THE CORPORATION OF THE TOWN OF LINCOLN
BY-LAW NO. 2025-61
A BY-LAW TO ESTABLISH AND REGULATE PAYMENT
OF VARIOUS FEES AND CHARGES
WHEREAS:
1.
Section 391 of the Municipal Act, 2001, S.O. 2001, c.25, as amended,
provides that despite any Act, a municipality may pass by-laws imposing
fees or charges on any class of persons for services or activities provided
or done by or on behalf of it and for the use of its property, including
property under its control.
2.
Section 69 (1) of the Planning Act R.S.O. 1990, c. P. 13, as amended,
provides that a municipality may establish a tariff of fees for the processing
of applications.
3.
Section 7 of the Building Code Act, 1992, S.O. 1992, as amended,
authorizes a municipal Council to pass by-laws concerning the issuance
of permits and related matters requiring the payment of fees on
applications for and on the issuance of permits.
4.
The Town of Lincoln Budget Committee considered and approved Report
FN-11-25 on November 12, 2025, and deems it expedient to enact a
comprehensive by-law establishing and requiring the payment of fees for
information, services, activities and use of Town property.
NOW THEREFORE, THE COUNCIL OF THE CORPORATION OF THE TOWN
OF LINCOLN ENACTS AS FOLLOWS:
1.
The fees and charges as set out in Schedule A attached hereto and
forming part of this By-law are hereby established and adopted by the
Council of the Town of Lincoln
2.
The fees and charges as listed in Schedule A to this By-Law include
Harmonized Sales Tax (HST), where indicated.
3.
All fees and charges applicable under this by-law shall be payable in
advance of services being rendered, except for:
a. Emergency services
b. Actions taken by the Town to rectify failures or by-law infractions
on the part of a resident, in which case, the fee payable will be in
arrears and invoiced after the service or activity is provided
c. Instances where the timing and conditions for payment is
prescribed in agreements or contracts approved by Council.
4.
In the event that any information, service, activity or use of Town
property is requested by a person, and a fee or charge for such
information, service, activity or use of Town property has not been
specifically provided for in Schedule A, a fee or charge shall be
calculated by Town staff to appropriately recover town costs and shall
be incorporated into this By-law as soon as is practicable.
5.
Fees and charges that have been imposed in accordance with this by-
law that remain unpaid after the date on which they are due shall have
interest applied at the rate of 1.25% per month until paid in full.
6.
All fees owing to the Town that are unpaid are considered a debt to the
Town and, together with all interest and penalties accrued thereupon,
may be collected by the Town by action, or may be collected by the
Town on its behalf, or may be added to the property tax roll and collected
in like manner as taxes.
Page 2 of 2
7.
The Treasurer is authorized to carry out the administration of this By-
law, including but not limited to the enforcement thereof, the collection
activity, and for initiating such legal action as may be considered
appropriate.
8.
Should any part of this By-law, including any part of a Schedule attached
hereto, be determined by a court of competent jurisdiction to be invalid
or of no force, it is the stated intention of Council that such invalid part
of this By-law shall be severable from this Bylaw and that the remainder
of this By-law, including the remainder of each Schedule, as applicable,
shall continue to operate and be in force.
9.
This By-law should be known as the "Fees and Charges By-law".
10.
By-law 2024-85 is hereby repealed.
11.
This By-law shall come into force and take effect on January 1, 2026.
PASSED AND ENACTED on the 15th day of December 2025.
MAYOR: SANDRA EASTON
CLERK: JULIE KIRKELOS
2026
FEES & CHARGES
EFFECTIVE JANUARY 1, 2026
Schedule A to By-law 2025-61
Table of Contents
ED & Culture ..................................................................................................................................... 1-5
Recreation ........................................................................................................................................ 6-11
Facilities ........................................................................................................................................ 12-21
Utilities .......................................................................................................................................... 22-26
Building ......................................................................................................................................... 27-35
Planning ........................................................................................................................................ 36-43
MLE (Municipal Law Enforcement) ............................................................................................... 44-46
Cemetery ...................................................................................................................................... 47-53
Public Works ................................................................................................................................. 54-56
Fire ................................................................................................................................................ 57-63
Clerks ............................................................................................................................................ 64-65
Finance ......................................................................................................................................... 66-67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: ED & Culture
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
ADULT PROGRAMS
Bob Ross - Oil Paint
18+
event
54.50
$
55.85
$
1.35
Y
Starlight Market (by donation)
event
-
$
-
$
-
N
Lecture Series (by donation)
18+
event
-
$
-
$
-
N
Museum Private Program & Tour
18+
event
22.60
$
22.60
$
-
Y
Historic Cemetery Walk
event
22.00
$
N/A
(22.00)
Y
Jordan Village Haunted Walk
event
N/A
25.00
$
25.00
Y
Harvest Pioneer Day
event
5.00
$
5.00
$
-
Y
CHILD AND YOUTH PROGRAMS
Studio Sunday
event
16.00
$
N/A
(16.00)
N
Steam Saturday
event
16.00
$
16.50
$
0.50
N
Starlight Market Craft
craft
5.00
$
N/A
(5.00)
N
Museum Specialty Camp
6 to 12
4 day wk
165.00
$
172.00
$
7.00
N
Museum Specialty Camp
6 to 12
5 day wk
206.00
$
214.00
$
8.00
N
PA Day Camp
6 to 12
day
42.50
$
42.80
$
0.30
N
Night at the Museum
6 to 12
42.50
$
N/A
(42.50)
N
1 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: ED & Culture
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
EDUCATIONAL AND OUTREACH PROGRAMS
School Program - Museum
school age
child
12.72
$
13.00
$
0.28
N
School Program - School or Virtual Outreach
school age
child
10.00
$
10.00
$
-
N
Senior Program - In home or Virtual Outreach
65+
person
10.00
$
10.00
$
-
Y
TOURS
Exhibits & Grounds Walking Tour
18+
1 hr
10.00
$
10.00
$
-
Y
RESEARCH/REPRODUCTION/MEMBERSHIPS
Reproduction fees: oversized prints or scan prices will depend on the cost associated with production.
Digital Or Scanned Images
image
5.51
$
5.65
$
0.14
Y
Archival Digital/Scanned Copy
copy
11.00
$
11.25
$
0.25
Y
Museum Membership Single
39.55
$
39.55
$
-
Y
Museum Membership Family
73.45
$
73.45
$
-
Y
Museum Membership Senior
35.59
$
35.59
$
-
Y
2 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: ED & Culture
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
Birthday Party - 2.5 hours
all ages
event
189.37
$
240.00
$
50.63
Y
Additional Guests
each
10.00
$
10.00
$
-
Y
Base Rate - 3 hours
event
854.65
$
902.28
$
47.63
Y
Additional hour
hr
284.70
$
300.76
$
16.06
Y
Base Rate - 3 hours
event
195.08
$
199.95
$
4.87
Y
Additional hour
hr
64.38
$
66.65
$
2.27
Y
Base Rate - 3 hours - After Hours
event
340.83
$
349.35
$
8.52
Y
Additional hour - After Hours
hr
113.60
$
116.44
$
2.84
Y
Non Profit Groups - Hourly
no minimum
hr
32.98
$
33.80
$
0.82
Y
Non Profit Groups - Hourly - After Hours
no minimum
hr
81.68
$
83.72
$
2.04
Y
FACILITY RENTALS - MUSEUM & CULTURAL CENTRE
Multipurpose Room
- includes multipurpose room; Wi-Fi; access to 36 chairs and 10 tables
- after hours includes 1 staff member to supervise
Entire Facility - After Hours
- includes multipurpose room, schoolhouse and grounds; Wi-Fi; access to 36 chairs and 10 tables; 2 staff to supervise.
3 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: ED & Culture
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
FACILITY RENTALS - MUSEUM & CULTURAL CENTRE CONT'D
Base Rate - 3 hours
event
340.83
$
359.82
$
18.99
Y
Additional hour
hr
113.61
$
119.94
$
6.33
Y
Base Rate - 3 hours - After Hours
event
482.66
$
509.56
$
26.90
Y
Additional hour - After Hours
hr
160.68
$
169.85
$
9.17
Y
Non Profit Groups - Hourly
no minimum
hr
113.61
$
119.94
$
6.33
Y
Non Profit Groups - Hourly - After Hours
no minimum
hr
160.68
$
169.85
$
9.17
Y
Hourly
no minimum
hr
103.88
$
109.68
$
5.80
Y
Hourly - After Hours
no minimum
hr
$
152.03
160.50
$
8.47
Y
Additional Tables - Above Museum Inventory
each
11.90
$
N/A
(11.90)
Y
Additional Chairs - Above Museum Inventory
each
3.14
$
N/A
(3.14)
Y
Tech Setup - Projector; microphone; speaker; PA
system
event
24.46
$
25.81
$
1.35
Y
PROGRAM CANCELLATION/REFUND
Program Admin Fee
each
15.00
$
15.00
$
-
N
Program Cancellation Fee
- 50% of Registration Fee
each
-
$
-
$
-
N
Schoolhouse
- includes schoolhouse and access to main facility for washroom use; 1 staff member
- after hours includes 2 staff members to supervise
Grounds Special Events (film crew, wedding ceremony, etc.)
- includes power access from main facility
- after hours includes 1 staff member to supervise
4 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: ED & Culture
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
FILMING PERMITS
Processing/Review Fee
permit
230.00
$
236.00
$
6.00
N
Permit Fee
each
as negotiated
as negotiated
SHORT TERM ACCOMMODATIONS AND BED AND BREAKFAST
By-law 2024-62
1-year license
each
550.00
$
550.00
$
-
N
2-year license
each
650.00
$
650.00
$
-
N
Renewal application
each
150.00
$
150.00
$
-
N
If an application is withdrawn to commenting agencies, 50% of the fee may be refunded.
