2025 Water Rate Study Report (Watson & Associates)

Perth South, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 372421403279 · verified 2026-10-18 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 September 17, 2025 [email protected] Water Rate Study Township of Perth South Watson & Associates Economists Ltd. Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction...................................................................................................... 1-1 1.1 Background ............................................................................................. 1-1 1.2 Study Process ......................................................................................... 1-2 1.3 Regulatory Changes in Ontario ............................................................... 1-2 1.4 Sustainable Water and Sewage Systems Act ......................................... 1-3 1.5 Financial Plans Regulation ..................................................................... 1-5 1.6 Water Opportunities Act, 2010 ................................................................ 1-7 1.7 Infrastructure for Jobs and Prosperity Act, 2015 (I.J.P.A.) ...................... 1-8 1.8 Forecast Growth and Servicing Requirements ..................................... 1-10 2. Capital Infrastructure Needs........................................................................... 2-1 2.1 Capital Forecast ...................................................................................... 2-1 3. Lifecycle Costing ............................................................................................. 3-1 3.1 Overview of Lifecycle Costing ................................................................. 3-1 3.1.1 Definition .................................................................................... 3-1 3.1.2 Financing Costs ......................................................................... 3-1 3.1.3 Costing Methods ........................................................................ 3-4 3.2 Impact on Budgets .................................................................................. 3-6 4. Capital Cost Financing Options ..................................................................... 4-1 4.1 Summary of Capital Cost Financing Alternatives .................................... 4-1 4.2 Development Charges Act, 1997 ............................................................ 4-2 4.3 Municipal Act .......................................................................................... 4-2 4.4 Historical and Current Grant Funding Availability ................................... 4-4 4.5 Existing Reserves/Reserve Funds .......................................................... 4-6 4.6 Debenture Financing............................................................................... 4-6 4.7 Infrastructure Ontario .............................................................................. 4-6 4.7.1 Housing-Enabling Water Infrastructure Lending Stream ............ 4-7 4.8 Recommended Capital Financing Approach ........................................... 4-8 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. 5. Overview of Expenditures and Revenues ..................................................... 5-1 5.1 Water Operating Expenditures ................................................................ 5-1 5.2 Water Operating Revenues .................................................................... 5-1 6. Pricing Structures ........................................................................................... 6-1 6.1 Introduction ............................................................................................. 6-1 6.2 Alternative Pricing Structures .................................................................. 6-2 6.3 Assessment of Alternative Pricing Structures ......................................... 6-4 6.4 Rate Structures in Ontario ...................................................................... 6-9 6.5 Recommended Rate Structures ............................................................ 6-10 7. Analysis of Water Rates and Policy Matters ................................................. 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 Water Rates ............................................................................................ 7-1 7.3 Connection Fees ..................................................................................... 7-2 8. Recommendations .......................................................................................... 8-1 Appendix A Detailed Water Rate Calculations - Black Creek ................. A-1 Appendix B Detailed Water Rate Calculations - St. Pauls ...................... B-1 Watson & Associates Economists Ltd. List of Acronyms and Abbreviations Acronym Full Description of Acronym A.M.O. Association of Municipalities of Ontario A.W.W.A. American Water Works Association cu.m. Cubic metre C.W.W.F. Clean Water and Wastewater Fund D.C.A. Development Charges Act, 1997 F.I.R. Financial Information Return I.J.P.A. Infrastructure for Jobs and Prosperity Act, 2015 I.O. Infrastructure Ontario LPAT Local Planning Appeal Tribunal M.O.E. Ministry of Environment O.C.I.F. Ontario Community Infrastructure Fund O.C.W.A. Ontario Clean Water Agency O.L.T. Ontario Land Tribunal O.M.B. Ontario Municipal Board O.Reg. Ontario Regulation O.S.I.F.A. Ontario Strategic Infrastructure Financing Authority P.S.A.B. Public Sector Accounting Board P.T.I.F. Public Transit Infrastructure Fund S.W.S.S.A. Sustainable Water and Sewage Systems Act, 2002 Executive Summary Watson & Associates Economists Ltd. PAGE i Executive Summary The Township of Perth South retained Watson & Associates Economists Ltd. (Watson) to undertake a Water Rate Study. This study aims to provide a water rate analysis for current capital and operating forecasts, in addition to lifecycle cost requirements. The results of this analysis provide for updated water rates for customers within the serviced areas of the Township of Perth South. The rate analysis contained herein continues to provide fiscally responsible practices that align with current provincial legislation. This analysis includes rate increases that allow the Township to work towards saving the full lifecycle replacement amounts required for adequate asset management practices. The analysis presented herein provides the following: - The Township has two distinct water service areas: the Black Creek and St. Pauls water systems. Each area has its own rate to recover capital and operating costs associated with the respective system. - The current rate structure for both water systems is a flat rate. - The 2026 to 2035 capital spending program for the Black Creek water system totals $161,200 (inflated dollars). - The 2026 to 2035 capital spending program for the St. Pauls water system totals $217,000 (inflated dollars). - Provisions for asset management needs have been factored into the rate analysis to align with the recommendations in the Township's Asset Management Plan. - Annual operating expenditures related to wages and salaries are increasing by 2% per annum over the forecast, while expenditures related to utilities, fuels, and chemicals are increasing at 5% per annum. - Existing water customers total 33 in the Black Creek water system and 36 in the St. Pauls water system. It is anticipated the Township will see an increase of approximately 5 new customers in the St. Pauls system over the next 10-year period and no growth is anticipated in the Black Creek system; and - The present rate structure (annual flat rate) is continued for both water systems in order to recover the capital and operating related costs. Based on the above information, the estimated rate increases are as follows: Watson & Associates Economists Ltd. PAGE ii - In order to meet the needs of the water forecast for the Black Creek system, the flat rate is anticipated to increase annually by 5% from 2026 to 2030, and 3% every year thereafter. - To meet the needs of the water forecast for the St. Pauls system, the flat rate is anticipated to increase annually by 3% from 2026 to 2034. - The connection fee for new users is currently $2,000 per new property that connects into the water system. This rate has not been adjusted for inflation since 2002. It is recommended that the connection fee is updated to $5,500 per property to adjust for inflation and reflect the current costs of the water system. Table ES-1 summarizes the recommended water rates for the Black Creek system based on the analysis provided herein over the forecast period. Table ES-2 summarizes the recommended water rates for the St. Pauls system over the forecast period. Watson & Associates Economists Ltd. PAGE iii Table ES-1 Township of Perth South Annual Customer Water Bill - Black Creek Table ES-2 Township of Perth South Annual Customer Water Bill - St. Pauls Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Annual Flat Rate $1,694 $1,779 $1,868 $1,961 $2,059 $2,162 $2,227 $2,294 $2,363 $2,433 $2,506 % Increase 5% 5% 5% 5% 5% 3% 3% 3% 3% 3% Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Annual Flat Rate $1,599 $1,647 $1,696 $1,747 $1,800 $1,854 $1,909 $1,967 $2,026 $2,086 $2,149 % Increase 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% Report Watson & Associates Economists Ltd. Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 1. Introduction 1.1 Background The Township of Perth South is located in Perth County, with a population of approximately 3,776 population. The Township currently provides water via two well- based distribution systems: Black Creek water system and St. Pauls water system. Both systems are small residential systems with unmetered water users. Currently, there are 33 water customers in the Black Creek system and 36 water customers in the St. Pauls system. The water systems in the Township utilize an annual flat rate charge for their customers. Table 1-1 provides the existing rates currently in effect for the Black Creek and St. Pauls water systems. Table 1-1 Township of Perth South Water Rates - 2025 Since the Walkerton crisis, the Province has continued to make legislative changes for municipal water and wastewater systems. Noted below are the historical changes along with pending legislation anticipated to be implemented in the future. Watson & Associates Economists Ltd. (Watson) was retained by the Township of Perth South to assist in addressing these changes in a proactive manner as they relate to the water systems. The assessment provided herein addresses changes recommended to the water rates based on the most current information and forecasts the implications over the next 10-year period. Black Creek Water System $1,694 St. Pauls Water System $1,599 Township of Perth South 2025 - Water Billing Rates Annual Flat Rate Watson & Associates Economists Ltd. PAGE 1-2 1.2 Study Process The objectives of the study and the steps involved in carrying out this assignment are summarized below: - Identify all current and future water system capital needs to assess the immediate and longer-term implications; - Identify potential methods of cost recovery from the capital needs listing. These recovery methods may include other statutory authorities (e.g. Municipal Act) as an offset to recovery through the water rates; - Identify existing operating costs by component and estimate future operating costs over the next ten years. This assessment identifies fixed and variable costs in order to project those costs sensitive to changes to the existing infrastructure inventory, as well as costs which may increase commensurate with growth; and - Provide staff and Council the findings to assist in gaining approval of the rates for 2026 and future years. 1.3 Regulatory Changes in Ontario Resulting from the water crisis in Walkerton, significant regulatory changes have been made in Ontario. These changes arise as a result of the Walkerton Commission and the 93 recommendations made by the Walkerton Inquiry Part II report. Areas of recommendation include: - watershed management and source protection; - quality management; - preventative maintenance; - research and development; - new performance standards; - sustainable asset management; and - lifecycle costing. The legislation which would have most impacted municipal water and wastewater rates was the Sustainable Water and Sewage Systems Act (S.W.S.S.A.) which would have required municipalities to implement full cost pricing. The legislation was enacted in Watson & Associates Economists Ltd. PAGE 1-3 2002, however, it had not been implemented pending the approval of its regulations. The Act was repealed as of January 1, 2013. It is expected that the provisions of the Water Opportunities Act will implement the fundamental requirements of S.W.S.S.A. Furthermore, on December 27, 2017, O. Reg. 588/17 was released under the Infrastructure for Jobs and Prosperity Act, 2015 (I.J.P.A.), which outlines the requirements for asset management for municipalities. The results of the asset management review under this Act will need to be considered in light of the recent investments undertaken by the Township and the capital spending plan provided herein. The following sections describe these various resulting changes. 