| permit required for | Work or construction, demolition or a change of use of a building. | work or construction, demolition or a change of use |
| fee basis | Based on area in m2; rates in $/m2 unless otherwise specified; minimum $200.00; unlisted permits 1% of construction value. | General Notes Table 1; Minimum Permit Fee |
| fees location | Town's Annual Budget Process and the Building By-Law | Fees and Charges as Approved by the Town's Annual Budget Process |
| fine range | 50% of the required permit fee, maximum $5,000.00 | Building Without A Permit |
scout note
Annual building-permit fee schedule set under the Building By-law and the Town's budget process; lists per-square-metre permit fees by class of construction (assembly, detention/care, residential, etc.) for 2025.