By-law #89-13 Level of Service Policy for Township Roads

North Frontenac, Ontario · No. 89-13 · adopted 2013-10-15 · summary & facts

This is the exact embedded text of the captured official document. Snapshot b41362db25fc · verified 2026-10-17 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

THE CORPORATION OF THE TOWNSHIP OF NORTH FRONTENAC BY-LAW #89-13 BEING A BY-LAW TO ESTABLISH A LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS FOR THE CORPORATION OF THE TOWNSHIP OF NORTH FRONTENAC AND WHEREAS Section 11(3) of the Municipal Act, 2001, as amended authorizes the Municipality to pass By-laws respecting matters within spheres under the jurisdiction of the Municipality including highways, including parking and traffic on highways; AND WHEREAS Section 44(1) of the Municipal Act, 2001, as amended provides the municipality that has jurisdiction over a highway or bridge shall keep it in a state of repair that is reasonable in the circumstances, including the character and location of the highway or bridge; AND WHEREAS Section 44(2) of the Municipal Act, 2001, as amended provides that a municipality that defaults in complying with subsection 44(1) is, subject to the Negligence Act, liable for all damages any person sustains because of the default; AND WHEREAS Section 44(3) of the Municipal Act, 2001, as amended provides that despite subsection (2), a municipality is not liable for failing to keep a highway or bridge in a reasonable state of repair if, (a) it did not know and could not reasonably have been expected to have known about the state of repair of the highway or bridge; (b) it took reasonable steps to prevent the default from arising; or (c) at the time the cause of action arose, minimum standards established under subsection (4) applied to the highway or bridge and to the alleged default and those standards have been met. AND WHEREAS Section 44(4) of the Municipal Act, 2001, as amended permits the Minister of Transportation to make regulations establishing minimum standards of repair for highways and bridges being Regulation 239/02 which developed the criteria for Minimum Maintenance Standards; AND WHEREAS the Council of the Corporation of the Township of North Frontenac deems it expedient to enact a by-law to establish a Level of Service Policy for Township Roads; NOW THEREFORE the Council of The Corporation of the Township of North Frontenac does hereby adopt the "Level of Service Policy for Township Roads" attached hereto as Schedule "A" being the "Level of Service Policy"; Schedule "B" being the "Road Summary By Name, Class, AADT" and Schedule "C" being the "Seasonal Roads"; AND THAT the Public Works Manager is hereby authorized by Council to update, make corrections and/or amendments, at any time to any information contained within this Level of Service Policy - Schedule "B" -- "Road Summary By Name, Class, AADT" and Schedule "C" -- "Seasonal Roads" on an as required basis (i.e. changes in the AADT, etc.). The Public Works Manager shall provide a copy of all changes to this Schedule to the Clerk to retain with the Original By-law and Policy for future reference if required; and the Clerk shall also provide a copy of said update to Council and the Chief Administrative Officer (CAO) for information purposes. Also, the Public Works Manager shall ensure the Policy and Schedule remains current on the Township's website; AND THAT By-law #53-04 (previous Road Service Standards By-law) and By-law 11909 are hereby repealed in their entirety; AND THAT all resolutions, by-laws or parts/schedules of by-laws, or actions of Council relating to the Level of Service for Township Roads, that are inconsistent with the provisions of this new Level of Service Policy for Township Roads; or which are contrary to or inconsistent with this new Policy; are hereby repealed and rescinded; AND THAT this By-Law shall come into force and take effect on the date of its passing. READ A FIRST AND SECOND TIME, THIS 15TH DAY OF OCTOBER, 2013. READ A THIRD TIME AND FINALLY PASSED THIS 15TH DAY OF OCTOBER, 2013. SCHEDULE "A" TO BY-LAW 89-13 TOWNSHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS This policy sets out the minimum standards of maintenance and repair for highways (roads) under municipal jurisdiction for the purpose of clause 44 (3) (c) of the Municipal Act, S.O. 2001, c.25. The minimum standards of repair set out herein are applicable only in respect of motor vehicles using the highways owned and maintained by the Township of North Frontenac. It is the objective of the Township Public Works (Roads) Department to conduct its operational activities in an efficient and effective way, so as to provide safe driving conditions on all roads owned and maintained by the Township. Operations will be consistent