Oshawa 2024 Development Charges Background Study

Oshawa, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 23f5e902e8a5 · verified 2026-10-28 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 April 25, 2024 [email protected] 2024 Development Charge Background Study City of Oshawa ________________________ This report consolidates the April 25, 2024 Background Study, the June 19, 2024 Addendum 1 Report, and the final approved By-law Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the Development Charges Act, 1997 ................................... 1-3 1.3.1 More Homes for Everyone Act, 2022 ......................................... 1-3 1.3.2 More Homes Built Faster Act, 2022 ........................................... 1-4 1.3.3 Helping Homebuyers, Protecting Tenants Act, 2023 ................. 1-7 1.3.4 Affordable Homes and Good Jobs Act, 2023 ............................. 1-7 1.3.5 Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) ... 1-10 2. City of Oshawa Current D.C. Policy ............................................................... 2-1 2.1 Schedule of Charges .............................................................................. 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-1 2.4 Indexing .................................................................................................. 2-2 2.5 Redevelopment Credits .......................................................................... 2-2 2.6 Exemptions ............................................................................................. 2-2 2.7 Current Development Charges ............................................................... 2-3 3. Anticipated Development in the City of Oshawa .......................................... 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Class of Services .................................................................................... 4-7 4.8 Eligible Debt and Committed Excess Capacity ....................................... 4-8 4.9 Existing Reserve Funds .......................................................................... 4-8 4.10 Deductions .............................................................................................. 4-9 4.10.1 Reduction Require by Level of Service Ceiling ........................ 4-10 4.10.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.10.3 Reduction for Benefit to Existing Development ........................ 4-11 4.10.4 Reduction for Anticipated Grants, Subsidies, and Other Contributions ............................................................................ 4-12 4.11 Municipal-wide vs. Area-Specific .......................................................... 4-12 4.12 Allocation of Development .................................................................... 4-12 4.13 Asset Management ............................................................................... 4-13 4.14 Mandatory Discount for Rental Housing Development ......................... 4-13 5. D.C. Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and 10-Year Capital Costs for City-wide D.C. Services and Class of Services Calculation ............................................ 5-1 5.2.1 Fire Protection Services ............................................................. 5-1 5.2.2 Parks and Recreation Services .................................................. 5-2 5.2.3 Library Services ......................................................................... 5-3 5.2.4 Provincial Offences Act including By-law Enforcement Services ..................................................................................... 5-4 5.2.5 Waste Diversion ......................................................................... 5-4 5.2.6 Growth-Related Studies (Class of Service) ................................ 5-5 5.3 Service Levels and 27-Year (2024-2051) Capital Costs for City- wide D.C. Services Calculation ............................................................. 5-18 5.3.1 Services Related to a Highway ................................................ 5-18 5.3.2 Stormwater Drainage and Control Services ............................. 5-19 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-2 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions ................................................................................ 7-4 7.3.5 Timing of Collection ................................................................... 7-5 7.3.6 Indexing ..................................................................................... 7-6 7.3.7 D.C. Spatial Applicability ............................................................ 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-8 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-8 7.4.2 By-law In-force Date .................................................................. 7-8 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-8 7.5 Other Recommendations ........................................................................ 7-9 8. By-law Implementation ................................................................................... 8-1 8.1 Public Consultation Process ................................................................... 8-1 8.1.1 Introduction ................................................................................ 8-1 8.1.2 Public Meeting of Council........................................................... 8-1 8.1.3 Other Consultation Activity ......................................................... 8-1 8.1.4 Anticipated Impact of the Charge on Development .................... 8-2 8.2 Implementation Requirements ................................................................ 8-3 8.2.1 Introduction ................................................................................ 8-3 8.2.2 Notice of Passage ...................................................................... 8-3 8.2.3 By-law Pamphlet ........................................................................ 8-3 8.2.4 Appeals ...................................................................................... 8-4 8.2.5 Complaints ................................................................................. 8-4 8.2.6 Credits ....................................................................................... 8-5 8.2.7 Front-Ending Agreements .......................................................... 8-5 8.2.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D D.C. Reserve Fund Policy ................................................................... D-1 Appendix E Local Service Policy .............................................................................E-1 Appendix F Asset Management Plan ....................................................................... F-1 Appendix G Proposed D.C. By-law ......................................................................... G-1 Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx List of Acronyms and Abbreviations Acronym Full Description of Acronym A.M.P. Asset management plan CANSIM Canadian Socio-Economic Information Management System (Statistics Canada) D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross floor area LPAT Local Planning Appeal Tribunal l.m Linear Meters N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O.P.A. Official Plan Amendment O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit S.D.E. Single detached equivalent S.D.U. Single detached unit S.W.M. Stormwater management sq.ft. square foot sq.m square metre Executive Summary Watson & Associates Economists Ltd. PAGE i H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Executive Summary (a) The report provided herein represents the Development Charges (D.C.) Background Study for the City of Oshawa (City) required by the Development Charges Act, 1997, as amended (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Introduction and overview of the legislative requirements of the D.C.A.; - Chapter 2 - Review of the City's present D.C. policies; - Chapter 3 - Summary of the anticipated residential and non-residential development for the City; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of the historical level of service, increase in capital needs, identification of future capital costs to service the anticipated development, and related deductions and allocations; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and rules; and - Chapter 8 - By-law implementation. (b) D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to impose these charges. The methodology required to determine the charges is detailed in Chapter 4; a simplified summary is provided below. 1) Identify amount, type, and location of the anticipated development; 2) Identify the increase in need for service to accommodate growth; 3) Identify capital costs to provide services to meet the needs; 4) Deduct: o Grants, subsidies, and other contributions; o Benefit to existing development; o Amounts in excess of 15-year historical service calculation; and o D.C. reserve funds (where applicable); Watson & Associates Economists Ltd. PAGE ii 2024 Development Charges Background Study (Final) - Consolidated Report 5) Net capital costs are then allocated between residential and non-residential development types; and 6) Net costs divided by the anticipated development to provide the D.C. (c) Subsequent to the passage of the City's 2019 D.C. By-law, as amended, a number of amendments to the D.C.A. have taken place. These changes have been incorporated throughout the report and in the draft by-laws, as necessary. The legislative Acts that have amended the D.C.A. include the following (details of each Act are provided in Chapter 1 of this report): - Bill 109: More Homes for Everyone Act, 2022 - Bill 23: More Homes Built Faster Act, 2022 - Bill 97: Helping Homebuyers, Protecting Tenants Act, 2023 - Bill 134: Affordable Homes and Good Jobs Act, 2023 - Bill 185: Cutting Red Tape to Build More Homes Act, 2024 A summary of some of the revisions provided from these Acts are outlined below: - Historical level of service calculation extended to a 15-year period; - Capital cost definition revised to remove prescribe services for which land or an interest in land will be restricted (no services currently prescribed); - Annual installment payments for rental and institutional development, in six equal payments commencing at occupancy; - The determination1 of D.C.s for development occurring within two years of a site plan or zoning by-law amendment planning approval for applications received between January 1, 2020, and June 5, 2024, and for development occurring within 18 months of a site plan or zoning by-law amendment planning approval for applications received on or after June 6, 2024; - Maximum Interest Rate for Installments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications to be set at the average prime rate plus 1%; 1 With charges determined at the time of planning application. Watson & Associates Economists Ltd. PAGE iii 2024 Development Charges Background Study (Final) - Consolidated Report - Additional residential unit exemption includes allowance of a third unit as- of-right; - Statutory exemptions for Affordable Units, Attainable Units (currently not in force); - Statutory exemptions for Affordable Inclusionary Zoning Units; - Statutory exemption for non-profit housing; - Mandatory discount for rental housing, based on the number of bedrooms; - Maximum life of a D.C. by-law extended from 5 years to 10 years after the by-law comes into force; - Requirement to Allocate Funds Received - municipalities are required to spend or allocate at least 60% of their reserve fund at the beginning of the year for water, wastewater, and services related to a highway; - Additional requirements related to the annual D.C. reserve fund Treasurer's statement; - Provision to allow minor amendments to D.C. by-laws concerning by-law expiry dates; and - D.C. public notice requirements. (d) Table ES-1 outlines the net population increase, residential unit increase, non- residential Gross Floor Area (G.F.A.) increase, and non-residential employment increase for the 10-year (2024 to 2033) and 27-year (2024 to 2051) forecast periods. The growth forecast is further detailed in Chapter 3 and Appendix A. Watson & Associates Economists Ltd. PAGE iv 2024 Development Charges Background Study (Final) - Consolidated Report Table ES-1 City of Oshawa Summary of Anticipated City-Wide D.C. Growth Measure 10 Year 2024 to 2033 27 Year 2024 to 2051 (Net) Population Increase 36,928 101,395 (Gross) Population Increase in New Households 41,206 112,421 Residential Unit Increase 14,701 42,249 Non-Residential Gross Floor Area Increase (sq.ft.) 814,430 863,189 (e) The capital costs identified in Table ES-2 demonstrate the total D.C. eligible capital costs arising from the growth forecast for each eligible service as detailed further in Chapter 5. The D.C.A. requires a summary be provided of the gross capital costs and the net costs to be recovered over the life of the by-laws (i.e., 10-years). This calculation is provided by service and is presented in Table 6-3. In total, gross capital costs of approximately $959.76 million have been identified through discussions with City staff for all services. Of this gross amount, approximately $35.74 million is related to growth needs beyond the forecast period and will be included in future D.C. studies. Other deductions have been made related to grants, subsidies, and other contributions including, but not limited to, the local service portion of the capital works in the amount of approximately $13.19 million. In addition, deductions of approximately $213.79 million have been deducted from the gross costs relate to the portion of capital projects that will benefit the existing community and approximately $1.54 million related to amounts ineligible for recovery under D.C.s. The resultant net growth- related costs included in the D.C. calculations is approximately $695.51 million, of which $572.46 million is attributed to residential development and $123.06 million allocated to non-residential development. Watson & Associates Economists Ltd. PAGE v 2024 Development Charges Background Study (Final) - Consolidated Report Table ES-2 City of Oshawa Summary of Costs Anticipated in the Term of the By-laws Description Value (2024$) Total gross expenditures planned over the next ten years $959,762,223 Less: benefit to existing development $213,786,360 Less: post planning period benefit $35,737,700 Less: ineligible services under the D.C.A. $1,542,240 Less: grants, subsidies, and other contributions $13,185,000 Net costs to be recovered from D.C.s. $695,510,922 (f) At present, the City imposes D.C.s on residential and non-residential uses in accordance with By-law 60-2019, as amended by By-law 33-2021. The City is undertaking a D.C. public process and anticipates passing D.C. by-laws for each service identified in the D.C. Background Study. The mandatory public meeting has been set for May 24, 2024, with adoption of the D.C. by-laws anticipated for June 24, 2024. The following services are calculated based on a City-wide 27-year forecast period: - Services Related to a Highway; and - Stormwater Drainage and Control Services. The following services and class of services are calculated based on a City- wide 10-year forecast period: - Fire Protection Services; - Parks and Recreation Services; - Library Services; - Waste Diversion Services; - Provincial Offices Act (P.O.A.), including by-law enforcement; and - Growth-Related Studies Class of Services. Watson & Associates Economists Ltd. PAGE vi 2024 Development Charges Background Study (Final) - Consolidated Report (g) The City-wide D.C. currently in effect for single and semi-detached dwelling units is $35,591. City-wide non-residential commercial/institutional charges are $182.56 per sq.m of gross floor area, and industrial charges are $76.80 per sq.m of gross floor area. (h) This report has undertaken a recalculation of the charges based on future identified needs (presented in Schedule ES-4 for residential and non-residential). Charges have been provided on a City-wide basis for all services. The corresponding single detached unit charge for full services is $38,227. The non- residential commercial/institutional charge is $189.61 per sq.m ($17.61 per sq.ft.) of gross floor area and industrial charge is $78.58 per sq.m ($7.30 per sq.ft.) of gross floor area. Watson & Associates Economists Ltd. PAGE vii 2024 Development Charges Background Study (Final) - Consolidated Report Table ES-4 City of Oshawa Calculated Schedule of Development Charges Single and Semi-Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units Industrial (per sq.ft. of Total Floor Area) Industrial (per sq.m. of Total Floor Area) Non-Industrial (per sq.ft. of Total Floor Area) Non-Industrial (per sq.m. of Total Floor Area) City-Wide Services: Services Related to a Highway 18,617 13,901 11,705 7,350 6,011 4.92 52.96 13.12 141.22 Fire Protection Services 1,372 1,024 862 541 443 0.37 3.98 0.97 10.49 Parks and Recreation Services 14,649 10,938 9,210 5,783 4,730 0.73 7.86 1.95 20.99 Library Services 1,637 1,222 1,029 646 529 0.08 0.86 0.22 2.37 Provincial Offences Act including By-Law Enforcement 50 37 31 20 16 0.01 0.11 0.04 0.43 Stormwater Drainage and Control Services 1,570 1,172 987 620 507 1.11 11.95 1.09 11.73 Waste Diversion Services 41 31 26 16 13 0.01 0.11 0.03 0.32 City-Wide Class of Services: Growth-Related Studies 291 217 183 115 94 0.07 0.75 0.19 2.05 Total City-Wide Services and Class of Services $38,227 $28,542 $24,033 $15,091 $12,343 $7.30 $78.58 $17.61 $189.61 RESIDENTIAL Services & Class of Services Non-Residential Watson & Associates Economists Ltd. PAGE viii 2024 Development Charges Background Study (Final) - Consolidated Report (i) Tables ES-5, ES-6, and ES-7 provide a comparison of the current and calculated rates for a single-detached dwelling and non-residential development on a per sq.m. basis, respectively. Table ES-5 City of Oshawa Single-detached Dwelling Development Charge Comparison Table ES-6 City of Oshawa Non-residential (Commercial/Institutional) Development Charge Comparison per sq.m. of Gross Floor Area Services/Class of Services Current Calculated as Per D.C. Study (April 25, 2024) Calculated as per Addendum Report City-Wide Services/Classes: Services Related to a Highway 19,690 18,617 18,617 Fire Protection Services 849 1,372 1,372 Parks and Recreation Services 13,032 14,649 14,649 Library Services 555 1,637 1,637 Provincial Offences Act including By-Law Enforcement - 50 50 Stormwater Drainage and Control Services 1,389 1,416 1,570 Waste Diversion Services 25 41 41 Growth-Related Studies 51 - 291 Total City-Wide Services/Class of Services $35,591 $37,782 $38,227 Services/Class of Services Current Calculated as Per D.C. Study (April 25, 2024) Calculated as per Addendum Report City-Wide Services/Classes: Services Related to a Highway 162.12 141.33 141.22 Fire Protection Services 7.00 10.49 10.49 Parks and Recreation Services 6.09 20.99 20.99 Library Services 0.26 2.37 2.37 Provincial Offences Act including By-Law Enforcement - 0.43 0.43 Stormwater Drainage and Control Services 6.67 10.33 11.73 Waste Diversion Services 0.20 0.32 0.32 Growth-Related Studies 0.22 - 2.05 Total City-Wide Services/Class of Services $182.56 $186.27 $189.61 Watson & Associates Economists Ltd. PAGE ix 2024 Development Charges Background Study (Final) - Consolidated Report Table ES-7 City of Oshawa Non-residential (Industrial) Development Charge Comparison per sq.m. of Gross Floor Area (j) Considerations by Council - The D.C. background study represents the increase in need for service and associated net capital costs attributable to residential and non-residential development over the respective forecast periods. Chapter 7 herein, provides the D.C. by-law policy recommendations and rules that govern the imposition of the charges. Council will consider the findings and recommendations provided herein and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-laws for each service, which are appended in Appendices G through M herein. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the D.C. by-laws; and - considering reductions in the charge (obtained by removing certain services or capital costs on which the charge is based and/or by a general reduction in the charge). As the D.C.A. does not allow for any exempted or reduced amount to be made up through higher D.C.s from other development, any such decision would Services/Class of Services Current Calculated as Per D.C. Study (April 25, 2024) Calculated as per Addendum Report City-Wide Services/Classes: Services Related to a Highway 61.59 52.96 52.96 Fire Protection Services 2.62 3.98 3.98 Parks and Recreation Services 6.09 7.86 7.86 Library Services 0.26 0.86 0.86 Provincial Offences Act including By-Law Enforcement - 0.11 0.11 Stormwater Drainage and Control Services 6.06 11.52 11.95 Waste Diversion Services 0.09 0.11 0.11 Growth-Related Studies 0.09 - 0.75 Total City-Wide Services/Class of Services $76.80 $77.39 $78.58 Watson & Associates Economists Ltd. PAGE x 2024 Development Charges Background Study (Final) - Consolidated Report require the consideration of an alternative (i.e., non-D.C.) funding source provided by the City. Report Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1. Introduction 1.1 Purpose of this Document The City of Oshawa (City) retained Watson & Associates Economists Ltd. (Watson), to undertake the development charges (D.C.) background study and by-law(s) process. This draft background study has been prepared for public comment. This background study has been prepared pursuant to the requirements of the Development Charges Act, 1997 (D.C.A.), as amended, (section 10) and, accordingly, recommends new D.C.s and D.C. by-law policies for the City. This D.C. background study will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. In the event that additional refinements are required subsequent to by-law adoption, Waston would assist the City with future updates accordingly. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the City's D.C. background study, as summarized in Chapter 4. It begins by addressing the forecast amount, type, and location of growth as detailed in Chapter 3 and Appendix A. Further, Chapter 5 provides the increase in need and capital costs of services, which provides the basis for the D.C. calculations included in Chapter 6. It also addresses the requirement for "rules" (contained in Chapter 7) and the proposed by-laws are be made available as part of the approval process (included as Appendices G through M). In addition, the report includes the City's current D.C. rates and policies (Chapter 2) to provide a comparison with those being proposed. It further addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The chapters in the report are supported by Appendices containing the data required to explain and substantiate the calculation of the charges. Watson & Associates Economists Ltd. PAGE 1-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1.2 Summary of the Process The public meeting required under section 12 of the D.C.A., has been scheduled for May 24, 2024. Its purpose is to present the study to the public and to solicit public input. The meeting is also being held to answer any questions regarding the study's purpose, methodology and the proposed D.C. by-laws. In accordance with the legislation, the background study and proposed D.C. by-laws will be available for public review on April 25, 2024. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at, or immediately following the public meeting; - refinements to the report, if required; and - Council consideration of the by-laws subsequent to the public meeting. Figure 1-1 outlines the proposed schedule to be followed with respect to the D.C. by-law adoption process Figure 1-1 Schedule of Key D.C. Process Dates Process Steps Dates Data collection, growth forecast development, staff review, engineering work, D.C. calculations and policy work Late 2023 to Early 2024 Council meeting related to D.C. policies April 12, 2024 Public release of the D.C. Background study and proposed by-laws April 25, 2024 Council Meeting to Present the D.C. Background Study and proposed by-laws April 29, 2024 Watson & Associates Economists Ltd. PAGE 1-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Process Steps Dates Public meeting notice posted 21 Days prior to the Public Meeting Public meeting of Council May 24, 2024 Public release of Addendum #1 to Background Study June 19, 2024 Council considers adoption of background study, as amended, and passage of by-law June 24, 2024 Public notice given of by-law passage By 20 days after passage Last day for by-law appeal 40 days after passage City makes pamphlet available (where by-law not appealed) By 60 days after in force date 1.3 Changes to the Development Charges Act, 1997 Over the past three years, since the 2021 update study, a number of changes to the D.C.A. have been introduced through various legislation including the following: 1.3.1 More Homes for Everyone Act, 2022 On April 14, 2022, the More Homes for Everyone Act, 2022 received Royal Assent. One of the D.C.A. amendments, and O. Reg. 438/22, prescribed additional information to be included in the annual Treasurer's Statement on D.C. reserve funds and its publication. The following additional information must be provided for each service for which a D.C. is collected for during the year: a) whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law; Watson & Associates Economists Ltd. PAGE 1-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx b) if the answer to a) is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; and c) if no money was spent from the reserve fund during the year, a statement as to why there was no spending during the year. These requirements have been further amended to require that the annual Treasurer's Statement be made available to the public on the municipality's website, or in the municipal office. 1.3.2 More Homes Built Faster Act, 2022 The More Homes Built Fast Act, 2022, received Royal Assent on November 28, 2022. This Act amends several pieces of legislation including the Planning Act and the D.C.A. The following provides a summary of the amendments to the D.C.A.: 1.3.2.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the greater of one unit or 1% of the existing residential units will be exempt from D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- detached, or rowhouse contains no more than two residential units, and no other buildings or ancillary structures contain any residential units. Watson & Associates Economists Ltd. PAGE 1-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1.3.2.2 Removal of Housing as an Eligible D.C. Service Housing services is removed as an eligible service. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. 1.3.2.3 New Statutory Exemptions for Affordable Units, Attainable Units, Inclusionary Zoning Units, and Non-Profit Housing developments Affordable units, attainable units, inclusionary zoning units and non-profit housing developments are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. o Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. - Non-Profit Housing: Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. 1.3.2.4 Historical Level of Service extended to 15-year period instead of the historical 10-year period Prior to Royal Assent of Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. Watson & Associates Economists Ltd. PAGE 1-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1.3.2.5 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act will prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed. 1.3.2.6 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. 1.3.2.7 D.C. By-law Expiry A D.C. by-law now expires ten years after the day it comes into force unless the by-law provides for an earlier expiry or repeal date. This extends the by-law's life from what used to be a maximum of five years. 1.3.2.8 Installment Payments Non-profit housing development has been removed from the instalment payment section of the D.C.A. under Section 26.1, as these units are now exempt from the payment of a D.C. 1.3.2.9 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. Watson & Associates Economists Ltd. PAGE 1-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1.3.2.10 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed, which allowed municipalities to choose the interest rate to impose. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by-law amendment applications occurring after November 28, 2022. 1.3.2.11 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities will be required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water services, wastewater services, and services related to a highway. Other services may be prescribed by the regulation. 1.3.3 Helping Homebuyers, Protecting Tenants Act, 2023 The Helping Homebuyers, Protecting Tenants Act (Bill 97) received Royal Assent on June 8, 2023. This bill extends the mandatory exemption from payment of D.C.s for additional residential units in new residential buildings or in existing houses to all lands versus just urban lands. 1.3.4 Affordable Homes and Good Jobs Act, 2023 The exemption for affordable residential units was included in the More Homes Built Faster Act (Bill 23), enacted by the Province on November 28, 2022. Under this legislation, affordable residential units were defined within subsection 4.1 of the D.C.A. and exemptions for D.C.s were provided in respect of this definition. While the legislation was enacted in November 2022, the ability for municipalities to implement the exemptions required the Minister of Municipal Affairs and Housing to publish an "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin." This bulletin would inform the average market rent and purchase price to be used in determining which developments qualify as affordable residential units. As of the time of writing, this bulletin had not been published by the Minister. Bill 134 received Royal Assent on December 4, 2023 and provides for a modification to the affordable residential unit definition by: Watson & Associates Economists Ltd. PAGE 1-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - Introducing an income-based test for affordable rent and purchase price; and - Increasing the threshold for the market test of affordable rent and purchase price. This change provides the exemption based on the lesser of the two measures. Moreover, the rules in subsection 4.1 of the D.C.A. are unchanged with respect to: - The tenant and purchaser transacting the affordable unit being at arm's length; - The intent of maintaining the affordable residential unit definition for a 25-year period, requiring an agreement with the municipality (which may be registered on title); and - Exemptions for attainable residential units and associated rules (requiring further regulations). The following table provides the provided through Bill 134 (underlining added for emphasis). Table 1-1 Definition of Affordable Residential Units Item Bill 134 Definition (as per D.C.A.) Affordable residential unit rent (subsection 4.1 (2), para. 1) The rent is no greater than the lesser of, i. the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and ii. the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. Average market rent/rent based on income (subsection 4.1 (5)) for the purposes of subsection 4.1 (2), para. 1 The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for renter households in the applicable local municipality; and (b) identify the rent that, in the Minister's opinion, is equal to 30 per cent of the income of the household referred to in clause (a). Affordable residential unit ownership (subsection 4.1 (3), para. 1) The price of the residential unit is no greater than the lesser of, i. the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and ii. 90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. Watson & Associates Economists Ltd. PAGE 1-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Item Bill 134 Definition (as per D.C.A.) Average market purchase price/purchase price based on income (subsection 4.1 (6)) for the purposes of subsection 4.1 (3), para. 1 The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for households in the applicable local municipality; and (b) identify the purchase price that, in the Minister's opinion, would result in annual accommodation costs equal to 30 per cent of the income of the household referred to in clause (a) As noted, the bulletin was release on May 1, 2024, which provides the information for the City to measure against for determining the applicability of the exemption from the D.C. (as well as C.B.C. and Parkland requirements). The bulletin provides the following information is specific to the City (it is noted that the Bulletin will be updated annually): - For Affordable Ownership Units: the average household income in the City provides the amount to be measured against as the 90% of average purchase prices is greater for all unit types, as provided in Table 1-2. Table 1-2 Definition of Affordable Residential Units Units 90% of Average Purchase Price Average Household Income in the City Detached House $801,000 $362,900 Semi-Detached House $621,000 $362,900 Row/townhouse $585,000 $362,900 Condominium Apartment $504,000 $362,900 - For Affordable Rental Units: The average market rent for bachelor, 1-bedroom, and 2-bedroom units, is lower than the average rent based on household income and therefore, provides the amount to be measured against (as noted in Table 1- 3, where the monthly rent is lower than the amounts indicated). For units with 3 or more bedrooms, the average rent based on household income in the City is Watson & Associates Economists Ltd. PAGE 1-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx the lower than the average market rent and is therefore the amount to measured against. Table 1-3 Definition of Affordable Residential Units Units Average Market Rent Average Rent Based on Household Income in the City Bachelor unit $1,068 $1,940 1-Bedroom unit $1,425 $1,940 2-Bedroom unit $1,653 $1,940 3 or more Bedrooms $1,946 $1,940 1.3.5 Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) The Cutting Red Tape to Build More Homes Act, 2024 (Bill 185), was introduced on April 10, 2024, and received Royal Assent on June 6, 2024. This Act amends the D.C.A as follows: - Reintroduces studies as an eligible cost for services, including a D.C. background study; - Removes the mandatory phase-in of a D.C. by-law; - Reduces the time period for the determination of a D.C. applicable to site plan and zoning by-law amendment applications, whereby the time period between the building permit issuance and planning application approval is reduced to 18 months from two years (note, the two-year time period still applies to applications received between January 1, 2020 and June 5, 2024; - Permits the repeal of the date the D.C. by-law expires (allowing for the 10-year by-law term provided in the D.C.A.); - Allows minor D.C. by-law amendments related to the inclusion of studies, removal of the mandatory phase-in of a D.C. by-law and removal of expiry date for by-laws passed between November 28, 2022 and June 6, 2024; and Watson & Associates Economists Ltd. PAGE 1-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - Permits municipalities to publish D.C. public notice on municipal websites where newspapers of general circulation are not available. As Bill 185 has been enacted, this D.C. Background Study includes the cost of studies, and the other amendments made to the D.C.A. as noted above. Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 2 City of Oshawa's Current D.C. Policy Watson & Associates Economists Ltd. PAGE 2-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 2. City of Oshawa Current D.C. Policy 2.1 Schedule of Charges The City adopted by-law number 60-2019 on July 1, 2019, which provides for City-wide D.C.s to be imposed in the City. The City then amended by-law 60-2019 via by-laws 33-2021, 121-2021, and 46-2022. The following sections review the current D.C. policies within by-law 60-2019, as amended. 2.2 Services Covered The following services are covered under By-law 60-2019, as amended: - Transportation; - Fire Protection; - Parks, Recreation and Trails; - Library Services; - Administration (Growth-Related Studies); - Watercourse Improvements (Stormwater Drainage and Control Services); - Parking; and - Waste Diversion Services. 2.3 Timing of D.C. Calculation and Payment The by-law indicates that D.C.s are payable at the time of the first action or approval with respect to: - The passing of a zoning by-law or an amendment thereto; - The approval of a minor variance; - A conveyance of land to which a by-law passed under Subsection 50(7) of the Planning Act; - The approval of a plan of subdivision; - A consent; - The approval under the Condominium Act; or - The issuance of a building permit. Watson & Associates Economists Ltd. PAGE 2-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 2.4 Indexing D.C.s within the by-law are adjusted semi-annually on January 1 and July 1 each year, without amendment to the By-law, in accordance with the Statistics Canada Quarterly "Capital Expenditure Price Statistics", published each year or such other equivalent publication or as otherwise prescribed by regulation pursuant to the Act. 2.5 Redevelopment Credits Where development involves the demolition and replacement of a building or structure on the same site, or the conversion from one principal use to another, the developer shall be allowed a redevelopment credit. A credit will apply for the demolition of buildings or structures that have been in existence for a minimum of five years and where the demolition permit issued is within the 120-month period (10 years) preceding the issuance of a building permit. The issuance of the demolition permit and the actual demolition to the satisfaction of the Chief Building Official must occur not later than twenty-four months after the issuance of the building permit. Redevelopment credits are also given for the conversion of all or part of a building or structure that has been in existence for a minimum of five (5) years. The credit is calculated by applying the 'applicable charge' to the floor area and units being demolished or converted. No credit will be provided for the demolition of a school or place of worship where the demolition permit is issued on or after July 1, 2019. 