2024 Development Charges Background Study

Lincoln, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 996c235fb738 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 March 22, 2024 [email protected] Development Charges Background Study - Consolidated Report Town of Lincoln Office Consolidation of the December 22. 2023 Background Study and the February 9, 2024 Addendum Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the D.C.A.: Bill 108, 138, 197, and 213 ............................... 1-3 1.3.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters ............................................ 1-3 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 ..................... 1-4 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 .................... 1-4 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 ....... 1-7 1.4 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 ..... 1-7 1.4.1 Additional Residential Unit Exemption ....................................... 1-7 1.4.2 Removal of Housing as an Eligible D.C. Service ....................... 1-8 1.4.3 New Statutory Exemption for Non-Profit Housing ...................... 1-8 1.4.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units ........................ 1-8 1.4.5 Historical Level of Service Extended to Previous 15-Year Period ........................................................................................ 1-9 1.4.6 Revised Definition of Capital Costs ............................................ 1-9 1.4.7 Mandatory Phase-in of a D.C. .................................................... 1-9 1.4.8 D.C. By-law Expiry ................................................................... 1-10 1.4.9 Installment Payments ............................................................... 1-10 1.4.10 Rental Housing Discount.......................................................... 1-10 1.4.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications ......................................................... 1-10 1.4.12 Requirement to Allocate Funds Received ................................ 1-10 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx 2. Current Town of Lincoln D.C. Policies .......................................................... 2-1 2.1 Schedule of Charges .............................................................................. 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-2 2.4 Indexing .................................................................................................. 2-2 2.5 Redevelopment Allowance ..................................................................... 2-2 2.6 Exemptions ............................................................................................. 2-3 3. Anticipated Development in the Town of Lincoln ......................................... 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Classes of Services ................................................................................ 4-8 4.8 Existing Reserve Funds .......................................................................... 4-8 4.9 Deductions .............................................................................................. 4-9 4.9.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.9.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.9.3 Reduction for Benefit to Existing Development ........................ 4-11 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-12 4.10 Municipal-wide vs. Area Rating ............................................................. 4-12 4.11 Allocation of Development .................................................................... 4-12 4.12 Asset Management ............................................................................... 4-12 4.13 Transit ................................................................................................... 4-13 4.14 Mandatory Phase-in of a D.C. ............................................................... 4-14 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and 10-Year Capital Costs for Lincoln's D.C. Calculation .............................................................................................. 5-1 5.2.1 Parks and Recreation Services .................................................. 5-1 5.3 Service Levels and 20-Year Capital Costs for Lincoln's D.C. Calculation .............................................................................................. 5-5 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx 5.3.1 Services Related to a Highway .................................................. 5-5 5.3.2 Fire Services ............................................................................ 5-13 5.3.3 Library Services ....................................................................... 5-16 5.4 Urban 20-Year Capital Costs for Lincoln's D.C. Calculation ................. 5-18 5.4.1 Water Services ......................................................................... 5-18 5.4.2 Wastewater Services ............................................................... 5-20 5.4.3 Stormwater Services ................................................................ 5-22 5.5 Area-Specific Calculation for the Campden Development Area ............ 5-24 5.5.1 Stormwater Drainage - Campden ............................................ 5-24 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Phasing in .................................................................................. 7-5 7.3.6 Timing of Collection ................................................................... 7-5 7.3.7 The Applicable Areas ................................................................. 7-5 7.3.8 Indexing ..................................................................................... 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-6 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-6 7.4.2 By-law In-force Date .................................................................. 7-7 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-7 7.4.4 Area Rating ................................................................................ 7-7 7.5 Other Recommendations ........................................................................ 7-8 8. By-law Implementation ................................................................................... 8-1 8.1 Public Consultation Process ................................................................... 8-1 8.1.1 Introduction ................................................................................ 8-1 8.1.2 Public Meeting of Council........................................................... 8-1 8.1.3 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 8.3.1 Introduction ................................................................................ 8-3 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D D.C. Reserve Fund Policy ................................................................... D-1 Appendix E Local Service Policy .............................................................................E-1 Appendix F Asset Management Plan ....................................................................... F-1 Appendix G Proposed D.C. By-law ......................................................................... G-1 Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx List of Acronyms and Abbreviations A.M.P. Asset management plan C.B.C. Community Benefits Charge D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross floor area LPAT Local Planning Appeal Tribunal LPPL Lincoln Pelham Public Library Board N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O.M.B. Ontario Municipal Board O.P.A. Official Plan Amendment O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit S.D.E. Single detached equivalent S.D.U. Single detached unit S.W.M. Stormwater management sq.ft. square foot sq.m square metre Executive Summary Watson & Associates Economists Ltd. PAGE i H:\LINCOLN\2023 DC\Report\Final Report.docx Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for the Town of Lincoln required by the Development Charges Act, 1997, as amended (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Overview of the legislative requirements of the Act; - Chapter 2 - Review of present D.C. policies of the Town; - Chapter 3 - Summary of the residential and non-residential growth forecasts for the Town; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of future capital requirements to service growth and related deductions and allocations; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and rules; and - Chapter 8 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below. 1) Identify amount, type and location of growth. 2) Identify servicing needs to accommodate growth. 3) Identify capital costs to provide services to meet the needs. 4) Deduct: - Grants, subsidies and other contributions; - Benefit to existing development; - Amounts in excess of 15-year historical service calculation; and - D.C. reserve funds (where applicable); 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs divided by growth to provide the D.C. Watson & Associates Economists Ltd. PAGE ii H:\LINCOLN\2023 DC\Report\Final Report.docx 3. Subsequent to the passage of the Town's 2018 D.C. By-law, the Town undertook a D.C. Update Study in 2022 to pass an amending D.C. By-law to incorporate a number of changes to the D.C.A. as a result of the following Acts (details of each Act are provided in Chapter 1 of this report): - Bill 108: More Homes, More Choice Act, 2019 - Bill 138: Plan to Build Ontario Together Act, 2019 - Bill 197: COVID-19 Economic Recovery Act, 2020 - Bill 213: Better for People, Smarter for Business Act, 2020 Since that time, the Province introduced another set of revisions to the D.C.A. through Bill 23: More Homes Built Faster Act, 2022. Bill 23 was first introduced on October 25, 2022, and received Royal Assent on November 28, 2022. It is noted that, as of the time of writing, the Province has announced (on December 13, 2023) potential changes to the phase-in requirements and the removal of studies as eligible capital costs. The details of these changes will be forthcoming in early 2024 and Watson will monitor and advise as to the nature of these changes. A summary of the changes provided from Bill 23 are outlined below (further details are provided in Chapter 1 of this report): - Additional Residential Unit Exemption: Allowance of a third unit as-of-right; - Removal of Housing as an Eligible D.C. Service; - New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units; Note: Bill 134: Affordable Homes and Good Jobs Act, 2023 was released on September 28, 2023 which proposes a new definition of "affordable" under the D.C.A. and receive Royal Assent on December 4, 2023: - Owned unit (lesser of): cost is less than 30% of the 60th percentile of income for households in the municipality or 90% of the average purchase price as defined in a new Bulletin. - Rental unit (lesser of): rent is less than 30% of the 60th percentile of income for rental households or average market rent set out in a new Bulletin. The exemptions for Affordable Units and Attainable Unit exemptions are not currently in force. These exemptions will be in force upon proclamation and through the release of the Provincial bulletin. Should the Province Watson & Associates Economists Ltd. PAGE iii H:\LINCOLN\2023 DC\Report\Final Report.docx release further information before the D.C. by-law is passed, the Town can amend the D.C. study accordingly. - New Statutory Exemption: Non-Profit Housing; - Historical Level of Service extended to previous 15-year period instead of the previous 10-year period; - Capital Cost definition revised to remove studies and prescribe services for which land or an interest in land will be restricted (nothing prescribed to date); - Mandatory Phase-in of a D.C. passed after January 1, 2022, as follows: o Year 1 - 80% of the maximum charge; o Year 2 - 85% of the maximum charge; o Year 3 - 90% of the maximum charge; o Year 4 - 95% of the maximum charge; and o Year 5 to expiry - 100% of the maximum charge. - D.C. By-law expiry will be a maximum of 10 years after the date the by-law comes into force; - D.C. for Rental Housing developments to receive a discount as follows: o Three or more bedrooms - 25% reduction; o Two bedrooms - 20% reduction; and o All other bedroom quantities - 15% reduction. - Maximum Interest Rate for Installments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications to be set at the average prime rate plus 1%; and - Requirement to Allocate Funds Received - municipalities are required to spend or allocate at least 60% of their reserve fund at the beginning of the year for water, wastewater, and services related to a highway. 4. The growth forecast (Chapter 3) on which the D.C. study is based, projects the following population, housing, and non-residential floor area for the 10-year (2023 to 2032), 20-year (2023 to 2043), and urban 20-year (2023 to 2043) periods. Watson & Associates Economists Ltd. PAGE iv H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table ES-1 Summary of Growth Forecast by Planning Period Town of Lincoln 5. On October 1, 2018, the Town of Lincoln passed By-law 2018-93 under the D.C.A. The by-law imposes D.C.s on residential and non-residential uses. This by-law was amended via By-law 2022-30. The Town is undertaking a D.C. public process and anticipates passing a new by-law on April 15, 2024, with the mandatory public meeting on February 20, 2024. 6. The Town's D.C. currently in effect (as of January 1, 2023) is $33,735 for single detached dwelling units for full services. The non-residential charges are as follows: industrial charge is $91.33 per sq.m, commercial is $219.27 per sq.m, and institutional is $155.90 per sq.m. Additionally, area-specific charges for Campden (stormwater) are $18,511 for a single detached dwelling unit. As the Town's current D.C. by-law is set to index on January 1, 2024, these charges are anticipated to increase by 6.57%. 7. This report has undertaken a recalculation of the charges based on future identified needs (presented in Schedule ES-3 and ES-4 for residential and non- residential). Charges have been provided on a Town-wide basis for all services excluding water, wastewater, and stormwater services, which have been provided on an urban-wide basis. The corresponding single-detached unit charge for full services is $44,138. The corresponding non-residential charges (based on a per square metre of building area) for full services are as follows: primary charge is $34.77 per sq.m, industrial charge is $129.49 per sq.m, commercial is $310.97 per sq.m, and institutional is $230.35 per sq.m. With respect to the area-specific charges for Campden (stormwater) the amount is 10 Year 20 Year Urban 20 Year 2023-2032 2023-2043 2023-2043 (Net) Population Increase 6,195 12,515 11,710 Residential Unit Increase 3,612 7,210 6,910 Non-Residential Gross Floor Area Increase (sq.ft.) 583,700 1,003,300 834,300 Measure Watson & Associates Economists Ltd. PAGE v H:\LINCOLN\2023 DC\Report\Report for Addendum.docx calculated to be $18,776 for a single detached dwelling unit. These rates are submitted to Council for their consideration. 8. The D.C.A. requires a summary be provided of the gross capital costs and the net costs to be recovered over the life of the by-law. This calculation is provided by service and is presented in Table 6-5. A summary of these costs is provided below: Table ES-2 Summary of Expenditures Anticipated Over the Life of the By-law Summary of Expenditures Anticipated Over the Life of the By-law Expenditure Amount Total gross expenditures planned over the next ten years $362,973,134 Less: Benefit to existing development $124,863,179 Less: Post planning period benefit $39,494,300 Less: Ineligible re: Level of Service $542,960 Less: Grants, subsidies and other contributions $6,130,040 Net costs to be recovered from development charges $191,942,656 This suggests that for the non-D.C. cost over the ten-year D.C. by-law (benefit to existing development, and grants, subsidies and other contributions), $131.54 million (or an annual amount of $13.15 million) will need to be contributed from taxes and rates, or other sources. With respect to the post period benefit amount of $39.49 million, it will be included in subsequent D.C. study updates to reflect the portion of capital that benefits growth in the post period D.C. forecasts. Based on the above table, the Town plans to spend $362.97 million over the life of the by-law, of which $191.94 million (53%) is recoverable from D.C.s. Of this net amount, $174.42 million is recoverable from residential development and $17.52 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. 9. Considerations by Council - The background study represents the service needs arising from residential and non-residential growth over the forecast periods. The following services are calculated based on an urban 20-year forecast: Watson & Associates Economists Ltd. PAGE vi H:\LINCOLN\2023 DC\Report\Final Report.docx - Water Services; - Wastewater Services; and - Stormwater Services. The following services are calculated based on a 20-year forecast: - Services Related to a Highway - Roads and Related; - Public Works (Facilities and Fleet); - Fire Protection Services; and - Library Services. The following services are calculated based on a 10-year forecast to 2032: - Parks and Recreation Services. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-law which is appended in Appendix G. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; and - considering reductions in the charge by class of development (obtained by removing certain services on which the charge is based and/or by a general reduction in the charge). Watson & Associates Economists Ltd. PAGE vii H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table ES-3 Schedule of Development Charges Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Studio and 1 Bedroom Special Care/Special Dwelling Units Primary Commercial Industrial Institutional Town-wide Services Services Related to a Highway 17,428 14,422 12,333 7,991 6,680 23.57 141.33 58.88 104.73 Fire Protection Services 3,643 3,015 2,578 1,670 1,396 4.95 29.49 12.27 21.85 Parks and Recreation Services 9,645 7,981 6,825 4,423 3,697 5.70 34.12 14.21 25.30 Library Services 914 756 647 419 350 0.54 3.55 1.51 2.58 Total Town-wide Services 31,630 26,174 22,383 14,503 12,123 34.77 208.50 86.86 154.46 Urban Services Stormwater Drainage and Control Services 2,083 1,724 1,474 955 798 - 17.11 7.10 12.70 Wastewater Services 4,457 3,688 3,154 2,044 1,708 - 36.49 15.18 27.02 Water Services 5,968 4,939 4,223 2,737 2,287 - 48.87 20.34 36.17 Total Urban Services 12,508 10,351 8,851 5,736 4,793 - 102.47 42.63 75.89 Total Town-Wide + Urban 44,138 36,525 31,234 20,239 16,916 34.77 310.97 129.49 230.35 RESIDENTIAL Service NON-RESIDENTIAL (per sq.m of Gross Floor Area) Watson & Associates Economists Ltd. PAGE viii H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table ES-4 Schedule of Development Charges - Campden Area Specific Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Studio and 1 Bedroom Special Care/Special Dwelling Units Primary Commercial Industrial Institutional Campden Area-Specific Stormwater Drainage 18,776 15,538 13,287 8,609 7,196 - - - - Campden Area-Specific 18,776 15,538 13,287 8,609 7,196 - - - - RESIDENTIAL Service NON-RESIDENTIAL (per sq.m of Gross Floor Area) Report Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the D.C.A., as amended, (D.C.A.) (section 10) and, accordingly, recommends new development charges (D.C.s) and policies for the Town of Lincoln. The Town retained Watson & Associates Economists Ltd. (Watson), to undertake the D.C. study process throughout 2023. Watson worked with Town staff in preparing the D.C. analysis and policy recommendations. This D.C. background study, containing the proposed D.C. by-law, will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the Town's D.C. background study, as summarized in Chapter 4. It also addresses the requirement for "rules" (contained in Chapter 7) and the proposed by-law to be made available as part of the approval process (included as Appendix G). In addition, the report is designed to set out sufficient background on the legislation (Chapter 4), Lincoln's current D.C. policies (Chapter 2) and the policies underlying the proposed by-law, to make the exercise understandable to those who are involved. Finally, it addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The chapters in the report are supported by Appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 1.2 Summary of the Process The public meeting required under section 12 of the D.C.A. is scheduled for February 20, 2024. Its purpose is to present the study to the public and to solicit public input. The meeting is also being held to answer any questions regarding the study's purpose, methodology, and the proposed modifications to the Town's D.C.s. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review on December 22, 2023. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at, or immediately following the public meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Figure 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process. Figure 1-1 Schedule of Key D.C. Process Dates for the Town of Lincoln Schedule of Study Milestone Dates 1. Data collection, staff review, engineering work, D.C. calculations and policy work February to November 2023 2. Public release of final D.C. Background study and proposed by-law December 22, 2023 3. Public meeting advertisement placed in newspaper(s) By January 30, 2024 4. Public release of addendum to the D.C. Background Study February 9, 2024 5. Stakeholder Meeting February 14, 2024 6. Public meeting of Council February 20, 2024 7. Council considers adoption of background study and passage of by-law April 15, 2024 8. Newspaper notice given of by-law passage By 20 days after passage 9. Last day for by-law appeal 40 days after passage 10. Town makes pamphlet available (where by-law not appealed) By 60 days after in force date Watson & Associates Economists Ltd. PAGE 1-3 H:\LINCOLN\2023 DC\Report\Final Report.docx 1.3 Changes to the D.C.A.: Bill 108, 138, 197, and 213 1.3.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters On May 2, 2019, the Province introduced Bill 108, which proposed changes to the D.C.A. The Bill was introduced as part of the Province's "More Homes, More Choice: Ontario's Housing Supply Action Plan." The Bill received Royal Assent on June 6, 2019. While having received Royal Assent, many of the amendments to the D.C.A. would not come into effect until they are proclaimed by the Lieutenant Governor (many of these changes were revised through Bill 197). At the time of writing, the following provisions have been proclaimed: - Effective January 1, 2020, rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Interest may be charged on the instalments, and any unpaid amounts may be added to the property and collected as taxes. As per Bill 23, non-profit housing developments are now exempt from paying D.C.s, however, prior to Bill 23, and as a result of Bill 108, non-profit housing developments paid D.C.s in 21 equal annual payments. Effective January 1, 2020, the D.C. amount for all developments occurring within 2 years of a Site Plan or Zoning By-law Amendment planning approval (for application submitted after this section is proclaimed), shall be determined based on the D.C. in effect on the day of Site Plan or Zoning By-law Amendment application. If the development is not proceeding via these planning approvals, then the amount is determined as of the date of issuance of a building permit. On February 28, 2020, the Province released updated draft regulations related to the D.C.A. and the Planning Act. A summary of the changes that were to take effect upon proclamation by the Lieutenant Governor is provided below: Changes to Eligible Services - Prior to Bill 108, the D.C.A. provided a list of ineligible services whereby municipalities could include growth related costs for any service that was not listed. With Bill 108, the changes to the D.C.A. would now specifically list the Watson & Associates Economists Ltd. PAGE 1-4 H:\LINCOLN\2023 DC\Report\Final Report.docx services that are eligible for inclusion in the by-law. Further, the initial list of eligible services under Bill 108 was limited to "hard services", with the "soft services" being removed from the D.C.A. These services would be considered as part of a new community benefits charge (discussed below) imposed under the Planning Act. As noted in the next section this list of services has been amended through Bill 197. Mandatory 10% deduction - The amending legislation would have removed the mandatory 10% deduction for all services that remain eligible under the D.C.A. Remaining Services to be Included in a New Community Benefits Charge (C.B.C.) Under the Planning Act - It was proposed that a municipality may, by by-law, impose a C.B.C. against land to pay for the capital costs of facilities, services and matters required because of development or redevelopment in the area to which the by-law applies. The C.B.C. was proposed to include formerly eligible D.C. services that are not included in the above listing, in addition to parkland dedication and bonus zoning contributions. 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 On November 6, 2019, the Province released Bill 138 which provided further amendments to the D.C.A. and Planning Act. This Bill received Royal Assent on December 10, 2019, and was proclaimed which resulted in sections related to the D.C.A. (schedule 10) becoming effective on January 1, 2020. The amendments to the D.C.A. included removal of instalment payments for commercial and industrial developments that were originally included in Bill 108. 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 In response to the global pandemic that began affecting Ontario in early 2020, the Province released Bill 197 which provided amendments to a number of Acts, including the D.C.A. and Planning Act. This Bill also revised some of the proposed changes identified in Bill 108. Bill 197 was tabled on July 8, 2020, received Royal Assent on July 21, 2020, and was proclaimed on September 18, 2020. The following provides a summary of the changes: Watson & Associates Economists Ltd. PAGE 1-5 H:\LINCOLN\2023 DC\Report\Final Report.docx 1.3.3.1 D.C. Related Changes List of D.C. Eligible Services - As noted above, under Bill 108 some services were to be included under the D.C.A. and some would be included under the C.B.C. authority. Bill 197, however, revised this proposed change and has included all services (with some exceptions) under the D.C.A. These services are as follows: o Water supply services, including distribution and treatment services; o Wastewater services, including sewers and treatment services. o Storm water drainage and control services. o Services related to a highway. o Electrical power services. o Toronto-York subway extension. o Transit services. o Waste diversion services. o Policing services. o Fire protection services. o Ambulance services. o Library services. o Long-term Care services. o Parks and Recreation services, but not the acquisition of land for parks. o Public Health services. o Childcare and early years services. o Housing services (no longer eligible as per Bill 23). o Provincial Offences Act services. o Services related to emergency preparedness. o Services related to airports, but only in the Regional Municipality of Waterloo. o Additional services as prescribed. Classes of Services - D.C. Pre-Bill 108/197 legislation (i.e., D.C.A., 1997) allowed for categories of services to be grouped together into a minimum of two categories (90% and 100% services). Watson & Associates Economists Ltd. PAGE 1-6 H:\LINCOLN\2023 DC\Report\Final Report.docx The Act (as amended) repeals and replaces the above with the four following subsections: - A D.C. by-law may provide for any eligible service or capital cost related to any eligible service to be included in a class, set out in the by-law. - A class may be composed of any number or combination of services and may include parts or portions of the eligible services or parts or portions of the capital costs in respect of those services. - A D.C. by-law may provide for a class consisting of studies in respect of any eligible service whose capital costs are described in paragraphs 5 and 6 of s. 5 of the D.C.A. - A class of service set out in the D.C. by-law is deemed to be a single service with respect to reserve funds, use of monies, and credits. Note: An initial consideration of "class" appears to mean any group of services. Mandatory 10% Deduction As well, the removal of the 10% deduction for soft services under Bill 108 has been maintained. As a result of the passage of Bill 197, and subsequent proclamation on September 18, 2020, this report has provided the D.C. calculations without the 10% mandatory deduction. 1.3.3.2 C.B.C. Related Changes C.B.C. Eligibility The C.B.C. is limited to lower-tier and single-tier municipalities; upper-tier municipalities will not be allowed to impose this charge. 1.3.3.3 Combined D.C. and C.B.C. Impacts D.C. vs. C.B.C. Capital Cost - A C.B.C. may be imposed with respect to the services listed in s. 2 (4) of the D.C.A. (eligible services), "provided that the capital costs that are intended to be Watson & Associates Economists Ltd. PAGE 1-7 H:\LINCOLN\2023 DC\Report\Final Report.docx funded by the community benefits charge are not capital costs that are intended to be funded under a development charge by-law." 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exempt the payment of D.C.s for developments of land intended for use by a university that receives operating funds from the Government. As a result, this mandatory exemption will be included in the D.C. by-law. 1.4 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Bill amends a number of pieces of legislation including the Planning Act and the D.C.A. It is noted that, as of the time of writing, the Province has announced (on December 13, 2023) potential changes to the phase-in requirements and the removal of studies as eligible capital costs. The details of these changes will be forthcoming in early 2024 and Watson will monitor and advise as to the nature of these changes. The following provides a summary of the changes to the D.C.A.: 1.4.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the creation of the greater of one unit or 1% of the existing residential units will be exempt from a D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; Watson & Associates Economists Ltd. PAGE 1-8 H:\LINCOLN\2023 DC\Report\Final Report.docx o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. 1.4.2 Removal of Housing as an Eligible D.C. Service Housing services are removed as an eligible service. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. 1.4.3 New Statutory Exemption for Non-Profit Housing Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. 1.4.