1.4 Sustainable Water and Sewage Systems Act As noted earlier, the S.W.S.S.A. was passed on December 13, 2002. The intent of the Act was to introduce the requirement for municipalities to undertake an assessment of the "full cost" of providing their water and wastewater services. It is noted, however, that this Act has been repealed. To provide broader context and understanding to other legislation discussed herein, a description of the Act is provided below. Full costs for water service was defined in subsection 3(7) of the Act and included "...source protection costs, operating costs, financing costs, renewal and replacement costs and improvement costs associated with extracting, treating or distributing water to the public and such other costs which may be specified by regulation." Similar provisions were made for wastewater services in subsection 4(7) with respect to "...collecting, treating or discharging wastewater." The Act would have required the preparation of two reports for submission to the Ministry of the Environment (or such other member of the Executive Council as may be assigned the administration of this Act under the Executive Council Act). The first report was on the "full cost of services" and the second was the "cost recovery plan." Once these reports were reviewed and approved by the Ministry, the municipality would have been required to implement the plans within a specified time period. In regard to the full cost of services report, the municipality (deemed a regulated entity under the Act) would prepare and approve a report concerning the provision of water and sewage services. This report was to include an inventory of the infrastructure, a management plan providing for the long-term integrity of the systems, and would address the full cost of providing the services (other matters may be Watson & Associates Economists Ltd. PAGE 1-4 specified by the regulations) along with the revenue obtained to provide them. A professional engineer would certify the inventory and management plan portion of the report. The municipality's auditor would be required to provide a written opinion on the report. The report was to be approved by the municipality and then be forwarded to the Ministry along with the engineer's certification and the auditor's opinion. The regulations would stipulate the timing for this report. The second report was referred to as a cost recovery plan and would address how the municipality intended to pay for the full costs of providing the service. The regulations were to specify limitations on what sources of revenue the municipality may use. The regulations may have also provided limits as to the level of increases any customer or class of customer may experience over any period of time. Provision was made for the municipality to implement increases above these limits; however, ministerial approval would be required first. Similar to the first report, the municipal auditor would provide a written opinion on the report prior to Council's adoption, and this opinion must accompany the report when submitted to the Province. The Act provided the Minister the power to approve or not approve the plans. If the Minister was not satisfied with the report or if a municipality did not submit a plan, the Minister may have a plan prepared. The cost to the Crown for preparing the plan would be recovered from the municipality. As well, the Minister may direct two or more regulated municipalities to prepare a joint plan. This joint plan may be directed at the onset or be directed by the Minister after receiving the individual plans from the municipalities. The Minister also had the power to order a municipality to generate revenue from a specific revenue source or in a specified manner. The Minister may have also ordered a regulated entity to do or refrain from doing such things as the Minister considered advisable to ensure that the entity pays the full cost of providing the services to the public. Once the plans were approved and in place, the municipality would be required to submit progress reports. The timing of these reports and the information to be contained therein would be established by the regulations. A municipal auditor's opinion must be provided with the progress report. Municipalities would also revise the plans if they deem the estimate does not reflect the full cost of providing the services, as a result of a change in circumstances, regulatory or other changes that affect their plan, Watson & Associates Economists Ltd. PAGE 1-5 etc. The municipality would then revise its prior plan, provide an auditor's opinion, and submit the plan to the Minister. 1.5 Financial Plans Regulation On August 16, 2007, the M.O.E. passed O.Reg 453/07 which requires the preparation of financial plans for water (and wastewater) systems. The M.O.E. has also provided a Financial Plan Guidance Document to assist in preparing the plans. A brief summary of the key elements of the regulation is provided below: - The financial plan will represent one of the key elements for the municipality to obtain its Drinking Water Licence; - The financial plans shall be for a period of at least six years, but longer planning horizons are encouraged; - As the regulation is under the Safe Drinking Water Act, 2002, the preparation of the plan is mandatory for water and encouraged for wastewater; - The plan is considered a living document (i.e. will be updated as annual budgets are prepared) but will need to be undertaken, at a minimum, every five years; - The plans generally require the forecasting of capital, operating and reserve fund positions, providing detailed inventories, forecasting future users and volume usage and corresponding calculation of rates. In addition, P.S.A.B. information on the system must be provided for each year of the forecast (i.e. total non- financial assets, tangible capital asset acquisitions, tangible capital asset construction, betterments, write-downs, disposals, total liabilities and net debt); - The financial plans must be made available to the public (at no charge) upon request and be available on the municipality's website. The availability of this information must also be advertised; and - The financial plans are to be approved by Resolution of the Council or governing body indicating that the drinking water system is financially viable. In general, the financial principles of the draft regulations follow the intent of S.W.S.S.A. to move municipalities towards financial sustainability. Many of the prescriptive requirements, however, have been removed (e.g. preparation of two separate documents for provincial approval, auditor opinions, engineer certifications, etc.). Watson & Associates Economists Ltd. PAGE 1-6 A Guideline ("Towards Financially Sustainable Drinking Shores - Water and Wastewater Systems") had been developed to assist municipalities in understanding the Province's direction and provided a detailed discussion on possible approaches to sustainability. The Province's Principles of Financially Sustainable Water and Wastewater Services are provided below: Principle #1: Ongoing public engagement and transparency can build support for, and confidence in, financial plans and the system(s) to which they relate. Principle #2: An integrated approach to planning among water, wastewater, and stormwater systems is desirable given the inherent relationship among these services. Principle #3: Revenues collected for the provision of water and wastewater services should ultimately be used to meet the needs of those services. Principle #4: Lifecycle planning with mid-course corrections is preferable to planning over the short term, or not planning at all. Principle #5: An asset management plan is a key input to the development of a financial plan. Principle #6: A sustainable level of revenue allows for reliable service that meets or exceeds environmental protection standards, while providing sufficient resources for future rehabilitation and replacement needs. Principle #7: Ensuring users pay for the services they are provided leads to equitable outcomes and can improve conservation. In general, metering and the use of rates can help ensure users pay for services received. Principle #8: Financial plans are "living" documents that require continuous improvement. Comparing the accuracy of financial projections with actual results can lead to improved planning in the future. Principle #9: Financial plans benefit from the close collaboration of various groups, including engineers, accountants, auditors, utility staff, and municipal Council. Watson & Associates Economists Ltd. PAGE 1-7 1.6 Water Opportunities Act, 2010 As noted earlier, since the passage of the Safe Drinking Water Act, 2002, continuing changes and refinements to the legislation have been introduced. Some of these Bills have found their way into law, while others have not been approved. Bill 72, the Water Opportunities Act, 2010, was introduced into legislation on May 18, 2010 and received Royal Assent on November 29, 2010. The Act provides for the following elements: - The fostering of innovative water, wastewater and stormwater technologies, services and practices in the private and public sectors; - Preparation of water conservation plans to achieve water conservation targets established by the regulations; and - Preparation of sustainability plans for municipal water services, municipal wastewater services and municipal stormwater services. With regard to the sustainability plans: - The Act extends from the water financial plans and requires a more detailed review of the water financial plan and requires a full plan for wastewater and stormwater services; and - Regulations will provide performance targets for each service - these targets may vary based on the jurisdiction of the regulated entity or the class of entity. The financial plan shall include: - An asset management plan for the physical infrastructure; - A financial plan; - For water, a water conservation plan; - An assessment of risks that may interfere with the future delivery of the municipal service, including, if required by the regulations, the risks posed by climate change and a plan to deal with those risks; and - Strategies for maintaining and improving the municipal service, including strategies to ensure the municipal service can satisfy future demand, consider technologies, services and practices that promote the efficient use of water and Watson & Associates Economists Ltd. PAGE 1-8 reduce negative impacts on Ontario's water resources, and increase co- operation with other municipal service providers. Performance indicators will be established by service, with the following considerations: - May relate to the financing, operation or maintenance of a municipal service or to any other matter in respect of what information may be required to be included in a plan; - May be different for different municipal service providers or for municipal services in different areas of the Province. Regulations will prescribe: - Timing; - Contents of the plans; - Which identified portions of the plan will require certification; - Public consultation process; and - Limitations, updates, refinements, etc. As noted earlier, it is expected that this Act will implement the principles of the S.W.S.S.A. once all regulations are put in place. 