2024 Development Charge Background Study

Quinte West, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot a57e0fa843e3 · verified 2026-10-28 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Watson & Associates Economists Ltd. 905-272-3600 June 13, 2024 [email protected] 2024 Development Charge Background Study City of Quinte West ________________________ For Public Circulation and Comment Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ...................................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Summary of the Process ......................................................................... 1-2 1.3 Changes to the Development Charges Act, 1997 ................................... 1-3 1.3.1 More Homes for Everyone Act, 2022 (Bill 109) .......................... 1-3 1.3.2 More Homes Built Fast Act, 2022 (Bill 23) ................................. 1-4 1.3.3 Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) ..... 1-8 2. Current City of Quinte West D.C. Policy ........................................................ 2-1 2.1 By-law Enactment ................................................................................... 2-1 2.2 Services Covered ................................................................................... 2-1 2.3 Timing of D.C. Calculation and Payment ................................................ 2-1 2.4 Indexing .................................................................................................. 2-2 2.5 Redevelopment Credits .......................................................................... 2-2 2.6 Area to Which the By-law Applies and Exemptions ................................ 2-2 3. Anticipated Development in the City of Quinte West ................................... 3-1 3.1 Requirement of the Act ........................................................................... 3-1 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast ......................................................................................... 3-1 3.3 Summary of Growth Forecast ................................................................. 3-2 4. The Approach to the Calculation of the Charge ........................................... 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 Increase in the Need for Service ............................................................. 4-1 4.4 Local Service Policy ................................................................................ 4-6 4.5 Capital Forecast ...................................................................................... 4-6 4.6 Treatment of Credits ............................................................................... 4-7 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 4.7 Eligible Debt and Committed Excess Capacity ....................................... 4-7 4.8 Existing Reserve Funds .......................................................................... 4-8 4.9 Deductions .............................................................................................. 4-9 4.9.1 Reduction Required by Level of Service Ceiling ........................ 4-9 4.9.2 Reduction for Uncommitted Excess Capacity .......................... 4-10 4.9.3 Reduction for Benefit to Existing Development ........................ 4-10 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions ............................................................................ 4-11 4.10 Municipal-Wide vs. Area Rating ............................................................ 4-12 4.11 Allocation of Development .................................................................... 4-12 5. D.C.-Eligible Cost Analysis by Service .......................................................... 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Service Levels and City-Wide 10-Year Capital Costs for D.C. Calculation .............................................................................................. 5-1 5.2.1 Fire Protection Services ............................................................. 5-1 5.2.2 Policing Services ........................................................................ 5-2 5.2.3 Transit Services ......................................................................... 5-2 5.2.4 Parks and Recreation Services .................................................. 5-4 5.2.5 Library Services ......................................................................... 5-4 5.2.6 Ambulance Services .................................................................. 5-5 5.2.7 Waste Diversion Services .......................................................... 5-5 5.2.8 Growth Related Studies ............................................................. 5-6 5.3 Service Levels and City-Wide 20-Year Capital Costs for D.C. Calculation .............................................................................................. 5-1 5.3.1 Services Related to a Highway .................................................. 5-1 5.4 Area Specific Capital Costs of Buildout for D.C. Calculation ................... 5-1 5.4.1 Water Services ........................................................................... 5-1 5.4.2 Wastewater Services ................................................................. 5-1 6. D.C. Calculation ............................................................................................... 6-1 7. D.C. Policy Recommendations and D.C. Policy Rules ................................. 7-1 7.1 Introduction ............................................................................................. 7-1 7.2 D.C. By-law Structure ............................................................................. 7-2 7.3 D.C. By-law Rules ................................................................................... 7-2 7.3.1 Payment in any Particular Case ................................................. 7-2 7.3.2 Determination of the Amount of the Charge ............................... 7-2 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) ................................................................................ 7-3 7.3.4 Exemptions (full or partial) ......................................................... 7-4 7.3.5 Transition ................................................................................... 7-5 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 7.3.6 Timing of Collection ................................................................... 7-5 7.3.7 Indexing ..................................................................................... 7-5 7.3.8 D.C Spatial Applicability ............................................................. 7-6 7.4 Other D.C. By-law Provisions ................................................................. 7-6 7.4.1 Categories of Services for Reserve Fund and Credit Purposes .................................................................................... 7-6 7.4.2 By-law In-force Date .................................................................. 7-7 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter-Reserve Fund Borrowing ................................................... 7-7 7.5 Other Recommendations ........................................................................ 7-7 8. Asset Management Plan ................................................................................. 8-1 8.1 Introduction ............................................................................................. 8-1 8.2 Non-Transit Services .............................................................................. 8-3 8.3 Transit Services ...................................................................................... 8-4 8.3.1 State of Local Infrastructure ....................................................... 8-6 8.3.2 Expected Levels of Service ........................................................ 8-6 8.3.3 Asset Management Strategy ...................................................... 8-7 8.3.4 Financing Strategy ..................................................................... 8-9 9. By-law Implementation ................................................................................... 9-1 9.1 Public Consultation Process ................................................................... 9-1 9.1.1 Introduction ................................................................................ 9-1 9.1.2 Public Meeting of Council........................................................... 9-1 9.1.3 Other Consultation Activity ......................................................... 9-1 9.2 Anticipated Impact of the Charge on Development ................................. 9-2 9.3 Implementation Requirements ................................................................ 9-3 9.3.1 Introduction ................................................................................ 9-3 9.3.2 Notice of Passage ...................................................................... 9-3 9.3.3 By-law Pamphlet ........................................................................ 9-3 9.3.4 Appeals ...................................................................................... 9-4 9.3.5 Complaints ................................................................................. 9-4 9.3.6 Credits ....................................................................................... 9-5 9.3.7 Front-Ending Agreements .......................................................... 9-5 9.3.8 Severance and Subdivision Agreement Conditions ................... 9-5 Appendix A Background Information on Residential and Non-Residential Growth Forecast ............................................................................................. A-1 Appendix B Level of Service ................................................................................... B-1 Appendix C Long-Term Capital and Operating Cost Examination ...................... C-1 Appendix D Local Service Policy ............................................................................ D-1 Table of Contents (Cont'd) Page Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix E Proposed Development Charge By-law ..............................................E-1 Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx List of Acronyms and Abbreviations Acronym Full Description of Acronym D.C. Development charge D.C.A. Development Charges Act, 1997 as amended G.F.A. Gross floor area LPAT. Local Planning Appeal Tribunal N.F.P.O.W. No Fixed Place of Work OLT. Ontario Land Tribunal O.M.B. Ontario Municipal Board O. Reg. Ontario Regulation P.O.A. Provincial Offences Act P.P.U. Persons per unit sq.m. square metre sq.ft. square foot km kilometre Executive Summary Watson & Associates Economists Ltd. PAGE i H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Executive Summary 1. The report provided herein represents the Development Charges (D.C.) Background Study for City of Quinte West (City) required by the Development Charges Act, 1997 (D.C.A.). This report has been prepared in accordance with the methodology required under the D.C.A. The contents include the following: - Chapter 1 - Introduction and overview of the legislative requirements of the D.C.A.; - Chapter 2 - Current City D.C. policy; - Chapter 3 - Summary of the residential and non-residential growth forecasts for the City; - Chapter 4 - Approach to calculating the D.C.; - Chapter 5 - Review of historical service standards and identification of D.C. recoverable capital costs to service growth; - Chapter 6 - Calculation of the D.C.s; - Chapter 7 - D.C. policy recommendations and D.C. by-law rules; - Chapter 8 - Asset management plan requirements of the D.C.A.; and - Chapter 9 - By-law implementation. 2. D.C.s provide for the recovery of growth-related capital expenditures from new development. The D.C.A. is the statutory basis to recover these charges. The methodology is detailed in Chapter 4; a simplified summary is provided below: 1) Identify amount, type and location of growth; 2) Identify servicing needs to accommodate growth; 3) Identify capital costs to provide services to meet the needs; 4) Deduct: - Grants, subsidies and other contributions; - Benefit to existing development; - Amounts in excess of 15-year historical service calculation; - D.C. reserve funds; Watson & Associates Economists Ltd. PAGE ii H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 5) Net costs are then allocated between residential and non-residential benefit; and 6) Net costs divided by growth to provide the D.C. calculation. 3. Changes to the D.C.A. were introduced through five bills passed in the Ontario legislature since the City's last D.C. by-law: Bill 109, and Bill 23, Bill 97, Bill 134, and Bill 185. The following provides a brief summary of the recent changes. Bill 109: More Homes for Everyone Act, 2022 On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. Further information is provided in subsection 1.3.1. Bill 23: More Homes Built Faster Act, 2022 On November 28, 2022, Bill 23 received Royal Assent. This Act amends a number of pieces of legislation including the Planning Act and the D.C.A. Subsequently, further amendments to these provisions were made through Bills 97 and 134. The following provides a summary of the changes to the D.C.A. (further details are provided in subsection 1.3.2 of this report): - Additional residential unit exemption: Allowance of a third unit to be exempt from D.C.s in existing and new residential dwellings; - Removal of housing as an eligible D.C. service; - New statutory exemptions for affordable units, attainable units (to be in effect upon proclamation by the Lieutenant Governor); - New statutory exemptions for inclusionary zoning units, and non-profit housing developments; - Historical level of service extended to 15-year period instead of the prior 10-year period; - Capital cost definition may be revised to prescribe services for which land or an interest in land will be restricted; - Capital cost definition has been revised to remove studies; Watson & Associates Economists Ltd. PAGE iii H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - Mandatory reduction for new D.C. by-laws passed after November 28, 2022, as follows: o Year 1 - 80% of the maximum charge; o Year 2 - 85% of the maximum charge; o Year 3 - 90% of the maximum charge; o Year 4 - 95% of the maximum charge; and o Year 5 to expiry - 100% of the maximum charge. - D.C. by-law expiry will be 10 years after the date the by-law comes into force (unless repealed earlier); - D.C. for rental housing developments to receive a discount as follows: o Three or more bedrooms - 25% reduction; o Two bedrooms - 20% reduction; and o All other bedroom quantities - 15% reduction. - Maximum interest rate for installments and determination of charge for eligible site plan and zoning by-law amendment applications to be set at the average prime rate plus 1%; and - Requirement to allocate funds received- municipalities will be required to spend or allocate at least 60% of their reserve fund at the beginning of the year for water, wastewater, and services related to a highway. Bill 185: Cutting Red Tap to Build Mor Homes Act, 2024 On June, 6, 2024, Bill 185 received Royal Assent and includes the following changes to the D.C.A. - The removal of the Mandatory Phase-in for D.C. by-laws passed after Bill 185 comes into effect; - A reduction to the D.C. rate freeze timelines for developments proceeding though site plan and zoning by-law amendment applications under the Planning Act. Charges are currently held at rates in place on the date the application is made until building permit issuance, provided the building permit is issued within two (2) years of the approval of the application. This time period is proposed to be reduced to 18 months under Bill 185 (note that the two (2) year timeline will still apply to applications received prior to Bill 185 receiving Royal Assent); Watson & Associates Economists Ltd. PAGE iv H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - Inclusion of growth-related studies, including the D.C. background study, as a D.C.-eligible costs; - Provide a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date; - To allow minor amendments related to the imposition of studies, removal of the mandatory phase-in, and extension of by-law expiry dates (subject to the 10-year limitations provided in the D.C.A.) to be undertaken for by- laws passed after November 28, 2022 and before Bill 185 takes effect; and - To modernize public notice requirements. 4. The City is undertaking a D.C. public process and anticipates passing a new by- law for the eligible services. The mandatory public meeting has been set for July 17, 2024 with adoption of the by-law anticipated for August 14, 2024, with the effective date of the new by-law to be determined in advance of the expiry of the current by-law on January 1, 2026. 5. The growth forecast (Chapter 3) on which the D.C. is based, projects the following population, housing and non-residential floor area for the 10-year period (2024 to 2033), 20-year period (2024-2043) and urban buildout period. Watson & Associates Economists Ltd. PAGE v H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table ES-1 Summary of Growth Forecast by Planning Period Measure 10-Year 2024 to 2033 20-Year 2024 to 2043 2024 to Urban Buildout (Net) Population Increase 3,887 7,171 18,740 Residential Unit Increase 1,825 3,279 8,388 Non-Residential - Gross Floor Area Increase (sq.ft.) 817,700 1,433,300 2,633,800 Source: Watson & Associates Economists Ltd. forecast 2024. 6. Chapter 5 herein provides, in detail and by service area, the gross capital costs for the increase in need to service new development and the respective deductions that have been made to arrive at the D.C. recoverable costs included in the calculation of the charge. The following services are calculated based on a City-wide 10-year forecast: - Fire Protection Services; - Policing Services; - Transit Services; - Parks and Recreation Services; - Library Services; - Ambulance Services; - Growth-Related Studies; and - Waste Diversion Services. The following service is calculated based on a City-wide 20-year forecast: - Services Related to a Highway (including municipal works facilities, fleet and equipment). The following area specific services are calculated based over the water and wasterwater urban area buildout: - Water Services; and - Wastewater Services. A summary of the total growth-related costs is provided below in Table ES-2. Watson & Associates Economists Ltd. PAGE i H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table ES-2 Summary of Expenditures Anticipated Over the Respective Forecast Periods Summary of Expenditures Anticipated Over the Life of the By-law Expenditure Amount Total Gross Capital Costs $450,436,000 Less: Benefit to Existing Development $152,695,000 Less: Post Planning Period Benefit $34,080,000 Less: Other Deductions $7,174,000 Less: Existing D.C. Reserve Funds $9,301,000 Less: Grants, Subsidies and Other Contributions $432,000 Net Costs to be Recovered from Development Charges $246,752,000 Based on the above table, the City plans to spend $450.4 million over the planning periods of which $246.8 million (55%) is recoverable from D.C.s. Of the net $246.8 million included in the calculation, $206.7 million is recoverable from residential development and $40.1 million from non-residential development. It is noted also that any exemptions or reductions in the charges would reduce this recovery further. This suggests that non-D.C. costs over the forecast periods will total $194.4 million. This report has undertaken a calculation of charges based on the anticipated development summarized in Table ES-1 and the future identified needs (presented in Table ES-2). Charges have been provided on an area-sepcifc basis for Water and Wastewater Services and a City-wide basis for all other services . The corresponding single detached unit charge is $37,525 in the urban serviced area. The non-residential charge is $193.10 per sq.m. of building area. The calculated schedule of charges is presented in Table ES-3. Watson & Associates Economists Ltd. PAGE ii H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table ES-3 Calculated Schedule of Development Charges NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom (per sq.m. of Gross Floor Area) Municipal Wide Services Services Related to a Highway 9,638 6,922 7,375 4,192 51.02 Fire Protection Services 170 122 130 74 0.97 Policing Services 775 557 593 337 4.31 Transit Services 85 61 65 37 0.43 Parks and Recreation Services 535 384 409 233 0.65 Library Services 280 201 214 122 0.32 Ambulance 246 177 188 107 1.40 Waste Diversion 72 52 55 31 0.00 Growth-Related Studies 150 108 115 65 0.75 Total Municipal Wide Services 11,951 8,584 9,144 5,198 59.85 Urban Services Wastewater Services 21,674 15,566 16,585 9,427 113.45 Water Services 3,900 2,801 2,984 1,696 19.81 Total Urban Services 25,574 18,367 19,569 11,123 133.26 TOTAL RURAL AREA 11,951 8,584 9,144 5,198 59.85 TOTAL WATER ONLY SERVICED AREA 15,851 11,385 12,128 6,894 79.65 TOTAL URBAN AREA (WATER AND WASTEWATER SERVICES) 37,525 26,951 28,713 16,321 193.10 RESIDENTIAL Service Watson & Associates Economists Ltd. PAGE i H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 7. Chapter 7 outlines the D.C. by-law policy recommendations and rules as summarized below: - Timing of Collection: o D.C.s to be calculated and payable at the time of building permit issuance o D.C.s for developments proceeding through Site Plan or Zoning By- law Amendment applications will be determined based on the charges in effect on the day of the application (charges to be frozen for a maximum period of 18 months after planning application approval) o Rental housing and institutional developments would pay D.C.s in six equal annual payments, commencing from the date of occupancy - Statutory D.C. Exemptions: o Upper/Lower Tier Governments and School Boards o Development of lands intended for use by a university that received operating funds from the Government o Existing industrial building expansions (may expand by 50% with no D.C.) o Additional residential units in existing and new residential buildings  May add up to two apartments for a single detached, semi- detached or row house (only one unit can be in an ancillary structure)  One additional unit or 1% of the units in an existing rental residential building with four or more residential units o Non-profit housing o Inclusionary zoning affordable units o Affordable housing - D.C. Discounts for rental housing development based on dwelling unit type: o >2 bedrooms - 25% discount o 2 bedrooms - 20% discount o <2 bedrooms - 15% discount - Non-Statutory Deductions: Watson & Associates Economists Ltd. PAGE ii H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx o Where a lot levy, impost fee or development charge was collected as a condition for a lot created by consent pursuant to Section 53 of the Planning Act, R.S.O. 1990 c.P. 13; and o A grant equal to the calculated charge for residential and non- residential development within the commercial core areas. - Redevelopment credits provided where building permit issuance occurs within three years for conversion or demolitions of existing structures - Charges to be indexed annually on December 31 of each year, in accordance with the D.C.A. 8. Council will consider the findings and recommendations provided in the report and, in conjunction with public input, approve such policies and rates it deems appropriate. These directions will refine the draft D.C. by-law which is appended in Appendix E. These decisions may include: - adopting the charges and policies recommended herein; - considering additional exemptions to the by-law; - considering reductions in the charge by class of development (e.g., obtained by removing certain services on which the charge is based and/or by a general reduction in the charge); and - Determining the effective date of the by-law. Development Charge Background Study Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 1 Introduction Watson & Associates Economists Ltd. PAGE 1-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 1. Introduction 1.1 Purpose of this Document This background study has been prepared pursuant to the requirements of the Development Charges Act 1997 (s.10), and accordingly, recommends new Development Charges (D.C.s) and policies for the City of Quinte West (City). The City retained Watson & Associates Economists Ltd. (Watson) to undertake the D.C. study process. Watson worked with senior staff of the City in preparing this D.C. analysis and the policy recommendations. This D.C. background study, containing the proposed D.C. by-law, will be distributed to members of the public in order to provide interested parties with sufficient background information on the legislation, the study's recommendations, and an outline of the basis for these recommendations. This report has been prepared, in the first instance, to meet the statutory requirements applicable to the City's D.C. background study, as summarized in Chapter 4. It also addresses the forecast amount, type, and location of growth (Chapter 3), the requirement for "rules" governing the imposition of the charges (Chapter 7), and the proposed by-law to be made available as part of the approval process (Appendix E). In addition, the report is designed to set out sufficient background on the legislation and the policies underlying the proposed by-law, to make the exercise understandable to interested parties. Finally, the D.C. background study addresses post-adoption implementation requirements (Chapter 9) which are critical to the successful application of the new policy. The chapters in the report are supported by appendices containing the data required to explain and substantiate the calculation of the charge. A full discussion of the statutory requirements for the preparation of a background study and calculation of a D.C. is provided herein. Watson & Associates Economists Ltd. PAGE 1-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 1.2 Summary of the Process A public meeting required under Section 12 of the D.C.A. has been scheduled for July 17, 2024, at least two weeks after the posting of the D.C. background study and draft D.C. by-law on the City's website. Its purpose is to present the background study and draft D.C. by-law to the public and to solicit public input on the matter. The public meeting is also being held to answer any questions regarding the study's purpose, methodology and the proposed D.C. by-law for the City. In accordance with the legislation, the background study and proposed D.C. by-law will be available for public review at least 60 days prior to by-law passage. The process to be followed in finalizing the report and recommendations includes: - consideration of responses received prior to, at or immediately following the public meeting; and - finalization of the report and Council consideration of the by-law subsequent to the public meeting. Table 1-1 outlines the study process to date and the proposed schedule to be followed with respect to the D.C. by-law adoption process. Table 1-1 Schedule of Key D.C. Process Dates Process Steps Dates 1. Project initiation meeting with City staff April 2023 2. Data collection and staff interviews April 2023 to January 2024 3. Present study process to City Councill July 23, 2023 4. Presentation of draft findings and D.C. policy discussion with City staff January to May 2024 5. Presentation of draft findings and D.C. policies to City Council June 5, 2024 Watson & Associates Economists Ltd. PAGE 1-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Process Steps Dates 6. D.C. Background Study and draft D.C. by-law available to public By June 14, 2024 7. Public Meeting of Council July 17, 2024 8. D.C. By-law passage (anticipated) August 14, 2024 9. D.C. By-Law effective date TBD, 2024 10. Newspaper notice given of by-law passage By 20 days after passage 11. Last day for by-law appeal 40 days after passage 12. Municipality makes available D.C. pamphlet by 60 days after in force date 1.3 Changes to the Development Charges Act, 1997 Since the City's last D.C. Study in 2020, a number of changes to the Development Charges Act, 1997 have been introduced through various legislation including the following: - More Homes for Everyone Act, 2022 (Bill 109) - More Homes Built Fast Act, 2022 (Bill 23); - Helping Homebuyers, Protecting Tenants Act, 2023 (Bill 97) - Affordable Homes and Good Jobs Act, 2023 (Bill 134); and - Cutting Red Tape to Build More Homes Act, 2024 (Bill 185). The following provides an overview of the changes to the D.C.A. that each of these pieces of legislation provided. 