2.6 Exemptions The following non-statutory exemptions are provided under By-law 60-2019 (as amended): - Lands wholly within that part of Oshawa partially known as the Downtown Urban Growth Centre; - Lands designated under federal law as land reserved for the exclusive use of aboriginal peoples; - New Industrial building or structure or the enlargement of an existing Industrial building or structure; - Temporary building or structure; Watson & Associates Economists Ltd. PAGE 2-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - Agricultural building or structure; - Apartment Dwelling Unit or a Townhouse Dwelling other than a Street Townhouse Building on lands within the Trent University land area; - Apartment Dwelling Unit or a Townhouse Dwelling Unit, except back-to-back Townhouses, on lands within the Downtown Shoulder Area; - Apartment Dwelling Unit or a Townhouse Dwelling other than a Street Townhouse Building on the 1569 Simcoe Street North property, provided building permits are issued for the units within three years of the in-force date of this by- law; - Lands used solely for the purposes of a non-profit institution defined as: o Non-Profit Institution; o Hospital; o Nursing Home; - That part of a building used solely for the purposes of a Medical Clinic shall be equal to 50% of the Commercial Development Charge. It is noted that statutory exemptions resulting from D.C.A. amendments as noted in Chapter 1, must also be witness by the City even though they may not be currently reflected in the existing by-law. 2.7 Current Development Charges The current D.C.s for residential development for the City are shown in Table 2-1, as per By-law 60-2019, as amended. Watson & Associates Economists Ltd. PAGE 2-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 2-1 City of Oshawa Current Schedule of Development Charges As of January 1, 2024 Single & Semi Detached Duplex (for two units) Multiples Apartments with >= 2 Bedrooms Apartments with < 2 Bedrooms Lodging House (per unit) Indstrial (per sq.m. of Gross Floor Area) Commercial/ Institutional (per sq.m. of Gross Floor Area) Transportation 19,690 24,786 15,861 12,392 7,607 6,836 61.59 162.12 Fire Protection Services 849 1,069 686 534 328 296 2.62 7.00 Parks and Recreation Services 13,032 16,406 10,500 8,202 5,036 4,524 6.09 6.09 Library Services 555 700 449 350 214 194 0.26 0.26 Waste Diversion 25 31 19 15 10.00 8.00 0.09 0.20 Stormwater Drainage and Control Services 1,389 1,749 1,119 874 538 482 6.06 6.67 Growth-Related Studies 51 61 45 31 20.00 17.00 0.09 0.22 Total $35,591 $44,802 $28,679 $22,398 $13,753 $12,357 $76.80 $182.56 Residential Non-Residential Services Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 3 Anticipated Development in the City of Oshawa Watson & Associates Economists Ltd. PAGE 3-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 3. Anticipated Development in the City of Oshawa 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the City will be required to provide services over a 10-year (mid-2024 to mid-2034) and longer-term (mid-2024 to mid- 2051) time horizon. Chapter 3 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson. The growth forecast provided herein builds on growth assumptions established in Envision Durham, the Durham Region Official Plan (adopted by Regional Council May 17, 2024). In addition to this source, the following information sources were consulted: - City of Oshawa Official Plan (Office Consolidation December 2024); - Durham Region Growth Management Strategy - Phase 2 Area Municipal Growth Allocations and Land Needs (Final Report October 17, 2024); - 2006, 2011, and 2016 population, household, and employment Census data; - 2021 population and household Census data; - Historical residential and non-residential building permit data over the 2014 to 2024 period; - Residential supply opportunities as provided by the City of Oshawa; and - Discussions with City staff regarding anticipated residential and non-residential development in the City of Oshawa. Watson & Associates Economists Ltd. PAGE 3-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the City and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 2-1 below, and Schedule 1 in Appendix A. As identified in Table 2-1 and Appendix A, Schedule 1, the permanent population in Oshawa is anticipated to reach approximately 223,200 by mid-2034 and 287,700 by mid-2051, resulting in an increase of approximately 36,900 and 101,400 persons, respectively.1 Figure 3-1 Population and Household Forecast Model 1 The population figures used in the calculation of the 2024 D.C. and C.B.C. exclude the net Census undercount, which is estimated at approximately 3.8% Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 3-1 City of Oshawa Residential Growth Forecast Summary Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 146,950 141,590 1,870 139,720 34,705 7,705 12,375 145 54,930 1,700 2.578 155,270 149,607 1,932 147,675 38,101 8,190 12,383 123 58,797 1,756 2.544 165,490 159,458 1,828 157,630 40,085 9,075 13,285 150 62,595 1,662 2.547 182,020 175,383 1,373 174,010 42,330 10,095 14,065 150 66,640 1,248 2.632 193,310 186,256 1,460 184,796 43,519 11,426 16,554 150 71,649 1,327 2.600 231,630 223,184 1,824 221,360 50,077 17,400 18,392 150 86,019 1,658 2.595 298,540 287,651 2,483 285,168 58,262 29,391 25,165 150 112,968 2,257 2.546 8,320 8,017 62 7,955 3,396 485 8 -22 3,867 56 10,220 9,851 -104 9,955 1,984 885 902 27 3,798 -94 16,530 15,925 -455 16,380 2,245 1,020 780 0 4,045 -414 11,290 10,873 87 10,786 1,189 1,331 2,489 0 5,009 79 38,320 36,928 364 36,564 6,558 5,974 1,838 0 14,370 331 105,230 101,395 1,023 100,372 14,743 17,965 8,611 0 41,319 930 [1] Census undercount estimated at approximately 3.8%. Note: Population including the undercount has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Mid 2034 Mid 2024 - Mid 2034 Historical Forecast Incremental Mid 2006 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2006 - Mid 2011 Mid 2021 Mid 2024 Mid 2051 Mid 2021 - Mid 2024 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Source: Envision Durham, the Durham Region Official Plan (adopted by Regional Council May 17, 2023) derived by Watson & Associates Economists Ltd., 2024. Mid 2024 - Mid 2051 Watson & Associates Economists Ltd. PAGE 3-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Figure 3-2 City of Oshawa Annual Housing Forecast1 Source: Historical housing activity from 2014 and 2015 from Statisics Canada. Permits after 2015 are from the City of Oshawa. [1] Growth forecast represents calendar year. 1,022 794 1,409 899 1,754 1,265 550 1,208 2,106 1,204 1,4371,4371,4371,4371,4371,4371,4371,4371,4371,4371,4371,437 1,5851,5851,5851,5851,5851,6151,6151,6151,6151,6151,6151,6151,6151,6151,615 0 500 1,000 1,500 2,000 2,500 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE 3-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Provided below is a summary of the key assumptions and findings regarding the City of Oshawa D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, 2, 6, and 7) - The housing unit mix for the City was derived from the Durham Region Growth Management Strategy - Phase 2 Area Municipal Growth Allocations and Land Needs (Final Report October 17, 2022), a detailed review of historical development activity (as per Schedule 7), as well as active residential development applications and discussions with City staff regarding anticipated development trends for Oshawa (Schedule 6). - Based on the above indicators, the 2024 to 2051 household growth forecast for the City is comprised of a unit mix of 36% low-density units (single-detached and semi-detached), 43% medium-density (multiples except for apartments), and 21% high-density (accessory units, bachelor, 1-bedroom, and 2+ bedroom apartments) units. 2. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 3. Population in New Housing Units (Appendix A - Schedules 3, 4 and 5) - The number of permanent housing units to be occupied by mid-2051 in the City of Oshawa over the forecast period is presented in Figure 3-2. Over the mid-2024 to mid-2051 forecast period, the City is anticipated to average approximately 1,530 new housing units per year. Watson & Associates Economists Ltd. PAGE 3-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - Institutional population [1] is anticipated to increase by approximately 1,020 people between mid-2024 to mid-2051. - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 8 summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the City of Oshawa. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which have been recently experienced in both new and older units. Forecast 25-year average P.P.U.s by dwelling type are as follows: o Low density: 3.407 o Medium density: 2.544 o High density2: 1.796 4. Existing Units and Population Change (Appendix A - Schedules 3, 4 and 5) - Existing households for mid-2024 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3, 4, and 53. The forecast population change in existing households over the 2024 to 2051 forecast period is forecast to decline by approximately 11,000. 5. Employment (Appendix A - Schedules 10a and 10b) [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. 2 Includes accessory units, bachelor, 1-bedroom and 2-or-more-bedroom apartments. 3 Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Watson & Associates Economists Ltd. PAGE 3-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - The employment projections provided herein are largely based on the Durham Region Growth Management Strategy - Phase 2 Area Municipal Growth Allocations and Land Needs (Final Report October 17, 2024). - 2016 employment data 1,2 (place of work) for the City of Oshawa is outlined in Schedule 10a. The 2016 employment base is comprised of the following sectors: o 105 primary (0%); o 3,820 work at home employment (7%); o 10,220 industrial (20%); o 20,670 commercial/population-related (40%); and o 17,340 institutional (33%). - The 2016 employment by usual place of work, including work at home, is 52,155. An additional 9,980 employees have been identified for the City of Oshawa in 2016 that have no fixed place of work (N.F.P.O.W.).3 - Total employment, including work at home and N.F.P.O.W. for the City of Oshawa is anticipated to reach approximately 82,500 by mid-2034 and 107,300 by mid-2051. This represents an employment increase of approximately 12,780 and 37,570, respectively. - Schedule 10b, Appendix A, summarizes the employment forecast, excluding work-at-home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work-at-home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). 1 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. 2 Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. 3 No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Watson & Associates Economists Ltd. PAGE 3-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work-at-home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the City of Oshawa (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 65,400 by mid-2034 and 85,900 by mid-2051. This represents an employment increase of approximately 10,630 for the 10-year forecast period and 31,100 for the longer-term period.[1] 6. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 10b) - Square footage estimates were calculated in Schedule 8b based on the following employee density assumptions: o 1,200 sq.ft. per employee for industrial; o 400 sq.ft. per employee for commercial/population-related; and o 625 sq.ft. per employee for institutional employment. - The City-wide incremental G.F.A. is anticipated to increase by 8.14 million sq.ft. over the 10-year forecast period and 23.3 million sq.ft. over the longer-term forecast period (mid-2024 to mid-2051). - In terms of percentage growth, the mid-2024 to mid-2051 incremental G.F.A. forecast by sector is broken down as follows: o industrial - 64%; o commercial/population-related - 25%; o and institutional - 11%. [1] G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 10a and 10b. Total employment growth in Schedule 10b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within municipalities and indicates the D.C. eligible service components included in the D.C. background study for the City. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1B (as per the legend in Table 4-1A). Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the City's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that City Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Figure 4-1 The Process of Calculating a Development Charge under the Act that must be followed Watson & Associates Economists Ltd. PAGE 4-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 4-1A Categories of City Services to be Addressed as Part of the Calculation - Eligibility Legend Eligibility for Inclusion in the D.C. Calculation Description Yes City provides the service - service has been included in the D.C. calculation. No City provides the service - service has not been included in the D.C. calculation. n/a City does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Table 4-1B Categories of City Services to be Addressed as Part of the Calculation Categories of City Services Inclusion in the D.C. Calculation Service Components 1. Water supply services, including distribution and treatment services n/a n/a n/a n/a 1.1 Treatment plants, Water Supply, and Storage Facilities 1.2 Distribution systems 1.3 Local systems 1.4 Vehicles and equipment1 2. Wastewater services, including sewers and treatment services n/a n/a n/a n/a 2.1 Treatment plants 2.2 Sewage trunks 2.3 Local systems 2.4 Vehicles and equipment1 3. Stormwater Drainage and Control Services Yes Yes Yes 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Categories of City Services Inclusion in the D.C. Calculation Service Components 4. Services Related to a Highway Yes Yes Yes No Yes Yes Yes Yes Yes 4.1 Arterial roads 4.2 Collector roads 4.3 Bridges, Culverts and Roundabouts 4.4 Local municipal roads 4.5 Traffic signals 4.6 Sidewalks and streetlights 4.7 Active Transportation 4.8 Works Yard 4.9 Rolling stock1 5. Electrical Power Services n/a n/a n/a 5.1 Electrical substations 5.2 Electrical distribution system 5.3 Electrical system rolling stock1 6. Transit Services n/a n/a 6.1 Transit vehicles1 & facilities 6.2 Other transit infrastructure 7. Waste Diversion Services Yes Yes 7.1 Waste diversion facilities 7.2 Waste diversion vehicles and equipment1 8. Policing Services n/a n/a n/a 8.1 Police detachments 8.2 Police rolling stock1 8.3 Small equipment and gear 9. Fire Protection Services Yes Yes Yes 9.1 Fire stations 9.2 Fire Vehicles1 9.3 Fire Equipment and gear 10. Ambulance Services n/a n/a 10.1 Ambulance station space 10.2 Vehicles1 11. Services provided by a board within the meaning of the Public Libraries Act Yes Yes Yes 11.1 Public library space (incl. furniture and equipment) 11.2 Library vehicles1 11.3 Library materials 12. Services Related to Long- Term Care n/a n/a 12.1 Long-Term Care space 12.2 Vehicles1 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Categories of City Services Inclusion in the D.C. Calculation Service Components 13. Parks and Recreation Services Ineligible Yes Yes Yes Yes 13.1 Acquisition of land for parks, woodlots, and E.S.A.s 13.2 Development of municipal parks 13.3 Parks rolling stock1 and yards 13.4 Facilities, such as arenas, indoor pools, fitness facilities, community centres, etc. 13.5 Recreation vehicles and equipment1 14. Services Related to Public Health n/a n/a 14.1 Public Health department space 14.2 Public Health department vehicles1 15. Child Care and Early Years Programs and Services within the meaning of Part VI of the Child Care and Early Years Act, 2014 and any related services. n/a n/a 15.1 Childcare space 15.2 Vehicles1 16. Services related to proceedings under the Provincial Offences Act, including by-law enforcement services and municipally administered court services Yes Yes 16.1 P.O.A. space, including by-law enforcement and municipally administered court services 16.2 Vehicles1 & Equipment 17. Services Related to Emergency Preparedness No No 17.1 Emergency Preparedness Space 17.2 Equipment 18. Services Related to Airports Ineligible Ineligible 18.1 Airports 18.2 Other Airports 19. Provision of Headquarters for the General Administration of Municipalities and Area Municipal Boards Ineligible Ineligible Ineligible 19.1 Office space 19.2 Office furniture 19.3 Computer equipment 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Categories of City Services Inclusion in the D.C. Calculation Service Components 20. Other Yes 20.1 Interest on money borrowed to pay for growth-related capital 20.2 Growth Studies, including the D.C. background study cost 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The City's Local Service Policy is included in Appendix E. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two potential cost reductions and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a. costs to acquire land or an interest therein (including a leasehold interest); b. costs to improve land; c. costs to acquire, lease, construct or improve buildings and structures; d. costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; and e. interest on money borrowed to pay for the above-referenced costs. Watson & Associates Economists Ltd. PAGE 4-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx f. costs to undertake studies in connection with the above-referenced matters (include costs of the D.C. background study). In order for an increase in need for service to be included in the D.C. calculation, City Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the City's approved and proposed capital budgets and servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that, "...the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. Currently, there are no outstanding credits to be included in the D.C. calculations. 4.7 Class of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible services. With respect to growth-related studies, section 7(3) of the D.C.A. states that: "For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3)". These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. Watson & Associates Economists Ltd. PAGE 4-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 4.8 Eligible Debt and Committed Excess Capacity Section 66 of the D.C.A., 1997 states that for the purposes of developing a D.C. by-law, a debt incurred with respect to an eligible service may be included as a capital cost, subject to any limitations or reductions in the Act. Similarly, s.18 of O. Reg. 82/98 indicates that debt with respect to an ineligible service may be included as a capital cost, subject to several restrictions. In order for such costs to be eligible, two conditions must apply. First, they must have funded excess capacity which is able to meet service needs attributable to the anticipated development. Second, the excess capacity must be "committed," that is, either before or at the time it was created, Council must have expressed a clear intention that it would be paid for by D.C.s or other similar charges. For example, this may have been done as part of previous D.C. processes. Outstanding growth-related debt has been included in the D.C. calculations, where applicable. 4.9 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in s. 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in future. For services that are subject to a per-capita-based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the next 10-year period, which underlie the D.C. calculation herein. The alternative would involve the City spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, Watson & Associates Economists Ltd. PAGE 4-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx the City will use these reserve funds for the City's cost share of applicable development- related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development which contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The City projected D.C. reserve fund balance, less outstanding commitments related to prior year capital approvals, by service as of December 31, 2023, is provided in Table 4- 2. Table 4-2 Projected Development Charge Reserve Fund Balances As of December 31, 2023 Note: Amounts in brackets are deficient balances. 4.10 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. Service December 31, 2023 Closing Balance Less Outstanding Commitments December 31, 2023 Adjusted Closing Balance Services Related to a Highway (Transportation) $66,989,860.34 $24,270,596.00 $42,719,264.34 Parking $53,829.42 $53,829.42 $0.00 Fire Protection Services ($2,970,723.13) $161,356.57 ($3,132,079.70) Parks and Recreation Services $30,162,890.58 $519,104.34 $29,643,786.24 Library Services $3,685,247.71 $3,392.75 $3,681,854.96 Provincial Offences Act including By-Law Enforcement $0.00 $0.00 $0.00 Waste Diversion $29,968.90 $0.00 $29,968.90 Stormwater Drainage and Control Services $6,272,458.83 $2,397,773.00 $3,874,685.83 Growth Studies ($261,349.09) $0.00 ($261,349.09) Total $103,962,183.56 $27,406,052.08 $76,556,131.48 Watson & Associates Economists Ltd. PAGE 4-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 4.10.1 Reduction Require by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the average cost of providing such units based on replacement costs, engineering standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service, which meets the requirements of the Act, i.e., cost per unit. It is noted that for Water, Wastewater, and Stormwater Services, other legislation dictates the level of service to be provided for new infrastructure, therefore, a historic service standard calculation is not required. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.10.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the City's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, (e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is Watson & Associates Economists Ltd. PAGE 4-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx already available, then widening would not be included as an increase in need, in the first instance). 4.10.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.10.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive limited (or no) benefit as a result. On the other hand, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a City-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access Watson & Associates Economists Ltd. PAGE 4-12 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.10.4 Reduction for Anticipated Grants, Subsidies, and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.11 Municipal-wide vs. Area-Specific This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area-rating of services (providing charges for specific areas and services); however, it is not mandatory to implement area rating. 4.12 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. Watson & Associates Economists Ltd. PAGE 4-13 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 4.13 Asset Management The legislation now requires that a D.C. background study must include an asset management plan (subsection 10 (2) c.2). The asset management plan (A.M.P.) must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, approaches, and policies on asset management planning. This examination has been included in Appendix F. 4.14 Mandatory Discount for Rental Housing Development For all rental housing developments that are subject to D.C.s, where a by-law is passed after November 28, 2022, the charge is discounted for the rental housing development relative to the maximum charge that could be imposed under the by-law. The amount of the discount is dependant on the number of bedrooms in each unit, as follows: 1. Residential units intended for use as a rented residential premises with three (3) or more bedrooms - 25% discount. 2. Residential units intended for use as a rented residential premises with two (2) bedrooms - 20% discount. 3. Residential units intended for use as a rented residential premises not referred to 1 or 2 above - 15% discount. Note that these discounts are not part of the methodology required for calculating the charge, but a rule that has to be included in the by-laws which informs implementation. Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 5 D.C. Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 5. D.C. Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis for the defined service areas. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A., and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: 1. The service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and 2. The infrastructure cost calculation, which determines the potential D.C. recoverable cost. The nature of the capital projects and timing identified in the Chapter reflect Council's current intention. Over time, however, City projects and Council priorities may change; accordingly, Council's intentions may be altered, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and 10-Year Capital Costs for City-wide D.C. Services and Class of Services Calculation This section evaluates the development-related capital requirements for Fire Protection, Parks and Recreation, Library, Provincial Offences Act (P.O.A) including By-law Enforcement, Waste Diversion Services, and Growth-Related Studies over the 10-year forecast period (2024 to 2033). 5.2.1 Fire Protection Services The City currently provides fire protection services through six (6) fire stations, along with additional facilities such as a temporary fire training tower, a portable washroom, training portable, and 2 C-Can Storage units. These amount to a total of 78,081 sq.ft. of facility area. The City also owns 45 vehicles as well as a total inventory of 1,937 small equipment and gear. Watson & Associates Economists Ltd. PAGE 5-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx The facility spaces and additional assets provide an average level of service of approximately $576 per capita over the past 15 year. In aggregate, the maximum D.C. eligible amount that can be included in the calculation of the charge for the services is approximately $21.3 million. Table 5-1 provides the associated 10-year capital program for Fire Protection Services. To support future growth, the gross cost of growth-related capital projects identified by the City is approximately $60.58 million. In addition, the deficit in the Fire D.C. reserve fund of approximately $3.13 million has been included related to growth-works undertaken and committed through prior year capital approvals. A deduction related to the post-period benefits for future growth of approximately $28.87 million, has been made. Further, deductions related to the benefit to the existing community and grants, subsidies, and other contributions have been made, totalling approximately $7.6 and $6 million, respectively. As a result, $21.27 million has been included in the calculation of the charge, of which is $16.59 million (78%) had been apportioned to residential development and $4.68 million (22%) has been apportioned to non-residential development, based on the relationship of incremental population and employment growth. 5.2.2 Parks and Recreation Services The City currently provides a variety of parks and recreation-related assets to service the community. A summary of the inventory is provided below: 1. 1,229 acres of parkland including parks and parkettes (e.g., community, neighbourhood, regional, etc.), and open space; 2. 380 amenities that include items such as sport fields, baseball diamonds, skateboard parks, playgrounds, splashpads, and tennis courts, etc.; 3. 30,474 linear metres of trails and paths; 4. 914,137 sq.ft. of recreational building area that includes various recreation centres, pools, gymnasiums, etc., 5. 51,156 sq.ft. of Parks Operations Facility space; 6. 127 vehicles and equipment related to Parks and Recreation Services, including pickup trucks, trailers, mowers, etc. The total inventory of assets related to Parks and Recreation Services has provided an invested level of service of $6,458 per capita over the past 15-years. The capital Watson & Associates Economists Ltd. PAGE 5-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx program for the 10-year growth-related needs for the City is provided in table 5-2. The program includes the needs for additional parkland development, recreation facilities, trail development, and vehicles. It also includes the outstanding growth-related debt for the operation depot and Delpark Homes Centre. As such, the gross capital cost for all projects is $308.83 million. A deduction of approximately $34.4 million was made to recognize the post-period benefit of the capital works, and $58.29 million was deducted as a result of the benefit to the existing community. Further, $29.64 million in existing D.C. reserve funds has been deduction from the capital costs, resulting in net D.C. recoverable costs of approximately $186.5 million. The D.C. recoverable cost has been apportioned to residential and non-developments, of $177.17 million and $9.32 million, respectively. As the predominant users of this service tend to be residents of the City, the growth-related costs have been allocated 95% to residential and 5% to non- residential development. 5.2.3 Library Services The City currently owns and maintains four libraries, with a total of 95,085 sq.ft. of library space. The libraries house an inventory of approximately 341,200 library collection items, and two 2 vehicles. As such, the average level of service over the past 15 years was approximately $564 per capita. Based on the application of this level of service to the incremental 10-year forecast growth, the City would be eligible to collect approximately $20.84 million from D.C.s for the service over the forecast period. The corresponding 10-year capital program is provided in Table 5-3. The capital projects include provisional items along with additional new and expansion of library branches. Specifically, the need for additional library facility space was identified in the City's Parks Recreation Library and Culture (P.R.L.C.) Facility Needs Assessment. As such, the gross capital cost estimate of all projects is approximately $26.41 million. Deductions related to the benefit to the existing community of $1.88 million have been made, net of the reserve fund adjustment of $3.68 million, which have also been deducted. Therefore, the total D.C. recoverable cost included in the calculation is $20.84 million, of which $19.8 million and $1.04 million, approximately, have been allocated to residential and non-residential development, respectively. Similar to Parks and Recreation Services, the growth-related cost-share has been apportioned 95% to residential and 5% to non-residential development as the predominant users of this service tend to be residents of the City. Watson & Associates Economists Ltd. PAGE 5-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 5.2.4 Provincial Offences Act including By-law Enforcement Services The City currently owns and maintains approximately 18,000 sq.ft. of facility space of P.O.A., including By-law Enforcement. This includes office and garage space along with the Oshawa Executive Airport. Additionally, there are 25 vehicles that are utilized to provide this service, including vans, SUVs, and pickup trucks. As such, the total inventory of assets over the past 15-years results in an invested level of service of approximately $70 per capita. When applied to the 10-year forecast population, a maximum D.C. eligible cost of $2.58 million is applicable. As outlined in Table 5-4, the gross capital cost for capital projects for P.O.A. including By-law Enforcement is approximately $1.1 million, which includes additional vehicles, expansions, and other necessary equipment required to accommodate growth over the forecast period. A benefit to existing deduction of $307,100 was applied. Therefore, the total of $778,200 in growth-related needs have been included in the calculation of the D.C. Of this D.C. recoverable amount, approximately $607,000 (78%) is allocated to the residential development and approximately $171,200 (22%) to the non-residential base on the incremental growth in population and employment over the 10-year forecast period. 5.2.5 Waste Diversion The City is responsible for the collection of waste including materials diverted from landfills. The City's service level for waste diversion is comprised of a share of the Consolidated Operations Depot as well as a number of vehicles including those used for waste collection. The garbage packers have been utilized for diversion over the past 15-years at a range of 34% to 39%, with the balance of the vehicles related to landfill (which is ineligible for recovery through D.C.s). The City maintains 667 sq.ft. of facility space related to waste diversion and 9.12 vehicles and equipment. Therefore, the average level of service over the past 15 years is approximately $23 per capita. Based on the application of this level of service to the incremental 10-year forecast growth, the City would be eligible to collect $854,145 from D.C.s over the forecast period. As shown in Table 5-5, the growth-related capital needs for this service include the acquisition of three (3) additional collection vehicles and the City's share of the land and construction costs related to the Northern Depot, providing a gross capital cost of approximately $2.2 million. A deduction related to the post-period benefit of $127,200 has been made. Other deductions of $1.33 million have been made to recognize the Watson & Associates Economists Ltd. PAGE 5-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx portion of these costs associated with landfill which is ineligible for recovery through D.C.s. Further, a deduction related to the benefit to the existing community of $55,800 has also been made, net of the reserve fund adjustment of approximately $30,000. As a result, a total D.C. recoverable cost of $638,791 has been included in the calculation of the charge, with $498,257 (78%) attributable to residential development and $140,534 (22%) attributable to non-residential development, which is based on the incremental growth in population to employment for the 10-year forecast period. 5.2.6 Growth-Related Studies (Class of Service) Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible services. With respect to growth-related studies, Section 7 (3) of the D.C.A. states that: For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3). These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and draft by-law provided herein include a class for growth-related studies. This class is comprised of the following municipal-wide services: - Services Related to a Highway; - Fire Protection Services; - Parks and Recreation Services; - Library Services; - P.O.A. Services, including By-law Enforcement; - Stormwater Drainage and Control Services; and - Waste Diversion Services. The following provides a list of the studies that have been identified for the 2024 to 2034 forecast period: - D.C. Background Studies; - Official Plan; Watson & Associates Economists Ltd. PAGE 5-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - Zoning Study; - Part II Plan Studies (Whitebelt expansion areas); - Airport Land Use Study; - Fire Master Plans; - Grade Separation Study; - Integrated Transportation Master Plan Updates; - Operations Needs Study; - Parks, Recreation, Library and Culture Facility Needs Assessment Update; - Harbour Park Masterplan; - Storm Water Management Best Practices Study/Master Plans; - Water Resources Public Education; and - Low Impact Development (LID) Program. The total cost of these studies is approximately $6.39 million, including $261,349 for the existing D.C. reserve fund deficit for growth-related studies. After deducting approximately $1.76 million for the benefit to existing share and $210,000 to recognize the benefit to non-D.C.-eligible services that some studies will include, the D.C. eligible costs for studies that have been considered with the calculation of the charge within the class of services total approximately $4.42 million as presented in Table 5-6. For planning related studies, a deduction of 10% of the growth-related costs have been applied to recognize the extent to which the studies relate to non-D.C.