This is the exact embedded text of the captured official document.
Snapshot 69b3952abc28 · verified 2026-10-26 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Page 1 of 37
-
Office Consolidation - August 22, 2025
By-law No. 2024-134 amended by By-law No. 2025-048
By-law No. 2024-134 amended by By-law No. 2025-054
By-law No. 2024-134 amended by By-law No. 2025-063
The Corporation of the Township of Oro-Medonte
By-law No. 2024-134
A By-law to provide for the imposition of fees or charges,
and to Repeal By-law No. 2024-094 (Fees and Charges By-law)
Whereas Section 8 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended, provides the
powers of a municipality under this or any other Act shall be interpreted broadly so as to confer
broad authority on the municipality to enable the municipality to govern its affairs as it considers
appropriate and to enhance the municipality's ability to respond to municipal issues;
And Whereas Section 9 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended, provides that
a municipality has the capacity, rights, powers and privileges of a natural person for the purpose
of exercising its authority under this or any other Act;
And Whereas Part XII, Section 391(1) of the Municipal Act, 2001, S.O. 2001, c. 25, as
amended, authorizes a municipality to impose fees or charges on persons, for services or
activities provided or done by or on behalf of it; for costs payable by it for services or activities
provided or done by or on behalf of any other municipality or local board; and for the use of its
property including property under its control;
And Whereas Section 391(2) of the Municipal Act, 2001, S.O. 2001 c.25, as amended, provides
that a fee or charge for capital costs related to services or activities may be imposed on persons
not receiving an immediate benefit from the services or activities but who will receive a benefit at
some later point in time;
And Whereas subsection 391(3) of the Municipal Act, 2001, S.O. 2001, c. 25, as amended,
provides that the costs included in a fee or charge may include costs incurred by a municipality
related to administration, enforcement and the establishment, acquisition and replacement of
capital assets;
And Whereas Section 11(3) of the Municipal Act, 2001, S.O. 2001, c. 25, as amended, provides
that a municipality may pass by-laws respecting matters relating to public utilities;
And Whereas The Corporation of the Township of Oro-Medonte operates and maintains
communal tile beds hereinafter referred to as the "communal tile works";
And Whereas the Council of The Corporation of the Township of Oro-Medonte deems it
necessary to impose a sewer service charge upon those lands that derive a benefit from the
sewage works;
And Whereas The Corporation of the Township of Oro-Medonte operates and maintains
municipal drinking water systems;
And Whereas Section 398(2) of the Municipal Act, 2001, S.O. 2001, c. 25, as amended,
provides the Treasurer of a local municipality may add charges imposed by the municipality
under Part XII of the said Act to the tax roll for the property to which the public utility was supplied
and collect them in the same manner as municipal taxes;
And Whereas Section 110 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended, provides
that a municipality may enter into agreements for the provision of municipal capital facilities by
any person and may pass by-laws to enter into agreements relating thereto;
And Whereas The Corporation of the Township off Oro-Medonte has entered into such an
agreement with Freed in regards to the Horseshoe Valley Resort Waste Water Treatment Plant,
pursuant to By-law No. 2014-075, as amended, that is owned and operated by Freed;
Page 2 of 37
And Whereas Section 69(1) of the Planning Act, R.S.O., 1990, c.P.13, as amended, provides
that a municipality may establish a tariff of fees for the processing of applications;
And Whereas Section 7(1) of the Building Code Act, 1992, S.O. 1992, c.23, as amended,
authorizes the Council of a municipality to pass by-laws requiring the payment of fees on
applications for and on the issuance of permits, requiring the payment of fees for maintenance
inspections, and prescribing the amounts of the fees;
And Whereas a public meeting was held on April 11, 2018 under the authority of the Building Code
Act, Section 7(6), S.O. 1992, c.23 as amended, to obtain public comments with respect to the
proposed amendments to the Fees and Charges by-law;
And Whereas Section 5(0.1) of the Fire-Protection and Prevention Act, 1997, S.O. 1997, c.4, as
amended, authorizes a municipality to establish, maintain and operate a fire department for all or
any part of the municipality;
And Whereas Council of the Township of Oro-Medonte did, on the 11th. day of September, 2024,
enact By-Law No. 2024-094;
Now Therefore the Council of the Township of Oro-Medonte hereby enacts as follows:
1. That this By-law be known as the "Fees and Charges By-law''.
2. That the following Schedules, attached hereto, form part of this By-law:
Schedule A
Administration
Schedule B
Building
Schedule C
Fire & Emergency Services
Schedule D
Recreation and Community Services
Schedule E
Planning
Schedule F
Operations
Schedule G
Communal Tile
Schedule H
Finance
Schedule I
Municipal Law Enforcement
Schedule J
Drinking Water
Schedule K
Wastewater Treatment (Freed PVT)
Schedule L
Craighurst Wastewater System
3. That Appendix "1" attached hereto lists services and fees imposed under separate by-laws,
Acts, or Ontario Regulations.
4. Any person desirous of using those services or property of the Township of Oro Medonte
described in Schedules "A" to and including "K" shall pay the fee set out opposite the
description or name of the particular service or property, as shown in Schedules "A" to and
including "K".
5. Despite the provision of Section 4, Council or its delegated authority may, in its discretion
upon application to it, waive or reduce the fees set out in Schedules "A" to and including "K"
for any person, on a one time or on a continuing basis.
6. All fees payable under this By-law shall be payable in advance of providing the service
except for:
a) emergency services;
b) actions taken by the Township of Oro-Medonte to rectify failures or by-law infractions
on the part of a resident;
c) specific fees prescribed in Schedule "E" (Planning) to this By-law; in which case the fee
payable will be in arrears and invoiced subsequent to the service or activity provided.
Page 3 of 37
7. That Appendix "1" attached hereto lists services and fees imposed under separate by-laws,
Acts, or Ontario Regulations.
8. Any person desirous of using those services or property of the Township of Oro Medonte
described in Schedules "A" to and including "K" shall pay the fee set out opposite the
description or name of the particular service or property, as shown in Schedules "A" to and
including "K".
9. Despite the provision of Section 4, Council or its delegated authority may, in its discretion
upon application to it, waive or reduce the fees set out in Schedules "A" to and including "K"
for any person, on a one time or on a continuing basis.
10. All fees payable under this By-law shall be payable in advance of providing the service
except for:
a) emergency services;
b) actions taken by the Township of Oro-Medonte to rectify failures or by-law infractions
on the part of a resident;
c) specific fees prescribed in Schedule "E" (Planning) to this By-law; in which case the fee
payable will be in arrears and invoiced subsequent to the service or activity provided.
11. If for any reason fees owing under this By-law remain unpaid after 30 days, same shall bear
interest at the rate of 1.25% per month until paid in full. In addition to any interest owing,
each payment that is not paid when due, shall bear an administrative penalty of $25.00.
12. Where a deposit is required under this By-law for services rendered by the Township,
and actual costs exceed the deposited amount, such costs shall be deemed to be fees
owing under this By-law and Section 7 of this By-law shall pertain to such outstanding
costs.
13. Any fees that are owing to the Township of Oro-Medonte and that are unpaid are a debt to
the Township of Oro-Medonte and, together with all interest and penalties accrued
thereupon, may be collected by the Township of Oro-Medonte by action or may be collected
by the Township of Oro-Medonte on its behalf or may be collected in like manner as taxes.
14. Should any section, subsection, clause, paragraph or provision of this By-law, including
any part of the Schedules to this By-law, be declared by a court of competent jurisdiction to
be invalid, the same shall not affect the validity of the Bylaw as a whole or any part thereof,
other than the provision or part of the schedule so declared to be invalid.
15. Any other by-law or part thereof inconsistent with the provisions of this By-law is hereby
repealed.
16. And That this by-law and the following schedules shall come into force and take effect on
January 1st, 2025.
By-law No. 2024-134 As Amended and As Consolidated
Disclaimer
While every effort has been made to ensure accuracy, the official versions of any applicable by-
laws are the definitive legal documents.
Page 4 of 37
Schedule "A" to Amending By-Law No. 2024-134
Administration
1.
Compliance Reports (subject to 5 day turnaround time)
a) Building Information (Tax Exempt)
$ 150.00
b) Septic Information (Tax Exempt)
$ 150.00
c) Environmental (Tax Exempt)
$ 150.00
d) Site Plan Information (Tax Exempt)
$ 367.00
e) Zoning Information (Tax Exempt)
$150.00
f) Development Charge/Lot Levy Information (Tax
Exempt)
$ 20.00
2.
Documents
a) Fire & Emergency Services Master Plan
(Background material)
$ 20.00
b) Official Plan
$ 53.50
c) Zoning By-law
$ 42.80
d) Recreation Master Plan (on USB stick)
e) Development Engineering Policies, Process, and
Design Standards (on USB stick)
$ 40.00
$ 20.00
3.