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units Affordable units, attainable units, and inclusionary zoning units (affordable) are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. o Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Watson & Associates Economists Ltd. PAGE 1-9 H:\LINCOLN\2023 DC\Report\Final Report.docx Further to the above, Bill 134: Affordable Homes and Good Jobs Act, 2023 was released on September 28, 2023 which proposes a new definition of "affordable" under the D.C.A. and receive Royal Assent on December 4, 2023: - Owned unit (lesser of): cost is less than 30% of the 60th percentile of income for households in the municipality or 90% of the average purchase price as defined in a new Bulletin - Rental unit (lesser of): rent is less than 30% of the 60th percentile of income for rental households or average market rent set out in a new Bulletin Note: the above exemptions are not currently in force. These exemptions will be in force upon proclamation and revisions to the regulations. The bulletin has yet to be published as at the time of writing this report. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.4.5 Historical Level of Service Extended to Previous 15-Year Period Prior to Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. 1.4.6 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act may prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed. 1.4.7 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. Watson & Associates Economists Ltd. PAGE 1-10 H:\LINCOLN\2023 DC\Report\Final Report.docx 1.4.8 D.C. By-law Expiry A D.C. by-law now expires 10 years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's life from five (5) years, prior to Bill 23. 1.4.9 Installment Payments Non-profit housing development has been removed from the instalment payment section of the Act (section 26.1), as these units are now exempt from the payment of a D.C. 1.4.10 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. 1.4.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by- law amendment applications occurring after November 28, 2022. 1.4.12 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities will be required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Other services may be prescribed by the regulation. Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 2 Current Town of Lincoln D.C. Policies Watson & Associates Economists Ltd. PAGE 2-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 2. Current Town of Lincoln D.C. Policies 2.1 Schedule of Charges On October 1, 2018, the Town of Lincoln passed By-law, 2018-93 under the D.C.A. This by-law was amended via By-law 2022-30. These by-laws impose D.C.s for residential and non-residential uses. The table below provides the rates currently in effect, as of January 1, 2023. Table 2-1 Town of Lincoln Current D.C. Rates January 1, 2023 2.2 Services Covered The following services are covered under By-law 2018-93, as amended: - Services Related to a Highway; - Fire Protection Services; - Parks and Recreation Services; - Library Services; - Growth Studies; - Stormwater Drainage and Control Services; - Stormwater Drainage (Campden); - Wastewater Services; and Service Single & Semi Detached Multiples Apartments 2 Bedrooms + Apartments Bachelor and 1 Bedroom Special Care/Special Dwelling Units Commercial Industrial Institutional Town-Wide Services: Services Related to a Highway 12,002 9,699 8,082 4,929 4,043 92.95 38.95 66.57 Fire Protection Services 1,978 1,598 1,333 812 666 15.55 6.47 10.95 Parks and Recreation Services 9,775 7,899 6,582 4,015 3,291 11.33 4.60 8.09 Library Services 682 551 459 280 230 0.75 0.50 0.62 Growth Studies 2,095 1,694 1,410 861 706 14.94 6.35 10.70 Total Town-Wide Services 26,532 21,441 17,866 10,897 8,936 135.52 56.87 96.93 Urban Services: Stormwater Drainage and Control Services 2,263 1,830 1,526 929 761 43.43 17.92 30.48 Wastewater Services 3,419 2,763 2,303 1,405 1,151 28.00 11.44 19.66 Water Services 1,521 1,230 1,024 624 512 12.32 5.10 8.83 Total Urban Services 7,203 5,823 4,853 2,958 2,424 83.75 34.46 58.97 Grand Total Town + Urban 33,735 27,264 22,719 13,855 11,360 219.27 91.33 155.90 Campden Area Specific: Stormwater Drainage 18,511 14,957 12,464 7,603 6,232 - - - Non-Residential ($ per sq.m. of Gross Floor Area) Residential ($ per Unit) Watson & Associates Economists Ltd. PAGE 2-2 H:\LINCOLN\2023 DC\Report\Final Report.docx - Water Services. 2.3 Timing of D.C. Calculation and Payment Development charges shall be calculated and payable in full in money or by provision of services as may be agreed upon, or by credit granted under the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies. 2.4 Indexing Rates shall be adjusted, without amendment to the By-law, annually on January 1, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02).1 2.5 Redevelopment Allowance In the case of the re-development involving the demolition and replacement of all or part of a building or structure: 1) a redevelopment credit shall be allowed, provided that the singular and certain parcel of land was improved by occupied structures within the last five years prior to the issuance of the building permit required by the development, and the building permit for the development has been issued within five years from the date the demolition permit has been issued; and 2) if a development on a singular and certain parcel of land involves the demolition and replacement of a building or structure, or the conversion from one principal use to another, a redevelopment credit shall be allowed equivalent to: 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 2-3 H:\LINCOLN\2023 DC\Report\Final Report.docx a. the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable, and/or b. the gross floor area of the building demolished/ converted multiplied by the current non-residential development charge in place at the time the development charge is payable. Provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. 2.6 Exemptions The following non-statutory exemptions are provided under By-law 2018-93, as amended: - lands, buildings, or structures used or to be used for a place of worship or for the purposes of a cemetery or burial ground exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended; - the development of non-residential farm buildings for farming activities; - the development of a farm help house within a farm building; - granny flats; - parking structures; - elevators and elevator machine rooms; and - canopies. Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 3 Anticipated Development in the Town of Lincoln Watson & Associates Economists Ltd. PAGE 3-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 3. Anticipated Development in the Town of Lincoln 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the Town will be required to provide services over a 10-year (2023 to 2033), and a longer-term (2023 to 2043) time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the Town over the forecast period, including: - Niagara Official Plan, November 4, 2022; - Niagara Region Official Plan, PDS 17-2022, 2051 Land Needs Assessment, June 2022, Hemson Consulting Ltd.; - Town of Lincoln Official Plan, Approved November 2016 and Consolidated December 2018; - Town of Lincoln 2018 Development Charges Background Study Consolidated Report, November 30, 2018, and 2022 Development Charges Update Study, March 1, 2022, by Watson & Associates Economists Ltd. - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential building permit data over the 2013 to 2022 period; - Residential and non-residential supply opportunities as identified by Town of Lincoln staff; and - Discussions from Town staff regarding anticipated residential and non-residential development in the Town of Lincoln. Watson & Associates Economists Ltd. PAGE 3-2 H:\LINCOLN\2023 DC\Report\Final Report.docx 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the Town and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, population in the Town of Lincoln (excluding census undercount) is anticipated to reach approximately 32,360 by mid-2033 and 38,680 by mid-2043, resulting in an increase of approximately 6,200 and 12,520 persons, respectively. 1 Figure 3-1 Population and Household Forecast Model 1 The population figures used in the calculation of the 2023 D.C. exclude the net Census undercount, which is estimated at approximately 2.5%. Population figures presented herein have been rounded. Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, Region and Provincial Forecast of Residential Units Watson & Associates Economists Ltd. PAGE 3-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 3-1 Town of Lincoln Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.5% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes studio, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived from Niagara Region Official Plan, PDS 17-2022, 2051 Land Needs Assessment, June 2022, Hemson Consulting Ltd., and discussions with Town of Lincoln staff regarding servicing and land supply by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 23,060 22,487 782 21,705 6,675 920 486 79 8,160 711 2.756 24,390 23,787 837 22,950 6,985 1,160 505 65 8,715 761 2.729 26,370 25,719 779 24,940 7,350 1,485 665 55 9,555 708 2.692 26,830 26,169 794 25,375 7,457 1,564 716 55 9,792 722 2.672 33,190 32,364 984 31,380 8,045 2,366 2,765 55 13,231 895 2.446 39,670 38,684 1,169 37,515 8,339 2,766 5,501 55 16,661 1,063 2.322 1,330 1,300 55 1,245 310 240 19 -14 555 50 1,980 1,932 -58 1,990 365 325 160 -10 840 -53 460 450 15 435 107 79 51 0 237 14 6,360 6,195 190 6,005 588 802 2,049 0 3,439 173 12,840 12,515 375 12,140 882 1,202 4,785 0 6,869 341 Forecast Incremental Mid 2043 Mid 2021 - Mid 2023 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Mid 2023 - Mid 2043 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Mid 2023 Mid 2033 Mid 2023 - Mid 2033 Watson & Associates Economists Ltd. PAGE 3-4 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure 3-2 Township of Lincoln Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from Town of Lincoln building permit data, 2013 to 2022. 185 121 84 85 159 369 548 268 203 34 345 344 344 344 344 344 344 344 343 343 343 343 343 343 343 343 343 343 343 343 0 100 200 300 400 500 600 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE 3-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Provided below is a summary of the key assumptions and findings regarding the Town of Lincoln D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, 6 and 7) - The housing unit mix for the Town was derived from a detailed review of historical development activity (as per Schedule 7), as well as active residential development applications (as per Schedule 6) and discussions with Town staff regarding anticipated development trends for the Town of Lincoln. - Based on the above indicators, the 2023 to 2043 household growth forecast for the Town is comprised of a unit mix of 13% low density units (single detached and semi-detached), 17% medium density (multiples except apartments) and 70% high density (studio, 1-bedroom and 2- bedroom apartments). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the Town of Lincoln - In accordance with forecast demand and available land supply, the amount and percentage of forecast housing growth between 2023 and 2043 by development location is summarized below. Table 3-2 Town of Lincoln Geographic Location of Residential Development Development Location Amount of Housing Growth, 2023 to 2043 Percentage of Housing Growth, 2023 to 2043 Beamsville 2,900 42% Prudhommes 2,920 42% Campden 120 2% Remaining Urban Area 630 9% Watson & Associates Economists Ltd. PAGE 3-6 H:\LINCOLN\2023 DC\Report\Final Report.docx Development Location Amount of Housing Growth, 2023 to 2043 Percentage of Housing Growth, 2023 to 2043 Total Urban Area 6,570 96% Rural Area 300 4% Town of Lincoln 6,870 100% Note: Figures may not sum precisely due to rounding. 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2043 in the Town of Lincoln over the forecast period is presented in Table 3-1. Over the 2023 to 2043 forecast period, the Town is anticipated to average approximately 685 new housing units per year. - Institutional population 1 is anticipated to increase by approximately 380 people between 2023 to 2043. - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the Town of Lincoln. Due to data limitations high density P.P.U. data was derived from the Region of Niagara. The total calculated 1 Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-7 H:\LINCOLN\2023 DC\Report\Final Report.docx P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 2.883 o Medium density: 2.161 o High density: 1.763 5. Existing Units and Population Change (Appendix A - Schedules 3, 4, and 5) - Existing households for mid-2023 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.1 The forecast population change in existing households over the 2023 to 2043 forecast period is forecast to decline by approximately 1,680. 6. Employment (Appendix A - Schedules 10a, 10b and 10c) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in the Town divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data 2,3 (place of work) for the Town of Lincoln is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-8 H:\LINCOLN\2023 DC\Report\Final Report.docx o 1,145 primary (12%); o 1,130 work at home employment (12%); o 2,700 industrial (28%); o 2,670 commercial/population-related (28%); and o 1,945 institutional (20%). - The 2016 employment by usual place of work, including work at home, is 9,590. An additional 1,3100 employees have been identified for the Town of Lincoln in 2016 that have no fixed place of work (N.F.P.O.W.).1 - Total employment, including work at home and N.F.P.O.W. for the Town of Lincoln is anticipated to reach approximately 13,300 by mid-2033 and 14,360 by mid-2043. This represents an employment increase of approximately 1,330 for the 10-year forecast period and 2,390 for the longer-term forecast period. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the Town of Lincoln (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 9,990 by mid-2033 and 10,710 by mid-2043. This represents an employment 1 No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Watson & Associates Economists Ltd. PAGE 3-9 H:\LINCOLN\2023 DC\Report\Final Report.docx increase of approximately 900 for the 10-year forecast period and 1,630 for the longer-term forecast period. 1 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 10b) - Square footage estimates were calculated in Schedule 10b based on the following employee density assumptions: o 3,000 sq.ft. per employee for primary; o 1,200 sq.ft. per employee for industrial; o 500 sq.ft. per employee for commercial/population-related; and o 675 sq.ft. per employee for institutional employment. - The Town-wide incremental G.F.A. is anticipated to increase by 383,700 sq.ft. over the 10-year forecast period and 1,003,300 sq.ft. over the longer-term forecast period. - In terms of percentage growth, the 2023 to 2043 incremental G.F.A. forecast by sector is broken down as follows: o Primary - 14% o industrial - 14%; o commercial/population-related - 44%; and o institutional - 28%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 10c) - Schedule 10c summarizes the anticipated amount, type and location of non-residential development by servicing area for the Town of Lincoln by area. - The amount and percentage of forecast total non-residential growth between 2023 and 2043 by development location is summarized below. 1 G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 10a and 10b. Total employment growth in Schedule 10b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. Total employment in Schedule 10b is anticipated to reach approximately 9,900 by mid-2033 and 10,530 by mid-2043. Watson & Associates Economists Ltd. PAGE 3-10 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 3-3 Town of Lincoln Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2023 to 2043 Percentage of Non- Residential G.F.A., 2023 to 2043 Beamsville 567,600 57% Prudhommes 239,900 24% Campden 0 0% Remaining Urban Area 26,700 3% Total Urban Area 834,300 83% Rural Area 169,000 17% Town of Lincoln 1,003,300 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within the Town. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the Town's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that Town Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure 4-1 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 15. 16. 13. 14. 9. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services Financially Sustainable 7a. Transit Services Detailed Requirements 7b. 10. Municipal Services 2. Eligible Services Ineligible Services Tax Base, User Rates, etc. Watson & Associates Economists Ltd. PAGE 4-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 1. Services Related to a Highway Yes 1.1 Arterial roads 100 Yes 1.2 Collector roads 100 Yes 1.3 Bridges, culverts and roundabouts 100 No 1.4 Local municipal roads 0 Yes 1.5 Traffic signals 100 Yes 1.6 Sidewalks and streetlights 100 Yes 1.7 Active transportation 100 2. Other Transportation Services n/a 2.1 Transit vehicles1 & facilities 100 n/a 2.2 Other transit infrastructure 100 Ineligible 2.3 Municipal parking spaces - indoor 0 Ineligible 2.4 Municipal parking spaces - outdoor 0 Yes 2.5 Works yards 100 Yes 2.6 Rolling stock1 100 n/a 2.7 Ferries 100 n/a 2.8 Airport 100 3. Stormwater Drainage and Control Services Yes 3.1 Main channels and drainage trunks 100 Yes 3.2 Channel connections 100 Yes 3.3 Retention/detention ponds 100 1 with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-4 H:\LINCOLN\2023 DC\Report\Final Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 4. Fire Protection Services Yes 4.1 Fire stations 100 Yes 4.2 Fire pumpers, aerials and rescue vehicles1 100 Yes 4.3 Small equipment and gear 100 5. Park Services (i.e., Parks and Open Space) Ineligible 5.1 Acquisition of land for parks, woodlots and E.S.A.s 0 Yes 5.2 Development of area municipal parks 100 Yes 5.3 Development of district parks 100 Yes 5.4 Development of municipal- wide parks 100 Yes 5.5 Development of special purpose parks 100 Yes 5.6 Parks rolling stock1 and yards 100 6. Recreation Services Yes 6.1 Arenas, indoor pools, fitness facilities, community centres, etc. (including land) 100 Yes 6.2 Recreation vehicles and equipment1 100 7. Library Services Yes 7.1 Public library space (incl. furniture and equipment) 100 Yes 7.2 Library vehicles1 100 Yes 7.3 Library materials 100 8. Emergency Preparedness Services No 8.1 Facility space (incl. furniture and equipment) 100 No 8.2 Vehicles1 100 No 8.3 Equipment 100 9. Electrical Power Services Ineligible 9.1 Electrical substations 0 Ineligible 9.2 Electrical distribution system 0 Ineligible 9.3 Electrical system rolling stock 0 1 with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 10. Provision of Cultural, Entertainment and Tourism Facilities and Convention Centres Ineligible 10.1 Cultural space (e.g., art galleries, museums and theatres) 0 Ineligible 10.2 Tourism facilities and convention centres 0 11. Wastewater Services n/a 11.1 Treatment plants 100 Yes 11.2 Sewage trunks 100 n/a 11.3 Local systems 0 Yes 11.4 Vehicles and equipment1 100 12. Water Supply Services n/a 12.1 Treatment plants 100 Yes 12.2 Distribution systems 100 n/a 12.3 Local systems 0 Yes 12.4 Vehicles and equipment1 100 13. Waste Management Services Ineligible 13.1 Landfill collection, transfer vehicles and equipment 0 Ineligible 13.2 Landfills and other disposal facilities 0 n/a 13.3 Waste diversion facilities 100 n/a 13.4 Waste diversion vehicles and equipment1 100 14. Policing Services n/a 14.1 Policing detachments 100 n/a 14.2 Policing rolling stock1 100 n/a 14.3 Small equipment and gear 100 15. Homes for the Aged n/a 15.1 Homes for the aged space 100 n/a 15.2 Vehicles1 100 16. Child Care n/a 16.1 Child-care space 100 n/a 16.2 Vehicles1 100 17. Health n/a 17.1 Health department space 100 n/a 17.2 Health department vehicles1 100 18. Social Housing n/a 18.1 Social housing space 0 19. Provincial Offences Act (P.O.A.) n/a 19.1 P.O.A. space 100 20. Social Services Ineligible 20.1 Social service space 0 1 with 7+ year lifetime Watson & Associates Economists Ltd. PAGE 4-6 H:\LINCOLN\2023 DC\Report\Final Report.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components Maximum Potential D.C. Recovery % 21. Ambulance n/a 21.1 Ambulance station space 100 n/a 21.2 Vehicles1 100 22. Hospital Provision Ineligible 22.1 Hospital capital contributions 0 23. Provision of Headquarters for the General Administration of Municipalities and Area Municipal Boards Ineligible 23.1 Office space 0 Ineligible 23.2 Office furniture 0 Ineligible 23.3 Computer equipment 0 24. Other Services Ineligible 24.1 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land and facilities, including the D.C. background study cost 0 Yes 24.2 Interest on money borrowed to pay for growth-related capital 0-100 1 with a 7+ year lifetime 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The Town's detailed Local Service Policy is provided in Appendix E. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two Watson & Associates Economists Ltd. PAGE 4-7 H:\LINCOLN\2023 DC\Report\Final Report.docx potential cost reductions and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; and e) interest on money borrowed to pay for the above-referenced costs; In order for an increase in need for service to be included in the D.C. calculation, Town Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the Town's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that "the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a Watson & Associates Economists Ltd. PAGE 4-8 H:\LINCOLN\2023 DC\Report\Final Report.docx funding shortfall with respect to future service needs. Outstanding credit obligations have been included in the D.C. calculations. 4.7 Classes of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible service. These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and by-law provided herein do not include a class of service. 4.8 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in the future. For services that are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the future forecast periods, which underlie the D.C. calculation herein. The alternative would involve the Town spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the Town will use these reserve funds for the Town's cost share of applicable development-related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development that contributed them Watson & Associates Economists Ltd. PAGE 4-9 H:\LINCOLN\2023 DC\Report\Final Report.docx (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The Town's D.C. Reserve Fund balances by service as of December 31, 2022, are shown below: Table 4-2 Summary of Development Charges Reserve Fund Balances As of December 31, 2022 Note: Amounts in brackets are deficit balances. 4.9 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. 4.9.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the Service Ending Balance as of December 31, 2022 Commitments / Adjustments Adjusted Totals Services Related to a Highway 5,362,243 (1,547,470) 3,814,773 Fire Protection Services (749,664) (90,000) (839,664) Parks and Recreation Services (1,938,181) - (1,938,181) Library Services 230,961 - 230,961 Stormwater Drainage and Control Services (3,688,132) (249,640) (3,937,772) Wastewater Services 898,709 (199,330) 699,379 Water Services 866,154 - 866,154 *Note: The Town also has a balance of ($423,683) in the Growth Studies D.C. Reserve Fund and $103,204 in the Parking Spaces D.C. Reserve Fund, however these are no longer D.C. eligible services. Watson & Associates Economists Ltd. PAGE 4-10 H:\LINCOLN\2023 DC\Report\Final Report.docx background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the average cost of providing such units based on replacement costs, engineering standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. With respect to transit services, the changes to the Act introduced in 2015 have provided for an alternative method for calculating the service standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.9.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the Town's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. Watson & Associates Economists Ltd. PAGE 4-11 H:\LINCOLN\2023 DC\Report\Final Report.docx 4.9.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. Alternatively, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a Town-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users Watson & Associates Economists Ltd. PAGE 4-12 H:\LINCOLN\2023 DC\Report\Final Report.docx from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.10 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area rating. Further discussion is provided in section 7.4.4 of this report. 4.11 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. 4.12 Asset Management The legislation now requires that a D.C. background study must include an asset management plan (A.M.P.) (subsection 10 (2) c. 2). The A.M.P. must deal with all Watson & Associates Economists Ltd. PAGE 4-13 H:\LINCOLN\2023 DC\Report\Final Report.docx assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches, and policies on the asset management planning. This examination has been included in Appendix F. 4.13 Transit The D.C.A. provides for the following matters for Transit: - The Background Study requires the following in regard to transit costs (as per subsection 8 (2) of the Regulations): o The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. i. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, ii. the anticipated development over the 10-year period immediately following the preparation of the background study, or iii. the anticipated development after the 10-year period immediately following the preparation of the background study. o An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. o An assessment of ridership forecasts for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. o An assessment of the ridership capacity for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study. - A forward-looking service standard (as per 6.1(2) of the Regulations): o The service is a discrete service. Watson & Associates Economists Ltd. PAGE 4-14 H:\LINCOLN\2023 DC\Report\Final Report.docx o No portion of the service that is intended to benefit anticipated development after the 10-year period immediately following the preparation of the background study may be included in the estimate. o No portion of the service that is anticipated to exist as excess capacity at the end of the 10-year period immediately following the preparation of the background study may be included in the estimate. - A detailed asset management strategy and reporting requirements (subsection 6.1 (3) of the Regulation) that includes lifecycle costs, action plans that will enable the assets to be sustainable, summary of how to achieve the proposed level of service, discussion on procurement measures and risk. The Town does not currently have local transit services, and in the near future does not intend to consider the implementation of any local transit services. Therefore, the above calculations and reporting requirements are not required. 4.14 Mandatory Phase-in of a D.C. As described in Chapter 1, all D.C. by-laws passed after January 1, 2022, the charge must be phased-in relative to the maximum charge that could be imposed under the by- law. The phase-in for the first 5-years that the by-law is in force, is as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. As noted in section 1.4, as of the time of writing, the Province has announced (on December 13, 2023) potential changes to the phase-in requirements. The details of these changes will be forthcoming in early 2024 and Watson will monitor and advise as to the nature of these changes. Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: - the service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts (note that this is not required for stormwater, water, or wastewater); and - the infrastructure cost calculation, which determines the potential D.C. recoverable cost. The nature of the capital projects and timing identified in the Chapter reflects Council's current intention. Over time, however, Town projects and Council priorities change; accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and 10-Year Capital Costs for Lincoln's D.C. Calculation This section evaluates the development-related capital requirements for parks and recreation services over a Town-wide 10-year planning period from 2023 to 2032. 