-eligible services. Planning related studies and future D.C. background studies have been allocated to the services in the following manner: - Services Related to a Highway - 72.18% - Fire Protection Services - 1.92% - Parks and Recreation Services - 16.87% - Library Services - 1.89% - P.O.A. Services, including By-law Enforcement - 0.07% - Stormwater Drainage and Control Services - 7.01% - Waste Diversion Services - 0.06% The allocation of the net growth-related costs between residential and non-residential development is based on the residential and non-residential allocations for each service Watson & Associates Economists Ltd. PAGE 5-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx area and are presented in Table 5-7 below (resulting in an overall split of 80% residential and 20% non-residential). Watson & Associates Economists Ltd. PAGE 5-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-1 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Fire Protection Services Potential D.C. Recoverable Cost Prj. No. Residential Share Non- Residential Share 2024 to 2033 78% 22% 1 Fire Training Facility 2028-2029 10,990,000 6,594,000 4,396,000 2,748,000 1,648,000 1,285,440 362,560 2 Fire Station #7 2027-2028 24,760,000 9,025,000 15,735,000 2,476,000 13,259,000 10,342,020 2,916,980 3 Pumper/Rescue & Equipment for Fire Station #7 2026-2028 1,425,000 - 1,425,000 143,000 1,282,000 999,960 282,040 4 Bunker Gear for additional Firefighters (20) Station #7 2026-2028 328,800 328,800 32,900 295,900 230,802 65,098 5 Fire Station #8 2034-2051 11,500,000 11,500,000 - - - - - 6 Pumper/Rescue for Fire Station #8 2034-2051 1,425,000 1,425,000 - - - - - 7 Bunker Gear for additional Firefighters (20) Satation 2034-2051 328,800 328,800 - - - - - 8 Two 8' x 40' C-Can (storage) 2024 21,000 - 21,000 - 21,000 16,380 4,620 9 NG911 Network Upgrade (Phase 1) 2024 1,119,325 - 1,119,325 16,200 1,100,000 3,125 2,438 688 10 NG911 Network Upgrade (Phase 2) 2024 3,695,000 - 3,695,000 644,000 2,926,000 125,000 97,500 27,500 11 NG911 Network Upgrade (Phase 3) 2024-2025 3,185,675 - 3,185,675 1,333,000 1,593,000 259,675 202,546 57,128 12 Fire Distpatch Expansion 2024 600,000 - 600,000 200,000 360,000 40,000 31,200 8,800 13 Additional Rescue for Intensification in Existing Area 2024 1,200,000 - 1,200,000 - 1,200,000 936,000 264,000 Adjustments: 14 Reserve Fund Adjustment 3,132,080 - 3,132,080 - 3,132,080 2,443,022 689,058 Total 63,710,680 28,872,800 - 34,837,880 7,593,100 5,979,000 21,265,780 16,587,308 4,678,472 Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2024$) Less: Watson & Associates Economists Ltd. PAGE 5-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-2 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Parks and Recreation Services Prj. No. Residential Share Non- Residential Share 2024 to 2033 95% 5% 1 New Community Centre in Northwoods Business Area 2026-2027 112,719,173 - 112,719,173 11,271,900 101,447,273 96,374,910 5,072,364 2 Northwoods - North Field Parkland Development and Amenities 2026-2027 26,984,000 - 26,984,000 - 26,984,000 25,634,800 1,349,200 3 Northwoods - South Field (Windfields Community Park) - Parkland Development and Amenities 2026-2027 15,557,000 - 15,557,000 - 15,557,000 14,779,150 777,850 4 Rotary Park Redevelopment 2024-2025 25,000,000 - 25,000,000 12,500,000 12,500,000 11,875,000 625,000 5 Kedron Part II Plan Community Park 2028-2029 11,717,000 - 11,717,000 585,900 11,131,100 10,574,545 556,555 6 Thornton Community Park Development (Rose Valley Community Park) 2024-2025 8,600,000 - 8,600,000 430,000 8,170,000 7,761,500 408,500 7 Downtown Park (Bond/Simcoe Urban Park) 2024-2025 3,568,000 - 3,568,000 356,800 3,211,200 3,050,640 160,560 8 Harbour Park Redevelopment 2034-2051 18,915,000 9,457,000 9,458,000 9,458,000 - - - 9 Fittings Subdivision Park 2027-2028 731,000 - 731,000 36,600 694,400 659,680 34,720 10 North Central Taunton Park 2027-2028 827,000 - 827,000 41,400 785,600 746,320 39,280 11 Kedron Part II Plan Neighbourhood Park 1 2027-2028 797,000 - 797,000 39,900 757,100 719,245 37,855 12 Kedron Part II Plan Neighbourhood Park 2 2025-2026 797,000 - 797,000 39,900 757,100 719,245 37,855 13 Simcoe and Elena Park 2025-2026 945,000 - 945,000 47,300 897,700 852,815 44,885 14 Kedron Part II Plan Parkette 1 2025-2026 457,000 - 457,000 22,900 434,100 412,395 21,705 15 Kedron Part II Plan Parkette 2 2027-2028 482,000 - 482,000 24,100 457,900 435,005 22,895 16 Kedron Part II Plan Parkette 3 2027-2028 457,000 - 457,000 22,900 434,100 412,395 21,705 17 Kedron Part II Plan Parkette 4 2024 350,000 - 350,000 17,500 332,500 315,875 16,625 18 Kedron Part II Plan Parkette 5 2025-2026 482,000 - 482,000 24,100 457,900 435,005 22,895 19 Kedron Part II Plan Parkette 6 2025-2026 482,000 - 482,000 24,100 457,900 435,005 22,895 20 Kedron Part II Plan Parkette 7 2027 407,000 - 407,000 20,400 386,600 367,270 19,330 21 Kedron Part II Plan Parkette 8 2027-2028 482,000 - 482,000 24,100 457,900 435,005 22,895 22 Kedron Part II Plan Parkette 9 2028-2029 457,000 - 457,000 22,900 434,100 412,395 21,705 23 Kedron Part II Plan Parkette 10 2027-2028 482,000 - 482,000 24,100 457,900 435,005 22,895 24 Second Marsh Redevelopment 2025-2033 6,500,000 - 6,500,000 4,875,000 1,625,000 1,543,750 81,250 25 Taunton Part II Plan - Link 1 (Esterbrook to Salmers/Arborwood); Link 3 (Esterbrook to Conlin incl. 1 underpass) 2024 2,712,000 - 2,712,000 271,200 2,440,800 2,318,760 122,040 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-2 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Parks and Recreation Services Prj. No. Residential Share Non- Residential Share 2024 to 2033 95% 5% 26 Windfields Part II Plan - Link 5 (Conlin to Britannia east of Bridle) 2024-2025 1,650,000 - 1,650,000 165,000 1,485,000 1,410,750 74,250 27 Not in Part II Plan - Link 6 (between Ormond Dr.South and North) - 2.7km 2034-2051 870,000 783,000 87,000 87,000 - - - 28 Not in Part II Plan - Link 7 (Ormond Dr. To Ritson) - 1.4 km 2034-2051 290,000 261,000 29,000 29,000 - - - 29 Windfields Part II Plan - Link 12 (East-west link to Neigh Park 4 incl 1 Bridge) 2027-2028 639,000 - 639,000 63,900 575,100 546,345 28,755 30 Windfields Part II Plan - Link 13 (Britannia to Pipeline) 2024-2025 2,640,000 - 2,640,000 264,000 2,376,000 2,257,200 118,800 31 Windfields Part II Plan - Link 14 (Britannia to Hydro Corr. Incl. 1 Underpass) 2027-2028 556,000 - 556,000 55,600 500,400 475,380 25,020 32 Taunton Part II Plan - Link 15 (Legends to Conlin Rd.) 2029-2030 697,000 - 697,000 69,700 627,300 595,935 31,365 33 Windfields Part II Plan - Link 17 (Conlin to Britannia Incl. 1 Bridge & 1 Underpass) 2027-2028 1,162,000 - 1,162,000 116,200 1,045,800 993,510 52,290 34 Kedron Part II Plan - Link 18 (Conlin to Planning Area North Boundary at East Ritson) 2027-2028 581,000 - 581,000 58,100 522,900 496,755 26,145 35 Eastdale Part II Plan - Link 19 (Grandview to Townline Incl. 1 Bridge) 2027-2028 494,000 - 494,000 49,400 444,600 422,370 22,230 36 Pinecrest Part II Plan - Link 24 (East of Harmony Rd. and North of Beatrice St. to West of Grandview Rd. and South of Taunton 2027-2028 511,000 - 511,000 51,100 459,900 436,905 22,995 37 Pinecrest Part II Plan - Link 25 (East of Wilson Rd. and North of Beatrice St. to West of Harmony Rd. and North of Beatrice St.) 2027-2028 558,000 - 558,000 55,800 502,200 477,090 25,110 38 Pinecrest Part II Plan - Link 26 (West of Harmony Rd. and North of Beatrice St. to West of Harmony Rd. and South of Taunton 2028-2029 604,000 - 604,000 60,400 543,600 516,420 27,180 39 Eastdale Part II Plan - Link 27 (East of Harmony Rd. and North of Adelaide Ave. to East of Harmony Rd. and South of Roslin Rd.) 2028-2029 464,000 - 464,000 46,400 417,600 396,720 20,880 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-2 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Parks and Recreation Services Prj. No. Residential Share Non- Residential Share 2024 to 2033 95% 5% 40 Eastdale Part II Plan - Link 28 (East of Harmony Rd. and North of Adelaide Ave. to Link 27) 2029-2030 139,000 - 139,000 13,900 125,100 118,845 6,255 41 Eastdale Part II Plan - Link 29 (East of Harmony Rd. and North of Rossland Rd. to Ridge Valley Park) 2029-2030 232,000 - 232,000 23,200 208,800 198,360 10,440 42 Eastdale Part II Plan - Link 30 (East of Grandview St. and North of Rossland Rd. to Link 19) 2030-2031 558,000 - 558,000 55,800 502,200 477,090 25,110 43 Eastdale Part II Plan - Link 31 (West of Grandview St. and North of Rossland Rd. to Ridge Valley Park) 2030-2031 279,000 - 279,000 27,900 251,100 238,545 12,555 44 Taunton Part II Plan - Link 32 (West of Grandview St. and North of Taunton Rd. to West of Grandview St. and South of 2031-2032 279,000 - 279,000 27,900 251,100 238,545 12,555 45 Taunton Part II Plan - Link 33 (West of Grandview St. and North of Coldstream to West of Grandview St. and Salmers Dr.) 2031-2032 46,000 - 46,000 4,600 41,400 39,330 2,070 46 Windfields Part II Plan - Link 34 (Link 11 to Link 10) 2030-2031 186,000 - 186,000 18,600 167,400 159,030 8,370 47 Link 36 (Farewell Park to Florell Park) 2031-2032 604,000 - 604,000 302,000 302,000 286,900 15,100 48 Link 37 (Florell Park to Colonel Sam Dr.) 2032-2033 5,924,000 - 5,924,000 2,962,000 2,962,000 2,813,900 148,100 49 Link 38 - Colonel Sam Dr. to South of Hwy. 401 2032-2033 837,000 - 837,000 418,500 418,500 397,575 20,925 50 Link 39 - West of Harmony Rd at Easton Park to Harmony Creek Trail 2033 279,000 - 279,000 139,500 139,500 132,525 6,975 51 Link 40 - West of Harmony Rd. and North of Rossland Rd. to East of Attersley and North of Rossland Rd. 2033 33,000 - 33,000 16,500 16,500 15,675 825 52 Link 41 - East of Harmony Rd. to Wilson Rd. South and Taunton Rd. 2033 46,000 - 46,000 23,000 23,000 21,850 1,150 53 Link 42 - West of Ritson Rd. and North of Britannia Ave. to Link 59 2033 116,000 - 116,000 58,000 58,000 55,100 2,900 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-12 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-2 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Parks and Recreation Services Prj. No. Residential Share Non- Residential Share 2024 to 2033 95% 5% 54 Link 43 - Beatrice Rd. to South of Taunton Rd. 2033 56,000 - 56,000 28,000 28,000 26,600 1,400 55 Link 44 - Beatrice Rd. and West of Wilson Rd. to South of Taunton Rd. 2034-2051 741,000 370,500 370,500 370,500 - - - 56 Link 45 - South of Taunton and West of Wilson to South of Whitehall Park 2034-2051 638,000 319,000 319,000 319,000 - - - 57 Link 46 - Goodman Park to West end of Annapolis Ave, 2034-2051 928,000 464,000 464,000 464,000 - - - 58 Link 47 - Prestwick Park to South of Taunton Rd. and East of Thornton Rd. 2034-2051 2,860,000 1,430,000 1,430,000 1,430,000 - - - 59 Link 48 - North of Adelaide and East of Park Rd. to Alexandra St. 2034-2051 1,137,500 568,700 568,800 568,800 - - - 60 Link 49 - East / West Link South of Airport 2034-2051 870,000 435,000 435,000 435,000 - - - 61 Not in Part II Plan - Link 50 - West of Ritson Rd and South of Winchester Rd. to Link 13 2034-2051 429,000 214,500 214,500 214,500 - - - 62 Link 51 - North of Taunton Rd and South of Simcoe St. to Conlin Rd. 2034-2051 1,820,000 910,000 910,000 910,000 - - - 63 Link 52 - Link 51 to Link 7 2034-2051 1,335,000 667,500 667,500 667,500 - - - 64 Link 53 - Glovers Rd. to South of Camp Samac 2034-2051 3,640,000 1,820,000 1,820,000 1,820,000 - - - 65 Link 54 - North of Ormond Dr, to South of Conlin Rd. 2034-2051 1,040,000 520,000 520,000 520,000 - - - 66 Link 55 - South of Conlin Rd. and East of Ritson Rd. to Wilson Rd. and South of Conlin 2034-2051 580,000 290,000 290,000 290,000 - - - 67 Link 56 - South of Conlin Rd. and East of Ritson Rd. to Quail Run Dr. 2034-2051 174,000 87,000 87,000 87,000 - - - 68 Link 57 - North of Greenhill Ave. and West of Harmony Rd. to Quail Run Dr. 2034-2051 174,000 87,000 87,000 87,000 - - - 69 Link 58 - Link 18 to Link 59 2034-2051 754,000 377,000 377,000 377,000 - - - 70 Link 59 - From Thornton Rd. to Townline Rd. 2034-2051 4,120,000 2,060,000 2,060,000 2,060,000 - - - 71 Link 60 - North of Winchester Rd. and West of Grandview St. to Link 59 2034-2051 174,000 87,000 87,000 87,000 - - - 72 Link 61 - West of Townline Rd. and South of Winchester Rd. to Link 59 2028-2029 279,000 - 279,000 139,500 139,500 132,525 6,975 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-13 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-2 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Parks and Recreation Services Prj. No. Residential Share Non- Residential Share 2024 to 2033 95% 5% 73 Link 62 - West of Winchester Rd. and North of Link 59 to South of Columbus Rd. 2034-2051 1,690,000 845,000 845,000 845,000 - - - 74 Link 63 - East of Thornton Rd. and South of Columbus Rd. to North of Howden Rd. 2034-2051 2,089,000 1,044,500 1,044,500 1,044,500 - - - 75 Large Grass Mower 2028-2030 189,000 - 189,000 9,500 179,500 170,525 8,975 76 Forestry Bucket Truck 37 foot 2028-2030 225,000 - 225,000 11,300 213,700 203,015 10,685 77 Tractor with plow and salter for trails 2026 300,000 - 300,000 - 300,000 285,000 15,000 78 Horticulture Pickup 2026 100,000 - 100,000 - 100,000 95,000 5,000 79 Tractor with plow and salter for trails 2030 300,000 - 300,000 - 300,000 285,000 15,000 80 Northern Depot (land and construction) 2027-2028 17,761,000 11,292,500 6,468,500 - 6,468,500 6,145,075 323,425 Outstanding Growth-Related Debt & 81 Consolidated Operations Depot Outstanding 2024-2033 1,238,172 - 1,238,172 61,900 1,176,272 1,117,459 58,814 82 Consolidated Operations Depot Outstanding 2024-2033 140,874 - 140,874 7,000 133,874 127,180 6,694 83 Unfunded Delpark Homes Centre Debt 2024-2027 816,722 - 816,722 - 816,722 775,886 40,836 84 Unfunded Delpark Homes Centre Debt Interest - Discounted 2024-2027 50,931 - 50,931 - 50,931 48,385 2,547 Adjustments: 85 Reserve Fund Adjustment - 29,643,786 (29,643,786) (28,161,597) (1,482,189) Total 308,831,373 34,390,200 - 274,441,173 87,941,786 - 186,499,387 177,174,418 9,324,969 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-14 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-3 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Library Services Residential Share Non- Residential Share 2024 to 2033 95% 5% 1 Addition to Collections System Wide 2024 141,400 - 141,400 7,100 134,300 127,585 6,715 2 New Branch 2026-2027 15,906,000 - 15,906,000 1,759,700 14,146,300 13,438,985 707,315 3 Addition to Collections System Wide 2025-2033 860,000 - 860,000 43,000 817,000 776,150 40,850 4 New Branch Technology & Furniture 2025-2033 675,000 - 675,000 74,700 600,300 570,285 30,015 5 Library Lending Machines 2025-2033 150,000 - 150,000 - 150,000 142,500 7,500 6 New Branch Opening Day Collection 2025-2033 500,000 - 500,000 - 500,000 475,000 25,000 7 Expansion of Library branches 2025-2033 8,019,000 - 8,019,000 - 8,019,000 7,618,050 400,950 8 Library branch expansion Technology & Furniture 2025-2033 157,500 - 157,500 - 157,500 149,625 7,875 Adjustments: 9 Reserve Fund Adjustment 3,681,855 (3,681,855) (3,497,762) (184,093) Total 26,408,900 - - 26,408,900 5,566,355 - 20,842,545 19,800,418 1,042,127 Prj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-15 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-4 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Provincial Offences Act Including By-law Enforcement Table 5-5 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Waste Diversion Services Prj. No. Residential Share Non- Residential Share 2024 to 2033 78% 22% 1 Compact Cars & Midsize Cars- Class 00 (4) 2024-2026 260,000 - 260,000 - 260,000 202,800 57,200 2 Compact Cars & Midsize Cars- Class 00 (5) 2027-2031 325,000 - 325,000 - 325,000 253,500 71,500 3 Expansion of Space at Airport 2025 71,300 - 71,300 - 71,300 55,614 15,686 4 By-Law Enforcement Vehicle Equipment (Cameras) 2025 100,000 - 100,000 83,000 17,000 13,260 3,740 5 Hand Held Radios 2025-2031 50,000 - 50,000 - 50,000 39,000 11,000 6 Hand Held Printers 2025-2031 9,000 - 9,000 - 9,000 7,020 1,980 7 Automated Speed Enforcement Cameras (9) 2024-2033 270,000 - 270,000 224,100 45,900 35,802 10,098 Total 1,085,300 - - 1,085,300 307,100 - 778,200 606,996 171,204 Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Prj. No. Residential Share Non- Residential Share 2024 to 2033 78% 22% 1 Collection Vehicle 2026-2030 557,000 - 339,770 217,230 27,900 189,330 147,677 41,653 2 Collection Vehicle 2030 557,000 - 339,770 217,230 27,900 189,330 147,677 41,653 3 Collection Vehicle 2033 557,000 - 339,770 217,230 - 217,230 169,439 47,791 4 Northern Depot (land and construction) 2027-2028 513,000 127,200 312,930 72,870 - 72,870 56,839 16,031 Adjustments: 5 Reserve Fund Adjustment 29,969 (29,969) (23,376) (6,593) Total 2,184,000 127,200 1,332,240 724,560 85,769 - 638,791 498,257 140,534 Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-16 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-6 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Growth-Related Studies 2024 to 2033 1 Development Charge Background Study Amendment 2028-2029 All Services 200,000 - - 200,000 - - 200,000 160,793 39,207 2 Development Charge Background Study Update 2033 All Services 200,000 - - 200,000 - - 200,000 160,793 39,207 3 Official Plan 2025-2027 All Services 450,000 - 45,000 405,000 225,000 - 180,000 144,714 35,286 4 Zoning Study 2028-2030 All Services 450,000 - 45,000 405,000 225,000 - 180,000 144,714 35,286 5 Part II Plan Studies (whitbelt expansion areas) 2027-2030 All Services 700,000 - 70,000 630,000 - - 630,000 506,501 123,499 6 Airport Land Use Redevelopment Study 2030-2033 All Services 500,000 - 50,000 450,000 250,000 - 200,000 160,793 39,207 7 Fire Master Plan 2025 Fire Protection Services 200,000 - - 200,000 50,000 - 150,000 117,000 33,000 8 Fire Master Plan 2030 Fire Protection Services 200,000 - - 200,000 50,000 - 150,000 117,000 33,000 9 Grade Separation Study 2027-2028 Services Related to a Highway 87,000 - - 87,000 21,800 - 65,200 50,204 14,996 10 Integrated Transportation Master Plan Update 2024-2025 Services Related to a Highway 650,000 - - 650,000 162,500 - 487,500 375,375 112,125 11 Integrated Transportation Master Plan Update 2029-2030 Services Related to a Highway 650,000 - - 650,000 162,500 - 487,500 375,375 112,125 12 Operations Needs Study 2033 Services Related to a Highway 100,000 - - 100,000 50,000 - 50,000 38,500 11,500 13 Parks, Recreation, Library and Culture Facility Needs Assessment Update (75%) 2028-2030 Parks and Recreation Services 112,500 - - 112,500 56,300 - 56,200 53,390 2,810 14 Harbour Park Masterplan 2028-2033 Parks and Recreation Services 392,000 - - 392,000 196,000 - 196,000 186,200 9,800 15 Parks, Recreation, Library and Culture Facility Needs Assessment Update (25%) 2028-2030 Library Services 37,500 - - 37,500 18,800 - 18,700 17,765 935 16 Storm Water Management Best Practices Study/Master Plan 2024-2025 Stormwater Services 500,000 - - 500,000 125,000 - 375,000 288,750 86,250 17 Storm Water Management Best Practices Study/Master Plan Update 2029-2030 Stormwater Services 500,000 - - 500,000 125,000 - 375,000 288,750 86,250 18 Water Resources Public Education 2027-2028 Stormwater Services 50,000 - - 50,000 38,800 - 11,200 8,624 2,576 19 Low Impact Development (LID) Program 2025-2033 Stormwater Services 150,000 - - 150,000 - - 150,000 115,500 34,500 Reserve Fund Adjustment 261,349 - 261,349 - 261,349 207,880 53,469 Total 6,390,349 - 210,000 6,180,349 1,756,700 - 4,423,649 3,518,621 905,028 Service to Which Project Relates Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions (to recognize benefit to non- D.C. services) Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Residential Share Non- Residential Share Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 5-17 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-7 Infrastructure Costs Covered in the D.C. Calculation - Growth-Related Studies Class of Services - Residential/Non-Residential Shares Services Total Residential Share Non-Residential Share Stormwater Drainage and Control Services 1,086,842 838,500 248,342 Services Related to a Highway 2,378,389 1,834,930 543,459 Waste Diversion 979 763 216 Fire Protection Services 351,349 274,370 76,979 Library Services 51,738 48,676 3,061 Parks and Recreation Services 553,162 520,452 32,710 Provincial Offences Act including By-Law Enforcement 1,191 930 261 Total 4,423,649 3,518,621 905,028 Overall Growth Studies Class of Services Residential/Non-Residential % 80% 20% Watson & Associates Economists Ltd. PAGE 5-18 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 5.3 Service Levels and 27-Year (2024-2051) Capital Costs for City-wide D.C. Services Calculation This section evaluates the development-related capital requirements for Services Related to a Highway and Stormwater Drainage and Control Services within the 27-year forecast period (2024 to 2051). It should be noted that Stormwater Services infrastructure cost calculation is not limited by a historical level of service as indicated earlier in section 4.10.1. 5.3.1 Services Related to a Highway The City provides Services Related to a Highway through various service components that are listed below: - 183 km of roadways, sidewalks, and multi-use paths; - 53 arterial and collector bridges and culverts; - 3,103 streetlights and traffic signals; - 80,479 sq.ft. in public works space; - 152 vehicles and equipment. The total inventory of assets over the past 15 years results in an invested level of service of $8,879 per capita. When applied to the forecast population and employment growth to 2051, a maximum D.C. eligible cost of approximately $900.29 million. The capital needs provided for in the calculation of the charge include: - new road construction, - road widenings - intersection improvements; - arterial road resurfacing; - sidewalks on Regional roads and multi-use paths; - traffic control and accessible pedestrian signals; - streetlights on Regional roads; - unfunded growth-related capital costs for the Consolidated Operations Depot; - share of new Northern Depot; and - additional road maintenance vehicles. Watson & Associates Economists Ltd. PAGE 5-19 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-8 provides the 27-year capital program for Services Related to a Highway. A gross capital cost of approximately $1.01 billion over the 2024-2051 forecast period was identified. Deductions related to the benefit to the existing development and additional grants, subsidies and other contributions for new development were applied of approximately $100.03 million and $7.2 million, respectively. Further, the uncommitted D.C. reserve fund balance of $42.72 million, approximately, has been deducted. As a result, the total D.C. recoverable cost included in the calculation of the charge is $797.81 million, of which $614.32 million (77%) and $183.5 million (23%) is allocated to residential and non-residential development, respectively. The allocations are based on the incremental growth in population to employment for the 27-year forecast period. 5.3.2 Stormwater Drainage and Control Services The capital program for watercourse improvements (i.e., stormwater drainage and control services) includes various projects that include improvements to the City's creeks and channels along with provisional items for watercourse erosion control work and watercourse expansion/upsizing needs. The capital needs have been applied to the 2024 to 2051 forecast period. The gross capital cost for all projects is approximately $123.66 million (as provided in Table 5-9). The calculation of share attributable to development during the 2024-2051 period takes into consideration the impact of future development in relation to the needs of existing development within each respective sub-watershed and ranges from 0% to 95% with the majority of the projects assigned a benefit to existing development of 15%. Therefore, deductions for the benefit to the existing community has been made for approximately $42.16 million along with an adjustment to the reserve fund of $3.87 million. Further, a deduction of $160,400 to recognize the developer's responsibility consistent with the local service policy, has also been made. As such, the total D.C. recoverable share is approximately $77.46 million, which has been allocated between residential, and non-residential commercial/institutional, and non-residential industrial development. The allocations to the benefitting development have been made based on anticipated flow contribution by land use and is variable on a project-by-project basis. Watson & Associates Economists Ltd. PAGE 5-20 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-8 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation for Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No. Location Residential Share Non-Residential Share 2024 to 2051 77% 23% Roads: 1 (DANTONBURY) BRITANNIA AVE W West Limit to Thornton Rd N 2024-2028 3,806,000 - 3,806,000 - - 3,806,000 2,930,620 875,380 2 (KEDRON) GRANDVIEW ST N 50M N Of Britannia Ave to (Kedron) ARTC3 2024-2028 8,095,000 - 8,095,000 - - 8,095,000 6,233,150 1,861,850 3 (KEDRON) GRANDVIEW ST N (Kedron) ARTC3 to Winchester Rd E 2034-2051 8,238,000 - 8,238,000 - - 8,238,000 6,343,260 1,894,740 4 (KEDRON) TOWNLINE RD N 280M North Of Conlin Rd E to Britannia Ave 2024-2028 8,077,000 - 8,077,000 - - 8,077,000 6,219,290 1,857,710 5 (KEDRON) TOWNLINE RD N Britannia Ave to Winchester Rd E 2034-2051 13,494,000 - 13,494,000 - - 13,494,000 10,390,380 3,103,620 6 (KEDRON) WILSON RD N Conlin Rd E to (Kedron) ARTC3 2024-2028 11,788,000 - 11,788,000 1,067,600 - 10,720,400 8,254,708 2,465,692 7 (NORTHWOOD) STEVENSON RD N Taunton Rd W to (Northwood) Mid-Block Arterial 2029-2033 15,534,000 8,699,000 6,835,000 621,400 - 6,213,600 4,784,472 1,429,128 8 (PINECREST) BEATRICE ST E Harmony Rd N to Ridgemount Blvd 2034-2051 10,636,000 - 10,636,000 - - 10,636,000 8,189,720 2,446,280 9 (WINDFIELDS) BRITANNIA AVE W Thornton Rd N to Windfields Farm Dr 2024-2028 17,621,000 - 17,621,000 - - 17,621,000 13,568,170 4,052,830 10 AIRPORT BLVD Keith Ross Dr to Taunton Rd W 2024-2028 1,132,000 - 1,132,000 - - 1,132,000 871,640 260,360 11 ALBERT ST At CPR to 20M S Of Fisher ST 2024-2028 18,693,000 - 18,693,000 3,851,200 6,750,000 8,091,800 6,230,686 1,861,114 12 COLUMBUS RD At Oshawa Creek & At Harmony Creek to Various Locations East of Simcoe St. N. & Mary St. N. 2034-2051 15,892,000 - 15,892,000 - - 15,892,000 12,236,840 3,655,160 13 COLUMBUS RD E At Oshawa Creek to 23M E OF RITSON RD N 2024-2028 28,119,000 - 28,119,000 1,222,700 - 26,896,300 20,710,151 6,186,149 14 COLUMBUS RD E SIMCOE ST N to GRASS GROVE LANE 2029-2033 13,642,000 - 13,642,000 1,001,700 28,500 12,611,800 9,711,086 2,900,714 15 COLUMBUS RD E At Oshawa Creek to 113M E Of Wilson Rd N 2034-2051 17,633,000 - 17,633,000 2,033,600 - 15,599,400 12,011,538 3,587,862 16 COLUMBUS RD W AT OSHAWA CREEK to 207M W OF SIMCOE ST N 2029-2033 14,435,000 - 14,435,000 1,321,500 - 13,113,500 10,097,395 3,016,105 17 COLUMBUS RD W AT OSHAWA CREEK to 207M W OF SIMCOE ST N 2034-2051 18,002,000 - 18,002,000 1,644,600 - 16,357,400 12,595,198 3,762,202 18 CONLIN RD E AT HARMONY CREEK to 187M W OF TOWNLINE RD N & 60M E OF COPPERMINE ST 2024-2028 67,919,000 - 67,919,000 6,791,900 - 61,127,100 47,067,867 14,059,233 19 AT CONLIN RD E 80M E of Wilson Rd N 2024-2028 12,227,000 - 12,227,000 1,222,700 - 11,004,300 8,473,311 2,530,989 20 HOWDEN RD E AT OSHAWA CREEK - 422M E OF RITSON RD N 2034-2051 21,158,000 - 21,158,000 2,769,200 - 18,388,800 14,159,376 4,229,424 21 HOWDEN RD W At Oshawa Creek - 817M E of Thornton Rd N 2034-2051 13,823,000 - 13,823,000 1,009,200 - 12,813,800 9,866,626 2,947,174 22 AT RITSON RD N 872M N of Columbus Rd E 2034-2051 2,192,000 - 2,192,000 - - 2,192,000 1,687,840 504,160 23 RITSON RD N AT OSHAWA CREEK - Various Locations 2034-2051 88,934,000 - 88,934,000 5,997,800 - 82,936,200 63,860,874 19,075,326 24 THORNTON RD N AT OSHAWA CREEK - Various Locations 2024-2028 45,153,000 - 45,153,000 2,838,200 - 42,314,800 32,582,396 9,732,404 25 THORNTON RD N At Various Locations 2029-2033 316,000 - 316,000 - - 316,000 243,320 72,680 26 THORNTON RD N (NORTHERN) ARTC6 - COLUMBUS RD W 2034-2051 819,400 - 819,400 - - 819,400 630,938 188,462 27 THORNTON RD N At Various Locations 2034-2051 41,527,000 - 41,527,000 4,833,500 - 36,693,500 28,253,995 8,439,505 28 BEATRICE ST E At Harmony Creek - 84M E Of Simcoe St N 2034-2051 48,618,000 - 48,618,000 2,181,300 - 46,436,700 35,756,259 10,680,441 29 BEATRICE ST W Various Locations 2052 41,793,000 41,793,000 - - - - - - 30 BRIDLE2 At Various Locations 2029-2033 13,482,000 - 13,482,000 - - 13,482,000 10,381,140 3,100,860 30 BRIDLE3 At Various Locations 2029-2033 17,843,000 - 17,843,000 - - 17,843,000 13,739,110 4,103,890 30 JOHN ST EULALIE AVE CONNECTION John St E to Eulalie Ave 2024-2028 3,333,000 - 3,333,000 - - 3,333,000 2,566,410 766,590 31 KING/BOND CORRIDOR CITY WIDE 2024-2028 1,271,000 - 1,271,000 - - 1,271,000 978,670 292,330 32 KING/BOND CORRIDOR CITY WIDE 2029-2033 12,500,000 - 12,500,000 6,250,000 - 6,250,000 4,812,500 1,437,500 33 MARY ST N Various Locatioins 2029-2033 2,977,000 - 2,977,000 272,200 - 2,704,800 2,082,696 622,104 34 RAGLAN RD E Simcoe St N - Townline Rd N 2034-2051 17,088,000 - 17,088,000 2,563,200 - 14,524,800 11,184,096 3,340,704 35 SIMCOE ST S SOUTH LIMIT to HARBOUR RD 2029-2033 19,962,000 - 19,962,000 1,923,200 - 18,038,800 13,889,876 4,148,924 36 STEVENSON RD N Various Locatioins 2029-2033 5,324,000 - 5,324,000 - - 5,324,000 4,099,480 1,224,520 37 STEVENSON RD N STEVENSON RD N to AIRPORT BLVD 2034-2051 11,051,000 - 11,051,000 - - 11,051,000 8,509,270 2,541,730 38 SURVEY EQUIPMENT UPGRADES City Wide 2024-2028 50,000 - 50,000 2,500 - 47,500 36,575 10,925 Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-21 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-8 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation for Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No. Location Residential Share Non-Residential Share 2024 to 2051 77% 23% 39 INTENSIFICATION TRANSPORTATION INFRASTRUCUTRE City Wide 2024-2028 750,000 - 750,000 375,000 - 375,000 288,750 86,250 40 TOWN2 AT BRITLE1 & AT TOWNLINE RD N 2024-2028 700,000 - 700,000 - - 700,000 539,000 161,000 41 TOWNLINE RD N Various Locatioins 2024-2028 2,186,000 - 2,186,000 197,900 - 1,988,100 1,530,837 457,263 42 TOWNLINE RD N Various Locatioins 2034-2051 17,590,000 15,303,300 2,286,700 351,800 - 1,934,900 1,489,873 445,027 43 TOWNLINE RD S CHERRYDOWN DR to 90m S OF OLIVE AVE 2029-2033 36,606,000 - 36,606,000 63,900 - 36,542,100 28,137,417 8,404,683 44 WILSON RD N (KEDRON) ARTC3 to WINCHESTER RD E 2034-2051 5,625,000 - 5,625,000 509,400 - 5,115,600 3,939,012 1,176,588 45 WILSON RD N TAUNTON RD E to CONLIN RD E 2034-2051 15,632,000 - 15,632,000 1,415,700 - 14,216,300 10,946,551 3,269,749 46 WILSON RD S Various Locations 2029-2033 6,378,000 - 6,378,000 667,000 - 5,711,000 4,397,470 1,313,530 47 WINCHESTER RD E GRANDVIEW ST N to TOWNLINE RD N 2034-2051 1,866,000 - 1,866,000 279,900 - 1,586,100 1,221,297 364,803 48 Arterial Road Resurfacing Various 2024-2028 8,355,000 - 8,355,000 6,266,300 - 2,088,700 1,608,299 480,401 49 Arterial Road Resurfacing Various 2029-2033 8,355,000 - 8,355,000 6,266,300 - 2,088,700 1,608,299 480,401 50 Arterial Road Resurfacing Various 2034-2051 14,203,000 - 14,203,000 10,652,300 - 3,550,700 2,734,039 816,661 51 COL4 AT WINCHESTER RD W 2024-2028 10,342,000 - 10,342,000 879,100 427,500 9,035,400 6,957,258 2,078,142 52 DREW ST TORONTO AVE to FIRST AVE/MCNAUGHTON 2024-2028 1,251,000 - 1,251,000 153,700 - 1,097,300 844,921 252,379 53 FIRST AVE SIMCOE ST S to DREW ST/MCNAUGHTON AVE 2024-2028 4,246,000 - 4,246,000 521,700 - 3,724,300 2,867,711 856,589 54 MCNAUGHTON AVE DREW ST/FIRST AVE to RITSON RD S 2024-2028 1,486,000 - 1,486,000 182,600 - 1,303,400 1,003,618 299,782 Active Transportation: Sidewalks and Multi-use on City Roads: 55 LAVAL DR THORNTON RD S to STEVENSON RD S 2029-2033 415,000 - 415,000 41,500 - 373,500 287,595 85,905 56 ACTIVE TRANSPORTATION NETWORK CONNECTIVITY CITY WIDE - VARIOUS LOCATIONS 2024-2028 5,000,000 - 5,000,000 - - 5,000,000 3,850,000 1,150,000 Active Transportation: Sidewalks and Multi-use Paths on Regional Roads: 57 (EASTDALE) ROSSLAND RD E GRANDVIEW ST N to TOWNLINE RD N 2024-2028 1,453,000 - 1,453,000 - - 1,453,000 1,118,810 334,190 58 (KEDRON) HARMONY RD N CONLIN RD E to WINCHESTER RD E and CONLIN RD E to 343M N OF CONLIN RD E 2024-2028 450,000 - 450,000 - - 450,000 346,500 103,500 59 ACTIVE TRANSPORTATION CONNECTIVITY (MTO) CITY WIDE - VARIOUS LOCATIONS 2024-2028 12,250,000 - 12,250,000 6,125,000 - 6,125,000 4,716,250 1,408,750 60 ADELAIDE AVE W OSHAWA/WHITBY BOUNDARY - THORNTON RD N 2024-2028 273,000 - 273,000 - - 273,000 210,210 62,790 61 BLOOR ST E Various Locations 2024-2028 1,333,000 - 1,333,000 - - 1,333,000 1,026,410 306,590 62 BLOOR ST W Various Locations 2024-2028 966,000 - 966,000 - - 966,000 743,820 222,180 63 BLR1 50M N OF BRITANNIA AVE - (KEDRON) ARTC3 2024-2028 778,000 - 778,000 - - 778,000 599,060 178,940 64 CHAMPLAIN AVE Various Locations 2029-2033 1,300,000 - 1,300,000 - - 1,300,000 1,001,000 299,000 65 GIBB ST Various Locations 2024-2028 1,513,000 - 1,513,000 - - 1,513,000 1,165,010 347,990 66 GIBB ST E SIMCOE ST S to RITSON RD S 2024-2028 701,000 - 701,000 - - 701,000 539,770 161,230 67 HARMONY RD N CONLIN RD E to BRITANNIA AVE E and 1131 M N OF WINCHESTER RD E to COLUMBUS RD E 2024-2028 666,000 - 666,000 - - 666,000 512,820 153,180 68 OLIVE AVE DREW ST to RITSON RD S 2024-2028 85,100 - 85,100 - - 85,100 65,527 19,573 69 RITSON RD N Various Locations 2034-2051 1,698,000 - 1,698,000 - - 1,698,000 1,307,460 390,540 70 ROSSLAND RD E Various Locations 2024-2028 2,353,000 - 2,353,000 - - 2,353,000 1,811,810 541,190 71 ROSSLAND RD W Various Locations 2024-2028 966,000 - 966,000 - - 966,000 743,820 222,180 72 SIMCOE ST N Various Locations 2034-2051 3,117,000 - 3,117,000 - - 3,117,000 2,400,090 716,910 73 TAUNTON RD E Various Locations 2024-2028 1,751,000 - 1,751,000 - - 1,751,000 1,348,270 402,730 74 TAUNTON RD W WEST CITY LIMITS to THORNTON RD N and SOMERVILLE ST to SIMCOE ST N 2024-2028 369,000 - 369,000 - - 369,000 284,130 84,870 Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-22 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-8 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation for Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No. Location Residential Share Non-Residential Share 2024 to 2051 77% 23% 75 THORNTON RD N DRYDEN BLVD to TAUNTON RD W 2024-2028 336,000 - 336,000 - - 336,000 258,720 77,280 76 THORNTON RD S CHAMPLAIN AVE to KING ST W 2024-2028 1,150,000 - 1,150,000 - - 1,150,000 885,500 264,500 77 TOWNLINE RD N Various Locations 2024-2028 1,916,000 - 1,916,000 - - 1,916,000 1,475,320 440,680 78 TOWNLINE RD S OLIVE AVE to KING ST E 2029-2033 327,000 - 327,000 - - 327,000 251,790 75,210 79 WILSON RD N Various Locations 2029-2033 806,000 - 806,000 - - 806,000 620,620 185,380 Programs: 80 GEODETIC CONTROL SURVEY MONUMENTS City Wide 2024-2028 207,800 - 207,800 - - 207,800 160,006 47,794 81 GEODETIC CONTROL SURVEY MONUMENTS City Wide 2029-2033 166,200 - 166,200 - - 166,200 127,974 38,226 82 GEODETIC CONTROL SURVEY MONUMENTS City Wide 2034-2051 706,500 - 706,500 - - 706,500 544,005 162,495 83 City Wide - Misc Land City Wide 2024-2033 2,500,000 - 2,500,000 - - 2,500,000 1,925,000 575,000 84 City Wide - Misc Land City Wide 2034-2051 4,250,000 - 4,250,000 - - 4,250,000 3,272,500 977,500 85 City Wide - Misc Design & Engineering costs City Wide 2024-2033 800,000 - 800,000 - - 800,000 616,000 184,000 86 City Wide - Misc Design & Engineering costs City Wide 2034-2051 1,360,000 - 1,360,000 - - 1,360,000 1,047,200 312,800 87 Neighbourhood Traffic Management Projects City Wide 2024-2033 500,000 - 500,000 50,000 - 450,000 346,500 103,500 88 Neighbourhood Traffic Management Projects City Wide 2034-2051 850,000 - 850,000 85,000 - 765,000 589,050 175,950 Traffic Signals: 89 Accessible Pedestrian Signals King/Gibbons 2024 85,000 - 85,000 4,300 - 80,700 62,139 18,561 90 New Traffic Control Signals Grandview St N & Ridgemount Blvd 2029 250,000 - 250,000 12,500 - 237,500 182,875 54,625 91 New Traffic Control Signals Laval Dr & Smartcentres 2027 250,000 - 250,000 12,500 - 237,500 182,875 54,625 92 New Traffic Control Signals Hillcroft & Mary St N 2026 250,000 - 250,000 12,500 - 237,500 182,875 54,625 93 Accessible Pedestrian Signals Bond & Claymore 2024 100,000 - 100,000 5,000 - 95,000 73,150 21,850 94 New Traffic Control Signals Coldstream Dr & Townline Rd N 2025 250,000 - 250,000 12,500 - 237,500 182,875 54,625 95 New Traffic Control Signals Laval Drive & Fox St 2028 250,000 - 250,000 12,500 - 237,500 182,875 54,625 96 New PXO Pedestrian Signal TBD - multiyear 2024-2032 362,500 - 362,500 18,100 - 344,400 265,188 79,212 97 Control&Warning Signals Conlin Conlin Rd W & Stevenson Rd N 2031-2035 250,000 - 250,000 12,500 - 237,500 182,875 54,625 98 New Intersection Pedestrian Signals Traffic Control Signals Conlin Rd E & Riverton St/Verne Bowen Street 2024 225,000 - 225,000 11,300 - 213,700 164,549 49,151 99 Traffic Signal Uninteruptible Power Supply TBD - multiyear (2024-2033) 2024-2033 600,000 - 600,000 30,000 - 570,000 438,900 131,100 100 Accessible Pedestrian Signals TBD - multiyear 2024-2033 1,233,000 - 1,233,000 61,700 - 1,171,300 901,901 269,399 101 Accessible Pedestrian Signals TBD - multiyear (2034-2051) 2034-2051 1,700,000 - 1,700,000 85,000 - 1,615,000 1,243,550 371,450 102 New PXO Pedestrian Signal TBD - multiyear (2034-2051) 2034-2051 616,300 - 616,300 30,800 - 585,500 450,835 134,665 103 New Traffic Control Signals TBD - multiyear (2034-2051) 2034-2051 1,416,700 - 1,416,700 70,800 - 1,345,900 1,036,343 309,557 Streetlights on Regional Roads: - 104 Gibb St - Streetlighting Upgrades East of Stevenson Rd to Simcoe St S 2024 987,000 - 987,000 148,100 - 838,900 645,953 192,947 105 Ritson Rd N - Streetlighting Upgrades Taunton to Conlin 2025 1,186,000 - 1,186,000 177,900 - 1,008,100 776,237 231,863 106 Rossland Rd E - Streetlighting Upgrades Ritson to Harmony Rd 2026 990,000 - 990,000 148,500 - 841,500 647,955 193,545 107 Stevenson Rd 330M S of Gibb St to Bond St W 2026 744,000 - 744,000 111,600 - 632,400 486,948 145,452 108 Bloor St W West city limits to west of Stevenson Rd S 2025-2030 1,191,400 - 1,191,400 178,700 - 1,012,700 779,779 232,921 109 Adelaide Ave W West city limits to Thornton Rd N 2025 261,000 - 261,000 39,200 - 221,800 170,786 51,014 110 Harmony Rd N Conlin Rd E to Winchester Rd E 2033 1,346,000 - 1,346,000 201,900 - 1,144,100 880,957 263,143 Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-23 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-8 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation for Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No. Location Residential Share Non-Residential Share 2024 to 2051 77% 23% 111 Champlain Ave Whitby/Oshawa Boundary to Thornton Rd S 2025 215,000 - 215,000 32,300 - 182,700 140,679 42,021 112 Ritson Rd N Maine St to Winchester Rd E 2031 1,138,000 - 1,138,000 170,700 - 967,300 744,821 222,479 113 Thornton Rd - Streetlighting Champlain Ave to King St 2027 1,116,000 - 1,116,000 167,400 - 948,600 730,422 218,178 114 Stevenson Rd - Streetlighting Upgrades Bond St to Rossland Rd 2027 1,156,000 - 1,156,000 173,400 - 982,600 756,602 225,998 115 Bloor St E - Streetlighting Upgrade Harmony Rd to Townline Rd 2025 1,044,000 - 1,044,000 156,600 - 887,400 683,298 204,102 116 Rossland Rd E - Streetlighting Harmony Rd to Townline Rd 2029 978,000 - 978,000 146,700 - 831,300 640,101 191,199 117 Gibb St/Olive Ave Simcoe St S to Ritson Rd S 2025 522,000 - 522,000 78,300 - 443,700 341,649 102,051 118 Bloor St E Ritson Rd S to Farewell St 2031 735,000 - 735,000 110,300 - 624,700 481,019 143,681 119 Wilson Rd N Rossland Rd to Taunton Rd 2031-2035 1,813,000 - 1,813,000 - - 1,813,000 1,396,010 416,990 120 Townline Rd N King St E to Conlin Rd 2025-2030 3,519,300 - 3,519,300 - - 3,519,300 2,709,861 809,439 121 Townline Rd S King St E to Olive Ave 2031-2035 728,700 - 728,700 - - 728,700 561,099 167,601 122 Simcoe St N Taunton Rd W to 307m north of Glovers Rd 2036-2051 641,600 - 641,600 - - 641,600 494,032 147,568 123 Harmony Rd N Conlin Rd E to Winchester Rd E 2025-2030 1,981,800 - 1,981,800 - - 1,981,800 1,525,986 455,814 124 Stevenson Rd N Gibb St to Rossland Rd W 2031-2035 2,532,800 - 2,532,800 - - 2,532,800 1,950,256 582,544 125 Winchester Road East Simcoe St N to Townline Rd N 2031-2035 4,354,700 - 4,354,700 - - 4,354,700 3,353,119 1,001,581 126 Winchester Road West Thornton Rd N to Simcoe St N 2031-2035 1,421,900 - 1,421,900 - - 1,421,900 1,094,863 327,037 127 Thornton Rd S Champlain Rd to King St W 2025-2030 1,724,100 - 1,724,100 - - 1,724,100 1,327,557 396,543 128 Thornton Rd S Dryden Blvd to Taunton Rd W 2025-2030 728,700 - 728,700 - - 728,700 561,099 167,601 129 Ritson Rd N Ormond Dr to Conlin Rd W 2036-2051 1,466,400 - 1,466,400 - - 1,466,400 1,129,128 337,272 130 Wilson Rd N Bloor St E to Olive Ave 2031-2035 844,300 - 844,300 - - 844,300 650,111 194,189 131 Rossland Rd W West City Limits to Somerville St 2025-2030 2,221,800 - 2,221,800 - - 2,221,800 1,710,786 511,014 132 Rossland Rd E Ritson Rd N to Grandview St N 2025-2030 1,733,000 - 1,733,000 - - 1,733,000 1,334,410 398,590 133 Taunton Rd E Simcoe St N to Townline Rd N 2025-2030 3,643,700 - 3,643,700 - - 3,643,700 2,805,649 838,051 134 Taunton Rd W Somerville St to Simcoe St N 2025-2030 319,900 - 319,900 - - 319,900 