1.7 Infrastructure for Jobs and Prosperity Act, 2015 (I.J.P.A.) On June 4, 2015, the Province of Ontario passed the I.J.P.A. which, over time, will require municipalities to undertake and implement asset management plans for all infrastructure they own. On December 27, 2017, the Province released Ontario Regulation 588/17 under the I.J.P.A. which has three phases that municipalities must meet: Watson & Associates Economists Ltd. PAGE 1-9 Figure 1-1 Legislative Timelines set out by the Jobs and Prosperity Act Legislation related to Asset Management Plans Note: on March 15, 2021, the Province filed Regulation 193/21 to extend all of the timelines of Regulation 588/17 by one year (reflected in the table above). Every municipality in Ontario was required to prepare a strategic asset management policy by July 1, 2019. Municipalities will be required to review their strategic asset management policies at least every five years and make updates as necessary. The subsequent phases are as follows: - Phase 1 - Asset Management Plan (by July 1, 2022): o For core assets, municipalities must have the following:  Inventory of assets;  Current levels of service measured by standard metrics; and  Costs to maintain levels of service. - Phase 2 - Asset Management Plan (by July 1, 2024): o Same steps as Phase 1 but for all assets. - Phase 3 - Asset Management Plan (by July 1, 2025): o Builds on Phase 1 and 2 by adding:  Proposed levels of service; and  Lifecycle management and financial strategy. In relation to water (which is considered a core asset), municipalities were to have an asset management plan that addresses the related infrastructure by July 1, 2022 (Phase 1). O.Reg. 588/17 specifies that the municipality's asset management plan must include the following for each asset category: 1-Jan-18 1-Jul-19 1-Jul-20 1-Jul-21 1-Jul-22 1-Jul-23 1-Jul-24 1-Jul-25 Strategic Asset Management Policy Asset Management Plans - Current Levels of Service Asset Management Plans - Proposed Levels of Service Deadline for completion Update - Current levels of service - Asset (inventory) analysis - Current performance of assets - Lifecycle activities and costs to maintain current levels of service - Impacts of growth on current levels of service - Proposed levels of service - Proposed performance of assets - Lifecycle activities and costs to achieve proposed levels of service - Financial strategy - Impacts of growth on proposed levels of service Core municipal infrastructure assets All municipal infrastructure assets Watson & Associates Economists Ltd. PAGE 1-10 - The current levels of service being provided, determined in accordance with the following qualitative descriptions and technical metrics and based on data from at most the two calendar years prior to the year in which all information required under this section is included in the asset management plan; - The current performance of each asset category, including: o a summary of the assets in the category; o the replacement cost of the assets in the category; o the average age of the assets in the category, determined by assessing the average age of the components of the assets; o the information available on the condition of the assets in the category; o a description of the municipality's approach to assessing the condition of the assets in the category, based on recognized and generally accepted good engineering practices where appropriate; and - The lifecycle activities that would need to be undertaken to maintain the current levels of service. 1.8 Forecast Growth and Servicing Requirements The Township of Perth South services 69 water customers, with 33 customers in Black Creek and 36 customers in St. Pauls. Information on the existing number of customers was obtained from the Township. For future water customers to be added to the systems, consideration has been given to development potential for both the Black Creek and St. Pauls areas. Based on discussions with staff, there are no future developments anticipated in the Black Creek area over the forecast period. With respect to St. Pauls, it is anticipated that five (5) new water customers will be added to the system over the forecast period. Table 1-2 provides the forecast of water users in the St. Pauls water system. Watson & Associates Economists Ltd. PAGE 1-11 Table 1-2 Township of Perth South 2025 to 2035 Water System Forecast - St. Pauls Water Users Forecast - St. Pauls Year Total Users 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2025 3 2 3 3 3 3 3 3 3 3 3 3 2026 2 1 2 2 2 2 2 2 2 2 2 2027 0 - - - - - - - - - 2028 0 - - - - - - - - 2029 0 - - - - - - - 2030 0 - - - - - - 2031 0 - - - - - 2032 0 - - - - 2033 0 - - - 2034 0 - - 2035 0 - Total 5 2 4 5 5 5 5 5 5 5 5 5 Water Customer Forecast 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Existing 36 36 36 36 36 36 36 36 36 36 36 New - Growth 2 4 5 5 5 5 5 5 5 5 5 Total 38 40 41 41 41 41 41 41 41 41 41 Watson & Associates Economists Ltd. Chapter 2 Capital Infrastructure Needs Watson & Associates Economists Ltd. PAGE 2-1 2. Capital Infrastructure Needs 2.1 Capital Forecast Capital forecasts have been provided for each of the water systems and are presented on Tables 2-1 through 2-2 (note: the costs are provided in inflated dollars). The basis for these forecasts is the capital infrastructure replacement needs based on recommendations from the Ontario Clean Water Agency (O.C.W.A.) and discussions with Township staff. Additional provisions related to asset replacement needs have been incorporated into the capital forecast to align with the recommendations provided in the Township's Asset Management Plan. These recommendations provided for an annual amount to be spent related to the replacement of existing assets. A summary of the capital works related is provided in the following tables. Table 2-1 presents the capital forecast summary for the Black Creek water system, and Table 2-2 presents the capital forecast summary for the St. Pauls water system. Watson & Associates Economists Ltd. PAGE 2-2 Table 2-1 Township of Perth South 2026 to 2035 Water Capital Forecast Summary (Inflated $) - Black Creek Description Total 2026 to 2035 Years Undertaken Capital Expenditures Chemicals 5,900 2026-2030 Chlorine Injectors and Parts 1,400 2026-2030 Water Service Repair Parts 4,260 2026-2030 Well House Repairs (Pipe, Valves, etc.) 3,950 2026-2030 UV Parts (Solenoid Valves, Circuit Boards, etc.) 4,300 2026-2030 Well Inspection 3,300 2027 Data Logger Maintenance 500 2028 Overtime/Call-Outs 12,000 2026-2030 Contingency 6,400 2026-2030 Lifecycle UV Lamps 5,500 2026-2030 Chemical Pump Replacement Parts 6,260 2026-2030 Pressure Tank Replacement 2,860 2026, 2028, 2030 Analyzer Probe 6,600 2027, 2030 Chlorine Analyzer Parts (Electrolyte Membrane Cap) 2,740 2026-2030 Provision for Asset Management Needs 95,230 2026-2035 Total Capital Expenditures 161,200 Watson & Associates Economists Ltd. PAGE 2-3 Table 2-2 Township of Perth South 2026 to 2035 Water Capital Forecast Summary (Inflated $) - St. Pauls Description Total 2026 to 2035 Years Undertaken Capital Expenditures Chemicals 5,900 2026-2030 Chlorine Injectors and Parts 1,410 2026-2030 Water Service Repairs 4,330 2026-2030 Well House Repairs (pipe, valves, etc.) 4,250 2026-2030 UV Parts (Solenoid Valves, Circuit Boards, etc.) 4,300 2026-2030 Data Logger Maintenance/Upgrade 3,000 2027 Overtime/Call-Outs 12,200 2026-2030 Contingency 6,400 2026-2030 Lifecycle UV Lamps 5,500 2026-2030 Chemical Pump Replacement Parts 6,290 2026-2030 Pressure Tank Replacement 1,930 2027, 2029 Analyzer Probe 6,400 2027, 2030 Chlorine Analyzer Parts (Electrolyte/Membrance Cap) 2,740 2026-2035 Flowmeter Replacement 3,100 2027 Provision for Asset Management Needs 149,250 2026-2035 Total Capital Expenditures 217,000 Watson & Associates Economists Ltd. Chapter 3 Lifecycle Costing Watson & Associates Economists Ltd. PAGE 3-1 3. Lifecycle Costing 3.1 Overview of Lifecycle Costing 3.1.1 Definition For many years, lifecycle costing has been used in the field of maintenance engineering and to evaluate the advantages of using alternative materials in construction or production design. The method has gained wider acceptance and use in the areas of industrial decision-making and the management of physical assets. By definition, lifecycle costs are all the costs which are incurred during the lifecycle of a physical asset, from the time its acquisition is first considered to the time it is taken out of service for disposal or redeployment. The stages which the asset goes through in its lifecycle are specification, design, manufacture (or build), install, commission, operate, maintain and disposal. Figure 3-1 depicts these stages in a schematic form. 3.1.2 Financing Costs This section will focus on financing mechanisms in place to fund the costs incurred throughout the asset's life. In a municipal context, services are provided to benefit tax/rate payers. Acquisition of assets is normally timed in relation to direct needs within the community. At times, economies of scale or technical efficiencies will lead to oversizing an asset to accommodate future growth within the Township. Over the past few decades, new financing techniques such as development charges have been employed based on the underlying principle of having tax/rate payers who benefit directly from the service paying for that service. Operating costs which reflect the cost of the service for that year are charged directly to all existing tax/rate payers who have received the benefit. Operating costs are normally charged through the tax base or user rates. Capital expenditures are recouped through several methods, with operating budget contributions, development charges, reserves, developer contributions and debentures, being the most common. Watson & Associates Economists Ltd. PAGE 3-2 Figure 3-1 Lifecycle Costing Select or Specify Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Remove Dispose User Cost to User Investment Costs Operating Costs Maintenance Costs Monitoring Costs Disposal Costs Life Cycle Costs New construction related to growth could produce developer contributions to fund a significant portion of projects, where new assets are being acquired to allow growth within the Township to continue. As well, debentures could be used to fund such works, with the debt charge carrying costs recouped from taxpayers in the future. Note, Watson & Associates Economists Ltd. PAGE 3-3 development charges are typically utilized to recover capital costs associated with new growth, however, the Township does not currently have development charges in place. Capital construction to replace existing infrastructure, however, is largely not growth- related and will therefore not yield developer contributions to assist in financing these works. Hence, a municipality will be dependent upon debentures, reserves and contributions from the operating budget to fund these works. Figure 3-2 depicts the costs of an asset from its initial conception through to replacement and then continues to follow the associated costs through to the next replacement. As referred to earlier, growth-related financing methods such as developer contributions could be utilized to finance the growth-related component of the new asset. These revenues are collected (indirectly) from the new homeowner who benefits directly from the installation of this asset. Other financing methods may be used as well to finance the non-growth-related component of this project, such as reserves which have been collected from past tax/rate payers, operating budget contributions which are collected from existing tax/rate payers and debenturing which will be carried by future tax/rate payers. Ongoing costs for monitoring, operating and maintaining the asset will be charged annually to the existing tax/rate payer. When the asset requires replacement, the sources of financing will be limited to reserves, debentures and contributions from the operating budget. At this point, the question is raised: "If the cost of replacement is to be assessed against the tax/rate payer who benefits from the replacement of the asset, should the past tax/rate payer pay for this cost or should future rate payers assume this cost?" If the position is taken that the past user has used up the asset, hence he should pay for the cost of replacement, then a charge should be assessed annually through the life of the asset, to have funds available to replace it when the time comes. If the position is taken that the future tax/rate payer should assume this cost, then debenturing and, possibly, a contribution from the operating budget should be used to fund this work. Charging for the cost of using up an asset is the fundamental concept behind depreciation methods utilized by the private sector. This concept allows for expending the asset as it is used up in the production process. The tracking of these costs forms part of the product's selling price and, hence, end-users are charged for the asset's depreciation. The same concept can be applied in a municipal setting to charge Watson & Associates Economists Ltd. PAGE 3-4 existing users for the asset's use and set those funds aside in a reserve to finance the cost of replacing the asset in the future. Figure 3-2 Financing Lifecycle Costs Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Development Charges (Growth) Reserves/Reserve Funds Debentures Taxation User Fees Grants Other Proceeds on Disposal Funding of Disposal/ Decommissioning Costs Tax Supported Operating Budget User Fees Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal 3.1.3 Costing Methods There are two fundamental methods of calculating the cost of the usage of an asset and for the provision of the