2026 Development Charge Study and proposed By-law (Watson, July 10, 2026)

Norfolk, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 0b93e861e2ce · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 July 10, 2026 [email protected] Development Charges Background Study Norfolk County ________________________ Watson & Associates Economists Ltd. Table of Contents Page 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the Development Charges Act, 1997 ................................... 1-3 1.3.1 Bill 108: More Homes, More Choices Act, 2019......................... 1-4 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 ..................... 1-4 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 .................... 1-5 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 ....... 1-6 1.3.5 Bill 109: More Homes for Everyone Act, 2022 ........................... 1-7 1.3.6 Bill 23: More Homes Built Faster Act, 2022................................ 1-7 1.3.7 Bill 134: Affordable Homes and Good Jobs Act, 2023 ............. 1-11 1.3.8 Bill 185: Cutting Red Tape to Build More Homes Act ............... 1-13 1.3.9 Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025 ......................................................................................... 1-16 1.3.10 Bill 60: Fighting Delays, Building Faster Act, 2025 ................... 1-17 1.3.11 Bill 98: Building Homes and Improving Transportation Act, 2026 ......................................................................................... 1-21 2. Norfolk County's Current D.C. Policies ......................................................... 2-1 2.1 By-law Enactment ................................................................................... 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Current Development Charges Rates ..................................................... 2-1 2.4 Timing of D.C. Calculation and Payment ................................................ 2-2 2.5 Indexing .................................................................................................. 2-2 2.6 Redevelopment Credit ............................................................................ 2-3 2.7 Exemptions ............................................................................................. 2-3 3. Anticipated Development in Norfolk County ................................................. 3-1 3.1 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 3.2 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Classes of Services ................................................................................ 4-7 4.8 Eligible Debt and Committed Excess Capacity ....................................... 4-7 4.9 Existing Reserve Funds .......................................................................... 4-8 4.10 Deductions .............................................................................................. 4-9 4.10.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.10.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.10.3 Reduction for Benefit to Existing Development ........................ 4-10 4.10.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-11 4.11 Municipal-wide vs. Area Rating ............................................................. 4-12 4.12 Allocation by Type of Development ...................................................... 4-12 4.13 Asset Management ............................................................................... 4-12 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and 10-Year Capital Costs for the D.C. Calculation ........ 5-3 5.2.1 Fire Protection Services ............................................................. 5-3 5.2.2 Parks and Recreation Services .................................................. 5-4 5.2.3 Library Services ......................................................................... 5-4 5.2.4 Ambulance Services .................................................................. 5-5 5.2.5 Growth-Related Studies (Class of Service) ................................ 5-6 5.3 Service Levels and Buildout Capital Costs for D.C. Calculation ........... 5-13 5.3.1 Services Related to a Highway ................................................ 5-13 5.4 Urban Buildout Capital Costs for D.C. Calculation ................................ 5-18 5.4.1 Water Service .......................................................................... 5-18 5.4.2 Wastewater Services ............................................................... 5-18 6. D.C. Calculation and Comparison .................................................................. 6-1 6.1 D.C. Calculation ...................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-1 7.3 D.C. By-law Rules ................................................................................... 7-2 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Timing of Collection ................................................................... 7-5 7.3.6 Indexing ..................................................................................... 7-6 7.3.7 D.C. Spatial Applicability ............................................................ 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-7 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-7 7.4.2 By-law In-force Date .................................................................. 7-7 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-7 7.5 Other Recommendations ........................................................................ 7-7 8. By-law Implementation ................................................................................... 8-1 8.1 Introduction ............................................................................................. 8-1 8.1.1 Public Meeting of Council........................................................... 8-1 8.1.2 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 8.3.1 Introduction ................................................................................ 8-3 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D Asset Management Plan ..................................................................... D-1 Appendix E Draft Development Charges By-law ....................................................E-1 Watson & Associates Economists Ltd. List of Acronyms and Abbreviations Acronym Full Description of Acronym A.M.P. Asset management plan B.T.E. Benefit to existing D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross Floor Area N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O.Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit sq.ft. square foot sq.m square metre Report Watson & Associates Economists Ltd. Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the Development Charges Act, 1997, as amended, (D.C.A.) and, accordingly, recommends new development charges (D.C.s) and policies for Norfolk County (County). The County retained Watson & Associates Economists Ltd. (Watson) in 2025, to undertake the D.C. study process and update the current County-wide D.C. by-law (By- law 2019-100). Watson worked with County staff in preparing the D.C. analysis and policy recommendations. This D.C. background study will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the County's D.C. background study, as summarized in Chapter 4. The forecast amount, type, and location of development is summarized in Chapter 3, with technical details provided in Appendix A. Chapters 5 and 6 identify the increase in need by service, calculate the D.C. recoverable capital costs and schedule of charges by type of development. The requirement for "rules" governing the imposition of the D.C. is provided in Chapter 7. The proposed D.C. by-law, to be made available to the public as part of the approval process, is included as Appendix E. The D.C. background study is designed to set out sufficient background on the legislation, the County's current D.C. policies (Chapter 2), and the policies underlying the proposed by-law, to make the exercise understandable to those who are involved. The D.C. background study addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The chapters in the report are supported by appendices containing the data required to explain and substantiate the calculation of the charge. Watson & Associates Economists Ltd. PAGE 1-2 1.2 Summary of the Process The public meeting required under Section 12 of the D.C.A. is planned for July 28, 2026. Its purpose is to present the D.C. background study and draft D.C. by-law to the public and to solicit public input on the matter. The public meeting is also being held to answer any questions regarding the study's purpose, methodology, and the proposed policies contained within the draft D.C. by-laws. In accordance with the legislation requiring that the D.C. background study and draft by-law be made available to the public at least two weeks prior to the public meeting, the D.C. Background Study and proposed D.C. By-law will be available for public review on July 10, 2026. This timing of release also complies with the legislative requirement for the background study to be available for public review at least 60 days prior to by-law passage. The County anticipates Council consideration of the D.C. By-law for adoption on September 22, 2026. The process to be followed in finalizing the report and recommendations includes: - County's consideration of responses received prior to, at, or immediately following the public meeting; - Finalization of the D.C. background study and draft by-law(s) to address any required changes; and - Council consideration of the D.C. by-law(s), anticipated to occur on September 22, 2026. Table 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process. Watson & Associates Economists Ltd. PAGE 1-3 Figure 1-1 Schedule of Key D.C. Process Dates Schedule of Study Milestone Dates 1. Data collection, staff review, engineering work, D.C. calculations and policy work August 2025 to June 2026 2. Council information session June 6, 2026 3. Public release of the D.C. Background study and proposed D.C. by-law July 10, 2026 4. Public meeting advertisement posted to the County's website At least 21 days prior to the Public Meeting 5. Public meeting of Council July 28, 2026 6. Council considers adoption of background study and passage of by-law September 22, 2026 7. Notice given of by-law passage By 20 days after passage 8. Last day for by-law appeal 40 days after passage 9. County makes pamphlet available (where by-law has not been appealed) By 60 days after the in-force date 1.3 Changes to the Development Charges Act, 1997 Over the past several years, a number of changes to the D.C.A. have been introduced through various legislation, including the following: - More Home, More Choice Act, 2019 - Plan to Build Ontario Together Act, 2019 - COVID-19 Economic Recovery Act, 2020 - Better for People, Smarter for Business Act, 2020 - More Homes for Everyone Act, 2022 - More Homes Built Faster Act, 2022 - Affordable Homes and Good Jobs Act, 2023 - Cutting Red Tape to Build More Homes Act, 2024 - Protect Ontario by Building Faster and Smarter Act, 2025 - Fighting Delays, Building Faster Act, 2025 and Regulatory Changes - Building Homes and Improving Transportation Act, 2026 The following provides an overview of the amendments to the D.C.A. that each of these pieces of legislation provided. Watson & Associates Economists Ltd. PAGE 1-4 1.3.1 Bill 108: More Homes, More Choices Act, 2019 The Province introduced the More Homes, More Choice Act (Bill 108) which proposed changes to the D.C.A. as part of the province's "More Homes, More Choice: Ontario's Housing Supply Action Plan." The More Homes, More Choice Act received Royal Assent on June 6, 2019. At that time many of the amendments to the D.C.A. did not come into effect, awaiting proclamation by the Lieutenant Governor. On January 1, 2020, the following provisions were proclaimed: - A D.C. for rental housing and institutional developments will be payable in six equal annual installments, with the first payment commencing on the date of occupancy. Non-profit housing developments will pay D.C.s in 21 equal annual payments (note, that further changes related to non-profit housing have been made under the More Homes Built Faster Act, as summarized below). Any unpaid D.C. amounts may be added to the tax roll and collected in the same manner as taxes. - For all developments triggering a D.C. within two years of a Site Plan or Zoning By-law Amendment planning approval, the D.C. shall be determined based on the charges that were in effect on the date the planning application was submitted to the municipality. These provisions only apply to Site Plan and Zoning By-law Amendment planning applications received on or after January 1, 2020. These amendments do not affect developments approved under other planning application types (e.g., plan of subdivision, minor variance, etc.). - The removal of the 10% statutory deduction for soft services, i.e., services limited to a 10-year forecast period. 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 The Plan to Build Ontario Together Act, 2019 (Bill 138) provided further amendments to the D.C.A. and the Planning Act. This Act received Royal Assent on December 10, 2019. Proclamation resulted in the sections related to the D.C.A. (schedule 10) coming into effect on January 1, 2020. The amendments to the D.C.A. included the removal of instalment payments for commercial and industrial developments that were originally included in the More Homes, More Choice Act. Watson & Associates Economists Ltd. PAGE 1-5 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 In response to the global pandemic that began affecting Ontario in early 2020, the Province released the COVID-19 Economic Recovery Act, 2020 (Bill 197) which provided amendments to a number of statutes, including the D.C.A. and Planning Act. The COVID-19 Economic Recovery Act further revised some of the proposed changes identified in the More Homes, More Choice Act and Plan to Build Ontario Together Act. The COVID-19 Economic Recovery Act received Royal Assent on July 21, 2020, and was proclaimed on September 18, 2020. The following provides a summary of the amendments to the D.C.A.: 1.3.3.1 List of D.C. Eligible Services The D.C.A. previously defined ineligible services for D.C.s. The amendments to the D.C.A. now defined the services that are eligible for inclusion in a D.C. by-law. The following summarizes the D.C. eligible services: - Water supply services, including distribution and treatment services; - Wastewater services, including sewers and treatment services; - Storm water drainage and control services; - Services related to a highway; - Electrical power services; - Toronto-York subway extension, as defined in subsection 5.1 (1); - Transit services other than the Toronto-York subway extension; - Waste diversion services; - Policing services; - Fire protection services; - Ambulance services; - Library Services; - Long-term care services; - Parks and recreation services (excluding the acquisition of land for parks); - Public health services; - Childcare and early years services; - Housing services (Note that as per Bill 23, housing services are no longer eligible); - Provincial Offences Act services; - Services related to emergency preparedness; Watson & Associates Economists Ltd. PAGE 1-6 - Services related to airports, but only in the Regional Municipality of Waterloo; and - Additional services as prescribed. 1.3.3.2 Classes of D.C. Services Prior to the amendments, the D.C.A. allowed for categories of services to be grouped together into a minimum of two categories, i.e., 90% services and 100% services. The amendments repealed these rules and replaced them with the following provisions: - A D.C. by-law may provide for any eligible service or capital cost related to any eligible service to be included in a class as set out in the by-law. - A class may be composed of any number or combination of services, and may include parts or portions of the eligible services or parts or portions of the capital costs in respect of those services. - A class of service set out in the D.C. by-law is deemed to be a single service with respect to reserve funds, use of monies, and credits. 1.3.3.3 Statutory Exemptions The D.C.A. provides for statutory exemptions from payment of D.C.s related to additional residential units, where the development is creating additional residential dwelling units within prescribed classes of existing residential buildings or structures. This statutory exemption has been expanded to include secondary residential dwelling units, in prescribed classes, that are ancillary to existing residential buildings. Furthermore, additional statutory exemptions are provided for the creation of a second dwelling unit in prescribed classes of proposed new residential buildings, including structures ancillary to new dwellings. Note, that further changes related to additional residential units have been made under the More Homes Built Faster Act, as summarized in subsection 1.3.6 below. 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exempt the payment of D.C.s for developments of land intended for use by a university that receives operating Watson & Associates Economists Ltd. PAGE 1-7 funds from the Government. As a result, this mandatory exemption will be included in the D.C. by-law. 1.3.5 Bill 109: More Homes for Everyone Act, 2022 On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. - The following additional information must be provided for each D.C. service being collected for during the year: a. whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law; and b. if the answer to a) is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; and - For any service for which a D.C. was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. The D.C.A. has also been amended to now require that the annual Treasurer's statement be made available to the public on the website of the municipality or, if there is no such website, in the municipal office. 1.3.6 Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Bill amended a number of pieces of legislation including the Planning Act and D.C.A. The following provides a summary of the changes to the D.C.A.: 1.3.6.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: Watson & Associates Economists Ltd. PAGE 1-8 - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the greater of one unit or 1% of the existing residential units will be exempt from D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. 1.3.6.2 Removal of Housing as an Eligible D.C. Service Housing is removed as an eligible service as of November 28, 2022. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. It is noted that the charge for housing services is still applicable where rates have been frozen for the purposes of instalment payments under the D.C.A. 1.3.6.3 New Statutory Exemption for Non-Profit Housing Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. 1.3.6.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units Affordable units, attainable units, and inclusionary zoning units (affordable) are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. Watson & Associates Economists Ltd. PAGE 1-9 - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. Note: The definitions above of an Affordable Rental Unit and Affordable Owned Unit have been modified through Bill 134. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Note: the above Affordable Owned and Rental Unit exemptions came into force as of June 1, 2024. At the time of writing, it is not known when the exemption for Attainable Units will be in force. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.3.6.5 Historical Level of Service Extended to 15-Year Period Instead of the Historical 10-Year Period Prior to Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. 1.3.6.6 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act may prescribe services for which land or an interest in land will be restricted. Note: the definition of capital costs was revised to reverse the change related to studies through Bill 185. Watson & Associates Economists Ltd. PAGE 1-10 1.3.6.7 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. Note: this change was reversed by Bill 185 (discussed in section 1.3.5). 1.3.6.8 D.C. By-law Expiry A D.C. by-law now expires 10 years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's life from five (5) years, prior to Bill 23. 1.3.6.9 Installment Payments Non-profit housing development has been removed from the instalment payment section of the Act (section 26.1), as these units are now exempt from the payment of a D.C. 1.3.6.10 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. 1.3.6.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate Watson & Associates Economists Ltd. PAGE 1-11 provision would apply to all instalment payments and eligible site plan and zoning by- law amendment applications occurring after November 28, 2022. 1.3.6.12 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities are required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Other services may be prescribed by the regulation. 1.3.7 Bill 134: Affordable Homes and Good Jobs Act, 2023 The exemption for affordable residential units was included in the More Homes Built Faster Act (Bill 23), enacted by the Province on November 28, 2022. Under this legislation, affordable residential units were defined within subsection 4.1 of the D.C.A. and exemptions for D.C.s were provided in respect of this definition. While the legislation was enacted in November 2022, the ability for municipalities to implement the exemptions is based on the "Affordable Residential Units for the Purposes of the Development Charges Act, Bulletin" published by the Minister of Municipal Affairs and Housing. This bulletin informs the average market rent and purchase price to be used in determining which developments qualify as affordable residential units. This bulletin was originally published on April 5, 2024. Bill 134 received Royal Assent on December 4, 2023 and provides for a modification to the affordable residential unit definition by: - Introducing an income-based test for affordable rent and purchase price; and - Increasing the threshold for the market test of affordable rent and purchase price. This change provides the exemption based on the lesser of the two measures. Moreover, the rules in subsection 4.1 of the D.C.A. are unchanged with respect to: - The tenant and purchaser transacting the affordable unit being at arm's length; - The intent of maintaining the affordable residential unit definition for a 25-year period, requiring an agreement with the municipality (which may be registered on title); and - Exemptions for attainable residential units and associated rules (requiring further regulations). Watson & Associates Economists Ltd. PAGE 1-12 The following table presents the definitions provided through Bill 134 (underlining added for emphasis). Item Bill 134 Definition (Current D.C.A. Definition) Affordable residential unit rent (subsection 4.1 (2), para. 1) The rent is no greater than the lesser of, i. the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and ii. the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. Average market rent/rent based on income (subsection 4.1 (5)) for the purposes of subsection 4.1 (2), para. 1 The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for renter households in the applicable local municipality; and (b) identify the rent that, in the Minister's opinion, is equal to 30 per cent of the income of the household referred to in clause (a). Affordable residential unit ownership (subsection 4.1 (3), para. 1) The price of the residential unit is no greater than the lesser of, i. the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and ii. 90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. Average market purchase price/purchase price based on income (subsection 4.1 (6)) for the purposes of subsection 4.1 (3), para. 1 The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for households in the applicable local municipality; and (b) identify the purchase price that, in the Minister's opinion, would result in annual accommodation costs equal to 30 per cent of the income of the household referred to in clause (a) As noted above, the original bulletin came into effect on June 1, 2024, which provides the information for the County to measure against for determining the applicability of the exemption from the D.C. (as well as Community Benefits Charges and Parkland requirements). The most recent version of the bulletin, which came into effect on July 1, 2026, provides the following information for the County: Watson & Associates Economists Ltd. PAGE 1-13 - For Affordable Ownership Units: the income-based affordable purchase price provides the relevant threshold for the affordable residential units exemption, as it is lower than 90% of the average market purchase price for all unit types. The income-based affordable purchase prices and 90% of average market purchase prices for the County, as established through the most recent bulletin, are summarized by unit type in the table below: Unit Type Income-based Affordable Purchase Price 90% of Average Market Purchase Price Detached House $376,400 $648,000 Semi-Detached House $376,400 $513,000 Row/townhouse $376,400 $549,000 Condominium Apartment $376,400 $594,000 - For Affordable Rental Units: the average market rent provides the relevant threshold for the affordable residential units exemption for all unit types. The income-based affordable rents and average market rents for the County, as established through the most recent bulletin, are summarized in the table below: Unit Type Income-based Affordable Rent Average Market Rent Bachelor unit $1,750 $667 1-Bedroom unit $1,750 $1,004 2-Bedroom unit $1,750 $993 3 or more Bedrooms $1,750 $1,744 1.3.8 Bill 185: Cutting Red Tape to Build More Homes Act On April 10, 2024, the Province released Bill 185: Cutting Red Tape to Build More Homes Act. The Bill received Royal Assent on June 6, 2024. This Bill reversed many of the key changes that were implemented through Bill 23. The following sections provide a summary of the changes. Watson & Associates Economists Ltd. PAGE 1-14 1.3.8.1 Revised Definition of Capital Costs Bill 185 reversed the capital cost amendments of Bill 23 by reinstating studies as an eligible capital cost. The following paragraphs were added to subsection 5(3) of the D.C.A.: 5. Costs to undertake studies in connection with any of the matters referred to in paragraphs 1 to 4. 6. Costs of the development charge background study required under section 10. 1.3.8.2 Removal of the Mandatory Phase-in Bill 23 required the phase-in of charges imposed in a D.C. by-law over a five-year term for any by-laws passed after January 1, 2022. Bill 185 removed this mandatory phase- in. This change is effective for any D.C. by-laws passed after Bill 185 came into effect. For site plan and zoning by-law amendment applications that were made prior to Bill 185 receiving Royal Assent, the charges payable will be the charges that were in place on the day the planning application was made (i.e., including the mandatory phase-in). 1.3.8.3 Process for Minor Amendments to D.C. By-laws Section 19 of the D.C.A. requires that a municipality must follow sections 10 through 18 of the D.C.A. (with necessary modifications) when amending D.C. by-laws. Sections 10 through 18 of the D.C.A. generally require the following: - Completion of a D.C. background study, including the requirement to post the background study 60 days prior to passage of the D.C. by-law; - Passage of a D.C. by-law within one year of the completion of the D.C. background study; - A public meeting, including notice requirements; and - The ability to appeal the by-law to the Ontario Land Tribunal. Bill 185 allows municipalities to undertake minor amendments to D.C. by-laws for the following purposes without adherence to the requirements noted above (with the exception of the notice requirements): Watson & Associates Economists Ltd. PAGE 1-15 1. To repeal a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date (subject to the 10-year limitations provided in the D.C.A.); 2. To impose D.C.s for studies, including the D.C. background study; and 3. To remove the provisions related to the mandatory phase-in of D.C.s. Minor amendments related to items 2 and 3 noted above may be undertaken only if the D.C. by-law being amended was passed after November 28, 2022, and before Bill 185 took effect. Moreover, the amending by-law must be passed within six months of Bill 185 coming into effect. Notice requirements for these minor amending by-laws are similar to the typical notice requirements, with the exception of the requirement to identify the last day for appealing the by-law (as these provisions do not apply). 1.3.8.4 Reduction of D.C. Rate Freeze Timeframe Bill 108 provided for the requirement to freeze the D.C.s imposed on developments subject to a site plan and/or a zoning by-law amendment application. The D.C. rate for these developments is "frozen" at the rates that were in effect at the time the site plan and/or zoning by-law amendment application was submitted (subject to applicable interest). Once the application is approved by the municipality, if the date the D.C. is payable is more than two years from the approval date, the D.C. rate freeze would no longer apply. Bill 185 reduced the two-year timeframe to 18 months. 