246,323 73,577 135 Phillip Murray Ave Stevenson Rd S to Park Rd S 2025-2030 737,600 - 737,600 - - 737,600 567,952 169,648 136 Park Rd S Phillip Murray Ave to Fenelon Cres 2025-2030 311,000 - 311,000 - - 311,000 239,470 71,530 137 Wentworth St W Boundary Rd to Stevenson Rd S 2025-2030 1,066,500 - 1,066,500 - - 1,066,500 821,205 245,295 Facilities: 138 Northern Depot (land and construction) 2027-2028 46,705,000 - 46,705,000 11,008,000 - 35,697,000 27,486,690 8,210,310 Vehicles & Equipment: 139 1/2 Ton Pickup 2024 100,000 - 100,000 - - 100,000 77,000 23,000 140 1/2 Ton Pickup 2029 100,000 - 100,000 - - 100,000 77,000 23,000 141 3/4 Ton Pickup 2025 120,000 - 120,000 - - 120,000 92,400 27,600 142 1 Ton Pickup 2025 125,000 - 125,000 - - 125,000 96,250 28,750 143 1 Ton Pickup 2029 125,000 - 125,000 - - 125,000 96,250 28,750 144 Vactor Truck 2034 700,000 - 700,000 - - 700,000 539,000 161,000 145 Road Sweeper 2026 600,000 - 600,000 - - 600,000 462,000 138,000 146 Tandum Plow 2026 659,000 - 659,000 - - 659,000 507,430 151,570 147 Tandum Plow 2031 659,000 - 659,000 - - 659,000 507,430 151,570 148 Sidewalk Plow 2028 190,000 - 190,000 - - 190,000 146,300 43,700 149 1/2 Ton Pickup 2031 100,000 - 100,000 - - 100,000 77,000 23,000 Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-24 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-8 (continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation for Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No. Location Residential Share Non-Residential Share 2024 to 2051 77% 23% 150 1/2 Ton Pickup 2036 100,000 - 100,000 - - 100,000 77,000 23,000 151 3/4 Ton Pickup 2031 120,000 - 120,000 - - 120,000 92,400 27,600 152 3/4 Ton Pickup 2036 120,000 - 120,000 - - 120,000 92,400 27,600 153 3/4 Ton Pickup 2041 120,000 - 120,000 - - 120,000 92,400 27,600 154 1 Ton Pickup 2032 125,000 - 125,000 - - 125,000 96,250 28,750 155 1 Ton Pickup 2037 125,000 - 125,000 - - 125,000 96,250 28,750 156 1 Ton Pickup 2043 125,000 - 125,000 - - 125,000 96,250 28,750 157 Large Excavator 2038 425,000 - 425,000 - - 425,000 327,250 97,750 158 Road Sweeper 2037 600,000 - 600,000 - - 600,000 462,000 138,000 159 Sidewalk Plow 2031 190,000 - 190,000 - - 190,000 146,300 43,700 160 Sidewalk Plow 2038 190,000 - 190,000 - - 190,000 146,300 43,700 161 Sidewalk Plow 2045 190,000 - 190,000 - - 190,000 146,300 43,700 162 Single axle plow 2033 450,000 - 450,000 - - 450,000 346,500 103,500 163 Single axle plow 2038 450,000 - 450,000 - - 450,000 346,500 103,500 164 Tandum Plow 2043 659,000 - 659,000 - - 659,000 507,430 151,570 165 Tandum Plow 2048 659,000 - 659,000 - - 659,000 507,430 151,570 166 Loader 2035 350,000 - 350,000 - - 350,000 269,500 80,500 167 Loader 2045 350,000 - 350,000 - - 350,000 269,500 80,500 Outstanding Growth-Related Debt and Adjustments: 168 Consolidated Operations Depot Outstanding D.C. Recoverable Share (Outstanding Debt Principal) 2024-2033 1,539,497 - 1,539,497 77,000 - 1,462,497 1,126,123 336,374 169 Consolidated Operations Depot Outstanding D.C. Recoverable Share (Outstanding Debt Interest - Discounted) 2024-2033 175,158 - 175,158 8,800 - 166,358 128,095 38,262 170 Reserve Fund Adjustment - 42,719,264 - (42,719,264) (32,893,834) (9,825,431) Total 1,013,565,355 65,795,300 947,770,055 142,749,964 7,206,000 797,814,091 614,316,850 183,497,241 Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-25 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-9 City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Stormwater Drainage and Control Services Residential Share Commercial/ Institutional Share Industrial Share 2024 to 2051 varies varies varies 1 BOND ST W BRIDGE - 90M W OF MCMILLAN DR to 100M W OF MCMILLAN DR 2024-2028 5,020,000 - - 5,020,000 2,510,000 - 2,510,000 1,932,700 346,380 230,920 2 COLUMBUS II WATERCOURSE PROJECTS - VARIOUS 2034-2051 5,693,000 - - 5,693,000 854,000 - 4,839,000 3,629,250 725,850 483,900 3 CONSORTIUM WATERCOURSE BANK STABILIZATION - VARIOUS 2024-2028 20,000 - - 20,000 3,000 - 17,000 12,750 2,550 1,700 4 CONSORTIUM WATERCOURSE BANK STABILIZATION - VARIOUS 2029-2033 20,000 - - 20,000 3,000 - 17,000 12,750 2,550 1,700 5 CONSORTIUM WATERCOURSE BANK STABILIZATION - VARIOUS 2034-2051 20,000 - - 20,000 3,000 - 17,000 12,750 2,550 1,700 6 GOODMAN CREEK WATERCOURSE IMPROVEMENT - ROSSLAND RD W to BERMUDA AVE 2034-2051 265,700 - - 265,700 39,900 - 225,800 45,160 11,290 169,350 7 GOODMAN CREEK Preliminary Design - ADELAIDE AVE W to TAUNTON RD W 2034-2051 1,644,900 - - 1,644,900 246,700 - 1,398,200 279,640 69,910 1,048,650 8 GOODMAN CREEK Preliminary Design 2034-2051 816,000 - - 816,000 122,400 - 693,600 138,720 34,680 520,200 9 GOODMAN CREEK WATERCOURSE IMPROVEMENT - PARK RD S to NASSAU ST 2034-2051 163,900 - - 163,900 24,600 - 139,300 27,860 6,965 104,475 10 HARMONY B3 EAST Preliminary Design - COLDSTREAM DR to CONLIN RD E 2034-2051 1,483,800 - - 1,483,800 222,600 - 1,261,200 1,198,140 63,060 - 11 HARMONY B5 Preliminary Design - KING ST E to GRANDVIEW ST N 2034-2051 250,000 - - 250,000 37,500 - 212,500 201,875 10,625 - 12 HARMONY B5 CONSTRUCTION - KING ST E to GRANDVIEW ST N 2034-2051 833,500 - - 833,500 125,000 - 708,500 673,075 35,425 - 13 HARMONY CREEK - BR 2 WATERCOURSE IMPROVEMENT DESIGN - HILLCROFT ST to ROSSLAND RD E DESIGN 2034-2051 250,000 - - 250,000 37,500 37,500 175,000 166,250 8,750 - 14 HARMONY CREEK - BR 2 WATERCOURSE IMPROVEMENT - HILLCROFT ST to ROSSLAND RD E 2034-2051 819,400 - - 819,400 122,900 122,900 573,600 544,920 28,680 - 15 HARMONY CREEK B2 DIVERSION - ROSSLAND ROAD E to BEATRICE ST E 2034-2051 1,266,500 - - 1,266,500 190,000 - 1,076,500 1,022,675 53,825 - 16 HARMONY CREEK BR 3 WATERCOURSE IMPROVEMENT - HARMONY CREEK BRANCH 1 CONFLUENCE to ADELAIDE AVE E 2034-2051 371,100 - - 371,100 55,700 - 315,400 299,630 15,770 - 17 HARMONY CREEK BR 3 WATERCOURSE IMPROVEMENT DESIGN - HARMONY CREEK BRANCH 1 CONFLUENCE to ADELAIDE AVE E 2034-2051 250,000 - - 250,000 37,500 - 212,500 201,875 10,625 - 18 HARMONY CREEK BRANCH 1 - BOND ST E to WILSON RD N 2034-2051 416,900 - - 416,900 62,500 - 354,400 336,680 17,720 - 19 HARMONY CREEK BRANCH 1 WATERCOURSE IMPROVEMENT - CENTRAL PARK BLVD N to RITSON RD N 2034-2051 486,100 - - 486,100 72,900 - 413,200 392,540 20,660 - 20 HARMONY CREEK BRANCH 2 DIVERSION - ROSSLAND RD E to 300M N OF ROSSLAND RD E 2034-2051 204,500 - - 204,500 30,700 - 173,800 165,110 8,690 - 21 HARMONY CREEK BRANCH 2 WATERCOURSE IMPROVEMENT - 300M N OF ROSSLAND RD E to WILSON RD N 2034-2051 297,900 - - 297,900 44,700 - 253,200 240,540 12,660 - Less: Potential D.C. Recoverable Cost Prj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-26 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-9 (Continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Stormwater Drainage and Control Services Residential Share Commercial/ Institutional Share Industrial Share 2024 to 2051 varies varies varies 22 HARMONY CREEK BRANCH 5 - HARMONY CREEK BRANCH 1 to KING ST E 2034-2051 491,100 - - 491,100 73,700 - 417,400 396,530 20,870 - 23 KEDRON WATERCOURSE PROJECTS - VARIOUS 2034-2051 5,338,000 - - 5,338,000 800,700 - 4,537,300 3,402,975 680,595 453,730 24 KING ST W BRIDGE - AT OSHAWA CREEK to 67M W OF MCMILLAN DR 2024-2028 7,615,000 - - 7,615,000 3,807,500 - 3,807,500 2,855,625 571,125 380,750 25 OSHAWA CREEK - MAIN BR WATERCOURSE IMPROVEMENT - THOMAS ST to 200M N OF THOMAS ST 2034-2051 153,400 - - 153,400 23,000 - 130,400 97,800 19,560 13,040 26 OSHAWA CREEK - MAIN BR WATERCOURSE IMPROVEMENT - 200M N OF THOMAS ST to WENTWORTH ST W 2034-2051 212,700 - - 212,700 31,900 - 180,800 135,600 27,120 18,080 27 OSHAWA CREEK - MAIN BR WATERCOURSE IMPROVEMENT - HWY 401 to CPR RAILWAY 2034-2051 479,300 - - 479,300 71,900 - 407,400 305,550 61,110 40,740 28 OSHAWA CREEK BRANCH 1 - HARBOUR EAST OF SIMCOE ST S to HARBOUR EAST OF SIMCOE ST S 2034-2051 333,400 - - 333,400 50,000 - 283,400 212,550 42,510 28,340 29 OSHAWA CREEK MAIN BRANCH - BOND ST W to 120M N OF BOND ST W 2034-2051 90,300 - - 90,300 13,500 - 76,800 57,600 11,520 7,680 30 OSHAWA CREEK MAIN BRANCH - BOND ST W to 70M S OF KING ST W 2034-2051 130,800 - - 130,800 19,600 - 111,200 83,400 16,680 11,120 31 RAIL STRUCTURE EXPANSION - 420M S OF GIBB ST 2024-2028 15,892,000 - - 15,892,000 7,946,000 - 7,946,000 5,959,500 1,191,900 794,600 32 RAIL STRUCTURE EXPANSION CP - 390M E OF SIMCOE ST S 2024-2028 8,735,000 - - 8,735,000 873,500 - 7,861,500 5,896,125 1,179,225 786,150 33 RAIL STRUCTURE EXPANSION Metrolinx - 390M E OF SIMCOE ST S 2024-2028 14,700,000 - - 14,700,000 1,470,000 - 13,230,000 9,922,500 1,984,500 1,323,000 34 ROSSLAND RD W BRIDGE - 132M W OF WAVERLY ST N to 140M W OF WAVERLY ST N 2024-2028 4,268,900 - - 4,268,900 2,134,500 - 2,134,400 1,600,800 320,160 213,440 35 STORMWATER IMPROVEMENTS - SITE 1 AT STORM OUTFALL 37 - GIBB ST to JOHN ST W 2024-2028 2,625,000 - - 2,625,000 1,312,500 - 1,312,500 984,375 196,875 131,250 36 STORMWATER IMPROVEMENTS - SITE 2 AT STORM OUTFALL 301 - GIBB ST to JOHN ST W 2024-2028 400,000 - - 400,000 200,000 - 200,000 150,000 30,000 20,000 37 STORMWATER IMPROVEMENTS - SITE 3 AT STORM OUTFALL 286 - GIBB ST to JOHN ST W 2024-2028 915,000 - - 915,000 457,500 - 457,500 343,125 68,625 45,750 38 INTENSIFICATION STORMWATER INFRASTRUCTURE - VARIOUS 2024-2028 250,000 - - 250,000 125,000 - 125,000 93,750 18,750 12,500 39 TAUNTON RD BRIDGE - 145M E OF THORNTON RD N to 150M E OF THORNTON RD N 2024-2028 3,733,000 - - 3,733,000 1,866,500 - 1,866,500 1,399,875 279,975 186,650 40 HARMONY CREEK BRANCH 4 DESIGN - BRANCH 3 CONFLUENCE to TOWNLINE ROAD 2034-2051 250,000 - - 250,000 37,500 - 212,500 201,875 10,625 - 41 HARMONY CREEK BRANCH 4 - BRANCH 3 CONFLUENCE to TOWNLINE ROAD 2034-2051 2,118,200 - - 2,118,200 317,700 - 1,800,500 1,710,475 90,025 - 42 HARMONY CREEK BRANCH 3 DESIGN - BRANCHES 2 & 3 CONFLUENCE to HARMONY ROAD NORTH 2034-2051 250,000 - - 250,000 37,500 - 212,500 201,875 10,625 - 43 HARMONY CREEK BRANCH 3 - BRANCHES 2 & 3 CONFLUENCE to HARMONY ROAD NORTH 2034-2051 605,100 - - 605,100 90,800 - 514,300 488,585 25,715 - 44 HARMONY CREEK BRANCH 2 - THE 2ND WILSON ROAD NORTH CULVERT to BEATRICE STREET EAST 2024-2028 353,400 - - 353,400 53,000 - 300,400 285,380 15,020 - Less: Potential D.C. Recoverable Cost Prj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-27 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 5-9 (Continued) City of Oshawa Infrastructure Costs Included in the Development Charge Calculation For Stormwater Drainage and Control Services Residential Share Commercial/ Institutional Share Industrial Share 2024 to 2051 varies varies varies 45 HARMONY BRANCH 1 DESIGN - MARICA AVENUE to OSHAWA BLVD. NORTH 2034-2051 250,000 - - 250,000 37,500 - 212,500 201,875 10,625 - 46 HARMONY BRANCH 1 - MARICA AVENUE to OSHAWA BLVD. NORTH 2034-2051 333,400 - - 333,400 50,000 - 283,400 269,230 14,170 - 47 GOODMAN CREEK Preliminary Design - Adelaide Ave W to Taunton Rd W 2034-2051 12,500,000 - - 12,500,000 6,250,000 - 6,250,000 1,250,000 312,500 4,687,500 48 GOODMAN CREEK Preliminary Design 2034-2051 12,500,000 - - 12,500,000 6,250,000 - 6,250,000 1,250,000 312,500 4,687,500 49 Provision for Watercourse Erosion Control Works Required due to Growth 2034-2051 4,515,000 - - 4,515,000 2,910,400 - 1,604,600 1,075,082 192,552 336,966 50 Provision for Watercourse Structure Expansion/Upsizing to Accommodate additional Flow Deamnds due to Growth 2034-2051 3,026,000 - - 3,026,000 - - 3,026,000 2,027,420 363,120 635,460 Reserve Fund Adjustment - - - - 3,874,686 - (3,874,686) (2,596,040) (464,962) (813,684) Total 123,657,200 - - 123,657,200 46,032,486 160,400 77,464,314 51,798,327 9,102,830 16,563,157 Less: Potential D.C. Recoverable Cost Prj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 6. D.C. Calculation Tables 6-1 and 6-2 calculate the proposed D.C.s to be imposed for City-wide services on development area over the 27-year forecast period (2024-2051) and the 10-year forecast period (2024-2033), respectively. The D.C. eligible costs for each service were determined in Chapter 5 for all City-wide services, based on their associated proposed capital programs. Table 6-3 calculates the proposed D.C.s to be imposed on development on a City-wide basis for the growth-related studies class of service. The calculation for residential development is generated on a per capita basis and is based upon five (5) forms of housing types (singles and semi-detached dwellings, other multiples, bachelor and 1-bedroom apartments, 2+ bedrooms apartments, and lodging units). The non-residential D.C. has been calculated an industrial and non-industrial basis and presented on both a per sq.ft. and per sq.m. of G.F.A. basis. For the residential calculations, the total cost is divided by the "gross" (new resident) population to determine the per capita amount. The residential D.C. recoverable capital cost calculations set out in Chapter 5 are based on the net anticipated population increase (the forecast new unit population less the anticipated decline in existing units). The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 5) to calculate the charges in Tables 6-1 to 6-3, inclusive. Table 6-4 presents a summary of the calculated schedule of D.C.s for all services across the residential and non-residential development types. Table 6-5 summarizes the gross capital expenditures and sources of revenue for works anticipated to be undertaken during the 10-year life of the by-laws. Watson & Associates Economists Ltd. PAGE 6-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 6-1 City of Oshawa City-Wide D.C. Calculation for the 27-year Forecast Period (2024-2051) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. Industrial Non-Industrial Industrial per sq. ft. Non-Industrial per sq. ft. $ $ $ $ $ $ $ $ 1. Services Related to a Highway 1.1 Roads and Related, Public Works facilities, vehicles & equipment 614,316,850 183,497,241 18,617 7.87 73,398,896 110,098,345 4.92 13.12 2. Stormwater Drainage and Control Services 2.1 Channels, drainage and ponds 51,798,327 25,665,987 1,570 1.10 16,563,157 9,102,830 1.11 1.09 TOTAL $666,115,177 $209,163,228 $20,187 $8.97 $89,962,053 $119,201,175 $6.03 $14.21 D.C.-Eligible Capital Cost $666,115,177 $209,163,228 89,962,053 $119,201,175 27-Year Gross Population/GFA Growth (sq.ft.) 112,421 23,306,100 14,917,400 8,388,700 Cost Per Capita/Non-Residential GFA (sq.ft.) $5,925.18 $8.97 $6.03 $14.21 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.407 $20,187 Other Multiples 2.544 $15,074 Apartments - 2 Bedrooms + 2.142 $12,692 Apartments - Bachelor and 1 Bedroom 1.345 $7,969 Special Care/Special Dwelling Units 1.100 $6,518 SERVICE Watson & Associates Economists Ltd. PAGE 6-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 6-2 City of Oshawa City-Wide D.C. Calculation for the 10-year Forecast Period (2024-2033) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. Industrial Non-Industrial Industrial per sq. ft. Non-Industrial per sq. ft. $ $ $ $ $ $ $ $ 3. Fire Protection Services 3.1 Fire facilities, vehicles & equipment 16,587,308 4,678,472 1,372 0.57 1,964,958 2,713,514 0.37 0.97 4. Parks and Recreation Services 4.1 177,174,418 9,324,969 14,649 1.15 3,916,487 5,408,482 0.73 1.95 5. Library Services 5.1 Library facilities, materials and vehicles 19,800,418 1,042,127 1,637 0.13 437,693 604,434 0.08 0.22 6. Provincial Offences Act including By-Law Enforcement 6.1 Facilities, vehicles and equipment 606,996 171,204 50 0.02 71,906 99,298 0.01 0.04 7. Waste Diversion Services 7.1 Waste diversion facilites, vehicles, equipment and other 498,257 140,534 41 0.02 59,024 81,510 0.01 0.03 TOTAL $214,667,397 $15,357,306 $17,749 $1.89 $6,450,068 $8,907,238 $1.20 $3.21 D.C.-Eligible Capital Cost $214,667,397 $15,357,306 6,450,068 $8,907,238 10-Year Gross Population/GFA Growth (sq.ft.) 41,206 8,144,300 5,370,800 2,773,500 Cost Per Capita/Non-Residential GFA (sq.ft.) $5,209.62 $1.89 $1.20 $3.21 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.407 $17,749 Other Multiples 2.544 $13,253 Apartments - 2 Bedrooms + 2.142 $11,159 Apartments - Bachelor and 1 Bedroom 1.345 $7,007 Special Care/Special Dwelling Units 1.100 $5,731 Park development, amenities, trails, recreation facilities, vehicles & equipment SERVICE Watson & Associates Economists Ltd. PAGE 6-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 6-3 City of Oshawa City-Wide D.C. Calculation for the 10-year Forecast Period (2024-2033) for the Growth Studies Class of Service 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. Industrial Non-Industrial Industrial per sq. ft. Non-Industrial per sq. ft. $ $ $ $ $ $ $ $ 8. Growth-Related Studies 3,518,621 905,028 291 0.11 380,113 524,915 0.07 0.19 TOTAL $3,518,621 $905,028 $291 $0.11 $380,113 $524,915 $0.07 $0.19 D.C.-Eligible Capital Cost $3,518,621 $905,028 380,113 $524,915 10-Year Gross Population/GFA Growth (sq.ft.) 41,206 8,144,300 5,370,800 2,773,500 Cost Per Capita/Non-Residential GFA (sq.ft.) $85.39 $0.11 $0.07 $0.19 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 3.407 $291 Other Multiples 2.544 $217 Apartments - 2 Bedrooms + 2.142 $183 Apartments - Bachelor and 1 Bedroom 1.345 $115 Special Care/Special Dwelling Units 1.100 $94 CLASS OF SERVICES Watson & Associates Economists Ltd. PAGE 6-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 6-4 City of Oshawa Calculated Schedule of Development Charges by Service Single and Semi-Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units Industrial (per sq.ft. of Total Floor Area) Industrial (per sq.m. of Total Floor Area) Non-Industrial (per sq.ft. of Total Floor Area) Non-Industrial (per sq.m. of Total Floor Area) City-Wide Services: Services Related to a Highway 18,617 13,901 11,705 7,350 6,011 4.92 52.96 13.12 141.22 Fire Protection Services 1,372 1,024 862 541 443 0.37 3.98 0.97 10.49 Parks and Recreation Services 14,649 10,938 9,210 5,783 4,730 0.73 7.86 1.95 20.99 Library Services 1,637 1,222 1,029 646 529 0.08 0.86 0.22 2.37 Provincial Offences Act including By-Law Enforcement 50 37 31 20 16 0.01 0.11 0.04 0.43 Stormwater Drainage and Control Services 1,570 1,172 987 620 507 1.11 11.95 1.09 11.73 Waste Diversion Services 41 31 26 16 13 0.01 0.11 0.03 0.32 City-Wide Class of Services: Growth-Related Studies 291 217 183 115 94 0.07 0.75 0.19 2.05 Total City-Wide Services and Class of Services $38,227 $28,542 $24,033 $15,091 $12,343 $7.30 $78.58 $17.61 $189.61 RESIDENTIAL Services & Class of Services Non-Residential Watson & Associates Economists Ltd. PAGE 6-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table 6-5 City of Oshawa Gross Expenditure and Sources of Revenue Summary for Costs to be Incurred over the 10-Year Life of the By-laws Sources of Financing Tax Base or Other Non-D.C. Source D.C. Reserve Fund Other Deductions Benefit to Existing Other Funding Residential Non-Residential 1. Services Related to a Highway 1.1 Roads and Related, Public Works facilities, vehicles & equipment 550,505,400 0 106,138,564 7,206,000 8,699,000 329,915,613 98,546,222 2. Stormwater Drainage and Control Services 2.1 Channels, drainage and ponds 64,547,300 0 26,636,686 0 0 28,853,215 9,057,399 3. Fire Protection Services 3.1 Fire facilities, vehicles & equipment 47,324,800 0 7,593,100 5,979,000 15,619,000 14,144,286 3,989,414 4. Parks and Recreation Services 4.1 Park development, amenities, trails, recreation facilities, vehicles & equipment 261,316,173 0 65,702,086 0 11,292,500 175,105,508 9,216,079 5. Library Services 5.1 Library facilities, materials and vehicles 26,408,900 0 5,566,355 0 0 19,800,418 1,042,127 6. Provincial Offences Act including By-Law Enforcement 6.1 Facilities, vehicles and equipment 1,085,300 0 307,100 0 0 606,996 171,204 7. Waste Diversion Services 7.1 Waste diversion facilites, vehicles, equipment and other 2,184,000 1,332,240 85,769 0 127,200 498,257 140,534 Total Expenditures & Revenues (Services) $953,371,873 $1,332,240 $212,029,660 $13,185,000 $35,737,700 $568,924,294 $122,162,980 8. Growth-Related Studies 6,390,349 210,000 1,756,700 0 0 3,518,621 905,028 Total Expenditures & Revenues (Services/Class of Service) $959,762,223 $1,542,240 $213,786,360 $13,185,000 $35,737,700 $572,442,915 $123,068,008 Post D.C. Period Benefit Total Gross Cost Services/Class of Services Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction This chapter outlines the D.C. policy recommendations and by-law rules. Subsection 5 (1) 9 of the D.C.A. states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection 6." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided give consideration for the recent amendments to the D.C.A. as summarized in Chapter 1. However, these policies are provided for Council's consideration and may be refined prior to adoption of the by-law. Watson & Associates Economists Ltd. PAGE 7-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 7.2 D.C. By-law Structure It is recommended that: - The City uses a uniform City-wide D.C. calculation for all services and class of services considered herein; and - The City uses one D.C. by-law for all eligible services and class of services to be recovered through D.C.s. 7.3 D.C. By-law Rules The following sets out the recommended rules governing the calculation, payment, and collection of D.C.s in accordance with subsection 6 of the D.C.A. It is recommended that the following provides the basis for the D.C.s: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., s.2(2), a D.C. be calculated, payable and collected where the development requires one or more of the following: (a) the passing of a zoning by-law or of an amendment to a zoning by-law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure. 7.3.2 Determination of the Amount of the Charge The following convention be adopted: 1. Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type Watson & Associates Economists Ltd. PAGE 7-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the amount of square feet of G.F.A. constructed for eligible uses (i.e., primary, industrial, commercial, and institutional). 2. Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, as follows: - For Fire Protection Services, P.O.A. including By-law Enforcement, Waste Diversion Services, a 78% residential and 22% non-residential attribution has been made, over the City-wide 10-Year forecast period; - Library and Parks and Recreation Services, 95% residential attribution and 5% non-residential attribution over the City-wide 10-year forecast period; - For Stormwater Drainage and Control Services, the allocation is variable on a project-by-project basis based on anticipated flow contribution by land use. The non-residential share has been further subdivided into commercial/Institutional and industrial shares using the same approach, over the City-wide 27-Year forecast period; - Services Related to a Highway, a 77% residential and 23% non-residential attribution has been made, to recognize the residential and non-residential sector uses over the City-wide 27-Year forecast period; and - For the Growth-Related Studies Class of Services, the cost allocations between residential and non-residential is based on the allocations for each service area based on the eligible D.C. service that each study relates to. This results in an overall allocation of 80% to residential development and 20% to non-residential development. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) Where, as a result of the redevelopment of land, a building or structure existing on the same land within five years prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: Watson & Associates Economists Ltd. PAGE 7-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1. the number of dwelling units demolished/converted multiplied by the applicable residential development charge in place at the time the development charge is payable; and/or 2. the gross floor area of the building demolished/converted multiplied by the current non-residential development charge in place at the time the development charge is payable. The demolition/conversion credit is allowed only if the land was improved by occupied structures, and if the demolition permit related to the site was issued less than 60 months (5 years) prior to the issuance of a building permit. 7.3.4 Exemptions Statutory exemptions include the following: - Partial exemption for industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50%, is subject to D.C.s (subsection 4 (3) of the D.C.A.); - Full exemption for buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education; - Full exemption for additional residential development in existing buildings: development that results only in the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (based on prescribed limits set out in section 2 of O. Reg. 82/98); - Full exemption for additional residential development in new dwellings: development that includes the creation of up to two additional dwelling units (based on prescribed limits set out in section 2 of O. Reg. 82/98); and - Full exemption for a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - Full exemption for affordable units, attainable units, (once proclaimed); - Full exemption for affordable inclusionary zoning units, and non-profit housing developments; and Watson & Associates Economists Ltd. PAGE 7-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - Partial exemption through a discount for rental housing units based on bedroom size as prescribed (i.e., three or more bedrooms - 25% discount, two bedrooms - 20% discount, and all others - 15% discount). Non-statutory (discretionary exemptions) include the following: - D.C.s shall not be imposed on the development of an agricultural building or structure; - Lands wholly within that part of Oshawa partially known as the Core Area of the Downtown Oshawa Urban Growth Centre; - New Industrial building or structure or the enlargement of an existing Industrial building or structure; - Temporary building or structure; - Apartment Dwelling Unit or a Townhouse Dwelling other than a Street Townhouse Building on lands within that part of King Street/Thornton Road Intensification Area; - Apartment Dwelling Unit or a Townhouse Dwelling Unit, except back-to-back Townhouses, on lands within the Shoulder Area of the Downtown Oshawa Urban Growth Centre; - Lands used solely for the purposes of a non-profit institution defined as: o Non-Profit Institution; o Hospital; o Long-term Care Home; - That part of a building used solely for the purposes of a Medical Clinic shall be equal to 50% of the Commercial Development Charge. 7.3.5 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the City and an owner under s. 27 of the D.C.A. Rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy, and then on the anniversary of occupancy for the following five (5) years. Watson & Associates Economists Ltd. PAGE 7-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Moreover, the D.C. amount for all developments occurring within two (2) years of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020, and June 5, 2024), shall be determined based on the D.C. in effect on the day of the applicable Site Plan or Zoning By-law Amendment application. The D.C. amount for all developments occurring within eighteen (18) months of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted as of June 6, 2024), shall be determined based on the D.C. in effect on the day of the applicable Site Plan or Zoning By-law Amendment application. Installment payments and payments determined at the time of Site Plan or Zoning By- law Amendment applications are subject to annual interest charges. The maximum interest rate the City can impose is the average prime rate plus 1% as defined in subsection 26.3(1) of the Act. 7.3.6 Indexing Indexing of the D.C.s shall be implemented on a mandatory basis annually commencing on January 1st and July 1st, in accordance with the Statistics Canada Quarterly, Non- Residential Building Construction Price Index, as may be amended from time to time, for the most recent year-over-year period. 7.3.7 D.C. Spatial Applicability The D.C.A. historically has provided the opportunity for a municipality to impose municipal-wide charges or area specific charges. Sections 2(7) and 2(8) of the D.C.A. provide that a D.C. by-law may apply to the entire municipality or only part of it and more than one D.C. by-law may apply to the same area. The D.C.A. now require municipalities to consider the application of municipal-wide and area-specific D.C.s. s.10(2) (c.1) requires Council to consider the use of more than one D.C. by-law to reflect different needs from services in different areas. Most municipalities in Ontario have established uniform, municipal-wide D.C.s. When area-specific charges are used, it is generally to underpin master servicing and front-end financing arrangements for more localized capital costs. The rationale for maintaining a municipal-wide D.C. approach is based, in part, on the following: Watson & Associates Economists Ltd. PAGE 7-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 1. All City services, except for water and wastewater, require that the average 15- year service standard be calculated. This average service standard multiplied by growth in the City, establishes an upper ceiling on the amount of funds that can be collected from all developing landowners. Section 4 (4) of O. Reg. 82/98 provides that "if a development charge by-law applies to a part of the municipality, the level of service and average level of service cannot exceed that which would be determined if the by-law applied to the whole municipality." Put in layman terms, the average service standard multiplied by the growth within the specific area would establish an area-specific ceiling which would significantly reduce the total revenue recoverable for the City hence potentially resulting in D.C. revenue shortfalls and impacts on property taxes. 2. City-wide D.C.s ensures a consistent approach to financing the entire cost associated with growth-related capital projects. For example, user rates and property taxes are required to finance the share of growth-related capital projects not recoverable by D.C.s and all associated operating costs. Therefore, the use of area specific D.C.s results in a share of growth-related capital costs being recovered from a specific area, with the remaining capital costs of the projects (i.e., non-D.C. recoverable share) and the associated operating costs with those new assets being recovered from uniform user rates and property taxes, applied to the entire Municipality. 3. Expanding on item 1, attempting to impose an area charge potentially causes equity issues in transitioning from a City-wide approach to an area-specific approach. For example, if all services were now built (and funded) within Area A (which is 75% built out) and this was funded with some revenues from Areas B and C, moving to an area-rating approach would see Area A contribute no funds to the costs of services in Areas B and C. The D.C.s would be lower in Area A (as all services are now funded) and higher in Areas B and C. As well, funding shortfalls may then potentially encourage the municipality to provide less services to Areas B and C due to reduced revenue. 4. Services are generally available across the City, used often by all residents and are not restricted to one specific geographic area. The use of a City-wide D.C. approach reflects these system-wide benefits of service and more closely aligns with the funding principles of service provision (e.g., uniform municipal-wide property tax rates, etc.). Watson & Associates Economists Ltd. PAGE 7-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Based on the foregoing and discussions with City staff, there is no apparent justification for the establishment of area-specific D.C.s at this time. The recommendation is to apply City-wide D.C.s for all services. 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes It is recommended that the City's D.C. collections be contributed into eight (8) separate reserve funds, including: - Services Related to a Highway; - Fire Protection Services; - Parks and Recreation Services; - Library Services; - P.O.A. Services, including By-law Enforcement; - Stormwater Drainage and Control Services; - Waste Diversion; and - Growth-Related Studies. 7.4.2 By-law In-force Date The by-law will come into force on the date of by-law passage, or a later date as determined by Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-laws come into force (as per s.11 of O. Reg. 82/98). Watson & Associates Economists Ltd. PAGE 7-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies, and other contributions;" "Adopt the D.C. approach to calculate the charges on a uniform City-wide basis for all services and class of services" "Approve the capital project listing set out in Chapter 5 of the D.C. Background Study dated April 25, 2024, as amended, subject to further annual review during the capital budget process;" "Approve the D.C. Background Study dated April 25, 2024, as amended;" "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix G." Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 8. By-law Implementation 8.1 Public Consultation Process 8.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution. It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT) (formerly the Local Planning Appeal Tribunal (LPAT)). 8.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority Watson & Associates Economists Ltd. PAGE 8-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional/primary development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, institutional buildings, and buildings on agricultural lands. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in City D.C. policy. Their primary concern is frequently with the quantum of the charge, gross floor area exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.1.4 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 8.2 Implementation Requirements 8.2.1 Introduction Once the City has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.2.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the City Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by- law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.2.3 By-law Pamphlet In addition to the "notice" information, the City must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; Watson & Associates Economists Ltd. PAGE 8-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The City must give one copy of the most recent pamphlet without charge, to any person who requests one. 8.2.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the City Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The City is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.2.5 Complaints A person required to pay a D.C., or his agent, may complain to the City Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of City Council to the OLT Watson & Associates Economists Ltd. PAGE 8-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 8.2.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the City agrees to expand the credit to other services for which a D.C. is payable. 8.2.7 Front-Ending Agreements The City and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the City to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the Development Charges Act, 1989. Accordingly, the City assesses whether this mechanism is appropriate for its use, as part of funding projects prior to City funds being available. 8.2.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. PAGE 8-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the City is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 1 City of Oshawa Residential Growth Forecast Summary Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 146,950 141,590 1,870 139,720 34,705 7,705 12,375 145 54,930 1,700 2.578 155,270 149,607 1,932 147,675 38,101 8,190 12,383 123 58,797 1,756 2.544 165,490 159,458 1,828 157,630 40,085 9,075 13,285 150 62,595 1,662 2.547 182,020 175,383 1,373 174,010 42,330 10,095 14,065 150 66,640 1,248 2.632 193,310 186,256 1,460 184,796 43,519 11,426 16,554 150 71,649 1,327 2.600 231,630 223,184 1,824 221,360 50,077 17,400 18,392 150 86,019 1,658 2.595 298,540 287,651 2,483 285,168 58,262 29,391 25,165 150 112,968 2,257 2.546 8,320 8,017 62 7,955 3,396 485 8 -22 3,867 56 10,220 9,851 -104 9,955 1,984 885 902 27 3,798 -94 16,530 15,925 -455 16,380 2,245 1,020 780 0 4,045 -414 11,290 10,873 87 10,786 1,189 1,331 2,489 0 5,009 79 38,320 36,928 364 36,564 6,558 5,974 1,838 0 14,370 331 105,230 101,395 1,023 100,372 14,743 17,965 8,611 0 41,319 930 [1] Census undercount estimated at approximately 3.8%. Note: Population including the undercount has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Mid 2034 Mid 2024 - Mid 2034 Historical Forecast Incremental Mid 2006 Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2006 - Mid 2011 Mid 2021 Mid 2024 Mid 2051 Mid 2021 - Mid 2024 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Source: Envision Durham, the Durham Region Official Plan (adopted by Regional Council May 17, 2023) derived by Watson & Associates Economists Ltd., 2024. Mid 2024 - Mid 2051 Watson & Associates Economists Ltd. PAGE A-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Figure A-1 City of Oshawa Annual Housing Forecast [1] Source: Historical housing activity from 2014 and 2015 from Statisics Canada. Permits after 2015 are from the City of Oshawa. [1] Growth forecast represents calendar year. 1,022 794 1,409 899 1,754 1,265 550 1,208 2,106 1,204 1,4371,4371,4371,4371,4371,4371,4371,4371,4371,4371,4371,437 1,5851,5851,5851,5851,5851,6151,6151,6151,6151,6151,6151,6151,6151,6151,615 0 500 1,000 1,500 2,000 2,500 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE A-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 2 City of Oshawa Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed. 2024 - 2034 6,558 5,974 1,838 14,370 40,842 (4,278) 36,564 364 36,928 2024 - 2051 14,743 17,965 8,611 41,319 111,398 (11,026) 100,372 1,023 101,395 [1] Includes townhouses and apartments in duplexes. [2] Includes accessory apartments, bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Source: Envision Durham, the Durham Region Official Plan (adopted by Regional Council May 17, 2023) derived by Watson & Associates Economists Ltd., 2024. City of Oshawa Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Watson & Associates Economists Ltd. PAGE A-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 3 City of Oshawa Current Year Growth Forecast Mid 2021 to Mid 2024 Mid 2021 Population 175,383 Occupants of Units (2) 5,009 New Housing Units, multiplied by P.P.U. (3) 2.302 Mid 2021 to Mid 2024 gross population increase 11,529 11,529 Occupants of New Units 79 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Mid 2024 gross population increase 86 86 Decline in Housing Units (4) 66,640 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.011 Mid 2021 to Mid 2024 total decline in population -742 -742 Population Estimate to Mid 2024 186,256 Net Population Increase, Mid 2021 to Mid 2024 10,873 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.681 24% 0.874 Multiples (6) 2.194 27% 0.583 Apartments (7) 1.700 50% 0.845 Total 100% 2.302 ¹ Based on 2021 Census custom database ² Based on Building permit/completion activity (4) 2021 households taken from Statistics Canada Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 4 City of Oshawa Ten Year Growth Forecast Mid 2024 to Mid 2034 Mid 2024 Population 186,256 Occupants of Units (2) 14,370 New Housing Units, multiplied by P.P.U. (3) 2.842 Mid 2024 to Mid 2034 gross population increase 40,842 40,842 Occupants of New Units 331 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2024 to Mid 2034 gross population increase 364 364 Decline in Housing Units (4) 71,649 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.060 Mid 2024 to Mid 2034 total decline in population -4,278 -4,278 Population Estimate to Mid 2034 223,184 Net Population Increase, Mid 2024 to Mid 2034 36,928 (1) Mid 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.407 46% 1.555 Multiples (6) 2.544 42% 1.058 Apartments (7) 1.796 13% 0.230 one bedroom or less 1.345 two bedrooms or more 2.142 Total 100% 2.842 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2024 households based upon 2021 Census (66,640 units) + Mid 2021 to Mid 2024 unit estimate (5,009 units) = 71,649 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Population 2021 Population (175,383) + Mid 2021 to Mid 2024 estimated housing units to beginning of forecast period (5,009 x 2.302 = 11,529) + (79 x 1.1 = 86) + (66,640 x -0.011 = -742) = 186,256 Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 5 City of Oshawa Longer-Term Growth Forecast Mid 2024 to Mid 2051 Mid 2024 Population 186,256 Occupants of Units (2) 41,319 New Housing Units, multiplied by P.P.U. (3) 2.696 Mid 2024 to Mid 2051 gross population increase 111,398 111,398 Occupants of New Units 930 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2024 to Mid 2051 gross population increase 1,023 1,023 Decline in Housing Units (4) 41,319 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.267 Mid 2024 to Mid 2051 total decline in population -11,026 -11,026 Population Estimate to Mid 2051 287,651 Net Population Increase, Mid 2024 to Mid 2051 101,395 (1) Mid 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 3.407 36% 1.216 Multiples (6) 2.544 43% 1.106 Apartments (7) 1.796 21% 0.374 one bedroom or less 1.345 two bedrooms or more 2.142 Total 100% 2.696 ¹ Persons per unit based on Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2024 households based upon 2021 Census (66,640 units) + Mid 2021 to Mid 2024 unit estimate (5,009 units) = 71,649 units. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Population 2016 Population (175,383) + Mid 2021 to Mid 2024 estimated housing units to beginning of forecast period (5,009 x = 11,775) + (66,640 x - 0.0135 = -902) = 186,256 Watson & Associates Economists Ltd. PAGE A-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 6 City of Oshawa Units in the Development Approvals Process as of Year-End 2023 151 469 4,436 5,056 3% 9% 88% 100% 2,055 1,715 2,357 6,127 34% 28% 38% 100% 712 2,510 24,597 27,819 3% 9% 88% 100% Total 2,918 4,694 31,390 39,002 % Breakdown 7% 12% 80% 100% Note: 'Application Under Review' includes Site Plans, OPAs, and ZBAs without a development status provided. Source: City of Oshawa Planning Department, as of February 2024. 1 Includes townhomes and apartments in duplexes. 2 Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Stage of Development Density Type Singles & Semi- Detached Multiples1 Apartments2 Total Registered Not Built % Breakdown Draft Plans Approved % Breakdown % Breakdown Application Under Review Watson & Associates Economists Ltd. PAGE A-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 7 City of Oshawa Historical Residential Building Permits Years 2014 to 2023 Residential Building Permits Total 2014 436 150 208 794 2015 759 177 473 1,409 2016 630 267 2 899 2017 627 624 503 1,754 2018 352 174 739 1,265 Sub-total 2,804 1,392 1,925 6,121 Average (2014 - 2018) 561 278 385 1,224 % Breakdown 45.8% 22.7% 31.4% 100.0% 2019 241 87 222 550 2020 149 314 745 1,208 2021 451 591 657 1,699 2022 517 570 1,019 2,106 2023 221 170 813 1,204 Sub-total 1,579 1,732 3,456 6,767 Average (2019 - 2023) 316 346 691 1,353 % Breakdown 23.3% 25.6% 51.1% 100.0% 2014 - 2023 Total 4,383 3,124 5,381 12,888 Average 438 312 538 1,289 % Breakdown 34.0% 24.2% 41.8% 100.0% [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. Singles & Semi Detached Multiples[1] Apartments[2] Year Source: Historical housing activity from 2014 and 2015 from Statisics Canada. Permits after 2015 are from the City of Oshawa. Watson & Associates Economists Ltd. PAGE A-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 8a City of Oshawa Persons Per Unit by Age and Type of Dwelling (2021 Census) Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted 1-5 - 2.938 2.800 3.682 5.147 3.681 6-10 - - 2.095 3.681 5.242 3.807 0.486 11-15 - - 2.323 3.379 4.747 3.503 3.407 16-20 - - 2.143 3.295 4.964 3.385 3.407 20-25 - - 2.026 2.972 4.227 3.015 3.407 25-35 - - 1.471 2.828 4.000 2.867 35+ - 1.581 1.957 2.651 3.991 2.627 3.407 Total 1.762 1.911 2.007 2.894 4.371 2.900 Age of Multiples[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted 1-5 1.190 1.178 1.862 2.938 - 2.194 6-10 - 1.300 2.000 2.849 - 2.337 (0.059) 11-15 - - 1.810 2.761 - 2.469 2.544 16-20 - - - 2.857 - 2.877 2.544 20-25 - - 2.048 3.288 - 2.720 2.544 25-35 - - 2.308 3.074 - 2.769 35+ - 1.324 2.014 2.810 3.628 2.530 2.544 Total 1.235 1.320 2.008 2.851 3.797 2.516 Age of Apartments[2] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average Adjusted 1-5 1.294 1.326 1.848 2.857 - 1.700 6-10 - 1.158 2.028 - - 1.707 0.137 11-15 - 1.235 2.222 - - 1.707 1.796 16-20 - 1.188 2.375 - - 1.974 1.796 20-25 - 1.333 2.487 - - 2.297 1.796 25-35 - 1.220 2.000 3.533 - 1.896 35+ 0.889 1.228 1.971 2.748 - 1.811 1.796 Total 1.111 1.233 1.992 2.824 3.800 1.822 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 1.350 1.524 2.134 3.536 5.179 3.059 6-10 - 1.256 2.014 3.599 5.103 3.417 11-15 - 1.440 2.157 3.302 4.691 3.269 16-20 - 1.500 2.154 3.251 5.034 3.258 20-25 - 1.457 2.247 3.015 4.217 2.882 25-35 - 1.463 1.972 2.901 3.833 2.567 35+ 1.184 1.265 1.979 2.680 3.900 2.406 Total 1.366 1.308 2.004 2.881 4.280 2.611 [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. [3] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as 'Other' P.P.U. Not calculated for samples less than or equal to 50 dwelling units, and does not include institutional population. [1] Includes townhouses and apartments in duplexes. Watson & Associates Economists Ltd. PAGE A-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 9 City of Oshawa Person Per Unit Structural Type and Age of Dwelling (2021 Census) 3.68 3.81 3.50 3.39 3.01 2.87 2.63 2.19 2.34 2.47 2.88 2.72 2.77 2.53 1.70 1.71 1.71 1.97 2.30 1.90 1.81 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Watson & Associates Economists Ltd. PAGE A-12 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 10a City of Oshawa Employment Forecast, 2024 to 2051 Employment Mid 2011 149,607 0.001 0.020 0.090 0.133 0.121 0.364 0.062 0.426 85 2,980 13,448 19,908 18,090 54,510 9,264 63,774 51,530 Mid 2016 159,458 0.001 0.024 0.064 0.130 0.109 0.327 0.063 0.390 105 3,820 10,223 20,668 17,340 52,155 9,980 62,135 48,335 Mid 2024 186,256 0.001 0.028 0.054 0.139 0.100 0.323 0.052 0.374 205 5,292 10,020 25,951 18,638 60,105 9,610 69,715 54,813 Mid 2034 223,184 0.001 0.029 0.065 0.138 0.090 0.322 0.047 0.370 205 6,398 14,496 30,693 20,175 71,966 10,531 82,497 65,568 Mid 2051 287,651 0.001 0.030 0.078 0.141 0.081 0.330 0.043 0.373 205 8,582 22,451 40,517 23,173 94,928 12,352 107,280 86,346 Mid 2011 - Mid 2016 9,851 0.0001 0.0040 -0.0258 -0.0035 -0.0122 -0.0373 0.0007 -0.0366 20 840 -3,225 760 -750 -2,355 716 -1,639 -3,195 Mid 2016 - Mid 2024 26,798 0.0004 0.0045 -0.0103 0.0097 -0.0087 -0.0044 -0.0110 -0.0154 100 1,472 -203 5,283 1,298 7,950 -370 7,580 6,478 Mid 2024 - Mid 2034 36,928 -0.0002 0.0003 0.0112 -0.0018 -0.0097 -0.0003 -0.0044 -0.0047 0 1,106 4,476 4,742 1,536 11,861 921 12,782 10,754 Mid 2024 - Mid 2051 101,395 -0.0004 0.0014 0.0243 0.0015 -0.0195 0.0073 -0.0087 -0.0013 0 3,290 12,431 14,566 4,535 34,823 2,742 37,565 31,532 Mid 2011 - Mid 2016 1,970 0.0000 0.0008 -0.0052 -0.0007 -0.0024 -0.0075 0.0001 -0.0073 4 168 -645 152 -150 -471 143 -328 -639 Mid 2016 - Mid 2024 3,350 0.00006 0.00056 -0.00129 0.00121 -0.00108 -0.00055 -0.00137 -0.00192 12 184 -25 660 162 994 -46 948 810 Mid 2024 - Mid 2034 3,693 -0.00002 0.00003 0.00112 -0.00018 -0.00097 -0.00003 -0.00044 -0.00047 0 111 448 474 154 1,186 92 1,278 1,075 Mid 2024 - Mid 2051 3,380 -0.00001 0.00005 0.00090 0.00006 -0.00072 0.00027 -0.00032 -0.00005 0 122 460 539 168 1,290 102 1,391 1,168 ¹ Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same work place location at the beginning of each shift". Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc. Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source: Envision Durham, the Durham Region Official Plan (adopted by Regional Council May 17, 2023) derived by Watson & Associates Economists Ltd., 2024. Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W . N.F.P.O.W.[1] Work at Home Industrial Commercial/ Population Related Total Employment (Including N.F.P.O.W.) Institutional N.F.P.O.W.[1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Watson & Associates Economists Ltd. PAGE A-13 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule 10b City of Oshawa Employment and Gross Floor Area (G.F.A.) Forecast, 2024 to 2051 Mid 2011 149,607 13,448 19,908 18,090 51,530 16,137,000 7,963,000 12,391,700 36,746,700 Mid 2016 159,458 10,223 20,668 17,340 48,335 12,267,000 8,267,000 11,877,900 32,726,900 Mid 2024 186,256 10,020 25,951 18,597 54,772 12,023,800 10,380,300 12,739,000 35,757,000 Mid 2034 223,184 14,496 30,693 20,005 65,398 17,394,600 12,277,200 13,615,600 43,901,300 Mid 2051 287,651 22,451 40,517 22,696 85,869 26,941,200 16,206,800 15,301,200 59,063,100 Mid 2011 - Mid 2016 9,851 -3,225 760 -750 -3,195 Mid 2016 - Mid 2024 26,798 -203 5,283 1,257 6,437 -243,200 2,113,300 861,100 3,030,100 Mid 2024 - Mid 2034 36,928 4,476 4,742 1,407 10,625 5,370,800 1,896,900 876,600 8,144,300 Mid 2024 - Mid 2051 101,395 12,431 14,566 4,099 31,096 14,917,400 5,826,500 2,562,200 23,306,100 Mid 2011 - Mid 2016 1,970 -645 152 -150 -639 Mid 2016 - Mid 2024 3,350 -25 660 157 805 -30,400 264,163 107,638 378,763 Mid 2024 - Mid 2034 3,693 448 474 141 1,063 537,080 189,690 87,660 814,430 Mid 2024 - Mid 2051 3,755 460 539 152 1,152 552,496 215,796 94,896 863,189 Source: Envision Durham, the Durham Region Official Plan (adopted by Regional Council May 17, 2023) derived by Watson & Associates Economists Ltd., 2024. [1] Square Foot Per Employee Assumptions Industrial 1,200 Commercial/ Population Related 400 Institutional 625 Note: Numbers may not add to totals due to rounding. Period Population Gross Floor Area in Square Feet (Estimated)[¹] Employment Incremental Change Industrial Commercial/ Population Related Institutional[2] Total Industrial Commercial/ Population Related Institutional[2] Total Annual Average [2] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. Watson & Associates Economists Ltd. PAGE B-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-1 City of Oshawa Summary of the Level of Service Ceiling by Services Considered Cost (per capita) Services Related to a Highway - Roads $5,330.80 0.0011 km of Roadways, Sidewalks, and Multi-Use Paths 4,846,182 per km $540,516,466 Services Related to a Highway - Bridges and Culverts $2,067.53 0.0003 Number of Structures 6,891,767 per item $209,637,204 Services Related to a Highway - Traffic Signals & Streetlights $955.33 0.0192 No. of Traffic Signals & Streetlights, and Intersections 49,757 per signal $96,865,685 Services Related to a Highway - Facilities $376.60 0.5633 sq.ft. of building area 669 per sq.ft. $38,185,357 Services Related to a Highway - Vehicles & Equipment $148.77 0.0009 No. of vehicles and equipment 165,300 per vehicle $15,084,534 Fire Protection Services - Facilities $420.26 0.4309 sq.ft. of building area 975 per sq.ft. $15,519,361 Fire Protection Services - Vehicles & Equipment $128.24 0.0002 No. of vehicles 641,200 per vehicle $4,735,647 Fire Protection Services - Small Equipment and Gear $27.85 0.0100 No. of equipment and gear 2,785 per item $1,028,445 Parkland Development $736.12 0.0072 Acres of Parkland 102,239 per acre $27,183,439 Parkland Amenities $814.35 0.0021 No. of parkland amenities 387,786 per amenity $30,072,317 Parkland Trails $267.86 0.1661 Linear Metres of Paths and Trails 1,613 per linear m $9,891,534 Recreation Facilities $4,440.47 5.6394 sq.ft. of building area 787 per sq.ft. $163,977,676 Park Operations Facilities $112.62 0.2346 sq.ft. of building area 480 per sq.ft. $4,158,831 Parks & Recreation Vehicles and Equipment $86.84 0.0007 No. of vehicles and equipment 124,057 per vehicle $3,206,828 Library Services - Facilities $476.41 0.5899 sq.ft. of building area 808 per sq.ft. $17,592,868 Library Services - Collection Materials $87.50 2.5507 No. of library collection items 34 per collection item $3,231,200 Library Services - Vehicles $0.52 0.0124 No. of vehicles and equipment 41,935 per vehicle $19,203 Provincial Offences Act including By-law Enforcement - Facilities $61.64 0.0844 sq.ft. of building area 730 per sq.ft. $2,276,242 Provincial Offences Act including By-law Enforcement - Vehicles & Equipment $8.31 0.0001 No. of Vehicles and Equipment 83,100 per vehicle $306,872 Waste Diversion - Facilities $5.87 0.0090 sq.ft. of building area 652 per sq.ft. $216,767 Waste Diversion - Vehicles & Equipment $17.26 0.0000 No. of vehicles and equipment 420,976 per vehicle $637,377 Service Related to a Highway Waste Diversion Library Provincial Offences Act including By-law Enforcement Parks & Recreation Fire Protection Maximum Ceiling LOS 15 Year Average Service Standard Quality (per capita) Quantity (per capita) SUMMARY OF SERVICE STANDARDS AS PER DEVELOPMENT CHARGES ACT, 1997, AS AMENDED Service Category Sub-Component Watson & Associates Economists Ltd. PAGE B-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-2 City of Oshawa Services Related to a Highway - Roads and Related Unit Measure: km of Roadways, Sidewalks, and Multi-Use Paths Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/km) Arterials A/B 15 15 15 15 15 15 16 16 16 16 16 16 16 17 17 $13,360,000 Arterials C 24 24 25 25 27 27 28 29 30 30 31 32 32 33 33 $11,810,000 Rurals 37 37 37 37 37 38 38 38 38 38 34 34 36 36 36 $7,210,000 Regional Road (Arterial A/B) Sidewalks 85 85 85 86 86 86 86 86 86 86 86 86 87 87 87 $519,800 Regional Road (Arterial A/B) Multi-Use Paths 5 5 5 5 5 5 5 5 5 5 5 9 9 10 10 $578,100 Total 166 166 167 169 171 172 174 175 176 176 173 177 180 183 183 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 15 Year Average 2009 to 2023 Quantity Standard 0.0011 Quality Standard $4,846,182 Service Standard $5,331 D.C. Amount (before deductions) 27 Year Forecast Population 101,395 $ per Capita $5,331 Eligible Amount $540,516,466 Watson & Associates Economists Ltd. PAGE B-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-3 City of Oshawa Services Related to a Highway - Bridges and Culverts Service: Services Related to a Highway - Bridges and Culverts Unit Measure: Number of Structures Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Bridges (Arterial A/B) 8 8 9 9 10 11 11 11 11 11 13 13 13 13 13 $15,892,000 Bridges (Arterial C) 7 7 7 7 7 7 7 7 7 7 6 6 6 6 6 $12,880,000 Bridges (Collectors) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $9,870,000 Culverts (Arterial A/B) 12 12 12 12 12 13 13 13 13 13 13 13 13 13 13 $2,192,000 Culverts (Arterial C) 6 6 6 7 7 7 9 10 10 10 10 10 10 10 10 $1,850,000 Culverts (Collectors) 7 7 7 7 7 8 8 8 9 9 9 9 9 9 9 $1,500,000 Total 42 42 43 44 45 48 50 51 52 52 53 53 53 53 53 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 15 Year Average 2009 to 2023 Quantity Standard 0.0003 Quality Standard $6,891,767 Service Standard $2,068 D.C. Amount (before deductions) 27 Year Forecast Population 101,395 $ per Capita $2,068 Eligible Amount $209,637,204 Watson & Associates Economists Ltd. PAGE B-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-4 City of Oshawa Services Related to a Highway - Traffic Signals and Streetlights Service: Services Related to a Highway - Traffic Signals & Streetlights Unit Measure: No. of Traffic Signals & Streetlights, and Intersections Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Streetlights 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 3,045 $12,000 Arterials A/B Roundabout Intersection (items) - - - - - 1 1 1 1 1 1 1 1 1 1 $5,808,800 Arterials C Roundabout Intersection (items) 1 1 1 1 1 1 1 3 5 5 5 5 5 5 6 $4,822,400 Regional Intersection (Items) 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 $5,808,800 Traffic Control Signals (City only) 29 31 31 31 31 33 34 34 34 34 35 35 36 36 36 $374,700 Total 3,090 3,092 3,092 3,092 3,092 3,095 3,096 3,098 3,100 3,100 3,101 3,101 3,102 3,102 3,103 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0210 0.0209 0.0207 0.0205 0.0203 0.0201 0.0198 0.0194 0.0191 0.0185 0.0182 0.0180 0.0177 0.0173 0.0169 15 Year Average 2009 to 2023 Quantity Standard 0.0192 Quality Standard $49,757 Service Standard $955 D.C. Amount (before deductions) 27 Year Forecast Population 101,395 $ per Capita $955 Eligible Amount $96,865,685 Watson & Associates Economists Ltd. PAGE B-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-5 City of Oshawa Services Related to a Highway - Public Works Facilities Class of Service: Services Related to a Highway - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. North Depot - offices/garages/sand 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 14,700 $332 $1,085 Conant St. East Facility - Traffic Dep/Purchasing 11,500 11,500 11,500 11,500 11,500 11,500 - - - - - - - - - $508 $771 Ritson Rd. Depot 53,300 53,300 53,300 53,300 53,300 53,300 53,300 53,300 - - - - - - - $332 $577 Farewell - Road Portion Only 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 8,100 $575 $845 Consolidated Operations Depot - Office - - - - - - 10,466 10,466 10,466 10,466 10,466 10,466 10,466 10,466 10,466 $474 $734 Consolidated Operations Depot - Garage - - - - - - 6,244 6,244 6,244 6,244 6,244 6,244 6,244 6,244 6,244 $408 $660 Consolidated Operations Depot - Heated Inventory Storage - - - - - - 9,518 9,518 9,518 9,518 9,518 9,518 9,518 9,518 9,518 $408 $660 Consolidated Operations Depot - Salt Building - - - - - - 15,494 15,494 15,494 15,494 15,494 15,494 15,494 15,494 15,494 $200 $431 Consolidated Operations Depot - Covered Storage Building - - - - - - 15,957 15,957 15,957 15,957 15,957 15,957 15,957 15,957 15,957 $66 $284 Total 87,600 87,600 87,600 87,600 87,600 87,600 133,779 133,779 80,479 80,479 80,479 80,479 80,479 80,479 80,479 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.5945 0.5914 0.5855 0.5810 0.5751 0.5677 0.8567 0.8390 0.4946 0.4803 0.4713 0.4664 0.4589 0.4490 0.4376 15 Year Average 2009 to 2023 Quantity Standard 0.5633 Quality Standard $669 Service Standard $377 D.C. Amount (before deductions) 27 Year Forecast Population 101,395 $ per Capita $377 Eligible Amount $38,185,357 Watson & Associates Economists Ltd. PAGE B-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-6 City of Oshawa Services Related to a Highway - Public Works Vehicles & Equipment Class of Service: Services Related to a Highway - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Compact SUV/Crossover 1 1 1 1 1 1 - - - - 1 1 1 1 1 $58,000 1/2 Ton Pickup - - - - - 6 6 6 6 7 7 7 7 7 7 $100,000 3/4 - 1 ton Pickup 8 8 10 10 10 10 10 4 4 4 5 6 5 4 3 $120,000 Compact Van 1 1 1 1 1 1 1 1 1 1 - - - - - $57,000 1/2 Ton Pickup Compact 10 10 7 6 6 1 1 1 1 1 - - - - - $58,000 Dump Stake Hoist Trucks (4600-4900K) 5 5 5 5 6 6 6 12 14 13 14 12 12 12 12 $125,000 Dump Trucks (12000-13500K) 2 2 2 1 1 - - - - - - 1 1 1 2 $375,000 Dump Trucks (13600K) 20 20 20 16 16 16 16 13 13 13 13 13 13 13 13 $450,000 Dump Trucks (16100-22000) 3 3 3 3 3 3 3 3 3 3 3 3 5 5 5 $659,000 Special Purpose Light Trucks 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $165,000 Utility Truck 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 $500,000 Small Salt Sanders 1 1 4 4 4 4 4 4 4 4 - - - - - $12,000 Catchbasin Cleaner 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $700,000 Street Flusher 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $300,000 Snow Blowers Large 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 $190,000 Street Sweepers 3 2 2 2 2 2 2 2 2 2 2 2 2 2 4 $600,000 Sidewalk Plows 9 9 9 10 10 11 11 11 11 12 12 15 14 15 14 $190,000 Rollers 1-3 Ton 3 3 3 3 3 3 3 3 3 3 2 2 2 2 1 $37,000 Sidewalk Sweepers 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $280,000 Roads Graders over 130 HP 6 6 5 4 3 3 3 3 3 3 3 3 3 3 3 $525,000 Fork Lift Truck - - - - - - - 2 2 2 2 2 2 2 2 $108,000 Back Hoe 3/4 Yard 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $425,000 Back Hoe 3/8 Yard - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $210,000 Tractors and Attachments 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 $200,000 Front End Loaders AWD 4 4 4 3 3 3 3 3 3 3 3 3 3 4 4 $502,000 Skid Steer Loader 1 1 1 1 1 1 1 1 1 - - - - - - $142,000 Litter Vacuum - - - 1 1 1 1 1 1 2 2 2 2 2 2 $130,000 Water Pumps 1-3" 5 5 5 5 5 5 5 5 5 3 3 3 3 3 3 $5,200 Stream Generators 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 $58,000 Arrowboard Warning Devices 1 2 2 2 2 2 2 6 6 6 6 6 6 6 6 $29,000 Portable Air Compressors 3 3 3 3 3 2 2 2 2 2 4 3 3 3 3 $60,000 Line Marking Machines 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 $16,000 Concrete Grinders 3 3 3 3 3 3 3 2 2 1 3 3 3 3 3 $6,000 Portable Electrical Generator 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $4,800 Trailers 9 10 10 10 9 9 9 8 7 10 10 9 8 11 8 $18,000 Asphalt Trailer 1 1 1 1 1 1 1 1 1 1 2 2 2 3 2 $30,000 Asphalt Recycler 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $75,000 Sewer Cleaner 1 1 1 1 1 1 1 1 1 1 - - - - - $180,000 Power Scythes 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $1,900 Equipment Power Washer 1 1 1 1 1 1 1 1 1 1 3 2 2 2 2 $27,000 Concrete Saws - Small 3 3 3 3 3 3 3 3 3 3 3 3 5 6 6 $3,000 Watson & Associates Economists Ltd. PAGE B-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-6 (continued) City of Oshawa Services Related to a Highway - Public Works Facilities Class of Service: Services Related to a Highway - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Concrete Saw - Large 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $30,000 Breakers - Tampers Air 14 12 6 6 6 6 6 6 6 6 6 6 5 5 5 $3,000 Chainsaw 3 3 3 4 4 4 4 4 4 3 4 4 4 4 6 $1,300 Tamper - Gas 9 9 9 9 9 9 10 10 10 10 10 10 9 9 9 $4,500 Tar Kettles 1 1 1 1 1 1 1 1 1 1 1 1 - - - $7,500 EV Charging Stations - COD - - - - - - - - - - - - - 2 2 $42,000 Total 155 155 149 144 143 143 143 144 145 145 147 148 146 155 152 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0011 0.0010 0.0010 0.0010 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0008 0.0009 0.0008 15 Year Average 2009 to 2023 Quantity Standard 0.0009 Quality Standard $165,300 Service Standard $149 D.C. Amount (before deductions) 27 Year Forecast Population 101,395 $ per Capita $149 Eligible Amount $15,084,534 Watson & Associates Economists Ltd. PAGE B-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-7 City of Oshawa Fire Protection Services - Facilities Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Firehall #1 - 199 Adelaide Ave W 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000 $637 $969 Firehall #2 - 1111 Simcoe St S 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 $637 $980 Firehall #3 - 50 Beatrice St E 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 $637 $980 Firehall #4 - 50 Harmony Rd N 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 $637 $967 Firehall #5 - 1550 Harmony Rd N 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 17,890 $637 $980 Firehall #6 - 2339 Simcoe St N - - - - - - - 10,675 10,675 10,675 10,675 10,675 10,675 10,675 10,675 $637 $980 Fire Training Tower - Temporary - 1000 Stevenson Rd N - - - - - - - - - - - - - - 2,016 $682 $1,733 Training Portable - - - - - - - - - - - - - - 800 $52 $208 Portable Washroom - - - - - - - - - - - - - - 60 $509 $629 2 C-Can Storage Units (8 x 40 ft each) - - - - - - - - - - - - - - 640 $16 $138 Total 63,890 63,890 63,890 63,890 63,890 63,890 63,890 74,565 74,565 74,565 74,565 74,565 74,565 74,565 78,081 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.4336 0.4313 0.4271 0.4237 0.4194 0.4140 0.4091 0.4676 0.4583 0.4450 0.4367 0.4321 0.4252 0.4160 0.4246 15 Year Average 2009 to 2023 Quantity Standard 0.4309 Quality Standard $975 Service Standard $420 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $420 Eligible Amount $15,519,361 Watson & Associates Economists Ltd. PAGE B-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-8 City of Oshawa Fire Protection Services - Vehicles and Equipment Unit Measure: No. of vehicles Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Pumper 8 8 8 8 8 8 8 8 8 9 9 9 9 9 10 $1,124,000 Tanker 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $674,000 Rescue 21 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,200,000 Aerial 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $2,320,000 Aerial Platform - - - - - - - - - - - - 1 1 1 $2,610,000 Hazmat Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 3/4 ton pick-up 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $110,000 Command Vehicle 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $179,800 Car 9 9 9 9 9 10 10 10 10 10 13 13 14 15 17 $65,000 Pick-up Truck 4 4 4 4 4 5 5 5 5 5 4 4 4 4 4 $90,000 1/2 ton Pick-up Truck 4 4 4 4 4 5 5 5 5 5 4 4 4 4 4 $90,000 Rescue 25 - - - - - - - - - - - - - - 1 $906,000 Total 33 33 33 33 33 36 36 36 36 37 38 38 40 41 45 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 15 Year Average 2009 to 2023 Quantity Standard 0.0002 Quality Standard $641,200 Service Standard $128 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $128 Eligible Amount $4,735,647 Watson & Associates Economists Ltd. PAGE B-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-9 City of Oshawa Fire Protection Services - Small Equipment and Gear Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Bunker Gear 323 325 326 323 324 324 308 299 295 294 345 345 345 355 395 $3,300 Portable Radios 120 120 120 120 120 73 73 73 73 73 87 87 87 87 119 $10,000 Mobile Radios 21 21 21 21 21 14 14 14 14 14 18 18 18 18 18 $9,900 Helmets 167 167 167 167 167 167 167 167 185 185 185 185 186 191 211 $500 Boots 167 167 167 167 167 167 167 167 185 185 185 185 186 191 211 $800 Gloves 167 167 167 167 167 167 167 167 185 185 185 185 186 191 211 $160 Balaclavas 167 167 167 167 167 167 167 167 185 185 185 185 186 191 211 $180 Hurst E-Draulic Extrication Tools - - - - 6 6 6 6 6 6 6 6 6 6 7 $66,900 Thermal Imaging Cameras 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 $6,800 SCBA Harnesses 87 87 87 87 87 87 87 87 87 87 87 87 87 87 87 $10,700 SCBA Bottles 215 215 215 215 215 215 215 215 215 215 215 215 215 215 215 $1,700 SCBA Masks 97 97 97 97 97 97 97 97 97 170 170 170 170 175 198 $500 MSA HCN Detectors - - - - 6 6 6 6 6 6 6 6 6 6 7 $1,000 MSA 4 Gas Detectors - - - - 9 9 9 9 9 9 9 9 9 9 10 $1,700 MSA 5 Gas Detectors - - - - - - - - - - - - 1 1 1 $6,000 Cascade Compressor System 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $44,000 Commercial Extractors 2 2 2 2 2 2 2 2 2 2 2 2 4 4 6 $35,000 Blow Hard Fans - - - - - - - - - - 5 5 6 6 7 $7,700 Vetter Bag and System 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $9,000 Bunker Gear Dryers 2 2 2 2 2 2 2 2 2 2 2 2 4 4 6 $8,400 Total 1,551 1,553 1,554 1,551 1,573 1,519 1,503 1,494 1,562 1,634 1,708 1,708 1,718 1,753 1,937 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0105 0.0105 0.0104 0.0103 0.0103 0.0098 0.0096 0.0094 0.0096 0.0098 0.0100 0.0099 0.0098 0.0098 0.0105 15 Year Average 2009 to 2023 Quantity Standard 0.0100 Quality Standard $2,785 Service Standard $28 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $28 Eligible Amount $1,028,445 Watson & Associates Economists Ltd. PAGE B-12 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-10 City of Oshawa Parks and Recreation Services - Parkland Development Unit Measure: Acres of Parkland Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Acre) Neighbourhood 329 330 332 343 343 352 352 362 363 363 363 363 369 369 369 $106,000 Community 178 188 188 212 212 212 212 212 212 212 212 212 212 229 263 $125,000 City 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 $155,000 Regional - Active Use 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 $155,000 Regional - Passive Use 199 199 199 199 199 199 199 199 199 199 199 199 199 199 199 $95,000 Parkette 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 $254,000 Second Marsh 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 $46,000 Open Space - Woodlot (Highgate Park) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $1,122 Open Space - Central Valley Natural Park 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 $49,000 Total 1,103 1,114 1,116 1,151 1,151 1,160 1,161 1,170 1,171 1,171 1,171 1,171 1,177 1,196 1,229 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0075 0.0075 0.0075 0.0076 0.0076 0.0075 0.0074 0.0073 0.0072 0.0070 0.0069 0.0068 0.0067 0.0067 0.0067 15 Year Average 2009 to 2023 Quantity Standard 0.0072 Quality Standard $102,239 Service Standard $736 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $736 Eligible Amount $27,183,439 Watson & Associates Economists Ltd. PAGE B-13 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-11 City of Oshawa Parks and Recreation Services - Parkland Amenities Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Splashpad - Major 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 $824,000 Splashpad - Minor 1 2 2 4 4 4 4 4 4 4 4 4 5 5 6 $360,000 Cooling Stations 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 $148,000 Sports Fields - lit aritificial turf 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $6,954,000 Sports Fields - multi-use, lit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $862,000 Sports Fields - multi-use, unlit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $340,000 Sports Fields - 11v11 - irrigation 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $661,000 Sports Fields - 11v11 - lit 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,220,000 Sports Fields - 11v11 - unlit 21 21 21 22 22 23 23 24 24 24 24 24 24 24 24 $635,000 Sports Fields - 5v5 to 9v9 - unlit 23 23 23 23 23 23 23 24 24 24 24 24 25 25 26 $201,000 Softball Diamonds - lit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $948,000 Softball Diamonds - unlit 35 35 35 35 35 35 35 35 35 35 35 35 35 35 35 $371,000 Slo-pitch Diamonds 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 $165,000 Hardball Diamonds - lit - Kinsmen 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,294,000 Hardball Diamonds - lit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $1,294,000 Hardball Diamonds - unlit 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 $371,000 Tennis Courts - lit 4 4 4 4 4 6 6 6 6 6 6 11 11 11 $523,000 Tennis Courts - unlit 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4 $376,000 Pickleball Courts 4 4 4 4 4 4 4 4 4 4 4 4 4 8 8 $365,000 Multi-Use Courts - Alexandra/Stone St 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $237,000 Cricket Pitch - unlit 1 1 1 $3,050,000 Basketball Courts - full, plexipave surface coating 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $106,000 Basketball Courts - full 6 7 7 7 7 7 7 7 7 7 7 7 8 8 9 $73,000 Basketball Courts - half 6 6 6 8 8 10 10 10 11 12 12 12 13 13 13 $38,000 Basketball Single Hoops 3 3 3 3 3 3 3 4 5 5 5 5 5 5 5 $30,000 Skateboard Parks 1 2 2 3 3 3 3 3 3 3 3 3 3 3 3 $989,000 Bike Parks - RVP (existing) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $275,000 Bike Parks - RVP (new addition) - - - - - - - - - - - - 1 1 1 $647,000 Playgrounds - EWF 68 71 77 84 84 89 91 96 100 100 100 100 107 110 112 $407,000 Playgrounds - rubber safety surface 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $714,000 Shade Structures 60 61 61 63 63 64 64 66 66 66 66 66 66 66 66 $137,000 Bocce Court - Radio Park 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $462,000 Butterfly/Pollinator Garden - - - 1 1 1 1 1 1 1 1 1 1 1 2 $99,000 Watson & Associates Economists Ltd. PAGE B-14 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-11 (continued) City of Oshawa Parks and Recreation Services - Parkland Amenities Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Lawn Bowling Court - lit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,638,000 Off-Leash Dog Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 $297,000 Total 279 291 297 314 314 323 328 338 344 345 345 345 364 373 380 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0019 0.0020 0.0020 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0020 0.0020 0.0021 0.0021 0.0021 15 Year Average 2009 to 2023 Quantity Standard 0.0021 Quality Standard $387,786 Service Standard $814 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $814 Eligible Amount $30,072,317 Watson & Associates Economists Ltd. PAGE B-15 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-12 City of Oshawa Parks and Recreation Services - Parkland Trails Service: Parkland Trails Unit Measure: Linear Metres of Paths and Trails Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/ Linear Metre) Harmony Creek 4,630 4,630 4,630 4,630 5,430 5,856 5,856 5,856 5,856 5,856 5,856 5,856 5,856 5,856 6,556 $2,489 Oshawa Creek 7,580 7,580 7,580 7,680 7,680 8,281 8,281 8,281 8,281 8,281 8,281 9,984 9,984 9,984 10,815 $822 Waterfront Trail 4,260 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 7,459 $822 Michael Starr Trail 4,870 4,870 4,870 4,870 4,870 4,939 4,939 4,939 4,939 4,939 4,939 4,939 4,939 4,939 4,939 $822 Pedestrian Bridges 458 458 458 458 458 703 703 703 703 703 703 703 703 703 705 $20,300 Total 21,798 24,997 24,997 25,097 25,897 27,238 27,238 27,238 27,238 27,238 27,238 28,941 28,941 28,941 30,474 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.1479 0.1688 0.1671 0.1664 0.1700 0.1765 0.1744 0.1708 0.1674 0.1626 0.1595 0.1677 0.1650 0.1615 0.1657 15 Year Average 2009 to 2023 Quantity Standard 0.1661 Quality Standard $1,613 Service Standard $268 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $268 Eligible Amount $9,891,534 Watson & Associates Economists Ltd. PAGE B-16 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-13 City of Oshawa Parks and Recreation Services - Recreation Facilities Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Donevan Arena/Pool 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 51,773 $547 $813 Harman Park Arena 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 64,000 $353 $502 Children's Arena 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 $473 $644 Civic Recreation Complex 132,978 132,978 211,474 211,474 211,474 211,474 211,474 211,474 211,474 211,474 211,474 211,474 211,474 211,474 211,474 $387 $709 Northview Community Centre 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 23,866 $626 $947 Bandshell/Music Centre(Memorial Park) 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 $946 $1,253 Columbus Community Hall 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 3,270 $1,020 $1,574 Jubilee Pavilion 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 $417 $460 Cordova Community Centre 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $662 $941 Washrooms/changerooms/storage/field house 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 14,892 $135 $149 Neighbourhood Assoc. Community Centres 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 62,420 $641 $918 Delpark Homes Centre (excludes Library) 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 190,901 $584 $854 South Oshawa Community Centre 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 45,000 $735 $1,021 South Oshawa Gymnasium 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 $735 $810 Tribute Communities Centre - 50% of total 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 $854 $1,152 Arts Resource Centre (excludes theatre) 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 3,021 $542 $808 Rotary Pool and Change House 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 - $1,550 $1,835 Lake Vista Splash Pad Storage building 1,200 - - - - - - - - - - - - - - $767 $1,056 Camp Samac Pool 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 $157 $173 Campus Ice Centre (86% of floor area) 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 70,520 $421 $464 Mary St. Public School Gymnasium 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 - $735 $810 Total 843,441 842,241 920,737 920,737 920,737 920,737 920,737 920,737 920,737 920,737 920,737 920,737 920,737 920,737 914,137 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 5.7236 5.6858 6.1544 6.1065 6.0448 5.9666 5.8962 5.7742 5.6588 5.4955 5.3921 5.3356 5.2499 5.1370 4.9707 15 Year Average 2009 to 2023 Quantity Standard 5.6394 Quality Standard $787 Service Standard $4,440 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $4,440 Eligible Amount $163,977,676 Watson & Associates Economists Ltd. PAGE B-17 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-14 City of Oshawa Parks and Recreation Services - Parks Operations Facilities Service: Park Operations Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Farewell - Parks share only 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 20,036 $144 $369 Consolidated Operations Depot - Office - - - - - - 9,344 9,344 9,344 9,344 9,344 9,344 9,344 9,344 9,344 $474 $734 Consolidated Operations Depot - Heated Inventory Storage - - - - - - 9,518 9,518 9,518 9,518 9,518 9,518 9,518 9,518 9,518 $408 $660 Consolidated Operations Depot - Salt Building - - - - - - 1,722 1,722 1,722 1,722 1,722 1,722 1,722 1,722 1,722 $200 $431 Consolidated Operations Depot - Covered Stoage - - - - - - 5,319 5,319 5,319 5,319 5,319 5,319 5,319 5,319 5,319 $66 $284 Consolidated Operations Depot - Garage - - - - - - 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 5,217 $408 $660 Total 20,036 20,036 20,036 20,036 20,036 20,036 51,156 51,156 51,156 51,156 51,156 51,156 51,156 51,156 51,156 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.1360 0.1353 0.1339 0.1329 0.1315 0.1298 0.3276 0.3208 0.3144 0.3053 0.2996 0.2964 0.2917 0.2854 0.2782 15 Year Average 2009 to 