with the needs of a low traffic volume rural road system. Maintenance will be performed, monitored and recorded as detailed in the following guidelines that comprise, with this policy statement and the definitions below, our Level of Service Document. This document is based on the criteria for Minimum Maintenance Standards as developed by the Province in Ontario Regulation 239/02 to provide municipalities with a legal defence against liability from actions arising with regard to levels of care on roads and bridges. Using the chart provided by the Province to determine Highway class based on speed limit and Average Annual Daily Traffic (AADT) counts, all roads within the Township are determined to be either Class 4, 5 or 6 roads. Please see Schedule "B" to this policy for a detailed list. The Public Works Manager is hereby authorized by Council to update, make corrections and/or amendments, as required, at any time to any information contained within this Level of Service Policy - Schedule "B" -- "Road Summary By Name, Class, AADT" (Le. changes in the AADT, etc.), and Schedule "C" - "Seasonal Roads" (i.e. changes in year-round residency). The Public Works Manager shall provide a copy of all changes to Schedule "B" and Schedule "C" to the Clerk to retain with the Original By-law and Policy for future reference if required; and the Clerk shall also provide a copy of said update to Council and the Chief Administrative Officer (CAO) for information purposes. Also, the Public Works Manager shall ensure the Policy and Schedule remains current on the Township's website. However, 0. Reg. 239/02 does not specify minimum standards for Class 6 roads and, therefore this document will set a level of service for Class 6 roads that is equivalent to the minimum maintenance standards for Class 5 roads, as set by the Province in 0. Reg. 239/02. These guidelines are used to provide guidance and set minimum standards for our Roads Department, however; depending on work load and other unknown circumstances, maintenance activities may in some instances occur sooner than the minimum times detailed below and do not change the normal minimum standard. DEFINITIONS In this Level of Service Document,  "cm" means centimetres; correspondingly "m" means metres and "mm" means millimetres.  "day" means a 24-hour period;  "dead end" roads are those that do not have an exit through another intersecting road;  "highway" means a common and public highway and includes any bridge, trestle, viaduct or other structure forming part of the highway and, except as otherwise provided, includes a portion of a highway;  "ice" means all kinds of ice, however formed;  "motor vehicle" has the same meaning as in subsection 1 (1) of the Highway Traffic Act, R.S.O. 1990, except that it does not include a motor assisted bicycle; S:\CLERK\By-laws\2013 By-laws\89-13 Schedule A.doc Page 1 of 10  "non-paved surface" means a surface that is not a paved surface, otherwise known as "loose- topped"; for our purposes "non-paved surface" further means gravel surfaced.  "0. Reg. 239/02" refers to Ontario Regulation 239/02, and any amendment thereto, which lays out the minimum maintenance standards for municipal highways  "Ontario Traffic Manual" means the Ontario Traffic Manual published by the Ministry of Transportation, as amended from time to time;  "paved surface" means a surface with a wearing layer or layers of asphalt, concrete or asphalt emulsion;  "private road" means a road that is not owned by the Township;  "roadway" has the same meaning as in subsection 1 (1) of the Highway Traffic Act;  "seasonal highway/road" means a road that is owned by the Township, but on which no winter maintenance is performed;  "snow accumulation" means the natural accumulation of new fallen snow or wind-blown snow or slush; alone or together, that covers more than half a lane width of a roadway;  "snow-packed" means the desired state of a highway during the period of winter road maintenance which includes the compacted snow or ice that can accumulate on municipal highways during a number of minor snow events;  "shoulder" means the portion of a highway that provides lateral support to the roadway and that may accommodate stopped motor vehicles and emergency use;  "surface" means the top of a roadway or shoulder;  "unmaintained municipal road" refers to a road that is owned, but not maintained, by the Township;  "weather" means air temperature, wind and precipitation;  "winter highway maintenance" occurs from November 15 to and including April 15 of each year. CLASSIFICATION OF HIGHWAYS For the purposes of this policy, every highway or part of a highway under the jurisdiction of a municipality in Ontario is classified in Table 1 as a Class 1, Class 2, Class 3, Class 4, Class 5 or Class 