5 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Recreation
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
WATER SAFETY LESSONS
Bronze Star
under 14
20 hrs
82.80
$
86.10
$
3.30
N
Bronze Star - Youth
14+
20 hrs
93.00
$
97.30
$
4.30
Y
Bronze Medallion
- Includes Manual and Workbook
under 14
20 hrs
201.55
$
209.60
$
8.05
N
Bronze Medallion - Youth
- Includes Manual and Workbook
14+
20 hrs
227.75
$
236.85
$
9.10
Y
Bronze Cross
under 14
20 hrs
159.10
$
165.45
$
6.35
N
Bronze Cross - Youth
14+
20 hrs
179.80
$
186.99
$
7.19
Y
Drop In Lessons
4+
per lesson
6.75
$
7.00
$
0.25
N
Drop In Lessons - Adult
18+
per lesson
9.00
$
9.50
$
0.50
Y
Lifesaving Society - Parent & Tot
per 30 min lesson
7.25
$
7.50
$
0.25
N
Lifesaving Society - Preschool 1 - 5
3 to 5
per 30 min lesson
7.25
$
7.50
$
0.25
N
Lifesaving Society - Level 1 - 4
6+
per 30 min lesson
7.25
$
7.50
$
0.25
N
Lifesaving Society - Level 3 - 4
6+
per 45 min lesson
8.50
$
9.00
$
0.50
N
Lifesaving Society - Level 5 - 6
under 14
per 60 min lesson
10.50
$
10.90
$
0.40
N
Lifesaving Society - Level 5 - 6 Youth
14+
per 60 min lesson
11.75
$
12.35
$
0.60
Y
National Lifeguard Recert
16+
5 hrs
99.70
$
103.70
$
4.00
Y
6 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Recreation
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
WATER SAFETY LESSONS CONT'D
Rookie, Ranger, Star - Youth
16+
per 60 min lesson
11.75
$
12.20
$
0.45
Y
Rookie, Ranger, Star
under 14
per 60 min lesson
10.40
$
10.80
$
0.40
N
LANE SWIM
Adult
18+
entrance
4.25
$
4.50
$
0.25
Y
Older Adult
55+
entrance
3.25
$
3.50
$
0.25
Y
FITNESS - AFG COMMUNITY POOL ONLY
Adult - Drop in
18+
1 hr
7.50
$
7.75
$
0.25
Y
Older Adult - Drop In
55+
series
7.50
$
7.75
$
0.25
Y
Season Pass - 8 weeks
18+
series
121.40
$
126.25
$
4.85
Y
Clip Card - 10 Classes
18+
series
67.50
$
69.75
$
2.25
Y
SEASON SWIM PASS
12 weeks
Child
3 to 13
season
75.50
$
78.52
$
3.02
Y
Youth
14 to 17
season
79.00
$
82.16
$
3.16
Y
Adult
18 to 64
season
82.00
$
85.28
$
3.28
Y
Older Adult
55+
season
75.50
$
78.52
$
3.02
Y
Family
all ages
season
144.00
$
149.76
$
5.76
Y
7 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Recreation
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
LEISURE SWIM CLIP CARD
Child - 10 swims
3 to 13
card
29.25
$
31.50
$
2.25
Y
Youth - 10 swims
14 to 17
card
33.75
$
36.00
$
2.25
Y
Adult - 10 swims
18 to 64
card
38.25
$
40.50
$
2.25
Y
Older Adult - 10 swims
55+
card
29.25
$
36.00
$
6.75
Y
Family - 10 swims
all ages
card
$
99.00
108.00
$
9.00
Y
Family - 5 Swims
all ages
card
55.00
$
60.00
$
5.00
Y
LEISURE SWIM
Child
3 to 13
entrance
3.25
$
3.50
$
0.25
Y
Youth
14 to 17
entrance
3.75
$
4.00
$
0.25
Y
Adult
18 to 64
entrance
4.25
$
4.50
$
0.25
Y
Older Adult
55+
entrance
3.25
$
3.50
$
0.25
Y
Family
all ages
entrance
11.00
$
12.00
$
1.00
Y
Group - No fee for Support Person
per person
entrance
3.25
$
3.50
$
0.25
Y
Heat Alert Swims
per person
entrance
N/A
1.00
$
1.00
Y
Toonie Swims
per person
entrance
N/A
2.00
$
2.00
Y
8 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Recreation
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
PRIVATE LESSONS
Single Lessons
Child
3 to 13
per lesson
27.00
$
28.10
$
1.10
N
Youth
14 to 17
per lesson
30.00
$
31.20
$
1.20
Y
Adult
18+
per lesson
30.00
$
31.20
$
1.20
Y
SEMI-PRIVATE LESSONS
Single Lessons
Child
3 to 13
per lesson
17.00
$
17.70
$
0.70
N
Youth
14 to 17
per lesson
19.00
$
19.75
$
0.75
Y
Adult
18+
per lesson
19.00
$
19.75
$
0.75
Y
SWIM TEAM - AFG COMMUNITY POOL ONLY
7 weeks
Child
3 to 13
series
154.50
$
160.70
$
6.20
N
Youth
14 to 17
series
174.50
$
181.48
$
6.98
Y
Family - 3 or more children
3 to 17
series
419.00
$
435.75
$
16.75
N
SUMMER PROGRAMS
Adventure Camp
4 to 12
5 day wk
174.00
$
181.00
$
7.00
N
Adventure Camp
4 to 12
4 day wk
139.00
$
145.00
$
6.00
N
Speciality Camp
7 to 12
5 day wk
206.00
$
214.00
$
8.00
N
Speciality Camp
7 to 12
4 day wk
165.00
$
172.00
$
7.00
N
Extended Care
4 to 12
day
8.50
$
8.85
$
0.35
N
9 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Recreation
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
SUMMER PROGRAMS CONT'D
Late Pickup Fee - 15 mins +
occurrence
5.00
$
5.00
$
-
N
Swim Lessons At Camp
7 to 12
daily
7.25
$
7.50
$
0.25
N
Leader In Training
12.5 to 13
5 day wk
174.00
$
180.95
$
6.95
N
Leader In Training - Youth
14 to 16
5 day wk
196.60
$
204.50
$
7.90
Y
Leader In Training
12.5 to 13
4 day wk
139.00
$
144.50
$
5.50
N
Leader In Training - Youth
14 to 16
4 day wk
157.00
$
163.30
$
6.30
Y
MULTI FAMILY SUMMER CAMP DISCOUNT
Holiday Break Camp
4 to 12
per day
42.50
$
44.00
$
1.50
N
ADULT RECREATION PROGRAMS
Yoga
18+
1 class
14.70
$
14.70
$
-
Y
NIA
18+
1 class
14.70
$
14.70
$
-
Y
Ballroom Dance
18+
1 class
14.70
$
14.70
$
-
Y
Move To Be Fit
18+
1 class
13.20
$
13.20
$
-
Y
HOLIDAY BREAK CAMP (Winter Break, March Break, PA Day)
First child will pay full price, any additional children will received a 10% discount. Valid only for summer camp programs, when siblings are
attending camp the same week.
10 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Recreation
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
LINCOLN SENIORS' CLUB MEMBER DISCOUNT
Yoga
55+
1 class
11.00
$
11.45
$
0.45
Y
NIA
55+
1 class
11.00
$
11.45
$
0.45
Y
Ballroom Dance
55+
1 class
11.00
$
11.45
$
0.45
Y
Move To Be Fit
55+
1 class
9.90
$
10.30
$
0.40
Y
CHILD/YOUTH RECREATION PROGRAMS
Babysitter / Stay Safe Training
9 to 13
1 day course
56.00
$
58.25
$
2.25
N
Cooking Club
7 to 12
1 class
28.00
$
29.00
$
1.00
N
Dance Sampler
4 to 10
1 class
7.50
$
8.00
$
0.50
N
Music Munchkins
0 to 4
1 class
10.40
$
10.80
$
0.40
N
Holiday Mashup / Curbside Pick Up Kit
4 to 12
1 class/kit
22.00
$
23.00
$
1.00
N
Super Saturday
4 to 10
1 class
33.00
$
34.00
$
1.00
N
Smash Club
4 to 14
1 class
14.38
$
N/A
(14.38)
N
Skipping Class
7+
1 class
16.00
$
17.00
$
1.00
N
Sportball
18mos to 12
yrs
1 class
17.50
$
N/A
(17.50)
N
Skateboard Lesson
6 to 14
1 class
22.00
$
23.00
$
1.00
N
Fun with Friends
1-4 years
1 class
12.00
$
12.00
$
-
N
Learn to Code Classes
6-12 years
1 class
18.00
$
N/A
(18.00)
N
PROGRAM CANCELLATION/REFUND
Program Admin Fee
each
15.00
$
15.00
$
-
N
Program Cancellation Fee
- 50% of Registration Fee
each
-
$
-
$
-
N
Lincoln Seniors' Club Members receive 25% discount on recreation fitness programs - proof of valid membership required.
11 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
NOTES:
ELECTRIC VEHICLE CHARGING STATIONS
Level 2 EV Charging Station (Hourly Use)
hr
2.83
$
2.90
$
0.07
Y
POOL RENTAL
Full use of AFG or Jordan Lions Park Pool
hr
150.00
$
156.00
$
6.00
Y
ARENA ICE RENTAL
Prime Ice
- Weekdays after 4pm & Weekends
hr
250.40
$
260.40
$
10.00
Y
Non Prime Ice
- Weekdays before 4pm
hr
162.25
$
168.75
$
6.50
Y
Minor Sport Rate
hr
190.90
$
197.60
$
6.70
Y
School Rate
hr
108.20
$
112.50
$
4.30
Y
Day Of Ice Prime
hr
162.25
$
168.75
$
6.50
Y
Day Of Ice Non Prime
hr
141.10
$
146.75
$
5.65
Y
Special Event
Includes Arena, lower concourse, 4 meeting rooms.
day
1,807.10
$
1,879.38
$
72.28
Y
Large Scale Rental Deposit (Covering facility damage,
cleaning costs, additional staff costs)
200.00
$
200.00
$
-
N
Changes to ice related fees will be effective at the start of the season; September 2026
All rentals require insurance listing the Town of Lincoln as an additional insured.
Reimbursement of Town direct costs as required; Parks will remain open to the public.
12 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
PUBLIC SKATING
Child
3 to 13
entrance
3.25
$
3.50
$
0.25
Y
Youth
14 to 17
entrance
3.75
$
4.00
$
0.25
Y
Adult
18 to 64
entrance
4.25
$
4.50
$
0.25
Y
Older Adult
55+
entrance
3.25
$
3.50
$
0.25
Y
Family - 2 adults; up to 4 children
all ages
entrance
$
11.00 $
12.00
1.00
Y
PUBLIC SKATING CLIP CARD
Child - 10 skates
3 to 13
card
29.25
$
31.50
$
2.25
Y
Youth - 10 skates
14 to 17
card
33.75
$
36.00
$
2.25
Y
Adult - 10 skates
18 to 64
card
38.25
$
40.50
$
2.25
Y
Older Adult - 10 skates
55+
card
29.25
$
31.50
$
2.25
Y
Family - 2 adults; up to 4 children - 10 skates
all ages
card
99.00
$
108.00
$
9.00
Y
Family - 2 adults; up to 4 children - 5 skates
all ages
card
55.00
$
60.00
$
5.00
Y
PUBLIC SKATING PASS
Child
3 to 13
season
75.00
$
78.00
$
3.00
Y
Youth
14 to 17
season
85.00
$
88.40
$
3.40
Y
Adult
18 to 64
season
103.00
$
107.10
$
4.10
Y
Older Adult
55+
season
75.00
$
78.00
$
3.00
Y
Family - 2 adults; up to 4 children
all ages
season
205.00
$
213.20
$
8.20
Y
13 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
DROP IN RECREATION PROGRAM FEES - (i.e. Pickleball, Basketball & floor hockey)
Child
3 to 13
entrance
3.25
$
3.50
$
0.25
Y
Youth
14 to 17
entrance
3.75
$
4.00
$
0.25
Y
Adult
18 to 64
entrance
4.25
$
4.50
$
0.25
Y
Older Adult - 10 skates
55+
entrance
3.25
$
3.50
$
0.25
Y
Family - 2 adults; up to 4 children
all ages
entrance
11.00
$
12.00
$
1.00
Y
Pickleball Court Rental Fee
1 court + net
hr
N/A
22.60
$
22.60
Y
DROP IN RECREATION PROGRAM FEES - (i.e. PIckleball, Basketball & Floor hockey) - CLIP CARD
Child - 10 visits
3 to 13
card
29.25
$
31.50
$
2.25
Y
Youth - 10 visits
14 to 17
card
33.75
$
36.00
$
2.25
Y
Adult - 10 visits
18 to 64
card
38.25
$
40.50
$
2.25
Y
Older Adult - 10 visits
55+
card
29.25
$
31.50
$
2.25
Y
Family - 2 adults; up to 4 children - 10 visits
all ages
card
99.00
$
108.00
$
9.00
Y
Family - 2 adults; up to 4 children - 5 visits
all ages
card
55.00
$
60.00
$
5.00
Y
DROP IN RECREATION PROGRAM FEES - (i.e. Pickleball, basketball, floor hockey) - 3 MONTH SEASON PASS
Child
3 to 13
3 months
75.00
$
78.00
$
3.00
Y
Youth
14 to 17
3 months
85.00
$
88.40
$
3.40
Y
Adult
18 to 64
3 months
103.00
$
107.10
$
4.10
Y
Older Adult
55+
3 months
75.00
$
78.00
$
3.00
Y
Family - 2 adults; up to 4 children
all ages
3 months
205.00
$
213.20
$
8.20
Y
14 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
PLAY PASS
Child
3 to 13
season
150.00
$
156.00
$
6.00
Y
Youth
14 to 17
season
170.00
$
176.80
$
6.80
Y
Adult
18 to 64
season
185.00
$
192.40
$
7.40
Y
Older Adult
55+
season
150.00
$
156.00
$
6.00
Y
Family - 2 adults; up to 4 children
all ages
season
350.00
$
364.00
$
14.00
Y
PICK UP HOCKEY (SHINNY)
Adult
18+
each
13.50
$
13.50
$
-
Y
Clip Card - 6 skates
18+
card
75.90
$
75.90
$
-
Y
TICKET ICE
Skater (Child, Youth)
each
6.25
$
6.50
$
0.25
Y
Clip Card - 10 skates
card
56.25
$
58.50
$
2.25
Y
STICK & PUCK
Skater (Child, Adult, Youth, Older Adult)
3+
each
6.25
$
6.50
$
0.25
Y
Clip Card - 10 skates
per person
card
56.25
$
58.50
$
2.25
Y
Access for public skates, public swims and drop in recreation programs for the calendar year
Recreational Hockey Games - Adult
Figure Skating Practice - Free Coach
Recreational Hockey Practice - All ages
15 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
ARENA AND HALL RENTALS
Hall / Pickleball Court
hr
55.10
$
57.30
$
2.20
Y
Small Parking Lot
event
34.20
$
35.60
$
1.40
Y
Hall - Max 100 people
hr
46.00
$
47.85
$
1.85
Y
Dry Ice/Floor
seasonal
hr
122.50
$
127.40
$
4.90
Y
Dry Ice/Floor - Minor Sports & Schools
seasonal
hr
76.10
$
79.15
$
3.05
Y
Meeting Room - max 30 people
1 room
hr
27.60
$
28.70
$
1.10
Y
Meeting Room - max 60 people
2 rooms
hr
36.80
$
38.30
$
1.50
Y
Meeting Room - max 100 people
3 rooms
hr
46.00
$
47.85
$
1.85
Y
Concourse
hr
40.55
$
41.60
$
1.05
Y
Dry Ice/Floor
seasonal
hr
122.50
$
127.40
$
4.90
Y
Dry Ice/Floor - Minor Sports & Schools
seasonal
hr
76.10
$
79.15
$
3.05
Y
Pickleball Court Rental Fee
1 court
hr
20.00
$
20.80
$
0.80
Y
Parking Lot - one section
event
72.80
$
75.70
$
2.90
Y
Special Event
day
1,807.10
$
1,879.38
$
72.28
Y
Children's Skating Party
event
111.30
$
115.75
$
4.45
Y
Fleming Centre
Includes Arena dry floor, lower concourse, 4 meeting rooms
