalks to allow for effective snow removal. Winter Parking By-Law: On-street winter parking restrictions are in effect from November 1st to April 15th. Vehicles parked during snow removal operations may be ticketed or towed at the owner's expense. Depositing of Snow or Ice Regulations By-Law: Residents are responsible for removing snow from their own properties and cannot move snow onto other properties or municipal areas. Non-compliance will result in written warnings and, if repeated, fines and possible towing. Violations of these By-laws may result in fines under the Provincial Offences Act, R.S.O. 1990. Understanding Levels of Services The Town's Winter Maintenance Manual establishes service levels based on provincial legislation, roadway classifications, operational capacity, and local needs. The Town strives to provide winter maintenance services that meet or exceed regulatory requirements; however, it is important to recognize that: - Not all roads and sidewalks can be serviced simultaneously. - Winter weather conditions can change rapidly. - Significant weather events may temporarily impact service levels. - Maintaining safe and passable routes does not always mean bare pavement conditions. - Snowbanks at driveway entrances are an unavoidable consequence of 22 2024-2025 Winter Maintenance Manual September 2026 snowplowing operations. - Recovery activities such as snow removal and roadway widening may occur after the initial storm response. 23 2024-2025 Winter Maintenance Manual September 2026 Frequently Asked Questions Why hasn't my residential street been plowed yet? During a snowfall, the Town prioritizes clearing main arterial and collector roads first, in accordance with established service levels and Minimum Maintenance Standards. As a result, plows may not immediately reach local residential or lower-volume roads. The Town generally deploys snow clearing operations when snow accumulation reaches approximately 5 cm. Residential streets are typically addressed after priority routes have been restored to a safe and passable condition and are generally completed within 24 hours after snowfall has ended. How long will it take to clear the snow off my street? The time required to clear a street depends on several factors, including the amount of snowfall, wind conditions, traffic volumes, parked vehicles, equipment availability, and whether additional snowfall occurs during operations. Priority routes such as arterial roads, collector roads, school zones, and emergency access routes are addressed first. Residential streets are generally completed within 24 hours after snowfall has ended; however, severe storms, consecutive weather events, or significant weather events may result in longer response times. How long will it take to clear the sidewalks? Maintained sidewalks are generally cleared within 48 hours following the end of a snowfall event. Priority pedestrian routes, school zones, public facilities, and heavily travelled sidewalks are serviced first. During prolonged snow events, freezing rain, or significant weather events, crews may focus on maintaining safe and passable pedestrian routes before undertaking full cleanup operations. Why does the snowplow end up blocking my driveway with snow? Snowplows clear streets from the centerline toward the curb. As a result, snow is pushed into the boulevard area and may accumulate across private driveways. Unfortunately, this is an unavoidable part of snow clearing operations. The boulevard area is designed to accommodate snow storage from the roadway, and there is no 24 2024-2025 Winter Maintenance Manual September 2026 practical way to clear a public roadway without affecting driveway entrances. Can the Town clear the snowbank in front of my driveway? The Town is responsible for maintaining public roadways and sidewalks. The Town does not have the resources to remove snowbanks located at private driveway entrances. Snowbanks that form at the end of driveways are a normal by-product of roadway plowing operations. Removing these snowbanks from every private driveway would significantly impact winter maintenance resources and service levels. Residents requiring assistance with snowbank removal are encouraged to contact a private snow removal contractor. Why is my road still snow-covered after the snowplow has been through? Many municipal roads, particularly lower-volume residential streets, are maintained with a compacted snow surface during winter months. Winter maintenance activities such as plowing, sanding, salting, and grading are intended to maintain safe and passable driving conditions rather than bare pavement at all times. Road conditions may vary depending on weather conditions, temperatures, traffic volumes, and available resources. Why doesn't the Town clear roads down to bare pavement? The Town's winter maintenance program is designed to meet or exceed the Minimum Maintenance Standards for Municipal Highways while balancing service levels, operational capacity, and financial responsibility. Maintaining bare pavement at all times would require significantly greater staffing, equipment, materials, and funding. The Town's objective is to maintain safe and passable transportation routes throughout the winter season. Why are some roads plowed before others? Roads are maintained according to a priority system based on roadway classification, traffic volumes, emergency access requirements, school zones, and community needs. 25 2024-2025 Winter Maintenance Manual September 2026 Priority routes are serviced first to ensure emergency services, school transportation, public transit, and essential travel can continue safely during winter weather events. Why does the snowplow come down my street more than once during the same snowfall? Winter maintenance is an ongoing process during active weather events. The first pass may be intended to keep the roadway open and passable, while subsequent passes improve roadway conditions as snow continues to accumulate. Additional plowing, sanding, salting, grading, or snow removal may be required as conditions change. Why are snowplows and sanders operating in the middle of the night? To ensure roads are safe and passable for morning traffic, winter maintenance activities may take place overnight. Working during overnight hours also reduces conflicts with traffic and parked vehicles, allowing crews to operate more efficiently and safely. Why are snowplows and sanders out when it is not snowing? Town crews may perform winter maintenance activities in anticipation of changing weather conditions. Roads may be treated prior to forecasted snow, freezing rain, or rapid temperature changes. Particular attention is often given to hills, curves, intersections, bridges, and other locations susceptible to ice formation. Why has snow removal not started on my street yet? Snow removal (lifting and hauling snow) is different from snowplowing. Snowplowing keeps roads open and passable during and immediately after storms. Snow removal is typically undertaken when snowbanks begin to affect roadway width, visibility, pedestrian safety, parking availability, or snow storage capacity. Snow removal operations are prioritized throughout the winter season based on operational needs and available resources. 26 2024-2025 Winter Maintenance Manual September 2026 Why do roads seem narrower later in the winter? Repeated snowfall events cause snowbanks to gradually increase in size throughout the winter season. Roadway width may become reduced until snow removal operations are undertaken. The Town monitors roadway width, visibility, pedestrian activity, parking requirements, and snow storage capacity when determining snow removal priorities. What about the high snowbanks along my street? The Town will address high snowbanks when they create visibility concerns, reduce roadway width, affect pedestrian safety, interfere with parking, or create snow storage issues. Snowbank removal is prioritized based on public safety considerations, operational needs, and available resources. Why doesn't the Town clear snowbanks at every intersection? Snowbank removal is prioritized at locations where visibility concerns create a safety issue for motorists, pedestrians, school zones, or emergency access routes. Due to the large number of intersections throughout the municipality, snowbank removal must be prioritized based on operational needs and available resources. Why are road graders used when snowplows have already cleared the road? Road graders are used to manage the compacted snowpack that develops throughout the winter season. Grading helps improve traction, reduce rutting, maintain roadway conditions, and prevent the snowpack from becoming excessively compacted. In some cases, grading can reduce the need for more intensive corrective measures such as scarifying. What happens during a Significant Weather Event? A Significant Weather Event may be declared when weather conditions are severe 27 2024-2025 Winter Maintenance Manual September 2026 enough that the Town may be temporarily unable to achieve prescribed service levels. During these events, winter maintenance operations focus on maintaining safe and passable transportation routes and preserving access for emergency services. Once conditions improve, recovery operations will continue until normal service levels are restored. Who can I call if my street hasn't been plowed? Residents on local roads are encouraged to allow up to 24 hours following the end of a snowfall event before reporting concerns regarding snowplowing. Depending on storm severity, multiple snowfalls, equipment availability, and operational priorities, response times may vary. Residents may contact the Public Works Department if they have concerns regarding winter maintenance service levels. Why doesn't the Town immediately respond to every winter maintenance complaint? All complaints and service requests are reviewed and recorded by the Public Works Department. While every concern is important, winter maintenance operations are guided by established service levels, roadway priorities, weather conditions, operational requirements, and public safety considerations. Operational decisions are made based on the needs of the overall transportation network rather than individual requests. Schedules Schedule A - Classification of Roads Schedule B - Snow Plowing & Grader Beats Schedule C - Salting Routes Schedule D - Sanding Routes Schedule E - Snow Pulls Schedule F - Daily Recordings Templates Schedule G - Maintained Sidewalks Schedule H - Location of Municipal Parking Lots Schedule I - Location of Sand Boxes Schedule J - O. Reg. 239/02 - Minimum Maintenance Standards for Municipal Highways Schedule K - "Winter Parking" By-Law (amending Parking By-Law 15-017 Schedule L - Depositing of Snow or Ice Regulations By-Law 9 2025-2026 Winter Maintenance Manual December 2025 Schedule A Classification of Roads Roads Division m To Goodfish Lake & Nettie Lake Road Classifications ± To Landfill & McTavish Brant H Pumphouse Goodfish & Nettie ilt W o il W ishman n s F o de m o D n Fe ral s I a n s rv y G rierso e i