2023 Quantity Standard 0.2346 Quality Standard $480 Service Standard $113 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $113 Eligible Amount $4,158,831 Watson & Associates Economists Ltd. PAGE B-18 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-15 City of Oshawa Parks and Recreation Services - Parks and Recreation Vehicles & Equipment Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Sub Compact 2 2 1 - - - - - - - - - - - - $75,000 Compact SUV/Crossover - - - - 1 1 1 1 2 2 2 2 2 2 2 $58,000 1/2 Ton Pickup 1 1 1 1 1 1 1 1 1 3 4 5 5 5 5 $100,000 3/4 - 1 ton Pickup 12 12 12 12 12 12 12 7 7 7 6 8 7 6 6 $120,000 Compact Van 2 2 2 2 2 2 2 1 1 1 - - - - - $57,000 1/2 1 ton Van 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $67,000 1/2 Ton Pickup Compact 7 7 7 8 8 8 8 7 8 8 9 9 9 7 7 $58,000 Dump Stake Hoist Trucks (4600-4900K) 7 7 7 7 7 7 7 11 10 9 8 5 5 5 5 $125,000 Dump Trucks (12000-13500K) 1 1 1 1 1 1 1 1 1 2 2 6 8 8 8 $375,000 Dump Trucks (13600K) - - - 1 1 1 1 1 1 1 1 - - - - $450,000 Special Purpose Light Trucks 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 $135,000 Utility Truck 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 $450,000 Small Salt Sanders 2 2 2 2 2 2 2 2 2 2 - - - - - $12,000 Lawn Seeder 4 4 4 4 4 4 4 4 4 5 5 7 5 5 6 $45,000 Aerial Lifts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $465,000 Wood Chipper 2 2 2 2 2 2 2 2 2 3 3 3 3 2 2 $165,000 Soil Shreader 1 1 1 1 1 - - - - - - - - - - $15,000 Turf Sweeper 2 2 2 2 2 2 2 2 2 2 3 3 3 3 2 $52,000 Utility Work Machine - - - 1 1 1 1 1 1 1 1 1 1 1 1 $133,000 Back Hoe 3/8 Yard 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2 $210,000 Tractors and Attachments 12 11 11 10 10 10 10 10 10 10 10 9 9 9 9 $200,000 Tractor with Gang Mower 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 $200,000 Front End Loaders AWD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $502,000 Skid Steer Loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $142,000 Wheeled Tractors 13-20 HP 6 6 6 7 7 8 8 8 8 8 7 7 6 6 6 $97,000 Ice Resurfacers 9 7 7 7 7 7 7 7 7 7 7 7 9 7 7 $210,000 Wheeled Utility Vehicle 4 4 4 5 5 5 5 5 5 5 7 8 8 8 8 $45,000 Stump Cutter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $101,000 Litter Vacuum 2 2 2 1 1 1 1 1 1 - - - - - - $115,000 Water Pumps 1-3" 1 1 1 1 1 1 1 1 1 - - - - - - $5,200 Portable Air Compressors 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 $60,000 Tandem Dump Trailer 1 1 1 1 1 1 1 1 1 1 1 1 - - - $24,000 Trailers 7 7 7 7 7 7 7 7 8 9 7 7 8 8 8 $18,000 Chemical Sprayers 8 8 8 8 8 8 8 8 8 8 7 7 7 9 9 $22,000 Rotary Mowers 9 9 9 8 8 8 8 8 8 8 10 7 10 10 12 $37,000 Portable Welder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $45,000 EV Charging Stations - Delpark - - - - - - - - - - - - - 2 2 $44,600 Watson & Associates Economists Ltd. PAGE B-19 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-15 (continued) City of Oshawa Parks and Recreation Services - Parks and Recreation Vehicles & Equipment Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) EV Charging Stations - Civic - - - - - - - - - - - - - 2 2 $46,800 EV Charging Stations - South Oshawa - - - - - - - - - - - - - 2 2 $43,500 Total 120 116 116 117 118 118 118 115 118 121 120 121 123 125 127 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0008 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 15 Year Average 2009 to 2023 Quantity Standard 0.0007 Quality Standard $124,057 Service Standard $87 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $87 Eligible Amount $3,206,828 Watson & Associates Economists Ltd. PAGE B-20 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-16 City of Oshawa Library Services -Library Facilities Service: Library Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Northview Branch 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 12,800 $590 $898 Jess Hann Branch 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 $584 $916 McLaughlin Library 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 $605 $761 Delpark Homes Centre Branch 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 9,785 $584 $916 Total 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 95,085 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.6452 0.6419 0.6356 0.6306 0.6242 0.6162 0.6089 0.5963 0.5844 0.5675 0.5568 0.5510 0.5422 0.5305 0.5170 15 Year Average 2009 to 2023 Quantity Standard 0.5899 Quality Standard $808 Service Standard $476 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $476 Eligible Amount $17,592,868 Watson & Associates Economists Ltd. PAGE B-21 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-17 City of Oshawa Library Services -Library Collection Materials Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Hardcover books 295,923 309,728 319,266 311,412 310,018 312,168 301,812 307,549 271,296 258,001 246,405 246,150 235,930 232,433 223,795 $35 Paperbacks 32,858 34,414 35,474 34,600 36,599 32,895 37,365 32,498 22,685 23,188 21,426 21,412 19,129 18,846 21,766 $11 Periodical Titles 863 857 828 753 773 762 748 661 444 434 430 436 432 351 329 $80 DVD & BluRay 16,501 19,118 22,800 27,248 31,335 36,196 43,613 51,313 52,954 52,986 58,655 59,851 46,141 57,820 47,982 $36 Audiobooks (Books on CD) - - - - - 8,254 8,443 9,392 8,456 8,413 7,856 7,524 7,215 6,671 6,980 $56 Special Collections - digital format - - - - - 5,299 5,616 6,981 4,067 2,442 2,442 2,938 3,049 3,049 3,210 $20 Special Collections - original format - - - - - 6,552 6,600 7,380 3,903 11,371 17,500 17,571 16,521 16,521 17,699 $20 Kits - - - - - - - - 2,124 1,945 1,145 1,146 1,177 1,186 1,217 $16 eAudio Books (Overdrive/CloudLibrary) - - 1,314 3,361 3,865 2,096 2,579 1,816 6,369 6,887 6,887 5,840 3,409 3,045 3,273 $38 eBooks (Overdrive/CloudLibrary) - - 12,814 13,509 13,162 16,279 20,101 21,004 24,945 26,616 26,616 27,373 21,864 12,196 12,086 $26 eMagazines (Zinio/Flipster) - - - - - 41 25 47 61 55 79 49 43 50 25 $555 Video Games 565 804 882 1,037 1,192 1,991 2,515 2,865 2,850 2,821 1,177 1,492 1,782 2,058 2,318 $73 Databases - 29 29 20 20 18 23 20 24 26 17 17 17 17 18 $2,552 Maker/Coding/VR technology - - - - - - - 32 74 119 122 122 122 147 131 $160 3D printers - - - - - - - 1 5 5 5 5 7 7 8 $2,304 Public Access Computers - 84 84 83 83 89 89 100 121 120 120 86 79 84 67 $1,100 eReaders - - 42 42 30 - 22 20 - - - - - - $200 Lending laptops/tablets - 15 15 - 10 64 19 33 38 23 8 8 - $200 Connect Kits (Tablet & hotspot) - - - - - - - - - - - - 20 24 17 $578 WiFi hotspots - - - - - - - - - 10 20 30 29 41 35 $112 Realia (Be Fit Kits, Passes,sports equipment) - - - - - - - - 10 80 79 72 93 156 219 $102 Download and Streaming Services - - - - - - - - - - 3 3 - 3 4 $116,564 eLearning Digital Resources - - - - - - - - 3 4 4 4 4 4 5 $11,460 Book Lending Kiosk - - - - - - - - - - - - - - 1 $48,000 Compact Disks 21,686 25,928 28,162 26,452 20,701 21,880 23,290 23,979 23,271 15,832 13,520 12,324 11,235 - - $32 CD-ROMS 70 76 76 55 - - - - - - - - - - - $39 Books on Tapes/Kits 11,533 11,415 11,452 10,548 10,976 - - - - - - - - - - $91 $0 Total 379,999 402,468 433,196 429,120 428,766 444,560 452,883 465,679 423,715 411,393 404,531 404,453 368,306 354,709 341,185 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 2.5787 2.7170 2.8956 2.8460 2.8149 2.8809 2.9002 2.9204 2.6041 2.4554 2.3690 2.3438 2.1000 1.9790 1.8552 15 Year Average 2009 to 2023 Quantity Standard 2.5507 Quality Standard $34 Service Standard $88 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $88 Eligible Amount $3,231,200 Watson & Associates Economists Ltd. PAGE B-22 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-18 City of Oshawa Library Services -Library Vehicles Service: Library Services - Vehicles Unit Measure: No. of vehicles Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Delivery van 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,000 Outreach van 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,000 Total 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard (per 1,000) 0.01360 0.01350 0.01340 0.01330 0.01310 0.01300 0.01280 0.01250 0.01230 0.01190 0.01170 0.01160 0.01140 0.01120 0.01090 15 Year Average 2009 to 2023 Quantity Standard 0.0124 Quality Standard (per 1,000) $41,935 Service Standard $1 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $1 Eligible Amount $19,203 Watson & Associates Economists Ltd. PAGE B-23 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-19 City of Oshawa P.O.A. Including By-law Enforcement Services - Facilities Service: Provincial Offences Act including By-law Enforcement - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Consolidated Operations Depot - Office - - - - - - 16,072 16,072 16,072 16,072 16,072 16,072 16,072 16,072 16,072 $474 $734 Consolidated Operations Depot - Garage - - - - - - 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 1,027 $408 $660 44 Simcoe St. - - 5,724 5,724 5,724 5,724 5,724 5,724 5,724 5,724 5,724 - - - - $474 $734 Mary St. Office Space 1,150 1,150 - - - - - - - - - - - - - $496 $758 Oshawa Executive Airport - - - - - - - - - - - - 900 900 900 $496 $674 Total 1,150 1,150 5,724 5,724 5,724 5,724 22,823 22,823 22,823 22,823 22,823 17,099 17,999 17,999 17,999 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0078 0.0078 0.0383 0.0380 0.0376 0.0371 0.1462 0.1431 0.1403 0.1362 0.1337 0.0991 0.1026 0.1004 0.0979 15 Year Average 2009 to 2023 Quantity Standard 0.0844 Quality Standard $730 Service Standard $62 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $62 Eligible Amount $2,276,242 Watson & Associates Economists Ltd. PAGE B-24 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-20 City of Oshawa P.O.A. Including By-law Enforcement Services - Vehicles and Equipment Service: Provincial Offences Act including By-law Enforcement - Vehicles & Equipment Unit Measure: No. of Vehicles and Equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Compact Cars & Midsize Cars 10 10 12 13 13 13 13 13 15 15 15 17 14 14 14 $75,000 Compact SUV/Crossover (Electric) - - - - - - - - - - - - - - 4 $65,000 Compact SUV/Crossover (Gas) 2 2 2 2 2 2 2 2 2 - - - - - - $58,000 Compact Van 2 2 2 2 2 1 - - - - - - - - - $67,000 1500 - 4500kg 1/2- 1 Ton Van - - 2 2 2 3 3 3 4 4 4 6 4 4 5 $57,000 1/2 Ton Pickup Compact - - - - - - - - - - 1 1 1 1 1 $58,000 Wheeled Utility Vehicle - - - - - - - - - - 1 1 1 1 1 $45,000 Total 14 14 18 19 19 19 18 18 21 19 21 25 20 20 25 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 15 Year Average 2009 to 2023 Quantity Standard 0.0001 Quality Standard $83,100 Service Standard $8 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $8 Eligible Amount $306,872 Watson & Associates Economists Ltd. PAGE B-25 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-21 City of Oshawa Waste Diversion - Facilities Service: Waste Diversion - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) 2024 Value/sq.ft. with land, site works, Consolidated Operations Depot - Office - - - - - - 292 292 292 292 292 292 292 292 292 $474 $650 Consolidated Operations Depot - Garage - - - - - - 375 375 375 375 375 375 375 375 375 $408 $660 Wilson Road South (Units 5, 6, 7 and 8) 2,500 2,500 2,500 2,500 2,500 2,500 - - - - - - - - - $474 $650 Total 2,500 2,500 2,500 2,500 2,500 2,500 667 667 667 667 667 667 667 667 667 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0170 0.0169 0.0167 0.0166 0.0164 0.0162 0.0043 0.0042 0.0041 0.0040 0.0039 0.0039 0.0038 0.0037 0.0036 15 Year Average 2009 to 2023 Quantity Standard 0.0090 Quality Standard $652 Service Standard $5.87 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $6 Eligible Amount $216,767 Watson & Associates Economists Ltd. PAGE B-26 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Schedule B-22 City of Oshawa Waste Diversion - Vehicles & Equipment Service: Waste Diversion - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Compact SUV/Crossover 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - - - - - - $58,000 1/2 Ton Pickup 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 - - - - - $100,000 1/2 Ton Pickup Compact - - - - - - - - - 1.00 1.00 1.00 1.00 1.00 1.00 $58,000 Dump Stake Hoist Trucks (4600-4900K) - - - - - - - 1.00 - 1.00 1.00 1.00 1.00 1.00 1.00 $127,000 Garbage Packers* 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 4.25 3.50 5.18 4.69 5.12 5.12 $580,000 Leased Vehicles - - - - - - - - - - - - - - 2.00 $487,000 Total 6.25 6.25 6.25 6.25 6.25 6.25 6.25 7.25 5.25 7.25 5.50 7.18 6.69 7.12 9.12 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.000042 0.000042 0.000042 0.000041 0.000041 0.000041 0.000040 0.000045 0.000032 0.000043 0.000032 0.000042 0.000038 0.000040 0.000050 15 Year Average 2009 to 2023 Quantity Standard 0.0000 Quality Standard $420,976 Service Standard $17 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $17 Eligible Amount $637,377 Watson & Associates Economists Ltd. PAGE C-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix C: Long-Term Capital and Operating Cost Examination As a requirement of the D.C.A. under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the D.C. background study. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the City's approved 2022 Financial Information Return (F.I.R.). In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs that are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. Lifecycle costs were estimated by dividing the growth-related costs by the average useful life. The useful life assumptions used for each asset class are provided in Table C-1. Table C-1 Average Useful Life by Asset Class Asset Lifecycle Cost Average Useful Life Stormwater Infrastructure 40 to 80 Facilities 50 Services Related to a Highway 20 to 40 Parkland Development 20 Vehicles 15 Small Equipment & Gear 10 Library Materials 10 Watson & Associates Economists Ltd. PAGE C-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table C-2 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while Municipal program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Table C-2 Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICES/CLASS OF SERVICES GROSS COST LESS BENEFIT TO EXISTING ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES 1. Services Related to a Highway 1.1 Roads and Related, Public Works facilities, vehicles & equipment 870,815,391 35,892,422 14,748,481 50,640,903 2. Stormwater Drainage and Control Services 2.1 Channels, drainage and ponds 77,624,714 1,291,774 1,371,307 2,663,081 3. Fire Protection Services 3.1 Fire facilities, vehicles & equipment 56,117,580 1,436,186 7,785,722 9,221,908 4. Parks and Recreation Services 4.1 Park development, amenities, trails, recreation facilities, vehicles & equipment 220,889,587 7,309,120 8,013,989 15,323,109 5. Library Services 5.1 Library facilities, materials and vehicles 20,842,545 679,216 1,835,228 2,514,444 6. Provincial Offences Act including By-Law Enforcement 6.1 Facilities, vehicles and equipment 778,200 102,412 1,770,996 1,873,408 7. Waste Diversion Services 7.1 Waste diversion facilites, vehicles, equipment and other 2,098,231 117,940 1,138,363 1,256,303 8. Growth-Related Studies 4,633,649 - - - Total $1,253,799,897 $46,829,069 $36,664,085 $83,493,155 Watson & Associates Economists Ltd. PAGE D-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D D.C. Reserve Fund Policy Watson & Associates Economists Ltd. PAGE D-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D: D.C. Reserve Fund Policy D.1 Legislative Requirements The Development Charges Act, 1997, as amended (D.C.A.) requires development charge (D.C.) collections (and associated interest) to be placed in separate reserve funds. Sections 33 through 36 of the D.C.A. provide the following regarding reserve fund establishment and use: - A municipality shall establish a reserve fund for each service to which the D.C. by-law relates; subsection 7 (1), however, allows services to be grouped into categories of services for reserve fund (and credit) purposes and for classes of services to be established. - The municipality shall pay each D.C. it collects into a reserve fund or funds to which the charge relates. - The money in a reserve fund shall be spent only for the "capital costs" determined through the legislated calculation process (as per subsection 5 (1) 2 to 8). - Money may be borrowed from the fund but must be paid back with interest (O. Reg. 82/98, subsection 11 (1) defines this as Bank of Canada rate either on the day the by-law comes into force or, if specified in the by-law, the first business day of each quarter). - D.C. reserve funds may not be consolidated with other municipal reserve funds for investment purposes and may only be used as an interim financing source for capital undertakings for which D.C.s may be spent (section 37). Annually, the Treasurer of the municipality is required to provide Council with a financial statement related to the D.C. by-law(s) and reserve funds. This statement must be made available to the public and may be requested to be forwarded to the Minister of Municipal Affairs and Housing. Subsection 43 (2) and O. Reg. 82/98 prescribe the information that must be included in the Treasurer's statement, as follows: - opening balance; - closing balance; Watson & Associates Economists Ltd. PAGE D-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - description of each service and/or service category for which the reserve fund was established (including a list of services within a service category); - transactions for the year (e.g., collections, draws) including each asset's capital costs to be funded from the D.C. reserve fund and the manner for funding the capital costs not funded under the D.C. by-law (i.e., non-D.C. recoverable cost share and post-period D.C. recoverable cost share); - for projects financed by D.C.s, the amount spent on the project from the D.C. reserve fund and the amount and source of any other monies spent on the project; - amounts borrowed, purpose of the borrowing, and interest accrued during previous year; - amount and source of money used by the municipality to repay municipal obligations to the D.C. reserve fund; - list of credits by service or service category (outstanding at the beginning of the year, given in the year, and outstanding at the end of the year by the holder); - for credits granted under section 14 of the previous D.C.A., a schedule identifying the value of credits recognized by the municipality, the service to which it applies, and the source of funding used to finance the credit; and - a statement as to compliance with subsection 59 (1) of the D.C.A., whereby the municipality shall not impose, directly or indirectly, a charge related to a development or a requirement to construct a service related to development, except as permitted by the D.C.A. or another Act. Recent changes arising from Bill 109 (More Homes for Everyone Act, 2022) provide that the Council shall make the statement available to the public by posting the statement on the website or, if there is no such website, in the municipal office. In addition, Bill 109 introduced the following requirements which shall be included in the treasurer's statement. - For each service for which a development charge is collected during the year o whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law, and o if the answer to the above is no, the amount the municipality now expects to incur and a statement as to why this amount is expected. Watson & Associates Economists Ltd. PAGE D-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx - For any service for which a development charge was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. Based upon the above, Appendix D-1 and Attachments 1 through 3 (Appendix D-2 through D-4), set out the format for which annual reporting to Council should be provided. D.2 D.C. Reserve Fund Application Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5(1)." This provision clearly establishes that reserve funds collected for a specific service are only to be used for that service, or to be used as a source of interim financing of capital undertakings for which a D.C. may be spent. Watson & Associates Economists Ltd. PAGE D-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D-1 Annual Treasurer's Statement of Development Charge Reserve Funds Services Related to a Highway Stormwater Drainage and Control Services Fire Protection Services Parks and Recreation Services Library Services Provincial Offences Act including By- Law Enforcement Waste Diversion Services Growth- Related Studies Opening Balance, January 1, ________ 0 Plus: Development Charge Collections 0 Accrued Interest 0 Repayment of Monies Borrowed from Fund and Associated Interest1 0 Sub-Total 0 0 0 0 0 0 0 0 Less: Amount Transferred to Capital (or Other) Funds2 0 Amounts Refunded 0 Amounts Loaned to Other D.C. Service Category for Interim Financing 0 Credits3 0 Sub-Total 0 0 0 0 0 0 0 0 Closing Balance, December 31, ________ 0 0 0 0 0 0 0 0 1 Source of funds used to repay the D.C. reserve fund 2 See Attachment 1 for details 3 See Attachment 2 for details The Municipality is compliant with s.s. 59.1 (1) of the Development Charges Act , whereby charges are not directly or indirectly imposed on development nor has a requirement to construct a service related to development been imposed, except as permitted by the Development Charges Act or another Act. Total Description Services/Class of Services to which the Development Charge Relates Watson & Associates Economists Ltd. PAGE D-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D-2 Amount Transferred to Capital (or Other) Funds - Capital Fund Transactions D.C. Recoverable Cost Share Non-D.C. Recoverable Cost Share D.C. Forecast Period Post D.C. Forecast Period D.C. Reserve Fund Draw D.C. Debt Financing Grants, Subsidies Other Contributions Post-Period Benefit/ Capacity Interim Financing Grants, Subsidies Other Contributions Other Reserve/Reser ve Fund Draws Tax Supported Operating Fund Contributions Rate Supported Operating Fund Contributions Debt Financing Grants, Subsidies Other Contributions Services Related to a Highway Capital Cost A Capital Cost B Capital Cost C Sub-Total - Services Related to Highways $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fire Protection Services Capital Cost D Capita Cost E Capital Cost F Sub-Total - Fire Protection Services $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Parks and Recreation Services Capital Cost G Capita Cost H Capital Cost I Sub-Total - Parks and Recreation Services $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Capital Fund Transactions Gross Capital Cost Watson & Associates Economists Ltd. PAGE D-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D-3 Amount Transferred to Operating (or Other) Funds - Operating Fund Transactions D.C. Reserve Fund Draw Post D.C. Forecast Period Non-D.C. Recoverable Cost Share Operating Fund Transactions Principal Interest Principal Interest Source Principal Interest Source Services Related to a Highway Capital Cost J Capita Cost K Capital Cost L Sub-Total - Services Related to a Highway $0 $0 $0 $0 $0 $0 $0 Fire Protection Services Capital Cost M Capita Cost N Capital Cost O Sub-Total - Fire Protection Services $0 $0 $0 $0 $0 $0 $0 Parks and Recreation Services Capital Cost P Capita Cost Q Capital Cost R Sub-Total - Parks and Recreation Services $0 $0 $0 $0 $0 $0 $0 Annual Debt Repayment Amount Watson & Associates Economists Ltd. PAGE D-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D-4 Statement of Credit Holder Transactions Credit Holder Applicable D.C. Reserve Fund Credit Balance Outstanding Beginning of Year ________ Additional Credits Granted During Year Credits Used by Holder During Year Credit Balance Outstanding End of Year ________ Credit Holder A Credit Holder B Credit Holder C Credit Holder D Credit Holder E Credit Holder F Watson & Associates Economists Ltd. PAGE D-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D-5 Statement of Reserve Fund Balance Allocations Service: Services Related to a Highway Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Watson & Associates Economists Ltd. PAGE D-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix D-6 Description of the Service for which each Development Charge Reserve Fund was Established Services/Class of Services Description Services Related to a Highway The fund is used for growth-related projects for roads, bridges, structures, active transportation, streetlights, sidewalks, and other related road infrastructure Fire Protection Services The fund is used for growth-related projects supporting fire protection services, including facilities, vehicles, equipment, and gear Parks and Recreation Services The fund is used for growth-related projects related to parkland development, parkland amenities, recreational trails, parkland buildings, recreation facilities, and parks & recreation vehicles and equipment Library Services The fund is used for growth-related projects including library facilities, furniture, shelving, collection materials, vehicles, and other related library infrastructure Provincial Offences Act including By-Law Enforcement The fund is used for growth-related projects including facilities, vehicles, and equipment Stormwater Drainage and Control Services The fund is used for growth-related projects for stormwater management facilities, erosion control, storm drainage, and other stormwater related infrastructure Waste Diversion Services The fund is used for growth-related projects for, facilities, vehicles, equipment, and other waste diversion infrastructure Growth-Related Studies (Class of Services) The fund is used for growth-related studies Watson & Associates Economists Ltd. PAGE E-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix E Local Service Policy Watson & Associates Economists Ltd. PAGE E-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix E: Local Service Policy Introduction This policy sets out the City of Oshawa's general guidelines on determining growth- related engineering infrastructure and parkland development that may be eligible for funding, in whole or in part, by development charges (D.C.) versus costs that are considered as a local service, to be emplaced separately by landowners, pursuant to a development agreement. The Development Charges Act, 1997 (D.C.A.) governs what constitutes eligible services for D.C. funding, and which services are considered ineligible. In the development of a new subdivision or site plan, certain elements that are considered D.C. eligible services may be cost-shared with the developer(s), creditable, or reimbursable if the developer is doing the work on behalf of the City. There are also elements of the developer works that are considered to be local services, which are the infrastructure or component thereof required to facilitate a development, and are therefore, deemed to provide local rather than City-wide growth benefits. Section 59 of the D.C.A. considers local services to be a direct developer responsibility, which means that the capital costs shall be borne entirely by the developer(s), with no credit or reimbursement from the City. These guidelines are developed in connection with Section 59 of the D.C.A. and Section 51 and 53 of the Planning Act. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered, in the context of these policy guidelines, as subsection 59(2) of the D.C.A., and the relationship between any existing and proposed development in the surrounding area as well as the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area. Local services are not included in the development charge calculation. Services Related to a Highway A highway and services related to a highway are intended for the transportation of people and goods via many different modes including, but not limited to passenger automobiles, commercial vehicles, transit vehicles, bicycles, and pedestrians. The highway shall consist of all land and associated infrastructure built to support (or Watson & Associates Economists Ltd. PAGE E-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx service) this movement of people and goods regardless of the mode of transportation employed, thereby achieving a complete street. A complete street is the concept whereby a highway is planned, designed, operated, and maintained to enable pedestrians, cyclists, public transit users and motorists to safely and comfortably be moved, thereby allowing for the efficient movement of persons and goods. The associated infrastructure to achieve this concept shall include, but is not limited to: road pavement structure and curbs; grade separation/bridge structures (for any vehicles, railways and/or pedestrians); grading, drainage and retaining wall features; culvert structures; storm water drainage systems; utilities; traffic control systems; signage; gateway features; street furniture; active transportation facilities (e.g. sidewalks, bike lanes, multi-use trails which interconnect the transportation network, etc.); transit lanes & lay-bys; roadway illumination systems; boulevard and median surfaces (e.g. sod & topsoil, paving, etc.); street trees and landscaping; parking lanes & lay-bys; (excluding on-street parking in the downtown) and driveway entrances; noise attenuation systems; railings and safety barriers. 1. Roads - Local and Collector Roads Internal to Development, inclusive of all land and associated infrastructure - direct developer responsibility under s.59 of the D.C.A. as a local service. - Oversizing of Arterial Type 'C' Roads Internal to Development, in excess of an 11 m pavement width, not required for the specific development (i.e., required for future development external to a specific development or the area to which a specific development relates) - included in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. - Arterial Type "C" Roads External to Development, inclusive of all land and associated infrastructure - if needed to support a specific development or required to link with the area to which the plan relates, direct developer responsibility under s.59 of the D.C.A.; - Arterial Type "C" Roads External to Development, inclusive of all land and associated infrastructure - if not needed to support a specific development or required to link with the area to which the plan relates, include in the D.C. calculation to the extent permitted under s.5(1) of the D.C.A.; - Arterial Type "A" and Type "B" Roads: Included as part of road costing funded through D.C.A., s.5(1). Watson & Associates Economists Ltd. PAGE E-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 2. Sidewalks - Sidewalks internal to development - developer responsibility. - Sidewalks external and abutting developments to be a developer responsibility including upgrades, expansion and/or realignment as required through the development agreement to the City's standard; otherwise included in the D.C. - Sidewalks external and not abutting developments - Included as costing funded through D.C.A., s.5(1)., with the exception of transition sections, up to a maximum of 25m in length beyond the abutting development, to connect new sidewalks to existing sidewalks. 3. Bridges and Culverts - Culverts and Bridges on local and collector roads within developments to be a developer responsibility. - Oversizing of Culverts and Bridges on Arterial Type "C" roads Internal to Development, in excess of an 11 m pavement width, not required for the specific development (i.e., required for future development external to a specific development or the area to which a specific development relates) - included in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. - Culverts and Bridges on arterial roads external to developments - Included as part of costing funded through the D.C.A., s.5(1). Watercourse Improvements Developers are required to pay for any erosion protection work to adjacent lands they are developing, where erosion works are necessary to protect the development. This work will be determined on a site basis and is over and above any work for which watercourse development charges are collected. Providing stormwater management ponds and other facilities required by the development including all associated features such as landscaping and fencing shall be direct developer responsibilities as a local service. Storm Sewer systems and drainage works that are required, related to, or within the area needed to support the development, either internal or external to the area to which the plan relates: Direct developer responsibility under s. 59 of the D.C.A. as a local service. Watson & Associates Economists Ltd. PAGE E-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Parkland Development With respect to parkland dedications, developer responsibilities include preparation of a concept plan and overall grading plan, grading, topsoil, sodding, fencing, and sub- surface drainage. Parkland Development for City Parks, Community Parks, Regional Parks, Neighbourhood Parks, Parkettes and Open Space: responsibility to provide up to base condition is a direct developer responsibility as a local service provision under s. 59 of the D.C.A. including, but not limited to, the following: - Clearing and grubbing. - Topsoil Stripping and stockpiling, (Topsoil or any fill or soils shall not be stockpiled on parkland without the approval of the City.). - Parkland shall be free of any contaminated soil or subsoil. - Servicing - Water, Hydro, Stormwater, Sanitary, Electrical, Fibre/ phone, catch basins, meter, and meter boxes to the entrance of the park as per City's requirements. - Rough grading (pre-grading) and the supply of topsoil to the required depth as per City requirements. - Parkland shall not be mined for engineering fill and replaced with fill or topsoil. - Parkland shall be conveyed free and clear of all encumbrances. - When parkland parcels cannot be developed in a timely manner, they shall be graded to ensure positive drainage and seeded to minimize erosion and dust. - Temporary fencing may also be required where there is no permanent fence to prevent illegal dumping. - Temporary Park sign advising future residents that the site is a future park. - Perimeter fencing of parkland to the City standard located on the public property side of the property line adjacent land uses (residential, industrial, commercial) as required by the City is a direct developer responsibility as a local service under s. 59 of the D.C.A. - Required heritage features within the park as set out within the Planning approval conditions. All other parkland development to be included in D.C., over the base condition that will be required to be provided by the developing landowner prior to parkland dedication, including, but not limited to, program facilities, amenities, furniture, and recreation trails. Watson & Associates Economists Ltd. PAGE E-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Parkland Development for Parkettes, developer responsibility built fully to City standards with agreed upon reimbursement based on the negotiated timelines to be included in development agreements (to be funded through D.C.'s). Watson & Associates Economists Ltd. PAGE F-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix F Asset Management Plan Watson & Associates Economists Ltd. PAGE F-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix F: Asset Management Plan The recent changes to the Development Charges Act, 1997, as amended (D.C.A.) (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset through its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the development charge (D.C.). Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program-related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which are to be completed by 2021 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE F-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Watson & Associates Economists Ltd. PAGE F-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Commensurate with the above, the City's prepared an A.M.P. in 2021 for its existing core infrastructure assets; however, it did not take into account future growth-related assets. As a result, the asset management requirement for the D.C. must be undertaken in the absence of this information. In recognition to the schematic above, the following table (presented in 2024$) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, as all capital costs included in the D.C. eligible capital costs are not included in the City's A.M.P., the present infrastructure gap and associated funding plan have not been considered at this time. Hence the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that will require financing from municipal financial resources (i.e., rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2024 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are approximately $89.26 million. 5. Consideration was given to the potential new tax and user fee revenue which will be generated as a result of new growth. These revenues will be available to assist in financing the expenditures above. The new operating revenues are $97.01 million. 