5.2.1 Parks and Recreation Services The Town currently has 244.63 acres of parkland within its jurisdiction. The parkland consists of various neighbourhood, community, destination, sports parks, natural and open space, and parks within schools. The Town's level of service over the historical 15-year period (2008-2022) equals an average of 10 acres of parkland per 1,000 population, or an investment of $1,611 per capita. Over the forecast period the Town would be eligible to collect approximately $9.98 million from D.C.s for parkland development. Watson & Associates Economists Ltd. PAGE 5-2 H:\LINCOLN\2023 DC\Report\Final Report.docx With respect to recreation facilities, there are currently 11 facilities provided by the Town including the Jordan Arena, Lincoln Centre, and Fleming Memorial Arena/Centre, etc. In total, these facilities provide the Town with 122,474 sq.ft. of recreation facility space. Based on the inventory of space over the historical 15-year period (2008 to 2022), the Town has provided an average of approximately 4.64 sq.ft. of space per capita or an investment of $2,472 per capita. Over the forecast period the Town would be eligible to collect approximately $15.32 million from D.C.s for recreation facility space. The Town also maintains and operates a fleet of 96 vehicles and equipment, which has an estimated replacement value of approximately $1.98 million. This results in a calculated average level of service for the historical 15-year period of $82 per capita, providing a D.C. eligible amount over the forecast period of $506,132. In total, the Town is eligible to collect approximately $25.80 million for parks and recreation services. Based on the projected growth over the 2023 to 2032 forecast period, the Town has identified future capital needs totaling approximately $59.33 million, with approximately $24.20 million benefiting existing development and approximately $10.39 million being attributed to growth outside the 10-year forecast period. These capital needs include various parkland development projects, park naturalizations, Victoria waterfront / Prudhommes municipal facility space, new office space at Town Hall, and the parks portion of a new works yard, etc. A further deduction of $635,040 has been made to recognize the Region's contribution and a grant the Town received for the Sho'arishon Park (Jordan Hollow) project. Recoveries of $119,199 and approximately $1.94 million were added to the calculations to recognize outstanding credits and the Town's reserve fund deficit, respectively. Therefore the total net growth capital cost included in the D.C. for parks and recreation services is approximately $26.16 million. As the predominant users of parks and recreation tend to be residents of the Town, the forecast growth-related costs have been allocated 95% to residential development and 5% to non-residential development. Watson & Associates Economists Ltd. PAGE 5-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-1 Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2023-2032 95% 5% 1 Charles Daley Park 2027-2029 3,650,000 - 3,650,000 2,445,500 1,204,500 1,144,275 60,225 2 Prudhommes Waterfront Park 2027-2029 7,000,000 - 7,000,000 - 7,000,000 6,650,000 350,000 3 Hilary Bald Park 2033+ 4,948,400 1,237,100 3,711,300 3,711,300 - - - 4 Meadowood Park 2033+ 727,700 545,800 181,900 181,900 - - - 5 Beamsville Lions Park 2030 2,000,000 - 2,000,000 1,500,000 500,000 475,000 25,000 6 Naturalization Park Development 2026-2028 150,000 - 150,000 112,500 37,500 35,625 1,875 7 Provision for Additional Vehicles and Equipment 2023-2032 1,500,000 - 1,500,000 - 1,500,000 1,425,000 75,000 8 Victoria Waterfront / Prudhommes Precinct Municipal Service Location 2023 390,000 - 390,000 - 390,000 370,500 19,500 9 New Office Space (Town Hall) - Parks and Recreation Potion 2028-2032 4,224,000 1,170,900 3,053,100 2,449,900 603,200 573,040 30,160 10 New Works Yard - Parks and Recreation Portion 2028-2032 10,440,000 4,422,900 6,017,100 3,738,700 2,278,400 2,164,480 113,920 11 Jordan Lions Park Renewal 2030 20,120,000 3,018,000 17,102,000 10,060,000 7,042,000 6,689,900 352,100 12 Sho'arishon Park (Jordan Hollow) 2023-2024 718,040 - 718,040 - 635,040 83,000 78,850 4,150 13 New Tandem Landscape Trailer 2025 10,500 - 10,500 - 10,500 9,975 525 14 New Kubota Mowers (2) 2025-2030 38,000 - 38,000 - 38,000 36,100 1,900 15 Campden Park Construction 2026-2027 500,000 - 500,000 - 500,000 475,000 25,000 Gross Capital Cost Estimate (2023$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-4 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-1 (Continued) Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2023-2032 95% 5% 16 Fleming Centre Land Debenture - Principal 2023 144,507 - 144,507 - 144,507 137,282 7,225 17 Fleming Centre Land Debenture - Interest (Discounted) 2023 5,419 - 5,419 - 5,419 5,148 271 18 Fleming Centre Construction Debenture - Principal 2023 2,365,486 - 2,365,486 - 2,365,486 2,247,212 118,274 19 Fleming Centre Construction Debenture - Interest (Discounted) 2023 396,382 - 396,382 - 396,382 376,563 19,819 Outstanding Credit 119,199 - 119,199 - 119,199 113,239 5,960 Reserve Fund Adjustment 1,938,181 - 1,938,181 - 1,938,181 1,841,271 96,909 Total 61,385,815 10,394,700 - 50,991,115 24,199,800 635,040 26,156,275 24,848,461 1,307,814 Gross Capital Cost Estimate (2023$) Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-5 H:\LINCOLN\2023 DC\Report\Final Report.docx 5.3 Service Levels and 20-Year Capital Costs for Lincoln's D.C. Calculation This section evaluates the development-related capital requirements for services related to a highway - roads and related, public works (facilities and fleet), fire services, and library services over a Town-wide 20-year planning period from 2023 to 2043. 5.3.1 Services Related to a Highway Roads and Related The Town of Lincoln currently owns and maintains: - 218 km of 2-lane rural roads; - 74 km of 2-lane urban roads; - 58 vehicular bridges; - 10 culverts greater than 3m; and - 10 culverts less than 3m. The level of service provided over the historical 15-year period translates to an average investment of $54,500 per capita and a maximum D.C. eligible amount of approximately $682.07 million for recovery over the forecast period. The Town has identified future capital needs totaling approximately $151.42 million of which approximately $56.90 million is attributable to existing development. These capital projects include road reconstructions, upgrades, sidewalks, a traffic light, and bridge and culvert replacements. A deduction of $843,800 has been made for the share of the projects that benefit growth outside the forecast period. A deduction of approximately $3.81 million has been made from the calculations to reflect the balance in the D.C. reserve fund. Additionally deductions of $542,960 and approximately $2.98 million have been made to account for the amount the Town has previously spent and grants the Town has received for these projects, respectively. The resulting net growth- related amount of approximately $86.35 million is being included in the D.C. calculations. The residential/non-residential capital cost allocation for service related to a highway - roads and related is based on the ratio of the anticipated population and employment Watson & Associates Economists Ltd. PAGE 5-6 H:\LINCOLN\2023 DC\Report\Final Report.docx growth over the urban 20-year forecast period. This results in 90% being allocated to residential development and 10% to non-residential development. Watson & Associates Economists Ltd. PAGE 5-7 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-2 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 1 23rd St. (Culp Rd. to Menno St.) 2033-2035 2,000,000 - 2,000,000 600,000 1,400,000 1,260,000 140,000 2 4th Ave (19th St. to Jordan Rd.) 2030-2032 4,400,000 - 4,400,000 1,320,000 3,080,000 2,772,000 308,000 3 Aberdeen Rd. (King St. to Hillside Dr.) 2024 4,372,000 - 4,372,000 2,028,500 315,000 2,028,500 1,825,650 202,850 4 Bartlett Rd. (King St. to South Service Rd.) 2027-2029 14,550,000 - 56,390 14,493,610 7,246,800 7,246,810 6,522,129 724,681 5 Campden Rd ( Urban Boundary) 2030-2032 2,970,000 - 2,970,000 742,500 2,227,500 2,004,750 222,750 6 Glendale (King to Rittenhouse) 2039-2042 1,037,500 - 1,037,500 1,037,500 - - - 7 Greenlane Road Reconstruction (Lincoln Ave to Bartlett Rd) 2025-2027 9,000,000 - 9,000,000 - 9,000,000 8,100,000 900,000 8 William St. Neighbourhood Reconstruction 2026-2028 9,087,500 - 9,087,500 4,543,800 4,543,700 4,089,330 454,370 9 Hillside Dr. (Ashby to Aberdeen) 2024 1,225,000 - 74,146 1,150,854 345,300 805,554 724,998 80,555 10 Lincoln Av Road Reconstruction (Oakwood to South Service Rd) 2024 8,106,350 - 44,291 8,062,059 3,153,500 1,755,000 3,153,559 2,838,203 315,356 11 King St Sidewalks & Streetscape (Vineland) (Town's Share) 2025 5,500,000 - 5,500,000 4,950,000 550,000 495,000 55,000 12 Menno St Road Reconstruction (23rd to Victoria) 2031-2032 2,310,000 - 2,310,000 1,155,000 1,155,000 1,039,500 115,500 13 Greenlane Reconstruction Phase 1 (Lincoln Ave to King St. includes MUP on King) 2025 12,393,821 - 165,426 12,228,395 2,830,800 905,000 8,492,595 7,643,335 849,259 14 Greenlane Ph2&Ph3 Reconstruction (Konkle- Bartlett) 2025 9,860,000 - 9,860,000 2,465,000 7,395,000 6,655,500 739,500 15 Durham Rd Upgrade to Industrial Standard (King St to South Service Rd) 2024 3,853,757 - 37,882 3,815,875 954,000 2,861,875 2,575,688 286,188 16 Union Rd Upgrade to Industrial Standard (Bartlett Rd to Ontario St) 2030 2,612,500 - 2,612,500 2,090,000 522,500 470,250 52,250 17 Provision for road improvements as a result of agri-tourism 2023-2042 4,975,000 - 4,975,000 - 4,975,000 4,477,500 497,500 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-8 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-2 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 18 Red Maple Ave Road Reconstruction (Bridgeport Dr to Jordan Road) 2023-2026 2,350,000 - 164,824 2,185,176 721,100 1,464,076 1,317,668 146,408 19 North Service Road Sidewalk & Streetscaping (Rural project with Town cost share assumed at 50%) - West of Prudhommes to Victoria Avenue 2026-2031 2,362,500 - 2,362,500 - 2,362,500 2,126,250 236,250 20 Enhanced Road Directional Signage 2024-2025 118,800 - 118,800 59,400 59,400 53,460 5,940 21 Greenlane - Victoria Avenue to Bartlett Road (widen for AT - key east/west connector and bring it up to hotmix standard) (Includes culvert work) 2027-2030 2,500,000 - 2,500,000 625,000 1,875,000 1,687,500 187,500 22 Rose Ave and Hillview Drive (Rose Ave to King Street) 2035-2037 1,037,500 - 1,037,500 103,800 933,700 840,330 93,370 23 Hixon Street Road Reconstruction (Hillside to South Limits) 2039-2042 2,000,000 750,000 1,250,000 500,000 750,000 675,000 75,000 24 Thirty Road from King Street to South Limit 2028 4,500,000 - 4,500,000 4,050,000 450,000 405,000 45,000 25 19th St. (St. Johns Drive to King Street) 2029-2032 1,900,000 - 1,900,000 570,000 1,330,000 1,197,000 133,000 26 19th St WM & Road Reconstruction (4th-Red Maple) 2030-2033 4,070,000 - 4,070,000 1,221,000 2,849,000 2,564,100 284,900 27 23rd Street (Menno St to King St) 2028-2031 3,125,000 - 3,125,000 1,562,500 1,562,500 1,406,250 156,250 28 Jordan Station Rd Reconstruction & WM Replacement 2029 3,201,000 - 3,201,000 1,408,400 1,792,600 1,613,340 179,260 Traffic Lights 29 Bartlett Rd. @ John St. 2025-2026 450,000 - 450,000 45,000 405,000 364,500 40,500 Sidewalks 30 Ontario St. E/S (150m South of SSR to Greenlane) 2030 187,500 - 187,500 18,800 168,700 151,830 16,870 31 Mountain St (Cassandra to Hillside) 2023-2028 196,875 - 196,875 19,700 177,175 159,458 17,718 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-9 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-2 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 32 Victoria Ave (West Side Culp to 140m South of CNR Tracks) 2033 290,625 - 290,625 145,300 145,325 130,793 14,533 33 King St (North Side 125m east of Cherry Heights to Bartlett Rd) 2030 80,000 - 80,000 8,000 72,000 64,800 7,200 34 King Street (South Side Urban Limit to Nineteenth Street) 2024 150,000 - 150,000 - 150,000 135,000 15,000 35 Fly Rd Campden New s/w extending the current east limits (north Side) 2028-2030 225,000 - 225,000 45,000 180,000 162,000 18,000 36 Edelheim Road Sidewalk Construction (Extension from existing to Hixon) 2035-2040 150,000 75,000 75,000 - 75,000 67,500 7,500 37 Miller Av Sidewalk Construction West Side (Menno to North Limit) 2035-2040 75,000 18,800 56,200 37,500 18,700 16,830 1,870 Bridges - - 38 Seventeenth St Bridge Replacement 2030 1,039,200 - 1,039,200 935,300 103,900 93,510 10,390 39 Balls Falls Truss Bridge Replacement 2033 2,300,000 - 2,300,000 2,070,000 230,000 207,000 23,000 40 21st Street Bailey Bridge Replacement 2033 4,600,000 - 4,600,000 4,140,000 460,000 414,000 46,000 41 Henry Avenue Pedestrian Bridge 2033 172,500 - 172,500 155,300 17,200 15,480 1,720 42 Tamarac Avenue Pedestrian Bridge 2029 230,000 - 230,000 138,000 92,000 82,800 9,200 43 West Avenue Pedestrian Bridge 2029 230,000 - 230,000 138,000 92,000 82,800 9,200 44 John Street Rigid Frame Bridge Replacement 2026-2027 345,000 - 345,000 310,500 34,500 31,050 3,450 45 John Street Rigid Frame Bridge Replacement 2029-2030 230,000 - 230,000 207,000 23,000 20,700 2,300 46 Bartlett Rd #26 Bridge Upgrades (Primary Road) 2025-2028 734,800 - 734,800 183,700 551,100 495,990 55,110 Culverts (Greater than 3m) 47 Eleventh St Culvert Replacement #20109, 450m south of King Street 2033 532,600 - 532,600 479,300 53,300 47,970 5,330 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-10 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-2 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 48 Culverts (Less than 3m) 49 John Street and Sann Road Intersection Cross Culvert Replacement 2025-2026 287,500 - 287,500 258,800 28,700 25,830 2,870 50 Cross culvert replacement at 4294 John Street 2025-2026 345,000 - 345,000 310,500 34,500 31,050 3,450 51 Greenlane and Maple Grove Intersection Cross Culvert Upgrade -Inter-Community Secondary Priority Loop 2028-2029 230,000 - 230,000 - 230,000 207,000 23,000 52 Cherry Avenue and Greenlane Intersection Cross Culvert 2027 230,000 - 230,000 207,000 23,000 20,700 2,300 53 John St - Intersection of Maple Grove Road Cross Culvert Replacement -Inter- Community Secondary Priority Loop 2025-2026 230,000 - 230,000 207,000 23,000 20,700 2,300 54 4066 Twenty-First St Cross Culvert Replacement 2027 207,000 - 207,000 186,300 20,700 18,630 2,070 55 John St - 3675 John Street Cross Culvert Replacement 2025-2026 69,000 - 69,000 62,100 6,900 6,210 690 56 Cherry Avenue - 3801 Cherry Avenue Cross Culvert Replacement 2023 57,500 - 57,500 51,800 5,700 5,130 570 57 Cherry Avenue - 3900 Cherry Avenue Cross Culvert Replacement 2029 57,500 - 57,500 51,800 5,700 5,130 570 58 Twenty First Street - 50m North of Glen Road Cross Culvert Replacement 2023 225,000 - 225,000 202,500 22,500 20,250 2,250 Debt/Financing Costs 59 Jordan Village Growth-Related Principal 2023 5,023,125 - 5,023,125 - 5,023,125 4,520,813 502,313 60 Jordan Village Discounted Interest 2023 2,174,292 - 2,174,292 - 2,174,292 1,956,863 217,429 61 Lincoln Ave. Discounted Interest 2023 1,443,535 - 1,443,535 - 1,443,535 1,299,182 144,354 62 Aberdeen Rd Discounted Interest 2023 749,713 - 749,713 - 749,713 674,742 74,971 63 Durham Rd Reconstruction Discounted Interest 2024 1,193,149 - 1,193,149 - 1,193,149 1,073,834 119,315 64 Greenlane Rd Discounted Interest 2026 1,260,421 - 1,260,421 - 1,260,421 1,134,379 126,042 Reserve Fund Adjustment 3,814,773 (3,814,773) (3,433,296) (381,477) Total 151,420,063 843,800 542,960 150,033,303 60,712,873 2,975,000 86,345,430 77,710,887 8,634,543 Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-11 H:\LINCOLN\2023 DC\Report\Final Report.docx Public Works (Facilities and Fleet) The Town provides approximately 24,544 sq.ft. of facility space, and 85 vehicles and equipment. The average level of investment provided over the historical 15-year period was $766 which results in a D.C. eligible amount of approximately $9.58 million. Based on the anticipated growth in the Town over the forecast period, approximately $47.79 million in facility space and vehicles have been identified. Capital projects include the public works portion of new office space at Town Hall, a new works yard, pickup trucks, new sidewalk clearing machines, etc. A deduction for the amount that benefits the existing development of approximately $20.20 million has been included. Additionally, a deduction of approximately $18.16 million has been included for the share of the projects that benefit growth outside the forecast period. After all deductions, the net growth-related D.C. recoverable amount of approximately $9.43 million has been included in the D.C. calculations. The residential/non-residential capital cost allocation for service related to a highway - public works (facilities and fleet) is based on the ratio of the anticipated population and employment growth over the long-term forecast period. This results in 90% being allocated to residential development and 10% to non-residential development. Watson & Associates Economists Ltd. PAGE 5-12 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-3 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Public Works (Facilities and Fleet) Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 1 New Office Space (Town Hall) - Public Works Portion 2028-2032 16,544,000 7,097,400 9,446,600 7,444,800 2,001,800 1,801,620 200,180 2 New Works Yard - Public Works Portion 2028-2032 26,760,000 11,062,600 15,697,400 12,577,200 3,120,200 2,808,180 312,020 3 New Single Axle Snow Plow Truck (Smaller Size) (2) 2026-2030 700,000 - 700,000 175,000 525,000 472,500 52,500 4 New sidewalk snow clearing machines (3) 2025-2030 750,000 - 750,000 - 750,000 675,000 75,000 5 New roads pickup trucks (3) 2025-2030 195,000 - 195,000 - 195,000 175,500 19,500 6 New 4x4 Pickup Truck w plow attachment/sander 2025 100,000 - 100,000 - 100,000 90,000 10,000 7 Small Sidewalk Sweeper 2025 178,000 - 178,000 - 178,000 160,200 17,800 8 Gradall 2030 400,000 - 400,000 - 400,000 360,000 40,000 9 Excavator with wheels 2035 350,000 - 350,000 - 350,000 315,000 35,000 10 Tandem Dump Truck 2028 400,000 - 400,000 - 400,000 360,000 40,000 11 Snow Blower Attachment for Backhoe 2030 25,000 - 25,000 - 25,000 22,500 2,500 12 Asphalt Paver 2028 150,000 - 150,000 - 150,000 135,000 15,000 13 Float Trailer 2035 50,000 - 50,000 - 50,000 45,000 5,000 14 Hotbox 2035 50,000 - 50,000 - 50,000 45,000 5,000 15 Trackless 2025 250,000 - 250,000 - 250,000 225,000 25,000 16 HydroVac Truck 2030 661,000 - 661,000 - 661,000 594,900 66,100 17 F-450 Truck 2030 180,000 - 180,000 - 180,000 162,000 18,000 18 Steamer Trailer 2025 28,000 - 28,000 - 28,000 25,200 2,800 19 Golf Cart (Sidewalk Insepctions) 2025 15,000 - 15,000 - 15,000 13,500 1,500 Total 47,786,000 18,160,000 - 29,626,000 20,197,000 - 9,429,000 8,486,100 942,900 Grants, Subsidies and Other Contributions Attributable to New Development Total Post Period Benefit Other Deductions Net Capital Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Benefit to Existing Development Watson & Associates Economists Ltd. PAGE 5-13 H:\LINCOLN\2023 DC\Report\Final Report.docx 5.3.2 Fire Services The Town of Lincoln currently operates its fire services from four (4) facilities with 27,530 sq.ft. of facility space, providing for a per capita average level of service of 1.05 sq.ft. per capita or $985 per capita. This level of service provides the Town with a maximum D.C. eligible amount for recovery over the forecast period of approximately $12.32 million. The fire department has a current inventory of 21 vehicles. The inventory provided over the previous 15-year period results in a calculated average level of service of 0.80 vehicles per 1,000 population, and an average level of investment of $543 per capita. This level of service provides for a D.C.-eligible amount of approximately $6.80 million over the forecast period. In addition to vehicles, the Town also provides 1,263 items of small equipment and gear for use in fire services, with a total value of approximately $3.61 million. This results in a calculated average level of service for the historical 15-year period of $106 per capita, providing for a D.C.-eligible amount over the forecast period of approximately $1.33 million for small equipment and gear. Based on the above, the maximum D.C.-eligible amount for recovery over the 2023 to 2051 forecast period for fire services is approximately $20.45 million. To service new development, the Town has identified future capital needs totaling approximately $31.45 million, including the need for replacing and expanding the Vineland/Prudhommes and Beamsville South fire stations, a new safety training trailer, additional aerial, pumper, squad, and prevention vehicles, and equipment for new fire fighters. Of this amount, deductions of approximately $9.23 million and $2.20 million have been made for the amount that benefits the existing development and for the share of the projects that benefit growth outside the forecast period, respectively. Additionally, $839,664 has been included to recover the current reserve fund deficit, resulting in a net growth-related amount of approximately $20.02 million for inclusion in the D.C. calculations. These costs are shared between residential and non-residential development based on the population to employment ratio over the forecast period, resulting in 90% being allocated to residential development and 10% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-14 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-4 Infrastructure Cost Included in the Development Charges Calculation Fire Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 1 Replace and Expand Fire Station & EOC (Vineland/Prudhommes) 2023-2025 12,000,000 - 12,000,000 3,640,600 8,359,400 7,523,460 835,940 2 Replace and Expand Fire Station (Beamsville South) 2028-2029 11,000,000 2,200,000 8,800,000 5,500,000 3,300,000 2,970,000 330,000 3 New Fire Safety Training Trailer 2025 180,000 - 180,000 90,000 90,000 81,000 9,000 4 Additional Aerial Truck (Prudhommes) - with equipment 2027 3,600,000 - 3,600,000 - 3,600,000 3,240,000 360,000 5 Additional Pumper (Beamsville South) - with equipment 2023-2024 1,100,000 - 1,100,000 - 1,100,000 990,000 110,000 6 Additional Squad Truck (Vineland) - with Equipment 2028 400,000 - 400,000 - 400,000 360,000 40,000 7 Additional SCBA (16) 2023-2026 148,800 - 148,800 - 148,800 133,920 14,880 8 Additional Station Air Compressor 2025 90,000 - 90,000 - 90,000 81,000 9,000 9 Additional Auto Extrication Equipment (4) 2024-2031 80,000 - 80,000 - 80,000 72,000 8,000 10 Additional Thermal Imaging Camera (2) 2025-2031 25,000 - 25,000 - 25,000 22,500 2,500 11 Additional SCBA Bottles (48) 2023-2031 96,000 - 96,000 - 96,000 86,400 9,600 12 Additional SCBA Masks (24) 2025-2031 19,200 - 19,200 - 19,200 17,280 1,920 13 Portable Pump (2) 2024-2031 16,000 - 16,000 - 16,000 14,400 1,600 14 Bunker Gear & Protective Clothing (48) 2025-2031 278,400 - 278,400 - 278,400 250,560 27,840 15 Multi Gas Detectors (2) 2024-2031 13,000 - 13,000 - 13,000 11,700 1,300 16 Training Officer Vehicle 2024 75,000 - 75,000 - 75,000 67,500 7,500 17 Additional Pumper (Vineland) - with Equipment 2030-2031 1,100,000 - 1,100,000 - 1,100,000 990,000 110,000 18 Additional Prevention Vehicle 2030 85,000 - 85,000 - 85,000 76,500 8,500 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2023$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-15 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-4 (Continued) Infrastructure Cost Included in the Development Charges Calculation Fire Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2023-2043 90% 10% 19 Vehicle Radio Repeaters (2) 2024-2031 70,000 - 70,000 - 70,000 63,000 7,000 20 Additional Firefighter Pagers (24) 2025-2031 28,800 - 28,800 - 28,800 25,920 2,880 Financing Costs - 21 Pumper Truck Financing 2025 203,833 - 203,833 - 203,833 183,449 20,383 Reserve Fund Adjustment 839,664 - 839,664 839,664 755,698 83,966 Total 31,448,697 2,200,000 - 29,248,697 9,230,600 - 20,018,097 18,016,287 2,001,810 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2023$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-16 H:\LINCOLN\2023 DC\Report\Final Report.docx 5.3.3 Library Services The Town currently operates its library services out of the Moses F. Rittenhouse and Fleming branches, providing a total of 15,100 sq.ft. in library space. The Town also utilizes a library van, valued at approximately $60,000. Over the past 15 years, the Town has sustained a current level of service average of 0.56 sq.ft. of facility space, and 3.40 collection materials per capita. Including facilities, vehicles, and collection materials (e.g., books, electronic collections, public computers, etc.), the level of service provided is $527.27 per capita. When applied over the forecast period, this average level of service translates into a D.C.-eligible amount of approximately $6.60 million. As of January 1, 2023, the library services for the Town of Lincoln and Town of Pelham will be operated by the Lincoln Pelham Public Library Board (LPPL). For future capital needs, collection materials will be shared between the two municipalities, with 58% of the cost assigned to Lincoln, and 42% being assigned to Pelham. With respect to facilities, each municipality will be responsible for their own infrastructure. For Lincoln, the LPPL has identified a need to expand Pelham's library services based on the forecasted growth over the next 20 years. The LPPL has identified the need for a book locker for Prudhommes, a book mobile, approximately a 7,000 sq.ft expansion to the Moses F. Rittenhouse branch, and a provision for new materials and equipment totalling approximately $6.78 million. A deduction of $230,961 has been made from the calculations to reflect the balance in the D.C. reserve fund. Additionally, a deduction of approximately $1.79 million has been made for the share of the projects anticipated to benefit growth outside the forecast period. This results in a net growth-related amount of approximately $4.76 million being included in the D.C. calculations. While library usage is predominately residential based, there is some use of the facilities by non-residential users, for the purpose of research. To acknowledge this use of the growth-related capital costs have been allocated 95% residential development and 5% non-residential development. Watson & Associates Economists Ltd. PAGE 5-17 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-5 Infrastructure Cost Included in the Development Charges Calculation Library Services Prj.No Residential Share Non- Residential Share 2023-2043 95% 5% 1 Book Locker - Prudhommes 2027 90,000 - 90,000 - 90,000 85,500 4,500 2 Fleming Centre Land Debenture - Principal 2023 25,501 - 25,501 - 25,501 24,226 1,275 3 Fleming Centre Land Debenture - Interest (Discounted) 2023 956 - 956 - 956 908 48 4 Fleming Centre Construction Debenture - Principal 2023 417,439 - 417,439 - 417,439 396,567 20,872 5 Fleming Centre Construction Debenture - Interest (Discounted) 2023 69,950 - 69,950 - 69,950 66,452 3,497 6 Provision for New Materials and Equipment 2023-2032 464,000 - 464,000 - 464,000 440,800 23,200 7 Moses F. Rittenhouse Branch Expansion 2026 5,600,000 1,792,000 3,808,000 - 3,808,000 3,617,600 190,400 8 Book Mobile 2024 116,000 - 116,000 - 116,000 110,200 5,800 Reserve Fund Adjustment 230,961 (230,961) (219,413) (11,548) Total 6,783,846 1,792,000 - 4,991,846 230,961 - 4,760,885 4,522,841 238,044 Timing (year) Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2023$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-18 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 5.4 Urban 20-Year Capital Costs for Lincoln's D.C. Calculation This section evaluates the development-related capital requirements for water services, wastewater services, and stormwater services over an urban 20-year planning period from 2023 to 2043. 5.4.1 Water Services The Town has identified the need to undertake water-related capital works in the urban areas in the form of new watermains and upsizing existing watermains. In total, the gross capital cost included is approximately $56.48 million, which includes a reduction of $866,154 to recognize the current balance in the Town's reserve fund. Deductions in the amounts of approximately $14.90 million and $7.39 million have been applied to recognize the portion of the works that will benefit the existing developments in the Town, and the portion of the works that benefit growth outside the forecast period, respectively. Additionally, deductions totalling $2.52 million for the Region's contributions to the capital program have been applied, resulting in a net growth capital cost of approximately $30.81 million for inclusion in the D.C. calculation. These costs are shared between residential and non-residential based on the population to employment ratio over the 20-year urban forecast period, resulting in 90% being residential development and 10% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-19 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table 5-6 Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2023-2043 90% 10% 1 Prudhommes Watermain Construction Upgrade (Includes Victoria Avenue Crossing) 2025 19,500,000 - 19,500,000 5,265,000 14,235,000 12,811,500 1,423,500 2 Victoria Avenue Watermain Twinning for Prudhommes 2028-2032 11,250,000 7,390,700 3,859,300 - 3,859,300 3,473,370 385,930 3 Cherry Heights Blvd & Eastdale Dr WM Replacement 2033-2035 550,000 - 550,000 275,000 275,000 247,500 27,500 4 Main Street - Watermain Upgrades 2023 3,040,000 - 3,040,000 835,000 1,370,000 835,000 751,500 83,500 5 Ontario Street Watermain Upgrade from Fresien to Greenlane 2040 3,000,000 - 3,000,000 900,000 2,100,000 1,890,000 210,000 6 19th St. (St. Johns Drive to King Street) 2029-2032 660,000 - 660,000 198,000 462,000 415,800 46,200 7 19th St WM & Road Reconstruction (4th-Red Maple) 2030-2033 1,430,000 - 1,430,000 429,000 1,001,000 900,900 100,100 8 Jordan Station Rd Reconstruction & WM Replacement 2029 1,649,000 - 1,649,000 725,600 923,400 831,060 92,340 9 Greenlane Ph1 Upgrade/Widening Multi use Trail 2025 3,012,640 - 3,012,640 1,303,800 1,150,000 558,840 502,956 55,884 10 Lincoln Ave S Ph2 Road Reconstruction 2032-2033 523,600 - 523,600 366,500 157,100 141,390 15,710 11 William St Neighbourhood Reconstruction project 2026-2028 3,312,500 - 3,312,500 2,318,800 993,700 894,330 99,370 12 Aberdeen & Hillside Slope Stabil & Reconstruction 2024 106,305 - 106,305 53,200 53,105 47,795 5,311 13 Lincoln Avenue Road Reconstruction - King to SSR 2024 3,474,150 - 3,474,150 1,737,100 1,737,050 1,563,345 173,705 14 Menno St WM Replacement and Road Reconstruction 2031-2032 990,000 - 990,000 495,000 495,000 445,500 49,500 Financing Costs - - 15 Prudhommes Watermain Construction 2023 3,985,934 - 3,985,934 - 3,985,934 3,587,341 398,593 Reserve Fund Adjustment 866,154 (866,154) (779,539) (86,615) Total 56,484,129 7,390,700 - 49,093,429 15,768,154 2,520,000 30,805,275 27,724,747 3,080,527 Other Deductions Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-20 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 5.4.2 Wastewater Services The Town has identified the need to undertake wastewater-related capital works in the urban areas in the form of various new sanitary sewers, extensions, upgrades, and upsizing. The total gross capital cost included is approximately $42.11 million. Deductions in the amounts of approximately $17.06 million and $1.34 million have been made to account for the benefit to existing development and the portion of the works that benefit growth outside of the forecast period. Additionally a deduction of approximately $699,379 has been made to account for the existing reserve fund balance. After deductions, the total net growth related capital cost of approximately $23.01 million has been included in the D.C. These costs are shared between residential and non-residential based on the population to employment ratio over the 20-year urban forecast period, resulting in 90% being residential development and 10% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-21 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table 5-7 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2023-2043 90% 10% 1 Prudhommes Lakefront Gravity Sewer & Upgrades 2024-2025 4,620,000 1,339,800 3,280,200 - 3,280,200 2,952,180 328,020 2 South Service Rd. (Ontario St to west Urban Boundary) 2030-2035 1,650,000 - 1,650,000 495,000 1,155,000 1,039,500 115,500 3 Twenty-Third Street (Menno St. to Culp Rd.) 2027-2028 840,000 - 840,000 90,500 749,500 674,550 74,950 4 Ontario St (King to Greenlane) 2023-2024 8,350,000 - 8,350,000 4,175,000 4,175,000 3,757,500 417,500 5 Hixon St. (King St. to George St.) 2030 3,000,000 - 3,000,000 1,500,000 1,500,000 1,350,000 150,000 6 Town Wide I/I Reduction Work Program 2023-2043 15,000,000 - 15,000,000 7,500,000 7,500,000 6,750,000 750,000 7 West Avenue - Sewer Upgrades 2024 1,065,000 - 1,065,000 - 1,065,000 958,500 106,500 8 William St Neighbourhood Reconstruction project 2026-2028 1,850,000 - 1,850,000 925,000 925,000 832,500 92,500 9 Lincoln Ave S Ph2 Road Reconstruction 2032-2033 976,800 - 976,800 683,800 293,000 263,700 29,300 10 Hinan Drive Sewer Upsizing 2031-2032 550,000 - 550,000 385,000 165,000 148,500 16,500 11 Union Drive Sewer Upgrade 2030-2032 2,612,500 - 2,612,500 1,306,300 1,306,200 1,175,580 130,620 Financing Costs - 12 Ontario St Sanitary Sewer Upsizing 2023 1,591,031 - 1,591,031 - 1,591,031 1,431,928 159,103 Reserve Fund Adjustment - - - 699,379 (699,379) (629,441) (69,938) Total 42,105,331 1,339,800 - 40,765,531 17,759,979 - 23,005,552 20,704,997 2,300,555 Other Deductions Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-22 H:\LINCOLN\2023 DC\Report\Final Report.docx 5.4.3 Stormwater Services The Bartlett Creek project is a carryover from the previous D.C. study. The cost of the project has been revised to approximately $8.60 million based on increases in land cost as well as increased construction values. The total gross capital cost included is approximately $12.58 million which includes an outstanding credit and approximately $3.94 million to recover the current reserve fund deficit, resulting in a net growth-related amount of approximately $10.75 million for inclusion in the D.C. calculations. These costs are shared between residential and non-residential based on the population to employment ratio over the 20-year urban forecast period, resulting in 90% being residential development and 10% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-23 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Stormwater Services Residential Share Non- Residential Share 2023-2043 90% 10% 1 Bartlett Creek 2024 8,601,400 - 8,601,400 1,825,700 6,775,700 6,098,130 677,570 Outstanding Credit 37,210 - 37,210 - 37,210 33,489 3,721 Reserve Fund Adjustment 3,937,772 - 3,937,772 - 3,937,772 3,543,995 393,777 Total 12,576,382 - - 12,576,382 1,825,700 - 10,750,682 9,675,614 1,075,068 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Other Deductions Net Capital Cost Prj.No Increased Service Needs Attributable to Anticipated Development Watson & Associates Economists Ltd. PAGE 5-24 H:\LINCOLN\2023 DC\Report\Final Report.docx 5.5 Area-Specific Calculation for the Campden Development Area This section evaluates the development-related capital requirements for stormwater services within the Campden development area. 5.5.1 Stormwater Drainage - Campden The Campden stormwater drainage project is a carryover from the 2014 and 2019 D.C. studies. The cost of the stormwater management facility has been revised to $2,329,000 based on indexing. This cost will service the residential development within Campden and is therefore being allocated 100% to residential. Watson & Associates Economists Ltd. PAGE 5-25 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Campden Stormwater Services Residential Share Non- Residential Share 2023-2043 100% 0% 1 Campden Storm Water Management Facility - East 2028-2032 2,329,000 - 2,329,000 - 2,329,000 2,329,000 - Total 2,329,000 - - 2,329,000 - - 2,329,000 2,329,000 - Other Deductions Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2023$) Post Period Benefit Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 6. D.C. Calculation Tables 6-1 and 6-1a calculate the proposed urban area D.C.s to be imposed for infrastructure services based upon a 20-year urban forecast period (stormwater, water, and wastewater). Table 6-2 calculates the proposed uniform D.C.s to be imposed on anticipated development in the Town for Town-wide services over a 20-year planning horizon (services related to a highway, fire protection services, and library services). Table 6-3 calculates the proposed uniform D.C. to be imposed on anticipated development in the Town for Town-wide services over a 10-year forecast period (parks and recreation services). The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (singles and semi-detached, multiples, apartments 2+ bedrooms, apartments studio and 1 bedroom, and special care/special dwelling units). The non-residential D.C. has been calculated on a per sq.ft. of G.F.A. basis for all types of non-residential development (industrial, commercial, and institutional). The D.C.