1.3.1 More Homes for Everyone Act, 2022 (Bill 109) On April 14, 2022, Bill 109 received Royal Assent. One of the changes of the Bill and Ontario Regulation (O. Reg.) 438/22 that took effect upon Royal Assent included Watson & Associates Economists Ltd. PAGE 1-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx amending the D.C.A. and O. Reg. 82/98 related to the requirements for the information which is to be included in the annual Treasurer's statement on D.C. reserve funds and the requirement for publication of the statement. The following additional information must be provided for each D.C. service being collected for during the year: a) whether, as of the end of the year, the municipality expects to incur the amount of capital costs that were estimated, in the relevant development charge background study, to be incurred during the term of the applicable development charge by-law; b) if the answer to a) is no, the amount the municipality now expects to incur and a statement as to why this amount is expected; and c) if no money was spent from the reserve fund during the year, a statement as to why there was no spending during the year. The changes to the D.C.A. has also been amended to now require that the annual Treasurer's statement be made available to the public on the website of the municipality or, if there is no such website, in the municipal office. 1.3.2 More Homes Built Fast Act, 2022 (Bill 23) On November 28, 2022, Bill 23 received Royal Assent. This Act amends a number of pieces of legislation including the Planning Act and the D.C.A. Subsequently the additional residential unit exemptions were amended through Bill 97 and exemptions for affordable units were further amended through Bill 134. The following provides a summary of the changes to the D.C.A.: 1.3.2.1 Additional Residential Unit Exemption The rules for these exemptions are now provided in the D.C.A., rather than the regulations and are summarized as follows: - Exemption for residential units in existing rental residential buildings - For rental residential buildings with four or more residential units, the greater of one unit or 1% of the existing residential units will be exempt from D.C. - Exemption for additional residential units in existing and new residential buildings - The following developments will be exempt from a D.C.: Watson & Associates Economists Ltd. PAGE 1-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx o A second unit in a detached, semi-detached, or rowhouse if all buildings and ancillary structures cumulatively contain no more than one residential unit; o A third unit in a detached, semi-detached, or rowhouse if no ancillary buildings or structures contain any residential units; and o One residential unit in a building or structure ancillary to a detached, semi- detached, or rowhouse on a parcel of land, if the detached, semi- detached, or rowhouse contains no more than two residential units and no other buildings or ancillary structures contain any residential units. o Bill 97 (The Helping Homebuyers, Protecting Tenants Act), extended the mandatory exemption from payment of D.C.s for addition residential units new residential buildings or in existing houses to all lands versus just urban lands. 1.3.2.2 Removal of Housing as an Eligible D.C. Service Housing services is removed as an eligible service. Municipalities with by-laws that include a charge for housing services can no longer collect for this service. 1.3.2.3 New Statutory Exemptions for Affordable Units, Attainable Units, and Inclusionary Zoning Units Affordable units, attainable units, inclusionary zoning units and non-profit housing developments will be exempt from the payment of D.C.s, as follows: - Affordable Rental Units: o The rent is no greater than the lesser of, o the income-based affordable rent for the residential unit set out in the Affordable Residential Units bulletin, as identified by the Minister of Municipal Affairs and Housing in accordance with subsection (5), and o the average market rent identified for the residential unit set out in the Affordable Residential Units bulletin. - Affordable Owned Units: o The price of the residential unit is no greater than the lesser of,  the income-based affordable purchase price for the residential unit set out in the Affordable Residential Units bulletin, as identified by Watson & Associates Economists Ltd. PAGE 1-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx the Minister of Municipal Affairs and Housing in accordance with subsection (6), and  90 per cent of the average purchase price identified for the residential unit set out in the Affordable Residential Units bulletin. - Attainable Units: Excludes affordable units and rental units; will be defined as prescribed development or class of development and sold to a person who is at "arm's length" from the seller. o Note: for affordable and attainable units, the municipality shall enter into an agreement that ensures the unit remains affordable or attainable for 25 years. Also exemptions for affordable and attainable units will come into effect on a day to be named by proclamation of the Lieutenant Governor. - Inclusionary Zoning Units: Affordable housing units required under inclusionary zoning by-laws are exempt from a D.C. 1.3.2.4 New Statutory Exemption for Non-Profit Housing Non-profit housing development has been removed from the instalment payment section of the Act (section 26.1), as these units are now exempt from the payment of D.C.s. 1.3.2.5 Rental Housing Discount The D.C. payable for rental housing development will be reduced based on the number of bedrooms in each unit as follows: - Three or more bedrooms - 25% reduction; - Two bedrooms - 20% reduction; and - All other bedroom quantities - 15% reduction. 1.3.2.6 Historical Level of Service extended to 15-year period instead of the historical 10-year period Prior to Royal Assent of Bill 23, the increase in need for service was limited by the average historical level of service calculated over the 10-year period preceding the preparation of the D.C. background study. This average historical level of service is now extended to the historical 15-year period. Watson & Associates Economists Ltd. PAGE 1-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 1.3.2.7 Revised Definition of Capital Costs The definition of capital costs has been revised to remove studies. Further, the regulations to the Act will prescribe services for which land or an interest in land will be restricted. As at the time of writing, no services have been prescribed for this purpose. 1.3.2.8 Mandatory Phase-in of a D.C. For all D.C. by-laws passed after January 1, 2022, the charge must be phased-in annually over the first five years the by-law is in force, as follows: - Year 1 - 80% of the maximum charge; - Year 2 - 85% of the maximum charge; - Year 3 - 90% of the maximum charge; - Year 4 - 95% of the maximum charge; and - Year 5 to expiry - 100% of the maximum charge. 1.3.2.9 D.C. By-law Expiry A D.C. by-law now expires ten years after the day it comes into force (unless the by-law provides for an earlier expiry date). This extends the by-law's maximum life from what was previously five years. 1.3.2.10 Maximum Interest Rate for Instalments and Determination of Charge for Eligible Site Plan and Zoning By-law Amendment Applications The Act allows interest to be charged on D.C.s calculated at the time of Site Plan or Zoning By-law Amendment applications (S.26.2 of the Act) and for mandatory installment payments (S. 26.1 of the Act). No maximum interest rate was previously prescribed, which allowed municipalities to choose the interest rate to impose. As per Bill 23, the maximum interest rate is set at the average prime rate plus 1%. This maximum interest rate provision would apply to all instalment payments and eligible site plan and zoning by-law amendment applications occurring after November 28, 2022. 1.3.2.11 Requirement to Allocate Funds Received Annually, beginning in 2023, municipalities will be required to spend or allocate at least 60% of the monies in a reserve fund at the beginning of the year for water services, Watson & Associates Economists Ltd. PAGE 1-8 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx wastewater services, and services related to a highway. Other services may be prescribed by the regulation. 1.3.3 Cutting Red Tape to Build More Homes Act, 2024 (Bill 185) On June, 6, 2024, Bill 185 received Royal Assent and includes the following changes to the D.C.A. - The removal of the Mandatory Phase-in for D.C. by-laws passed after Bill 185 comes into effect; - A reduction to the D.C. rate freeze timelines for developments proceeding though site plan and zoning by-law amendment applications under the Planning Act. Charges are currently held at rates in place on the date the application is made until building permit issuance, provided the building permit is issued within two (2) years of the approval of the application. This time period is proposed to be reduced to 18 months under Bill 185 (note that the two (2) year timeline will still apply to applications received prior to Bill 185 receiving Royal Assent); - Inclusion of growth-related studies, including the D.C. background study, as a D.C.-eligible costs; - Provide a provision of the D.C. by-law specifying the date the by-law expires or to amend the provision to extend the expiry date; - To allow minor amendments related to the imposition of studies, removal of the mandatory phase-in, and extension of by-law expiry dates (subject to the 10-year limitations provided in the D.C.A.) to be undertaken for by-laws passed after November 28, 2022 and before Bill 185 takes effect; and - To modernize public notice requirements. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 2 Current City of Quinte West D.C. Policy Watson & Associates Economists Ltd. PAGE 2-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 2. Current City of Quinte West D.C. Policy 2.1 By-law Enactment The City adopted their current D.C. by-law on December 7, 2020, which provides for City-wide and area-specific D.C.s to be imposed. The by-law will expire on January 1, 2026 and the following sections review the current D.C. policies within the by-law. 2.2 Services Covered The following City-wide services are included under the current by-law: - Services Related to a Highway (including municipal works facilities, fleet and equipment); - Fire Protection Services; - Police Services; - Transit Services; - Parks and Recreation Services; - Library Services; - Ambulance Services; - Social Housing Services; - Waste Diversion Services; and - Growth Studies. The following area specifc services are included under the current by-law: - Water Services; and - Wastewater Services. 2.3 Timing of D.C. Calculation and Payment Calculation and payment of D.C.s are due and payable at the time of building permit issuance for the development. The D.C.A. also allow the City to enter into alternative payment agreements with owners. Watson & Associates Economists Ltd. PAGE 2-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 2.4 Indexing The by-law provide for annual indexing of the charges on December 31st of each year. Table 2-1 provides the charges currently in effect, for residential and non-residential development types, as well as the breakdown of the charges by service. Table 2-1 City of Quinte West 2024 Development Charges 2.5 Redevelopment Credits D.C. credits for residential and non-residential redevelopments, are provided for demolitions/conversions of development that pre-exists three years prior to the date of payment of the D.C. 2.6 Area to Which the By-law Applies and Exemptions The current by-law provides for the following statutory exemptions, including those that have been revised or introduced since the time of by-law passage: - Upper/Lower Tier Governments and School Boards Single and Semi- Detached Dwelling Apartments & 2 Bedrooms + Apartments Bachelor & 1 Bedroom Other Multiples Municipal Wide Services Roads and Related Services 4,669 3,427 1,977 3,295 22.83 Fire Protection Services 235 173 98 165 1.20 Police Services 639 469 270 450 3.30 Transit Services 74 55 32 52 0.38 Parks and Recreation Services 394 290 167 279 0.38 Library Services 193 142 81 135 0.18 Ambulance Services 228 167 97 161 1.18 Social Housing - - - - - Waste Diversion Services 104 76 45 72 - Growth Studies 64 48 26 46 0.33 Total Municipal Wide Services 6,600 4,847 2,793 4,655 29.78 Urban Services Wastewater Services 7,358 5,401 3,117 5,191 37.85 Water Services 1,052 773 446 743 5.43 Total Urban Services 8,410 6,174 3,563 5,934 43.28 Grand Total Rural Service Area 6,600 4,847 2,793 4,655 29.78 Grand Total Water Only Serviced Area 7,652 5,620 3,239 5,398 35.21 Grand Total Urban Services Area 15,010 11,021 6,356 10,589 73.06 Residential NON-RESIDENTIAL (per sq.m. of Gross Floor Area) Service Watson & Associates Economists Ltd. PAGE 2-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - Development of lands intended for use by a university that received operating funds from the Government - Existing industrial building expansions (may expand by 50% with no D.C.) - Additional residential units in existing and new residential buildings o May add up to two apartments for a single detached, semi-detached or row house (only one unit can be in an ancillary structure) o One additional unit or 1% of the units in an existing rental residential building with four or more residential units - Non-profit housing - Inclusionary zoning affordable units - Affordable housing - D.C. discounts for rental housing development based on dwelling unit type: o >2 bedrooms - 25% discount o 2 bedrooms - 20% discount o <2 bedrooms - 15% discount The D.C. by-law also provides non-statutory exemptions from payment of D.C.s with respect to: - Industrial developments; - Where a lot levy, impost fee or development charge was collected as a condition for a lot created by consent pursuant to Section 53 of the Planning Act, R.S.O. 1990 c.P. 13; and - A grant equal to the calculated charge for residential and non-residential development within the commercial core areas. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 3 Anticipated Development in the City of Quinte West Watson & Associates Economists Ltd. PAGE 3-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 3. Anticipated Development in the City of Quinte West 3.1 Requirement of the Act The growth forecast contained in this chapter (with supplemental tables in Appendix A) provides for the anticipated development for which the City will be required to provide services over a 10-year (2024 to 2034), 20-year (2024 to 2044), and an urban buildout (2024 to urban buildout[1]) time horizon. Chapter 4 provides the methodology for calculating a D.C. as per the D.C.A. Figure 4-1 presents this methodology graphically. It is noted in the first box of the schematic that in order to determine the D.C. that may be imposed, it is a requirement of subsection 5 (1) of the D.C.A. that "the anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." 3.2 Basis of Population, Household and Non-Residential Gross Floor Area Forecast The D.C. growth forecast has been derived by Watson in consultation with the City of Quinte West. In preparing the growth forecast, the following information sources were consulted to assess the residential and non-residential development potential for the City over the forecast period, including: - City of Quinte West 2022 Residential Land Needs Assessment Report, March 2022; by Quinte West Planning Department; - City of Quinte West 2021 Water and Wastewater Master Plans, Master Plan Report - Final, December 6, 2021, by Jacobs; - City of Quinte West Official Plan, 2023 10 Year Review Draft Document; - City of Quinte West 2020 Development Charges Background Study, October 2, 2020, by Watson & Associates Economists Ltd. [1] Urban buildout is based on the ultimate servicing capacity identified in the City of Quinte West 2021 Water and Wastewater Master Plan Report - Final, December 6, 2021. It is important to note urban buildout is based on servicing potential for the urban area, and the ultimate servicing capacity exceeds currently designated urban lands. Watson & Associates Economists Ltd. PAGE 3-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - 2011, 2016 and 2021 population, household and employment Census data; - Historical residential building permit data over the 2013 to July 2023 year-to-date period; - Residential and non-residential supply opportunities as identified by City of Quinte West staff; and - Discussions with City staff regarding anticipated residential and non-residential development in the City of Quinte West. 3.3 Summary of Growth Forecast A detailed analysis of the residential and non-residential growth forecasts is provided in Appendix A and the methodology employed is illustrated in Figure 3-1. The discussion provided herein summarizes the anticipated growth for the City and describes the basis for the forecast. The results of the residential growth forecast analysis are summarized in Table 3-1 below, and Schedule 1 in Appendix A. As identified in Table 3-1 and Appendix A - Schedule 1, population in the City (excluding census undercount) is anticipated to reach approximately 51,860 by early- 2034, 55,180 by early-2044, and 66,900 by urban buildout, resulting in an increase of approximately 7,260, 8,010 and 18,980 persons, respectively. [1] [1] The population figures used in the calculation of the 2024 D.C. exclude the net Census undercount, which is estimated at approximately 2.7%. Population figures presented herein have been rounded. Watson & Associates Economists Ltd. PAGE 3-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Figure 3-1 Population and Household Forecast Model Intensification Designated Lands Servicing Capacity Residential Units in the Development Process Employment Market by Local Municipality, Economic Outlook Local, region and Provincial Forecast of Residential Units Decline in Existing Population Net Population Increase Historical Housing Construction DEMAND SUPPLY Occupancy Assumptions Gross Population Increase Watson & Associates Economists Ltd. PAGE 3-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 3-1 City of Quinte West Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.7% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. [4] Urban buildout forecast is based on the ultimate servicing capacity identified in the City of Quinte West 2021 Water and Wastewater Master Plan Report - Final, December 6, 2021. It is important to note urban buildout is based on servicing potential for the urban area, and the ultimate servicing capacity exceeds currently designated urban lands. Notes: Numbers may not add due to rounding. Source: Derived from the City of Quinte West Official Plan, 2023 10 Year Review Draft Document, the City of Quinte West 2022 Residential Land Needs Assessment Report, March 2022, and the City of Quinte West 2021 Water and Wastewater Master Plans, Master Plan Report - Final, December 6, 2021, Jacobs, by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 44,240 43,086 536 42,550 13,854 586 2,474 468 17,382 487 2.479 44,750 43,577 712 42,865 14,330 665 2,425 415 17,835 647 2.443 47,810 46,560 580 45,980 15,360 740 2,535 425 19,060 527 2.443 49,210 47,922 597 47,325 15,791 787 2,632 425 19,635 543 2.441 53,250 51,861 649 51,212 16,959 1,085 2,991 425 21,460 590 2.417 56,670 55,183 687 54,496 17,666 1,407 3,416 425 22,914 625 2.408 68,697 66,899 834 66,065 19,554 2,784 5,260 425 28,023 758 2.387 510 491 176 315 476 79 -49 -53 453 160 3,060 2,983 -132 3,115 1,030 75 110 10 1,225 -120 1,400 1,362 17 1,345 431 47 97 0 575 16 4,040 3,939 52 3,887 1,168 298 359 0 1,825 47 7,460 7,261 90 7,171 1,875 620 784 0 3,279 82 19,487 18,977 237 18,740 3,763 1,997 2,628 0 8,388 215 Early 2024 - Early 2034 Forecast Early 2024 - Early 2044 Incremental Early 2024 - Urban Buildout[4] Historical Early 2044 Urban Buildout [4] Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Early 2024 Early 2034 Mid 2021 - Early 2024 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Watson & Associates Economists Ltd. PAGE 3-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Figure 3-2 City of Quinte West Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from City of Quinte West building permit data, 2013 to July 2023 year-to-date, by Watson & Associates Economists Ltd. 98 108 182 320 259 222 342 233 266 209 200 200 200 185 185 185 185 185 160 160 160 160 160 145 145 145 145 145 132 131 131 0 50 100 150 200 250 300 350 400 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE 3-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Provided below is a summary of the key assumptions and findings regarding the City D.C. growth forecast: 1. Unit Mix (Appendix A - Schedules 1 and 6) - The housing unit mix for the City was derived from a detailed review of historical development activity (as per Schedule 6), as well as active residential development applications, and discussions with City staff regarding anticipated development trends for the City. - Based on the above indicators, the 2024 to 2044 household growth forecast for the City is comprised of a unit mix of 57% low density units (single detached and semi-detached), 19% medium density (multiples except apartments) and 24% high density (bachelor, 1-bedroom and 2- bedroom apartments). 