revenue required when the time comes to retire and replace it. The first method is the Depreciation Method. This method recognizes the reduction in the value of the asset through wear and tear and aging. There are two commonly used forms of depreciation: the straight-line method and the reducing balance method (shown graphically in Figure 3-3). Watson & Associates Economists Ltd. PAGE 3-5 The straight-line method is calculated by taking the original cost of the asset, subtracting its estimated salvage value (estimated value of the asset at the time it is disposed of) and dividing this by the estimated number of years of useful life. The reducing balance method is calculated by utilizing a fixed percentage rate and this rate is applied annually to the undepreciated balance of the asset value. The second method of lifecycle costing is the sinking fund method. This method first estimates the future value of the asset at the time of replacement. This is done by inflating the original cost of the asset at an assumed annual inflation rate. A calculation is then performed to determine annual contributions (equal or otherwise) which, when invested, will grow with interest to equal the future replacement cost. The preferred method used herein for forecasting purposes is the sinking fund method of lifecycle costing. Watson & Associates Economists Ltd. PAGE 3-6 Figure 3-3 Process STRAIGHT LINE DEPRECIATION Original Cost $x $x $x $x $x $x $x $x $x $x Formula: Original Cost - Salvage Cost Number of Years of Useful Life SINKING FUND METHOD $x $x $x $x $x $x $x $x $x $x 1. "Estimate Future Replacement Cost" Original Cost Future Replacement Cost Future Replacement Cost 2. "Estimate Annual Contribution which will Grow with Interest to Equal Future Replacement Cost" Total Annual Contributions Equal Original Cost "Annual Inflation" "Annual Interest Earnings" 3.2 Impact on Budgets The Township's Asset Management Plan outlines the total replacement cost of the Township's water asset inventory to be approximately $2.08 million (2025 dollars). Based on useful life assumptions and replacement costs of the water assets, the average annual level of investment recommended for both water systems in the Asset Management Plan is approximately $34,500 per year. Watson & Associates Economists Ltd. PAGE 3-7 To integrate the asset management needs into the rate calculations, and ensure the full lifecycle costs are being incorporated into the capital plan, additional asset management provisions have been included in the capital needs forecast for both water systems. The $34,500 has been allocated to each water system based on the proportionate share of existing assets. Approximately 43% of the existing water assets are part of the Black Creek system, and 57% are part of the St. Pauls system. This share has been applied to the $34,500 to determine an annual provision in the capital forecast (see Section 2). Watson & Associates Economists Ltd. https://watsonecon.sharepoint.com/sites/PerthSouth-2025WaterRateStudyandFP/Shared Documents/Report/2025 Perth South Water Rate Study Report - Updated September 17.docx Chapter 4 Capital Cost Financing Options Watson & Associates Economists Ltd. PAGE 4-1 4. Capital Cost Financing Options 4.1 Summary of Capital Cost Financing Alternatives Historically, the powers that municipalities had to raise alternative revenues to taxation to fund capital services have been restrictive. Over the past decade, legislative reforms have been introduced. Some of these have expanded municipal powers (e.g. Bill 26 introduced in 1996 to provide for expanded powers for imposing fees and charges), while others appear to restrict them (e.g. Bill 98 in 1997 and Bill 23 in 2022 providing amendments to the Development Charges Act). The Province passed a new Municipal Act which came into force on January 1, 2003. Part XII of the Act and O.Reg. 584/06 govern a municipality's ability to impose fees and charges. In contrast to the previous Municipal Act, this Act provides municipalities with broadly defined powers and does not differentiate between fees for operating and capital purposes. It is anticipated that the powers to recover capital costs under the previous Municipal Act will continue within the new Statutes and Regulations, as indicated by s.9(2) and s.452 of the new Municipal Act. Under s.484 of Municipal Act, 2001, the Local Improvement Act was repealed with the in-force date of the Municipal Act (January 1, 2003). The municipal powers granted under the Local Improvement Act now fall under the jurisdiction of the Municipal Act. To this end, on December 20, 2002, O.Reg. 390/02 was filed, which allowed for the Local Improvement Act to be deemed to remain in force until April 1, 2003. O.Reg. 119/03 was enacted on April 19, 2003, which restored many of the previous Local Improvement Act provisions; however, the authority is now provided under the Municipal Act. The methods of capital cost recovery available to municipalities are provided as follows: Recovery Methods Section Reference - Development Charges Act, 1997 4.2 - Municipal Act o Fees and Charges o Sewer and Water Area Charges o Connection Fees o Local Improvements 4.3 - Historical Grant Funding Availability 4.4 Watson & Associates Economists Ltd. PAGE 4-2 Recovery Methods Section Reference - Existing Reserves/Reserve Funds 4.5 - Debenture Financing 4.6 - Infrastructure Ontario 4.7 4.2 Development Charges Act, 1997 Development charges are a revenue tool used by municipalities to recover the capital costs associated with new development and redevelopment. These costs are in addition to what a developer/builder normally constructs as part of their subdivision (i.e. Local Services). Empowered by the Development Charges Act, 1997, municipalities may pass by-laws to impose charges to recover the capital costs associated with development and redevelopment, however, the Township does not currently impose development charges. 4.3 Municipal Act Part XII of the Municipal Act provides municipalities with broad powers to impose fees and charges via passage of a by-law. These powers, as presented in s.391(1), include imposing fees or charges: - "for services or activities provided or done by or on behalf of it; - for costs payable by it for services or activities provided or done by or on behalf of any other municipality or local board; and - for the use of its property including property under its control." Restrictions are provided to ensure that the form of the charge is not akin to a poll tax. Any charges not paid under this authority may be added to the tax roll and collected in a like manner. The fees and charges imposed under this part are not appealable to the Ontario Land Tribunal (OLT) (formerly Local Planning Appeal Tribunal (LPAT), formerly O.M.B.). Section 221 of the previous Municipal Act permitted municipalities to impose charges, by by-law, on owners or occupants of land who would or might derive benefit from the construction of sewage (storm and sanitary) or water works being authorized (in a specific benefit area). For a by-law imposed under this section of the previous Act: Watson & Associates Economists Ltd. PAGE 4-3 - A variety of different means could be used to establish the rate and recovery of the costs and could be imposed by a number of methods at the discretion of Council (i.e. lot size, frontage, number of benefiting properties, etc.); - Rates could be imposed with respect to costs of major capital works, even though an immediate benefit was not enjoyed; - Non-abutting owners could be charged; - Recovery was authorized against existing works, where a new water or sewer main was added to such works, "notwithstanding that the capital costs of existing works has in whole or in part been paid;" - Charges on individual parcels could be deferred; - Exemptions could be established; - Repayment was secured; and - OLT approval was not required. While under the new Municipal Act no provisions are provided specific to the previous s.221, the intent to allow capital cost recovery through fees and charges is embraced within s.391. The new Municipal Act also maintains the ability of municipalities to impose capital charges for water and sewer services on landowners not receiving an immediate benefit from the works. Under s.391(2) of the Act, "a fee or charge imposed under subsection (1) for capital costs related to sewage or water services or activities may be imposed on persons not receiving an immediate benefit from the services or activities but who will receive a benefit at some later point in time." Also, capital charges imposed under s.391 are not appealable to the OLT on the grounds that the charges are "unfair or unjust." Section 222 of the previous Municipal Act permitted municipalities to pass a by-law requiring buildings to connect to the municipality's sewer and water systems, charging the owner for the cost of constructing services from the mains to the property line. Under the new Municipal Act, this power still exists under Part II, General Municipal Powers (s.9 (3) b of the Municipal Act). Enforcement and penalties for this use of power are contained in s.427 (1) of the Municipal Act. Under the previous Local Improvement Act: - A variety of different types of works could be undertaken, such as watermain, storm and sanitary sewer projects, supply of electrical light or power, bridge construction, sidewalks, road widening and paving; Watson & Associates Economists Ltd. PAGE 4-4 - Council could pass a by-law for undertaking such work on petition of a majority of benefiting taxpayers, on a 2/3 vote of Council and on sanitary grounds, based on the recommendation of the Minister of Health. The by-law was required to go to the OLT, which might hold hearings and alter the by-law, particularly if there were objections; - The entire cost of a work was assessed only upon the lots abutting directly on the work, according to the extent of their respective frontages, using an equal special rate per metre of frontage; and - As noted, this Act was repealed as of April 1, 2003; however, O.Reg. 119/03 was enacted on April 19, 2003 which restores many of the previous Local Improvement Act provisions; however, the authority is now provided under the Municipal Act. 4.4 Historical and Current Grant Funding Availability Phase 1 (April 1, 2016 to March 31, 2018) Funding was provided by the Government of Canada to expressly help municipalities with repair and rehabilitation projects. Funding was mainly provided through the Clean Water and Wastewater Fund (C.W.W.F.) and Public Transit Infrastructure Fund (P.T.I.F.) in Federal Phase 1 projects. The C.W.W.F. was announced in Ontario on September 15, 2016. The Fund was $1.1 billion for water, wastewater, and storm water systems in Ontario. The federal government provided $569 million and Ontario and municipal governments provided $275 million each. Over 1,300 water, wastewater, and storm water projects have been approved in Ontario through the C.W.W.F. In Ontario, P.T.I.F. accounted for nearly $1.5 billion of the national total of $3.4 billion. The program was allocated by ridership numbers from the Canadian Urban Transit Association. The Association of Municipalities of Ontario (A.M.O.) understands that $1 billion of Ontario's share has been approved. Phase 2: Next Steps The federal government announced Phase 2 of its infrastructure funding plan with a total of $180 billion spent over 11 years. In addition to the balance of funding for previous green, social, and public transit infrastructure funds ($20 billion each, including Watson & Associates Economists Ltd. PAGE 4-5 Phase 1), the government added $10.1 billion for trade and transportation infrastructure and $2 billion for rural and northern communities. In Phase 2, Ontario was eligible for $11.8 billion including $8.3 billion for transit, $2.8 billion for green infrastructure, $407 million for community, culture and recreation and $250 million for rural and northern communities. Canada Community-Building Fund The Canada Community-Building Fund is a permanent source of funding provided up front, twice-a-year, to Provinces and Territories, who in turn flow this funding to their municipalities to support local infrastructure priorities. Municipalities can pool, bank and borrow against this funding, providing significant financial flexibility. Every year, the Canada Community-Building Fund provides over $2 billion and supports approximately 2,500 projects in communities across Canada. Each municipality selects how best to direct the funds with the flexibility provided to make strategic investments across 18 different project categories, which include other water and wastewater servicing. Ontario Government The Province has taken steps to increase municipal infrastructure funding. The