Development Charges Background Study, Aug 2024

Port Colborne, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 27114890e9b0 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 August 23, 2024 [email protected] Development Charges Background Study City of Port Colborne Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the D.C.A.: Bill 108, 138, 197, and 213 ............................... 1-3 1.3.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters ............................................ 1-3 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 .................... 1-4 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 ................... 1-4 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 ...... 1-7 1.4 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 ..... 1-7 1.4.1 Additional Residential Unit Exemption ....................................... 1-7 1.4.2 Removal of Housing as an Eligible D.C. Service ....................... 1-8 1.4.3 New Statutory Exemption for Non-Profit Housing ...................... 1-8 1.4.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units ........................ 1-8 1.4.5 Historical Level of Service Extended to Previous 15-Year Period ........................................................................................ 1-9 1.4.6 Revised Definition of Capital Costs ............................................ 1-9 1.4.7 Mandatory Phase-in of a D.C. .................................................... 1-9 1.4.8 D.C. By-law Expiry ..................................................................... 1-9 1.4.9 Installment Payments ................................................................. 1-9 1.4.10 Rental Housing Discount.......................................................... 1-10 1.4.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications ......................................................... 1-10 1.4.12 Requirement to Allocate Funds Received ................................ 1-10 1.4.13 Bill 134: Affordable Homes and Good Jobs Act, 2023 ............. 1-10 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1.5 Bill 185: Cutting Red Tape to Build More Homes Act, 2024.................. 1-12 1.5.1 Revised Definition of Capital Costs .......................................... 1-12 1.5.2 Removal of the Mandatory Phase-in ........................................ 1-12 1.5.3 Process for Minor Amendments to D.C. By-laws ..................... 1-13 1.5.4 Reduction of D.C. Rate Freeze Timeframe .............................. 1-14 1.5.5 Modernizing Public Notice Requirements ................................ 1-14 2. Current City of Port Colborne D.C. Policies .................................................. 2-1 2.1 Schedule of Charges .............................................................................. 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-2 2.4 Indexing .................................................................................................. 2-2 2.5 Redevelopment Allowance ..................................................................... 2-2 2.6 Exemptions ............................................................................................. 2-3 3. Anticipated Development in the City of Port Colborne ................................ 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 4.7 Classes of Services ................................................................................ 4-7 4.8 Existing Reserve Funds .......................................................................... 4-8 4.9 Deductions .............................................................................................. 4-9 4.9.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.9.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.9.3 Reduction for Benefit to Existing Development ........................ 4-10 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-12 4.10 Municipal-wide vs. Area Rating ............................................................. 4-12 4.11 Allocation of Development .................................................................... 4-12 4.12 Asset Management ............................................................................... 4-12 4.13 Transit ................................................................................................... 4-13 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.2 Service Levels and 12-Year Capital Costs for Port Colborne's D.C. Calculation .............................................................................................. 5-1 5.2.1 Services Related to a Highway .................................................. 5-1 5.2.2 Fire Services .............................................................................. 5-6 5.2.3 Parks and Recreation Services .................................................. 5-8 5.2.4 Library Services ....................................................................... 5-11 5.2.5 Growth Studies ........................................................................ 5-13 5.3 Service Levels and Urban 12-Year Capital Costs for the City of Port Colborne's D.C. Calculation .................................................................. 5-16 5.3.1 Water Services ......................................................................... 5-16 5.3.2 Wastewater Services ............................................................... 5-18 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. By-law Rules ................................ 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-3 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Timing of Collection ................................................................... 7-5 7.3.6 The Applicable Areas ................................................................. 7-5 7.3.7 Indexing ..................................................................................... 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-6 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-6 7.4.2 By-law In-force Date .................................................................. 7-6 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-6 7.4.4 Area Rating ................................................................................ 7-7 7.5 Other Recommendations ........................................................................ 7-8 8. By-law Implementation ................................................................................... 8-1 8.1 Public Consultation Process ................................................................... 8-1 8.1.1 Introduction ................................................................................ 8-1 8.1.2 Public Meeting of Council........................................................... 8-1 8.1.3 Other Consultation Activity ......................................................... 8-1 8.2 Anticipated Impact of the Charge on Development ................................. 8-2 8.3 Implementation Requirements ................................................................ 8-3 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 8.3.1 Introduction ................................................................................ 8-3 8.3.2 Notice of Passage ...................................................................... 8-3 8.3.3 By-law Pamphlet ........................................................................ 8-3 8.3.4 Appeals ...................................................................................... 8-4 8.3.5 Complaints ................................................................................. 8-4 8.3.6 Credits ....................................................................................... 8-5 8.3.7 Front-Ending Agreements .......................................................... 8-5 8.3.8 Severance and Subdivision Agreement Conditions ................... 8-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D D.C. Reserve Fund Policy ................................................................... D-1 Appendix E Local Service Policy .............................................................................E-1 Appendix F Asset Management Plan ....................................................................... F-1 Appendix G Proposed D.C. By-Law ........................................................................ G-1 Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx List of Acronyms and Abbreviations A.M.P. Asset management plan C.B.C. Community Benefits Charge D.C. Development charge D.C.A. Development Charges Act, 1997, as amended F.I.R. Financial Information Return G.F.A. Gross floor area LPAT Local Planning Appeal Tribunal N.F.P.O.W. No fixed place of work O.L.T. Ontario Land Tribunal O.M.B. Ontario Municipal Board O.P.A. Official Plan Amendment O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit S.D.E. Single detached equivalent S.D.U. Single detached unit sq.ft. square foot sq.m square metre Executive Summary Watson & Associates Economists Ltd. PAGE i H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for the City of Port Colborne (City) required by the Development Charges Act, 1997, as amended (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Overview of the legislative requirements of the D.C.A.; - Chapter 2 - Review of present D.C. policies of the City; - Chapter 3 - Summary of the residential and non-residential growth forecasts for the City; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of future capital requirements to service growth and related deductions and allocations; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and rules; and - Chapter 8 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below. 1) Identify amount, type and location of growth. 2) Identify servicing needs to accommodate growth. 3) Identify capital costs to provide services to meet the needs. 4) Deduct: - Grants, subsidies and other contributions; - Benefit to existing development; - Amounts in excess of 15-year historical service calculation; and - D.C. reserve funds (where applicable); 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs divided by growth to provide the D.C. Watson & Associates Economists Ltd. PAGE ii H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 3. A number of changes to the D.C.A. have occurred since the passage of the City's 2019 D.C. By-law. Some of the changes were introduced through four bills passed in the Ontario legislature: Bill 108, Bill 138, Bill 197, and Bill 213. The changes included the following: - Instalment payments for rental housing, institutional developments, and non-profit housing; - Rate freeze on D.C.s for applications proceeding through Site Plan or Zoning By-law Amendment applications; - Removal of the 10% mandatory deduction on all D.C. eligible services; - Introduction of a new authority under the Planning Act to implement Community Benefit Charges (C.B.C.); - Eligible Services: The list of eligible services for the D.C. was expanded to include most services eligible under the D.C.A. prior to Bill 108; and - New exemption for universities that receive operating funds from the Government. 4. The Province has since introduced another set of revisions to the D.C.A. through Bill 23: More Homes Built Faster Act, 2022. Bill 23 was first introduced on October 25, 2022, and received Royal Assent on November 28, 2022. A summary of the changes provided from Bill 23 are outlined below (further details are provided in Chapter 1 of this report): - Additional residential unit exemption: allowance of a third unit as-of-right; - Removal of Housing as an eligible D.C. service; - New statutory exemption for Affordable Units; - New statutory exemption for Attainable Units; - New statutory exemption for Affordable Inclusionary Zoning Units; - New statutory exemption for Non-Profit Housing; - Historical level of service extended to previous 15-year period instead of the previous 10-year period; - Capital Cost definition revised to remove studies and prescribe services for which land or an interest in land will be restricted (nothing prescribed to date); - Mandatory phase-in of a D.C. for by-laws passed after January 1, 2022, as follows: Watson & Associates Economists Ltd. PAGE iii H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx o Year 1 - 80% of the maximum charge; o Year 2 - 85% of the maximum charge; o Year 3 - 90% of the maximum charge; o Year 4 - 95% of the maximum charge; and o Year 5 to expiry - 100% of the maximum charge. - D.C. By-law expiry will be a maximum of 10 years after the date the by-law comes into force; - D.C. for Rental Housing developments to receive a discount as follows: o Three or more bedrooms - 25% reduction; o Two bedrooms - 20% reduction; and o All other bedroom quantities - 15% reduction. - Maximum interest rate for instalments and determination of charge for eligible Site Plan and Zoning By-law Amendment applications to be set at the average prime rate plus 1%; and - Requirement to allocate funds received - municipalities are required to spend or allocate at least 60% of their reserve fund at the beginning of the year for water, wastewater, and services related to a highway. 5. On April 10, 2024, the Province released Bill 185: Cutting Red Tape to Build More Homes Act. The Bill received Royal Assent on June 6, 2024. A summary of the changes provided from Bill 185 are outlined below (further details are provided in Chapter 1 of this report): - The definition of eligible capital costs (to include certain studies); - The removal of the mandatory phase-in of charges; - The process for minor amendments to D.C. by-laws; - A reduction of time for the D.C. rate freeze related to site plan and zoning by-law amendment planning applications; - Modernizing public notice requirements; and - Implementation of the affordable residential unit exemptions. 6. The growth forecast (Chapter 3) on which the D.C. study is based, projects the following population, housing, and non-residential floor area for the 12-year period (2024 to 2036). Watson & Associates Economists Ltd. PAGE iv H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table ES-1 Summary of Growth Forecast by Planning Period City of Port Colborne 7. On November 12, 2019, the City of Port Colborne passed By-law 6733/97/19 under the D.C.A. The by-law imposes D.C.s on residential and non-residential uses. The City is undertaking a D.C. public process and anticipates passing a new by-law on October 22, 2024, with the mandatory public meeting scheduled for September 24, 2024. 8. The City's D.C. currently in effect (as of January 1, 2024) is $11,419 for single detached dwelling units for full services. The non-residential charge is $4.10 per sq.ft. of gross floor area for full services. This report has undertaken a recalculation of the charges based on future identified needs (presented in Schedule ES-3 for residential and non-residential). Charges have been provided on a City-wide basis for all services excluding water and wastewater services, which have been provided on an urban-wide basis. The corresponding single- detached unit charge for full services is $30,529. The non-residential charge is $12.05 per sq.ft. of building area for full services. These rates are submitted to Council for their consideration. 9. The D.C.A. requires a summary be provided of the gross capital costs and the net costs to be recovered over the life of the by-law. This calculation is provided by service and is presented in Table 6-4. A summary of these costs is provided below: 12 Year Urban 12-Year 2024 to 2036 2024 to 2036 (Net) Population Increase 3,859 3,960 Residential Unit Increase 2,097 1,989 Non-Residential Gross Floor Area Increase (sq.ft.) 976,000 958,800 Source: Watson & Associates Economists Ltd. Forecast 2024 Measure Watson & Associates Economists Ltd. PAGE v H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table ES-2 Summary of Expenditures Anticipated Over the Life of the By-law Summary of Expenditures Anticipated Over the Life of the By-law Expenditure Amount Total gross expenditures planned over the next ten years $214,234,031 Less: Benefit to existing development $30,909,369 Less: Post planning period benefit $48,009,400 Less: Other Deductions $82,500 Less: Grants, subsidies and other contributions $0 Net costs to be recovered from development charges $135,232,762 This suggests that for the non-D.C. cost over the ten-year D.C. by-law (benefit to existing development, and grants, subsidies and other contributions), $30.99 million (or an annual amount of $3.10 million) will need to be contributed from taxes and rates, or other sources. With respect to the post period benefit amount of $48.01 million, it will be included in subsequent D.C. study updates to reflect the portion of capital that benefits growth in the post period D.C. forecasts. Based on the above table, the City plans to spend $214.23 million over the life of the by-law, of which $135.23 million (63%) is recoverable from D.C.s. Of this net amount, $107.19 million is recoverable from residential development and $28.04 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. 10. Considerations by Council - The background study represents the service needs arising from residential and non-residential growth over the forecast periods. The following services are calculated based on an urban 12-year forecast: - Water Services; and - Wastewater Services. The following services are calculated based on a City-wide 12-year forecast: - Services Related to a Highway - Roads and Related; - Public Works (Facilities and Fleet); Watson & Associates Economists Ltd. PAGE vi H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Fire Protection Services; - Library Services; - Growth Studies; and - Parks and Recreation Services. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-law which is appended in Appendix G. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; and - considering reductions in the charge by class of development (obtained by removing certain services on which the charge is based and/or by a general reduction in the charge). Watson & Associates Economists Ltd. PAGE vii H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table ES-3 Schedule of Development Charges Multiples means all dwellings other than single-detached, semi-detached and apartment unit dwellings. NON-RESIDENTIAL Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Municipal Wide Services/Class of Service: Services Related to a Highway 2,328 1,803 1,630 1,078 893 1.12 Public Works (Facilities and Fleet) 2,444 1,893 1,711 1,131 937 1.17 Fire Protection Services 1,709 1,324 1,197 791 655 0.82 Parks and Recreation Services 5,018 3,886 3,514 2,323 1,924 0.45 Library Services 663 513 464 307 254 0.06 Growth Studies 1,101 853 771 510 422 0.53 Total Municipal Wide Services/Class of Service 13,263 10,272 9,287 6,140 5,085 4.15 Urban Services Wastewater Services 11,453 8,870 8,020 5,301 4,391 5.24 Water Services 5,813 4,502 4,071 2,691 2,229 2.66 Total Urban Services 17,266 13,372 12,091 7,992 6,620 7.90 GRAND TOTAL RURAL AREA 13,263 10,272 9,287 6,140 5,085 4.15 GRAND TOTAL URBAN AREA 30,529 23,644 21,378 14,132 11,705 12.05 Service/Class of Service RESIDENTIAL Report Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the D.C.A., as amended, (D.C.A.) (section 10) and, accordingly, recommends new development charges (D.C.s) and policies for the City of Port Colborne. The City retained Watson & Associates Economists Ltd. (Watson), to undertake the D.C. study process throughout 2023 and 2024. Watson worked with City staff in preparing the D.C. analysis and policy recommendations. This D.C. background study, containing the proposed D.C. by-law, will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the City's D.C. background study, as summarized in Chapter 4. It also addresses the requirement for "rules" (contained in Chapter 7) and the proposed by-law to be made available as part of the approval process (included as Appendix G). In addition, the report is designed to set out sufficient background on the legislation (Chapter 4), the City's current D.C. policies (Chapter 2) and the policies underlying the proposed by-law, to make the exercise understandable to those who are involved. Finally, it addresses post-adoption implementation requirements (Chapter 8) which are critical to the successful application of the new policy. The chapters in the report are supported by Appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1.2 Summary of the Process The public meeting required under section 12 of the D.C.A. has been scheduled for September 24, 2024. Its purpose is to present the study to the public and to solicit public input. The meeting is also being held to answer any questions regarding the study's purpose, methodology, and the proposed modifications to the City's D.C.s. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review on August 23, 2024. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at, or immediately following the public meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Figure 1-1 outlines the study process to date and the proposed schedule to be followed with respect to the D.C. by-law adoption process. Figure 1-1 Schedule of Key D.C. Process Dates for the City of Port Colborne Schedule of Study Milestone Dates 1. Data collection, staff review, engineering work, D.C. calculations and policy work September 2023 to June 2024 2. Stakeholder Meeting May 1, 2024 3. Public release of final D.C. Background study and proposed by-law August 23, 2024 4. Public meeting advertisement placed in newspaper(s) September 3, 2024 5. Public meeting of Council September 24, 2024 6. Council considers adoption of background study and passage of by-law October 22, 2024 7. Newspaper notice given of by-law passage By 20 days after passage 8. Last day for by-law appeal 40 days after passage 9. City makes pamphlet available (where by-law not appealed) By 60 days after in force date Watson & Associates Economists Ltd. PAGE 1-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1.3 Changes to the D.C.A.: Bill 108, 138, 197, and 213 1.3.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters On May 2, 2019, the Province introduced Bill 108, which proposed changes to the D.C.A. The Bill was introduced as part of the Province's "More Homes, More Choice: Ontario's Housing Supply Action Plan." The Bill received Royal Assent on June 6, 2019. While having received Royal Assent, many of the amendments to the D.C.A. would not come into effect until they are proclaimed by the Lieutenant Governor (many of these changes were revised through Bill 197). At the time of writing, the following provisions have been proclaimed: - Effective January 1, 2020, rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Interest may be charged on the instalments, and any unpaid amounts may be added to the property and collected as taxes. As per Bill 23, non-profit housing developments are now exempt from paying D.C.s; however, prior to Bill 23, and as a result of Bill 108, non-profit housing developments paid D.C.s in 21 equal annual payments. - Effective January 1, 2020, the D.C. amount for all developments occurring within 2 years of a Site Plan or Zoning By-law Amendment planning approval (for application submitted after this section is proclaimed), shall be determined based on the D.C. in effect on the day of Site Plan or Zoning By-law Amendment application. If the development is not proceeding via these planning approvals, then the amount is determined as of the date of issuance of a building permit. As per Bill 185 this time frame was reduced from 2 years to 18 months. On February 28, 2020, the Province released updated draft regulations related to the D.C.A. and the Planning Act. A summary of the changes that were to take effect upon proclamation by the Lieutenant Governor is provided below. Changes to Eligible Services - Prior to Bill 108, the D.C.A. provided a list of ineligible services whereby municipalities could include growth related costs for any service that Watson & Associates Economists Ltd. PAGE 1-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx was not listed. With Bill 108, the changes to the D.C.A. would now specifically list the services that are eligible for inclusion in the by-law. Furthermore, the initial list of eligible services under Bill 108 was limited to "hard services", with the "soft services" being removed from the D.C.A. These services would be considered as part of a new community benefits charge (discussed below) imposed under the Planning Act. As noted in the next section this list of services has been amended through Bill 197. Mandatory 10% deduction - The amending legislation would have removed the mandatory 10% deduction for all services that remain eligible under the D.C.A. Remaining Services to be Included in a New Community Benefits Charge (C.B.C.) Under the Planning Act - It was proposed that a municipality may, by by-law, impose a C.B.C. against land to pay for the capital costs of facilities, services and matters required because of development or redevelopment in the area to which the by-law applies. The C.B.C. was proposed to include formerly eligible D.C. services that are not included in the above listing, in addition to parkland dedication and bonus zoning contributions. 1.3.2 Bill 138: Plan to Build Ontario Together Act, 2019 On November 6, 2019, the Province released Bill 138 which provided further amendments to the D.C.A. and Planning Act. This Bill received Royal Assent on December 10, 2019, and was proclaimed which resulted in sections related to the D.C.A. (schedule 10) becoming effective on January 1, 2020. The amendments to the D.C.A. included removal of instalment payments for commercial and industrial developments that were originally included in Bill 108. 1.3.3 Bill 197: COVID-19 Economic Recovery Act, 2020 In response to the global pandemic that began affecting Ontario in early 2020, the Province released Bill 197 which provided amendments to a number of Acts, including the D.C.A. and Planning Act. This Bill also revised some of the proposed changes identified in Bill 108. Bill 197 was tabled on July 8, 2020, received Royal Assent on July 21, 2020, and was proclaimed on September 18, 2020. The following provides a summary of the changes. Watson & Associates Economists Ltd. PAGE 1-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1.3.3.1 D.C.-Related Changes List of D.C.