This is the exact embedded text of the captured official document.
Snapshot 91ead83aaa69 · verified 2026-10-19 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Setback from the Trans Canada Pipeline (Section 72)
72.
Despite any other provision to the contrary, buildings and structures must be set back from
a lot line abutting the O1O Subzone which contains the TransCanada Pipeline a minimum
distance of:
(1)
for any principal building or structure, seven metres from a rear lot line; and
(2)
for any building or structure, three metres from an interior side lot line.