n t re e e n t uir At i Bu Pi s sm k rn d ing rd ns s n t re e i e cl a l e H d m i w e ern H T G o v ippissi n g N t n Airpor io a t Be Goodfish St ves F irst rn re a er ha Ai w arg To rd rp t H t or h i g nd t W r o D Sec rd un i f Th Al i e ter D l e l 0 1,000 Wa d u M es rt h n etr la d c n Pro n u a F o Kirk s Highway 66 & Swastika p n T e e c C c t F ifth h M k at c L a ra t C Ca mus L Churchill rn m e n e k M e e c a F a h u o ve b e u e s e s l M G r o l t op l h l n Hi e o Taylor ' O n re Pa k on m g y c D ix a t Be rk o ls e n Po m av plar W R o wa n ll r Po Ba rn pe e e o e o rt v h r o M G o ldt W r o a n a G n y e i d e King Q u e C n s In mi er Que C Pre Rand en om nd f Ra 6 o rl 6 rt y l Ea a ai Birch w a R r Ath eni i t v h s e i g u H d Peck rsi n d I Legend e a Lakes ki s t y r s h e a a Sw H Arc Parcels 0 500 Meters Railway Roads Class 3 Corridor n t m e rn Class 4 Corridor e o v G Class 5 Corridor Prepared by: The Department of Physical Services To Swastika Metres Revised: November 21, 2017 m v ia Highway 66 0 250 500 750 1,000 MTO Maintained 10 2025-2026 Winter Maintenance Manual December 2025 Schedule B Snow Plowing and Grader Beats Archer M ain Goodfish Duncan Allen Pollock Taylor Poplar W oods First Fifth Prospect Lebel Park Tower Third King Station Rand Federal W ater Dixon Harding Prem ier Balsam Day Highway66 Fourth Dunfield Second M cCam us Governm ent Carter Brant Earl W ilson Tweedsm uir Grierson M cKelvie Burnside Com fort Goldthorpe Queen Hillcrest Churchill Inn George Foss Chaput Prince Dark Kirkpatrick O'M eara Algonquin Birch Callbeck Hilton Irvine Hilltop Governm ent Rand Governm ent Queen Airport Pinetree Bernhardt Airport Roads Division W inter M aintenance Plowing Routes ± 0 250 500 7501,000 M etres To G oodfish Lake & Nettie Lake m G oodfish & Nettie Prepared by: The Departm ent of Physical Services Revised: Novem ber 30, 2018 m Hays Governm ent Peck Swastika Athenia Riverside 0 1,000 M etres Highw ay 66 & Sw astika 0 500 M eters To Landfill & M cTavish Pum phouse Legend Truck Beat 1 Truck Beat 2 Truck Beat 3 Grader Beat 1 Lakes Parcels Railway To Sw astika via Highw ay 66 m 11 2025-2026 Winter Maintenance Manual December 2025 Schedule C Salting Routes Archer M ain Goodfish Duncan Allen Pollock Taylor Poplar W oods First Fifth Prospect Lebel Park Tower Third King Station Rand Federal W ater Dixon Harding Prem ier Balsam Day Highway66 Fourth Kirkland Dunfield Second M cCam us Governm ent Carter Brant Earl W ilson Tweedsm uir Grierson M cKelvie Burnside Com fort Goldthorpe Queen Hillcrest Churchill Inn George Foss Nippissing W ishm an Chaput Prince Dark M acPherson Callbeck Hilton Hilltop Blom field Industrial Governm ent Second Governm ent Queen Airport Pinetree Bernhardt Airport Roads Division W inter M aintenance Salting Route ± 0 250 500 7501,000 M etres To G oodfish Lake & Nettie Lake m G oodfish & Nettie Prepared by: The Departm ent of Physical Services Revised: Novem ber 30, 2018 m Hays Governm ent Peck Swastika Athenia Riverside 0 1,000 M etres Highw ay 66 & Sw astika 0 500 M eters To Landfill & M cTavish Pum phouse Legend Lakes Parcels Railway Salting Route To Sw astika via Highw ay 66 m 12 2025-2026 Winter Maintenance Manual December 2025 Schedule D Sanding Routes Archer M ain Goodfish Duncan Allen Pollock Taylor Poplar W oods First Fifth Lebel Park Tower Third Station Rand W ater Dixon Harding Prem ier Balsam Day Highway66 Fourth Kirkland Dunfield Governm ent Brant Earl W ilson Grierson Burnside Goldthorpe Queen Hillcrest Churchill Foss Nippissing Chaput Prince Callbeck Hilton Irvine Hilltop Industrial Governm ent Rand Governm ent Airport Pinetree Bernhardt Airport Roads Division W inter M aintenance Sanding Route ± 0 250 500 7501,000 M etres To G oodfish Lake & Nettie Lake m G oodfish & Nettie Prepared by: The Departm ent of Physical Services Revised: Novem ber 30, 2018 m Hays Governm ent Peck Swastika Athenia Riverside 0 1,000 M etres Highw ay 66 & Sw astika 0 500 M eters To Landfill & M cTavish Pum phouse Legend Sanding Lakes Parcels Railway To Sw astika via Highw ay 66 m Regular W eather Conditions Archer M ain Goodfish Duncan Allen Pollock Taylor Poplar W oods First Fifth Lebel Park Tower Third Station Rand W ater Dixon Harding Prem ier Balsam Day Highway66 Fourth Kirkland Dunfield Governm ent Brant Earl W ilson Grierson Burnside Goldthorpe Queen Hillcrest Churchill Foss Nippissing Chaput Prince Callbeck Hilton Irvine Hilltop Industrial Governm ent Rand Governm ent Airport Pinetree Bernhardt Airport Roads Division W inter M aintenance Sanding Route ± 0 250 500 7501,000 M etres To G oodfish Lake & Nettie Lake m G oodfish & Nettie Prepared by: The Departm ent of Physical Services Revised: Novem ber 30, 2018 m Hays Governm ent Peck Swastika Athenia Riverside 0 1,000 M etres Highw ay 66 & Sw astika 0 500 M eters To Landfill & M cTavish Pum phouse Legend Sanding Lakes Parcels Railway To Sw astika via Highw ay 66 m Adverse W eather Conditions 13 2025-2026 Winter Maintenance Manual December 2025 Schedule E Snow Pulls Archer M ain Goodfish Duncan Allen Pollock Taylor Poplar W oods First Fifth Prospect Lebel Park Tower Third King Station Rand Federal W ater Dixon Harding Prem ier Balsam Day Highway66 Fourth Kirkland Dunfield Second M cCam us Governm ent Carter Brant Earl W ilson Tweedsm uir Grierson M cKelvie Burnside Com fort Goldthorpe Queen Hillcrest Churchill Inn George Foss Chaput Prince Dark O'M eara Algonquin Birch Callbeck Hilton Irvine Hilltop Industrial Second Governm ent Rand Governm ent Queen Airport Pinetree Bernhardt Airport Roads Division W inter M aintenance Snow Rem oval ± 0 250 500 7501,000 M etres To G oodfish Lake & Nettie Lake m G oodfish & Nettie Prepared by: The Departm ent of Physical Services Revised: Novem ber 30, 2018 m Hays Governm ent Peck Swastika Athenia Riverside 0 1,000 M etres Highw ay 66 & Sw astika 0 500 M eters To Landfill & M cTavish Pum phouse Legend Lakes Parcels Railway Snow Rem oval Pull Area 1 Pull Area 2 Pull Area 3 To Sw astika via Highw ay 66 m 14 2025-2026 Winter Maintenance Manual December 2025 Schedule F Daily Recording Templates TOWN OF KIRKLAND LAKE WINTER MAINTENANCE MANUAL DATA RECORDING Date: Start time: End time: Activity: Plow Truck Beat 1 Beat 2 Beat 3 Grader Beat 1 Loader T251 T258 Backhoe T257 T256 Trackless T261 T260 Sand/Salt Truck Beat 1 Beat 2 Trackless T261 T260 Snow Removal Truck Beat 1 Beat 2 Beat 3 Loader T251 T258 Backhoe T257 T256 Trackless T261 T260 Scarify Grader Loader T251 T258 Backhoe T257 T256 Other: _________________________________________________________________________________ ***Areas completed shall be highlighted on accompanying map WEATHER Weather data shall be attached to report, 3 times daily. Additional notes to be recorded below: 15 2025-2026 Winter Maintenance Manual December 2025 Schedule G Maintained Sidewalks Archer Main Goodfish Duncan Taylor Pollock Allen Poplar Woods First Fifth - Prospect Lebel Park Tower Third King Station Rand Federal Water Dixon Harding Premier Highway 66 Balsam Fourth Kirkland Dunfield Second McCamus Government Day Carter Earl Tweedsmuir Wilson Grierson McKelvie Burnside Comfort Goldthorpe Young Queen Nipissing Hillcrest Churchill Inn George Foss Chaput Prince O'Meara Algonquin Birch Brant Beaver Lakeshore Callbeck Chateau Conroy Irvine McChesney Hilltop Industrial Kirk Second Rand Government Lebel Park Government Queen Airport Pinetree Bernhardt Airport Roads Division Winter Maintenance Sidewalk Snow Removal 0 250 500 750 1,000 Metres To Goodfish Lake & Nettie Lake m Goodfish & Nettie Prepared by: The Department of Physical Services Revised: June 27, 2022 m 66 Government Peck Swastika Athenia Riverside 0 1,000 Metres Highway 66 & Swastika 0 500 Meters To Landfill & McTavish Pumphouse Legend Lakes Parcels Railway Sidewalk Priority Level 1 Priority Level 2 Priority Level 3 To Swastika via Highway 66 m 16 2025-2026 Winter Maintenance Manual December 2025 Schedule H Location of Municipal Parking Lots Archer Main Goodfish Duncan Taylor Pollock Allen Poplar Woods First Fifth - Prospect Lebel Park Tower Third King Station Rand Federal Water Dixon Harding Premier Highway 66 Balsam Fourth Kirkland Dunfield Second McCamus Government Day Carter Earl Tweedsmuir Wilson Grierson McKelvie Burnside Comfort Goldthorpe Queen Nipissing Hillcrest Churchill Inn George Foss Chaput Prince O'Meara Algonquin Birch Brant Beaver Lakeshore Callbeck Conroy Irvine Oakes McChesney Wright Hargreaves Hilltop Industrial Kirk Rand Government Lebel Park Government Queen Airport Pinetree Bernhardt Airport Roads Division Winter Maintenance Municipal Parking Lots 0 250 500 750 1,000 Metres To Goodfish Lake & Nettie Lake m Goodfish & Nettie Prepared by: The Department of Physical Services Revised: June 27, 2022 m 66 Government Peck Swastika Athenia Riverside 0 1,000 Metres Highway 66 & Swastika 0 500 Meters To Landfill & McTavish Pumphouse Legend Lakes Parcels Railway Parking Lots To Swastika via Highway 66 m 17 2025-2026 Winter Maintenance Manual December 2025 Schedule I Location of Sandboxes Archer M ain Goodfish Duncan Allen Pollock Taylor Poplar W oods First Fifth Prospect Lebel Park Tower Third King Rand Federal W ater Dixon Harding Prem ier Balsam Day Highway66 Dunfield Governm ent Carter Brant Earl W ilson Tweedsm uir Grierson Burnside Com fort Goldthorpe Queen Hillcrest Churchill Foss Chaput Furlong Birch Beaver Irvine Oakes Hilltop Kirk Governm ent Governm ent Queen Airport Pinetree Bernhardt Airport Roads Division W inter M aintenance Sandbox Locations ± 0 250 500 7501,000 M etres To G oodfish Lake & Nettie Lake m G oodfish & Nettie Prepared by: The Departm ent of Physical Services Revised: Novem ver 20, 2018 m Governm ent 0 1,000 M etres Highw ay 66 & Sw astika 18 2025-2026 Winter Maintenance Manual December 2025 Schedule J Minimum Maintenance Standards for Municipal Highways (Roadways) Municipal Act, 2001 Loi de 2001 sur les municipalités ONTARIO REGULATION 239/02 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Consolidation Period: From May 3, 2018 to the e-Laws currency date. Last amendment: 366/18. Legislative History: 288/03, 613/06, 23/10, 47/13, 366/18. This Regulation is made in English only. Definitions 1. (1) In this Regulation, "bicycle facility" means the on-road and in-boulevard cycling facilities listed in Book 18 of the Ontario Traffic Manual; "bicycle lane" means, (a) a portion of a roadway that has been designated by pavement markings or signage for the preferential or exclusive use of cyclists, or (b) a portion of a roadway that has been designated for the exclusive use of cyclists by signage and a physical or marked buffer; "cm" means centimetres; "day" means a 24-hour period; "encroachment" means anything that is placed, installed, constructed or planted within the highway that was not placed, installed, constructed or planted by the municipality; "ice" means all kinds of ice, however formed; "motor vehicle" has the same meaning as in subsection 1 (1) of the Highway Traffic Act, except that it does not include a motor assisted bicycle; "non-paved surface" means a surface that is not a paved surface; "Ontario Traffic