-Eligible Services - As noted above, under Bill 108 some services were to be included under the D.C.A. and some would be included under the C.B.C. authority. Bill 197, however, revised this proposed change and has included all services (with some exceptions) under the D.C.A. These services are as follows: o Water supply services, including distribution and treatment services. o Wastewater services, including sewers and treatment services. o Storm water drainage and control services. o Services related to a highway. o Electrical power services. o Toronto-York subway extension. o Transit services. o Waste diversion services. o Policing services. o Fire protection services. o Ambulance services. o Library services. o Long-term care services. o Parks and recreation services, but not the acquisition of land for parks. o Public health services. o Childcare and early years services. o Housing services (no longer eligible as per Bill 23). o Provincial Offences Act services. o Services related to emergency preparedness. o Services related to airports, but only in the Regional Municipality of Waterloo. o Additional services as prescribed. Classes of Services - D.C. Pre-Bill 108/197 legislation (i.e., D.C.A., 1997) allowed for categories of services to be grouped together into a minimum of two categories (90% and 100% services). Watson & Associates Economists Ltd. PAGE 1-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx The Act (as amended) repeals and replaces the above with the four following subsections: - A D.C. by-law may provide for any eligible service or capital cost related to any eligible service to be included in a class, set out in the by-law. - A class may be composed of any number or combination of services and may include parts or portions of the eligible services or parts or portions of the capital costs in respect of those services. - A D.C. by-law may provide for a class consisting of studies in respect of any eligible service whose capital costs are described in paragraphs 5 and 6 of section 5 of the D.C.A. - A class of service set out in the D.C. by-law is deemed to be a single service with respect to reserve funds, use of monies, and credits. Note: An initial consideration of "class" appears to mean any group of services. Mandatory 10% Deduction As well, the removal of the 10% deduction for soft services under Bill 108 has been maintained. As a result of the passage of Bill 197, and subsequent proclamation on September 18, 2020, this report has provided the D.C. calculations without the 10% mandatory deduction. 1.3.3.2 C.B.C.-Related Changes C.B.C. Eligibility The C.B.C. is limited to lower-tier and single-tier municipalities; upper-tier municipalities will not be allowed to impose this charge. 1.3.3.3 Combined D.C. and C.B.C. Impacts D.C. vs. C.B.C. Capital Cost - A C.B.C. may be imposed with respect to the services listed in subsection 2 (4) of the D.C.A. (eligible services), "provided that the capital costs that are intended Watson & Associates Economists Ltd. PAGE 1-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx to be funded by the community benefits charge are not capital costs that are intended to be funded under a development charge by-law." 1.3.4 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exempt the payment of D.C.s for developments of land intended for use by a university that receives operating funds from the Government. As a result, this mandatory exemption will be included in the D.C. by-law. 1.4 Changes to the D.C.A. - Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Bill amends a number of pieces of legislation including the Planning Act and the D.C.A (Note that a number of items from Bill 23 were revised by Bill 185, which is discussed in section 1.5). The following provides a summary of the changes to the D.C.A.: 1.4.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the creation of the greater of one unit or 1% of the existing residential units will be exempt from a D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no buildings or ancillary structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of urban land, if the detached, semi- Watson & Associates Economists Ltd. PAGE 1-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. 1.4.2 Removal of Housing as an Eligible D.C. Service Housing services are removed as an eligible service. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. 1.4.3 New Statutory Exemption for Non-Profit Housing Non-profit housing units are exempt from D.C.s and D.C. instalment payments due after November 28, 2022. 1.4.4 New Statutory Exemptions for Affordable Units, Attainable Units, and Affordable Inclusionary Zoning Units Affordable units, attainable units, and inclusionary zoning units (affordable) are exempt from the payment of D.C.s, as follows: - Affordable Rental Units: Where rent is no more than 80% of the average market rent as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. - Affordable Owned Units: Where the price of the unit is no more than 80% of the average purchase price as defined by a new bulletin published by the Ministry of Municipal Affairs and Housing. Note: Section 1.4.13 provides further details on the Affordable Rental Unit and Affordable Owned Unit definitions, which have been modified through Bill 134. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. o Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Note: the above Affordable Owned and Rental Unit exemptions came into force as of June 1, 2024. At the time of writing, it is not known when the exemption for Attainable Units will be in force. Watson & Associates Economists Ltd. PAGE 1-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.4.5 Historical Level of Service Extended to Previous 15-Year Period Prior to Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average is now extended to the historical 15-year period. 1.4.6 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Furthermore, the regulations to the Act may prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed. 1.4.7 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. 1.4.8 D.C. By-law Expiry A D.C. by-law now expires 10 years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's life from five years, prior to Bill 23. 1.4.9 Installment Payments Non-profit housing development has been removed from the instalment payment section of the Act (subsection 26.1), as these units are now exempt from the payment of a D.C. Watson & Associates Economists Ltd. PAGE 1-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1.4.10 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. 1.4.11 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications No maximum interest rate was previously prescribed. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by- law amendment applications occurring after November 28, 2022. 1.4.12 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities will be required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Other services may be prescribed by the regulation . 1.4.13 Bill 134: Affordable Homes and Good Jobs Act, 2023 The exemption for affordable residential units was included in the More Homes Built Faster Act (Bill 23), enacted by the Province on November 28, 2022. Under this legislation, affordable residential units were defined within subsection 4.1 of the D.C.A. and exemptions for D.C.s were provided in respect of this definition. While the legislation was enacted in November 2022, the ability for municipalities to implement the exemptions is based on the "Affordable Residential Units for the Purposes of the Development Charges Act, 1997 Bulletin" published by the Minister of Municipal Affairs and Housing. This bulletin informs the average market rent and purchase price to be used in determining which developments qualify as affordable residential units. This bulletin was published on April 5, 2024. Bill 134 received Royal Assent on December 4, 2023 and provides for a modification to the affordable residential unit definition by: Watson & Associates Economists Ltd. PAGE 1-11 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Introducing an income-based test for affordable rent and purchase price; and - Increasing the threshold for the market test of affordable rent and purchase price. This change provides the exemption based on the lesser of the two measures. Moreover, the rules in subsection 4.1 of the D.C.A. are unchanged with respect to: - The tenant and purchaser transacting the affordable unit being at arm's length; - The intent of maintaining the affordable residential unit definition for a 25-year period, requiring an agreement with the municipality (which may be registered on title); and - Exemptions for attainable residential units and associated rules (requiring further regulations). The following table provides the definitions provided through Bill 134 (underlining added for emphasis). Item Bill 134 Definition (Current D.C.A. Definition) Affordable residential unit rent (subsection 4.1 (2), para. 1) The rent is no greater than the lesser of, i. the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and ii. the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. Average market rent/rent based on income (subsection 4.1 (5)) for the purposes of subsection 4.1 (2), para. 1 The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for renter households in the applicable local municipality; and (b) identify the rent that, in the Minister's opinion, is equal to 30 per cent of the income of the household referred to in clause (a). Affordable residential unit ownership (subsection 4.1 (3), para. 1) The price of the residential unit is no greater than the lesser of, i. the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (6), and ii. 90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. Watson & Associates Economists Ltd. PAGE 1-12 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Item Bill 134 Definition (Current D.C.A. Definition) Average market purchase price/purchase price based on income (subsection 4.1 (6)) for the purposes of subsection 4.1 (3), para. 1 The Minister of Municipal Affairs and Housing shall, (a) determine the income of a household that, in the Minister's opinion, is at the 60th percentile of gross annual incomes for households in the applicable local municipality; and (b) identify the purchase price that, in the Minister's opinion, would result in annual accommodation costs equal to 30 per cent of the income of the household referred to in clause (a) Note: the Affordable Unit exemption came into force on June 1, 2024. 1.5 Bill 185: Cutting Red Tape to Build More Homes Act, 2024 On April 10, 2024, the Province released Bill 185: Cutting Red Tape to Build More Homes Act. The Bill received Royal Assent on June 6, 2024. This Bill reversed many of the key changes that were implemented through Bill 23. The following sections provide a summary of the changes. 1.5.1 Revised Definition of Capital Costs Bill 185 reversed the capital cost amendments of Bill 23 by reinstating studies as an eligible capital cost. The following paragraphs were added to subsection 5(3) of the D.C.A.: 5. Costs to undertake studies in connection with any of the matters referred to in paragraphs 1 to 4. 6. Costs of the development charge background study required under section 10. 1.5.2 Removal of the Mandatory Phase-in As noted in Section 1.4.7 above, Bill 23 required the phase-in of charges imposed in a D.C. by-law over a five-year term for any by-laws passed after January 1, 2022. Bill 185 removed this mandatory phase-in. This change is effective for any D.C. by-laws passed after Bill 185 came into effect. Watson & Associates Economists Ltd. PAGE 1-13 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx For site plan and zoning by-law amendment applications that were made prior to Bill 185 receiving Royal Assent, the charges payable will be the charges that were in place on the day the planning application was made (i.e., including the mandatory phase-in). 1.5.3 Process for Minor Amendments to D.C. By-laws Section 19 of the D.C.A. requires that a municipality must follow sections 10 through 18 of the D.C.A. (with necessary modifications) when amending D.C. by-laws. Sections 10 through 18 of the D.C.A. generally require the following: - Completion of a D.C. background study, including the requirement to post the background study 60 days prior to passage of the D.C. by-law; - Passage of a D.C. by-law within one year of the completion of the D.C. background study; - A public meeting, including notice requirements; and - The ability to appeal the by-law to the Ontario Land Tribunal. Bill 185 allows municipalities to undertake minor amendments to D.C. by-laws for the following purposes without adherence to the requirements noted above (with the exception of the notice requirements): 1. To repeal a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date (subject to the 10-year limitations provided in the D.C.A.); 2. To impose D.C.s for studies, including the D.C. background study; and 3. To remove the provisions related to the mandatory phase-in of D.C.s. Minor amendments related to items 2 and 3 noted above may be undertaken only if the D.C. by-law being amended was passed after November 28, 2022, and before Bill 185 took effect. Moreover, the amending by-law must be passed within six months of Bill 185 coming into effect. Notice requirements for these minor amending by-laws are similar to the typical notice requirements, with the exception of the requirement to identify the last day for appealing the by-law (as these provisions do not apply). Watson & Associates Economists Ltd. PAGE 1-14 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 1.5.4 Reduction of D.C. Rate Freeze Timeframe Bill 108 (see Section 1.3.1 above) provides for the requirement to freeze the D.C.s imposed on developments subject to a site plan and/or a zoning by-law amendment application. The D.C. rate for these developments is "frozen" at the rates that were in effect at the time the site plan and/or zoning by-law amendment application was submitted (subject to applicable interest). Once the application is approved by the municipality, if the date the D.C. is payable is more than two years from the approval date, the D.C. rate freeze would no longer apply. Bill 185 reduced the two-year timeframe to 18 months. 1.5.5 Modernizing Public Notice Requirements The D.C.A. sets out the requirements for municipalities to give notice of public meetings and of by-law passage. These requirements are prescribed in sections 9 and 10 of O. Reg. 82/98 and include giving notice in a newspaper of sufficiently general circulation in the area to which the by-law would apply. The regulatory changes modernized public notice requirements by allowing municipalities to provide notice on a municipal website if a local newspaper is not available. Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 2 Current City of Port Colborne D.C. Policies Watson & Associates Economists Ltd. PAGE 2-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 2. Current City of Port Colborne D.C. Policies 2.1 Schedule of Charges On November 12, 2019, the City of Port Colborne passed By-law, 6733/97/19 under the D.C.A. This by-law imposes D.C.s for residential and non-residential uses. The table below provides the rates currently in effect, as of January 1, 2024. Table 2-1 City of Port Colborne Current D.C. Rates January 1, 2024 Multiples means all dwellings other than single-detached, semi-detached and apartment unit dwellings. 2.2 Services Covered The following services are covered under By-law 6733/97/19: - Services Related to a Highway; - Fire Protection Services; - Parks and Recreation Services; - Library Services; - Growth Studies; Non-Residential Service Single & Semi Detached Multiples Apartments with >= 2 Bedrooms Apartments with < 2 Bedrooms Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) City-wide Services: Services Related to a Highway 2,160 1,595 1,557 952 862 1.10 Fire Protection Services 155 114 112 68 62 0.08 Parks and Recreation Services 3,304 2,439 2,382 1,456 1,319 0.23 Library Services 163 120 118 72 65 0.010 Studies 356 263 256 157 143 0.17 Total City-wide Services 6,138 4,531 4,425 2,705 2,451 1.59 Urban Services: Wastewater Services 1,593 368 353 239 636 0.76 Water Services 3,688 1,464 1,407 950 1,472 1.75 Total Urban Services 5,281 1,832 1,760 1,189 2,108 2.51 GRAND TOTAL - RURAL AREA 6,138 4,531 4,425 2,705 2,451 1.59 GRAND TOTAL - URBAN AREA 11,419 6,363 6,185 3,894 4,559 4.10 Residential Watson & Associates Economists Ltd. PAGE 2-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Wastewater Services; and - Water Services. 2.3 Timing of D.C. Calculation and Payment Development charges shall be calculated and payable in full in money or by provision of services as may be agreed upon, or by credit granted under the Act, on the date that the first building permit is issued in relation to a building or structure on land to which a development charge applies. 2.4 Indexing Rates shall be adjusted, without amendment to the By-law, annually on the anniversary date of the By-law (November 12), in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02)1. However, it should be noted that the current rates were not indexed since the By-law came into effect. 2.5 Redevelopment Allowance As a result of the redevelopment of land, a building or structure existing on the same land within 12 months prior to the date of payment of D.C.s in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the D.C.s otherwise payable with respect to such redevelopment shall be reduced by the following amounts: 1) in the case of a residential building or structure, or in the case of a mixed-use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C. under subsections 3.11 of the 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 2-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx by-law by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and 2) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable D.C.s under subsection 3.12 of the by-law by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the D.C.s otherwise payable with respect to the redevelopment. 2.6 Exemptions The following non-statutory exemptions are provided under By-law 6733/97/19: - Infill Housing (as defined in the by-law); - Non-residential farm buildings for the purpose of an agricultural use except for any building constructed to accommodate on On-Farm Business which shall be considered to be an industrial building; - Downtown core area; - Brownfield properties under the City of Port Colborne Brownfield Community Improvement Plan, which have an approved application and agreement under the Brownfield Rehabilitation Grant Program; - Industrial development shall be exempt from payment of D.C.s on any square footage of gross floor area constructed over 5,000 sq.ft.; - Partial exemption requiring the payment of only the roads and fire protection components of the charge for all residential unit types constructed within the Sherkston Secondary Plan Area; and - Partial exemption for certain Community Improvement Plan areas based upon specific policies approved by Council. Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 3 Anticipated Development in the City of Port Colborne Watson & Associates Economists Ltd. PAGE 3-1 H:\Port Colborne\2024 DC\Growth\Report\Port Colborne - 2024 DC - Chapter 3 & Appendix A .docx 3. Anticipated Development in the City of Port Colborne 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the City will be required to provide services over a 2024 to 2036 time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson in consultation with the City of Port Colborne. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the City over the forecast period, including: - City of Port Colborne Growth Analysis Review, Draft Report, April 2023, Dillon Consulting Ltd.; - City of Port Colborne 2019 Development Charges Background Study, June 24, 2019, Watson & Associates Economists Ltd.; - City of Port Colborne Official Plan, as approved by the Ontario Municipal Board on November 25, 2013, and updated September 5, 2017; - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential building permit data over the 2014 to 2023 period; - Residential and non-residential supply opportunities as identified by City of Port Colborne staff; and - Discussions with City staff regarding anticipated residential and non-residential development in the City of Port Colborne. Watson & Associates Economists Ltd. PAGE 3-2 H:\Port Colborne\2024 DC\Growth\Report\Port Colborne - 2024 DC - Chapter 3 & Appendix A .docx 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the City and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, population in the City of Port Colborne (excluding census undercount) is anticipated to reach approximately 24,260 by mid-2036 resulting in an increase of approximately 3,860 people. [1] [1] The population figures used in the calculation of the 2024 D.C. exclude the net Census undercount, which is estimated at approximately 2.5%. Population figures presented herein have been rounded. Watson & Associates Economists Ltd. PAGE 3-3 H:\Port Colborne\2024 DC\Growth\Report\Port Colborne - 2024 DC - Chapter 3 & Appendix A .docx Figure 3-1 Population and Household Forecast Model Occupancy Assumptions Gross Population Increase Decline in Existing Population Net Population Increase DEMAND SUPPLY Residential Units in the Development Process Historical Housing Construction Intensification Forecast of Residential Units Employment Market by Local Municipality, Economic Outlook Local, Region and Provincial Designated Lands Servicing Capacity Watson & Associates Economists Ltd. PAGE 3-4 H:\Port Colborne\2024 DC\Growth\Report\Port Colborne - 2024 DC - Chapter 3 & Appendix A .docx Table 3-1 City of Port Colborne Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.5% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived by Watson & Associates Economists Ltd., 2024 Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 18,890 18,424 449 17,975 6,050 600 1,161 95 7,906 408 2.330 18,770 18,306 441 17,865 6,005 670 1,210 135 8,020 401 2.283 20,540 20,033 628 19,405 6,295 685 1,280 450 8,710 571 2.300 20,910 20,397 642 19,755 6,426 698 1,411 450 8,985 584 2.270 24,870 24,255 760 23,495 7,233 1,254 2,038 450 10,975 691 2.210 -120 -118 -8 -110 -45 70 49 40 114 -7 1,770 1,727 187 1,540 290 15 70 315 690 170 370 364 14 350 131 13 131 0 275 13 Mid 2024 - Mid 2036 3,960 3,858 118 3,740 807 556 627 0 1,990 107 Forecast Mid 2036 Mid 2021 - Mid 2024 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Incremental Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Mid 2024 Watson & Associates Economists Ltd. PAGE 3-5 H:\Port Colborne\2024 DC\Growth\Report\Port Colborne - 2024 DC - Chapter 3 & Appendix A .docx Figure 3-2 City of Port Colborne Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from City of Port Colborne building permit data, 2014 to 2023. 9 16 35 45 40 54 54 133 59 83 105 135 170 170 170 170 170 180 180 180 180 180 0 20 40 60 80 100 120 140 160 180 200 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE 3-6 H:\Port Colborne\2024 DC\Growth\Report\Port Colborne - 2024 DC - Chapter 3 & Appendix A .docx Provided below is a summary of the key assumptions and findings regarding the City of Port Colborne D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1, and 5) - The housing unit mix for the City was derived from a detailed review of historical development activity (as per Schedule 5), as well as active residential development applications, and discussions with City staff regarding anticipated development trends for the City of Port Colborne. - Based on the above indicators, the 2024 to 2036 household growth forecast for the City is comprised of a unit mix of 41% low density units (single detached and semi-detached), 28% medium density (multiples except apartments) and 31% high density (bachelor, 1-bedroom and 2- bedroom apartments). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the City of Port Colborne - In accordance with forecast demand and available land supply, the amount and percentage of forecast housing growth between 2024 and 2036 by development location is summarized below. Table 3-2 City of Port Colborne Geographic Location of Residential Development Development Location Amount of Housing Growth, 2024 to 2036 Percentage of Housing Growth, 2024 to 2036 Urban 1,880 95% Rural 110 5% City of Port Colborne 1,990 100% Note: Figures may not sum precisely due to rounding. Watson & Associates Economists Ltd. PAGE 3-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3 and 4) - The number of housing units to be constructed by 2036 in the City of Port Colborne over the forecast period is presented in Table 3-1. Over the 2024 to 2036 forecast period, the City is anticipated to average approximately 166 new housing units per year. - Institutional population [1] is anticipated to increase by approximately 120 people between 2024 to 2036. - Population in new units is derived from Schedules 3 and 4, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 6a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the City of Port Colborne. Due to data limitations high density P.P.U. data was derived from the Region of Niagara which includes the City of Port Colborne, and is outlined in Schedule 6b. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 15-year average P.P.U.s by dwelling type are as follows: o Low density: 2.869 o Medium density: 2.222 o High density: 1.759 [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5. Existing Units and Population Change (Appendix A - Schedules 3 and 4) - Existing households for mid-2024 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 4.[1] The forecast population change in existing households over the 2024 to 2036 forecast period is forecast to decline by approximately 910. 6. Employment (Appendix A - Schedules 8a, 8b and 8c) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in the City divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [2],[3] (place of work) for the City of Port Colborne is outlined in Schedule 8a. The 2016 employment base is comprised of the following sectors: o 125 primary (2%); o 535 work at home employment (10%); o 1,518 industrial (28%); o 2,053 commercial/population-related (38%); and o 1,175 institutional (22%). [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - The 2016 employment by usual place of work, including work at home, is 5,405. An additional 790 employees have been identified for the City of Port Colborne in 2016 that have no fixed place of work (N.F.P.O.W.).[1] - Total employment, including work at home and N.F.P.O.W. for the City of Port Colborne is anticipated to reach approximately 8,660 by mid-2036. This represents an employment increase of approximately 1,670 for the 2024 to 2036 forecast period. - Schedule 8b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the City of Port Colborne (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 6,480 by mid-2036. This represents an employment increase of approximately 1,170 for the 2024 to 2036 forecast period. [2] 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 8b) [2] No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." [2] G.F.A. and employment associated within special care institutional dwellings treated as residential, resulting in an institutional employment difference between Schedules 8a and 8b. Total employment growth in Schedule 8b (excluding work at home and N.F.P.O.W. employment) has been downwardly adjusted to account for institutional employment associated with special care facilities. Total employment in Schedule 8b is anticipated to reach approximately 6,420 by mid-2036. Watson & Associates Economists Ltd. PAGE 3-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Square footage estimates were calculated in Schedule 8b based on the following employee density assumptions: o 1,400 sq.ft. per employee for industrial; o 510 sq.ft. per employee for commercial/population-related; and o 670 sq.ft. per employee for institutional employment. - The City-wide incremental G.F.A. is anticipated to increase by 976,000 sq.ft. over the 2024 to 2036 forecast period. - In terms of percentage growth, the 2024 to 2036 incremental G.F.A. forecast by sector is broken down as follows: o industrial - 61%; o commercial/population-related - 25%; and o institutional - 14%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 8c) - Schedule 8c summarizes the anticipated amount, type and location of non-residential development by area for the City of Port Colborne. - The amount and percentage of forecast total non-residential growth between 2024 and 2036 by development location is summarized below. Table 3-3 City of Port Colborne Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2024 to 2036 Percentage of Non- Residential G.F.A., 2024 to 2036 Urban 958,800 98% Rural 17,200 2% City of Port Colborne 976,000 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-1 lists the full range of municipal services that are provided within the City. A number of these services are not included in the list of eligible services provided in subsection 2 (4) of the D.C.A. as being ineligible for inclusion in D.C.s. These are shown as "ineligible" on Table 4-1. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services that are potentially eligible for inclusion in the City's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that City Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure 4-1 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service Ceiling Re: Increased Need Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure D.C. Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions D.C. By-law(s) Spatial Applicability D.C. Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 15. 16. 13. 14. 9. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historical Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by D.C.s 7. Non-Transit Services Financially Sustainable 7a. Transit Services Detailed Requirements 7b. 10. Municipal Services 2. Eligible Services Ineligible Services Tax Base, User Rates, etc. Watson & Associates Economists Ltd. PAGE 4-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components 1. Services Related to a Highway Yes 1.1 Arterial roads Yes 1.2 Collector roads Yes 1.3 Bridges, culverts and roundabouts No 1.4 Local municipal roads Yes 1.5 Traffic signals Yes 1.6 Sidewalks and streetlights Yes 1.7 Active transportation 2. Other Transportation Services n/a 2.1 Transit vehicles[1] & facilities n/a 2.2 Other transit infrastructure Ineligible 2.3 Municipal parking spaces - indoor Ineligible 2.4 Municipal parking spaces - outdoor Yes 2.5 Works yards Yes 2.6 Rolling stock1 n/a 2.7 Ferries n/a 2.8 Airport 3. Stormwater Drainage and Control Services Yes 3.1 Main channels and drainage trunks Yes 3.2 Channel connections No 3.3 Retention/detention ponds [1] with 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components 4. Fire Protection Services Yes 4.1 Fire stations Yes 4.2 Fire pumpers, aerials and rescue vehicles[1] Yes 4.3 Small equipment and gear 5. Park Services (i.e., Parks and Open Space) Ineligible 5.1 Acquisition of land for parks, woodlots and E.S.A.s Yes 5.2 Development of area municipal parks Yes 5.3 Development of district parks Yes 5.4 Development of municipal-wide parks Yes 5.5 Development of special purpose parks Yes 5.6 Parks rolling stock[1] and yards 6. Recreation Services Yes 6.1 Arenas, indoor pools, fitness facilities, community centres, etc. (including land) Yes 6.2 Recreation vehicles and equipment[1] 7. Library Services Yes 7.1 Public library space (incl. furniture and equipment) Yes 7.2 Library vehicles[1] Yes 7.3 Library materials 8. Emergency Preparedness Services No 8.1 Facility space (incl. furniture and equipment) No 8.2 Vehicles[1] No 8.3 Equipment 9. Electrical Power Services Ineligible 9.1 Electrical substations Ineligible 9.2 Electrical distribution system Ineligible 9.3 Electrical system rolling stock 10. Provision of Cultural, Entertainment and Tourism Facilities and Convention Centres Ineligible 10.1 Cultural space (e.g., art galleries, museums and theatres) Ineligible 10.2 Tourism facilities and convention centres [1] with 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components 11. Wastewater Services n/a 11.1 Treatment plants Yes 11.2 Sewage trunks No 11.3 Local systems Yes 11.4 Vehicles and equipment[1] 12. Water Supply Services n/a 12.1 Treatment plants Yes 12.2 Distribution systems No 12.3 Local systems Yes 12.4 Vehicles and equipment[1] 13. Waste Management Services Ineligible 13.1 Landfill collection, transfer vehicles and equipment Ineligible 13.2 Landfills and other disposal facilities n/a 13.3 Waste diversion facilities n/a 13.4 Waste diversion vehicles and equipment[1] 14. Policing Services n/a 14.1 Policing detachments n/a 14.2 Policing rolling stock[1] n/a 14.3 Small equipment and gear 15. Homes for the Aged n/a 15.1 Homes for the aged space n/a 15.2 Vehicles[1] 16. Child Care n/a 16.1 Child-care space n/a 16.2 Vehicles[1] 17. Health n/a 17.1 Health department space n/a 17.2 Health department vehicles[1] 18. Social Housing Ineligible 18.1 Social housing space 19. Provincial Offences Act (P.O.A.) No 19.1 P.O.A. space 20. Social Services Ineligible 20.1 Social service space 21. Ambulance n/a 21.1 Ambulance station space n/a 21.2 Vehicles[1] 22. Hospital Provision Ineligible 22.1 Hospital capital contributions 23. Provision of Headquarters for the General Administration of Municipalities and Area Municipal Boards Ineligible 23.1 Office space Ineligible 23.2 Office furniture Ineligible 23.3 Computer equipment [1] with 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Categories of Municipal Services Eligibility for Inclusion in the D.C. Calculation Service Components 24. Other Services Yes 24.1 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land and facilities, including the D.C. background study cost Yes 24.2 Interest on money borrowed to pay for growth-related capital [1] with a 7+ year useful life 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The City's detailed Local Service Policy is provided in Appendix E. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require two potential cost reductions and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; Watson & Associates Economists Ltd. PAGE 4-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; e) Costs to undertake studies in connection with any of the matters referred to in paragraphs a to d; f) Costs of the development charge background study required under section 10; and g) interest on money borrowed to pay for the above-referenced costs. In order for an increase in need for service to be included in the D.C. calculation, City Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the City's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that "the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. There are no current outstanding credits for inclusion in the D.C. calculations. 4.7 Classes of Services Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible service. Watson & Associates Economists Ltd. PAGE 4-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and by-law provided herein have identified a class of service for growth studies. 4.8 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, section 35 does restrict the way in which the funds are used in the future. For services that are subject to a per capita based, service level "cap," the reserve fund balance should be applied against the development-related costs for which the charge was imposed once the project is constructed (i.e., the needs of recent growth). This cost component is distinct from the development-related costs for the future forecast periods, which underlie the D.C. calculation herein. The alternative would involve the City spending all reserve fund monies prior to renewing each by-law, which would not be a sound basis for capital budgeting. Thus, the City will use these reserve funds for the City's cost share of applicable development- related projects, which are required but have not yet been undertaken, as a way of directing the funds to the benefit of the development that contributed them (rather than to future development, which will generate the need for additional facilities directly proportionate to future growth). The City's D.C. Reserve Fund balances by service as of December 31, 2023, are shown below: Watson & Associates Economists Ltd. PAGE 4-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 4-2 Summary of Development Charges Reserve Fund Balances As of December 31, 2023 4.9 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed below. 4.9.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in section 4.3 does "not include an increase that would result in the level of service [for the additional development increment] exceeding the average level of the service provided in the municipality over the 15-year period immediately preceding the preparation of the background study" (D.C.A., subsection 5 (1) 4). O. Reg. 82/98 (section 4) goes further to indicate that "both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area, or road length per capita and a quality measure, in terms of the average cost of providing such units based on replacement costs, engineering Service Balance Services Related to a Highway $62,075 Fire Protection Services $4,778 Parks and Recreation Services $119,749 Library Services $5,282 Public Works $134 Administration $9,221 Wastewater Services $48,508 Water Services $95,763 Total $345,509 Watson & Associates Economists Ltd. PAGE 4-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx standards, or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. With respect to transit services, the changes to the Act introduced in 2015 have provided for an alternative method for calculating the service standard ceiling. Transit services must now utilize a forward-looking service standard analysis, described later in this section. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.9.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the City's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.9.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; Watson & Associates Economists Ltd. PAGE 4-11 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need, by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. Alternatively, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a City-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. Watson & Associates Economists Ltd. PAGE 4-12 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.10 Municipal-wide vs. Area Rating This step involves determining whether all of the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the amended D.C.A., it is now mandatory to "consider" area rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area rating. Further discussion is provided in section 7.4.4 of this report. 4.11 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. 4.12 Asset Management The legislation now requires that a D.C. background study must include an asset management plan (A.M.P.) (subsection 10 (2) c. 2). The A.M.P. must deal with all assets that are proposed to be funded, in whole or in part, by D.C.s. The current regulations provide very extensive and specific requirements for the A.M.P. related to transit services (as noted in the subsequent subsection); however, they are silent with respect to how the A.M.P. is to be provided for all other services. As part of any A.M.P., the examination should be consistent with the municipality's existing assumptions, Watson & Associates Economists Ltd. PAGE 4-13 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx approaches, and policies on the asset management planning. This examination has been included in Appendix F. 4.13 Transit The D.C.A. provides for the following matters for Transit: - The Background Study requires the following in regard to transit costs (as per subsection 8 (2) of the Regulations): o The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. i. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, ii. the anticipated development over the 10-year period immediately following the preparation of the background study, or iii. the anticipated development after the 10-year period immediately following the preparation of the background study. o An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. o An assessment of ridership forecasts for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. o An assessment of the ridership capacity for all modes of transit services proposed to be funded by the development charge over the 10-year period immediately following the preparation of the background study. - A forward-looking service standard (as per 6.1(2) of the Regulations): o The service is a discrete service. o No portion of the service that is intended to benefit anticipated development after the 10-year period immediately following the preparation of the background study may be included in the estimate. Watson & Associates Economists Ltd. PAGE 4-14 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx o No portion of the service that is anticipated to exist as excess capacity at the end of the 10-year period immediately following the preparation of the background study may be included in the estimate. - A detailed asset management strategy and reporting requirements (subsection 6.1 (3) of the Regulation) that includes lifecycle costs, action plans that will enable the assets to be sustainable, summary of how to achieve the proposed level of service, discussion on procurement measures and risk. The City does not currently have local transit services, and in the near future does not intend to consider the implementation of any local transit services. Therefore, the above calculations and reporting requirements are not required. Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4, was followed in determining D.C. eligible costs. The service component is evaluated on two format sheets: - the service standards that provide the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts (note that this is not required for water or wastewater); and - the infrastructure cost calculation, which determines the potential D.C. recoverable cost. The nature of the capital projects and timing identified in the Chapter reflects Council's current intention. Over time, however, City projects and Council priorities change; accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and 12-Year Capital Costs for Port Colborne's D.C. Calculation This section evaluates the development-related capital requirements for all services over a City-wide 12-year planning period from 2024 to 2036. 5.2.1 Services Related to a Highway Roads and Related The City of Port Colborne currently owns and maintains: - 251 km of roads; - 4 bridges; - 26 culverts; Watson & Associates Economists Ltd. PAGE 5-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - 91 km of sidewalks; - 4 traffic signals; and - 2,153 streetlights. This provides an average level of investment of $36,576 per capita, resulting in a D.C.- eligible recovery amount of approximately $141.15 million over the 12-year forecast period. With respect to future needs, the City has identified capital projects for road works totalling approximately $20.21 million. The capital projects identified include road urbanizations, sidewalks, and a provision for other roads related works. Of this amount, approximately $4.99 million is deducted for the amount that benefits existing development, and $62,075 is deducted to reflect the balance in the reserve fund. Additionally, a deduction of approximately $10.19 million has been made to reflect the portion that benefits growth beyond the forecast period to 2036. Therefore, net growth- related capital cost included in the D.C. calculations is approximately $4.97 million. The residential/non-residential allocation for services related to a highway is based on the ratio of anticipated population and employment growth over the forecast period to 2036. This results in a 78% allocation to residential development and 22% allocation to non-residential development. Watson & Associates Economists Ltd. PAGE 5-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-1 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Roads and Related Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024 to 2036 78% 22% 1 Elizabeth Street Urbanization - Highway 3 to Killaly St. E (1000m) 2024-2051 2,000,000 1,008,000 992,000 600,000 392,000 305,760 86,240 2 Lorraine Road Urbanization 2024-2051 1,770,000 892,100 877,900 531,000 346,900 270,582 76,318 3 Killaly Street East Urbanization 2024-2051 3,340,000 1,683,400 1,656,600 1,002,000 654,600 510,588 144,012 4 East Side Lands Roads Infrastructure - Progress North 2026-2030 7,000,000 3,528,000 3,472,000 2,100,000 1,372,000 1,070,160 301,840 5 East Side Lands Roads Infrastructure - Progress South 2026-2030 2,520,000 1,270,100 1,249,900 756,000 493,900 385,242 108,658 6 East Side Lands Roads Infrastructure - New Road from HWY 140 to Progress Drive 2026-2030 2,520,000 1,814,400 705,600 - 705,600 550,368 155,232 7 Sidewalk - John Street (250m) 2024 62,500 - 62,500 - 62,500 48,750 13,750 8 Provision for Other Roads Related Works 2024-2036 1,000,000 - 1,000,000 - 1,000,000 780,000 220,000 Reserve Fund Adjustment - - - 62,075 (62,075) (48,418) (13,656) Total 20,212,500 10,196,000 - 10,016,500 5,051,075 - 4,965,425 3,873,032 1,092,394 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Public Works (Facilities and Fleet) The Public Works Department has 64.50 vehicles and major equipment (a portion of a vehicle is shared with Parks and Recreation) with a replacement cost totalling approximately $10.01 million. The inventory provided over the historical 15-year period results in an average level of service of 2.90 vehicles and equipment per 1,000 population. This results in an average level of investment of $464 per capita. Over the forecast period, the D.C.-eligible amount for vehicles and equipment is approximately $1.79 million. The City's Public Works service operates out of a combined 48,150 sq.ft. of facility space, providing an average level of service of 1.64 sq.ft. per capita or $841 per capita. This level of service provides the City with a maximum D.C.-eligible amount for recovery over the forecast period of approximately $3.25 million. In total, the City is eligible to collect approximately $5.04 million for public works infrastructure. Based on the anticipated growth over the forecast period to 2036, the capital works identified include the existing Operations Centre debt (principal and discounted interest) costs, a tandem snow plow, sidewalk machine, and other additions to the City's fleet. The total gross capital cost identified is approximately $9.36 million. Of this amount, a deduction of approximately $4.15 million has been made to reflect the portion that benefits growth beyond the forecast period to 2036. Additionally, a deduction of $134 has been made to account for the existing reserve fund balance. Therefore, the net growth-related capital cost included for recovery is approximately $5.21 million. The residential/non-residential allocation for services related to a highway - public works (facilities and fleet) is based on the ratio of anticipated population and employment growth over the forecast period. This results in a 78% allocation to residential development and 22% allocation to non-residential development. Watson & Associates Economists Ltd. PAGE 5-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-2 Infrastructure Cost Included in the Development Charges Calculation Services Related to a Highway - Public Works (Facilities and Fleet) Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024 to 2036 78% 22% 1 Operations Centre Growth-Related Debt - Principal 2024-2047 6,317,071 3,295,900 3,021,171 - 3,021,171 2,356,514 664,658 2 Operations Centre Growth-Related Debt - Discounted Interest 2024-2047 1,174,724 612,900 561,824 - 561,824 438,223 123,601 3 Tandem Snow Plow 2027 600,000 - 600,000 - 600,000 468,000 132,000 4 Sidewalk Machine 2027 300,000 - 300,000 - 300,000 234,000 66,000 5 Cube Van 2030 300,000 75,000 225,000 - 225,000 175,500 49,500 6 Pickup Truck with Plow 2030 90,000 22,500 67,500 - 67,500 52,650 14,850 7 Loader with Attachments 2030 500,000 125,000 375,000 - 375,000 292,500 82,500 8 Water Van 2030 80,000 20,000 60,000 - 60,000 46,800 13,200 Reserve Fund Adjustment - - - 134 (134) (105) (29) Total 9,361,795 4,151,300 - 5,210,495 134 - 5,210,361 4,064,082 1,146,279 Gross Capital Cost Estimate (2024$) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.2.2 Fire Services The City currently operates its fire services out of Fire Station #1 (Killaly St. W) which provides a total of 21,000 sq.ft. of facility space. Over the historical 15-year period the City provided 1.11 sq.ft. of facility space per capita, which equates to an investment of $808 per capita. Based on the anticipated growth over the forecast period, this level of service provides the City with a maximum D.C.-eligible amount for recovery of approximately $3.12 million related to fire facility space. The fire department has a current inventory of 10 vehicles. Over the historical 15-year period, the City has provided an average level of investment of $347 per capita. Based on the average level of service the total D.C.-eligible amount for fire vehicles over the forecast period is approximately $1.34 million. The fire department utilizes fire equipment and gear with a total replacement cost of approximately $1.25 million. Over the historical 15-year period the City provided an average level of investment of $64 per capita. This results in a D.C.-eligible amount of approximately $0.25 million for small equipment and gear over the forecast period to 2036. In total, the City is eligible to collect approximately $4.70 million for fire services. The City has identified the need for an expansion to Station 1, a new platform truck, the East Side fire hall, and vehicles and equipment for the East Side fire hall. The total gross capital cost of these projects is estimated to be approximately $12.66 million. Of the total gross capital cost, approximately $6.81 million and $2.20 million have been deducted for the amount that benefits growth outside the forecast period, and the amount that benefits existing development, respectively. Additionally, $4,778 was deducted to account for the existing reserve fund balance. The resulting total net growth-related capital costs included in the D.C. calculations is approximately $3.64 million. These costs are shared between residential and non-residential growth based on the population to employment ratio over the forecast period to 2036. This results in 78% of the costs being allocated to residential development and 22% being allocated to non- residential development. Watson & Associates Economists Ltd. PAGE 5-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-3 Infrastructure Cost Included in the Development Charges Calculation Fire Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024 to 2036 78% 22% 1 Expansion to Station 1 2028-2034 1,000,000 - 1,000,000 - 1,000,000 780,000 220,000 2 Platform Truck 2028-2034 3,000,000 576,000 2,424,000 2,200,000 224,000 174,720 49,280 3 East Side Fire Hall 2028-2034 6,300,000 4,536,000 1,764,000 - 1,764,000 1,375,920 388,080 4 Fire truck (Engine for East Side) 2028-2034 1,250,000 900,000 350,000 - 350,000 273,000 77,000 5 Fire truck (Tanker for East Side) 2028-2034 750,000 540,000 210,000 - 210,000 163,800 46,200 6 Equipment for East Side FH 2028-2034 260,000 187,200 72,800 - 72,800 56,784 16,016 7 SCBA East Side 2028-2034 95,000 68,400 26,600 - 26,600 20,748 5,852 Reserve Fund Adjustment - - - 4,778 (4,778) (3,727) (1,051) Total 12,655,000 6,807,600 - 5,847,400 2,204,778 - 3,642,622 2,841,245 801,377 Post Period Benefit Other Deductions Net Capital Cost Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.2.3 Parks and Recreation Services The City currently has 222.81 acres of parkland within its jurisdiction. These parks consist of various sized neighbourhood parks, parkettes, City parks, and community parks. Over the historical 15-year period the City provided an average of 11.80 acres of parkland development per 1,000 population, or an investment of $1,265 per capita Over the forecast period the City would be eligible to collect approximately $4.88 million from D.C.s for parkland development. The City currently provides 97 parkland amenities, including various types of fields, courts, playground equipment, washrooms, pavilions and gazebos, etc. Over the historical 15-year period the City provided an average of 5.1 amenities per 1,000 population, or an average level of investment of $969 per capita. Over the forecast period to 2036 the City would be eligible to collect approximately $3.74 million from D.C.s for parkland amenities. In addition to parkland development and amenities, the City currently has 24,800 linear meters of parkland trails. Over the historical 15-year period the City provided an average of 1.28 linear meters of parkland trails per capita, or an investment of $321 per capita. Over the forecast period to 2036 the City would be eligible to collect approximately $1.24 million from D.C.s for parkland trails. With respect to recreation facilities, there are currently 9 facilities provided by the City consisting of community centres, the Vale Health & Wellness Centre, Sugarloaf Marina, etc. In total, these facilities provide the City with 163,297 sq.ft. of recreation facility space. Based on the inventory of space provided over the historical 15-year period (2009 to 2023), the City has provided an average of approximately 7.25 sq.ft. of space per capita or an investment of $4,200 per capita. Over the forecast period the City would be eligible to collect approximately $16.21 million from D.C.s for recreation facility space. The City also maintains and operates a fleet of 54.5 vehicles and equipment (a portion of a vehicle is shared with Public Works) , which have an estimated replacement value of approximately $3.50 million. This results in a calculated average level of service for the historical 15-year period of $172 per capita, providing a D.C. eligible amount over the forecast period of approximately $0.66 million. Watson & Associates Economists Ltd. PAGE 5-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx In total, the City is eligible to collect approximately $26.73 million for parks and recreation services. Based on the projected growth over the 2024 to 2036 forecast period, the City has identified future capital needs totaling approximately $45.26 million. These capital needs include various playgrounds, parkland development, sports courts and fields, and provisions for additional trails, infrastructure, vehicles, and equipment. Through a review of the proposed capital works, a deduction of approximately $31.37 million has been made to reflect the portion of works that benefit growth beyond the forecast period to 2036, and approximately $4.99 million has been deducted for the benefit to the existing community. Additionally, $119,749 has been deducted to reflect the existing balance in the D.C. reserve fund. Therefore, the total net growth capital cost included in the D.C. for parks and recreation services is approximately $8.79 million. As the predominant users of parks and recreation tend to be residents of the City, the forecasted growth-related costs have been allocated 95% to residential development and 5% to non-residential development. Watson & Associates Economists Ltd. PAGE 5-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-4 Infrastructure Cost Included in the Development Charges Calculation Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2024 to 2036 95% 5% 1 Facility Addition & Site Works, Community Space, and Baseball Diamonds 2025-2033 35,000,000 29,000,000 6,000,000 3,000,000 3,000,000 2,850,000 150,000 2 Signature Park Development and Amenities 2026-2027 1,600,000 - 1,600,000 - 1,600,000 1,520,000 80,000 3 Outdoor Structure (Ice Rink in the Winter and Tennis/Pickleball in the Summer) 2025-2033 4,000,000 1,800,000 2,200,000 1,000,000 1,200,000 1,140,000 60,000 4 Playground - Lock 8 2027 500,000 - 500,000 250,000 250,000 237,500 12,500 5 Playground - Vale 2033 500,000 500,000 - - - - - 6 Playground - North End 2025 500,000 - 500,000 - 500,000 475,000 25,000 7 Playground - East Side 2025 350,000 - 350,000 - 350,000 332,500 17,500 8 Ice Resurfacer 2025-2032 150,000 67,500 82,500 37,500 45,000 42,750 2,250 9 Basketball court 2025 60,000 - 60,000 - 60,000 57,000 3,000 10 Two Splash Pads 2027 1,000,000 - 1,000,000 700,000 300,000 285,000 15,000 11 Provision for Parks and Recreation Infrastructure, Vehicles, and Equipment 2025-2032 1,000,000 - 1,000,000 - 1,000,000 950,000 50,000 12 Provision for Additional Trails 2025-2032 600,000 - 600,000 - 600,000 570,000 30,000 Reserve Fund Adjustment - - - 119,749 (119,749) (113,761) (5,987) Total 45,260,000 31,367,500 - 13,892,500 5,107,249 - 8,785,251 8,345,989 439,263 Post Period Benefit Other Deductions Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-11 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.2.4 Library Services The City currently operates its library services out of 310 King St. totalling 23,116 sq.ft of space. The City also maintains collection materials including books, subscriptions, board games and puzzles, public computers, etc. valued at approximately $2.20 million. Over the historical 15-year period the City provided an average level of investment of $1,032 per capita for library facilities and materials. When applied over the forecast period to 2036, this average level of service translates into a D.C.