2. Geographic Location of Residential Development (Appendix A - Schedule 2) - Schedule 2 summarizes the anticipated amount, type, and location of development by area for the City. - In accordance with forecast demand and available water and wastewater servicing capacity, the amount and percentage of forecast housing growth between 2024 and 2044 by development location is summarized below. Table 3-2 City of Quinte West Geographic Location of Residential Development Development Location Amount of Housing Growth, 2024 to 2044 Percentage of Housing Growth, 2024 to 2044 Urban 2,860 87% Rural 420 13% City of Quinte West 3,280 100% Note: Figures may not sum precisely due to rounding. Watson & Associates Economists Ltd. PAGE 3-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 3. Planning Period - Short- and longer-term time horizons are required for the D.C. process. The D.C.A. limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. 4. Population in New Units (Appendix A - Schedules 3, 4 and 5) - The number of housing units to be constructed by urban buildout in the City of Quinte West over the forecast period is presented in Table 3-1. Over the 2024 to 2044 forecast period, the City is anticipated to average approximately 164 new housing units per year. - Institutional population [1] is anticipated to increase by approximately 90 people between 2024 to 2044. - Population in new units is derived from Schedules 3, 4 and 5, which incorporate historical development activity, anticipated units (see unit mix discussion) and average persons per unit (P.P.U.) by dwelling type for new units. - Schedule 7a summarizes the average P.P.U. assumed for new housing units by age and type of dwelling based on Statistics Canada 2021 custom Census data for the City of Quinte West. Due to data limitations high density P.P.U. data was derived from Hastings County which includes the City of Quinte West, and is outlined in Schedule 7b. The total calculated P.P.U. for all density types has been adjusted accordingly to account for the P.P.U. trends which has been recently experienced in both new and older units. Forecasted 25-year average P.P.U.s by dwelling type are as follows: o Low density: 2.743 o Medium density: 1.970 o High density: 1.749 [1] Institutional population largely includes special care facilities such as nursing home or residences for senior citizens. A P.P.U. of 1.100 depicts 1-bedroom and 2-or-more- bedroom units in collective households. Watson & Associates Economists Ltd. PAGE 3-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 5. Existing Units and Population Change (Appendix A - Schedules 3, 4, and 5) - Existing households for early-2024 are based on the 2021 Census households, plus estimated residential units constructed between mid- 2021 to the beginning of the growth period, assuming a minimum six- month lag between construction and occupancy (see Schedule 3). - The change in average occupancy levels for existing housing units is calculated in Schedules 3 through 5.[1] The forecast population change in existing households over the 2024 to 2044 forecast period is forecast to decline by approximately 560. 6. Employment (Appendix A - Schedules 9a, 9b and 9c) - The employment projections provided herein are largely based on the activity rate method, which is defined as the number of jobs in the City divided by the number of residents. Key employment sectors include primary, industrial, commercial/population-related, institutional, and work at home, which are considered individually below. - 2016 employment data [2],[3] (place of work) for the City of Quinte West is outlined in Schedule 9a. The 2016 employment base is comprised of the following sectors: o 150 primary (1%); o 1,080 work at home employment (6%); o 4,733 industrial (28%); o 4,668 commercial/population-related (28%); and o 6,065 institutional (36%). [1] Change in occupancy levels for existing households occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. [2] 2016 employment is based on Statistics Canada 2016 Place of Work Employment dataset by Watson & Associates Economists Ltd. [3] Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. Watson & Associates Economists Ltd. PAGE 3-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - The 2016 employment by usual place of work, including work at home, is 16,695. An additional 2,070 employees have been identified for the City of Quinte West in 2016 that have no fixed place of work (N.F.P.O.W.).[1] - Total employment, including work at home and N.F.P.O.W. for the City of Quinte West is anticipated to reach approximately 22,260 by early-2034, 23,190 by early-2044, and 25,720 by urban buildout. This represents an employment increase of approximately 1,300 for the 10-year forecast period, 2,240 for the 20-year forecast period, and 4,760 for the urban buildout forecast period. - Schedule 9b, Appendix A, summarizes the employment forecast, excluding work at home employment and N.F.P.O.W. employment, which is the basis for the D.C. employment forecast. The impact on municipal services from work at home employees has already been included in the population forecast. The need for municipal services related to N.F.P.O.W. employees has largely been included in the employment forecast by usual place of work (i.e., employment and gross floor area generated from N.F.P.O.W. construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential G.F.A. calculation. Accordingly, work at home and N.F.P.O.W. employees have been removed from the D.C.A. employment forecast and calculation. - Total employment for the City of Quinte West (excluding work at home and N.F.P.O.W. employment) is anticipated to reach approximately 17,950 by early-2034, 18,690 by early-2044, and 20,350 by urban buildout. This represents an employment increase of approximately 1,010 for the 10- year forecast period, 1,750 for the 20-year forecast period, and 3,410 for the urban buildout forecast period. 7. Non-Residential Sq.ft. Estimates (G.F.A.), Appendix A - Schedule 9b) - Square footage estimates were calculated in Schedule 9b based on the following employee density assumptions: [2] No fixed place of work is defined by Statistics Canada as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Watson & Associates Economists Ltd. PAGE 3-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx o 3,000 sq.ft. per employee for primary; o 1,100 sq.ft. per employee for industrial; o 500 sq.ft. per employee for commercial/population-related; and o 700 sq.ft. per employee for institutional employment. - The City-wide incremental G.F.A. is anticipated to increase by 817,700 sq.ft. over the 10-year forecast period, 1,433,300 over the 20-year forecast period, and 2,633,800 sq.ft. over the urban buildout forecast period. - In terms of percentage growth, the 2024 to 2044 incremental G.F.A. forecast by sector is broken down as follows: o Primary - 6% o industrial - 46%; o commercial/population-related - 18%; and o institutional - 29%. 8. Geographic Location of Non-Residential Development (Appendix A, Schedule 9c) - Schedule 9c summarizes the anticipated amount, type and location of non-residential development by area for the City of Quinte West. - The amount and percentage of forecast total non-residential growth between 2024 and 2044 by development location is summarized below. Table 3-3 City of Quinte West Geographic Location of Non-Residential Development Development Location Amount of Non- Residential G.F.A. (sq.ft.), 2024 to 2044 Percentage of Non- Residential G.F.A., 2024 to 2044 Urban 1,151,600 80% Rural 281,700 20% City of Quinte West 1,433,300 100% Note: Figures may not sum precisely due to rounding Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 4 The Approach to the Calculation of the Charge Watson & Associates Economists Ltd. PAGE 4-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 4. The Approach to the Calculation of the Charge 4.1 Introduction This chapter addresses the requirements of subsection 5 (1) of the D.C.A. with respect to the establishment of the need for service which underpins the D.C. calculation. These requirements are illustrated schematically in Figure 4-1. 4.2 Services Potentially Involved Table 4-2 lists the full range of municipal services that are provided by the City. A number of these services are not listed as eligible services for inclusion in a D.C. by- law as per subsection 2 (4) of the D.C.A. These are shown as "ineligible" on Table 4-2. Two ineligible costs defined in subsection 5 (3) of the D.C.A. are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years." In addition, local roads are covered separately under subdivision agreements and related means (as are other local services). Services which are potentially eligible for inclusion in the City's D.C. are indicated with a "Yes." 4.3 Increase in the Need for Service The D.C. calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for each service to be covered by the by-law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, subsection 5 (1) 3, which requires that Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would be most appropriate. Watson & Associates Economists Ltd. PAGE 4-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Figure 4-1 The Process of Calculating a Development Charge under the Act that must be followed Watson & Associates Economists Ltd. PAGE 4-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 4-1 Categories of Municipal Services to be Addressed as Part of the Calculation - Eligibility Legend Eligibility for Inclusion in the D.C. Calculation Description Yes Municipality provides the service - service has been included in the D.C. calculation. No Municipality provides the service - service has not been included in the D.C. calculation. n/a Municipality does not provide the service. Ineligible Service is ineligible for inclusion in the D.C. calculation. Table 4-2 Categories of Municipal Services to be Addressed as Part of the Calculation Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 1. Water supply services, including distribution and treatment services Yes Yes n/a No 1.1 Treatment plants 1.2 Distribution systems 1.3 Local systems 1.4 Vehicles and equipment1 2. Wastewater services, including sewers and treatment services Yes Yes n/a No 2.1 Treatment plants 2.2 Sewage trunks 2.3 Local systems 2.4 Vehicles and equipment3 3. Stormwater Drainage and Control Services No No No 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 4. Services Related to a Highway Yes Yes Yes No Yes Yes Yes Yes Yes 4.1 Arterial roads 4.2 Collector roads 4.3 Bridges, Culverts and Roundabouts 4.4 Local municipal roads 4.5 Traffic signals 4.6 Sidewalks and streetlights 4.7 Active Transportation 4.8 Works Yard 4.9 Rolling stock1 5. Electrical Power Services n/a n/a n/a 5.1 Electrical substations 5.2 Electrical distribution system 5.3 Electrical system rolling stock4 6. Transit Services Yes Yes 6.1 Transit vehicles4 & facilities 6.2 Other transit infrastructure 7. Waste Diversion Services Yes Yes 7.1 Waste diversion facilities 7.2 Waste diversion vehicles and equipment4 8. Policing Services Yes Yes Yes 8.1 Police detachments 8.2 Police rolling stock1 8.3 Small equipment and gear 9. Fire Protection Services Yes Yes Yes 9.1 Fire stations 9.2 Fire Vehicles1 9.3 Fire Equipment and gear 10. Ambulance Services Yes Yes 10.1 Ambulance station space 10.2 Vehicles4 11. Services provided by a board within the meaning of the Public Libraries Act Yes No Yes 11.1 Public library space (incl. furniture and equipment) 11.2 Library vehicles4 11.3 Library materials 12. Services Related to Long- Term Care n/a n/a 12.1 Long-Term Care space 12.2 Vehicles4 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 13. Parks and Recreation Services Ineligible Yes Yes Yes Yes 13.1 Acquisition of land for parks, woodlots and E.S.A.s 13.2 Development of municipal parks 13.3 Parks rolling stock1 and yards 13.4 Facilities, such as arenas, indoor pools, fitness facilities, community centres, etc. 13.5 Recreation vehicles and equipment5 14. Services Related to Public Health No No 14.1 Public Health department space 14.2 Public Health department vehicles1 15. Child Care and Early Years Programs and Services within the meaning of Part VI of the Child Care and Early Years Act, 2014 and any related services. No No 15.1 Childcare space 15.2 Vehicles5 16. Services related to proceedings under the Provincial Offences Act, including by-law enforcement services and municipally administered court services No No 16.1 P.O.A. space, including by-law enforcement and municipally administered court services 16.2 Vehicles1 17. Services Related to Emergency Preparedness No No 17.1 Emergency Preparedness Space 17.2 Equipment 18. Services Related to Airports n/a Ineligible 18.1 Airports (in the Regional Municipality of Waterloo) 18.2 Other Airports 1 with a 7+ year useful life Watson & Associates Economists Ltd. PAGE 4-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Categories of Municipal Services Inclusion in the D.C. Calculation Service Components 19. Other Yes Yes 19.1 Interest on money borrowed to pay for growth-related capital 19.2 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land [2] and facilities, including the D.C. background study cost [2] same percentage as service component to which it pertains 4.4 Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. A copy of the City's Local Service Policy is included in this report as Appendix D. 4.5 Capital Forecast Paragraph 7 of subsection 5 (1) of the D.C.A. requires that "the capital costs necessary to provide the increased services must be estimated." The Act goes on to require potential cost reductions and the regulation sets out the way in which such costs are to be presented. These requirements are outlined below. These estimates involve capital costing of the increased services discussed above. This entails costing actual projects or the provision of service units, depending on how each service has been addressed. The capital costs include: a) costs to acquire land or an interest therein (including a leasehold interest); b) costs to improve land; c) costs to acquire, lease, construct or improve buildings and structures; Watson & Associates Economists Ltd. PAGE 4-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx d) costs to acquire, lease or improve facilities, including rolling stock (with a useful life of 7 or more years), furniture and equipment (other than computer equipment), materials acquired for library circulation, reference, or information purposes; e) interest on money borrowed to pay for the above-referenced costs; f) costs to undertake studies in connection with the above-referenced matters; and g) costs of the D.C. background study. In order for an increase in need for service to be included in the D.C. calculation, municipal Council must indicate "that it intends to ensure that such an increase in need will be met" (subsection 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast, or similar expression of the intention of Council (O. Reg. 82/98 section 3). The capital program contained herein reflects the City's approved and proposed capital budgets and master servicing/needs studies. 4.6 Treatment of Credits Section 8, paragraph 5, of O. Reg. 82/98 indicates that a D.C. background study must set out "the estimated value of credits that are being carried forward relating to the service." Subsection 17, paragraph 4, of the same regulation indicates that, "...the value of the credit cannot be recovered from future D.C.s," if the credit pertains to an ineligible service. This implies that a credit for eligible services can be recovered from future D.C.s. As a result, this provision should be made in the calculation, in order to avoid a funding shortfall with respect to future service needs. Outstanding D.C. credits have been included within the Water and Wastewater Service areas. 4.7 Eligible Debt and Committed Excess Capacity Section 66 of the D.C.A. states that for the purposes of developing a D.C. by-law, a debt incurred with respect to an eligible service may be included as a capital cost, subject to any limitations or reductions in the Act. Similarly, s.18 of O. Reg. 82/98 indicates that debt with respect to an ineligible service may be included as a capital cost, subject to several restrictions. Watson & Associates Economists Ltd. PAGE 4-8 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx In order for such costs to be eligible, two conditions must apply. First, they must have funded excess capacity which is able to meet service needs attributable to the anticipated development. Second, the excess capacity must be "committed," that is, either before or at the time it was created, Council must have expressed a clear intention that it would be paid for by D.C.s or other similar charges. For example, this may have been done as part of previous D.C. processes. 4.8 Existing Reserve Funds Section 35 of the D.C.A. states that: "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 8 of subsection 5 (1)." There is no explicit requirement under the D.C.A. calculation method set out in subsection 5 (1) to net the outstanding reserve fund balance as part of making the D.C. calculation; however, s.35 does restrict the way in which the funds are used in future. The City D.C. Reserve Funds balances, by service, are presented in Table 4-3 below. 2023 year-end reserve fund balances have been adjusted to account for eligible and actual reserve fund draws and commitments occurring over the 2020 to 2023 period. These balances have been applied against future spending requirements for all services. Watson & Associates Economists Ltd. PAGE 4-9 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 4-3 City of Quinte West Estimated D.C. Reserve Fund Balances 4.9 Deductions The D.C.A. potentially requires that four deductions be made to the increase in the need for service. These relate to: - the level of service ceiling; - uncommitted excess capacity; - benefit to existing development; and - anticipated grants, subsidies, and other contributions. The requirements behind each of these reductions are addressed as follows: 4.9.1 Reduction Required by Level of Service Ceiling This is designed to ensure that the increase in need included in 4.3 does "...not include an increase that would result in the level of service (for the additional development increment) exceeding the average level of the service provided in the Municipality over the 15-year period immediately preceding the preparation of the background study..." O. Reg. 82.98 (s.4) goes further to indicate that, "...both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." Service Totals Fire Protection Services ($195,071) Parks and Recreation $937,300 Ambulance $61,638 Services Related to a Highway $5,165,281 Policing Services $282,002 Library Services $13,638 Water Services $530,875 Wastewater Services $2,197,057 Waste Diversion $32,237 Transit $19,570 Growth-Related Studies $61,598 Total $9,106,124 Watson & Associates Economists Ltd. PAGE 4-10 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx In many cases, this can be done by establishing a quantity measure in terms of units as floor area, land area or road length per capita, and a quality measure in terms of the average cost of providing such units based on replacement costs, engineering standards or recognized performance measurement systems, depending on circumstances. When the quantity and quality factors are multiplied together, they produce a measure of the level of service which meets the requirements of the Act, i.e., cost per unit. The average service level calculation sheets for each service component in the D.C. calculation are set out in Appendix B. 4.9.2 Reduction for Uncommitted Excess Capacity Paragraph 5 of subsection 5 (1) requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the municipality's "excess capacity," other than excess capacity which is "committed." "Excess capacity" is undefined, but in this case must be able to meet some or all of the increase in need for service, in order to potentially represent a deduction. The deduction of uncommitted excess capacity from the future increase in the need for service would normally occur as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g., if a road widening to accommodate increased traffic is not required because sufficient excess capacity is already available, then widening would not be included as an increase in need, in the first instance. 4.9.3 Reduction for Benefit to Existing Development Section 5 (1) 6 of the D.C.A. provides that, "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development." The general guidelines used to consider benefit to existing development included: - the repair or unexpanded replacement of existing assets that are in need of repair; - an increase in average service level of quantity or quality (compare water as an example); - the elimination of a chronic servicing problem not created by growth; and Watson & Associates Economists Ltd. PAGE 4-11 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - providing services where none previously existed (generally considered for water or wastewater services). This step involves a further reduction in the need by the extent to which such an increase in service would benefit existing development. The level of service cap in section 4.9.1 is related but is not the identical requirement. Sanitary, storm, and water trunks are highly localized to growth areas and can be more readily allocated in this regard than other services such as services related to a highway, which do not have a fixed service area. Where existing development has an adequate service level which will not be tangibly increased by an increase in service, no benefit would appear to be involved. For example, where expanding existing library facilities simply replicates what existing residents are receiving, they receive very limited (or no) benefit as a result. On the other hand, where a clear existing service problem is to be remedied, a deduction should be made accordingly. In the case of services such as recreation facilities, community parks, libraries, etc., the service is typically provided on a municipal-wide system basis. For example, facilities of the same type may provide different services (i.e., leisure pool vs. competitive pool), different programs (i.e., hockey vs. figure skating), and different time availability for the same service (i.e., leisure skating available on Wednesdays in one arena and Thursdays in another). As a result, residents will travel to different facilities to access the services they want at the times they wish to use them, and facility location generally does not correlate directly with residence location. Even where it does, displacing users from an existing facility to a new facility frees up capacity for use by others and generally results in only a very limited benefit to existing development. Further, where an increase in demand is not met for a number of years, a negative service impact to existing development is involved for a portion of the planning period. 4.9.4 Reduction for Anticipated Grants, Subsidies and Other Contributions This step involves reducing the capital costs necessary to provide the increased services by capital grants, subsidies, and other contributions (including direct developer contributions required due to the local service policy) made or anticipated by Council and in accordance with various rules such as the attribution between the share related Watson & Associates Economists Ltd. PAGE 4-12 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx to new vs. existing development. That is, some grants and contributions may not specifically be applicable to growth or where Council targets fundraising as a measure to offset impacts on taxes (O. Reg. 82/98, section 6). 4.10 Municipal-Wide vs. Area Rating This step involves determining whether all the subject costs are to be recovered on a uniform municipal-wide basis or whether some or all are to be recovered on an area- specific basis. Under the D.C.A., it is now mandatory to "consider" area-rating of services (providing charges for specific areas and services), however, it is not mandatory to implement area-rating. Further discussion is provided in section 7.3.8. 4.11 Allocation of Development This step involves relating the costs involved to anticipated development for each period under consideration and using allocations between residential and non-residential development and between one type of development and another, to arrive at a schedule of charges. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 5 D.C.-Eligible Cost Analysis by Service Watson & Associates Economists Ltd. PAGE 5-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 5. D.C.-Eligible Cost Analysis by Service 5.1 Introduction This chapter outlines the basis for calculating eligible costs for the D.C.s to be applied on a uniform and area-specific basis. In each case, the required calculation process set out in subsection 5 (1) paragraphs 2 to 7 in the D.C.A. and described in Chapter 4 was followed in determining D.C. eligible costs. The nature of the capital projects and timing identified in this chapter reflects Council's current intention. Over time, however, City projects and Council priorities change; and accordingly, Council's intentions may alter, and different capital projects (and timing) may be necessary to meet the need for services required by new growth. 