Manual" means the Ontario Traffic Manual published by the Ministry of Transportation, as amended from time to time; "paved surface" means a surface with a wearing layer or layers of asphalt, concrete or asphalt emulsion; "pothole" means a hole in the surface of a roadway caused by any means, including wear or subsidence of the road surface or subsurface; "roadway" has the same meaning as in subsection 1 (1) of the Highway Traffic Act; "shoulder" means the portion of a highway that provides lateral support to the roadway and that may accommodate stopped motor vehicles and emergency use; "sidewalk" means the part of the highway specifically set aside or commonly understood to be for pedestrian use, typically consisting of a paved surface but does not include crosswalks, medians, boulevards, shoulders or any part of the sidewalk where cleared snow has been deposited; "significant weather event" means an approaching or occurring weather hazard with the potential to pose a significant danger to users of the highways within a municipality; "snow accumulation" means the natural accumulation of any of the following that, alone or together, covers more than half a lane width of a roadway: 1. Newly-fallen snow. 2. Wind-blown snow. 3. Slush; "substantial probability" means a significant likelihood considerably in excess of 51 per cent; 1 "surface" means the top of a sidewalk, roadway or shoulder; "utility" includes any air, gas, water, electricity, cable, fiber-optic, telecommunication or traffic control system or subsystem, fire hydrants, sanitary sewers, storm sewers, property bars and survey monuments; "utility appurtenance" includes maintenance holes and hole covers, water shut-off covers and boxes, valves, fittings, vaults, braces, pipes, pedestals, and any other structures or items that form part of or are an accessory part of any utility; "weather" means air temperature, wind and precipitation. "weather hazard" means the weather hazards determined by Environment Canada as meeting the criteria for the issuance of an alert under its Public Weather Alerting Program. O. Reg. 239/02, s. 1 (1); O. Reg. 23/10, s. 1 (1); O. Reg. 47/13, s. 1; O. Reg. 366/18, s. 1 (1, 2). (2) For the purposes of this Regulation, every highway or part of a highway under the jurisdiction of a municipality in Ontario is classified in the Table to this section as a Class 1, Class 2, Class 3, Class 4, Class 5 or Class 6 highway, based on the speed limit applicable to it and the average daily traffic on it. O. Reg. 239/02, s. 1 (2); O. Reg. 366/18, s. 1 (3). (3) For the purposes of subsection (2) and the Table to this section, the average daily traffic on a highway or part of a highway under municipal jurisdiction shall be determined, (a) by counting and averaging the daily two-way traffic on the highway or part of the highway; or (b) by estimating the average daily two-way traffic on the highway or part of the highway. O. Reg. 239/02, s. 1 (3); O. Reg. 23/10, s. 1 (2); O. Reg. 366/18, s. 1 (3). (4) For the purposes of this Regulation, unless otherwise indicated in a provision of this Regulation, a municipality is deemed to be aware of a fact if, in the absence of actual knowledge of the fact, circumstances are such that the municipality ought reasonably to be aware of the fact. O. Reg. 366/18, s. 1 (4). TABLE CLASSIFICATION OF HIGHWAYS Column 1 Average Daily Traffic (number of motor vehicles) Column 2 91 - 100 km/h speed limit Column 3 81 - 90 km/h speed limit Column 4 71 - 80 km/h speed limit Column 5 61 - 70 km/h speed limit Column 6 51 - 60 km/h speed limit Column 7 41 - 50 km/h speed limit Column 8 1 - 40 km/h speed limit 53,000 or more 1 1 1 1 1 1 1 23,000 - 52,999 1 1 1 2 2 2 2 15,000 - 22,999 1 1 2 2 2 3 3 12,000 - 14,999 1 1 2 2 2 3 3 10,000 - 11,999 1 1 2 2 3 3 3 8,000 - 9,999 1 1 2 3 3 3 3 6,000 - 7,999 1 2 2 3 3 4 4 5,000 - 5,999 1 2 2 3 3 4 4 4,000 - 4,999 1 2 3 3 3 4 4 3,000 - 3,999 1 2 3 3 3 4 4 2,000 - 2,999 1 2 3 3 4 5 5 1,000 - 1,999 1 3 3 3 4 5 5 500 - 999 1 3 4 4 4 5 5 200 - 499 1 3 4 4 5 5 6 50 - 199 1 3 4 5 5 6 6 0 - 49 1 3 6 6 6 6 6 O. Reg. 366/18, s. 1 (5). Application 2. (1) This Regulation sets out the minimum standards of repair for highways under municipal jurisdiction for the purpose of clause 44 (3) (c) of the Act. O. Reg. 288/03, s. 1. (2) REVOKED: O. Reg. 23/10, s. 2. (3) This Regulation does not apply to Class 6 highways. O. Reg. 239/02, s. 2 (3). Purpose 2.1 The purpose of this Regulation is to clarify the scope of the statutory defence available to a municipality under clause 44 (3) (c) of the Act by establishing maintenance standards which are non-prescriptive as to the methods or materials to be used in complying with the standards but instead describe a desired outcome. O. Reg. 366/18, s. 2. MAINTENANCE STANDARDS Patrolling 2 3. (1) The standard for the frequency of patrolling of highways to check for conditions described in this Regulation is set out in the Table to this section. O. Reg. 23/10, s. 3 (1); O. Reg. 366/18, s. 3 (2). (2) If it is determined by the municipality that the weather monitoring referred to in section 3.1 indicates that there is a substantial probability of snow accumulation on roadways, ice formation on roadways or icy roadways, the standard for patrolling highways is, in addition to that set out in subsection (1), to patrol highways that the municipality selects as representative of its highways, at intervals deemed necessary by the municipality, to check for such conditions. O. Reg. 47/13, s. 2; O. Reg. 366/18, s. 3 (2). (3) Patrolling a highway consists of observing the highway, either by driving on or by electronically monitoring the highway, and may be performed by persons responsible for patrolling highways or by persons responsible for or performing highway maintenance activities. O. Reg. 23/10, s. 3 (1). (4) This section does not apply in respect of the conditions described in section 10, subsections 11 (0.1) and 12 (1) and section 16.1, 16.2, 16.3 or 16.4. O. Reg. 23/10, s. 3 (1); O. Reg. 366/18, s. 3 (3). TABLE PATROLLING FREQUENCY Class of Highway Patrolling Frequency 1 3 times every 7 days 2 2 times every 7 days 3 once every 7 days 4 once every 14 days 5 once every 30 days O. Reg. 239/02, s. 3, Table; O. Reg. 23/10, s. 3 (2). Weather monitoring 3.1 (1) From October 1 to April 30, the standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once every shift or three times per calendar day, whichever is more frequent, at intervals determined by the municipality. O. Reg. 47/13, s. 3; O. Reg. 366/18, s. 4. (2) From May 1 to September 30, the standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once per calendar day. O. Reg. 47/13, s. 3; O. Reg. 366/18, s. 4. Snow accumulation, roadways 4. (1) Subject to section 4.1, the standard for addressing snow accumulation on roadways is, (a) after becoming aware of the fact that the snow accumulation on a roadway is greater than the depth set out in the Table to this section, to deploy resources as soon as practicable to address the snow accumulation; and (b) after the snow accumulation has ended, to address the snow accumulation so as to reduce the snow to a depth less than or equal to the depth set out in the Table within the time set out in the Table, (i) to provide a minimum lane width of the lesser of three metres for each lane or the actual lane width, or (ii) on a Class 4 or Class 5 highway with two lanes, to provide a total width of at least five metres. O. Reg. 47/13, s. 4; O. Reg. 366/18, s. 5 (1). (2) If the depth of snow accumulation on a roadway is less than or equal to the depth set out in the Table to this section, the roadway is deemed to be in a state of repair with respect to snow accumulation. O. Reg. 47/13, s. 4. (3) For the purposes of this section, the depth of snow accumulation on a roadway and, if applicable, lane width under clause (1) (b), may be determined in accordance with subsection (4) by a municipal employee, agent or contractor, whose duties or responsibilities include one or more of the following: 1. Patrolling highways. 2. Performing highway maintenance activities. 3. Supervising staff who perform activities described in paragraph 1 or 2. O. Reg. 47/13, s. 4; O. Reg. 366/18, s. 5 (2). (4) The depth of snow accumulation on a roadway and lane width may be determined by, (a) performing an actual measurement; (b) monitoring the weather; or (c) performing a visual estimate. O. Reg. 47/13, s. 4; O. Reg. 366/18, s. 5 (3). (5) For the purposes of this section, addressing snow accumulation on a roadway includes, (a) plowing the roadway; 3 (b) salting the roadway; (c) applying abrasive materials to the roadway; (d) applying other chemical or organic agents to the roadway; (e) any combination of the methods described in clauses (a) to (d). O. Reg. 366/18, s. 5 (4). (6) This section does not apply to that portion of the roadway, (a) designated for parking; (b) consisting of a bicycle lane or other bicycle facility; or (d) used by a municipality for snow storage. O. Reg. 366/18, s. 5 (4). TABLE SNOW ACCUMULATION - ROADWAYS Class of Highway Depth Time 1 2.5 cm 4 hours 2 5 cm 6 hours 3 8 cm 12 hours 4 8 cm 16 hours 5 10 cm 24 hours O. Reg. 47/13, s. 4; O. Reg. 366/18, s. 5 (5). Snow accumulation on roadways, significant weather event 4.1 (1) If a municipality declares a significant weather event relating to snow accumulation, the standard for addressing snow accumulation on roadways until the declaration of the end of the significant weather event is, (a) to monitor the weather in accordance with section 3.1; and (b) if deemed practicable by the municipality, to deploy resources to address snow accumulation on roadways, starting from the time that the municipality deems appropriate to do so. O. Reg. 366/18, s. 7. (2) If the municipality complies with subsection (1), all roadways within the municipality are deemed to be in a state of repair with respect to snow accumulation until the applicable time in the Table to section 4 expires following the declaration of the end of the significant weather event by the municipality. O. Reg. 366/18, s. 7. (3) Following the end of the weather hazard in respect of which a significant weather event was declared by a municipality under subsection (1), the municipality shall, (a) declare the end of the significant weather event when the municipality determines it is appropriate to do so; and (b) address snow accumulation on roadways in accordance with section 4. O. Reg. 366/18, s. 7. Snow accumulation, bicycle lanes 4.2 (1) Subject to section 4.3, the standard for addressing snow accumulation on bicycle lanes is, (a) after becoming aware of the fact that the snow accumulation on a bicycle lane is greater than the depth set out in the Table to this section, to deploy resources as soon as practicable to address the snow accumulation; and (b) after the snow accumulation has ended, to address the snow accumulation so as to reduce the snow to a depth less than or equal to the depth set out in the Table to this section to provide a minimum bicycle lane width of the lesser of 1 metre or the actual bicycle lane width. O. Reg. 366/18, s. 7. (2) If