| permit required for | Construct, demolish, occupy, or change use of a building; construct or demolish a Sewage System, unless a permit as set out in Schedule "A" is issued. | s. 3.1, 3.2, 3.3 |
| fee basis | Total fees calculated using Schedule "C - 1" methods and Schedule "C - 2" individual fees; Schedule "C - 2" adjusted annually by CPI. | s. 7.1 |
| authority | Chief Building Official and Inspectors | s. 2.2.4, 2.2.8 |
scout note
Town of Perth's consolidated Building Code Act by-law regulating construction, demolition, change-of-use and on-site sewage-system permits: application requirements, inspections, and fees (Schedules A-D; fee tables C-1/C-2 adjusted annually by CPI). Passed 16 Apr 2024.