6 highway, based on the applicable speed limit and the AADT. For the purposes of determining the Class of highway, the AADT on a highway or part of a highway under municipal jurisdiction may be determined, by estimating the average daily two-way traffic on the highway or part of the highway in accordance with accepted traffic engineering methods. For "dead end" roads, in lieu of a manual 4 hour traffic count, a simple count of the number of permanent year round residences on the road multiplied by 6, for rural areas, will estimate the number of trips each house generates and is an accepted traffic engineering method for rural areas and those with lower volume as most of our roads are. This is the method that the municipality will use to determine AADT for it's roads. TABLE 1 CLASSIFICATION OF HIGHWAYS Posted or Statutory Speed Limit (kilometres per hour) 91 - 100 81 - 90 71 - 80 61 - 70 51 - 60 41 - 50 1 - 40 Average Annual Daily Traffic (number of motor CLASS of ROAD 15,000 or more 1 1 1 2 2 2 2 12,000 - 14,999 1 1 1 2 2 3 3 10,000 - 11,999 1 1 2 2 3 3 3 S:\CLERMBy-laws\2013 By-laws\89-13 Schedule A.doc Page 4 of 10 8,000 - 9,999 1 1 2 3 3 3 3 6,000 - 7,999 1 2 2 3 3 3 3 5,000 - 5,999 1 2 2 3 3 3 3 4,000 - 4,999 1 2 3 3 3 3 4 3,000 - 3,999 1 2 3 3 3 4 4 2,000 - 2,999 1 2 3 3 4 4 4 1,000 - 1,999 1 3 3 3 4 4 5 500 - 999 1 3 4 4 4 4 5 200 - 499 1 3 4 4 5 5 5 50 - 199 1 3 4 5 5 5 5 0-49 1 3 6 6 6 6 6 MINIMUM STANDARDS ROUTINE PATROLLING The minimum standard for the frequency of routine patrolling of highways is set out in Table 2. Routine patrolling shall be carried out by driving on the highway to check for conditions described in this policy. If it is determined by the municipality that the weather monitoring indicates that there is a substantial probability of snow accumulation on roadways, ice formation on roadways or icy roadways, the minimum standard for patrolling highways is, in addition to that set out in Table 2, to patrol highways that the municipality selects as representative of its highways, at intervals deemed necessary by the municipality, to check for such conditions. Patrolling a highway consists of observing the highway, either by driving on or by electronically monitoring the highway, and may be performed by persons responsible for patrolling highways or by persons responsible for or performing highway maintenance activities. TABLE 2 ROUTINE PATROLLING FREQUENCY Class of Highway Routine Patrolling Winter Road Patrols Frequency 4 once every 14 days At least once each week from November 15 to and including April 15 5 once every 30 days At least once each week from November 15 to and including April 15 6 once every 30 days At least once each week from November 15 to and including April 15 WEATHER MONITORING The minimum standard for weather monitoring requires the Roads Department, Public Works Manager or Foreman, to monitor current and future weather forecasts. The monitoring will generally be carried out by checking the local and regional weather conditions and forecasts on the internet, from sites such as The Weather Channel and Environment Canada. A record of weather monitoring shall be maintained in the Roads Department office. S:\CLERMBy-laws\2013 By-laws\89-13 Schedule A.doc Page 3 of 10 From October 1 to April 30, the minimum standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once every shift or three times per calendar day, whichever is more frequent, at intervals determined by the municipality. From May 1 to September 30, the minimum standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once per calendar day. WINTER MAINTENANCE The Road Department will be responsible for winter road patrols and winter maintenance activities. However, there are a few minor roads, usually too narrow for our standard plow trucks, where the winter maintenance activities are contracted out. The Public Works Department and our Contractors have the equipment, schedules, manpower and procedures in place to commence winter control operation on the 15th day of November each year until April 15th of the following year. Winter control equipment and manpower will be available on a continuous basis, 7 days a week 24 hours a day to respond to any winter event during this period. There are several roads or road sections that are considered "seasonal" which are owned by the Township but on which no winter maintenance will be performed. Generally, a road may be considered "seasonal" and not require winter maintenance if there are no year-round or permanent residents living on a particular road or road section. Schedule "C" to this policy includes the list of Seasonal Roads. For all intents and purposes these roads are considered "temporarily closed", (i.e., November 15th to April 15th) and may only be used