-eligible costs for each service component were developed in Chapter 5 for all Town services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the "gross" (new resident) population to determine the per capita amount. The eligible-D.C. cost calculations set out in Chapter 5 are based on the net anticipated population increase (the forecast new unit population less the anticipated decline in existing units). The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 7) to calculate the charge in Tables 6-1, 6-1a, 6-2, and 6-3. With respect to non-residential development, the total costs associated with non- residential development have been allocated to primary development, commercial development, industrial development, and institutional development based on the relative share of employment (for the forecast period) anticipated for each category. These costs have then been divided by the anticipated primary, commercial, industrial, and institutional development respectfully, over the planning period to calculate a cost per sq.ft. of gross floor area. Watson & Associates Economists Ltd. PAGE 6-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 6-4 summarizes the total D.C. that is applicable for Town-wide services and Table 6-5 summarizes the gross capital expenditures and sources of revenue for works to be undertaken during the life of the by-law. Watson & Associates Economists Ltd. PAGE 6-3 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table 6-1 Town of Lincoln Development Charge Calculation Urban area Services 20-Year (2023 to 2043) 2023$ D.C.-Eligible Cost 2023$ D.C.- Eligible Cost 2023$ D.C.-Eligible Cost 2023$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. Primary Commercial Industrial Institutional Primary per sq.ft. Commercial per sq.ft. Industrial per sq.ft. Institutional per sq.ft. $ $ $ $ $ $ $ $ $ $ $ 1. Stormwater Drainage and Control Services 1.1 Channels, drainage and ponds 9,675,614 1,075,068 2,083 - 650,115 94,346 330,607 - 1.59 0.66 1.18 9,675,614 1,075,068 2,083 - 650,115 94,346 330,607 - 1.59 0.66 1.18 2. Wastewater Services 2.1 Treatment plants & Sewers 20,704,997 2,300,555 4,457 - 1,391,191 201,892 707,472 - 3.39 1.41 2.51 20,704,997 2,300,555 4,457 - 1,391,191 201,892 707,472 - 3.39 1.41 2.51 3. Water Services 3.1 Treatment, storage and distribution systems 27,724,747 3,080,527 5,968 - 1,862,856 270,341 947,330 - 4.54 1.89 3.36 27,724,747 3,080,527 5,968 - 1,862,856 270,341 947,330 - 4.54 1.89 3.36 TOTAL 58,105,358 6,456,151 12,508 - 3,904,162 566,580 1,985,409 - 9.52 3.96 7.05 D.C.-Eligible Capital Cost $58,105,358 $6,456,151 - $3,904,162 $566,580 $1,985,409 20-Year Urban Gross Population/GFA Growth (sq.ft.) 13,334 834,300 - 410,000 142,800 281,500 Cost Per Capita/Non-Residential GFA (sq.ft.) $4,358 $7.74 - $9.52 $3.96 $7.05 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.870 $12,508 Multiples 2.375 $10,349 Apartments - 2 Bedrooms + 2.031 $8,850 Apartments - Bachelor and 1 Bedroom 1.316 $5,735 Special Care/Special Dwelling Units 1.100 $4,793 Watson & Associates Economists Ltd. PAGE 6-4 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 6-1a Town of Lincoln Development Charge Calculation Urban area Services - Campden 2023$ D.C.-Eligible Cost 2023$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1a. Stormwater Drainage 1.1a Channels, drainage and ponds 2,329,000 - 18,776 - 2,329,000 - 18,776 - TOTAL 2,329,000 $0.00 18,776 $0.00 D.C.-Eligible Capital Cost $2,329,000 $0 Campden Growth Forecast 356 - Cost Per Capita/Non-Residential GFA (sq.ft.) $6,542 $0.00 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.870 $18,776 Multiples 2.375 $15,538 Apartments - 2 Bedrooms + 2.031 $13,287 Apartments - Bachelor and 1 Bedroom 1.316 $8,609 Special Care/Special Dwelling Units 1.100 $7,196 Watson & Associates Economists Ltd. PAGE 6-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 6-2 Town of Lincoln Development Charge Calculation Town-wide Services 20-Year (2023 to 2043) 2023$ D.C.-Eligible Cost 2023$ D.C.- Eligible Cost 2023$ D.C.-Eligible Cost 2023$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. Primary Commercial Industrial Institutional Primary per sq.ft. Commercial per sq.ft. Industrial per sq.ft. Institutional per sq.ft. $ $ $ $ $ $ $ $ $ $ $ 4. Services Related to a Highway 4.1 Roads and Related 77,710,887 8,634,543 15,712 278,152 5,184,277 704,257 2,467,858 1.97 11.84 4.93 8.77 4.2 Public Works (Facilities and Fleet) 8,486,100 942,900 1,716 30,374 566,128 76,905 269,492 0.22 1.29 0.54 0.96 86,196,987 9,577,443 17,428 308,526 5,750,404 781,162 2,737,350 2.19 13.13 5.47 9.73 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 18,016,287 2,001,810 3,643 64,486 1,201,909 163,273 572,142 0.46 2.74 1.14 2.03 18,016,287 2,001,810 3,643 64,486 1,201,909 163,273 572,142 0.46 2.74 1.14 2.03 6. Library Services 6.1 Library facilities, materials and vehicles 4,522,841 238,044 914 7,668 142,924 19,416 68,036 0.05 0.33 0.14 0.24 4,522,841 238,044 914 7,668 142,924 19,416 68,036 0.05 0.33 0.14 0.24 TOTAL 108,736,115 11,817,297 21,985 380,681 7,095,238 963,851 3,377,528 2.70 16.20 6.75 12.00 D.C.-Eligible Capital Cost $108,736,115 $11,817,297 $380,681 $7,095,238 $963,851 $3,377,528 20-Year Gross Population/GFA Growth (sq.ft.) 14,195 1,003,300 141,000 438,000 142,800 281,500 Cost Per Capita/Non-Residential GFA (sq.ft.) $7,660 $11.78 $2.70 $16.20 $6.75 $12.00 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.870 $21,985 Multiples 2.375 $18,193 Apartments - 2 Bedrooms + 2.031 $15,558 Apartments - Bachelor and 1 Bedroom 1.316 $10,081 Special Care/Special Dwelling Units 1.100 $8,426 Watson & Associates Economists Ltd. PAGE 6-6 H:\LINCOLN\2023 DC\Report\Final Report.docx Table 6-3 Town of Lincoln Development Charge Calculation Town-wide Services 10-Year (2023 to 2032) 2023$ D.C.-Eligible Cost 2023$ D.C.- Eligible Cost 2023$ D.C.-Eligible Cost 2023$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. Primary Commercial Industrial Institutional Primary per sq.ft. Commercial per sq.ft. Industrial per sq.ft. Institutional per sq.ft. $ $ $ $ $ $ $ $ $ $ $ 7. Parks and Recreation Services 7.1 Park development, vehicles, trails and recreation facilities 24,848,461 1,307,814 9,645 41,216 746,643 147,426 372,529 0.53 3.17 1.32 2.35 24,848,461 1,307,814 9,645 41,216 746,643 147,426 372,529 0.53 3.17 1.32 2.35 TOTAL 24,848,461 1,307,814 9,645 41,216 746,643 147,426 372,529 0.53 3.17 1.32 2.35 D.C.-Eligible Capital Cost $24,848,461 $1,307,814 $41,216 $746,643 $147,426 $372,529 10-Year Gross Population/GFA Growth (sq.ft.) 7,394 583,700 78,000 235,500 111,600 158,600 Cost Per Capita/Non-Residential GFA (sq.ft.) $3,361 $2.24 $0.53 $3.17 $1.32 $2.35 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.870 $9,645 Multiples 2.375 $7,981 Apartments - 2 Bedrooms + 2.031 $6,825 Apartments - Bachelor and 1 Bedroom 1.316 $4,423 Special Care/Special Dwelling Units 1.100 $3,697 Watson & Associates Economists Ltd. PAGE 6-7 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table 6-4 Town of Lincoln Development Charge Calculation Total All Services 2023$ D.C.-Eligible Cost 2023$ D.C.- Eligible Cost 2023$ D.C.-Eligible Cost 2023$ D.C.-Eligible Cost Residential Non-Residential S.D.U. Primary Commercial Industrial Institutional Primary per sq.ft. Commercial per sq.ft. Industrial per sq.ft. Institutional per sq.ft. $ $ $ $ $ $ $ $ $ $ $ Urban-wide Services/Classes 20 Year 58,105,358 6,456,151 12,508 - 3,904,162 566,580 1,985,409 - 9.52 3.96 7.05 Town-wide Services/Classes 20 Year 108,736,115 11,817,297 21,985 380,681 7,095,238 963,851 3,377,528 2.70 16.20 6.75 12.00 Town-wide Services/Classes 10 Year 24,848,461 1,307,814 9,645 41,216 746,643 147,426 372,529 0.53 3.17 1.32 2.35 TOTAL 191,689,934 19,581,262 44,138 421,897 11,746,043 1,677,857 5,735,466 3.23 28.89 12.03 21.40 Campden Area-Specific 2,329,000 - 18,776 - - - - - - - - Watson & Associates Economists Ltd. PAGE 6-8 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table 6-5 Town of Lincoln Gross Expenditure and Sources of Revenue Summary for Costs to be Incurred over the Life of the By-law Sources of Financing Tax Base or Other Non-D.C. Source D.C. Reserve Fund Other Deductions Benefit to Existing Other Funding Residential Non-Residential 1. Stormwater Drainage and Control Services 1.1 Channels, drainage and ponds 8,601,400 0 1,825,700 0 0 6,098,130 677,570 1.2 Campden Stormwater Drainage 2,329,000 0 0 0 0 2,329,000 0 2. Wastewater Services 2.1 Treatment plants & Sewers 32,934,789 0 12,542,629 0 1,339,800 17,147,124 1,905,236 3. Water Services 3.1 Treatment, storage and distribution systems 52,314,829 0 13,436,500 2,520,000 7,390,700 26,070,866 2,896,763 4. Services Related to a Highway 4.1 Roads and Related 128,696,213 542,960 47,324,150 2,975,000 0 70,068,693 7,785,410 4.2 Public Works (Facilities and Fleet) 47,336,000 0 20,197,000 0 18,160,000 8,081,100 897,900 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 30,609,033 0 9,230,600 0 2,200,000 17,260,589 1,917,843 6. Library Services 6.1 Library facilities, materials and vehicles 6,499,536 0 0 0 1,792,000 4,472,159 235,377 7. Parks and Recreation Services 7.1 Park development, vehicles, trails and recreation facilities 53,652,335 0 20,306,600 635,040 8,611,800 22,893,950 1,204,945 Total Expenditures & Revenues $362,973,134 $542,960 $124,863,179 $6,130,040 $39,494,300 $174,421,612 $17,521,044 Post D.C. Period Benefit Total Gross Cost Service/Class Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided are based on the Town's existing policies; with some modifications and consideration for the changes to the D.C.A. resulting from Bills 108, 197, 213 and 23. Watson & Associates Economists Ltd. PAGE 7-2 H:\LINCOLN\2023 DC\Report\Final Report.docx 7.2 D.C. By-law Structure It is recommended that: - the Town uses a uniform Town-wide D.C. calculation for all Town-wide services; - D.C.s for water, wastewater, and stormwater services be imposed on the urban service areas of the Town; - The Town uses an area-specific D.C. calculation for stormwater drainage for the Campden area; and - separate D.C. by-laws be used for each service. Note the draft by-law provided in Appendix G will carry the same policies and definitions for each individual D.C. by-law. 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable, and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; Watson & Associates Economists Ltd. PAGE 7-3 H:\LINCOLN\2023 DC\Report\Final Report.docx (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the number of square feet of G.F.A. constructed for eligible uses (i.e., industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, e.g. - for parks and recreation services and library services, a 5% non-residential attribution has been made to recognize use by the non-residential sector; - for services related to a highway - roads and related, public works (facilities and fleet), fire protection services, water services, wastewater services, and stormwater services a 90% residential/10% non-residential attribution has been made based on a population vs. employment growth ratio over the 20-year (2023 to 2043) forecast period; and - for the Campden stormwater drainage area, a 100% attribution to residential development has been made as residential units will be the only benefitting development in the area. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) If a development involves the demolition and replacement of a building or structure on the same site (within 5 years prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part), or the conversion from one principal use to another, the developer shall be allowed a credit equivalent to: Watson & Associates Economists Ltd. PAGE 7-4 H:\LINCOLN\2023 DC\Report\Final Report.docx 1) the number of dwelling units demolished/converted multiplied by the applicable residential D.C. in place at the time the D.C. is payable; and/or 2) the G.F.A. of the building demolished/converted multiplied by the current non- residential D.C. in place at the time the D.C. is payable; provided that such amounts shall not exceed, in total, the amount of the development charges otherwise payable with respect to the redevelopment. 7.3.4 Exemptions (full or partial) a) Statutory exemptions: - industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education (section 3); - may add up to 2 apartments in an existing or new detached, semi-detached, or rowhouse (including in an ancillary structure); - add one additional unit or 1% of existing units in an existing rental residential building; - a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - affordable units, attainable units, and affordable inclusionary zoning units (to be in force at a later date); - non-profit housing; and - discount for rental housing units based on bedroom size (i.e., three or more bedrooms - 25% reduction, two bedrooms - 20% reduction, and all others - 15% reduction). b) Non-statutory exemptions for Council consideration: - lands, buildings, or structures used or to be used for a place of worship or for the purposes of a cemetery or burial ground exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended; - the development of non-residential farm buildings for farming activities; Watson & Associates Economists Ltd. PAGE 7-5 H:\LINCOLN\2023 DC\Report\Final Report.docx - the development of a farm help house within a farm building; - garden suites; - parking structures; - elevators and elevator machine rooms; and - canopies. 7.3.5 Phasing in As required by Bill 23, the calculated D.C. will be phased-in over a five-year period as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. As noted in earlier sections, as of the time of writing, the Province has announced (on December 13, 2023) potential changes to the phase-in requirements. The details of these changes will be forthcoming in early 2024 and Watson will monitor and advise as to the nature of these changes. 7.3.6 Timing of Collection A D.C. that is applicable under Section 5 of the D.C.A. shall be calculated and payable; - Where a permit is required under the Building Code Act in relation to a building or structure, the owner shall pay the D.C. prior to issuance of the first building permit prior to the commencement of development or redevelopment as the case may be; and - Despite above, Council, from time to time, and at any time, may enter into agreements providing for all or any part of a D.C. to be paid before or after it would otherwise be payable. 7.3.7 The Applicable Areas The charges developed herein provide for varying charges within the Town, as follows: Watson & Associates Economists Ltd. PAGE 7-6 H:\LINCOLN\2023 DC\Report\Final Report.docx - All Town-wide services - the full residential and non-residential charge will be imposed on all lands within the Town; and - Water, Wastewater, and Stormwater - the full residential and non-residential charge will be imposed on the urban service areas of the Town; and - Stormwater Campden Area-Specific - the full residential charge will be imposed on development in the Campden area. 7.3.8 Indexing Indexing of the D.C.s shall be implemented on a mandatory basis annually commencing on May 1, 2024, and each January 1st thereafter, in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10- 0276-02)1 for the most recent year-over-year period. 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes The Town's D.C. collections are currently reserved in nine (9) separate reserve funds: Water DC, Fire DC, Admin DC, Wastewater DC, Storm Drainage DC, Library Services DC, Roads DC, Parks & Rec DC, and Parking Spaces DC. It is recommended that the Admin DC and Parking Spaces DC reserve fund balances be utilized or incorporated as part of the Town's General Capital Reserves as these services are no longer eligible D.C. services. Appendix D outlines the reserve fund policies that the Town is required to follow as per the D.C.A. 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 H:\LINCOLN\2023 DC\Report\Final Report.docx 7.4.2 By-law In-force Date A by-law under the D.C.A. comes into force on the day after which the by-law is passed by Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day the by-law comes into force updated on the first business day pf every January, April, July and October (as per section 11 of O. Reg. 82/98). 7.4.4 Area Rating The D.C.A. required that Council must consider the use of area specific charges: 1. Section 2 (9) of the D.C.A. now requires a municipality to implement area-specific D.C.s for either specific services which are prescribed and/or for specific municipalities which are to be regulated (note that at this time, no municipalities or services are prescribed by the regulations). 2. Section 10 (2) c.1 of the D.C.A. requires that "the development charges background study shall include consideration of the use of more than one development charge by-law to reflect different needs for services in different areas." In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area rated. The second item requires Council to consider the use of area rating. Currently the Town's by-law does provide for area rating for water, wastewater, and stormwater services, including an area rating for the area of Campden with respect to stormwater. All other Town services are recovered based on a uniform, Town-wide basis. There have been several reasons why they have not been imposed including: 1. All Town services, with the exception of water, wastewater and stormwater require that the average 15-year service standard be calculated. This average service standard multiplied by growth in the Town, establishes an upper ceiling on the amount of funds that can be collected from all developing landowners. Watson & Associates Economists Ltd. PAGE 7-8 H:\LINCOLN\2023 DC\Report\Final Report.docx Section 4 (4) of O. Reg. 82/98 provides that "if a development charge by-law applies to a part of the municipality, the level of service and average level of service cannot exceed that which would be determined if the by-law applied to the whole municipality." Put in layman terms, the average service standard multiplied by the growth within the specific area would establish an area-specific ceiling which would significantly reduce the total revenue recoverable for the Town hence potentially resulting in D.C. revenue shortfalls and impacts on property taxes. 2. Expanding on item 1, attempting to impose an area charge potentially causes equity issues in transitioning from a Town-wide approach to an area-specific approach. For example, if all services were now built (and funded) within Area A (which is 75% built out) and this was funded with some revenues from Areas B and C, moving to an area-rating approach would see Area A contribute no funds to the costs of services in Areas B and C. The D.C.s would be lower in Area A (as all services are now funded) and higher in Areas B and C. As well, funding shortfalls may then potentially encourage the municipality to provide less services to Areas B and C due to reduced revenue. 3. Many services provided (roads, parks and recreation facilities, etc.) are not restricted to one specific area and are often used by all residents. For example, arenas located in different parts of the Town will be used by residents from all areas depending on the programing of the facility (i.e., a public skate is available each night, but at a different arena; hence usage of any one facility at any given time is based on programming availability). For the reasons noted above, it is recommended that Council continue the D.C. approach to calculate the charges on an urban area basis for water, wastewater, and stormwater, an area-specific for stormwater for Campden, and on a uniform Town-wide basis for all other services. 7.5 Other Recommendations It is recommended that Council: Watson & Associates Economists Ltd. PAGE 7-9 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" "Continue the D.C. approach to calculate the charges on a uniform Town-wide basis for all services except water, wastewater, and stormwater;" "Continue the D.C. approach to calculate the charges on an urban-area basis for water, wastewater, and stormwater services;" "Continue the D.C. approach to calculate the charges on an area-specific basis for stormwater in the area of Campden;" "Approve the capital project listing set out in Chapter 5 of the D.C.s Background Study dated December 22, 2023, subject to further annual review during the capital budget process;" "Approve the D.C.s Background Study dated December 22, 2023, as amended (with Addendum #1, dated February 9, 2024);" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix G." Watson & Associates Economists Ltd. H:\LINCOLN\2023 DC\Report\Final Report.docx Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 H:\LINCOLN\2023 DC\Report\Final Report.docx 8. By-law Implementation 8.1 Public Consultation Process 8.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution. It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT) (formerly the Local Planning Appeal Tribunal (LPAT)). 8.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority Watson & Associates Economists Ltd. PAGE 8-2 H:\LINCOLN\2023 DC\Report\Final Report.docx of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in municipal D.C. policy. Their primary concern is frequently with the quantum of the charge, G.F.A. exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 H:\LINCOLN\2023 DC\Report\Final Report.docx 8.3 Implementation Requirements 8.3.1 Introduction Once the Town has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the Town Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by-law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the Town must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; Watson & Associates Economists Ltd. PAGE 8-4 H:\LINCOLN\2023 DC\Report\Final Report.docx - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The Town must give one copy of the most recent pamphlet without charge, to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the Town Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The Town is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the Town Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Watson & Associates Economists Ltd. PAGE 8-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of Town Council to the OLT. 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 8.3.7 Front-Ending Agreements The Town and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the Town to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the Development Charges Act, 1989. Accordingly, the Town assesses whether this mechanism is appropriate for its use, as part of funding projects prior to Town funds being available. 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and Watson & Associates Economists Ltd. PAGE 8-6 H:\LINCOLN\2023 DC\Report\Final Report.docx - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the Town is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 1 Town of Lincoln Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.5% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes studio, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived from Niagara Region Official Plan, PDS 17-2022, 2051 Land Needs Assessment, June 2022, Hemson Consulting Ltd., and discussions with Town of Lincoln staff regarding servicing and land supply by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 23,060 22,487 782 21,705 6,675 920 486 79 8,160 711 2.756 24,390 23,787 837 22,950 6,985 1,160 505 65 8,715 761 2.729 26,370 25,719 779 24,940 7,350 1,485 665 55 9,555 708 2.692 26,830 26,169 794 25,375 7,457 1,564 716 55 9,792 722 2.672 33,190 32,364 984 31,380 8,045 2,366 2,765 55 13,231 895 2.446 39,670 38,684 1,169 37,515 8,339 2,766 5,501 55 16,661 1,063 2.322 1,330 1,300 55 1,245 310 240 19 -14 555 50 1,980 1,932 -58 1,990 365 325 160 -10 840 -53 460 450 15 435 107 79 51 0 237 14 6,360 6,195 190 6,005 588 802 2,049 0 3,439 173 12,840 12,515 375 12,140 882 1,202 4,785 0 6,869 341 Forecast Incremental Mid 2043 Mid 2021 - Mid 2023 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Mid 2023 - Mid 2043 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Mid 2023 Mid 2033 Mid 2023 - Mid 2033 Watson & Associates Economists Ltd. PAGE A-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure 1 Town of Lincoln Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from Town of Lincoln building permit data, 2013 to 2022. 185 121 84 85 159 369 548 268 203 34 345 344 344 344 344 344 344 344 343 343 343 343 343 343 343 343 343 343 343 343 0 100 200 300 400 500 600 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE A-4 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 2 Town of Lincoln Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes studio, 1-bedroom, and 2-bedroom+ apartment units. Source: Watson & Associates Economists Ltd. 2023 - 2033 438 802 2,049 3,289 6,774 (1,159) 5,614 190 5,804 2023 - 2043 582 1,202 4,785 6,569 12,959 (1,624) 11,335 375 11,710 2023 - 2033 215 422 1,038 1,674 3,447 (788) 2,659 92 2,752 2023 - 2043 259 703 1,939 2,902 5,833 (1,104) 4,729 161 4,889 2023 - 2033 96 347 838 1,281 2,578 0 2,578 90 2,668 2023 - 2043 96 421 2,402 2,919 5,509 0 5,509 187 5,696 2023 - 2033 60 0 0 60 174 (26) 147 0 147 2023 - 2043 120 0 0 120 344 (37) 307 0 307 2023 - 2033 67 33 173 273 575 (345) 230 8 238 2023 - 2043 106 78 444 628 1,273 (483) 790 27 817 2023 - 2033 150 0 0 150 430 (40) 391 0 391 2023 - 2043 300 0 0 300 861 (56) 805 0 805 2023 - 2033 588 802 2,049 3,439 7,204 (1,199) 6,005 190 6,195 2023 - 2043 882 1,202 4,785 6,869 13,820 (1,680) 12,140 375 12,515 Town of Lincoln Rural Urban Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Beamsville Prudhommes Campden Remaining Urban Area Watson & Associates Economists Ltd. PAGE A-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 3 Town of Lincoln Current Year Growth Forecast Mid-2021 to Mid-2023 Mid 2021 Population 25,719 Occupants of Units (2) 237 New Housing Units, multiplied by P.P.U. (3) 2.354 Mid 2021 to Mid 2023 gross population increase 558 558 Occupants of New Units 14 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Mid 2023 gross population increase 15 15 Decline in Housing Units (4) 9,555 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.013 Mid 2021 to Mid 2023 total decline in population -123 -123 Population Estimate to Mid 2023 26,169 Net Population Increase, Mid 2021 to Mid 2023 450 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2 ) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.758 45% 1.245 Multiples (6) 2.194 33% 0.731 Apartments (7) 1.755 22% 0.378 Total 100% 2.354 ¹ Based on 2021 Census custom database ² Based on Building permit/completion activity (4) 2021 households taken from Statistics Canada Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 4 Town of Lincoln 10-Year Growth Forecast Mid-2023 to Mid-2033 Mid 2023 Population 26,169 Occupants of Units (2) 3,439 New Housing Units, multiplied by P.P.U. (3) 2.095 Mid 2023 to Mid 2033 gross population increase 7,204 7,204 Occupants of New Units 173 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2023 to Mid 2033 gross population increase 190 190 Decline in Housing Units (4) 9,792 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.122 Mid 2023 to Mid 2033 total decline in population -1,199 -1,199 Population Estimate to Mid 2033 32,364 Net Population Increase, Mid 2023 to Mid 2033 6,195 (1) Mid 2023 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.870 17% 0.491 Multiples (6) 2.375 23% 0.554 Apartments (7) 1.763 60% 1.050 one bedroom or less 1.316 two bedrooms or more 2.031 Total 100% 2.095 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2023 households based upon 2021 Census (9,555 units) + Mid 2021 to Mid 2023 unit estimate (237 units) = 9,792 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Population 2021 Population (25,719) + Mid 2021 to Mid 2023 estimated housing units to beginning of forecast period (237 x 2.354 = 558) + (14 x 1.1 = 15) + (9,555 x -0.013 = -123) = 26,169 Watson & Associates Economists Ltd. PAGE A-7 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 5 Town of Lincoln Long-Term Growth Forecast Mid-2023 to Mid-2043 Mid 2023 Population 26,169 Occupants of Units (2) 6,869 New Housing Units, multiplied by P.P.U. (3) 2.012 Mid 2023 to Mid 2043 gross population increase 13,820 13,820 Occupants of New Units 341 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2023 to Mid 2043 gross population increase 375 375 Decline in Housing Units (4) 9,792 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.172 Mid 2023 to Mid 2043 total decline in population -1,680 -1,680 Population Estimate to Mid 2043 38,684 Net Population Increase, Mid 2023 to Mid 2043 12,515 (1) Mid 2023 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.870 13% 0.368 Multiples (6) 2.375 18% 0.416 Apartments (7) 1.763 70% 1.228 one bedroom or less 1.316 two bedrooms or more 2.031 Total 100% 2.012 ¹ Persons per unit based on Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2023 households based upon 2021 Census (9,555 units) + Mid 2021 to Mid 2023 unit estimate (237 units) = 9,792 units. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Weighted Persons Per Unit Average 2021 Population (25,719) + Mid 2021 to Mid 2023 estimated housing units to beginning of forecast period (237 x 2.354 = 558) + (14 x 1.1 = 15) + (9,555 x -0.013 = -123) = 26,169 Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Watson & Associates Economists Ltd. PAGE A-8 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 6a Town of Lincoln Summary of Active Development Applications, Vacant Land Supply and Intensification Housing Potential as of 2023 Total Urban Areas [1] Includes townhomes and apartments in duplexes. [2] Includes studio, 1 bedroom and 2 bedroom+ apartments. [3] Includes draft plans, pre-consultation and site specific developments. Source: Derived from Town of Lincoln data as of May 2023, by Watson & Associates Economists Ltd. 25 46 0 71 35% 65% 0% 100% 73 42 4 119 61% 35% 3% 100% 240 779 7,163 8,182 3% 10% 88% 100% 318 547 3,566 4,431 7% 12% 80% 100% Total 656 1,414 10,733 12,803 % Breakdown 5% 11% 84% 100% Stage of Development % Breakdown Draft Plans Approved % Breakdown % Breakdown Vacant lands designated for Residential % Breakdown Application Under Review[3] Density Type Singles & Semi- Detached Multiples[1] Apartments[2] Total Registered Not Built Watson & Associates Economists Ltd. PAGE A-9 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 6b Town of Lincoln Summary of Active Development Applications, Vacant Land Supply and Intensification Housing Potential as of 2023 Beamsville [1] Includes townhomes and apartments in duplexes. [2] Includes studio, 1 bedroom and 2 bedroom+ apartments. [3] Includes draft plans, pre-consultation and site specific developments. Source: Derived from Town of Lincoln data as of May 2023, by Watson & Associates Economists Ltd. 9 46 0 55 16% 84% 0% 77% 11 8 0 19 58% 42% 0% 16% 51 251 3,551 3,853 1% 7% 92% 47% 198 528 1,884 2,610 8% 20% 72% 59% Total 269 833 5,435 6,537 % Breakdown 2% 7% 42% 51% % Breakdown Vacant lands designated for Residential % Breakdown Stage of Development Density Type Singles & Semi- Detached Multiples[1] Apartments[2] Total Registered Not Built % Breakdown Draft Plans Approved % Breakdown Application Under Review[3] Watson & Associates Economists Ltd. PAGE A-10 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 6c Town of Lincoln Summary of Active Development Applications, Vacant Land Supply and Intensification Housing Potential as of 2023 Prudhommes [1] Includes townhomes and apartments in duplexes. [2] Includes studio, 1 bedroom and 2 bedroom+ apartments. [3] Includes draft plans, pre-consultation and site specific developments. Source: Derived from Town of Lincoln data as of May 2023, by Watson & Associates Economists Ltd. 0 0 0 0 - - - - 0 0 0 0 - - - - 96 495 3,510 4,101 2% 12% 86% 100% 0 0 878 878 0% 0% 100% 100% Total 96 495 4,388 4,979 % Breakdown 2% 10% 88% 100% % Breakdown Vacant lands designated for Residential % Breakdown Registered Not Built % Breakdown Draft Plans Approved % Breakdown Application Under Review[3] Stage of Development Density Type Singles & Semi- Detached Multiples[1] Apartments[2] Total Watson & Associates Economists Ltd. PAGE A-11 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 6c Town of Lincoln Summary of Active Development Applications, Vacant Land Supply and Intensification Housing Potential as of 2023 Campden [1] Includes townhomes and apartments in duplexes. [2] Includes studio, 1 bedroom and 2 bedroom+ apartments. [3] Includes draft plans, pre-consultation and site specific developments. Source: Derived from Town of Lincoln data as of May 2023, by Watson & Associates Economists Ltd. 12 0 0 12 100% 0% 0% 100% 33 0 0 33 100% 0% 0% 100% 54 0 0 54 100% 0% 0% 100% 76 0 0 76 100% 0% 0% 100% Total 175 0 0 175 % Breakdown 100% 0% 0% 100% % Breakdown Vacant lands designated for Residential % Breakdown Registered Not Built % Breakdown Draft Plans Approved % Breakdown Application Under Review[3] Stage of Development Density Type Singles & Semi- Detached Multiples[1] Apartments[2] Total Watson & Associates Economists Ltd. PAGE A-12 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 7 Town of Lincoln Historical Residential Building Permits Years 2013 to 2022 [1] Includes townhouses and apartments in duplexes. [2] Includes studio, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from Town of Lincoln data, by Watson & Associates Economists Ltd. Residential Building Permits Total 2013 105 80 0 185 2014 78 43 0 121 2015 48 35 1 84 2016 74 10 1 85 2017 62 97 0 159 Sub-total 367 265 2 634 Average (2013 - 2017) 73 53 0 127 % Breakdown 57.9% 41.8% 0.3% 100.0% 2018 58 193 118 369 2019 116 191 241 548 2020 141 53 74 268 2021 76 79 48 203 2022 31 0 3 34 Sub-total 422 516 484 1,422 Average (2018 - 2022) 84 103 97 284 % Breakdown 29.7% 36.3% 34.0% 100.0% 2013 - 2022 Total 789 781 486 2,056 Average 79 78 49 206 % Breakdown 38.4% 38.0% 23.6% 100.0% Singles & Semi Detached Multiples[1] Apartments[2] Year Watson & Associates Economists Ltd. PAGE A-13 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 8a Town of Lincoln Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhomes and apartments in duplexes. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted[2] 1-5 - - - 2.959 - 2.758 6-10 - - 2.000 2.952 4.333 2.875 2.816 (0.160) 11-15 - - 1.833 2.861 4.500 2.931 2.855 2.870 16-20 - - 1.692 2.750 - 2.667 2.808 2.870 20-25 - - 1.765 2.933 4.538 2.958 2.838 2.870 25-35 - - 1.545 2.855 3.714 2.730 35+ - 1.571 1.811 2.838 4.056 2.748 2.810 2.870 Total 0.727 1.487 1.829 2.858 4.163 2.780 Age of Multiples[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted[2] 1-5 - - 1.955 2.357 - 2.194 6-10 - - - 2.784 - 2.690 2.442 0.194 11-15 - - - 2.737 - 2.385 2.423 2.375 16-20 - - - 2.688 - 2.259 2.382 2.375 20-25 - - 1.533 - - 1.885 2.283 2.375 25-35 - - 1.583 2.647 - 2.241 35+ - - 1.781 2.571 - 2.038 2.242 2.375 Total 0.833 1.600 1.770 2.615 - 2.224 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - - 1.952 2.758 - 2.527 6-10 - - 1.800 2.892 4.333 2.782 11-15 - - 1.833 2.785 4.500 2.820 16-20 - - 1.818 2.667 - 2.562 20-25 - - 1.676 2.918 4.538 2.699 25-35 - - 1.606 2.816 3.467 2.510 35+ - 1.230 1.774 2.805 3.933 2.580 Total - 1.286 1.776 2.806 4.072 2.609 Watson & Associates Economists Ltd. PAGE A-14 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 8b Region of Niagara Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes studio, 1 bedroom and 2 bedroom+ apartments. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population Age of Apartments[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted[2] 1-5 - 1.291 1.688 2.600 - 1.755 6-10 - 1.200 1.763 2.033 - 1.603 11-15 - 1.500 1.823 3.000 - 1.797 1.718 1.763 16-20 - 1.246 1.922 2.130 - 1.701 1.714 1.763 20-25 - 1.266 2.028 2.412 - 1.745 1.720 1.763 25-35 - 1.226 1.773 3.043 - 1.602 35+ 1.017 1.192 1.749 2.447 2.545 1.575 Total 1.037 1.207 1.764 2.463 2.778 1.599 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 2.692 1.378 1.881 2.987 4.086 2.634 6-10 - 1.356 1.846 2.840 4.441 2.639 11-15 - 1.463 1.839 2.923 4.133 2.727 16-20 - 1.378 1.834 2.849 4.106 2.669 20-25 - 1.367 1.851 2.777 3.748 2.558 25-35 - 1.283 1.814 2.789 3.922 2.481 35+ 1.295 1.246 1.799 2.579 3.721 2.311 Total 1.504 1.270 1.812 2.661 3.846 2.396 Watson & Associates Economists Ltd. PAGE A-15 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 9 Town of Lincoln Person Per Unit Structural Type and Age of Dwelling (2021 Census) 2.76 2.88 2.93 2.67 2.96 2.73 2.75 2.19 2.69 2.38 2.26 1.88 2.24 2.04 1.76 1.60 1.80 1.70 1.75 1.60 1.57 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Apartment P.P.U.s are based on Niagara Region. Watson & Associates Economists Ltd. PAGE A-16 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 10a Town of Lincoln Employment Forecast, 2023 to 2043 [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source: Derived from Niagara Region Official Plan, PDS 17-2022, 2051 Land Needs Assessment, June 2022, Hemson Consulting Ltd., and discussions with Town of Lincoln staff regarding servicing and land supply by Watson & Associates Economists Ltd. Employment Mid 2011 22,487 0.050 0.057 0.107 0.093 0.078 0.385 0.048 0.433 1,135 1,275 2,400 2,100 1,750 8,660 1,074 9,734 7,385 Mid 2016 23,787 0.048 0.048 0.114 0.112 0.082 0.403 0.055 0.458 1,145 1,130 2,700 2,670 1,945 9,590 1,311 10,901 8,460 Mid 2023 26,169 0.044 0.054 0.115 0.109 0.079 0.401 0.056 0.457 1,146 1,422 3,014 2,845 2,070 10,497 1,475 11,972 9,075 Mid 2033 32,364 0.036 0.050 0.096 0.102 0.074 0.359 0.052 0.411 1,172 1,631 3,107 3,316 2,394 11,620 1,683 13,303 9,989 Mid 2043 38,684 0.031 0.046 0.081 0.096 0.069 0.323 0.048 0.371 1,193 1,798 3,133 3,721 2,662 12,507 1,853 14,360 10,709 Mid 2011 - Mid 2016 1,300 -0.0023 -0.0092 0.0068 0.0189 0.0039 0.0180 0.0074 0.0254 10 -145 300 570 195 930 237 1,167 1,075 Mid 2016 - Mid 2023 2,382 -0.0043 0.0068 0.0017 -0.0035 -0.0027 -0.0020 0.0012 -0.0008 1 292 314 175 125 907 164 1,071 615 Mid 2023 - Mid 2033 6,195 -0.0076 -0.0039 -0.0192 -0.0063 -0.0051 -0.0421 -0.0044 -0.0465 26 209 93 471 324 1,123 208 1,331 914 Mid 2023 - Mid 2043 12,515 -0.0130 -0.0079 -0.0342 -0.0125 -0.0103 -0.0778 -0.0085 -0.0863 47 376 119 876 592 2,010 378 2,388 1,634 Mid 2011 - Mid 2016 260 -0.0005 -0.0018 0.0014 0.0038 0.0008 0.0036 0.0015 0.0051 2 -29 60 114 39 186 47 233 215 Mid 2016 - Mid 2023 340 -0.0006 0.0010 0.0002 -0.0005 -0.0004 -0.0003 0.0002 -0.0001 0 42 45 25 18 130 23 153 88 Mid 2023 - Mid 2033 620 -0.0008 -0.0004 -0.0019 -0.0006 -0.0005 -0.0042 -0.0004 -0.0046 3 21 9 47 32 112 21 133 91 Mid 2023 - Mid 2043 626 -0.0006 -0.0004 -0.0017 -0.0006 -0.0005 -0.0039 -0.0004 -0.0043 2 19 6 44 30 101 19 119 82 N.F.P.O.W.[1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Industrial Commercial/ Population Related Primary Total Total Employment (Including N.F.P.O.W.) Institutional Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W.[1] Work at Home Watson & Associates Economists Ltd. PAGE A-17 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 10b Town of Lincoln Employment and Gross Floor Area (G.F.A.) Forecast, 2023 to 2043 [1] Square Foot Per Employee Assumptions Primary - Non-Bona Fide Farming 3,000 Industrial 1,200 Commercial/Population-Related 500 Institutional 675 [2] Primary industry includes bona-fide, non bona-fide farming and cannabis growing operation related employment. [3] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. *Reflects Mid-2023 to Mid-2043 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 22,487 1,135 2,400 2,100 1,750 7,385 3,405,000 2,880,000 1,050,000 1,473,500 8,808,500 Mid 2016 23,787 1,145 2,700 2,670 1,945 8,460 3,435,000 3,240,000 1,335,000 1,637,700 9,647,700 Mid 2023 26,169 1,146 3,014 2,845 2,070 9,075 3,438,000 3,616,800 1,422,500 1,742,900 10,220,200 Mid 2033 32,364 1,172 3,107 3,316 2,305 9,900 3,516,000 3,728,400 1,658,000 1,908,900 10,811,300 Mid 2043 38,684 1,193 3,133 3,721 2,487 10,534 3,579,000 3,759,600 1,860,500 2,031,400 11,230,500 Mid 2011 - Mid 2016 1,300 10 300 570 195 1,075 Mid 2016 - Mid 2023 2,382 1 314 175 125 615 3,000 376,800 87,500 105,200 572,500 Mid 2023 - Mid 2033 6,195 26 93 471 235 825 78,000 111,600 235,500 158,600 583,700 Mid 2023 - Mid 2043 12,515 47 119 876 417 1,459 141,000 142,800 438,000 281,500 1,003,300 Mid 2011 - Mid 2016 260 2 60 114 39 215 Mid 2016 - Mid 2023 340 0 45 25 18 88 429 53,829 12,500 15,029 81,786 Mid 2023 - Mid 2033 620 3 9 47 24 83 7,800 11,160 23,550 15,860 58,370 Mid 2023 - Mid 2043 626 2 6 44 21 73 7,050 7,140 21,900 14,075 50,165 Annual Average Incremental Change Industrial Commercial/ Population Related Institutional[3] Total Primary - Non- Bona Fide Farming[2] Industrial Commercial/ Population Related Institutional[3] Total Period Population Employment Gross Floor Area in Square Feet (Estimated)[¹] Primary Watson & Associates Economists Ltd. PAGE A-18 H:\LINCOLN\2023 DC\Report\Final Report.docx Schedule 10c Town of Lincoln Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square Foot Per Employee Assumptions Primary - Non-Bona Fide Farming 3,000 Industrial 1,200 Commercial/Population-Related 500 Institutional 675 [2] Primary industry includes bona-fide, non bona-fide farming and cannabis growing operation related employment. [3] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. [4] Employment Increase does not include No Fixed Place of Work. *Reflects Mid-2023 to Mid-2043 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2023 - 2033 - 111,600 220,500 158,600 490,700 769 2023 - 2043 - 142,800 410,000 281,500 834,300 1,356 2023 - 2033 - 111,600 86,000 150,600 348,200 488 2023 - 2043 - 142,800 159,900 264,900 567,600 831 2023 - 2033 - - 129,000 - 129,000 258 2023 - 2043 - - 239,900 - 239,900 480 2023 - 2033 - - - - - - 2023 - 2043 - - - - - - 2023 - 2033 - - 5,500 8,000 13,500 23 2023 - 2043 - - 10,100 16,600 26,700 45 2023 - 2033 78,000 - 15,000 - 93,000 30 2023 - 2043 141,000 - 28,000 - 169,000 56 2023 - 2033 78,000 111,600 235,500 158,600 583,700 825 2023 - 2043 141,000 142,800 438,000 281,500 1,003,300 1,459 Town of Lincoln Rural Remaining Urban Area Prudhommes Beamsville Institutional G.F.A. S.F.[1],[3] Total Non- Residential G.F.A. S.F. Commercial G.F.A. S.F.[1] Employment Increase[4] Development Location Timing Primary G.F.A. S.F.[1],[2] Industrial G.F.A. S.F.[1] Campden Urban Watson & Associates Economists Ltd. PAGE B-1 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix B: Level of Service Cost (per capita) Services Related to a Highway - Roads $50,267.00 0.0129 km of roadways 3,896,667 per km 629,091,505 Services Related to a Highway - Bridges, Culverts & Structures $4,233.13 0.0033 Number of Bridges, Culverts & Structures 1,282,767 per item 52,977,622 Public Works - Facilities $327.01 1.0850 sq.ft. of building area 301 per sq.ft. 4,092,530 Public Works - Vehicles & Equipment $438.86 0.0035 No. of vehicles and equipment 125,389 per vehicle 5,492,333 Fire Protection Services - Facilities $984.53 1.0522 sq.ft. of building area 936 per sq.ft. 12,321,393 Fire Protection Services - Vehicles & Equipment $543.22 0.0008 No. of vehicles 679,025 per vehicle 6,798,398 Fire Protection Services - Small Equipment and Gear $105.97 0.0393 No. of equipment and gear 2,696 per item 1,326,215 Parkland Development $1,610.82 0.0100 Acres of Parkland 161,082 per acre 9,979,030 Recreation Facilities $2,472.26 4.6399 sq.ft. of building area 533 per sq.ft. 15,315,651 Parks & Recreation Vehicles and Equipment $81.70 0.0025 No. of vehicles and equipment 32,680 per vehicle 506,132 Library Services - Facilities $442.19 0.5642 sq.ft. of building area 784 per sq.ft. 5,534,008 Library Services - Collection Materials $84.77 3.3992 No. of library collection items 25 per collection item 1,060,897 Library Services - Vehicles $0.31 0.00001 No. of vehicles and equipment 60,330 per vehicle 3,880 Fire Protection Library Parks & Recreation Maximum Ceiling LOS 15 Year Average Service Standard Quality (per capita) Quantity (per capita) SUMMARY OF SERVICE STANDARDS AS PER DEVELOPMENT CHARGES ACT, 1997, AS AMENDED Service Category Sub-Component Service Related to a Highway Watson & Associates Economists Ltd. PAGE B-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Services Related to a Highway - Roads Unit Measure: km of roadways Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/km) Rural kilometres 2 lane 213 213 221 230 239 248 248 248 248 248 248 248 248 218 218 $3,583,000 Urban kilometres 2 lane 65 65 65 66 66 67 68 68 68 68 70 73 74 74 74 $4,980,000 Total 278 278 286 296 305 315 316 316 316 316 318 321 322 292 292 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0126 0.0125 0.0129 0.0132 0.0134 0.0137 0.0135 0.0134 0.0133 0.0133 0.0133 0.0131 0.0126 0.0113 0.0112 15 Year Average 2008-2022 Quantity Standard 0.0129 Quality Standard $3,896,667 Service Standard $50,267 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $50,267 Eligible Amount $629,091,505 Watson & Associates Economists Ltd. PAGE B-4 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Services Related to a Highway - Bridges, Culverts & Structures Unit Measure: Number of Bridges, Culverts & Structures Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/item) Bridges - Vehicular 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 $1,600,000 Culverts Greater than 3m 9 9 9 9 9 9 9 9 9 9 9 9 9 9 10 $575,000 Culverts Less than 3m (cross culverts not driveway culverts) 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 $190,000 Total 77 77 77 77 77 77 77 77 77 77 77 77 77 77 78 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0035 0.0035 0.0035 0.0034 0.0034 0.0034 0.0033 0.0033 0.0032 0.0032 0.0032 0.0031 0.0030 0.0030 0.0030 15 Year Average 2008-2022 Quantity Standard 0.0033 Quality Standard $1,282,767 Service Standard $4,233 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $4,233 Eligible Amount $52,977,622 Watson & Associates Economists Ltd. PAGE B-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Facilities Unit Measure: sq.ft. of building area Description Proportion Used by Each Service 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Services Related to a Highway Jordan Yard 50% 2,500 2,500 2,500 - - - - - - - - - - - - $175 $215 Beamsville Yard 50% 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 8,750 $175 $215 Salt and Sand Dome 50% 522 522 522 522 522 522 522 522 522 522 522 522 522 522 522 $175 $215 Quarry Road Storage Facility 50% 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 $300 $352 Public Works/Planning Office Space (Beamsville) 50% 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 $600 $683 Water Services Jordan Yard 25% 1,250 1,250 1,250 - - - - - - - - - - - - $175 $215 Beamsville Yard 25% 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 $175 $215 Salt and Sand Dome 25% 261 261 261 261 261 261 261 261 261 261 261 261 261 261 261 $175 $215 Quarry Road Storage Facility 25% 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 $300 $352 Public Works/Planning Office Space (Beamsville) 25% 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 $600 $683 Wastewater Services Jordan Yard 25% 1,250 1,250 1,250 - - - - - - - - - - - - $175 $215 Beamsville Yard 25% 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 4,375 $175 $215 Salt and Sand Dome 25% 261 261 261 261 261 261 261 261 261 261 261 261 261 261 261 $175 $215 Quarry Road Storage Facility 25% 450 450 450 450 450 450 450 450 450 450 450 450 450 450 450 $300 $352 Public Works/Planning Office Space (Beamsville) 25% 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 1,050 $600 $683 Total 29,544 29,544 29,544 24,544 24,544 24,544 24,544 24,544 24,544 24,544 24,544 24,544 24,544 24,544 24,544 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 1.3421 1.3306 1.3266 1.0915 1.0771 1.0694 1.0493 1.0380 1.0318 1.0335 1.0269 1.0024 0.9646 0.9543 0.9374 15 Year Average 2008-2022 Quantity Standard 1.0850 Quality Standard $301 Service Standard $327 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $327 Eligible Amount $4,092,530 Watson & Associates Economists Ltd. PAGE B-6 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) 4 Ton Dump - Ford 1999 (VT26) 1 1 1 1 1 1 - - - - - - - - - $106,000 4 Ton Dump - Ford 1999 (VT27) 1 1 1 1 1 1 - - - - - - - - - $122,000 4 Ton Dump - Ford 1 1 1 1 1 - - - - - - - - - - $108,000 4 Ton Dump - Ford 1 1 1 1 1 - - - - - - - - - - $102,000 Asphalt grinder for EB23 1 1 1 1 1 - - - - - - - - - - $29,300 Asphalt paver (EM45) 1 1 1 1 1 1 1 1 1 1 - - - - - $142,000 AVR (Mechanic) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 Backhoe - JD + new buckets 1996 (EB24) 1 1 1 1 1 1 - - - - - - - - - $449,000 Backhoe - JD + new buckets 2008 (EB27) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $410,000 Backhoe - John Deere (EB23) 1 1 1 1 1 - - - - - - - - - - $373,000 Backhoe - John Deere 2005 (EB26) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $373,000 Backhoe - JD + new buckets & snowplow 2012 (EB24) - - - - 1 1 1 1 1 1 1 1 1 1 1 $168,000 Boom Mower for ER11 1 1 1 1 1 - - - - - - - - - - $64,000 Bush Hog for ER11 1 1 1 1 1 - - - - - - - - - - $20,000 Car - Dodge Caliber - 2007 (VC14) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $30,000 Car - Chevy Malibu - 2002 (VC17) 1 1 1 1 1 1 1 1 1 - - - - - - $50,000 Cargo Van - Dodge 1 1 1 1 1 - - - - - - - - - - $62,000 Cargo Van - Ford + outfitting 2005 (VV22) 1 1 1 1 1 1 1 1 1 - - - - - - $55,000 Cube Van - Ford + outfitting 2002 (VV21) 1 1 1 1 1 1 - - - - - - - - - $140,000 Cargo Van - Chevrolet + outfitting 2010 (VV19) - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $61,000 Cargo Van - Chevrolet + outfitting 2012 (VV20) - - - - 1 1 1 1 1 1 1 1 1 1 1 $62,000 Watson & Associates Economists Ltd. PAGE B-7 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Dump International 2006 (VT24) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $198,000 Dump -Sterling (VT25) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $204,000 Dump Truck - Ford Single Axle 1 1 1 1 1 - - - - - - - - - - $34,000 Dump Truck - Ford Single Axle 1 1 1 1 1 - - - - - - - - - - $392,000 Dump Truck - Ford Tandem Axle 1 1 1 1 1 - - - - - - - - - - $430,000 Dump Truck - International Single Axle 2012 (VD34) - - - - 1 1 1 1 1 1 1 1 1 1 1 $397,000 Dump Truck - International Single Axle 2009 (VD32) - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Dump Truck - International Single Axle 2010 (VD33) - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $390,000 Dump Truck - International Single Axle 2008 (VD30) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $352,000 Dump Truck - International Single Axle 2009 (VD31) - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $354,000 Dump Truck - Sterling Single Axle 2000 (VD17) 1 1 1 1 1 - - - - - - - - - - $392,000 Dump Truck - Sterling Single Axle 2000 (VD18) 1 1 1 1 1 1 1 - - - - - - - - $390,000 Dump Truck - Sterling Single Axle 2000 (VD19) 1 1 1 1 1 1 1 1 1 1 1 - - - - $392,000 Dump Truck - Sterling Single Axle 2005 (VD20) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $392,000 Dump Truck - Sterling Single Axle (VD16) 1 1 1 1 1 - - - - - - - - - - $419,000 Dump Truck - Sterling Tandem Axle 2007 (VD39) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $428,000 Dump Truck - Volvo Tandem 1 1 1 1 1 - - - - - - - - - - $486,000 Foot Tamper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $9,000 Watson & Associates Economists Ltd. PAGE B-8 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Gas Cutting Torches 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000 Gas Cutting Torches 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000 Generator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $3,000 Generator - 3500 Watt 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,000 Grader - Champion 1991 (EG31) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $654,000 Heavy Duty Air Jack 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $8,000 Hydraulic Powerpack - JCB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,000 Loader - John Deere FWD 1999 (EB25) 1 1 1 1 1 1 - - - - - - - - - $494,000 Mechanic's Hoist 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $27,000 Pickup Truck - Chevy Silverado 2008 (VP26) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Chevy Silverado 2010 (VP27) - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Dodge 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Dodge 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Dodge (VP29) 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Dodge (VP28) 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Dodge 2007 (VP23) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Dodge 2007 (VP41) 1 1 1 1 1 1 1 1 1 1 1 - - - - $65,000 Pickup Truck - Dodge 2012 (VP29) - - - - 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Dodge 2012 (VP30) - - - - 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Ford 2006 (VP01) 1 1 1 1 1 1 1 1 1 1 1 - - - - $65,000 Pickup Truck - Ford 2006 (VP02) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Watson & Associates Economists Ltd. PAGE B-9 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Pickup Truck - Ford 2006 (VP03) 1 1 1 1 1 1 1 1 1 1 1 - - - - $65,000 Pickup Truck - Ford 2002 (VC15) 1 1 1 1 1 1 - - - - - - - - - $65,000 Pickup Truck - Ford 2004 (VP33) 1 1 1 1 1 1 - - - - - - - - - $65,000 Pickup Truck - Ford 2004 (VP34) 1 1 1 1 1 1 - - - - - - - - - $65,000 Pickup Truck - Ford 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Ford 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Ford 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Ford 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Ford (VP10) 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - Ford (VP09) 1 1 1 1 1 - - - - - - - - - - $65,000 Plasma Cutter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $3,000 Plate Tamper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $9,000 Plow Attachment for EM43 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $14,000 Post Pounder - Hydraulic 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,000 Post Puller - Hydraulic 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $6,000 Pumps 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000 Rear Flail for ER11 - Was replaced with ER78 - no unit was assigned 1 1 1 1 1 - - - - - - - - - $24,000 Roller 2006 (EM40) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,000 Salt/sand Spreader for ER11 - Was replaced with ER78 - no unit was assigned 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,000 Sandblaster 1 1 1 1 1 - - - - - - - - - - $6,000 Watson & Associates Economists Ltd. PAGE B-10 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Scanner - Snap-on 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,000 Sewer Pump 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,000 Sewer Rodder - Sreco 1982 (EM36) 1 1 1 1 1 1 1 - - - - - - - - $119,000 Sheet Painter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,000 Side Flail for ER11 - Was replaced with ER78 - no unit was assigned 1 1 1 1 1 - - - - - - - - - - $33,000 Snow Blade for ER11 - Was replaced with ER78 - no unit was assigned 1 1 1 1 1 - - - - - - - - - - $13,000 Stihl Quick Cut Saw 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000 Street Sweeper - Elgin 2008 (VD38) 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $315,000 Tamper, Jumping Jack 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,000 Thompson Steamer 1982 (EM39) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $74,000 Tractor - New Holland (ER78) 1 1 1 1 1 - - - - - - - - - - $315,000 Trailer - Hitchman 2013 (EA56) - - - - - 1 1 1 1 1 1 1 1 1 1 $3,000 Trailer - Miska - Landscape Tandem 2008 (EA55) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,000 Trailer - roller 2008 (EA53) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $11,000 Trailer - Wiscot Paint Machine 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $6,000 Trailer - Wiscot Shoring 2002 (EA51) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,000 Vacuum Sweeper - Tymco 1999 (EM33) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $519,000 Welder (Shop) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,900 Welder (Truck) 1 1 1 1 1 1 1 1 1 1 1 - - - - $12,400 Dump Truck Tandem (VD35) 2014 - - - - - - 1 1 1 1 1 1 1 1 1 $407,100 Watson & Associates Economists Ltd. PAGE B-11 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Dump Truck Tandem (VD36) 2017 - - - - - - - - - 1 1 1 1 1 1 $407,100 Dump Truck Single (VD37) 2019 - - - - - - - - - - - 1 1 1 1 $372,400 Street Sweeper -Elgin (VD38) 2020 - - - - - - - - - - - - 1 1 1 $493,500 Dump Truck Tandem (VD39) 2020 - - - - - - - - - - - - 1 1 1 $407,100 Dump Truck Single (VD40) 2022 - - - - - - - - - - - - - - 1 $372,400 Dump Truck Single (VD41) 2022 - - - - - - - - - - - - - - 1 $372,400 Dump Truck Tandem (VD42) 2022 - - - - - - - - - - - - - - 1 $461,000 Pickup Truck Chevy (VP31) 2013 - - - - - 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck Chevy (VP33) 2015 - - - - - - - 1 1 1 1 1 1 1 1 $65,000 Pickup Truck Chevy (VP34) 2015 - - - - - - - 1 1 1 1 1 1 1 1 $65,000 Pickup Truck Chevy (VP38) 2017 - - - - - - - - - 1 1 1 1 1 1 $65,000 Pickup Truck Chevy (VP40) 2018 - - - - - - - - - - 1 1 1 1 1 $65,000 Pickup Truck Chevy (VP41) 2019 - - - - - - - - - - - 1 1 1 1 $65,000 Pick Truck Ford (VP42) 2019 - - - - - - - - - - - 1 1 1 1 $65,000 4-ton Dump Truck (VT26) 2014 - - - - - - 1 1 1 1 1 1 1 1 1 $100,000 4-ton Dump Truck (VT27) 2014 - - - - - - 1 1 1 1 1 1 1 1 1 $100,000 4-ton Dump Truck (VT28) 2020 - - - - - - - - - - - 1 1 1 $100,000 4-ton Dump Truck (VT29) 2020 - - - - - - - - - - - - 1 1 1 $100,000 Cube Van (VV21) 2014 - - - - - - 1 1 1 1 1 1 1 1 1 $120,000 Van (VV23) 2019 - - - - - - - - - - - 1 1 1 1 $80,000 Tractor John Deere (ER78) 2010 - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $120,000 Tractor John Deere (ER79) 2019 - - - - - - - - - - - 1 1 1 1 $65,000 Tractor Kubota (ER80) 2020 - - - - - - - - - - - - 1 1 1 $59,000 Tractor Kubota (ER81) 2020 - - - - - - - - - - - - 1 1 1 $59,000 Tractor Kubota (ER82) 2021 - - - - - - - - - - - - - - 1 $113,000 Watson & Associates Economists Ltd. PAGE B-12 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Car Ford (VC15) 2015 - - - - - - - 1 1 1 1 1 1 1 1 $40,000 Car Ford (VC16) 2015 - - - - - - - 1 1 1 1 1 1 1 1 $40,000 Car GMC (VC18) 2019 - - - - - - - - - - - 1 1 1 1 $40,000 Car Chevy (VC19) 2020 - - - - - - - - - - - - 1 1 1 $40,000 Car Chevy (VC20) 2020 - - - - - - - - - - - - 1 1 1 $40,000 Car Toyota (VC21) 2021 - - - - - - - - - - - - - 1 1 $40,000 Caterpillar Loader (EB25) 2013 - - - - - 1 1 1 1 1 1 1 1 1 1 $300,000 John Deere Backhoe (EB26) 2020 - - - - - - - - - - - - 1 1 1 $250,000 John Deere Backhoe (EB27) 2022 - - - - - - - - - - - - - - 1 $250,000 Total 89 91 95 95 100 75 71 73 73 73 73 74 80 80 85 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0040 0.0041 0.0043 0.0042 0.0044 0.0033 0.0030 0.0031 0.0031 0.0031 0.0031 0.0030 0.0031 0.0031 0.0032 15 Year Average 2008-2022 Quantity Standard 0.0035 Quality Standard $125,389 Service Standard $439 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $439 Eligible Amount $5,492,333 Watson & Associates Economists Ltd. PAGE B-13 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Fire Station #1 - 4594 Ontario St., Beamsville 