Ontario Community Infrastructure Fund (O.C.I.F.) was increased in 2016 with formula-based support growing to $200 million, and application funding growing to $100 million annually by 2018/2019. As well, $15 million annually will go to the new Connecting Links program to help pay for the construction and repair costs of municipal roads that connect communities to provincial highways. This is on top of the Building Ontario Up investment of $130 billion in public infrastructure over 10 years starting in 2015. Recently the Province announced funding through a new Ontario Infrastructure Bank. This new, arms-length, board-governed agency will assist investors and institutions to further participate in large-scale infrastructure projects. Ontario is providing $825 million over three years towards the Housing-Enabling Water Systems Fund, which will help municipalities repair, rehabilitate and expand drinking water, wastewater and stormwater infrastructure needed to build more homes. Watson & Associates Economists Ltd. PAGE 4-6 4.5 Existing Reserves/Reserve Funds The Township has established reserves and reserve funds for water costs within each water system. The following table summarizes the water reserves utilized in this analysis and their respective estimated balances at December 31, 2024: Table 4-1 Water Reserves As of December 31, 2024 4.6 Debenture Financing Although it is not a direct method of minimizing the overall cost to the ratepayer, debentures are used by municipalities to assist in cash flowing large capital expenditures. The Ministry of Municipal Affairs regulates the level of debt incurred by Ontario municipalities, through its powers established under the Municipal Act. Ontario Regulation 403/02 provides the current rules respecting municipal debt and financial obligations. Through the rules established under these regulations, a municipality's debt capacity is capped at a level where no more than 25% of the municipality's own purpose revenue may be allotted for servicing the debt (i.e. debt charges). The Township of Perth South's calculation on Debt Capacity is shown on Schedule 81 of the Township's most recent Financial Information Return (F.I.R.). This calculates to the Township's estimated annual repayment limit of approximately $1.41 million. Based on 20-year financing at an assumed rate of 4.5%, the available debt for the Township is approximately $18.33 million. 4.7 Infrastructure Ontario Infrastructure Ontario (I.O.) is an arms-length crown corporation, which supports the Ontario government's goals of modernizing and maximizing the value of public Reserve Dec. 31 2024 Water Black Creek Water Reserve 170,716 St. Pauls Water Reserve 234,387 Watson & Associates Economists Ltd. PAGE 4-7 infrastructure. Its lending program was established as a tool to offer low-cost and longer-term financing to assist municipalities in modernizing and renewing their infrastructure. I.O. combines the infrastructure renewal needs of municipalities into an infrastructure investment "pool." I.O. will raise investment capital to finance loans to the public sector by selling Infrastructure Renewal Bonds to individual and institutional investors. I.O. provides access to infrastructure capital that would not otherwise be available to smaller borrowers. Larger borrowers receive longer loan terms than they could get in the financial markets. They can also save on costs such as legal fees and underwriting commissions. Under the I.O. approach, all borrowers receive the same low interest rate. I.O. will enter into a financial agreement with each municipality, subject to technical and credit reviews, for a loan up to the maximum amount of the loan request. To be eligible to receive these loans, municipalities must submit a formal application along with pertinent financial information. Allotments are prioritized and distributed based upon the Province's assessment of need. 4.7.1 Housing-Enabling Water Infrastructure Lending Stream On November 28, 2024, the Province and I.O. announced the Housing-Enabling Water Infrastructure (H.E.W.I.) lending stream. This lending stream will provide up to $1.0 billion in loans to municipalities for projects to construct, expand, and rehabilitate drinking water, wastewater, and stormwater infrastructure to enable new housing development. Eligible projects under this stream include: - Potable Water Assets: Treatment plants, reservoirs, local pipes, distribution system watermains, municipal service lines, and pump stations. - Wastewater Assets: Lagoon systems, pump stations, lift stations, linear assets, treatment plants, storage tanks, and collection systems. - Stormwater Assets: Management facilities and linear assets such as conveyance piping, ditches, and culverts. Key features of this lending stream include lower interest rates, the option to defer interest payments during the construction phase of a project, and extended amortization periods (up to 40 years). Additionally, municipalities have the flexibility to issue multiple debentures in sequence over the 40-year period (i.e., split terms during debentures) and to pay down the principal between sequential debentures. This program started Watson & Associates Economists Ltd. PAGE 4-8 accepting applications on December 2, 2024, and is being administered on a "first- come-first-served" basis until the maximum program amount is reached. 4.8 Recommended Capital Financing Approach Of the various funding alternatives provided in this section, the following are recommended for further consideration by the Township of Perth South for the capital expenditures (inflated) provided in Chapter 2: Table 4-2 Township of Perth South 2026-2035 Capital Forecast Financing Sources Inflated $ Tables 4-3 and 4-4 provide for the full capital expenditure and funding programs by year for the water systems in Black Creek and St. Pauls, respectively. Description Water - Black Creek Water - St. Pauls Capital Financing Provincial/Federal Grants - - Non-Growth Related Debenture Requirements - - Operating Contributions - - Black Creek Water Reserve 161,200 - St. Pauls Water Reserve - 217,000 Total Capital Financing 161,200 217,000 Watson & Associates Economists Ltd. PAGE 4-9 Table 4-3 Township of Perth South Capital Budget Forecast - Water (inflated $) Black Creek Water System Budget 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Expenditures Chemicals 1,000 5,900 1,100 1,100 1,200 1,200 1,300 - - - - - Chlorine Injectors and Parts 220 1,400 240 260 280 300 320 - - - - - Water Service Repair Parts 775 4,260 800 830 850 880 900 - - - - - Well House Repairs (Pipe, Valves, etc.) 700 3,950 750 750 800 800 850 - - - - - UV Parts (Solenoid Valves, Circuit Boards, etc.) 700 4,300 800 850 850 900 900 - - - - - Well Inspection - 3,300 - 3,300 - - - - - - - - Data Logger Maintenance 3,000 500 - - 500 - - - - - - - Overtime/Call-Outs 2,400 12,000 2,400 2,400 2,400 2,400 2,400 - - - - - Contingency 1,100 6,400 1,200 1,200 1,300 1,300 1,400 - - - - - Lifecycle: UV Lamps 950 5,500 1,000 1,050 1,100 1,150 1,200 - - - - - Chemical Pump Replacement Parts 1,175 6,260 1,200 1,230 1,250 1,280 1,300 - - - - - Pressure Tank Replacement - 2,860 930 - 950 - 980 - - - - - Analyzer Probe - 6,600 - 3,300 - - 3,300 - - - - - Chlorine Analyzer Parts (Electrolyte Membrane Cap) 500 2,740 530 530 550 550 580 - - - - - Provision for Asset Management Needs - 95,230 1,640 1,670 1,710 1,740 1,780 16,660 16,990 17,330 17,680 18,030 Total Capital Expenditures 12,520 161,200 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Capital Financing Provincial/Federal Grants - Non-Growth Related Debenture Requirements - - - - - - - - - - - - Operating Contributions - - - - - - - - - - - - Black Creek Water Reserve 12,520 161,200 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Total Capital Financing 12,520 161,200 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Total Description Forecast Watson & Associates Economists Ltd. PAGE 4-10 Table 4-3 Township of Perth South Capital Budget Forecast - Water (inflated $) (Cont'd) St. Pauls Water System Budget 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Expenditures New Drinking Water Well 160,000 - - - - - - - - - - - Chemicals 1,000 5,900 1,100 1,100 1,200 1,200 1,300 - - - - - Chlorine Injectors and Parts 220 1,410 240 260 280 300 330 - - - - - Water Service Repairs 775 4,330 800 830 850 900 950 - - - - - Well House Repairs (pipe, valves, etc.) 700 4,250 750 800 850 900 950 - - - - - UV Parts (Solenoid Valves, Circuit Boards, etc.) 750 4,300 800 850 850 900 900 - - - - - Data Logger Maintenance/Upgrade - 3,000 - 3,000 - - - - - - - - Overtime/Call-Outs 2,400 12,200 2,400 2,400 2,400 2,400 2,600 - - - - - Contingency 1,100 6,400 1,200 1,200 1,300 1,300 1,400 - - - - - Lifecycle: UV Lamps 950 5,500 1,000 1,050 1,100 1,150 1,200 - - - - - Chemical Pump Replacement Parts 1,175 6,290 1,200 1,230 1,250 1,280 1,330 - - - - - Pressure Tank Replacement 925 1,930 - 950 - 980 - - - - - - Analyzer Probe - 6,400 - 3,200 - - 3,200 - - - - - Chlorine Analyzer Parts (Electrolyte/Membrance Cap) 500 2,740 530 530 550 550 580 - - - - - Flowmeter Replacement - 3,100 - 3,100 - - - - - - - - Provision for Asset Management Needs - 149,250 6,380 6,510 6,640 6,770 6,910 22,300 22,740 23,200 23,660 24,140 Total Capital Expenditures 170,495 217,000 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Capital Financing Provincial/Federal Grants - Non-Growth Related Debenture Requirements - - - - - - - - - - - - Operating Contributions - - - - - - - - - - - - St. Pauls Water Reserve 170,495 217,000 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Total Capital Financing 170,495 217,000 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Description Total Forecast Watson & Associates Economists Ltd. Chapter 5 Overview of Expenditures and Revenues Watson & Associates Economists Ltd. PAGE 5-1 5. Overview of Expenditures and Revenues 5.1 Water Operating Expenditures In this report, the forecast water budget figures (2026 to 2035) are based on the 2025 operating budgets. The operating expenditures have been provided by staff and have been adjusted over the forecast period by an annual inflationary factor of 2.0%. Expenditures related to utilities, fuels, chemicals and other materials are assumed to increase by 5% per annum. Annual contributions have been provided to the capital reserves over the forecast period in order to minimize the need for debt to finance the capital program. 5.2 Water Operating Revenues The Township has miscellaneous revenue sources to help contribute towards operating expenditures. These miscellaneous revenues include penalties and interest payments, which have been assumed to increase at a rate of 2% annually. In addition, new user connection charges have been factored into the St. Pauls operating forecast, based on the anticipated five (5) new connections (see Section 1.8). This connection charge is currently $2,000 per new connection, however, further review of this charge has been undertaken as part of this rate study (see Section 7.2). Table 5-1 and 5-2 provides for the operating budget for the Black Creek water system and St. Pauls water system, respectively. Watson & Associates Economists Ltd. PAGE 5-2 Table 5-1 Township of Perth South Water Operating Budget Forecast - Black Creek (inflated $) Budget Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Expenditures Operating Costs Direct Salaries & Wages 6,656 6,656 6,656 6,656 6,656 6,790 6,930 7,070 7,210 7,350 7,500 Employee - CPP 130 130 130 130 130 133 136 139 142 145 148 Employee - EI 153 153 153 153 153 156 159 162 165 168 171 Employee - EHT 130 130 130 130 130 133 136 139 142 145 148 Employee WSIB 228 228 228 228 228 233 238 243 248 253 258 Employee Benefits 387 387 387 387 387 395 403 411 419 427 436 Employee - OMERS 599 599 599 599 599 611 623 635 648 661 674 Materials & Supplies 81 83 85 87 89 91 93 95 97 99 101 Hydro 3,478 3,572 3,668 3,767 3,869 4,060 4,260 4,470 4,690 4,920 5,170 Heat 443 455 467 480 493 518 544 571 600 630 662 Postage and Courier 121 124 127 131 135 138 141 144 147 150 153 Telephone 560 577 595 613 632 645 658 671 684 698 712 Insurance 120 123 126 129 132 135 138 141 144 147 150 Building Repairs and Maintenance 500 514 528 543 558 569 580 592 604 616 628 Equipment Repairs and Maintenance 2,000 2,055 2,112 2,170 2,230 2,270 2,320 2,370 2,420 2,470 2,520 OCWA 1 - Fixed Price 24,570 25,239 25,926 26,631 27,355 27,900 28,460 29,030 29,610 30,200 30,800 OCWA 2 - Contract Extras 5,420 5,570 5,724 5,882 6,045 6,170 6,290 6,420 6,550 6,680 6,810 OCWA 3 - Third Party 4,034 4,135 4,238 4,344 4,453 4,540 4,630 4,720 4,810 4,910 5,010 Contracted Services 5,500 514 528 542 557 568 579 591 603 615 627 Security System Monitoring 328 337 346 355 365 372 379 387 395 403 411 