the depth of snow accumulation on a bicycle lane is less than or equal to the depth set out in the Table to this section, the bicycle lane is deemed to be in a state of repair in respect of snow accumulation. O. Reg. 366/18, s. 7. (3) For the purposes of this section, the depth of snow accumulation on a bicycle lane and, if applicable, lane width under clause (1) (b), may be determined in the same manner as set out in subsection 4 (4) and by the persons mentioned in subsection 4 (3), with necessary modifications. O. Reg. 366/18, s. 7. (4) For the purposes of this section, addressing snow accumulation on a bicycle lane includes, (a) plowing the bicycle lane; (b) salting the bicycle lane; (c) applying abrasive materials to the bicycle lane; (d) applying other chemical or organic agents to the bicycle lane; (e) sweeping the bicycle lane; or 4 (f) any combination of the methods described in clauses (a) to (e). O. Reg. 366/18, s. 7. TABLE SNOW ACCUMULATION - BICYCLE LANES Column 1 Class of Highway or Adjacent Highway Column 2 Depth Column 3 Time 1 2.5 cm 8 hours 2 5 cm 12 hours 3 8 cm 24 hours 4 8 cm 24 hours 5 10 cm 24 hours O. Reg. 366/18, s. 7. Snow accumulation on bicycle lanes, significant weather event 4.3 (1) If a municipality declares a significant weather event relating to snow accumulation, the standard for addressing snow accumulation on bicycle lanes until the declaration of the end of the significant weather event is, (a) to monitor the weather in accordance with section 3.1; and (b) if deemed practicable by the municipality, to deploy resources to address snow accumulation on bicycle lanes, starting from the time that the municipality deems appropriate to do so. O. Reg. 366/18, s. 7. (2) If the municipality complies with subsection (1), all bicycle lanes within the municipality are deemed to be in a state of repair with respect to snow accumulation until the applicable time in the Table to section 4.2 expires following the declaration of the end of the significant weather event by the municipality. O. Reg. 366/18, s. 7. (3) Following the end of the weather hazard in respect of which a significant weather event was declared by a municipality under subsection (1), the municipality shall, (a) declare the end of the significant weather event when the municipality determines it is appropriate to do so; and (b) address snow accumulation on bicycle lanes in accordance with section 4.2. O. Reg. 366/18, s. 7. Ice formation on roadways and icy roadways 5. (1) The standard for the prevention of ice formation on roadways is doing the following in the 24-hour period preceding an alleged formation of ice on a roadway: 1. Monitor the weather in accordance with section 3.1. 2. Patrol in accordance with section 3. 3. If the municipality determines, as a result of its activities under paragraph 1 or 2, that there is a substantial probability of ice forming on a roadway, treat the roadway, if practicable, to prevent ice formation within the time set out in Table 1 to this section, starting from the time that the municipality determines is the appropriate time to deploy resources for that purpose. O. Reg. 366/18, s. 8. (2) If the municipality meets the standard set out in subsection (1) and, despite such compliance, ice forms on a roadway, the roadway is deemed to be in a state of repair until the applicable time set out in Table 2 to this section expires after the municipality becomes aware of the fact that the roadway is icy. O. Reg. 366/18, s. 8. (3) Subject to section 5.1, the standard for treating icy roadways is to treat the icy roadway within the time set out in Table 2 to this section, and an icy roadway is deemed to be in a state of repair until the applicable time set out in Table 2 to this section expires after the municipality becomes aware of the fact that a roadway is icy. O. Reg. 366/18, s. 8. (4) For the purposes of this section, treating a roadway means applying material to the roadway, including but not limited to, salt, sand or any combination of salt and sand. O. Reg. 366/18, s. 8. (5) For greater certainty, this section applies in respect of ice formation on bicycle lanes on a roadway, but does not apply to other types of bicycle facilities. O. Reg. 366/18, s. 8. TABLE 1 ICE FORMATION PREVENTION Class of Highway Time 1 6 hours 2 8 hours 3 16 hours 4 24 hours 5 24 hours O. Reg. 366/18, s. 8. 5 TABLE 2 TREATMENT OF ICY ROADWAYS Class of Highway Time 1 3 hours 2 4 hours 3 8 hours 4 12 hours 5 16 hours O. Reg. 366/18, s. 8. Icy roadways, significant weather event 5.1 (1) If a municipality declares a significant weather event relating to ice, the standard for treating icy roadways until the declaration of the end of the significant weather event is, (a) to monitor the weather in accordance with section 3.1; and (b) if deemed practicable by the municipality, to deploy resources to treat icy roadways, starting from the time that the municipality deems appropriate to do so. O. Reg. 366/18, s. 8. (2) If the municipality complies with subsection (1), all roadways within the municipality are deemed to be in a state of repair with respect to any ice which forms or may be present until the applicable time in Table 2 to section 5 expires after the declaration of the end of the significant weather event by the municipality. O. Reg. 366/18, s. 8. (3) Following the end of the weather hazard in respect of which a significant weather event was declared by a municipality under subsection (1), the municipality shall, (a) declare the end of the significant weather event when the municipality determines it is appropriate to do so; and (b) treat icy roadways in accordance with section 5. O. Reg. 366/18, s. 8. Potholes 6. (1) If a pothole exceeds both the surface area and depth set out in Table 1, 2 or 3 to this section, as the case may be, the standard is to repair the pothole within the time set out in Table 1, 2 or 3, as appropriate, after becoming aware of the fact. O. Reg. 239/02, s. 6 (1); O. Reg. 366/18, s. 8 (1). (1.1) For the purposes of this section, the surface area and depth of a pothole may be determined in accordance with subsections (1.2) and (1.3), as applicable, by a municipal employee, agent or contractor whose duties or responsibilities include one or more of the following: 1. Patrolling highways. 2. Performing highway maintenance activities. 3. Supervising staff who perform activities described in paragraph 1 or 2. O. Reg. 366/18, s. 8 (2). (1.2) The depth and surface area of a pothole may be determined by, (a) performing an actual measurement; or (b) performing a visual estimate. O. Reg. 366/18, s. 8 (2). (1.3) For the purposes of this section, the surface area of a pothole does not include any area that is merely depressed and not yet broken fully through the surface of the roadway. O. Reg. 366/18, s. 8 (2). (2) A pothole is deemed to be in a state of repair if its surface area or depth is less than or equal to that set out in Table 1, 2 or 3, as appropriate. O. Reg. 239/02, s. 6 (2); O. Reg. 47/13, s. 6. TABLE 1 POTHOLES ON PAVED SURFACE OF ROADWAY Class of Highway Surface Area Depth Time 1 600 cm² 8 cm 4 days 2 800 cm² 8 cm 4 days 3 1000 cm² 8 cm 7 days 4 1000 cm² 8 cm 14 days 5 1000 cm² 8 cm 30 days O. Reg. 239/02, s. 6, Table 1. 6 TABLE 2 POTHOLES ON NON-PAVED SURFACE OF ROADWAY Class of Highway Surface Area Depth Time 3 1500 cm² 8 cm 7 days 4 1500 cm² 10 cm 14 days 5 1500 cm² 12 cm 30 days O. Reg. 239/02, s. 6, Table 2. TABLE 3 POTHOLES ON PAVED OR NON-PAVED SURFACE OF SHOULDER Class of Highway Surface Area Depth Time 1 1500 cm² 8 cm 7 days 2 1500 cm² 8 cm 7 days 3 1500 cm² 8 cm 14 days 4 1500 cm² 10 cm 30 days 5 1500 cm² 12 cm 60 days O. Reg. 239/02, s. 6, Table 3. Shoulder drop-offs 7. (1) If a shoulder drop-off is deeper than 8 cm, for a continuous distance of 20 metres or more, the standard is to repair the shoulder drop-off within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 366/18, s. 9 (1). (2) A shoulder drop-off is deemed to be in a state of repair if its depth is less than 8 cm. O. Reg. 366/18, s. 9 (1). (3) In this section, "shoulder drop-off" means the vertical differential, where the paved surface of the roadway is higher than the surface of the shoulder, between the paved surface of the roadway and the paved or non-paved surface of the shoulder. O. Reg. 239/02, s. 7 (3). TABLE SHOULDER DROP-OFFS Class of Highway Time 1 4 days 2 4 days 3 7 days 4 14 days 5 30 days O. Reg. 366/18, s. 9 (2). Cracks 8. (1) If a crack on the paved surface of a roadway is greater than 5 cm wide and 5 cm deep for a continuous distance of three metres or more, the standard is to repair the crack within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 366/18, s. 10 (1). (2) A crack is deemed to be in a state of repair if its width or depth is less than or equal to 5 cm. O. Reg. 366/18, s. 10 (1). TABLE CRACKS Column 1 Column 2 Class of Highway Time 1 30 days 2 30 days 3 60 days 4 180 days 5 180 days O. Reg. 366/18, s. 10 (2). 7 Debris 9. (1) If there is debris on a roadway, the standard is to deploy resources, as soon as practicable after becoming aware of the fact, to remove the debris. O. Reg. 239/02, s. 9 (1); O. Reg. 366/18, s. 11. (2) In this section, "debris" means any material (except snow, slush or ice) or object on a roadway, (a) that is not an integral part of the roadway or has not been intentionally placed on the roadway by a municipality, and (b) that is reasonably likely to cause damage to a motor vehicle or to injure a person in a motor vehicle. O. Reg. 239/02, s. 9 (2); O. Reg. 47/13, s. 9. Luminaires 10. (0.1) REVOKED: O. Reg. 366/18, s. 12. (1) The standard for the frequency of inspecting all luminaires to check to see that they are functioning is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 366/18, s. 12. (2) For conventional illumination, if three or more consecutive luminaires on the same side of a highway are not functioning, the standard is to repair the luminaires within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 366/18, s. 12. (3) For conventional illumination and high mast illumination, if 30 per cent or more of the luminaires on any kilometre of highway are not functioning, the standard is to repair the luminaires within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 366/18, s. 12. (4) Despite subsection (2), for high mast illumination, if all of the luminaires on consecutive poles on the same side of a highway are not functioning, the standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the luminaires. O. Reg. 366/18, s. 12. (5) Despite subsections (1), (2) and (3), for conventional illumination and high mast illumination, if more than 50 per cent of the luminaires on any kilometre of a Class 1 highway with a speed limit of 90 kilometres per hour or more are not functioning, the standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the luminaires. O. Reg. 366/18, s. 12. (6) Luminaires are deemed to be in a state of repair, (a) for the purpose of subsection (2), if the number of non-functioning consecutive luminaires on the same side of a highway does not exceed two; (b) for the purpose of