4,402 4,402 4,402 4,402 6,600 6,600 6,600 6,600 6,600 7,368 7,368 7,368 7,368 7,368 7,368 $750 $900 Old Fire Station #2 - 4238 Fly Rd., Campden 3,223 3,223 3,223 3,223 3,223 3,223 3,223 3,223 3,223 3,223 3,223 - - - - $600 $750 New Fire Station #2 - 3970 Fly Rd., Campden - - - - - - - - - - - 5,345 5,345 5,345 5,345 $700 $897 Fire Station #3 - 3335 Tallman Dr., Vineland 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 4,360 $700 $835 Fire Station #4 - 3763 19th St., Jordan 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 10,457 $800 $1,047 Total 22,442 22,442 22,442 22,442 24,640 24,640 24,640 24,640 24,640 25,408 25,408 27,530 27,530 27,530 27,530 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 1.0195 1.0107 1.0077 0.9980 1.0813 1.0736 1.0534 1.0421 1.0359 1.0699 1.0631 1.1243 1.0819 1.0704 1.0515 15 Year Average 2008-2022 Quantity Standard 1.0522 Quality Standard $936 Service Standard $985 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $985 Eligible Amount $12,321,393 Watson & Associates Economists Ltd. PAGE B-14 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Fire Protection Services - Vehicles & Equipment Unit Measure: No. of vehicles Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Command 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $125,000 Prevention 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 $85,000 Aerial (100 ft Platform) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,300,000 Pumper Rescue 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $1,100,000 Tanker 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 $800,000 Air/Rehab Unit - - - - - 1 1 1 1 1 1 1 1 1 1 $500,000 Heavy Rescue 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000,000 Squad 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $250,000 Pumper 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 $1,100,000 UTV - - - - - - - - - 1 1 1 1 1 1 $32,000 UTV Trailer - - - - - - - - - 1 1 1 1 1 1 $10,000 Total 15 15 16 16 16 17 17 17 18 20 20 21 21 21 21 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0008 0.0008 0.0008 0.0009 0.0008 0.0008 0.0008 15 Year Average 2008-2022 Quantity Standard 0.0008 Quality Standard $679,025 Service Standard $543 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $543 Eligible Amount $6,798,398 Watson & Associates Economists Ltd. PAGE B-15 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/item) Bunker Gear & Protective Clothing 101 101 101 101 101 101 101 101 101 118 118 138 158 178 202 $5,800 Firefighter Pagers with Chargers 120 120 120 120 120 120 120 120 140 140 140 140 140 140 144 $1,200 Station Air Compressors 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 S.C.B.A.'s 34 34 34 34 34 40 40 40 40 44 50 50 50 50 50 $9,300 SCBA Masks 56 56 56 56 56 61 61 61 61 80 135 135 135 135 135 $800 Air Cylinders 103 103 103 103 103 115 115 115 115 115 160 160 160 160 160 $2,000 Washer Extractors - - 1 1 1 4 4 4 4 4 4 4 4 4 4 $10,000 Thermal Imaging Cameras 5 5 5 5 5 5 5 5 5 5 8 8 8 8 8 $12,500 Hurst Auto Extrication (RAM) 5 5 5 5 5 5 5 5 5 5 1 1 1 1 1 $16,000 Hurst Auto Extrication (Spreader) 1 1 1 1 1 1 1 1 1 1 7 7 7 7 7 $20,000 Hurst Auto Extrication (Cutter) 1 1 1 1 1 1 1 1 1 1 7 7 7 7 7 $20,000 Multi Gas Detectors 1 1 1 1 4 4 4 4 4 4 5 5 5 5 5 $6,500 Portable Pumps 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 $8,000 Portable Radio 31 31 31 31 31 41 41 41 41 41 44 44 44 44 44 $5,000 Mobile Radio 14 14 15 15 15 17 17 18 20 21 22 23 23 23 23 $7,000 Vehicle Radio Repeaters - - - - - - - - - - - - - - 4 $35,000 Hoses - 45mm 94 94 94 102 102 126 141 156 171 186 201 201 201 201 201 $300 Hoses - 60mm 65 65 65 65 65 77 90 103 116 129 142 142 142 142 142 $350 Hoses - 100mm 37 37 37 37 37 37 46 55 64 73 81 81 81 81 81 $1,200 Hoses - 125mm - - - - - 9 9 9 9 9 9 9 9 9 9 $1,100 Nozzles 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 $1,500 Total 703 703 705 713 716 799 837 875 934 1,012 1,170 1,191 1,211 1,231 1,263 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0319 0.0317 0.0317 0.0317 0.0314 0.0348 0.0358 0.0370 0.0393 0.0426 0.0490 0.0486 0.0476 0.0479 0.0482 15 Year Average 2008-2022 Quantity Standard 0.0393 Quality Standard $2,696 Service Standard $106 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $106 Eligible Amount $1,326,215 Watson & Associates Economists Ltd. PAGE B-16 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Acre) Destination Park 24.80 24.80 24.80 24.80 28.46 28.46 28.46 28.46 28.46 28.46 28.46 28.46 28.46 28.46 28.46 $193,000 Sports Park 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 59.70 $193,000 Community Park 16.11 16.11 16.11 16.11 16.11 16.11 16.11 16.11 16.11 16.11 16.11 19.27 19.27 19.27 19.27 $193,000 Neighbourhood Park 13.59 13.59 13.59 13.59 13.59 13.59 13.59 13.59 13.59 13.59 15.19 15.19 15.19 15.19 15.19 $193,000 Natural Area 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 77.94 $116,000 Open Space Linkage 32.16 32.16 32.64 32.64 32.64 33.44 39.97 39.97 39.97 39.97 40.57 40.57 40.77 40.77 40.77 $160,000 Schools (Municipal Portion 33%) 1.97 1.97 1.97 1.97 1.97 1.97 1.97 1.97 3.30 3.30 3.30 3.30 3.30 3.30 3.30 $96,000 Total 226.28 226.28 226.76 226.76 230.42 231.22 237.75 237.75 239.07 239.07 241.27 244.43 244.63 244.63 244.63 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0103 0.0102 0.0102 0.0101 0.0101 0.0101 0.0102 0.0101 0.0101 0.0101 0.0101 0.0100 0.0096 0.0095 0.0093 15 Year Average 2008-2022 Quantity Standard 0.0100 Quality Standard $161,082 Service Standard $1,611 D.C. Amount (before deductions) 10 Year Forecast Population 6,195 $ per Capita $1,611 Eligible Amount $9,979,030 Watson & Associates Economists Ltd. PAGE B-17 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Beamsville Arena 24,600 24,600 24,600 24,600 24,600 24,600 - - - - - - - - - $500 $573 Jordan Arena 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 30,400 $450 $518 Jordan Lions Building 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 2,550 $450 $518 Lincoln Centre 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 7,400 $450 $518 Bennett Hall 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 4,600 2,300 $350 $408 Howard House 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 2,120 $350 $408 Fleming Memorial Arena / Centre - - - - - - 57,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000 57,000 $600 $683 Outdoor Pool-Beamsville 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 5,591 $250 $297 Outdoor Pool-Jordan - 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 5,027 $250 $297 Beam St. Facility - - - - - - 5,758 5,758 5,758 5,758 5,758 5,758 5,758 5,758 - $350 $408 Community Services Office Space (Beamsville) 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 $600 $683 De Sousa Winery - - - - - - - - - - - 5,486 5,486 5,486 5,486 $225 $270 Quarry Road (Barn) 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 3,200 $175 $215 Total 81,861 86,888 86,888 86,888 86,888 86,888 125,046 125,046 125,046 125,046 125,046 130,532 130,532 130,532 122,474 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 3.7188 3.9132 3.9014 3.8639 3.8131 3.7858 5.3461 5.2885 5.2569 5.2653 5.2321 5.3309 5.1300 5.0753 4.6778 15 Year Average 2008-2022 Quantity Standard 4.6399 Quality Standard $533 Service Standard $2,472 D.C. Amount (before deductions) 10 Year Forecast Population 6,195 $ per Capita $2,472 Eligible Amount $15,315,651 Watson & Associates Economists Ltd. PAGE B-18 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) 100 gal. Watering System (Ea72) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $6,300 Aerator (EA71) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 Bannerman Ball Diamond groomer 2005 (EA35) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $18,300 Bannerman Ball Diamond groomer 1999 (EA36) 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $25,300 Bannerman Belt Liner 1 1 1 1 1 1 1 1 1 1 4 4 4 4 4 $1,200 Bannerman Overseeder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,900 Bannerman Top Dresser 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,700 Beach Groomer 1 1 1 1 1 1 - - - - - - - - - $62,400 Brush Chipper - Morbark 2003 (EM44) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,900 Cargo Van - Ford + outfitting 2005(VV18) 1 1 1 1 1 1 1 1 1 - - - - - - $74,200 Excavator - Volvo 1 1 1 1 1 - - - - - - - - - - $136,700 Forklift - JCB 2005 (EM43) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $117,600 Gator ATV - John Deere 6x4 2000 (EL81) 1 1 1 1 1 - - - - - - - - - - $31,300 Heavy Duty Pallet Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,300 Ice Edger 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $5,800 Ice Resurfacer - Beamsville 2003 propane (EM35) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $238,300 Ice Resurfacer - Jordan 2008 electric (EM47) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $230,400 Ice Resurfacer - Spare 1 1 1 1 1 - - - - - - - - - - $118,800 Leafblower 3 3 3 3 2 2 2 2 2 2 6 8 10 12 14 $1,200 Watson & Associates Economists Ltd. PAGE B-19 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Pickup Truck - Chevy Silverado 2008 (VP25) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $65,000 Pickup Truck - Ford F 150 2014 (VP32) - - - - - - 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Dodge 2007 (VP22) 1 1 1 1 1 1 1 1 1 1 1 1 - - - $65,000 Pickup Truck - Dodge 2012 (VP28) - - - - 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - Ford 2004 (VP14) 1 1 1 1 1 - - - - - - - - - - $65,000 Pickup Truck - GMC Sierra 1500 (VP35) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pickup Truck - GMC Sierra 1500 (VP36) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Pressure Washer 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 $17,500 Progator-John Deere 2008 (EL82) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $55,900 Push Mowers - 2 3 3 3 3 3 3 3 3 3 3 3 4 4 5 6 $1,000 Riding Mower - John Deere 1 1 1 1 1 - - - - - - - - - - $15,400 Riding Mower - Kubota 2WD 2008 (EL 14) 1 1 1 1 1 1 1 1 1 1 1 - - - - $25,200 Riding Mower - Kubota 4WD 2000 (EL12) 1 1 1 1 1 - - - - - - - - - - $55,300 Riding Mower - Kubota Zero Turn 2005 (EL13) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $29,700 Rototiller - - - - 1 1 1 1 1 1 1 2 2 3 3 $1,200 RTV - Kubota 2007 (EL16) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $29,700 Sprayer - 50 gal 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $3,500 Tractor - Ford (ER 16) 1 1 1 1 1 1 1 1 1 1 1 - - - - $52,000 Watson & Associates Economists Ltd. PAGE B-20 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Tractor - Massey Ferguson 2007 (ER75) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $52,000 Tractor - Massey Ferguson 2007 (ER76) 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $52,000 Tractor - Massey Ferguson 2007 (ER77) 1 1 1 1 1 1 1 1 1 1 - - - - - $52,000 Trailer - Hitchman (Tent) 1 1 1 1 1 - - - - - - - - - - $3,200 Trailer - Hitchman 22' Tandem 1 1 1 1 1 - - - - - - - - - - $13,400 Trailer - Wiscot 1997 (EA49) 1 1 1 1 1 1 1 1 1 1 - - - - - $2,900 Trailer - Wiscot-small Tandem 1 1 1 1 1 - - - - - - - - - - $4,900 Watercannon 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $62,300 Weedeaters 6 6 6 6 6 6 6 6 6 6 8 10 10 12 13 $700 M.F. Mower-2013 (EL83) - - - - - 1 1 1 1 1 1 1 - - - $21,400 Kubota RTV-2015 (EL84) - - - - - - - 1 1 1 1 1 1 - - $22,600 Kubota Mower-2016 (EL85) - - - - - - - - 1 1 1 1 1 1 1 $42,400 Utility Trailer (EA76) - - - - - - - - 1 1 1 1 1 1 1 $2,900 Gang Mower -2106 (EA77) - - - - - - - - 1 1 1 1 1 1 1 $17,600 Sod cutter Billy Goat - - - - - - - - - - - - - - 1 $4,300 IGO Liners - - - - - - - - - - - - - - 2 $1,600 Lazer Liners - - - - - - - - - - - - - - 2 $3,800 Green works Electric trimmers - - - - - - - - - - - - - - 3 $800 Bannerman Gill/Groomer - - - - - - - - - - - - - - 2 $3,800 Green works electric Mowers - - - - - - - - - - - - - - 3 $900 Ford Pickup (VP39) 2018 - - - - - - - - - - - 1 1 1 1 $65,000 Chevy Pickup (VP43) 2019 - - - - - - - - - - - - 1 1 1 $65,000 Chevy Pickup (VP44) 2020 - - - - - - - - - - - - - 1 1 $65,000 Ford Van (VV22) 2018 - - - - - - - - - - 1 1 1 1 1 $120,000 Watson & Associates Economists Ltd. PAGE B-21 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/Vehicle) Kubbota Mower (EL86) 2017 - - - - - - - - - 1 1 1 1 1 1 $19,000 Kubota Mower (EL87) 2017 - - - - - - - - - 1 1 1 1 1 1 $19,000 Kubota Mower (EL88) 2018 - - - - - - - - - - 1 1 1 1 1 $19,000 Kubota Mower (EL89) 2018 - - - - - - - - - - 1 1 1 1 1 $19,000 Kubota Mower (EL90) 2019 - - - - - - - - - - - 1 1 1 1 $19,000 Kubota Mower (EL91) 2019 - - - - - - - - - - - 1 1 1 1 $19,000 Kubota Mower (EL92) 2020 - - - - - - - - - - - - 1 1 1 $19,000 Kubota Mower (EL93) 2020 - - - - - - - - - - - - 1 1 1 $19,000 Kubota UTV (EL94) 2021 - - - - - - - - - - - - - 1 1 $29,500 Kubota UTV (EL95) 2021 - - - - - - - - - - - - - 1 1 $29,500 Kubota Mower (EL96) 2022 - - - - - - - - - - - - - - 1 $19,000 Kubota Mower (EL97) 2022 - - - - - - - - - - - - - - 1 $19,000 Kubota Mower (EL98) 2022 - - - - - - - - - - - - - - 1 $19,000 Ford car (VC17) 2019 - - - - - - - - - - - 1 1 1 1 $40,000 Total 54 54 54 54 55 47 47 48 51 52 62 70 72 78 96 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.0025 0.0024 0.0024 0.0024 0.0024 0.0020 0.0020 0.0020 0.0021 0.0022 0.0026 0.0029 0.0028 0.0030 0.0037 15 Year Average 2008-2022 Quantity Standard 0.0025 Quality Standard $32,680 Service Standard $82 D.C. Amount (before deductions) 10 Year Forecast Population 6,195 $ per Capita $82 Eligible Amount $506,132 Watson & Associates Economists Ltd. PAGE B-22 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Library Services - Facilities Unit Measure: sq.ft. of building area Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Beam St. Facility 5,758 5,758 5,758 5,758 5,758 5,758 - - - - - - - - - $350 $444 Moses F. Rittenhouse 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 $800 $988 Fleming Branch - - - - - - 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $600 $746 Total 10,858 10,858 10,858 10,858 10,858 10,858 15,100 15,100 15,100 15,100 15,100 15,100 15,100 15,100 15,100 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 0.4933 0.4890 0.4875 0.4829 0.4765 0.4731 0.6456 0.6386 0.6348 0.6358 0.6318 0.6167 0.5934 0.5871 0.5767 15 Year Average 2008-2022 Quantity Standard 0.5642 Quality Standard $784 Service Standard $442 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $442 Eligible Amount $5,534,008 Watson & Associates Economists Ltd. PAGE B-23 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Value ($/item) Collections 78,066 78,549 78,968 77,798 82,446 78,234 77,067 82,418 76,671 76,671 76,671 78,870 86,861 88,000 88,000 $24 Electronic Collection - 0.4 0.4 0.4 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $53,700 Public Computers 15 15 15 15 15 15 19 19 19 19 19 19 29 29 29 $1,600 Maker Space Kit - - - - - - - - - - - - - 3 3 $200 3D Printers - - - - - - - - - - - - 1 1 2 $5,500 Internet Hot Spot - - - - - - - - - - - - - 10 20 $200 Total 78,081 78,564 78,983 77,813 82,462 78,250 77,087 82,438 76,691 76,691 76,691 78,890 86,892 88,044 88,055 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard 3.5470 3.5383 3.5465 3.4604 3.6188 3.4094 3.2957 3.4865 3.2241 3.2292 3.2088 3.2218 3.4149 3.4233 3.3632 15 Year Average 2008-2022 Quantity Standard 3.3992 Quality Standard $25 Service Standard $85 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $85 Eligible Amount $1,060,897 Watson & Associates Economists Ltd. PAGE B-24 H:\LINCOLN\2023 DC\Report\Final Report.docx Town of Lincoln Service Standard Calculation Sheet Service: Library Services - Vehicles Unit Measure: No. of library collection items Description 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2018 Value ($/item) 2023 Value ($/item) Library Van - - - - - - - - - - - - - 1 1 $60,000 Total - - - - - - - - - - - - - 1 1 Population 22,013 22,204 22,271 22,487 22,787 22,951 23,390 23,645 23,787 23,749 23,900 24,486 25,445 25,719 26,182 Per Capita Standard - - - - - - - - - - - - - 0.00004 0.00004 15 Year Average 2008-2022 Quantity Standard 0.00001 Quality Standard $60,330 Service Standard $0.31 D.C. Amount (before deductions) 20 Year Forecast Population 12,515 $ per Capita $0.31 Eligible Amount $3,880 Watson & Associates Economists Ltd. PAGE C-1 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix C: Long-Term Capital and Operating Cost Examination Town of Lincoln Annual Capital and Operating Cost Impact As a requirement of the Development Charges Act, 1997, as amended, under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the development charge. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the Town's approved 2022 Financial Information Return (F.I.R.). In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. The following factors were utilized to calculate the annual replacement cost of the capital projects (annual contribution = factor X capital asset cost) and are based on an annual growth rate of 2% (net of inflation) over the average useful life of the asset: Watson & Associates Economists Ltd. PAGE C-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Table C-1 Town of Lincoln Lifecycle Cost Factors and Average Useful Lives Table C-2 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while Town program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Average Useful Life Factor Water and Wastewater Infrastructure 80 0.005160705 Facilities 50 0.01182321 Services Related to a Highway 50 0.01182321 Parkland Development 40 0.016555748 Vehicles 15 0.057825472 Small Equipment & Gear 10 0.091326528 Library Materials 10 0.091326528 Lifecycle Cost Factors Asset Watson & Associates Economists Ltd. PAGE C-4 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Table C-2 Town of Lincoln Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE/CLASS OF SERVICE GROSS COST LESS BENEFIT TO EXISTING ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES 1. Stormwater Drainage and Control Services 1.1 Channels, drainage and ponds 13,079,682 289,740 34,426 324,166 2. Wastewater Services 2.1 Treatment plants & Sewers 24,345,352 546,796 2,356,512 2,903,308 3. Water Services 3.1 Treatment, storage and distribution systems 40,715,975 904,041 2,471,431 3,375,472 4. Services Related to a Highway 4.1 Roads and Related 90,707,190 4,159,843 1,994,898 6,154,741 4.2 Public Works (Facilities and Fleet) 27,589,000 1,136,722 2,489,784 3,626,506 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 22,218,097 992,262 1,756,210 2,748,472 6. Library Services 6.1 Library facilities, materials and vehicles 6,552,885 237,747 727,150 964,897 7. Parks and Recreation Services 7.1 Park development, vehicles, trails and recreation facilities 37,186,015 1,394,309 1,619,718 3,014,027 Total 262,394,196 9,661,460 13,450,130 23,111,590 Watson & Associates Economists Ltd. PAGE D-1 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix D D.C. Reserve Fund Policy Watson & Associates Economists Ltd. PAGE D-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix D: D.C. Reserve Fund Policy D.1 Legislative Requirements The Development Charges Act, 1997, as amended (D.C.A.) requires development charge (D.C.) collections (and associated interest) to be placed in separate reserve funds. Sections 33 through 36 of the D.C.A. provide the following regarding reserve fund establishment and use: - A municipality shall establish a reserve fund for each service to which the D.C. by-law relates; subsection 7 (1), however, allows services to be grouped into categories of services for reserve fund (and credit) purposes and for classes of services to be established. - The municipality shall pay each D.C. it collects into a reserve fund or funds to which the charge relates. - The money in a reserve fund shall be spent only for the "capital costs" determined through the legislated calculation process (as per subsection 5 (1) 2 to 8). - Money may be borrowed from the fund but must be paid back with interest (O. Reg. 82/98, subsection 11 (1) defines this as Bank of Canada rate either on the day the by-law comes into force or, if specified in the by-law, the first business day of each quarter). - D.C. reserve funds may not be consolidated with other municipal reserve funds for investment purposes and may only be used as an interim financing source for capital undertakings for which D.C.s may be spent (section 37). Annually, the Treasurer of the municipality is required to provide Council with a financial statement related to the D.C. by-law(s) and reserve funds. This statement must be made available to the public and may be requested to be forwarded to the Minister of Municipal Affairs and Housing. Subsection 43 (2) and O. Reg. 82/98 prescribe the information that must be included in the Treasurer's statement, as follows: - opening balance; - closing balance; Watson & Associates Economists Ltd. PAGE D-3 H:\LINCOLN\2023 DC\Report\Final Report.docx - description of each service and/or service category for which the reserve fund was established (including a list of services within a service category); - transactions for the year (e.g. collections, draws) including each asset's capital costs to be funded from the D.C. reserve fund and the manner for funding the capital costs not funded under the D.C. by-law (i.e. non-D.C. recoverable cost share and post-period D.C. recoverable cost share); - for projects financed by D.C.s, the amount spent on the project from the D.C. reserve fund and the amount and source of any other monies spent on the project; - amounts borrowed, purpose of the borrowing, and interest accrued during previous year; - amount and source of money used by the municipality to repay municipal obligations to the D.C. reserve fund; - list of credits by service or service category (outstanding at the beginning of the year, given in the year, and outstanding at the end of the year by the holder); - for credits granted under section 14 of the previous D.C.A., a schedule identifying the value of credits recognized by the municipality, the service to which it applies and the source of funding used to finance the credit; and - a statement as to compliance with subsection 59 (1) of the D.C.A., whereby the municipality shall not impose, directly or indirectly, a charge related to a development or a requirement to construct a service related to development, except as permitted by the D.C.A. or another Act. Recent changes arising from Bill 109 (More Homes for Everyone Act, 2022) provide that the Council shall make the statement available to the public by posting the statement on the website or, if there is no such website, in the municipal office. In addition, Bill 109 introduced the following requirements which shall be included in the treasurer's statement. - For each service for which a development charge is collected during the year o whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law, and o if the answer to subparagraph i is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; Watson & Associates Economists Ltd. PAGE D-4 H:\LINCOLN\2023 DC\Report\Final Report.docx - For any service for which a development charge was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. Additionally, as per subsection 35(3) of the D.C.A.: 35(3) If a service is prescribed for the purposes of this subsection, beginning in the first calendar year that commences after the service is prescribed and in each calendar year thereafter, a municipality shall spend or allocate at least 60 per cent of the monies that are in a reserve fund for the prescribed service at the beginning of the year. The services currently prescribed are water, wastewater, and services related to a highway. Therefore, as of 2023, a municipality shall spend or allocate at least 60 percent of the monies in the reserve fund at the beginning of the year. There are generally two (2) ways in which a municipality may approach this requirement: a) Include a schedule are part of the annual treasurer's statement; or b) Incorporate the information into the annual budgeting process. Based upon the above, Figure 1 and Attachments 1 and 2, set out the format for which annual reporting to Council should be provided. Attachment 3 provides for the schedule for allocating reserve fund balances to projects. D.2 D.C. Reserve Fund Application Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5(1)." This provision clearly establishes that reserve funds collected for a specific service are only to be used for that service, or to be used as a source of interim financing of capital undertakings for which a D.C. may be spent. Watson & Associates Economists Ltd. PAGE D-5 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure D-1 Town of Lincoln Annual Treasurer's Statement of Development Charge Reserve Funds Services to which the Development Charge Relates Description Services Related to a Highway Water Services Wastewater Services Fire Protection Services Parks and Recreation Services Opening Balance, January 1, ________ 0 Plus: Development Charge Collections 0 Accrued Interest 0 Repayment of Monies Borrowed from Fund and Associated Interest1 0 Sub-Total 0 0 0 0 0 0 Less: Amount Transferred to Capital (or Other) Funds2 0 Amounts Refunded 0 Amounts Loaned to Other D.C. Service Category for Interim Financing 0 Credits3 0 Sub-Total 0 0 0 0 0 0 Closing Balance, December 31, ________ 0 0 0 0 0 0 1 Source of funds used to repay the D.C. reserve fund 2 See Attachment 1 for details 3 See Attachment 2 for details The Municipality is compliant with s.s. 59.1 (1) of the Development Charges Act , whereby charges are not directly or indirectly imposed on development nor has a requirement to construct a service related to development been imposed, except as permitted by the Development Charges Act or another Act. Total Watson & Associates Economists Ltd. PAGE D-6 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure D-2a Town of Lincoln Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Capital Fund Transactions D.C. Recoverable Cost Share Non-D.C. Recoverable Cost Share D.C. Forecast Period Post D.C. Forecast Period Capital Fund Transactions Gross Capital Cost D.C. Reserve Fund Draw D.C. Debt Financing Grants, Subsidies Other Contributions Post-Period Benefit/ Capacity Interim Financing Grants, Subsidies Other Contributions Other Reserve/Reserv e Fund Draws Tax Supported Operating Fund Contributions Rate Supported Operating Fund Contributions Debt Financing Grants, Subsidies Other Contributions Services Related to a Highway Capital Cost A Capital Cost B Capital Cost C Sub-Total - Services Related to Highways $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost D Capita Cost E Capital Cost F Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost G Capita Cost H Capital Cost I Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Watson & Associates Economists Ltd. PAGE D-7 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure D-2b Town of Lincoln Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Operating Fund Transactions D.C. Reserve Fund Draw Post D.C. Forecast Period Non-D.C. Recoverable Cost Share Operating Fund Transactions Principal Interest Principal Interest Source Principal Interest Source Services Related to a Highway Capital Cost J Capita Cost K Capital Cost L Sub-Total - Services Related to a Highway $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost M Capita Cost N Capital Cost O Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost P Capita Cost Q Capital Cost R Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 Annual Debt Repayment Amount Watson & Associates Economists Ltd. PAGE D-8 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure D-3 Town of Lincoln Attachment 2 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Credit Holder Transactions Credit Holder Applicable D.C. Reserve Fund Credit Balance Outstanding Beginning of Year ________ Additional Credits Granted During Year Credits Used by Holder During Year Credit Balance Outstanding End of Year ________ Credit Holder A Credit Holder B Credit Holder C Credit Holder D Credit Holder E Credit Holder F Watson & Associates Economists Ltd. PAGE D-9 H:\LINCOLN\2023 DC\Report\Final Report.docx Figure D-4 Town of Lincoln Attachment 3 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Reserve Fund Balance Allocations Service: Water Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Service: Wastewater Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Service: Services Related to a Highway Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Watson & Associates Economists Ltd. PAGE E-1 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix E Local Service Policy Watson & Associates Economists Ltd. PAGE E-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix E: Local Service Policy Town of Lincoln Recommended General Policy Guidelines on Development Charge and Local Service Funding for Road-related, Stormwater Management, Parkland Development, Water, and Sanitary Sewer Works The following guidelines set out in general terms the size and nature of engineered infrastructure that is included in the study as a development charge project versus infrastructure that is considered as a local service, to be emplaced separately by landowners, pursuant to a development agreement. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, these policy guidelines, the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area, and subsection 59(2) of the Development Charges Act, 1997. SERVICES RELATED TO A HIGHWAY A highway and services related to a highway are intended for the transportation of people and goods via many different modes including, but not limited to passenger automobiles, commercial vehicles, transit vehicles, bicycles and pedestrians. The highway shall consist of all land and associated infrastructure built to support (or service) this movement of people and goods regardless of the mode of transportation employed, thereby achieving a complete street. A complete street is the concept whereby a highway is planned, designed, operated and maintained to enable pedestrians, cyclists, public transit users and motorists to safely and comfortably be moved, thereby allowing for the efficient movement of persons and goods. The associated infrastructure to achieve this concept shall include, but is not limited to: road pavement structure and curbs; grade separation/bridge structures (for any vehicles, railways and/or pedestrians); grading, drainage and retaining wall features; culvert structures; storm water drainage systems; utilities; traffic control systems; signage; gateway features; street furniture; active transportation facilities (e.g. Watson & Associates Economists Ltd. PAGE E-3 H:\LINCOLN\2023 DC\Report\Final Report.docx sidewalks, bike lanes, multi-use trails which interconnect the transportation network, etc.); transit lanes & lay-bys; roadway illumination systems; boulevard and median surfaces (e.g. sod & topsoil, paving, etc.); street trees and landscaping; parking lanes & lay-bys; (excluding on-street parking in the downtown) and driveway entrances; noise attenuation systems; railings and safety barriers. 