Schedule "A" to By-law 2023-21 (amended) - Building Permit Fee Schedule

Plummer Additional, Ontario · No. 2023-21 · summary & facts

This is the exact embedded text of the captured official document. Snapshot e3c3e8369b24 · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

1 Schedule "A" to By-law 2023-21(amended) Fees in effect October 16, 2025 Building Permit Fee Schedule Permit Type Fee Residential New Dwelling Units, Renovations & Additions $1.75/sq ft Seasonal Dwellings, Renovations & Additions $1.25/sq ft Accessory Buildings and Decks without Foundation $200 Accessory Buildings and Decks with Foundation $0.60/sq ft Minor Renovations* $150 Plumbing - additional fee applies as part of application for new construction, renovation or addition, as applicable $30 incl 5 fixtures + $12 for each additional Demolition $150 Building Relocation $200 Temporary Structures $200 Woodstoves/Fireplaces $200 Non-residential Permits New Construction & Additions $2.25/sq ft Alterations & Renovations $1.19/sq ft Non-Residential Accessory Buildings $0.60/sq ft Agricultural New Construction & Additions $0.55/sq ft Renovation of Existing Agricultural Building $0.55/sq ft Demolition $150 Administration Fees New Construction Permit Review Fee (all groups) - payable upon application; deducted from final permit fee $250 Minimum Permit Fee $150 Conditional Permit Agreement $150 Partial Permit (Foundation Only) $150 Change of Use Permit - Without Construction $150 Additional Inspection Fee $150 Orders Issued (per order issued)** $150 * Transfer of Permit $250 Permit Renewal $150 Alternative Solution Proposal $250 + third party costs Third Party Review Costs As charged to Township Building Without a Permit Fees Doubled * Minor renovations include: window/door replacement, roofing, siding, minor interior alterations, etc. * Fee can be avoided by taking action to comply before order is issued. 2 Permits are not required for the following: Line fences Landscaping Eavestroughs Painting Demolition of a detached accessory building under 15 sq m (161 sq ft) Air conditioning units Drywall and interior renovations that do not change the structural integrity of the building Accessory structures under 15 sq m (161 sq ft) that do not hold a living quarter Replacement of windows/doors with no structural change Roofing (shingles/metal roof), provided that new materials are the same as those being replaced. Non-structural board replacements to existing decks Exemptions: Buildings and/or structures or any part thereof that are exempt from assessment by virtue of paragraphs 3, 9, 10, and 19 of Section 3 of The Assessment Act, R.S.O. 1970, as amended, are exempt from permit fees. All other aspects of municipal, provincial, and all other codes, regulations, and by-laws must be adhered to in their entirety. Refunds: 50% of a permit fee may be refunded, at the discretion of the Chief Building Official, if: - a building permit has been issued, - applicable fees have been paid, and - the project has not commenced.