at the operator's own risk. Notice of the temporary closure of these roads will be posted at the point of temporary closure and on our Township's website. SNOW ACCUMULATION The minimum standard for clearing snow accumulation is,  after becoming aware of the fact that the snow accumulation on a roadway is greater than the depth set out in Table 3, to deploy resources as soon as practicable to address the snow accumulation; and  after the snow accumulation has ended, to address the snow accumulation so as to reduce the snow to a depth less than or equal to the depth set out in Table 3 within the time set out in the Table, to provide a total width of at least five (5) metres on a Class 4, 5 and 6 highways with two lanes. If the depth of snow accumulation on a roadway is less than or equal to the depth set out in the Table, the roadway is deemed to be in a state of repair with respect to snow accumulation. The depth of snow on a roadway may be determined by a municipal employee, agent or contractor, whose duties or responsibilities include one or more of the following: 1. Patrolling highways, 2. Performing highway maintenance activities, 3. Supervising staff who patrol or maintain highways. The depth of snow accumulation on a roadway may be determined by: a. Performing an actual measurement, b. Monitoring the weather, c. Performing a visual estimate. During winter operations a number of minor snow events may result in non-paved surfaces becoming snow-packed. Once this compacted snow accumulates it is considered part of the road for the application of our Level of Service and is the desired condition. During periods of thaw, appropriate remedial action would be required as the depth of the compacted snow base becomes unstable. This remedial action may include plowing, salting and sanding, as determined, to break up the base and S:\CLERK\By-laws\2013 By-laws\89-13 Schedule A.doc Page 4 of 10 remove it from the traveled sections of the road. It will be the duty of the Public Works Manager and Foreman to determine best treatment methods for implementation. This section only applies to a municipality during the season when the municipality performs winter highway maintenance. TABLE 3 SNOW ACCUMULATION Class of Highway Depth Time Desired Road Condition 4 8 cm 16 hours Snow-packed or bare 5 10 cm 24 hours Snow-packed or bare 6 10 cm 24 hours Snow-packed or bare ICY ROADWAYS The minimum standard for treating icy roadways is to deploy resources to treat an icy roadway as soon as practicable after becoming aware of the condition; and to treat the icy roadway within the time set out in Table 4 after becoming aware of the condition. It is acceptable to "spot" treat only those sections that are in fact icy. The entire road does not require the same treatment; however, the treatment that is applied and the locations are required to be documented each and every time this treatment method is used. This section only applies to the municipality during the season when the municipality performs winter highway maintenance. TABLE 4 ICY ROADWAYS Class of Highway Time Desired Surface Condition 4 12 hours Snow-packed bare or 5 16 hours Snow-packed bare or 6 16 hours Snow-packed bare or POTHOLES If a pothole exceeds both the surface area and depth set out in Table 5 or 6, as the case may be, the minimum standard is to repair the pothole within the time set out in Table 5 or 6, as appropriate, after becoming aware of the fact. A pothole shall be deemed to be repaired if its surface area or depth is less than or equal to that set out in Table 5 or 6, as appropriate. SACLERK\By-laws\2013 By-laws\89-13 Schedule A.doc Page 5 of 10 TABLE 5A POTHOLES ON PAVED SURFACE OF ROADWAY Class of Highway Surface Area Depth Time 4 1000 cm2 8 cm 14 days 5 1000 cm2 8 cm 30 days 6 1000 cm2 10 cm 30 days TABLE 5B POTHOLES ON NON-PAVED SURFACE OF ROADWAY Class of Highway Surface Area Depth Time 4 1500 cm2 10 cm 14 days 5 1500 cm2 12 cm 30 days 6 1500 cm2 12 cm 30 days TABLE 6 POTHOLES ON PAVED OR NON-PAVED SURFACE OF SHOULDER Class of Highway Surface Area Depth Time 4 1500 cm2 10 cm 30 days 5 1500 cm2 12 cm 60 days 6 1500 cm2 12 cm 60 days SHOULDER DROP-OFFS If a shoulder drop-off is deeper, for a continuous distance of 20 metres or more, than the depth set out in Table 7, the minimum standard is to repair the shoulder drop-off within the time set out in the Table after becoming aware of the fact. A shoulder drop-off shall be deemed to be repaired if its depth is less than or equal to that set out in the Table. In this section, "shoulder drop-off' means the vertical differential, where the paved surface of the roadway is higher than the surface of the shoulder, between the paved surface of the roadway and the paved or non-paved surface of the shoulder. TABLE 