Property Taxes 797 820 843 867 891 909 927 946 965 984 1,004 Sub Total Operating 56,235 52,401 53,596 54,824 56,087 57,336 58,624 59,947 61,293 62,671 64,093 Capital-Related Existing Debt (Principal) - Non-Growth Related - - - - - - - - - - Existing Debt (Interest) - Non-Growth Related - - - - - - - - - - New Non-Growth Related Debt (Principal) - - - - - - - - - - New Non-Growth Related Debt (Interest) - - - - - - - - - - Transfer to Capital - - - - - - - - - - - Transfer to Capital Reserve - 6,481 8,226 10,085 12,062 14,215 15,071 15,957 16,886 17,851 18,842 Sub Total Capital Related - 6,481 8,226 10,085 12,062 14,215 15,071 15,957 16,886 17,851 18,842 Total Expenditures 56,235 58,882 61,822 64,909 68,149 71,551 73,695 75,904 78,179 80,522 82,935 Revenues Penalty & Interest 180 185 190 195 200 204 208 212 216 220 224 Contributions from Reserves / Reserve Funds 144 - - - - - - - - - - Total Operating Revenue 324 185 190 195 200 204 208 212 216 220 224 Water Billing Recovery - Total 55,911 58,697 61,632 64,714 67,949 71,347 73,487 75,692 77,963 80,302 82,711 Forecast Watson & Associates Economists Ltd. PAGE 5-3 Table 5-2 Township of Perth South Water Operating Budget Forecast - St. Pauls (inflated $) Budget Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Expenditures Operating Costs Direct Salaries & Wages 6,656 6,656 6,656 6,656 6,656 6,790 6,930 7,070 7,210 7,350 7,500 Employee - CPP 130 130 130 130 130 133 136 139 142 145 148 Employee - EI 153 153 153 153 153 156 159 162 165 168 171 Employee - EHT 130 130 130 130 130 133 136 139 142 145 148 Employee - WSIB 228 228 228 228 228 233 238 243 248 253 258 Employee Benefits 387 387 387 387 387 395 403 411 419 427 436 Employee - OMERS 599 599 599 599 599 611 623 635 648 661 674 Materials & Supplies 252 259 266 273 281 287 293 299 305 311 317 Hydro 3,389 3,481 3,575 3,672 3,771 3,960 4,160 4,370 4,590 4,820 5,060 Heat 781 802 824 846 869 912 958 1,006 1,056 1,109 1,164 Postage and Courier 121 124 127 131 135 138 141 144 147 150 153 Telephone 550 565 581 597 614 626 639 652 665 678 692 Insurance 119 122 125 128 131 134 137 140 143 146 149 Equipment Repairs and Maintenance 1,713 1,760 1,809 1,859 1,910 1,950 1,990 2,030 2,070 2,110 2,150 OCWA 1 - Fixed Price 24,571 25,240 25,927 26,632 27,356 27,900 28,460 29,030 29,610 30,200 30,800 OCWA 2 - Contract Extras 3,558 3,657 3,758 3,862 3,969 4,050 4,130 4,210 4,290 4,380 4,470 OCWA 3 - Third Party 4,108 4,219 4,333 4,450 4,570 4,660 4,750 4,850 4,950 5,050 5,150 Contracted Services 6,040 1,069 1,099 1,129 1,160 1,180 1,200 1,220 1,240 1,260 1,290 Security System Monitoring 175 180 185 190 195 199 203 207 211 215 219 Sub Total Operating 53,660 49,761 50,892 52,052 53,244 54,447 55,686 56,957 58,251 59,578 60,949 Capital-Related Existing Debt (Principal) - Non-Growth Related - - - - - - - - - - - Existing Debt (Interest) - Non-Growth Related - - - - - - - - - - - New Non-Growth Related Debt (Principal) - - - - - - - - - - - New Non-Growth Related Debt (Interest) - - - - - - - - - - - Transfer to Capital - - - - - - - - - - - Transfer to Water Reserve 13,605 20,635 19,191 20,132 21,104 22,126 23,178 24,267 25,404 26,581 27,788 Sub Total Capital Related 13,605 20,635 19,191 20,132 21,104 22,126 23,178 24,267 25,404 26,581 27,788 Total Expenditures 67,265 70,396 70,083 72,184 74,348 76,573 78,864 81,224 83,655 86,159 88,737 Revenues Penalty & Interest 503 517 531 546 561 572 583 595 607 619 631 New User Connection Fee 6,000 4,000 - - - - - - - - - Contributions from Reserves / Reserve Funds - - - - - - - - - - - Total Operating Revenue 6,503 4,517 531 546 561 572 583 595 607 619 631 Water Billing Recovery - Total 60,762 65,879 69,552 71,638 73,787 76,001 78,281 80,629 83,048 85,540 88,106 Forecast Watson & Associates Economists Ltd. Chapter 6 Pricing Structures Watson & Associates Economists Ltd. PAGE 6-1 6. Pricing Structures 6.1 Introduction Rates, in their simplest form, can be defined as total costs to maintain the utility function divided by either the total expected volume to be generated for the period for metered systems, or the total number of customers for unmetered systems. Total costs are usually a combination of operating costs (e.g. staff costs, distribution costs, maintenance, administration, etc.) and capital-related costs (e.g. past debt to finance capital projects, transfers to reserves to finance future expenditures, etc.). The schematic below provides a simplified illustration of the rate calculation for water. "Annual Costs" These operating and capital expenditures will vary over time. Examples of factors that will affect the expenditures over time are provided below. Operations - Inflation; - Increased maintenance as system ages; and - Changes to provincial legislation. Operations - Staff and operating authority (OCWA) costs - Distribution Costs - Maintenance - Meter reading and billing, etc. Capital Related - Past debt - Contributions to reserves - Contribution to capital Total Costs Customers Rate Watson & Associates Economists Ltd. PAGE 6-2 Capital Related - New capital will be built as areas expand; - Replacement capital needed as system ages; and - Financing of capital costs are a function of policy regarding reserves and direct financing from rates (pay as you go), debt and user pay methods (Municipal Act). 6.2 Alternative Pricing Structures Throughout Ontario, and as well, Canada, the use of pricing mechanisms varies between municipalities. The use of a particular form of pricing depends upon numerous factors, including Council preference, administrative structure, surplus/deficit system capacities, economic/demographic conditions, to name a few. Municipalities within Ontario have two basic forms of collecting revenues for water purposes, those being through incorporation of the costs within the tax rate charged on property assessment and/or through the establishment of a specific water rate billed to the customer. Within the rate methods, there are five basic rate structures employed along with other variations: - Flat Rate (non-metered customers); - Constant Rate; - Declining Block Rate; - Increasing (or Inverted) Block Rate; - Hump Back Block Rate; and - Base Charges. The definitions and general application of the various methods are as follows: Property Assessment: This method incorporates the total costs of providing water into the general requisition or the assessment base of the municipality. This form of collection is a "wealth tax," as payment increases directly with the value of property owned and bears no necessary relationship to actual consumption. This form is easy to administer as the costs to be recovered are incorporated in the calculation for all general services, normally collected through property taxes. Flat Rate: This rate is a constant charge applicable to all customers served. The charge is calculated by dividing the total number of user households and other entities Watson & Associates Economists Ltd. PAGE 6-3 (e.g. businesses) into the costs to be recovered. This method does not recognize differences in actual consumption but provides for a uniform spreading of costs across all users. Some municipalities define users into different classes of similar consumption patterns, that is, a commercial user, residential user and industrial user, and charge a flat rate by class. Each user is then billed on a periodic basis. No meters are required to facilitate this method, but an accurate estimate of the number of users is required. This method ensures set revenue for the collection period but is not sensitive to consumption, hence may cause a shortfall or surplus of revenues collected. Constant Rate: This rate is a volume-based rate, in which the consumer pays the same price per unit consumed, regardless of the volume. The price per unit is calculated by dividing the total cost of the service by the total volume used by total consumers. The bill to the consumer climbs uniformly as the consumption increases. This form of rate requires the use of meters to record the volume consumed by each user. This method closely aligns the revenue recovery with consumption. Revenue collected varies directly with the consumption volume. Declining Block Rates: This rate structure charges a successively lower price for set volumes, as consumption increases through a series of "blocks." That is to say that within set volume ranges, or blocks, the charge per unit is set at one rate. Within the next volume range, the charge per unit decreases to a lower rate, and so on. Typically, the first, or first and second blocks cover residential and light commercial uses. Subsequent blocks normally are used for heavier commercial and industrial uses. This rate structure requires the use of meters to record the volume consumed by each type of user. This method requires the collection and analysis of consumption patterns by user classification to establish rates at a level which does not over or under collect revenue from rate payers. Increasing or Inverted Block Rates: The increasing block rate works essentially the same way as the declining block rate, except that the price of water in successive blocks increases rather than declines. Under this method the consumer's bill rises faster with higher volumes used. This rate structure also requires the use of meters to record the volume consumed by each user. This method requires, as with the declining block structure, the collection and analysis of consumption patterns by user classification to establish rates at a level which does not over or under collect from rate payers. Watson & Associates Economists Ltd. PAGE 6-4 The Hump Back Rate: The hump back rate is a combination of an increasing block rate and the declining block rate. Under this method the consumer's bill rises with higher volumes used up to a certain level and then begins to fall for volumes in excess of levels set for the increasing block rate. 6.3 Assessment of Alternative Pricing Structures The adoption by a municipality or utility of any one particular pricing structure is normally a function of a variety of administrative, social, demographic and financial factors. The number of factors, and the weighting each particular factor receives, can vary between municipalities. The following is a review of some of the more prevalent factors. Figure 6-1 Factors in Assessing Rate Structures and Funding Approaches Cost Recovery Cost recovery is a prime factor in establishing a particular pricing structure. Costs can be loosely defined into different categories: operations, maintenance, capital, financing and administration. These costs often vary between municipalities and even within a municipality, based on consumption patterns, infrastructure age, economic growth, etc. The pricing alternatives defined earlier can all achieve the cost recovery goal, but some do so more precisely than others. Fixed pricing structures, such as Property Administrative Burden Financial Sustainability Conservation Equity Cost Recovery Funding Approach Policy Analysis Watson & Associates Economists Ltd. PAGE 6-5 Assessment and Flat Rate, are established on the value of property or on the number of units present in the municipality, but do not adjust in accordance with consumption. Thus, if actual consumption for the year is greater than projected, the municipality incurs a higher cost of production, but the revenue base remains static (since it was determined at the beginning of the year), thus potentially providing a funding shortfall. Conversely, if the consumption level declines below projections, fixed pricing structures will produce more revenue than actual costs incurred. The other pricing methods (declining block, constant rate, increasing block) are consumption-based and generally will generate revenues in proportion to actual consumption. Administration Administration is defined herein as the staffing, equipment and supplies required to support the undertaking of a particular pricing strategy. This factor not only addresses the physical tangible requirements to support the collection of the revenues, but also the intangible requirements, such as policy development. The easiest pricing structure to support is the Property Assessment structure. As municipalities undertake the process of calculating property tax bills and the collection process for their general services, the incorporation of the water costs into this calculation would have virtually no impact on the administrative process and structure. The Flat Rate pricing structure is relatively easy to administer as well. It is normally calculated to collect a set amount, either on a monthly, quarterly, semi-annual or annual basis, and is billed directly to the customer. The impact on administration centres mostly on the accounts receivable or billing area of the