Historical Books
a) Hills of Oro (Tax Exempt)
$ 3.00
b) Kith 'n Kin (Tax Exempt)
$ 20.00
c) Knox Presbyterian Church
$ 3.15
d) Medonte A Township Remembered (Tax Exempt)
$20.00
e) Oro African Church (Tax Exempt)
$10.00
f) Story of Oro (Tax Exempt)
$ 15.00
4.
Line Fence Dispute
a) Administration Fee
$350.00
5.
Maps and Oversized Documents
a) 11" x 17"
$ 5.00
b) Oversize black and white print
$ 10.00
c) Oversize colour print
$ 15.00
d) Oversize scan (on USB stick)
$ 12.00
e) Township Road Map
$ 10.00
6.
Commissioning of Documents
a) Commissioning Fee (Tax Exempt)
$ 25.00
b) Certifying Document (Tax Exempt)
$ 25.00
7.
Miscellaneous
a) Assessment Information (on USB stick)
$ 300.00
b) Photocopies - for all departments
Black and White
$ 0.50/page
Colour
$ 0.75/page
Scan
$ 2.00/per
document
c) Township Pins
$ 5.00
d) General Administrative Letters
$ 25.00
e) Records Search including publicly available information $ 7.50/15 min.
f) Shipping & Handling Documents
Market Rate
g) Copies of Livestreamed Meetings (on USB stick)
$10.00/meeting
h) Alcohol and Gaming Commission of Ontario (AGCO)
Temporary Extension Requests (Corporate
Services Application fee)
$ 200.00
i) Municipal Freedom of Information and Protection of
Privacy Act (per R.R.O.1990, Reg. 823):
i) Application/request for access $5.00
ii) Search time (by any person) $7.50/15 min.
iii) Record preparation (including severing and redaction
of any part of a record by any person) $7.50/15 min.
Page 5 of 37
8.
Municipal Address Signage
a) Sign Posts
$ 55.00
b) Municipal Address Sign
$ 25.00
9.
Land Purchase Request
a) Administration Fee (non-refundable)
$ 350.00
b) Deposit Upon Council's Approval (Tax Exempt)
$ 7,500.00
Note: In the event that the applicant chooses not to proceed with the land
purchase request, the deposit, minus any costs already incurred by
the Township with respect to the potential purchase/sale, will be
refunded to the applicant. The applicant will be supplied with
copies of invoices which shall identify the costs that have already
been incurred by the Township.
10.
Request to Lift Reserve Blocks
Administration Fee (non-refundable)
$ 350.00
Note: The applicant shall be responsible for all costs incurred by the
Township with respect to their request, whether the request is
approved or not. The applicant shall be invoiced accordingly, and
any such invoice shall include copies of invoices which shall
identify the costs that have been incurred by the Township.
11.
Request for Easement Over Municipal Property
a) Administration Fee (non-refundable)
$ 350.00
Note: The applicant shall be responsible for all costs incurred by the
Township with respect to their request, whether the request is
approved or not. The applicant shall be invoiced accordingly, and
any such invoice shall include copies of invoices which shall
identify the costs that have been incurred by the Township.
12.
Encroachment and License Agreements
a) Application Fee (Tax Exempt)
$ 700.00
b) Annual Fee (utilizing own insurance) (Tax
Exempt)
$ 150.00
c) Annual Fee (utilizing Township insurance)
(Tax Exempt)
$ 250.00
13.
Other Land Matters
Administration Fee (non-refundable)
$ 350.00
14.
Additional Costs Incurred
When the Township, or another municipal, provincial or federal
agency/entity on the Township's behalf, takes actions or pays money to
rectify failures, by-law infractions or situations created by, or on behalf of
a person, including but not limited to non-compliance with the terms of
any agreement or permit or license, such person shall be responsible for
all costs paid or payable by the Township including the cost of staff time,
equipment expenses and other expenses incurred by the Township. The
person responsible shall be invoiced for all costs. The minimum invoice
shall not be for less than three (3) hours of time or $1,000.
Note:
Fees and charges identified in this Schedule include all applicable taxes, unless otherwise specified.
Page 6 of 37
Schedule "B" to By-Law No. 2024-134
Building
1.
Calculation of Permit Fees
Permit fees shall be calculated based on the formula given below, unless
otherwise specified in the schedule.
The minimum fee for a permit shall be in accordance with the specified
rate for the current year unless specifically stated as a flat rate.
Any fee not determined in the following is determined at the discretion of the
Chief Building Official.
Permit Fee = Service Index (SI) x Total gross floor area (A)
Note: Gross floor area (A) calculated in square feet and is measured to the
outer face of exterior walls and to the centre of fire walls.
2.
Permit Fees
Building Classification & Construction
Service Index (SI)
Table 2.1
$ / ft2
3.
Refund of Permit Fees
3.1
Pursuant to this by-law, the portion of the total calculated permit
fees that may be refunded shall be a percentage of the total fees
payable under this by-law, calculated as follows in regard to
functions undertaken by the municipality:
a) 75% if only administrative functions have been performed;
b) 50% if administrative and plans examination functions have
been performed;
c) 25% if the permit has been issued and no field inspections
have been performed subsequent to permit issuance; or
d) 0% if any field inspections have been performed subsequent
to permit issuance.
However, in all cases a minimum permit fee will be retained.
3.2
The permit fee shall be returned to the person named on the fee receipt,
unless such person advises the Chief Building Official, in writing and prior to
release of the refund, of a change in name, in which case the refund shall be
returned to the person then authorized to receive it. When only the minimum
fee, or less has been collected/submitted, no refund will be processed.
4.
Conditional Permits
Conditional permit application requests to be reviewed
in accordance with the OBC and the current procedure.
4.1
Securities
As requested and issued by the Chief Building Official,
to be paid in addition to applicable permit fees in
accordance with the fees specified in Table 2.1.
The amount deemed shall be the amount of the security deposit required in the form of a letter of
credit.
For all projects subject to a conditional permit agreement, if the Chief Building Official determines
that the subject construction has not been removed or the lands have not been restored to its
original state in accordance with the agreement, the securities may be drawn upon in full or in part
to restore the lands. Should the Township incur additional costs, the Township shall have a lien
on the lands for such amount.
Page 7 of 37
5.
Notes
5.1
Total fee is payable upon receipt of completed application and invoice.
5.2
Where a person is found to have commenced construction or demolition of a
building without a permit having been issued, the permit fee listed in Table 2.1
shall be doubled, minimum fee of Minimum Permit Fee in accordance with
Table 2.1 in addition to required fees will be applied.
5.3
Indexing - Table 2.1 prescribes a 2.5% annual increase to permit fees without amendment to this
By-law, effective January 1st each year, commencing as of the date of passing of this by-law.
6. Cost Recovery
Where an Order is issued under the Building Code Act, the property owner or any other person
responsible for the action, shall pay fees in accordance with Table 2.1. Where an Order is issued
under the Act and where the named achieved eventual compliance with the Order, the Township
may choose not to prosecute the named, if satisfactory settlement is reached.
7. Additional Costs
When the Township, or another municipal, provincial, or federal agency/entity on the Township's
behalf, takes actions or pays money to rectify failures, by-law infractions or situations created by, or
on behalf of a person, including but not limited to non-compliance with the terms of any agreement,
or permit, or license, such person shall be responsible for all costs paid or payable by the Township
including the cost of staff time, equipment expenses and other expenses incurred by the Township.
The person shall be invoiced for all costs. The minimum invoice shall not be for less than three (3)
hours of time or $ 1,000.00.
Page 8 of 37
Building Permit Fees Table 2.1
2025 Fees
2026 Fees
2027 Fees
2028 Fees
2029 Fees
2030 Fees
2031 Fees
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
2.1 Non Residential Occupancies
Group A, B, D & E
a)New Construction
2.25
-
2.31
-
2.37
-
2.43
-
2.49
-
2.55
-
2.61
b)Renovation / Alteration to the above
1.01
-
1.04
-
1.06
-
1.09
-
1.11
-
1.14
-
1.17
c)Accessory Buildings to the above
0.79
-
0.81
-
0.83
-
0.85
-
0.88
-
0.90
-
0.92
Group F
a)New Construction
1.60
-
1.64
-
1.68
-
1.73
-
1.77
-
1.81
-
1.86
b)Renovation / Alteration to the above
1.01
-
1.04
-
1.06
-
1.09
-
1.11
-
1.14
-
1.17
c)Accessory Buildings to the above
0.79
-
0.81
-
0.83
-
0.85
-
0.88
-
0.90
-
0.92
d)Fire Code Retrofit as a result of Fire
Department inspection
-
-
-
-
-
-
-
-
-
-
-
-
-
Minor - as determined by CBO
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Major - as determined by CBO
1.01
-
1.04
-
1.06
-
1.09
-
1.11
-
1.14
-
1.17
Group G
Storage Buildings - Pole barn, Coverall,
Manure etc.