7 SHOULDER DROP-OFFS Class of Highway Depth Time 4 8 cm 30 days 5 8 cm 30 days 6 8 cm 30 days SACLERK\By-laws\2013 By-laws\89-13 Schedule A.doc Page 6 of 10 CRACKS If a crack on the paved surface of a roadway is greater, for a continuous distance of three metres or more, than the width and depth set out in the Table to this section, the minimum standard to repair the crack within the time set out in the Table after becoming aware of the fact. A crack is deemed to be in a state of repair if its width and depth is less than or equal to that set out in the Table. TABLE 8 CRACKS Class of Highway Width Depth Time 4 5cm 5cm 180 days 5 5cm 5cm 180 days 6 5cm 5cm 180 days DEBRIS If there is debris on a roadway, the minimum standard is to deploy resources, as soon as practicable after becoming aware of the fact, to remove the debris. In this section, "debris" means any material or object on a roadway that is not an integral part of the roadway or has not been intentionally placed on the roadway by a municipality, and that is reasonably likely to cause damage to a motor vehicle or to injure a person in a motor vehicle. It may include, but not be limited to, garbage, garbage bags, tires, or other large quantities of litter. LUMINAIRES As per section 10.6.(b) of 0. Reg. 239/02, the standard only applies to Class 3, 4 and 5 highways with a posted speed of 80 km/hr or more. All of our luminaires are located in hamlets or built-up areas where the posted speed is less than 80 km/hr. SIGNS The minimum standard for the frequency of inspecting signs of a type listed below to check to see if they meet the retro-reflectivity requirements of the Ontario Traffic Manual is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. If any sign of a type listed below is illegible, improperly oriented or missing, the minimum standard is to deploy resources as soon as practicable after becoming aware of the fact to repair or replace the sign. This section applies to the following types of signs: 1. Checkerboard. 2. Curve sign with advisory speed tab. 3. Do not enter. 4. One Way. 5. School Zone Speed Limit. 6. Stop. 7. Stop Ahead. 8. Stop Ahead, New. 9. Traffic Signal Ahead, New. 10. Two-Way Traffic Ahead S:\CLERK\By-laws\2013 By-laws\89-13 Schedule A.doc Page 7 of 10 11. Wrong Way. 12. Yield. 13. Yield Ahead. 14. Yield Ahead, New. REGULATORY OR WARNING SIGNS If a regulatory or warning sign other than a sign listed above is illegible, improperly oriented or missing, the minimum standard is to repair or replace the sign within the time set out in Table 9 after becoming aware of the fact. In this section, "regulatory sign" and "warning sign" have the same meaning as in the Ontario Traffic Manual. TABLE 9 REGULATORY AND WARNING SIGNS Class of Highway Time 4 30 days 5 30 days 6 30 days TRAFFIC CONTROL SIGNAL SYSTEMS We do not have traffic control signal systems on our roadways that we are responsible for. The corresponding section of 0. Reg. 239/02 does not apply in our municipality. BRIDGE DECK SPALLS In this section, "bridge deck spall" means a cavity left by one or more fragments detaching from the paved surface of the roadway or shoulder of a bridge. If a bridge deck spall exceeds both the surface area and depth set out in the Table to this section, the minimum standard is to repair the bridge deck spall within the time set out in the Table after becoming aware of the fact. A bridge deck spall is deemed to be in a state of repair if its surface area or depth is less than or equal to that set out in the Table. 0. Reg. 239/02, s. 15 (2); 0. Reg. 47/13, s. 14. TABLE 10 BRIDGE DECK SPALLS Class of Highway Surface Area Depth Time 4 1000 cm2 8 cm 7 days 5 1000 cm2 8 cm 7 days 6 1000 cm2 8 cm 7 days SURFACE DISCONTINUITIES In this section, "surface discontinuity" means a vertical discontinuity creating a step formation at joints or cracks in the paved surface of the roadway, including bridge deck joints, expansion joints and approach slabs to a bridge. SACLERK\By-laws\2013 By-laws\89-13 Schedule A.doc Page 8 of 10 If a surface discontinuity on a roadway, other than a surface discontinuity on a bridge deck, exceeds the height set out in the Table to this section, the minimum standard is to repair the surface discontinuity within the time set out in the Table after becoming aware of the fact. A surface discontinuity on a roadway, other than a surface discontinuity on a bridge deck, is deemed to be in a state of repair if its height is less than or equal to the height set out in the Table to this section. If a surface discontinuity on a bridge deck exceeds five centimetres, the minimum standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the surface discontinuity on the bridge deck. A surface discontinuity on a bridge deck is deemed to be in a