subsection (3), if more than 70 per cent of luminaires on any kilometre of highway are functioning; (c) for the purpose of subsection (4), if one or more of the luminaires on consecutive poles on the same side of a highway are functioning; (d) for the purpose of subsection (5), if more than 50 per cent of luminaires on any kilometre of highway are functioning. O. Reg. 366/18, s. 12. (7) In this section, "conventional illumination" means lighting, other than high mast illumination, where there are one or more luminaires per pole; "high mast illumination" means lighting where there are three or more luminaires per pole and the height of the pole exceeds 20 metres; "luminaire" means a complete lighting unit consisting of, (a) a lamp, and (b) parts designed to distribute the light, to position or protect the lamp and to connect the lamp to the power supply. O. Reg. 239/02, s. 10 (7). TABLE LUMINAIRES Class of Highway Time 1 7 days 2 7 days 3 14 days 4 14 days 5 14 days 8 O. Reg. 239/02, s. 10, Table. Signs 11. (0.1) The standard for the frequency of inspecting signs of a type listed in subsection (2) to check to see that they meet the retro-reflectivity requirements of the Ontario Traffic Manual is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 7 (1); O. Reg. 47/13, s. 11 (1); O. Reg. 366/18, s. 13. (0.2) A sign that has been inspected in accordance with subsection (0.1) is deemed to be in a state of repair with respect to the retro-reflectivity requirements of the Ontario Traffic Manual until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the sign has ceased to meet these requirements. O. Reg. 47/13, s. 11 (2). (1) If any sign of a type listed in subsection (2) is illegible, improperly oriented, obscured or missing, the standard is to deploy resources as soon as practicable after becoming aware of the fact to repair or replace the sign. O. Reg. 239/02, s. 11 (1); O. Reg. 23/10, s. 7 (2); O. Reg. 366/18, s. 13. (2) This section applies to the following types of signs: 1. Checkerboard. 2. Curve sign with advisory speed tab. 3. Do not enter. 3.1 Load Restricted Bridge. 3.2 Low Bridge. 3.3 Low Bridge Ahead. 4. One Way. 5. School Zone Speed Limit. 6. Stop. 7. Stop Ahead. 8. Stop Ahead, New. 9. Traffic Signal Ahead, New. 10. Two-Way Traffic Ahead. 11. Wrong Way. 12. Yield. 13. Yield Ahead. 14. Yield Ahead, New. O. Reg. 239/02, s. 11 (2); O. Reg. 23/10, s. 7 (3). Regulatory or warning signs 12. (1) The standard for the frequency of inspecting regulatory signs or warning signs to check to see that they meet the retro-reflectivity requirements of the Ontario Traffic Manual is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 8; O. Reg. 47/13, s. 12 (1); O. Reg. 366/18, s. 13. (1.1) A regulatory sign or warning sign that has been inspected in accordance with subsection (1) is deemed to be in a state of repair with respect to the retro-reflectivity requirements of the Ontario Traffic Manual until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the sign has ceased to meet these requirements. O. Reg. 47/13, s. 12 (2). (2) If a regulatory sign or warning sign is illegible, improperly oriented, obscured or missing, the standard is to repair or replace the sign within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 23/10, s. 8; O. Reg. 366/18, s. 13. (3) In this section, "regulatory sign" and "warning sign" have the same meanings as in the Ontario Traffic Manual, except that they do not include a sign listed in subsection 11 (2) of this Regulation. O. Reg. 23/10, s. 8. TABLE REGULATORY AND WARNING SIGNS Class of Highway Time 1 7 days 2 14 days 9 3 21 days 4 30 days 5 30 days O. Reg. 239/02, s. 12, Table. Traffic control signal systems 13. (1) If a traffic control signal system is defective in any way described in subsection (2), the standard is to deploy resources as soon as practicable after becoming aware of the defect to repair the defect or replace the defective component of the traffic control signal system. O. Reg. 239/02, s. 13 (1); O. Reg. 366/18, s. 13. (2) This section applies if a traffic control signal system is defective in any of the following ways: 1. One or more displays show conflicting signal indications. 2. The angle of a traffic control signal or pedestrian control indication has been changed in such a way that the traffic or pedestrian facing it does not have clear visibility of the information conveyed or that it conveys confusing information to traffic or pedestrians facing other directions. 3. A phase required to allow a pedestrian or vehicle to safely travel through an intersection fails to occur. 4. There are phase or cycle timing errors interfering with the ability of a pedestrian or vehicle to safely travel through an intersection. 5. There is a power failure in the traffic control signal system. 6. The traffic control signal system cabinet has been displaced from its proper position. 7. There is a failure of any of the traffic control signal support structures. 8. A signal lamp or a pedestrian control indication is not functioning. 9. Signals are flashing when flashing mode is not a part of the normal signal operation. O. Reg. 239/02, s. 13 (2). (3) Despite subsection (1) and paragraph 8 of subsection (2), if the posted speed of all approaches to the intersection or location of the non-functioning signal lamp or pedestrian control indication is less than 80 kilometres per hour and the signal that is not functioning is a green or a pedestrian "walk" signal, the standard is to repair or replace the defective component by the end of the next business day. O. Reg. 239/02, s. 13 (3); O. Reg. 366/18, s. 13. (4) In this section and section 14, "cycle" means a complete sequence of traffic control indications at a location; "display" means the illuminated and non-illuminated signals facing the traffic; "indication" has the same meaning as in the Highway Traffic Act; "phase" means a part of a cycle from the time where one or more traffic directions receive a green indication to the time where one or more different traffic directions receive a green indication; "power failure" means a reduction in power or a loss in power preventing the traffic control signal system from operating as intended; "traffic control signal" has the same meaning as in the Highway Traffic Act; "traffic control signal system" has the same meaning as in the Highway Traffic Act. O. Reg. 239/02, s. 13 (4). Traffic control signal system sub-systems 14. (1) The standard is to inspect, test and maintain the following traffic control signal system sub-systems once per calendar year, with each inspection taking place not more than 16 months from the previous inspection: 1. The display sub-system, consisting of traffic signal and pedestrian crossing heads, physical support structures and support cables. 2. The traffic control sub-system, including the traffic control signal cabinet and internal devices such as timer, detection devices and associated hardware, but excluding conflict monitors. 3. The external detection sub-system, consisting of detection sensors for all vehicles, including emergency and railway vehicles and pedestrian push- buttons. O. Reg. 239/02, s. 14 (1); O. Reg. 47/13, s. 13 (1); O. Reg. 366/18, s. 13. (1.1) A traffic control signal system sub-system that has been inspected, tested and maintained in accordance with subsection (1) is deemed to be in a state of repair until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the traffic control signal system sub-system has ceased to be in a state of repair. O. Reg. 47/13, s. 13 (2). (2) The standard is to inspect, test and maintain conflict monitors every five to seven months and at least twice per calendar year. O. Reg. 239/02, s. 14 (2); O. Reg. 47/13, s. 13 (3); O. Reg. 366/18, s. 13. 10 (2.1) A conflict monitor that has been inspected, tested and maintained in accordance with subsection (2) is deemed to be in a state of repair until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the conflict monitor has ceased to be in a state of repair. O. Reg. 47/13, s. 13 (4). (3) In this section, "conflict monitor" means a device that continually checks for conflicting signal indications and responds to a conflict by emitting a signal. O. Reg. 239/02, s. 14 (3). Bridge deck spalls 15. (1) If a bridge deck spall exceeds both the surface area and depth set out in the Table to this section, the standard is to repair the bridge deck spall within the time set out in the Table after becoming aware of the fact. O. Reg. 239/02, s. 15 (1); O. Reg. 366/18, s. 13. (2) A bridge deck spall is deemed to be in a state of repair if its surface area or depth is less than or equal to that set out in the Table. O. Reg. 239/02, s. 15 (2); O. Reg. 47/13, s. 14. (3) In this section, "bridge deck spall" means a cavity left by one or more fragments detaching from the paved surface of the roadway or shoulder of a bridge. O. Reg. 239/02, s. 15 (3). TABLE BRIDGE DECK SPALLS Class of Highway Surface Area Depth Time 1 600 cm² 8 cm 4 days 2 800 cm² 8 cm 4 days 3 1,000 cm² 8 cm 7 days 4 1,000 cm² 8 cm 7 days 5 1,000 cm² 8 cm 7 days O. Reg. 239/02, s. 15, Table. Roadway surface discontinuities 16. (1) If a surface discontinuity on a roadway, other than a surface discontinuity on a bridge deck, exceeds the height set out in the Table to this section, the standard is to repair the surface discontinuity within the time set out in the Table after becoming aware of the fact. O. Reg. 23/10, s. 9; O. Reg. 366/18, s. 13. (1.1) A surface discontinuity on a roadway, other than a surface discontinuity on a bridge deck, is deemed to be in a state of repair if its height is less than or equal to the height set out in the Table to this section. O. Reg. 47/13, s. 15. (2) If a surface discontinuity on a bridge deck exceeds five centimetres, the standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the surface discontinuity on the bridge deck. O. Reg. 23/10, s. 9; O. Reg. 366/18, s. 13. (2.1) A surface discontinuity on a bridge deck is deemed to be in a state of repair if its height is less than or equal to five centimetres. O. Reg. 47/13, s. 15. (3) In this section, "surface discontinuity" means a vertical discontinuity creating a step formation at joints or cracks in the paved surface of the roadway, including bridge deck joints, expansion joints and approach slabs to a bridge. O. Reg. 23/10, s. 9. TABLE SURFACE DISCONTINUITIES Class of Highway Height Time 1 5 cm 2 days 2 5 cm 2 days 3 5 cm 7 days 4 5 cm 21 days 5 5 cm 21 days O. Reg. 239/02, s. 16, Table. Sidewalk surface discontinuities 16.1 (1) The standard for the frequency of inspecting sidewalks to check for surface discontinuity is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 10; O. Reg. 47/13, s. 16 (1); O. Reg. 366/18, s. 13. 