-eligible amount of approximately $3.98 million from D.C.s for library services. With respect to capital needs to accommodate growth over the forecast period, the City has identified RFID equipment, a bookmobile, and provisions for library space, collections, and equipment. In total, the gross capital cost estimate is approximately $1.17 million. Of this amount, $5,282 has been deducted to account for the existing reserve fund balance. Therefore, the net growth-related capital cost included in the D.C. calculations is approximately $1.16 million. While library usage is predominately residential based, there is some use of the facilities by non-residential users, for the purpose of research. To acknowledge this use, the growth-related capital costs have been allocated 95% to residential development and 5% to non-residential development. Watson & Associates Economists Ltd. PAGE 5-12 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-5 Infrastructure Cost Included in the Development Charges Calculation Library Services Prj.No Residential Share Non- Residential Share 2024 to 2036 95% 5% 1 Provision for New Library Collections and Equipment 2025-2033 150,000 - 150,000 - 150,000 142,500 7,500 2 NovelBranch and RFID equipment 2024-2025 90,000 - 90,000 - 90,000 85,500 4,500 3 Bookmobile 2024-2028 200,000 - 200,000 - 200,000 190,000 10,000 4 Provision for New Library Space 2025-2027 725,311 - 725,311 - 725,311 689,046 36,266 Reserve Fund Adjustment - - - 5,282 (5,282) (5,018) (264) Total 1,165,311 - - 1,165,311 5,282 - 1,160,029 1,102,027 58,001 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Post Period Benefit Other Deductions Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-13 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.2.5 Growth Studies The City has identified the need for various studies over the forecast period, including master servicing studies, a transportation master plan, D.C. studies, etc. The total capital costs of these studies are approximately $5.62 million. For planning related studies, a deduction of $117,500 has been applied to recognize the extent to which the studies relate to non-D.C.-eligible services. Further deductions of approximately $3.15 million and $9,221 have been made to recognize the benefit to the existing community, as well as the existing reserve fund balance, respectively. Therefore, the net amount of approximately $2.34 million has been included in the D.C. calculations. These costs are shared between residential and non-residential growth based on the population to employment ratio over the 12-year forecast period to 2036, resulting in 78% being allocated to residential development and 22% being allocated to non- residential development. Watson & Associates Economists Ltd. PAGE 5-14 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-6 Infrastructure Cost Included in the Development Charges Calculation Growth Studies Residential Share Non- Residential Share 2024 to 2036 78% 22% 1 Wastewater Master Servicing Study 2024 255,000 - 255,000 127,500 127,500 99,450 28,050 2 Wastewater Master Servicing Study 2028 255,000 - 255,000 127,500 127,500 99,450 28,050 3 Flow Monitoring 2024-2036 1,200,000 - 1,200,000 900,000 300,000 234,000 66,000 4 Water Master Servicing Study 2024 150,000 - 150,000 75,000 75,000 58,500 16,500 5 Water Master Servicing Study 2029 150,000 - 150,000 75,000 75,000 58,500 16,500 6 Hydraulic Modelling 2024-2036 300,000 - 300,000 225,000 75,000 58,500 16,500 7 Outfall Investigation 2024 150,000 - 150,000 112,500 37,500 29,250 8,250 8 Flow Monitoring 2024 100,000 - 100,000 75,000 25,000 19,500 5,500 9 CCTV Data Collection 2024 200,000 - 200,000 150,000 50,000 39,000 11,000 10 City-Wide Camera Inspections 2024 350,000 - 350,000 262,500 87,500 68,250 19,250 11 Stormwater Master Servicing Study 2024 200,000 - 200,000 100,000 100,000 78,000 22,000 12 Stormwater Master Servicing Study 2029 200,000 - 200,000 100,000 100,000 78,000 22,000 13 Transportation Master Plan 2025 200,000 - 200,000 50,000 150,000 117,000 33,000 14 Transportation Master Plan 2030 200,000 - 200,000 50,000 150,000 117,000 33,000 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Other Deductions (to recognize benefit to non-D.C. services) Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-15 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-6 (Continued) Infrastructure Cost Included in the Development Charges Calculation Growth Studies Residential Share Non- Residential Share 2024 to 2036 78% 22% 15 Development Charges Study 2024 75,000 - 75,000 - 75,000 58,500 16,500 16 Development Charges Study Update 2026 30,000 - 30,000 - 30,000 23,400 6,600 17 Development Charges Study 2030 75,000 - 75,000 - 75,000 58,500 16,500 18 Official Plan 2024 300,000 - 30,000 270,000 135,000 135,000 105,300 29,700 19 Official Plan Update 2030 175,000 - 17,500 157,500 39,400 118,100 92,118 25,982 20 Zoning By-law 2025 150,000 - 17,500 132,500 66,300 66,200 51,636 14,564 21 Zoning By-law Update 2030 100,000 - 17,500 82,500 41,300 41,200 32,136 9,064 22 Infrastructure Needs Study 2024 250,000 - 25,000 225,000 168,800 56,200 43,836 12,364 23 Parks and Recreation Master Plan Update 2025 150,000 - 150,000 37,500 112,500 87,750 24,750 24 Fire Master Plan 2025 150,000 - 150,000 75,000 75,000 58,500 16,500 25 Long-Term Financial Plan 2026 100,000 - 10,000 90,000 75,600 14,400 11,232 3,168 26 Urban Forestry Management 2029 150,000 - 150,000 75,000 75,000 58,500 16,500 Reserve Fund Adjustment - - 9,221 (9,221) (7,192) (2,029) Total 5,615,000 - 117,500 5,497,500 3,153,121 - 2,344,379 1,828,616 515,763 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Less: Potential D.C. Recoverable Cost Other Deductions (to recognize benefit to non-D.C. services) Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-16 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.3 Service Levels and Urban 12-Year Capital Costs for the City of Port Colborne's D.C. Calculation 5.3.1 Water Services Based on the urban serviced forecast period to 2036, a number of water projects have been identified to service developments throughout the City. For water services, the capital program identified by the City includes watermain additions, extensions, and upsizes. The total gross capital cost for the capital projects is approximately $55.12 million. With respect to deductions, the following adjustments have been made: - Approximately $13.38 million to benefit existing development; - Approximately $30.05 million to benefit growth beyond the forecast period to 2036; and - $95,763 to account for the existing reserve fund balance. Therefore, the net growth-related capital cost of approximately $11.59 million has been included in the D.C. calculations. The costs for water services are shared between residential and non-residential growth based on the population to employment ratio over the urban 12-year forecast period. This results in 78% of the costs being allocated to residential development and 22% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-17 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-7 Infrastructure Cost Included in the Development Charges Calculation Water Services Residential Share Non- Residential Share 2024 to 2036 78% 22% 1 East Side Lands Water Infrastructure 2026-2030 23,100,000 - 23,100,000 - 23,100,000 18,018,000 5,082,000 2 W-3 - Main Street 300mm (1065m) 2030-2035 5,705,200 - 5,705,200 5,134,700 570,500 444,990 125,510 3 W-4 - Main Street East 300mm (675m) 2030-2035 1,865,100 - 1,865,100 1,193,700 671,400 523,692 147,708 4 W-5 - Highway 3 300mm (1640m - New Watermain) 2030-2035 4,182,600 - 4,182,600 - 4,182,600 3,262,428 920,172 5 W-7 - Lorraine Road 300mm (885m - New Watermain) 2035-2040 2,257,200 - 2,257,200 - 2,257,200 1,760,616 496,584 6 W-8 - Killaly Street East 300mm (1670m - New Watermain) 2030-2035 4,259,200 - 4,259,200 - 4,259,200 3,322,176 937,024 7 W-9 - Clarke Street 250mm (1320m - New Watermain) 2037 3,343,100 - 3,343,100 2,674,500 668,600 521,508 147,092 8 W-10 - King Street 250mm (845m) 2030 2,469,500 - 2,469,500 1,086,600 1,382,900 1,078,662 304,238 9 W-11 - Elm Street 250mm (710m) 2030 2,075,100 - 2,075,100 1,058,300 1,016,800 793,104 223,696 10 W-12 - Sugarloaf Street 250mm (1225m) 2030 3,102,800 - 3,102,800 2,234,000 868,800 677,664 191,136 11 W-13 - Elgin Street 300mm (440m - New Watermain) 2035-2040 1,122,300 - 1,122,300 - 1,122,300 875,394 246,906 12 W-14 - Rosemount Ave 300mm (770m - New Watermain) 2035-2040 1,636,600 - 1,636,600 - 1,636,600 1,276,548 360,052 Post Period Adjustment 30,050,568 (30,050,568) - (30,050,568) (23,439,443) (6,611,125) Reserve Fund Adjustment - 95,763 (95,763) (74,695) (21,068) Total 55,118,700 30,050,568 - 25,068,132 13,477,563 - 11,590,569 9,040,644 2,549,925 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. PAGE 5-18 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 5.3.2 Wastewater Services Based on the forecast period to 2036, a number of wastewater projects have been identified to service developments throughout the City. The capital program identified by the City includes sanitary sewer mains (additions, extensions, and upgrades), sanitary pumping stations, and an inflow and infiltration reduction program. The total gross capital cost for the capital projects is approximately $90.58 million. With respect to deductions, the following adjustments have been made: - Approximately $8.84 million to benefit existing development; - Approximately $58.85 million to benefit growth beyond the forecast period to 2036; and - $48,508 to account for the existing reserve fund balance. Therefore, the net growth-related capital cost of $22.84 million is being included in the D.C. calculations. The costs for wastewater services are shared between residential and non-residential growth based on the population to employment ratio over the urban 12-year forecast period. This results in 78% of the costs being allocated to residential development and 22% being allocated to non-residential development. Watson & Associates Economists Ltd. PAGE 5-19 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 5-8 Infrastructure Cost Included in the Development Charges Calculation Wastewater Services Residential Share Non- Residential Share 2024 to 2036 78% 22% 1 SS-1 - Johnston Street 450mm (235m) 2035-2040 568,700 - 568,700 415,200 153,500 119,730 33,770 2 SS-9 - Johnston Street 450mm (740m) 2035-2040 1,651,700 - 1,651,700 - 1,651,700 1,288,326 363,374 3 SS-2 - Killaly Street East 600mm (805m) 2030 2,480,800 - 2,480,800 - 2,480,800 1,935,024 545,776 4 East Side Lands Wastewater Servicing 2025-2030 26,514,600 - 26,514,600 - 26,514,600 20,681,388 5,833,212 5 SS-5 - Ost Avenue 375mm (530m) 2026 1,220,500 - 1,220,500 939,800 280,700 218,946 61,754 6 SS-8 - Sugarloaf Street 450mm (500m) 2030 1,209,000 - 1,209,000 737,500 471,500 367,770 103,730 7 FM-1 & 2a- Barrick Road 300/450mm (6060m) 2026-2027 24,000,000 - 24,000,000 - 24,000,000 18,720,000 5,280,000 8 FM-2b - Elizabeth & 2nd Concession 300mm (2400m) 2030 6,120,700 - 6,120,700 - 6,120,700 4,774,146 1,346,554 9 FM-3 - Marina Drive 150mm (650m) 2030 1,381,500 - 1,381,500 - 1,381,500 1,077,570 303,930 10 FM-4 100mm (350m) 2045-2054 595,200 - 595,200 - 595,200 464,256 130,944 11 SPS 2 - Killaly Residential Development 238mm 2030-2034 12,645,100 - 12,645,100 - 12,645,100 9,863,178 2,781,922 12 SPS 3 - Marina 20mm 2030-2034 2,125,200 - 2,125,200 - 2,125,200 1,657,656 467,544 13 SPS 4 - North West 10mm 2045-2054 1,062,700 - 1,062,700 - 1,062,700 828,906 233,794 14 Overall I&I Reduction Program 2024-2035 9,000,000 - 9,000,000 6,750,000 2,250,000 1,755,000 495,000 Post Period Adjustment 58,847,904 (58,847,904) - (58,847,904) (45,901,365) (12,946,539) Reserve Fund Adjustment - - - 48,508 (48,508) (37,836) (10,672) Total 90,575,700 58,847,904 - 31,727,796 8,891,008 - 22,836,788 17,812,695 5,024,093 Less: Potential D.C. Recoverable Cost Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 6. D.C. Calculation Table 6-1 calculates the proposed uniform D.C.s to be imposed on anticipated development in the City for urban services over a 12-year planning horizon (water and wastewater). Table 6-2 calculates the proposed uniform D.C.s to be imposed on anticipated development in the City for City-wide services over a 12-year planning horizon (services related to a highway, public works (facilities and fleet), fire services, parks and recreation services, library services, and growth studies). The calculation for residential development is generated on a per capita basis and is based upon five forms of housing types (singles and semi-detached, multiples, apartments 2+ bedrooms, apartments studio and 1 bedroom, and special care/special dwelling units). The non-residential D.C. has been calculated on a per sq.ft. of G.F.A. basis for all types of non-residential development (industrial, commercial, and institutional). The D.C.-eligible costs for each service component were developed in Chapter 5 for all City services, based on their proposed capital programs. For the residential calculations, the total cost is divided by the "gross" (new resident) population to determine the per capita amount. The eligible-D.C. cost calculations set out in Chapter 5 are based on the net anticipated population increase (the forecast new unit population less the anticipated decline in existing units). The cost per capita is then multiplied by the average occupancy of the new units (Appendix A, Schedule 7) to calculate the charge in Table 6-1. With respect to non-residential development, the total costs in the uniform charge allocated to non-residential development (based on need for service) have been divided by the anticipated development over the planning period to calculate a cost per sq.ft. of G.F.A. Table 6-3 summarizes the total D.C. that is applicable for City-wide services and Table 6-4 summarizes the gross capital expenditures and sources of revenue for works to be undertaken during the life of the by-law. Watson & Associates Economists Ltd. PAGE 6-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 6-1 City of Port Colborne Development Charge Calculation Urban Area Services 12-Year (2024 to 2036) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1. Wastewater Services 1.1 Sewers 17,812,695 5,024,093 11,453 5.24 17,812,695 5,024,093 11,453 5.24 2. Water Services 2.1 Distribution systems 9,040,644 2,549,925 5,813 2.66 9,040,644 2,549,925 5,813 2.66 TOTAL 26,853,339 7,574,019 17,266 7.90 D.C.-Eligible Capital Cost 26,853,339 $7,574,019 Urban 12-Year Gross Population/GFA Growth (sq.ft.) 4,462 958,800 Cost Per Capita/Non-Residential GFA (sq.ft.) $6,018.23 $7.90 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.869 $17,266 Multiples 2.222 $13,373 Apartments - 2 Bedrooms + 2.009 $12,091 Apartments - Bachelor and 1 Bedroom 1.328 $7,992 Special Care/Special Dwelling Units 1.100 $6,620 Watson & Associates Economists Ltd. PAGE 6-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 6-2 City of Port Colborne Development Charge Calculation City-wide Services 12-Year (2024 to 2036) 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 3. Services Related to a Highway 3.1 Roads and Related 3,873,032 1,092,394 2,328 1.12 3,873,032 1,092,394 2,328 1.12 4. Public Works (Facilities and Fleet) 4.1 Public Works (Facilities and Fleet) 4,064,082 1,146,279 2,444 1.17 4,064,082 1,146,279 2,444 1.17 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 2,841,245 801,377 1,709 0.82 2,841,245 801,377 1,709 0.82 6. Parks and Recreation Services 6.1 Park development, amenities, trails, vehicles and equipment, and recreation facilities 8,345,989 439,263 5,018 0.45 8,345,989 439,263 5,018 0.45 7. Library Services 7.1 Library facilities & materials 1,102,027 58,001 663 0.06 1,102,027 58,001 663 0.06 8. Growth Studies 8.1 Growth Studies 1,828,616 515,763 1,101 0.53 1,828,616 515,763 1,101 0.53 TOTAL 22,054,991 4,053,077 13,263 4.15 D.C.-Eligible Capital Cost $22,054,991 $4,053,077 12-Year Gross Population/GFA Growth (sq.ft.) 4,771 976,000 Cost Per Capita/Non-Residential GFA (sq.ft.) $4,622.72 $4.15 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.869 $13,263 Multiples 2.222 $10,272 Apartments - 2 Bedrooms + 2.009 $9,287 Apartments - Bachelor and 1 Bedroom 1.328 $6,139 Special Care/Special Dwelling Units 1.100 $5,085 Watson & Associates Economists Ltd. PAGE 6-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 6-3 City of Port Colborne Development Charge Calculation Total All Services 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ Urban-wide Services 12 Year 26,853,339 7,574,019 17,266 7.90 Municipal-wide Services 12 Year 22,054,991 4,053,077 13,263 4.15 TOTAL 48,908,330 11,627,096 30,529 12.05 Watson & Associates Economists Ltd. PAGE 6-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table 6-4 City of Port Colborne Gross Expenditure and Sources of Revenue Summary for Costs to be Incurred over the Life of the By-law Sources of Financing Tax Base or Other Non-D.C. Source D.C. Reserve Fund Other Deductions Benefit to Existing Other Funding Residential Non- Residential 1. Wastewater Services 1.1 Sewers 85,879,218 - 7,813,664 - - 60,891,133 17,174,422 2. Water Services 2.1 Distribution systems 43,557,080 - 9,441,620 - - 26,610,059 7,505,401 3. Services Related to a Highway 3.1 Roads and Related 15,475,119 - 3,617,786 - 7,892,321 3,092,709 872,303 4. Public Works (Facilities and Fleet) 4.1 Public Works (Facilities and Fleet) 5,127,302 - - - 1,941,978 2,484,553 700,771 5. Fire Protection Services 5.1 Fire facilities, vehicles & equipment 12,655,000 - 2,200,000 - 6,807,600 2,844,972 802,428 6. Parks and Recreation Services 6.1 Park development, amenities, trails, vehicles and equipment, and recreation facilities 45,260,000 - 4,987,500 - 31,367,500 8,459,750 445,250 7. Library Services 7.1 Library facilities & materials 1,165,311 - - - - 1,107,046 58,266 8. Growth Studies 8.1 Growth Studies 5,115,000 82,500 2,848,800 - - 1,703,286 480,414 Total Expenditures & Revenues $214,234,031 $82,500 $30,909,369 $0 $48,009,400 $107,193,507 $28,039,255 Post D.C. Period Benefit Total Gross Cost Service/Class Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 7 D.C. Policy Recommendations and D.C. By-law Rules Watson & Associates Economists Ltd. PAGE 7-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 7. D.C. Policy Recommendations and D.C. By-law Rules 7.1 Introduction Subsection 5 (1) 9 states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided are based on the City's existing policies; with some modifications and consideration for the changes to the D.C.A. resulting from Bills 108, 197, 213, 23, and 185. Watson & Associates Economists Ltd. PAGE 7-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 7.2 D.C. By-law Structure It is recommended that: - the City uses a uniform City-wide D.C. calculation for all City-wide services; - D.C.s for water and wastewater be imposed on the urban serviced areas of the City; and - one D.C. by-law be used for all services. 7.3 D.C. By-law Rules The following subsections set out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with section 6 of the D.C.A. It is recommended that the following sections provide the basis for the D.C.s.: 7.3.1 Payment in any Particular Case In accordance with the D.C.A., subsection 2 (2), a D.C. be calculated, payable, and collected where the development requires one or more of the following: "(a) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure." Watson & Associates Economists Ltd. PAGE 7-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous decade. Costs allocated to non-residential uses will be assigned based on the number of square feet of G.F.A. constructed for eligible uses (i.e., industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, e.g. - for parks and recreation services and library services, a 5% non-residential attribution has been made to recognize use by the non-residential sector; and - for services related to a highway - roads and related, public works (facilities and fleet), fire protection services, growth studies, water services, and wastewater services a 78% residential/22% non-residential attribution has been made based on a population vs. employment growth ratio over the 12-year (2024 to 2036) forecast period. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) If a development involves the demolition of and replacement of a building or structure on the same site, or the conversion from one principal use to another, the developer shall be allowed a credit equivalent to: 1) the number of dwelling units demolished/converted multiplied by the applicable residential D.C. in place at the time the D.C. is payable; and/or 2) the gross floor area of the building demolished/converted multiplied by the current non-residential D.C. in place at the time the D.C. is payable. The demolition credit is allowed only if the land was improved by occupied structures and if the demolition permit related to the site was issued less than 12 months prior to the issuance of a building permit. The credit can, in no case, exceed the amount of D.C.s that would otherwise be payable. Watson & Associates Economists Ltd. PAGE 7-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 7.3.4 Exemptions (full or partial) Statutory exemptions include the following: - Partial exemption for industrial building additions of up to and including 50% of the existing G.F.A. (defined in O. Reg. 82/98, section 1) of the building; for industrial building additions that exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s (subsection 4 (3) of the D.C.A.); - Full exemption for buildings or structures owned by and used for the purposes of any municipality, local board, or Board of Education; - Full exemption for additional residential development within or ancillary to existing buildings: development that results only in the enlargement of an existing dwelling unit, or that results only in the creation of up to two additional dwelling units (based on limits set out in subsection 2 (3.2) of the Act); - Full exemption for additional residential development within or ancillary to new dwellings: development that includes the creation of up to two additional dwelling units (based on limits set out in subsection 2 (3.3) of the Act); - Full exemption for the creation of the greater of one residential unit or 1% of the existing residential units in an existing rental residential building; - Full exemption for a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario; - Full exemption for affordable units; - Full exemption for attainable units, (in effect on a day to be named by proclamation of the Lieutenant Governor); - Full exemption for affordable inclusionary zoning units; - Full exemption for non-profit housing developments; and - Partial exemption through a discount for rental housing units based on bedroom size as prescribed (i.e., three or more bedrooms - 25% discount, two bedrooms - 20% discount, and all others - 15% discount). Non-statutory exemptions included in the draft by-law for Council's consideration: - Non-residential farm buildings for the purpose of an agricultural use except for any building constructed to accommodate on On-Farm Business which shall be considered to be an industrial building; and Watson & Associates Economists Ltd. PAGE 7-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Industrial development shall be exempt from payment of D.C.s on any square footage of gross floor area constructed over 5,000 sq.ft.; and - Partial exemption for certain Community Improvement Plan areas based upon specific policies approved by Council. 7.3.5 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the City and an owner under s. 27 of the D.C.A. Rental housing and institutional developments will pay D.C.s in 6 equal annual payments commencing at occupancy. Moreover, the D.C. amount for all developments occurring within eighteen months of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the D.C. in effect on the day the applicable Site Plan or Zoning By-law Amendment application was submitted (as a complete application). Instalment payments and payments determined at the time of Site Plan or Zoning By- law Amendment application are subject to annual interest charges. The maximum interest rate the City can impose is the average prime rate plus 1%. 7.3.6 The Applicable Areas The charges developed herein provide for varying charges within the City, as follows: - All City-wide Services - the full residential and non-residential charge will be imposed on all lands within the City; and - Water and Wastewater - the full residential and non-residential charge will be imposed on the urban service areas of the City. Watson & Associates Economists Ltd. PAGE 7-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 7.3.7 Indexing Rates shall be adjusted, without amendment to the By-law, annually on the anniversary date of the By-law in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10-0276-02)1. 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes The City's D.C. collections are currently reserved in eight (8) separate reserve funds: Roads, Water, Wastewater, Fire, Public Works, Administration, Parks and Recreation, and Library. It is recommended that the City rename the Administration reserve fund to "Growth Studies". Appendix D outlines the reserve fund policies that the City is required to follow as per the D.C.A. 7.4.2 By-law In-force Date A by-law under the D.C.A. comes into force on the day after which the by-law is passed by Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-law comes into force (as per section 11 of O. Reg. 82/98). 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 7.4.4 Area Rating The D.C.A. required that Council must consider the use of area specific charges: 1. Section 2 (9) of the D.C.A. now requires a municipality to implement area-specific D.C.s for either specific services which are prescribed and/or for specific municipalities which are to be regulated (note that at this time, no municipalities or services are prescribed by the regulations). 