Includes admission for 20 skaters and 2 adults into scheduled public skate, 2 1/2 hours of one meeting room
Jordan Arena
Lincoln Community Centre
16 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
ARENA AND HALL RENTALS CONT'D
Children's Sports Party
event
111.30
$
115.75
$
4.45
Y
After Hour Premium Rental Fee (after 10pm)
hr
27.55
$
28.65
$
1.10
Y
Rental Deposit (Covering facility damage, cleaning
costs, additional staff costs)
200.00
$
200.00
$
-
N
Classroom Rental - max 30 people
1 room
hr
N/A
28.70
$
28.70
Y
Prime Time - Weekdays after 5pm and Weekends
full gym
hr
NA
50.85
$
50.85
Y
Non Prime - Weekdays before 5pm
full gym
hr
NA
39.55
$
39.55
Y
Not for Profit
full gym
hr
NA
39.55
$
39.55
Y
Private Rental
Full Gym + Staff
hr
NA
84.75
$
84.75
Y
Prime Time - Weekdays after 5pm and Weekends
full gym
hr
NA
45.20
$
45.20
Y
Non Prime - Weekdays before 5pm
full gym
hr
NA
33.90
$
33.90
Y
Not for Profit
full gym
hr
NA
33.90
$
33.90
Y
Private Rental
Full Gym + Staff
hr
NA
57.30
$
57.30
Y
Includes1 hour use of half of arena dry floor for 20 children and 2 adults, 2 1/2 hours of one meeting room
FORMER BEAMSVILLE DISTRICT SECONDARY SCHOOL
Recreation Gym - Wing #3
Small Gym - Wing #1
17 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
CHARLES DALEY PARK
Area Rental under 50 people
1 area
hr
20.00
$
20.80
$
0.80
Y
Small Scale Rental - 51-100 people
2 areas
hr
40.00
$
41.60
$
1.60
Y
Medium Scale Rental - 101-250 people
all areas
hr
60.00
$
62.40
$
2.40
Y
Large Scale Rental - 251+ people
all areas
day
1,386.85
$
1,442.30
$
55.45
Y
Large Scale Private and/or Ticketed Event (251+ people)
all areas
day
1,807.10
$
1,879.38
$
72.28
Y
Parking Lot Section
one section
day
72.80
$
75.70
$
2.90
Y
Small Gazebo - Upper Parking Lot
max 10 people
day
27.60
$
28.70
$
1.10
Y
Rental Deposit (Covering facility damage, cleaning costs,
additional staff costs)
day
500.00
$
500.00
$
-
N
ROTARY PARK
Rotary Park Small Pavillion
seasonal
day
72.80
$
75.70
$
2.90
Y
Outdoor Learning Classroom
seasonal
day
27.60
$
28.70
$
1.10
Y
Rotary Park Large Pavillion Rental - under 50 people
large pavillion
hr
20.00
$
20.80
$
0.80
Y
Small Scale Rental - 51-100 people
large pavillion
hr
40.00
$
41.60
$
1.60
Y
Medium Scale Rental - 101-250 people
all areas
hr
60.00
$
62.40
$
2.40
Y
Large Scale Rental - 251 people +
all areas
day
1,386.85
$
1,442.30
$
55.45
Y
Areas: Small Pavillion; Outdoor Learning Classroom
Areas: East Pavillion; West Pavilion; Designated Picnic Area; Bandshell
18 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
SPORTS PARKS
Small Tournaments - All Fields and Pavilion
under 500 people
day
444.60
$
462.38
$
17.78
Y
Large Events - All Fields and Pavilion
500+ people
day
1,386.84
$
1,442.30
$
55.46
Y
Sports Field Rental - Adult - No Lights
18+
per hour
31.20
$
32.45
$
1.25
Y
Sports Field Rental - Adult - Lights 7pm+
18+
per hour
37.45
$
38.95
$
1.50
Y
Sports Field Rental - Child Team
7 and under
person
14.05
$
14.60
$
0.55
N
Sports Field Rental - Youth Team
8 to 18
person
18.20
$
18.90
$
0.70
N
Sports Field Lights - Child or Youth Team
7pm+
per hour
6.25
$
6.50
$
0.25
Y
Pavillion Rental
seasonal
hr
20.00
$
20.80
$
0.80
Y
Large Parking Lot Rental
Seasonal
day
72.80
$
75.70
$
2.90
Y
NEIGHBOURHOOD PARKS
Park Space
hr
34.10
$
35.45
$
1.35
Y
Multi Purpose Court (Prokich Park)
hr
34.10
$
34.45
$
0.35
Y
Multi Purpose Court (Prokich Park)
event
444.60
$
462.38
$
17.78
Y
Sports Parks: Beamsville Lions Park; Jordan Lions Park
Areas: Open grass areas at neighbourhood parks (For example: fitness or recreational classes)
19 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
COMMEMORATIVE DONATIONS
Bench With Plaque
2,475.00
$
2,475.00
$
-
N
Tree With Plaque
900.00
$
900.00
$
-
N
Picnic Table With Plaque
2,890.00
$
2,890.00
$
-
N
Plaque For Existing Tree
325.00
$
325.00
$
-
N
Plaque For Existing Bench
234.00
$
234.00
$
-
N
Charles Daley Park Boardwalk Plaque
208.00
$
208.00
$
-
N
Fleming Centre Arena Seat Plaque
208.00
$
208.00
$
-
N
Children's Wings of Hope Plaque
208.00
$
208.00
$
-
N
FOOD AND REFRESHMENT VENDOR
Class "A" Food and Refreshment Vendor Permit
per permit
364.00
$
364.00
$
-
Y
Class "B" Food and Refreshment Vendor Permit
per permit
208.00
$
208.00
$
-
Y
Tax Receipt Can Be Issued
20 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Facilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
FILMING AT TOWN HALL PROPERTY
Fees and Charges for filming at Town owned properties
are subject to the discretion of the Directors
each
as negotiated
as negotiated
ADDITIONAL RENTAL FEES
Facility and Park Cancellation Fee
occurrence
25.00
$
25.00
$
-
N
Additional Picnic Tables or Garbage Cans
up to 9 additional event
165.40
$
169.55
$
4.14
Y
Facility Cleaning Fee
per hour
85.00
$
85.00
$
-
N
Event - Set Up / Move In / Take Down
day
315.00
$
327.00
$
12.00
Y
Rental Deposit (Covering facility damage, cleaning costs,
additional staff costs)
day
500.00
$
500.00
$
-
N
INCIDENT COST RECOVERY
Wages
hour
100%
100%
-
N
Department Overhead
based on wage
49%
35%
(14%)
N
Admin Overhead
based on wage
13%
15%
2%
N
Direct material and supplies
each
100%
100%
-
N
21 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Utilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
VARIABLE RATE - BASED ON WATER USAGE
Water Charge
m3 of water
3.173
$
3.312
$
0.140
N
Wastewater Surcharge (Sep-May)
m3 of water
3.978
$
4.299
$
0.320
N
Wastewater Surcharge (Jun-Aug)
m3 of water
3.196
$
3.453
$
0.260
N
FLAT RATE
Flat Wastewater rates-no water service
quarter
$
230.22 $
241.80
11.580
N
Wastewater Service on Property
quarter
195.48
$
204.26
$
8.78
N
Wastewater Base
quarter
34.74
$
37.54
$
2.80
N
BASE CHARGES - BASED ON SERVICE
Water and Wastewater Service on Property
Hookup Size 12.5mm to 19mm (1/2" to 3/4")
quarter
69.59
$
73.92
$
4.33
N
Water Base
quarter
34.85
$
36.38
$
1.53
N
Wastewater Base
quarter
34.74
$
37.54
$
2.80
N
Hookup Size 25mm (1")
quarter
158.82
$
168.70
$
9.88
N
Water Base
quarter
79.53
$
83.02
$
3.49
N
Wastewater Base
quarter
79.29
$
85.68
$
6.39
N
Hookup Size 38mm (1-1/2")
quarter
229.48
$
243.75
$
14.27
N
Water Base
quarter
114.91
$
119.95
$
5.04
N
Wastewater Base
quarter
114.57
$
123.80
$
9.23
N
Related: By-law 02-21; By-law 01-134
Related: By-law 02-21; By-law 2019-112
Related: By-law 02-21; By-law 01-134
22 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Utilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
BASE CHARGES - BASED ON SERVICE CONT'D
Hookup Size 50mm (2")
quarter
388.37
$
412.51
$
24.14
N
Water Base
quarter
194.47
$
203.00
$
8.53
N
Wastewater Base
quarter
193.90
$
209.51
$
15.61
N
Hookup Size 64mm to 75mm (2-1/2" to 3")
quarter
564.96
$
600.07
$
35.11
N
Water Base
quarter
282.90
$
295.30
$
12.40
N
Wastewater Base
quarter
282.06
$
304.77
$
22.71
N
Hookup Size 100mm (4")
quarter
741.42
$
787.50
$
46.08
N
Water Base
quarter
371.26
$
387.54
$
16.28
N
Wastewater Base
quarter
370.16
$
399.96
$
29.80
N
Hookup Size 150mm (6")
quarter
1,239.98
$
1,317.06
$
77.08
N
Water Base
quarter
620.91
$
648.14
$
27.23
N
Wastewater Base
quarter
619.07
$
668.92
$
49.85
N
Hookup Size 200mm (8")
quarter
1,461.05
$
1,551.87
$
90.82
N
Water Base
quarter
731.61
$
763.69
$
32.08
N
Wastewater Base
quarter
729.44
$
788.18
$
58.74
N
Hookup Size 250mm (10")
quarter
1,753.26
$
1,862.25
$
108.99
N
Water Base
quarter
877.93
$
916.43
$
38.50
N
Wastewater Base
quarter
875.33
$
945.82
$
70.49
N
23 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Utilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
Water Service on Property - No Wastewater Service
Hookup Size 12.5mm to 19mm (1/2" to 3/4")
quarter
36.67
$
38.28
$
1.61
N
Hookup Size 25mm (1")
quarter
83.77
$
87.46
$
3.69
N
Hookup Size 38mm (1-1/2")
quarter
121.07
$
126.40
$
5.33
N
Hookup Size 50mm (2")
quarter
204.81
$
213.82
$
9.01
N
Hookup Size 64mm to 75mm (2-1/2" to 3")
quarter
297.92
$
311.03
$
13.11
N
Hookup Size 100mm (4")
quarter
391.02
$
408.22
$
17.20
N
Hookup Size 150mm (6")
quarter
653.81
$
682.58
$
28.77
N
Hookup Size 200mm (8")
quarter
916.62
$
956.30
$
39.68
N
Temporary Connection - Plus Deposit
each
125.00
$
125.00
$
-
N
Water Hauler Station - Plus Deposit
Hookup Size 3" - Large Volume (*charged in periods with
consumption)
monthly*
144.54
$
150.88
$
6.34
N
Hookup Size 1" - Small Volume (*charged in periods with consumption) monthly*
48.18
$
50.29
$
2.11
N
Construction Water - New Construction Permits
<235 m2
permit
201.46
$
210.32
$
8.86
N
235 m2 to 470 m2
permit
469.58
$
490.24
$
20.66
N
>470 m2
permit
626.11
$
653.66
$
27.55
N
24 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Utilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
MISCELLANEOUS
Account Notices (Disconnection, Non-Payment)
each
58.00
$
59.00
$
1.00
N
Manual Meter Read
each
121.00
$
124.00
$
3.00
N
Touch Pad/Radio Frequency (RF) Box Install/Move ≤19mm
>19 mm will be charged Actual Costs for time and materials
each
384.00
$
394.00
$
10.00
N
Meter Install/Move ≤19mm In Buildings
>19mm or in pits will be charged Actual Costs for time and materials
each
482.00
$
494.00
$
12.00
N
Repair Damaged Meter ≤19mm
each
482.00
$
494.00
$
12.00
N
Repair Damaged Meter >19mm
each
Actual Costs
Actual Costs
Meter Testing ≤19mm
>19mm will be charged Actual Costs for time and materials
each
384.00
$
394.00
$
10.00
N
By-law 2024-62
device
Actual Costs
Actual Costs
Watermain Commissioning
each
Actual Costs +
Water Sampling
Costs + Actual
Water Usage
Actual Costs +
Water Sampling
Costs + Actual
Water Usage
Hydrant Flow Testing
each
Actual Costs
120.00
$
120.00
N
Related: By-law 03-75; By-law 2011-64; By-law 2019-46
25 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Utilities
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
MAINTENANCE WORK - REGULAR HOURS
Turn On or Off
trip
117.00
$
120.00
$
3.00
N
Temporary Hydrant/Other Connection
each
122.00
$
125.00
$
3.00
N
Frozen Pipe Assistance
each
401.00
$
411.00
$
10.00
N
Rod Sewer or TV Lateral
each
618.00
$
633.00
$
15.00
N
Watermain Tapping
≤50mm
Witness of Tapping
each
312.00
$
320.00
$
8.00
N
Water Service Call - After Hours
each
234.00
$
240.00
$
6.00
N
DEPOSITS
Water Hauler Station
Hookup Size 3" - Large Volume
account
100.00
$
100.00
$
-
N
Hookup Size 1" - Small Volume
account
50.00
$
50.00
$
-
N
Hydrants
account
1,200.00
$
1,200.00
$
-
N
Temporary Hydrant/Other Connection (2019-22)
account
1,200.00
$
1,200.00
$
-
N
Services provided during overtime hours are charged at double the regular hours rate
Related: By-law 2019-112; By-law 01-134; By-law 2019-22
26 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
BUILDING PERMIT APPLICATION FEES
Minimum Fee
per permit
221.45
$
225.00
$
3.55
N
GROUP "A" ASSEMBLY
Portable Classrooms
flat fee
427.24
$
427.24
$
-
N
Schools
sq. metre
21.37
$
21.37
$
-
N
All Recreation Facilities, Including Arenas/Gymnasiums
sq. metre
21.37
$
21.37
$
-
N
Day-Care Facilities
sq. metre
21.37
$
21.37
$
-
N
Libraries
sq. metre
21.37
$
21.37
$
-
N
Places Of Worship
sq. metre
21.37
$
21.37
$
-
N
Restaurants - Over 30 Seats
sq. metre
21.37
$
21.37
$
-
N
Non-Residential - Outdoor Patio
flat fee
600.70
$
600.70
$
-
N
Alterations
sq. metre
11.98
$
11.98
$
-
N
Additions
sq. metre
21.37
$
21.37
$
-
N
GROUP "B" INSTITUTIONAL
Institutional
sq. metre
23.57
$
23.57
$
-
N
Hospital
sq. metre
23.57
$
23.57
$
-
N
Nursing Homes
sq. metre
23.57
$
23.57
$
-
N
Alterations
sq. metre
11.98
$
11.98
$
-
N
Additions
sq. metre
23.57
$
23.57
$
-
N
27 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
GROUP "C" RESIDENTIAL
Single Detached Dwelling, Semi-Detached Dwelling, Duplex
sq. metre
15.97
$
15.97
$
-
N
Triplex, Fourplex, Row, Townhouse
sq. metre
15.97
$
15.97
$
-
N
Repeat Plans For Single Detached, Etc.