11 (1.1) A sidewalk that has been inspected in accordance with subsection (1) is deemed to be in a state of repair with respect to any surface discontinuity until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge of the presence of a surface discontinuity in excess of two centimetres. O. Reg. 47/13, s. 16 (2). (2) If a surface discontinuity on or within a sidewalk exceeds two centimetres, the standard is to treat the surface discontinuity within 14 days after acquiring actual knowledge of the fact. O. Reg. 366/18, s. 14. (2.1) REVOKED: O. Reg. 366/18, s. 14. (3) A surface discontinuity on or within a sidewalk is deemed to be in a state of repair if it is less than or equal to two centimetres. O. Reg. 366/18, s. 14. (4) For the purpose of subsection (2), treating a surface discontinuity on or within a sidewalk means taking reasonable measures to protect users of the sidewalk from the discontinuity, including making permanent or temporary repairs, alerting users' attention to the discontinuity or preventing access to the area of discontinuity. O. Reg. 366/18, s. 14. (5) In this section, "surface discontinuity" means a vertical discontinuity creating a step formation at any joint or crack in the surface of the sidewalk or any vertical height difference between a utility appurtenance found on or within the sidewalk and the surface of the sidewalk. O. Reg. 366/18, s. 14. Encroachments, area adjacent to sidewalk 16.2 (1) The standard for the frequency of inspecting an area adjacent to a sidewalk to check for encroachments is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 366/18, s. 15. (2) The area adjacent to a sidewalk that has been inspected in accordance with subsection (1) is deemed to be in a state of repair in respect of any encroachment present. O. Reg. 366/18, s. 15. (3) For greater certainty, the area adjacent to a sidewalk begins at the outer edges of a sidewalk and ends at the lesser of the limit of the highway, the back edge of a curb if there is a curb and a maximum of 45 cm. O. Reg. 366/18, s. 15. (4) The area adjacent to a sidewalk is deemed to be in a state of repair in respect of any encroachment present unless the encroachment is determined by a municipality to be highly unusual given its character and location or to constitute a significant hazard to pedestrians. O. Reg. 366/18, s. 15. (5) If a municipality determines that an encroachment is highly unusual given its character and location or constitutes a significant hazard to pedestrians, the standard is to treat the encroachment within 28 days after making such a determination, and the encroachment is deemed in a state of repair for 28 days from the time of the determination by the municipality. O. Reg. 366/18, s. 15. (6) For the purpose of subsection (4), treating an encroachment means taking reasonable measures to protect users, including making permanent or temporary repairs, alerting users' attention to the encroachment or preventing access to the area of the encroachment. O. Reg. 366/18, s. 15. Snow accumulation on sidewalks 16.3 (1) Subject to section 16.4, the standard for addressing snow accumulation on a sidewalk after the snow accumulation has ended is, a) to reduce the snow to a depth less than or equal to 8 centimetres within 48 hours; and b) to provide a minimum sidewalk width of 1 metre. O. Reg. 366/18, s. 15. (2) If the depth of snow accumulation on a sidewalk is less than or equal to 8 centimetres, the sidewalk is deemed to be in a state of repair in respect of snow accumulation. O. Reg. 366/18, s. 15. (3) If the depth of snow accumulation on a sidewalk exceeds 8 centimetres while the snow continues to accumulate, the sidewalk is deemed to be in a state of repair with respect to snow accumulation, until 48 hours after the snow accumulation ends. O. Reg. 366/18, s. 15. (4) For the purposes of this section, the depth of snow accumulation on a sidewalk may be determined in the same manner as set out in subsection 4 (4) and by the persons mentioned in subsection 4 (3) with necessary modifications. O. Reg. 366/18, s. 15. (5) For the purposes of this section, addressing snow accumulation on a sidewalk includes, (a) plowing the sidewalk; (b) salting the sidewalk; (c) applying abrasive materials to the sidewalk; (d) applying other chemical or organic agents to the sidewalk; or (e) any combination of the methods described in clauses (a) to (d). O. Reg. 366/18, s. 15. 12 Snow accumulation on sidewalks, significant weather event 16.4 (1) If a municipality declares a significant weather event relating to snow accumulation, the standard for addressing snow accumulation on sidewalks until the declaration of the end of the significant weather event is, (a) to monitor the weather in accordance with section 3.1; and (b) if deemed practicable by the municipality, to deploy resources to address snow accumulation on sidewalks starting from the time that the municipality deems appropriate to do so. O. Reg. 366/18, s. 15. (2) If the municipality complies with subsection (1), all sidewalks within the municipality are deemed to be in a state of repair with respect to any snow present until 48 hours following the declaration of the end of the significant weather event by the municipality. O. Reg. 366/18, s. 15. (3) Following the end of the weather hazard in respect of which a significant weather event was declared by a municipality under subsection (1), the municipality shall, (a) declare the end of the significant weather event when the municipality determines it is appropriate to do so; and (b) address snow accumulation on sidewalks in accordance with section 16.3. O. Reg. 366/18, s. 15. Ice formation on sidewalks and icy sidewalks 16.5 (1) Subject to section 16.6, the standard for the prevention of ice formation on sidewalks is to, (a) monitor the weather in accordance with section 3.1 in the 24-hour period preceding an alleged formation of ice on a sidewalk; and (b) treat the sidewalk if practicable to prevent ice formation or improve traction within 48 hours if the municipality determines that there is a substantial probability of ice forming on a sidewalk, starting from the time that the municipality determines is the appropriate time to deploy resources for that purpose. O. Reg. 366/18, s. 15. (2) If ice forms on a sidewalk even though the municipality meets the standard set out in subsection (1), the sidewalk is deemed to be in a state of repair in respect of ice until 48 hours after the municipality first becomes aware of the fact that the sidewalk is icy. O. Reg. 366/18, s. 15. (3) The standard for treating icy sidewalks after the municipality becomes aware of the fact that a sidewalk is icy is to treat the icy sidewalk within 48 hours, and an icy sidewalk is deemed to be in a state of repair for 48 hours after it has been treated. O. Reg. 366/18, s. 15. (4) For the purposes of this section, treating a sidewalk means applying materials including salt, sand or any combination of salt and sand to the sidewalk. O. Reg. 366/18, s. 15. Icy sidewalks, significant weather event 16.6 (1) If a municipality declares a significant weather event relating to ice, the standard for addressing ice formation or ice on sidewalks until the declaration of the end of the significant weather event is, (a) to monitor the weather in accordance with section 3.1; and (b) if deemed practicable by the municipality, to deploy resources to treat the sidewalks to prevent ice formation or improve traction, or treat the icy sidewalks, starting from the time that the municipality deems appropriate to do so. O. Reg. 366/18, s. 15. (2) If the municipality complies with subsection (1), all sidewalks within the municipality are deemed to be in a state of repair with respect to any ice which forms or is present until 48 hours after the declaration of the end of the significant weather event by the municipality. O. Reg. 366/18, s. 15. (3) Following the end of the weather hazard in respect of which a significant weather event was declared by a municipality under subsection (1), the municipality shall, (a) declare the end of the significant weather event when the municipality determines it is appropriate to do so; and (b) address the prevention of ice formation on sidewalks or treat icy sidewalks in accordance with section 16.5. O. Reg. 366/18, s. 15. Winter sidewalk patrol 16.7 (1) If it is determined by the municipality that the weather monitoring referred to in section 3.1 indicates that there is a substantial probability of snow accumulation on sidewalks in excess of 8 cm, ice formation on sidewalks or icy sidewalks, the standard for patrolling sidewalks is to patrol sidewalks that the municipality selects as representative of its sidewalks at intervals deemed necessary by the municipality. O. Reg. 366/18, s. 15. (2) Patrolling a sidewalk consists of visually observing the sidewalk, either by driving by the sidewalk on the adjacent roadway or by driving or walking on the sidewalk or by electronically monitoring the sidewalk, and may be performed by persons responsible for patrolling roadways or sidewalks or by persons responsible for or performing roadway or sidewalk maintenance activities. O. Reg. 366/18, s. 15. 13 Closure of a highway 16.8 (1) When a municipality closes a highway or part of a highway pursuant to its powers under the Act, the highway is deemed to be in a state of repair in respect of all conditions described in this Regulation from the time of the closure until the highway is re-opened by the municipality. O. Reg. 366/18, s. 15. (2) For the purposes of subsection (1), a highway or part of a highway is closed on the earlier of, (a) when a municipality passes a by-law to close the highway or part of the highway; and (b) when a municipality has taken such steps as it determines necessary to temporarily close the highway or part of a highway. O. Reg. 366/18, s. 15. Declaration of significant weather event 16.9. A municipality declaring the beginning of a significant weather event or declaring the end of a significant weather event under this Regulation shall do so in one or more of the following ways: 1. By posting a notice on the municipality's website. 2. By making an announcement on a social media platform, such as Facebook or Twitter. 3. By sending a press release or similar communication to internet, newspaper, radio or television media. 4. By notification through the municipality's police service. 5. By any other notification method required in a by-law of the municipality. O. Reg. 366/18, s. 15. REVIEW OF REGULATION Review 17. (1) The Minister of Transportation shall conduct a review of this Regulation and Ontario Regulation 612/06 (Minimum Maintenance Standards for Highways in the City of Toronto) made under the City of Toronto Act, 2006 every five years. O. Reg. 613/06, s. 2. (2) Despite subsection (1), the first review after the completion of the review started before the end of 2007 shall be started five years after the day Ontario Regulation 23/10 is filed. O. Reg. 23/10, s. 11. 