0.54
-
0.55
-
0.57
-
0.58
-
0.60
-
0.61
-
0.63
Barns, Riding Arenas, Agricultural
Processing Buildings (viewing areas - see
Group A)
1.01
-
1.04
-
1.06
-
1.09
-
1.11
-
1.14
-
1.17
Page 9 of 37
Building Permit Fees Table 2.1
2025 Fees
Per
Sq.
ft.
2026 Fees
Per
Sq.
ft.
2027 Fees
Per
Sq.
ft.
2028 Fees
Per
Sq.
ft.
2029 Fees
Per
Sq.
ft.
2030 Fees
Per
Sq.
ft.
2031 Fees
Per
Sq.
ft.
Greenhouse
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Flat
Per
Sq.
ft.
Greenhouse Subject to Site Plan Control
1.01
-
1.04
-
1.06
-
1.09
-
1.11
-
1.14
-
1.17
2.2 Residential Occupancies
Group C
a)New Construction - gross floor area
above grade
2.25
-
2.31
-
2.37
-
2.43
-
2.49
-
2.55
-
2.61
b)New Construction - basement/crawl
space
0.66
-
0.67
-
0.69
-
0.71
-
0.73
-
0.74
-
0.76
c) Renovation/Alteration/finishing
basement
0.66
-
0.67
-
0.69
-
0.71
-
0.73
-
0.74
-
0.76
d) Accessory Building / Garage
0.66
-
0.67
-
0.69
-
0.71
-
0.73
-
0.74
-
0.76
e) Decks, covered porches, balconies
-
-
-
-
-
-
-
-
-
-
-
-
-
i)As part of the original dwelling
permit - Less than 108 sq.ft.
Included /W
Dwelling
Included /W
Dwelling
-
Included /W
Dwelling
Included /W
Dwelling
-
Included /W
Dwelling
-
Included /W
Dwelling
-
Included /W
Dwelling
-
ii)As part of the original dwelling
permit - Over 108 sq.ft.
350.00
359.38
-
368.36
-
377.57
-
387.01
-
396.69
-
406.61
-
iii)Separate permit (not part of
original dwelling permit)
350.00
359.38
-
368.36
-
377.57
-
387.01
-
396.69
-
406.61
-
f) Solid fuel burning appliance
(woodstove, fireplace, etc.)
350.00
359.38
-
368.36
-
377.57
-
387.01
-
396.69
-
406.61
-
Page 10 of 37
Building Permit Fees Table 2.1
2025 Fees
Per
Sq.
ft.
2026 Fees
Per
Sq.
ft.
2027 Fees
Per
Sq.
ft.
2028 Fees
Per
Sq.
ft.
2029 Fees
Per
Sq.
ft.
2030 Fees
Per
Sq.
ft.
2031 Fees
Per
Sq.
ft.
2.3 Other Permits
Portable Buildings (School, sales office,
etc.)
400.00
410.72
-
420.99
-
431.51
-
442.30
-
453.36
-
464.69
-
Tents (short term for special events or a
summer season)
-
-
-
-
-
-
-
-
-
-
-
-
-
Up to 2,420 ft2 aggregate area
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Over 2,420 ft2 aggregate area
400.00
410.72
-
420.99
-
431.51
-
442.30
-
453.36
-
464.69
-
Demolition
250.00
256.70
-
263.12
-
269.70
-
276.44
-
283.35
-
290.43
-
Demolition - Engineered
400.00
410.72
-
420.99
-
431.51
-
442.30
-
453.36
-
464.69
-
Change of Use (No construction
proposed)
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Designated structures under Div A
1.3.1.1.
400.00
410.72
-
420.99
-
431.51
-
442.30
-
453.36
-
464.69
-
Retaining walls
-
-
-
-
-
-
-
-
-
-
-
-
Signs under Div B 3.15
-
-
-
-
-
-
-
-
-
-
-
-
Solar Collector on a building >5m2
total area
-
-
-
-
-
-
-
-
-
-
-
-
Wind Turbine >3kW
-
-
-
-
-
-
-
-
-
-
-
-
Outdoor pool, public spa under Div B
3.11 & 3.12 etc.
-
-
-
-
-
-
-
-
-
-
-
-
Plumbing, over 6 Fixtures
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Minimum
Fee
Plumbing, 0-6 Fixtures
105.29
108.11
-
110.82
-
113.59
-
116.43
-
119.34
-
122.32
-
Page 11 of 37
Building Permit Fees Table 2.1
2025 Fees
Per
Sq.
ft.
2026 Fees
Per
Sq.
ft.
2027 Fees
Per
Sq.
ft.
2028 Fees
Per
Sq.
ft.
2029 Fees
Per
Sq.
ft.
2030 Fees
Per
Sq.
ft.
2031 Fees
Per
Sq.
ft.
Service Trench Inspection, Water or
Sewer - Each
125.00
128.35
-
131.56
-
134.85
-
138.22
-
141.67
-
145.22
-
Conditional Permit
2 x permit
fees Min
1,500 Max
10,000
2 x permit
fees Min
1,540 Max
10,268
-
2 x permit
fees Min
1,579 Max
10,525
-
2 x permit
fees Min
1,618 Max
10,788
-
2 x permit
fees Min
1,659 Max
11,058
-
2 x permit
fees Min
1,700 Max
11,334
-
2 x permit
fees Min
1,743 Max
11,617
-
Conditional Permit - Securities
(refundable)
Residential -
$50,000
Non-Res -
$150,000
Residential -
$51,340
Non-Res -
$154,020
-
Residential -
$52,624
Non-Res -
$157,871
-
Residential -
$53,939
Non-Res -
$161,817
-
Residential -
$55,288
Non-Res -
$165,863
-
Residential -
$56,670
Non-Res -
$170,009
-
Residential -
$58,086
Non-Res -
$174,259
-
2.4 Sewage System
Septic Size Verification
450.00
462.06
-
473.61
-
485.45
-
497.59
-
510.03
-
522.78
-
Sewage System Permit/New or
Replacement (Class 2, 3, or 4)
1,000.00
1,026.80
-
1,052.47
-
1,078.78
-
1,105.75
-
1,133.40
-
1,161.73
-
Septic Tank Replacement/Holding Tank
Replacement
550.00
564.74
-
578.86
-
593.33
-
608.16
-
623.37
-
638.95
-
2.5 Miscellaneous
Transfer Permit (to new owner)
105.29
108.11
-
110.82
-
113.59
-
116.43
-
119.34
-
122.32
-
Re-inspection Fee
105.29
108.11
-
110.82
-
113.59
-
116.43
-
119.34
-
122.32
-
Certified Model Home Review (Non-
refundable)
750.00
770.10
-
789.35
-
809.09
-
829.31
-
850.05
-
871.30
-
L.L.B.O. inspection & letters for
occupant loads
300.00
308.04
-
315.74
-
323.63
-
331.73
-
340.02
-
348.52
-
Permit Revision (in addition to
applicable permit fees and review rate)
100.00
102.68
-
105.25
-
107.88
-
110.58
-
113.34
-
116.17
-
Review rate (Building Officials) -for
review of revisions to plans,
administration and enforcement
125.25
128.61
-
131.82
-
135.12
-
138.50
-
141.96
-
145.51
-
Page 12 of 37
Building Permit Fees Table 2.1
2025 Fees
Per
Sq.
ft.
2026 Fees
Per
Sq.
ft.
2027 Fees
Per
Sq.
ft.
2028 Fees
Per
Sq.
ft.
2029 Fees
Per
Sq.
ft.
2030 Fees
Per
Sq.
ft.
2031 Fees
Per
Sq.
ft.
File Search - electronic documents
50.00
51.34
-
52.62
-
53.94
-
55.29
-
56.67
-
58.09
-
File Search - physical and scanned
documents
100.00
102.68
-
105.25
-
107.88
-
110.58
-
113.34
-
116.17
-
Annual file maintenance fee (change
effective Jan 1, 2026)
Note: Applicable on all permits not
closed after three (3) years on Building
subsequent to issuance.
250.00
256.70
-
263.12
-
269.70
-
276.44
-
283.35
-
290.43
-
Lot Grading:
Initial & Final Review - Assumed
subdivisions/ Infill Lots
500.00
513.40
-
526.24
-
539.39
-
552.88
-
566.70
-
580.86
-
Initial & Final Review - Unassumed
subdivisions/ ICI projects
1,000.00
1,026.80
1,052.47
1,078.78
1,105.75
1,133.40
1,161.73
Each Subsequent review
150.00
154.02
-
157.87
-
161.82
-
165.86
-
170.01
-
174.26
-
Alternative Solutions:
Alternative Solutions Examination Fee:
-
-
-
-
-
-
-
-
-
-
-
-
Base fee
600.00
616.08
-
631.48
-
647.27
-
663.45
-
680.04
-
697.04
-
plus per hour of review time
125.25
128.61
-
131.82
-
135.12
-
138.50
-
141.96
-
145.51
-
Page 13 of 37
Building Permit Fees Table 2.1
2025 Fees
Per
Sq.
ft.