sq. metre
12.77
$
12.77
$
-
N
Apartment Buildings
- 3 Storeys Or Less And/Or Less Than 600 m2
sq. metre
$
15.97
15.97
$
-
N
Hotels/ Motels
- 3 Storeys Or Less And/Or Less Than 600 m2
sq. metre
15.97
$
15.97
$
-
N
Trailers/ Mobile Homes
sq. metre
427.24
$
427.24
$
-
N
Alterations
sq. metre
10.30
$
10.30
$
-
N
Additions
- Singles To Townhouses
sq. metre
15.97
$
15.97
$
-
N
Additions
- Apartments To Hotels/Motels
sq. metre
15.97
$
15.97
$
-
N
GROUP "C" RESIDENTIAL - LARGE BUILDINGS
Apartment Buildings
- 4 Storeys And Over And/Or More Than 600 m2
sq. metre
16.28
$
16.28
$
-
N
Hotels/ Motels
- 4 Storeys And Over And/Or More Than 600 m2
sq. metre
16.28
$
16.28
$
-
N
Alterations
sq. metre
10.30
$
10.30
$
-
N
Additions
sq. metre
16.28
$
16.28
$
-
N
28 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
GROUP "D", "E", "F2", "F3" SMALL BUILDINGS
Single Occupancy
sq. metre
18.03
$
18.03
$
-
N
Multiple Occupancies - Shell Only
sq. metre
13.65
$
13.65
$
-
N
Interior Renovations
sq. metre
13.65
$
13.65
$
-
N
Alterations to Group D
sq. metre
12.24
$
12.24
$
-
N
Alterations to Group E
sq. metre
12.24
$
12.24
$
-
N
Alterations to Group F
sq. metre
11.98
$
11.98
$
-
N
Additions
sq. metre
18.03
$
18.03
$
-
N
GROUP "D" LARGE BUILDINGS
Office Buildings, Other Business And Personal Services
Single Occupancy
sq. metre
15.84
$
15.84
$
-
N
Multiple Occupancies - Shell Only
sq. metre
12.24
$
12.24
$
-
N
Interior Renovations
sq. metre
12.24
$
12.24
$
-
N
Alterations
sq. metre
12.24
$
12.24
$
-
N
Additions
sq. metre
15.84
$
15.84
$
-
N
GROUP "E" MERCANTILE - LARGE BUILDINGS
Retail Stores
Single Occupancy
sq. metre
15.84
$
15.84
$
-
N
Multiple Occupancies - Shell Only
sq. metre
12.24
$
12.24
$
-
N
Interior Renovations
sq. metre
12.24
$
12.24
$
-
N
Alterations
sq. metre
12.24
$
12.24
$
-
N
Additions
sq. metre
15.84
$
15.84
$
-
N
Office, Retail, Other Business And Personal Services And Manufacturing/Warehouse Buildings
29 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
GROUP "F" INDUSTRIAL - LARGE BUILDINGS
Manufacturing/Warehouse
sq. metre
17.90
$
17.90
$
-
N
Parking Garage
sq. metre
$
11.98
11.98
$
-
N
Open Mezzanine
sq. metre
11.98
$
11.98
$
-
N
Alterations
sq. metre
11.98
$
11.98
$
-
N
Additions
sq. metre
17.90
$
17.90
$
-
N
ADDITIONAL RESIDENTIAL STRUCTURES
Garage, Storage Shed, Carport
sq. metre
4.97
$
4.97
$
-
N
Deck, Balcony, Open Porch
sq. metre
4.97
$
4.97
$
-
N
Sunroom (Unheated)
sq. metre
7.90
$
7.90
$
-
N
Finishing A Basement Area
sq. metre
4.97
$
4.97
$
-
N
New Foundation/Basement For An Existing Dwelling
sq. metre
4.97
$
4.97
$
-
N
Private Swimming Pool
flat fee
257.70
$
257.70
$
-
N
INSPECTION FEES
Where An Inspector Determines That The Work For Which An
Inspection Has Been Requested Is Not Sufficiently Complete To Allow
For Proper Inspection (Not Ready)
per inspection
103.00
$
103.00
$
-
N
Where A Requested Inspection Reveals An Infraction That Was
Identified At A Previous Inspection And Not Remedied (Re-Inspection)
per inspection
103.00
$
103.00
$
-
N
Additional Inspections/Non-Routine Inspections
per inspection
103.00
$
103.00
$
-
N
Liquor License Inspections
per inspection
228.96
$
228.96
$
-
N
30 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
OTHER CLASSIFICATIONS
Plumbing Only
Up To 10 Fixtures.
flat fee
186.95
$
186.95
$
-
N
Over 10 Fixtures
Based on estimated value of construction
per $1,000 value
12.77
$
12.77
$
-
N
Hvac/Sprinkler/Mechanical
- Residential
flat fee
186.95
$
186.95
$
-
N
Hvac/Sprinkler/Mechanical
- Non-Residential
- Based on estimated value of construction
per $1,000 value
12.77
$
12.77
$
-
N
Greenhouse (Growing Area Only)
- First 929 m2 of building area
sq. metre
1.94
$
1.94
$
-
N
Greenhouse (Growing Area Only)
- Portion of building area over 929 m2
sq. metre
0.16
$
0.16
$
-
N
Farm Building, Air Supported Structure
sq. metre
3.32
$
3.32
$
-
N
Relocation/Moving Permits
Flat Fee
480.60
$
480.60
$
-
N
Tents
- $175 Minimum; $400 Maximum
sq. metre
2.49
$
2.49
$
-
N
Public Pools
flat fee
2,136.22
$
2,136.22
$
-
N
Demolitions (Complete Or Partial Building)
- $350 Minimum
sq. metre
0.48
$
0.48
$
-
N
Woodstoves, Fireplaces, Chimneys
flat fee
186.95
$
186.95
$
-
N
Signs
flat fee
267.08
$
267.08
$
-
N
Temporary Signs
- Community Events
flat fee
53.35
$
53.35
$
-
N
Designated Structures (Retaining Walls/Solar Panels)
Based on estimated value of construction
per $1,000 value
N/A
12.77
$
12.77
N
31 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
CONDITIONAL PERMITS
To Construct A Building, Or Part Thereof, Pursuant To The Conditional
Permit Provisions Of The Building Code Act
flat fee
2,136.22
$
2,136.22
$
-
N
CHANGE OF USE (WITH NO CONSTRUCTION)
flat fee
427.24
$
427.24
$
-
N
OCCUPANCY PERMIT (PER UNIT) AS PER OBC
flat fee
135.96
$
135.96
$
-
N
TRANSFER OF PERMIT
Where ownership changes on a property and there are no other
changes to the project or professional services required.
flat fee
221.45
$
225.00
$
3.55
N
ADDITIONAL PERMIT FEE
- $100 Minimum
per hr
80.13
$
80.13
$
-
N
REVISIONS TO PERMITS
- $100 Minimum
per hr
77.80
$
80.13
$
2.33
N
PERMIT APPROVAL
Where The Work Cannot Be Described (EVC)
per $1,000 value
12.40
$
12.77
$
0.37
N
Where an applicant for a permit makes a material change to a plan specification document, or other information, following application for a
permit, the chief building official may increase the required permit fee or fees by applying the rates in this schedule to the full extent of the
changes and may require payment of such increased fee or fees prior to the approval of such changes or the issuance of such permit.
32 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
OTHER FEES
Written Property Information/Work Orders
per Letter/ property
215.00
$
225.00
$
10.00
N
Application For Variance To Sign By-Law
flat fee
518.50
$
518.50
$
-
N
E-Mail Monthly Building Activity Report
$3.11/per report/
month
37.30
$
37.30
$
-
N
TIMING OF PAYMENT OF APPLICATION FEES
REFUND OF FEES
If administrative functions, zoning functions and grading reviewing functions have been performed, 60% of the fee may be refunded.
If administrative functions, zoning functions, grading review functions and plan examination functions have been performed, 40% of the fee may
be refunded.
If the permit has been issued and no inspections have been performed subsequent to the issuance of the permit 30% of the fee may be
refunded. Once any inspections have been performed, no refund will be given.
No refund shall be made of an amount less than $225.00.
Any payments outstanding to the town shall be deducted from the performance deposit by the Treasurer, prior to the refund being
issued.
If only administrative functions have been performed, 70% of the fee may be refunded.
In the event of non-commencement of any project after a permit has been issued, the applicant may, provided a written request has been
made, be entitled to a refund of permit fees. The refund shall be determined by the Chief Building Official in accordance with the following
schedule which sets out the percentage of fees eligible for refund:
Fees are subject to change from time to time. the permit fee is payable at the time of the submission of the application. The balance of the fee
as a result of the review of the building permit and all other fees are payable prior to the issuance of a building permit.
33 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
REACTIVATION
CONSULTING SERVICES
PERFORMANCE DEPOSITS
Performance Deposit (Site Plan Agreement)
- As per agreement
As per
agreement
As per
agreement
N
Performance Deposit
- When not part of Site Plan Agreement
per dwelling unit
2,000.00
$
2,000.00
$
-
N
Performance Deposit
- all other permit applications
per permit
1,000.00
$
1,000.00
$
-
N
Performance Deposit
- Moving of building
per permit
3,000.00
$
3,000.00
$
-
N
Performance Deposit
- Where as a condition of permitting the construction of a new dwelling,
the existing dwelling must be demolished within two months of
occupying the new dwelling
per permit
5,000.00
$
5,000.00
$
-
N
To obtain a refund of your performance bond deposit, please contact the building department. Your refund request must include evidence that
the required works have been completed for which the deposit was secured to the satisfaction of the Chief Building Official. After a minimum of
one year, the Town may send a notice to the address on file to notify you that the deposit may be subject to forfeiture if we do not receive a
response from you within thirty (30) days. If through no fault of the Town, the deposit has not been refunded after the expiry of the thirty (30) day
period, the Town may without further notice declare the deposit forfeited, whereupon the deposit shall become the property of the Town free of all
claims.