18. OMITTED (PROVIDES FOR COMING INTO FORCE OF PROVISIONS OF THIS REGULATION). O. Reg. 239/02, s. 18. Back to top 14 19 2025-2026 Winter Maintenance Manual December 2025 Schedule K "Winter Parking" By-Law 20-040 (amending Parking By-Law 15-017) THE CORPORATION OF THE TOWN OF KIRKLAND LAKE BY-LAW NUMBER 20-040 BEING A BY-LAW TO AMEND BY-LAW 15-017 FOR THE REGULATION OF PARKING FOR THE TOWN OF KIRKLAND LAKE WHEREAS according to Section 27 of the Municipal Act, S.O. 2001, Chapter 25, as amended, the Council of a Municipality may pass by-laws in respect to highways; AND WHEREAS Section 137 of the Highway Traffic Act, R.S.O. 1990, Chapter H.8, as amended, permits the Council of the Municipality to provide by-laws for the erection of stop signs at the intersections on highways under its jurisdiction; AND WHEREAS Council deems it expedient to amend By-law No. 15-017 to amend no parking areas within the Town of Kirkland Lake; NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWN OF KIRKLAND LAKE HEREBY ENACTS AS FOLLOWS: 1. THAT the following be added as 16.6 "No person shall park a motor vehicle in a municipal parking lot beyond the times mentioned in the table below." Municipal Parking Lot Number Winter Months (November - April) Summer Months (May - October) 1 7:00 am - 2:00 am No restrictions 2 5:30 am - 2:00 am No restrictions 3 7:00 am - 2:00 am No restrictions 4 7:00 am - 2:00 am No restrictions 5 7:00 am - 2:00 am No restrictions 1. THAT the following be added as 17.5 "No person shall park a trailer on public property without prior approval from Council." 2. THAT the following be added as 18.7 "No person shall park a recreational vehicle on public property without prior approval from Council." 3. THAT Schedule "K" detailing Parking Restrictions within the Town of Kirkland Lake be hereby deleted and replaced with the updated Schedule "K", as attached to this By-law as Schedule "A". 4. THAT Table "K" detailing Parking Restrictions within the Town of Kirkland Lake be hereby deleted and replaced with the updated Table "K", as attached to this By-law as Schedule "B". 5. THAT this By-law shall come into full force and effect on the date of final passage hereof at which time all By-laws and/or resolutions that are inconsistent with the provisions of this By-law and the same are hereby repealed or rescinded insofar as it is necessary to give effect to the provisions of this By-law. READ A FIRST, SECOND AND THIRD TIME, ENACTED AND PASSED this 21st day of April 2020. Patrick Kiely Mayor Meagan Elliott Clerk Parking Restr ictions map 20-040 Schedule A By-Law 15-017 Amended by By-law 18-109 Amended by By-law 19-021 Amended by By-law 19-029 Amended by By-law 19-119 Amended by By-law 20-012 Amended by By-law 20-024 Amended by By-law 20-036 Amended by By-law 20- Table K - Parking Restrictions Identification Location From To Road Time Period Number Side 1 AI Wende Front Entrance to Mall Rear entrance to Mall West No parking between Nov. 1st and April 15th 2 Allen Avenue Government Road East South to laneway West No parking at any time 3 Allen Avenue Government Road East 20 metres South East No parking at any time 4 Burnside Drive Government Road East Railway tracks East No parking at any time 5 Burnside Drive Government Road East Railway tracks West No parking at any time 6 Churchill Drive Fourth Street 26m South East No parking at any time 7 Churchill Drive Entrance to Assomption School on Churchill Drive Carter Avenue West No parking at any time 8 Churchill Drive Carter Avenue Duncan Avenue South North No parking Monday to Friday 8:00am to 4:30pm 9 Duncan Avenue Government Road 33 metres North West No parking at any time 10 Duncan Avenue Prospect and Duncan Intersection (4 Duncan S) Wright-Hargreaves Avenue East No parking at any t ime 11 Duncan Avenue Prospect and Duncan Intersection South boudary of 9 Duncan S West No parking at any time 12 Duncan Avenue North 44 Duncan Ave North 36 Duncan Ave N East No parking at any t ime 13 Duncan Avenue North Wright Hargreaves Avenue North of Police Station North East No parking at anytime 14 Duncan Avenue South O'Meara Boulevard Churchill Drive West No parking between 8:00am and 9:00am AND between 3:00pm and 4:00pm 15 Fifth Street Allan Avenue 74 Fifth St North No parking at any time 16 Foss Lane Federal Street Wishman St Both No parking at any time 17 Foss Lane Grierson Road Federal St Both No parking at any time 18 Government Road East Station Road Entrance of KL Inn North No parking at any time 19 Government Road East Station Road 61 Government Road East South No parking at any time 20 Government Road East Entrance to post office parking Station Road South No parking at any time 21 Government Road East Station Road Tweedsmuir Road North No parking at any time 20-040 Schedule B By-Law 15-017 Identification Number 22 Location Government Road East From Tweedsmuir Road To 14 Government Road East Road Side North Time Period No parking at any time 23 Government Road East Allan Avenue middle ofll Government Road E South No parking at any time 24 Government Road East Allan Avenue 30 Metres East (middle of lot at 83 Government Road E) South No parking at any time 25 Government Road West Duncan Avenue West end of 2 Government Road North No parking at any time 26 Government Road West Prospect Avenue Stairs in front of 6 Gov't Rd W North No parking at any time 27 Government Road West Lasalle Theatre (98 Government Road West) East to 90 Government Road W North No parking at any time 28 Government Road West 80 Government Road West 60 Government Rd W North No parking at any time 29 Government Road West Prospect Avenue Government Road W (Suykens Denture) North No parking at any time 30 Government Road West Water Lane 102 Government Road West North No parking at any time 31 Government Road West Prospect Avenue 25 metres West South No parking at any time 32 Kirkland Street East Station Road 14 Kirkland Street (Union Gas) North No parking at any time 33 Kirkland Street East Light post in front of Library Entrance Accessible parking space North No parking at any time 34 Kirkland Street East Duncan Avenue South Library Entrance North No parking at any time 35 Kirkland Street West Government Road West Lebel Avenue North No parking at any time 36 Kirkland Street West Town Hall Duncan Avenue South Town Hall Business only, between 8am and 7pm 37 Kirkland Street West Government Road West Laneway between 55 and 57 Kirkland St W South No parking at any time 38 39 Kirkland Street West Lebel Avenue 19 Kirkland Street West Government Road West Prospect Avenue 40 metres South South West No parking at any time 40 Lebel Avenue Kirkland Street West Laneway beside 39 Kirkland Street (Holy Name Church) East No parking at any time No parking at any time 41 42 Main Street Main Street Government Road West Government Road West Laneway behind 93 Government Road W 49 metres South East West No parking at any time 43 Market Street Water Lane Government Road West West No parking at any time No parking between Nov. 1st and April 15th By-law 15-017 Identification Location From To Road Time Period Number Side 44 O'Meara Boulevard 9 metres South of Fire Department 12 metres North of Fire Department East No parking at any time 45 O'Meara Boulevard McCamus Avenue 12 Metres South West No parking at any time 46 Prospect Avenue Government Road West South 39 metres (NW corner of municipal parking lot) East No parking at any time 47 Prospect Avenue 39 Prospect Avenue Kirkpatrick Avenue West No parking at any time 48 Prospect Avenue Corner of Prospect Ave and Government Road 13 metres North East No parking at any time West 49 Prospect Avenue Water lane Duncan Avenue East No parking at any time 50 Prospect Avenue Rear parking lot of Family Health Team/Entrance to old Commodore Duncan Avenue West No parking at any time 51 Prospect Avenue Government Road West 25 metres north/accessible parking space West No parking at any time 52 Second Street St. Peter's lane 1 Hospital Green North No parking at any time 52 Second Street Churchill Drive 41 Second Street South No parking at any time 54 Second Street Churchill Drive 25 metres West South No parking at any time 55 Station Road South Tower Street Laneway North of 40 Tower St. East No parking at any time 56 Station Road South Kirkland Street East 47 metres north, beside central school West No parking at any time entrance 57 Station Road North Government Road East 45 metres North East No parking at any time 58 Station Road North Government Road East 35 metres North West No parking at any time 59 Tweedsmuir Road Government Road East 35 metres North West No parking at any time 60 Water lane Market Street Prospect Avenue South No parking at any time 61 Water lane Government Road West 22 Water lane North No parking at any time 62 Water lane Market Street Government Road West South No parking at any time 63 Water lane Prospect Avenue 25 Metres West North No parking at any time 64 Westinghouse Avenue Childs Avenue North side of 12 Childs Avenue West No parking at any time 65 Woods Street South of 8 Woods Street (White Eagle) North of 8 Woods Street East No parking at any time 66 Woods Street Poplar Avenue 71 Woods Street West No parking at any time 67 Woods Street Queen Street South end of School parking lot East No parking Monday to Friday 8:00am to 4:30pm 20 2025-2026 Winter Maintenance Manual December 2025 Schedule L Depositing of Snow or Ice Regulations By-Law 22-062 THE CORPORATION OF THE TOWN OF KIRKLAND LAKE BY-LAW NUMBER 22-062 BEING A BY-LAW TO REGULATE THE DEPOSITING OF SNOW OR ICE ON MUNICIPAL OWNED OR OPERATED PROPERTY WITHIN THE TOWN OF KIRKLAND LAKE WHEREAS Section 8(1) of the Municipal Act, 2001, as amended, confers upon the Municipality, authority to govern its affairs as it considers appropriate and to enhance the Municipality's ability to respond to municipal issues; AND WHEREAS Section 10(1) of the Municipal Act, 2001, as amended, authorizes municipalities to pass by-laws for the health, safety and well-being of persons; AND WHEREAS pursuant to Section 446(1) of the Municipal Act S.O. 2001, c.25, as amended, a municipality may direct that in default of clearing the land or refuse by the person directed or required to do it, the cleaning and clearing of land shall be done at the person's expense; AND WHEREAS pursuant to Section 446 (2) of the Municipal Act S.O. 2001, c.25, as amended, a municipality may, for the purposes of 446(1), enter upon land at any reasonable time; AND WHEREAS pursuant to Section 446, clauses 3, 4, 5, 6, 7 & 8 of the Municipal Act S.O. 2001, c.25, as amended, a municipality may recover the costs of clearing the land from the person directed or required to do it and the municipality may recover the costs by action or by adding the costs to the tax roll and colleting them in the same manner as taxes; AND WHEREAS Section 181 of the Highway Traffic Act, RSO 1990, as amended, prohibits deposit of snow or ice on a roadway without permission from the road authority; AND WHEREAS, Council of the Corporation of the Town of Kirkland Lake deems it advisable to pass a by-law prohibiting the obstructing of roadways and sidewalks and regulating the placement of snow thereon; NOW THEREFORE BE IT RESOLVED THAT THE COUNCIL OF THE CORPORATION OF THE TOWN OF KIRKLAND LAKE ENACTS AS FOLLOWS: 1 DEFINITIONS The words and phrases defined in this section have the following meaning for the purposes of this By-law: 1.1 "Boulevard" means a strip of ground between the sidewalk and road; or the strip of ground between the edge of a property and the road; 1.2 "Highway" means a common and public highway, street, avenue, lane, parkway, driveway, sidewalk, square, place, bridge, viaduct, trestle, including the area between the lateral property lines that is intended for the use of the general public; or as amended under the Highway Traffic Act, R.S.O., 1990; BY-LAW NUMBER 22-062 - ROADWAY SNOW DEPOSITING BY-LAW The Corporation of the Town of Kirkland Lake Page 2 of 5 1.3 "Motor Vehicle" includes an automobile, motorcycle, motor assisted bicycle and any other vehicle propelled or driven otherwise than by muscular power, but does not include a street car, or other motor vehicle, traction engine, farm tractor, self-propelled implement of husbandry or road-building machine. A motor vehicle must have valid provincial registration. 