state of repair if its height is less than or equal to five centimetres. TABLE 11 SURFACE DISCONTINUITIES Class of Highway Height Time 4 5 cm 21 days 5 5 cm 21 days 6 5 cm 21 days S:\CLERMBy-laws\2013 By-laws\89-13 Schedule A.doc Page 9 of 10 MINIMUM STANDARDS FOR CATEGORIES NOT INCLUDED IN 0. REG. 239/02 TREES This section applies to the mitigation of a tree-fall on a roadway. A tree-fall on a roadway may occur if all the following conditions are present: 1. The entire tree or a significant portion of the tree must appear dead, as evidenced by no leaves during normal in-leaf season, and the tree must be on the Township right-of-way, and 2. The trunk of the tree must be greater than 0.3 m in diameter, and 3. There must be a significant likelihood of the tree falling on the roadway, if it falls. After becoming aware of the fact that one or more of the conditions noted above exist the level of service is to secure the tree from falling on a roadway within the lag time as shown in Table 12. TABLE 12 TREES Class of Highway Time 4 30 days 5 30 days 6 30 days FLOODING A flood condition exists where water, flowing or standing, covers more than half a lane width of highway. Where floods exceed the depth of 10 cm, a response is required. Flood conditions on roadways should have warning signs posted as a response. Further, where the roadway is not closed, it should be monitored at reasonable intervals during the flood. The time for responding should be no more than 12 hours after becoming aware of the condition. Flood mitigation, while in a flood condition, is at the discretion of the road authority. Repeat flooding within a two week period is considered a single occurrence. Where the maximum frequency is exceeded the zone should be posted to advise of the potential hazard. Where the maximum frequency per month is exceeded and where flooding occurs more frequently than once every two years, remedial action shall be considered. TABLE 13 FLOODING Class of Highway Acceptable Depth Depth at which action is required 4 10 cm 10 cm 5 10 cm 20 cm 6 10 cm 20 cm DUST Where dust caused by traffic on a loose top road surface impacts on reasonable vehicle safety, relative to the ambient condition of the road, that condition should not occur for more than 6 months of the year. This policy does not apply where the condition occurs over a distance of less than 100 metres or where there are no permanent structures adjacent to the roadway. This standard does not apply to shoulders but to the travelled portion of the road. Dust suppression will be applied in accordance with the guidelines of the Ontario Ministry of Environment and Ministry of Transportation. Dust abatement to address other criteria such as field crops, and air quality are not addressed in this policy. S:\CLERMBy-laws\2013 By-laws\89-13 Schedule A.doc Page 10 of 10 SCHEDULE "B" TO BY-LAW #89-13 TOWNSHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS ROAD SUMMARY BY NAME, CLASS, AADT ASSET_NAME -Class Number- -District ID- AADT -Section Number- Surface Type * Length (Km) Shoulder Width Left (m) Shoulder Width Right (m) Surface Width (m) Arco! Road Class 4 3 100 71 LCB 1.2 0.5 0.5 6.0 Arco! Road Class 6 3 49 419 G/S 0.5 0 0 6.2 Arco! Road Class 6 3 49 420 G/S 2.5 0 0 4.2 Ardoch Road Class 4 2 312 34 HCB 0.9 1.2 1.2 6.3 Ardoch Road Class 4 2 312 39 LCB 0.25 1.5 1.5 6.7 Ardoch Road Class 4 2 312 40 LCB 2 1.5 1.5 6.5 Ardoch Road Class 4 2 312 41 LCB 0.6 1.5 1.5 6.7 Ardoch Road Class 4 2 312 37 LCB 2.75 1.5 1.3 5.8 Ardoch Road Class 4 2 312 38 LCB 4.8 1 1 6.5 Ardoch Road Class 4 2 312 35 LCB 1.65 1.2 1 6.3 Ardoch Road Class 4 2 312 42 LCB 0.8 1 1.5 6.6 Ardoch Road Class 4 2 312 36 LCB 1.6 1.2 1 6.7 Ardoch Road Class 4 3 312 44 LCB 2 1 1 6.5 Ardoch Road Class 4 3 312 43 LCB 1.5 1 1.5 6.6 Austris Road Class 6 2 49 405 G/S 1.95 0 0 4.0 Austris Road Class 6 2 49 404 G/S 0.6 0 0 6.3 Beach Road Class 6 2 49 441 G/S 0.85 0 0 5.6 Black Road Class 6 1 49 460 G/S 0.5 0 0 4.5 Brown's Bay Road Class 6 1 49 469 G/S 0.65 0 0 4.0 Brule Lake Road Class 6 2 49 436 G/S 4.63 0 0 5.4 Buckshot Lake Road Class 4 2 400 66 LCB 1.05 1.2 1.2 6.4 Buckshot Lake Road Class 4 2 400 65 LCB 1.45 1.2 1.2 6.4 Buckshot Lake Road Class 4 2 400 70 LCB 1.8 1 1 6.3 Buckshot Lake Road Class 4 2 400 68 LCB 1.3 1.3 1.3 6.0 Buckshot Lake Road Class 4 2 400 74 LCB 0.2 1.3 1.3 6.0 Buckshot Lake Road Class 4 2 400 73 LCB 0.2 1.3 1.3 6.0 Buckshot Lake Road Class 4 2 400 75 LCB 2.5 1.3 1.3 6.0 Buckshot Lake Road Class 4 2 400 67 LCB 1.2 1.2 1.2 6.4 Buckshot Lake Road Class 4 2 400 69 LCB 2.7 1.3 1.3 6.0 Canonto Road Class 4 3 200 53 LCB 2.9 0.8 0.8 5.8 Canonto Road Class 4 3 200 52 LCB 2.76 0.8 0.8 5.0 Canonto Road Class 4 3 250 54 LCB 3.2 0.5 0.5 5.9 Chatham Road Class 6 3 49 418 G/S 2.1 0 0 3.8 Crotch Lake Access