5.2 Service Levels and City-Wide 10-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for City-wide services over the 10-year planning period (2024-2033). Each service is evaluated on two format sheets: the average historical 15-year level of service calculation (see Appendix B), which "caps" the D.C. amounts; and the infrastructure cost calculation, which determines the potential D.C. recoverable cost. 5.2.1 Fire Protection Services Fire Protection Services are provided through 50,122 sq.ft. of facility space, 44 vehicles, and 162 equipment items. This historical level of investment results in an average level of service of $843 per capita over the past 15-years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 3,887 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $3.3 million that could be included in the calculation of the charge. To provide service to new development over the 10-year forecast period, $265,000 in gross capital costs of growth-related projects have been identified, including equipment and study costs. $115,000 has been deducted as a benefit to existing development and $195,100 has been added to reflect existing D.C. reserve fund deficits to be recovered Watson & Associates Economists Ltd. PAGE 5-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx over the forecast period resulting in $345,800 being included in the calculation of the charge. These D.C. eligible costs are then attributed 79% to residential development and 21% to non-residential development based on the relationship of population to employment growth anticipated over the 10-year forecast period (i.e., 3,887 population and 1,008 employment). These growth-related projects and costs are detailed in Table 5-1. 5.2.2 Policing Services Policing Services are provided through 28,134 sq.ft. of facility space and 2 equipment items. This historical level of investment results in an average level of service of $311 per capita over the past 15-years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 3,887 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $1.2 million that could be included in the calculation of the charge. To provide service to new development over the 10-year forecast period, $10.3 million in gross capital costs of growth-related projects have been identified, primarily related to the growth-related costs of the Police Headquarters. $5.6 million has been deducted as a benefit to existing development and $2.8 million has been deducted as a benefit to growth beyond the 10-year forecast period. After removing $282,000 for the existing reserve fund balance, $1.6 million has been included in the calculation of the charge. These D.C. eligible costs are then attributed 79% to residential development and 21% to non-residential development based on the relationship of population to employment growth anticipated over the 10-year forecast period (i.e., 3,887 population and 1,008 employment). These growth-related projects and costs are detailed in Table 5-2. 5.2.3 Transit Services Ontario Regulation 82/98 sets forth the requirements for transit services and the available capacity of capital costs to provide for the increase in need. Subsection 8(2) of the regulation states that for transit services the background study shall set out: 1. "The calculations that were used to prepare the estimate for the planned level of service for the transit services, as mentioned in subsection 5.2 (3) of the Act. Watson & Associates Economists Ltd. PAGE 5-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 2. An identification of the portion of the total estimated capital cost relating to the transit services that would benefit, i. the anticipated development over the 10-year period immediately following the preparation of the background study, or ii. the anticipated development after the 10-year period immediately following the preparation of the background study. 3. An identification of the anticipated excess capacity that would exist at the end of the 10-year period immediately following the preparation of the background study. 4. An assessment of ridership forecasts for all modes of transit services proposed to be funded by the D.C. over the 10-year period immediately following the preparation of the background study, categorized by development types, and whether the forecasted ridership will be from existing or planned development. 5. An assessment of the ridership capacity for all modes of transit services proposed to be funded by the D.C. over the 10-year period immediately following the preparation of the background study." Transit ridership is anticipated to increase with growth in the City at the same ridership per capita rates (i.e., 1.6 trips per capita). Over the 10-year forecast period, this equates to an increase in ridership of 6,329 trips. Based on the forecast ridership and the fact that transit improvements will be used by both new and existing residents, approximately 8% of the incremental ridership is attributed to new development (i.e. incremental population growth represents 8% of the anticipated 2033 population). Anticipated needs of the system include a new on-demand bus, shelters, vehicle storage, technology modernization, and future study costs. The gross capital cost for these projects is $767,800. Deductions of $574,600 and $19,600 are applied for the benefit to existing development and for existing reserve fund balances. This results in a total of $173,600 of growth-related needs being included in the D.C. calculation. The net growth-related costs for transit services have been allocated between future residential and non-residential development on the basis of incremental population to employment growth over the 10-year forecast period (i.e. 79% residential/ 21% non- residential). Watson & Associates Economists Ltd. PAGE 5-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx These growth-related projects and costs are detailed in Table 5-3. 5.2.4 Parks and Recreation Services The City provides Parks and Recreation Services through the maintenance of 144 parkland amenities, 52 kms of trails, 195,906 sq.ft. of facility space, and 109 vehicle and equipment items across the City. This total historical level of investment results in an average level of service of $2,939 per capita over the past 15-years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 3,887 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $11.4 million that could be included in the calculation of the charge. To provide service to new development over the 10-year forecast period $6.7 million in gross capital costs have been identified for various parkland development and equipment needs. $4.9 million has been deducted as a benefit to existing development and $937,300 has been deducted for existing D.C. reserve funds resulting in $ 907,600 being included in the calculation of the charge. These D.C.-eligible costs are then attributed 95% to residential development as they are the primary uses of Parks and Recreation Services. These growth-related projects and costs are detailed in Table 5-4. 5.2.5 Library Services The City provides Library Services through 22,200 sq.ft. of facility space and the maintenance of 105,206 collection items. This total historical level of investment results in an average level of service of $217 per capita over the past 15-years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 3,887 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $2.0 million that could be included in the calculation of the charge. To provide service to new development over the 10-year forecast period, gross capital costs of $505,800 have been identified from which $17,800 has been deducted for the benefit to existing development and $13,600 recognizing the existing reserve fund balance. This results in $474,300 being included in the calculation of the charge. Watson & Associates Economists Ltd. PAGE 5-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx These D.C. eligible costs are then attributed 95% to residential development as they are the primary users for Library Services. These growth-related projects and costs are detailed in Table 5-5 5.2.6 Ambulance Services Ambulance Services are provided in the City by Hastings County. The City's share for the assets used to provide service include 7,591 sq.ft. of facility space, and 8.1 vehicles. This total historical level of investment results in an average level of service of $129 per capita over the past 15-years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 3,887 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $500,800 that could be included in the calculation of the charge. To provide service to new development over the 10-year forecast period, $6.8 million in gross capital costs of growth-related projects have been identified, including additional facility space. $1.5 million has been deducted as a benefit to development beyond the forecast period and a further $4.7 million has been deducted for the service provision to municipalities outside of Quinte West. 61,600 has been deducted for D.C. reserve funds already collected towards these needs resulting in $$500,800 being included in the calculation of the charge. These D.C. eligible costs are then attributed 79% to residential development and 21% to non-residential development based on the relationship of population to employment growth anticipated over the 10-year forecast period (i.e., 3,887 population and 1,008 employment). These growth-related projects and costs are detailed in Table 5-6. 5.2.7 Waste Diversion Services The City provides Waste Diversion Services through curbside collection of organics. In total, the City's share contracted vehicles and equipment items results in an average level of service of $30 per capita over the past 15-years. When applied against the anticipated population growth over the 10-year forecast period (i.e., 3,887 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $115,200 that could be included in the calculation of the charge. To provide service to new development over the 10-year forecast period, the capital component of collection costs and additional green bins have been identified. The Watson & Associates Economists Ltd. PAGE 5-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx gross capital costs are $260,200. $92,500 has been deducted for the solid waste share of the incremental costs and $20,300has been deducted for the benefit to growth beyond the 10-year forecast period. After deducting the existing reserve fund balance of $32,30, $115,200 has been included in the calculation of the charge. These D.C. eligible costs are then attributed 100% to residential development as they are the beneficiaries of this service. These growth-related projects and costs are detailed in Table 5-7. 5.2.8 Growth Related Studies Section 7 of the D.C.A. states that a D.C. by-law may provide for any D.C. eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each D.C. eligible services. With respect to growth-related studies, Section 7 (3) of the D.C.A. states that: For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3). These provisions allow for services to be grouped together to create a class for the purposes of the D.C. by-law and D.C. reserve funds. The D.C. calculations and draft by-law provided herein include a class for growth-related studies. This class is comprised of the following City-wide services: The following provides a list of the studies that have been identified for the 2024 to 2033 forecast period: - D.C. Background Studies (2) - Official Plan Updates (2) - Zoning Bylaw Review (2) - Secondary Growth Plan (2) - Stormwater Master Plan For planning related studies, a deduction of 10% of the growth-related costs has been applied to recognize the extent to which the studies relate to non-D.C.-eligible services. Watson & Associates Economists Ltd. PAGE 5-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Planning related studies and future D.C. background studies have been allocated to the services in the following manner: - Fire protection services - 0.9% - Policing services - 4.1% - Transit services - 0.5% - Parks and recreation services - 2.4% - Library services - 1.2% - Ambulance services - 1.3% - Waste diversion services - 0.2% - Services related to a highway - 89.2% The total cost of these studies is $530,000 of which $152,500 is a benefit to existing development. A deduction of $14,500 has been made to recognize the portion of planning studies related to D.C.-ineligible services, as mentioned above. The existing reserve fund balance of $61,600 has been deducted, resulting in a net D.C.-eligible cost of $301,400 over the 10-year forecast period as presented in Table 5-8 below. The allocation of the net growth-related costs between residential and non-residential development is based on the residential and non-residential allocations for each service area and are presented in Table 5-9 below. Watson & Associates Economists Ltd. PAGE 5-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-1 Infrastructure Costs Covered in the D.C. Calculation - Fire Protection Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2033 79% 21% 1 New Firefighter 2024-2033 14,200 - 14,200 - 14,200 11,218 2,982 2 Training Vehicle 2024-2033 74,200 - 74,200 18,600 55,600 43,924 11,676 3 Communications Tower 2024-2033 77,300 - 77,300 71,400 5,900 4,661 1,239 Studies - - - - - - - 4 Fire Master Plan 2027-2033 100,000 - 100,000 25,000 75,000 59,250 15,750 - - - - - - - Reserve Fund Adjustment - - - - 195,071 154,106 40,965 - - - - - - - - - - - - - - Total 265,700 - 265,700 115,000 - 345,771 273,159 72,612 Increased Service Needs Attributable to Anticipated Development Timing (year) Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Post Period Benefit Net Capital Cost Gross Capital Cost Estimate (2024$) Watson & Associates Economists Ltd. PAGE 5-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-2 Infrastructure Costs Covered in the D.C. Calculation - Policing Services Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2033 79% 21% 1 Camera & Network Upgrades 2024-2033 675,000 - 675,000 617,500 57,500 45,425 12,075 2 Police Station (NPV of future Principal Payments) 2024-2040 7,458,606 2,396,912 5,061,694 4,203,900 857,794 677,658 180,137 3 Police Station (NPV of future Interest Payments) 2024-2040 1,375,370 441,992 933,379 775,200 158,179 124,961 33,218 4 Post Period Beneft of Previous Police Station Debt Payments - Principal 577,042 577,042 - 577,042 455,863 121,179 5 Post Period Beneft of Previous Police Station Debt Payments - Interest 210,981 210,981 - 210,981 166,675 44,306 Reserve Fund Adjustment - - - - (282,002) (222,782) (59,220) - - - - - - - - - - - - - - Total 10,296,999 2,838,903 7,458,096 5,596,600 - 1,579,494 1,247,800 331,694 Net Capital Cost Benefit to Existing Development Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Grants, Subsidies and Other Contributions Attributable to New Development Total Watson & Associates Economists Ltd. PAGE 5-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-3 Infrastructure Costs Covered in the D.C. Calculation - Transit Services Less: Potential D.C. Recoverable Cost Prj.No Residential Share Non- Residential Share 2024-2033 79% 21% New Route - Loyalist - - - - - - - 1 Transit Shelters/Hubs 2024-2033 63,900 - 63,900 59,000 4,900 3,871 1,029 - - - - - - - 2 Outside Vehicle Storage with Pow 2024-2033 71,000 - 71,000 65,600 5,400 4,266 1,134 3 Specialized On-Demand Bus 2024-2033 63,900 - 63,900 59,000 4,900 3,871 1,029 4 Tranist Bus Tech Modernization 2024-2033 369,000 - 369,000 341,000 28,000 22,120 5,880 Studies - - - - - - - 5 Transit Master Plan 2027-2033 200,000 - 200,000 50,000 150,000 118,500 31,500 - - - - - - - Reserve Fund Adjustment - - - - (19,570) (15,461) (4,110) - - - - - - - Total 767,800 - 767,800 574,600 - 173,630 137,167 36,462 Increased Service Needs Attributable to Anticipated Development Timing (year) Total Gross Capital Cost Estimate (2024$) Post Period Benefit Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-4 Infrastructure Costs Covered in the D.C. Calculation - Parks and Recreation Services Prj.No Residential Share Non- Residential Share 2024-2033 95% 5% 1 Smits Park 2024 85,000 - 85,000 - 85,000 80,750 4,250 2 Bayswater Park 2026 35,500 - 35,500 - 35,500 33,725 1,775 3 Hillside Meadows Park 2025 85,000 - 85,000 - 85,000 80,750 4,250 4 Murray Heights Park 2024 85,000 - 85,000 - 85,000 80,750 4,250 5 Young's Cove Park 2025 71,000 - 71,000 - 71,000 67,450 3,550 6 New Turf Field 2025-2030 2,554,700 - 2,554,700 2,259,900 294,800 280,060 14,740 7 Frankford Softball Canteen/Washrooms (City Share) 2025-2033 354,800 - 354,800 324,600 30,200 28,690 1,510 8 Centennial Park Message Board Display 2025-2033 212,900 - 212,900 194,800 18,100 17,195 905 9 Centennial Park Mulitsurface Court 2025-2033 709,600 - 709,600 354,800 354,800 337,060 17,740 10 Centennial Lighting 2nd half of soccer 1&2 2025-2033 248,400 - 248,400 227,200 21,200 20,140 1,060 11 Centennial Park Special Events Building Storage 2025-2033 141,900 - 141,900 129,800 12,100 11,495 605 12 Two Full sized soccer pitches 2025-2033 567,700 - 567,700 283,900 283,800 269,610 14,190 13 Bain Park Comfort Station 2025-2033 1,135,400 - 1,135,400 1,038,600 96,800 91,960 4,840 14 Truck/Trailer/Mower 2024-2033 241,300 - 241,300 - 241,300 229,235 12,065 15 New Ball Diamond Groomer 2025 44,000 - 44,000 - 44,000 41,800 2,200 Trails - - - - - - - 16 Pine Marsh Lane Connecting Link 2024-2033 14,200 - 14,200 11,400 2,800 2,660 140 17 Rapid Roads Connecting Link - Bata Island 2024-2033 42,600 - 42,600 34,100 8,500 8,075 425 Studies - - - - - - - 18 Parks and Recreation Master Plan 2024 100,000 - 100,000 25,000 75,000 71,250 3,750 - - - - - - - Reserve Fund Adjustment - - - - (937,300) (890,435) (46,865) Total 6,729,000 - 6,729,000 4,884,100 - 907,600 862,220 45,380 Post Period Benefit Net Capital Cost Less: Potential D.C. Recoverable Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Gross Capital Cost Estimate (2024$) Increased Service Needs Attributable to Anticipated Development Timing (year) Watson & Associates Economists Ltd. PAGE 5-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-5 Infrastructure Costs Covered in the D.C. Calculation - Library Services Prj.No Residential Share Non- Residential Share 2024-2033 95% 5% 1 Additional Collections Material 2024-2033 385,552 - 385,552 - 385,552 366,274 19,278 2 Self Checkout Stations (1) 2024-2033 13,400 - 13,400 1,000 12,400 11,780 620 3 Remote Hold Locker 2024 56,800 - 56,800 4,300 52,500 49,875 2,625 Studies - - - - - - - 4 Library Strategic Plan 2024-2033 50,000 - 50,000 12,500 37,500 35,625 1,875 - - - - - - - Reserve Fund Adjustment - - - - (13,638) (12,956) (682) - - - - - - - Total 505,752 - 505,752 17,800 - 474,314 450,598 23,716 Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-6 Infrastructure Costs Covered in the D.C. Calculation - Ambulance Services Prj.No Residential Share Non- Residential Share 2024-2033 79% 21% 1 Stirling EMS Base 2024 5,459,000 1,178,538 3,827,305 453,157 - 453,157 357,994 95,163 2 Additional Ambulances (4) 2024-2033 1,316,000 284,110 922,648 109,243 - 109,243 86,302 22,941 - - - - - - - Reserve Fund Adjustment - - - - (61,638) (48,694) (12,944) - - - - - - - Total 6,775,000 1,462,648 4,749,953 562,400 - - 500,762 395,602 105,160 Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-7 Infrastructure Costs Covered in the D.C. Calculation - Waste Diversion Services Prj. No Residential Share Non- Residential Share 2024-2033 100% 0% 1 Waste Collection Contract 2024-2033 154,134 20,276 92,481 41,378 - 41,378 41,378 - 2 Green Bins 2024-2033 103,750 103,750 - 103,750 103,750 - 3 Post Period Benefit of D.C. Completed Projects 2,281 2,281 - 2,281 2,281 - Reserve Fund Adjustment (32,237) (32,237) - Total 260,165 20,276 92,481 147,408 - - 115,172 115,172 - Gross Capital Cost Estimate (2024$) Total Less: Potential D.C. Recoverable Cost Increased Service Needs Attributable to Anticipated Development Timing (year) Post Period Benefit Other Deductions Net Capital Cost Benefit to Existing Developmen t Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-8 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-8 Infrastructure Costs Covered in the D.C. Calculation - Growth-Related Studies 2024-2033 1 D.C. Background Study 2024-2028 60,000 - 60,000 - 60,000 2 D.C. Background Study 2029-2033 60,000 - 60,000 - 60,000 3 Official Plan Update 2024-2028 50,000 - 2,500 47,500 25,000 22,500 4 Official Plan Update 2029-2033 50,000 - 2,500 47,500 25,000 22,500 5 Zoning Bylaw Review 2024-2028 50,000 - 2,500 47,500 25,000 22,500 6 Zoning Bylaw Review 2029-2033 50,000 - 2,500 47,500 25,000 22,500 7 Secondary Growth Plan 2025-2028 30,000 - 2,250 27,750 7,500 20,250 8 Secondary Growth Plan 2029-2033 30,000 - 2,250 27,750 7,500 20,250 9 Stormwater Master Plan 2025-2033 150,000 - 150,000 37,500 112,500 - - - - - Reserve Fund Adjustment - - - (61,598) Total 530,000 - 14,500 515,500 152,500 - 301,402 Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Less: Potential D.C. Recoverable Cost Other Deductions (to recognize benefit to non-D.C. services) Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Watson & Associates Economists Ltd. PAGE 5-9 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-9 Infrastructure Costs Covered in the D.C. Calculation - Growth-Related Studies - Residential/Non-Residential Shares Class/ Service Total Residential Share Non- Residential Share Services Related to a Highway 185,610 148,488 37,122 Fire Protection Services 1,889 1,492 397 Policing Services 8,629 6,817 1,812 Transit Services 949 749 199 Parks and Recreation Services 4,959 4,711 248 Library Services 2,591 2,462 130 Ambulance 2,736 2,161 575 Waste Diversion 629 629 - Stormwater Management Services 93,410 74,728 18,682 Total 301,402 242,238 59,164 Residential/Non-Residential % 80% 20% Watson & Associates Economists Ltd. PAGE 5-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 5.3 Service Levels and City-Wide 20-Year Capital Costs for D.C. Calculation This section evaluates the development-related capital requirements for City-wide services over the 20-year planning period (2024-2043). 5.3.1 Services Related to a Highway The City currently provides Services Related to a Highway utilizing an inventory of 1,511 km of roads, 77 bridges and culverts, and 31 signalized intersections, and 3,092 streetlights. The services are also managed through the use of 175,020 sq.ft. of public works facility space and 142 vehicles and equipment items. This total historical level of investment results in an average level of service of $35,055 per capita over the past 15- years. When applied against the anticipated population growth over the 20-year forecast period (i.e., 7,171 net population growth, excluding institutional population), this results in a maximum D.C. eligible amount of $241,8 million that could be included in the calculation of the charge. To provide service to new development over the 20-year forecast period, $160.0 million in gross capital costs of growth-related projects have been identified based on needs identified in past master plans and D.C. background studies, as well as study costs and incremental interest costs associated with the capital program. $88.3 million has been deducted as a benefit to existing development and a further $29.8 million has been deducted for the benefit to growth beyond the 20-year forecast period. A further $2.7 million has been deducted for other contributions as well as $5.2 million for existing reserve fund balances. already collected towards these needs resulting in $34.0 million being included in the calculation of the charge. These D.C. eligible costs are then attributed 80% to residential development and 20% to non-residential development based on the relationship of population to employment growth anticipated over the 20-year forecast period (i.e., 7,171 population and 1,750 employment). These growth-related projects and costs are detailed in Table 5-10. Watson & Associates Economists Ltd. PAGE 5-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-10 Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2043 80% 20% 1 County Road 40: From 401 to Hwy 2 - Change to 4 Lanes 2030-2040 15,054,000 3,914,000 11,140,000 3,734,000 7,406,000 5,924,800 1,481,200 2 Wooler Rd Bridge Replacement and Foundations 2024 15,450,000 - 2,317,500 13,132,500 10,506,000 2,626,500 2,101,200 525,300 3 Wooler Rd Bridge - 2 to 4 lanes 2045 15,450,000 15,450,000 - - - - - 4 Sidney St - 2 to 4 lanes (North Murray to Hamilton) 2031-2040 4,199,000 1,091,700 3,107,300 1,380,000 1,727,300 1,381,840 345,460 5 Sidney St - 2 to 4 lanes (Hamilton to Monogram) w/underpass 2031-2040 20,001,000 5,200,300 14,800,700 12,000,000 2,800,700 2,240,560 560,140 6 2nd Dug Hill Road: From Hwy 2 to Creek 2025 4,969,000 - 4,969,000 1,080,000 3,889,000 3,111,200 777,800 7 Improve traffic flow along dixon and dundas corridor 2027-2029 1,305,000 - 1,305,000 978,800 326,200 260,960 65,240 8 DJ McDonald Bridge - Widening 2-4 Lanes 2033-2042 25,750,000 3,433,300 22,316,700 19,313,000 3,003,700 2,402,960 600,740 9 Dixon Drive: From Bridge to Sidney - Change to 4 Lanes 2030-2040 2,509,000 669,100 1,839,900 858,000 981,900 785,520 196,380 10 Dundas Street West: @ Fourth Avenue - Add a turning lane 2031-2040 515,000 - 515,000 334,800 180,200 144,160 36,040 11 Douglas Road: From Glen Miller to Foster Stearns 2024 515,000 - 515,000 113,300 401,700 321,360 80,340 12 Highway 2: From 2nd Dug Hill to County Rd 40 - Change to 4 Lanes 2026 5,295,000 - 5,295,000 1,218,000 4,077,000 3,261,600 815,400 13 New Service truck for Mechanics 2024 318,000 - 318,000 - 318,000 254,400 63,600 14 2 light fleet, 2 tandem plows and 1 sidewalk plow 2024-2042 1,349,000 - 1,349,000 - 1,349,000 1,079,200 269,800 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Total Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-10 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Services Related to a Highway Less: Potential D.C. Recoverable Cost Prj. No Residential Share Non- Residential Share 2024-2043 80% 20% Active Transportation - - - - - - - Trails - - - - - - - 15 N/S Connecting Link Trenton to Frankford 2033-2042 3,090,000 - 3,090,000 2,472,000 618,000 494,400 123,600 16 E/W link Bain Park to Centennial Park 2024 3,811,000 - 3,811,000 3,048,800 432,000 330,200 264,160 66,040 17 Paving & Lighting of trail from Dufferin to Canal - 5.3km 2032 3,399,000 - 3,399,000 2,719,200 679,800 543,840 135,960 18 Paving & Lighting of trail from Canal to Youngs Cove - 2.1km 2032 1,263,000 - 1,263,000 1,010,400 252,600 202,080 50,520 19 Paving & Lighting of Canal and Shore road connecting waterfront trail to Loyalist Pkwy - 1.1km 2032 661,000 - 661,000 528,800 132,200 105,760 26,440 20 Pedestrian Bridge over Murray Canal 2032 5,150,000 - 5,150,000 4,120,000 1,030,000 824,000 206,000 21 Two Viewing Platforms, signalled crosswalk on Hwy 33, boardwalk and pumphouse area upgrades. 