2026 Fees
Per
Sq.
ft.
2027 Fees
Per
Sq.
ft.
2028 Fees
Per
Sq.
ft.
2029 Fees
Per
Sq.
ft.
2030 Fees
Per
Sq.
ft.
2031 Fees
Per
Sq.
ft.
2.6 Septic Maintenance Program
On-Site Sewage System Maintenance
Program (O. Reg 315/10)
-
-
-
-
-
-
-
-
-
-
-
-
Administration/Inspection Fee: (change
effective upon commencement of next
cycle in accordance with Ontario Building
Code)
-
-
-
-
-
-
-
-
-
-
-
-
One time/ 5 year cycle
450.00
450.00
-
450.00
-
450.00
-
450.00
-
450.00
-
450.00
-
Annually/5 year cycle
90.00
90.00
-
90.00
-
90.00
-
90.00
-
90.00
-
90.00
-
Minimum Permit Fee
350.00
359.38
-
368.36
-
377.57
-
387.01
-
396.69
-
406.61
-
Page 14 of 37
Schedule "C" to By-Law No. 2024-134
Fire & Emergency Services
1.
Request for Fire Reports
$75.00
2.
Request for Written Information (mortgage
clearance letters, changes of ownership,
letter of confirmation etc.)
$75.00
3.
Inspection Requests (excluding
inspections required under a building
permit)
3.1
Residential Fire Inspection
$75.00
3.2
Commercial Fire Inspection
$175.00
3.3
Industrial Fire Inspection
$300.00
3.4
Care/Treatment Occupancy Fire Inspection
$150.00
3.5
Request for Fire Inspection - No Show
$100.00
3.6
Fireworks Approval & Inspections
$100.00
4.
Standby Fees & Cost Recovery
4.1) Fire Apparatus Standby (shows,
exhibitions demonstrations (Municipal
events exempt)
MTO
Rates/Hr
/Apparatus
4.2) Security Standby for incendiary
fires (per apparatus per/ hour plus any
other associated costs)
MTO
Rates/Hr
/Apparatus
4.3) Motor Vehicle Collision - Kings
Highway
MTO
Rates/Hr/
Apparatus
4.4) Motor Vehicle Collision or vehicle
fires - all other Roads (non-Township
Residents)
MTO
Rates/Hr/
Apparatus
4.5) Elevator Call - after responding to
two (2) calls in the same calendar year
due to poor or non-maintenance of
device after warning
$300.00
4.6) False Alarms (more than 2 false
alarms in 12 months at same building
due to faulty or
improperly installed or maintained
equipment or in the opinion of the Fire
Chief or designate that the alarm could
have been prevented by alternate
measures)
4.6a) Third False Alarm
4.6b) All subsequent False Alarms
with the 12 months
$500.00
$750.00
4.7) Response to Open Air Fire calls
(applies to all complaints that are
investigated and are
found to be non-compliant, or the
owner will not or cannot suppress the
fire in a non-compliant investigation.
MTO
Rates/Hr/
Apparatus
4.8) Emergency Response on
Roadways/ Waterways/Railways.
Services provided for emergencies
involving damage or faulty electrical
MTO
Rates/Hr/
Apparatus
Page 15 of 37
power transmission and distribution
and their associated hardware, vehicle
boats, PWC' or trains, on roadways
waterways or rail lines.
4.9) Technical response from other
emergency services or organizations
for the purpose of emergency
mitigation.
4.10) Services provided outside of the
scope of operations by the OMFES
such as securing heavy equipment for
the use of extinguishment or fire
investigation, the use of provincial fire
resources such as firefighting aircraft
for the use of fire extinguishment.
4.11) Standby for utility companies
until such time they can arrive on
scene and release emergency crews
or mitigate the emergency
4.12) Securing of a Property
All actual
costs
related to
the
response
All actual
costs
related to
the
response
MTO
Rates/ Hr
/Apparatus
All actual
costs
related to
the
response
4.13) Use of suppression foam, dry
chemical etc at a response call
All actual
costs
related to
the
response
5.
Open Air Burning Fire Permits
5.1 Residential Recreation Permit
$10.00
5.2 Agricultural Permit
$10.00
6.
Training/Facility Rentals
6.1 Training Room Rental
$250.00/Day
6.2 Training Grounds Rental
$500.00/Day +
Consumables
Page 16 of 37
Schedule "D" to By-Law No. 2024-134
Recreation and Community Services
1.
Definitions:
For the purpose of this Schedule:
"Resident" shall mean an individual who resides or rents/owns property
within the boundaries of the Township of Oro-Medonte.
2.
Ice Rentals (One hour rental is based on 50 minutes of ice time with a 10
minutes flood)
Prime Time
(4:00 p.m. to Close & Weekends & Holidays)
$ 247.20/hour
Non-Prime Time
(before 4:00 p.m. Mon. to Fri.)
$ 149.35/hour
Minor Sports - Prime Time
(4:00 p.m. to Close & Weekends & Holidays)
$ 186.95/hour
Minor Sports - Non-Prime Time
(before 4:00 p.m. Mon. to Fri.)
$ 149.35/hour
3.
Non-Ice Rentals (Arena Floor Space)
Adult
$ 82.50/hour
Minor Sports
$ 70.60/hour
Floor for events/show (8 hr max) (additional fees for set
up)
$ 711.90/8 hr.
max
Floor for events/show with Dancing (including SOCAN)
(8 hr max) (Additional fees for set up)
$ 800.85/8 hr.
max
Floor for events/show - Each hour after 8 hours
(Additional fees for set up)
$ 89.00/hour
4.
Public Skating
Adults (on admission (pay at the door) - no permit
required)
$ 3.00/person
Youth (on admission (pay at the door) - no permit
required)
$ 2.00/person
Seniors
$ 0.00/person
Pre-School
$ 0.00/person
5.
Banquet Hall Rentals
Banquet Hall Rentals - Private Rental - meeting,
birthday, instructional (2 hr min) (Additional fees for
set up)
$ 53.25/hour
Banquet Hall Rentals - Not for Profit rental (2 hr min)
(Additional fees for set up)
$ 23.60/hour
Tournaments/Banquets - Full Day - No Alcohol -
Celebration, tournaments, banquets (8 hr max)
(Additional fees for set up)
$ 296.60/8hr.
max
Tournaments/Banquets - Full Day - No Alcohol -
Each hour after 8 hours (Additional fees for set up)
$ 59.35/hr. extra
Party/Reception (incl. SOCAN) - Alcohol Event (8 hr
max) (Additional fees for set up)
$ 533.95/8hr.
max
Party/Reception (incl. SOCAN) - Each hour after 8
hours (Additional fees for set up)
$ 59.35/hr. extra
6.
Ball Diamond Rentals
Adult with Lights
$ 47.50/hour
Adult without Lights
$ 27.00/hour
Minor with Lights
$ 39.50/hour
Minor without Lights
$ 21.50/hour
7.
Pavilions
Bayview Memorial Park - 4 Hr block (8am-12pm or
12pm-4pm) - Resident
$ 100.00/4 hrs.
Page 17 of 37
Bayview Memorial Park - 4 Hr block (8am-12pm or
12pm-4pm) - Non-Resident
$115.50/4 hrs.
Bayview Memorial Park - All Day - Resident
$148.30/day
Bayview Memorial Park - All Day - Non-Resident
$178.00/day
Vasey - all day
$ 77.15/day
Vasey - 4 hr block
$45.00/4 hrs.
Lions Diamond (Incl. when Lions 1 & 2 diamonds are
rented together - all day
$ 77.15/day
Lions - 4 hr block
$45.00/4 hrs.
8.
Facilities
SWCC Multipurpose Room - 2 hr. min.
Each additional hour
Full day (8hrs.)
$84.75/2hr.
$45.25 /hr.
$250.00
SWCC Gymnasium
Single Gym
Double Gym
Single Gym - Community Service Org. (CSO)
Double Gym - Community Service Org. (CSO)
Full Day - Single Gym (8hrs.)
Full Day - Double Gym (8 hrs.)
Full Day - Single Gym (CSO) (8hrs.)
Full Day - Double Gym (CSO) (8hrs.)
*Double Gym availability subject to SCDSB
available times
$60.00/hr.
$120.00/hr.
$45.00/hr.
$90/hr.
$465.00
$900.00
$350.00
$700.00
Arena Meeting Room - 2-hour minimum
$ 84.75/2hr.
min.
Arena Meeting Room - Each hour after 2 hours
$ 45.25/hr. extra
Carley Community Hall - weekday/weekend rental
(no minimum)
$ 113.00 rental
Eady Community Hall - weekday rental (3 hr min)
$ 56.50/3 hr. min.
Eady Community Hall - Each hour after 3 hours
$ 17.00/hour extra
Edgar Community Hall - weekday rental
$ 67.75/wk. day
Edgar Community Hall - weekend rental
$ 90.50/wknd
Edgar Community Hall - special event rental
135.50
Hawkestone Community Hall - weekday rental (2
hr min)
$ 28.25/2hr min.