municipality, but normally requires minor additional staff or operating costs to undertake. The three remaining methods, those being Increasing Block Rate, Constant Rate and Declining Block Rate, have a more dramatic effect on administration. These methods are dependent upon actual consumption and hence involve a major structure in place to administer. First, meters must be installed in all existing units in the municipality, and units to be subsequently built must be required to include these meters. Second, meter readings must be undertaken periodically. Hence staff must be available for this purpose or a service contract must be negotiated. Third, the billings process must be expanded to accommodate this process. Billing must be done per a defined period, Watson & Associates Economists Ltd. PAGE 6-6 requiring staff to produce the bills. Lastly, either through increased staffing or by service contract, an annual maintenance program must be set up to ensure meters are working effectively in recording consumed volumes. The benefit derived from the installation of meters is that information on consumption patterns becomes available. This information provides benefit to administration in calculating rates which will ensure revenue recovery. Additionally, when planning what services are to be constructed in future years, the municipality or utility has documented consumption patterns distinctive to its own situation, which can be used to project sizing of growth-related works. Equity Equity is always a consideration in the establishment of pricing structures but its definition can vary depending on a municipality's circumstances and based on the subjective interpretation of those involved. For example: is the price charged to a particular class of rate payer consistent with those of a similar class in surrounding municipalities; through the pricing structure does one class of rate payer pay more than another class; should one pay based on ability to pay, or on the basis that a unit of water costs the same to supply no matter who consumes it; etc.? There are many interpretations. Equity therefore must be viewed broadly in light of many factors as part of achieving what is best for the municipality as a whole. Conservation In today's society, conservation of natural resources is increasingly being more highly valued. Controversy continuously focuses on the preservation of non-renewable resources and on the proper management of renewable resources. Conservation is also a concept which applies to a municipality facing physical limitations in the amount of water which can be supplied to an area. As well, financial constraints can encourage conservation in a municipality where the cost of providing each additional unit is increasing. Pricing structures such as property assessment and flat rate do not, in themselves, encourage conservation. In fact, depending on the price which is charged, they may even encourage resource "squandering," either because consumers, without the price discipline, consume water at will, or the customer wants to get his money's worth and hence adopts more liberal consumption patterns. The fundamental reason for this is Watson & Associates Economists Ltd. PAGE 6-7 that the price paid for the service bears no direct relationship to the volume consumed and hence is viewed as a "tax," instead of being viewed as the price of a purchased commodity. The Declining Block Rate provides a decreasing incentive towards conservation. By creating awareness of volumes consumed, the consumer can reduce his total costs by restricting consumption; however, the incentive lessens as more water is consumed, because the marginal cost per unit declines as the consumer enters the next block pricing range. Similarly, those whose consumption level is at the top end of a block have less incentive to reduce consumption. The Constant Rate structure presents the customer with a linear relationship between consumption and the cost thereof. As the consumer pays a fixed cost per unit, his bill will vary directly with the amount consumed. This method presents tangible incentive for consumers to conserve water. As metering provides direct feedback as to usage patterns and the consumer has direct control over the total amount paid for the commodity, the consumer is encouraged to use only those volumes that are reasonably required. The Inverted Block method presents the most effective pricing method for encouraging conservation. Through this method, the price per unit consumed increases as total volumes consumed grow. The consumer becomes aware of consumption through metering with the charges increasing dramatically with usage. Hence, there normally is awareness that exercising control over usage can produce significant savings. This method not only encourages conservation methods, but may also penalize legitimate high-volume users if not properly structured. Figure 6-2 provides a schematic representation of the various rate structures (note property tax as a basis for revenue recovery has not been presented for comparison, as the proportion of taxes paid varies in direct proportion to the market value of the property). The graphs on the left-hand side of the figure present the cost per unit for each additional amount of water consumed. The right-hand side of the figure presents the impact on the customer's bill as the volume of water increases. Following the schematic is a table summarizing each rate structure. Watson & Associates Economists Ltd. PAGE 6-8 Figure 6-2 "Rate Structure" "Impact on Individual Customer" Flat Rate: Cost Per Unit Total Bill Charged Volume Volume Constant Rate: Cost Per Unit Total Bill Charged Volume Volume Declining Block Rate: Cost Per Unit Total Bill Charged Volume Volume Increasing Block Rate: Cost Per Unit Total Bill Charged Volume Volume Hump Back Rate: Cost Per Unit Total Bill Charged Volume Volume WATER RATE PRICING CONCEPTS Watson & Associates Economists Ltd. PAGE 6-9 Figure 6-3 Summary of Various Rate Structures and their Impact on Customer Bills as Volume Usage Increases Rate Structure Cost Per Unit As Volume Increases Impact On Customer Bill As Volume Increases Flat Rate Cost per unit decreases as more volume consumed Bill remains the same no matter how much volume is consumed Constant Rate Cost per unit remains the same Bill increases in direct proportion to consumption Declining Block Cost per unit decreases as threshold targets are achieved Bill increases at a slower rate as volumes increase Increasing Block Cost per unit increases as threshold targets are achieved Bill increases at a faster rate as volumes increase Hump Back Rate Combination of an increasing block at the lower consumption volumes and then converts to a declining block for the high consumption Bill increases at a faster rate at the lower consumption amounts and then slows as volumes increase 6.4 Rate Structures in Ontario In a past survey of over 170 municipalities (approximately half of the municipalities who provide water and/or sewer), all forms of rate structures are in use by Ontario municipalities. The most common rate structure is the constant rate (for metered municipalities). Most municipalities (approximately 92%) who have volume rate structures also impose a base monthly charge. Historically, the development of a base charge often reflected either the recovery of meter reading/billing/collection costs, plus administration or those costs plus certain fixed costs (such as capital contributions or reserve contributions). More recently, many municipalities have started to establish base charges based on ensuring a secure portion of the revenue stream which does not vary with volume consumption. Selection Watson & Associates Economists Ltd. PAGE 6-10 of the quantum of the base charge is a matter of policy selected by individual municipalities. 6.5 Recommended Rate Structures Based on the foregoing, it is recommended that the Township continue the same flat rate structure in the future for Black Creek and St. Pauls. The Township may consider implementing meters in the future to provide for an alternative rate structure, however the benefits of metering will need to be weighed against other factors such as cost of installation, ongoing operating costs, additional administrative burden, etc. Watson & Associates Economists Ltd. Chapter 7 Analysis of Water Rates and Policy Matters Watson & Associates Economists Ltd. PAGE 7-1 7. Analysis of Water Rates and Policy Matters 7.1 Introduction To summarize the analysis undertaken thus far, Chapter 2 reviewed capital-related issues and responds to the provincial directives to maintain and upgrade infrastructure to required levels. Chapter 4 provided a review of capital financing options to which water reserve contributions will be the basis for financing future capital replacement. Chapter 5 established the 10-year operating forecast of expenditures including an annual capital reserve contribution. This chapter will provide for the calculation of the flat rates over the forecast period. These calculations will be based on the net operating expenditures (the variable costs) provided in Chapter 5, divided by the number of customers as provided in section 1.8. 7.2 Water Rates Based on the discussion of rate structures provided in section 6.5 and the recommendation to continue with the present structure, the rates are calculated for each system by taking the net recoverable amounts from Table 5-1 and 5-2 (the product of total expenditures less non-rate revenue) and completes the calculation by dividing them by the number of customers resulting in the forecasted rates. The needs for water are balanced throughout the forecast period for both water system. Additional operating expenditures and lifecycle costs create pressure on the financial sustainability of the water systems. The Black Creek water reserve has a balance of approximately $170,700 as of December 31, 2024. In order to meet the needs for water, it is recommended that the flat rates for customers in the Black Creek system increase by 5% annually from 2026 to 2030, and 3% every year thereafter. These increases will allow for the Township to fund capital needs and maintain existing assets as identified through the Asset Management Plan. In addition, Township staff have also identified the need to replace the existing water well within the next 15 years. These recommended rate increases will allow the Township to fund this replacement utilizing existing reserve balances. With respect to the St. Pauls water system, the water reserve has a balance of approximately $234,400 as of December 31, 2024. It is recommended that the flat rates Watson & Associates Economists Ltd. PAGE 7-2 for St. Pauls water users increase by 3% annually from 2026 to 2034. These rate increases allow the Township to fund the ongoing operating needs of the system, the identified capital needs, and provides for the maintenance of annual asset replacements in line with the Asset Management Plan recommendations. The above increases are recommended to ensure that the Township can fund the capital and operating costs without the need for debentures. The forecasted rates are presented below in Table 7-1 and 7-2 for Black Creek and St. Pauls, respectively. Detailed calculations of the flat rates are provided in Appendix A. 7.3 Connection Fees The Township imposes a connection fee for any new users that connect to the water system. The current rate is $2,000 per new property and is based on By-law #40-2002 which was passed in 2002. It is recommended that these rates be indexed to current dollars so that the charge is better aligned to the costs of the water system. The indexed rate would result in a connection fee of $5,500 per property. Watson & Associates Economists Ltd. PAGE 7-3 Table 7-1 Township of Perth South Forecasted Annual Residential Water Bill - Black Creek Table 7-2 Township of Perth South Forecasted Annual Residential Water Bill - St. Pauls Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Annual Flat Rate $1,694 $1,779 $1,868 $1,961 $2,059 $2,162 $2,227 $2,294 $2,363 $2,433 $2,506 % Increase 5% 5% 5% 5% 5% 3% 3% 3% 3% 3% Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Annual Flat Rate $1,599 $1,647 $1,696 $1,747 $1,800 $1,854 $1,909 $1,967 $2,026 $2,086 $2,149 % Increase 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% Watson & Associates Economists Ltd. Chapter 8 Recommendations Watson & Associates Economists Ltd. PAGE 8-1 8. Recommendations As presented within this report, capital and operating expenditures have been identified and forecast over a 10-year period for water services. Based upon the foregoing, the following recommendations are identified for consideration by Township Council: 1. That Council provide for the recovery of all water costs through full cost recovery rates. 