Schedule "A" to Bylaw No. 2023-29 - Building Permit Fees

North Dundas, Ontario · No. 2023-29 · summary & facts

This is the exact embedded text of the captured official document. Snapshot e0a58074e0e5 · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Rate Flat/Minimum Fee 1 All except as noted below $1.69/ft² $2,524 2 Portable Classroom $709/unit - 3 Single Family Dwelling $1.36/ft² $2,005 4 Multi-Residential (2 units or more; includes the addition of a unit in a S.F.D., Semi-Detached, Townhouse, Row House) $1.57/ft² $1,452 5 Apartment Building $1,106/unit - 6 Addition and Major Renovation $1.16/ft² $622 7 Garage, Carport, Accessory Building $0.72/ft² $346 8 Porch, Deck, Veranda, Minor Renovation $0.91/ft² $242 9 Garden Suite (as defined in the Planning Act) $709/unit - 10 Pre-Fabricated Dwelling, Relocating Existing Dwelling $1,106/unit - 11 Porch, Deck, Veranda, Garage, Carport, Solid Fuel Burning Appliance when forms part of the new residential unit (exlcudes mobile home, pre-fabricated dwelling, dwelling being relocated and tiny house) 50% of established fee 50% of established fee 12 Tiny House (398ft² or less in building area and not more than one dwelling unit) $3.46/ft² $1,148 13 Tiny House Constructed Off-Site (398ft² or less in building area and not more than one dwelling unit) $2.05/ft² $816 14 All $1.34/ft² $2,212 15 All except as noted below $0.52/ft² $1,832 16 Office Area in any Industrial Building $1.57/ft² - 17 Self-Service Storage Buildings $0.59/ft² $1,659 18 Accessory Building $0.91/ft² $588 19 Additions and Major Renovations $1.21/ft² $761 20 Minor Renovations $0.88/ft² $484 21 New Barns (Livestock) $0.22/ft² $1,521 22 Additions, Renovations, Accessory $0.35/ft² $691 23 Silo, Grain Bin, Manure Storage $380/unit - 24 Livestock Barns and Additions 3000ft² or less $0.44/ft² $574 25 Fixtures $20/fixture - 26 Connecting to Municipal Services (water and sewers) - $138 27 Water and/or Sewer Line Service Inspection $68/100ft $138 28 Building ≤ 6458ft² - $207 29 Buildings > 6458ft² - $252 30 Fabric Covered Structures $0.24/ft² $553 31 Where calculation of a permit fee on a per ft² basis is unfeasible, impractical, or does not properly reflect the service provided as determined by the CBO $20/$1,000 of construction value - 32 Where calculation of a permit fee for an addition, major or minor renovation does not properly reflect the service provided as determined by the CBO Rate for new construction - 33 New HRV, ERV unit when not part of new construction - $138 34 Designated Structures - $553 35 Change of Use (no construction is proposed) - $415 36 Solid Fuel Burning Appliance - $173 37 Tent $69/additional tent $138 (up to 2 tents) 38 Sign - $207 39 Addition of new plumbing fixtures only - $138 40 Transfer of Permit - $70 41 Liquor Licence - $77 42 Building Code Compliance Letter - $113 43 Limiting Distance Agreement - $173 44 Permit Reactivation (where no performance deposit was required or after performance deposit is lost) - $136, valid up to one year from the date of payment 45 Photocopies 5-10% ink coverage - Related to an application being submitted to the Township $6.80/page (plotter printer), $0.68/page (11" X 17"), $0.34/page (8.5" X 14" or 8.5" X 11") - Demolition All Other Plumbing SCHEDULE ''A'' TO BYLAW No. 2023-29 Fees Increased March 1, 2025 Fees to be calculated using the gross building area Class of Permit Group A and B - Assembly, Care and Detention Group C - Residential Group D and E - Business, Personal Service and Mercantile Group F - Industrial Group A, B, D, E and F Farm Buildings 46 Conditional Permit 5% surcharge up to $1,358 $138 47 Subsequent Design Review, Alternate Solutions, Revisions to Approved Plans, Re-inspections $138/hour - 48 Peer Review (Study, Report, Plans) At cost of applicant +5% administrative surcharge - 49 Work started without a permit Cost of building permit multiplied by 2 - 50 Letter Sent for Building without a Permit - $48 51 Orders to Comply issued except as noted below - $69 52 Stop Work/Unsafe Order issued - $207 53 Emergency Order issued - $415 54 Register a document on title 55 Where residential dwelling units are identical to each other and permit applications are submitted within 4 months of each other 56 Tent permit applications submitted for Not-for-Profit Organizations 57 Permit applications submitted for property owned by the Township 58 Value between $0 and $24,999 - $200 59 Value between $25,000 and $99,999 - $500 60 Value between $100,000 and $399,999 - $1,500 61 Value between $400,000 and $999,999 for