1.3.8.5 Modernizing Public Notice Requirements The D.C.A. sets out the requirements for municipalities to give notice of public meetings and of by-law passage. These requirements are prescribed in sections 9 and 10 of O. Reg. 82/98 and include giving notice in a newspaper of sufficiently general circulation in the area to which the by-law would apply. The regulatory changes modernized public notice requirements by allowing municipalities to provide notice on a municipal website if a local newspaper is not available. Watson & Associates Economists Ltd. PAGE 1-16 1.3.9 Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025 On May 12, 2025, the Province released Bill 17: Protect Ontario by Building Faster and Smarter Act, 2025. The Bill received Royal Assent on June 5, 2025. This Bill introduces some additional exemptions, changes to the timing of payment for residential D.C.s, and provides regulatory authority to make future changes. The following subsections provide a summary of the changes: 1.3.9.1 Deferral of Residential D.C. Payments to Occupancy Changes to section 26.1 of the D.C.A. provide that a D.C. payable for residential development (other than rental housing developments, which are subject to payment in instalments) are payable upon the earlier of the issuance of an occupancy permit, or the day the building is first occupied. Only under circumstances prescribed in the regulations may the municipality require a financial security. As such, the prescribed circumstances may allow for securities when no occupancy permit is required. Municipalities shall not impose interest on the deferral of D.C. payment to occupancy. 1.3.9.2 Removal of Interest for Legislated Instalments Changes to section 26.1 of the Act remove the ability to charge interest on instalments for rental housing and institutional development. This also applies to future instalments for existing deferrals. 1.3.9.3 Early Payment for Residential/Institutional Changes provide that a person required to pay a D.C. for residential or institutional development (i.e. instalments or at occupancy), can pay earlier without the requirement to enter into an early payment agreement. 1.3.9.4 Exemption for Long-term Care Homes Before this change, long-term care homes were subject to the instalment payment provisions of the D.C.A. As of June 5, 2025, Long-term care homes are exempt from D.C.s, as well as all future instalment payments, where applicable. Watson & Associates Economists Ltd. PAGE 1-17 1.3.9.5 Revised Definition of Capital Costs Section 5(3) of the D.C.A. provides for a definition of capital costs that are eligible for inclusion in the D.C. calculations. The changes introduced by Bill 17 added the following wording to the beginning of the section: "Subject to the regulations". As such, the Province may make changes to limit the definition of capital costs via changes to the D.C. regulations. 1.3.9.6 Expanded Simplified D.C. By-law Amendment Process In addition to the reason for the simplified process set out in Section 1.3.5.3, a D.C. by- law may now also be amended through the simplified amendment process to repeal the indexing provision or decrease the D.C. for one or more types of development. 1.3.9.7 Lower Charge - Current vs. Rate Freeze This change provides that the municipality must charge the lower of the D.C. calculated with the rate freeze (including interest) and the D.C. at current rates at the time the D.C. is payable. This change assists where municipalities reduce their D.C. and therefore can impose the reduced D.C. in cases where the rate freeze applies. 1.3.9.8 Grouping of Services for the Purposes of Using Credits This change provides the Province with the ability to make changes through the regulations to group D.C. services together for the purposes of applying D.C. credits. 1.3.10 Bill 60: Fighting Delays, Building Faster Act, 2025 The Provincial government introduced Bill 60, Fighting Delays, Building Faster Act, 2025 and Regulatory Proposals on October 23, 2025. The Bill received Royal Assent on November 27, 2025. The following subsections provide a summary of the changes: 1.3.10.1 Addition of Class of Service for Land Acquisition The legislative change provides for land acquisition as a separate class of service1. Anticipated land acquisition capital needs are to be grouped together for the purposes 1 Section 7 of the D.C.A. states that a class of service may be established for the purposes of a D.C. by-law that is a combination of D.C. eligible services or a subset of a D.C. eligible service. Watson & Associates Economists Ltd. PAGE 1-18 of the D.C. calculations. Land acquisition capital needs are also to be excluded from the historical Level of Service calculations. The anticipated capital costs for land are restricted to 10 years for all services except the following: - Water; - Wastewater; - Stormwater; - Service related to a Highway; - Electrical; - Transit; - Police; and - Fire. As land acquisition is considered a class of service, municipalities are required to establish a separate reserve fund for these capital costs. As such, funds are to be segregated for this purpose only and used solely for land costs. Similar to other reserve funds, monies in this reserve fund can be borrowed and repaid, with interest. With respect to credits, municipalities need to ensure appropriate accounting of credits for land separately from credits for other applicable services. Section 35 of the D.C.A. is amended to add an exception to the use of monies in established reserve funds. This section states that monies in a reserve fund can be used for land acquisition, however, they cannot be used for land acquisition if those costs are to be paid for with the reserve fund established for land acquisition. 1.3.10.2 Required Timelines for the Annual Treasurer's Statement Section 43(1) of the Act has been amended to require the Treasurer's statements to be completed by June 30 of each year (previously based on a date determined by Council). Further, Section 43(3) of the Act is amended to require a copy of the Treasurer's statement to be submitted to the Minister by July 15 of each year. 1.3.10.3 Addition of Requirements for Local Service Policies Subsections 59(2.2) through 59(2.11) of the Act generally set out the following: Watson & Associates Economists Ltd. PAGE 1-19 - A Local Service Policy is required for all D.C. eligible services to which a D.C. by- law imposes a charge and where some part of the service will be provided as a local service; - A Local Service Policy is required to impose a condition of local services on development and only to the extent it has been identified in the Local Service Policy. That is, a municipality could not require a work or classes of work to be provided as a local service if it is not identified as such in the Local Service Policy; o This does not apply where a municipality does not impose a D.C. for that service; o This applies the day a municipality establishes the Local Services Policy or 18 months after Bill 60 received Royal Assent; - Required content for a Local Service Policy: o Works or classes of works related to development that are intended to be required as a Local Service - Optional content for a Local Service Policy: o Works or classes of works that are not intended to be required as a Local Service; o Works or classes of works that are partially required as a Local Service; - The municipality shall give a copy of the Local Service Policy to the Minister of Municipal Affairs and Housing upon request, by the date requested; and - The Local Service Policy must be reviewed, requiring a resolution of Council declaring if a revision is needed. The Resolution shall be passed at the time of passing any D.C. by-law or when a revision to the policy is required. 1.3.10.4 Requirement to Provide Documents to the Minister Changes to Section 10 and Section 13 of the D.C.A. require municipalities to provide copies of documents to the Minister upon request, by the date requested. In addition, section 59(2.8) of the Act requires a copy of the Local Service Policy to be provided to the Minister upon request, by the date requested. 1.3.10.5 Regulatory Changes Bill 60 also provided for regulatory changes to Ontario Regulation 82/98. These changes are with respect to the following matters: Watson & Associates Economists Ltd. PAGE 1-20 Merging of Credits This change merges water supply services and wastewater services for the purposes of credits. As provided in subsection 2 (4) of the D.C.A., the D.C.-eligible services of water supply and wastewater include distribution and treatment, and sewers and treatment, respectively. Transparency of B.T.E. Calculations Regulatory changes require municipalities to provide greater details with respect to how capital costs are determined and how the growth-related and non-growth-related shares of the costs are determined. This appears to be required for each service, rather than on a project-by-project basis. Details of Land Acquisition Section 8 of Ontario Regulation 82/98 has been amended to require land acquisition costs to be included in the D.C. background presentation of: - The total of the estimated capital costs relating to the service; - The allocation of the total of the estimated costs between costs that would benefit new development and costs that would benefit existing development; - The total of the estimated capital costs relating to the service that will be incurred during the term of the proposed development charge by-law; - The allocation of the costs incurred during the term of the proposed by-law between costs that would benefit new development and costs that would benefit existing development; and - The estimated and actual value of credits that are being carried forward relating to the service. Information Accessibility The changes increase reporting requirements for the Annual Treasurer's Statements to include: - The amount from each reserve fund that was committed to a project, but had not been spent, as of the end of the year; - The amount of debt that had been issued for a project as of the end of the year; and Watson & Associates Economists Ltd. PAGE 1-21 - Identify where in the D.C. background study the project's capital costs were estimated. This does not apply in circumstances where a municipality uses a unique identifier in both background studies and treasurer's statements to identify each project. 1.3.11 Bill 98: Building Homes and Improving Transportation Act, 2026 On June 2, 2026, Bill 98 received Royal Assent. The most notable change included the exemption of non-profit retirement homes from the payment of D.C.s. As a result, this mandatory exemption will be included in the D.C. by-law. Watson & Associates Economists Ltd. Chapter 2 Norfolk County's Current D.C. Policies Watson & Associates Economists Ltd. PAGE 2-1 2. Norfolk County's Current D.C. Policies 2.1 By-law Enactment County Council enacted By-law 2019-100 on October 15, 2019, which establishes D.C.s for both County-wide and urban area-specific services. 2.2 Services Covered The following services are covered under the County-wide D.C. By-law: County-wide Services - Services Related to a Highway; - Fire Protection; - Parks and Recreation; - Parking; - Library; - Growth-related studies; and - Ambulance. Area-specific Services - Water; and - Wastewater. 2.3 Current Development Charges Rates Table 2-1 provides the D.C.s currently in effect on a County-wide basis and for urban area services for residential and non-residential development types, as well as the breakdown of the charges by service. Watson & Associates Economists Ltd. PAGE 2-2 Table 2-1 Norfolk County Current County-wide D.C. Rates 2.4 Timing of D.C. Calculation and Payment D.C.s are calculated and payable on the date that the first building permit is issued in relation to a building or structure on land to which the D.C. relates. Where D.C.s apply to land in relation to which a building permit is required, the building permit shall not be issued until the D.C. has been paid in full. Council from time to time, and at any time, may enter into agreements providing for all or any part of a D.C. to be paid before or after it would otherwise be payable, in accordance with section 27 of the D.C.A. 2.5 Indexing Indexing of the D.C.s shall occur annually on January 1st, in accordance with the most recent twelve-month change in the Statistics Canada Quarterly, Non-Residential Building Construction Price Index. Non-Residential Single & Semi Detached Multiples Apartments with >= 2 Bedrooms Apartments with < 2 Bedrooms per sq.m County-wide Services/Class of Services Services Related to a Highway 2,745 1,919 1,758 1,159 26.15 Fire Protection Services 988 691 632 417 9.63 Parks and Recreation Services 2,565 1,792 1,641 1,082 - Parking 217 152 139 92 2.03 Library Services 1,373 959 880 580 - Ambulance Services 194 137 125 84 1.84 Growth-Related Studies 133 92 85 54 1.28 Total County-wide Services/Class of Services $8,215 $5,742 $5,260 $3,468 $40.93 Urban Services Water Services 10,971 7,665 7,023 4,634 80.99 Wastewater Services 6,523 4,557 4,177 2,755 48.27 Total Urban Services 17,494 12,222 11,200 7,389 129.26 GRAND TOTAL RURAL AREA $8,215 $5,742 $5,260 $3,468 $40.93 GRAND TOTAL URBAN AREA $25,709 $17,964 $16,460 $10,857 $170.19 Residential Service Watson & Associates Economists Ltd. PAGE 2-3 2.6 Redevelopment Credit D.C.s payable in cases of redevelopment are calculated by reducing the D.C. payable by the number of former residential units or by the amount of former non-residential G.F.A. that existed on the property within 10 years of the redevelopment. Where an existing non-residential building or structure is converted in whole or in part to residential uses, the residential D.C. payable is reduced by an amount equal to the non- residential D.C. previously paid for the development being converted. Any reduction will not produce a refund. Where an existing residential building is converted in whole or in part to non-residential uses, the non-residential D.C. payable for G.F.A. converted is reduced by an amount equal to any residential D.C. previously paid for the residential building being converted. If a dwelling unit is only partially converted, the D.C. reduction will be in proportion to the extent of the conversion, but the reduction will not produce a refund. 2.7 Exemptions The County's existing by-law provides for the following statutory and non-statutory exemptions: Statutory Exemptions: - Land used for Board of Education purposes; - Local board of the County; - Industrial additions of up to and including 50% of the existing gross floor area of the building. For industrial additions which exceed 50% of the existing gross floor area, only the portion of the addition in excess of 50% is subject to development charges; - Residential development that results in only the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (as specified by O. Reg. 82/98); and - Affordable housing (given that the D.C. liabilities of the affordable housing project are not eligible for funding by senior levels of government, and which receives funding from the County under its social housing program). Watson & Associates Economists Ltd. PAGE 2-4 Non-statutory Exemptions: - Place of worship; - Roofed accommodation development; - Temporary structures; - Farm help house development; - Farming business development; - Parking garages (exclusively devoted to parking); - All development within the boundaries of the "Central Business Districts" (as defined within the County's official plan); and - Brownfield development that is approved by the County. Watson & Associates Economists Ltd. Chapter 3 Anticipated Development in Norfolk County Watson & Associates Economists Ltd. PAGE 3-1 3. Anticipated Development in Norfolk County The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the County will be required to provide services over a 10-year (mid-2026 to mid-2036) and a longer-term (mid-2026 to Urban Buildout) time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.1 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson in consultation with the County. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the County over the forecast period, including: - Norfolk County Official Plan, Consolidated October 16, 2025 - Norfolk County Housing Needs Assessment Final Report, June 26, 2025, by Watson & Associates Economists Ltd. - Norfolk County Comprehensive Review, November 7, 2023 by Watson & Associates Economists Ltd. - Norfolk County 2018 Development Charges Background Study Report, December 21, 2018, by Watson & Associates Economists Ltd. - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential and non-residential building permit data over the 2016 to 2025 period; - Residential and non-residential supply opportunities as identified by County staff; and County - Discussions with County staff regarding anticipated residential and non- residential development in Norfolk County. Watson & Associates Economists Ltd. PAGE 3-2 3.2 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A, and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for Norfolk County and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, the population in the County (excluding census undercount) is anticipated to reach approximately 78,680 by mid- 2036 and 97,140 by urban buildout, resulting in an increase of approximately 6,680 and 25,140 persons, respectively. [1] [1] The population figures used in the calculation of the 2026 D.C. exclude the net Census undercount, which is estimated at approximately 4.1%. Population figures presented herein have been rounded. Watson & Associates Economists Ltd. PAGE 3-3 Figure 3-1 Population and Household Forecast Model Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-4 Table 3-1 Norfolk County Residential Growth Forecast Summary [1] Census undercount estimated at approximately 4.1%. Note: Population including the undercount has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add due to rounding. The buildout forecast refers to the buildout of the Norfolk County urban area and has been assessed for designated urban lands and servicing capacity. Source: Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings [2] Apartments [3] Other Total Households Equivalent Institutional Households 65,770 63,175 1,810 61,365 21,627 1,192 2,067 160 25,046 1,645 2.522 66,680 64,044 1,619 62,425 22,325 1,340 2,075 260 26,000 1,472 2.463 70,270 67,490 1,265 66,225 23,585 1,505 2,280 220 27,590 1,150 2.446 74,960 72,000 1,342 70,658 24,653 1,608 2,602 220 29,083 1,220 2.476 81,911 78,676 1,466 77,209 26,563 2,478 2,862 220 32,123 1,333 2.449 101,130 97,138 1,811 95,327 30,966 4,572 4,614 220 40,372 1,646 2.406 910 869 -191 1,060 698 148 8 100 954 -173 3,590 3,446 -354 3,800 1,260 165 205 -40 1,590 -322 4,690 4,510 77 4,433 1,068 103 322 0 1,493 70 6,951 6,676 124 6,551 1,910 870 260 0 3,040 113 26,170 25,138 469 24,669 6,313 2,964 2,012 0 11,289 426 Incremental Mid 2026 - Mid 2036 Mid 2026 - Buildout Mid 2021 - Mid 2026 Mid 2011 - Mid 2016 Population (Including Census Undercount) [1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Buildout Mid 2021 Mid 2026 Mid 2036 Historical Forecast Watson & Associates Economists Ltd. PAGE 3-5 Provided below is a summary of the key assumptions and findings regarding the County's D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, 6 and 7) - The housing unit mix for the County was derived from a detailed review of historical development activity (as per Schedule 7), as well as active residential development applications (as per Schedule 6), and discussions with County staff regarding anticipated development trends for Norfolk County. - Based on the above indicators, the 2026 to 2036 household growth forecast for the County is comprised of a unit mix of 63% low density units (single detached and semi-detached), 29% medium density (row and townhouses, and apartments in duplexes) and 8% high density (bachelor, 1-bedroom and 2-bedroom apartments, and secondary suites). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the County. - In accordance with forecast demand and available land supply, the amount and percentage of forecast permanent housing growth between 2026 and 2036 by development location is summarized below. Table 3-2 Norfolk County Geographic Location of Residential Development Development Location Amount of Housing Growth, 2026 to 2036 Percentage of Housing Growth, 2026 to 2036 Urban 2,860 94% Rural 180 6% Norfolk County 3,040 100% Note: Figures may not sum precisely due to rounding. Watson & Associates Economists Ltd. PAGE 3-6 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services and land for certain services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth- related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by 2036 in the County over the forecast period is presented in Table 3-1. Over the 2026 to 2036 forecast period, the County is anticipated to average 304 new housing units per year. - Institutional population is anticipated to increase by approximately 120 people between 2026 to 2036.[1] - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the County. Due to data limitations, high-density P.P.U. data was derived from the Haldimand-Norfolk Census Division, which includes the County of Norfolk, and is outlined in Schedule 8b. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 2.583 o Medium density: 1.758 o High density: 1.568 [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more-bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-7 5. Existing Units and Population Change (Appendix A - Schedules 3, 4, and 5) - Existing households for mid-2026 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.[1] The forecast population change in existing households over the 2026 to 2036 forecast period is forecast to decline by approximately 320. 6. Employment (Appendix A - Schedules 10a, 10b and 10c) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in the County divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [2],[3] (place of work) for the County is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: o 1,390 primary (7%); o 2,740 work at home employment (14%); o 3,810 industrial (19%); o 7,520 commercial/population-related (38%); and o 4,290 institutional (22%). [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-8 - The 2016 employment by usual place of work, including work at home, is 19,740. An additional 3,740 employees have been identified for the County in 2016 who have no fixed place of work (N.F.P.O.W.).[1] - Total employment, including work at home and N.F.P.O.W. for the County is anticipated to reach approximately 28,950 by mid-2036 and 35,740 by urban buildout. This represents an employment increase of approximately 2,420 for the 10-year forecast period and 9,220 for the longer-term forecast period. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the County (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 21,140 by mid-2036 and 25,890 by urban buildout. This represents an employment increase of approximately 1,820 for the 10-year forecast period and 6,570 for the longer-term forecast period. 7. Non-Residential Sq.m. Estimates (G.F.A.), Appendix A - Schedule 10b) - Square meter estimates were calculated in Schedule 10b based on the following employee density assumptions: o 279 sq.m. per employee for primary; o 139 sq.m. per employee for industrial; o 46 sq.m. per employee for commercial / population related; [1] No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Watson & Associates Economists Ltd. PAGE 3-9 o 65 sq.m. per employee for institutional employment. - The County-wide incremental G.F.A. is anticipated to increase by approximately 157,200 sq.m. over the 10-year forecast period and 517,500 sq.ft. over the longer-term forecast period. - In terms of percentage growth, the mid-2026 to 2036 incremental G.F.A. forecast by sector is broken down as follows: o Primary - 24% o Industrial - 30%; o Commercial/ population related - 24%; and o Institutional - 23%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 10c) - Schedule 10c summarizes the anticipated amount, type and location of non-residential development by area for the County. - The amount and percentage of forecast total non-residential growth between 2026 and 2036 by development location is summarized below. Table 3-3 Norfolk County Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.m.), 2026 to 2036 Percentage of Non- Residential G.F.A., 2026 to 2036 Urban 109,300 70% Rural 47,900 30% Norfolk County 157,200 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service, which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within the County. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the County's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development" for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that County Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 Figure 4-1 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 15. 16. 13. 14. 9. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services Financially Sustainable 7a. Transit Services Detailed Requirements 7b. 10. Municipal Services 2. Eligible Services Ineligible Services Tax Base, User Rates, etc. Watson & Associates Economists Ltd. PAGE 4-3 Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 1. Water supply services, including distribution and treatment services Yes Yes No Yes 1.1 Treatment plants 1.2 Distribution systems 1.3 Local systems 1.4 Vehicles and equipment1 2. Wastewater services, including sewers and treatment services Yes Yes No Yes 2.1 Treatment plants 2.2 Sewage trunks 2.3 Local systems 2.4 Vehicles and equipment1 3. Stormwater Drainage and Control Services Yes Yes No 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 4. Services Related to a Highway Yes Yes Yes No Yes Yes Yes Yes Yes 4.1 Arterial roads 4.2 Collector roads 4.3 Bridges, Culverts and Roundabouts 4.4 Local roads 4.5 Traffic signals 4.6 Sidewalks and streetlights 4.7 Active Transportation 4.8 Works Yard 4.9 Rolling stock1 5. Electrical Power Services n/a n/a n/a 5.1 Electrical substations 5.2 Electrical distribution system 5.3 Electrical system rolling stock1 6. Transit Services No No 6.1 Transit vehicles1 & facilities 6.2 Other transit infrastructure 7. Waste Diversion Services No No 7.1 Waste diversion facilities 7.2 Waste diversion vehicles and equipment1 8. Policing Services No No No 8.1 Police detachments 8.2 Police rolling stock1 8.3 Small equipment and gear 9. Fire Protection Services Yes Yes Yes 9.1 Fire stations 9.2 Fire Vehicles1 9.3 Fire Equipment and gear 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-4 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 10. Ambulance Services Yes Yes 10.1 Ambulance station space 10.2 Vehicles1 11. Services provided by a board within the meaning of the Public Libraries Act Yes Yes Yes 11.1 Public library space (incl. furniture and equipment) 11.2 Library vehicles1 11.3 Library materials 12. Services Related to Long- Term Care n/a n/a 12.1 Long-Term Care space 12.2 Vehicles1 13. Parks and Recreation Services Ineligible Yes Yes Yes Yes 13.1 Acquisition of land for parks, woodlots, and E.S.A.s 13.2 Development of municipal parks 13.3 Parks rolling stock1 and yards 13.4 Facilities, such as arenas, indoor pools, fitness facilities, community centres, etc. 13.5 Recreation vehicles and equipment1 14. Services Related to Public Health n/a n/a 14.1 Public Health department space 14.2 Public Health department vehicles1 15. Child Care and Early Years Programs and Services within the meaning of Part VI of the Child Care and Early Years Act, 2014 and any related services. No 15.1 Childcare space 16. Services related to proceedings under the Provincial Offences Act, including by-law enforcement services and municipally administered court services No No 16.1 P.O.A. space, including by-law enforcement and municipally administered court services 16.2 Vehicles1 17. Services Related to Emergency Preparedness No No 17.1 Emergency Preparedness Space 17.2 Equipment 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-5 Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 18. Services Related to Airports n/a Ineligible 18.1 Airports (in the Regional Municipality of Waterloo) 18.2 Other Airports 19. Other Yes Yes 19.1 Interest on money borrowed to pay for growth-related capital 19.2 Growth Studies, including the D.C. background study cost Table 4-2 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes County provides the service - service has been included in the D.C. calculation. No County provides the service - service has not been included in the D.C. calculation. n/a County does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Watson & Associates Economists Ltd. PAGE 4-6 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The County's detailed Local Service Policy is provided under separate cover. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two potential cost reductions, and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; e) Costs to undertake studies in connection with any of the matters referred to in paragraphs a to d; f) Costs of the development charge background study required under section 10; and g) interest on money borrowed to pay for the above-referenced costs. Watson & Associates Economists Ltd. PAGE 4-7 In order for an increase in need for service to be included in the D.C. calculation, County Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O.Reg. 82/98 section 3). The capital program contained herein reflects the County's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that "the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. The County has no outstanding D.C. credit obligations to include in the D.C. calculations. 4.7 Classes of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible service. These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and by-law provided herein have identified growth-related studies as a class of service. 4.8 Eligible Debt and Committed Excess Capacity Section 66 of the D.C.A. states that for the purposes of developing a D.C. by-law, a debt incurred with respect to an eligible service may be included as a capital cost, subject to any limitations or reductions in the Act. Watson & Associates Economists Ltd. PAGE 4-8 In order for such costs to be eligible, two conditions must apply. First, they must have funded excess capacity which is able to meet service needs attributable to the anticipated development. Second, the excess capacity must be "committed," that is, either before or at the time it was created, Council must have expressed a clear intention that it would be paid for by D.C.s or other similar charges. For example, this may have been done as part of previous D.C. processes. 