Any payments outstanding to the Town shall be deducted from the deposit by the Treasurer, prior to the refund being issued.
Where any application requires the town to hire a consultant to review supporting technical studies on behalf of the town, the applicant shall be
responsible for all costs, and those costs shall be payable upon submission of an invoice from the town.
Any work for which a permit is issued shall be deemed to have been abandoned and cancelled six months after the date of filing, unless in the
opinion of the Chief Building Official such work is seriously proceeded with and a full fee shall be required to activate a new permit application.
34 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Building
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
NOTES
9. Relocation permit for a building authorizes the moving of the building only. A separate building permit is required for the foundation and any
other construction.
10. Fees for additions shall be calculated at the same rate as stated for major occupancy.
11. Where construction has commenced prior to the issuance of a building permit, the prescribed permit fees shall be doubled. Construction is
defined as placing of concrete; installation of plumbing or buried piping for building drain, sewer drainage pipe or water distribution pipe.
8. If the work regulated by the permit cannot be described otherwise, the permit application fee shall be $12.77 for each $1,000.00 of the value of
the work proposed. The value to be determined by the Chief Building Official.
7. Revisions or amendment to a permit is $80.13 per hour with a minimum of $100.00
6. New construction and additions include plumbing and other regulated building services and components but does not include septic systems.
5. Major occupancy is based on the Ontario Building Code.
4. Unfinished basements and crawl spaces are not used in the fee calculation for new construction and additions. Attached garages are not
used in the fee calculation for new dwellings.
3. There are no deductions from the gross floor area for openings such as stairs, shafts, etc.
2. Square metres is the gross floor area of all floors, mezzanines, lofts and habitable areas for each major occupancy classification measured
from the outer face of the exterior walls or center line of a fire separation.
1. Permit fee is based on $ per square metre or $ flat fee.
35 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
OFFICIAL PLAN AMENDMENT
Official Plan Amendment Application - Major
each
33,100.00
$
33,928.00
$
828.00
N
Official Plan Amendment Application - Minor
each
22,067.00
$
22,619.00
$
552.00
N
ZONING BY-LAW AMENDMENT
Zoning By-Law Amendment Application - Major each
33,100.00
$
33,928.00
$
828.00
N
Zoning By-Law Amendment Application - Minor
each
16,550.00
$
16,964.00
$
414.00
N
Zoning By-Law Amendment Application -Condition Of Consent
each
6,620.00
$
6,785.00
$
165.00
N
Zoning By-Law Amendment Application- Removal Of (H) Holding Symbol each
3,000.00
$
3,000.00
$
-
N
Zoning By-Law Amendment Application-Temporary Use By-Law each
8,827.00
$
4,000.00
$
(4,827.00)
N
Zoning By-Law Amendment Application-Extension To Temporary Use By-
Law
each
3,999.00
$
2,000.00
$
(1,999.00)
N
Temporary Use Agreement
each
2,864.00
$
2,936.00
$
72.00
N
SITE PLAN
Site Plan Approval Application-New Buildings (Initial Or Amendment
Where A New Agreement Is Required), plus fee per residential unit
each
14,344.00
$
14,703.00
$
359.00
N
Site Plan Approval Application-Additions To Existing Buildings (Initial Or
Amendment Where A New Agreement Is Required), plus fee per
residential unit
each
9,930.00
$
10,178.00
$
248.00
N
Fee per residential unit (up to 250 units)
unit
100.00
$
100.00
$
-
N
Site Plan Approval Amendment Application (Where No New Agreement Is
Required)
each
10,000.00
$
7,000.00
$
(3,000.00)
N
36 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
SITE PLAN CONT'D
Site Plan Approval Application-Greenhouses (Initial Or Amendment Where
A New Agreement Is Required)
each
9,930.00
$
10,178.00
$
248.00
N
Site Plan Approval Amendment Application-Greenhouses (Where No New
Agreement Is Required)
each
9,930.00
$
6,500.00
$
(3,430.00)
N
Site Plan Approval Application For A Farm Helphouse
each
4,414.00
$
4,524.00
$
110.00
N
Discharge Of A Registered Site Plan Agreement
each
1,145.00
$
1,174.00
$
29.00
N
CONDOMINIUM
Draft Plan Of Condominium Application
each
11,479.00
$
11,766.00
$
287.00
N
Draft Plan Of Condominium Application-Vacant Land Or Common
Elements
each
$ 11,479.00 $ 11,766.00 287.00 N
Extension To Draft Plan Approval Of A Draft Plan Of Condominium
each
1,719.00
$
1,762.00
$
43.00
N
Final Approval Of A Draft Plan Of Condominium-Vacant Land Or Common
Elements
each
2,758.00
$
2,827.00
$
69.00
N
Final Approval Of A Draft Plan Of Condominium
each
2,758.00
$
2,827.00
$
69.00
N
SUBDIVISION
Draft Plan Of Subdivision Application Base Fee, plus fee per unit
each
19,950.00
$
19,950.00
$
-
N
Per Unit Fee (up to 250 residential units)
unit
100.00
$
100.00
$
-
N
Revisions To A Draft Approved Plan Of Subdivision
each
9,920.00
$
9,920.00
$
-
N
Extension To Draft Plan Approval Of A Draft Plan Of Subdivision
each
1,620.00
$
1,620.00
$
-
N
Subdivision Agreement Application-Minor (<25 units)
each
12,500.00
$
12,500.00
$
-
N
Subdivision Agreement Application-Major/Multiple Phases
each
31,060.00
$
35,000.00
$
3,940
N
Amendment To A Registered Subdivision Agreement
each
7,550.00
$
7,550.00
$
-
N
Final Approval Of A Draft Plan Of Subdivision
each
2,600.00
$
2,600.00
$
-
N
37 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
COMMITTEE OF ADJUSTMENT
Minor Variance Application
property, lot or unit
3,000.00
$
3,000.00
$
-
N
Minor Variance Application-Residential & Agricultural Zones
property, lot or unit
1,720.00
$
1,720.00
$
-
N
Consent Application
each new lot
created
3,000.00
$
3,000.00
$
-
N
Final Certification Fee For A Consent Application
each
350.00
$
350.00
$
-
N
Validation of Title Application
each
2,000.00
$
2,000.00
$
-
N
OTHER
Cash In Lieu Of Parking Agreement
each
3,111.00
$
3,111.00
$
-
N
Cash In Lieu Of Parking Fee Per Parking Space
each
12,444.00
$
12,444.00
$
-
N
Development Agreement Application
each
9,710.00
$
9,710.00
$
-
N
Pre-Servicing Agreement Application
each
9,710.00
$
9,710.00
$
-
N
Amendment To A Registered Development Agreement
each
2,160.00
$
2,160.00
$
-
N
Subdivision Or Development Or Site Plan Assumption Agreement
each
2,700.00
$
2,700.00
$
-
N
Deeming By-Law
each
760.00
$
760.00
$
-
N
Removal Of Part-Lot Control Application
each
1,730.00
$
1,730.00
$
-
N
Model Home Agreement
Where permitted by the Subdivision or Site Plan Agreement
each
460.00
$
460.00
$
-
N
Written Property Information
property, lot or unit
330.00
$
330.00
$
-
N
Preconsultation Fee - Major Application
each meeting
1,500.00
$
2,000.00
$
500.00
N
Preconsultation Fee - Minor Application
each meeting
520.00
$
520.00
$
-
N
38 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
ENGINEERING AND PERMITS
Special Events Permit Application
annual
80.00
$
80.00
$
-
N
Special Event Permit Annual Renewal
annual
80.00
$
80.00
$
-
N
Road Closing Application - Minor
each
1,730.00
$
1,730.00
$
-
N
Road Closing Application - All Others
each
3,560.00
$
3,560.00
$
-
N
ADMINISTRATION FEES
5% of the total cost of the works and services up to $100,000; plus
5%
5%
4% of the total cost of the works and services in excess of $100,000 and
up to $500,000; plus
4%
4%
By-law 2024-62
3%
3%
2% of the total cost of the works and services in excess of $2,000,000 and
up to $4,000,000; plus
2%
2%
1% of the total cost of the works and services in excess of $4,000,000
1%
1%
100% of all legal costs
Actual Costs
Actual Costs
- For any development agreement application, site plan approval application, subdivision agreement application, pre-servicing agreement or any
amendments or assumption agreements thereto
39 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
SITE ALTERATION PERMIT CLASS 1 (FILL/ALTERATION)
Base Fee
Property 0.4 Hectares Or Less
year
459.00
$
459.00
$
-
N
Property Greater Than 0.4 Hectares
year
765.00
$
765.00
$
-
N
Fill Area Fee
All Properties
hectare & year
24.00
$
25.00
$
1.00
N
Revision Fee
121.00
$
124.00
$
3.00
N
Site Inspection Fee
each
153.00
$
153.00
$
-
N
Renewal Fee
50% of permit
fee
50% of permit
fee
N
Fill Permit
- 10% of work value up to $250
permit
10%
10%
N
Fill Permit Inspection Flat Fee
permit
110.00
$
113.00
$
3.00
N
Where any class 1 works have commenced prior to the issuance of a
permit, all fees will be doubled
x2
x2
SITE ALTERATION PERMIT CLASS 2 (TREES)
Application Fee Pre-Work
year
405.00
$
405.00
$
-
N
Application Fee Post-Work
year
1,009.00
$
1,009.00
$
-
N
Revision Fee
121.00
$
124.00
$
3.00
N
Site Inspection Fee
each
256.00
$
262.00
$
6.00
N
Renewal Fee
50% of permit
fee
50% of permit
fee
N
40 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
TREE REMOVAL FEES
Cash In Lieu Of Tree Planting Fee
year
486.00
$
486.00
$
-
N
Performance Bond To Guarantee Survival Of Tree For 1 Year From The
Date Of Planting
year
486.00
$
486.00
$
-
N
DOCUMENT FEES
Copy Of Official Plan
year
109.61
$
112.00
$
2.39
Y
Certified Copy Of Official Plan
year
145.77
$
149.00
$
3.23
Y
Copy Of Zoning By-Law
87.01
$
89.00
$
1.99
Y
Certified Copy Of Zoning By-Law
each
109.61
$
112.00
$
2.39
Y
Maps
6.78
$
7.00
$
0.22
Y
DEVELOPMENT CHARGES ALTERNATIVE PAYMENT AGREEMENTS
By-law 2024-62
Application fee
each
$500.00
$500.00
-
N
Administration fee (minimum of $5,000, maximum $10,000)
each
1% of DC
deferred
1% of DC
deferred
N
Recovery of legal or external fees related to the agreement
at cost
at cost
Y
APPLICATIONS TO ADJUST THE ENVIRONMENTAL CONSERVATION ZONING BOUNDARY
No zoning by-law amendment application fee is required to adjust the boundary of the environmental conservation zoning on a parcel of land where
the adjustments are supported by the Niagara Peninsula Conservation Authority and/or the Ministry of Natural Resources.
41 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
TIMING OF PAYMENT OF APPLICATIONS FEES AND ADMINISTRATION FEES
REFUND OF FEES
REACTIVATION
Application fees are subject to change from time to time. all application fees are payable upon submission, except those for site plan
administration fees, subdivision agreement administration fees, pre-servicing agreement administration fees and development agreement
administration fees
If an application is withdrawn prior to circulation to commenting agencies, 70% of the fee may be refunded.
The draft plan of subdivision application fee is associated with the initial review of the subdivision proposal only and shall not be deemed to be
payment towards the administration and overhead, engineering, legal and other costs incurred by the municipality in preparing and administering
subdivision agreements. the subdivision agreement, pre-servicing agreement and development agreement administration fees are payable prior to
the registration of the agreement.
The site plan administration fees are payable prior to approval of the site plan, when the signed agreement has been submitted by the applicant to
the town.
If an application is withdrawn after circulation to commenting agencies but prior to public notice being mailed or advertised, 40% of the fee may be
refunded.
If an application is withdrawn after notice of the public meeting being mailed or advertised, but prior to the staff report being prepared, 20% of the
fee may be refunded.
In addition, any payments outstanding to the town shall be deducted from the application fee by the Treasurer, prior to the refund being issued by
the town.
Any application which has been withdrawn or has been inactive for a period of one year shall be considered abandoned and a full fee shall be
required to activate a new application.