6. In consideration of the above, the capital plan is deemed to be financially sustainable. Watson & Associates Economists Ltd. PAGE F-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Table F-1 City of Oshawa Asset Management - Future Expenditures and Associated Revenues 2024$ 2051 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 $5,125,202 Annual Debt Payment on Post Period Capital2 $640,088 Annual Lifecycle $46,829,069 Incremental Operating Costs (for D.C. Services) $36,664,085 Total Expenditures $89,258,445 Revenue (Annualized) Total Existing Revenue4 $235,253,938 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $97,012,305 Total Revenues $332,266,243 4 As per Sch. 10 of FIR 3 All infastructure costs included in Area Specifc by-laws have been included 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE G-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx Appendix G Proposed D.C. By-law Watson & Associates Economists Ltd. PAGE G-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx THE CORPORATION OF THE CITY OF OSHAWA BY-LAW NUMBER 2024-___ BEING A BY-LAW to establish development charges for the Corporation of the City of Oshawa with respect to Development Charges WHEREAS the Corporation of the City of Oshawa currently has and will continue to experience growth through development and redevelopment; and, WHEREAS development and redevelopment require the provision of physical and social services by the Corporation of the City of Oshawa; and, WHEREAS the Development Charges Act, 1997, S.O. 1997, c. 27 (the "Act") authorizes the Council of a municipality to pass by laws for the imposition of development charges against land; and, WHEREAS Council desires to ensure that the capital cost of meeting development related demands for, or the burden on, City services does not place an undue financial burden on the City, or its taxpayers and that new development contributes no more than the net capital cost attributable to providing the historic level of services and meeting the requirements of section 5(1) of the Act; and, WHEREAS the City has undertaken a study of, among other matters, the matters set out in section 10 of the Act and section 8 of O. Reg. 82/98, including services, service levels, expected development, development related facilities and the costs thereof; and, WHEREAS The "City of Oshawa 2024 Development Charge Background Study" dated April 25, 2024 prepared by Watson and Associates Economists Ltd. and the proposed development charge by-law were posted to the City's website at least sixty days prior to the passage of the development charges bylaw, made available to the public at least two weeks prior to the public meeting and Council gave at least twenty days' notice to the public in accordance with section 12 of O. Reg. 82/98; and, WHEREAS The "City of Oshawa 2024 Development Charge Background Study" dated April 25, 2024 prepared by Watson and Associates Economists Ltd. was amended by "Addendum to the 2024 Development Charges Background Study", and the proposed revised development charge by-law was posted to the City's website on June 19, 2024 in response to legislative and other minor changes; and, Watson & Associates Economists Ltd. PAGE G-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx WHEREAS a public meeting pursuant to section 12 of the Act was held on May 24, 2024, and Council heard and received comments and representations from all persons who requested to be heard. NOW THEREFORE the Council of the Corporation of the City of Oshawa hereby enacts as follows: 1. INTERPRETATION 1.1 In this By law, where words appear with their first letter capitalized, the words are intended to have the meanings set out for them in the lettered paragraphs of this Section: a) "Accessory" means a building, structure, or use which is commonly incidental, subordinate, or secondary and exclusively devoted to the main building or structure, or the main, principal, or primary use. It is located on the same lot as the main building or structure, or the main, principal, or primary use, b) "Accessory Residential Building" shall mean a detached building not used for human habitation except in the case of a building accessory to a single detached dwelling, semi-detached dwelling, semi-detached building, duplex, or street townhouse dwelling that contains a lawful accessory apartment, that the building or structure is naturally and normally incidental to or subordinate in purpose or both, and is exclusively devoted to a principal use, building or structure; c) "Act" means the Development Charges Act, 1997, S.O. 1997, c. 27; d) "Affordable Residential Unit" means a Residential Unit that meets the criteria set out in subsection 4.1 of the Act; e) "Agricultural" is in reference to use, means land, buildings or structures used, designed, or intended to be used solely for an "agricultural operation" as that term is defined in section 1 of the Farming and Food Production Protection Act, 1998, S.O. 1998, c. 1, and excludes Cannabis Production Facilities; Watson & Associates Economists Ltd. PAGE G-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx f) "Ancillary Residential Use" means a Residential Dwelling that would be ancillary to a Single Detached Dwelling, Semi-Detached Dwelling, or Rowhouse dwelling; g) "Apartment Dwelling Unit" means any Dwelling Unit which is not a Single Detached Dwelling, a Semi-Detached Dwelling, a Dwelling Unit within a Townhouse, or either of the two Dwelling Units comprising a Duplex and includes a Stacked Townhouse unit; h) "Attainable Residential Unit" means a residential unit that meets the criteria set out in subsection 4.1 of the Act; i) "Back-to-Back Townhouse" means each of two Townhouses that shares a common rear wall with the other for at least 50% of its width; j) "Bed and Breakfast Establishment" means a Single Detached Dwelling in which not more than three (3) Bedrooms are made available for the temporary accommodation of travellers, to whom meals may be furnished, but does not include a Hotel or a Lodging House; k) "Bedroom" means a habitable room used or capable of use for sleeping accommodation, including a den, study, or other similar area, but excluding a living room, dining room, kitchen, utility room, bathroom, sunroom, or porch; l) "Board of Education" has the same meaning as the term "board" defined in the Education Act; m) "Building Code Act" means the Building Code Act, 1992, S.O. 1992, c. 23; n) "By-law" means this By-law, including its recitals and schedules and all future amendments including successor By-laws; o) "Cannabis" means: i. a cannabis plant; Watson & Associates Economists Ltd. PAGE G-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx ii. any part of a cannabis plant, including the phytocannabinoids produced by, or found in, such a plant regardless of whether that part has been processed or not; iii. any substance or mixture of substances that contains or has on it any part of such a plant; and iv. any substance that is identical to any phytocannabinoid produced by, or found in, such a plant, regardless of how the substance was obtained; p) "Cannabis Plant" means a plant that belongs to the genus Cannabis; q) "Cannabis Production Facilities" means a building, or part thereof, designed, used, or intended to be used for one or more of the following: growing, production, processing, harvesting, testing, alteration, destruction, storage, packaging, shipment, or distribution of cannabis where a license, permit or authorization has been issued under applicable federal law and does include, but is not limited to such buildings as a greenhouse and agricultural building associated with the use. It does not include a building or part thereof solely designed, used, or intended to be used for retail sales of cannabis; r) "City" means The Corporation of the City of Oshawa; s) "Capital Levy" means a City fee or charge levied or required to be paid prior to November 22, 1991 as a result of development approval, including land division, for arterial and collector roads, recreation and parks facilities and watercourse improvements, but excluding payments collected by the City in consideration of "best efforts" clauses or other agreements to collect and remit monies in partial or full payment for front- ending the payment for the installation of City services or facilities; t) "Commercial" is in reference to use, means land, buildings or structures of any kind whatsoever used, designed, or intended to be used for a non- residential use other than an Agricultural use or an Industrial use; Watson & Associates Economists Ltd. PAGE G-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx u) "Correctional Group Home" means a Group Home containing one or more persons who have been placed on probation, released on parole, admitted for correctional purposes, or found to be not criminally responsible for a crime by virtue of mental incapacity; v) "Crisis Care Residence" means an establishment that provides a means of immediate, temporary accommodation and assistance for a short-term period, which is generally less than one week for the majority of the residents and includes a hostel; w) "Development" means: i. any activity or proposed activity in respect of land that requires one or more of the actions referred to in section 2.3 of this By law; ii. the redevelopment of land; or iii. the redevelopment, expansion, extension, or alteration, or any two or more of them, of a use, building or structure; x) "Development Charge" means a charge imposed by this By-law; y) "Duplex" means the whole of a building, which was not originally constructed as a Single Detached Dwelling, that consists of two Dwelling Units, one of which has at least 50% of its Gross Floor Area located wholly or partially above the other and each of which has an independent entrance either directly from the outside or through a common vestibule or hallway; z) "Dwelling Unit" means unit consisting of one or more rooms, which contains toilet and cooking facilities, and which is designed for use as a single housekeeping establishment. Notwithstanding the foregoing, a suite with a bedroom and bathroom but not a kitchen within a Long-Term Care Facility or Retirement home shall be considered a Dwelling Unit for purposes of calculating density; aa) "Education Act" means the Education Act, R.S.O. 1990, c. E.2; Watson & Associates Economists Ltd. PAGE G-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx bb) "Financial Institution" means an establishment which provides money management services directly to the public, including a bank, trust company, credit union, securities firm, finance company, mortgage brokerage or any other similar use; cc) "Gross Floor Area" means: i. for a Residential Development, the total floor area, measured between the outside of exterior walls or between the outside of exterior walls and the centre line of Party Walls dividing the building from another building, of all floors above the average level of finished ground adjoining the building at its exterior walls; and ii. for a Non-Residential Development, the total floor area of all floors, whether above or below grade, measured between the outside of exterior walls, or between the outside of exterior walls and the centre line of Party Walls and, without limitation, includes (A) cellars (B) basements (C) corridors (D) lobbies (E) half-storeys (F) mezzanines and (G) areas occupied by interior walls or partitions but does not include (A) elevator shafts (B) stairwells (C) roof areas (D) crawl spaces (E) indoor refuse storage or collection areas (F) mechanical or electrical rooms or (G) areas used for parking or loading, whether in the main building or an Accessory building. Watson & Associates Economists Ltd. PAGE G-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx dd) "Group Home" means a Dwelling Unit housing three (3) to ten (10) persons, exclusive of staff, who, by reason of their emotional, mental, social, or physical condition or legal status require a group living arrangement for their well-being, and who live under responsible supervision, with the group home licensed or approved for funding under Provincial statutes; ee) "Hospice" means a building or portion of a mixed-use building designed and intended to provide palliative care and emotional support to the terminally ill in a home or homelike setting so that quality of life is maintained, and family members may be active participants in care; ff) "Hospital" has the same meaning as the term, "hospital" defined in section 1 of the Public Hospitals Act, R.S.O. 1990, c. P.40; gg) "Hotel" means a building or part of a building or group of buildings mainly used for the purpose of catering to the needs of the travelling public by furnishing sleeping accommodation and includes a motel or motor hotel but does not include a Bed and Breakfast Establishment or a Lodging House; hh) "Industrial" is in reference to use, means land, buildings, or structures of any kind whatsoever or any portion thereof, used, designed, or intended to be used for or in connection with, a) manufacturing, producing, processing, storing, or distributing something, b) research or development in connection with manufacturing, producing, or processing something, c) retail sales by a manufacturer, producer, or processor of something they manufactured, produced, or processed, if the retail sales are at the site where the manufacturing, production or processing takes place, d) office or administrative purposes, if they are, Watson & Associates Economists Ltd. PAGE G-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx i. carried out with respect to manufacturing, producing, processing, storage or distributing of something, and ii. in or attached to the building or structure used for that manufacturing, producing, processing, storage, or distribution; ii) "Institutional development" means development of a building or structure intended for use: a. as a long-term care home within the meaning of subsection 2 (1) of the Fixing Long-Term Care Act, 2021, S.O. 2021, c. 39, Sched.1; b. as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010, S.O. 2010, c. 11; c. by any institution of the following post-secondary institutions for the objects of the institution: i. a university in Ontario that receives direct, regular, and ongoing operation funding from the Government of Ontario; ii. a college or university federated or affiliated with a university described in subclause (i); or iii. an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institute Act, 2017; d. as a memorial home, clubhouse, or athletic grounds by an Ontario branch of the Royal Canadian Legion; or e. as a hospice to provide end of life care; jj) "Live-work Unit" means a Building, or part of thereof, which contains, or is intended to contain, both a Dwelling Unit and non-residential unit and which is intended for both Residential Use and Non-residential Use concurrently, and shares a common wall or floor with or without direct access between the residential and non-residential uses; kk) "Local Board" has the same meaning as the term, "local board", defined in the Act; Watson & Associates Economists Ltd. PAGE G-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx ll) "Local Services" means those services, facilities or things which are under the jurisdiction of the City and are related to a plan of subdivision or within the area to which the plan relates in respect of the lands under Sections 41, 51 or 53 of the Planning Act, R.S.O. 1990, Chap. P.13, as amended, or any successor thereof; mm)"Lodging House" means a building or part of a building, containing Lodging Units, which does not appear to function as a Dwelling Unit, although one may be included with the Lodging Units. It includes, without limitation, a rooming house and a boarding house, a fraternity house, a sorority house, a student residence, and an apartment hotel. It does not include a Hotel, a Crisis Care Residence, a Group Home, a Correctional Group Home, a Bed and Breakfast Establishment, a Long-term Care Home, or a Retirement Residence. nn) "Lodging Unit" means one or more rooms within a building used or designed to be used for sleeping accommodations, each of which may contain cooking or washroom facilities, but not both. oo) "Long-term Care Home" means a residential building or the residential portion of a mixed-use building within the meaning of subsection 2 (1) of the Fixing Long-Term Care Act, 2021, O. 2021, c. 39, Sched.1.; pp) "Lot" means a parcel of land which is i. shown as a lot or block on a registered plan of subdivision; or ii. described in a single transfer/deed of land of legal effect registered in the Land Registry Office or the Land Titles Office for the Land Registry Division of Durham; qq) "Medical Clinic" means that a building or part of a building in which no less than one thousand four hundred and eighty-six square metres (1,486 m²) of Gross Floor Area is used by physicians, surgeons, dentists, drugless practitioners or any other health care professionals, their staff, and their patients, for the purpose of consultation, diagnosis or treatment of humans and may include medical laboratories or an ancillary pharmacy; Watson & Associates Economists Ltd. PAGE G-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx rr) "Non-profit housing development", for the purposes of rule 12.2 in Schedule "C", means development of a building or structure intended for use as residential premises by: i. a corporation without share capital to which the Corporations Act, R.S.O. 1990, c. C.38 applies, that is in good standing under that Act and whose primary objective is to provide housing; ii. a corporation without share capital to which the Canada Not-for- profit Corporations Act, S.C. 2009, c. 23 applies, that is in good standing under that Act and whose primary objective is to provide housing; or iii. a non-profit housing co-operative that is in good standing under the Co-operative Corporations Act, R.S.O. 1990, c. C.35. ss) "Non-profit Institution" means i. a "registered charity" as defined in subsection 248(1) of the Income Tax Act, R.S.C. 1985, c. 1 (5th Supp.), as amended; ii. a corporation that is a non-profit organization for the purposes of paragraph 57(1)(b) of the Corporations Tax Act, R.S.O. 1990, c. C.40; or iii. a "place of worship" that is used primarily for worship and is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, c. A.31; tt) "Non-Residential" in reference to use, means land, buildings or structures of any kind whatsoever used, designed, or intended to be used for other than a Residential use. uu) Office" means a building or part of a building in which one or more persons are employed in the management, direction and conducting of a business, agency, brokerage or a labour or fraternal organization or in which professionally qualified persons and their staff provide services to clients or patients but does not include any part of a building in which goods, wares, merchandise, foodstuffs or farm produce or other Watson & Associates Economists Ltd. PAGE G-12 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx substances, articles or things are displayed, stored, or offered for wholesale or retail sale or rental; vv) "Oshawa" means the geographical area under the jurisdiction of the City; ww) "Other Multiple Dwellings" means all residential dwellings other than a Single-detached Dwelling, Semi-detached Dwelling, Apartment Dwelling, and Lodging Unit, and includes the portion of a Live-Work Unit intended to be used exclusively for living accommodations for one or more individuals; xx) "Owner" means the legal or equitable owner of land; yy) "Party Wall" means a wall jointly owned and used by two parties under an easement agreement or by right in law and erected at or upon a line separating two parcels of land each of which may be lawfully transferred or conveyed in accordance with the provisions of the Planning Act; zz) "Place of worship" means that part of a building or structure used for worship and that is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, c. A.31, as amended, and does not include portions of buildings used for any commercial or other institutional uses, including, but not limited to, daycare facilities, private schools, and entertainment facilities, or for residential purposes; aaa) "Planning Act" means the Planning Act, R.S.O. 1990, c. P.13; bbb) "Redevelopment" means the construction, erection or placing of one or more buildings or structures on land where all or part of a building or structure has previously been demolished on such land, or changing the use of a building or structure from residential to non-residential or from non-residential to residential; ccc) "Rental housing" is for the purposes of rule 12.1 in Schedule "C", means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises; ddd) "Residential" in reference to use, means land, buildings, or structures of any kind whatsoever or any portion thereof, used, designed, or Watson & Associates Economists Ltd. PAGE G-13 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx intended to be used for one or more individuals as living accommodations or combined live/work accommodations; eee) "Retirement Residence" means a residential building or the residential portion of a mixed-use building which provides accommodation for persons of retirement age, where common facilities for the preparation and consumption of food are provided for the residents of the building, and where each unit or living accommodation has separate sanitary facilities, less than full culinary facilities and a separate entrance from a common hall; fff) "Retirement Residence Unit" means a unit within a Retirement Residence; ggg) "Rowhouse Dwelling" means a building containing three or more attached dwelling units in a single row, each of which dwelling units has an independent entrance from the outside and is vertically separated from any abutting dwelling unit; hhh) "Semi-Detached Dwelling" means a Residential building originally constructed so as to consist entirely of two Dwelling Units, attached by vertical walls, each having a separate entrance from the exterior; iii) "Single Detached Dwelling" means a Residential building which is separate and detached from other buildings or structures and which contains only a Dwelling Unit but does not include a mobile home; jjj) "Stacked Townhouse" means each of two (2) Townhouses that is attached horizontally to the other Townhouse, two (2) or more Townhouses high; kkk) "Street Townhouse Building" means a Townhouse for which each Dwelling Unit within the Townhouse abuts and has its own driveway access to an improved street. lll) "Temporary" in reference to use, means land, buildings, or structures of any kind whatsoever or any portion thereof, used, designed, or intended to be used for a period not exceeding three (3) years; and Watson & Associates Economists Ltd. PAGE G-14 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx mmm) "Townhouse" means a building divided vertically into at least three Dwelling Units, attached by common walls at least six metres (6.0m) in length and at least one storey in height, in addition to any basement, with each Dwelling Unit having a separate entrance from the outside other than a Stacked Townhouse. nnn) "Triplex" means a building containing 3 Apartment Dwelling Units. 1.2 The captions, article and sections names and numbers appearing in this By-law are for convenience of reference only and have no effect on its interpretation. This By-law is to be read with all changes of gender and number required by the context. 1.3 If any section, subsection, paragraph, clause, sub-clause, item or any of the words contained in this By-law are held wholly or partially illegal, invalid or unenforceable by any court or tribunal of competent jurisdiction, the remainder of this By-law shall not be affected by the judicial holding, but shall remain in full force and effect. 1.4 Each reference to Provincial legislation in this By-law is a reference to the most current version of that Provincial legislation and, in every case, includes all applicable amendments to the legislation, including successor legislation. 2. DESIGNATION OF SERVICES 2.1 The categories of services for which development charges are imposed under this by-law are as follows: a. Services Related to a Highway; b. Fire Protection Services; c. Parks and Recreation Services; d. Library Services; e. Provincial Offences Act, including By-law Enforcement; f. Stormwater Drainage and Control Services; and g. Waste Diversion Services. 2.2 The category of class of services for which development charges are imposed under this by-law is as follows: Watson & Associates Economists Ltd. PAGE G-15 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx a. Growth-Related Studies. 2.3 The components of the services and class of services, designated in sections 2.1 and 2.2 are described in Schedule A. 3. APPLICATION OF BY-LAW RULES 3.1 Development Charges shall be payable in the amounts set out in this by-law where: 3.2 All Development in Oshawa, unless expressly excluded or exempted in this By- law, is deemed to increase the need for the service set out in Schedule "A" to this By law. 3.3 Subject to the provisions of this By-law, Development Charges shall be imposed against all Development which requires any of the following: a. the passing of a zoning by-law, or an amendment to a zoning by-law under section 34 of the Planning Act; b. the approval of a minor variance under section 45 of the Planning Act which involves a change in use, intensification of use or expansion of use; c. a conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act applies; d. the approval of a plan of subdivision under section 51 of the Planning Act; e. a consent under section 53 of the Planning Act; f. the approval of a description under section 9 of the Condominium Act, 1998, S.O. 1998, c. 19; or g. the issuing of a permit under the Building Code Act in relation to a building or structure. 3.4 No Development Charge shall be imposed where the only effect of an action mentioned in section 3.3 of this By-law is to permit: a. an enlargement to an existing dwelling unit; Watson & Associates Economists Ltd. PAGE G-16 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx b. A second residential unit in an existing detached dwelling, semi-detached dwelling, or rowhouse dwelling on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the existing detached dwelling, semi-detached dwelling or rowhouse dwelling cumulatively contain no more than one residential unit; c. A third residential unit in an existing detached dwelling, semi-detached dwelling, or rowhouse dwelling on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the existing detached dwelling, semi-detached dwelling, or rowhouse dwelling contains any residential units; d. One residential unit in a building or structure ancillary to an existing detached dwelling, semi-detached dwelling, or rowhouse dwelling on a parcel of land, if the existing detached dwelling, semi-detached dwelling, or rowhouse dwelling contains no more than two residential units and no other building or structure ancillary to the existing detached dwelling, semi-detached dwelling, or rowhouse dwelling contains any residential units; e. A second residential unit in a new detached dwelling, semi-detached dwelling, or rowhouse dwelling on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the new detached dwelling, semi-detached dwelling, or rowhouse dwelling cumulatively will contain no more than one residential unit; f. A third residential unit in a new detached dwelling, semi-detached dwelling, or rowhouse dwelling on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the new detached dwelling, semi-detached dwelling, or rowhouse dwelling contains any residential units; g. One residential unit in a building or structure ancillary to a new detached dwelling, semi-detached dwelling, or rowhouse dwelling on a parcel of land, if the new detached dwelling, semi-detached dwelling, or rowhouse Watson & Associates Economists Ltd. PAGE G-17 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx dwelling contains no more than two residential units and no other building or structure ancillary to the new detached dwelling, semi-detached dwelling, or rowhouse dwelling contains any residential units; or h. In an existing rental residential Building, which contains four or more residential Dwelling Units, the creation of the greater of one residential Dwelling Unit or one percent of the existing residential Dwelling Units. i. Notwithstanding the above, Development Charges shall be imposed, if the total gross floor area of the additional one or two units exceeds the gross floor area of the existing or proposed new single detached dwelling unit j. Notwithstanding the above, Development Charges shall be imposed, if the additional Dwelling Unit has a gross floor area greater than: i. in the case of a semi-detached or rowhouse dwelling, the gross floor area of the existing or proposed new dwelling unit; and ii. in the case of any other residential building, the gross floor area of the smallest dwelling unit already contained in the residential building. 3.5 Discounts for Rental Housing: The Development Charge payable for Rental Housing developments will be reduced based on the number of bedrooms in each unit as follows: a. Three or more bedrooms - 25% reduction; b. Two bedrooms - 20% reduction; and c. All other bedroom quantities - 15% reduction. 3.6 No Development Charge shall be imposed with respect to any Development: a. by, on behalf of, or on lands owned by and used for the purposes of a municipality, a Local Board, or a Board of Education; b. Land vested in or leased to a publicly assisted university where it is intended to be occupied and used by the university that receives direct, regular, and ongoing operating funds from the Government of Ontario for the purposes of post-secondary education if the development is intended to be occupied and used by the university; Watson & Associates Economists Ltd. PAGE G-18 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx c. Non-profit housing development; d. Affordable inclusionary residential units; e. Affordable residential units; f. Attainable residential units; g. on lands wholly within that part of Oshawa partially known as the Core Area of the Downtown Oshawa Urban Growth Centre and as depicted in Schedule "D" to this By-law; h. on that part of lands used solely for the purposes of i. a Non-Profit Institution; ii. a Hospital; or iii. a Long-term Care Home; i. respecting a new Industrial building or structure or the enlargement of an existing Industrial building or structure; j. respecting a Temporary building or structure; k. respecting an Agricultural building or structure; l. respecting an Apartment Dwelling Unit on lands within that part of King Street/Thornton Road Intensification Area shown as the shaded portion on the maps in Schedule "E" to this By-law; m. respecting a Townhouse Dwelling other than a Street Townhouse Building on lands within that part of King Street/Thornton Road Intensification Area shown as the shaded portion on the maps in Schedule "E" to this By-law; or n. respecting an Apartment Dwelling Unit or a Townhouse Dwelling Unit, except back-to-back Townhouses, on lands within that part of the Shoulder Area of the Downtown Oshawa Urban Growth Centre as shown as the shaded portion of the map in Schedule "F" to this By-law. o. respecting a new Financial Institution. Watson & Associates Economists Ltd. PAGE G-19 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 3.7 The Development Charge imposed with respect to that part of a building used solely for the purposes of a Medical Clinic shall be equal to 100% of the Commercial Development Charge. 3.8 No more than one Development Charge for each service designated in Schedule "A" to this By-law shall be imposed upon any lands, buildings, or structures to which this By-law applies even though two or more of the actions described in section 3.3 of this By-law are required before the lands, buildings, or structures can be developed for a single Development. However, nothing in this section prevents the imposition of a Development Charge in respect of subsequent Development. 3.9 This By-law does not limit the City's ability to require, as a condition or in an agreement pursuant to sections 50, 51 or 53 of the Planning Act, local services related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the Owner, or local services to be installed or paid for by the Owner as a condition of approval under section 53 of the Planning Act. 4. Rules for Calculation and Collection of Development Charges 4.1 The Development Charges set out in Schedule "B" to this By-law shall be imposed on Residential uses of lands, buildings, or structures, including Residential uses Accessory to a Non-Residential use and, in the case of a mixed-use building or structure, according to the type of Residential use, and calculated with respect to each of the services according to the type of Residential use. 4.2 Notwithstanding section 4.1, residential Duplex and Triplex buildings developed on lands within that part of Oshawa, where zoning permits a Single Detached Dwelling, will be subject to the charge for a single detached dwelling unit. 4.3 The development charges imposed on a Retirement Residence unit shall be payable at the rate applicable to an apartment of one bedroom or smaller. 4.4 The Development Charges set out in Schedule "B" to this By-law shall be imposed on Non-Residential uses of lands, buildings, or structures and, in the case of a mixed used building or structure, on the Non-Residential uses in the mixed-use building or structure, calculated with respect to each of the services according to the Gross Floor Area of the Non-Residential use. Watson & Associates Economists Ltd. PAGE G-20 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 4.5 Schedule "C" to this By-law prescribes the rules for determining whether a Development Charge is payable in any particular case and for determining the amount of the Development Charge. 4.6 Development Charges shall be adjusted semi-annually on January 1st and July 1st each year, commencing on the 1st day of January, 2025, by the Statistics Canada Quarterly Non-residential Building Construction Price Index, as prescribed by regulation pursuant to the Act. 4.7 Development Charges shall be payable by cash or by certified cheque in Canadian funds. 4.8 If a Development does not require a building permit pursuant to the Building Code Act but does require one or more of the other actions described in section 3.3 of this By- law, then the Development Charge will nonetheless be payable in respect of such Development. 5. Credits and Prepayments 5.1 Notwithstanding any other provision of this By-law, where a Development involves a. the demolition of buildings or structures that have been in existence for a minimum of five (5) years pursuant to a demolition permit issued pursuant to the Building Code Act within the sixty (60) month period preceding the issuance of a building permit pursuant to the Building Code Act respecting the Development; or b. the conversion of all or part of a building or structure that has been in existence for a minimum of five (5) years from one principal use to another principal use on the same land the Development Charge otherwise payable with respect to such Development shall be reduced by the following amounts: a. in the case of a Residential building or structure, or the Residential uses in a mixed-use building or structure, an amount calculated by multiplying the applicable Development Charge set out in Schedule "B" to this By-law by Watson & Associates Economists Ltd. PAGE G-21 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx the number representing the type of Dwelling Units that have been or will be demolished or converted to another principal use; and b. in the case of a Non-Residential building or structure, or the Non- Residential uses in a mixed-use building or structure, an amount calculated by multiplying the applicable Development Charge set out in Schedule "B" to this By-law by the Gross Floor Area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the Development Charge otherwise payable with respect to such Development. 5.2 Notwithstanding any other provision of this By-law, no development charges will be payable on a change of use permit, where the change of use is from industrial to commercial, and where the industrial building has been in place for more than 20 years from the date the change of use permit is issued. 5.3 Notwithstanding any other provision of this By-law, where a demolition permit for a building or structure is issued on or after July 1, 2024, no credit will be given for the demolition if the building or structure was exempt from the payment of development charges on account of being Development on that part of lands used solely for the purposes of a "religious organization" as defined in subsection 1(1) of the Religious Organizations' Lands Act, R.S.O. 1990, c. R.23 or on account of being Development by, on behalf of, or on lands owned by and used for the purposes of a Board of Education. 5.4 For the purpose of section 5.1(a) of this By-law, the issuance of the demolition permit and the actual demolition to the satisfaction of the Chief Building Official may post date the issuance of the building permit by no more than twenty-four (24) months. 5.5 Notwithstanding section 4.6 of this By-law, where, in respect of a Development, a. all requirements for the issuance of a building permit under subsection 8(2) of the Building Code Act have been satisfied before the date of an adjustment of Development Charges pursuant to section 4.6 of this By- law; and Watson & Associates Economists Ltd. PAGE G-22 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx b. an amount equal to the Development Charge in effect as at the date of payment has been paid before the date of the particular adjustment of Development Charges contemplated by paragraph (a) of this section 5.5, the applicable Development Charge is the amount contemplated by paragraph (b) of this section 5.5. 5.6 Where, as demonstrated to the satisfaction of the Chief Building Official, a Capital Levy was paid to the City in respect of a development approval on a Lot and a Development Charge is payable under this By-law as a result of Development on that same Lot, a credit will be provided against the Development Charge to the current Owner of that Lot upon that Owner making a written request to the City's Chief Building Official subject to the following: c. the amount of the credit shall be limited to the amount of the Capital Levy paid for services that are being funded under this By-law, d. no credit for payment of a Capital Levy was previously provided to any person in respect of any Development on that same Lot, whether heretofore or hereafter occurring, e. this credit shall not operate to reduce a Development Charge to less than zero, and f. no credit shall be given for any interest on or indexing of the Capital Levy paid; however, notwithstanding subsections (a) through (d) hereof, where, as demonstrated to the satisfaction of the Chief Building Official, a Capital Levy was paid to the City in respect of a development approval on a Lot and a Development Charge in relation to a Single Detached Dwelling is payable under this By-law as a result of Development on that same Lot, no Development Charge shall be payable subject to the following: a. no credit for payment of a Capital Levy was previously provided to any person in respect of any Development on that same Lot, whether heretofore or hereafter occurring, Watson & Associates Economists Ltd. PAGE G-23 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx b. this credit shall not operate to reduce a Development Charge to less than zero, c. no credit shall be given for any interest on or indexing of the Capital Levy paid, and d. the credit contemplated under this section 5.6 shall only be applied to the first sixteen (16) Lots that comply with the criteria prescribed by this section 4.4. 