1.4 "Municipal By-law Enforcement Officer" means a person appointed by the Town of Kirkland Lake and authorized to carry out the enforcement of this By- Law and other town by-Laws; 1.5 "Municipality" means the Corporation of the Town of Kirkland Lake; 1.6 "Officer" means a Municipal By-law Enforcement Officer, a Police Officer, or another agent as designated by the Chief Administrative Officer; 1.7 "Open Space" means open unobstructed space on a site which is suitable for landscaping, including any part of the site occupied by recreational accessory buildings, any surfaced walk, patio or similar area, any sports or recreational area, any ornamental or swimming pool, and the roof or other part of a building or area, but excluding any driveway or ramp, whether surfaced or not, any curb, retaining wall, motor vehicle parking area, or loading space. 1.8 "Owner" includes the person holding registered title to land and the person for the time being managing or receiving the rent or paying the municipal taxes on the land in question, whether on his, her or its own account or as agent or trustee of any other person or who would so receive the rent if such were let, and shall also include a lessee or occupant of the land. Where the person holding registered title to the land is a condominium corporation, the owner of the corporation and not its member; 1.9 "Person" means any human being, firm, association, partnership, private club, incorporated company, corporation, tenants in common, joint tenants, agent or trustee and heirs, executors or other legal representatives of a person to whom the context can apply according to law and for the purpose of this By-law includes the owner or driver of a vehicle; 1.10 "Pile" means a concentration of snow and/or ice pushed into a pile above the height of 1.52 metres (5 feet); 1.11 "Police Officer" means a sworn member of the Ontario Provincial Police; 1.12 "Private Driveway" means improved land on a highway, which provides vehicular access from the roadway to a parking area or a laneway on adjacent land; BY-LAW NUMBER 22-062 - ROADWAY SNOW DEPOSITING BY-LAW The Corporation of the Town of Kirkland Lake Page 3 of 5 1.13 "Roadway" means that part of the highway that is improved, designated or ordinarily used for vehicular traffic, but does not include the shoulder, curbs, sidewalks; 1.14 "Sidewalk" Shall be defined as the portion of the road allowance, located between the paved portion of the street and the property line, so constructed for the purpose of transporting pedestrians; 1.15 "Significant Weather Event" means an approaching or occurring weather hazard with the potential to pose a significant danger to users of the highways within a municipality. As per Regulation 239/02 of the Municipal Act 2001, an Ontario municipality may declare a significant weather event when a weather hazard is approaching or occurring and has the potential to pose a significant danger to users of the highways in which they have authority over. This declaration suspends the standard timelines required for municipalities to meet their winter maintenance objectives until the municipality declares the significant weather event has ended. During the course of a declared significant weather event, the standard for addressing winter maintenance is to monitor the weather and to deploy resources to address the issue starting from the time that the municipality deems it appropriate to do so. When the municipality has declared the event has ended, the standard timelines for winter maintenance activities will resume. 1.16 "Town" means the Corporation of the Town of Kirkland Lake; 1.17 "Travelled Portion of the Roadway" shall be defined as that part of a roadway designated or intended for use by vehicular traffic; 1.18 "Town Owned Property" is a piece of property, owned or operated by, or upon which a legal easement exists in favour of the Corporation of the Town of Kirkland Lake; 2 GENERAL PROHIBITIONS 2.1 No person shall deposit or cause to be deposited any snow or ice upon any portion of any highway or bridge located within the territorial limits of the Corporation of the Town of Kirkland Lake. 2.2 No person shall deposit, or stockpile, or cause to be deposited or stockpiled, snow or ice within the roadways as to obstruct the line of sight of vehicles entering the roadway from a private driveway or at an intersection. 2.3 No person shall deposit any snow or ice from private property or cause to be deposited on any part of a roadway within the Corporation of the Town of Kirkland Lake. 2.4 No person shall deposit, or cause to be deposited, snow or ice on any sidewalk plowed by the Corporation of the Town of Kirkland Lake. BY-LAW NUMBER 22-062 - ROADWAY SNOW DEPOSITING BY-LAW The Corporation of the Town of Kirkland Lake Page 4 of 5 2.5 No person shall deposit, or cause to be deposited, snow or ice on, or within one (1) metre of a fire hydrant or in a manner that obstructs access to a fire hydrant. 2.6 No person shall relocate snow or ice within the roadway in such a manner as to encroach on the cleared portion of the roadway intended for vehicular and pedestrian traffic, or that would result in the obstruction of normal visibility of the safe movement of vehicular and pedestrian traffic on the roadway. 2.7 No person shall deposit, or cause to be deposited, snow or ice on Town owned property. 2.8 No person shall pile, redistribute, or otherwise cause the accumulation of snow or ice on a sidewalk, travelled portion of a roadway, within the Municipality, in such a manner as to obstruct the view or movement, in any way, of snow clearing equipment under the jurisdiction of the Town's Public Works Department. 2.9 No person shall move snow or ice from within the roadway from one side of the cleared portion of the roadway intended for vehicular and pedestrian traffic, to the other side of the roadway. 3 EXEMPTIONS 3.1 The provisions of this By-law shall not apply to the Corporation of the Town of Kirkland Lake or the Ontario Ministry of Transportation, or contractors thereof, for the purposes of snow clearing operations on highways; 4 REMEDIATION 4.1 If the Director of Public Works deems, at his or her sole discretion, that the nature, volume or consistency of snow or ice accumulation can create a public hazard, the Director of Public Works or designate is authorized to have the material be removed and to invoice the property Owner for the expense incurred or by adding such expense to the tax roll and collecting them in the same manner as taxes in accordance with Section 446 of the Municipal Act. 4.2 Expenses invoiced to the Owner or added to the tax roll by the Corporation of the Town of Kirkland Lake will be on a cost recovery basis. 5 OBSTRUCTION 5.1 No person shall hinder, interfere with or otherwise obstruct, either directly or indirectly, an officer, employee of the Corporation of the Town of Kirkland Lake and/or agent in the lawful exercise or power of duty under this By-law. 6 ENFORCEMENT 6.1 Any Officer is authorized to order any person in violation of the provisions of this By-law and to request compliance therewith; BY-LAW NUMBER 22-062 - ROADWAY SNOW DEPOSITING BY-LAW The Corporation of the Town of Kirkland Lake Page 5 of 5 6.2 Any Officer is authorized to order any person believed by such Officer to be in contravention of this By-law to desist from any activity comprising of or contributing to such contravention; 7 PENALTY 7.1 Every Person who contravenes any provision of this By-law, is guilty of an offence and upon conviction is liable to a penalty pursuant to the Provincial Offences Act, R.S.O. 1990, C.P. 33, as amended (see Schedule "A"). 8 AUTHORITY TO TOW VEHICLES 8.1 In addition to any other penalties provided for the By-law, a Municipal By-law Enforcement Officer, a Police Officer or an individual designated by the Chief Administrative Officer, may, where a vehicle is parked or stopped in contravention of any portion of this By-law, cause it to be moved or taken to and placed or stored in a suitable place as designated by the Corporation of the Town of Kirkland Lake. All fees, costs and expenses associated with the towing and storing of the vehicle will be charged to the Owner and must be paid before the vehicle will be released. 9 VALIDITY AND SEVERABILITY 9.1 Should any section, subsection, clause, paragraph or provision of this By-law be declared by a Court of competent jurisdiction to be invalid, the same shall not affect the validity of this By-law as a whole or any part thereof, other than the Part so declared to be invalid. 10 THAT this By-law shall be known and cited as the Town's "Roadway Snow Depositing By-Law". 11 THAT Schedule "A" of this By-Law shall be deemed to be incorporated into and form part of this By-Law. 12 THAT By-Law 08-089 is hereby repealed. 13 THAT this By-Law shall come into force and effect upon the date of passing. READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 16th DAY OF AUGUST, 2022. Pat Kiely, Mayor Jennifer Montreuil, Municipal Clerk SCHEDULE 'A' TO BY-LAW 22-062 THE CORPORATION OF THE TOWN OF KIRKLAND LAKE PART 1 PROVINCIAL OFFENCES ACT BY-LAW NO. 22-062 BEING A BY-LAW TO REGULATE THE DEPOSITING OF SNOW OR ICE ON MUNICIPAL OWNED OR OPERATED PROPERTY WITHIN THE TOWN OF KIRKLAND LAKE ITEM COLUMN 1 Short Form Wording COLUMN 2 Provincial Creating or Defining Offence COLUMN 3 Set Fine 1 Depositing or cause to be deposited, snow or ice on highway or bridge Section 2.1 175.00 2 Depositing or cause to be deposited, snow or ice on roadway that obstructs the vehicle traffic line of sight Section 2.2 175.00 3 Depositing or cause to be deposited, snow or ice on roadway Section 2.3 175.00 4 Depositing or cause to be deposited snow or ice on sidewalk Section 2.4 175.00 5 Depositing or cause to be deposited, snow or ice on, or within 1 metre of a fire hydrant Section 2.5 200.00 6 Relocating snow or ice within the roadway to encroach upon the cleared portion of the roadway Section 2.6 175.00 7 Depositing or cause to be deposited, snow or ice on town owned property Section 2.7 175.00 8 Pile the accumulation of snow on sidewalk or travelled portion of a roadway Section 2.8 175.00 9 Moving snow from one side of roadway to other side of roadway Section 2.9 175.00 10 Obstructing or hindering an Officer Section 5.1 300.00 NOTE: Penalty provision for the offences indicated above is Section 7 of BY-LAW 22-062, a certified copy of which has been filed.