Building permits — Northeastern Manitoulin and the Islands, Ontario

Do I need a building permit? What does it cost?

In the Municipality of Northeastern Manitoulin and the Islands, Ontario, building permit rules are set by Building By-Law No. 2023-10 (rescinds By-laws 2012-15 and 98-20), verified 2026-09-25. Permit required for: Construction, demolition, change of use, or occupancy of a partially complete building. Exemptions: No permit is required for structures under 100 square feet; no permit is required for structures under 161 square feet for buildings being used for storage. Permit fees: As set out in Schedule "A"; e.g. New buildings $12 per $1000 (Minimum $1200); Industrial / Commercial Construction $14 per $1000 (Minimum $1500).

Building By-Law No. 2023-10 (rescinds By-laws 2012-15 and 98-20) adopted bylaw
permit required for Construction, demolition, change of use, or occupancy of a partially complete building. s. 3
exemptions No permit is required for structures under 100 square feet; no permit is required for structures under 161 square feet for buildings being used for storage. Schedule "A" Notes
fee basis As set out in Schedule "A"; e.g. New buildings $12 per $1000 (Minimum $1200); Industrial / Commercial Construction $14 per $1000 (Minimum $1500). Schedule "A"
fees location Schedule "A" s. 11(1)
authority Chief Building Official s. 2(1)(g)
scout note

Passed under s.8 Building Code Act, 1992; governs construction, demolition, change-of-use permits, inspections and fees (Schedule A fees, Schedule B application requirements). Comes into force April 20, 2023.