BY-LAW NO. 2035-25 <<
BEING A BY-LAW RESPECTING CONSTRUCTION, DEMOLITION
AND CHANGE OF USE PERMITS AND INSPECTIONS.
WHEREAS Section 391 (1) of the Municipal Act, 2001, as amended,
authorizes a municipality to impose fees or charges on persons for services or
activities provided or done by or on behalf of it.
AND WHEREAS under the Building Code Act Section 7(1) allows the
Council of a municipality to pass require the payment of fees for the issuance of
permits;
AND WHEREAS under the Building Code Act Section 7(2) the total amount
of the fees authorized under clause {1} must not exceed the anticipated
reasonable costs of the principal authority to administer and enforce this Act in
its Area of jurisdiction.
NOW THEREFORE BE IT RESOLVED THAT the Council for the Township of
Larder Lake enacts as follows:
1. THAT the Building Permit Fees charged be outlined as Schedule A.
2. THAT the Clerk is hereby authorized to make minor modifications or corrections
of a grammatical or typographical nature to the by-law and schedule after passage
of this by-law where such modifications or corrections do not alter the intent of
the by-law.
3. THAT this By-law comes into force and effect on January 1, 2026.
4. THAT all other By-laws and resolutions, or parts thereto, contrary hereto or
inconsistent herewith, be and the same are hereby repealed.
READ A FIRST, SECOND AND THIRD TIME in open Council this 18th day of
November, 2025.
Patricia Quinn /MAYOR
abe /CAO C ice
4
SCHEDULE 'A' TO BY-LAW NO.
BUILDING PERMIT FEES
The fees payabie by the applicant for a construction, demolition, change of use of conditional
permit or inspection fees shall be as follows:
Permit fees shall be $9.25 per thousand based on a value of contract price. If there is no
contract price in a written agreement, the permit fee will be calculated by Building Department
as follows:
Deposit: $90 per application
| RA {Residential (single family dwelling including prefabricated homes $1.30
| RB [Seasonal Buikling no interior finish (insulation, sheeting, etc.
| RC __ [Garage / Cold Storag [$0.65 |persq ft |
| RD {Deck / Bakon [$0.50 |per sq _|
| RE [Interior Renovations (phimbing other structuralchange) $160.00
| RF [Newfoundations i $260.00 fixed
$ 105.00
| RH _[NewroofEntire Roof{structuralchanges) | $235.00
| RI {Mmor Structural Repair/Change $ 105.00
| RJ [New door / window (structural changes
| RK (Fieakrmsystem CS $108.00
| RL jWood Fired Appliance $ 90.00
| RM [RoofopSobr sd $210.00
| RN [Demolition CdS 90.00
Commercial/Industrial/Assembty/Ins titutional 2026 Municipal Fee
| CA _[CommerciaVIndustriaYAssembly/institutional $2.35 |persqft |
| CB _[CommerciaVIndustria'Assembly/Institutional-Cold Storage $ 0.80 |persqtt |
| CC [New Doors or Windows (structural changes $ 160.00
| CD __ [Interior Akeration (plumbing, other structural change $ 260.00
| CE __ [New Roof (Structural Change $ 390.00
| _CF [Minor Structural Repair/Change $ 160.00
Rooftop Solar $ 365.00
| Cl _|BunkhouseAwork camp/trailer (minimum of $1000 1$ 1.60 |persg ht |
| CJ [Demolition (Building over 600 m2 or over 3 storeys (Div. 1.2.2.3(1 $ 160.00
Demolition other than above $ 90.00
| FA _ [Farm Building / addition $ 0.80 [persg ft |
| FB __ [Prefabricated Storage Silos $ 190.00
| FC -- [BunkhouseAvork camp/trailer (minimum of $1000 1$ 1.60 |persq ft |
| OB [Change ofuse ifconstructionsrequred S$ 90.00 ft ee
| OC __|Moving permit (Relocation of structure over 108 ft2 to or froma prope
| GA___ [Permit - File maintenance fe (Dormant 12mths + $ 90.00
| GB _[Inspectionrequestbyowner $90.00 feach
$90.00
FEE NOTES;
e There shall be an administration charge equal to one and a haif times the above
calculated fees, applied to all construction that begins prior to the issuance of a
permit.
e Fees will be rounded to the nearest dollar.
« Conditional and partial permits will be calculated at the regular rate for the
complete project.
*« No permit shall be less than $90.00 minimum.
Refunds
1. No refund shall be given for an application fee, or fees for a conditional, change
of use or partial permit.
2. No refund shall be given for permits or inspections valued at $100 or less.
3. Where a permit fee has been paid pursuant to this By-law, fees may be refunded
based on the following formula and to Section 6.1 of this By-law:
Construction or Demolition Permit
i) 80% where the application is withdrawn or only administrative
functions have been performed;
ii) 50% if administrative, applicable law compliance and plans
examination functions have been performed;
iii) 25% if the permit has been issued and the application is withdrawn
or construction does not commence, or no field inspections have
been carried cut
iv) No refunds if field inspections have been carried out.
Dormant Building Permit
1. The dormant fee is designed to encourage timely completion of construction
projects and offset the administrative costs of managing prolonged open permits.
2. No additional fees will be applied during the first two years following the issuance
of a building permit.
3. Annual fees will apply to permits open beyond two years, starting in year three:
a. Year 3: $100 fee
b. Year 4: $200 fee
c. Year 5: $300 fee
d. Year 6 and beyond: $500 fee per year.
4. Fee collection begins at the end of 2025, providing homeowners and contractors
additional time to complete ongoing projects.