2. Section 10 (2) c.1 of the D.C.A. requires that "the development charges background study shall include consideration of the use of more than one development charge by-law to reflect different needs for services in different areas." In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area rated. The second item requires Council to consider the use of area rating. Currently the City's by-law provides for area-rating for water and wastewater services, while all other services are to be recovered on a uniform, City-wide basis. There have been several reasons why area-rating has not been imposed on these services, including: 1. All City services, with the exception of water and wastewater, require that the average 15-year service standard be calculated. This average service standard multiplied by growth in the City, establishes an upper ceiling on the amount of funds that can be collected from all developing landowners. Section 4 (4) of O. Reg. 82/98 provides that "if a development charge by-law applies to a part of the municipality, the level of service and average level of service cannot exceed that which would be determined if the by-law applied to the whole municipality." Put in layman terms, the average service standard multiplied by the growth within the specific area would establish an area-specific ceiling which would significantly reduce the total revenue recoverable for the City hence potentially resulting in D.C. revenue shortfalls and impacts on property taxes. 2. Expanding on item 1, attempting to impose an area charge potentially causes equity issues in transitioning from a City-wide approach to an area-specific approach. For example, if all services were now built (and funded) within Area A Watson & Associates Economists Ltd. PAGE 7-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx (which is 75% built out) and this was funded with some revenues from Areas B and C, moving to an area-rating approach would see Area A contribute no funds to the costs of services in Areas B and C. The D.C.s would be lower in Area A (as all services are now funded) and higher in Areas B and C. As well, funding shortfalls may then potentially encourage the municipality to provide less services to Areas B and C due to reduced revenue. 3. Many services provided (roads, parks and recreation facilities, etc.) are not restricted to one specific area and are often used by all residents. For example, arenas located in different parts of the City will be used by residents from all areas depending on the programing of the facility (i.e., a public skate is available each night, but at a different arena; hence usage of any one facility at any given time is based on programming availability). For the reasons noted above, it is recommended that Council calculate the charges on a uniform City-wide basis for all services except for water and wastewater, which are to be calculated on an urban area-specific basis. 7.5 Other Recommendations It is recommended that Council: "Whenever appropriate, request that grants, subsidies and other contributions be clearly designated by the donor as being to the benefit of existing development or new development, as applicable;" "Adopt the assumptions contained herein as an 'anticipation' with respect to capital grants, subsidies and other contributions;" "Continue the D.C. approach to calculate the charges on a uniform City-wide basis for all non-water and wastewater services, and on an urban-area basis for water and wastewater services;" "Approve the capital project listing set out in Chapter 5 of the D.C.s Background Study dated August 23, 2024, subject to further annual review during the capital budget process;" "Approve the D.C.s Background Study dated August 23, 2024;" Watson & Associates Economists Ltd. PAGE 7-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx "Determine that no further public meeting is required;" and "Approve the D.C. By-law as set out in Appendix G". Watson & Associates Economists Ltd. H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Chapter 8 By-law Implementation Watson & Associates Economists Ltd. PAGE 8-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 8. By-law Implementation 8.1 Public Consultation Process 8.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 8.1.2), as well as the optional, informal consultation process (section 8.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 8.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 8.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution. It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (OLT) (formerly the Local Planning Appeal Tribunal (LPAT)). 8.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority Watson & Associates Economists Ltd. PAGE 8-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, and institutions. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade, and the Economic Development Agencies, who are all potentially interested in municipal D.C. policy. Their primary concern is frequently with the quantum of the charge, G.F.A. exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 8.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. PAGE 8-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 8.3 Implementation Requirements 8.3.1 Introduction Once the City has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 8.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the City Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by- law relates, or by posting on the municipality's website if, in the clerk's opinion, a newspaper as described above does not exist; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 8.3.3 By-law Pamphlet In addition to the "notice" information, the City must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; Watson & Associates Economists Ltd. PAGE 8-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The City must give one copy of the most recent pamphlet without charge, to any person who requests one. 8.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and OLT hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the OLT by filing a notice of appeal with the City Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The City is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 8.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the City Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of City Council to the OLT. Watson & Associates Economists Ltd. PAGE 8-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 8.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 8.3.7 Front-Ending Agreements The City and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the City to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the Development Charges Act, 1989. Accordingly, the City assesses whether this mechanism is appropriate for its use, as part of funding projects prior to City funds being available. 8.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. PAGE 8-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the City is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 1 City of Port Colborne Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.5% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Notes: Numbers may not add due to rounding. Source: Derived by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 18,890 18,424 449 17,975 6,050 600 1,161 95 7,906 408 2.330 18,770 18,306 441 17,865 6,005 670 1,210 135 8,020 401 2.283 20,540 20,033 628 19,405 6,295 685 1,280 450 8,710 571 2.300 20,910 20,397 642 19,755 6,426 698 1,411 450 8,985 584 2.270 24,870 24,255 760 23,495 7,233 1,254 2,038 450 10,975 691 2.210 -120 -118 -8 -110 -45 70 49 40 114 -7 1,770 1,727 187 1,540 290 15 70 315 690 170 370 364 14 350 131 13 131 0 275 13 Mid 2024 - Mid 2036 3,960 3,858 118 3,740 807 556 627 0 1,990 107 Forecast Mid 2036 Mid 2021 - Mid 2024 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Historical Incremental Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Mid 2024 Watson & Associates Economists Ltd. PAGE A-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure 1 City of Port Colborne Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from City of Port Colborne building permit data, 2014 to 2023. 9 16 35 45 40 54 54 133 59 83 105 135 170 170 170 170 170 180 180 180 180 180 0 20 40 60 80 100 120 140 160 180 200 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE A-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 2 City of Port Colborne Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Derived by Watson & Associates Economists Ltd. 2024 - 2036 699 556 627 1,882 4,344 -502 3,842 118 3,960 2024 - 2036 108 0 0 108 310 -411 -101 0 -101 2024 - 2036 807 556 627 1,990 4,653 -913 3,741 118 3,859 Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Gross Population Existing Unit Net Population Increase, Excluding Institutional Institutional Population Net Population Including Institutional Location Residential Units In New Units Population Change Urban Rural City of Port Colborne Watson & Associates Economists Ltd. PAGE A-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 3 City of Port Colborne Current Year Growth Forecast Mid-2021 to Mid-2024 Mid 2021 Population 20,033 Occupants of Units (2) 275 New Housing Units, multiplied by P.P.U. (3) 2.214 Mid 2021 to Mid 2024 gross population increase 609 609 Occupants of New Units 13 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Mid 2024 gross population increase 14 14 Decline in Housing Units (4) 8,710 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.030 Mid 2021 to Mid 2024 total decline in population -259 -259 Population Estimate to Mid 2024 20,397 Net Population Increase, Mid 2021 to Mid 2024 364 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.677 48% 1.275 Multiples (6) 2.159 5% 0.102 Apartments (7) 1.755 48% 0.836 Total 100% 2.214 ¹ Based on 2021 Census custom database ² Based on Building permit/completion activity (4) 2021 households taken from Statistics Canada Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Note: Numbers may not add to totals due to rounding. Watson & Associates Economists Ltd. PAGE A-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 4 City of Port Colborne 12-Year Growth Forecast Mid-2024 to Mid-2036 Mid 2024 Population 20,397 Occupants of Units (2) 1,990 New Housing Units, multiplied by P.P.U. (3) 2.338 Mid 2024 to Mid 2036 gross population increase 4,653 4,653 Occupants of New Units 107 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2024 to Mid 2036 gross population increase 118 118 Decline in Housing Units (4) 8,985 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.102 Mid 2024 to Mid 2036 total decline in population -913 -913 Population Estimate to Mid 2036 24,255 Net Population Increase, Mid 2024 to Mid 2036 3,858 (1) Mid 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.869 41% 1.164 Multiples (6) 2.222 28% 0.621 Apartments (7) 1.759 32% 0.554 one bedroom or less 1.328 two bedrooms or more 2.009 Total 100% 2.338 ¹ Persons per unit based on Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Mid 2024 households based upon 2021 Census (8,710 units) + Mid 2021 to Mid 2024 unit estimate (275 units) = 8,985 units. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Population Note: Numbers may not add to totals due to rounding. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average 2021 Population (20,033) + Mid 2021 to Mid 2024 estimated housing units to beginning of forecast period (275 x 2.214 = 609) + (13 x 1.1 = 14) + (8,710 x -0.03 = -259) = 20,397 Watson & Associates Economists Ltd. PAGE A-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 5 City of Port Colborne Historical Residential Building Permits Years 2014 to 2023 [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from City of Port Colborne building permit data, by Watson & Associates Economists Ltd. Residential Building Permits Total 2014 9 0 0 9 2015 8 8 0 16 2016 31 0 4 35 2017 45 0 0 45 2018 26 2 12 40 Sub-total 119 10 16 145 Average (2014 - 2018) 24 2 3 29 % Breakdown 82.1% 6.9% 11.0% 100.0% 2019 34 4 16 54 2020 30 0 24 54 2021 34 0 99 133 2022 51 6 2 59 2023 0 0 0 0 Sub-total 149 10 141 300 Average (2019 - 2023) 30 2 28 60 % Breakdown 49.7% 3.3% 47.0% 100.0% 2014 - 2023 Total 268 20 157 445 Average 27 2 16 45 % Breakdown 60.2% 4.5% 35.3% 100.0% Singles & Semi Detached Multiples[1] Apartments[2] Year Watson & Associates Economists Ltd. PAGE A-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 6a City of Port Colborne Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 15 Year Average 15 Year Average Adjusted[1] 1-5 - - 1.917 2.824 - 2.677 6-10 - - - - - - 2.677 (0.138) 11-15 - - - 3.150 - 3.308 2.993 2.869 16-20 - - - 2.500 - 2.545 2.844 2.869 20-25 - - - 3.150 - 3.080 2.903 2.869 25-35 - - - 2.900 - 2.567 35+ - 1.682 1.886 2.432 3.462 2.332 2.752 2.869 Total 0.200 1.833 1.891 2.484 3.823 2.390 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - - 1.882 2.842 - 2.548 6-10 - - - - - 2.786 11-15 - - - 2.958 - 3.000 16-20 - - 1.933 2.565 - 2.341 20-25 - - - 2.962 - 2.650 25-35 - - 2.071 2.900 - 2.381 35+ - 1.196 1.795 2.477 3.313 2.180 Total - 1.216 1.829 2.521 3.526 2.230 Watson & Associates Economists Ltd. PAGE A-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 6b Region of Niagara Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhomes and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. [3] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Multiples[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 15 Year Average 15 Year Average Adjusted[3] 1-5 - 1.407 1.796 2.633 - 2.159 6-10 - 1.889 1.768 2.502 - 2.210 11-15 - 1.294 1.798 2.665 - 2.235 2.201 2.222 16-20 - 1.385 1.742 2.364 - 2.107 2.178 2.222 20-25 - 1.667 1.675 2.408 - 2.061 2.154 2.222 25-35 - 1.364 1.882 2.683 - 2.365 35+ 0.813 1.267 1.836 2.687 3.670 2.260 Total 0.771 1.331 1.802 2.621 3.847 2.226 Age of Apartments[2] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 15 Year Average 15 Year Average Adjusted[3] 1-5 - 1.291 1.688 2.600 - 1.755 6-10 - 1.200 1.763 2.033 - 1.603 11-15 - 1.500 1.823 3.000 - 1.797 1.718 1.759 16-20 - 1.246 1.922 2.130 - 1.701 1.714 1.759 20-25 - 1.266 2.028 2.412 - 1.745 1.720 1.759 25-35 - 1.226 1.773 3.043 - 1.602 35+ 1.017 1.192 1.749 2.447 2.545 1.575 Total 1.037 1.207 1.764 2.463 2.778 1.599 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 2.692 1.378 1.881 2.987 4.086 2.634 6-10 - 1.356 1.846 2.840 4.441 2.639 11-15 - 1.463 1.839 2.923 4.133 2.727 16-20 - 1.378 1.834 2.849 4.106 2.669 20-25 - 1.367 1.851 2.777 3.748 2.558 25-35 - 1.283 1.814 2.789 3.922 2.481 35+ 1.295 1.246 1.799 2.579 3.721 2.311 Total 1.504 1.270 1.812 2.661 3.846 2.396 Watson & Associates Economists Ltd. PAGE A-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 7 City of Port Colborne Person Per Unit Structural Type and Age of Dwelling (2021 Census) 2.68 0.00 3.31 2.55 3.08 2.57 2.33 2.16 2.21 2.23 2.11 2.06 2.36 2.26 1.76 1.60 1.80 1.70 1.75 1.60 1.57 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Multiple and Apartment P.P.U.s are based on Niagara . Watson & Associates Economists Ltd. PAGE A-11 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 8a City of Port Colborne Employment Forecast, 2024 to 2036 [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Source: Watson & Associates Economists Ltd. Employment Mid 2011 18,424 0.008 0.015 0.083 0.118 0.065 0.288 0.030 0.318 140 270 1,530 2,165 1,200 5,305 561 5,866 5,035 Mid 2016 18,306 0.007 0.029 0.083 0.112 0.064 0.295 0.043 0.339 125 535 1,518 2,053 1,175 5,405 793 6,198 4,870 Mid 2024 20,397 0.006 0.038 0.088 0.106 0.060 0.298 0.045 0.343 123 774 1,790 2,169 1,230 6,086 911 6,997 5,312 Mid 2036 24,255 0.005 0.044 0.091 0.109 0.061 0.311 0.046 0.357 123 1,066 2,213 2,655 1,487 7,544 1,120 8,664 6,478 Mid 2011 - Mid 2016 -118 -0.001 0.015 0.000 -0.005 -0.001 0.007 0.013 0.020 -15 265 -13 -113 -25 100 232 332 -165 Mid 2016 - Mid 2024 2,091 -0.001 0.009 0.005 -0.006 -0.004 0.003 0.001 0.004 -2 239 272 117 55 681 118 799 442 Mid 2024 - Mid 2036 3,858 -0.001 0.006 0.004 0.003 0.001 0.013 0.002 0.014 0 292 424 486 257 1,458 209 1,667 1,166 Mid 2011 - Mid 2016 -24 0.000 0.003 0.000 -0.001 0.000 0.001 0.003 0.004 -3 53 -3 -23 -5 20 46 66 -33 Mid 2016 - Mid 2024 261 0.000 0.001 0.001 -0.001 0.000 0.000 0.000 0.001 0 30 34 15 7 85 15 100 55 Mid 2024 - Mid 2036 322 0.000 0.001 0.000 0.000 0.000 0.001 0.000 0.001 0 24 35 40 21 122 17 139 97 Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W.[1] Work at Home Industrial Commercial/ Population Related Total Employment (Including N.F.P.O.W.) Institutional N.F.P.O.W.[1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Watson & Associates Economists Ltd. PAGE A-12 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 8b City of Port Colborne Employment and Gross Floor Area (G.F.A.) Forecast, 2024 to 2036 [1] Square Foot Per Employee Assumptions Industrial 1,400 Commercial/Population-Related 510 Institutional 670 [2] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. *Reflects Mid-2024 to Mid-2036 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 18,424 140 1,530 2,165 1,200 5,035 2,142,000 1,104,200 940,200 4,606,400 Mid 2016 18,306 125 1,518 2,053 1,175 4,870 2,124,500 1,046,800 920,600 4,466,900 Mid 2024 20,397 123 1,790 2,169 1,230 5,312 2,505,300 1,106,400 963,700 4,944,400 Mid 2036 24,255 123 2,213 2,655 1,432 6,423 3,098,200 1,354,100 1,099,100 5,920,400 Mid 2011 - Mid 2016 -118 -15 -13 -113 -25 -165 Mid 2016 - Mid 2024 2,091 -2 272 117 55 442 380,800 59,600 43,100 477,500 Mid 2024 - Mid 2036 3,858 0 424 486 202 1,111 592,900 247,700 135,400 976,000 Mid 2011 - Mid 2016 -24 -3 -3 -23 -5 -33 Mid 2016 - Mid 2024 261 0 34 15 7 55 47,600 7,450 5,388 59,688 Mid 2024 - Mid 2036 322 0 35 40 17 93 49,408 20,642 11,283 81,333 Period Population Employment Gross Floor Area in Square Feet (Estimated)[¹] Primary Incremental Change Industrial Commercial/ Population Related Institutional[2] Total Industrial Commercial/ Population Related Institutional[2] Total Annual Average Watson & Associates Economists Ltd. PAGE A-13 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 8c City of Port Colborne Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square Foot Per Employee Assumptions Industrial 1,400 Commercial/Population-Related 510 Institutional 670 [2] Forecast institutional employment and gross floor area has been adjusted downward to account for employment associated with special care units. [3] Employment Increase does not include No Fixed Place of Work. *Reflects Mid-2024 to Mid-2036 forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2024 - 2036 580,300 243,100 135,400 958,800 1,093 2024 - 2036 12,600 4,600 - 17,200 18 2024 - 2036 592,900 247,700 135,400 976,000 1,111 Urban Rural City of Port Colborne Development Location Timing Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Employment Increase[3] Institutional G.F.A. S.F.[1],[2] Total Non- Residential G.F.A. S.F. Watson & Associates Economists Ltd. PAGE A-14 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Schedule 9 City of Port Colborne Employment Categories by Major Employment Sector Note: Employment is classified by North American Industry Classification System (NAICS) Code. Source: Watson & Associates Economists Ltd., 2024. Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Comments Categories which relate to local land-based resources Categories which relate primarily to industrial land supply and demand Categories which relate primarily to population growth within the municipality NAICS Employment by industry Watson & Associates Economists Ltd. PAGE B-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix B: Level of Service Cost (per capita) Services Related to a Highway - Roads $33,529.27 0.0133 km of roadways 2,520,998 per km 129,389,453 Services Related to a Highway - Bridges, Culverts & Structures $1,072.40 0.0016 Number of Bridges, Culverts & Structures 670,250 per item 4,138,392 Services Related to a Highway - Sidewalks and Active Transportation $1,196.20 0.0048 km of sidewalks and active transportation 249,208 per km 4,616,136 Services Related to a Highway - Traffic Signals & Streetlights $778.13 0.1139 No. of Traffic Signals 6,832 per signal 3,002,804 Public Works - Facilities $841.40 1.6367 sq.ft. of building area 514 per sq.ft. 3,246,963 Public Works - Vehicles & Equipment $463.95 0.0029 No. of vehicles and equipment 159,983 per vehicle 1,790,383 Fire Protection Services - Facilities $807.52 1.1092 sq.ft. of building area 728 per sq.ft. 3,116,220 Fire Protection Services - Vehicles & Equipment $346.92 0.0005 No. of vehicles 693,840 per vehicle 1,338,764 Fire Protection Services - Small Equipment and Gear $63.92 0.0163 No. of equipment and gear 3,921 per item 246,667 Parkland Development $1,264.85 0.0118 Acres of Parkland 107,191 per acre 4,881,056 Parkland Amenities $968.99 0.0051 No. of parkland amenities 189,998 per amenity 3,739,332 Parkland Trails $320.83 1.2833 Linear Metres of Paths and Trails 250 per linear m 1,238,083 Recreation Facilities $4,200.42 7.2463 sq.ft. of building area 580 per sq.ft. 16,209,421 Parks & Recreation Vehicles and Equipment $171.80 0.0026 No. of vehicles and equipment 66,077 per vehicle 662,976 Library Services - Facilities $905.98 1.2210 sq.ft. of building area 742 per sq.ft. 3,496,177 Library Services - Collection Materials $126.40 3.1231 No. of library collection items 40 per collection item 487,778 Parks & Recreation Fire Protection SUMMARY OF SERVICE STANDARDS AS PER DEVELOPMENT CHARGES ACT, 1997, AS AMENDED Service Related to a Highway Public Works Service Category Sub-Component Library Maximum Ceiling LOS 15 Year Average Service Standard Quality (per capita) Quantity (per capita) Watson & Associates Economists Ltd. PAGE B-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Services Related to a Highway - Roads Unit Measure: km of roadways Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/km) Roads - Arterial 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 $2,800,000 Roads - Other 171 171 171 171 171 171 171 171 171 171 171 171 171 171 171 $2,400,000 Total 251 251 251 251 251 251 251 251 251 251 251 251 251 251 251 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0135 0.0136 0.0136 0.0137 0.0137 0.0137 0.0137 0.0137 0.0135 0.0132 0.0130 0.0128 0.0125 0.0124 0.0124 15 Year Average 2009 to 2023 Quantity Standard 0.0133 Quality Standard $2,520,998 Service Standard $33,529 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $33,529 Eligible Amount $129,389,453 Watson & Associates Economists Ltd. PAGE B-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Services Related to a Highway - Bridges, Culverts & Structures Unit Measure: Number of Bridges, Culverts & Structures Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Bridges 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 1,240,000 Culverts 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 590,000 Total 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0016 0.0015 0.0015 0.0015 0.0015 15 Year Average 2009 to 2023 Quantity Standard 0.0016 Quality Standard $670,250 Service Standard $1,072 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $1,072 Eligible Amount $4,138,392 Watson & Associates Economists Ltd. PAGE B-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Services Related to a Highway - Sidewalks and Active Transportation Unit Measure: km of sidewalks and active transportation Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/km) Sidewalks 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91 $250,000 Total 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0049 0.0048 0.0047 0.0046 0.0045 0.0045 0.0045 15 Year Average 2009 to 2023 Quantity Standard 0.0048 Quality Standard $249,208 Service Standard $1,196 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $1,196 Eligible Amount $4,616,136 Watson & Associates Economists Ltd. PAGE B-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Services Related to a Highway - Traffic Signals & Streetlights Unit Measure: No. of Traffic Signals Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Traffic Signaled Intersections 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $130,000 Streetlights 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 2,153 $6,600 Total 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 2,157 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.1163 0.1166 0.1171 0.1173 0.1173 0.1175 0.1177 0.1178 0.1158 0.1136 0.1117 0.1096 0.1077 0.1067 0.1063 15 Year Average 2009 to 2023 Quantity Standard 0.1139 Quality Standard $6,832 Service Standard $778 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $778 Eligible Amount $3,002,804 Watson & Associates Economists Ltd. PAGE B-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Class of Service: Public Works - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Offices/Garages/Storage 6,304 6,304 6,304 6,304 6,304 6,304 6,304 6,304 - - - - - - - $227 $272 Flammable Storage Building 120 120 120 120 120 120 120 120 - - - - - - - $175 $215 Sand/Salt Dome 4,200 4,200 4,200 4,200 4,200 4,200 4,200 4,200 - - - - - - - $175 $215 Storage Warehouse 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 - - - - - - - $175 $215 Trailer 12x32 - - - 384 384 384 384 384 - - - - - - - $175 $215 Operations Centre - - - - - - - - 36,000 36,000 36,000 36,000 36,000 36,000 36,000 $600 $750 Storage Containers (6) - - - - - - - - 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $25 $116 Car Wash Bay - - - - - - - - 1,600 1,600 1,600 1,600 1,600 1,600 1,600 $300 $420 Salt Dome - - - - - - - - 9,350 9,350 9,350 9,350 9,350 9,350 9,350 $175 $282 Total 16,624 16,624 16,624 17,008 17,008 17,008 17,008 17,008 48,150 48,150 48,150 48,150 48,150 48,150 48,150 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.8964 0.8989 0.9023 0.9247 0.9247 0.9265 0.9281 0.9291 2.5845 2.5358 2.4929 2.4470 2.4037 2.3818 2.3734 15 Year Average 2009 to 2023 Quantity Standard 1.6367 Quality Standard $514 Service Standard $841 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $841 Eligible Amount $3,246,963 Watson & Associates Economists Ltd. PAGE B-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Chipper 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $75,000 Dump Truck 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 $450,000 Line Painter 0.5 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.5 0.5 0.5 0.5 0.5 $12,700 Loader 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 $450,000 Pickup (F150 or 1500) 11.0 11.0 8.0 8.0 11.0 9.0 11.0 10.0 10.0 9.0 8.0 9.0 9.0 9.0 10.0 $57,000 Pickup (F250 and above)(2 with plow and sander) 3.0 3.0 4.0 4.0 5.0 4.0 7.0 7.0 7.0 7.0 6.0 6.0 6.0 6.0 8.0 $85,000 Roller 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $65,000 SUV 2.0 2.0 2.0 2.0 2.0 2.0 3.0 4.0 4.0 6.0 6.0 7.0 7.0 7.0 7.0 $63,800 Ford Ranger - - 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $50,900 Tractor (45-60 Hp) with rotary cutter (1) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 $75,000 Trailer 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 3.0 3.0 3.0 3.0 $16,000 Vacuum Street Sweeper 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 $415,000 Van (Upfitted) 2.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 4.0 6.0 6.0 5.0 5.0 5.0 5.0 $125,000 Small Van 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 $75,000 Large Cube Van 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $450,000 Zero Turn 2.