2. That Council consider the Capital Plan for water as provided in Tables 2-1 and 2- 2 and the associated Capital Financing Plan as set out in Tables 4-3 and 4-4. 3. That Council consider the water rates for Black Creek and St. Pauls as provided in Tables 7-1 and 7-2, respectively. 4. That Council consider the updated connection fee as provided in Section 7.3. Appendices Watson & Associates Economists Ltd. PAGE A-1 Appendix A Detailed Water Rate Calculations - Black Creek Watson & Associates Economists Ltd. PAGE A-2 Appendix A: Detailed Water Rate Calculations - Black Creek Table A-1 Township of Perth South Capital Budget Forecast (Inflated $) - Black Creek Budget 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Expenditures Chemicals 1,000 5,900 1,100 1,100 1,200 1,200 1,300 - - - - - Chlorine Injectors and Parts 220 1,400 240 260 280 300 320 - - - - - Water Service Repair Parts 775 4,260 800 830 850 880 900 - - - - - Well House Repairs (Pipe, Valves, etc.) 700 3,950 750 750 800 800 850 - - - - - UV Parts (Solenoid Valves, Circuit Boards, etc.) 700 4,300 800 850 850 900 900 - - - - - Well Inspection - 3,300 - 3,300 - - - - - - - - Data Logger Maintenance 3,000 500 - - 500 - - - - - - - Overtime/Call-Outs 2,400 12,000 2,400 2,400 2,400 2,400 2,400 - - - - - Contingency 1,100 6,400 1,200 1,200 1,300 1,300 1,400 - - - - - Lifecycle: UV Lamps 950 5,500 1,000 1,050 1,100 1,150 1,200 - - - - - Chemical Pump Replacement Parts 1,175 6,260 1,200 1,230 1,250 1,280 1,300 - - - - - Pressure Tank Replacement - 2,860 930 - 950 - 980 - - - - - Analyzer Probe - 6,600 - 3,300 - - 3,300 - - - - - Chlorine Analyzer Parts (Electrolyte Membrane Cap) 500 2,740 530 530 550 550 580 - - - - - Provision for Asset Management Needs - 95,230 1,640 1,670 1,710 1,740 1,780 16,660 16,990 17,330 17,680 18,030 Total Capital Expenditures 12,520 161,200 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Capital Financing Provincial/Federal Grants - Non-Growth Related Debenture Requirements - - - - - - - - - - - - Operating Contributions - - - - - - - - - - - - Black Creek Water Reserve 12,520 161,200 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Total Capital Financing 12,520 161,200 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Total Description Forecast Watson & Associates Economists Ltd. PAGE A-3 Table A-2 Township of Perth South Schedule of Debenture Repayments - Black Creek Table A-3 Township of Perth South Black Creek Water Reserve Continuity (Inflated $) Debenture Principal Year (Inflated) 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2026 - - - - - - - - - - 2027 - - - - - - - - - 2028 - - - - - - - - 2029 - - - - - - - 2030 - - - - - - 2031 - - - - - 2032 - - - - 2033 - - - 2034 - - 2035 - Total Annual Debt Charges - - - - - - - - - - - - 2025 Forecast Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Opening Balance 170,716 158,052 154,982 147,633 146,857 149,348 149,279 150,644 152,603 155,202 158,480 Transfer from Operating - 6,481 8,226 10,085 12,062 14,215 15,071 15,957 16,886 17,851 18,842 Transfer for Lifecycle Needs Transfer to Capital 12,520 12,590 18,470 13,740 12,500 17,210 16,660 16,990 17,330 17,680 18,030 Transfer to Operating 144 - - - - - - - - - - Closing Balance 158,052 151,943 144,738 143,978 146,419 146,352 147,690 149,611 152,159 155,373 159,292 Interest 3,039 2,895 2,880 2,928 2,927 2,954 2,992 3,043 3,107 3,186 Watson & Associates Economists Ltd. PAGE A-4 Table A-4 Township of Perth South Operating Budget Forecast (Inflated $) - Black Creek Budget Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Expenditures Operating Costs Direct Salaries & Wages 6,656 6,656 6,656 6,656 6,656 6,790 6,930 7,070 7,210 7,350 7,500 Employee - CPP 130 130 130 130 130 133 136 139 142 145 148 Employee - EI 153 153 153 153 153 156 159 162 165 168 171 Employee - EHT 130 130 130 130 130 133 136 139 142 145 148 Employee WSIB 228 228 228 228 228 233 238 243 248 253 258 Employee Benefits 387 387 387 387 387 395 403 411 419 427 436 Employee - OMERS 599 599 599 599 599 611 623 635 648 661 674 Materials & Supplies 81 83 85 87 89 91 93 95 97 99 101 Hydro 3,478 3,572 3,668 3,767 3,869 4,060 4,260 4,470 4,690 4,920 5,170 Heat 443 455 467 480 493 518 544 571 600 630 662 Postage and Courier 121 124 127 131 135 138 141 144 147 150 153 Telephone 560 577 595 613 632 645 658 671 684 698 712 Insurance 120 123 126 129 132 135 138 141 144 147 150 Building Repairs and Maintenance 500 514 528 543 558 569 580 592 604 616 628 Equipment Repairs and Maintenance 2,000 2,055 2,112 2,170 2,230 2,270 2,320 2,370 2,420 2,470 2,520 OCWA 1 - Fixed Price 24,570 25,239 25,926 26,631 27,355 27,900 28,460 29,030 29,610 30,200 30,800 OCWA 2 - Contract Extras 5,420 5,570 5,724 5,882 6,045 6,170 6,290 6,420 6,550 6,680 6,810 OCWA 3 - Third Party 4,034 4,135 4,238 4,344 4,453 4,540 4,630 4,720 4,810 4,910 5,010 Contracted Services 5,500 514 528 542 557 568 579 591 603 615 627 Security System Monitoring 328 337 346 355 365 372 379 387 395 403 411 Property Taxes 797 820 843 867 891 909 927 946 965 984 1,004 Sub Total Operating 56,235 52,401 53,596 54,824 56,087 57,336 58,624 59,947 61,293 62,671 64,093 Capital-Related Existing Debt (Principal) - Non-Growth Related - - - - - - - - - - Existing Debt (Interest) - Non-Growth Related - - - - - - - - - - New Non-Growth Related Debt (Principal) - - - - - - - - - - New Non-Growth Related Debt (Interest) - - - - - - - - - - Transfer to Capital - - - - - - - - - - - Transfer to Capital Reserve - 6,481 8,226 10,085 12,062 14,215 15,071 15,957 16,886 17,851 18,842 Sub Total Capital Related - 6,481 8,226 10,085 12,062 14,215 15,071 15,957 16,886 17,851 18,842 Total Expenditures 56,235 58,882 61,822 64,909 68,149 71,551 73,695 75,904 78,179 80,522 82,935 Revenues Penalty & Interest 180 185 190 195 200 204 208 212 216 220 224 Contributions from Reserves / Reserve Funds 144 - - - - - - - - - - Total Operating Revenue 324 185 190 195 200 204 208 212 216 220 224 Water Billing Recovery - Total 55,911 58,697 61,632 64,714 67,949 71,347 73,487 75,692 77,963 80,302 82,711 Forecast Watson & Associates Economists Ltd. PAGE A-5 Table A-5 Township of Perth South Water Rate Forecast (Inflated $) - Black Creek Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total Water Billing Recovery 55,911 58,697 61,632 64,714 67,949 71,347 73,487 75,692 77,963 80,302 82,711 Total Customers 33 33 33 33 33 33 33 33 33 33 33 Constant Rate 1,694 1,779 1,868 1,961 2,059 2,162 2,227 2,294 2,363 2,433 2,506 Annual Percentage Change 5% 5% 5% 5% 5% 3% 3% 3% 3% 3% Watson & Associates Economists Ltd. PAGE B-1 Appendix B Detailed Water Rate Calculations - St. Pauls Watson & Associates Economists Ltd. PAGE B-2 Appendix B: Detailed Water Rate Calculations - St. Pauls Table B-1 Township of Perth South Capital Budget Forecast (Inflated $) - St. Pauls Budget 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Capital Expenditures New Drinking Water Well 160,000 - - - - - - - - - - - Chemicals 1,000 5,900 1,100 1,100 1,200 1,200 1,300 - - - - - Chlorine Injectors and Parts 220 1,410 240 260 280 300 330 - - - - - Water Service Repairs 775 4,330 800 830 850 900 950 - - - - - Well House Repairs (pipe, valves, etc.) 700 4,250 750 800 850 900 950 - - - - - UV Parts (Solenoid Valves, Circuit Boards, etc.) 750 4,300 800 850 850 900 900 - - - - - Data Logger Maintenance/Upgrade - 3,000 - 3,000 - - - - - - - - Overtime/Call-Outs 2,400 12,200 2,400 2,400 2,400 2,400 2,600 - - - - - Contingency 1,100 6,400 1,200 1,200 1,300 1,300 1,400 - - - - - Lifecycle: UV Lamps 950 5,500 1,000 1,050 1,100 1,150 1,200 - - - - - Chemical Pump Replacement Parts 1,175 6,290 1,200 1,230 1,250 1,280 1,330 - - - - - Pressure Tank Replacement 925 1,930 - 950 - 980 - - - - - - Analyzer Probe - 6,400 - 3,200 - - 3,200 - - - - - Chlorine Analyzer Parts (Electrolyte/Membrance Cap) 500 2,740 530 530 550 550 580 - - - - - Flowmeter Replacement - 3,100 - 3,100 - - - - - - - - Provision for Asset Management Needs - 149,250 6,380 6,510 6,640 6,770 6,910 22,300 22,740 23,200 23,660 24,140 Total Capital Expenditures 170,495 217,000 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Capital Financing Provincial/Federal Grants - Non-Growth Related Debenture Requirements - - - - - - - - - - - - Operating Contributions - - - - - - - - - - - - St. Pauls Water Reserve 170,495 217,000 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Total Capital Financing 170,495 217,000 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Description Total Forecast Watson & Associates Economists Ltd. PAGE B-3 Table B-2 Township of Perth South Schedule of Debenture Repayments (Inflated $) - St. Pauls Table B-3 Township of Perth South St. Pauls Water Reserve Continuity (Inflated $) Debenture Principal Year (Inflated) 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2026 - - - - - - - - - - 2027 - - - - - - - - - 2028 - - - - - - - - 2029 - - - - - - - 2030 - - - - - - 2031 - - - - - 2032 - - - - 2033 - - - 2034 - - 2035 - Total Annual Debt Charges - - - - - - - - - - - - 2025 Forecast Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Opening Balance 234,387 77,497 83,366 77,058 81,518 85,673 87,871 90,524 93,893 98,019 102,959 Transfer from Operating 13,605 20,635 19,191 20,132 21,104 22,126 23,178 24,267 25,404 26,581 27,788 Transfer to Capital 170,495 16,400 27,010 17,270 18,630 21,650 22,300 22,740 23,200 23,660 24,140 Transfer to Operating - - - - - - - - - - - Closing Balance 77,497 81,732 75,547 79,920 83,993 86,148 88,749 92,052 96,097 100,940 106,607 Interest 1,635 1,511 1,598 1,680 1,723 1,775 1,841 1,922 2,019 2,132 Watson & Associates Economists Ltd. PAGE B-4 Table B-4 Township of Perth South Water Operating Budget Forecast (Inflated $) - St. Pauls Budget Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Expenditures Operating Costs Direct Salaries & Wages 6,656 6,656 6,656 6,656 6,656 6,790 6,930 7,070 7,210 7,350 7,500 Employee - CPP 130 130 130 130 130 133 136 139 142 145 148 Employee - EI 153 153 153 153 153 156 159 162 165 168 171 Employee - EHT 130 130 130 130 130 133 136 139 142 145 148 Employee - WSIB 228 228 228 228 228 233 238 243 248 253 258 Employee Benefits 387 387 387 387 387 395 403 411 419 427 436 Employee - OMERS 599 599 599 599 599 611 623 635 648 661 674 Materials & Supplies 252 259 266 273 281 287 293 299 305 311 317 Hydro 3,389 3,481 3,575 3,672 3,771 3,960 4,160 4,370 4,590 4,820 5,060 Heat 781 802 824 846 869 912 958 1,006 1,056 1,109 1,164 Postage and Courier 121 124 127 131 135 138 141 144 147 150 153 Telephone 550 565 581 597 614 626 639 652 665 678 692 Insurance 119 122 125 128 131 134 137 140 143 146 149 Equipment Repairs and Maintenance 1,713 1,760 1,809 1,859 1,910 1,950 1,990 2,030 2,070 2,110 2,150 OCWA 1 - Fixed Price 24,571 25,240 25,927 26,632 27,356 27,900 28,460 29,030 29,610 30,200 30,800 OCWA 2 - Contract Extras 3,558 3,657 3,758 3,862 3,969 4,050 4,130 4,210 4,290 4,380 4,470 OCWA 3 - Third Party 4,108 4,219 4,333 4,450 4,570 4,660 4,750 4,850 4,950 5,050 5,150 Contracted Services 6,040 1,069 1,099 1,129 1,160 1,180 1,200 1,220 1,240 1,260 1,290 Security System Monitoring 175 180 185 190 195 199 203 207 211 215 219 Sub Total Operating 53,660 49,761 50,892 52,052 53,244 54,447 55,686 56,957 58,251 59,578 60,949 Capital-Related Existing Debt (Principal) - Non-Growth Related - - - - - - - - - - - Existing Debt (Interest) - Non-Growth Related - - - - - - - - - - - New Non-Growth Related Debt (Principal) - - - - - - - - - - - New Non-Growth Related Debt (Interest) - - - - - - - - - - - Transfer to Capital - - - - - - - - - - - Transfer to Water Reserve 13,605 20,635 19,191 20,132 21,104 22,126 23,178 24,267 25,404 26,581 27,788 Sub Total Capital Related 13,605 20,635 19,191 20,132 21,104 22,126 23,178 24,267 25,404 26,581 27,788 Total Expenditures 67,265 70,396 70,083 72,184 74,348 76,573 78,864 81,224 83,655 86,159 88,737 Revenues Penalty & Interest 503 517 531 546 561 572 583 595 607 619 631 New User Connection Fee 6,000 4,000 - - - - - - - - - Contributions from Reserves / Reserve Funds - - - - - - - - - - - Total Operating Revenue 6,503 4,517 531 546 561 572 583 595 607 619 631 Water Billing Recovery - Total 60,762 65,879 69,552 71,638 73,787 76,001 78,281 80,629 83,048 85,540 88,106 Forecast Watson & Associates Economists Ltd. PAGE B-5 Table B-5 Township of Perth South Water Rate Forecast - St. Pauls Description 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total Water Billing Recovery 60,762 65,879 69,552 71,638 73,787 76,001 78,281 80,629 83,048 85,540 88,106 Total Customers 38 40 41 41 41 41 41 41 41 41 41 Constant Rate 1,599.00 1,646.97 1,696.38 1,747.27 1,799.69 1,853.68 1,909.29 1,966.57 2,025.57 2,086.34 2,148.93 Annual Percentage Change 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%