City of Ottawa Zoning By-law 2008-250: Utility Installations (Sec. 91)

Ottawa, Ontario · No. 2008-250 · summary & facts

This is the exact embedded text of the captured official document. Snapshot a394df072096 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Part 3 - Specific Use Provisions (Sections 80-93) 3 - 1 City of Ottawa Zoning By-law 2008-250 Consolidation Utility Installations (Section 91) 91. (1) A utility installation is permitted in all zones other than EP, ME or MR subject to the following provisions: (a) any building containing the utility installation must comply with zone setback provisions and maximum building height; (b) no offices, maintenance uses or indoor or outdoor storage facilities are permitted except where otherwise allowed in the zone; and (c) no dust, smoke, noise or odour may be produced that is likely to be dangerous or obnoxious. (d) electrical substations are not permitted within the flood plain overlay; (e) poles, pedestals, drop lines, cables, pipelines, kiosks, cabinets and other similar equipment used to provide services from a utility installation to a use, building or structure are not considered to constitute a utility installation and are not subject to the provisions of this By-law; (By-law 2024-563) (f) utility installations that are subject to the requirements of the Environmental Assessment Act are permitted in all zones, and are not subject to the provisions of this Zoning By-law. (2) There are no minimum lot area or minimum lot width requirements for a utility installation. (3) Despite Section 20, parking need only be provided on the basis of the actual gross floor area of a building associated with the utility installation. (4) Antenna systems, including satellite dishes, are not subject to the regulations of this Zoning By-law, but are subject to the City's Municipal Concurrence and Public Consultation Process for Antenna Systems. (By-law 2013-224) (5) Reserved for future use (6) Reserved for future use (7) Where a maximum yard setback and a minimum required setback from hydro infrastructure both apply, the maximum setback in the zoning by-law is deemed to be increased to the minimum setback required from hydro infrastructure. (By-law 2024-563) Accessory Battery Energy Storage System (Section 91-A) 91-A (1) An Accessory Battery Energy Storage System is permitted: (By-law 2025-072) (a) In the AG zone, a battery energy storage system is limited to 2% of the total lot area, to a maximum of 1 hectare. (By-law 2025-072) (b) In residential zones, installed in accordance with the Ontario Electrical Code, must be completely enclosed within a building or other accessory structure or mounted on the exterior surface of a building, outside the flood plain overlay. (By-law 2025- 072) (c) In any non-residential zone, other than the EP, ME, and MR zones, and outside the flood plain overlay, either enclosed within a building or other accessory structure or unenclosed, subject to the following: (By-law 2025-072) (i) they may not exceed 20% of the total lot area or 1 hectare, whichever is the lesser; (By-law 2025-072) Part 3 - Specific Use Provisions (Sections 80-93) 3 - 2 City of Ottawa Zoning By-law 2008-250 Consolidation (ii) they must be set back a minimum of 10 m from any lot line, and a 1.5 m opaque screen must be provided from a public street or a residential use on an abutting lot; (By-law 2025-072) (iii) unenclosed rooftop systems must be set back a minimum of 1.5 m from any exterior wall of the building, and may not project more than 1.5 m above the maximum building height. (By-law 2025-072)