1. Arterial and Collector Roads (including Structures) i. New Collector Roads internal to a development are direct developer responsibility. ii. New, widened, extended or upgraded, Arterial and Collector Roads external to a development are considered to be development charge projects. iii. New Collector Roads external to a development, but primarily acting as a connection serving a development, are a direct developer responsibility. iv. All other roads are considered to be the developer's responsibility. 2. Traffic Control Systems, Signals and Intersection Improvements i. On new arterial roads and arterial road improvements unrelated to a specific development: included as part of road costing funded through D.C.'s. ii. On non-arterial roads, or for any private site entrances or entrances to specific development: direct developer responsibility under s.59 of D.C.A. (as a local service). iii. On arterial or collector road intersections with Regional roads: include in D.C.'s or in certain circumstances, may be a direct developer responsibility iv. Intersection improvements, new or modified signalization, signal timing & optimization plans, area traffic studies for highways attributed to growth and unrelated to a specific development: included in D.C. calculation as permitted under s.5(1) of the D.C.A. Watson & Associates Economists Ltd. PAGE E-4 H:\LINCOLN\2023 DC\Report\Final Report.docx 3. Streetlights i. Streetlights on new arterial roads an arterial road improvements: considered part of the complete street and included as part of the road costing funded through D.C.'s or in exceptional circumstances, may be direct developer responsibility through local service provisions (s.59 of D.C.A.). ii. Streetlights on non-arterial roads internal to development: considered part of the complete street and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). iii. Streetlights on non-arterial roads external to development, needed to support a specific development or required to link with the area to which the plan relates: considered part of the complete street and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). 4. Transportation Related Pedestrian and Cycling Facilities i. Sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within arterial roads, Regional roads and provincial highway corridors: considered part of the complete street and included in D.C.'s, or, in exceptional circumstances, may be direct developer responsibility through local service provisions (s.59 of D.C.A.). ii. Sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within or linking to non-arterial road corridors internal to development: considered part of the complete street and is a direct developer responsibility through local service provisions (s.59 of D.C.A.). iii. Other sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within non-arterial road corridors external to development and needed to support a specific development or required to link with the area to which the plan relates: direct developer responsibility under s.59 of D.C.A. (as a local service). iv. Multi-use trails (not associated with a road), inclusive of all land and required infrastructure, that go beyond the function of a (parkland) recreational trail and Watson & Associates Economists Ltd. PAGE E-5 H:\LINCOLN\2023 DC\Report\Final Report.docx form part of the municipality's active transportation network for cycling and/or walking: included in D.C.'s 5. Transit Lanes and Lay-bys i. Transit lanes and lay-bys located within municipal arterial and regional road corridors: considered part of the complete street and included in D.C.'s ii. Transit lanes and lay-bys located within non-arterial road corridors internal to development: considered part of the complete street and direct developer responsibility under s. 59 of the D.C.A. (as a local service). iii. Transit lanes and lay-bys located within non-arterial road corridors external to development and needed to support a specific development or required to link with the area to which the plan relates: direct developer responsibility under s. 59 of the D.C.A. (as a local service). 6. Transit Bus Stops and Amenities i. Transit bus stops and amenities internal to development: direct developer responsibility under s.59 of D.C.A. (as a local service). ii. Transit bus stops and amenities on arterial roads: included in Municipality's Transit D.C.'s consistent with D.C.A., s.5(1). LAND ACQUISITION FOR ROADS 7. Road Allowances i. Land acquisition for Arterial or Collector Roads, to the widths required according to the approved engineering standards, is primarily provided by dedications under the Planning Act. In areas where limited or no development is anticipated, and direct dedication is unlikely, the land acquisition is considered to be part of the capital cost of the related development charge project Watson & Associates Economists Ltd. PAGE E-6 H:\LINCOLN\2023 DC\Report\Final Report.docx 8. Grade Separations i. Land acquisition for Grade Separations (beyond normal dedication requirements) is considered to be part of the capital cost of the related development charge project. The detailed engineering requirements of the above items are governed by the approved detailed engineering standards for the Town. PARKLAND DEVELOPMENT 9. Recreational Trails i. Recreational trails (Multi-use trails) that do not form part of the municipality's active transportation network, and their associated infrastructure (landscaping, bridges, trail surface, etc.), is included in area municipal parkland D.C.'s. 10. Parkland i. Parkland Development for Community Parks, District Parks, Neighbourhood Parks and Village Squares: direct developer responsibility to provide at base condition, as per the parks standards as developed, as a local service provision. ii. Program facilities, amenities, and furniture, within parkland: are included in D.C.s. 11. Landscape Buffer Blocks. Features, Cul-de-sac Islands, Berms, Grade Transition Areas, Walkway Connections to Adjacent Arterial Roads, Open Space, Etc. i. The cost of developing all landscape buffer blocks, landscape features, cul-de- sac islands, berms, grade transition areas, walkway connections to adjacent arterial roads, open space and other remnant pieces of land conveyed to the municipality shall be a direct developer responsibility as a local service. Such costs include but are not limited to: - pre-grading, sodding or seeding, supply and installation of amended topsoil, (to the Municipality's required depth), landscape features, perimeter fencing and amenities and all planting. Watson & Associates Economists Ltd. PAGE E-7 H:\LINCOLN\2023 DC\Report\Final Report.docx - Perimeter fencing to the Municipal standard located on the public property side of the property line adjacent land uses (such as but limited to arterial roads) as directed by the Municipality. WATER 12. Watermains i. Watermains internal to the development are considered to be a local service unless the Town requests a watermain be oversized, in which case the oversizing is a development charge project. ii. External watermains of any size required by a development to connect to an existing local trunk main are considered to be the developer's local service responsibility. iii. Watermains of any size required to connect a development charge eligible pumping station or reservoir to the supply network are considered to be development charge projects. iv. Providing new underground services or upgrading existing underground services external to the development if the services are required to service the development, and if the pipe sizes do not exceed 300mm, are considered to be the developer's local service responsibility. 13. Booster Stations and Reservoirs i. New or expanded water booster pumping stations and reservoir projects servicing two or more developments are considered to be development charge projects. All others are the responsibility of the developer. ii. All other new or expanded water booster pumping stations and reservoir projects that do not qualify as above are the responsibility of the developer. iii. The detailed engineering requirements of the above items are governed by the approved detailed engineering standards for the Town. Watson & Associates Economists Ltd. PAGE E-8 H:\LINCOLN\2023 DC\Report\Final Report.docx WASTEWATER 14. Sanitary Sewers i. Sanitary Sewers internal to the development are considered to be a local service, unless the Town requests a sewer be oversized, in which case the oversizing is a development charge project. ii. Sanitary Sewers of any size required by a development to connect to an existing local trunk main are considered to be the developer's responsibility. iii. Sanitary Sewers of any size required to connect a pumping station or treatment plant to the collection network are considered to be development charge projects. iv. Providing new underground services or upgrading existing underground services external to the development if the services are required to service the development, and if the pipe sizes do not exceed 300mm, are considered to be the developer's local service responsibility. 15. Pumping Stations i. New or expanded pumping stations internal or external to a development, that are fed by sanitary sewers which qualify as a development charge project are also considered to be development charge projects. ii. New or expanded pumping stations fed by sanitary sewers that do not qualify as a development charge project are the responsibility of the developer. The above pipe sizes in section 15(iv) govern, unless the hydraulic conditions of a particular development require a different pipe size, in which case the minimum pipe size determined by such hydraulic conditions shall be the developer's responsibility. LAND ACQUISITION FOR WATER AND WASTEWATER WORKS 16. Booster Stations and Reservoirs i. Where required, land acquisition for Booster Stations and Reservoirs which are development charge projects, to the size required by the design of the facility, is to be provided by the developer as part of the development approval process. Watson & Associates Economists Ltd. PAGE E-9 H:\LINCOLN\2023 DC\Report\Final Report.docx The market value of the land is considered to be part of the capital cost of the related development charge project. 17. Pumping Stations i. Where required, land acquisition for Pumping Stations which are development charges projects, to the size required by the design of the facility, is to be provided by the developer as part of the development approval process. The market value of the land is considered to be part of the capital cost of the related development charge project. The detailed engineering requirements of the above items are governed by the approved detailed engineering standards for the Town. STORMWATER MANAGEMENT 18. Stormwater i. Over-sizing cost of stormwater facilities capacity, excluding land, to accommodate runoff from new, widened, extended or upgraded municipal arterial roads that are funded as a development charges project: included as part of road costing funded through D.C.'s. ii. Erosion works, inclusive of all restoration requirements, related to a development application: direct developer responsibility under s. 59 of the D.C.A. (as a local service). iii. Monitoring works: included in D.C.'s consistent with the D.C.A., s.5(1). Storm sewer systems and drainage works that are required for a specific development, either internal or external to the area to which the plan relates: direct developer responsibility under s. 59 of the D.C.A. (as a local service) Watson & Associates Economists Ltd. PAGE F-1 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix F Asset Management Plan Watson & Associates Economists Ltd. PAGE F-2 H:\LINCOLN\2023 DC\Report\Final Report.docx Appendix F: Asset Management Plan The recent changes to the Development Charges Act, 1997, as amended (D.C.A.) (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset throughout its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program- related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which are to be completed by 2022 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE F-3 H:\LINCOLN\2023 DC\Report\Final Report.docx Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE F-4 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Commensurate with the above, the Town prepared an A.M.P. in 2022 for its existing assets; however, it did not take into account future growth-related assets for all services included in the D.C. calculations. As a result, the asset management requirement for the D.C. must be undertaken in the absence of this information. In recognition to the schematic above, the following table (presented in 2023 $) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, as all capital costs included in the D.C.-eligible capital costs are not included in the Town's A.M.P., the present infrastructure gap and associated funding plan have not been considered at this time. Hence the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that will require financing from municipal financial resources (i.e., taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2023 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are approximately $36.68 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are approximately $9.70 million. This amount, totalled with the existing operating revenues of approximately $48.62 million, provides annual revenues of approximately $58.28 million by the end of the period. Watson & Associates Economists Ltd. PAGE F-5 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 6. In consideration of the above, the capital plan is deemed to be financially sustainable. Town of Lincoln Asset Management - Future Expenditures and Associated Revenues 2023$ Asset Management - Future Expenditures and Associated Revenues 2043 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 10,658,814 Annual Debt Payment on Post Period Capital2 2,912,962 Lifecycle: Annual Lifecycle - Municipal-wide Services 9,661,460 Incremental Operating Costs (for D.C. Services) 13,450,130 Total Expenditures $36,683,365 Revenue (Annualized) Total Existing Revenue3 $48,617,749 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $9,659,963 Total Revenues $58,277,712 3 As per Sch. 10 of FIR 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE G-1 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Appendix G Proposed D.C. By-law Watson & Associates Economists Ltd. PAGE G-2 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Appendix G: Proposed D.C. By-law THE CORPORATION OF THE TOWN OF LINCOLN BY-LAW NO. 2024-XX A BY-LAW FOR THE IMPOSITION OF DEVELOPMENT CHARGES AND TO REPEAL BY-LAWS 2018-93 and 2022-30 WHEREAS: 1. Subsection 2(1) of the Development Charges Act, 1997, S.O. 1997, c. 27 (hereinafter called "the Act") provides that the council of a municipality may pass by-laws for the imposition of development charges against land for increased capital costs required because of the need for services arising from development in the area which the by-law applies; 2. The Council of the Corporation of the Town of Lincoln ("Town of Lincoln") desires to ensure that the capital costs of meeting development related demands for, or the burden on, Town services does not place an undue financial burden on the Town or its existing taxpayers while, at the same time, ensuring new development contributes no more than the net capital costs attributable to providing the historical level of services and meeting the requirements of Section 5 (1) of the Act; 3. The Council of the Town of Lincoln has given Notice in accordance with Section 12 of the Act of its intention to pass a by-law under Section 2 of the Act; 4. The Council of the Town of Lincoln has heard all persons who applied to be heard no matter whether in objection to, or in support of, the development charge proposal at a public meeting held on February 20, 2024; 5. The Council of the Town of Lincoln had before it a report entitled Development Charges Background Study dated December 22, 2023, as amended February 9, 2024 prepared by Watson & Associates Economists Ltd., wherein it is indicated that the development of any land within the Town of Lincoln will increase the need for services as defined herein; Watson & Associates Economists Ltd. PAGE G-3 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 6. The Council of the Town of Lincoln on February 20, 2024 determined that no additional public meeting was required; 7. The Council of the Town of Lincoln on February 20, 2024 approved the applicable Development Charges Background Study, dated December 22, 2023, as amended February 9, 2024 in which certain recommendations were made relating to the establishment of a development charge policy for the Town of Lincoln pursuant to the Development Charges Act, 1997. NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE TOWN OF LINCOLN ENACTS AS FOLLOWS: 1.0 DEFINITIONS 1.1 In this by-law, (1) "Act" means the Development Charges Act, 1997, S.O. 1997, c. 27, as amended, or any successor thereto. (2) "Accessory Use" means where used to describe a use, building, or structure, that the use, building, or structure is naturally and normally incidental, subordinate in purpose or floor area or both, and exclusively devoted to a principal use, building or structure. (3) "Affordable Residential Unit" means a Dwelling Unit that meets the criteria set out in subsection 4.1 (2) or 4.1(3) of the Act; (4) "Agricultural Produce Processing Building or Structure" means a building or structure or portion thereof used for processing local farm produce as an ancillary use to an agricultural use. (5) "Agricultural Produce Stand" means a seasonal building or structure where Ontario grown produce is retailed to the general public and is accessory to an agricultural use. (6) "Agricultural Produce Warehouse and/or Shipping Building or Structure" means a building or structure or portion thereof where local agricultural produce and/or products are stored and distributed to and from. Watson & Associates Economists Ltd. PAGE G-4 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (7) "Agricultural Research" means the use of a building or structure for agricultural research. (8) "Agricultural Use" means use or intended use for bona fide farming purposes (a) including (but not limited to): (b) cultivation of crops, whether on open land or in greenhouses, including (but not limited to) fruit, vegetables, herbs, grains, field crops, marijuana, sod, trees, shrubs, flowers, and ornamental plants; (c) raising of animals, including (but not limited to) cattle, horses, pigs, poultry, livestock, fish; (d) agricultural animal husbandry, dairying, equestrian activities, horticulture, fallowing, pasturing, and market gardening; (e) Agricultural Produce Stand and Farm Produce Outlet; (f) Agricultural Research uses on lands within an Agricultural Zone; (g) the first 750 square metres of an Agricultural Produce Processing Building, or Structure located on lands within an Agricultural Zone; and (h) the first 750 square metres of an Agricultural Produce Warehouse and/or Shipping Building or Structure on lands within an Agricultural Zone. but excluding: (i) retail sales activities except those retail sales activities associated with Section (7)(a); Watson & Associates Economists Ltd. PAGE G-5 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (j) restaurants, banquet facilities, hospitality facilities, Craft Breweries, Craft Distilleries, Estate Wineries, Farm Wineries, and Residential Uses; (k) services related to grooming, boarding, or breeding of household pets; and (l) Marijuana Processing or Production Facilities. (9) "Apartment Unit" means any residential dwelling unit within a building containing five or more dwelling units where access to each residential unit is obtained through a common entrance or entrances from the street level and the residential units are connected by an interior corridor. (10) "Attainable Residential Unit" means a Dwelling Unit that meets the criteria set out in subsection 4.1(4) of the Act. (11) "Back-to-back Townhouse Dwelling" means a building containing four or more dwelling units separated vertically by a common wall, including a rear common wall, that do not have rear yards. (12) "Bedroom" means a habitable room larger than seven square metres, including a den, study, or other similar area, but does not include a living room, dining room or kitchen. (13) "Benefiting Area" means an area defined by a map, plan, or legal description in a front-ending agreement as an area that will receive a benefit from the construction of a service. (14) "Board of Education" means a board defined in subsection 1(1) of the Education Act, R.S.O. 1990, c.E.2, as amended, or any successor thereto. (15) "Building Code Act" means the Building Code Act, 1992, S.O. 1992, c. 23, as amended, or any successor thereto. (16) "Building Permit" means a permit pursuant to the Building Code Act, 1992, S.O. 1992, c. 23, as amended; Watson & Associates Economists Ltd. PAGE G-6 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (17) "Capital cost" means costs incurred or proposed to be incurred by the municipality or a local board thereof directly or by others on behalf of, and as authorized by the municipality or local board, (a) to acquire land or an interest in land, including a leasehold interest; (b) to improve land; (c) to acquire, lease, construct or improve buildings and structures; and (d) to acquire, lease, construct or improve facilities including: (i) rolling stock with an estimated useful life of seven years or more, (ii) furniture and equipment, other than computer equipment, and (iii) materials acquired for circulation, reference or information purposes by a library board as defined in the Public Libraries Act; required for the provision of services designated in this by-law within or outside the municipality, including interest on borrowing for those expenditures under clauses (a), (b), (c) and (d) that are growth-related. (18) "Class" means a grouping of services combined to create a single service for the purposes of this By-law and as provided in Section 7 of the Development Charges Act. (19) "Commercial" means any non-residential development not defined under "institutional" or "industrial" and includes retail development and hotels/motels. (20) "Council" means the Council of the Corporation of the Town of Lincoln. Watson & Associates Economists Ltd. PAGE G-7 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (21) "Craft Brewery" means a building or structure as a secondary use on the same farm parcel of land for the processing of crops, fruit, fermentation, production, bottling, aging, and storing of beer and beer-related products where the crops or fruit used in the production of the beer shall be locally grown. A craft brewery may also include the retail sale of beer, hospitality room, restaurant, office, and a laboratory. (22) "Craft Distillery" means a building or structure as a secondary use on the same farm parcel of land for the processing of crops, fruit, fermentation, production, bottling, aging, and storing of distilled spirits and spirit-related products where the crops or fruit used in the production shall be locally grown. A distillery may also include the retail sale of spirits, hospitality room, restaurant, office, and a laboratory. (23) "Development" means the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that has the effect of increasing the size or usability thereof and includes redevelopment. Notwithstanding the foregoing, development does not include temporary structures, including but not limited to, seasonal hoop structures, seasonal fabric structures, tents, or agricultural produce stands. (24) "Development Charge" means a charge imposed pursuant to this By- law. (25) "Dwelling Room" means either: (a) each bedroom used, designed, or intended for use by one or more persons living together in a lodging home, dormitories, or (b) in the case of a special care/special dwelling unit/room, each individual room or suite of rooms used, designed, or intended for use by one or two persons with or without exclusive sanitary and/or culinary facilities. (26) "Dwelling unit" means any part of a building or structure used, designed, or intended to be used as a domestic establishment in which one or more Watson & Associates Economists Ltd. PAGE G-8 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx persons may sleep and are provided with culinary and sanitary facilities for their exclusive use. (27) "Estate winery" means a building or structure as a secondary use to a vineyard and/or fruit farm on the same farm parcel of land for the processing of fruit, fermentation, production, bottling, aging, and storing of wine and wine-related products where the fruit used in the production of the wine shall be locally grown. An estate winery may also include the retail sale of wine, hospitality room, restaurant, winery office and a laboratory. (28) "Existing" means a building or structure existing as of the date of passage of this by-law. (29) "Farm Helphouse" means a dwelling unit for seasonal or full-time farm help located within a farm building, ancillary to a farm and located on the same lot therewith. (30) "Farm Produce Outlet" means a building or structure where Ontario grown produce, bakery produced on the premises, processed fruit is prepared on the premises, Ontario grown greenhouse and nursery produces and Ontario made floral products are retailed to the general public and is accessory to an agricultural use. (31) "Farm Winery" means a building or structure as a secondary use to a vineyard and/or fruit farm on the same farm parcel of land for the processing of locally grown fruit, fermentation, production, bottling, aging and storage of wine and wine-related products where the fruit used in the production of the wine shall be predominantly from the vineyard and/or fruit farm located on the same land as the farm winery as well as part of a farmer's own farm operation. A farm winery may also include the retail sale of wine, hospitality room, restaurant, winery office and a laboratory. (32) "Garden Suite" means a one-unit detached, temporary residential structure containing culinary and sanitary facilities, that is ancillary to an existing residential structure and that is designed to be temporary. Watson & Associates Economists Ltd. PAGE G-9 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (33) "Grade" means the average level of finished ground adjoining a building or structure at all exterior walls. (34) "Greenhouse" means a building or structure for the growing of such items as flowers, bushes, shrubs, trees, plants, fruits, vegetables, and other types of nursery stock. (35) "Gross Floor Area" means the total floor area of all floors above grade of a dwelling unit measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of party walls dividing the dwelling unit from other dwelling units or other portion of a building. In the case of a non-residential building or structure, or in the case of a mixed-use building or structure in respect of the non-residential portion thereof, the total area of all building floors above or below grade measured between the outside surfaces of the exterior walls, or between the outside surfaces of exterior walls and the centre line of party walls dividing a non- residential use and a residential use, except for: (a) a room, elevator, or enclosed area within the building or structure above or below grade that is used exclusively for the accommodation of heating, cooling, ventilating, electrical, mechanical or telecommunications equipment that services the building; (b) loading facilities above or below grade; (c) a part of the building or structure below grade that is used for the parking of motor vehicles or for storage or other accessory use. (36) "Group Home" means a residential building or the residential portion of a mixed-use building containing a single housekeeping unit which is supervised on a 24-hour basis on site by agency staff on a shift rotation basis, and funded wholly or in part by any government or its agency, or by public subscription or donation, or by any combination thereof and licensed, approved or supervised by the Province of Ontario for the Watson & Associates Economists Ltd. PAGE G-10 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx accommodation of persons under any general or special act and amendments or replacements thereto. A group home may contain an office provided that the office is used only for the operation of the group home in which it is located. (37) "Hotels/Motels" means a commercial establishment catering to the needs of the traveling or vacationing public by supplying accommodation with or without food but does not include a "boarding or lodging dwelling" or an "apartment dwelling". A hotel/motel may include accessory uses such as personal service uses, eating establishments and banquet and/or convention facilities. (38) "Industrial" means lands, buildings or structures used or designed or intended for use for manufacturing, processing, fabricating or assembly of raw goods, warehousing, or bulk storage of goods, and includes office uses and the sale of commodities to the general public where such uses are accessory to an industrial use but does not include the sale of commodities to the general public through a warehouse club. "Marijuana Processing Facilities" are also included in this category. (39) "Industrial Use" means land, buildings or structures used for or in connection with manufacturing by: (a) manufacturing, producing, and processing goods for a commercial purpose, as well as storing and/or distribution of goods manufactured, produced, or processed on site; (b) research or development in connection with manufacturing, producing, or processing good for a commercial purpose; (c) retail sales by a manufacturer, producer, or processor of goods they manufactured, produced, or processed, if the retail sales are at the site where the manufacturing, production or processing takes place; (d) office or administrative purposes if it is: Watson & Associates Economists Ltd. PAGE G-11 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (i) carried out with respect to manufacturing, producing, processing, storage or distributing of something; and (ii) in or attached to the building or structure used for that manufacturing, producing, processing, storage, or distribution; (40) "Institutional" means lands, buildings or structures used or designed or intended for use by an organized body, society, or religious groups for promoting a public or non-profit purpose and shall include, but without limiting the generality of the foregoing, places of worship, group homes, nursing homes, and special care facilities. (41) "Institutional Development" means development of a building or structure intended for use: (a) as a long-term care home within the meaning of subsection 2(1) of the Fixing Long-Term Care Act, 2021, S.O. 2021, c. 39, Sched. 1 ("Fixing Long-Term Care Act"); (b) as a retirement home within the meaning of subsection 2(1) of the Retirement Homes Act, 2010, S.O. 2010, c. 11 (c) by any of the following post-secondary institutions for the objects of the institution: (i) a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario, (ii) a college or university federated or affiliated with a university described in subclause (i), or (iii) an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institutes Act, 2017, S.O. 2017, c. 34, Sched. 