residential - $2,000 62 Value between $400,000 and $999,999 for non-residential - $3,000 63 Value equal to or over $1,000,000 for residential construction - $3,000 64 Value equal to or over $1,000,000 for non-residential construction - $5,000 Note 1 Note 2 a) b) c) d) e) Note 3 Note 4 a) b) c) d) e) Note 5 Note 6 Note 7 Note 8 Note 9 Any permit issued before June 1, 2022 for which a performance deposit has been paid and the permit has not been closed, the performance deposit will be deducted $136 annually. Any permit issued on or after June 1, 2022 for which a performance deposit has been paid and the permit has not been closed, the performance deposit will be deducted in accordance with Note 2, 3, and 4 (as applicable). No refund of the Refundable Fee will be issued if the Work and all required inspections are not fully completed within five (5) years of the date of the issuance of the Permit. The refund of the whole or in part of the Refundable Fee shall not be deemed a waiver of any provisions of any Bylaw or requirements under the Building Code Act or regulations made thereunder. Also, the refund should not be construed as a certification or guarantee that the Building for which a Permit was issued meets all the requirements of the Building Act or regulations made thereunder. The refund of the whole or in part of the Refundable Fee shall be returned to the Payer of the permit, unless other arrangements have been made in writing with the Chief Building Official. Note to Permit Fees In the event that a project requires permit fees to be calculated using multiple rates, the flat/minimum fee for each rate shall apply to the applicable area. Transition Thirty per cent (30%) of the Refundable Fee is to be refunded if the Work and all required inspections are completed within five (5) years of the date of issuance of the Permit Once a Permit has been issued by the Chief Building Official, except as per Note 3 and 4, the Refundable Fee will be refunded in whole or in part in accordance with the following provisions: One hundred per cent (100%) of the Refundable Fee is to be refunded if the Work and all required inspections are fully completed within one (1) year of the date of issuance of the Permit, Ninety per cent (90%) of the Refundable Fee is to be refunded if the Work and all required inspections are fully completed within two (2) years of the date of issuance of the Permit, Sixty per cent (60%) of the Refundable Fee is to be refunded if the Work and all required inspections are fully completed within three (3) years of the date of issuance of the Permit, Thirty per cent (30%) of the Refundable Fee is to be refunded if the Work and all required inspections are completed within four (4) years of the date of issuance of the Permit, No refund of the Refundable Fee will be issued if the Work and all required inspections are not fully completed within four (4) years of the date of Permit issuance. This will not relieve the Permit Holder of obligations under any regulations of any Bylaw, the Building Code Act or regulations made thereunder. The Refundable fee may be deducted for any re-inspection, revisions to approved plans at the hourly rate at the discretion of the Chief Building Official. Once a Permit has been issued by the Chief Building Official, for any Permit having a construction value of greater than $999,999, the Refundable Fee will be refunded in whole or in part in accordance with the following provisions: One hundred per cent (100%) of the Refundable Fee is to be refunded if the Work and all required inspections are fully completed within two (2) years of the date of issuance of the Permit Ninety per cent (90%) of the Refundable Fee is to be refunded if the Work and all required inspections are fully completed within three (3) years of the date of issuance of the Permit, Sixty per cent (60%) of the Refundable Fee is to be refunded if the Work and all required inspections are fully completed within four (4) years of the date of issuance of the Permit Notes to Administrative Performance Deposit Administrative Surcharge All associated costs Reduction in Fees 15% Reduction in Fees (excludes initial unit, Plumbing, Administrative Surcharges, Other and Administrative Performance Deposits) 100% Reduction in Fees 50% Reduction in Fees Administrative Performance Deposit In the event that the project value indicated by the applicant does not properly reflect the actual work, the Chief Building Official may require a higher or lower performance deposit, or not require a performance deposit.