By-law 2026-03 Amend Water Regulation By-law 2025-08 with 2026 Rates and Fees

Penetanguishene, Ontario · No. 2026-03 · adopted 2026-01-21 · summary & facts

This is the exact embedded text of the captured official document. Snapshot fb96e7009097 · verified 2026-10-18 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

THE CORPORATION OF THE TOWN OF PENETANGUISHENE BY-LAW NUMBER 2026-03 Being a By-Law to Amend the Town of Penetanguishene Water Regulation By- law 2025-08 with 2026 Rates and Fees WHEREAS pursuant to section 9 of the Municipal Act, 2001 S.O. 2001, chapter 25 a municipality has the capacity, rights, powers and privileges of a natural person for the purpose of exercising its authority under this or any other Act; AND WHEREAS pursuant to section 8. (1) of the Municipal Act, 2001 S.O. 2001, chapter 25 the powers of a municipality under this or any other Act shall be interpreted broadly so as to confer broad authority on the municipality to enable the municipality to govern its affairs as it considers appropriate to enhance the municipality's ability to respond to municipal issues; AND WHEREAS section 11 of the Municipal Act, 2001, as amended, authorizes a lower tier municipality to pass by-laws with respect to public utilities; AND WHEREAS the Town of Penetanguishene By-law 2025-08, Section 20 states that Schedules A-A, A-B, A-C, B, C and D shall form part of this By-law; AND WHEREAS it is deemed necessary to amend Schedule A-A Schedule of Fees, Schedule A-B Water Meter Sizing and Cost, and Schedule A-C Schedule of Rates; NOW THEREFORE the Council of the Town of Penetanguishene hereby enacts as follows: 1. THAT Schedule A-A Schedule of Fees, Schedule A-B Water Meter Sizing and Cost, and Schedule A-C Schedule of Rates of By-law 2025-08 are hereby repealed and replaced with Schedule A-A, A-B, and A-C attached hereto and will form part of this By-law, as amended; 2. AND THAT all other provisions of By-law 2025-08 remain in full force and effect. 3. AND FINALLY THAT By-law 2026-03 take force and effect on January 1, 2026. BY-LAW read a first, second and third time and finally passed by Council this 21st day of January, 2026. _____________________________ MAYOR Doug Rawson _____________________________ CLERK Kelly Cole By-law #2026-03 Schedule A-A 2026 Schedule of Fees Section Service Fee Application Form Required Responsible Department 1 5.1 Temporary connection for use in residential construction $199.68 flat rate (indexed annually) plus $193.87 for each extension (indexed annually) Application for water service Public Works 2 6.1 Use of a Municipally- owned fire hydrant for water supply $50 per connection per day plus unit charge per m3 of water obtained Fire hydrant use permit Public Works 3 6.11 Private Fire Hydrant $33.55/month (indexed annually) Public Works 4 9.1 b)i. Bulk water purchase Commercial metered consumption rate Bulk Water Station Fee $4.07/m3 (indexed annually) Application for the purpose of bulk water purchase Public Works 5 9.5 Fire protection sprinkler system $41.76/month (indexed annually) Public Works 6 10.10 Reconsideration of large water consumption billing $20.00 Appeal in writing Finance 7 10.7 a) Test water meter at owner's request $75.00 Written request Public Works 8 11.1 Water service installation fee Actual cost with a deposit of $7,500.00 Application for water service Public Works 9 11.2 Turning water supply on or off other than a new service 7:00 am to 3:30 pm Monday to Friday $50.00 All other days/times $225.00 Public Works 10 11.5 Water meter removal and reinstallation $100.00 removal $100.00 inspection Public Works 11 11.7 Final Billing Fee $40.00 Finance # of Units Minimum Flow 2 .03gpm 3 .03gpm 4-5 .11gpm 6-10 3/4 gpm 11 to 20 1 gpm Meter Size Meter c/w TP Angle/Straight Meter Ball Valve Check Valve Isolation Ball Valve c/w drain Expansion Tank Meter wire 100' Sub-Total Sensus Transmitter HST METER PACKAGE TOTAL Quick Code Inspection Fee Total Meter and Inspection 5/8" iperl 228.85 $ 241.50 $ 78.20 $ 28.75 $ 126.50 $ $26.29 730.09 $ 228.85 $ 124.66 $ 1,083.60 $ WMP1 50.00 $ 1,133.60 $ 3/4"iperl 302.45 $ 241.50 $ 78.20 $ 28.75 $ $ 126.50 $26.29 803.69 $ 228.85 $ 134.23 $ 1,166.77 $ WMP2 50.00 $ 1,216.77 $ 1" iperl 371.45 $ 322.00 $ 195.50 $ 48.30 $ 126.50 $ $26.29 1,090.04 $ 228.85 $ 171.46 $ 1,490.34 $ WMP3 50.00 $ 1,540.34 $ 1-1/2" Omni R2 2,490.75 $ 575.00 $ Owner's Responsibility Owner's Responsibility Owner's Responsibility $26.29 3,092.04 $ 228.85 $ 431.72 $ 3,752.60 $ WMP4 50.00 $ 3,802.60 $ 2" Omni R2 2,742.25 $ 805.00 $ Owner's Responsibility Owner's Responsibility Owner's Responsibility $26.29 3,573.54 $ 228.85 $ 494.31 $ 4,296.70 $ WMP5 50.00 $ 4,346.70 $ Price per meter package: 5/8" iperl .11-25gpm 3/4" iperl .11-35gpm 1" iperl .4-55gpm 1-1/2" Omni R2 2-150gpm 2" Omni R2 2.5-200gpm Meter Size Normal Flow Meter sizes are determined by number of units. If the meter is too large, we lose low flows. If too small, the meter will wear prematurely. Also of greater concern, is water quality. If the service and TOWN OF PENETANGUISHENE - WATER DIVISION SCHEDULE A-B 2026 WATER METER SIZING AND COST meter are too large, water quality is compromised. The following is merely a guideline to determine required meter size for new or existing buildings. This calculation is based on maximum consumption of 10usgpm per unit. By-law #2026-03 By-law #2026-03 Schedule A-C 2026 Schedule of Rates 2026 (effective January 1, 2026) Water Fixed Portion (Flat Rate) per year: Meter Size (inches) 0.625 $136.80 0.750 $136.80 1.000 $191.87 1.500 $246.39 2.000 $396.92 3.000 $1,505.70 4.000 $1,916.08 6.000 $2,874.19 8.000 $3,832.29 Water Cost per Cubic Metre $1.89 Wastewater Fixed Portion (Flat Rate) per year: Meter Size (inches) 0.625 $280.61 0.750 $280.61 1.000 $393.38 1.500 $505.13 2.000 $814.08 3.000 $3,087.47 4.000 $3,929.17 6.000 $3,929.17 8.000 $5,893.90 Wastewater Cost per Cubic Metre $3.88