6. Front Ending Agreements 6.1 The City may enter into front-ending agreements with Owners in accordance with the provisions of the Act. 7. Schedules 7.1 The following schedules shall form part of this by-law: Schedule "A" - Components of Services and Class of Services Designated in subsections 2.1 and 2.2. Schedule "B" - Residential and Non-Residential Schedule of Development Charges. Schedule "C" - Rules for Application of the Development Charges By-law. Schedule "D" - Map of Core Area of the Downtown Oshawa Urban Growth Centre. Schedule "E" - Map of King Street/Thornton Road Intensification Area. Schedule "F" - Map of Shoulder Area of the Downtown Oshawa Urban Growth Centre. 8. Miscellaneous 11.1 All complaints pursuant to section 20 of the Act or section 257.85 of the Education Act, R.S.O. 1990, c. E.2 shall be heard by City Council sitting in Committee of the Whole. The City Council shall conduct hearings in accordance with the provisions of the Statutory Powers Procedure Act, R.S.O. 1990, c. S.22 and other applicable law. Watson & Associates Economists Ltd. PAGE G-24 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 11.2 This By-law shall come into force and take effect on July 1, 2024. 11.3 This By-law may be cited as the "Development Charges By-law". 11.4 By-law 60-2019 is hereby repealed on July 1, 2024. Watson & Associates Economists Ltd. PAGE G-25 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx By-law passed this twenty-fourth day of June, 2024. _______________________ Mayor Carter _______________________ City Clerk Watson & Associates Economists Ltd. PAGE G-26 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx SCHEDULE "A" TO BY-LAW DESIGNATED MUNICIPAL SERVICES AND CLASS OF SERVICES UNDER THIS BY- LAW City-Wide Services - Services Related to a Highway; - Fire Protection Services; - Parks and Recreation Services; - Library Services; - P.O.A. Services, including By-law Enforcement; - Stormwater Drainage and Control Services; and - Waste Diversion Services. City-Wide Class of Services - Growth-Related Studies. Watson & Associates Economists Ltd. PAGE G-27 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx SCHEDULE "B" TO BY-LAW SCHEDULE OF DEVELOPMENT CHARGES Single and Semi-Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units Industrial (per sq.ft. of Total Floor Area) Industrial (per sq.m. of Total Floor Area) Non-Industrial (per sq.ft. of Total Floor Area) Non-Industrial (per sq.m. of Total Floor Area) City-Wide Services: Services Related to a Highway 18,617 13,901 11,705 7,350 6,011 4.92 52.96 13.12 141.22 Fire Protection Services 1,372 1,024 862 541 443 0.37 3.98 0.97 10.49 Parks and Recreation Services 14,649 10,938 9,210 5,783 4,730 0.73 7.86 1.95 20.99 Library Services 1,637 1,222 1,029 646 529 0.08 0.86 0.22 2.37 Provincial Offences Act including By-Law Enforcement 50 37 31 20 16 0.01 0.11 0.04 0.43 Stormwater Drainage and Control Services 1,570 1,172 987 620 507 1.11 11.95 1.09 11.73 Waste Diversion Services 41 31 26 16 13 0.01 0.11 0.03 0.32 City-Wide Class of Services: Growth-Related Studies 291 217 183 115 94 0.07 0.75 0.19 2.05 Total City-Wide Services and Class of Services $38,227 $28,542 $24,033 $15,091 $12,343 $7.30 $78.58 $17.61 $189.61 RESIDENTIAL Services & Class of Services Non-Residential Watson & Associates Economists Ltd. PAGE G-28 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx SCHEDULE "C" TO BY-LAW Rules for Application of the Development Charges By-law 1. Where a Development is proposed which requires any of the actions set out in section 3.3 of this By-law, the rules in this Schedule shall be applied to determine the application of this By-law. These rules apply to all Development. 2. The Development must be reviewed to determine whether it is exempt in whole or in part pursuant to one or more provisions of this By-law. 2.1 Notwithstanding rule 2, where the development of land results from the approval of a Site Plan or Zoning By-law Amendment received and approved between January 1, 2020, and June 5, 2024, and the approval of the application occurred within 2 years of building permit issuance, the Development Charges under Section 2 shall be calculated based on the rates set out in Schedule "B" on the date of the planning application, including interest. Where both planning applications apply, Development Charges shall be calculated on the rates, including interest, set out in Schedule "B" on the date of the later planning application, the Development Charges shall be calculated based on the rate in effect on the date of the Site Plan or Zoning By-law Amendment application, including interest. 2.2 Notwithstanding rule 2, where the development of land results from the approval of a Site Plan or Zoning By-law Amendment received on or after January 1, 2020, where the approval of the application occurred on or after June 6, 2024, and the approval of the application occurred within 18 months of building permit issuance, the Development Charges under Section 2 shall be calculated based on the rates set out in Schedule "B" on the date of the planning application, including interest. Where both planning applications apply, Development Charges shall be calculated on the rates, including interest, set out in Schedule "B" on the date of the later planning application, the Development Charges shall be calculated based on the rate in effect on the date of the Site Plan or Zoning By-law Amendment application, including interest. Watson & Associates Economists Ltd. PAGE G-29 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 3. The amount in Schedule "B", must be examined to determine the effect of any indexing which has occurred pursuant to section 4.6 of this By-law. The amount to apply must reflect any such indexing. 4. The amount in Schedule "B" does not need to be adjusted in accordance with paragraph 5 (1) 6 of the Act because the Study has taken those considerations into account in determining the amount in Schedule "B". 5. The Development must be classified as Residential, Non-Residential, or mixed- use Development. 6. For Residential Development, the total number and type of Dwelling Units set out in Schedule "B" must be determined. The rates as shown in Schedule "B" (adjusted, if applicable, in accordance with rule 3) is then applied to the number of Dwelling Units contemplated by the Development to determine the total amount of Residential Development Charges payable, subject to an exemption or discount as per this by-law or the Act, applies. 7. For Non-Residential Development, the Gross Floor Area of the Development must be determined. The rates as shown in Schedule "B" (adjusted, if applicable, in accordance with rule 3) is then applied to the Gross Floor Area contemplated by the Development to determine the total amount of Non- Residential Development Charges payable, subject to an exemption or discount as per this by-law or the Act, applies. 8. For mixed Residential and Non-Residential Development, Development Charges are determined by applying each of rules 6 and 7 to each part of the Development comprising, respectively, Residential Development and Non- Residential Development. 9. The Development must be examined to determine whether any credits contemplated by article 5 of this By-law. If so, such credits are applied against the total Development Charges payable pursuant to rules 6, 7 or 8, as applicable. 10. Subject to the provisions of the Act, the City may enter into an agreement to permit an Owner to perform work that relates to a service or class of services to which this By-law relates. In such circumstances, the City shall give the Owner a credit toward the Development Charge subject to the provisions of the Act. Watson & Associates Economists Ltd. PAGE G-30 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 11. A Development Charge shall be paid on or before the date that a building permit is issued pursuant to the Building Code Act in relation to a building or structure on land to which a Development Charge applies. No building permit shall be issued until the Development Charge is paid. Where the Development Charge is payable pursuant to section 4.8 of this By-law, the Development Charge must be paid prior to the completion of the applicable action, or actions referenced in section 3.3 of this By-law. For this purpose, the date of completion of the approvals contemplated by paragraph 3.3(d) of this By-law shall be the date on which all agreements imposed as a condition to an approval pursuant to subsection 51(26) of the Planning Act have been duly executed by all parties to such agreements. 11.1 Notwithstanding rule 11, development charges for rental housing and institutional developments are due and payable in 6 installments commencing with the first installment payable on the date of occupancy, and each subsequent installment, including interest, payable on the anniversary date each year thereafter. 12. If any or all of a Development Charge remains unpaid after it has become payable, the amount unpaid shall be added to the tax roll for the land which was the subject of the Development and shall be collected in the same manner as taxes. 13. The City's Treasurer shall collect all Development Charges imposed by this By- law when those Development Charges are due and payable, together with all development charges payable upon the issuance of a building permit imposed in accordance with any development charge by-law passed by the Regional Municipality of Durham, and by any Board of Education. 14. Where a complaint results in a refund or when the City has determined that a refund is due, the City's Treasurer shall calculate the amount of any overpayment to be refunded to any Owner who made the payment, and the refund shall be paid with interest to be calculated from the date on which the overpayment was collected to the date on which the refund is paid. Watson & Associates Economists Ltd. PAGE G-31 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx 15. The interest rate to be used for any refund shall be the Bank of Canada rate in effect on the later of the date that this By-law comes into force, or the date of the most recent quarterly adjustment as set out in rule 16. 16. For the purpose of determining the quarterly adjustments contemplated by rule 15, the Bank of Canada interest rate in effect on the date that this By-law comes into force shall be adjusted on the first day of January, 2025 to the rate established by the Bank of Canada on that date, and shall be adjusted quarter- yearly thereafter on the first business day of each of April, July, October and January, to the rate established by the Bank of Canada on the day of the adjustment. 17. Interest for the purposes of rule 2.1, 2.2, and 11.1 shall be determined as prescribed in the Development Charges Act, as amended from time to time. Watson & Associates Economists Ltd. PAGE G-32 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx SCHEDULE "D" TO BY-LAW Map of Core Area of the Downtown Oshawa Urban Growth Centre Watson & Associates Economists Ltd. PAGE G-33 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx SCHEDULE "E" TO BY-LAW Map of King Street/Thornton Road Intensification Area Watson & Associates Economists Ltd. PAGE G-34 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\2024 Development Charges Background Study (Final) - Consolidated Report.docx SCHEDULE "F" TO BY-LAW Map of Shoulder Area of the Downtown Oshawa Urban Growth Centre Watson & Associates Economists Ltd. 905-272-3600 [email protected] June 19, 2024 Addendum to the 2024 Development Charges Background Study City of Oshawa ________________________ For Public Circulation and Comment Watson & Associates Economists Ltd. H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Table of Contents Page 1. Summary of Revisions to the April 25, 2024 Development Charges Background Study ........................................................................................... 1-1 2. Addendum ........................................................................................................ 2-3 2.1 Refinements to Services Related to a Highway ...................................... 2-3 2.2 Refinements to Parks and Recreation Services ...................................... 2-5 2.3 Refinements to Capital Project Costs for Stormwater Drainage and Control Services ..................................................................................... 2-7 2.4 Growth-Related Studies .......................................................................... 2-7 2.5 Impacts on the Calculated D.C. ............................................................ 2-10 3. Changes to the D.C.B.S................................................................................... 3-1 4. Process for Adoption of the D.C. By-law ....................................................... 4-1 Appendix A Amended Pages .................................................................................. A-1 Watson & Associates Economists Ltd. PAGE 1-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx 1. Summary of Revisions to the April 25, 2024 Development Charges Background Study Commensurate with the provisions of the Development Charges Act (D.C.A.), 1997, the City of Oshawa (City) has undertaken a Development Charges Background Study (D.C.B.S.) and has distributed the study and draft by-law to the public. The following provides a summary of the key dates in the Development Charges (D.C.s) by-law process: - April 12, 2024 - Council meeting to confirm D.C. polices; - April 25, 2024 - Release D.C.B.S. and draft by-law; - April 29, 2024 - Council meeting to present the D.C.B.S. and draft by-laws; - May 24, 2024 - Public meeting of Council; - June 24, 2024 - Anticipated passage of D.C. By-law; and - July 1, 2024 - Anticipated date of by-law enactment. On June, 6, 2024, the Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) received Royal Assent and includes the following changes to the D.C.A.: - The removal of the Mandatory Phase-in for D.C. by-laws passed after Bill 185 comes into effect; - A reduction to the D.C. rate freeze timelines for developments proceeding though site plan and zoning by-law amendment applications under the Planning Act. Charges are currently held at rates in place on the date the application is made until building permit issuance, provided the building permit is issued within two (2) years of the approval of the application. This time period is reduced to 18 months under Bill 185. Note that the two-year timeline will still apply to applications received between January 1, 2020, and prior to Bill 185 receiving Royal Assent (i.e., June 6, 2024); - Inclusion of growth-related studies, including the D.C. background study, as a D.C.-eligible costs; - A provision to permit the repeal of the expiry date for existing D.C. by-laws; - To allow minor amendments related to the imposition of studies, removal of the mandatory phase-in, and extension of by-law expiry dates (subject to the 10-year Watson & Associates Economists Ltd. PAGE 1-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx limitations provided in the D.C.A.) to be undertaken for by-laws passed after November 28, 2022, and prior to Bill 185 taking effect (i.e., June 6, 2024); and - To modernize public notice requirements, to allow municipalities to post D.C. public notices on municipal websites where newspapers of general circulation are not available. The purpose of the addendum to the April 25, 2024 D.C.B.S. is to include D.C. eligible costs for growth-related studies, reflect other changes in the D.C.A. as per Bill 185 (such as the changes to the D.C. "freeze" time period, and the removal of the statutory phase-in of the charge in new by-law), provide for minor corrections to historical service standard calculations for Services Related to a Highway and Parks & Recreation services, correct an error in the Stormwater Drainage and Control Services D.C. calculations, collapse the draft by-laws for each service into one by-law for all services/class of services, and other minor housekeeping amendments. The refinements, as they relate to the calculation of the D.C.s are detailed in this report, and will form part of the D.C.B.S. for Council's consideration and approval prior to adoption of the D.C. By-law. Additionally, the April 25, 2024 D.C.B.S. included a draft by-law for each service, which was proposed to address the mandatory phase-in of a D.C. over the first five years of the by-law. This was to ensure that if a future by-law amendment was required, that only the service(s) being updated would potentially be subject to the mandatory phase-in requirements and the other services included in other by-laws would not be affected. With the D.C.A. being amended by Bill 185 to remove the mandatory phase-in of a new D.C. by-law, the City is choosing to incorporate all services and class of services into one by-law. As such, a revised by-law is contained herein, which also embraces other changes to the D.C.A. as per Bill 185 related to the timing of the rate freeze, and removal of the mandatory phase-in. Watson & Associates Economists Ltd. PAGE 2-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx 2. Addendum This section of the addendum report provides an explanation for the above-noted refinements. 2.1 Refinements to Services Related to a Highway The D.C.A. provides that the increase in need for service is limited by the average historical level of service calculated over the 15-year period preceding the preparation of the D.C. background study. A refinement required to the historical level of service calculation for Services Related to a Highway, specifically related to roadways, sidewalks, and multi-use paths, inventory, has been made to correct for a calculation error. Since the release of the D.C. Background Study, City staff have identified that the number of sidewalks and multi-use paths was overstated based on the inclusion of those within local roads, which are considered a local service requirement of developing landowners. These assets have now been removed. This update reduces the historical service standard maximum ceiling for this component by approximately $209.4 million (from $750.0 million to $540.52 million). When combined with all historical service standard components for Services Related to a Highway, the overall maximum D.C. recoverable capital costs for this service have decreased to a maximum ceiling of approximately $900.3 million. Table 2-1 identifies the updated 15-year historical level of service for roadways, sidewalks, and multi-use paths. The D.C. recoverable costs for Services Related to a Highway total $797.8 (approximately $102.5 million below the revised maximum ceiling) and as such are not affected by this change and the calculated D.C. rates are not impacted. Watson & Associates Economists Ltd. PAGE 2-4 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Table 2-1 Services Related to a Highway - Roadways, Sidewalks and Multi-Use Paths Unit Measure: km of Roadways, Sidewalks, and Multi-Use Paths Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/km) Arterials A/B 15 15 15 15 15 15 16 16 16 16 16 16 16 17 17 $13,360,000 Arterials C 24 24 25 25 27 27 28 29 30 30 31 32 32 33 33 $11,810,000 Rurals 37 37 37 37 37 38 38 38 38 38 34 34 36 36 36 $7,210,000 Regional Road (Arterial A/B) Sidewalks 85 85 85 86 86 86 86 86 86 86 86 86 87 87 87 $519,800 Regional Road (Arterial A/B) Multi-Use Paths 5 5 5 5 5 5 5 5 5 5 5 9 9 10 10 $578,100 Total 166 166 167 169 171 172 174 175 176 176 173 177 180 183 183 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0011 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 15 Year Average 2009 to 2023 Quantity Standard 0.0011 Quality Standard $4,846,182 Service Standard $5,331 D.C. Amount (before deductions) 27 Year Forecast Population 101,395 $ per Capita $5,331 Eligible Amount $540,516,466 Watson & Associates Economists Ltd. PAGE 2-5 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx 2.2 Refinements to Parks and Recreation Services A refinement to the historical level of service calculation for Parks and Recreation Services is required, specifically for the parkland development component of the service standard. Since the release of the D.C. Background Study, City staff have identified that the number of acres for Second Marsh was overstated, which included the acreage associated with open water, therefore, the acreage has been reduced accordingly. This update reduces the historical service standard maximum ceiling for this component by approximately $1.22 million (from $28.40 million to $27.18 million). When combined with all historical service standard components for Parks and Recreation Services, the overall maximum D.C. recoverable capital costs for this service have decreased to a maximum ceiling of approximately $238.5 million. Table 2- 2 reflects the updated 15-year historical level of service for parkland development. The D.C. eligible costs for Parks and Recreation Services ($186.3 million, excluding interest costs) remains approximately $52.2 million below the revised maximum ceiling; therefore, the calculated D.C. rates are not impacted. Watson & Associates Economists Ltd. PAGE 2-6 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Table 2-2 Parks and Recreation - Parkland Development Unit Measure: Acres of Parkland Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Acre) Neighbourhood 329 330 332 343 343 352 352 362 363 363 363 363 369 369 369 $106,000 Community 178 188 188 212 212 212 212 212 212 212 212 212 212 229 263 $125,000 City 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 $155,000 Regional - Active Use 95 95 95 95 95 95 95 95 95 95 95 95 95 95 95 $155,000 Regional - Passive Use 199 199 199 199 199 199 199 199 199 199 199 199 199 199 199 $95,000 Parkette 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 $254,000 Second Marsh 220 220 220 220 220 220 220 220 220 220 220 220 220 220 220 $46,000 Open Space - Woodlot (Highgate Park) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $1,122 Open Space - Central Valley Natural Park 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 $49,000 Total 1,103 1,114 1,116 1,151 1,151 1,160 1,161 1,170 1,171 1,171 1,171 1,171 1,177 1,196 1,229 Population 147,362 148,130 149,607 150,781 152,320 154,315 156,158 159,458 162,708 167,544 170,758 172,565 175,383 179,238 183,906 Per Capita Standard 0.0075 0.0075 0.0075 0.0076 0.0076 0.0075 0.0074 0.0073 0.0072 0.0070 0.0069 0.0068 0.0067 0.0067 0.0067 15 Year Average 2009 to 2023 Quantity Standard 0.0072 Quality Standard $102,239 Service Standard $736 D.C. Amount (before deductions) 10 Year Forecast Population 36,928 $ per Capita $736 Eligible Amount $27,183,439 Watson & Associates Economists Ltd. PAGE 2-7 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx 2.3 Refinements to Capital Project Costs for Stormwater Drainage and Control Services The D.C.A. requires that the capital costs necessary to provide the increased services be reduced by capital grants, subsidies, and other contributions made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. Since the release of the D.C. Background Study, City staff have identified a contribution deduction, from Metrolinx, that incorrectly applied to both a project under the Services Related to a Highway calculations and the stormwater project #33 (Rail structure expansion Metrolinx - 390M East of Simcoe St. South). This stormwater project was identified to have a gross cost of $14,700,000 and a deduction of $6,750,000 was originally included for this project to reflect a contribution. However, the same contribution was also deducted against the road component of the project (i.e., Project No. 11 Albert Street, under Services Related to a Highway). The revised total growth-related costs to be recovered through the D.C. calculations for Stormwater Drainage and Control Services has therefore been increased by $6,750,000, providing a revised net cost for inclusion in the D.C. calculations for Stormwater Drainage and Control Services of approximately $77.5 million. Overall, the above refinement has increased the calculated D.C. for Stormwater Drainage and Control Services. The D.C. for a single detached residential dwelling unit has increased by $154 (from $1,416 to $1,570). For non-residential development, the D.C. for commercial and institutional uses has increased by $1.40 per sq.m. of gross floor area (G.F.A.), from $10.33 to $11.73 and the D.C. for industrial uses has increased by $0.43 per sq.m. of G.F.A. (from $11.52 to $11.95). Note that this error was discovered prior to the Public Meeting, and was therefore, noted during the presentation at the Public Meeting of May 24, 2024. 2.4 Growth-Related Studies The D.C.A. permits the inclusion of studies undertaken to facilitate the completion of the City's capital works program. These studies have been included within a Growth- Watson & Associates Economists Ltd. PAGE 2-8 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Related Studies class of services, based on the eligible D.C. services to which the studies relate. Table 2-3 summarizes the studies that have been included within the class of services with the D.C.B.S., including the anticipated timing, gross capital costs, deductions related to D.C. ineligible services, benefit to existing, and the net D.C. eligible costs included in the calculation of the charge. Watson & Associates Economists Ltd. PAGE 2-9 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Table 2-3 Growth-Related Studies Class of Services 2024 to 2033 1 Development Charge Background Study Amendment 2028-2029 All Services 200,000 - - 200,000 - - 200,000 160,793 39,207 2 Development Charge Background Study Update 2033 All Services 200,000 - - 200,000 - - 200,000 160,793 39,207 3 Official Plan 2025-2027 All Services 450,000 - 45,000 405,000 225,000 - 180,000 144,714 35,286 4 Zoning Study 2028-2030 All Services 450,000 - 45,000 405,000 225,000 - 180,000 144,714 35,286 5 Part II Plan Studies (whitbelt expansion areas) 2027-2030 All Services 700,000 - 70,000 630,000 - - 630,000 506,501 123,499 6 Airport Land Use Redevelopment Study 2030-2033 All Services 500,000 - 50,000 450,000 250,000 - 200,000 160,793 39,207 7 Fire Master Plan 2025 Fire Protection Services 200,000 - - 200,000 50,000 - 150,000 117,000 33,000 8 Fire Master Plan 2030 Fire Protection Services 200,000 - - 200,000 50,000 - 150,000 117,000 33,000 9 Grade Separation Study 2027-2028 Services Related to a Highway 87,000 - - 87,000 21,800 - 65,200 50,204 14,996 10 Integrated Transportation Master Plan Update 2024-2025 Services Related to a Highway 650,000 - - 650,000 162,500 - 487,500 375,375 112,125 11 Integrated Transportation Master Plan Update 2029-2030 Services Related to a Highway 650,000 - - 650,000 162,500 - 487,500 375,375 112,125 12 Operations Needs Study 2033 Services Related to a Highway 100,000 - - 100,000 50,000 - 50,000 38,500 11,500 13 Parks, Recreation, Library and Culture Facility Needs Assessment Update (75%) 2028-2030 Parks and Recreation Services 112,500 - - 112,500 56,300 - 56,200 53,390 2,810 14 Harbour Park Masterplan 2028-2033 Parks and Recreation Services 392,000 - - 392,000 196,000 - 196,000 186,200 9,800 15 Parks, Recreation, Library and Culture Facility Needs Assessment Update (25%) 2028-2030 Library Services 37,500 - - 37,500 18,800 - 18,700 17,765 935 16 Storm Water Management Best Practices Study/Master Plan 2024-2025 Stormwater Services 500,000 - - 500,000 125,000 - 375,000 288,750 86,250 17 Storm Water Management Best Practices Study/Master Plan Update 2029-2030 Stormwater Services 500,000 - - 500,000 125,000 - 375,000 288,750 86,250 18 Water Resources Public Education 2027-2028 Stormwater Services 50,000 - - 50,000 38,800 - 11,200 8,624 2,576 19 Low Impact Development (LID) Program 2025-2033 Stormwater Services 150,000 - - 150,000 - - 150,000 115,500 34,500 Reserve Fund Adjustment 261,349 - 261,349 - 261,349 207,880 53,469 Total 6,390,349 - 210,000 6,180,349 1,756,700 - 4,423,649 3,518,621 905,028 Service to Which Project Relates Proj. No. Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions (to recognize benefit to non- D.C. services) Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Residential Share Non- Residential Share Potential D.C. Recoverable Cost Watson & Associates Economists Ltd. PAGE 2-10 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx In aggregate, the study costs that have been identified total approximately $6.39 million, including $261,349 for the existing D.C. reserve fund deficit for growth-related studies. Deductions of approximately $1.76 million for the benefit to existing share and $210,000 to recognize the cost which benefit non-D.C.-eligible services, have been made. The net D.C. eligible costs for studies that have been considered with the calculation of the charge totals approximately $4.42 million. These costs have been allocated between residential and non-residential development based on the same shares identified for each applicable service. This results in an overall residential share of approximately $3.53 million (80%), and non-residential share of approximately $0.89 million (20%). 2.5 Impacts on the Calculated D.C. Based on the changes identified, the amended schedule of charges is presented in Table 2-4. Watson & Associates Economists Ltd. PAGE 2-11 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Table 2-4 Amended Schedule of D.C.s Single and Semi-Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units Industrial (per sq.ft. of Total Floor Area) Industrial (per sq.m. of Total Floor Area) Non-Industrial (per sq.ft. of Total Floor Area) Non-Industrial (per sq.m. of Total Floor Area) City-Wide Services: Services Related to a Highway 18,617 13,901 11,705 7,350 6,011 4.92 52.96 13.12 141.22 Fire Protection Services 1,372 1,024 862 541 443 0.37 3.98 0.97 10.49 Parks and Recreation Services 14,649 10,938 9,210 5,783 4,730 0.73 7.86 1.95 20.99 Library Services 1,637 1,222 1,029 646 529 0.08 0.86 0.22 2.37 Provincial Offences Act including By-Law Enforcement 50 37 31 20 16 0.01 0.11 0.04 0.43 Stormwater Drainage and Control Services 1,570 1,172 987 620 507 1.11 11.95 1.09 11.73 Waste Diversion Services 41 31 26 16 13 0.01 0.11 0.03 0.32 City-Wide Class of Services: Growth-Related Studies 291 217 183 115 94 0.07 0.75 0.19 2.05 Total City-Wide Services and Class of Services $38,227 $28,542 $24,033 $15,091 $12,343 $7.30 $78.58 $17.61 $189.61 RESIDENTIAL Services & Class of Services Non-Residential Watson & Associates Economists Ltd. PAGE 2-12 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx By comparison to the charges presented in the April 25, 2024, D.C.B.S., the amended charge for a single and semi-detached residential unit would increase by $445 (+1.18%) from $37,782 to $38,227. The non-residential charges per sq.m. represent a 1.79% increase (+$3.34) over the April 25, 2024, charges of $186.27 for commercial and institutional developments. For industrial development, the amended charges represent a 1.53% increase (+$1.18) over the April 25, 2024, charges of $77.39. Tables 2-5 to 2- 7 provide a comparison of the updated charges presented herein to the current charges and the charges in the April 25, 2024, D.C.B.S. The comparison tables are provided for a single-detached residential dwelling unit (Table 2-5) and per sq.m. of (G.F.A.) for non- commercial/institutional development (Table 2-6) and industrial development (Table 2- 7). Table 2-5 Comparison of Current and Calculated D.C.s - Single-detached Dwelling Services/Class of Services Current Calculated as Per D.C. Study (April 25, 2024) Calculated as per Addendum Report City-Wide Services/Classes: Services Related to a Highway 19,690 18,617 18,617 Fire Protection Services 849 1,372 1,372 Parks and Recreation Services 13,032 14,649 14,649 Library Services 555 1,637 1,637 Provincial Offences Act including By-Law Enforcement - 50 50 Stormwater Drainage and Control Services 1,389 1,416 1,570 Waste Diversion Services 25 41 41 Growth-Related Studies 51 - 291 Total City-Wide Services/Class of Services $35,591 $37,782 $38,227 Watson & Associates Economists Ltd. PAGE 2-13 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Table 2-6 Comparison of Current and Calculated D.C.s - Non-residential (Commercial/Institutional) Table 2-7 Comparison of Current and Calculated D.C.s - Non-residential (Industrial) Services/Class of Services Current Calculated as Per D.C. Study (April 25, 2024) Calculated as per Addendum Report City-Wide Services/Classes: Services Related to a Highway 162.12 141.33 141.22 Fire Protection Services 7.00 10.49 10.49 Parks and Recreation Services 6.09 20.99 20.99 Library Services 0.26 2.37 2.37 Provincial Offences Act including By-Law Enforcement - 0.43 0.43 Stormwater Drainage and Control Services 6.67 10.33 11.73 Waste Diversion Services 0.20 0.32 0.32 Growth-Related Studies 0.22 - 2.05 Total City-Wide Services/Class of Services $182.56 $186.27 $189.61 Services/Class of Services Current Calculated as Per D.C. Study (April 25, 2024) Calculated as per Addendum Report City-Wide Services/Classes: Services Related to a Highway 61.59 52.96 52.96 Fire Protection Services 2.62 3.98 3.98 Parks and Recreation Services 6.09 7.86 7.86 Library Services 0.26 0.86 0.86 Provincial Offences Act including By-Law Enforcement - 0.11 0.11 Stormwater Drainage and Control Services 6.06 11.52 11.95 Waste Diversion Services 0.09 0.11 0.11 Growth-Related Studies 0.09 - 0.75 Total City-Wide Services/Class of Services $76.80 $77.39 $78.58 Watson & Associates Economists Ltd. PAGE 3-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx 3. Changes to the D.C.B.S. Based on the foregoing, the following revisions are made to the April 25, 2024 D.C.B.S. Accordingly, the amended pages are appended to this report: - Table of Contents - Updated to reflect the changes summarized below; - Executive Summary (pages ii to x) - Updated to reflect the revised charges, inclusion of study costs, and the legislative changes; - Pages 1-2 to 1-3 - Updated to reflect Public Meeting, By-law passage notice, and Addendum release date; - Pages 1-8 to 1.11 - Section 1.3 updated to reflect legislative changes; - Page 2-1 - Section 2.2 updated to reflect the enactment of Bill 185 to remove note related to study costs (note all other pages in Chapter 2 have shifted slightly due to the removal of text in Section2.2); - Pages 4-6 to 4-7-Table 4-1B, and Section 4.5 updated to reflect the eligible funding of study costs; - Page 4-13 - Section 4.14 removed to reflect legislative changes (removal of phase-in) and section 4.15 has been renumbered accordingly; - Page 5-1 - Updated to identify Class of Services in title of section 5.2 and in the text following the title to indicate that Growth-Related Studies are part of the costs embraced over the 10-year forecast period; - Page 5-2 - Section 5.2.2, updated to reflect the error in the historical level of service calculation for parkland development and the overall level of service ceiling for Parks and Recreation Services; - Pages 5-5 to 5-16 - Updated to add Section 5.2.6 to include growth-related study costs in the calculation of the charge, and adjust page numbering for the balance of the chapter due to this additional section, including adding the list of growth- related study costs in Table 5-6 (including additional pages as required); - Pages 5-14 to 5-23 - Updated historical level of service for Services Related to a Highway in section 5.3.1 as well as for the revised Stormwater Services capital program, in section 5.3.2, and updated page numbering (including additional pages) due to the additional pages added previously related to growth-related studies; - Pages 6-1 to 6-6 - Chapter 6 textual updates to include growth-related study costs and the revised Stormwater Services capital program in the calculation of the charge and updated page numbering (including additional pages); Watson & Associates Economists Ltd. PAGE 3-2 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx - Pages 7-2 to 7-9 o Section 7.2 updated for recommendation related to a city-wide basis for all services and class of services and the use of one by-law for all services and class of services; o Section 7.3.2 updated to identify the allocation of growth-related study costs between residential and non-residential development; o Section 7.3.5 removed to reflect legislative changes related to the removal of the mandatory phase-in) and section 7.3.6 to 7.3.8 have been renumbered accordingly; o Section 7.3.6 updated to reflect legislative changes related to the D.C. "freeze" timeframe; o Section 7.4.1 updated to include Growth-Related Studies as class of service that is recommended to be deposited into its own D.C. reserve fund; and o Section 7.5 updated to reflect this addendum. - Page B-2 - Updated Schedule B-1 to reflect changes to the summary of the level of service ceiling by service; - Page B-3 - Updated Schedule B-2 to reflect changes to the historical service standard for roads and related; - Page B-12 - Updated Schedule B-10 to reflect changes to the historical service standard for parkland development; - Page C-3 - Updated Table C-2 to reflect changes to the operating and capital expenditure impact for future capital expenditures due to the inclusion of Growth- Related Studies; - Pages D-5 and D-10 - Update tables to include Growth-Related Studies; - Page E-5 - Minor textual refinement to the local service policy related to parkland development, for clarity; - Pages F-4 and F-5 - Updated asset management calculations as a result of refining the Stormwater Services capital program; - Appendix G - Updated proposed by-law to reflect the inclusion of study costs as a class of services, and other legislative changes, due to the enactment of Bill 185. Further, as noted all services and class of services will now be contained in one by-law; Watson & Associates Economists Ltd. PAGE 3-3 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx - Appendices H through M, containing the draft by-laws for individual services, are removed, as all services and class of services will now be contained in one by- law (as set out in revised Appendix G); and - Throughout the report - updated page numbering, including additional pages, due to this addendum report, where required. Watson & Associates Economists Ltd. PAGE 4-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx 4. Process for Adoption of the D.C. By-law The revisions provided herein form the basis for the D.C. by-law and will be incorporated into the D.C.B.S. to be provided to Council prior to Council's consideration and adoption of the proposed D.C. by-law. If Council is satisfied with the above noted changes to the D.C.B.S. and D.C. by-law, then prior to by-law passage Council must: - Approve the D.C.B.S., as amended; - Determine that no further public meetings are required on the matter; and - Adopt the new D.C. by-law. Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\Oshawa\2024 DC & CBC & Parkland\Report\Addendum Report\Oshawa Addendum #1 Report.docx Appendix A Amended Pages (Inserted Throughout the Body of Report)