2032 3,901,000 - 3,901,000 3,120,800 780,200 624,160 156,040 22 Active Transportation Plan Needs 2024-2030 10,669,000 - 10,669,000 8,989,200 1,679,800 1,343,840 335,960 23 Active Transportation Plan Needs 2031-2040 12,768,000 - 12,768,000 10,757,700 2,010,300 1,608,240 402,060 Studies - - - - - - - 24 Transportation Master Plan 2027-2033 200,000 - 200,000 50,000 150,000 120,000 30,000 - - - - - - - 25 Net Present Value of Future Growth-Related Interest Payments 2024-2062 2,388,125 - 2,388,125 - 2,388,125 1,910,500 477,625 Reserve Fund Adjustment - - - - (5,165,281) (4,132,224) (1,033,056) Total 159,979,125 29,758,400 2,317,500 127,903,225 88,332,800 432,000 33,973,145 27,178,516 6,794,629 Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Other Deductions Total Net Capital Cost Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Watson & Associates Economists Ltd. PAGE 5-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 5.4 Area Specific Capital Costs of Buildout for D.C. Calculation This section evaluates the development-related capital requirements for area-specific water and wastewater services over the urban serviced area buildout planning period (2024-Buildout). Water and Wastewater Services needs have been informed by the City's Water and Wastewater Master Plan with updated costing where available as well as outstanding D.C. credits, study costs, and incremental interest costs associated with the capital program. 5.4.1 Water Services Capital needs of $52.5 million for Water Services have been identified. $20.4 million has been deducted as benefit to existing development and a further $530,900 has been deducted to account for the existing reserve balance. The net growth-related costs of $31.6 million (as detailed in Table 5-11) have been allocated to residential and non- residential development on the basis of incremental water flows over the forecast period (i.e., 85% residential and 15% non-residential). 5.4.2 Wastewater Services Gross capital costs of $211.6 million have been identified for growth-related wastewater infrastructure needs in the City over the buildout period. A deduction of $32.6 million has been applied to account for the benefits to existing development, as well as a deduction of $2.2 million for existing reserve funds, resulting in D.C. eligible costs of $176.8 million being included in the calculation of the charge. Costs have been apportioned as 84% residential and 16% non-residential on the basis of incremental wastewater demand over the forecast period by residential and non-residential development. The growth-related capital needs are further detailed in Table 5-12. Watson & Associates Economists Ltd. PAGE 5-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-11 Infrastructure Costs Covered in the D.C. Calculation - Water Services Residential Share Non- Residential Share 2024-Buildout 85% 15% Trenton - - - - - - - 1 WT-1 to WT-4 West End Trunk Water Main 2024 7,311,000 - 7,311,000 - 7,311,000 6,192,246 1,118,754 2 WT-7 Mt. Pelion Booster Station Upgrade (3 pumps at 89 L/s each) 2027 5,150,000 - 5,150,000 2,063,900 3,086,100 2,613,854 472,246 3 WT-8 Elevated Storage Tank (Trenton Zone 1) 2025 - 2027 11,330,000 - 11,330,000 5,665,000 5,665,000 4,798,122 866,878 4 Hillside North to Highway 2: 300mm Watermain Extension 2024-2025 721,000 - 721,000 - 721,000 610,670 110,330 5 WWT-2 FBI Trunk Upper 2nd Dug - Hillside West to Industrial Park - Water Portion 2024-2025 1,751,000 - 1,751,000 - 1,751,000 1,483,056 267,944 Frankford - - - - - - - 6 WF-1 Watermain to cross under Trent River at Hannah Ln (350 mm) 2042 3,687,000 - 3,687,000 2,456,600 1,230,400 1,042,120 188,280 7 WF-2 Trenton-Frankford Transmission Main (NPV of future debt payments) 2024-2043 7,362,122 - 7,362,122 4,905,400 2,456,722 2,080,786 375,936 8 WF-3 Frankford Booster Station (NPV of future debt payments) 2024-2043 1,758,936 - 1,758,936 1,172,000 586,936 497,121 89,815 9 WF-4 Elevated Storage Tank 2037 8,096,000 - 8,096,000 4,048,000 4,048,000 3,428,561 619,439 Oversizing - - - - - - - 10 Kelmencic Subdivision 2022 39,000 - 39,000 - 39,000 33,032 5,968 11 Woodland Heights Watermain 2024 406,063 - 406,063 - 406,063 343,926 62,137 12 Hillside Meadows Oversizing and Channelization 2024 78,933 - 78,933 - 78,933 66,854 12,079 13 Net Present Value of Future Growth-Related Interest Payments 2024-2063 4,136,474 - 4,136,474 - 4,136,474 3,503,496 632,977 14 Post Period Benefit of Frankford and Trenton Connection 2024-2063 507,672 - 507,672 - 507,672 429,986 77,686 Studies - - - - - - - 15 Water / Wastewater Master Plan 2027-2033 100,000 - 100,000 25,000 75,000 63,523 11,477 16 Water / Wastewater Master Plan 2037-2043 100,000 - 100,000 25,000 75,000 63,523 11,477 - - - - - - - Reserve Fund Adjustment - - - - (530,875) (449,639) (81,236) - - - - - - - Total 52,535,199 - 52,535,199 20,360,900 - 31,643,424 26,801,238 4,842,186 Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) City Prj. No Gross Capital Cost Estimate (2024$) Post Period Benefit Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-12 Infrastructure Costs Covered in the D.C. Calculation - Wastewater Services City Prj. No Residential Share Non- Residential Share 2024-Buildout 84% 16% Trenton Sewers 1 WWT-1 New 2nd Dug Hill Sewer - HWY-2 to Hillside West 2024 4,208,000 - 4,208,000 111,000 4,097,000 3,453,192 643,808 2 WWT-2 FBI Trunk Upper 2nd Dug - Hillside West to Industrial Park 2024 17,160,000 - 17,160,000 3,353,000 13,807,000 11,637,350 2,169,650 3 WWT-3 FBI Trunk Lower - Industrial Park to Dufferin Ave 2024 1,413,000 - 1,413,000 40,000 1,373,000 1,157,245 215,755 4 WWT-4 FBI Trunk Lower - Dufferin Ave to Creswell Dr 2024 4,424,000 - 4,424,000 918,000 3,506,000 2,955,063 550,937 5 WWT-5 FBI Trunk Lower - Creswell Dr to River Crossing 2024 1,275,000 - 1,275,000 516,000 759,000 639,730 119,270 6 WWT-7 King- Catherine to Dufferin 2040 630,000 - 630,000 96,000 534,000 450,087 83,913 7 WWT-8 Wooler Rd- Davis to Store 2024 2,400,000 - 2,400,000 330,000 2,070,000 1,744,718 325,282 8 WWT-11 Telephone- DS of Glenburnie FM 2035 418,000 - 418,000 52,000 366,000 308,486 57,514 9 WWT-13 Front DS of Water St SPS 2031 8,585,000 - 8,585,000 4,023,000 4,562,000 3,845,121 716,879 10 WWT-14 Front US River Crossing 2031 455,000 - 455,000 178,000 277,000 233,472 43,528 11 River Crossing Twin Sanitary Sewer, Dundas St. P.S. Upgrade (NPV of Future Debt Payments) 2024-2050 14,442,858 - 14,442,858 4,568,300 9,874,558 8,322,857 1,551,701 12 Post Period Benefit of Previous River Crossing Twin Sanitary Sewer, Dundas St. P.S. Upgrade Debt Payments 2024 745,993 - 745,993 - 745,993 628,767 117,226 - - - - - - - Trenton Facilities - - - - - - - 13 WWT-17 Water St SPS Pump Expansion 2024 109,000 - 109,000 109,000 91,872 17,128 14 WWT-21 Douglas Rd SPS Pump Expansion 2030 165,000 - 165,000 - 165,000 139,072 25,928 15 WWT-22 Trenton Wastewater Treatment Plant 2028-2029 60,389,000 - 60,389,000 5,150,000 55,239,000 46,558,673 8,680,327 16 Unfunded Post Period Benefit (Trenton WW Plant) 2024 9,451,948 - 9,451,948 - 9,451,948 7,966,657 1,485,291 17 Biosolids Storage (Batawa/Frankford/Trenton) 2045 11,289,000 - 11,289,000 9,191,600 2,097,400 1,767,812 329,588 Frankford Sewers 18 WWF-1 N Trent St- Glenwood to Huffman 2031 1,397,000 - 1,397,000 681,000 716,000 603,487 112,513 19 WWF-2 N Trent St- North of Glenwood 2042 539,000 - 539,000 262,000 277,000 233,472 43,528 20 WWF-3 Kyle Ct- Mitchel to Huffman 2030 408,000 - 408,000 55,000 353,000 297,529 55,471 21 WWF-4 Huffman St- Kyle to Trent N 2030 113,000 - 113,000 17,000 96,000 80,914 15,086 22 WWF-5 Huffman St- Kyle to Trent N 2030 231,000 - 231,000 34,000 197,000 166,043 30,957 23 WWF-6 Huffman St- West of Kyle 2030 130,000 - 130,000 21,000 109,000 91,872 17,128 24 WWF-7 N Trent St- Huffman to Concession 2030 1,999,000 - 1,999,000 308,000 1,691,000 1,425,274 265,726 25 WWF-8 N Trent St- Concession towards WWTP 2030 527,000 - 527,000 80,000 447,000 376,758 70,242 26 WWF-9 N Trent St- Mill to Trent N SPS 2030 2,639,000 - 2,639,000 510,000 2,129,000 1,794,446 334,554 27 WWF-17 Riverside Pkwy- North of Stonegate 2030 1,097,000 - 1,097,000 188,000 909,000 766,159 142,841 28 WWF-18 Riverside Pkwy- South of Stonegate 2030 939,000 - 939,000 141,000 798,000 672,601 125,399 Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Net Capital Cost Watson & Associates Economists Ltd. PAGE 5-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 5-12 (cont'd) Infrastructure Costs Covered in the D.C. Calculation - Wastewater Services City Prj. No Residential Share Non- Residential Share 2024-Buildout 84% 16% Frankford Facilities 29 WWF-19 Oxford SPS FM Upgrade 2030 134,000 - 134,000 30,721 103,279 87,049 16,229 30 WWF-20 Riverside SPS Pump 2026-2027 4,635,000 - 4,635,000 695,250 3,939,750 3,320,653 619,097 31 WWF-21 Trent SPS Pump & FM Upgrade 2026 6,180,000 - 6,180,000 927,000 5,253,000 4,427,537 825,463 32 WWF-22 Frankford Wastewater Treatment Plant 2032 16,676,000 - 16,676,000 16,676,000 14,055,512 2,620,488 - - - Batawa Sewers & Facilities 33 WWB-1 Plant St from Fraser Dr to to WWTP 2042 1,092,000 - 1,092,000 134,000 958,000 807,459 150,541 34 WWB-3 Batawa Wastewater Treatment Plant 2042 4,604,000 - 4,604,000 - 4,604,000 3,880,522 723,478 - - - - - - Oversizing 35 Woodland Heights Forcemain 2024 422,597 - 422,597 422,597 356,190 66,407 36 Woodland Heights Sanitary Sewer Oversizing 2024 37,772 - 37,772 37,772 31,837 5,936 37 Woodland Heights Pumping Station 2024 1,270,779 - 1,270,779 1,270,779 1,071,087 199,692 38 Hillside Meadows Oversizing and Channelization 2024 693,448 - 693,448 693,448 584,479 108,969 39 Net Present Value of Future Growth-Related Interest Payments 2024-2063 28,070,628 28,070,628 28,070,628 23,659,573 4,411,054 Studies 40 Water / Wastewater Master Plan 2027-2033 100,000 - 100,000 25,000 75,000 63,214 11,786 41 Water / Wastewater Master Plan 2037-2043 100,000 - 100,000 25,000 75,000 63,214 11,786 Reserve Fund Adjustment - - - - (2,197,057) (1,851,809) (345,248) - - - - - - Total 211,596,023 - 211,596,023 32,660,871 - 176,738,095 148,965,244 27,772,851 Less: Benefit to Existing Development Grants, Subsidies and Other Contributions Attributable to New Development Total Potential D.C. Recoverable Cost Prj.No Increased Service Needs Attributable to Anticipated Development Timing (year) Gross Capital Cost Estimate (2024$) Post Period Benefit Net Capital Cost Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 6 D.C. Calculation Watson & Associates Economists Ltd. PAGE 6-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 6. D.C. Calculation The calculation of the maximum D.C.s that could be imposed by Council has been undertaken for the growth-related capital costs identified in Chapter 5. Table 6-1 presents the City-wide D.C. calculation for all City-wide services over the 10-year planning horizon (i.e., 2024-2033). Table 6-2 presents the D.C. calculation for services related to a highway over the 20-year planning horizon (i.e., 2024-2043). Finally, Table 6-3 presents the calculations for Water and Wastewater Services over the buildout period (i.e., 2024 - Urban Buildout). The calculation for residential development is generated on a per capita basis and is based upon four forms of housing types (single and semi-detached, apartments 2+ bedrooms, apartment's bachelor and 1 bedroom, all other multiples). The non- residential D.C. has been calculated uniformly on a per sq.m. of G.F.A. basis. Table 6-4 summarizes the recommended schedule of charges, reflecting the maximum D.C.s by residential dwelling type, per sq.m. of G.F.A. for non-residential development. Tables 6-5 and 6-6 compare the current charges to the calculated charges presented herein for residential (single and semi-detached) and non-residential (per sq.m. of G.F.A.), respectively. The residential City-wide charges in the fully serviced urban areas, will increase by $22,515 per unit (+150%) to $37,525 per unit, while the non- residential City-wide charges will increase by $120.04 per sq.m. (+164%) to $193.10. Watson & Associates Economists Ltd. PAGE 6-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 6-1 City-Wide Services D.C. Calculation 2024-2033 Table 6-2 City-Wide Services D.C. Calculation 2024-2043 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 1. Fire Protection Services 273,159 72,612 170 0.09 2. Policing Services 1,247,800 331,694 775 0.40 3. Transit Services 137,167 36,462 85 0.04 4. Parks and Recreation Services 862,220 45,380 535 0.06 5. Library Services 450,598 23,716 280 0.03 6. Ambulance 395,602 105,160 246 0.13 7. Waste Diversion 115,172 - 72 - 8. Growth-Related Studies 242,238 59,164 150 0.07 TOTAL $3,723,957 $674,188 $2,313 $0.82 D.C.-Eligible Capital Cost $3,723,957 $674,188 10-Year Gross Population/GFA Growth (sq.ft.) 4,419 817,700 Cost Per Capita/Non-Residential GFA (sq.ft.) $842.71 $0.82 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.743 $2,312 Other Multiples 1.970 $1,660 Apartments - 2 Bedrooms + 2.099 $1,769 Apartments - Bachelor and 1 Bedroom 1.193 $1,005 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 8. Services Related to a Highway 27,178,516 6,794,629 9,638 4.74 TOTAL $27,178,516 $6,794,629 $9,638 $4.74 D.C.-Eligible Capital Cost $27,178,516 $6,794,629 20-Year Gross Population/GFA Growth (sq.ft.) 7,735 1,433,300 Cost Per Capita/Non-Residential GFA (sq.ft.) $3,513.71 $4.74 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.743 $9,638 Other Multiples 1.970 $6,922 Apartments - 2 Bedrooms + 2.099 $7,375 Apartments - Bachelor and 1 Bedroom 1.193 $4,192 Watson & Associates Economists Ltd. PAGE 6-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 6-3 Area-Specific Water and Wastewater Services D.C. Calculation 2024-Urban Buildout Table 6-4 Schedule of Calculated D.C.s 2024$ D.C.-Eligible Cost 2024$ D.C.-Eligible Cost SERVICE/CLASS Residential Non-Residential S.D.U. per sq.ft. $ $ $ $ 9. Wastewater Services 148,965,244 27,772,851 21,674 10.54 10. Water Services 26,801,238 4,842,186 3,900 1.84 TOTAL $148,965,244 $27,772,851 $21,674 10.54 D.C.-Eligible Capital Cost $148,965,244 $27,772,851 Buildout Gross Population/GFA Growth (sq.ft.) 18,853 2,633,800 Cost Per Capita/Non-Residential GFA (sq.ft.) $7,901.41 $10.54 By Residential Unit Type P.P.U. Single and Semi-Detached Dwelling 2.743 $21,674 Other Multiples 1.970 $15,566 Apartments - 2 Bedrooms + 2.099 $16,585 Apartments - Bachelor and 1 Bedroom 1.193 $9,426 NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom (per sq.m. of Gross Floor Area) Municipal Wide Services Services Related to a Highway 9,638 6,922 7,375 4,192 51.02 Fire Protection Services 170 122 130 74 0.97 Policing Services 775 557 593 337 4.31 Transit Services 85 61 65 37 0.43 Parks and Recreation Services 535 384 409 233 0.65 Library Services 280 201 214 122 0.32 Ambulance 246 177 188 107 1.40 Waste Diversion 72 52 55 31 0.00 Growth-Related Studies 150 108 115 65 0.75 Total Municipal Wide Services 11,951 8,584 9,144 5,198 59.85 Urban Services Wastewater Services 21,674 15,566 16,585 9,427 113.45 Water Services 3,900 2,801 2,984 1,696 19.81 Total Urban Services 25,574 18,367 19,569 11,123 133.26 TOTAL RURAL AREA 11,951 8,584 9,144 5,198 59.85 TOTAL WATER ONLY SERVICED AREA 15,851 11,385 12,128 6,894 79.65 TOTAL URBAN AREA (WATER AND WASTEWATER SERVICES) 37,525 26,951 28,713 16,321 193.10 RESIDENTIAL Service Watson & Associates Economists Ltd. PAGE 6-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 6-5 Comparison of Current and Calculated D.C.s Residential Service Current Calculated $ Increase % Increase Municipal Wide Services Services Related to a Highway 4,669 9,638 4,969 106% Fire Protection Services 235 170 (65) -28% Policing Services 639 775 136 21% Transit Services 74 85 11 15% Parks and Recreation Services 394 535 141 36% Library Services 193 280 87 45% Ambulance 228 246 18 8% Waste Diversion 104 72 (32) -31% Administration Studies 64 150 86 134% Total Municipal Wide Services 6,600 11,951 5,351 81% Area Specific Services: Wastewater Services 7,358 21,674 14,316 195% Water Services 1,052 3,900 2,848 271% Total Area Specific Services 8,410 25,574 17,164 204% Grand Total - Urban Area 15,010 37,525 22,515 150% Watson & Associates Economists Ltd. PAGE 6-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 6-6 Comparison of Current and Calculated D.C.s Non-Residential Service Current Calculated $ Increase % Increase Municipal Wide Services/Classes: Services Related to a Highway 22.83 51.02 28.19 123% Fire Protection Services 1.20 0.97 (0.23) -19% Policing Services 3.30 4.31 1.01 30% Transit Services 0.38 0.43 0.05 13% Parks and Recreation Services 0.38 0.65 0.27 70% Library Services 0.18 0.32 0.14 79% Ambulance 1.18 1.40 0.22 19% Waste Diversion - - - Administration Studies 0.33 0.75 0.42 128% Total Municipal Wide Services 29.78 59.85 30.07 101% Area Specific Services: Wastewater Services 37.85 113.45 75.60 200% Water Services 5.43 19.81 14.38 265% Total Area Specific Services 43.28 133.26 89.98 208% Grand Total - Urban Area 73.06 193.10 120.04 164% Non-Residential (per sq.m.) Comparison Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 7 D.C. Policy Recommendations and D.C. Policy Rules Watson & Associates Economists Ltd. PAGE 7-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 7. D.C. Policy Recommendations and D.C. Policy Rules 7.1 Introduction This chapter outlines the D.C. policy recommendations and by-law rules. Subsection 5 (1) 9 of the D.C.A. states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection 6." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of D.C.s. Subsection 5 (6) establishes the following restrictions on the rules: - the total of all D.C.s that would be imposed on anticipated development must not exceed the capital costs determined under subsection 5 (1) 2-7 for all services involved; - if the rules expressly identify a type of development, they must not provide for it to pay D.C.s that exceed the capital costs that arise from the increase in the need for service for that type of development; however, this requirement does not relate to any particular development; and - if the rules provide for a type of development to have a lower D.C. than is allowed, the rules for determining D.C.s may not provide for any resulting shortfall to be made up via other development. With respect to "the rules," section 6 states that a D.C. by-law must expressly address the matters referred to above re subsection 5 (1) paragraphs 9 and 10, as well as how the rules apply to the redevelopment of land. The rules provided give consideration for the recent changes to the D.C.A. resulting from Bills 109, 23, 97, 134, and 185. However, these policies are provided for Council's consideration and may be refined prior to adoption of the by-law. Watson & Associates Economists Ltd. PAGE 7-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 7.2 D.C. By-law Structure It is recommended that: - The City uses a uniform City-wide D.C. calculation for Fire Protection Services, Policing Services, Transit Services, Parks and Recreation Services, Library Services, Ambulance Services, Waste Diversion Services, Services Related to a Highway, and Growth-Related Studies. Area-specific D.C. calculations are to be used for Water Services, and Wastewater Services in the areas to which the services apply. - The City uses one by-law for all services. 7.3 D.C. By-law Rules The following sets out the recommended rules governing the calculation, payment and collection of D.C.s in accordance with subsection 6 of the D.C.A. 7.3.1 Payment in any Particular Case In accordance with the D.C.A., s.2(2), a D.C. be calculated, payable and collected where the development requires one or more of the following: (a) the passing of a zoning by-law or of an amendment to a zoning by-law under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure. 7.3.2 Determination of the Amount of the Charge The following conventions be adopted: Watson & Associates Economists Ltd. PAGE 7-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 1) Costs allocated to residential uses will be assigned to different types of residential units based on the average occupancy for each housing type constructed during the previous 25-year period. Costs allocated to non-residential uses will be assigned based on the amount of square meters of G.F.A. constructed for eligible uses (i.e., primary, industrial, commercial, and institutional). 2) Costs allocated to residential and non-residential uses are based upon a number of conventions, as may be suited to each municipal circumstance, as follows: - For Fire Protection Services, Policing Services, and Ambulance Services, a 79% residential and 21% non-residential attribution has been made based on a population vs. employment growth ratio over the City-wide forecast period; - For Transit Services and Ambulance Services a 79% residential and 21% non-residential attribution has been made based on a population vs. employment growth ratio over the City-wide forecast period; - For Parks and Recreation Services and Library Services, a 5% non- residential attribution has been made to recognize use by the non-residential sector; - For Waste Diversion Services, 100% of the costs have been allocated to the residential sector; - For Water and Wastewater Services, the growth-related costs have been allocated to the residential and non-residential sector based on the anticipated water and wastewater flows over the forecast period; and - For Growth-Related Studies, an 80% residential and 20% non-residential attribution has been made based on the allocations summarized in Table 5-9. 7.3.3 Application to Redevelopment of Land (Demolition and Conversion) If a development involves the demolition and replacement of a building or structure on the same site, or the conversion from one principal use to another, the developer shall be allowed a credit equivalent to: - the number of dwelling units demolished/converted multiplied by the applicable residential D.C. in place at the time the D.C. is payable; and/or - the G.F.A. of the building demolished/converted multiplied by the current non- residential D.C. in place at the time the D.C. is payable. Watson & Associates Economists Ltd. PAGE 7-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx The demolition credit is allowed only if the land was improved by occupied structures, and if the demolition permit related to the site was issued less than 36 months (3 years) prior to the issuance of a building permit. The credit can, in no case, exceed the amount of D.C.s that would otherwise be payable. 