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 $41,000 Air Compressor (Facilities) - - - - - - - - - - - 1.0 1.0 1.0 1.0 $15,000 CAT Hydraulic Hammer (Water) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $55,000 Hoe Pack (Water) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $75,000 Valve Turner Truck (water) - - - - - 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $250,000 Watson & Associates Economists Ltd. PAGE B-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Sweeper (loader attachment) - - - - - - - - - - 1.0 1.0 1.0 1.0 1.0 $47,000 Snow Blower (Loader Mounted) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $165,000 Sidewalk Tractor (Wille and Attachments) - - - - - - - - - - 1.0 1.0 1.0 1.0 1.0 $275,000 Excavator (Drains) with attachments) - - - - - - - - - - 1.0 1.0 1.0 1.0 1.0 $575,000 Hot box - - - - - - - - - - - - - - 1.0 $75,000 Back hoe 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 $240,000 Grader 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 - 1.0 1.0 1.0 1.0 1.0 $650,000 Total 47.50 49.00 48.00 47.00 53.00 51.00 58.00 56.00 59.00 61.00 60.50 60.50 60.50 60.50 64.50 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0026 0.0026 0.0026 0.0026 0.0029 0.0028 0.0032 0.0031 0.0032 0.0032 0.0031 0.0031 0.0030 0.0030 0.0032 15 Year Average 2009 to 2023 Quantity Standard 0.0029 Quality Standard $159,983 Service Standard $464 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $464 Eligible Amount $1,790,383 Watson & Associates Economists Ltd. PAGE B-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Fire Station #1 (Killaly St W) 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 $600 $728 Total 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 1.1324 1.1356 1.1398 1.1418 1.1418 1.1440 1.1460 1.1472 1.1272 1.1060 1.0872 1.0672 1.0483 1.0388 1.0351 15 Year Average 2009 to 2023 Quantity Standard 1.1092 Quality Standard $728 Service Standard $808 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $808 Eligible Amount $3,116,220 Watson & Associates Economists Ltd. PAGE B-11 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Fire Protection Services - Vehicles & Equipment Unit Measure: No. of vehicles Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Engine No. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,250,000 Engine No. 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,250,000 Engine No. 3 1 1 1 1 - - - - - - - - - - - $1,250,000 Ladder No. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,200,000 Tanker No. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $750,000 Command No. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Command No. 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Squad No. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Fire Prevention Officer Vehicle (Car 3) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $65,000 Rescue Vehicle - - - - 1 1 1 1 1 1 1 1 1 1 1 $700,000 Hazmat Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $7,500 Total 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 15 Year Average 2009 to 2023 Quantity Standard 0.0005 Quality Standard $693,840 Service Standard $347 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $347 Eligible Amount $1,338,764 Watson & Associates Economists Ltd. PAGE B-12 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) # of Equipped Firefighters 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 $7,000 Rescue Equipment - Auto Extrication 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $18,750 Dry Suits - - - - - - - - - - - - 10 10 10 $2,200 Mustangs 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 $3,000 Inflatable Boat and Accessories 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $25,000 Self-contained Breathing Apparatus 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 $9,500 Portable Radios 24 26 26 26 26 26 26 26 26 26 26 26 26 26 26 $1,500 Pagers and chargers 50 50 50 50 50 50 50 50 50 50 50 50 50 50 50 $600 Base Station - Communication 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 $20,000 Spare Bottles 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 $1,500 Face Pieces 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 $450 Compressor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $90,000 Hoses 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $71,000 Gas detection 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $1,650 Public Defibs - - - - - - 16 16 16 16 16 16 16 16 16 $1,500 Nozzles 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 $1,500 Total 295 297 297 297 297 297 313 314 314 314 314 314 324 324 324 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 15 Year Average 2009 to 2023 Quantity Standard 0.0163 Quality Standard $3,921 Service Standard $64 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $64 Eligible Amount $246,667 Watson & Associates Economists Ltd. PAGE B-13 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Acre) Neighbourhood Park (with Tot Lot) Chestnut Park 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 2.33 - $100,000 Dewitt Carter Playground 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 $75,000 East Village Community Park / Victoria Playground 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 $75,000 Hawthorne Heights Park 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 $100,000 Humberstone Shoe Park 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 $100,000 Jacob E. Barrick Park 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 3.25 $75,000 Johnston Street Playground 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54 $75,000 Library Park 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 0.52 $75,000 Oxford Boulevard Park 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 2.99 $100,000 Reservoir Park 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 5.47 $100,000 Sunset Park 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 $100,000 Westdale Park 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $75,000 Neighbourhood Park Maple Park 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 1.96 $100,000 Parkette Chippawa Park 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $75,000 Derek Point Memorial Garden 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 9.79 $75,000 Harry Dayboll / Oakwood Park 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 $75,000 Helen Kinnear Memorial Park 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 1.78 $75,000 Humberstone Cenotaph Park 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 $75,000 King George Memorial Park 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 $75,000 Seaway Park 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 1.69 $75,000 City Park (with Tot Lot) H.H. Knoll Lakeview Park 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 21.63 $125,000 Lock 8 Gateway Park 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 8.80 $125,000 Nickel Beach 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 18.52 $100,000 Thomas A. Lannan 45.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 57.21 $125,000 Watson & Associates Economists Ltd. PAGE B-14 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Parkland Development Unit Measure: Acres of Parkland Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Acre) Community Park (with Tot Lot) Humberstone Centennial Park 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 44.03 $100,000 Rose Shymansky Memorial Park 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 3.61 $75,000 Vimy Park / Melissa's & John Daly Playground 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 3.23 $100,000 Community Park Humberstone Centennial Park Beach 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 3.17 $100,000 Lockview Park 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 $100,000 Port Colborne Lions Field 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 4.81 $100,000 Port Colborne Tennis Club 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 $100,000 Port Colborne Westside / Rotary Complex 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 9.04 $100,000 Julia Yager (Bethel) Community Centre 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 $100,000 Sherkston Community Centre 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 $100,000 Total 213.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 225.14 222.81 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0115 0.0122 0.0122 0.0122 0.0122 0.0123 0.0123 0.0123 0.0121 0.0119 0.0117 0.0114 0.0112 0.0111 0.0110 15 Year Average 2009 to 2023 Quantity Standard 0.0118 Quality Standard $107,191 Service Standard $1,265 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $1,265 Eligible Amount $4,881,056 Watson & Associates Economists Ltd. PAGE B-15 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Lions Field Washrooms/Canteen 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $429,300 Nickel Beach Washrooms 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - $134,100 Washroom Trailer - - - - - - - - - - - - - - 2 $350,000 Nickel Beach Storage 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $26,900 Centennial Washrooms 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $134,100 Centennial Picnic Pavilion 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 $63,200 H. H. Knoll Lakeview Park Washrooms 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $185,100 Lakeview Bandstand 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $139,400 Lakeview Pavilion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $47,300 Lakeview Gazebos 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 $4,600 Lock 8 Washrooms 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $141,500 Lock 8 Picnic Shelter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $93,200 Lock 8 Fountain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $900,000 Lock 8 Lighthouse 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 H. H. Knoll Lakeview Park Spray Pad 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $415,000 Ball Diamonds - Lit 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $288,800 Ball Diamonds - Unlit 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 $115,600 Batting Cage 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Basketball Courts 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $60,000 Tennis Courts 7 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $80,100 Park Shelter - Kinnear - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $26,700 Soccer Pitch - Lit 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $370,100 Soccer Pitch - Unlit 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $222,700 Watson & Associates Economists Ltd. PAGE B-16 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Skate Park at Lock 8 - - - - 1 1 1 1 1 1 1 1 1 1 1 $1,402,200 Office/Shop/Equipment Storage 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $800,500 Bleachers 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 $80,000 Equestrian Corral 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $150,000 Small Playground 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $250,000 Medium Playground 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $350,000 Large Playground 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $500,000 Adult Fitness Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Total 95 94 95 96 97 97 97 97 97 97 97 97 97 97 97 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0051 0.0051 0.0052 0.0052 0.0053 0.0053 0.0053 0.0053 0.0052 0.0051 0.0050 0.0049 0.0048 0.0048 0.0048 15 Year Average 2009 to 2023 Quantity Standard 0.0051 Quality Standard $189,998 Service Standard $969 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $969 Eligible Amount $3,739,332 Watson & Associates Economists Ltd. PAGE B-17 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Parkland Trails Unit Measure: Linear Metres of Paths and Trails Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/ Linear Metre) Multi Use Trail (to Welland) 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 10,500 $250 Multi Use Trail (to Fort Erie) 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $250 H.H. Knoll 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,100 $250 Lock 8 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 $250 T. A. Lannan Sports Complex - - - - 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 $250 Elizabeth Street 900 900 900 900 900 900 900 900 900 900 900 900 900 900 900 $250 Total 23,200 23,200 23,200 23,200 24,700 24,700 24,700 24,700 24,700 24,700 24,700 24,700 24,700 24,700 24,800 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 1.2510 1.2545 1.2592 1.2614 1.3430 1.3455 1.3479 1.3493 1.3258 1.3008 1.2788 1.2553 1.2330 1.2218 1.2225 15 Year Average 2009 to 2023 Quantity Standard 1.2833 Quality Standard $250 Service Standard $321 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $321 Eligible Amount $1,238,083 Watson & Associates Economists Ltd. PAGE B-18 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Westside Arena and Complex 28,200 28,200 28,200 28,200 - - - - - - - - - - - $600 $683 Teeder Kennedy Youth Arena 26,500 26,500 - - - - - - - - - - - - - $600 $683 Centennial Pool 9,925 9,925 9,925 9,925 - - - - - - - - - - - $200 $242 Humberstone Community Hall 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 $600 $675 Sherkston Community Centre 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 2,800 $600 $675 Julia Yager Educational and Recreation Centre 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 5,100 $700 $776 P.C. Tennis Club 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 $500 $571 Sugarloaf Marina 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 8,847 $600 $671 Harbourmaster Building 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 $450 $508 Vale Health & Wellness Centre - - - - 140,000 140,000 140,000 140,000 140,000 140,000 140,000 140,000 140,000 140,000 140,000 $500 $557 Operations Centre - Recreation Portion - - - - - - - - 2,000 2,000 2,000 2,000 2,000 2,000 2,000 $600 $683 Operations Centre Greenhouse - - - - - - - - 1,400 1,400 1,400 1,400 1,400 1,400 1,400 $175 $215 Total 84,522 84,522 58,022 58,022 159,897 159,897 159,897 159,897 163,297 163,297 163,297 163,297 163,297 163,297 163,297 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 4.5577 4.5705 3.1493 3.1547 8.6938 8.7104 8.7256 8.7347 8.7653 8.6000 8.4544 8.2989 8.1518 8.0776 8.0493 15 Year Average 2009 to 2023 Quantity Standard 7.2463 Quality Standard $580 Service Standard $4,200 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $4,200 Eligible Amount $16,209,421 Watson & Associates Economists Ltd. PAGE B-19 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Beach Rake 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 $65,000 Boat 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $15,000 Chipper 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $75,000 Excavator (Mini X) - - - - - - - - - - 1.0 1.0 1.0 1.0 1.0 $75,000 Line Painter 0.5 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.5 0.5 0.5 0.5 0.5 $12,700 Travel Lift 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $400,000 Hydraulic Trailer Lift - - - - - 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $57,000 Pickup (F150 or 1500) 8.0 8.0 9.0 8.0 8.0 7.0 7.0 6.0 6.0 6.0 6.0 4.0 3.0 3.0 4.0 $57,000 Pickup (F250 or 2500 and above) 3.0 3.0 3.0 3.0 3.0 4.0 5.0 5.0 4.0 7.0 7.0 8.0 8.0 9.0 8.0 $85,000 RTV 2.0 2.0 3.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 $37,000 Telehandler - - - - - 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $314,000 Top Dresser (Turf Spreader) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $18,000 Tractor (15-45 Hp) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 $49,000 Tractor (45-60 Hp) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 3.0 3.0 3.0 3.0 $75,000 Trailer 5.0 5.0 8.0 10.0 10.0 11.0 11.0 12.0 12.0 12.0 14.0 13.0 12.0 12.0 12.0 $16,000 Van (Upfitted) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 $125,000 Van (Small) 3.0 3.0 3.0 4.0 3.0 3.0 1.0 1.0 1.0 - - - - - - $125,000 Weed Harvester 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $102,800 Zamboni 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 $175,000 Zero Turn 2.0 2.0 2.0 2.0 2.0 4.0 4.0 4.0 4.0 4.0 6.0 6.0 6.0 6.0 6.0 $41,000 Sander/Salter (Box Insert) - - - - - - - - - 1.0 1.0 1.0 1.0 1.0 1.0 $21,000 Water Real 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 $18,000 Total 37.5 38.0 43.0 46.0 45.0 50.0 50.0 50.0 50.0 53.0 57.5 55.5 53.5 54.5 54.5 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 0.0020 0.0021 0.0023 0.0025 0.0024 0.0027 0.0027 0.0027 0.0027 0.0028 0.0030 0.0028 0.0027 0.0027 0.0027 15 Year Average 2009 to 2023 Quantity Standard 0.0026 Quality Standard $66,077 Service Standard $172 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $172 Eligible Amount $662,976 Watson & Associates Economists Ltd. PAGE B-20 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Library Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Library (310 King Street) 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 $600 $742 Total 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 23,116 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 1.2465 1.2500 1.2547 1.2569 1.2569 1.2592 1.2614 1.2628 1.2408 1.2174 1.1968 1.1748 1.1540 1.1435 1.1394 15 Year Average 2009 to 2023 Quantity Standard 1.2210 Quality Standard $742 Service Standard $906 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $906 Eligible Amount $3,496,177 Watson & Associates Economists Ltd. PAGE B-21 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Books 57,589 57,037 56,484 55,932 55,379 64,309 65,903 59,230 52,931 39,915 38,433 39,591 39,152 39,354 40,862 $35 Print Serials Subscriptions (Newspapers/Periodicals) 59 59 59 59 59 50 50 48 50 50 50 29 20 16 16 $161 Compact Discs 1,598 1,599 1,601 1,602 1,603 1,595 1,666 1,572 1,703 920 975 944 774 773 773 $23 Talking Books 317 467 616 766 915 951 1,088 972 1,067 1,045 1,109 1,127 1,206 1,214 1,228 $59 Video Tapes 834 641 449 256 63 42 33 - - - - - - - - $47 Microfilm 764 784 804 823 843 847 863 883 895 907 923 930 954 962 999 $200 DVDs 1,818 2,549 3,280 4,010 4,741 5,130 5,470 5,268 5,342 4,965 5,452 4,746 5,141 5,308 5,507 $32 OverDrive (eBooks, digital magazines, audiobooks, video) - - - 1 1 1 1 1 1 1 1 1 1 1 1 $82,800 Novelist - - - 1 1 1 1 1 1 1 1 1 1 1 1 $19,500 Ancestry.ca - - - 1 1 1 1 1 1 1 1 1 1 1 1 $8,250 Freegal - - - - 1 1 - - - - - - - - - $71,100 Flipster Digital Magazine - Platform - - - - - 1 1 1 1 1 - - - - - $59,850 Hoopla - streaming video - - - - - - - - - - - - 1 1 1 $90,000 TumbleBooks - - - - - - - - 1 1 1 1 - - - $18,000 Universal Class - - - - - - - - - - 1 1 1 1 1 $20,250 RB Digital - ebooks, videos, emagazines - - - - - - - - - - - 1 1 - - $3,130 E-Readers - - - - 7 7 7 7 7 - - - - - - $270 Chromebook - - - - 5 5 5 5 5 5 5 5 5 5 5 $492 Watson & Associates Economists Ltd. PAGE B-22 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx City of Port Colborne Service Standard Calculation Sheet Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Music MakerSpace Instruments - - - - - - - - 6 6 6 6 6 6 $469 Video Games - - - - - - - - - - - 69 124 148 173 $80 Board games and puzzles - - - - - - - - - - - - 70 75 92 $28 Library of Things - Non-Traditional Items - - - - - - - - - - 58 65 73 90 97 $500 Library of Things - Technology - - - - - - - - - - - - - - 3 $650 Public Computers 15 17 17 17 17 17 15 15 15 19 20 20 17 17 13 $1,000 Total 62,994 63,152 63,308 63,467 63,636 72,958 75,104 68,004 62,020 47,837 47,036 47,538 47,548 47,973 49,779 Population 18,545 18,493 18,424 18,392 18,392 18,357 18,325 18,306 18,630 18,988 19,315 19,677 20,032 20,216 20,287 Per Capita Standard 3.40 3.41 3.44 3.45 3.46 3.97 4.10 3.71 3.33 2.52 2.44 2.42 2.37 2.37 2.45 15 Year Average 2009 to 2023 Quantity Standard 3.1231 Quality Standard $40 Service Standard $126 D.C. Amount (before deductions) 12 Year Forecast Population 3,859 $ per Capita $126 Eligible Amount $487,778 Watson & Associates Economists Ltd. PAGE C-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix C: Long-Term Capital and Operating Cost Examination City of Port Colborne Annual Capital and Operating Cost Impact As a requirement of the Development Charges Act, 1997, as amended, under subsection 10 (2) (c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the development charge. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the City's approved 2022 Financial Information Return (F.I.R.). In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. The following factors were utilized to calculate the annual replacement cost of the capital projects (annual contribution = factor X capital asset cost) and are based on an annual growth rate of 2% (net of inflation) over the average useful life of the asset: Watson & Associates Economists Ltd. PAGE C-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table C-1 City of Port Colborne Lifecycle Cost Factors and Average Useful Lives Table C-2 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while City program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Average Useful Life Factor Water and Wastewater Infrastructure 80 0.005160705 Facilities 50 0.01182321 Services Related to a Highway 50 0.01182321 Parkland Development 40 0.016555748 Vehicles 15 0.057825472 Small Equipment & Gear 10 0.091326528 Library Materials 10 0.091326528 Lifecycle Cost Factors Asset Watson & Associates Economists Ltd. PAGE C-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Table C-2 City of Port Colborne Operating and Capital Expenditure Impacts for Future Capital Expenditures SERVICE/CLASS OF SERVICE ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES Wastewater Services 4,633,155 653,441 5,286,596 Water Services 2,414,895 125,608 2,540,503 Services Related to a Highway 825,192 13,762 838,954 Public Works (Facilities and Fleet) 264,151 97,818 361,969 Fire Protection Services 620,664 318,829 939,493 Parks and Recreation Services 2,273,109 379,092 2,652,201 Library Services 92,304 9,307 101,611 Total 11,123,470 1,597,856 12,721,326 Watson & Associates Economists Ltd. PAGE D-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix D D.C. Reserve Fund Policy Watson & Associates Economists Ltd. PAGE D-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix D: D.C. Reserve Fund Policy D.1 Legislative Requirements The Development Charges Act, 1997, as amended (D.C.A.) requires development charge (D.C.) collections (and associated interest) to be placed in separate reserve funds. Sections 33 through 36 of the D.C.A. provide the following regarding reserve fund establishment and use: - A municipality shall establish a reserve fund for each service to which the D.C. by-law relates; subsection 7 (1), however, allows services to be grouped into categories of services for reserve fund (and credit) purposes and for classes of services to be established. - The municipality shall pay each D.C. it collects into a reserve fund or funds to which the charge relates. - The money in a reserve fund shall be spent only for the "capital costs" determined through the legislated calculation process (as per subsection 5 (1) 2 to 8). - Money may be borrowed from the fund but must be paid back with interest (O. Reg. 82/98, subsection 11 (1) defines this as Bank of Canada rate either on the day the by-law comes into force or, if specified in the by-law, the first business day of each quarter). - D.C. reserve funds may not be consolidated with other municipal reserve funds for investment purposes and may only be used as an interim financing source for capital undertakings for which D.C.s may be spent (section 37). Annually, the Treasurer of the municipality is required to provide Council with a financial statement related to the D.C. by-law(s) and reserve funds. This statement must be made available to the public and may be requested to be forwarded to the Minister of Municipal Affairs and Housing. Subsection 43 (2) and O. Reg. 82/98 prescribe the information that must be included in the Treasurer's statement, as follows: - opening balance; - closing balance; Watson & Associates Economists Ltd. PAGE D-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - description of each service and/or service category for which the reserve fund was established (including a list of services within a service category); - transactions for the year (e.g. collections, draws) including each asset's capital costs to be funded from the D.C. reserve fund and the manner for funding the capital costs not funded under the D.C. by-law (i.e. non-D.C. recoverable cost share and post-period D.C. recoverable cost share); - for projects financed by D.C.s, the amount spent on the project from the D.C. reserve fund and the amount and source of any other monies spent on the project; - amounts borrowed, purpose of the borrowing, and interest accrued during previous year; - amount and source of money used by the municipality to repay municipal obligations to the D.C. reserve fund; - list of credits by service or service category (outstanding at the beginning of the year, given in the year, and outstanding at the end of the year by the holder); - for credits granted under section 14 of the previous D.C.A., a schedule identifying the value of credits recognized by the municipality, the service to which it applies and the source of funding used to finance the credit; and - a statement as to compliance with subsection 59 (1) of the D.C.A., whereby the municipality shall not impose, directly or indirectly, a charge related to a development or a requirement to construct a service related to development, except as permitted by the D.C.A. or another Act. Recent changes arising from Bill 109 (More Homes for Everyone Act, 2022) provide that the Council shall make the statement available to the public by posting the statement on the website or, if there is no such website, in the municipal office. In addition, Bill 109 introduced the following requirements which shall be included in the treasurer's statement. - For each service for which a development charge is collected during the year o whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law, and o if the answer to subparagraph i is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; Watson & Associates Economists Ltd. PAGE D-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - For any service for which a development charge was collected during the year but in respect of which no money from a reserve fund was spent during the year, a statement as to why there was no spending during the year. Additionally, as per subsection 35(3) of the D.C.A.: 35(3) If a service is prescribed for the purposes of this subsection, beginning in the first calendar year that commences after the service is prescribed and in each calendar year thereafter, a municipality shall spend or allocate at least 60 per cent of the monies that are in a reserve fund for the prescribed service at the beginning of the year. The services currently prescribed are water, wastewater, and services related to a highway. Therefore, as of 2023, a municipality shall spend or allocate at least 60 percent of the monies in the reserve fund at the beginning of the year. There are generally two (2) ways in which a municipality may approach this requirement: a) Include a schedule are part of the annual treasurer's statement; or b) Incorporate the information into the annual budgeting process. Based upon the above, Figure 1 and Attachments 1 and 2, set out the format for which annual reporting to Council should be provided. Attachment 3 provides for the schedule for allocating reserve fund balances to projects. D.2 D.C. Reserve Fund Application Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 7 of subsection 5(1)." This provision clearly establishes that reserve funds collected for a specific service are only to be used for that service, or to be used as a source of interim financing of capital undertakings for which a D.C. may be spent. Watson & Associates Economists Ltd. PAGE D-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure D-1 City of Port Colborne Annual Treasurer's Statement of Development Charge Reserve Funds Services to which the Development Charge Relates Description Services Related to a Highway Public Works (Facilities and Fleet) Water Services Wastewater Services Parks and Recreation Services Fire Protection Services Library Services Growth Studies Opening Balance, January 