Hawkestone Community Hall - weekday rental (full
day)
$ 226.00/wk. day
Hawkestone Community Hall - weekend rental -
half day
$ 135.50/wknd ½
day
Hawkestone Community Hall - weekend rental -
full day
$ 226.00/wknd day
Jarratt Community Hall - weekday/weekend rental
(3 hr min)
$ 101.75/3 hr. min.
Jarratt Community Hall - weekday rental - full day
$ 203.50/wk day
full
Jarratt Community Hall - weekend rental - full day
$ 339.00/wknd day
full
9.
Simcoe County District School Board
Rates as outlined in Joint Use Agreement
10.
Deposits
Facility Rental Key Deposit (Tax Exempt)
$ 25.00/key
Cleaning Security Deposit (Tax Exempt)
$ 250.00
Alcohol Event Security Deposit (Tax Exempt)
$ 500.00
11
Horseshoe Valley Memorial Park
Tennis Court Use - Public Time Allocation
(Annual Fee per Resident)
$ 29.65/
resident
Page 18 of 37
12
Memorial Program Items (10-year period)
Tree only - no plaque - includes
installation
Tree and plaque - includes installation
Bench with plaque - includes permanent
concrete installation
$750.00
$1,200.00
$3,500.00
Notes: Fees and charges identified in this Schedule include all applicable
taxes, unless otherwise specified.
Fees and charges on Sections 2 and 3 also include the arena
reserve capital charge.
Page 19 of 37
Schedule "E" to By-Law No. 2024-134
Planning
1.
Planning Application Fees
Planning Application Fees shall be in accordance with the specified rate for
the current year outlined in Table 1.1.
Table 1.2 identifies resubmission fees that would be applicable by application
type and the number of application submissions that would be included in the
base application fee before the resubmission fees would apply.
Table 1.3 summarizes the refundable deposits for minor, major, and
combined applications.
Page 20 of 37
Planning
Application Fees
Table 1.1
2025 Fees
2026 Fees
2027 Fees
2028 Fees
2029 Fees
2030 Fees
2031 Fees
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per Sq.
M.
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per
Sq. M.
1. Pre-Consultation Application
1.1 Non Refundable
Application Fee1
$750.00
$770.00
$789.00
$809.00
$829.00
$850.00
$871.00
2. Development Application
Official Plan Amendment
2.1 Official Plan
Amendment - Major
$9,306.00
$9,555.00
$9,794.00
$10,039.00
$10,290.00
$10,547.00
$10,811.00
2.2 Official Plan
Amendment - Minor
$5,230.00
$5,370.00
$5,504.00
$5,642.00
$5,783.00
$5,928.00
$6,076.00
Zoning By-law Amendment
2.3 Zoning By-law
Amendment - Major
$7,263.00
$7,458.00
$7,644.00
$7,835.00
$8,031.00
$8,232.00
$8,438.00
2.4 Zoning By-law
Amendment - Minor
$4,000.00
$4,107.00
$4,210.00
$4,315.00
$4,423.00
$4,534.00
$4,647.00
2.5 No Zoning By-
law Amendment
application fee is
required to adjust
the boundary of the
Environmental
Protection Zone on
a parcel of land
where the
adjustments are
supported by the
Conservation
Authority and/or the
Ministry of Natural
resources and
Forestry
No Fee
No Fee
No Fee
No Fee
No Fee
No Fee
No Fee
2.6 Temporary Use
By-law
$4,500.00
$4,621.00
$4,736.00
$4,855.00
$4,976.00
$5,100.00
$5,228.00
2.7 Removal of
Holding Provision
$1,500.00
$1,540.00
$1,579.00
$1,618.00
$1,659.00
$1,700.00
$1,743.00
2.8 Combined
Official Plan
Amendment and
Zoning By-law
Amendment
$15,322.00
$15,732.00
$16,126.00
$16,529.00
$16,942.00
$17,366.00
$17,800.00
1 Pre-consultation fee to be credited to the applicant if the applicant moves forward with a full application
Page 21 of 37
Planning Application
Fees Table 1.1
2025 Fees
2026 Fees
2027 Fees
2028 Fees
2029 Fees
2030 Fees
2031 Fees
Base
Per
Unit
Per
Sq. M.
Base
Per Unit
Per Sq.
M.
Base
Per
Unit
Per
Sq. M.
Base
Per Unit
Per
Sq. M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
2.9 Zoning By-law
Amendment -
Condition of
Provisional Consent
$600.00
$615.00
$630.00
$646.00
$662.00
$678.00
$695.00
Subdivision and Condominium
2.10 Draft Plan of
Subdivision
$25,000.00
$385.00
$25,670.00
$395.00
$26,312.00
$405.00
$26,970.00
$415.00
$27,644.00
$425.00
$28,335.00
$436.00
$29,043.00
$447.00
2.11 Subdivision
Engineering Review
and Inspection
Coordination
$20,000.00
$539.00
$20,536.00
$554.00
$21,049.00
$568.00
$21,576.00
$582.00
$22,115.00
$596.00
$22,668.00
$611.00
$23,235.00
$626.00
2.12 Redline
Revision
$7,989.00
$8,203.00
$8,408.00
$8,618.00
$8,834.00
$9,054.00
$9,281.00
2.13 Draft Plan
Extension
$3,445.00
$3,537.00
$3,626.00
$3,716.00
$3,809.00
$3,905.00
$4,002.00
2.14 Subdivision
and Condominium
Agreement Revision
- Major
$2,510.00
$2,577.00
$2,641.00
$2,707.00
$2,775.00
$2,844.00
$2,915.00
2.15 Subdivision
and Condominium
Agreement Revision
- Minor
$1,207.00
$1,240.00
$1,271.00
$1,303.00
$1,335.00
$1,368.00
$1,403.00
2.16 Pre-Servicing
Agreement
$3,323.00
$3,412.00
$3,498.00
$3,585.00
$3,675.00
$3,767.00
$3,861.00
2.17 Part Lot
Control
$2,595.00
$2,664.00
$2,731.00
$2,799.00
$2,869.00
$2,941.00
$3,014.00
Site Plan Approval
2.18 Site Plan
Approval2
$5,000.00
$1.32
$5,134.00
$1.36
$5,262.00
$1.39
$5,394.00
$1.42
$5,529.00
$1.46
$5,667.00
$1.49
$5,809.00
$1.53
2.19 Site Plan
Revisions
$2,000.00
$2,054.00
$2,105.00
$2,158.00
$2,212.00
$2,267.00
$2,323.00
2 Applications that are 500.0 sq. m. or less are subject to the base fee only. Building area above 500.0 sq.m. of Gross Floor Area (GFA) as defined in the Township Zoning By-law will be subject to the fee per sq.m. of GFA.
Page 22 of 37
Planning Application
Fees Table 1.1
2025 Fees
2026 Fees
2027 Fees
2028 Fees
2029 Fees
2030 Fees
2031 Fees
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per Sq.
M.
Base
Per
Unit
Per
Sq. M.
Base
Per Unit
Per
Sq. M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
2.20 Site Plan
Agreement on
Unassumed/Private
road or for a
Residential Dwelling
or for a Bed and
Breakfast
Establishment
$2,000.00
$2,054.00
$2,105.00
$2,158.00
$2,212.00
$2,267.00
$2,323.00
2.21 Site Alteration
Permit for
Residential
Applications with
Less than 10 Units
$3,355.00
$3,445.00
$3,531.00
$3,619.00
$3,710.00
$3,803.00
$3,898.00
Committee of Adjustment
2.22 Provisional
Consent -
Application Fee
$2,500.00
$2,567.00
$2,631.00
$2,697.00
$2,764.00
$2,833.00
$2,904.00
2.23 Provisional
Consent - Validation
of Title
$1,000.00
$1,027.00
$1,052.00
$1,079.00
$1,106.00
$1,133.00
$1,162.00
2.24 Provisional
Consent - Re-
Circulation/Deferral
Fee
$500.00
$513.00
$526.00
$539.00
$553.00
$567.00
$581.00
2.25 Provisional
Consent -
Amendment to
Conditions of
Provisional Consent
$1,000.00
$1,027.00
$1,052.00
$1,079.00
$1,106.00
$1,133.00
$1,162.00
2.26 Certificate of
Consent Retained
Lands or Certificate
of Cancellation
$250.00
$257.00
$263.00
$270.00
$276.00
$283.00
$290.00
2.27 Minor
Variance -
Application Fee -
Major
$2,500.00
$2,567.00
$2,631.00
$2,697.00
$2,764.00
$2,833.00
$2,904.00
2.28 Minor
Variance -
Application Fee -
Minor
$1,000.00
$1,027.00
$1,052.00
$1,079.00
$1,106.00
$1,133.00
$1,162.00
2.29 Minor
Variance - Re-
Circulation/Deferral
Fee
$500.00
$513.00
$526.00
$539.00
$553.00
$567.00
$581.00
2.30 Development
Agreement
$2,000.00
$2,050.00
$2,101.25
$2,154.00
$2,208.00
$2,263.00
$2,319.00
Page 23 of 37
Planning Application
Fees Table 1.1
2025 Fees
2026 Fees
2027 Fees
2028 Fees
2029 Fees
2030 Fees
2031 Fees
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per Sq.