42 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Planning
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
APPEAL TO OLT
CONSULTING SERVICES
LEGAL SERVICES
Legal review, appraisal and surveying fees will be charged back to the applicant based on actual costs
To secure payment of such costs, the applicant will provide the town, upon notice and/or acknowledgement of an objection from the local planning
appeal tribunal, with an initial deposit of $5,000.00, such amount to be increased by an amount determined by the town in the event the town
determines that the nature of the application indicates that $5,000.00 may be inadequate.
Where any application requires the town to hire a consultant to review supporting technical studies on behalf of the town, the applicant shall be
responsible for all costs, and those costs shall be payable upon submission of an invoice from the town.
Where a decision on a development application in respect of a planning matter is referred or appealed to the local planning appeal tribunal and the
town and the applicant jointly support the decision, the applicant shall be responsible for all costs to the municipality associated therewith; this
includes all legal, expert testimony, and administrative and overhead costs.
Where a Committee of Adjustment decision has been appealed and council does not adopt the position recommended by town staff, then the
following provision shall apply in the event the applicant obtains a summons compelling town staff to attend the hearing of the local planning appeal
tribunal. Staff shall undertake such preparations as required for the hearing and the costs of such preparations and attendance at the hearing,
including any legal costs not otherwise associated with the hearing, shall be paid by the applicant who has obtained the summons. In this instance
the fee is $5,000.00 and shall be paid to the town not later than the day before the scheduled hearing of the Local Planning Appeal Tribunal.
Any costs to the town in excess of the deposit shall be paid to the town by the applicant upon submission of an invoice.
43 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: MLE
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
BY-LAW ENFORCEMENT FEES AND CHARGES
Inspection Fee
hour
131.00
$
134.00
$
3.00
N
Compliance Letter
each
126.00
$
129.00
$
3.00
N
Non-Compliance Administration Fee
each
169.00
$
173.00
$
4.00
Y
Property Standards - Bylaw 2016-27
Certificate Of Compliance
each
230.00
$
236.00
$
6.00
N
Discharge Of Order
each
482.00
$
494.00
$
12.00
N
File Notice Of Appeal
each
482.00
$
494.00
$
12.00
N
Works Undertaken By Town
Actual Costs
Actual Costs
Clean Yards - Bylaw 2018-92
Order
each
246.00
$
252.00
$
6.00
N
Officer Hearing Attendance
each
246.00
$
252.00
$
6.00
N
Works Undertaken By Town
Actual Costs
Actual Costs
Notice to Muzzle - Bylaw 2019-18
File Notice Of Appeal
each
482.00
$
494.00
$
12.00
N
Unlawfully Placed Signs on Public Property - By-law 02-24
Removal Fee - less than 0.6 m2 in size
each
126.00
$
129.00
$
3.00
N
Removal Fee - greater than 0.6 m2 in size
each
372.00
$
381.00
$
9.00
N
Noise Exemption
Application (up to 5 events)
each
328.00
$
336.00
$
8.00
N
Additional Events
each
79.00
$
81.00
$
2.00
N
Refusal - File Notice Of Appeal
each
482.00
$
494.00
$
12.00
N
44 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: MLE
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
BY-LAW ENFORCEMENT FEES AND CHARGES CONT'D
AMPS - By-laws 2017-24 & 2019-102
Hearing Non-Appearance Fee
each
115.00
$
108.00
$
(7.00)
N
Screening Non-Appearance Fee
each
58.00
$
54.00
$
(4.00)
N
NSF Fee
each
29.00
$
27.00
$
(2.00)
N
Late Payment Fee
each
24.00
$
22.00
$
(2.00)
N
MTO Search Fee
each
11.00
$
11.00
$
-
N
Parking On Unauthorized Area Of Land
each
45.80
$
46.90
$
1.10
N
ANIMAL CARE AND CONTROL FEES AND CHARGES
By-laws 2019-18 & 2020-40
Dog Registration
Sterilized
annual
28.60
$
29.30
$
0.70
N
Unsterilized
annual
57.30
$
58.70
$
1.40
N
Late Registration Surcharge (Jan 1 - Feb 29)
annual
17.30
$
17.70
$
0.40
N
Late Registration Surcharge (Mar 1 - May 31)
annual
34.40
$
35.30
$
0.90
N
Late Registration Surcharge (Jun 1 - Dec 31)
annual
57.30
$
58.70
$
1.40
N
Dog Kennel Registration
Registration
annual
171.90
$
176.20
$
4.30
N
Late Registration Surcharge (Jan 1 - Feb 29)
annual
57.30
$
58.70
$
1.40
N
Late Registration Surcharge (Mar 1 - May 31)
annual
114.60
$
117.50
$
2.90
N
Late Registration Surcharge (Jun 1 - Dec 31)
annual
171.90
$
176.20
$
4.30
N
Appeal of Refusal/Revocation
annual
143.30
$
146.90
$
3.60
N
Replacement Tag
each
5.80
$
5.90
$
0.10
N
45 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: MLE
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
Other MLE Fees and Charges By-Laws:
2019-101 Parking on Unauthorized Area By-Law
2021-55 Fire Route By-law
89-2000 Traffic By-law
05-70 Fire Route By-law
05-90 Municipal Parking Lots By-law
08-66 Municipal Parks By-law
2019-30 Parking on Private Property By-law
2018-92 Clean Yards By-law
2019-102 Parking on Unauthorized Area By-law
2020-40 Animal Care and Control By-law
97-2020 Accessible Parking By-law
2024-62 Short Term Accommodations By-law
2024-65 Parking in Municipal Parking Lots By-law
2025-51 Amend Non-Parking AMPs By-law
2025-16 Amend Clean Yards By-law
2025-45 Amend Non-Parking AMPs By-law
2022-33 Regulate Posters and Signs on Public Property and Road Allowance By-law
2021-30 Prohibit and Regulate Public Nuisances By-law
2022-44 Regulate the use of Municipal Parks By-law
2024-51 Non-Parking AMPs By-law
46 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
ADMINISTRATION SERVICES
327.00
$
N/A
(327.00)
Y
706.25
$
N/A
(706.25)
Y
157.00
$
N/A
(157.00)
Y
N/A
162.00
$
162.00
Y
N/A
162.00
$
162.00
Y
N/A
85.00
$
85.00
Y
N/A
337.00
$
337.00
Y
45.20
$
47.00
$
1.80
Y
*Plus applicable Care Charge if not previously paid with the lot
Interment Rights Certificate Replacement
Transfer Fee For Establishing Rights of Heirs and Transfering All
Remaining Interment Rights with new Certificate - Plus applicable
Care Charge if not previously paid with the lot
Application for single interment purposes where there is no named
Executor. No transfer of ownership. No new Interment Rights
Certificate.*
Application For Establishing Rights Of Heirs For Interment Purposes
- Plus applicable Care Charge if not previously paid with the lot
Transfer Fee From an Original Interment Rights Holder to enable the
transfer of all Interment Rights where none have been used
Transfer of all remaining rights initiated by the Interment Rights Holder.
New Interment Rights Certificate.*
Transfer of remaining rights initiated by the Executor of the deceased
Interment Rights Holder. New Interment Rights Certificate.*
Designation of a single interment by an Executor of a deceased
Interment Rights Holder. No new Interment Rights Certificate.*
47 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
INTERMENT RIGHTS
Resident
Single Grave
lot
2,938.00
$
3,026.00
$
88.00
Y
Land Charge
lot
1,762.80
$
1,815.60
$
52.80
Y
Care & Maintenance - 40% of Total Charge
lot
1,175.20
$
1,210.40
$
35.20
Y
Single Cremation
lot
1,348.00
$
1,388.00
$
40.00
Y
Land Charge
lot
808.80
$
832.80
$
24.00
Y
Care & Maintenance - 40% of Total Charge
lot
539.20
$
555.20
$
16.00
Y
Single Columbarium Niche "A"
niche
$
2,611.00
$
2,689.00
78.00
Y
Niche Charge
niche
$
1,697.15
$
1,747.85
50.70
Y
Care & Maintenance - 35% of Total Charge
niche
$
913.85
$
941.15
27.30
Y
Single Columbarium Niche "B"
niche
$
3,205.00
$
3,301.00
96.00
Y
Niche Charge
niche
$
2,083.25
$
2,145.65
62.40
Y
Care & Maintenance - 35% of Total Charge
niche
$
1,121.75
$
1,155.35
33.60
Y
48 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
INTERMENT RIGHTS CONT'D
Non-resident
Single Grave
lot
4,407.00
$
4,539.00
$
132.00
Y
Land Charge
lot
2,644.20
$
2,723.40
$
79.20
Y
Care & Maintenance - 40% of Total Charge
lot
1,762.80
$
1,815.60
$
52.80
Y
Single Cremation
lot
$
2,022.00
2,083.00
$
61.00 Y
Land Charge
lot
1,213.20
$
1,249.80
$
36.60
Y
Care & Maintenance - 40% of Total Charge
lot
808.80
$
833.20
$
24.40
Y
Single Columbarium Niche "A"
niche
$
3,917.00
$
4,035.00
118.00
Y
Niche Charge
niche
$
2,546.05
$
2,622.75
76.70
Y
Care & Maintenance - 35% of Total Charge
niche
$
1,370.95
$
1,412.25
41.30
Y
Single Columbarium Niche "B"
niche
$
4,808.00
$
4,952.00
144.00
Y
Niche Charge
niche
$
3,125.20
$
3,218.80
93.60
Y
Care & Maintenance - 35% of Total Charge
niche
$
1,682.80
$
1,733.20
50.40
Y
50% Premium over Resident
49 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
INTERMENT SERVICE FEES
Standard Burial
Regular Hours
burial
1,762.00
$
1,815.00
$
53.00
Y
Service Fee
burial
1,585.80
$
1,633.50
$
47.70
Y
Care & Maintenance - 10% of Total Charge
burial
176.20
$
181.50
$
5.30
Y
Overtime Hours - 30% Premium on Regular Hours
burial
2,291.00
N/A
(2,291.00)
Y
Service Fee
burial
2,061.90
$
N/A
(2,061.90)
Y
Care & Maintenance - 10% of Total Charge
burial
229.10
$
N/A
(229.10)
Y
Sunday/Holiday Hours - 50% Premium on Regular Hours
burial
2,643.00
2,723.00
$
80.00
Y
Service Fee
burial
2,378.70
$
2,450.70
$
72.00
Y
Care & Maintenance - 10% of Total Charge
burial
264.30
$
272.30
$
8.00
Y
Cremation or Stillbirth Burial
Regular Hours
burial
625.00
$
644.00
$
19.00
Y
Service Fee
burial
562.50
$
579.60
$
17.10
Y
Care & Maintenance - 10% of Total Charge
burial
62.50
$
64.40
$
1.90
Y
Overtime Hours - 30% Premium on Regular Hours
burial
813.00
$
N/A
(813.00)
Y
Service Fee
burial
731.70
$
N/A
(731.70)
Y
Care & Maintenance - 10% of Total Charge
burial
81.30
$
N/A
(81.30)
Y
Sunday/Holiday Hours - 50% Premium on Regular Hours
burial
938.00
$
966.00
$
28.00
Y
Service Fee
burial
844.20
$
869.40
$
25.20
Y
Care & Maintenance - 10% of Total Charge
burial
93.80
$
96.60
$
2.80
Y
2nd Interment - Cremation In Casket
burial
127.00
$
131.00
$
4.00
Y
Additional cremation options not identified below may be available for purchase.
50 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
Double Depth * Grandfathered Only
Regular Hours
burial
2,585.00
$
2,663.00
$
78.00
Y
Service Fee
burial
2,326.50
$
2,396.70
$
70.20
Y
Care & Maintenance - 10% of Total Charge
burial
258.50
$
266.30
$
7.80
Y
Overtime Hours - 30% Premium on Regular Hours
burial
3,361.00
$
N/A
(3,361.00)
Y
Service Fee
burial
3,024.90
$
N/A
(3,024.90)
Y
Care & Maintenance - 10% of Total Charge
burial
336.10
$
N/A
(336.10)
Y
Sunday/Holiday Hours - 50% Premium on Regular Hours
burial
3,878.00
$
3,995.00
$
117.00
Y
Service Fee
burial
3,490.20
$
3,595.50
$
105.30
Y
Care & Maintenance - 10% of Total Charge
burial
387.80
$
399.50
$
11.70
Y
Inurnment
Regular Hours
inurment
500.00
$
515.00
$
15.00
Y
Service Fee
inurment
400.00
$
412.00
$
12.00
Y
Care & Maintenance - 10% of Total Charge
inurment
100.00
$
103.00
$
3.01
Y
Overtime Hours - 30% Premium on Regular Hours
inurment
650.00
$
N/A
(650.00)
Y
Service Fee
inurment
520.00
$
N/A
(520.00)
Y
Care & Maintenance - 10% of Total Charge
inurment
130.00
$
N/A
(130.00)
Y
Sunday/Holiday Hours - 50% Premium on Regular Hours
inurment
750.00
$
773.00
$
23.00
Y
Service Fee
inurment
600.00
$
618.40
$
18.40
Y
Care & Maintenance - 10% of Total Charge
inurment
150.00
$
154.60
$
4.60
Y
2nd Inurnment in Niche
inurment
127.00
$
131.00
$
4.00
Y
Additional inurnment options not identified below may be available for purchase.