1, ________ 0 Plus: Development Charge Collections 0 Accrued Interest 0 Repayment of Monies Borrowed from Fund and Associated Interest1 0 Sub-Total 0 0 0 0 0 0 0 0 0 Less: Amount Transferred to Capital (or Other) Funds2 0 Amounts Refunded 0 Amounts Loaned to Other D.C. Service Category for Interim Financing 0 Credits3 0 Sub-Total 0 0 0 0 0 0 0 0 0 Closing Balance, December 31, ________ 0 0 0 0 0 0 0 0 0 1 Source of funds used to repay the D.C. reserve fund 2 See Attachment 1 for details 3 See Attachment 2 for details The Municipality is compliant with s.s. 59.1 (1) of the Development Charges Act , whereby charges are not directly or indirectly imposed on development nor has a requirement to construct a service related to development been imposed, except as permitted by the Development Charges Act or another Act. Total Watson & Associates Economists Ltd. PAGE D-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure D-2a City of Port Colborne Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Capital Fund Transactions D.C. Recoverable Cost Share Non-D.C. Recoverable Cost Share D.C. Forecast Period Post D.C. Forecast Period Capital Fund Transactions Gross Capital Cost D.C. Reserve Fund Draw D.C. Debt Financing Grants, Subsidies Other Contributions Post-Period Benefit/ Capacity Interim Financing Grants, Subsidies Other Contributions Other Reserve/Reserv e Fund Draws Tax Supported Operating Fund Contributions Rate Supported Operating Fund Contributions Debt Financing Grants, Subsidies Other Contributions Services Related to a Highway Capital Cost A Capital Cost B Capital Cost C Sub-Total - Services Related to Highways $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost D Capita Cost E Capital Cost F Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost G Capita Cost H Capital Cost I Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Watson & Associates Economists Ltd. PAGE D-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure D-2b City of Port Colborne Attachment 1 Annual Treasurer's Statement of Development Charge Reserve Funds Amount Transferred to Capital (or Other) Funds - Operating Fund Transactions D.C. Reserve Fund Draw Post D.C. Forecast Period Non-D.C. Recoverable Cost Share Operating Fund Transactions Principal Interest Principal Interest Source Principal Interest Source Services Related to a Highway Capital Cost J Capita Cost K Capital Cost L Sub-Total - Services Related to a Highway $0 $0 $0 $0 $0 $0 $0 Water Services Capital Cost M Capita Cost N Capital Cost O Sub-Total - Water $0 $0 $0 $0 $0 $0 $0 Wastewater Services Capital Cost P Capita Cost Q Capital Cost R Sub-Total - Wastewater $0 $0 $0 $0 $0 $0 $0 Annual Debt Repayment Amount Watson & Associates Economists Ltd. PAGE D-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure D-3 City of Port Colborne Attachment 2 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Credit Holder Transactions Credit Holder Applicable D.C. Reserve Fund Credit Balance Outstanding Beginning of Year ________ Additional Credits Granted During Year Credits Used by Holder During Year Credit Balance Outstanding End of Year ________ Credit Holder A Credit Holder B Credit Holder C Credit Holder D Credit Holder E Credit Holder F Watson & Associates Economists Ltd. PAGE D-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Figure D-4 City of Port Colborne Attachment 3 Annual Treasurer's Statement of Development Charge Reserve Funds Statement of Reserve Fund Balance Allocations Attachment 1 City of Port Colborne Statement of Reserve Fund Balance Allocations Service: Water Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Service: Wastewater Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Service: Services Related to a Highway Balance in Reserve Fund at Beginning of Year: 60% of Balance to be Allocated (at a minimum): Projects to Which Funds Will be Allocated Project Description Project Number Total Growth-related Capital Cost Remaining to be Funded Share of Growth-related Cost Allocated to Date Share of Growth-related Cost Allocated - Current Year Total $0 $0 $0 Watson & Associates Economists Ltd. PAGE E-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix E Local Service Policy Watson & Associates Economists Ltd. PAGE E-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix E: Local Service Policy City of Port Colborne General Policy Guidelines on Development Charge and Local Service Funding This Appendix sets out the municipality's General Policy Guidelines on Development Charges (D.C.) and local service funding for Services Related to a Highway, Stormwater Management, Parkland Development, and Underground Linear Services. The guidelines outline, in general terms, the size and nature of engineered infrastructure that is included in the study as a development charge project, versus infrastructure that is considered as a local service, to be emplaced separately by landowners, pursuant to a development agreement. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered, in the context of these policy guidelines as subsection 59 (2) of the Development Charges Act, 1997 (D.C.A.) on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, as well as the location and type of services required and their relationship to the proposed development and to existing and proposed development in the area. Services Related to a Highway A highway and services related to a highway are intended for the transportation of people and goods via many different modes including, but not limited to passenger automobiles, commercial vehicles, transit vehicles, bicycles and pedestrians. The highway shall consist of all land and associated infrastructure built to support (or service) this movement of people and goods regardless of the mode of transportation employed. The associated infrastructure to achieve this concept shall include, but is not limited to: road pavement structure and curbs; grade separation/bridge structures (for any vehicles, railways and/or pedestrians); grading, drainage and retaining wall features; culvert structures; stormwater drainage systems; utilities; traffic control systems; Watson & Associates Economists Ltd. PAGE E-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx signage; gateway features; street furniture; active transportation facilities (e.g. sidewalks, bike lanes, multi-use trails which interconnect the transportation network, etc.); transit lanes & lay-bys; roadway illumination systems; boulevard and median surfaces (e.g. sod & topsoil, paving, etc.); street trees and landscaping; parking lanes & lay-bys; (excluding on-street parking in the downtown) and driveway entrances; noise attenuation systems; railings and safety barriers. 1. Arterial and Collector Roads (including Structures) - New Collector Roads internal to a development are direct developer responsibility. - New, widened, extended or upgraded, Arterial and Collector Roads external to a development are considered to be development charge projects. - New Collector Roads external to a development, but primarily acting as a connection serving a development, are a direct developer responsibility. - All other roads are considered to be the developer's responsibility. 2. Traffic Control Systems, Signals and Intersection Improvements - On new arterial roads and arterial road improvements unrelated to a specific development: included as part of road costing funded through D.C.'s. - On non-arterial roads, or for any private site entrances or entrances to specific development: direct developer responsibility under s.59 of D.C.A. (as a local service). - On arterial or collector road intersections with Regional roads: Region's responsibility or in certain circumstances, may be a direct developer responsibility - Intersection improvements, new or modified signalization, signal timing & optimization plans, area traffic studies for highways attributed to growth and unrelated to a specific development: included in D.C. calculation as permitted under s.5(1) of the D.C.A. 3. Streetlights - Streetlights on new arterial roads an arterial road improvements: considered part of the complete street and included as part of the road costing funded through Watson & Associates Economists Ltd. PAGE E-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx D.C.'s or in exceptional circumstances, may be direct developer responsibility through local service provisions (s.59 of D.C.A.). - Streetlights on non-arterial roads internal to development: considered part of the complete street and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). - Streetlights on non-arterial roads external to development, needed to support a specific development or required to link with the area to which the plan relates: considered part of the complete street and included as a direct developer responsibility under s. 59 of the D.C.A. (as a local service). 4. Transportation Related Pedestrian and Cycling Facilities - Sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within arterial roads, Regional roads and provincial highway corridors: considered part of the complete street and included in D.C.'s, or, in exceptional circumstances, may be direct developer responsibility through local service provisions (s.59 of D.C.A.). - Sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within or linking to non-arterial road corridors internal to development: considered part of the complete street and is a direct developer responsibility through local service provisions (s.59 of D.C.A.). - Other sidewalks, multi-use trails, cycle tracks, and bike lanes, inclusive of all required infrastructure, located within non-arterial road corridors external to development and needed to support a specific development or required to link with the area to which the plan relates: direct developer responsibility under s.59 of D.C.A. (as a local service). - Multi-use trails (not associated with a road), inclusive of all land and required infrastructure, that go beyond the function of a (parkland) recreational trail and form part of the municipality's active transportation network for cycling and/or walking: included in D.C.'s 5. Transit Lanes and Lay-bys - Transit lanes and lay-bys located within municipal arterial and regional road corridors: considered part of the complete street and included in D.C.'s Watson & Associates Economists Ltd. PAGE E-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Transit lanes and lay-bys located within non-arterial road corridors internal to development: considered part of the complete street and direct developer responsibility under s. 59 of the D.C.A. (as a local service). - Transit lanes and lay-bys located within non-arterial road corridors external to development and needed to support a specific development or required to link with the area to which the plan relates: direct developer responsibility under s. 59 of the D.C.A. (as a local service). 6. Transit Bus Stops and Amenities - Transit bus stops and amenities internal to development: direct developer responsibility under s.59 of D.C.A. (as a local service). - Transit bus stops and amenities on arterial roads: included in Municipality's Transit D.C.'s consistent with D.C.A., s.5(1). LAND ACQUISITION FOR ROADS 7. Road Allowances - Land acquisition for Arterial or Collector Roads, to the widths required according to the approved engineering standards, is primarily provided by dedications under the Planning Act. In areas where limited or no development is anticipated, and direct dedication is unlikely, the land acquisition is considered to be part of the capital cost of the related development charge project 8. Grade Separations - Land acquisition for Grade Separations (beyond normal dedication requirements) is considered to be part of the capital cost of the related development charge project. The detailed engineering requirements of the above items are governed by the approved detailed engineering standards for the City. PARKLAND DEVELOPMENT 9. Recreational Trails Watson & Associates Economists Ltd. PAGE E-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - Recreational trails (Multi-use trails) that do not form part of the municipality's active transportation network, and their associated infrastructure (landscaping, bridges, trail surface, etc.), is included in area municipal parkland D.C.'s. 10. Parkland - Parkland Development for Community Parks, District Parks, Neighbourhood Parks and Village Squares: direct developer responsibility to provide at base condition, as defined in the Municipality's Parks Standards, as a local service provision. - Program facilities, amenities, and furniture, within parkland: are included in D.C.s. 11. Landscape Buffer Blocks. Features, Cul-de-sac Islands, Berms, Grade Transition Areas, Walkway Connections to Adjacent Arterial Roads, Open Space, Etc. - The cost of developing all landscape buffer blocks, landscape features, cul-de- sac islands, berms, grade transition areas, walkway connections to adjacent arterial roads, open space and other remnant pieces of land conveyed to the municipality shall be a direct developer responsibility as a local service. Such costs include but are not limited to: - pre-grading, sodding or seeding, supply and installation of amended topsoil, (to the Municipality's required depth), landscape features, perimeter fencing and amenities and all planting. - Perimeter fencing to the Municipal standard located on the public property side of the property line adjacent land uses (such as but limited to arterial roads) as directed by the Municipality. WATER 12. Watermains - Watermains internal to the development are considered to be a local service unless the City requests a watermain be oversized, in which case the oversizing is a development charge project. Watson & Associates Economists Ltd. PAGE E-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx - External watermains of any size required by a development to connect to an existing local trunk main are considered to be the developer's local service responsibility. - Watermains of any size required to connect a development charge eligible pumping station or reservoir to the supply network are considered to be development charge projects. - Providing new underground services or upgrading existing underground services external to the development if the services are required to service the development, and if the pipe sizes do not exceed 300mm, are considered to be the developer's local service responsibility. 13. Booster Stations and Reservoirs - New or expanded water booster pumping stations and reservoir projects servicing two or more developments are considered to be development charge projects. All others are the responsibility of the developer. - All other new or expanded water booster pumping stations and reservoir projects that do not qualify as above are the responsibility of the developer. - The detailed engineering requirements of the above items are governed by the approved detailed engineering standards for the City. WASTEWATER 14. Sanitary Sewers - Sanitary Sewers internal to the development are considered to be a local service, unless the City requests a sewer be oversized, in which case the oversizing is a development charge project. - Sanitary Sewers of any size required by a development to connect to an existing local trunk main are considered to be the developer's responsibility. - Sanitary Sewers of any size required to connect a pumping station or treatment plant to the collection network are considered to be development charge projects. - Providing new underground services or upgrading existing underground services external to the development if the services are required to service the development, and if the pipe sizes do not exceed 300mm, are considered to be the developer's local service responsibility. Watson & Associates Economists Ltd. PAGE E-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 15. Pumping Stations - New or expanded pumping stations internal or external to a development, that are fed by sanitary sewers which qualify as a development charge project are also considered to be development charge projects. - New or expanded pumping stations fed by sanitary sewers that do not qualify as a development charge project are the responsibility of the developer. - The above pipe sizes in section 15(iv) govern, unless the hydraulic conditions of a particular development require a different pipe size, in which case the minimum pipe size determined by such hydraulic conditions shall be the developer's responsibility. LAND ACQUISITION FOR WATER AND WASTEWATER WORKS 16. Booster Stations and Reservoirs - Where required, land acquisition for Booster Stations and Reservoirs which are development charge projects, to the size required by the design of the facility, is to be provided by the developer as part of the development approval process. The market value of the land is considered to be part of the capital cost of the related development charge project. 17. Pumping Stations - Where required, land acquisition for Pumping Stations which are development charges projects, to the size required by the design of the facility, is to be provided by the developer as part of the development approval process. The market value of the land is considered to be part of the capital cost of the related development charge project. - The detailed engineering requirements of the above items are governed by the approved detailed engineering standards for the City. STORMWATER MANAGEMENT 18. Stormwater - Over-sizing cost of stormwater facilities capacity, excluding land, to accommodate runoff from new, widened, extended or upgraded municipal arterial Watson & Associates Economists Ltd. PAGE E-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx roads that are funded as a development charges project: included as part of road costing funded through D.C.'s. - Erosion works, inclusive of all restoration requirements, related to a development application: direct developer responsibility under s. 59 of the D.C.A. (as a local service). - Monitoring works: included in D.C.'s consistent with the D.C.A., s.5(1). - Storm sewer systems and drainage works that are required for a specific development, either internal or external to the area to which the plan relates: direct developer responsibility under s. 59 of the D.C.A. (as a local service). Watson & Associates Economists Ltd. PAGE F-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix F Asset Management Plan Watson & Associates Economists Ltd. PAGE F-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix F: Asset Management Plan The recent changes to the Development Charges Act, 1997, as amended (D.C.A.) (new subsection 10 (2) (c.2)) require that the background study must include an asset management plan (A.M.P.) related to new infrastructure. Section 10 (3) of the D.C.A. provides: "The asset management plan shall, (a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner." In regard to the above, section 8 of the regulations was amended to include subsections (2), (3), and (4) which set out specific detailed requirements for transit (only). For all services except transit, there are no prescribed requirements at this time, thus requiring the municipality to define the approach to include in the background study. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset throughout its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program- related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. It should be noted that with the recent passing of the Infrastructure for Jobs and Prosperity Act (I.J.P.A.) municipalities are now required to complete A.M.P.s, based on certain criteria, which are to be completed by 2022 for core municipal services and 2024 for all other services. The amendments to the D.C.A. do not require municipalities to complete these A.M.P.s (required under I.J.P.A.) for the D.C. background study, rather the D.C.A. requires that the D.C. background study include information to show the assets to be funded by the D.C. are sustainable over their full lifecycle. Watson & Associates Economists Ltd. PAGE F-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal In 2012, the Province developed Building Together: Guide for municipal asset management plans which outlines the key elements for an A.M.P., as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Watson & Associates Economists Ltd. PAGE F-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. Commensurate with the above, the City prepared an A.M.P. in 2022 for its existing assets; however, it did not take into account future growth-related assets for all services included in the D.C. calculations. As a result, the asset management requirement for the D.C. must be undertaken in the absence of this information. In recognition to the schematic above, the following table (presented in 2024 $) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As well, as all capital costs included in the D.C.-eligible capital costs are not included in the City's A.M.P., the present infrastructure gap and associated funding plan have not been considered at this time. Hence the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects that will require financing from municipal financial resources (i.e., taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2024 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are approximately $24.82 million. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are approximately $7.33 million. This amount, totalled with the existing operating revenues of approximately $49.59 million, provides annual revenues of approximately $56.92 million by the end of the period. Watson & Associates Economists Ltd. PAGE F-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 6. In consideration of the above, the capital plan is deemed to be financially sustainable. City of Port Colborne Asset Management - Future Expenditures and Associated Revenues 2024$ Asset Management - Future Expenditures and Associated Revenues 2036 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 2,531,271 Annual Debt Payment on Post Period Capital2 9,564,382 Lifecycle: Annual Lifecycle - Municipal-wide Services 11,123,470 Incremental Operating Costs (for D.C. Services) 1,597,856 Total Expenditures 24,816,979 Revenue (Annualized) Total Existing Revenue3 $49,593,916 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $7,328,280 Total Revenues $56,922,196 3 As per Sch. 10 of FIR 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. PAGE G-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix G Proposed D.C. By-Law Watson & Associates Economists Ltd. PAGE G-1 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx Appendix G: Proposed D.C. By-law By-law Number _____ - of - The Corporation of the City of Port Colborne Being a by-law of the Corporation of the City of Port Colborne with respect to development charges. WHEREAS section 2(1) of the Development Charges Act, 1997 (hereinafter called "the Act") enables the Council of a municipality to pass by-laws for the imposition of development charges against land located in the municipality for increased capital costs required because of the need for services arising from development in the area to which the by-law applies; AND WHEREAS the Council of the Corporation of the City of Port Colborne (hereinafter called "the Council"), at its public meeting of September 24, 2024, approved a report dated August 23, 2024 entitled "City of Port Colborne, 2024 Development Charge Background Study", which report was prepared by Watson & Associates Economists Ltd.; AND WHEREAS the Council has given Notice in accordance with Section 12 of the Development Charges Act, 1997 of its development charge proposal and held a public meeting on September 24, 2024; AND WHEREAS the Council has heard all persons who applied to be heard in objection to, or in support of, the development charge proposal at such public meeting; NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE CITY OF PORT COLBORNE HEREBY enacts as follows: 1. In this by-law, DEFINITIONS DRAFT Watson & Associates Economists Ltd. PAGE G-2 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx "Act" means the Development Charges Act, as amended, or any successor thereof; "accessory use" means where used to describe a use, building, or structure that the use, building or structure is naturally and normally incidental, subordinate in purpose of floor area or both, and exclusively devoted to a principal use, building or structure; "affordable residential unit" means a Dwelling Unit that meets the criteria set out in subsection 4.1 of the Act. "agricultural use" means use or intended use for bona fide farming purposes: a) including (but not limited to): i) cultivation of crops whether on open land or in greenhouses, including (but not limited to) fruit, vegetables, grains, field crops, sod trees, shrubs, flowers, and ornamental plants; ii) raising of animals, including (but not limited to) cattle, horses, pigs, poultry, livestock, fish; and iii) animal husbandry, dairying, equestrian activities, horticultural, fallowing, pasturing, and market gardening; b) but excluding: i) winery activities; ii) retail sales activities; and iii) cannabis production facilities. "apartment unit" means any residential unit within a building containing three or more dwelling units where access to each residential unit is obtained through a common entrance or entrances from the street level and the residential units are connected by an interior corridor, and includes a stacked townhouse; "attainable residential unit" means a Dwelling Unit that meets the criteria set out in subsection 4.1 of the Act. DRAFT Watson & Associates Economists Ltd. PAGE G-3 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx "back-to-back townhouse dwelling" means a building containing more than two dwelling units separated vertically by a common wall, including a rear common wall, that do not have rear yards; "bedroom" means a habitable room larger than seven square metres, including a den, study or other similar area, but does not include a bathroom, living room, dining room or kitchen; "benefiting area" means an area defined by map, plan or legal description in a front-ending agreement as an area that will receive a benefit from the construction of a service; "board of education" has the same meaning as set out in the Education Act, R.S.O. 1990, Chap. E.2, as amended, or any successor thereof; "Building Code Act" means the Building Code Act, S.O. 1992, as amended, or any successor thereof; "cannabis" means a cannabis plant, including the phytocannabinoids produced by or found in such a plant regardless of whether that part has been processed or not and any substance or mixture of substances that contains or has in it and part of such a plant and any substance that is identical to a phytocannabinoid produced by or found in such a plant regardless of how the substance was obtained. Marihuana shall have the same definition. "cannabis production facility" means a facility structure for the cultivation, processing, packaging and shipping where cannabis is produced by a federally licensed producer and can be for the production of medical or recreational cannabis. "capital cost" shall have the same meaning as described in Section 5 of the Development Charges Act, 1997, as amended. "City" means the Corporation of the City of Port Colborne; "class" means a grouping of services combined to create a single service for the purposes of this By-law and as provided in Section 7 of the Development Charges Act. DRAFT Watson & Associates Economists Ltd. PAGE G-4 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx "commercial" means any use of land, structures or buildings for