4.9 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in the future. For services that are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the future forecast periods, which underlie the D.C. calculation herein. The alternative would involve the County spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the County will use these reserve funds for the County's cost share of applicable development-related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development that contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The County's D.C. Reserve Fund balances by service as of December 31, 2025, are shown below in Table 4-3. Watson & Associates Economists Ltd. PAGE 4-9 Table 4-3 Summary of Development Charges Reserve Fund Balances As of December 31, 2025 4.10 Deductions The D.C.A. requires that four potential deductions be considered against the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. 4.10.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the D.C. Reserve Fund Closing Dec 31/2025 (including Capital Commitments) Services Related to a Highway $2,107,869 Fire Protection Services $2,983,825 Parks and Recreation Services $4,359,359 Library Services $178,425 Growth-Related Studies ($350,366) Ambulance Services $345,725 Wastewater Services ($1,131,049) Water Services ($371,040) Total $8,122,748 Watson & Associates Economists Ltd. PAGE 4-10 average cost of providing such units based on replacement costs, engineering standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. With respect to transit services, the changes to the Act introduced in 2015 have provided for an alternative method for calculating the service standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.10.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the County's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.10.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); Watson & Associates Economists Ltd. PAGE 4-11 - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. Alternatively, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a County-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.10.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related Watson & Associates Economists Ltd. PAGE 4-12 to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.11 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area rating. Further discussion is provided in section 7.3.7 of this report. 4.12 Allocation by Type of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. 4.13 Asset Management The legislation requires that a D.C. background study must include an asset management plan (A.M.P.) (subsection 10 (2) c. 2). The A.M.P. must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches, and policies on asset management planning. This examination has been included in Appendix D. Watson & Associates Economists Ltd. Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: - The service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and - The infrastructure cost calculation, which determines the potential D.C. recoverable cost. The nature of the capital projects and timing identified in the chapter reflects Council's current intention. Over time, however, County projects and Council priorities change; accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. Note that due to recent legislative amendments to the D.C.A. and O. Reg. 82/98, the value of land has been excluded from the 15-year level of service analysis. In addition, Table 5-1 details the methodology for determining the benefit to existing deductions (B.T.E.s) for all capital projects included in the calculation of D.C.s. Notes included in this table are referenced in the "BTE Note" column of each service's listing of capital infrastructure. Table 5-1 Benefit to Existing (B.T.E.) Methodology For All Services/Class of Services Note Methodology 1 No B.T.E. calculated for incremental new assets to service growth 2 B.T.E. based on existing population relative to forecasted population by end of service's planning horizon 3 B.T.E. based on facility's existing gross floor area relative to planned gross floor area Watson & Associates Economists Ltd. PAGE 5-2 Note Methodology 4 B.T.E. of 20% based on average marginal costs to urbanize rural/semi- urban roads, including potential profile adjustments, streetlighting improvements or additions, sewage drains, curbs, paths, etc. 5 B.T.E. of 5% based on average marginal costs to widen and urbanize two- lane rural/semi-urban roads, including potential profile adjustments, streetlighting improvements or additions, sewage drains, curbs, paths, etc. 6 B.T.E. of 15% based on average marginal costs to widen four-lane rural/semi-urban roads, including potential profile adjustments, streetlighting improvements or additions, sewage drains, curbs, paths, etc. 7 B.T.E. of 10% based on average marginal costs to improve and expand two- lane rural roads, including potential lane width improvements, proper shoulders, etc. 8 No B.T.E. calculated for projects triggered in response to increased travel demand resulting from new development 9 B.T.E. of 5% calculated for projects triggered in response to increased travel demand resulting from new development, but where a minor benefit to existing development is recognized for sub-standard conditions 10 No B.T.E. calculated for pedestrian facility projects on major road corridors triggered in response to increased travel demand resulting from new development 11 B.T.E. based on share of total facility costs related to a swimming pool upgrade, comparing the existing pool capacity relative to planned pool capacity 12 B.T.E. based on existing population's maximum daily demand of water relative to the planned design capacity of the Inter Urban Water Supply Program's daily capacity 13 No B.T.E. identified for fully growth-related studies 14 B.T.E. of 10% identified for studies that generally address growth-related needs, but that also have a minor benefit to the existing community 15 B.T.E. of 25% identified for master plans or other studies that are primarily needed to understand future infrastructure requirements as the County grows 16 B.T.E. of 50% identified for studies that generally address growth-related needs, but also have a considerable benefit to the existing community 17 B.T.E. for debt repayments based on the underlying project's B.T.E. Watson & Associates Economists Ltd. PAGE 5-3 Note Methodology 18 100% B.T.E. identified for non-growth-related projects that have been included in the capital listing for traceability 5.2 Service Levels and 10-Year Capital Costs for the D.C. Calculation This section evaluates the development-related capital requirements for all of the County-wide services/class of services assessed over a 10-year planning period (mid- 2026 to mid-2036). 5.2.1 Fire Protection Services The County currently provides fire protection services through several fire facilities, totalling 70,799 sq.ft. of building space. The fire department also has a current inventory of 62 vehicles, including various fire apparatus, trucks, boats, and other support vehicles. Furthermore, the fire department has 1,774 items of small equipment and gear, sufficient to outfit 254 firefighters. In total, the inventory of fire protection assets provides a historical average level of service of $1,681 per capita. The historical level of investment in fire protection services provides for a D.C. eligible amount over the forecast period of approximately $11.22 million. The capital program for fire protection services is presented in Table 5-2. Based on the anticipated growth over the forecast period, the County has identified the need for the expansion and replacement of fire stations 5, 6, 7, and 10. Furthermore, costs related to additional vehicles and equipment, as well as a fire master plan, have been included. In total, the estimated gross capital cost of these works is approximately $33.26 million. A deduction recognizing the benefit to existing development of approximately $14.06 million has been made. Additionally, approximately $4.99 million has been deducted related to post-period benefits. Finally, an adjustment related to the existing reserve fund balance of $2.98 million has been made. The resulting net growth-related capital cost included in the D.C. calculations is approximately $11.22 million. These costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 79% (approximately $8.87 million) of costs have been allocated to residential Watson & Associates Economists Ltd. PAGE 5-4 development and 21% (approximately $2.36 million) of costs have been allocated to non-residential development. 5.2.2 Parks and Recreation Services The County has a variety of rural and urban parks, along with park trail systems, recreation facilities, amenities, and vehicles and equipment. In total, the County has 701.34 acres of parkland space. Further, the County has 176 parkland amenities, including dog parks, splash pads, and various sports fields, along with 61.3 km of parkland trails. The County also has 467,308 sq.ft. of recreational space and owns 62 vehicles and equipment items that support parks and recreation services. In total, the inventory of parks and recreation assets provides a historical average level of service of $6,040 per capita. The historical level of investment in parks and recreation services provides for a D.C. eligible amount over the forecast period of approximately $40.33 million. The capital forecast for parks and recreation services is presented in Table 5-3. Based on the anticipated growth over the forecast period, the County has identified several capital costs such as additional or expanded indoor recreation facilities, parkland amenities, fleet and equipment, and a parks and recreation master plan. In total, the gross estimated capital cost of these works is approximately $104.21 million. A benefit to the existing community of approximately $24.20 million has been deducted from the calculations, along with grants and other contributions attributable to new development of approximately $868,000. Additionally, approximately $34.46 million has been deducted related to post-period benefits. To reflect the existing reserve balance, an adjustment of approximately $4.36 million has been made. The resulting net growth- related capital cost included in the D.C. calculations is $40.33 million. As the predominant users of parks and recreation services tend to be residents of the County, and consistent with the County's historical practice, the D.C. recoverable costs have been allocated 100% to residential development and 0% to future non-residential development. 5.2.3 Library Services The County owns and operates five different libraries, providing a total facility space of 55,202 sq.ft. The library houses a variety of items such as books, periodicals, CDs and audiovisuals, along with electronic collections. These assets total 127,922 collection Watson & Associates Economists Ltd. PAGE 5-5 materials. In total, the inventory of library assets provides a historical average level of service of $927 per capita. The historical level of investment in library services provides for a D.C. eligible amount over the forecast period of approximately $6.19 million. Table 5-4 provides the capital program for library services. Based on the anticipated growth over the forecast period, the County has identified the need for additional facility space and collection materials, along with debt repayment costs. In total, the gross estimated capital cost of these works is approximately $9.49 million. A benefit to existing deduction of $3.12 million has been made in the calculations. To reflect the existing reserve fund balance, an adjustment of $178,425 has been made. The resulting net growth-related capital cost included in the D.C. calculations is approximately $6.19 million. Similar to parks and recreation services, as the predominant users of library services tend to be residents of the County, and consistent with the County's historical practice, the D.C. recoverable costs have been allocated 100% to residential development and 0% to future non-residential development. 5.2.4 Ambulance Services The County provides ambulance services, which it operates out of 20,110 sq.ft. of facility space. Further, the County has 153 vehicles and equipment to assist in providing ambulance services, including ambulances, other response vehicles, and equipment. In total, the inventory of these assets provides a historical average level of service of $258 per capita. The historical level of investment in ambulance services provides for a D.C. eligible amount over the forecast period of approximately $1.72 million. Table 5-5 provides the capital program for ambulance services. Based on the anticipated growth over the forecast period, the County has identified the need for additional facility space, as well as additional fleet and equipment. In total, the estimated gross capital cost of these works is approximately $25.72 million. A benefit to existing deduction of $5.26 million has been made in the calculations. Additionally, approximately $18.39 million has been deducted related to post-period benefits. To reflect the existing reserve fund balance, an adjustment of $345,725 has been made. The resulting net growth-related capital cost included in the D.C. calculations is approximately $1.72 million. Watson & Associates Economists Ltd. PAGE 5-6 These costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 79% (approximately $1.36 million) of costs have been allocated to residential development and 21% ($362,000) of costs have been allocated to non-residential development. 5.2.5 Growth-Related Studies (Class of Service) Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible services. With respect to growth-related studies, subsection 7 (3) of the D.C.A. states that: "For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3)". These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and draft by- law provided herein include a class for growth-related studies. All studies included in the D.C. calculations have been allocated across the different services that impose D.C.s, based on the proportion of the total net growth-related capital costs. The following provides a breakdown of these allocations: - Services Related to a Highway - 21% - Fire Protection Services - 9% - Parks and Recreation Services - 28% - Library Services - 4% - Ambulance Services - 1% - Wastewater Services - 22% - Water Services - 15% The list of growth-related studies, as provided in Table 5-6, has an estimated gross capital cost of approximately $1.51 million, including $350,336 related to previously unfunded studies. Deductions of $340,000 recognizing the benefit to existing development and 31,000 recognizing the benefit to non-D.C. services have been made. Watson & Associates Economists Ltd. PAGE 5-7 As a result, approximately $1.14 million in growth-related study costs has been included in the D.C. calculation. Costs relating to studies have been allocated between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. Consequently, 79% of costs have been allocated to residential development and 21% of costs have been allocated to non-residential development. As a result, approximately $902,100 and $239,800 have been allocated to residential and non- residential development, respectively. Watson & Associates Economists Ltd. PAGE 5-8 Table 5-2 Infrastructure Cost Included in the Development Charges Calculation Fire Protection Services Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2026 to 2035 79% 21% Facilities 1 Replace Fire Station #6 - Courtland 3 2029-2030 5,907,000 2,638,100 3,268,900 - 3,268,900 2,582,431 686,469 2 Replace Station #10 - St. Williams 3 2027-2028 5,623,000 2,140,300 3,482,700 - 3,482,700 2,751,333 731,367 3 Replace Fire Station #5 Delhi 3 2033-2034 12,226,000 6,767,100 5,458,900 1,569,783 3,889,117 3,072,402 816,715 4 Replace Fire Station #7 Langton 3 2035 5,907,000 2,485,600 3,421,400 3,421,400 - - - Vehicles & Equipment 5 Radio Communication Paging Frequency 1 2026 325,000 - 325,000 - 325,000 256,750 68,250 6 New Aerial Fire Truck 1 2031 2,954,000 - 2,954,000 - 2,954,000 2,333,660 620,340 7 Provision for Fully-equipped Firefighters (24) 1 2026-2035 213,600 - 213,600 - 213,600 168,744 44,856 Studies 8 Fire Master Plan 15 2035 100,000 25,000 75,000 - 75,000 59,250 15,750 Reserve Fund Adjustment (2,983,825) (2,357,222) (626,603) Total 33,255,600 14,056,100 - 19,199,500 4,991,183 - 11,224,492 8,867,349 2,357,143 Net Capital Cost Gross Capital Cost Estimate (2026$) Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Post Period Benefit Other Deductions Less: Watson & Associates Economists Ltd. PAGE 5-9 Table 5-3 Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Proj. No. Residential Share Non- Residential Share 2026 to 2035 100% 0% Recreation Facilities 1 New Recreational Centre (2 Ice Pads and 1 Pool) 11 2030 101,000,000 23,887,500 77,112,500 34,455,361 42,657,139 42,657,139 - 2 Multi Use Sports Pad - Port Rowan Community Centre 1 2027 200,000 - 200,000 - 200,000 200,000 - 3 Parking Area Expansion - Port Dover Arena 1 2028 200,000 - 200,000 - 200,000 200,000 - Parkland Amenities 4 Dog Park - Port Rowan 1 2029 45,000 - 18,000 27,000 - 27,000 27,000 - 5 Accessible Play Park - Waterford Cedarwood Park 1 2027 440,000 - 440,000 - 440,000 440,000 - 6 Simcoe Soccer Park - Back Area Development 1 2027-2028 550,000 - 150,000 400,000 - 400,000 400,000 - 7 East Field Lighting - McLaughlin Soccer Park 2 2026-2027 120,000 109,800 10,200 - 10,200 10,200 - 8 Simcoe Kinsmen Splash Pad Sun Shade 2 2026 25,000 22,900 2,100 - 2,100 2,100 - 9 Irrigation System - Simcoe Memorial Ball Park 2 2027 42,000 38,400 3,600 - 3,600 3,600 - 10 Kent St. Trail Upgrade - Greater Wellington Park 2 2027 56,000 51,200 4,800 - 4,800 4,800 - 11 Disc Golf Course 1 2027 32,000 - 32,000 - 32,000 32,000 - 12 Disc Golf Course 1 2029 35,000 - 35,000 - 35,000 35,000 - 13 Security Lighting - Delcrest Park 2 2027 30,000 27,400 2,600 - 2,600 2,600 - 14 Port Dover Splash Pad 1 2027 720,000 - 700,000 20,000 - 20,000 20,000 - Fleet and Equipment - - - - - - 15 Parks Garbage Truck 1 2027-2030 225,000 - 225,000 - 225,000 225,000 - 16 Area Mowers (2) 1 2031-2035 80,000 - 80,000 - 80,000 80,000 - 17 50 HP Tractor with Loader 1 2031-2035 70,000 - 70,000 - 70,000 70,000 - 18 Trail Groomer/Mower 1 2031-2035 90,000 - 90,000 - 90,000 90,000 - Studies 19 Parks and Recreation Master Plan 15 2030 250,000 62,500 187,500 - 187,500 187,500 - Reserve Fund Adjustment (4,359,359) (4,359,359) - Total 104,210,000 24,199,700 868,000 79,142,300 34,455,361 - 40,327,580 40,327,580 - Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Post Period Benefit Other Deductions Less: Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Watson & Associates Economists Ltd. PAGE 5-10 Table 5-4 Infrastructure Cost Included in the Development Charges Calculation Library Services Proj. No. Post Period Benefit Residential Share Non- Residential Share 2026 to 2035 100% 0% Building, Land & Furnishings 1 Waterford Library Expansion 1 2026-2027 646,000 - 646,000 - 646,000 646,000 - 2 Provision for New Library Facilities 1 5,087,000 - 5,087,000 - 5,087,000 5,087,000 - Material Acquisitions - - 3 Library Materials 1 2026 349,000 311,800 37,200 - 37,200 37,200 - 4 Library Materials 1 2027 349,000 311,800 37,200 - 37,200 37,200 - 5 Library Materials 1 2028 349,000 311,800 37,200 - 37,200 37,200 - 6 Library Materials 1 2029 349,000 311,800 37,200 - 37,200 37,200 - 7 Library Materials 1 2030 349,000 311,800 37,200 - 37,200 37,200 - 8 Library Materials 1 2031 349,000 311,800 37,200 - 37,200 37,200 - 9 Library Materials 1 2032 349,000 311,800 37,200 - 37,200 37,200 - 10 Library Materials 1 2033 349,000 311,800 37,200 - 37,200 37,200 - 11 Library Materials 1 2034 349,000 311,800 37,200 - 37,200 37,200 - 12 Library Materials 1 2035 349,000 311,800 37,200 - 37,200 37,200 - Debt Repayment 13 Delhi Library Expansion (Growth-related Portion) 17 262,371 - 262,371 - 262,371 262,371 - Reserve Fund Adjustment (178,425) (178,425) - Total 9,485,371 3,118,000 - 6,367,371 - - 6,188,946 6,188,946 - Less: Other Deductions Total Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2026$) Less: Watson & Associates Economists Ltd. PAGE 5-11 Table 5-5 Infrastructure Cost Included in the Development Charges Calculation Ambulance Services Proj. No. Residential Share Non- Residential Share 2026 to 2035 79% 21% Facilities 1 Waterford Station Expansion 3 2028 1,400,000 1,231,800 168,200 - 168,200 132,878 35,322 2 New Paramedic Services Headquarters 3 2030-2031 19,800,000 3,975,000 15,825,000 15,825,000 - - - 3 New Station - Courtland 1 2031-2032 1,600,000 - 1,600,000 1,600,000 - - - 4 New Station - St. Williams 1 2027-2028 1,600,000 - 1,600,000 963,765 636,235 502,626 133,609 Fleet and Equipment 5 New Mechanical CPR Devices (13) 1 2026 520,000 - 520,000 - 520,000 410,800 109,200 6 New Fully Equipped Ambulance (Fleet Expansion) 1 2027 440,000 - 440,000 - 440,000 347,600 92,400 7 Special Event Patient Transport Carts (2) 1 2028 300,000 - 300,000 - 300,000 237,000 63,000 8 Ambulance Security Safes 2 2027-2035 60,000 54,900 5,100 - 5,100 4,029 1,071 Reserve Fund Adjustment (345,725) (273,123) (72,602) Total 25,720,000 5,261,700 - 20,458,300 18,388,765 - 1,723,810 1,361,810 362,000 Gross Capital Cost Estimate (2026$) Total Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Post Period Benefit Other Deductions Less: Net Capital Cost Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Watson & Associates Economists Ltd. PAGE 5-12 Table 5-6 Infrastructure Cost Included in the Development Charges Calculation Growth-related Studies Residential Share Non- Residential Share 2026 to 2035 1 Development Charges Study 13 2026 150,000 - 150,000 - 150,000 118,500 31,500 2 Development Charges Study 13 2031 150,000 - 150,000 - 150,000 118,500 31,500 3 Official Plan Review (Outstanding Share) 13 2026 7,800 - 7,800 - 7,800 6,162 1,638 4 Official Plan Review 16 2031 100,000 50,000 50,000 - 3,000 47,000 37,130 9,870 5 Zoning By-law Review 16 2031 64,700 32,400 32,300 - 1,900 30,400 24,016 6,384 6 Port Dover Secondary Plan 16 2026 150,000 75,000 75,000 - 4,500 70,500 55,695 14,805 7 Simcoe Secondary Plan 16 2027 70,000 35,000 - 35,000 - 2,100 32,900 25,991 6,909 8 Delhi Secondary Plan 16 2027 80,000 40,000 40,000 - 2,400 37,600 29,704 7,896 9 Waterford Secondary Plan 16 2027 90,000 45,000 45,000 - 2,700 42,300 33,417 8,883 10 Land Evaluation and Area Review 16 2026 65,000 32,500 32,500 - 2,000 30,500 24,095 6,405 11 Development Standards Study 13 2027 40,000 - 40,000 - 2,400 37,600 29,704 7,896 12 Two-Zone Floodplain Study - Port Dover 14 2027 125,000 12,500 112,500 - 6,800 105,700 83,503 22,197 13 Housing Needs Assessment 15 2029 35,000 8,800 26,200 - 1,600 24,600 19,434 5,166 14 Housing Needs Assessment 15 2034 35,000 8,800 26,200 - 1,600 24,600 19,434 5,166 Previously Unfunded Amount 350,366 - 350,366 - 350,366 276,789 73,577 Total 1,512,866 340,000 - 1,172,866 - 31,000 1,141,866 902,074 239,792 Proj. No. Less: Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions (to recognize benefit to non- D.C. services) Increased Service Needs Attributable to Anticipated Development Gross Capital Cost Estimate (2026$) Timing (year) BTE Note Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-13 5.3 Service Levels and Buildout Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for all of the County-wide services assessed over the buildout planning period. 5.3.1 Services Related to a Highway The County owns and maintains approximately 1,192 lane kilometres of rural, urban, and semi-urban collector and arterial roads, as well as 258 bridges and culverts. Furthermore, the County also operates 146,659 sq.ft. of public work facility space along with 123 vehicles and equipment. The County also has 88 km of sidewalks on arterial and collector roads, along with 38 traffic signals and pedestrian crossings. In total, the inventory of assets provides a historical average level of service of $16,140 per capita. The historical level of investment in services related to a highway provides for a D.C. eligible amount over the forecast period of approximately $405.72 million. Table 5-7 provides the capital program for services related to a highway. Based on the anticipated growth in the buildout forecast period, capital projects such as new roads, upgrades to existing roads, and urbanization of roads have been identified. Additional works related to intersection upgrades and new sidewalks, walkways, and crossings, along with a provision for additional fleet and equipment and studies, have been included. In total, the estimated gross capital cost of these works totals approximately $146.34 million. A deduction of approximately $17.72 million has been made reflecting the benefit to the existing community, and approximately $1.62 million has been deducted for anticipated grant funding. A deduction of $746,600 related to post-period benefits has been made. Additionally, approximately $2.11 million has been deducted to reflect the existing reserve fund balance. The resulting net growth-related capital cost included in the D.C. calculations is $124.15 million. The capital costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 79% (approximately $98.08 million) of costs have been allocated to residential development and 21% (approximately $26.07 million) of costs have been allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-14 Table 5-7 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2026 to Buildout 79% 21% New Roads 1 Maria Lane (Argyle Ave) extension - Argyle Ave to Fertilizer Road, Delhi 1 2028 1,251,000 - 1,251,000 - 1,251,000 988,290 262,710 2 Main St (First Ave to Crosier) and Crosier St (Main Str to Cronton Rd) extensions, Delhi 1 2028 3,238,000 - 1,619,000 1,619,000 - 1,619,000 1,279,010 339,990 3 Class EA - New Lakeshore Rd, Port Dover (Extension and Area Improvements) 1 2035 500,000 - 500,000 - 500,000 395,000 105,000 4 New Lakeshore Road connection (New Lakeshore Road to Highway 6) 1 2040 2,167,600 - 2,167,600 - 2,167,600 1,712,404 455,196 5 Class EA - Dalton Road, Delhi 1 500,000 - 500,000 - 500,000 395,000 105,000 6 Dalton Rd - Croton Ave to Rhineland Rd (Extension) 1 2052 8,213,700 - 8,213,700 - 8,213,700 6,488,823 1,724,877 Road Upgrades 7 Ireland Rd - Queensway E to Decou Rd, Simcoe (Urbanization and Expansion to 3 4 2032 10,342,165 8,273,700 2,068,465 - 2,068,465 1,634,087 434,378 8 Queensway East/West - Ireland Rd to Hunt St, Simcoe (Centre turn-lane) 6 2026 9,054,695 1,358,200 7,696,495 - 7,696,495 6,080,231 1,616,264 9 Queensway West - Hunt St to Park Rd, (incl.intersection at Park Rd/Cedar 5 2035-2045 5,616,905 280,800 5,336,105 - 5,336,105 4,215,523 1,120,582 10 Hillcrest Rd - Highway No. 3 to St. Johns Rd, Simcoe 7 2035-2045 8,548,157 854,800 7,693,357 - 7,693,357 6,077,752 1,615,605 11 Thompson Rd - West of St. Bernard's School to Main St (Expansion to 3 lane X- 5 2035-2045 2,394,130 119,700 2,274,430 - 2,274,430 1,796,800 477,630 12 Radical Rd - Blueline Rd to Nelson St., Port Dover (Platform Expansion and Road 7 2049 1,579,000 157,900 1,421,100 - 1,421,100 1,122,669 298,431 13 Fertilizer Rd - Windham Rd 12 to Highway No. 3, Rd, Delhi (Platform Improvements) 7 2045 5,821,750 582,200 5,239,550 - 5,239,550 4,139,245 1,100,306 14 Concession 7 Townsend - Old Highway 24 to Highway 24, Waterford (Platform 7 2051 6,088,600 608,900 5,479,700 - 5,479,700 4,328,963 1,150,737 15 Wilson St - 98 Wilson Street to Fertilizer Road, Delhi (Plateform Expansion) 7 2048 1,481,900 148,200 1,333,700 - 1,333,700 1,053,623 280,077 16 West St - Holden Ave to Hillcrest Rd, Simcoe 7 2048 1,973,300 197,300 1,776,000 - 1,776,000 1,403,040 372,960 17 Fourteenth St West - 350m W of Norfolk St North to Park Rd, Simcoe 7 2038 2,381,650 238,200 2,143,450 - 2,143,450 1,693,326 450,125 Road Urbanization 18 New Lakeshore Rd, (Cecil to Woodhouse) Port Dover (Watermain Upgrade/2nd Feed to 4 2027 1,827,000 365,400 1,461,600 - 1,461,600 1,154,664 306,936 19 Old Highway 24 - Thompson Rd to Blueline Rd (Urbanization) 5 2050 2,766,963 138,300 2,628,663 - 2,628,663 2,076,644 552,019 20 Alice St - James St to Washington St (Urbanization) 4 2033 634,297 126,900 507,397 - 507,397 400,844 106,553 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Other Deductions BTE Note Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-15 Table 5-7 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2026 to Buildout 79% 21% 21 St. Andrew St - Clinton St to Market St E, Port Dover (Urbanization and 4 2038 833,200 166,600 666,600 - 666,600 526,614 139,986 22 Clifford St - St. George St from Dover Ave to Clifford St, Port Dover (Urbanization and 4 2038 424,100 84,800 339,300 - 339,300 268,047 71,253 23 Nelson St - Mergl Dr to St. George St, Port Dover (Urbanization) 4 2037 2,896,500 579,300 2,317,200 - 2,317,200 1,830,588 486,612 24 Silver Lake Rd and Cockshutt Rd to North Limit, Port Dover (Urbanization) 4 2039 2,277,900 455,600 1,822,300 - 1,822,300 1,439,617 382,683 25 Prospect St - Dover Mills Rd to Main St, Port Dover (Urbanization and Road 4 2041 2,645,400 529,100 2,116,300 - 2,116,300 1,671,877 444,423 26 New Lakeshore Rd (Woodhouse to Lakeview) , Port Dover (Road Urbanization 4 2030 1,115,256 223,100 892,156 - 892,156 704,803 187,353 27 Dover Mills Rd - Prospect St to Cockshutt Rd, Port Dover (Urbanization) 4 2042 2,894,070 578,800 2,315,270 - 2,315,270 1,829,063 486,207 28 Dalton Rd - Croton Ave to James St (Urbanization) 4 2038 2,220,515 444,100 1,776,415 - 1,776,415 1,403,368 373,047 29 Croton Ave - Crosier St to Dalton Rd, Delhi (Reconstruction, improved platform - rural 4 2039 950,769 190,200 760,569 - 760,569 600,850 159,719 30 Main St N - Amber St to Woodley Rd, and Woodley Rd to Concession 7, Waterford 5 2032 1,895,553 94,800 1,800,753 - 1,800,753 1,422,595 378,158 31 Deer Park Rd - Main St to Deer Park Pump Station (Urbanization following sanitary 4 2029 397,540 79,500 318,040 - 318,040 251,252 66,788 32 Decou Rd - Norfolk St South to Lynn Valley Trail (Urbanization and platform 5 2036 2,409,000 120,500 2,288,500 - 2,288,500 1,807,915 480,585 33 Decou Rd - Ireland Rd to 470m West (Urbanization and platform improvements) 5 2036 1,131,585 56,600 1,074,985 - 1,074,985 849,238 225,747 34 Wilson St - James St to 98 Wilson Street (Urbanization and Pedestrian Facility 5 2044 1,483,600 74,200 1,409,400 - 1,409,400 1,113,426 295,974 35 Fourteenth St West - Norfolk St North to 350m West, Simcoe 5 