51 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
Scattering
Regular Hours
scattering
313.00
$
322.00
$
9.00
Y
Service Fee
scattering
250.40
$
257.60
$
7.20
Y
Care & Maintenance - 10% of Total Charge
scattering
62.60
$
64.40
$
1.80
Y
Overtime Hours - 30% Premium on Regular Hours
scattering
407.00
$
N/A
(407.00)
Y
Service Fee
scattering
325.61
$
N/A
(325.61)
Y
Care & Maintenance - 10% of Total Charge
scattering
81.40
$
N/A
(81.40)
Y
Sunday/Holiday Hours - 50% Premium on Regular Hours
scattering
470.00
$
483.00
$
13.00
Y
Service Fee
scattering
376.00
$
386.40
$
10.40
Y
Care & Maintenance - 10% of Total Charge
scattering
94.00
$
96.60
$
2.60
Y
DIS-INTERMENTS SERVICE FEES
Dis-interment **
full burial
3,277.00
$
3,375.00
$
98.00
Y
Dis-interment and re-interment within same cemetery
full burial
5,537.00
$
5,703.00
$
166.00
Y
Dis-interment (inground) **
cremation
1,017.00
$
1,048.00
$
31.00
Y
Dis-interment (inground) and re-interment within same cemetery
cremation
1,808.00
$
1,862.00
$
54.00
Y
Dis-interment (niche) **
inurnment
904.00
$
931.00
$
27.00
Y
Dis-interment (niche) and re-interment within same cemetery
inurnment
1,356.00
$
1,397.00
$
41.00
Y
** all remains are removed from the Cemetery
LOT SERVICES
Shrub Trimming/Removal
per lot
N/A
85.00
$
85.00
Y
52 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Cemetery
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
MEMORIALIZATION
Monument Foundation & Install
Foundation Charge Per Cubic Foot
53.00
$
55.00
$
2.00
Y
Minimum Charge For Foundation
424.00
$
437.00
$
13.00
Y
Monument Inspection
99.00
$
102.00
$
3.00
Y
Markers Under 173 Sq In
183.00
$
188.00
$
5.00
Y
Markers Over 173 Sq In
221.00
$
228.00
$
7.00
Y
Marker Removal
N/A
188.00
$
188.00
Y
Cornerstones
196.00
$
202.00
$
6.00
Y
MARKER CARE AND MAINTENANCE
Flat Marker Less Than 173 Square Inches
-
$
-
$
-
Y
Flat Marker At Least 173 Square Inches
113.00
$
113.00
$
-
Y
226.00
$
226.00
$
-
Y
452.00
$
452.00
$
-
Y
PRODUCTS
Bronze Wreath
1,109.00
$
1,142.00
$
33.00
Y
Preneed Bronze Wreath Date Plate
131.00
$
135.00
$
4.00
Y
Wallplate
523.00
$
539.00
$
16.00
Y
Wallplate Space Hold
65.00
$
67.00
$
2.00
Y
QR memorial 1" heart
N/A
254.00
$
254.00
Y
QR memorial 2"x2" plaque
N/A
283.00
$
283.00
Y
Upright Marker 4 Feet Or Less In Height And 4 Feet Or Less In Length,
Including The Base
Upright Marker More Than 4 Feet In Either Height Or Length, Including
The Base
Prescribed by Bereavement Authority of Ontario (BAO)
Specialty items and other memorial options not identified below may be available for purchase.
53 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Public Works
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
INSPECTION FEES
Regular Hours
hr
160.00
$
164.00
$
4.00
N
Overtime Hours
hr
419.00
$
429.50
$
10.50
N
PERMIT PROCESSING AND REVIEW
Fire Line Servicing Permit - Inspection Required
Processing/Review Fee
permit
309.00
$
317.00
$
8.00
N
Refundable Security Deposit*
permit
1,500.00
$
1,500.00
$
-
N
Utility Permit - Inspection Required
Refundable Security Deposit*
permit
1,500.00
$
1,500.00
$
-
N
Entrance Permit - Inspection Required
Refundable Security Deposit - Residential*
permit
1,200.00
$
1,200.00
$
-
N
Refundable Security Deposit - Non-Residential*
permit
1,500.00
$
1,500.00
$
-
N
Moving Oversized/Overweight Load Permit - Inspection Required
Refundable Security Deposit*
permit
1,000.00
$
1,000.00
$
-
N
*Any payments outstanding to the Town shall be deducted from the deposit by the Treasurer, prior to the refund being issued.
54 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Public Works
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
PERMIT PROCESSING AND REVIEW CONT'D
Temporary Road Closure Permit - Inspection Required
Refundable Security Depost (Non-Profit)*
permit
250.00
$
250.00
$
-
N
Refundable Security Deposit (Profit)*
permit
500.00
$
500.00
$
-
N
Regular Hours - One Day Close/Open
permit
335.00
$
343.38
$
8.38
N
Overtime Hours - One Day Close/Open
permit
500.00
$
512.50
$
12.50
N
Regular & Overtime Hours - One Day Close/Open
permit
420.00
$
430.50
$
10.50
N
Double Time Hours (Stat Holiday & Sunday) - One Day Close/Open
permit
997.00
$
1,021.93
$
999.50
N
Temporary Road Occupancy Permit - Inspection Required
Refundable Security Deposit*
permit
1,000.00
$
1,000.00
$
-
N
Signage Fee
250.00
$
250.00
$
-
N
*Any payments outstanding to the Town shall be deducted from the deposit by the Treasurer, prior to the refund being issued.
55 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Public Works
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
SPECIALTY ITEMS
Sidewalk Deposit
each
-
$
-
$
-
N
Property Information - Available Municipal Services
property
68.00
$
70.00
$
2.00
N
Drainage Act
property
24.00
$
25.00
$
1.00
N
Tile Drainage Loan Application Fee
each
213.00
$
218.00
$
5.00
Y
Tile Drainage Town Inspection Flat Fee
each
278.00
$
285.00
$
7.00
Y
Tourism Sign
sign
372.00
$
381.00
$
9.00
N
Tourism Sign Maintenance
sign
37.00
$
38.00
$
1.00
N
Tourism Sign Inspection Flat Fee
sign
160.00
$
164.00
$
4.00
N
EQUIPMENT CHARGE-OUT RATES
Pick-up 4x4
hour
41.00
$
42.03
$
1.03
Y
Grader
hour
155.00
$
158.88
$
3.88
Y
Tandem Truck
hour
95.00
$
97.38
$
2.38
Y
Single Axle Truck (5 ton)
hour
95.00
$
97.38
$
2.38
Y
One ton
hour
95.00
$
97.38
$
2.38
Y
Backhoe
hour
50.00
$
51.25
$
1.25
Y
Van & 2-Wheel Drive Pick-up
hour
70.00
$
71.75
$
1.75
Y
INCIDENT COST RECOVERY
Wages
hour
100%
100%
- N
Department Overhead
based on wage
49%
35%
(14%) N
Admin Overhead
based on wage
13%
15%
2% N
Direct material and supplies
each
100%
100%
- N
56 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
OPEN AIR FIRE PERMIT
Farm - Agricultural Lands
-
$
-
$
-
N
Urban - Rural - Campground - Specific Event
25.00
$
25.00
$
-
N
Farm - Agricultural Lands
65.00
$
67.00
$
2.00
N
Urban - Rural - Campground - Specific Event
65.00
$
67.00
$
2.00
N
PERMITS
Consumer Fireworks Sales Permit Application
88.00
$
90.00
$
2.00
N
Display Fireworks Sales Permit Application
88.00
$
90.00
$
2.00
N
Public Fireworks Display Permit Application
235.00
$
241.00
$
6.00
N
Pyrotechnic Special Effects Permit Application
235.00
$
241.00
$
6.00
N
Fireworks / Pyrotechnic Supplemental Permit
88.00
$
90.00
$
2.00
N
PRODUCTS
Key Box Sales
260.00
$
378.00
$
118.00
Y
Fire Route Sign Sales
55.00
$
70.00
$
15.00
Y
Combination Smoke / Carbon Monoxide Alarm Sales
- Installation during response as required for Fire Code compliance
123.00
$
126.00
$
3.00
Y
Includes Site Inspection if required
Online Application
Paper Application
Installation not included unless indicated
57 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
FALSE ALARMS
False Fire Alarms Response - 1 Within 12 Months*
N/A $ 100.00
100.00
N
False Fire Alarms Response - 2 Within 12 Months*
1,000.00
$
1,000.00
$
-
N
False Fire Alarms Response - 3 Within 12 Months*
2,000.00
$
2,500.00
$
500.00
N
False Fire Alarms Response - 4+ Within 12 Months*
4,000.00
$
5,000.00
$
1,000.00
N
False Fire Alarms Response - 5+ Within 12 Months*
5,000.00
$
N/A
(5,000.00)
N
ON-SITE INSPECTIONS
Private Home Day Care - Less Than 5 Children
173.00
$
177.00
$
4.00
N
Licenced Day Care
344.00
$
353.00
$
9.00
N
Agco Liquor Licence Inspection
344.00
$
353.00
$
9.00
N
Residential (1 To 5 Units) - First Unit
344.00
$
353.00
$
9.00
N
Residential (1 To 5 Units) - Each Additional Unit
42.00
$
43.00
$
1.00
N
Residential (6 Or More Units) - First Unit
516.00
$
529.00
$
13.00
N
Residential (6 Or More Units) - Each Additional Unit
42.00
$
43.00
$
1.00
N
Assembly Occupancy - Up To 150 Persons
344.00
$
353.00
$
9.00
N
Assembly Occupancy - More Than 150 Persons
688.00
$
705.00
$
17.00
N
School Occupancy - Up To 150 Persons
344.00
$
353.00
$
9.00
N
Requested or Routine Inspections
Preventable and Malicious False Alarm - Response fee to a fire alarm activation determined by the Chief Fire Official to be a
Preventable False Alarm or a Malicious False Alarm where reasonable measures were not taken to prevent same. Fee is chargeable
to the Owner of the property at which the fire alarm was activated, as defined in Division A, Part 1 of the Ontario Fire Code [O.Reg.
213/07 as amended], for the first and every subsequent occurrence within a 12-month period where fire department vehicles are
dispatched.
*Note: False Alarm fees may be reduced by a verifiable amount paid to a Certified Fire Alarm Technician to repair/upgrade system,
or for other measures taken to the satisfaction of the Chief Fire Official to prevent further false alarms.
58 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
ON-SITE INSPECTIONS CONT'D
School Occupancy - More Than 150 Persons
688.00
$
705.00
$
17.00
N
Vulnerable Occupancy - Up To 10 Residents
Fire Drill Scenario Approval
802.00
$
822.00
$
20.00
N
Vulnerable Occupancy - 11 To 100 Residents
Fire Drill Scenario Approval
1,055.00
$
1,081.00
$
26.00
N
Vulnerable Occupancy - More Than 100 Residents
Fire Drill Scenario Approval
1,572.00
$
1,611.00
$
39.00
N
Commercial / Industrial Occupancy - Area Up To 900 Sq.M.(10,000 Sq.Ft.)
344.00
$
353.00
$
9.00
N
Commercial / Industrial Occupancy - Each Additional 450 Sq.M.
87.00
$
89.00
$
2.00
N
Licensed Marijuana Grow Facility Inspection - Area Up To 900
Sq.M.(10,000 Sq.Ft.)
344.00
$
353.00
$
9.00
N
Licensed Marijuana Grow Facility Inspection - Each Additional 450 Sq.M.