Road Class 6 2 49 402 G/S 1.09 0 0 3.0 Cruise Road Class 6 3 49 416 G/S 5.06 0 0 4.7 Delyea Road Class 6 1 49 462 G/S 0.47 0 0 5.3 * G/S - Gravel Surface LCB - Low Class Bituminous HCB - High Class Bituminous Page 1 of 5 SCHEDULE "B" TO BY-LAW #89-13 TOWNSHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS ROAD SUMMARY BY NAME, CLASS, AADT ASSET_NAME -Class Number- -District ID- AADT -Section Number- Surface Type * Length (Km) Shoulder Width Left (m) Shoulder Width Right (m) Surface Width (m) Don Anna Road Class 6 1 49 470 G/S 0.7 0 0 5.3 Donaldson Road Class 6 3 49 414 G/S 0.6 0 0 4.0 East Bay Road Class 6 2 49 447 G/S 1.38 0 0 4.3 Elphin-Maberley Road Class 4 3 150 49 LCB 2 1.3 1.3 6.2 Folger Road Class 6 3 49 417 G/S 3.71 0 0 4.0 Gemmill Road Class 6 3 49 411 G/S 1.24 0 0 5.0 Greer Road Class 6 2 49 403 G/S 5 0 0 4.5 Grindstone Lake Road Class 6 2 49 437 G/S 4.3 0 0 6.0 Gull Lake Road Class 4 1 100 83 LCB 1.3 0.5 0.5 5.5 Gull Lake Road Class 6 1 49 456 G/S 2.1 0 0 6.0 Gulley Road Class 4 3 150 47 LCB 2.69 0.5 0.5 5.1 Gutheinz Road Class 6 2 49 427 G/S 2 0 0 4.0 Harlowe Road Class 4 1 500 210 HCB 2.05 1 1 6.6 Harlowe Road Class 4 1 500 211 HCB 3.8 1.2 1.2 6.6 Harlowe Road Class 4 1 500 209 HCB 2.05 1.2 1.2 6.5 Head Road Class 4 1 100 79 LCB 0.9 0.5 0.5 5.8 Head Road Class 6 1 49 450 G/S 2 0 0 6.0 Henderson Road Class 4 1 200 212 HCB 1.1 0.7 0.7 6.3 Hills Lake Road Class 6 2 49 440 G/S 2.4 0 0 4.3 James Road Class 6 2 49 438 G/S 0.44 0 0 4.0 James Road Class 6 2 49 439 G/S 0.5 0 0 2.7 Jewel Road Class 6 1 49 91 LCB 0.15 0 0 5.5 Jewel Road Class 6 1 49 90 LCB 0.2 0 0 5.5 Kashwakamak Lake Road Class 4 1 150 85 LCB 2.8 0.5 0.5 5.7 Kashwakamak Lake Road Class 4 1 150 84 LCB 2.7 0.5 0.5 5.7 Ladyslipper Road Class 6 1 49 463 G/S 0.3 0 0 4.8 Lake Road Class 6 3 49 55 LCB 0.55 0.8 0.8 5.0 Levere Road Class 6 1 49 454 G/S 0.3 0 0 4.0 Little Pond Road Class 6 1 49 89 LCB 0.35 0 0 5.4 Lodge Road Class 6 3 49 45 LCB 0.55 0 0 5.4 Lookout Hill Road Class 6 2 49 62 LCB 0.16 0 0 6.0 Lothlonen Road Class 6 3 49 424 G/S 0.3 0 0 4.8 MacDonald Road Class 6 3 49 421 G/S 0.71 0 0 3.6 Marble Lake Road Class 6 1 49 453 G/S 4.4 0 0 6.2 Martelock Road Class 6 3 49 444 G/S 0.1 0 0 4.8 Martin Road Class 6 2 49 425 G/S 0.46 0 0 4.0 * G/S - Gravel Surface LCB - Low Class Bituminous HCB - High Class Bituminous Page 2 of 5 SCHEDULE "B" TO BY-LAW #89-13 TOWNSHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS ROAD SUMMARY BY NAME, CLASS, AADT ASSET_NAME -Class Number- -District ID- AADT -Section Number- Surface Type * Length (Km) Shoulder Width Left (m) Shoulder Width Right (m) Surface Width (m) Matawatchan Road Class 4 2 200 77 LCB 2.5 0 0 6.2 Mississagagon Lake Road Class 6 1 49 468 G/S 0.4 0 0 5.8 Morrow Road Class 6 3 49 413 G/S 3.74 0 0 4.1 Mosque Lake Road Class 6 2 49 442 G/S 2.4 0 0 5.5 Mountain Chute Road Class 6 3 49 202 HCB 0.95 1 1 6.4 Mountain Road Class 4 2 150 60 LCB 1.55 0.5 0.5 6.0 Mountain Road Class 4 2 150 61 LCB 1.2 0.7 0.7 5.9 Mountain Road Class 4 2 150 59 LCB 1.25 0.6 0.6 5.6 Mountain Road Class 6 2 49 433 G/S 4.2 0 0 6.2 Mountain Road Class 6 2 49 434 G/S 5.8 0 0 4.5 Myers Cave Road Class 4 1 150 87 LCB 2.1 0.5 0.5 6.0 Myers Cave Road Class 4 1 150 88 LCB 2.05 0.3 0.3 6.0 Myers Cave Road Class 4 1 150 86 LCB 2.6 0.3 0.3 6.0 Norcan Lake Lane Class 6 3 49 475 G/S 3.6 0 0 6.4 North Mazinaw Heights Road Class 4 1 100 208 HCB 1.25 0.3 0.3 6.3 North Mazinaw Heights Road Class 4 1 100 82 LCB 0.5 0.5 0.5 5.5 North Road Class 6 2 49 431 G/S 7.3 0 0 4.8 North Shore Road Class 4 2 100 76 LCB 0.35 0.8 0.8 4.2 North Shore Road Class 6 2 49 446 G/S 1.64 0 0 4.8 Nowell Road Class 6 1 49 465 G/S 0.15 0 0 4.8 Oak Road Class 6 1 49 461 G/S 0.85 0 0 5.4 Perry Road Class 6 1 49 467 G/S 0.37 0 0 5.2 Quackenbush Road Class 6 2 10 449 G/S 4.6 0 0 3.3 Ragged Chutes Road Class 6 3 49 412 G/S 1.3 0 0 4.4 River Road Class 4 2 100 47 LCB 1.3 0.5 0.5 6.0 River Road Class 4 3 150 445 G/S 0.75 0 0 6.5 River Road Class 4 3 150 423 G/S 1.7 0 0 6.3 River Road Class 4 3 150 72 LCB 0.8 1 1 5.3 River Road Class 4 3 150 57 LCB 2.25 0.5 0.5 6.0 River Road Class 4 3 150 56 LCB 1.4 0.5 0.5 5.3 River Road Class 6 2 49 407 G/S 3.08 0 0 5.5 Road 506 Class 4 1 800 30 LCB 3.85 1.8 1.8 6.7 Road 506 Class 4 1 800 31 LCB 0.45 1.8 1.8 6.7 Road 506 Class 4 1 800 26 LCB 2.3 1.5 1.5 6.8 Road 506 Class 4 1 800 32 LCB 1.35 1.8 1.8 7.5 Road 506 Class 4 1 800 27 LCB 1.2 1.8 1.8 6.7 Road 506 Class 4 1 800 28 LCB 0.7 1.8 1.8 6.7 * G/S - Gravel Surface LCB - Low Class Bituminous HCB - High Class Bituminous Page 3 of 5 SCHEDULE "B" TO BY-LAW #89-13 TOWNSHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS ROAD SUMMARY BY NAME, CLASS, AADT ASSET_NAME -Class Number- -District ID- AADT -Section Number- Surface Type * Length (Km) Shoulder Width Left (m) Shoulder Width