2047 1,564,000 78,200 1,485,800 - 1,485,800 1,173,782 312,018 Intersection Upgrades 36 St. Johns Rd at Blueline Rd, Port Dover (Intersection Improvements (Roundabout)) 8 2027-2050 6,380,000 - 6,380,000 - 6,380,000 5,040,200 1,339,800 37 St. Johns Rd at Cockshutt Rd, Port Dover (Intersection Improvements (Roundabout)) 8 2027-2050 6,380,000 - 6,380,000 - 6,380,000 5,040,200 1,339,800 38 Decou Rd at Norfolk St South, Simcoe (intersection improvements) 8 2026 1,148,300 - 1,148,300 - 1,148,300 907,157 241,143 39 Queensway East at Donly Dr N, Simcoe (intersection and pedestrian facility 8 2030 382,800 - 382,800 - 382,800 302,412 80,388 40 Queensway East at Ireland Rd, Simcoe (Signalization and Lane Adjustments) 8 2035 904,900 - 904,900 - 904,900 714,871 190,029 41 Victoria St at Donly Dr, Simcoe (Intersection Signalization) 8 2040 457,700 - 457,700 - 457,700 361,583 96,117 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Other Deductions BTE Note Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-16 Table 5-7 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2026 to Buildout 79% 21% 42 Alice St at Main St (Intersection Improvements) 9 2029 850,329 42,500 807,829 - 807,829 638,185 169,644 43 Class EA - Fertilizer Rd at Windham Rd 12, Delhi (Intersection Improvements) 8 2035 350,000 - 350,000 - 350,000 276,500 73,500 44 Brantford 4/Fertilizer Road Intersection Relignment/Improvement 8 2046 7,366,120 - 7,366,120 - 7,366,120 5,819,235 1,546,885 45 Blueline Rd at Highway No. 6, Port Dover (Intersection Improvements, Signal) 8 2040 739,300 - 739,300 - 739,300 584,047 155,253 46 Lynn River Heights Phase 2 at Highway No. 6, Port Dover (Intersection Improvements, 8 2046 681,500 - 681,500 - 681,500 538,385 143,115 47 Thompson Dr at Main St, Port Dover (Intersection Improvements, add turn lanes) 8 2030 1,172,000 - 1,172,000 - 1,172,000 925,880 246,120 48 Walker St at St. Andrew St, Port Dover (Intersection Improvements) 8 2050 746,600 - 746,600 746,600 - - - 49 St. George St at Walker St to Harbour St, Port Dover (Intersection Improvements 9 2038 378,400 18,900 359,500 - 359,500 284,005 75,495 50 Talbot St at Highway No 59 - Courtland (Intersection Improvements) 8 2032 766,900 - 766,900 - 766,900 605,851 161,049 New Sidewalks, Walkways, and Crossings 51 Ireland Rd to McIntosh Dr (129 Queensway East), Simcoe (Pedestrian Facility 10 2027-2050 192,700 - 192,700 - 192,700 152,233 40,467 52 Norfolk St South - Parker Dr to 591 Norfolk St South, Simcoe (Pedestrian Facility 10 2027-2050 125,100 - 125,100 - 125,100 98,829 26,271 53 Norfolk St South - Rail Trail (Aproximately James St) to Decou Rd, Simcoe (Pedestrian 10 2027-2050 199,500 - 199,500 - 199,500 157,605 41,895 54 Victoria St - Donly Dr to Pond St, Simcoe (Pedestrian Facility Improvements_ 10 2027-2050 879,000 - 879,000 - 879,000 694,410 184,590 55 Evergreen Hill Road - Oak St to Norfolk St South, Simcoe (Pedestrian Facility 10 2027-2050 386,200 - 386,200 - 386,200 305,098 81,102 56 Thompson Road - Main St to Duncombe Road (North Side sidewalk) 10 2027-2050 168,341 - 168,341 - 168,341 132,989 35,352 57 Church St East, Herbert Ave to Brantford Rd, Delhi (Pedestrian Facility Improvements) 10 2027-2050 385,400 - 385,400 - 385,400 304,466 80,934 58 Argyl Ave - James St to East Limit, Delhi (Pedestrian Facility Improvements) 10 2027-2050 644,700 - 644,700 - 644,700 509,313 135,387 59 James St, Tisdale St to Wilson Dr, Delhi (Pedestrian Facility Improvements - 10 2027-2050 247,200 - 247,200 - 247,200 195,288 51,912 60 James St, Tisdale St to Pinegrove Rd, Delhi (Pedestrian Facility Improvements, multi-use 10 2027-2050 199,400 - 199,400 - 199,400 157,526 41,874 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Other Deductions BTE Note Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-17 Table 5-7 (Continued) Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway Less: Less: Potential D.C. Recoverable Cost Proj. No. Residential Share Non- Residential Share 2026 to Buildout 79% 21% 61 Thompson Dr to Blue Lake Ave, Port Dover (Pedestrian Facility Improvements) 10 2027-2050 80,500 - 80,500 - 80,500 63,595 16,905 62 Front Rd - College Ave to Dock St, Port Rowan (Pedestrian Facility Upgrades) 10 2027-2050 525,000 - 525,000 - 525,000 414,750 110,250 63 Front Rd - Hunter Dr North to #60 Front Rd, Port Rowan (Pedestrian Facility Upgrades) 10 2027-2050 63,800 - 63,800 - 63,800 50,402 13,398 64 Main St of Courtland (Highway No. 3) - Talbot St to King Cres, Courtland 10 2027-2050 207,200 - 207,200 - 207,200 163,688 43,512 65 Talbot St - Main St of Courtland to Highway No. 59, Courtland (Pedestrian Facility 10 2027-2050 753,600 - 753,600 - 753,600 595,344 158,256 66 Main St of Courtland (Highway No. 3) - Talbot St to Courtland Lions Community 10 2027-2050 785,200 - 785,200 - 785,200 620,308 164,892 Fleet and Equipment 67 Provision for New Fleet and Equipment 1 2027-2050 8,476,000 - 8,476,000 - 8,476,000 6,696,040 1,779,960 Studies 68 ISMP Update (Road's share) 15 2027 600,000 150,000 450,000 - 450,000 355,500 94,500 69 ISMP Update (Road's share) 15 2036 600,000 150,000 450,000 - 450,000 355,500 94,500 70 ISMP Update (Road's share) 15 2046 600,000 150,000 450,000 - 450,000 355,500 94,500 Reserve Fund Adjustment (2,107,869) (1,665,217) (442,652) Total 146,343,490 17,717,300 1,619,000 127,007,190 746,600 - 124,152,721 98,080,650 26,072,071 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Other Deductions BTE Note Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2026$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-18 5.4 Urban Buildout Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for water and wastewater services, evaluated over the urban buildout forecast period. 5.4.1 Water Service The County has identified the need for various capital investments related to water services, as presented in Table 5-8 of which many projects relate to the Inter Urban Water Supply (I.U.W.S.) Program. These projects will effectively increase water servicing capacity for new development, and in some cases, benefit the existing population as well. Additional capital works such as new and upgraded facilities, new watermains, upgrades to existing watermains, fleet and equipment, and water-related studies have been identified. Ongoing debt repayment costs and previously unfunded amounts have also been included in the calculations. In total, the estimated gross capital cost of these works is approximately $518.2 million, including $371,040 representing previously unfunded amounts. A deduction reflecting benefits to the existing community of approximately $235.18 million has been included. Anticipated grants, subsidies, and other contributions attributable to new development of approximately $167.19 million have been deducted. It is noted that a significant share of the anticipated grant funding is related to the I.U.W.S. Program, which has been assumed to receive a combination of provincial and federal grant funding totaling two- thirds of the gross capital costs. Further, a deduction related to the post-period benefit of approximately $30.39 million has been made to benefit future growth. As a result, the net growth-related capital cost included in the D.C. calculations is approximately $85.45 million. The capital costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 80% (approximately $68.36 million) of costs have been allocated to residential development and 20% (approximately $17.09 million) of costs have been allocated to non-residential development. 5.4.2 Wastewater Services The County has identified the need for capital works related to wastewater services presented in Table 5-9. The capital projects include new and upgraded facilities, new wastewater mains, upgrades to existing wastewater mains, fleet and equipment, and Watson & Associates Economists Ltd. PAGE 5-19 studies related to wastewater services. Ongoing debt repayment costs and previously unfunded amounts have also been included in the calculations. In total, the gross estimated capital cost of these works is approximately $239.64 million, including approximately $1.13 million representing previously unfunded amounts. A benefit to the existing community of approximately $90.68 million has been deducted from the calculation, along with grants, subsidies, and other contributions of approximately $23.3 million. Furthermore, a post-period deduction of approximately $1.16 million has been made, accounting for the benefit to future development. As a result, the net growth- related capital cost included in the D.C. calculations is approximately $124.49 million. The capital costs are shared between residential and non-residential growth based on the incremental growth in population to employment over the forecast period. As a result, 80% (approximately $99.59 million) of costs have been allocated to residential development and 20% (approximately $24.89 million) of costs have been allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-20 Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2026 to Urban Buildout 80% 20% Inter Urban Water Supply Program 1 IUWS Phase 1 : Simcoe Transmission Watermain 12 2028 53,158,000 24,908,500 18,833,000 9,416,500 3,211,700 6,204,800 4,963,840 1,240,960 2 IUWS Phase 1 : Nanticoke WTP Upgrade #1 (10MLD) 12 2027 45,232,000 21,194,600 16,024,900 8,012,500 2,732,800 5,279,700 4,223,760 1,055,940 3 IUWS Phase 1: Simcoe to Booster Pumping Station 12 2027 11,300,000 5,294,900 4,003,400 2,001,700 682,700 1,319,000 1,055,200 263,800 4 IUWS Phase 1: Elevated Tank - Simcoe 12 2027 18,800,000 8,809,200 6,660,500 3,330,300 1,135,900 2,194,400 1,755,520 438,880 5 IUWS Phase 2 : Vertical Capital - Port Dover 12 2027-2029 20,506,000 9,608,600 7,264,900 3,632,500 1,238,900 2,393,600 1,914,880 478,720 6 IUWS Phase 2 : Feeder Mains to ET and Simcoe 12 2027-2029 18,547,000 8,690,700 6,570,900 3,285,400 1,120,600 2,164,800 1,731,840 432,960 7 IUWS Townsend Watermain Upsizing (NCP to SQ Rd) 12 2027-2028 670,000 313,900 237,400 118,700 40,500 78,200 62,560 15,640 8 IUWS Phase 3A Waterford: Vertical Capital 12 2029-2031 13,402,000 6,279,800 4,748,100 2,374,100 809,700 1,564,400 1,251,520 312,880 9 IUWS Phase 3B Delhi: Vertical Capital 12 2029-2031 28,845,000 13,516,000 10,219,300 5,109,700 1,742,800 3,366,900 2,693,520 673,380 10 IUWS Townsend Watermain Upsizing - Main to ET 12 2029-2030 2,050,000 960,600 726,300 363,100 123,800 239,300 191,440 47,860 11 IUWS Phase 3A Waterford: Feeder Mains to ET 12 2032 10,952,000 5,131,800 3,880,100 1,940,100 661,700 1,278,400 1,022,720 255,680 12 IUWS Phase 3B Delhi: Feeder Mains to ET 12 2029-2031 20,339,000 9,530,300 7,205,800 3,602,900 1,228,900 2,374,000 1,899,200 474,800 13 Phase 4 - Port Dover to Port Rowan 12 2043 52,072,000 24,399,600 18,448,200 9,224,200 3,146,100 6,078,100 4,862,480 1,215,620 14 Phase 2 Nanticoke WTP Upgrades 12 2041 63,641,000 29,820,600 22,546,900 11,273,500 3,845,100 7,428,400 5,942,720 1,485,680 15 Phase 3 Nanticoke WTP Upgrades 12 2049 63,641,000 29,820,600 22,546,900 11,273,500 3,845,100 7,428,400 5,942,720 1,485,680 16 Phase 5 - Port Rowan to Courtland 12 2048 41,774,000 19,574,300 14,799,800 7,399,900 2,523,900 4,876,000 3,900,800 975,200 17 IUWS Program Engineering 12 2027 3,632,000 1,701,900 1,286,800 643,300 219,400 423,900 339,120 84,780 Facilities 18 Waterford Water Storage 2027 200,000 100,000 100,000 - 100,000 80,000 20,000 19 Delhi Water Storage Improvements/Expansion 2030 200,000 100,000 100,000 - 100,000 80,000 20,000 20 Simcoe Water Storage Improvements/Expansion 2030 200,000 100,000 100,000 - 100,000 80,000 20,000 21 Port Rowan WTP and Intake Upgrades 2027 18,939,000 12,796,600 1,189,000 4,953,400 - 4,953,400 3,962,720 990,680 New Watermains 22 Argyle Ave Extension - Huggins Ave to Fertilizer Rd, Delhi (New waterline) 1 2028 459,000 - 459,000 - 459,000 367,200 91,800 23 Hwy 6 - Blueline Rd, Radical Rd, Port Dover 1 3,868,000 - 3,868,000 1,934,000 1,934,000 1,547,200 386,800 24 Norfolk St South - Parker Dr to 591 Norfolk St South to Decou Rd, Simcoe (Watermain 1 1,499,600 - 1,499,600 - 1,499,600 1,199,680 299,920 Proj. No. Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-21 Table 5-8 (Continued) Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2026 to Urban Buildout 80% 20% 25 Woodway Trl - 682 Ireland Rd to Trillium Way, Simcoe (Watermain Extension) 1 1,114,800 - 1,114,800 - 1,114,800 891,840 222,960 26 Old Hwy 24 North of Waterford - Woodley Rd to Concession 7 (Watermain Extension 1 525,074 - 525,074 - 525,074 420,059 105,015 27 Ireland Rd - Syl Apps to Decou Rd (Watermain Extension) 1 580,988 - 580,988 - 580,988 464,790 116,198 28 Old Highway 24 - Lam Blvd to Blueline Rd 1 287,000 - 287,000 143,500 143,500 114,800 28,700 29 Dalton Rd -James St to Croton Rd 200mm (Watermain Extension to loop to Crosier St 1 540,260 - 540,260 - 540,260 432,208 108,052 30 Croton Ave - Dalton Rd to Crosier Rd. (Watermain Extension, 200mm) 1 352,176 - 352,176 - 352,176 281,741 70,435 31 Dover Mills Rd - Prospect Dr to Cockshutt Rd (Watermain Extension) 1 547,531 - 547,531 - 547,531 438,025 109,506 32 Norfolk St South -Parker Dr to FOB to Willow Crt to Decou Rd (Watermain 1 993,367 - 993,367 - 993,367 794,694 198,673 33 South East Simcoe Watemain Trunk through Calibrex-LIV-Woodway 1 2028 1,039,430 - 1,039,430 - 1,039,430 831,544 207,886 34 Decou Rd - Willow Crt to Ireland Rd (Watermain Extension) 1 2029 1,035,474 - 1,035,474 - 1,035,474 828,379 207,095 35 Blueline Rd - Radical Rd to Highway 6 (West Dover Trunk Watermain) 1 2045 2,638,000 - 2,638,000 - 2,638,000 2,110,400 527,600 Watermain Upgrades 36 New Lakeshore Rd - Cecil Ave to Lakeview Ave (Upsizing) 2027 1,135,384 567,700 567,684 - 567,684 454,147 113,537 37 Colborne St N - Windham St to Queensway, Simcoe 2029 211,000 147,700 63,300 - 63,300 50,640 12,660 38 Washington St - Green St to Thompson Rd, Waterford 2031 586,000 527,400 58,600 - 58,600 46,880 11,720 39 South Dr - Oak St to Head St, Simcoe 2031 534,000 480,600 53,400 - 53,400 42,720 10,680 40 Thompson Rd - St. Bernard's School to Main St (Expansion) 356,387 285,100 71,287 - 71,287 57,030 14,257 Studies 41 ISMP Update (Water share) 15 2027 375,000 93,800 281,200 - 281,200 224,960 56,240 42 ISMP Update (Water share) 15 2036 375,000 93,800 281,200 - 281,200 224,960 56,240 43 ISMP Update (Water share) 15 2046 375,000 93,800 281,200 - 281,200 224,960 56,240 44 Water Model Update and Recalibration (All Systems) 15 2026 100,000 25,000 75,000 - 75,000 60,000 15,000 45 Water Model Update and Recalibration (All Systems) 15 2034 100,000 25,000 75,000 - 75,000 60,000 15,000 Proj. No. Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-22 Table 5-8 (Continued) Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2026 to Urban Buildout 80% 20% 46 Water Model Update and Recalibration (All Systems) 15 2042 100,000 25,000 75,000 - 75,000 60,000 15,000 47 Water Model Update and Recalibration (All Systems) 15 2050 100,000 25,000 75,000 - 75,000 60,000 15,000 Fleet and Equipment 48 Emergency Response Trailer 1 2026 25,000 - 25,000 - 25,000 20,000 5,000 49 Valve Trailer & Hydraulics 1 2026 40,000 - 40,000 - 40,000 32,000 8,000 50 Service Trench Box 1 2026 15,000 - 15,000 - 15,000 12,000 3,000 51 PRV and Chamber - Delhi / Courtland 2026 150,000 135,000 15,000 - 15,000 12,000 3,000 Debt Repayments - - - - - - 52 Simcoe Well Field Treatment Facility (growth portion only) 17 66,120 - 66,120 - 66,120 52,896 13,224 53 OIPC Debt Payments (Debt#161) (growth portion only) 17 3,611 - 3,611 - 3,611 2,889 722 54 Port Dover WTP Upgrades (growth portion only) 17 9,604,218 - 9,604,218 - 9,604,218 7,683,374 1,920,844 Previously Unfunded Amount 371,040 - 371,040 - 371,040 296,832 74,208 Total 518,203,461 235,177,400 167,192,200 115,833,861 30,387,100 - 85,446,761 68,357,409 17,089,352 Proj. No. Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Increased Service Needs Attributable to Anticipated Development Timing (year) BTE Note Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-23 Table 5-9 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2026 to Urban Buildout 80% 20% Facilities Port Dover WWTP Upgrades 1 Phase 1 2027 40,355,000 29,055,600 11,299,400 - 11,299,400 9,039,520 2,259,880 2 Phase 2 2028-2030 36,790,000 26,488,800 10,301,200 - 10,301,200 8,240,960 2,060,240 3 Simcoe WWTP Upgrades 4 Phase 1 (Biosolid Train Upgrades) 58,262,000 - 23,304,800 34,957,200 - 34,957,200 27,965,760 6,991,440 5 Phase 2 (Liquid Train Upgrades) 18 2027 34,114,000 34,114,000 - - - - - 6 Waterford WWTP Capacity Expansion 2033-2034 34,500,000 - 34,500,000 - 34,500,000 27,600,000 6,900,000 7 SPS Optimization and Upgrades 2026-2030 9,550,000 - 9,550,000 - 9,550,000 7,640,000 1,910,000 8 Blueline SPS Upgrades 1 2030 450,000 - 450,000 - 450,000 360,000 90,000 9 Main St SPS Upgrades, Delhi 1 2030 1,500,000 - 1,500,000 - 1,500,000 1,200,000 300,000 New Wastewater Mains 10 Mechanic St - Main St to 215m west of Main St 1 2030 707,084 - 707,084 - 707,084 565,667 141,417 11 Argyle Ave - Bluegrass Ph 4 to Fertilizer Rd 1 2028 275,000 - 275,000 - 275,000 220,000 55,000 12 Woodway Trail - 682 Ireland Rd to Trillium Way 1 2028 1,126,900 - 1,126,900 - 1,126,900 901,520 225,380 13 Old Hwy 24 - Woodley Rd to Concession 7 1 528,670 - 528,670 - 528,670 422,936 105,734 14 Dalton Rd - James St to Gardens, Delhi 1 315,534 - 315,534 - 315,534 252,427 63,107 15 Dover Mills Rd - Prospect St to Cockshutt Rd 1 780,884 - 780,884 - 780,884 624,707 156,177 16 Cockshutt Rd/Ryerse Trunk Expansion 1 2,428,207 - 2,428,207 - 2,428,207 1,942,566 485,641 17 Ireland Rd - Victoria St to Decou Rd 1 2,042,017 - 2,042,017 1,021,000 1,021,017 816,814 204,203 18 Old Highway 24 - Lam Blvd to Blueline Rd 1 282,860 - 282,860 141,400 141,460 113,168 28,292 19 South-East Simcoe Trunk Expansion - Calibrex-LIV-Woodway 1 2028 1,051,506 - 1,051,506 - 1,051,506 841,205 210,301 20 Port Dover Trunk Sanitary Extension (New Lakeshore, Lakeview, Highway 6) - Dover 1 2,188,345 - 2,188,345 - 2,188,345 1,750,676 437,669 Wastewater Main Upgrades 21 New Lakeshore Rd - Cecil Ave to Port Dover WWTP (Trunk Sewer Upsizing) 2027 787,831 551,500 236,331 - 236,331 189,065 47,266 22 Colborne St N - Windham St to Queensway W 2029 126,000 88,200 37,800 - 37,800 30,240 7,560 23 Cockshutt Rd (Wamsley/Barfoot - including former Eggink Lands SPS upgrades) 2035 3,197,100 - 3,197,100 - 3,197,100 2,557,680 639,420 Studies 24 ISMP Update (wastewater share) 15 2027 375,000 93,800 281,200 - 281,200 224,960 56,240 25 ISMP Update (wastewater share) 15 2036 375,000 93,800 281,200 - 281,200 224,960 56,240 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development BTE Note Proj. No. Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-24 Table 5-9 (Continued) Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2026 to Urban Buildout 80% 20% 26 ISMP Update (wastewater share) 15 2046 375,000 93,800 281,200 - 281,200 224,960 56,240 27 Sanitary Model Update and Recalibraton (All systems) 15 2026 100,000 25,000 75,000 - 75,000 60,000 15,000 28 Sanitary Model Update and Recalibraton (All systems) 15 2034 100,000 25,000 75,000 - 75,000 60,000 15,000 29 Sanitary Model Update and Recalibraton (All systems) 15 2042 100,000 25,000 75,000 - 75,000 60,000 15,000 30 Sanitary Model Update and Recalibraton (All systems) 15 2050 100,000 25,000 75,000 - 75,000 60,000 15,000 Fleet and Equipment 31 SPS Flow Meters - Phase 2 (All Sites) 1 2026 85,000 - 85,000 - 85,000 68,000 17,000 Debt Repayment 32 Simcoe WPCP Expansion Debt (growth portion only) 17 401,256 - 401,256 - 401,256 321,005 80,251 33 Wastewater Treatment Facility Engineering Services & Expansion (growth portion only) 17 2,049,614 - 2,049,614 - 2,049,614 1,639,691 409,923 34 WPCP Expansion Port Rowan Debt (growth portion only) 17 1,297,209 - 1,297,209 - 1,297,209 1,037,767 259,442 35 Delhi WW Treatment Plant Upgrade Debt 17 1,787,344 - 1,787,344 - 1,787,344 1,429,875 357,469 Previously Unfunded Amount 1,131,049 - 1,131,049 - 1,131,049 904,839 226,210 Total 239,635,410 90,679,500 23,304,800 125,651,110 1,162,400 - 124,488,710 99,590,968 24,897,742 Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development BTE Note Proj. No. Total Potential D.C. Recoverable Cost Less: Post Period Benefit Other Deductions Gross Capital Cost Estimate (2026$) Net Capital Cost Less: Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 6. D.C. Calculation and Comparison 6.1 D.C. Calculation This chapter presents the D.C. calculations for the growth-related capital costs identified in Chapter 5. Table 6-1 calculates the proposed County-wide D.C.s to be imposed on anticipated development in the County over the 10-year forecast period. Table 6-2 calculates the proposed County-wide D.C.s to be imposed on anticipated development in the County over the buildout forecast period. Table 6-3 calculates the D.C.s over the proposed urban buildout forecast period. The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (single and semi-detached, apartments 2+ bedrooms, bachelor and 1-bedroom apartments, other multiples, and special care/special dwelling units). The non-residential D.C.s have been calculated on a per sq.m of gross floor area basis for non-residential development. The D.C. eligible costs for each service component are provided in Chapter 5 for all County services/class of services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the population associated with new units to determine the per capita amount. The D.C.-eligible cost calculations set out in Chapter 5 are based on the forecast new unit population less any decline in the existing population, where applicable. The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 4) to calculate the charges in Table 6-1, Table 6-2, and Table 6-3. With respect to non-residential development, the total costs in the uniform charge allocated to non-residential development (based on need for service) have been divided by the anticipated development over the respective planning periods to calculate a cost per sq.m of G.F.A. Table 6-4 summarizes the calculated schedule of charges for services updated in this study, reflecting the maximum D.C.s by residential dwelling unit type and non-residential G.F.A. for County-wide and urban services. Table 6-5 and Table 6-6 compare the total existing charges, including D.C.s for services not updated within this study, to the charges proposed for a single detached residential Watson & Associates Economists Ltd. PAGE 6-2 dwelling unit and per square foot of G.F.A. for non-residential development, respectively. In total, the proposed charge for a single detached dwelling unit would increase by 282% ($23,149) in the rural area and would increase by 92% ($23,678) in the urban area. For non-residential development, the proposed D.C. in the rural area would increase by 69% ($28.27 per sq.ft. of G.F.A.) relative to the current charge. In the urban area, the proposed D.C. would increase by 3% ($4.56 per sq.ft. of G.F.A.) relative to the current charge. Table 6-1 Norfolk County Development Charge Calculation 2026-2036 2026$ D.C.-Eligible Cost 2026$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.m 1. Fire Protection Services 8,867,349 $ 2,357,143 $ 3,274 $ 14.99 $ 2. Parks and Recreation Services 40,327,580 $ - $ 14,893 $ - $ 3. Library Services 6,188,946 $ - $ 2,285 $ - $ 4. Ambulance Services 1,361,810 $ 362,000 $ 503 $ 2.30 $ 5. Growth-Related Studies 5.1 Fire Protection Services 81,187 $ 21,581 $ 30 $ 0.13 $ 5.2 Ambulance Services 9,021 $ 2,398 $ 3 $ 0.02 $ 5.3 Library Services 36,083 $ 9,592 $ 13 $ 0.06 $ 5.4 Parks and Recreation Services 252,581 $ 67,142 $ 93 $ 0.43 $ 5.5 Services Related to a Highway 189,436 $ 50,356 $ 70 $ 0.32 $ 5.6 Water Services 135,311 $ 35,969 $ 50 $ 0.23 $ 5.7 Wastewater Services 198,456 $ 52,754 $ 73 $ 0.34 $ TOTAL 57,647,759 $ 2,958,935 $ 21,287 $ 18.82 $ D.C.-Eligible Capital Cost 57,647,759 $ 2,958,935 $ 10-Year Gross Population/GFA Growth (sq.m) 6,995 157,200 Cost Per Capita/Non-Residential GFA (sq.m) 8,241 $ 18.82 $ By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.583 21,287 $ Other Multiples 1.758 14,488 $ Apartments - 2 Bedrooms + 1.748 14,406 $ Apartments - Bachelor and 1 Bedroom 1.368 11,274 $ Special Care/Special Dwelling Units 1.100 9,065 $ Watson & Associates Economists Ltd. PAGE 6-3 Table 6-2 Norfolk County Development Charge Calculation Buildout Table 6-3 Norfolk County Development Charge Calculation Urban Buildout 2026$ D.C.-Eligible Cost 2026$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.m 6. Services Related to a Highway 98,080,650 $ 26,072,071 $ 10,077 $ 50.38 $ TOTAL 98,080,650 $ 26,072,071 $ 10,077 $ 50.38 $ D.C.-Eligible Capital Cost 98,080,650 $ 26,072,071 $ Buildout Gross Population/GFA Growth (sq.m) 25,140 517,500 Cost Per Capita/Non-Residential GFA (sq.m) 3,901 $ 50.38 $ By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.583 10,077 $ Other Multiples 1.758 6,859 $ Apartments - 2 Bedrooms + 1.748 6,820 $ Apartments - Bachelor and 1 Bedroom 1.368 5,337 $ Special Care/Special Dwelling Units 1.10 4,292 $ 2026$ D.C.-Eligible Cost 2026$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.m 7. Water Services 68,357,409 $ 17,089,352 $ 7,336 $ 42.96 $ 8. Wastewater Services 99,590,968 $ 24,897,742 $ 10,687 $ 62.59 $ TOTAL 167,948,377 $ 41,987,094 $ 18,023 $ 105.55 $ D.C.-Eligible Capital Cost 167,948,377 $ 41,987,094 $ Urban Buildout Gross Population/GFA Growth (sq.m) 24,070 397,800 Cost Per Capita/Non-Residential GFA (sq.m) 6,977 $ 105.55 $ By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.583 18,023 $ Other Multiples 1.758 12,266 $ Apartments - 2 Bedrooms + 1.748 12,197 $ Apartments - Bachelor and 1 Bedroom 1.368 9,545 $ Special Care/Special Dwelling Units 1.100 7,675 $ Watson & Associates Economists Ltd. PAGE 6-4 Table 6-4 Norfolk County Calculated Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per m² of Gross Floor Area) County-wide Services/Class of Service: Services Related to a Highway 10,077 $ 6,858 $ 6,819 $ 5,337 $ 4,291 $ 50.38 $ Fire Protection Services 3,274 $ 2,228 $ 2,216 $ 1,734 $ 1,394 $ 14.99 $ Parks and Recreation Services 14,893 $ 10,136 $ 10,079 $ 7,888 $ 6,342 $ - $ Library Services 2,285 $ 1,555 $ 1,546 $ 1,210 $ 973 $ - $ Ambulance Services 503 $ 342 $ 340 $ 266 $ 214 $ 2.30 $ Growth-Related Studies 332 $ 226 $ 225 $ 176 $ 141 $ 1.53 $ Total County-wide Services/Class of Services 31,364 $ 21,345 $ 21,225 $ 16,611 $ 13,355 $ 69.20 $ Urban Services Water Services 7,336 $ 4,993 $ 4,965 $ 3,885 $ 3,124 $ 42.96 $ Wastewater Services 10,687 $ 7,274 $ 7,232 $ 5,660 $ 4,551 $ 62.59 $ Total Urban Services 18,023 $ 12,267 $ 12,197 $ 9,545 $ 7,675 $ 105.55 $ GRAND TOTAL RURAL AREA 31,364 $ 21,345 $ 21,225 $ 16,611 $ 13,355 $ 69.20 $ GRAND TOTAL URBAN AREA 49,387 $ 33,612 $ 33,422 $ 26,156 $ 21,030 $ 174.75 $ RESIDENTIAL Service/Class of Service Watson & Associates Economists Ltd. Table 6-5 Norfolk County Comparison of Current and Proposed Residential (Single Detached) D.C.s Table 6-6 Norfolk County Comparison of Current and Proposed Non-Residential D.C. (per sq.m of G.F.A.) Service/Class of Service Current Calculated Difference (Calculated - Current) County Wide Services/Classes: Services Related to a Highway 2,745 $ 10,077 $ 7,332 $ Fire Protection Services 988 $ 3,274 $ 2,286 $ Parks and Recreation Services 2,565 $ 14,893 $ 12,328 $ Parking 217 $ - $ (217) $ Library Services 1,373 $ 2,285 $ 912 $ Ambulance Services 194 $ 503 $ 309 $ Growth-Related Studies 133 $ 332 $ 199 $ Total Municipal Wide Services/Classes 8,215 $ 31,364 $ 23,149 $ Urban Services: Water Services 10,971 $ 7,336 $ (3,635) $ Wastewater Services 6,523 $ 10,687 $ 4,164 $ Total Urban Area Services 17,494 $ 18,023 $ 529 $ Grand Total - Rural Area 8,215 $ 31,364 $ 23,149 $ Grand Total - Urban Area 25,709 $ 49,387 $ 23,678 $ Service/Class of Service Current Calculated Difference (Calculated - Current) County Wide Services/Classes: Services Related to a Highway 26.15 $ 50.38 $ 24.23 $ Fire Protection Services 9.63 $ 14.99 $ 5.36 $ Parks and Recreation Services - $ - $ - $ Parking 2.03 $ - $ (2.03) $ Library Services - $ - $ - $ Ambulance Services 1.84 $ 2.30 $ 0.46 $ Growth-Related Studies 1.28 $ 1.53 $ 0.25 $ Total Municipal Wide Services/Classes 40.93 $ 69.20 $ 28.27 $ Urban Services: Water Services 80.99 $ 42.96 $ (38.03) $ Wastewater Services 48.27 $ 62.59 $ 14.32 $ Total Urban Area Services 129.26 $ 105.55 $ (23.71) $ Grand Total - Rural Area 40.93 $ 69.20 $ 28.27 $ Grand Total - Urban Area 170.19 $ 174.75 $ 4.56 $ Watson & Associates Economists Ltd. PAGE 6-2 Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above regarding subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. 7.2 D.C. By-law Structure It is recommended that: - The County imposes a County-wide D.C. calculations for the following services and class of services: Watson & Associates Economists Ltd. PAGE 7-2 o Services Related to a Highway; o Fire Protection Services; o Parks and Recreation Services; o Library Services; o Ambulance Services; and o Growth-related Studies. - The County imposes urban area D.C. calculations for the following services: o Water Services; and o Wastewater Services 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable, and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." Watson & Associates Economists Ltd. PAGE 7-3 7.3.2 Determination of the Amount of the Charge The following conventions were utilized in the calculation of the charge: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the amount of square feet of G.F.A. constructed for eligible uses (i.e., industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance and are summarized in Chapter 5. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) Where, as a result of the redevelopment of land, a building or structure existing on the same land within five years prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s by the gross floor area that has been or will be demolished or converted to another principal use. provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. Watson & Associates Economists Ltd. PAGE 7-4 7.3.4 Exemptions (full or partial) Statutory exemptions: - Partial exemption for industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - Full exemption for buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education; - Full exemption for additional residential development within or ancillary to existing buildings: development that results only in the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (based on limits set out in subsection 2 (3.2) of the Act); - Full exemption for additional residential development within or ancillary to new dwellings: development that includes the creation of up to two additional dwelling units (based on limits set out in subsection 2 (3.3) of the Act); - Full exemption for the creation of the greater of one residential unit or 1% of the existing residential units in an existing rental residential building; - Full exemption for a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - Full exemption for affordable units; - Full exemption for attainable units, (not yet in force); - Full exemption for affordable inclusionary zoning units; - Full exemption for non-profit housing developments; - Full exemption for non-profit retirement home developments; - Full exemption for long-term care homes; and - Partial exemption through a discount for rental housing units based on bedroom size as prescribed (i.e., three or more bedrooms - 25% discount, two bedrooms - 20% discount, and all others - 15% discount). Discretionary exemptions: - Temporary farm workers accommodations; - Farming business development; Watson & Associates Economists Ltd. PAGE 7-5 - Temporary structures including building without a foundation which is constructed, erected or placed on land for a continuous period of time not exceeding one year; and - Places of worship. It is noted that the County's current D.C. by-law includes a number of exemptions that have not been carried over into the draft by-law presented herein. The County will be considering shifting these exemptions to its Community Improvement Plan (CIP) program. This approach will provide the County with more flexibility to update the programs as the County's development needs and priorities change. The exemptions that are being considered for inclusion in the CIP program include the following: - Development within the boundaries of the "Central Business Districts"; - Industrial development; - Roofed Accommodation Development; and - Brownfield development. 7.3.5 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the County and an owner under s. 27 of the D.C.A. or as subsequently noted. D.C.s payable for residential development (other than rental housing, which are subject to payment in instalments) are payable upon the earlier of the issuance of an occupancy permit, or the day the building is first occupied. Rental housing and institutional developments will pay D.C.s in six (6) equal annual payments commencing at occupancy. The D.C. amount for all developments occurring within 18 months of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the lower of the D.C. in effect on the day the applicable Site Plan or Zoning By-law Amendment application was submitted (as a complete application), including interest, and the D.C. at current rates at the time the D.C. is calculated. Watson & Associates Economists Ltd. PAGE 7-6 Payments determined at the time of Site Plan or Zoning By-law Amendment application are subject to annual interest charges. The maximum interest rate the County can impose is the average prime rate plus 1%. 7.3.6 Indexing Rates shall be adjusted, without amendment to the By-law, annually on January 1, in accordance with the most recent twelve-month change for the Toronto series in the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0289-01).1 7.3.7 D.C. Spatial Applicability The D.C.A. historically has provided the opportunity for a municipality to impose municipal-wide charges or area specific charges. Subsections 2 (7) and 2 (8) of the D.C.A. provide that a D.C. by-law may apply to the entire municipality or only part of it and more than one D.C. by-law may apply to the same area. The D.C.A. now requires municipalities to consider the application of municipal-wide and area-specific D.C.s. Subsection 10 (2), clause (c.1) requires Council to consider the use of more than one D.C. by-law to reflect different needs from services in different areas. Most municipalities in Ontario have established uniform, municipal-wide D.C.s. When area- specific charges are used, it is generally to underpin master servicing and front-end financing arrangements for more localized capital costs. Based on the foregoing, it is proposed that uniform County-wide D.C.s be imposed for all services except water and wastewater services. D.C.s related to water and wastewater services will be imposed on an urban area basis. 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes It is recommended that the County's D.C. collections be contributed into eight (8) separate reserve funds, including: - Services Related to a Highway; - Fire Protection Services; - Parks and Recreation Services; - Library Services; - Ambulance Services; - Growth-related Studies; - Water Services; and - Wastewater Services. 7.4.2 By-law In-force Date The D.C. by-law is anticipated to be passed by Council on September 22, 2026, and to come into force on the following day, unless Council determines an alternative date for enactment. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-laws come into force (as per section 11 of O. Reg. 82/98). 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" Watson & Associates Economists Ltd. PAGE 7-8 "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" Adopt the D.C. approach to calculate the charges on a uniform municipal-wide basis for all services, except for water and wastewater services which will be imposed in the urban serviced area;" "Approve the capital project listing set out in Chapter 5 of the D.C. Background Study dated July 10, 2026, subject to further annual review during the capital budget process;" "Approve the D.C. Background Study dated July 10, 2026;" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix E." Watson & Associates Economists Ltd. Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 8. By-law Implementation 8.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.1 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution). It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT). 8.1.2 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the Watson & Associates Economists Ltd. PAGE 8-2 timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. Taxpayers in particular may have an interest, as any growth-related cost that is incurred that cannot be recovered from development charges (or other legislatively allowed cost recovery mechanisms) requires a separate funding source, which may often be the property tax base. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in municipal D.C. policy. Their primary concern is frequently with the quantum of the charge, G.F.A. exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 8.3 Implementation Requirements 8.3.1 Introduction Once the County has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the County Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given in one of the following ways: o by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice; o if in the clerk's opinion, a newspaper of sufficient circulation does not exist, by posting on the County's website; or o by personal service, fax, or mail to every owner of land in the area to which the by-law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the County must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: Watson & Associates Economists Ltd. PAGE 8-4 - a description of the general purpose of the D.C.s; - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The County must give one copy of the most recent pamphlet without charge to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the County Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The County is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the County Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of County Council to the OLT. Watson & Associates Economists Ltd. PAGE 8-5 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which may apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work, which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 8.3.7 Front-Ending Agreements The County and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the County to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use, which were contained in the Development Charges Act, 1989. Accordingly, the County assesses whether this mechanism is appropriate for its use, as part of funding projects prior to County funds being available, and as detailed in the County's Developer Front-end Funding and Reimbursement Policy (Policy GP-018). 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and Watson & Associates Economists Ltd. PAGE 8-6 - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the County is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 Schedule 1 Norfolk County Residential Growth Forecast Summary [1] Census undercount estimated at approximately 4.1%. Note: Population including the undercount has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add due to rounding. The buildout forecast refers to the buildout of the Norfolk County urban area and has been assessed for designated urban lands and servicing capacity. Source: Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings [2] Apartments [3] Other Total Households Equivalent Institutional Households 65,770 63,175 1,810 61,365 21,627 1,192 2,067 160 25,046 1,645 2.522 66,680 64,044 1,619 62,425 22,325 1,340 2,075 260 26,000 1,472 2.463 70,270 67,490 1,265 66,225 23,585 1,505 2,280 220 27,590 1,150 2.446 74,960 72,000 1,342 70,658 24,653 1,608 2,602 220 29,083 1,220 2.476 81,911 78,676 1,466 77,209 26,563 2,478 2,862 220 32,123 1,333 2.449 101,130 97,138 1,811 95,327 30,966 4,572 4,614 220 40,372 1,646 2.406 910 869 -191 1,060 698 148 8 100 954 -173 3,590 3,446 -354 3,800 1,260 165 205 -40 1,590 -322 4,690 4,510 77 4,433 1,068 103 322 0 1,493 70 6,951 6,676 124 6,551 1,910 870 260 0 3,040 113 26,170 25,138 469 24,669 6,313 2,964 2,012 0 11,289 426 Historical Forecast Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Buildout Mid 2021 Mid 2026 Mid 2036 Population (Including Census Undercount) [1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Incremental Mid 2026 - Mid 2036 Mid 2026 - Buildout Mid 2021 - Mid 2026 Mid 2011 - Mid 2016 Watson & Associates Economists Ltd. PAGE A-3 Schedule 2 Norfolk County Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Source: Watson & Associates Economists Ltd. 2026 - 2036 1,730 870 260 2,860 6,406 -147 6,259 124 6,383 2026 - Buildout 5,899 2,964 2,012 10,875 23,602 -1 23,601 469 24,070 2026 - 2036 180 0 0 180 465 -172 293 0 293 2026 - Buildout 414 0 0 414 1,069 -1 1,068 0 1,068 2026 - 2036 1,910 870 260 3,040 6,871 -319 6,552 124 6,676 2026 - Buildout 6,313 2,964 2,012 11,289 24,671 -2 24,669 469 25,138 Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Urban Rural Norfolk County Watson & Associates Economists Ltd. PAGE A-4 Schedule 3 Norfolk County Current Year Growth Forecast Mid-2021 to Mid-2026 Mid 2021 Population 67,490 Occupants of Units (2) 1,493 New Housing Units, multiplied by P.P.U. (3) 2.434 Mid 2021 to Mid 2026 gross population increase 3,634 3,634 Occupants of New Units 70 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Mid 2026 gross population increase 77 77 Change in Housing Units (4) 27,590 Unit Occupancy, multiplied by P.P.U. change rate (5) 0.029 Mid 2021 to Mid 2026 total change in population 799 799 Population Estimate to Mid 2026 72,000 Net Population Increase, Mid 2021 to Mid 2026 4,510 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.615 72% 1.871 Multiples (6) 1.973 7% 0.136 Apartments (7) 1.980 22% 0.427 Total 100% 2.434 [1] Based on 2021 Census custom database. [2] Based on Building permit/completion activity. (4) 2021 households taken from Statistics Canada Census. (5) Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-5 Schedule 4 Norfolk County 10-Year Growth Forecast Mid-2026 to Mid-2036 Mid 2026 Population 72,000 Occupants of Units (2) 3,040 New Housing Units, multiplied by P.P.U. (3) 2.260 Mid 2026 to Mid 2036 gross population increase 6,871 6,871 Occupants of New Units 113 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2026 to Mid 2036 gross population increase 124 124 Change in Housing Units (4) 29,083 Unit Occupancy, multiplied by P.P.U. change rate (5) -0.011 Mid 2026 to Mid 2036 total change in population -319 -319 Population Estimate to Mid 2036 78,676 Net Population Increase, Mid 2026 to Mid 2036 6,676 (1) Mid 2026 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.583 63% 1.623 Multiples (6) 1.758 29% 0.503 Apartments (7) 1.568 9% 0.134 one bedroom or less 1.368 two bedrooms or more 1.748 Total 100% 2.260 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2026 households based upon 2021 Census (27,590 units) + Mid 2021 to Mid 2026 unit estimate (1,493 units) = 29,083 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Population 2021 Population (67,490) + Mid 2021 to Mid 2026 estimated housing units to beginning of forecast period (1,493 x 2.434 = 3,634) + (70 x 1.1 = 77) + (27,590 x 0.029 = 799) = 72,000 Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 Schedule 5 Norfolk County Long-Term Growth Forecast Mid-2026 to Urban Buildout Mid 2026 Population 72,000 Occupants of Units (2) 11,289 New Housing Units, multiplied by P.P.U. (3) 2.185 Mid 2026 to Buildout gross population increase 24,671 24,671 Occupants of New Units 426 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2026 to Buildout gross population increase 469 469 Change in Housing Units (4) 29,083 Unit Occupancy, multiplied by P.P.U. change rate (5) 0.000 Mid 2026 to Buildout total change in population -2 -2 Population Estimate to Buildout 97,138 Net Population Increase, Mid 2026 to Buildout 25,138 (1) Mid 2026 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.583 56% 1.444 Multiples (6) 1.758 26% 0.462 Apartments (7) 1.568 18% 0.279 one bedroom or less 1.368 two bedrooms or more 1.748 Total 100% 2.185 [1] Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. [2] Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2026 households based upon 2021 Census (27,590 units) + Mid 2021 to Mid 2026 unit estimate (1,493 units) = 29,083 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Change occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Structural Type Persons Per Unit [1] (P.P.U.) % Distribution of Estimated Units [2] Weighted Persons Per Unit Average 2021 Population (67,490) + Mid 2021 to Mid 2026 estimated housing units to beginning of forecast period (1,493 x 2.434 = 3,634) + (70 x 1.1 = 77) + (27,590 x 0.029 = 799) = 72,000 Population Watson & Associates Economists Ltd. PAGE A-7 Schedule 6 Norfolk County Summary of Housing Units in Active Development Applications (Urban Area) [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Note: Vacant lands designated for residential includes opportunities in the Built-Up Area. Source: Derived from Norfolk County active development application data as of 2026, by Watson & Associates Economists Ltd. Singles & Semi- Detached Multiples [2] Apartments [3] Total Registered Not Built 185 45 0 230 % Breakdown 80% 20% 0% 100% Draft Plans Approved 1,235 1,908 1,202 4,345 % Breakdown 28% 44% 28% 100% Application Under Review 409 594 253 1,256 % Breakdown 33% 47% 20% 100% Vacant Lands Designated for Residential 4,070 417 557 5,044 % Breakdown 81% 8% 11% 100% Total 5,899 2,964 2,012 10,875 % Breakdown 54% 27% 19% 100% Stage of Development Density Type Watson & Associates Economists Ltd. PAGE A-8 Schedule 7 Norfolk County Historical Residential Building Permits Years 2016 to 2025 [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from building permit data for Norfolk County, by Watson & Associates Economists Ltd. Residential Building Permits Total 2016 287 44 0 331 2017 299 66 14 379 2018 183 77 0 260 2019 205 157 72 434 2020 208 95 29 332 Sub-total 1,182 439 115 1,736 Average (2016 - 2020) 236 88 23 347 % Breakdown 68.1% 25.3% 6.6% 100.0% 2021 533 53 28 614 2022 228 13 18 259 2023 117 0 33 150 2024 92 30 219 341 2025 98 7 24 129 Sub-total 1,068 103 322 1,493 Average (2021 - 2025) 214 21 64 299 % Breakdown 71.5% 6.9% 21.6% 100.0% 2016 - 2025 Total 2,250 542 437 3,229 Average 225 54 44 323 % Breakdown 69.7% 16.8% 13.5% 100.0% Year Singles & Semi Detached Multiples [1] Apartments [2] Watson & Associates Economists Ltd. PAGE A-9 Schedule 8a Norfolk County Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhomes and apartments in duplexes. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted[2] 1-5 - - 2.024 2.698 4.600 2.615 6-10 - - 1.821 2.667 4.158 2.565 (0.088) 11-15 - - 1.755 2.613 4.292 2.574 2.583 16-20 - - 1.821 2.554 3.737 2.440 2.583 21-25 - - 1.907 2.921 4.524 2.798 2.583 26-30 - - 1.882 2.671 3.778 2.698 30+ - 1.587 1.813 2.616 3.772 2.496 2.583 Total 1.000 1.608 1.834 2.634 3.924 2.528 Age of Multiples [1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted[2] 1-5 - - 1.684 - - 1.973 6-10 - - 1.818 - - 1.833 (0.032) 11-15 - - 1.533 2.000 - 1.700 1.758 16-20 - - 1.588 2.333 - 1.706 1.758 21-25 - - - - - 1.818 1.758 26-30 - - - - - 1.765 30+ - 1.300 1.956 2.520 - 1.963 1.758 Total 0.526 1.294 1.748 2.505 - 1.877 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.278 1.990 2.709 4.381 2.493 6-10 - - 1.857 2.599 4.158 2.492 11-15 - - 1.704 2.556 4.333 2.466 16-20 - 1.364 1.691 2.517 3.737 2.282 21-25 - 1.545 1.742 2.889 4.524 2.657 25-30 - 1.250 1.641 2.632 3.778 2.478 30+ 1.400 1.303 1.772 2.604 3.733 2.370 Total 1.379 1.312 1.780 2.616 3.888 2.400 Watson & Associates Economists Ltd. PAGE A-10 Schedule 8b Haldimand-Norfolk Census Division Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. [2] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Apartments [2] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted[2] 1-5 - 1.063 1.857 3.063 - 1.980 6-10 - - - - - - 11-15 - - - - - 1.267 1.568 16-20 - - 1.167 - - 1.238 1.568 21-25 - 1.273 - - - 1.500 1.568 26-30 - 1.286 1.737 - - 1.471 30+ 1.056 1.131 1.566 3.120 - 1.434 Total 0.962 1.144 1.582 3.195 - 1.465 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.316 1.962 2.928 4.842 2.694 6-10 - - 1.954 2.687 3.960 2.522 11-15 - 1.350 1.720 2.639 4.447 2.525 16-20 - 1.286 1.737 2.795 3.941 2.541 21-25 - 1.417 1.745 2.859 4.788 2.670 26-30 - 1.263 1.732 2.864 3.545 2.667 30+ 1.400 1.311 1.777 2.636 3.816 2.422 Total 1.556 1.311 1.793 2.688 3.973 2.479 Watson & Associates Economists Ltd. PAGE A-11 Schedule 9 Norfolk County Person Per Unit Structural Type and Age of Dwelling (2021 Census) 2.62 2.57 2.57 2.44 2.80 2.70 2.50 1.97 1.83 1.70 1.71 1.82 1.76 1.96 1.98 0.00 1.27 1.24 1.50 1.47 1.43 0.00 0.50 1.00 1.50 2.00 2.50 3.00 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Apartment P.P.U.s are based on the Haldimand-Norfolk Census Division Watson & Associates Economists Ltd. PAGE A-12 Schedule 10a Norfolk County Employment Forecast, 2026 to Buildout [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Note: Buildout refers to the urban area. Source: Watson & Associates Economists Ltd. Employment Mid 2011 63,175 0.022 0.044 0.057 0.117 0.070 0.311 0.055 0.365 1,360 2,810 3,627 7,383 4,440 19,620 3,445 23,065 16,810 Mid 2016 64,044 0.022 0.043 0.059 0.117 0.067 0.308 0.058 0.367 1,385 2,735 3,807 7,518 4,290 19,735 3,744 23,479 17,000 Mid 2026 72,000 0.023 0.045 0.059 0.118 0.069 0.313 0.055 0.368 1,624 3,228 4,245 8,487 4,964 22,548 3,973 26,521 19,320 Mid 2036 78,676 0.022 0.046 0.058 0.118 0.070 0.314 0.054 0.368 1,759 3,598 4,581 9,283 5,514 24,735 4,210 28,945 21,137 Buildout 97,138 0.022 0.046 0.054 0.119 0.073 0.315 0.055 0.370 1,968 4,465 5,234 11,549 7,139 30,355 5,382 35,737 25,890 Mid 2011 - Mid 2016 869 0.000 -0.002 0.002 0.001 -0.003 -0.002 0.004 0.002 25 -75 180 135 -150 115 299 414 190 Mid 2016 - Mid 2026 7,956 0.001 0.002 0.000 0.000 0.002 0.005 -0.003 0.002 239 493 438 969 674 2,813 229 3,042 2,320 Mid 2026 - Mid 2036 6,676 0.000 0.001 -0.001 0.000 0.001 0.001 -0.002 0.000 135 370 336 796 550 2,187 237 2,424 1,817 Mid 2026 - Buildout 25,138 0.000 0.001 -0.005 0.001 0.005 0.002 0.000 0.002 344 1,237 989 3,062 2,175 7,807 1,409 9,216 6,570 Mid 2011 - Mid 2016 174 0.000 0.000 0.000 0.000 -0.001 0.000 0.001 0.000 5 -15 36 27 -30 23 60 83 38 Mid 2016 - Mid 2026 796 0.000 0.000 0.000 0.000 0.000 0.001 0.000 0.000 24 49 44 97 67 281 23 304 232 Mid 2026 - Mid 2036 668 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 14 37 34 80 55 219 24 242 182 Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W. [1] Work at Home Industrial Commercial/ Population Related Total Employment (Including N.F.P.O.W.) Institutional N.F.P.O.W. [1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Watson & Associates Economists Ltd. PAGE A-13 Schedule 10b Norfolk County Employment and Gross Floor Area (G.F.A.) Forecast, 2026 to Buildout [1] Square meters Per Employee Assumptions Primary 279 Industrial 139 Commercial / Population Related 46 Institutional 65 [2] Primary industry includes agriculture and resource related employment. * Reflects Mid-2026 to buildout forecast period Note: Numbers may not add to totals due to rounding. Buildout refers to the urban area. Source: Watson & Associates Economists Ltd. Mid 2011 63,175 1,360 3,627 7,383 4,440 16,810 379,000 505,400 343,000 288,700 1,516,100 Mid 2016 64,044 1,385 3,807 7,518 4,290 17,000 386,000 530,500 349,200 279,000 1,544,700 Mid 2026 72,000 1,624 4,245 8,487 4,964 19,320 452,600 591,600 394,200 322,800 1,761,200 Mid 2036 78,676 1,759 4,581 9,283 5,514 21,137 490,200 638,400 431,200 358,600 1,918,400 Buildout 97,138 1,968 5,234 11,549 7,139 25,890 548,500 729,400 536,500 464,300 2,278,700 Mid 2011 - Mid 2016 869 25 180 135 -150 190 Mid 2016 - Mid 2026 7,956 239 438 969 674 2,320 66,600 61,100 45,000 43,800 216,500 Mid 2026 - Mid 2036 6,676 135 336 796 550 1,817 37,600 46,800 37,000 35,800 157,200 Mid 2026 - Buildout 25,138 344 989 3,062 2,175 6,570 95,900 137,800 142,300 141,500 517,500 Mid 2011 - Mid 2016 174 5 36 27 -30 38 Mid 2016 - Mid 2026 796 24 44 97 67 232 6,660 6,110 4,500 4,380 21,650 Mid 2026 - Mid 2036 668 14 34 80 55 182 3,760 4,680 3,700 3,580 15,720 Annual Average Primary [2] Industrial Commercial/ Population Related Institutional Total Incremental Change Industrial Commercial/ Population Related Institutional Total Period Population Employment Gross Floor Area in Square Meters (Estimated) [1] Primary Watson & Associates Economists Ltd. PAGE A-14 Schedule 10c Norfolk County Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square meters per employee assumptions: Primary 279 Industrial 139 Commercial / Population Related 46 Institutional 65 [2] Primary industry includes agriculture and resource related employment. [3] Employment Increase does not include No Fixed Place of Work. *Reflects 2026 to buildout forecast period Note: Numbers may not add to totals due to rounding. Buildout refers to the urban area. Source: Watson & Associates Economists Ltd. 2026 - 2036 - 43,900 31,800 33,600 109,300 1,515 2026 - Buildout - 131,100 130,300 136,400 397,800 5,843 2026 - 2036 37,600 2,900 5,200 2,200 47,900 302 2026 - Buildout 95,900 6,700 12,000 5,000 119,600 727 2026 - 2036 37,600 46,800 37,000 35,800 157,200 1,817 2026 - Buildout 95,900 137,800 142,300 141,500 517,500 6,570 Rural Norfolk County Urban Institutional G.F.A. S.M.[1] Total Non- Residential G.F.A. S.M. Employment Increase [3] Development Location Timing Primary G.F.A. S.M. [1],[2] Industrial G.F.A. S.M.[1] Commercial G.F.A. S.M.[1] Watson & Associates Economists Ltd. PAGE A-15 Schedule 11 Norfolk County Employment Categories by Major Employment Sector Note: Employment is classified by North American Industry Classification System (NAICS) Code. Source: Watson & Associates Economists Ltd. Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Comments Categories which relate to local land-based resources Categories which relate primarily to industrial land supply and demand Categories which relate primarily to population growth within the municipality NAICS Employment by industry Watson & Associates Economists Ltd. PAGE B-1 Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 Table B-1 Historical Level of Service Calculation Fire Protection Services - Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Teeterville - 3 bays 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 $600 $693 Vittoria, New 2009 - 5 bays 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 6,595 $600 $693 St. Williams, 1980 - 3 bays 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 $600 $693 Delhi, 1978 - 6 bays 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 6,642 $600 $693 Waterford, 1990 - 5 bays 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 5,592 $600 $693 Port Dover, 1991 - 5 bays 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 6,520 $600 $693 Langton, 1974 - 4 bays 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 3,681 $600 $693 Courtland, 1959 - 3 bays 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 4,466 $600 $693 Fairground New - 4 bays 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 7,287 $600 $693 Port Rowan, 1996 - 6 bays 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 6,958 $600 $693 Simcoe, 1973 - 6 bays 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 7,113 $600 $693 Delhi Administration Building (Fire's Share) - - - - - - - - - - 6,305 6,305 6,305 6,305 6,305 $600 $693 Total 64,494 64,494 64,494 64,494 64,494 64,494 64,494 64,494 64,494 64,494 70,799 70,799 70,799 70,799 70,799 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 1.0209 1.0208 1.0176 1.0136 1.0124 1.0070 0.9959 0.9837 0.9764 0.9647 1.0490 1.0224 1.0097 1.0015 0.9883 15 Year Average 2011 to 2025 Quantity Standard 1.0056 Quality Standard $693 Service Standard $697 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $697 Eligible Amount $4,652,304 Watson & Associates Economists Ltd. PAGE B-3 Table B-2 Historical Level of Service Calculation Fire Protection Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Delhi (Stn. 4,5,10,11) Pumper 5 5 5 5 5 5 3 3 3 3 3 3 3 3 3 $1,451,000 Pumper/Rescue - Stn 5 & 10 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,553,600 Tanker 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $1,451,000 Rescue Vehicle 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,453,800 Rehab Vehicle/Tow Vehicle - Stn 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Wildland Fire Vehicle - - - - - - - 1 1 1 1 1 1 1 1 $75,000 Air Trailer - - - - - - - - - - - - - - 1 $140,000 Nanticoke (Stn. 2, 3) Pumper/Tanker 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,507,900 Pumpers 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $1,451,000 Rescue Vehicle 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,453,800 Tanker 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,451,000 Off-Road Vehicles - Stn 2-ERV x1; Stn 3-Ranger x1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $63,600 Trailers - Stn 2 x1; Stn 3 x2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $9,200 Boat - Stn 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,400 Norfolk Township (Stn. 6, 7, 8, 9) Pumper 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $1,451,000 Tanker 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $1,451,000 Pumper/Tanker 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,507,900 Rescue Vehicle 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $1,453,800 Off-Road Vehicles - Stn 6-Ranger x1; Stn 8-Argo x1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 $63,800 Water/Rescue Tow Vehicles - Stn 9 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 $72,800 Trailers - Stn 6 x1; Stn9 x2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $9,200 Specialty Trailer/Ice Rescue - Stn 8 - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Boat - Stn 9 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $65,400 Simcoe (Stn. 1) & Administration Staff Vehicles 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $90,900 Pumpers 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,451,000 Aerial Ladder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,954,000 Rescue Vehicles 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,453,800 Tanker 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,451,000 Fire Safety Trailer Tow Vehicle 1 1 1 1 1 1 1 - - - - - - - - $90,900 Fire Safety Trailer - - - - - - - 1 1 1 1 1 1 1 1 $13,000 Watson & Associates Economists Ltd. PAGE B-4 Table B-2 (continued) Historical Level of Service Calculation Fire Protection Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Spare Pumpers 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $500,000 Decon Trailer - - - - - - - - - - - - - - 1 $180,000 Total 60 60 62 62 62 62 59 60 60 60 60 60 60 60 62 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15 Year Average 2011 to 2025 Quantity Standard 0.0009 Quality Standard $943,100 Service Standard $849 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $849 Eligible Amount $5,666,522 Watson & Associates Economists Ltd. PAGE B-5 Table B-3 Historical Level of Service Calculation Fire Protection Services - Small Equipment and Gear Number of Small Equipment and Gear Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Emergency Management Generator - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $127,200 Extrication Equipment 11 11 11 11 11 11 11 12 12 12 12 12 12 12 12 $89,900 Thermal Imaging Cameras 11 11 11 11 11 11 11 11 11 11 11 17 21 21 21 $9,000 Radio Towers (incl. equipment) 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $126,600 Water Rescue Suits 40 40 40 40 40 40 40 62 62 62 62 62 62 62 62 $1,600 Dry Hydrants 12 12 17 29 29 29 32 32 32 32 32 32 32 32 32 $50,000 SCBA 180 180 180 180 180 180 190 210 220 220 220 220 220 220 220 $10,000 SCBA Air Bottles (2 per pack) 360 360 360 360 360 360 420 420 420 420 420 420 420 420 420 $1,000 PPE (Helmet, Coat, & Pants) 242 242 242 242 242 242 254 254 254 254 254 254 254 254 254 $4,900 Pagers 242 242 242 242 242 242 254 260 260 260 260 260 260 260 260 $1,000 Portable Radios 160 160 160 160 160 160 160 170 170 170 170 170 170 170 170 $2,000 Air Filling Station - Stn 1, 2, 3, 4, 7, & 9 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 $81,900 Air Shelters with Accessories - - - - - - - - - - - - - - 2 $31,000 Drones - - - - - - - - - - - - - - 4 $30,000 Decon Packs/Field Decon (1 per Station) - - - - - - - - - - - - - - 12 $2,000 Gear Dryers (1 per Station) - - - - - - - - - - - 4 8 11 11 $11,000 Gear Extractors (1 per Station) - - - - - - - - - - - 4 8 11 11 $10,000 Equipment Extractors - - - - - - - - - - - - - - 2 $34,000 Fit Tester - - - - - - - - - - - - - - 1 $20,000 EV Suppression Equipment - - - - - - - - - - - - - - 3 $9,000 Gas Detectors 25 25 25 25 25 25 25 25 25 25 25 25 25 40 40 $2,000 RDC Inflatable Boat (1 per W/R Station) 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $6,000 Motorized Saws 38 38 38 38 38 38 38 38 38 38 38 38 38 38 38 $500 Gas Well Monitoring Equipment - - - - - - 6 6 6 6 6 6 8 8 8 $9,000 Mobile Radios 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 $2,000 Ladders - 35' 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 $5,000 Ladders - 24' 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 $2,000 Vent Fans 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 $8,000 Debifrillators 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 $3,000 R.I.T Bags 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 $5,000 Highrise Kits 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $5,000 Total 1,510 1,510 1,516 1,528 1,528 1,528 1,632 1,691 1,701 1,701 1,701 1,715 1,729 1,750 1,774 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.02 0.02 0.02 0.02 15 Year Average 2011 to 2025 Quantity Standard 0.0247 Quality Standard $5,492 Service Standard $136 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $136 Eligible Amount $905,666 Watson & Associates Economists Ltd. PAGE B-6 Table B-4 Historical Level of Service Calculation Parks and Recreation Services - Parkland Development Acres of Parkland Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Acre) Rural Wind-Del Park 30.05 30.05 30.05 30.05 30.05 30.05 30.05 30.36 30.36 30.36 30.36 30.36 30.36 30.36 30.36 $20,000 Swimming Pool Road Park 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 $20,000 Club House Road Parkland (woodlot) 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 $20,000 Norfolk Soccer Park 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 38.99 $20,000 Waterford Deer Park 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 20.02 $20,000 Teeterville Park 5.07 5.07 5.07 5.07 5.07 5.07 5.07 11.21 11.21 11.21 11.21 11.21 11.21 11.21 11.21 $20,000 De Cloet Forest Park - - - - - - - - - - - - - 55.84 55.84 $20,000 Delhi Trail Corridor 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 60.21 $20,000 Lynn Valley Trail Corridor 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 $20,000 Sunrise Trail Corridor 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 15.16 $20,000 Urban Fairgrounds Walsh 5.81 5.81 5.81 5.81 5.81 5.81 5.81 5.81 5.81 5.81 - - - - - $40,000 Percy Ryerse Park 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 2.89 $40,000 Oakwood Park 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 $40,000 Block AA Riverside Park 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 $40,000 Woodhouse Acres 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.49 1.49 1.49 1.49 1.49 1.49 1.49 1.49 $40,000 Vaughan Survey Park 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 $40,000 Murray Park 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 $40,000 Lingwood Park 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 $40,000 Ryerse Island Parkette 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 $40,000 Heritage Parkette 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 $40,000 Memorial Park 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 $40,000 St. Ladislaus 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 $40,000 AlligatorTug Waterway Park 4.20 4.20 4.20 4.20 4.20 4.20 4.20 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 $40,000 Brook Street Park 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 $40,000 Clifton Park (including Crescent Boulevard) 7.12 7.12 7.12 7.12 7.12 7.12 7.12 7.13 7.13 7.13 7.13 7.13 7.13 7.13 7.13 $40,000 Hill Street 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 $40,000 Holmewood Park 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 $40,000 Lynnwood Park 8.87 8.87 8.87 8.87 8.87 8.87 8.87 9.19 9.19 9.19 9.19 9.19 9.19 9.19 9.19 $40,000 Summit Circle 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 $40,000 Grant Anderson and Wellington Park 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 10.70 $40,000 Powell Park 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 $40,000 Kinsmen Park 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 18.45 $40,000 Audrey S Hellyer Park 4.82 4.82 4.82 4.82 4.82 4.82 4.82 7.53 7.53 7.53 7.53 7.53 7.53 7.53 7.53 $40,000 Courtland Park 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 13.52 $40,000 Langton Park 7.88 7.88 7.88 7.88 7.88 7.88 7.88 10.34 10.34 10.34 10.34 10.34 10.34 10.34 10.34 $40,000 Walsingham Community Park 5.14 5.14 5.14 5.14 5.14 5.14 5.14 5.45 5.45 5.45 5.45 5.45 5.45 5.45 5.45 $40,000 Houghton 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 $40,000 Port Rowan Optimist 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 $40,000 Port Rowan Community 9.24 9.24 9.24 9.24 9.24 9.24 13.61 13.61 13.61 13.61 13.61 13.61 13.61 13.61 13.61 $40,000 Bluegrass Estates 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 2.62 $40,000 Delhi Dog Park 1.98 1.98 1.98 1.98 1.98 1.98 1.98 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 $40,000 Watson & Associates Economists Ltd. PAGE B-7 Table B-4 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Parkland Development Acres of Parkland Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Acre) Gilbertville Parkland 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 $40,000 Quance Park 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 9.46 $40,000 Delhi Sports Park 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 9.48 $40,000 Centennial Park 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 $40,000 Delcrest Park 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.32 2.32 2.32 2.32 2.32 2.32 2.32 2.32 $40,000 Delhi Lions Park 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.86 1.86 1.86 1.86 1.86 1.86 1.86 1.86 $40,000 Memorial Park 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 $40,000 Big Creek Dr. Island Park 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 $40,000 Library Park 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 $40,000 Kinsmen Park 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42 $40,000 Sovereen Street Parkland 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 $40,000 Saint Williams Lions Park 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.27 6.27 6.27 6.27 6.27 6.27 6.27 6.27 $40,000 Turkey Point Park 2.50 2.50 2.50 2.50 2.50 2.50 2.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 3.50 $40,000 Thompson Memorial Park 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 5.07 $40,000 Lamport Park 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 $40,000 Bill's Corners Park 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 $40,000 Pinehurst Subdivision Park 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 2.97 $40,000 Oakes Subdivision Parkland 1.11 1.11 1.11 1.11 1.11 1.11 1.11 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 $40,000 Port Dover, lift bridge area Brant Hill Monument 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 $40,000 Historic Wintering Site, Don Jon Blvd., Port Dove 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 $40,000 Gulley Park (block 1), Port Dover (Woodlot) 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 $40,000 Gulley Park (block B), Port Dover (Woodlot) 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 $40,000 Green Belt (2 parts), St. George Street, Port Dov 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 0.44 $40,000 Denby Road & Green belt, Port Dover 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 3.24 $40,000 LynnPark Subdivision (nature trail) Port Dover (wo 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 $40,000 Port Rowan Lions 7.31 7.31 7.31 7.31 7.31 7.31 7.31 7.32 7.32 7.32 7.32 7.32 7.32 7.32 18.21 $40,000 Bank Lot 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 $40,000 Benson and Hedges Sports Park 7.98 7.98 7.98 7.98 7.98 7.98 7.98 17.98 17.98 17.98 17.98 17.98 17.98 17.98 17.98 $40,000 Fairview Heights Park 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.73 0.73 0.73 0.73 0.73 0.73 0.73 0.73 $40,000 Port Rowan Parkette 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 1.31 $40,000 Port Dover Baseball Diamond 3.19 3.19 3.19 3.19 3.19 3.19 3.19 $40,000 Don Shay Park 12.48 12.48 12.48 12.48 12.48 12.48 12.48 18.17 18.17 18.17 18.17 18.17 18.17 18.17 18.17 $40,000 Simcoe Bowling Green 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26 $40,000 Lions Ball Park 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 13.42 $40,000 Col Stalker Park Cedar St. 9.29 9.29 9.29 9.29 9.29 9.29 9.29 9.32 9.32 9.32 9.32 9.32 9.32 9.32 9.32 $40,000 Kinsmen Park and Splash Pad 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 3.68 $40,000 Lift Bridge Park 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 $40,000 Percy Carter Park 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 1.46 $40,000 Westwood Acres Park 4.99 4.99 4.99 4.99 4.99 4.99 4.99 14.59 14.59 14.59 14.59 14.59 14.59 14.59 14.59 $40,000 Evergreen Heights Park 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 2.05 $40,000 Golden Gardens Park 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 1.83 $40,000 Watson & Associates Economists Ltd. PAGE B-8 Table B-4 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Parkland Development Acres of Parkland Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Acre) Simson Park 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 $40,000 Freeman Park 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 $40,000 CrestLynn Park 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.22 3.22 3.22 3.22 3.22 3.22 3.22 3.22 $40,000 Briarwood Acres Park 3.58 3.58 3.58 3.58 3.58 3.58 3.58 3.59 3.59 3.59 3.59 3.59 3.59 3.59 3.59 $40,000 Ashton Park 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 $40,000 Waterworks 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 2.92 $40,000 Patterson Parkette 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 $40,000 Memorial Ball Diamond 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 7.59 $40,000 James St Horticulture Bed 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 $40,000 Waterford Bridge Parkette 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 $40,000 Waterford Downtown Parkette 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 $40,000 Bloomsberg Island Park 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 $40,000 Mill Pond Parkette 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 $40,000 Waterford Lions Park 0.35 0.35 0.35 0.35 0.35 0.35 0.35 4.43 4.43 4.43 4.43 4.43 4.43 4.43 4.43 $40,000 Waterford Centennial Park 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 4.03 $40,000 Shadow Lake Park (Incl. Blue Line Mill Parkette) 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 68.74 $40,000 Cottonwood St Park 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 0.69 $40,000 Lynndale Heights Park 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 8.13 $40,000 Port Rowan Community Park 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 1.93 $40,000 Cairn Parkette Port Rowan 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 $40,000 Harvest Glen Park 5.96 5.96 5.96 5.96 5.96 5.96 5.96 5.99 5.99 5.99 5.99 5.99 5.99 5.99 5.99 $40,000 Yin Park 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 2.74 $40,000 Somerset Park 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 9.24 $40,000 Pleasant Trail Park 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 3.21 $40,000 Inglewood Pond Park 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 $40,000 Port Dover Sportspark - 1.56 1.56 1.56 1.56 1.56 1.56 2.84 2.84 2.84 2.84 2.84 2.84 2.84 2.84 $40,000 Hawtrey Forest Park - - - - - - - - - 2.79 2.79 2.79 2.79 2.79 2.79 $40,000 Teeterville Park - - - - - - - - - - - - - - 0.40 $40,000 Total 588.36 589.92 589.92 589.92 589.92 589.92 594.29 637.23 637.23 640.02 634.21 634.21 634.21 690.05 701.34 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.010 0.010 0.010 0.009 0.009 0.009 0.010 0.010 15 Year Average 2011 to 2025 Quantity Standard 0.0094 Quality Standard $33,146 Service Standard $312 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $312 Eligible Amount $2,080,041 Watson & Associates Economists Ltd. PAGE B-9 Table B-5 Historical Level of Service Calculation Parks and Recreation Services - Parkland Amenities Number of Parkland Amenities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) SOCCER FIELDS Courtland Lions Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Langton Lions Athletic Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $220,000 Lynndale Heights Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Win-Del Park 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $220,000 McLaughlin Sports Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $220,000 Port Dover Lions 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Simcoe Youth Soccer Park 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $220,000 BALL DIAMONDS Wind-Del Community Park 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $220,000 Thompson Memorial Park, Vittoria 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 St. Williams Lions Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $220,000 Audrey S. Hellyer Ball Park - Waterford 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $220,000 Harry Misner Memerial Park - Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Port Dover Kinsmen Ball Park 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $220,000 Simcoe Lions Park 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $220,000 Stalker Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Courtland Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Langton Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Simcoe Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Walsingham 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Delhi Arena Diamond 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Delcrest Park, Delhi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Kinsmen Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 SKATEBOARD PARKS Port Rowan Skateboard Park - - - - 1 1 1 1 1 1 1 1 1 1 1 $250,000 Waterford Skateboard Park - - - - - - - - - - - - - - 1 $700,000 Port Dover Skateboard Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700,000 PLAYGROUNDS Wind-Del Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Delcrest Park, Delhi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Delhi Lion's Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $215,000 Pinehurst Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $158,000 Turkey Point Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Thompson Memorial Park, Vittoria 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Fairview Heights Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $154,000 Lynndale Heights Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $102,000 Kinsmen Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $123,300 Watson & Associates Economists Ltd. PAGE B-10 Table B-5 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Parkland Amenities Number of Parkland Amenities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Golden Gardens 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $215,000 Stalker Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Crestlynn Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Teeterville Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $50,000 Bills Corners 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Courtland Lions 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Kinsmen Park, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 St. Williams Lions 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,000 Lakeview Park, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $128,438 Oakwood, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $128,438 Woodhouse Acres, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,000 Waterford Lions 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Ashton, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Briarwood, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Evergreen Heights, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Patterson, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Simson, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Waterworks, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Wellington, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $121,000 Westwood Acres, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $265,000 Yin Park, Waterford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Freeman Crescent, Simcoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Bluegrass Estates 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,000 Port Rowan Watertower Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Simcoe Lions Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 COURTS Lit Tennis / Pickleball Thompson Memorial Park, Vittoria 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $143,850 Waterford (50/50 with high school single court) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Langton 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $119,875 Courtland 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $250,000 Port Rowan 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $250,000 Turkey Point Park - - - - - - - - - - - - - - 2 $88,000 Talbot - Percy Carter 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $250,000 Port Dover Sports Park 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $225,000 Unlit Tennis / Pickleball Wind-Del Community Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $200,000 St. Williams Lions Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $200,000 Pinehurst Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $359,625 Watson & Associates Economists Ltd. PAGE B-11 Table B-5 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Parkland Amenities Number of Parkland Amenities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Stalker Park 2 2 2 - - - - - - - - - - - - $100,000 Westwood Acres 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $359,625 Audrey S. Hellyer Park - 2 Courts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $359,625 Crestlynn Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $135,000 Volleyball Court Turkey Point Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,375 Win-Del Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,375 Port Rowan Optimist Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,375 Basketball Lynndale Heights 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Lingwood 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $128,438 Thorncliffe Park Briarwood 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,000 Percy Carter Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Delhi Lion's Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Turkey Point Park - Courts - - - - - - 1 1 1 1 1 1 1 1 1 $50,000 Fairview Park, Delhi - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 Delcrest Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $256,875 WATER PLAY FACILITIES Delhi Kinsmen Pool and Splash Pad 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,651,250 Simcoe Kinsmen Splash Pad 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $125,000 DOG PARKS Audrey S. Hellyer Park, Waterford - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $30,825 Port Dover Kinsmen Park - - - - - - - - - - - 1 1 1 1 $30,825 Port Rowan Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $30,825 SPECIAL FACILITIES Delhi Delhi Community Centre Arena Pavilion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $328,800 Picnic Pavilion, Quance Property 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Storage Building, Quance Property 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Storage Building McLaughlin Sports Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $600,000 Refreshment Booth/Comfort Station, Vittoria 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Dressing Rooms, McLaughlin Sports Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,431,800 Storage Building, Thompson Park, Vittoria 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Watson & Associates Economists Ltd. PAGE B-12 Table B-5 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Parkland Amenities Number of Parkland Amenities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Picnic Pavilion, Vittoria Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Dressing Rooms, Win'dell Park, Windham Centre 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,000,000 Storage Building, Win'dell Park, Windham Centre 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Storage and P.A. Booth, Win'dell Park, Windham Centre 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Storage/Washrooms/Pavilion/Refr eshment Booth, St. Williams Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $750,000 Baseball Scoreboards 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 $15,000 Picnic Pavillion Turkey Point 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $411,000 Memorial Park Gazebo, Delhi - - - - - - - - - - - - 1 1 1 $150,000 Norfolk Workshop/Daycare, Langton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,500,000 Changeroom, Langton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Picnic Pavilion, Langton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $154,125 Washrooms/Changeroom, Courtland 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Pavilion, Courtland 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Picnic Pavilion, Port Rowan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Washrooms, Lion's Park, Port Rowan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Washrooms/Changeroom, Walsingham 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Nanticoke Beach Washrooms, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Storage Building, Arena Park, Port Dover 1 1 1 - - - - - - - - - - - - $150,000 Batting Cage, Kinsmen Park, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Parks Department Storage Building, Waterford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Gazebo Lions Park, Waterford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Bandshell Powell Park, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $51,375 Port Dover Kinsmen Pavilion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $222,659 Elmer Lewis Parkette, Port Dover 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Simcoe Lighthouse, Norfolk Street 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Storage Building, Colborne Street 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Fountain, Wellington Park 1 1 1 - - - - - - - - - - - - $36,300 Watson & Associates Economists Ltd. PAGE B-13 Table B-5 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Parkland Amenities Number of Parkland Amenities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Equipment Storage, Pond Street 1 1 1 1 1 1 1 1 1 1 1 1 1 - - $437,100 Storage/Bleachers, Lion's Park, Davis Street 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $240,000 Picnic Pavilion, Lion's Park, Davis Street 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Chapel 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $400,000 Windmill 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Picnic Pavilion, Kinsmen Park, Talbot Street North 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,275 Lawn Bowling Clubhouse and Storage 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700,000 Batting Cage Simcoe Lion's Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Batting Cage Simcoe Memorial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Additional Infrastructure Optimst Park Rowan Pavilion - - - - - - - - - - - - 1 1 1 $150,000 Tourist Booth, Port Rowan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $250,000 Washroom Trailer - - - - - - 1 1 1 1 1 1 1 1 1 $125,000 Wind-Del Park Disc Golf Course - - - - - - - - - - - - - - 1 $50,000 Total 169 170 171 167 168 168 170 170 170 170 170 171 173 172 176 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.002 0.003 15 Year Average 2011 to 2025 Quantity Standard 0.0026 Quality Standard $253,715 Service Standard $660 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $660 Eligible Amount $4,403,890 Watson & Associates Economists Ltd. PAGE B-14 Table B-6 Historical Level of Service Calculation Parks and Recreation Services - Trails Linear KM of Trails Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/ Linear Kilometre) Total Trail Network 39.20 39.20 39.20 39.20 39.20 39.20 39.20 58.30 58.30 58.30 58.30 58.30 58.30 58.30 61.30 $150,000 Total 39 39 39 39 39 39 39 58 58 58 58 58 58 58 61 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 15 Year Average 2011 to 2025 Quantity Standard 0.0007 Quality Standard $159,571 Service Standard $112 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $112 Eligible Amount $745,709 Watson & Associates Economists Ltd. PAGE B-15 Table B-7 Historical Level of Service Calculation Parks and Recreation Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Licensed Vehicles Lowbed 3 3 3 3 3 3 3 3 3 3 3 3 3 5 5 $140,000 Pick-up Trucks 1 1 1 2 2 4 4 4 6 6 6 6 7 7 7 $60,000 SUV - - - - - - - - - - - - - - 2 $40,000 Trailers 8 8 8 8 8 9 10 10 10 10 10 10 10 11 13 $15,000 Vans - - - - - 1 1 1 1 1 1 1 1 1 1 $40,000 Unlicensed Equipment Backhoe 1 1 1 1 1 1 2 2 2 1 1 1 1 1 1 $260,000 Chippers - - - - - - - - - - - 1 1 1 1 $105,000 Fork Lifts 1 1 1 1 1 1 - - - - - - - - - $100,000 Graders 1 1 1 1 1 1 1 1 - - - - - - - $260,000 Ice Resurfacer 6 6 6 6 6 6 6 6 6 6 5 5 5 5 5 $220,000 Motors - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000 Mowers 8 7 8 10 12 11 11 12 12 14 14 13 15 16 16 $45,000 Sweeper 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 $100,000 Tractors 10 9 9 9 8 6 7 7 5 5 5 8 9 9 9 $55,000 UTV - - - 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Total 40 39 40 44 45 46 48 49 48 49 49 51 54 58 62 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 15 Year Average 2011 to 2025 Quantity Standard 0.0007 Quality Standard $78,571 Service Standard $55 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $55 Eligible Amount $367,180 Watson & Associates Economists Ltd. PAGE B-16 Table B-8 Historical Level of Service Calculation Parks and Recreation Services - Recreation Facilities Sq.ft. of Facility Space Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Arenas & Equipment Delhi Community Centre and Arena, 1987 59,326 59,326 59,326 59,326 59,326 59,326 59,326 59,326 59,326 59,326 59,326 59,326 59,326 61,735 61,735 $499 $524 Arena Tricenturena Waterford Church St., rebuilt 2003 62,100 62,100 62,100 62,100 62,100 62,100 62,100 62,100 62,100 62,100 62,100 62,100 62,100 64,023 64,023 $501 $526 Arena Port Dover St. George St. 55,732 55,732 55,732 55,732 55,732 55,732 55,732 55,732 55,732 55,732 55,732 55,732 55,732 58,029 58,029 $503 $528 Arena, Langton 33,662 33,662 33,662 33,662 33,662 33,662 33,662 33,662 33,662 33,662 33,662 33,662 33,662 35,010 35,010 $567 $596 Simcoe Recreation Centre, 1972, 1978, 2012 64,850 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 65,314 $870 $914 Talbot Gardens, 1947, 1993 (Simcoe) 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 70,337 $508 $534 Community Centres Charlotteville Community Hall/ Walsh Community Hall (1865) 4,718 4,718 4,718 4,718 4,718 4,718 4,718 4,718 4,718 4,718 4,718 4,718 4,718 - - $952 $1,050 Community Centre - Courtland, 1994 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 6,580 $952 $1,050 Courtland Scout Hall 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 4,690 $952 $1,050 Delhi Senior Citizens Centre/ Frienship Centre 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 3,969 $952 $1,050 Community Centre - Langton, 1965, 1967, 1993 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 8,967 $952 $1,050 Langton Workshop & Daycare 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 $952 $1,050 Community Centre - P.D. Lions St. George St. hall/kitchen/common space 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 14,905 $952 $1,050 Community Centre - P.D. Kinsmen Scout hall/kitchenette 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 1,599 $929 $1,024 Community Centre - P.D. Kinsmen clubhouse meeting room/kitchenette 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 1,468 $526 $579 Community Centre - Port Rowan, 1955 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 11,168 $952 $1,050 Community Centre - Walsingham, 1863 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 2,342 $952 $1,050 St. Williams and Area Community Centre, reconstructed 1997 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 4,277 $952 $1,050 Women's Institute Hall Teeterville 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 4,399 $952 $1,050 Vittoria & District Community Centre, 1988 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 10,904 $952 $1,050 Vittoria & District Community Centre, 2009 Expansion 673 673 673 673 673 673 673 673 673 673 673 673 673 673 673 $952 $1,050 Vittoria Town Hall, 1870 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 2,527 $952 $1,050 Community Centre - Waterford Lions Church St. 