7.3.4 Exemptions (full or partial) Statutory - The municipality or local board thereof; - A board of education; - Industrial additions of up to and including 50% of the existing G.F.A. of the building - for industrial additions which exceed 50% of the existing G.F.A., only the portion of the addition in excess of 50% is subject to D.C.s. Exemptions will only apply to 50% of the G.F.A. prior to the first expansion for which there was an exemption to the payment of D.C.s; - An enlargement to an existing dwelling unit; - Additional units in existing and new residential buildings: o May add up to two apartments for a single detached, semi-detached or row house (only one unit can be in an ancillary structure) o One additional unit or 1% of the units in an existing rental residential building with four or more residential units - Affordable Units, Attainable Units, and Inclusionary Zoning Units; - Non-Profit Housing; and - Universities. Non-Statutory - Where a lot levy, impost fee or development charge was collected as a condition for a lot created by consent pursuant to Section 53 of the Planning Act, R.S.O. 1990 c.P. 13; and - A grant equal to the calculated charge for residential and non-residential development within the commercial core areas. Watson & Associates Economists Ltd. PAGE 7-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 7.3.5 Transition Transition options such as the timing of the by-law becoming effective, phase-in policies, and policies related to active development applications will be considered through the public consultation process. 7.3.6 Timing of Collection The D.C.s for all services and classes are payable upon issuance of a building permit for each dwelling unit, building, or structure, subject to early or late payment agreements entered into by the City and an owner under section 27 of the D.C.A. Rental housing and institutional developments will pay D.C.s in six equal annual payments commencing at occupancy. Moreover, the D.C. amount for all developments occurring within 18 months of a Site Plan or Zoning By-law Amendment planning approval (for applications submitted after January 1, 2020), shall be determined based on the D.C. in effect on the day of the applicable Site Plan or Zoning By-law Amendment application. Installment payments and payments determined at the time of Site Plan or Zoning By- law Amendment application are subject to annual interest charges. The maximum interest rate the City can impose is the average prime rate plus 1% as defined in subsection. 26.3 (1) of the Act. 7.3.7 Indexing Indexing of the D.C.s shall be implemented on a mandatory basis annually on December 31 each year (commencing in 2025) in accordance with the Statistics Canada Quarterly, Non-Residential Building Construction Price Index (Table 18-10- 0135-01)1 for the most recent year-over-year period. 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-laws provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Watson & Associates Economists Ltd. PAGE 7-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 7.3.8 D.C Spatial Applicability The D.C.A. historically has provided the opportunity for a municipality to impose municipal-wide charges or area specific charges. Sections 2(7) and 2(8) of the D.C.A. provide that a D.C. by-law may apply to the entire municipality or only part of it and more than one D.C. by-law may apply to the same area. The D.C.A. now requires municipalities to consider the application of municipal-wide and area-specific D.C.s. s.10(2)(c.1) requires Council to consider the use of more than one D.C. by-law to reflect different needs from services in different areas. Most municipalities in Ontario have established uniform, municipal-wide D.C.s. The City's approach in prior by-laws has been to use area-specific charges for water and wastewater services. City-wide charges are imposed for all other services. When area-specific charges are used, it is generally to underpin master servicing and front-end financing arrangements for more localized capital costs or where services have a defined benefitting area. Based on the foregoing and discussions with City staff, area-specific D.C.s are suitable for Water Services and Wastewater Services. The recommendations are to continue to apply municipal-wide all other services. 7.4 Other D.C. By-law Provisions It is recommended that: 7.4.1 Categories of Services for Reserve Fund and Credit Purposes It is recommended that the City's D.C. collections be contributed into 11 separate reserve funds, including: - Fire Protection Services; - Policing Services; - Transit Services; - Parks and Recreation Services; - Library Services; - Ambulance Services; - Waste Diversion Services; - Services Related to a Highway; - Growth-Related Studies; Watson & Associates Economists Ltd. PAGE 7-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - Water Services; and - Wastewater Services. 7.4.2 By-law In-force Date The by-law will come into effect on a date to be determined by City Council. 7.4.3 Minimum Interest Rate Paid on Refunds and Charged for Inter- Reserve Fund Borrowing The minimum interest rate is the Bank of Canada rate on the day on which the by-laws come into force (as per s.11 of O. Reg. 82/98). 7.5 Other Recommendations It is recommended that Council: "Adopt the D.C. approach to calculate the charges on an area-specific bases for water and wastewater services, and on a uniform City-wide bases for all other services within this background study." "Approve the capital project listing set out in Chapter 5 of the D.C. Background Study dated June 13, 2024, subject to further annual review during the capital budget process." "Approve the D.C. Background Study dated June 13, 2024." "Determine that no further public meeting is required." and "Approve the D.C. By-law as set out in Appendix E". Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 8 Asset Management Plan Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 8. Asset Management Plan 8.1 Introduction The D.C.A. (new section 10 (c.2)) requires that the background study must include an Asset Management Plan (A.M.P) related to new infrastructure. Section 10 (3) of the D.C.A. provides: The A.M.P. shall, a) deal with all assets whose capital costs are proposed to be funded under the development charge by-law; b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; c) contain any other information that is prescribed; and d) be prepared in the prescribed manner. At a broad level, the A.M.P. provides for the long-term investment in an asset over its entire useful life along with the funding. The schematic below identifies the costs for an asset through its entire lifecycle. For growth-related works, the majority of capital costs will be funded by the D.C. Non-growth-related expenditures will then be funded from non-D.C. revenues as noted below. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-D.C. financing sources. The Province's Infrastructure for Jobs and Prosperity Act, 2015 (IJPA) was proclaimed on May 1, 2016. This legislation detailed principles for evidence-based and sustainable long-term infrastructure planning. The IJPA also gave the Province the authority to guide municipal asset management planning by way of regulation. In late 2017, the Province introduced O. Reg. 588/17 under the IJPA. The intent of O. Reg. 588/17 is to establish standard content for municipal asset management plans. Specifically, the regulations require that asset management plans be developed that define the current levels of service, identify the lifecycle activities that would be undertaken to achieve these levels of service, and provide a financial strategy to support the levels of service Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx and lifecycle activities. The requirements of O. Reg. 588/17 generally align with previous provincial AMP requirements, as follows: State of local infrastructure: asset types, quantities, age, condition, financial accounting valuation and replacement cost valuation. Desired levels of service: defines levels of service through performance measures and discusses any external trends or issues that may affect expected levels of service or the municipality's ability to meet them (for example, new accessibility standards, climate change impacts). Asset management strategy: the asset management strategy is the set of planned actions that will seek to generate the desired levels of service in a sustainable way, while managing risk, at the lowest lifecycle cost. Financing strategy: having a financial plan is critical for putting an A.M.P. into action. By having a strong financial plan, municipalities can also demonstrate that they have Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal New Assets Replacement Assets Reserves/Reserve Funds Debentures User Fees Grants Other Proceeds on Disposal Funding of Disposal / Decommissioning Costs Operating Budget Financing Methods Purchase Install Commission Operate Maintain Monitor (Throughout Life of Assets) (To End of Useful Life) Removal/Decommission Disposal Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx made a concerted effort to integrate the A.M.P. with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. The asset management requirement for this D.C. Background Study has been undertaken independently of any City A.M.P.s. 8.2 Non-Transit Services In recognition to the schematic in Section 8.1, the following table (presented in 2024$) has been developed to provide the annualized expenditures and revenues associated with new growth. Note that the D.C.A. does not require an analysis of the non-D.C. capital needs or their associated operating costs so these are omitted from the table below. As such, the following does not represent a fiscal impact assessment (including future tax/rate increases) but provides insight into the potential affordability of the new assets: 1. The non-D.C. recoverable portion of the projects which will require financing from City financial resources (i.e., taxation, rates, fees, etc.). This amount has been presented on an annual debt charge amount based on 20-year financing. 2. Lifecycle costs for the 2024 D.C. capital works have been presented based on a sinking fund basis. The assets have been considered over their estimated useful lives. 3. Incremental operating costs for the D.C. services (only) have been included. 4. The resultant total annualized expenditures are $25.4 million. Of this total, $10.5 million relates the annual debt payment costs for benefit to existing development of growth-related needs. 5. Consideration was given to the potential new taxation and user fee revenues which will be generated as a result of new growth. These revenues will be available to finance the expenditures above. The new operating revenues are $22.4 million. This amount, totalled with the existing operating revenues of $12.7 million, provides annual revenues of $144.1 million by the end of the period. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 6. In consideration of the above, the capital plan is deemed to be financially sustainable when considering the impacts on a City-wide basis. Table 8-1 Asset Management - Future Expenditures and Associated Revenues (2024$) 8.3 Transit Services In regard to the D.C.A. requirements for asset management for transit services, Ontario Regulation 82/98 (as amended) provides the following: "8(3) If a council of a municipality proposes to impose a development charge in respect of transit services, the asset management plan referred to in subsection 10 (2) (c.2) of the Act shall include the following in respect of those services" 2043 (Total) Expenditures (Annualized) Annual Debt Payment on Non-Growth Related Capital1 $10,520,058 Annual Debt Payment on Post Period Capital2 $2,297,299 Lifecycle: Annual Lifecycle - Municipal-wide Services $1,739,417 Annual Lifecycle - Area-specific Services3 $4,849,526 Sub-Total - Annual Lifecycle $6,588,943 Incremental Operating Costs (for D.C. Services) $6,021,941 Total Expenditures $25,428,242 Revenue (Annualized) Total Existing Revenue4 $121,709,548 Incremental Tax and Non-Tax Revenue (User Fees, Fines, Licences, etc.) $22,378,838 Total Revenues $144,088,386 4 As per Sch. 10 of FIR 3 All infastructure costs included in Area Specifc calculations have been included 1 Non-Growth Related component of Projects 2 Interim Debt Financing for Post Period Benefit Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Provided in Table 8-2 are the individual items prescribed by subsection 8(3) of the Regulation (as amended), which are addressed in the following sections. Table 8-2 Transit Services D.C. Background Study A.M.P. Requirements Ontario Regulation 82/98, as amended subsection 8(3) Requirements 1. A section that sets out the state of local infrastructure and that sets out, i. the types of assets and their quantity or extent, ii. the financial accounting valuation and replacement cost valuation for all assets, iii. the asset age distribution and asset age as a proportion of expected useful life for all assets, and iv. the asset condition based on standard engineering practices for all assets. 2. A section that sets out the proposed level of service and that, i. defines the proposed level of service through timeframes and performance measures, ii. discusses any external trends or issues that may affect the proposed level of service or the municipality's ability to meet it, and iii. shows current performance relative to the targets set out. 3. An asset management strategy that, i. sets out planned actions that will enable the assets to provide the proposed level of service in a sustainable way, while managing risk, at the lowest life cycle cost, ii. is based on an assessment of potential options to achieve the proposed level of service, which assessment compares, A. life cycle costs, B. all other relevant direct and indirect costs and benefits, and C. the risks associated with the potential options, iii. contains a summary of, in relation to achieving the proposed level of service, (not defined clearly) A. non-infrastructure solutions, B. maintenance activities, C. renewal and rehabilitation activities, D. replacement activities, E. disposal activities, and F. expansion activities, iv. discusses the procurement measures that are intended to achieve the proposed level of service, and v. includes an overview of the risks associated with the strategy and any actions that will be taken in response to those risks. 4. A financial strategy that, i. shows the yearly expenditure forecasts that are proposed to achieve the proposed level of service, categorized by, A. non-infrastructure solutions, B. maintenance activities, C. renewal and rehabilitation activities, D. replacement activities, E. disposal activities, and F. expansion activities, ii. provides actual expenditures in respect of the categories set out in sub-subparagraphs i A to F from the previous two years, if available, for comparison purposes, iii. gives a breakdown of yearly revenues by source, iv. discusses key assumptions and alternative scenarios where appropriate, (see associated text) and v. identifies any funding shortfall relative to financial requirements that cannot be eliminated by revising service levels, asset management or financing strategies, and discusses the impact of the shortfall and how the impact will be managed. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 8.3.1 State of Local Infrastructure To present an overall state of the infrastructure for transit assets, asset inventory, asset valuation, and age have been summarized from information provided by City staff. The transit assets included in this A.M.P. are the 27 Transit Services fleet vehicles. Provided in Table 8-3 is a high-level summary of the transit assets, useful life estimates, age, and replacement costs. In total, transit assets within the City have a replacement value of $2.9 million. Table 8-3 Asset Inventory and Valuation Asset age and useful life has been compiled from data received from the City. In aggregate, transit fleet has an average useful life of 7 years and are 7.3 years old. Summarized in Table 8-4 is the distribution of total asset replacement value by the percentage of estimated useful life consumed. Based on the distribution of replacement value, all of the transit assets have consumed greater than 50% of their useful lives while two thirds have consumed more than 75% of their respective useful lives. This distribution is reflective of the City's current fleet replacement practices. Table 8-4 Distribution of Asset Value by Percentage of Useful Life Consumed The City maintains a regular replacement schedule of transit vehicles as required on a condition basis or to meet with changes in regulations. 8.3.2 Expected Levels of Service A level of service (L.O.S.) analysis gives the City an opportunity to document the L.O.S. that is currently being provided and compare it to the L.O.S. that is expected. This can Description Number of Vehicles Useful Life Age Total Replacement Costs Transit Fleet 27 7 7.3 2,912,000 Description 0-25% 25%-50% 50%-75% 75%-100% Total Asset Replacement Value - - 959,282 1,952,718 % of Asset Replacement Value 0% 0% 33% 67% Percentage of Useful Life Consumed Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx be done through a review of current practices and procedures, an examination of trends or issues facing the City, or through an analysis of performance measures and targets that staff can use to measure performance. Expected L.O.S. can be impacted by a number of factors, including: 1. Legislative requirements; 2. Strategic planning goals and objectives; 3. Resident expectations; 4. Council or City staff expectations; and 5. Financial or resource constraints. The previous task of determining the state of the City's asset infrastructure establishes the asset inventory and condition, to guide the refinement and upkeep of asset infrastructure. It is important to document an expected L.O.S. that is realistic to the City. It is common to strive for the highest L.O.S., however these service levels usually come at a cost. It is also helpful to consider the risk associated with a certain L.O.S. Therefore, expected L.O.S. should be determined in a way that balances both level of investment and associated risk to the City. The City's capital budget forecast and Transit Service expansion plans measure the planned level of service in terms of increased ridership, replacement of buses and operational improvements (i.e. service expansion). The City will be maintaining existing services in addition to the having recently introduced a new route to continue to improve and expand services. 8.3.3 Asset Management Strategy The asset management strategy provides the recommended course of actions required to deliver the expected L.O.S. discussed in the previous section in a sustainable fashion. The course of actions, when combined together, form a long-term operating and capital forecast that includes: a) Non-infrastructure solutions: reduce costs and/or extend expected useful life estimates; Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx b) Maintenance activities: regularly scheduled activities to maintain existing useful life levels, or repairs needed due to unplanned events; c) Renewal/Rehabilitation: significant repairs or maintenance planned to increase the useful life of assets; d) Replacement/Disposal: complete disposal and replacement of assets, when renewal or rehabilitation is no longer an option; and e) Expansion: given planned growth as outlined in Chapter 3. The planned level of service primarily includes infrastructure-related solutions such as improving services (i.e. technology modernization) and additional transit shelters/hubs. Furthermore, the City will also require an additional specialized on demand transit bus and the creation of additional outdoor vehicle storage to accommodate the increase in fleet that was identified in the prior D.C. background study. This planned level of service will result in both operating and capital budget impacts over the forecast period. This has to be taken into consideration with the objective of increasing ridership while mitigating risk. Table 8-5 presents the annual lifecycle costs for the transit service assets based on the recommended actions described above. A fundamental approach to calculating the cost of using a capital asset and for the provision of the revenue required when the time comes to retire and replace it is the "sinking fund method". This method first estimates the future value of the asset at the time of replacement, by inflating the current value of the asset at an assumed annual capital inflation rate. A calculation is then performed to determine annual contributions which, when invested in a reserve fund, will grow with interest to a balance equal to the future replacement cost. The contributions are calculated such that they also increase annually with inflation. Table 8-5 Annual Lifecycle Cost Description Annual Lifecycle Cost Transit Shelters/Hubs 3,900 Outside Vehicle Storage with Power 2,586 Specialized On-Demand Bus 9,866 Tranist Bus Tech Modernization 22,524 Total 38,876 Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 8.3.4 Financing Strategy The financing strategy outlines the suggested financial approach to fund the recommended asset management strategy outlined in Section 8.3.3. This forecast expands on the City's 2024 operating and capital budgets. The financial forecast within this section of the asset management plan includes: 1. Annual expenditure forecasts broken down by: - Maintenance/non-infrastructure solutions; - Renewal/rehabilitation activities; - Replacement/disposal activities; and - Expansion activities. 2. A breakdown of annual funding/revenue by source. A summary of the replacement/disposal and expansionary capital needs over the 10- year forecast period are presented in Table 8-6. Table 8-6 Replacement/Disposal and Expansionary Capital The financing strategy forecast, presented in Table 8-7, assumes that all non-D.C.- eligible costs, not proposed to be funded (i.e. replacement capital and non-growth capital) will be debt funded. Furthermore, operating costs have been forecast to increase by 8% over the forecast period based on the anticipated increase in ridership. Description Total Replacement / Disposal Fleet New Transit Buses 2,080,000 Mobility Buses 840,000 Yearly Allotment for Shelters 230,000 Expansion Activities Fleet Transit Shelters/Hubs 64,000 Outside Vehicle Storage with Power 71,000 Specialized On-Demand Bus 64,000 Tranist Bus Tech Modernization 369,000 Total 3,718,000 Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Transit passenger revenues have been forecast such that the relationship of fare revenue to ridership is maintained. No changes to miscellaneous revenue sources have been assumed beyond those identified in the 2024 budget. Tax based support to fund operating and capital costs not funded from other sources (e.g. D.C.s and gas tax) is forecast to increase from $1.5 to $1.8 million over the forecast period. Watson & Associates Economists Ltd. PAGE 8-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table 8-7 Financing Strategy Description 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Maintenance / Non-Infrastructure Solutions Base Operating Costs1 2,362,632 2,362,632 2,362,632 2,362,632 2,362,632 2,362,632 2,362,632 2,362,632 2,362,632 2,362,632 Incremental Operating Costs2 18,723 37,447 56,170 74,893 93,616 112,340 131,063 149,786 168,510 187,233 Replacement / Disposal Debt Funded Fleet New Transit Buses 15,000 30,000 45,000 60,000 75,000 90,000 105,000 120,000 135,000 Mobility Buses 6,000 12,000 18,000 24,000 30,000 36,000 42,000 48,000 54,000 Yearly Allotment for Shelters 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Expansion Activities3 D.C. Funded Transit Shelters/Hubs 486 486 486 486 486 486 486 486 486 486 Outside Vehicle Storage with Power 539 539 539 539 539 539 539 539 539 539 Specialized On-Demand Bus 486 486 486 486 486 486 486 486 486 486 Tranist Bus Tech Modernization 2,801 2,801 2,801 2,801 2,801 2,801 2,801 2,801 2,801 2,801 Debt Funded Fleet Transit Shelters/Hubs 400 800 1,200 1,600 2,000 2,400 2,800 3,200 3,600 Outside Vehicle Storage with Power 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 Specialized On-Demand Bus 400 800 1,200 1,600 2,000 2,400 2,800 3,200 3,600 Tranist Bus Tech Modernization 2,400 4,800 7,200 9,600 12,000 14,400 16,800 19,200 21,600 Total 2,385,667 2,427,390 2,469,113 2,510,836 2,552,560 2,594,283 2,636,006 2,677,730 2,719,453 2,761,176 1. 2024 Operating Budget 3. Estimated Timing of Expansion Activities Description 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Operating Fares 255,476 255,476 255,476 255,476 255,476 255,476 255,476 255,476 255,476 255,476 Incremental Fare Revenue2 2,025 4,049 7,220 10,390 13,561 16,732 19,902 23,073 26,244 29,414 Other (Gas Tax) 532,000 532,000 532,000 532,000 532,000 532,000 532,000 532,000 532,000 532,000 Capital D.C. Revenue 4,311 4,311 4,311 4,311 4,311 4,311 4,311 4,311 4,311 4,311 Reserves 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 Municipal Contribution 1,509,355 1,549,053 1,587,606 1,626,159 1,664,711 1,703,264 1,741,817 1,780,369 1,818,922 1,857,474 Total 2,385,667 2,427,390 2,469,113 2,510,836 2,552,560 2,594,283 2,636,006 2,677,730 2,719,453 2,761,176 1. 2024 Operating Budget Expenditure Forecast Revenue Forecast 2. Forecast based on ridership increase. 