87.00
$
89.00
$
2.00
N
Illicit Marijuana Grow Operation / Clandestine Drug Lab Inspection
1,719.00
$
1,762.00
$
43.00
N
Tent / Temporary Structure Inspection
344.00
$
353.00
$
9.00
N
Food Truck / Refreshment Vehicle Inspection
173.00
$
177.00
$
4.00
N
Special Event Inspection - 1 hr increments
173.00
$
177.00
$
4.00
N
Short Term Accomodations (5 to 10 persons) - each
N/A
354.00
$
354.00
N
Short Term Accomodations (11 or more persons) - each
N/A
531.00
$
531.00
N
59 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
FIRE SERVICES RESPONSE
QEW Response
*Current MTO
Rate
*Current MTO
Rate
N
Open Air Fire Response
999.00
$
1,024.00
$
25.00
N
False Open Air Fire Complaint Response
999.00
$
1,024.00
$
25.00
N
Natural Gas Incident Response
999.00
$
1,024.00
$
25.00
N
Rehab Unit Response
1,010.00
$
550.00
$
(460.00)
N
Non-Emergency Assistance Response
999.00
$
1,024.00
$
25.00
N
Illicit Marijuana Grow Operation / Clandestine Drug Lab Response
999.00
$
1,024.00
$
25.00
N
Motor Vehicle Incident Response
999.00
$
1,024.00
$
25.00
N
Response to natural gas leak where prior service locates had not been obtained, or where proper procedures had not been followed
where service locates had been established, minimum 1 hour per responding apparatus.
Response of Rehab Unit to provide on-scene support services. Any costs for food, supplies, and costs to remove hazardous
materials from the scene are not included and will be billed on a full cost recovery basis in addition to the response fee
Fees are per apparatus and per hour
Will be updated to reflect the Ministry of Transportation Prescribed Rate
Response to investigate and/or extinguish an open fire in contravention of by-law, minimum 1 hour per responding apparatus.
Response to investigate a second or subsequent false or frivolous open air fire complaint within a 12-month period, minimum 1 hour
per responding appartus.
Subject to unit availability, minimum 1 hour per responding apparatus.
By-law 2024-62
Response to a motor vehicle fire or motor vehicle collision, other than on the Queen Elizabeth Way, to provide fire suppression,
rescue, and/or other emergency services to a resident or non-resident of the Town of Lincoln. Chargeable to the registered owner(s)
of the involved vehicle(s), minimum 1 hour per responding apparatus. In the case of a motor vehicle collision response, the fee is
chargeable to the owner(s) of the vehicle(s) determined to be at-fault.
60 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
FIRE SERVICES RESPONSE CONT'D
Technical Rescue Response
970.00
$
1,024.00
$
54.00
N
Fire Department Fees - Indemnification Technology
-
$
-
$
-
N
Current Ministry of Transportation rate for each responding apparatus for each hour or portion thereof, plus personnel rate for each
responding firefighter for each hour or portion thereof, plus any additional costs incurred during emergency response including but
not limited to foam and extinguishing agents, dry sprinkler powder aerosol (DPSA) or similar devices, metered water, costs to
replace damaged or destroyed equipment, costs for on-scene firefighter rehabilitation and decontamination services, and specialized
response costs such as third-party contractors and equipment (see notes).
1.Should the insurer pay the coverage to the property owner, the property owner is liable to remit these funds to the municipality or
its representative.
2.These cost recovery fees are HST exempt.
3.Where the Municipality believes and/or Indemnification Technology® indicates Fire Department Specific Response Fees are
applicable but the Owner does not have, in part or in full, insurance coverage for fire department charges for the Property, the
Municipality may adjust the Fire Department Specific Response Fees to the extent of insurance coverage upon provision by the
Owner of evidence, to the satisfaction of the Municipality, that no such insurance coverage exists or to demonstrate the limits of such
coverage.
Should the insurer pay the coverage to the property owner, the property owner shall be liable to remit these funds to the municipality
or its representative.
Response to an incident requiring technical rescue services, such as water or ice rescue, rope rescue, trench rescue, off-road
rescue, to provide emergency service to a resident or non-resident of Lincoln, minimum 1 hour per responding apparatus.
61 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
PROPANE RISK SAFETY MANAGEMENT PLAN (RSMP)
New / Modified Facility RSMP, More Than 5000 USWG
8 hour mimimum
$1,000 Deposit Required
173.00
$
177.00
$
4.00
N
Review Existing Facility RSMP, More Than 5000 USWG
4 hour minimum
$500 Deposit Required
173.00
$
177.00
$
4.00
N
New/Modified Facility RSMP, 5000 USWG Or Less
487.00
$
499.00
$
12.00
N
Review Existing Facility RSMP, 5000 USWG Or Less
258.00
$
264.00
$
6.00
N
Professional Engineer or Consultant Review of RSMP - Full recovery of all incurred costs including HST, plus 10% administrative
charge
62 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Fire
Description
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
MISCELLANEOUS
Fire Report
173.00
$
177.00
$
4.00
N
Legal Search
173.00
$
177.00
$
4.00
N
Fire Safety Plan Review - Initial (Subject to additional on-site inspection
fees if applicable)
173.00
$
177.00
$
4.00
N
Fire Safety Plan Review - Resubmission
173.00
$
177.00
$
4.00
N
Fire Prevention Officer Rate
173.00
$
177.00
$
4.00
N
Emergency Management Services
173.00
$
177.00
$
4.00
N
Fire Apparatus Standby/Fire Watch, with crew - per hour or part, minimum
2 hours
999.00
$
512.00
$
(487.00)
N
Fire Apparatus Requested for Special Event, with crew - per hour or part,
minimum 1 hour
N/A
512.00
$
512.00
N
Recovery Of Extraordinary Expenses
Actual Costs
Actual Costs
N
Full recovery of all costs including HST incurred by the fire department to provide service to other fire services or agencies pursuant
to an automatic aid or mutual aid agreement to retain the services of private contractors, rent special equipment, repair or replace
contaminated or damaged fire department equipment, and/or replace consumable materials used to rescue persons, suppress or
extinguish a fire, preserve property, prevent fire spread, remove hazardous materials, or otherwise mitigate an emergency situation,
or necessary to board up or secure an unsafe building or property, plus 10% administrative charge.
Billable services provided by Emergency Management Coordinator as requested. Program Costs extra: Full recovery of incurred
costs including HST to provide billable emergency management services as requested, plus 10% administrative charge.
Billable fire prevention assistance as requested, per hour or part.
63 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Clerks
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
GENERAL SERVICES - CLERKS
Lottery Licences
- per AGCO
3% of prize
3% of prize
N
Commissioner Fee
- waived for pension docs
document
26.00
$
27.00
$
1.00
N
Commissioner Fee-Non Resident
- waived for pension docs
document
32.00
$
33.00
$
1.00
N
Property Information Requests/Legal Letters Of Confirmation
request
68.00
$
70.00
$
2.00
N
Photocopies-Black & White
20 pages
11.00
$
11.00
$
-
Y
Photocopies-Colour
20 pages
20.00
$
21.00
$
1.00
Y
Marriage Licence
- Vital Statistics Act, R.S.O. 1990, c. V.4
each
138.00
$
141.00
$
3.00
N
Burial Permit
- Vital Statistics Act, R.S.O. 1990, c. V.4
each
24.00
$
24.00
$
-
N
Service Charge For After Hours Burial Permit
- Vital Statistics Act, R.S.O. 1990, c. V.4
each
34.00
$
35.00
$
1.00
N
Freedom Of Information Requests
request
Per legislation
Per legislation
N
Routine and Disclosure Fees
- $5 is to be submitted with the request, and the remaining $60 is
to be submitted upon successful retrieval of records
request
65.00
$
65.00
$
-
N
Additional fee per hour for complex requests
hour
80.00
$
80.00
$
-
N
Civil Marriage Ceremony *
- Marriage Act, R.S.O. 1990, c. M.3
ceremony
344.00
$
353.00
$
9.00
Y
Witness For A Civil Marriage Ceremony *
- Marriage Act, R.S.O. 1990, c. M.3
ceremony
29.00
$
30.00
$
1.00
Y
Renewal Of Vows *
ceremony
58.00
$
59.00
$
1.00
Y
* Fees for Civil Solemnization of Marriage, Marriage Witness, and Renewal of Marriage Vows at offsite locations are subject to a $350 and
applicable Town mileage rates
64 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Clerks
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
GENERAL SERVICES - CLERKS CONT'D
Certified True Copy
copy
20.00
$
20.00
$
-
N
Municipal Letter for Special Occasion
letter
65.00
$
65.00
$
-
N
Municipal Information Licensing Letter
letter
65.00
$
65.00
$
-
N
AGCO Liqour Sales Municipal Processing Fee
letter
65.00
$
65.00
$
-
N
Appeal/Tribunal Hearing Fees
each
130.00
$
130.00
$
-
N
ELECTION SIGN PERMIT FEES
Mayor and Regional Councillor
per candidate
250.00
$
250.00
$
- N
Ward Councillor
per candidate
150.00
$
200.00
$
50.00
N
Registered Third Parties/School Board Trustees
per candidate
100.00
$
200.00
$
100.00
N
Federal and Provincial Candidates
per candidate
N/A
200.00
$
200.00
N
The prescribed Election Sign deposit must be paid by cash, debit or cheque and payable to the Town of Lincoln, and is as follows:
If the Town must remove an election sign, we will deduct $25.00 per sign removed from the deposit. Election sign deposits will be refunded
within 90 days Voting Day, minus any deductions for the removal of election signs by the Town.
By-law 2025-50
65 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Finance
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
GENERAL SERVICES - FINANCE
Statements of Account Hard Copy (Property Tax, Utility)
each
12.00
$
13.00
$
1.00
N
Statements of Account Prior Years (Property Tax, Utility)
each
12.00
$
13.00
$
1.00
N
Statements of Account Previous Owner (Property Tax, Utility)
each
15.00
$
16.00
$
1.00
N
Reprints of Bills or Receipts Hard Copy (Property Tax, Utility)
each
12.00
$
13.00
$
1.00
N
New Roll or Account Creation (Property Tax, Utility)
each
41.00
$
42.00
$
1.00
N
Ownership Change (Property Tax, Utility)
each
41.00
$
42.00
$
1.00
N
Reminder Notice for Overdue Balance (Utility)
each
5.00
$
5.00
$
-
N
Transfer to Tax (Utility & Accounts Receivable)
per account
41.00
$
42.00
$
1.00
N
Transfer to Tax (Provincial Offences Act)
each
57.00
$
58.00
$
1.00
N
Transfer due to Use of Incorrect Account # - all subsequent
each
22.00
$
23.00
$
1.00
N
Cancel or Changes to Post-Dated Cheque Payment
each
22.00
$
23.00
$
1.00
N
Refund of Credit Balance on Account
each
20.00
$
20.00
$
-
N
Activate/Deactivate Water Hauler Utility Account
each
27.00
$
28.00
$
1.00
N
Returned Item Charge (NSF: Non-Sufficient Funds)
each
36.00
$
37.00
$
1.00
N
Tax Certificate-Manual
- Finance staff
each
70.00
$
70.00
$
-
N
Tax Certificate-Self Serve
- Online portal
each
35.00
$
35.00
$
-
N
Tax Certificate - Express
each
140.00
$
140.00
$
-
N
Utility Certificate
each
35.00
$
35.00
$
-
N
Administration Of Trust Fund Account - St. John's Cemetery
year
750.00
$
750.00
$
-
N
Mortgage Company for Interim and Final Payment Listing
per roll
18.00
$
19.00
$
1.00
N
66 of 67
Schedule A to By-law 2025-61
2026 Fees and Charges
Service: Finance
Description
Unit of Measure
2025 Fee
(After Tax)
2026 Fee
(After Tax)
Change
HST
PROPERTY TAX REGISTRATION AND TAX SALE FEES
Warning Notice - Before Tax Sale Registration*
per roll
50.00
$
50.00
$
-
N
Notice - Farm Debt Mediation*
per roll
200.00
$
200.00
$
-
N
Registration of Tax Arrears Certificate
per roll
250.00
$
250.00
$
-
N
Preparation of Extension Agreement
per roll
500.00
$
500.00
$
-
N
Tax Sale - First Notice*
per roll
300.00
$
300.00
$
-
N
Registration of Tax Arrears Cancellation Certificate
per roll
N/A
50.00
$
50.00
N
Tax Sale - Final Notice*
per roll
350.00
$
350.00
$
-
N
Sale by Tender/Auction
per roll
1,200.00
$
1,200.00
$
-
N
Tax Sale Tender Package
each
25.00
$
25.00
$
-
N
External Tax Sale Costs (including legal, consulting, registration fees,
advertising, etc.)
Actual
Costs+10%
Actual
Costs+10%
-
N
PENALTY AND INTEREST
Penalty - Property Tax installments, Utility charges
- 1.25% of unpaid amount due, applied 1st day after default
each
1.25%
1.25%
-
N
Interest - Accounts Receivable, Property Tax and Utility Arrears
- 1.25% per month applied to unpaid balance in following month
month
1.25%
1.25%
-
N
* A notice fee regarding tax registration or tax sale may be waived if the property owner pays the required amount or joins an approved pre-
authorized payment plan prior to the date stipulated on the notice.
67 of 67
Schedule A to By-law 2025-61