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 6,712 $952 $1,050 Adult Community Centre (Simcoe) - VACANT 27,648 27,648 27,648 27,648 27,648 27,648 27,648 27,648 27,648 27,648 27,648 27,648 - - - $159 $175 Watson & Associates Economists Ltd. PAGE B-17 Table B-8 (Continued) Historical Level of Service Calculation Parks and Recreation Services - Recreation Facilities Sq.ft. of Facility Space Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Pools Delhi Kinsmen Pool 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 3,664 $842 $884 Fieldhouses Courtland 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 $265 $292 Delhi Sports Park 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 $265 $292 McLauglin Sports Park, Delhi 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 6,525 $265 $292 Langton Arena 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $265 $292 Simcoe Memorial Park 916 916 916 916 916 916 916 916 916 916 916 916 916 916 916 $265 $292 Simcoe Lions Park 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 1,342 $265 $292 St. Williams 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 $265 $292 Thompson Park, Vittoria 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 2,130 $265 $292 Walsingham 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $265 $292 Win-Del Park 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 2,103 $265 $292 Total 491,233 491,697 491,697 491,697 491,697 491,697 491,697 491,697 491,697 491,697 491,697 491,697 464,049 467,308 467,308 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 7.7757 7.7824 7.7578 7.7279 7.7188 7.6774 7.5928 7.4995 7.4438 7.3546 7.2854 7.1002 6.6183 6.6102 6.5234 15 Year Average 2011 to 2025 Quantity Standard 7.3645 Quality Standard $666 Service Standard $4,903 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $4,903 Eligible Amount $32,730,759 Watson & Associates Economists Ltd. PAGE B-18 Table B-9 Historical Level of Service Calculation Library Services - Facilities Square Feet of Building Area Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Delhi 6,172 6,172 6,172 6,172 6,172 6,172 9,211 9,211 9,211 9,211 9,211 9,211 9,211 9,211 9,211 $900 $1,087 Waterford 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 6,982 $900 $1,087 Port Dover 4,320 4,320 4,320 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 $900 $1,087 Port Rowan 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 4,073 $900 $1,087 Simcoe 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 26,136 $900 $1,087 Total 47,683 47,683 47,683 52,163 52,163 52,163 55,202 55,202 55,202 55,202 55,202 55,202 55,202 55,202 55,202 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.7548 0.7547 0.7523 0.8198 0.8189 0.8145 0.8524 0.8420 0.8357 0.8257 0.8179 0.7971 0.7873 0.7808 0.7706 15 Year Average 2011 to 2025 Quantity Standard 0.8016 Quality Standard $1,087 Service Standard $871 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $871 Eligible Amount $5,817,333 Watson & Associates Economists Ltd. PAGE B-19 Table B-10 Historical Level of Service Calculation Library Services - Collection Materials No. of Collection Materials Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Books 158,221 171,469 131,335 148,120 137,272 125,406 115,018 116,247 115,859 102,113 108,923 96,137 115,309 112,222 104,593 $24 Audio/Visual 10,501 19,021 11,381 13,445 13,044 15,820 16,309 16,126 16,098 17,354 15,080 14,577 15,056 14,866 16,744 $29 Periodicals 4,663 4,663 4,663 4,492 3,403 4,084 4,288 4,016 3,335 2,791 2,382 2,246 2,042 1,872 3,097 $8 Database Subscriptions 7 7 10 10 10 36 26 28 31 45 45 48 46 51 48 $2,825 Catalogue Expense 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $17,396 E-Books & E-Audiobooks 2,487 2,542 2,599 2,657 2,716 2,776 2,838 2,901 2,965 3,031 3,099 3,167 3,238 3,439 3,439 $44 Total 175,880 197,703 149,989 168,725 156,446 148,123 138,480 139,319 138,289 125,335 129,530 116,176 135,692 132,451 127,922 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 2.784 3.129 2.367 2.652 2.456 2.313 2.138 2.125 2.094 1.875 1.919 1.678 1.935 1.874 1.786 15 Year Average 2011 to 2025 Quantity Standard 2.2082 Quality Standard $25 Service Standard $56 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $56 Eligible Amount $371,653 Watson & Associates Economists Ltd. PAGE B-20 Table B-11 Historical Level of Service Calculation Ambulance Services - Facilities Sq.ft. of Facilities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2018 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. Culver Street, Simcoe 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 3,432 $280 $662 New Station, Delhi 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 $280 $662 Port Rowan - Hwy #59 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 2,969 $280 $662 Firehall, Langton 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 1,252 $280 $662 Port Dover Base 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 2,960 $280 $662 Firehall, Waterford 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 2,138 $280 $662 Delhi Administration Building (Ambulance's Share) - - - - - - - - - - 5,019 5,019 5,019 5,019 5,019 $280 $662 Total 15,091 15,091 15,091 15,091 15,091 15,091 15,091 15,091 15,091 15,091 20,110 20,110 20,110 20,110 20,110 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.239 0.239 0.238 0.237 0.237 0.236 0.233 0.230 0.229 0.226 0.298 0.290 0.287 0.285 0.281 15 Year Average 2011 to 2025 Quantity Standard 0.2522 Quality Standard $662 Service Standard $167 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $167 Eligible Amount $1,114,692 Watson & Associates Economists Ltd. PAGE B-21 Table B-12 Historical Level of Service Calculation Ambulance Services - Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Ambulances Type 3 with Stretcher 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 $390,000 Other Vehicles Remote Access Vehicle 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $170,000 Remote Access Vehicle Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $20,000 Emergency Response Vehicle - Command - - - - - - 1 1 1 1 1 1 1 1 1 $140,000 Emergency Response Vehicle - Responder - - - - - - - - - - - - - - 2 $140,000 Emergency Response Vehicle - Responder (Duty Officer) 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 $155,000 Emergency Support Vehicle - Support (Mass Casualty) - - - - - - - - - 1 1 2 2 2 2 $140,000 Golf Cart 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $56,000 Equipment Equipment (per Uniformed Paramedic) 77 81 84 88 91 95 98 98 98 98 99 99 99 104 111 $1,200 Defibrillator 15 15 15 15 15 15 15 15 15 15 19 19 19 19 19 $40,000 Total 109 113 116 120 123 127 131 132 132 133 138 139 139 144 153 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 15 Year Average 2011 to 2025 Quantity Standard 0.0019 Quality Standard $48,021 Service Standard $91 D.C. Amount (before deductions) 10 Year Forecast Population 6,676 $ per Capita $91 Eligible Amount $609,118 Watson & Associates Economists Ltd. PAGE B-22 Table B-13 Historical Level of Service Calculation Services Related to a Highway - Roads Lane KM of Roads Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/km) Arterial - Rural Surface Treated - 2 lanes 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 180.55 $485,109 Asphalt - 2 lanes 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 761.26 $611,787 Asphalt - 3 lanes 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 $504,224 Arterial - Semi-urban Surface Treated - 2 lanes 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 4.42 $1,179,232 Asphalt - 2 lanes 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 61.84 $1,108,396 Asphalt - 3 lanes 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 2.03 $749,443 Arterial - Urban Asphalt - 2 lanes 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 71.39 $894,985 Asphalt - 3 lanes 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 1.16 $843,819 Asphalt - 4 lanes 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 39.40 $722,755 Asphalt - 5 lanes 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.74 $633,247 Collector - Rural Surface Treated - 2 lanes 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 6.15 $491,817 Asphalt - 2 lanes 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 15.89 $629,908 Collector - Semi-urban Asphalt - 2 lanes 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 $1,149,910 Collector - Urban Asphalt - 2 lanes 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 43.27 $828,550 Asphalt - 4 lanes 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 $745,233 Total 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 1,192 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 15 Year Average 2011 to 2025 Quantity Standard 0.0180 Quality Standard $650,763 Service Standard $11,714 D.C. Amount (before deductions) Buildout Forecast Population 25,138 $ per Capita $11,714 Eligible Amount $294,459,745 Watson & Associates Economists Ltd. PAGE B-23 Table B-14 Historical Level of Service Calculation Services Related to a Highway - Bridges and Culverts Number of Bridges and Culverts Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Bridges 125 124 124 124 124 124 124 124 124 124 124 124 124 124 124 $1,200,300 Culverts 116 115 115 115 115 115 115 115 115 115 115 115 115 115 115 $401,300 Pedestrian Bridges 18 18 18 18 18 18 18 18 18 18 18 19 19 19 19 $438,000 Total 259 257 257 257 257 257 257 257 257 257 257 258 258 258 258 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.0041 0.0041 0.0041 0.0040 0.0040 0.0040 0.0040 0.0039 0.0039 0.0038 0.0038 0.0037 0.0037 0.0036 0.0036 15 Year Average 2011 to 2025 Quantity Standard 0.0039 Quality Standard $787,659 Service Standard $3,072 D.C. Amount (before deductions) Buildout Forecast Population 25,138 $ per Capita $3,072 Eligible Amount $77,220,668 Watson & Associates Economists Ltd. PAGE B-24 Table B-15 Historical Level of Service Calculation Services Related to a Highway - Public Works Facilities Sq.ft. of Public Works Facilities Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Bld'g Value ($/sq.ft.) Value/sq.ft. with FF&E, site works, etc. 3090 Highway 59 (13.89 acres) Sand Dome 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 $100 $110 Salt Dome 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 $100 $110 1630 County Road 45 (13.29 acres) Admin/Operations Bldg 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 13,440 $600 $662 4329 Highway 59 (12.12 acres) Admin/Operations Bldg 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 4,587 $500 $551 Storage Dome 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 8,200 $100 $110 340 Argyle Ave (2.28 acres) Admin/Operations Bldg 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 8,027 $600 $662 Storage Building 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 $100 $110 Storage Dome 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 6,700 $100 $110 568 Queensway West (9.92 acres) Salt Dome 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 7,800 $100 $110 Salt Dome 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 2,900 $100 $110 8 Schellburg Ave (2.96 acres) Admin/Operations Bldg 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 17,506 $600 $662 Salt Dome 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 $100 $110 Storage Building 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 1,630 $100 $110 984 Charlotteville Rd 7 (1.17 acres) Salt Dome 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $100 $110 591 Norfolk Street S (9.64 acres) Admin/Operations Bldg 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 $600 $662 Storage Bldg 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 $100 $110 Storage Bldg 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 $100 $110 Storage Bldg 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $100 $110 Salt Dome 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 $100 $110 Salt Dome 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 $100 $110 1355 Thompson Rd (2.94 acres) Admin/Operations Bldg 4,000 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 7,969 $600 $662 Storage Bldg 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 $100 $110 Storage Bldg 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 $100 $110 Salt Dome 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 6,200 $100 $110 474 Concession 5 Townsend (10.16 acres) Salt Dome 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $100 $110 Salt Shed 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $100 $110 Total 142,690 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 146,659 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 2.2586 2.3213 2.3139 2.3050 2.3023 2.2899 2.2647 2.2369 2.2203 2.1937 2.1730 2.1178 2.0917 2.0745 2.0473 15 Year Average 2011 to 2025 Quantity Standard 2.2141 Quality Standard $315 Service Standard $697 D.C. Amount (before deductions) Buildout Forecast Population 25,138 $ per Capita $697 Eligible Amount $17,524,957 Watson & Associates Economists Ltd. PAGE B-25 Table B-16 Historical Level of Service Calculation Services Related to a Highway - Public Works Vehicles and Equipment Number of Vehicles and Equipment Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/Vehicle) Licensed Vehicles Asphalt Hotbox - - - - - - - - - - - - - 2 2 $60,000 Float 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $60,000 Lowbed - - - - 2 2 2 2 2 5 5 8 8 10 11 $180,000 Pick-up Trucks 1 1 1 1 2 3 3 3 7 10 13 17 24 27 27 $60,000 Single Axle - - 2 3 3 3 3 3 3 7 7 7 7 7 10 $405,000 Speed Camera - - - - - - - - 1 1 1 1 1 1 1 $15,000 Sweeper - 1 1 1 1 1 1 2 2 2 2 3 3 3 3 $580,000 Tandem Axle 17 17 17 17 18 19 19 19 19 19 23 25 23 21 29 $460,000 Trailers 1 1 1 1 1 2 2 2 2 2 2 2 2 2 4 $15,000 Unlicensed Equipment Backhoe 5 4 4 3 3 4 4 5 5 5 5 4 5 5 5 $260,000 Chip Spreader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Chippers 6 5 5 4 3 3 3 3 3 3 3 4 4 4 4 $105,000 Choppers - - - - - 1 1 1 2 2 2 3 4 4 5 $600,000 Graders 7 7 7 8 8 6 6 6 5 5 5 6 5 5 5 $300,000 Loaders 12 11 11 12 12 11 12 14 16 16 13 11 10 10 10 $300,000 Rollers 5 5 5 4 4 2 2 2 2 2 2 2 2 2 2 $200,000 Tractors 2 1 1 1 1 1 1 1 1 1 2 2 1 1 1 $200,000 Widener 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $95,000 Total 59 57 59 59 62 62 63 67 74 84 89 99 103 108 123 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.0009 0.0009 0.0009 0.0009 0.0010 0.0010 0.0010 0.0010 0.0011 0.0012 0.0013 0.0014 0.0015 0.0015 0.0017 15 Year Average 2011 to 2025 Quantity Standard 0.0012 Quality Standard $280,992 Service Standard $337 D.C. Amount (before deductions) Buildout Forecast Population 25,138 $ per Capita $337 Eligible Amount $8,476,282 Watson & Associates Economists Ltd. PAGE B-26 Table B-17 Historical Level of Service Calculation Services Related to a Highway - Sidewalks KM of Sidewalks Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/km) Arterial Roads 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 $150,000 Collector Roads 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 $150,000 Total 88 88 88 88 88 88 88 88 88 88 88 88 88 88 88 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0014 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0012 15 Year Average 2011 to 2025 Quantity Standard 0.0013 Quality Standard $153,900 Service Standard $200 D.C. Amount (before deductions) Buildout Forecast Population 25,138 $ per Capita $200 Eligible Amount $5,029,360 Watson & Associates Economists Ltd. PAGE B-27 Table B-18 Historical Level of Service Calculation Services Related to a Highway - Traffic Signals Number of Traffic Signals Description 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Value ($/item) Full Signals 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 $250,000 Intersection Pedestrian Signals 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 $175,000 Overhead Pedestrian Crossing - - - - - - - - - 3 3 6 6 6 6 $110,000 Total 31 31 31 31 31 31 31 31 31 34 34 38 38 38 38 Population 63,175 63,181 63,381 63,626 63,701 64,045 64,758 65,564 66,055 66,856 67,491 69,251 70,116 70,695 71,636 Per Capita Standard 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15 Year Average 2011 to 2025 Quantity Standard 0.0005 Quality Standard $239,740 Service Standard $120 D.C. Amount (before deductions) Buildout Forecast Population 25,138 $ per Capita $120 Eligible Amount $3,013,292 Watson & Associates Economists Ltd. PAGE C-1 Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 Appendix C: Long-Term Capital and Operating Cost Examination As a requirement of the D.C.A., as amended, under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the development charge. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the County's 2024 Financial Information Return. In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the reinvestment rate method, which estimates an annual lifecycle funding amount based on the expected useful life of an asset and any capital renewal needs throughout its useful life. It is assumed that this annual lifecycle funding amount will be contributed annually and invested so that those funds will cover the capital lifecycle costs associated with the asset. Table C-1 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while County program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Watson & Associates Economists Ltd. PAGE C-3 Table C-1 Norfolk County Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE INCREMENTAL OPERATING EXPENDITURES INCREMENTAL LIFECYCLE EXPENDITURES TOTAL ANNUAL EXPENDITURES Services Related to a Highway 4,906,506.99 8,076,686 12,983,193 Fire Protection Services 980,937.61 396,995 1,377,933 Parks and Recreation Services 1,285,438.91 1,001,420 2,286,859 Library Services 285,881.47 154,883 440,764 Ambulance Services 7,058,755.66 54,639 7,113,395 Water Services 1,904,858.66 4,036,467 5,941,325 Wastewater Services 1,909,226.59 2,722,764 4,631,991 Total $18,331,606 $16,443,854 $34,775,459 Watson & Associates Economists Ltd. PAGE D-1 Appendix D Asset Management Plan Watson & Associates Economists Ltd. PAGE D-2 Appendix D: Asset Management Plan The recent changes to the Development Charges Act, 1997, as amended (D.C.A.) (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset throughout its entire lifecycle. For growth-related works, the majority of initial capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be maintenance costs to extend the life of the asset along with additional program- related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which were to be completed by 2022 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE D-3 Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE D-4 made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Commensurate with the above, the County prepared an A.M.P. in 2025 for its existing assets; with a high level consideration of future growth-related assets for services included in the D.C. calculations. To ensure legislative compliance and complement the existing A.M.P. review, the asset management requirement for the D.C. is separately provided below. In recognition of the schematic above, the following table (presented in 2026$) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, the present infrastructure gap and associated funding plan have not been considered in the analysis below. Therefore, the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that may require financing from municipal financial resources (i.e., taxation, rates, fees, etc.) has been presented as an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2026 D.C. capital works have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total incremental annual expenditures are approximately $70.02 million. The share of these expenditures related to the growth component of the infrastructure is approximately $41.41 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are estimated at approximately $56.14 million. This amount, combined with the existing operating revenues of $295.05 million, will provide annual revenues of $351.19 by the end of the period. Watson & Associates Economists Ltd. PAGE D-5 6. In consideration of the above, the capital plan is deemed to be financially sustainable, as shown in Table D-1. Table D-1 Norfolk County Asset Management - Future Expenditures and Associated Revenues 2026$ Asset Management - Future Expenditures and Associated Revenues Total Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 28,616,634 Annual Debt Payment on Post Period Capital2 6,632,027 Lifecycle: Annual Lifecycle - Municipal-wide Services 9,684,623 Annual Lifecycle - Urban Services 6,759,231 Incremental Operating Costs (for D.C. Services) $18,331,606 Total Expenditures $70,024,121 Revenue (Annualized) Total Existing Revenue3 $295,052,707 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $56,136,484 Total Revenues $351,189,191 3 As per Sch. 10 of FIR 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE E-1 Appendix E Draft Development Charges By-law Watson & Associates Economists Ltd. PAGE E-2 The Corporation of Norfolk County By-Law 2026-XX Being a By-Law respecting Development Charges on Lands within The Corporation of Norfolk County. WHEREAS section 2(1) of the Development Charges Act, 1997, S.O. 1997, Chapter 27 (hereinafter may be referred to as "the Act") authorizes municipalities to pass a by-law for the imposition of development charges against land to pay for increased capital costs required because of increased needs for services arising from development of the area to which this by-law applies; AND WHEREAS Norfolk County, as required by Section 10 of the Act, has undertaken and completed a development charge background study regarding the anticipated amount, type and location of development; the increase in needs for services, estimated capital costs to provide for such increased needs, including the long term capital and operating costs for capital infrastructure required for the services; AND WHEREAS as required by Section 11 of the Act this By-law is being enacted within one year of the July 2026 completion of the said Development Charge Background Study, titled " Norfolk County 2026 Development Charges Background Study," dated July 10, 2026 prepared by Watson & Associates Economists Ltd. and has been made available to the public at least two weeks prior to the public meeting; AND WHEREAS the Council of Norfolk County, at its meeting of has adopted the September 22, 2026 Development Charges Background Study, as amended; AND WHEREAS in advance of passing this By-law the Council of Norfolk County has given notice of and held a public meeting on July 28, 2026 in accordance with Section 12(1)(b) of the Act regarding its proposals for this development charges by-law; AND WHEREAS the Council of Norfolk County, has heard all persons who applied to be heard no matter whether in objection to, or in support of, the said by-law; AND WHEREAS by resolution adopted by Council on September 22, 2026, Council has indicated that it intends to ensure that the increase in the need for services attributable to the anticipated development will be met; Watson & Associates Economists Ltd. PAGE E-3 AND WHEREAS by resolution adopted by Council on September 22, 2026, Council has indicated its intent that the future excess capacity identified in the Study shall be paid for by development charges or other similar charges; NOW THEREFORE the Council of The Corporation of Norfolk County hereby enacts as follows: 1. Definitions In this By-law, 1.1. "Act" means the Development Charges Act, 1997, S.O. 1997, C.27, amended; 1.2. "Agricultural land" means land which is zoned for agricultural or farming uses in the zoning by-law of Norfolk County, or a predecessor municipality; 1.3. "Additional residential dwelling unit" means a dwelling unit, whether contained within a proposed single detached dwelling, semi-detached dwelling or row dwelling, or ancillary to a single detached dwelling, a semi- detached dwelling, or a row dwelling including but not limited to a coach house, laneway suite or structure constructed above an existing garage or other structure separate from the primary dwelling unit, and which is not capable of being legally conveyed as a separate parcel of land from the primary dwelling unit; 1.4. "Affordable housing" means residential units where the rent (when renting) or price (when purchasing) does not exceed the limit set out by the "Affordable Residential Units for the Purpose of the Development Charges Act, 1997 Bulletin"; 1.5. "Affordable Residential Unit" means a residential unit that meets the criteria set out in section 4.1 of the Act. 1.6. "Ancillary" means a use, building, or structure that is normally incidental and/or subordinate to and is exclusively devoted to a main use, building or structure that is located on the same lot; Watson & Associates Economists Ltd. PAGE E-4 1.7. "Apartment" means a building consisting of more than four dwelling units with a private bathroom and kitchen facilities in each unit where the units are connected by an interior corridor and which is not a single detached dwelling, a semi-detached dwelling, additional residential dwelling units, temporary farm workers accommodation, a multiple unit dwelling, a mobile home or a temporary residential structure; 1.8. "Attainable Residential Unit" means a residential unit that meets the criteria set out in section 4.1 of the Act; 1.9. "Bank of Canada rate" means the policy interest rate established by the Bank of Canada. 1.10. "Bedroom" includes any room larger than eight square meters, including a den or study, which can be used as sleeping quarters but does not include a kitchen, bathroom, living room or dining room; 1.11. "Benefiting Area" means an area defined by a map, plan or legal description on a front-ending agreement as an area that will receive a benefit from the construction of a service; 1.12. "Brownfields" means land located within the urban areas as defined from time to time in the County's Official Plan, upon which there has been previous agricultural, industrial, institutional, or commercial or open lands use or other use as prescribed under the Environmental Protection Act, R.S.O. 1990, c.E.19 an Ontario Regulation 153/04 thereto, each as amended from time to time, and for which site remediation is required in accordance with a Phase 2 Environmental Site Assessment, and for which a Record of Site Condition has been filed on the Province's Brownfields Environmental Site Registry pursuant to the Environmental Protection Act, R.S.O. 1990, c.E.19 and Ontario Regulation 153/04 thereto, each as amended from time to time; 1.13. "Cannabis" means: i. a cannabis plant; ii. any part of a cannabis plant, including the phytocannabinoids produced by, or found in, such a plant, regardless of whether that part has been processed or not; Watson & Associates Economists Ltd. PAGE E-5 iii. any substance or mixture of substances that contains or has on it any part of such a plant; and iv. any substance that is identical to any phytocannabinoid produced by, or found in, such a plant, regardless of how the substance was obtained. 1.14. "Cannabis Plant" means a plant that belongs to the genus cannabis; 1.15. "Cannabis Production Facility" means a building, or part thereof, designed, used, or intended to be used for one or more of the following: cultivation, propagation, production, processing, harvesting, testing, alteration, destruction, storage, packaging, shipment or distribution of cannabis where a licence, permit or authorization has been issued under applicable federal law; 1.16. "Capital Cost" includes the capital costs defined in Section 5(3) of the Act; 1.17. "Commercial development" means a building or structure used, designed or intended for use for, or in connection with the purchase and/or sale and/or rental of commodities; the provision of services for a fee; or the operation of a business office. Commercial development does not include a retail development, an industrial development, roofed accommodation development, or cannabis production facilities as defined herein; but does include a parking garage used for commercial purposes. 1.18. "Council" means the Council of Norfolk County; 1.19. "County" means the body corporate continued as a municipality under the name "The Corporation of Norfolk County"; 1.20. "Development" means the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that has the effect of increasing the size or usability thereof, and includes redevelopment. 1.21. "Development charge or development charges" means the charges imposed by this By-law against land to pay for increased capital costs required because of increased needs for services arising from development of the area to which this By-law applies; Watson & Associates Economists Ltd. PAGE E-6 1.22. "Dwelling unit" means any part of a building or structure used, designed or intended to be used as a domestic establishment in which one or more persons may sleep and are provided with culinary and sanitary facilities for their exclusive use; 1.23. "Existing industrial development" means an industrial development that existed at the time of this By-law's in accordance with applicable regulation; 1.24. "Farming business" means a business operating on agricultural land with a current Farm Business Registration Number issued pursuant to the Farm Registration and farm Organization Funding Act, 7993, S.O. 1993 Chapter 21 and assessed in the Farmland Realty Tax Class by the Municipal Property Assessment Corporation but does not include cannabis production facilities; 1.25. "Front-ending agreement" means an agreement under section 44 of the Development Charges Act, 1997; 1.26. "Garden suite" means a temporary building containing one (1) dwelling unit where the unit is detached from the main dwelling and regulated under section 39.1 of The Planning Act; 1.27. "Grade" means the average level of proposed or finished ground adjoining, at all exterior walls of the main building; 1.28. "Gross Floor Area" means the total area of all floors above and below grade measured between the outside surface of exterior walls or between the outside surface of exterior walls and the centre line of firewalls. This includes covered roofs, canopies, walkways and thoroughfares but excludes those areas used exclusively for parking garages or parking structures, except where parking garages or parking structures are used for the sale, lease, or service of vehicles; 1.29. "Growth-related net capital cost" means the portion of the net capital cost of services that is reasonably attributable to the need for such net capital costs that results or will result from development in all or a defined part of Norfolk County; 1.30. "Inclusionary Zoning Residential Unit" means residential units that are affordable housing units required to be included in a development or Watson & Associates Economists Ltd. PAGE E-7 redevelopment pursuant to a by-law passed under section 34 of the Planning Act to give effect to the policies described in subsection 16 (4) of that Act. 1.31. "Industrial development" means a building used for, or in connection with: i. Manufacturing, producing, processing, storing or distributing something; ii. Research or development in connection with manufacturing, producing or processing, something; iii. Retail sales by a manufacturer, producer or processor of something they manufactured, produced or processed, if the retail sales are at the site which the manufacturing, production or processing takes place; iv. Office or administrative purposes, if they are: a. carried out with respect to manufacturing, producing, processing, storage or distributing of something, and, b. in or attached to the building or structure used for that manufacturing, producing or processing, storage or distribution; v. Without limiting the generality of the foregoing, industrial development also includes a building used as a commercial greenhouse which is not a farm business as defined herein, a warehouse, and a mini-storage facility; vi. Industrial development does not include cannabis production facilities. 