M.
Base
Per
Unit
Per
Sq. M.
Base
Per Unit
Per
Sq. M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
Other Planning Costing Categories
2.31 Model Home
Agreement
$2,799.00
$2,874.00
$2,946.00
$3,019.00
$3,095.00
$3,172.00
$3,252.00
2.32 Deeming By-
law
$2,110.00
$2,167.00
$2,221.00
$2,277.00
$2,334.00
$2,392.00
$2,452.00
2.33 Zoning
Certificate
$250.00
$257.00
$263.00
$270.00
$276.00
$283.00
$290.00
2.34 Zoning
Certificate -
Revision
$125.00
$128.00
$132.00
$135.00
$138.00
$142.00
$145.00
2.35 Solar Project -
Micro Fit
$250.00
$256.00
$263.00
$269.00
$276.00
$283.00
$290.00
2.36 Solar Project -
Fit
Between 11-50 KW
Between 51-100 KW
Over 100 KW
$350.00
$500.00
$5,000.00
$359.00
$513.00
$5,125.00
$368.00
$525.00
$5,253.00
$377.00
$538.00
$5,384.00
$386.00
$552.00
$5,519.00
$396.00
$566.00
$5,657.00
$406.00
$580.00
$5,798.00
2.37
Telecommunications
Tower Project
$2,245.00
$2,305.00
$2,363.00
$2,422.00
$2,483.00
$2,545.00
$2,608.00
2.38 Risk Management Official or Risk Management Inspector Services
a)Duties of the
Risk Management
Official or Risk
Management
Inspector regarding
a residential use or
home based
occupation as
defined by the
Zoning By-law and
pursuant to the
Clean Water Act
$135.00 /
hour
$270.00
deposit
$139.00 /
hour
$277.00
deposit
$142.00 /
hour
$284.00
deposit
$146.00 /
hour
$291.00
deposit
$149.00 /
hour
$299.00
deposit
$153.00 /
hour
$306.00
deposit
$156/hour
$314
deposit
b)Duties of the
Risk Management
Official or Risk
Management
Inspector regarding
a use other than
residential use or
home based
occupation and
pursuant to the
Clean Water Act
$135.00 /
hour
$1,350.00
deposit
$139.00 /
hour
$1,386.00
deposit
$142.00 /
hour
$1,421.00
deposit
$146.00 /
hour
$1,456.00
deposit
$149.00 /
hour
$1,493.00
deposit
$153.00 /
hour
$1,530.00
deposit
$156.00 /
hour
$1,568.00
deposit
Page 24 of 37
Planning Application
Fees Table 1.1
2025 Fees
2026 Fees
2027 Fees
2028 Fees
2029 Fees
2030 Fees
2031 Fees
Base
Per
Unit
Per
Sq. M.
Base
Per
Unit
Per Sq.
M.
Base
Per
Unit
Per
Sq. M.
Base
Per Unit
Per
Sq. M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
Base
Per Unit
Per Sq.
M.
2.39 Municipal
Information Letter
for Agency
$201.00
$206.00
$211.00
$216.00
$222.00
$227.00
$233.00
2.40 Temporary
Secondary Dwelling
or Trailer
$809.00
$831.00
$851.00
$873.00
$894.00
$917.00
$940.00
2.41 Compliance
Reports -
Subdivision
Information
$367.00
$377.00
$386.00
$396.00
$406.00
$416.00
$426.00
2.42 Ontario Land
Tribunal Appeal
Application
Processing
$875.00
$897.00
$919.00
$942.00
$966.00
$990.00
$1,015.00
2.43 Tree Security
Where securities are
required to be
collected in
accordance with a
Development
Agreement,
Subdivision
Agreement, Site
Plan Agreement or
resolution of Council
$5,000.00
$5,000.00
$5,000.00
$5,000.00
$5,000.00
$5,000.00
$5,000.00
Note: Fees and charges identified in this Schedule include all applicable taxes, unless otherwise specified.
Table 1.2
Planning Application Fees - Resubmission Fees
Application Type
% of Initial
Application
No. of
Submissions
Included in
Initial
Application
Official Plan Amendment - Major
25% 2
Official Plan Amendment - Minor
25% 2
Zoning By-law Amendment - Major
25% 2
Zoning By-law Amendment - Minor
25% 1
Draft Plan of Subdivision
25% 2
Site Plan Approval
25% 2
Page 25 of 37
Table 1.3
Planning Application Fees - Refundable Deposits
Required Refundable Deposits
Amount
Minor
$2,500.00
Major
$10,000.00
Combined Applications*
$25,000.00
*Combined Applications include 3 major applications, any additional applications will require additional deposits
Page 26 of 37
2.
Payment of Fees, Expenses and Actual Costs
2.1
The total amount payable is payable upon receipt of a completed application
form and prior to formal presentation to Council or its advisory bodies.
Application fees are non-refundable and are applicable on a per lot basis.
2.2
The applicant is liable for any direct costs incurred by the Township during the
processing of planning applications including legal, engineering, and other
consultant fees. These costs shall be invoiced to the applicant on a monthly
basis. In the event there is a security deposit on file with the Township, these
fees shall be dedicated from said deposit and where a minimum balance is
required throughout the processing of an application as set out in the
Schedule of Planning Fees, the applicant shall be invoiced an amount to
maintain the balance required for the security deposit.
2.3
Expenses incurred by staff associated with an application in excess of
Planning Act requirements and actual costs incurred for such items as
advertising, consulting (Planning, Development Engineering, and other) and
legal will be charged directly to the applicant and deducted from the
refundable deposit. As expenses and actual costs are incurred on behalf of
the application, they will be submitted to the applicant for reimbursement so
that the initial refundable deposit will be replenished to enable the Township
to pay further costs as they are incurred. In the event that the applicant does
not maintain the application fee and applicable deposits with the Finance
Department then the application will be considered not complete with respect
to the payment of fees under the Planning Act.
2.4
Any person making application to the Ontario Land Tribunal shall pay the
applicable fees outlined by the Ontario Land Tribunal and/or the Planning Act,
as amended. All fees for such applications are to be paid online through the
Ontario Land Tribunal e-file service or by certified cheque/money order to the
Minister of Finance, Province of Ontario.
2.5
The applicant shall pay all costs associated with a planning development
application including Ontario Land Tribunal Hearings and pre-hearing
consultation costs and appeal fees.
2.6
Where a Development Application in respect of a Planning Matter is referred to
appeals to the Ontario Land Tribunal and the Township and the applicant jointly
support the application either as a decision by Development Services
Committee prior to the filing of said appeal, or by way of settlement, the
applicant shall be responsible for all costs to the Municipality associated
therewith. Such costs shall include legal, expert testimony, and administrative
and overhead costs.
To secure payment of such costs, the applicant will provide the Township upon
notice and/or acknowledgement of an appeal to the Ontario Land Tribunal, with
an initial deposit of $ 5,000.00 such amount to be increased by an amount
determined by the Township in the event the Township determines the nature of
the application indicates that $ 5,000.00 may be inadequate.
Where a Development Services Committee decision(s) has been appealed and
the Committee does not adopt the position recommended by Township staff,
then the following provision shall apply in the event the applicant obtains a
summons compelling Township staff to attend the hearing of the Ontario Land
Tribunal. Staff shall undertake such preparations as required for the hearing
and the costs of such preparation and attendance at the hearing, including any
legal costs not otherwise associated with the hearing, shall be paid by the
applicant who has obtained the summons. In this instance, the fee is $5,000.00
and shall be paid to the Township not later than the day before the Ontario Land
Tribunal hearing.
Any costs to the Township in excess of the deposit shall be paid to the
Township by the applicant upon submission of an invoice thereof.
Page 27 of 37
2.7
2.8
2.9
2.10
2.11
2.12
The tariff of fees described in Schedule "E" shall not include the processing of
objections to amendments, the attendance of the Municipality at Ontario Land
Tribunal hearings, the attendance of the Municipality at any public meetings
other than those formally required by the Planning Act, the preparation of
Subdivision Agreements or the review and approval of engineering drawings
relating to subdivisions by the Municipality. The applicant agrees that, should
the above become necessary, the applicant will provide the Township with a
deposit which shall be determined by the Treasurer on an individual basis,
and the applicant will provide a written agreement to pay further deposits as
required, and to reimburse any costs not covered by the deposits.