Right (m) Surface Width (m) Road 506 Class 4 1 800 29 LCB 2.7 1.8 1.8 6.7 Road 506 Class 4 1 800 33 LCB 4.2 2 2 6.7 Road 506 Class 4 2 800 201 HCB 0.25 0 0 6.8 Road 506 Class 4 2 800 24 LCB 1.5 1.8 1.8 6.7 Road 506 Class 4 2 800 21 LCB 2.9 1.5 1.5 7.0 Road 506 Class 4 2 800 19 LCB 0.6 1.8 1.8 6.7 Road 506 Class 4 2 800 25 LCB 0.95 1.8 1.8 6.7 Road 506 Class 4 2 800 18 LCB 6.35 1.6 1.6 7.1 Road 506 Class 4 2 800 23 LCB 0.6 1.8 1.8 6.8 Road 506 Class 4 2 800 20 LCB 1 1.8 1.8 6.7 Road 506 Class 4 2 800 22 LCB 1.45 1.8 1.8 6.7 Road 509 Class 4 2 600 200 HCB 0.35 0 0 6.8 Road 509 Class 4 2 600 17 LCB 1.4 1 1 6.7 Road 509 Class 4 2 600 14 LCB 2.75 1 1.6 6.7 Road 509 Class 4 2 600 16 LCB 3.6 1.5 1.5 6.7 Road 509 Class 4 2 600 15 LCB 1.65 1.2 1.2 6.7 Road 509 Class 4 3 600 7 LCB 2.1 1 1 6.5 Road 509 Class 4 3 600 1 LCB 7.25 2 1.6 6.7 Road 509 Class 4 3 600 3 LCB 2.4 1 1 6.3 Road 509 Class 4 3 600 9 LCB 6.35 1 1 6.7 Road 509 Class 4 3 600 12 LCB 0.75 1.2 1.2 6.5 Road 509 Class 4 3 600 4 LCB 1.3 1 1 6.7 Road 509 Class 4 3 600 13 LCB 3.4 1 1 6.8 Road 509 Class 4 3 600 2 LCB 1.04 2.5 2.5 6.5 Road 509 Class 4 3 600 5 LCB 0.65 1 1 6.7 Road 509 Class 4 3 600 10 LCB 3.6 1 1 6.7 Road 509 Class 4 3 600 11 LCB 1.3 1 1 6.7 Road 509 Class 4 3 600 6 LCB 0.85 1.5 1.5 6.7 Road 509 Class 4 3 600 8 LCB 0.65 1 1 6.6 Robertsville Road Class 6 3 49 400 G/S 5.1 0 0 5.6 Russ Brown Road Class 6 2 49 448 G/S 2.7 0 0 3.5 Sand Lake Road Class 4 2 100 64 LCB 0.4 0.5 0.5 5.0 Sand Lake Road Class 4 2 100 63 LCB 1.7 0.5 0.5 6.0 Schonauer Road Class 6 2 49 408 G/S 0.8 0 0 4.5 Schooner Road Class 6 2 49 435 G/S 1.14 0 0 4.8 * G/S - Gravel Surface LCB - Low Class Bituminous HCB - High Class Bituminous Page 4 of 5 SCHEDULE "B" TO BY-LAW #89-13 TOWNSHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS ROAD SUMMARY BY NAME, CLASS, AADT ASSET_NAME -Class Number- -District ID- AADT -Section Number- Surface Type * Length (Km) Shoulder Width Left (m) Shoulder Width Right (m) Surface Width (m) Shabomeka Lake Road Class 4 1 100 92 LCB 1 0.8 0.8 6.7 Shabomeka Lake Road Class 4 1 100 80 LCB 1.75 0.5 0.5 5.5 Shabomeka Lake Road Class 6 1 49 451 G/S 3.15 0 0 7.5 Shiner Road Class 6 3 49 401 G/S 3.7 0 0 5.0 Skootamatta Lake Road Class 4 1 300 204 HCB 1 0.5 0.5 6.3 Skootamatta Lake Road Class 4 1 300 203 HCB 0.65 0.5 0.5 6.2 Skootamatta Lake Road Class 4 1 300 81 LCB 0.35 0.5 0.5 6.1 Smarts Road Class 6 1 49 455 G/S 0.25 0 0 5.0 Smith Road Class 4 2 100 46 LCB 1.1 0.3 0.3 5.3 Smith Road Class 6 2 49 406 G/S 6.1 0 0 5.0 Snider Road Class 6 1 49 78 LCB 0.65 0.3 0.3 6.4 South Bush Road Class 6 3 49 422 G/S 6.4 0 0 4.4 South Lavant Road Class 4 3 100 50 LCB 2 0.5 0.5 5.8 South Lavant Road Class 4 3 100 51 LCB 3.35 0.5 0.5 5.2 South Mazinaw Heights Road Class 4 1 100 207 HCB 0.5 0.3 0.3 6.2 South Mazinaw Heights Road Class 4 1 100 206 HCB 1.1 0.3 0.3 6.2 South Mazinaw Heights Road Class 4 1 100 205 HCB 0.35 0.3 0.3 5.8 South Road Class 4 2 100 58 LCB 2.5 0.9 0.9 5.2 South Road Class 6 2 49 429 G/S 0.7 0 0 4.0 South Road Class 6 2 49 428 G/S 1.5 0 0 6.4 Spencer Road Class 6 1 49 466 G/S 0.94 0 0 3.5 St. Pierres Road Class 6 3 49 409 G/S 0.2 0 0 3.9 Station Road Class 6 3 49 410 G/S 0.18 0 0 3.5 Station Road Class 6 3 49 48 LCB 0.17 0 0 3.5 Struthadam Road Class 6 2 49 432 G/S 6.22 0 0 2.9 Struthadam Road Class 6 3 49 443 G/S 1.56 0 0 4.4 Sunday Lake Drive Class 6 3 49 G/S 3.5 0 0 4.0 - 5.0 Swauger Lake Road Class 6 2 49 426 G/S 0.5 0 0 4.0 Thompson Road Class 6 1 49 457 G/S 0.51 0 0 4.5 Twin Oaks Road Class 6 2 49 430 G/S 1.45 0 0 5.0 Veley Road Class 6 1 49 458 G/S 0.68 0 0 4.5 Wellman Road Class 6 1 49 452 G/S 0.28 0 0 4.0 Whites Road Class 6 1 49 459 G/S 2 0 0 5.7 Wilbur Road Class 6 3 49 415 G/S 4.33 0 0 4.2 Wintergreen Road Class 6 1 49 464 G/S 5.6 0 0 5.0 TOTAL 334.11 * G/S - Gravel Surface LCB - Low Class Bituminous HCB - High Class Bituminous Page 5 of 5 SCHEDULE "C" to BY-LAW #89-13 TOWNDHIP OF NORTH FRONTENAC LEVEL OF SERVICE POLICY FOR TOWNSHIP ROADS SEASONAL ROADS Some part or all of each of these roads are seasonal in nature and are not maintained for their entire length ROAD NAME AADT SPEED LIMIT CLASS DISTANCE MAINTAINED DISTANCE PLOWED Browns Bay Road 49 50 km/h 6 0.65 km 0.1 km Chatham Road 49 50 km/h 6 2.1 km NONE Crotch Road Lake Access 49 50 km/h 6 1.09 km 0.1 km Gutheinz Road 49 50 km/h 6 2.0 km NONE Greer Road 49 50 km/h 6 5.1 km 4.0 km James Road 49 50 km/h 6 0.8 km 0.36 km Ladyslipper Road 49 50 km/h 6 0.3 km NONE Mountain Road (Mackie Lake Road) 49 50 km/h 6 14 km 10.1 km Morrow Road 49 50 km/h 6 3.7 km NONE Quackenbush Road 49 50 km/h 6 2.5 km NONE Russ Brown Road 49 50 km/h 6 2.7 km Only By Request Shiner Road 49 50 km/h 6 3.7 km 2.5 km South Bush Road 49 50 km/h 6 6.4 km 2.0 km Struthadam Road 49 50 km/h 6 6.6 km From River Road for 1.6