1.32. "Institutional development" means a building used for, or in connection with religious, charitable, cultural, educational (as defined in the Education Act, R.S.O. 1990, c. E.2), governmental, health or welfare purposes and shall include but not be limited to, public and private non-commercial schools, nursery schools or day care facilities; 1.33. "Institutional use", for the purposes of subsection 13(3), means a building used for or in connection with: i. as a long-term care home within the meaning of subsection 2 (1) of the Long Term Care Homes Act, 2007; Watson & Associates Economists Ltd. PAGE E-8 ii. as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010 iii. by any institution of the following post-secondary institutions for the objects of the institution: a. a university in Ontario that receives direct, regular and ongoing operation funding from the Government of Ontario; b. a college or university federated or affiliated with a university described in subclause (i); or c. an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institute Act, 2017; iv. as a memorial home, clubhouse or athletic grounds by an Ontario branch of the Royal Canadian Legion; or v. as a hospice to provide end of life care. 1.34. "Local Board" means a school board, transportation commission, public library board, board of park management, local board of health, board of commissioners of police, or any other board, commission, committee, or local authority established or exercising any power of authority under any general or special Act with respect to any of the affairs or purposes, including school purposes, of Norfolk County; 1.35. "Long-term care home" means a place that is licensed as a long-term care home under the Fixing Long-Term Care Act, 2021, and includes a municipal home, joint home or First Nations home approved under Part IX of the Act; 1.36. "Manufactured Home" means a manufactured home as defined in the Building Code Act, standard for manufactured homes CSA A-277, "Procedure for Certification of Factory Built Houses"; 1.37. "Mixed use development" means a building or structure in which there are or will be both residential and non-residential uses, but does not include a hotel, motel, resort development, guest house, boarding house, nursing home, retirement living multiple unit dwelling or home for the aged; Watson & Associates Economists Ltd. PAGE E-9 1.38. "Mobile home" means a mobile home as defined in the Building Code Act, standard for Mobile Homes CAN/CSA-Z240.2.1 "Structural Requirements for Mobile Homes"; 1.39. "Multiple unit dwelling" means a residential building consisting of three or more dwelling units attached by a vertical wall or walls and not abutting any dwelling units along a horizontal plane or additional residential dwelling units. These units are considered "other multiples" under Schedule B of this Bylaw. This includes, but is not limited to, row dwellings, multiplex, back-to-back townhouse dwelling, stacked townhouse dwelling, temporary farm workers accommodation and the residential component of live/work units. But does not include a single detached dwelling, semi-detached dwelling, or an apartment dwelling; 1.40. "Net Capital Cost" means the capital cost less capital grants, subsidies and other contributions made to the County or that the Council of Norfolk County anticipates will be made, including conveyances or payments under Sections 42, 51, and 53 of the Planning Act, R.S.O. 1990, Chapter P.13 in respect of the capital cost; 1.41. "Non-profit housing" means the development of a building or structure intended for use as a residential premises and developed by a corporation to which the Not-for-Profit Corporations, 2010 applies that is in good standing under that Act and whose primary object is to provide housing or a corporation without share capital to which the Canada Not-for-profit Corporations Act applies that is in good standing under that Act and whose primary object is to provide housing or a non-profit housing co-operative that is in good standing under the Co-operative Corporations Act; 1.42. "Non-residential" means a building used for or in connection with other than residential use, and, without limiting the generality of the foregoing includes commercial, industrial, institutional, roofed accommodations, and retail development; 1.43. "Parking garage" means a land, building or structure or part thereof which is provided and maintained for the purpose of temporary parking or storing of motor vehicles accessory to a permitted use; Watson & Associates Economists Ltd. PAGE E-10 1.44. "Place of Worship" means a building or structure which is or would be classified as exempt from taxation for realty taxes in accordance with the exemption for "...every place of worship and land used in connection therewith and every churchyard, cemetery or burying ground," in Assessment Act, R.S.O. 1990, Chapter A.31; 1.45. "Planning Act" means the Planning Act, R.S.O. 1990, c.P.-13, as amended. 1.46. "Predecessor Municipality" means the former Regional Municipality of Haldimand- Norfolk, former Corporation of the City of Nanticoke, former Corporation of the Town of Simcoe, former Corporation of the Township of Delhi and former Corporation of the Township of Norfolk; 1.47. "Rental Housing", means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises. 1.48. "Residential" includes: i. single detached dwellings; ii. special care dwelling units; iii. individual dwelling units in semi-detached dwellings; iv. temporary farm workers accommodation; v. individual mobile homes; vi. individual dwelling units in multiple unit dwellings; vii. individual apartment dwelling units; viii. individual manufactured homes; ix. temporary residential structures; x. semi-detached dwellings, multiple unit dwellings and apartments in buildings or structures which are not exclusively used for residential purposes; Watson & Associates Economists Ltd. PAGE E-11 xi. residential facility; and, xii. tiny homes. 1.49. "Residential facility" means a building containing two or more dwelling units which dwelling units do not have self-contained kitchens. Residential facility includes a garden suite within the meaning of Section 39.1 of the Planning Act. R.S.O. 1990, c. P.13, as amended. Residential facility does not include a single detached dwelling, a semi-detached dwelling, temporary farm workers accommodation, a multiple unit dwelling, an apartment, or roofed accommodation as defined herein; 1.50. "Retail development" means land, buildings or portions thereof used, designed or intended for use for the purpose of offering foods, wares, merchandise, substances, articles or things for sale directly or providing entertainment to the public and includes rental of wares, merchandise, substances, articles or things and includes offices and storage in connection with, related or ancillary to such retail uses. Retail development includes, but is not limited to: conventional restaurants, fast food restaurants, concert halls, theatres, cinemas, movie houses /drive-in theatres, automotive fuel stations with or without service facilities, specialty automotive shops, auto repairs, collision serviced car or truck washes, auto dealerships' regional shopping centres, community shopping centres, neighbourhood shopping centres, including more than two stores attached and under one ownership, department stores, discount stores, banks and similar financial institutions including credit unions (excluding freestanding bank kiosks), warehouse clubs and retail warehouses. Retail Development does not include roofed accommodation development. 1.51. "Roofed accommodation development" means a building or structure used, designed, or intended for use for the purpose of offering overnight accommodation to the public and includes hotels, motels, and inns; 1.52. "Row dwelling" means a residential building containing not less than three dwelling units with each unit separated by a common or party wall or walls with a separate outside entrance to each unit. For the purposes of this definition, a row dwelling with up to two additional dwelling units as defined in this By-law is deemed to be a row dwelling. Watson & Associates Economists Ltd. PAGE E-12 1.53. "Semi-detached dwelling" means a residential building consisting of two dwelling units attached by a vertical wall or walls; 1.54. "Services" means services designated in Schedule "A" of this By-law or designated in a front-ending agreement; 1.55. "Single detached dwelling" means a residential building containing one dwelling unit and not attached to another building or structure, whether or not the sole single detached dwelling is situated on a single lot, and includes manufactured homes but excludes tiny homes; 1.56. "Special care dwelling unit" means a unit within a residential facility that is designed to accommodate individuals with specific support needs, including independent permanent living arrangements, where support services such as meal preparation, grocery shopping, housekeeping, nursing, respite care and attendant services are provided at various levels, and: i. The units have a common entrance from street level; ii. The occupants have the right to use common halls, stairs, yards, rooms, and accessory buildings; and iii. The units or rooms may or may not have exclusive sanitary or culinary facilities or both. 1.57. "Temporary Building or Structure" means building without a foundation which is constructed, erected or placed on land for a continuous period of time not exceeding one (1) year, or a like addition or alteration to an existing building or an existing structure that has the effect of increasing the usability thereof for a continuous period not exceeding one (1) year. Temporary building or structure excludes a garden suite within the meaning of Section 39.1 of the Planning Act, R.S.O. 1990, c. P. 13, as amended; 1.58. "Temporary farm workers accommodations", means a residential building constructed on a farm and not attached to any other building or structure, with sleeping, cooking, living and sanitary facilities, and used for seasonal, interim or occasional residential uses by farm labourers; Watson & Associates Economists Ltd. PAGE E-13 1.59. "Tiny home" means a dwelling unit with a minimum useable floor area as determined by the Ontario Building Code, and a maximum usable floor area of 100 square metres. 2. Scope of By-law 2.1. This By-law applies to all of the land within Norfolk County. 3. Development Charges 3.1. The development of land, buildings or structures for residential and non- residential uses have required or will require the provision, enlargement, expansion of the services referenced in Schedule A. i. For the purposes of the water and wastewater services, development charges will be imposed if the development has or will have access to these services by the urban buildout forecast period. 3.2. The development of land is subject to a development charge where the development requires one of the following: i. The development of land is subject to a development charge where the development requires one of the following: a. The passing of a zoning by-law or an amendment thereto under Section 34 of the Planning Act; b. The approval of a minor variance under Section 45 of the Planning Act; c. A conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act applies; d. The approval of a plan of subdivision under Section 51 of the Planning Act; e. A consent under Section 53 of the Planning Act; f. The approval of a description under Section 50 of the Condominium Act; R.S.O. 1990, Chapter 26; or Watson & Associates Economists Ltd. PAGE E-14 g. The issuing of a permit under the Building Code Act, 1992, S.O. 1992, Chapter 23, in relation to a building or structure. ii. Subsection (i) shall not apply in respect to: a. local services installed or paid for by the owner within a plan of subdivision or within the area to which the plan relates, as a condition of approval under section 51 of the Planning Act; or b. local services installed or paid for by the owner as a condition of approval under section 53 of the Planning Act. 4. Calculation of Development Charges 4.1. The development charge with respect to the development of any land, buildings and structures are accordance with the rates set out in Schedule "B", subject to the other provisions of this By-law: i. The development charges set out in Schedule "B" shall be imposed on residential uses of lands, buildings or structures, including a dwelling unit accessory to a non-residential use and, in the case of a mixed-use building or structure, on the residential uses in the mixed-use building or structure, according to the type of residential unit, and calculated with respect to each of the services according to the type of residential use. The urban services rates shall only apply to lands which are or will be serviced by water and wastewater services. ii. The development charges described in Schedule "B" shall be imposed on non-residential uses of lands, buildings or structures, and, in the case of a mixed-use building or structure, on the non-residential uses in the mixed-use building or structure, and calculated with respect to each of the services according to the total floor area of the non-residential use. The urban services rates shall only apply to lands which are or will be serviced by water and wastewater services. 4.2. Subject to the provisions of this by-law, development charges against land are to be calculated and collected in accordance with the rates set out in Schedule "B" in respect of the services set out in Schedule "A" of this By-law. Watson & Associates Economists Ltd. PAGE E-15 i. Mixed-Use Development a. Where a development has both residential and non-residential uses, development charges will be assessed against both uses, to the extent of their respective uses of a building or structure, and as though the uses were separate. ii. Reduction of Development Charges for Redevelopment a. Despite any other provisions of this By-law, where, as a result of the redevelopment of land, a building or structure existing on the same land within 5 years prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: 1. in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable development charge under section 4.1 (i) by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and 2. in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable development charges under section 4.1 (ii), by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the development charges otherwise payable with respect to the redevelopment. Watson & Associates Economists Ltd. PAGE E-16 3. the credits provided under this section do not apply based upon an existing or previously existing development, which is exempt under the provisions of this By-law. iii. Change of Use a. Where an existing non-residential building or structure is converted in whole or in part to residential uses, the residential development charge payable for the dwelling units created shall be reduced by an amount equal to the non-residential development charge previously paid for the development being converted, but any such reduction shall not produce a refund. No credit will be provided for services excluded from the non- residential charge. b. Where an existing residential building is converted in whole or in part to non-residential uses, the non-residential development charge payable for the gross floor area so converted shall be reduced by an amount equal to any residential development charges previously paid for the residential building being converted, and if a dwelling unit is only partially converted the reduction shall be in proportion to the extent of the conversion, but any such reduction shall not produce a refund. c. Development charges assessable for the conversion of uses in a mixed-use building or structure shall be determined in accordance with subsections 4.2 (iii) (a) and 4.2 (iii) (b) of this By-law as applicable. iv. Tiny Homes a. Development charges for tiny homes shall be imposed at the applicable rate for bachelor and 1-bedroom apartment units. Watson & Associates Economists Ltd. PAGE E-17 5. Exemptions from Development Charges Residential Units in Existing Residential 5.1. This by-law shall not apply to that category of exempt development described in subsections 2 (3), 2 (3.1), and 2 (3.2) of the Act, namely: i. An enlargement to an existing dwelling unit; ii. A second residential unit in an existing detached house, semi-detached house, or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the existing detached house, semi-detached house or rowhouse cumulatively contain no more than one residential unit; iii. A third residential unit in an existing detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the existing detached house, semi-detached house or rowhouse contains any residential units; iv. One residential unit in a building or structure ancillary to an existing detached house, semi-detached house or rowhouse on a parcel of residential land, if the existing detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or structure ancillary to the existing detached house, semi- detached house or rowhouse contains any residential units; or v. In an existing rental residential building, which contains four or more residential units, the creation of the greater of one residential unit or one per cent of the existing residential units. Residential Units in New Residential 5.2. This By-law shall not apply to that category of exempt development described in subsection 2 (3.3) of the Act, namely: i. A second residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary Watson & Associates Economists Ltd. PAGE E-18 residential use, is permitted, if all buildings and structures ancillary to the new detached house, semi-detached house or rowhouse cumulatively will contain no more than one residential unit; ii. A third residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units; or iii. One residential unit in a building or structure ancillary to a new detached house, semi-detached house or rowhouse on a parcel of residential land, if the new detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units. Enlargement of Existing Industrial Development 5.3. This By-law does not apply to that category of exempt development described in section 4 of the Act, namely: i. The enlargement of the gross floor area on an existing industrial building, if the gross floor area is enlarged by 50 percent or less; ii. for the purpose of subsection (i) the terms "gross floor area" and "existing industrial building" shall have the same meaning as those terms have in O. Reg. 82/98 made under the Act. iii. Notwithstanding subsection (i), if the gross floor area of an existing industrial building is enlarged by more than 50 percent, development charges shall be calculated and collected in accordance with Schedule "A" on the amount by which the enlargement exceeds 50 percent of the gross floor area before the enlargement. iv. For the purpose of the application of section 4 of the Act to the operation of this By-law: Watson & Associates Economists Ltd. PAGE E-19 a. the gross floor area of an existing industrial building shall be calculated as it existed prior to the first enlargement in respect of that building for which an exemption under section 4 of the Act is sought; and b. the enlargement of the gross floor area of the existing building must: 1. be attached to the existing industrial building; 2. not be attached to the existing industrial building by means only of a tunnel, bridge, canopy, corridor or other passageway, shared below-grade connection, foundation, footing, parking facility, service tunnel or service pipe; 3. be for use or in connection with an industrial purpose as set out in this By-law; and 4. constitute a bona fide increase in the size of the existing building. Other Statutory Exemptions 5.4. This by-law shall not apply to that category of exempt development described in section 4.1 of the Act, namely that development charges shall not be imposed with respect to affordable residential units and attainable residential units. 5.5. This by-law shall not apply to that category of exempt development described in section 4.2 of the Act, namely that development charges shall not be imposed with respect to non-profit housing development. 5.6. This by-law shall not apply to that category of exempt development described in section 4.3 of the Act, namely that development charges shall not be imposed with respect to inclusionary zoning residential unit development. 5.7. This by-law shall not apply to that category of exempt development described in section 4.4 of the Act, namely that development charges shall not be imposed with respect to long-term care homes. Watson & Associates Economists Ltd. PAGE E-20 5.8. This by-law shall not apply to that category of exempt development described in section 4.5 of the Act, namely that development charges shall not be imposed with respect to non-profit retirement housing development. 5.9. Development which is or would be classified under the Assessment Act as exempt from taxation for realty taxes as a place of worship; a. Any development undertaken by: 1. Any board within the meaning of subsection 1 (1) of the Education Act, R.S.O. 1990, Chapter E.2, and, 2. Any local board of the County. Other Exemptions 5.10. Notwithstanding any other provision of this By-law, the following types of development are exempted from any development charges under this By-law: i. Temporary farm workers accommodations; ii. Farming business development; iii. Temporary structures including building without a foundation which is constructed, erected or placed on land for a continuous period of time not exceeding one year; and iv. Places of worship. 6. Discounts 6.1. Notwithstanding the provisions of this By-law, development charges for rental housing developments will be reduced based on the number of bedrooms in each unit as follows: i. Three or more bedrooms - 25% reduction; ii. Two bedrooms - 20% reduction; and iii. All other bedroom quantities - 15% reduction. Watson & Associates Economists Ltd. PAGE E-21 7. Timing of Calculation and Payment of Development Charges (as furthered outlines in GP-016 (Governance Policy - Timing of Development Charges Calculation) and GP-017 (Governance Policy - Development Charge Installment)) 7.1. Development charges shall be calculated, payable and collected in full in money or by provision of services as may be agreed upon, or by credit granted under the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies. 7.2. Where development charges apply to land in relation to which a building permit is required, the building permit shall not be issued until the development charge has been paid in full. 7.3. Notwithstanding subsections 7.1 and 7.2, development charges for rental housing and institutional developments are due and payable in 6 instalments commencing with the first instalment payable on the earlier of the date of first occupancy or the date of occupancy permit issuance, and each subsequent installment, including interest accrued prior to June 5, 2025, payable on the anniversary date each year thereafter. 7.4. Notwithstanding subsections 7.1 and 7.2, development charges for non-rental residential developments are due and payable in full on the earlier of: i. The day a permit is issued under the Building Code Act authorizing occupation of the building; or ii. The day the building is first occupied. 7.5. Where the development of land results from the approval of a Site Plan or Zoning By-law Amendment that was: i. Received and approved between January 1, 2020, and June 5, 2024, and the approval of the application occurred within 2 years of building permit issuance, the development charges under section 2 shall be calculated based on the lower of the rates set out in Schedule "B" on the date the planning application was made, including interest, or the rate currently in effect. Where both planning applications apply, development charges under section 2 shall be calculated based on the Watson & Associates Economists Ltd. PAGE E-22 rates, including interest, set out in Schedule "B" on the date of the later planning application; or ii. Received on or after June 6, 2024, and the approval of the application occurred within 18 months of building permit issuance, the development charges under section 2 shall be calculated based on the lower of the rates set out in Schedule "B" on the date the planning application was made, including interest, or the rate currently in effect. Where both planning applications apply, development charges under section 2 shall be calculated based on the rates, including interest, set out in Schedule "B" on the date of the later planning application. 7.6. Interest for the purposes of subsections 7.3 and 7.5 shall be determined as the maximum interest rate as defined in section 26.3 of the Act. 7.7. Notwithstanding subsections 7.1 to 7.5, Council from time to time, and at any time, may enter into agreements providing for all or any part of a development charge to be paid before or after it would otherwise be payable, in accordance with section 27 of the Act. 7.8. If development charges are paid and the applicable building permit is cancelled or revoked before construction begins, the development charges will be refunded to the registered owner of the land. 7.9. Prepayment or Deferral Agreements i. Council may authorize, in accordance with Section 27 of the Act, an agreement with a person to permit, on such terms as Council may require, the payment of a development charge before or after it is otherwise payable under this By-law. 7.10. Services in Lieu Agreements i. Council may agree, in accordance with Sections 38, 39, 40 and 41 of the Act, to allow a person to perform work that relates to a service to which this development charge by-law relates, in return for a credit towards the development charges payable by the said person, upon terms specified by Council in its agreement with the person. No such Watson & Associates Economists Ltd. PAGE E-23 credit shall exceed the total development charges payable by the person. 7.11. Front-Ending Agreements i. Council may authorize a front-ending agreement in accordance with the provisions of Part III of the Act, upon such terms as Council may require, in respect of the development of land, as detailed in the County's Developer Front-end Funding and Reimbursement Policy (Policy GP-018). 8. Administration of By-Law 8.1. This By-law shall be administered by the Treasurer of Norfolk County. 8.2. As authorized in paragraph ten of Section 5(1) of the Act, the development charges provided for in this By-law shall be adjusted annually by the percentage change during the preceding year, as recorded in the Statistics Canada, Table 18-10-0289-01 Building construction price indexes, by type of building. This adjustment shall take place on January 1st of each year. 8.3. The Treasurer shall, in each year prior to June 30th , furnish to Council a statement in respect of the separate reserve funds required by the Act for each service to which this By-law relates, for the prior year, containing the information set out in Section 43 of the Act and Section 12 of Ontario Regulation 82/98. 8.4. This By-Law may be referred to as the "2026 Norfolk County Development Charges By-Law". 8.5. This By-Law shall come into force and take effect on January 1, 2027. Read a first and second time this 22nd day of September 2026. Read a third time and finally passed this 22nd day of September 2026. ____________________ Mayor ____________________ Clerk Watson & Associates Economists Ltd. PAGE E-24 SCHEDULE "A" TO BY-LAW NO. 2026-XXX Services/Class of Services for Which Development Charges are levied County-wide Services/Class of Services: Services Related to a Highway Fire Protection Services Parks and Recreation Services Library Services Ambulance Services Growth-Related Studies (Class of Service) Urban Services: Water Wastewater Watson & Associates Economists Ltd. PAGE E-25 SCHEDULE "B" TO BY-LAW NO. 2026-XXX Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per m² of Gross Floor Area) County-wide Services/Class of Service: Services Related to a Highway 10,077 $ 6,858 $ 6,819 $ 5,337 $ 4,291 $ 50.38 $ Fire Protection Services 3,274 $ 2,228 $ 2,216 $ 1,734 $ 1,394 $ 14.99 $ Parks and Recreation Services 14,893 $ 10,136 $ 10,079 $ 7,888 $ 6,342 $ - $ Library Services 2,285 $ 1,555 $ 1,546 $ 1,210 $ 973 $ - $ Ambulance Services 503 $ 342 $ 340 $ 266 $ 214 $ 2.30 $ Growth-Related Studies 332 $ 226 $ 225 $ 176 $ 141 $ 1.53 $ Total County-wide Services/Class of Services 31,364 $ 21,345 $ 21,225 $ 16,611 $ 13,355 $ 69.20 $ Urban Services Water Services 7,336 $ 4,993 $ 4,965 $ 3,885 $ 3,124 $ 42.96 $ Wastewater Services 10,687 $ 7,274 $ 7,232 $ 5,660 $ 4,551 $ 62.59 $ Total Urban Services 18,023 $ 12,267 $ 12,197 $ 9,545 $ 7,675 $ 105.55 $ GRAND TOTAL RURAL AREA 31,364 $ 21,345 $ 21,225 $ 16,611 $ 13,355 $ 69.20 $ GRAND TOTAL URBAN AREA 49,387 $ 33,612 $ 33,422 $ 26,156 $ 21,030 $ 174.75 $ RESIDENTIAL Service/Class of Service