20. (42) "Interest Rate" means the annual rate of interest as set out in section 26.3 of the Act. Watson & Associates Economists Ltd. PAGE G-12 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (43) "Live/Work Unit" means a unit which contains separate residential and non-residential areas intended for both residential and non- residential uses concurrently and shares a common wall or floor with direct access between the residential and non-residential areas. (44) "Local Board" has the same definition as defined in the Development Charges Act, 1997. (45) "Local Services" means those services, facilities or things which are under the jurisdiction of the municipality and are related to a plan of subdivision or within the area to which the plan relates in respect of the lands under Sections 41, 51 or 53 of the Planning Act, R.S.O. 1990, c.P.13, as amended, or any successor thereto. (46) "Marijuana Processing Facilities" means a building or area used, designed, or intended for growing, producing, testing, destroying, storing or distribution, excluding retail sales, of medical marijuana or cannabis authorized by a license issued by the federal Minister of Health pursuant to section 25 of the Marihuana for Medical Purposes Regulations, SOR/2013- 119, under the Controlled Drugs and Substances Act, S.C. 1996, c.19. (47) "Mixed-Use Building" means a building or structure used for both residential and non-residential use; (48) "Mobile Home" means a dwelling unit that is designed to be transported either on its own wheels, on a flatbed or other trailer, or on detachable wheels, and which is suitable for permanent or seasonal occupancy as a residence, except for minor and incidental unpacking and assembly operations, placement on a mobile home stand and connections to utilities. (49) "Multiple Dwellings" means all dwellings other than single detached dwellings, semi-detached dwellings, and apartment house dwellings or a dwelling room, including, but not limited to, townhouse dwelling, multiplex, back-to-back townhouse dwelling, stacked townhouse dwelling, and the residential component of live/work units. Watson & Associates Economists Ltd. PAGE G-13 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (50) "Municipality" means the Corporation of the Town of Lincoln. (51) "Non-Profit Housing Development" means Development of a building or structure that meets the criteria set out in section 4.2 of the Act. (52) "Non-Residential Use" means a building or structure of any kind whatsoever used, designed, or intended to be used for other than a residential use and includes all commercial, industrial, and institutional uses. (53) "Nursing Home" means a residential building or the residential portion of a mixed-use building licensed as a nursing home by the Province of Ontario. (54) "Owner" means the owner of land or a person who has made application for an approval for the development of land upon which a development charge is imposed. (55) "Parking Structure" means buildings or structures uses for the parking of motor vehicles and includes underground parking within a building or structure of a residential, commercial, institutional, or industrial use. (56) "Place of Worship" means that part of a building or structure that is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, c.A.31, as amended or any successor thereto. (57) "Regulation" means any regulation made pursuant to the Act. (58) "Rental Housing" means development of a building or structure with four (4) or more residential units all of which are intended for use as rented residential premises. (59) "Residential Use" means lands, buildings or structures of any kind whatsoever used, designed, or intended to be used as living accommodations for one or more individuals. (60) "Retail Development" means land, buildings or portions thereof used, designed, or intended for use for the purpose of offering foods, wares, merchandise, substances, articles, or things for sale directly to the public Watson & Associates Economists Ltd. PAGE G-14 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx or providing services or entertainment to the public. Retail development excludes freestanding banks kiosks and seasonal outdoor tables as part of an existing restaurant, and includes, but not limited to: (a) land, buildings, or portions thereof used, designed, or intended for use for the rental of wares, merchandise, substances, articles, or things; (b) offices and storage in connection with, related to or ancillary to retail use; and (c) conventional restaurants; fast food restaurants; catering establishments, bars and taverns; beer and wine-making stores; concert halls/theatres/cinemas/movie houses/drive-in theatres; dinner theatres; casinos; amusement and theme parks; amusement arcades; bowling alleys; pet boarding kennels, pet boarding kennel services, pet obedience training centres, pet care, attendance and grooming services; fitness/recreation sport centres; hotels, motels/bed and breakfast facilities/rooming and boarding houses; gas stations and service stations; specialty automotive shops/auto repairs/collision services/car or truck washes; auto dealerships; shopping centres and plazas, including more than two attached stores under one ownership; department/discount stores; banks and similar financial institutions, including credit unions; insurance brokerages; investment advisory services; and warehouse clubs and retail warehouses. (61) "Semi-Detached Dwelling" means a dwelling unit in a residential building consisting of two dwelling units having one vertical wall or one horizontal wall, but no other parts, attached or another dwelling unit where the residential units are not connected by an interior corridor. (62) "Services" or "Service" means those services set out in Schedule "A" to this By-law. Watson & Associates Economists Ltd. PAGE G-15 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (63) "Servicing Agreement" means an agreement between a landowner and the municipality relative to the provision of municipal services to specified lands within the municipality. (64) "Single Detached Dwelling Unit" means a residential building consisting of one dwelling unit and not attached to another structure and includes mobile homes. (65) "Special Care/Special Dwelling Unit/Room" means a residence: (a) containing two (2) or more dwelling rooms, which rooms have common entrance from street level; and (b) where the occupants have the right to use in common with other occupants, halls, stairs, yards, common room, and accessory buildings; and (c) that is designed to accommodate persons with specific needs, including but not limited to, independent permanent living arrangements; and where (d) support services, such as meal preparation, grocery shopping, laundry, housing, nursing, respite care and attending services are provided at various levels; and includes but is not limited to retirement homes or lodges, group homes, dormitories, and hospices. (66) "Stacked Townhouse Dwelling" means a building containing two or more dwelling units where each dwelling unit is separated horizontally and/or vertically from another dwelling unit by a common wall. (67) "Temporary Buildings and Structures" are buildings and structures which are permitted during a period for special events, a temporary office for the sale of residential units and a mobile home as temporary accommodation for a period not to exceed 24 months as a dwelling unit is being erected on the same land, which will be removed at the end of the period. Watson & Associates Economists Ltd. PAGE G-16 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (68) Townhouse Swelling" means a residential building containing three or more dwelling units separated by vertical division, each of which units has a separate entrance to grade. 2.0 DESIGNATION OF SERVICES/CLASS OF SERVICES 2.1 The categories of services/class of services for which development charges are imposed under this by-law are as follows: (a) services related to a highway; (b) fire protection services; (c) parks and recreation services; (d) library services; (e) stormwater drainage and control services; (f) wastewater services; (g) water services; and (h) storm water management (Campden). 2.2 Components of the services/class of services designated in Subsection 2.1 are described in Schedule "A". 3.0 APPLICATION OF BY-LAW RULES 3.1 Development charges shall be payable by an owner in the amounts set out in this by-law where: (a) the lands are located in the area described in Subsection 3.2; and (b) the development of the lands requires any of the approvals set out in Subsection 3.4(a). Watson & Associates Economists Ltd. PAGE G-17 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Area to Which By-law Applies 3.2 Subject to Subsection 3.3, this by-law applies to all lands in the geographic area of the Town of Lincoln. (a) The Development Charges described in Schedule "B" to this by-law as "Municipal Wide" shall be calculated and collected on all lands in the geographic area of the Town of Lincoln. (b) The Development Charges described in Schedule "C" to this by-law as "Area Specific" shall be calculated and collected only in those areas as delineated in the Town of Lincoln Urban Service Area, as shown in Schedules "D-1" and "D-2" to this by-law. (c) The Development Charges described in Schedule "C-1" to this by- law as "Area Specific" shall be calculated and collected only in those areas as delineated in the Phase 2 development area of Campden, as shown in Schedule "D-3" to this by-law. 3.3 This by-law shall not apply to lands that are owned by and used for the purposes of: (a) the Corporation of the Town of Lincoln or a "local board" thereof; (b) a "board of education"; (c) the Corporation of the Regional Municipality of Niagara or a "local board" thereof. Development Charges Imposed 3.4 (a) Development charges shall be imposed on all lands, buildings or structures that are developed for residential or non-residential uses if the development requires: (i) the passing of a zoning by-law or an amendment to a zoning by-law under Section 34 of the Planning Act, R.S.O. 1990, c.P.13, as amended; Watson & Associates Economists Ltd. PAGE G-18 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (ii) the approval of a minor variance under Section 45 of the Planning Act; (iii) a conveyance of land to which a by-law passed under Subsection 50(7) of the Planning Act applies; (iv) the approval of a plan of subdivision under Section 51 of the Planning Act; (v) a consent under Section 53 of the Planning Act; (vi) the approval of a description under Section 50 of the Condominium Act, 1998, S.O. 1998, c. 19, as amended; or (vii) the issuing of a building permit under the Building Code Act, 1992, S.O. 1992, c. 23, as amended, in relation to a building or structure. (b) No more than one development charge for each service designated in Subsection 2.1 shall be imposed upon any lands, buildings, or structures to which this by-law applies even though two or more of the actions described in Subsection 3.4 (a) are required before the lands, buildings or structures can be developed. (c) Despite Subsection 3.4 (b), if two or more of the actions described in Subsection 3.4 (a) occur at different times, additional development charges shall be imposed if the subsequent action has the effect of increasing the need for services. Exemptions 3.5 Notwithstanding the provisions of this by-law, but subject to Subsection 3.5, development charges shall not be imposed with respect to: (a) lands, buildings, or structures used or to be used for a place of worship or for the purposes of a cemetery or burial ground exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended; (b) the development of non-residential farm buildings for farming activities; Watson & Associates Economists Ltd. PAGE G-19 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx (c) the development of a farm help house; (d) garden suite; (e) parking structures, including underground parking garages; (f) Elevators and elevator machine rooms; (g) temporary Uses in accordance with Section 1(60); (h) canopies including gas station canopies and those intended for the parking and loading or unloading of vehicles; (i) one or more enlargements of an existing industrial building on its site, whether attached or separate from the existing industrial building, up to a maximum of fifty per cent (50%) of the gross floor area before the first enlargement for which an exemption from the payment of development charges was granted pursuant to the Development Charges Act or this subsection. Development charges shall be imposed in accordance with Schedules "B" and "C" to this by-law, with respect to the amount of floor area of an enlargement that results in the gross floor area of the industrial building being increased by greater than fifty per cent (50%) of the gross floor area of the existing industrial building; or if the gross floor area is enlarged by more than fifty per cent (50%), development charges are payable on the amount by which the enlargement exceeds fifty per cent (50%) of the gross floor area before the enlargement. The amount of the development charge that would be payable multiplied by the fraction determined as follows: 1. Determine the amount by which the enlargement exceeds fifty per cent (50%) of the gross floor area before the enlargement. 2. Divide the amount determined under paragraph 1 by the amount of the enlargement. (j) Land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of post-secondary Watson & Associates Economists Ltd. PAGE G-20 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx education is exempt from development charges imposed under the Development Charges Act, 1997 if the development in respect of which development charges would otherwise be payable is intended to be occupied and used by the university. (k) Non-profit Residential Development; (l) Affordable Residential Units required pursuant to Section 34 and 16(4) of the Planning Act (Inclusionary Zoning). (m) Notwithstanding subsections 3.2 and 3.4, as of the date on which Section 4.1 of the Act is proclaimed into force, the following shall be exempt from Development Charges: (i) Affordable Residential Units; and (ii) Attainable Residential Units 3.5.1 Rules with Respect to Exemptions for Intensification of Existing or New Housing (a) Notwithstanding any other provision of this By-law, Development Charges shall not be imposed with respect to: (i) an enlargement to an existing Dwelling Unit; (ii) the creation of additional Dwelling Units equal to the greater of one (1) or 1% of the existing Dwelling Units in an existing Residential rental building containing four (4) or more Dwelling Units or prescribed ancillary structure to the existing Residential building; (b) Notwithstanding any other provision of this By-law, Development Charges shall not be imposed with respect to the creation of any of the following in existing Residential Units: (i) A second residential unit in an existing detached house, semi- detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the existing detached house, Watson & Associates Economists Ltd. PAGE G-21 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx semi-detached house or rowhouse cumulatively contain no more than one (1) residential unit. (ii) A third residential unit in an existing detached house, semi- detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the existing detached house, semi-detached house or rowhouse contains any residential units. (iii) One (1) residential unit in a building or structure ancillary to an existing detached house, semi-detached house or rowhouse on a parcel of land, if the existing detached house, semi-detached house or rowhouse contains no more than two (2) residential units and no other building or structure ancillary to the existing detached house, semi-detached house or rowhouse contains any residential units. (c) Notwithstanding any other provision of this By-law, Development Charges shall not be imposed with respect to the creation of any of the following in new residential units: (i) A second residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the new detached house, semi-detached house or rowhouse cumulatively will contain no more than one (1) residential unit. (ii) A third residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units. (iii) One (1) residential unit in a building or structure ancillary to a new detached house, semi-detached house or rowhouse on a parcel of land, if the new detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or Watson & Associates Economists Ltd. PAGE G-22 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units. 3.5.1 Rules with Respect to Rental Units Reductions (a) Notwithstanding any other provision of this By-law, the Development Charges payable for Residential Development, where the Dwelling Units are intended for rented Residential Use, will be reduced based on the number of bedrooms in each Dwelling Unit as follows: (i) Three (3) or more Bedrooms - 25% reduction; (ii) Two (2) Bedrooms - 20% reduction; and (iii) Fewer than two (2) Bedrooms - 15% reduction. Amount of Charges Residential 3.6 The development charges described in Schedules "B" and "C" to this by- law shall be imposed on residential uses of lands, buildings or structures, including a dwelling unit accessory to a non-residential use and, in the case of a mixed use building or structure, on the residential uses in the mixed use building or structure, including the residential portion of a live/work unit, according to the type of residential unit, and calculated with respect to each of the services according to the type of residential use. Non-Residential Uses 3.7 The development charges described in Schedules "B" and "C" to this by- law shall be imposed on non-residential uses of lands, buildings, or structures, and, in the case of a mixed-use building or structure, on the non- residential uses in the mixed-use building or structure, including the non- residential component of a live/work unit, and calculated with respect to each of the services according to the gross floor area of the non-residential use. Redevelopment of Residential Buildings or Structures Watson & Associates Economists Ltd. PAGE G-23 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 3.8 In the case of the demolition of all or part of a residential building or structure associated with a development on a singular and certain parcel of land: (a) a redevelopment credit shall be allowed, provided that the singular and certain parcel of land was improved by occupied structures within the last five years prior to the issuance of the building permit required by the development, and the building permit for the development has been issued within five years from the date the demolition permit has been issued; and (b) if a development on a singular and certain parcel of land involves the demolition and replacement of a building or structure, or the conversion from one principal use to another, a redevelopment credit shall be allowed equivalent to: (i) the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable, and/or (ii) the gross floor area of the building demolished/ converted multiplied by the current non-residential development charge in place at the time the development charge is payable. Redevelopment of Non-Residential Buildings or Structures 3.9 In the case of the demolition of all or part of a non-residential building or structure associated with a development on a singular and certain parcel of land: (a) a redevelopment credit shall be allowed, provided that the singular and certain parcel of land was improved by occupied structures within the last five years prior to the issuance of the building permit required by the development, and the building permit has been issued for the development within five years from the date the demolition permit has been issued; and (b) if a development on a singular and certain parcel of land involves the demolition of and replacement of a building or structure, or the conversion Watson & Associates Economists Ltd. PAGE G-24 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx from one principal use to another, a redevelopment credit shall be allowed equivalent to: (i) the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable, and/or (ii) the gross floor area of the building demolished/converted multiplied by the current non-residential development charge in place at the time the development charge is payable. Redevelopment - Conversions 3.10 In the case of a conversion of all or part of a building: (a) a credit shall be allowed against the development charges otherwise payable under this By-law; (b) the credit shall be calculated based on the portion of the building that is being converted by multiplying the number and type of dwelling units being converted or the commercial, industrial and institutional total floor area being converted by the relevant development charges under this By- law in effect on the date when the development charges are payable pursuant to this By-law with respect to the redevelopment; and (c) Where the amount of any credit pursuant to this section exceeds, in total, the amount of the development charges otherwise payable under this By- law with respect to the redevelopment, the excess credit shall be reduced to zero and shall not be carried forward unless the carrying forward of such excess credit is expressly permitted by a phasing plan for the redevelopment that is acceptable to the Treasurer. Credit Not to Exceed Development Charge 3.11 A redevelopment credit can, in no case, exceed the amount of the development charge that would otherwise be payable, and no redevelopment credit is available if the existing land use is exempt under this by-law. Watson & Associates Economists Ltd. PAGE G-25 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx Time of Payment of Development Charges 3.12 Development charges shall be calculated and be payable in full in money or by provision of services as may be agreed upon, or by credit granted under the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies. 3.13 Where development charges apply to land in relation to which a building permit is required, no building permit shall be issued until the development charges have been paid in full. 3.14 Where, by law, a building permit is required for development and development occurs without the issuance of a building permit by the municipality, a development charge shall be calculated and be due and payable in full in money upon demand by the municipality. 3.15 Where a development charge or any part of it remains unpaid after it is due and payable, the amount unpaid shall be added by the Treasurer of the Corporation of the Town of Lincoln to the tax roll where it shall be collected in the same manner as taxes. 3.16 Notwithstanding Sections 3.12 to 3.14, development charges for rental housing and institutional developments are due and payable in six equal annual instalment payments commencing with the first instalment payable on the date of occupancy, and each subsequent instalment, including interest (calculated in accordance with Section 26.3 of the Act), payable on the anniversary date each year thereafter. 3.17 Where the development of land results from the approval of a site plan or zoning by-law amendment application received on or after January 1, 2020, and the approval of the application occurred within two years of building permit issuance, the development charges under Sections 3.6 and 3.7 shall be calculated on the rates set out in Schedule "B" on the date of the receipt of a complete planning application, including interest. Where both planning applications apply development charges under Sections 3.6 and 3.7 shall be calculated on the rates payable on the anniversary date each year thereafter, set out in Schedule "B" on Watson & Associates Economists Ltd. PAGE G-26 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx the date of the later planning application, including interest (calculated in accordance with Section 26.3 of the Act). Alternative Payment Agreements 3.18 The Town may enter into an agreement under Section 27 of the Act, in a form and having content satisfactory to the Town's solicitor and having content satisfactory to the Treasurer, with any person who is required to pay a development charge providing for all or any part of the development charge to be paid before or after it would otherwise be payable. 3.19 Council directs the Chief Building Official or his or her designate to withhold the issuance of a building permit in relation to a building on land to which the development charge applies unless the development charge has been paid. 4.0 PAYMENT BY SERVICES 4.1 Despite the payments required under Subsection 3.12, Council may, by agreement, give a credit towards a development charge in exchange for work that relates to a service for which a development charge is imposed under this by-law. 5.0 BY-LAW AMENDMENT OR APPEAL 5.1 Where this By-law or any Development Charge prescribed thereunder is amended or repealed either by order of the Ontario Land Tribunal or by resolution of Council, the Treasurer of the Town shall calculate forthwith the Watson & Associates Economists Ltd. PAGE G-27 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx amount of any overpayment to be refunded as a result of said amendment or repeal. 5.2 Refunds that are required to be paid under Subsection 5.1 shall be paid with interest to be calculated as follows: (1) interest shall be calculated from the date on which the overpayment was collected to the date on which the refund is paid; (2) the minimum interest rate is what the Bank of Canada rate is on the day the By-law comes into force, updated on the first business day of every January, April, July and October. 6.0 INDEXING 6.1 Development charges imposed pursuant to this by-law shall be adjusted annually, without amendment to this by-law, commencing on May 1, 2024 and each January 1st thereafter, in accordance with the Statistics Canada Quarterly Construction Price Statistics. 7.0 PHASING 7.1 The amount of the Development Charges described in Schedules "B" and "C" to this By-law shall be reduced in accordance with Section 5(8) of the Act. Therefore, commencing in the year this By-law comes into force and subject to annual indexing in accordance with Section 6 of this By-law, the following percentages of the charges provided in Schedule "B" will be imposed: (1) Year 1 - 80 per cent; (2) Year 2 - 85 per cent; (3) Year 3 - 90 per cent; (4) Year 4 - 95 per cent; (5) Years 5 through 10 - 100 per cent. Watson & Associates Economists Ltd. PAGE G-28 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 8.0 SCHEDULES 8.1 The following schedules to this by-law form an integral part thereof: Schedule "A" Components of Services/Class of Services Designated in Subsection 2.1 Schedule "B" Residential and Non-Residential Development Charges - Municipal Wide Schedule "C" Residential Development Charges - Area-specific (Campden) Schedules "D-1" through "D-3" Town of Lincoln Urban Service Areas 9.0 HEADINGS FOR REFERENCE ONLY 9.1 The headings contained in this by-law are for convenience of reference only and shall not affect the construction or interpretation of this by-law. 10.0 SEVERABILITY 10.1 If, for any reason, any provision, section, subsection, or paragraph of this by-law is held to be invalid, it is hereby declared that all of the remainder of this by-law shall continue in full force and effect until repealed, re-enacted, or amended, in whole or in part, or dealt with in any other way. 11.0 DATE BY-LAW IN FORCE 11.1 This By-law shall come into force and effect on April XX, 2024. 12.0 DATE BY-LAW EXPIRES 12.1 This by-law will expire as of ten (10) years from the date of passage unless it is repealed at an earlier date. 13.0 REPEAL Watson & Associates Economists Ltd. PAGE G-29 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx 13.1 Upon the coming into force of this by-law, By-law No. 2018-93 (as amended) of the Town of Lincoln is hereby repealed. PASSED AND ENACTED on the XX day of April, 2024 MAYOR: SANDRA EASTON CLERK: JULIE KIRKELOS Watson & Associates Economists Ltd. PAGE G-30 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx SCHEDULE "A" TO BY-LAW NO. 2024-XX DESIGNATED MUNICIPAL SERVICES/CLASSES OF SERVICES UNDER THIS BY-LAW Town-Wide Services/Classes of Services - Services Related to a Highway o Roads and Related o Public Works Facilities, Vehicles and Equipment - Fire Protection Services o Fire Facilities o Fire Vehicles o Fire Small Equipment & Gear - Library Services o Library Facilities o Collection Materials - Parks and Recreation Services o Parkland Development o Park Vehicles and Equipment o Recreation Facilities Urban Area Services (Beamsville, Vineland, Jordan, Jordan Station. and Prudhommes) - Water Services o Distribution Systems - Wastewater Services o Collection Systems - Stormwater Services o Channels and Drainage Area-Specific Services (Campden) - Stormwater Drainage Watson & Associates Economists Ltd. PAGE G-31 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx SCHEDULE "B" TO BY-LAW NO. 2024-XX RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGE RATES Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Studio and 1 Bedroom Special Care/Special Dwelling Units Primary Commercial Industrial Institutional Town-wide Services Services Related to a Highway 17,428 14,422 12,333 7,991 6,680 23.57 141.33 58.88 104.73 Fire Protection Services 3,643 3,015 2,578 1,670 1,396 4.95 29.49 12.27 21.85 Parks and Recreation Services 9,645 7,981 6,825 4,423 3,697 5.70 34.12 14.21 25.30 Library Services 914 756 647 419 350 0.54 3.55 1.51 2.58 Total Town-wide Services 31,630 26,174 22,383 14,503 12,123 34.77 208.50 86.86 154.46 Urban Services Stormwater Drainage and Control Services 2,083 1,724 1,474 955 798 - 17.11 7.10 12.70 Wastewater Services 4,457 3,688 3,154 2,044 1,708 - 36.49 15.18 27.02 Water Services 5,968 4,939 4,223 2,737 2,287 - 48.87 20.34 36.17 Total Urban Services 12,508 10,351 8,851 5,736 4,793 - 102.47 42.63 75.89 Total Town-Wide + Urban 44,138 36,525 31,234 20,239 16,916 34.77 310.97 129.49 230.35 RESIDENTIAL Service NON-RESIDENTIAL (per sq.m of Gross Floor Area) Watson & Associates Economists Ltd. PAGE G-32 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx SCHEDULE "C" TO BY-LAW NO. 2024-XX RESIDENTIAL DEVELOPMENT CHARGES - AREA SPECIFIC (CAMPDEN) Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Studio and 1 Bedroom Special Care/Special Dwelling Units Campden Area-Specific Stormwater Drainage 18,776 15,538 13,287 8,609 7,196 RESIDENTIAL Service/Class of Service Watson & Associates Economists Ltd. PAGE G-33 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx SCHEDULE "D-1" TO BY-LAW NO. 2024 - XX TOWN OF LINCOLN URBAN SERVICE AREAS (BEAMSVILLE) Watson & Associates Economists Ltd. PAGE G-34 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx SCHEDULE "D-2" TO BY-LAW NO. 2024 - XX TOWN OF LINCOLN URBAN SERVICE AREAS (VINELAND, JORDAN, JORDAN STATION, PRUDHOMMES) Watson & Associates Economists Ltd. PAGE G-35 H:\LINCOLN\2023 DC\Report\Report for Addendum.docx SCHEDULE "D-3" TO BY-LAW NO. 2024 - XX TOWN OF LINCOLN CAMPDEN PHASE 2 DEVELOPMENT