Refund of Fees: If an application is withdrawn prior to circulation, 75% of the
application fee may be refunded. If an application is withdrawn after
circulation but prior to a staff report being prepared, 25% of the application fee
may be refunded. Applicants that participated in pre-consultation and pay the
fee as per Schedule 'E' and apply for applications under the Planning Act
shall have the pre-consultation fee deducted from the required application
fee(s) needed to facilitate the development proposal.
Reactivation: Any application which has been withdrawn or which has been
inactive for 12 months shall be considered abandoned and a full application
fee at the current rate shall be required to activate a new application.
Consulting Services: Where any application requires the Township to hire a
consultant to review supporting technical studies on behalf of the Township,
the applicant shall be responsible for all costs, and those costs shall be
payable upon submission of an invoice from the Township. In the event the
invoice is not paid in full, the application will be placed on hold and no further
work will be completed until payment is received.
All applicants, in addition to the fees as set out in Schedule "E" attached
hereto and forming part of this By-law, shall also be responsible for all legal
expenses that may be incurred by the Municipality in connection with their
application and those costs shall be payable upon submission of an invoice
from the Township.
That notwithstanding the tariff of fees prescribed in Schedule "E" attached
hereto and forming part of this By-law, the Council of the Corporation of the
Township of Oro-Medonte may, by resolution, reduce the amount of or waive
the requirements for the payment of the fee in respect of the application
where the Council is satisfied that it would be unreasonable to require
payment in accordance with the tariff.
Page 28 of 37
Schedule "F" to By-Law No. 2024-134
Operations
1.
Moving Permits (Oversize Equipment or Machinery)
Now Called Overdimensional Load Permits
a) Single Move Permit
b) Annual Moving Permit
2.
Tile Drainage Inspections
3.
Road Entrance Permits
a) Entrance Permit Fee (Non-refundable)
b) Additional Inspections
c) Appeal Application Filing Fee
d) Work done by Township for failure to comply with
Entrance By-law
4.
Road Occupancy Permits
a) Permit Fee (Non-refundable)
b) Road Cut Fee (Non-refundable)
c) Re-inspection Fee
d) Pavement Degradation Fees:
Pavement Age: 0-15 years
Pavement Age: 16-30 years
Pavement Age: Greater than 30 years
$ 75.00
$ 250.00
$ 150.00
$ 130.00
(includes up to 2
inspections)
$ 170.00
per site visit
$ 350.00
Cost of staff time and
materials and equipment
and vehicle fees and/or
subcontracted service plus
20% Administration Fee
$ 135.00
$ 250.00
$ 120.00
$ 50.00 per square metre
(m2)
$ 40.00 per square metre
(m2)
$ 0.00 per square metre
(m2)
5.
Cost Recovery for 3rd Party Incident Response or
Chargebacks
a) Work done by the Township for incident response Cost of staff time and
3rd party damage or emergency repairs/response
materials and equipment
and vehicle fees and/or
subcontracted service plus
20% administration fee
b) Equipment and Vehicle Fees
c) Staff Rate (AZ Operators, Equipment Operator,
Supervisors etc.)
d) Materials and Supplies
As per OPSS.PROV 127 -
Schedule of Rental Rates
for Construction
Equipment (As Updated)
plus staff rates per hour
plus benefit costs
Actual wage rates, plus
benefit cost, applicable
premiums, plus
administration fee of 20%
Full cost recovery plus
20%
Note: Pavement degradation fees are to address advanced road section
deterioration associated with road cuts.
Page 29 of 37
Schedule 'G' to By-Law No. 2024-134
Communal Tile
1.
Communal Tile Rates
Effective January 1 of each year, each unit connected to the municipal
communal tile fields in Horseshoe Valley shall be assessed a fixed operating
and capital charge, as noted below:
Year
Quarterly Charge
Operating
Capital
Total
2024
$129.85
$63.60
$193.45
2025
$137.65
$67.43
$205.08
2026
$145.90
$71.48
$217.38
2027
$154.65
$75.78
$230.43
2028
$163.93
$80.33
$244.26
2.
Connection fee inspection (tax exempt) $ 250.00
3.
The Treasurer shall, for each calendar quarter, issue bills to each unit based on
the applicable communal tile service charges. Bills shall be due and payable not
less than twenty one (21) days from the date of mailing.
4.
The Treasurer shall impose a five (5) percent late charge on all unpaid accounts
on the day after the due date.
5.
If an account remains unpaid, the municipality may collect amounts payable
pursuant to Section 398(2) of the Municipal Act, 2001, c.25, as amended.
Page 30 of 37
Schedule 'H' to By-Law No. 2024-134
Finance
1.
Returned Cheque, Not Sufficient Funds (NSF),
Stop Payments including Pre-Authorized Payments
$ 45.00
2.
Tax/Water Certificates
$ 60.00
3.
Special Request Tax Information Correspondence
$35.00
4.
Tax History Search (per year requested)
$20.00 (max
$50.00)
5.
Tax/Water Bill Reprint
$20.00
6.
Duplicate Tax/Water Receipts
$10.00
7.
Additions to the Tax Roll
$40.00
8.
Letter/Statement Confirming Assessment Records
$50.00
9.
Statement of Account
$10.00
10.
Arrears Notice
$10.00
11.
Warning Letter
$100.00
12.
Hand Deliver Charge
$100.00
13.
Tax Registration - preparation
$200.00
14.
Tax Registration - actual
Actual costs
15.
Tax Sale - preparation
$200.00
16.
Tax Sale - actual
Actual costs
17.
Tax Sale Tender Package
$40.00
Page 31 of 37
Schedule 'I' to By-Law No. 2024-134
Municipal Law Enforcement
1.
Fees
1.1
1.2
Permit Fees
a) Swimming Pool Fence
b) Signs (not regulated under the Ontario Building Code)
Inspections
a) Inspections required pursuant to Municipal By-laws
b) Re-inspection
Note: An inspection/re-inspection fee may be imposed for each
Flat Rate
$150.00
$150.00
$150.00
$150.00
inspection conducted in relation to non-compliance of municipal by
laws.
1.3
Miscellaneous
a) Permit Revision (in addition to applicable permit fees)
$ 75.00
b) File Search
$ 50.00
c) Annual file maintenance fee
$ 50.00
Note: Applicable on permits not granted a final approval after one (1)
year subsequent to permit issuance.
d) Permit Parking
Bayview Memorial Park and Line 9 Boat Launch
Non-Resident Parking (Daily)
Non-Resident Parking Pass (Annual)
Carthew Bay Boat Launch on Lakeshore Road East,
Shanty Bay Boat Launch and Shanty Bay Warf
Non-Resident Parking Pass {Annual)
1.4
e) Permit Parking
Non-Resident Parking (Daily)
Non-Resident Three Day Permit
Non-Resident Parking Pass (Annual)
Non-Resident Six Month Summer Permit (May 1st
October 31st)
Non-Resident Six Month Winter Permit (November 1st
April 3oth)
Additional Resident Permit (1 year validation)
2.
Licensing
$ 20.00/vehicle
$ 130.00/vehicle
$ 130.00/vehicle
$ 20.00/vehicle
$ 40.00/vehicle
$ 175.00/vehicle
$ 125.00/vehicle
$ 80.00/vehicle
$ 25.00/vehicle
2.1
Refer to Township Licensing By-laws to determine the applicable licensing
fees.
3.
Notes
3.1
Fees for classes of permits not described or included in this schedule are set
out in their associated By-law.
3.2
Total Fee is payable upon receipt of completed application.
3.3
Where a person is found to have commenced installation without the
appropriate permit, a fee twice the normal permit fee will be applied to offset
the additional administrative costs.
3.4
When a Municipal Law Enforcement Officer takes action to rectify failures,
By-law infractions or situations created by, or.on behalf of a person or
company, such person or company shall be responsible for all costs
associated with the retained contractors time, equipment expenses and all
other expenses occurred. The party responsible shall be invoiced for all cost.
Such invoice shall also include a 15% administration fee for staff's time.
Page 32 of 37
Schedule 'J' to By-Law No. 2024-134
Drinking Water
1.
Definitions
For the purpose of this Schedule:
1.1
"Municipal Drinking Water Area" shall mean a subdivision within The
Corporation of the Township of Oro-Medonte.
1.2
"Municipal Drinking Water Systems" shall include all drinking water works
established within the present Township of Oro-Medonte, and shall further
include any present or future extensions to the drinking water works under any
Act or under an agreement between the Township or its predecessors, but shall
not include any private drinking water works which have not been acquired,
established, maintained or operated by the Township or its predecessors.
1.3
"Owner" shall mean the assessed owner(s) as identified on the Assessment Roll
for taxation purposes during the current year, as amended.
1.4
"Treasurer" shall mean the Treasurer of The Corporation of the Township of
Oro-Medonte.
1.5
"Unit" shall mean an assessed or assessable unit within a residential,
commercial or industrial building, and shall include an apartment located within
a single family dwelling which is serviced by the Township Water System, as
permitted under the applicable Zoning By-law.
