By-law 2025-39 - Being a By-law Respecting Construction, Demolition and Change of Use Permits and Inspections

Matachewan, Ontario · No. 2025-39 · adopted 2025-12-03 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 83e9edd334dd · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

THE CORPORATION OF THE TOWNSHIP OF MATACHEWAN BY-LAW 2025-39 BEING A BY-LAW RESPECTING CONSTRUCTION, DEMOLITION AND CHANGE OF USE PERMITS AND INSPECTIONS. WHEREAS Section 391 (1) of the Municipal Act, 2001, as amended, authorizes a municipality to impose fees or charges on persons for services or activities provided or done by or on behalf of it. AND WHEREAS under the Building Code Act Section 7(1) allows the Council of a municipality to pass require the payment of fees for the issuance of permits; AND WHEREAS under the Building Code Act Section 7(2) the total amount of the fees authorized under clause (1) must not exceed the anticipated reasonable costs of the principal authority to administer and enforce this Act in its Area of jurisdiction. NOW THEREFORE BE IT RESOLVED THAT the Council for the Township of Matachewan enacts as follows: THAT the Building Permit Fees charged be outlined as Schedule A. 1. THAT the Clerk is hereby authorized to make minor modifications or corrections of a grammatical or typographical nature to the by-law and schedule after passage of this by-law where such modifications or corrections do not alter the intent of the by-law. 2. THAT this By-law comes into force and effect on January 1,2026. 3. THAT all other By-laws and resolutions, or parts thereto, contrary hereto or inconsistent herewith, be and the same are hereby repealed. 4. READ A FIRST TIME in open Council this 19th day ofNovember, 2025. Michael Young Mayor Cheryl Swfi son Clerk ^ READ A SECOND AND THIRD TIME in open Council, enacted andrpassed this 3rd day of December, 2025. ' 4(joung\ 5Vci0orV (Michact (Mayui-) jL^.i Cheryl ^anson Clerk ^ SCHEDULE 'A' TO BY-LAW NO. 2025-39 BUILDING PERMIT FEES The fees payable by the applicant for a construction, demolition, change of use of conditional permit or inspection fees shall be as follows: Permit fees shall be $9.25 per thousand based on a value of contract price. If there is no contract price in a written agreement, the permit fee will be calculated by Building Department as follows: Deposit: $90 per application Fee Code Residential 2026 Municipal Fee Residential (single efmily dwelling including prefabricated homes) Seasonal Building no interior finish (insulation, sheeting, etc.) RA $ 1.30 per sq ft RB $ 0.80 RC Garage / Cold Storage $ 0.65 per sq ft RD Deck / Balcony $ 0.50 per sq ft RE Interior Renovations (plumbing, other structural change) $ 160.00 fixed RF New foundations $ 260.00 fixed RG Foundation repairs $ 105.00 fixed RH New roofEntire Roof (structural changes) $ 235.00 fixed RI Minor Structural Repair/Change $ 105.00 fixed RJ New door / window (structural changes) $ 90.00 fixed RK Fire alarm system $ 105.00 fixed RL Wood Fired Appliance $ 90.00 fixed Rooftop Solar RM $210.00 fixed Demolition RN $ 90.00 fixed Fee Code Commercial/lRdustrial/Assembly/Institutional 2026 Municipal Fee CA Commerciaklndustrial/Assenibly/Institutional $ 2.35 per sq ft per sq ft CB Commercial/Industrial/Assembly/Institutional-Cold Storagg $ 0.80 CC New Doors or Windows (structural changjes) $ 160.00 fixed CD Interior Alteration (plumbing, other structural change) $ 260.00 fixed CE New Roof (Structural Changje) $ 390.00 fixed CF Minor Structural Repair/Change $ 160.00 fixed CG Fire Alarm System $210.00 fixed CH Rooftop Solar $ 365.00 fixed Cl Bunkhouse/work camp/trailer (minimum of $1000) $ 1.60 per sq ft CJ Demolition (Building over 600 m2 or over 3 storeys (Div. 1.2.2.3(1))) $ 160.00 fixed CK Demolition other than above $ 90.00 fixed Fee Code Farm 2026 Municipal Fee V FA . F ann-Building / addition $ 0.80 per sq ft FB * PrSfobricated Storage Silos $ 190.00 fixed FC Bunkhouse/work camp/trailer (minimum of $1000) $ 1.60 per sq ft FD Demolition $ 90.00 fixed Fee Code Other Building Fees 2026 Municipal Fee OA Change of use permit $ 90.00 fixed OB Change of use if construction is required $ 90.00 + fee OC Moving permit (Relocation of structure over 108 ft2 to or IroiTi a proper^) $ 160.00 fixed Signs OD $ 90.00 each Fee Code General Fees (HST Applies) 2026 Municipal Fee GA Permit - File maintenance efe (Dormant 12011115 +) $ 90.00 fixed Inspection request by owner GB $ 90.00 each GC Revisions to permit already issued $ 90.00 fixed GD Other Services $ 90.00 per hour GE Orders $210.00 fixed FEE NOTES: - There shall be an administration charge equal to one and a halftimes the above calculated fees, applied to all construction that begins prior to the issuance of a permit. - Fees will be rounded to the nearest dollar. - Conditional and partial permits will be calculated at the regular rate for the complete project. - No permit shall be less than $90.00 minimum. Refunds 1. No refund shall be given for an application fee, or fees for a conditional, change of use or partial permit. 2. No refund shall be given for permits or inspections valued at $100 or less. 3. Where a permit fee has been paid pursuant to this By-law, fees may be refunded based on the following formula and to Section 6.1 of this By-law; Construction or Demolition Permit 80% where the application is withdrawn or only administrative functions have been performed; i) ii) 50% if administrative, applicable law compliance and plans examination functions have been performed; iii) 25% if the permit has been issued and the application is withdrawn or construction does not commence, or no field inspections have been carried out iv) No refunds if field inspections have been carried out.