the purposes of buying or selling commodities and services, but does not include industrial or agricultural uses, and does not include hotels, motels, motor inns and boarding, lodging and rooming houses; "Council" means the Council of the City; "development" means the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that has the effect of increasing the size of usability thereof, and includes redevelopment; "development charge" means a charge imposed with respect to this by-law; "dwelling unit" means any part of a building or structure used, designed or intended to be used as a domestic establishment in which one or more persons may sleep and are provided with culinary and sanitary facilities for their exclusive use; "existing" means the number, use and size that existed as of the date this by-law passed; "farm building" means that part of a bona fide farming operation encompassing barns, silos and other ancillary development to an agricultural use, but excluding a residential use; "gross floor area" means: (1) in the case of a residential building or structure, the total area of all floors above grade of a dwelling unit measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of part walls dividing the dwelling unit from any other dwelling unit or other portion of a building; and (2) in the case of a non-residential building or structure, or in the case of a mixed-use building or structure in respect of the non-residential portion thereof, the total area of all building floors above or below grade measured between the outside surfaces of the exterior walls, or between the outside DRAFT Watson & Associates Economists Ltd. PAGE G-5 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx surfaces of exterior walls and the centre line of party walls dividing a non- residential use and a residential use, except for: (1) a room or enclosed area within the building or structure above or below that is used exclusively for the accommodation of heating, cooling, ventilating, electrical, mechanical or telecommunications equipment that service the building; (2) loading facilities above or below grade; and (3) a part of the building or structure below grade that is used for the parking or motor vehicles or for storage and other accessory use; "industrial" means lands, buildings or structures used or designed or intended for use for manufacturing, processing, fabricating or assembly or raw goods, warehousing or bulk storage of goods, and includes office uses and the sale of commodities to the general public where such uses are accessory to an industrial use, but does not include the sale of commodities to the general public through a warehouse club; "institutional development" means development of a building or structure that meets the criteria set out in section 11.1(2) of O.Reg. 82/98 to the Act; "interest rate" means the annual rate of interest as set out in section 26.3 of the Act; "Local Board" means a school board, public utility, commission, transportation commission, public library board, board of park management, local board of health, board of commissioners of police, planning board, or any other board, commission, committee, body or local authority established or exercising any power or authority under any general or special Act with respect to any of the affairs or purposes, including school purposes, of the City of Port Colborne or any part of parts thereof; "local services" means those services, facilities or things which are under the jurisdiction of the City and are related to a plan of subdivision or within the area to DRAFT Watson & Associates Economists Ltd. PAGE G-6 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx which the plan relates in respect of the lands under Sections 41, 51 or 53 of the Planning Act, R.S.O. 1990, Chap. P.13, as amended, or any successor thereof; "multiple dwellings" means all dwellings other than single-detached, semi- detached and apartment unit dwellings; "non-profit housing development" means Development of a building or structure that meets the criteria set out in section 4.2 of the Act. "non-residential use" means a building or structure of any kind whatsoever used, designed or intended to be used for other than a residential use; "Official Plan" means the Official Plan adopted for the City, as amended and approved; "owner" means the owner of land or a person who has made application for an approval for the development of land upon which a development charge is imposed; "park model trailer" means is a recreational unit that meets the following criteria: (i) It is built on a single chassis mounted on wheels; (ii) It is designed to facilitate relocation from time to time; (iii) It is designed as living quarters for seasonal camping and may be connected to those utilities necessary for operation of installed fixtures and appliances; and (iv) It has a gross floor area, including lofts, not exceeding 50m2 (538ft2) when in the set-up mode, and has a width greater than 2.6m (8.5ft) in the transit mode. "place of worship" means that part of a building or structure that is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, Chap. A.31, as amended, or any successor thereof; "rate" means the interest rate established weekly by the Bank of Canada based on Treasury Bills having a term of 91 days; DRAFT Watson & Associates Economists Ltd. PAGE G-7 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx "regulation" means any regulation made pursuant to the Act; "rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises; "residential dwelling" means a building, occupied or capable of being occupied as a home, residence or sleeping place by one or more persons, containing one or more dwelling units but not including motels, hotels, tents, truck campers, tourist trailers, mobile camper trailers or boarding, lodging or rooming houses; "residential use" means the use of a building or structure or portion thereof for one or more dwelling units. This also includes a dwelling unit on land that is used for an agricultural use; "row dwelling" means a building containing three or more attached dwelling units in a single row, each of which dwelling unit has an independent entrance from the outside and is vertically separated from any abutting dwelling unit; "semi-detached dwelling" means a dwelling unit in a residential building consisting of two dwelling units having one vertical wall or one horizontal wall, but not other parts, attached or another dwelling unit where the residential units are not connected by an interior corridor; "service" means a service designated in Schedule "A" to this by-law, and "services" shall have a corresponding meaning; "servicing agreement" means an agreement between a landowner and the City relative to the provision of municipal service to specified land within the City; "single detached dwelling unit" means a residential building consisting of one dwelling unit and not attached to another structure; "special care facilities" means lands, buildings or structures used or designed or intended for uses for the purpose of providing supervision, nursing care or medical treatment, which do not comprise dwelling units, that are licensed, approved or supervised under any special or general statute, and excludes the special care/special dwelling portions of the building; DRAFT Watson & Associates Economists Ltd. PAGE G-8 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx "special care/special dwelling" includes a park model trailer, and the residential portion of special care facilities containing rooms or suites of rooms designed or intended to be used for sleeping and living accommodation that have a common entrance from street level: i. Where the occupants have the right to use in common, halls, stairs, yards, common rooms and accessory buildings; ii. Which may or may not have exclusive sanitary and/or culinary facilities; iii. That is designed to accommodate persons with specific needs, including, but not limited to, independent permanent living arrangements; and iv. Where support services such as meal preparation, grocery shopping, laundry, housekeeping, nursing, respite care and attendant services may be provided at various levels. "stacked townhouse dwelling" means a building containing two or more dwelling units where each dwelling unit is separated horizontally and/or vertically from another dwelling unit by a common wall or floor. 2. DESIGNATION OF SERVICES 2.1 The categories of services for which development charges are imposed under this by-law are as follows: (1) Services Related to a Highway; (2) Public Works (Facilities and Fleet); (3) Fire Protection Services; (4) Parks and Recreation Services; (5) Library Services; (6) Growth Studies; (7) Wastewater Services; and DRAFT Watson & Associates Economists Ltd. PAGE G-9 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx (8) Water Services. 2.2 The components of the services designated in Section 2.1 are described in Schedule A. 3. APPLICATION OF BY-LAW RULES 3.1. Development charges shall be payable in the amounts set out in this by-law where: (1) the lands are located in the area described in Section 3.2; and (2) the development of the lands requires any of the approvals set out in Subsection 3.4(1). Area to Which By-law Applies 3.2. Subject to Section 3.3, this by-law applies to all lands in the City of Port Colborne whether or not the land or use thereof is exempt from taxation under s.13 or the Assessment Act. 3.3 Notwithstanding Clause 3.2 above, this by-law shall not apply to lands that are owned by and used for the purposes of: (1) the City or a local board thereof; (2) a board of education; (3) the Corporation of the Region of Niagara or a local board thereof; or (4) Land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of post-secondary education is exempt from development charges imposed under the Development Charges Act, 1997 if the development in respect of which development charges would otherwise be payable is intended to be occupied and used by the university. Approvals for Development DRAFT Watson & Associates Economists Ltd. PAGE G-10 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 3.4 (1) Development charges shall be imposed on all lands, buildings or structures that are developed for residential or non-residential uses if the development requires: (1) the passing of a zoning by-law or of an amendment to a zoning by-law under Section 34 of the Planning Act; (2) the approval of a minor variance under Section 45 of the Planning Act; (3) a conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act applies; (4) the approval of a plan of subdivision under Section 51 of the Planning Act; (5) a consent under Section 53 of the Planning Act; (6) the approval of a description under Section 50 of the Condominium Act, R.S.O. 1990, Chap. C.26, as amended, or any successor thereof; or (7) the issuing of a permit under the Building Code Act in relation to a building or structure. (2) No more than one development charge for each service designated in Subsection 2.1 shall be imposed upon any lands, buildings or structure to which this by-law applies even though two or more of the actions described in Subsection 3.4(1) are required before the lands, buildings or structures can be developed. (3) Despite Subsection 3.4(2), if two or more of the actions described in Subsection 3.4(1) occur at different times, additional development charges shall be imposed if the subsequent action has the effect of increasing the need for services. Exemptions 3.5 Notwithstanding the provisions of this by-law, development charges shall not be imposed with respect to: (1) an enlargement to an existing dwelling unit; DRAFT Watson & Associates Economists Ltd. PAGE G-11 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx (2) the creation of additional dwelling units equal to the greater of one or 1% of the existing dwelling units in an existing residential rental building containing four or more dwelling units or prescribed ancillary structure to the existing residential building; 3.6 Notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to the creation of any of the following in existing houses: a) A second residential unit in an existing detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the existing detached house, semi-detached house or rowhouse cumulatively contain no more than one residential unit. b) A third residential unit in an existing detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the existing detached house, semi-detached house or rowhouse contains any residential units. c) One residential unit in a building or structure ancillary to an existing detached house, semi-detached house or rowhouse on a parcel of urban residential land, if the existing detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or structure ancillary to the existing detached house, semi- detached house or rowhouse contains any residential units. 3.7 Notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to the creation of any of the following in new residential buildings: a) A second residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if all buildings and structures ancillary to the new detached house, semi-detached house or rowhouse cumulatively will contain no more than one residential unit b) A third residential unit in a new detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted, if no building or structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units DRAFT Watson & Associates Economists Ltd. PAGE G-12 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx c) One residential unit in a building or structure ancillary to a new detached house, semi-detached house or rowhouse on a parcel of urban residential land, if the new detached house, semi-detached house or rowhouse contains no more than two residential units and no other building or structure ancillary to the new detached house, semi-detached house or rowhouse contains any residential units 3.8 Notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to non-profit residential development; 3.9 Notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to affordable residential units required pursuant to section 34 and 16(4) of the Planning Act (Inclusionary Zoning); 3.10 Notwithstanding subsections 3.2 and 3.4, the following shall be exempt from Development Charges as per Section 4.1 of the Act: i. Affordable Residential Units: i. Affordable Residential Owned Units; ii. Affordable Residential Rental Units; ii. Attainable Residential Units. 3.11 Notwithstanding any other provision of this By-law, the Development Charges payable for Residential Developments, where the Dwelling Units are intended as Rental Housing, will be reduced based on the number of bedrooms in each Dwelling Unit in accordance with section 26.2(1.1) of the Development Charges Act, as follows: i Three (3) or more Bedrooms - 25% reduction; ii Two (2) Bedrooms - 20% reduction; and iii Fewer than two (2) Bedrooms - 15% reduction. 3.12 Exemption for Industrial Development: 3.12.1 Notwithstanding any other provision of this by-law, no development charge is payable with respect to an enlargement of the gross floor area of an existing industrial building where the gross floor area is enlarged by 50 percent or less. DRAFT Watson & Associates Economists Ltd. PAGE G-13 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 3.12.2 If a development includes the enlargement of the gross floor area of an existing industrial building, the amount of the development charge that is payable in respect of the enlargement is determined in accordance with the following: (i) Subject to subsection 3.12.2 (iii), if the gross floor area is enlarged by 50 per cent or less of the lesser of: (A) the gross floor area of the existing industrial building, or (B) the gross floor area of the existing industrial building before the first enlargement for which: (i) an exemption from the payment of development charges was granted, or (ii) a lesser development charge than would otherwise be payable under this by-law, or predecessor thereof, was paid, pursuant to Section 4 of the Act and this subsection, the amount of the development charge in respect of the enlargement is zero; (ii) Subject to subsection 3.12.2 (iii), if the gross floor area is enlarged by more than 50 per cent or less of the lesser of: (A) the gross floor area of the existing industrial building, or (B) the gross floor area of the existing industrial building before the first enlargement for which: (i) an exemption from the payment of development charges was granted, or (ii) a lesser development charge than would otherwise be payable under this by-law, or predecessor thereof, was paid, pursuant to Section 4 of the Act and this subsection, the amount of the development charge in respect of the enlargement is the amount of the development charge that would otherwise be payable multiplied by the fraction determined as follows: DRAFT Watson & Associates Economists Ltd. PAGE G-14 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx (A) determine the amount by which the enlargement exceeds 50 per cent of the gross floor area before the first enlargement, and (B) divide the amount determined under subsection (A) by the amount of the enlargement (iii) For the purposes of calculating the extent to which the gross floor area of an existing industrial building is enlarged in subsection 3.12.2 (ii), the cumulative gross floor area of any previous enlargements for which: (A) An exemption from the payment of development charges was granted, or (B) A lesser development charge than would otherwise be payable under this by-law, or predecessor thereof, was paid, pursuant to Section 4 of the Act and this subsection, shall be added to the calculation of the gross floor area of the proposed enlargement. (iv) For the purposes of this subsection, the enlargement must not be attached to the existing industrial building by means only of a tunnel, bridge, passageway, canopy, shared below grade connection, such as a service tunnel, foundation, footing or parking facility. 3.13 For the purpose of Section 3.12 herein, "existing industrial building" is used as defined in the Regulation made pursuant to the Act. 3.14 Other Exemptions: Notwithstanding the provision of this by-law, development charges shall not be imposed with respect to: (1) Non-residential farm buildings for the purpose of an agricultural use except for any building constructed to accommodate an On-Farm Business which shall be considered to be an industrial building; (2) Industrial development shall be exempt from payment of development charges on any square footage of gross floor area constructed over 5,000 square feet; and DRAFT Watson & Associates Economists Ltd. PAGE G-15 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx (3) Partial exemption for certain Community Improvement Plan areas based upon specific policies approved by Council. Amount of Charges Residential 3.15 The development charges set out in Schedule B shall be imposed on residential uses of lands, buildings or structures, including a dwelling unit accessory to a non-residential use and, in the case of a mixed use building or structure, on the residential uses in the mixed use building or structure, according to the type of residential unit, and calculated with respect to each of the services according to the type of residential use. Non-Residential 3.16 The development charges described in Schedule B to this by-law shall be imposed on non-residential uses of lands, buildings or structures, and, in the case of a mixed use building or structure, on the non-residential uses in the mixed use building or structure, and calculated with respect to each of the services according to the total floor area of the non-residential use. Reduction of Development Charges for Redevelopment 3.17 Despite any other provisions of this by-law, where, as a result of the redevelopment of land, a building or structure existing on the same land within 12 months prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (1) in the case of a residential building or structure, or in the case of a mixed- use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable development charge under Subsection 3.15 by the number, according to type, of dwelling units that have been demolished or will be demolished or converted to another principal use; and DRAFT Watson & Associates Economists Ltd. PAGE G-16 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx (2) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed use building or structure, an amount calculated by multiplying the applicable development charges under Subsection 3.16, by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the development charges otherwise payable with respect to the redevelopment. Timing of Payment of Development Charges 3.18 Development charges imposed under this by-law are calculated, payable, and collected upon issuance of a building permit with respect to each dwelling unit, building or structure. 3.19 Notwithstanding subsection 3.18, development charges for rental housing and institutional developments are due and payable in 6 installments commencing with the first installment payable on the date of first occupancy certificate issued, and each subsequent installment, including interest, payable on the anniversary date each year thereafter. 3.20 Where the development of land results from the approval of a site plan or zoning by-law amendment application received on or after January 1, 2020, and the approval of the application occurred within 18 months of building permit issuance, the development charges under section 3 of this by-law shall be calculated on the rates set out in Schedule "B" on the date of the receipt of a complete planning application, including interest. Where both planning applications apply development charges under section 3 of this by-law shall be calculated on the rates payable on the anniversary date each year thereafter, set out in Schedule "B" on the date of the later planning application, including interest (calculated in accordance with section 26.3 of the Act). 3.21 Despite Section 3.18 and 3.19, Council from time to time, and at any time, may enter into agreements providing for all or any part of a development charge to be paid before or after it would otherwise be payable, in accordance with Section 27 of the Act. DRAFT Watson & Associates Economists Ltd. PAGE G-17 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 4. PAYMENT BY SERVICES 4.1 Despite the payment required under Subsections 3.15 and 3.16, Council may, by agreement, give a credit towards a development charge in exchange for work that relates to a service to which a development charge relates under this by-law 5. INDEXING 5.1 Development charges imposed pursuant to this by-law shall be adjusted annually, without amendment to this by-law, on the anniversary date of the by- law, in accordance with the prescribed index in the Act. 6. SCHEDULES 6.1 The following schedules shall form part of this by-law: Schedule A - Components of Services Designated in Section 2.1 Schedule B - Schedule of Development Charges Schedule C1 - Map of East Waterfront Community Improvement Plan Schedule C2 - Map of Downtown Community Improvement Plan Schedule C3 - Map of Olde Humberstone Community Improvement Plan 7. CONFLICTS 7.1 Where the City and an owner or former owner have entered into an agreement with respect to land within the area to which this by-law applies, and a conflict exists between the provisions of this by-law and such agreement, the provisions of the agreement shall prevail to the extent that there is a conflict. 7.2 Notwithstanding Section 7.1, where a development which is the subject of an agreement to which Section 7.1 applies, is subsequently the subject of one or more of the actions described in Subsection 3.4(1), an additional development charge in respect of the development permitted by the action shall be calculated, payable and collected in accordance with the provisions of this by-law if the development has the effect of increasing the need for services, unless such agreement provides otherwise. DRAFT Watson & Associates Economists Ltd. PAGE G-18 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx 8. SEVERABILITY 8.1 If, for any reason, any provision of this by-law is held to be invalid, it is hereby declared to be the intention of Council that all of the remainder of this by-law shall continue in full force and effect until repealed, re-enacted, amended or modified. 9. DATE BY-LAW IN FORCE 9.1 This by-law shall come into effect at 12:01 AM on October 23, 2024. 10. DATE BY-LAW EXPIRES 10.1 This by-law shall expire at 12:01 AM on October 23, 2034 unless it is repealed by Council at an earlier date. 11. EXISTING BY-LAW REPEALED 11.1 By-law No. 6733/97/19 is hereby repealed as of the date and time of this by-law coming into effect. 12. SHORT TITLE This by-law may be cited as the "Port Colborne City-wide Development Charge Bylaw." READ a first and second time, this 22 day of October, 2024. READ a third time and finally passed in Council, this 22 day of October, 2024. THE CORPORATION OF THE CITY OF PORT COLBORNE ______________________________________ Mayor _______________________________________ Clerk DRAFT Watson & Associates Economists Ltd. PAGE G-19 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx BY-LAW NUMBER ____ SCHEDULE "A" DESIGNATED MUNICIPAL SERVICE UNDER THIS BY-LAW City-Wide Services Services Related to a Highway Roads Bridges, Culverts & Structures Sidewalks and Active Transportation Traffic Signals & Streetlights Public Works Facilities and Fleet Public Works Facilities Public Works Vehicles & Equipment Fire Protection Services Fire Facilities Fire Vehicles & Equipment Small Equipment and Gear Parks & Recreation Services Parkland Development Parkland Amenities Parkland Trails Recreation Facilities Parks & Recreation Vehicles and Equipment Library Services Library Facilities Library Collection Materials Growth Studies Urban Area Services Wastewater Services Water Services DRAFT Watson & Associates Economists Ltd. PAGE G-20 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx SCHEDULE "B" TO BY-LAW _____ OF CITY OF PORT COLBORNE SCHEDULE OF DEVELOPMENT CHARGES NON-RESIDENTIAL Single and Semi- Detached Dwelling Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom Special Care/Special Dwelling Units (per sq.ft. of Gross Floor Area) Municipal Wide Services/Class of Service: Services Related to a Highway 2,328 1,803 1,630 1,078 893 1.12 Public Works (Facilities and Fleet) 2,444 1,893 1,711 1,131 937 1.17 Fire Protection Services 1,709 1,324 1,197 791 655 0.82 Parks and Recreation Services 5,018 3,886 3,514 2,323 1,924 0.45 Library Services 663 513 464 307 254 0.06 Growth Studies 1,101 853 771 510 422 0.53 Total Municipal Wide Services/Class of Service 13,263 10,272 9,287 6,140 5,085 4.15 Urban Services Wastewater Services 11,453 8,870 8,020 5,301 4,391 5.24 Water Services 5,813 4,502 4,071 2,691 2,229 2.66 Total Urban Services 17,266 13,372 12,091 7,992 6,620 7.90 GRAND TOTAL RURAL AREA 13,263 10,272 9,287 6,140 5,085 4.15 GRAND TOTAL URBAN AREA 30,529 23,644 21,378 14,132 11,705 12.05 Service/Class of Service RESIDENTIAL DRAFT Watson & Associates Economists Ltd. PAGE G-21 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx SCHEDULE "C1" MAP OF EAST WATERFRONT COMMUNITY IMPROVEMENT PLAN DRAFT Watson & Associates Economists Ltd. PAGE G-22 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx SCHEDULE "C2" MAP OF DOWNTOWN COMMUNITY IMPROVEMENT PLAN DRAFT Watson & Associates Economists Ltd. PAGE G-23 H:\Port Colborne\2024 DC\Report\Final Report Aug-23-24.docx SCHEDULE "C3" MAP OF OLDE HUMBERSTONE COMMUNITY IMPROVEMENT PLAN DRAFT