1.6
"Vacant Lot" means any property not connected to a municipal drinking water
system to which drinking water service is available.
1.7
"Drinking Water Works" means any works for the collection, production,
treatment, storage, supply and distribution of drinking water, or any part of such
works, but does not include plumbing or other works to which the Ontario
Building Code Act and its regulations apply.
2.
Drinking Water Charges, Billing and Collection
2.1
As soon as the drinking water connection installation is approved by the
Township Inspector, he shall forthwith turn the drinking water on for the owner.
The owner will then be charged at the appropriate water rate, as per Schedule
'J'.
2.2
At the end of each quarter, the duly authorized employee shall read, or cause to
be read, all meters connected to the Municipal Drinking Water System to
determine the amount of water used during the quarter.
2.3
The Treasurer shall calculate water charges to be assessed against each unit
and vacant lot in a Municipal Drinking Water Area, in accordance with the
quarterly charges and rates per cubic meter as set out in Schedule 'J'.
2.4
The Treasurer shall, for each calendar quarter, issue bills to each unit or vacant
lot based on the applicable water charge or rate. Water bills shall be due and
payable not less than twenty-one (21) days from the date of mailing.
2.5
The Treasurer shall impose a five (5) percent late charge on all unpaid accounts
on the day after the due date.
2.6
If an account remains unpaid, the Township may collect amounts payable
pursuant to Section 398(2) of the Municipal Act, 2001, c. 25, as amended.
3.
Drinking Water Rates and Charges
3.1
Water Rates - Municipal Water Systems
Page 33 of 37
Effective January 1 of each year, each unit shall be assessed a fixed operating
and infrastructure charge and a per cubic meter consumption charge, as noted
below.
Effective January 1 of each year, each vacant lot shall be assessed a fixed
infrastructure charge, as noted below:
Year
Quarterly Operating Rates
Quarterly
Infrastructure
Charge (Capital)
Fixed
Quarterly
Charge
Consumption
Charge
<75 m3
per
quarter
>75 m3
per
quarter
2024
$84.00
$1.51
$2.29
$109.10
2025
$87.40
$1.57
$2.38
$117.80
2026
$90.90
$1.63
$2.48
$127.20
2027
$94.50
$1.70
$2.58
$137.40
2028
$98.30
$1.77
$2.68
$148.40
3.2
3.3
Horseshoe Zone 1 Drinking Water Integration Fee
In addition to fixed and consumption fees identified in Section 3.1 and once
connected to the Horseshoe Highlands Municipal Drinking Water System, each
unit shall be assessed a Horseshoe Zone 1 Drinking Water Integration as
follows:
$73.47 per quarter ($293.89 annually for a period of 25 years) OR a one-time
fee of $5,577.24, for those who elect to pay the full fee at the time that their
homes are connected to the integrated drinking water system.
Municipal Drinking Water Systems - No Access - Flat Rate
In addition to fixed fees identified in Section 3.1 and 3.2, owners on municipal
drinking water systems who do not allow access to their homes for the purpose
of the installation or repair of water meters will, after three notices, be charged
$400.00 per quarter ($1,600.00 annually). (Tax Exempt).
3.4
Municipal Drinking Water Systems - Non-Metered Units - Flat Rate
In addition to fixed fees identified in Section 3.1 and 3.2, where no quarterly
water meter reading can be obtained, the unit shall be automatically charged
a consumption charge of $300.00, per quarter ($1,200.00 annually), until a
meter is installed and a reading is obtained. (Tax Exempt)
3.5 Drinking Water Services provided by Freed (a private (PVT) utility) - Flat
Rate
Freed (PVT) Drinking Water
$ 220.00 per quarter
($ 880.00 annually)
3.6
Other Charges
a) Water Meter Seal Inspection
(Tax Exempt)
$80 per occurrence
b) Disconnection (Water Off)
Regular Business Hours (Tax Exempt)
After Hours
c) Reconnection Charge (Water On)
$100.00 per occurrence
$300.00 per occurrence
Page 34 of 37
Regular Business Hours (Tax Exempt)
After Hours
$100.00 per occurrence
$300.00 per occurrence
d) Single Service Call for Water On/Off not
exceeding 30 minutes during regular business
hours, scheduled in advance (Tax Exempt)
$65.00 per occurrence
e) Final Meter Read (Tax Exempt)
f) New Water Account Set Up (Tax Exempt)
g) Missed Water Meter Appointment/Return
Meter Inspection (Tax Exempt)
h) Water Meter Inspection and Testing (Tax
Exempt)
$ 35.00 per occurrence
$20.00
$65.00
$200.00 deposit to be
returned if meter is
determined faulty
i) Expansion Tank
$ 110.00
j) MXU-Radio Read Box
$ 220.00
k) Touch Pad
$ 30.00
4.
Water Meter Package
a) Includes Sensus iPERL water meter,
touchpad, angle valve, dual check BFP,
expansion tank, wire and MXU Smart Point
for ¾" service
$ 760.00
b) Includes Sensus iPERL water meter,
touchpad, angle valve, dual check BFP,
expansion tank, wire and MXU Smart Point
for 1" service
$ 790.00
Page 35 of 37
Schedule "K" to By-Law No. 2024-134
Wastewater Treatment (Freed PVT)
Annual Wastewater Treatment Charge
1.
An annual waste water treatment services charge, as specified below, shall
be imposed per unit upon those lands more particularly described in
Schedule "A" of By-law No. 2014-075, being the Horseshoe Valley Resort
Waste Water Treatment Plan Municipal Capital Facility By-law, an
agreement between The Corporation of the Township off Oro-Medonte and
Freed Utility Services Inc. The said charge will be comprised of the following
components:
a) Annual Waste Water Treatment Plant (WWTP) operating costs
$ 973.92
b) Recovery of Operating Shortfall - 2 years
$ 135.09
c) Reserve fund contribution for future upgrades,
improvements, repairs and maintenance
$ 113.38
d) Township administrative costs
$ 35.46
Total Annual Charge
$ 1,257.84
Quarterly Charge
$ 314.46
The above charge includes all applicable taxes, unless otherwise specified.
2.
The Treasurer shall, for each calendar quarter, issue bills to each applicable
land for the applicable number of units based on the above waste water
treatment services charge. Bills shall be due and payable not less than
twenty one (21) days from the date of mailing.
3.
The Treasurer shall impose a five (5) percent late charge on all unpaid
accounts on the day after the due date.
4.
If an account remains unpaid, the municipality may collect amounts payable
pursuant to Section 398(2) of the Municipal Act, 2001, c.25, as amended.
5.
Other Charges
a) Connection Fee Inspection - one time charge at issuance
of Building Permit
$ 850.00
Page 36 of 37
Schedule 'L' to By-Law No. 2024-134
Craighurst Wastewater System
1.
Craighurst Wastewater Rates
Effective January 1 of each year, each unit connected to the municipal Craighurst
Wastewater System shall be assessed a charge, as noted below:
Year
Quarterly Charge
Total Annual Cost
2025
$625.00
$2500.00
2026
$656.25
$2625.00
2027
$689.00
$2756.00
2028
$723.50
$2894.00
2029
$759.75
$3039.00
2030
$797.75
$3191.00
2.
"Unit" shall mean an assessed or assessable unit within a residential, commercial or
industrial building, and shall include an apartment located within a single-family
dwelling which is serviced by the Craighurst Wastewater System, as permitted under
the applicable Zoning By-law.
3.
As soon, as the wastewater connection installation is approved by the Township
Inspector, the property owner will then be charged at the appropriate wastewater, as
per Schedule 'L'.
4.
The Treasurer shall, for each calendar quarter, issue bills to each unit based on the
applicable Craighurst Wastewater charges. Bills shall be due and payable not less
than twenty-one (21) days from the date of mailing.
5.
Payments shall be payable to The Corporation of the Township of Oro-Medonte and
may be paid during office hours in person or by mail at the Oro-Medonte
Administration Centre, 148 Line 7 South, Oro Medonte, Ontario LOL 2EO, or at most
financial institutions. Payments made at a financial institution shall be deemed to be
paid on the date shown by the Teller's stamp on the bill stub. The Township shall not
be responsible for any applicable service charge payable to the bank. Cheques only
can be dropped at the drop boxes located at the Administration Centre.
6.
The Treasurer shall impose a five (5) percent late charge on all unpaid accounts on the
day after the due date.
7.
If an account remains unpaid, the municipality may collect amounts payable
pursuant to Section 398(2) of the Municipal Act, 2001, c.25, as amended.
Page 37 of 37
Appendix "1" to By-law No. 2024-134
Fees and Charges
Imposed under Separate By-law/Act/Ontario Regulation
a)
Development Charges: Development Charges Act, 1997, S.O. 1997, c.27
b)
Freedom of Information: Municipal Freedom of Information and Protection of
Privacy Act, R.S.O. 1990, c.M.56, as amended
c)
Refer to Township Licensing By-laws to determine the applicable licensing
fees.