In the Municipality of Meaford, Ontario, building permit rules are set by Building By-law No. 015-2012 (Building Permits By-law) and 1 other bylaw, verified 2026-09-25. Permit required for: Construction, demolition or change of use permits are required as set forth in Schedule 'A'. Permit fees: Calculated in accordance with the Fees and Charges By-law. Fees set in: Fees and Charges By-law (By-law No. 092-2011).
Building By-law No. 015-2012 (Building Permits By-law)
adopted bylaw
permit required for
Construction, demolition or change of use permits are required as set forth in Schedule 'A'.
s. 3
fee basis
Calculated in accordance with the Fees and Charges By-law.
s. 7.1
fees location
Fees and Charges By-law (By-law No. 092-2011)
s. 2(j)
authority
Chief Building Official
s. 4.11
scout note
Municipality of Meaford's by-law under s.7 Building Code Act, 1992 regulating construction, demolition and change-of-use permits and inspections, Schedules A-E; fees are per the Fees and Charges By-law as amended.
Fees and Charges By-law 2026-09
adopted bylaw
2026 consolidated fees and charges by-law confirmed to set current building permit fee rates (e.g. retaining-wall/minimum permit fee, 50% surcharge for unlawful work), referenced by the Building By-law for its fee schedule.