2. Forecast based on ridership increase. Watson & Associates Economists Ltd. PAGE 8-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Chapter 9 By-law Implementation Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 9. By-law Implementation 9.1 Public Consultation Process 9.1.1 Introduction This chapter addresses the mandatory, formal public consultation process (section 9.1.2), as well as the optional, informal consultation process (section 9.1.3). The latter is designed to seek the co-operation and participation of those involved, in order to produce the most suitable policy. Section 9.2 addresses the anticipated impact of the D.C. on development from a generic viewpoint. 9.1.2 Public Meeting of Council Section 12 of the D.C.A. indicates that before passing a D.C. by-law, Council must hold at least one public meeting, giving at least 20 clear days' notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background report are made available to the public at least two weeks prior to the (first) meeting. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, Council must determine whether a further meeting (under this section) is necessary (i.e., if the proposed by-law which is proposed for adoption has been changed in any respect, Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution). It is noted that Council's decision, once made, is final and not subject to review by a Court or the Ontario Land Tribunal (O.L.T.). 9.1.3 Other Consultation Activity There are three broad groupings of the public who are generally the most concerned with municipal D.C. policy: 1. The first grouping is the residential development community, consisting of land developers and builders, who are typically responsible for generating the majority Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx of the D.C. revenues. Others, such as realtors, are directly impacted by D.C. policy. They are, therefore, potentially interested in all aspects of the charge, particularly the quantum by unit type, projects to be funded by the D.C. and the timing thereof, and municipal policy with respect to development agreements, D.C. credits and front-ending requirements. 2. The second public grouping embraces the public at large and includes taxpayer coalition groups and others interested in public policy. 3. The third grouping is the industrial/commercial/institutional/primary development sector, consisting of land developers and major owners or organizations with significant construction plans, such as hotels, entertainment complexes, shopping centres, offices, industrial buildings, institutional buildings, and buildings on agricultural lands. Also involved are organizations such as Industry Associations, the Chamber of Commerce, the Board of Trade and the Economic Development Agencies, who are all potentially interested in City D.C. policy. Their primary concern is frequently with the quantum of the charge, gross floor area exclusions such as basements, mechanical or indoor parking areas, or exemptions and phase-in or capping provisions in order to moderate the impact. 9.2 Anticipated Impact of the Charge on Development The establishment of sound D.C. policy often requires the achievement of an acceptable balance between two competing realities. The first is that high non- residential D.C.s can, to some degree, represent a barrier to increased economic activity and sustained industrial/commercial growth, particularly for capital intensive uses. Also, in many cases, increased residential D.C.s can ultimately be expected to be recovered via housing prices and can impact project feasibility in some cases (e.g., rental apartments). On the other hand, D.C.s or other municipal capital funding sources need to be obtained in order to help ensure that the necessary infrastructure and amenities are installed. The timely installation of such works is a key initiative in providing adequate service levels and in facilitating strong economic growth, investment, and wealth generation. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 9.3 Implementation Requirements 9.3.1 Introduction Once the City has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The sections that follow present an overview of the requirements in each case. 9.3.2 Notice of Passage In accordance with section 13 of the D.C.A., when a D.C. by-law is passed, the City's Clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e., as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements which are summarized as follows: - notice may be given by publication in a newspaper which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax, or mail to every owner of land in the area to which the by-law relates; - subsection 10 (4) lists the persons/organizations who must be given notice; and - subsection 10 (5) lists the eight items that the notice must cover. 9.3.3 By-law Pamphlet In addition to the "notice" information, the City must prepare a "pamphlet" explaining each D.C. by-law in force, setting out: - a description of the general purpose of the D.C.s; Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx - the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge; - the services to which the D.C.s relate; and - a description of the general purpose of the Treasurer's statement and where it may be received by the public. Where a by-law is not appealed to the O.L.T., the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The City must give one copy of the most recent pamphlet without charge, to any person who requests one. 9.3.4 Appeals Sections 13 to 19 of the D.C.A. set out the requirements relative to making and processing a D.C. by-law appeal and O.L.T. hearing in response to an appeal. Any person or organization may appeal a D.C. by-law to the O.L.T. by filing a notice of appeal with the City Clerk, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. The City is conducting a public consultation process in order to address the issues that come forward as part of that process, thereby avoiding or reducing the need for an appeal to be made. 9.3.5 Complaints A person required to pay a D.C., or his agent, may complain to the City Council imposing the charge that: - the amount of the charge was incorrectly determined; - the reduction to be used against the D.C. was incorrectly determined; or - there was an error in the application of the D.C. Sections 20 to 25 of the D.C.A. set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a D.C. (or any part of it) is payable. A complainant may appeal the decision of City Council to the O.L.T. Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 9.3.6 Credits Sections 38 to 41 of the D.C.A. set out a number of credit requirements, which apply where a municipality agrees to allow a person to perform work in the future that relates to a service in the D.C. by-law. These credits would be used to reduce the amount of D.C.s to be paid. The value of the credit is limited to the reasonable cost of the work which does not exceed the average level of service. The credit applies only to the service to which the work relates unless the municipality agrees to expand the credit to other services for which a D.C. is payable. 9.3.7 Front-Ending Agreements The City and one or more landowners may enter into a front-ending agreement that provides for the costs of a project that will benefit an area in the City to which the D.C. by-law applies. Such an agreement can provide for the costs to be borne by one or more parties to the agreement who are, in turn, reimbursed in future by persons who develop land defined in the agreement. Part III of the D.C.A. (sections 44 to 58) addresses front-ending agreements and removes some of the obstacles to their use which were contained in the Development Charges Act, 1989. Accordingly, the City assesses whether this mechanism is appropriate for its use, as part of funding projects prior to City funds being available. 9.3.8 Severance and Subdivision Agreement Conditions Section 59 of the D.C.A. prevents a municipality from imposing directly or indirectly, a charge related to development or a requirement to construct a service related to development, by way of a condition or agreement under section 51 or section 53 of the Planning Act, except for: - "local services, related to a plan of subdivision or within the area to which the plan relates, to be installed or paid for by the owner as a condition of approval under section 51 of the Planning Act;" and - "local services to be installed or paid for by the owner as a condition of approval under section 53 of the Planning Act." Watson & Associates Economists Ltd. H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx It is also noted that subsection 59 (4) of the D.C.A. requires that the municipal approval authority for a draft plan of subdivision under subsection 51 (31) of the Planning Act, use its power to impose conditions to ensure that the first purchaser of newly subdivided land is informed of all the D.C.s related to the development, at the time the land is transferred. In this regard, if the municipality in question is a commenting agency, in order to comply with subsection 59 (4) of the D.C.A. it would need to provide to the approval authority information regarding the applicable municipal D.C.s related to the site. If the City is an approval authority for the purposes of section 51 of the Planning Act, it would be responsible to ensure that it collects information from all entities that can impose a D.C. The most effective way to ensure that purchasers are aware of this condition would be to require it as a provision in a registered subdivision agreement, so that any purchaser of the property would be aware of the charges at the time the title was searched prior to closing a transaction conveying the lands. Appendices Watson & Associates Economists Ltd. PAGE A-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix A Background Information on Residential and Non- Residential Growth Forecast Watson & Associates Economists Ltd. PAGE A-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 1 City of Quinte West Residential Growth Forecast Summary [1] Population includes the Census undercount estimated at approximately 2.7% and has been rounded. [2] Includes townhouses and apartments in duplexes. [3] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. [4] Urban buildout forecast is based on the ultimate servicing capacity identified in the City of Quinte West 2021 Water and Wastewater Master Plan Report - Final, December 6, 2021. It is important to note urban buildout is based on servicing potential for the urban area, and the ultimate servicing capacity exceeds currently designated urban lands. Notes: Numbers may not add due to rounding. Source: Derived from the City of Quinte West Official Plan, 2023 10 Year Review Draft Document, the City of Quinte West 2022 Residential Land Needs Assessment Report, March 2022, and the City of Quinte West 2021 Water and Wastewater Master Plans, Master Plan Report - Final, December 6, 2021, Jacobs, by Watson & Associates Economists Ltd. Population Institutional Population Population Excluding Institutional Population Singles & Semi- Detached Multiple Dwellings[2] Apartments[3] Other Total Households Equivalent Institutional Households 44,240 43,086 536 42,550 13,854 586 2,474 468 17,382 487 2.479 44,750 43,577 712 42,865 14,330 665 2,425 415 17,835 647 2.443 47,810 46,560 580 45,980 15,360 740 2,535 425 19,060 527 2.443 49,210 47,922 597 47,325 15,791 787 2,632 425 19,635 543 2.441 53,250 51,861 649 51,212 16,959 1,085 2,991 425 21,460 590 2.417 56,670 55,183 687 54,496 17,666 1,407 3,416 425 22,914 625 2.408 68,697 66,899 834 66,065 19,554 2,784 5,260 425 28,023 758 2.387 510 491 176 315 476 79 -49 -53 453 160 3,060 2,983 -132 3,115 1,030 75 110 10 1,225 -120 1,400 1,362 17 1,345 431 47 97 0 575 16 4,040 3,939 52 3,887 1,168 298 359 0 1,825 47 7,460 7,261 90 7,171 1,875 620 784 0 3,279 82 19,487 18,977 237 18,740 3,763 1,997 2,628 0 8,388 215 Early 2024 - Early 2034 Forecast Early 2024 - Early 2044 Incremental Early 2024 - Urban Buildout[4] Historical Early 2044 Urban Buildout [4] Mid 2011 - Mid 2016 Mid 2016 - Mid 2021 Mid 2011 Mid 2016 Mid 2021 Early 2024 Early 2034 Mid 2021 - Early 2024 Population (Including Census Undercount)[1] Year Excluding Census Undercount Housing Units Person Per Unit (P.P.U.): Total Population/ Total Households Watson & Associates Economists Ltd. PAGE A-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Figure 1 City of Quinte West Annual Housing Forecast [1] [1] Growth forecast represents calendar year. Source: Historical housing activity derived from City of Quinte West building permit data, 2013 to July 2023 year-to-date, by Watson & Associates Economists Ltd. 98 108 182 320 259 222 342 233 266 209 200 200 200 185 185 185 185 185 160 160 160 160 160 145 145 145 145 145 132 131 131 0 50 100 150 200 250 300 350 400 Housing Units Years Historical Low Density Medium Density High Density Historical Average Watson & Associates Economists Ltd. PAGE A-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 2 City of Quinte West Estimate of the Anticipated Amount, Type and Location of Residential Development for Which Development Charges can be Imposed [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. [3] Urban buildout forecast is based on the ultimate servicing capacity identified in the City of Quinte West 2021 Water and Wastewater Master Plan Report - Final, December 6, 2021. It is important to note urban buildout is based on servicing potential for the urban area, and the ultimate servicing capacity exceeds currently designated urban lands. Source: Derived from the City of Quinte West Official Plan, 2023 10 Year Review Draft Document, the City of Quinte West 2022 Residential Land Needs Assessment Report, March 2022, and the City of Quinte West 2021 Water and Wastewater Master Plans, Master Plan Report - Final, December 6, 2021, Jacobs, by Watson & Associates Economists Ltd. 2024 - 2034 949 298 359 1,606 3,818 (372) 3,445 52 3,497 2024 - 2044 1,455 620 784 2,859 6,583 (395) 6,188 90 6,278 2024 - Urban Buildout[3] 3,763 1,997 2,628 8,388 18,853 (113) 18,740 237 18,977 2024 - 2034 219 0 0 219 601 (160) 441 0 441 2024 - 2044 420 0 0 420 1,152 (169) 983 0 983 2024 - 2034 1,168 298 359 1,825 4,419 (532) 3,887 52 3,939 2024 - 2044 1,875 620 784 3,279 7,735 (564) 7,171 90 7,261 2024 - Urban Buildout[3] 3,763 1,997 2,628 8,388 18,853 (113) 18,740 237 18,977 Rural City of Quinte West Urban Location Residential Units In New Units Population Change Gross Population Existing Unit Net Population Increase, Excluding Institutional Institutional Population Net Population Including Institutional Development Timing Single & Semi- Detached Multiples[1] Apartments[2] Total Watson & Associates Economists Ltd. PAGE A-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 3 City of Quinte West Current Year Growth Forecast Mid-2021 to Early-2024 Mid 2021 Population 46,560 Occupants of Units (2) 575 New Housing Units, multiplied by P.P.U. (3) 2.470 Mid 2021 to Early 2024 gross population increase 1,420 1,420 Occupants of New Units 16 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Mid 2021 to Early 2024 gross population increase 17 17 Decline in Housing Units (4) 19,060 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.004 Mid 2021 to Early 2024 total decline in population -75 -75 Population Estimate to Early 2024 47,922 Net Population Increase, Mid 2021 to Early 2024 1,362 (1) 2021 population based on Statistics Canada Census unadjusted for Census undercount. (2) (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.625 75% 1.968 Multiples (6) 2.413 8% 0.197 Apartments (7) 1.807 17% 0.305 Total 100% 2.470 ¹ Based on 2021 Census custom database ² Based on Building permit/completion activity (4) 2021 households taken from Statistics Canada Census. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Estimated residential units constructed, Mid-2021 to the beginning of the growth period assuming a six-month lag between construction and occupancy. Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 4a City of Quinte West 10-Year Growth Forecast Early-2024 to Early-2034 Early 2024 Population 47,922 Occupants of Units (2) 1,825 New Housing Units, multiplied by P.P.U. (3) 2.421 Early 2024 to Early 2034 gross population increase 4,419 4,419 Occupants of New Units 47 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2024 to Early 2034 gross population increase 52 52 Decline in Housing Units (4) 19,635 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.027 Early 2024 to Early 2034 total decline in population -532 -532 Population Estimate to Early 2034 51,861 Net Population Increase, Early 2024 to Early 2034 3,939 (1) Early 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.743 64% 1.755 Multiples (6) 1.970 16% 0.322 Apartments (7) 1.749 20% 0.344 one bedroom or less 1.193 two bedrooms or more 2.099 Total 100% 2.421 ¹ Persons per unit based on adjusted Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2024 households based upon 2021 Census (19,060 units) + Mid 2021 to Early 2024 unit estimate (575 units) = 19,635 units. (5) (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. Population 2021 Population (46,560) + Mid 2021 to Early 2024 estimated housing units to beginning of forecast period (575 x 2.47 = 1,420) + (16 x 1.1 = 17) + (19,060 x -0.004 = -75) = 47,922 Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 4b City of Quinte West 20-Year Growth Forecast Early-2024 to Early-2044 Early 2024 Population 47,922 Occupants of Units (2) 3,279 New Housing Units, multiplied by P.P.U. (3) 2.359 Early 2024 to Early 2044 gross population increase 7,735 7,735 Occupants of New Units 82 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2024 to Early 2044 gross population increase 90 90 Decline in Housing Units (4) 19,635 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.029 Early 2024 to Early 2044 total decline in population -564 -564 Population Estimate to Early 2044 55,183 Net Population Increase, Early 2024 to Early 2044 7,261 (1) Early 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.743 57% 1.569 Multiples (6) 1.970 19% 0.372 Apartments (7) 1.749 24% 0.418 one bedroom or less 1.193 two bedrooms or more 2.099 Total 100% 2.359 ¹ Persons per unit based on Statistics Canada Custom 2021 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2024 households based upon 2021 Census (19,060 units) + Mid 2021 to Early 2024 unit estimate (575 units) = 19,635 units. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. 2021 Population (46,560) + Mid 2021 to Early 2024 estimated housing units to beginning of forecast period (575 x 2.47 = 1,420) + (16 x 1.1 = 17) + (19,060 x -0.004 = -75) = 47,922 Population Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average Watson & Associates Economists Ltd. PAGE A-8 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 5 City of Quinte West Urban Buildout Growth Forecast Early-2024 to Urban Buildout Early 2024 Population 47,922 Occupants of Units (2) 8,388 New Housing Units, multiplied by P.P.U. (3) 2.248 Early 2024 to Urban Buildout gross population increase 18,853 18,853 Occupants of New Units 215 Equivalent Institutional Units, multiplied by P.P.U. (3) 1.100 Early 2024 to Urban Buildout gross population increase 237 237 Decline in Housing Units (4) 19,635 Unit Occupancy, multiplied by P.P.U. decline rate (5) -0.006 Early 2024 to Urban Buildout total decline in population -113 -113 Population Estimate to Urban Buildout 66,899 Net Population Increase, Early 2024 to Urban Buildout 18,977 (1) Early 2024 Population based on: (2) Based upon forecast building permits/completions assuming a lag between construction and occupancy. (3) Average number of persons per unit (P.P.U.) is assumed to be: Singles & Semi Detached 2.743 45% 1.231 Multiples (6) 1.970 24% 0.469 Apartments (7) 1.749 31% 0.548 one bedroom or less 1.193 two bedrooms or more 2.099 Total 100% 2.248 ¹ Persons per unit based on Statistics Canada Custom 2016 Census database. ² Forecast unit mix based upon historical trends and housing units in the development process. (4) Early 2024 households based upon 2021 Census (19,060 units) + Mid 2021 to Early 2024 unit estimate (575 units) = 19,635 units. (5) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (6) Includes townhouses and apartments in duplexes. (7) Includes bachelor, 1-bedroom and 2-bedroom+ apartments. Note: Numbers may not add to totals due to rounding. Structural Type Persons Per Unit¹ (P.P.U.) % Distribution of Estimated Units² Weighted Persons Per Unit Average 2016 Population (46,560) + Mid 2021 to Early 2024 estimated housing units to beginning of forecast period (575 x = 1,420) + (19,060 x -0.003 = -58) = 47,922 Population Watson & Associates Economists Ltd. PAGE A-9 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 6 City of Quinte West Historical Residential Building Permits Years 2013 to 2022 [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1-bedroom, and 2-bedroom+ apartment units. Source: Historical housing activity derived from City of Quinte West data, by Watson & Associates Economists Ltd. Residential Building Permits Total 2013 91 4 3 98 2014 90 18 0 108 2015 135 44 3 182 2016 196 68 56 320 2017 239 15 5 259 Sub-total 751 149 67 967 Average (2013 - 2017) 150 30 13 193 % Breakdown 77.7% 15.4% 6.9% 100.0% 2018 194 21 7 222 2019 287 24 31 342 2020 173 48 12 233 2021 209 26 31 266 2022 158 16 35 209 Sub-total 1,021 135 116 1,272 Average (2018 - 2022) 204 27 23 254 % Breakdown 80.3% 10.6% 9.1% 100.0% 2013 - 2022 Total 1,772 284 183 2,239 Average 177 28 18 224 % Breakdown 79.1% 12.7% 8.2% 100.0% Singles & Semi Detached Multiples[1] Apartments[2] Year Watson & Associates Economists Ltd. PAGE A-10 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 7a City of Quinte West Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Singles and Semi-Detached Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted [1] 1-5 - - 1.739 2.671 3.483 2.625 6-10 - - 2.273 2.952 3.684 2.966 2.795 (0.151) 11-15 - - 2.182 2.867 4.321 3.034 2.875 2.743 16-20 - - 1.813 2.731 3.406 2.735 2.840 2.743 20-25 - - 2.000 2.670 3.176 2.656 2.803 2.743 25-35 - - 1.929 2.585 3.261 2.571 35+ - 1.558 1.871 2.571 3.627 2.473 2.723 2.743 Total 0.667 1.722 1.879 2.619 3.603 2.555 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - - 1.836 2.699 3.625 2.587 6-10 - - 1.842 2.879 3.684 2.847 11-15 - - 2.188 2.833 4.172 2.949 16-20 - - 1.889 2.720 3.303 2.676 20-25 - - 1.889 2.700 3.176 2.416 25-35 - 1.250 2.000 2.543 3.308 2.497 35+ - 1.287 1.860 2.560 3.686 2.323 Total - 1.281 1.870 2.607 3.622 2.413 Watson & Associates Economists Ltd. PAGE A-11 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 7b Hastings County Person Per Unit by Age and Type of Dwelling (2021 Census) [1] Includes townhouses and apartments in duplexes. [2] Includes bachelor, 1 bedroom and 2 bedroom+ apartments. [3] Adjusted based on historical trends. Note: Does not include Statistics Canada data classified as "Other." P.P.U. Not calculated for samples less than or equal to 50 dwelling units and does not include institutional population. Age of Multiples[1] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted [3] 1-5 - - 1.621 2.595 - 2.413 6-10 - - 1.900 2.250 - 2.143 11-15 - - 1.625 2.182 - 1.600 2.052 1.970 16-20 - - 1.750 2.563 - 1.809 1.991 1.970 20-25 - - 1.933 2.077 - 1.903 1.974 1.970 25-35 - - 1.810 2.630 - 2.304 35+ - 1.239 1.986 2.815 3.750 2.353 Total 1.100 1.270 1.882 2.678 4.111 2.253 Age of Apartments[2] Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 25 Year Average 25 Year Average Adjusted [3] 1-5 - 1.095 2.067 - - 1.807 6-10 - - - - - 1.769 11-15 - 1.273 1.842 - - 1.697 1.758 1.749 16-20 - 1.267 2.077 - - 1.818 1.773 1.749 20-25 - 1.261 1.690 - - 1.557 1.730 1.749 25-35 - 1.378 1.763 - - 1.643 35+ 0.900 1.186 1.835 3.079 - 1.601 Total 0.810 1.198 1.843 3.043 - 1.615 Age of All Density Types Dwelling < 1 BR 1 BR 2 BR 3/4 BR 5+ BR Total 1-5 - 1.625 1.882 2.701 4.063 2.534 6-10 - 1.762 1.837 2.833 3.965 2.758 11-15 - 1.407 1.878 2.776 3.961 2.713 16-20 - 1.281 1.865 2.622 3.488 2.519 20-25 - 1.233 1.836 2.630 3.729 2.444 25-35 - 1.304 1.841 2.714 3.385 2.473 35+ 1.324 1.258 1.846 2.522 3.670 2.256 Total 1.333 1.285 1.849 2.577 3.714 2.342 Watson & Associates Economists Ltd. PAGE A-12 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 8 City of Quinte West Person Per Unit Structural Type and Age of Dwelling (2021 Census) 2.63 2.97 3.03 2.74 2.66 2.57 2.47 2.41 2.14 1.60 1.81 1.90 2.30 2.35 1.81 1.77 1.70 1.82 1.56 1.64 1.60 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 1-5 6-10 11-15 16-20 20-25 25-35 35+ Persons Per Dwelling Age of Dwelling Singles and Semi-Detached Multiples Apartments Multiple and Apartment P.P.U.s are based on Hastings County. Watson & Associates Economists Ltd. PAGE A-13 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 9a City of Quinte West Employment Forecast, 2024 to Urban Buildout [1] Statistics Canada defines no fixed place of work (N.F.P.O.W.) employees as "persons who do not go from home to the same workplace location at the beginning of each shift. Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc." Note: Statistics Canada 2021 Census place of work employment data has been reviewed. The 2021 Census employment results have not been utilized due to a significant increase in work at home employment captured due to Census enumeration occurring during the provincial COVID-19 lockdown from April 1, 2021 to June 14, 2021. [2] Urban buildout forecast is based on the ultimate servicing capacity identified in the City of Quinte West 2021 Water and Wastewater Master Plan Report - Final, December 6, 2021. It is important to note urban buildout is based on servicing potential for the urban area, and the ultimate servicing capacity exceeds currently designated urban lands. Source: Watson & Associates Economists Ltd. Employment Mid 2011 43,086 0.002 0.018 0.093 0.110 0.147 0.371 0.040 0.411 80 795 4,028 4,748 6,325 15,975 1,735 17,710 15,180 Mid 2016 43,577 0.003 0.025 0.109 0.107 0.139 0.383 0.048 0.431 150 1,080 4,733 4,668 6,065 16,695 2,070 18,765 15,615 Early 2024 47,922 0.004 0.027 0.103 0.112 0.134 0.381 0.056 0.437 198 1,312 4,942 5,373 6,426 18,250 2,703 20,953 16,938 Early 2034 51,861 0.004 0.028 0.102 0.109 0.131 0.375 0.055 0.429 214 1,477 5,280 5,672 6,780 19,423 2,833 22,256 17,946 Early 2044 55,183 0.004 0.029 0.101 0.107 0.127 0.367 0.053 0.420 228 1,585 5,546 5,884 7,030 20,273 2,917 23,190 18,688 Urban Buildout[2] 66,899 0.003 0.029 0.092 0.095 0.114 0.333 0.052 0.384 231 1,921 6,124 6,385 7,608 22,269 3,447 25,716 20,348 Mid 2011 - Mid 2016 491 0.0016 0.0063 0.0151 -0.0031 -0.0076 0.0123 0.0072 0.0196 70 285 705 -80 -260 720 335 1,055 435 Mid 2016 - Early 2024 4,345 0.0007 0.0026 -0.0055 0.0050 -0.0051 -0.0023 0.0089 0.0066 48 232 209 705 361 1,555 633 2,188 1,323 Early 2024 - Early 2034 3,939 0.0000 0.0011 -0.0013 -0.0027 -0.0034 -0.0063 -0.0018 -0.0081 16 166 339 300 354 1,173 130 1,303 1,008 Early 2024 - Early 2044 7,261 0.0000 0.0013 -0.0026 -0.0055 -0.0067 -0.0135 -0.0035 -0.0170 30 274 605 512 604 2,023 214 2,237 1,750 Early 2024 - Urban Buildout[2] 18,977 -0.0007 0.0013 -0.0116 -0.0167 -0.0204 -0.0480 -0.0049 -0.0528 33 610 1,182 1,013 1,182 4,019 744 4,763 3,409 Mid 2011 - Mid 2016 98 0.0003 0.0013 0.0030 -0.0006 -0.0015 0.0025 0.0014 0.0039 14 57 141 -16 -52 144 67 211 87 Mid 2016 - Early 2024 579 0.00009 0.00034 -0.00073 0.00067 -0.00068 -0.00031 0.00119 0.00088 6 31 28 94 48 207 84 292 176 Early 2024 - Early 2034 394 0.00000 0.00011 -0.00013 -0.00027 -0.00034 -0.00063 -0.00018 -0.00081 2 17 34 30 35 117 13 130 101 Early 2024 - Early 2044 363 0.00000 0.00007 -0.00013 -0.00027 -0.00034 -0.00067 -0.00018 -0.00085 1 14 30 26 30 101 11 112 87 Total (Excluding Work at Home and N.F.P.O.W.) Incremental Change Annual Average Total Including N.F.P.O.W. N.F.P.O.W.[1] Work at Home Industrial Commercial/ Population Related Total Employment (Including N.F.P.O.W.) Institutional N.F.P.O.W.[1] Activity Rate Period Population Primary Work at Home Industrial Commercial/ Population Related Institutional Total Employment Primary Total Watson & Associates Economists Ltd. PAGE A-14 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 9b City of Quinte West Employment and Gross Floor Area (G.F.A.) Forecast, Urban Buildout [1] Square Foot Per Employee Assumptions Primary - Non-Bona Fide Farming 3,000 Industrial 1,100 Commercial/Population-Related 500 Institutional 700 [2] Primary industry includes agriculture and resource related employment. *Reflects Early-2024 to Urban Buildout forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. Mid 2011 43,086 80 4,028 4,748 6,325 15,180 240,000 4,430,300 2,373,800 4,427,500 11,471,600 Mid 2016 43,577 150 4,733 4,668 6,065 15,615 450,000 5,205,800 2,333,800 4,245,500 12,235,100 Early 2024 47,922 198 4,942 5,373 6,426 16,938 594,100 5,435,700 2,686,300 4,498,200 13,214,300 Early 2034 51,861 214 5,280 5,672 6,780 17,946 642,000 5,808,000 2,836,000 4,746,000 14,032,000 Early 2044 55,183 228 5,546 5,884 7,030 18,688 684,000 6,100,600 2,942,000 4,921,000 14,647,600 Urban Buildout[3] 66,899 231 6,124 6,385 7,608 20,348 693,000 6,735,900 3,192,500 5,325,600 15,947,000 Mid 2011 - Mid 2016 491 70 705 -80 -260 435 Mid 2016 - Early 2024 4,345 48 209 705 361 1,323 144,100 229,900 352,500 252,700 979,200 Early 2024 - Early 2034 3,939 16 339 300 354 1,008 47,900 372,300 149,700 247,800 817,700 Early 2024 - Early 2044 7,261 30 605 512 604 1,750 89,900 664,900 255,700 422,800 1,433,300 Early 2024 - Urban Buildout[3] 18,977 - 1,182 1,013 1,182 3,377 - 1,300,200 506,200 827,400 2,633,800 Mid 2011 - Mid 2016 98 14 141 -16 -52 87 Mid 2016 - Early 2024 579 6 28 94 48 176 19,213 30,653 47,000 33,693 130,560 Early 2024 - Early 2034 394 2 34 30 35 101 4,790 37,230 14,970 24,780 81,770 Early 2024 - Early 2044 363 1 30 26 30 87 4,495 33,245 12,785 21,140 71,665 Period Population Employment Total Annual Average Primary Industrial Institutional Total Primary[2] Gross Floor Area in Square Feet (Estimated)[1] Incremental Change Commercial/ Population Related Institutional Industrial Commercial/ Population Related Watson & Associates Economists Ltd. PAGE A-15 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 9c City of Quinte West Estimate of the Anticipated Amount, Type and Location of Non-Residential Development for Which Development Charges Can Be Imposed [1] Square Foot Per Employee Assumptions Primary - Non-Bona Fide Farming 3,000 Industrial 1,100 Commercial/Population-Related 500 Institutional 700 [2] Primary industry includes agriculture and resource related employment. [3] Employment Increase does not include No Fixed Place of Work. *Reflects Early-2024 to Urban Buildout forecast period. Note: Numbers may not add up precisely due to rounding. Source: Watson & Associates Economists Ltd. 2024 - 2034 - 316,300 132,800 219,800 668,900 867 2024 - 2044 - 564,900 221,300 365,400 1,151,600 1,478 2024 - Urban Buildout[4] 1,300,200 506,200 827,400 2,633,800 3,377 2024 - 2034 47,900 56,000 16,900 28,000 148,800 141 2024 - 2044 89,900 100,000 34,400 57,400 281,700 272 2024 - 2034 47,900 372,300 149,700 247,800 817,700 1,008 2024 - 2044 89,900 664,900 255,700 422,800 1,433,300 1,750 2024 - Urban Buildout[4] - 1,300,200 506,200 827,400 2,633,800 3,377 City of Quinte West Rural Urban Institutional G.F.A. S.F.[1] Total Non- Residential G.F.A. S.F. Employment Increase[3] Development Location Timing Primary G.F.A. S.F.[1],[2] Industrial G.F.A. S.F.[1] Commercial G.F.A. S.F.[1] Watson & Associates Economists Ltd. PAGE A-16 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Schedule 10 City of Quinte West Employment Categories by Major Employment Sector Note: Employment is classified by North American Industry Classification System (NAICS) Code. Source: Watson & Associates Economists Ltd. Primary Industry Employment 11 Agriculture, forestry, fishing and hunting 21 Mining and oil and gas extraction Industrial and Other Employment 22 Utilities 23 Construction 31-33 Manufacturing 41 Wholesale trade 48-49 Transportation and warehousing 56 Administrative and support Population Related Employment 44-45 Retail trade 51 Information and cultural industries 52 Finance and insurance 53 Real estate and rental and leasing 54 Professional, scientific and technical services 55 Management of companies and enterprises 56 Administrative and support 71 Arts, entertainment and recreation 72 Accommodation and food services 81 Other services (except public administration) Institutional 61 Educational services 62 Health care and social assistance 91 Public administration Comments Categories which relate to local land-based resources Categories which relate primarily to industrial land supply and demand Categories which relate primarily to population growth within the municipality NAICS Employment by industry Watson & Associates Economists Ltd. PAGE B-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix B Level of Service Watson & Associates Economists Ltd. PAGE B-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-1 Service Standard Calculation - Fire Protection Services - Facilities City of Quinte West Service Standard Calculation Sheet Service: Fire Protection Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Fire Hall # 1 - Front St. 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 5,800 $480 $558 Fire Hall # 2 - Cameron Rd. 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 $480 $558 Fire Hall # 3 - Aitkens Rd. 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 4,160 $480 $558 Fire Hall # 4 - Vermilyea Rd. 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 12,400 12,400 12,400 12,400 $480 $558 Fire Hall # 5 - Plant St. 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 3,394 $480 $558 Fire Hall # 6 - County Rd 5 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 1,989 $480 $558 Fire Hall # 7 - Scott Ave 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 3,679 $480 $558 Fire Prevention Trailer 360 360 360 360 360 360 360 360 360 360 $441 $513 New Fire Hall #1 - Dixon Drive 21,000 21,000 21,000 21,000 21,000 $480 $558 Total 29,882 29,882 29,882 29,882 29,882 29,882 29,882 29,882 29,882 29,882 44,722 50,122 50,122 50,122 50,122 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.6998 0.7022 0.7023 0.7013 0.7010 0.7009 0.7005 0.6971 0.6861 0.6767 1.0027 1.1050 1.0901 1.0752 1.0641 15 Year Average 2009-2023 Quantity Standard 0.8203 Quality Standard $558 Service Standard $458 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $458 Eligible Amount $1,778,303 Watson & Associates Economists Ltd. PAGE B-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-2 Service Standard Calculation - Fire Protection Services - Vehicles & Equipment City of Quinte West Service Standard Calculation Sheet Service: Fire Protection Services - Vehicles & Equipment Unit Measure: No. of vehicles Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Aerial Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,500,000 Triple Combination Pumper 10 9 10 10 10 11 11 11 10 10 9 9 9 9 9 $600,000 Tanker 8 8 8 8 8 8 8 9 10 10 11 11 11 11 11 $500,000 Utility Truck 5 6 6 8 11 12 12 11 11 11 10 10 10 10 10 $75,000 Fire Prevention/Equipment Van 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $61,600 SCAT/Rescue Van 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 $224,700 Marine Unit 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 $63,300 Total 35 35 36 38 42 45 45 45 45 45 44 44 44 44 44 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0008 0.0008 0.0008 0.0009 0.0010 0.0011 0.0011 0.0010 0.0010 0.0010 0.0010 0.0010 0.0010 0.0009 0.0009 15 Year Average 2009-2023 Quantity Standard 0.0010 Quality Standard $336,780 Service Standard $337 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $337 Eligible Amount $1,309,064 Watson & Associates Economists Ltd. PAGE B-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-3 Service Standard Calculation - Fire Protection Services - Small Equipment & Gear City of Quinte West Service Standard Calculation Sheet Service: Fire Protection Services - Small Equipment and Gear Unit Measure: No. of equipment and gear Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Equipped Firefighters - Volunteer 126 137 137 137 137 137 137 137 137 137 137 137 137 137 137 $10,000 Equipped Firefighters - Full Time 14 14 16 16 16 16 16 16 16 16 16 16 16 16 16 $14,600 Jaws of Life 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $49,700 Communications Infrastructure 1 1 1 $779,000 Radio Tower 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $75,000 Total 148 159 161 161 161 161 161 161 161 161 161 161 162 162 162 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0035 0.0037 0.0038 0.0038 0.0038 0.0038 0.0038 0.0038 0.0037 0.0036 0.0036 0.0035 0.0035 0.0035 0.0034 15 Year Average 2009-2023 Quantity Standard 0.0037 Quality Standard $13,324 Service Standard $49 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $49 Eligible Amount $191,629 Watson & Associates Economists Ltd. PAGE B-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-4 Service Standard Calculation - Services Related to a Highway - Roads City of Quinte West Service Standard Calculation Sheet Service: Services Related to a Highway - Roads Unit Measure: Lane km of roadways Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/lane km) Asphalt - Arterial 409 409 409 409 409 409 409 409 409 409 409 409 409 409 409 $1,402,088 Asphalt - Local 298 298 299 299 300 300 301 301 303 304 304 305 307 309 309 $1,617,697 Surface Treated - All 793 793 793 793 793 793 793 793 793 793 793 793 793 793 793 $248,745 Total 1,500 1,500 1,501 1,501 1,502 1,502 1,503 1,503 1,505 1,506 1,506 1,507 1,509 1,511 1,511 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0351 0.0353 0.0353 0.0352 0.0352 0.0352 0.0352 0.0351 0.0345 0.0341 0.0338 0.0332 0.0328 0.0324 0.0321 15 Year Average 2009-2023 Quantity Standard 0.0343 Quality Standard $837,423 Service Standard $28,724 D.C. Amount (before deductions) 20 Year Forecast Population 7,171 $ per Capita $28,724 Eligible Amount $205,976,936 Watson & Associates Economists Ltd. PAGE B-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-5 Service Standard Calculation - Services Related to a Highway - Bridges and Culverts City of Quinte West Service Standard Calculation Sheet Service: Services Related to a Highway - Bridges, Culverts & Structures Unit Measure: Number of Bridges, Culverts & Structures Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Bridges 45 45 45 45 45 45 45 45 45 45 45 45 45 45 45 $3,896,000 Culverts 32 32 32 32 32 32 32 32 32 32 32 32 32 32 32 $889,000 Total 77 77 77 77 77 77 77 77 77 77 77 77 77 77 77 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018 0.0017 0.0017 0.0017 0.0017 0.0017 0.0016 15 Year Average 2009-2023 Quantity Standard 0.0018 Quality Standard $2,581,706 Service Standard $4,647 D.C. Amount (before deductions) 20 Year Forecast Population 7,171 $ per Capita $4,647 Eligible Amount $33,324,139 Watson & Associates Economists Ltd. PAGE B-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-6 Service Standard Calculation - Services Related to a Highway - Traffic Signals & Streetlights City of Quinte West Service Standard Calculation Sheet Service: Services Related to a Highway - Traffic Signals & Streetlights Unit Measure: No. of Traffic Signals Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Streetlights 2,704 2,711 2,744 2,744 2,810 2,823 2,871 2,880 2,903 2,923 2,932 2,944 3,048 3,092 3,092 $2,700 Traffic Signals 30 30 30 30 31 31 31 31 31 31 31 31 31 31 31 $247,000 Total 2,734 2,741 2,774 2,774 2,841 2,854 2,902 2,911 2,934 2,954 2,963 2,975 3,079 3,123 3,123 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0640 0.0644 0.0652 0.0651 0.0667 0.0669 0.0680 0.0679 0.0674 0.0669 0.0664 0.0656 0.0670 0.0670 0.0663 15 Year Average 2009-2023 Quantity Standard 0.0663 Quality Standard $5,283 Service Standard $350 D.C. Amount (before deductions) 20 Year Forecast Population 7,171 $ per Capita $350 Eligible Amount $2,511,786 Watson & Associates Economists Ltd. PAGE B-8 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-7 Service Standard Calculation - Services Related to a Highway - Public Works - Facilities City of Quinte West Service Standard Calculation Sheet Class of Service: Depots and Domes Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Equipment Storage Shed Cold Storage - 30 Pelham St., Trenton 680 680 680 680 680 680 680 680 680 $153 $172 Garage/Eqpt. Storage - 30 Pelham St., Trenton 20,313 20,313 20,313 20,313 20,313 20,313 20,313 20,313 20,313 $334 $372 Sand/Salt Shed - 30 Pelham St., Trenton 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 $75 $86 3 Bay Storage Garage, Sand Dome & Salt Shed - L-14, C3, Murrary Twp Colonial 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 $58 $68 Storage Bldg. - Tuckers Corners 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 $277 $309 Storage Shed - Wallbridge, Sidney 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 2,100 $166 $187 Sand/Salt Dome - Wallbridge, Sidney 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 $57 $66 Storage Building - Aikins Rd., Sidney 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $138 $156 Equipment Depot - Murray Twp 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 8,400 $243 $272 Sand/Salt Building - Murray Twp 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 5,520 $162 $182 Sand/Salt Building - Front St. Stirling 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 6,500 $58 $68 Equipment Depot - Murray Twp 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 4,700 $170 $191 Public Works Bldg. - Frankford 6,500 6,500 6,500 6,500 6,500 $334 $372 Eqpt. Depot - Tuckers Corners, Sidney 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 5,400 $57 $66 Dome/Storage Shed - Glen Miller (Murray Twp) 5,520 5,520 5,520 5,520 5,520 $162 $182 Shop and Equip Depot - 18 Pelham St. 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 $243 $272 Consolidated Operations Cenre - Roads 96,000 96,000 96,000 96,000 96,000 $326 $363 Snow Management Facility 5,400 5,400 $0 $4 Total 112,033 112,033 112,033 112,033 112,033 100,013 100,013 100,013 100,013 70,620 166,620 169,620 169,620 175,020 175,020 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 2.6237 2.6328 2.6330 2.6292 2.6283 2.3460 2.3446 2.3333 2.2962 1.5993 3.7359 3.7396 3.6891 3.7544 3.7157 15 Year Average 2009-2023 Quantity Standard 2.8467 Quality Standard $246 Service Standard $700 D.C. Amount (before deductions) 20 Year Forecast Population 7,171 $ per Capita $700 Eligible Amount $5,022,784 Watson & Associates Economists Ltd. PAGE B-9 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-8 Service Standard Calculation - Services Related to a Highway - Public Works - Vehicles & Equipment Class of Service: Public Works - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Dump Trucks (Large) 3 3 3 3 3 3 3 3 3 3 3 3 3 1 1 $324,000 Dump Trucks (Small) 6 6 5 5 5 5 5 5 5 5 5 5 5 5 5 $68,800 Half Tons 38 39 37 36 34 32 32 32 32 32 32 32 32 14 14 $60,000 3/4 Tons 5 5 5 7 7 9 9 9 9 9 9 9 9 14 14 $80,000 1 Ton 2 2 4 4 4 4 4 4 4 4 4 4 4 2 2 $90,000 Flusher Truck 1 1 1 1 2 2 2 2 2 2 2 2 2 1 1 $700,000 Rear Packer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $328,000 Bucket Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $379,800 Cars 3 3 1 1 1 $45,000 Trailer 1 1 1 1 1 1 1 1 1 1 1 1 1 8 8 $19,000 Graders 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 $350,000 Sweepers 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 $398,500 Loaders/Backhoes/Tractors 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 $425,000 Snowblowers/Plows (sidewalks) 6 6 6 6 6 6 6 6 6 6 6 7 8 9 9 $250,000 Vibrator Roller 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 $149,600 Wheel loader 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 $378,000 Excavator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $340,000 Survey Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $105,500 Fork Lift 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $164,000 Comporssors/Generators/Chipper/Packer 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $100,000 Other 21 23 23 24 24 24 24 24 24 24 24 24 24 24 24 $25,000 Snowplow Trucks single 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 $380,000 Snowplow Trucks tandem 11 18 18 18 18 17 17 17 17 17 17 17 17 21 21 $450,000 Snowplow Trucks Triaxle 2 2 2 2 2 2 2 2 2 $475,000 Van 1 1 1 1 1 1 1 1 1 1 1 $60,000 Total 133 144 141 142 142 141 143 143 143 143 143 144 145 142 142 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0031 0.0034 0.0033 0.0033 0.0033 0.0033 0.0034 0.0033 0.0033 0.0032 0.0032 0.0032 0.0032 0.0030 0.0030 15 Year Average 2009-2023 Quantity Standard 0.0032 Quality Standard $197,872 Service Standard $633 D.C. Amount (before deductions) 20 Year Forecast Population 7,171 $ per Capita $633 Eligible Amount $4,540,605 Watson & Associates Economists Ltd. PAGE B-10 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-9 Service Standard Calculation - Policing Services - Facilities City of Quinte West Service Standard Calculation Sheet Service: Policing Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Police Station 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 26,734 26,734 26,734 26,734 $666 $773 Police Annex 3,700 3,700 3,700 3,700 3,700 3,700 3,700 3,700 3,700 3,700 3,700 $282 $329 Community Policing Office 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 $341 $397 Total 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100 17,100 28,134 28,134 28,134 28,134 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.4005 0.4019 0.4019 0.4013 0.4012 0.4011 0.4009 0.3989 0.3926 0.3873 0.3834 0.6203 0.6119 0.6035 0.5973 15 Year Average 2009-2023 Quantity Standard 0.4536 Quality Standard 685 Service Standard $311 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $311 Eligible Amount $1,207,419 Watson & Associates Economists Ltd. PAGE B-11 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-10 Service Standard Calculation - Policing Services - Vehicles & Equipment City of Quinte West Service Standard Calculation Sheet Service: Policing Services - Vehicles Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Radar Trailers 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $16,400 Total 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard (per 1,000) 0.0468 0.0470 0.0470 0.0469 0.0469 0.0469 0.0469 0.0467 0.0459 0.0453 0.0448 0.0441 0.0435 0.0429 0.0425 15 Year Average 2009-2023 Quantity Standard (per 1,000) 0.0456 Quality Standard $16 Service Standard $1 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $1 Eligible Amount $2,915 Watson & Associates Economists Ltd. PAGE B-12 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-11 Service Standard Calculation - Parks and Recreation Services - Parkland Amenities City of Quinte West Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Amphitheatre Centennial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,412,800 Lit Skateboard Park Centennial Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $993,500 Frankford Skate Park 1 1 1 1 1 1 1 $709,600 Baseball Fields Centennial Park - Bayshore 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $2,000,000 Centennial Park - Don Ogden 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,500,000 Bain park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $2,000,000 Frankford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,200,000 Tuckers Corners 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,200,000 Montrose 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $709,600 Woller Atheltic 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,200,000 York Subdivision 1 1 1 1 1 1 1 $332,800 Soccer Pitches Bain park Regular 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,419,300 Centennial park Regular 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 $1,419,300 Centennial park Mini 9 9 9 9 9 9 9 9 9 10 10 10 11 11 11 $461,300 Trenton cold storage 2 2 2 2 2 2 $141,900 Harts Corner 1 Mini 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $33,400 Queen Elizabeth Park Mini 1 1 1 1 1 1 1 1 1 $85,200 Wooler Athletic Reg 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $212,900 York Subdivision mini 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $85,200 Tennis Courts Tuckers Corner 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $191,600 Hanna Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $191,600 York subdivision 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $127,700 Play Structures Large - - - - - - - 2 2 2 2 2 2 2 2 $400,000 Medium 11 11 11 12 12 12 12 12 13 14 14 14 16 17 17 $80,000 Small 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 $50,000 Swingsets 1 Bay 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $8,500 2 Bay 24 24 24 25 25 25 25 25 26 27 27 27 29 30 30 $13,500 3 Bay 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $15,750 Watson & Associates Economists Ltd. PAGE B-13 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-11 (cont'd) Service Standard Calculation - Parks and Recreation Services - Parkland Amenities City of Quinte West Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Splashpad Centennial park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,277,300 Frankford park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $638,700 Bandshell 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $283,900 Canteens 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $30,800 Lighting of Fields 7 7 7 7 7 7 7 7 10 10 10 10 10 10 10 $567,700 Golf Course Storage Shed 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $141,900 Mt. Pelion Tower 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $346,300 Washroom Buildings Dockside (Dundas St), Trenton 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $84,000 Bain Memorial Park, Trenton 1 1 1 $108,600 Centennial Park, Trenton 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 $283,900 Tourist Park, Frankford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $283,900 Wooler Community Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $249,400 Pavillions Frankford 1 1 1 1 1 1 1 1 1 1 1 $397,400 Centennial park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $532,200 Bain 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $326,400 Farmers Market 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $532,200 Chatterton Valley 1 1 1 1 1 1 1 1 1 1 $326,400 Picnic Shelters Ball Diamond Murray Twp 1 1 1 1 1 1 $48,100 Applegrove 1 1 1 1 1 1 $85,200 Frankfrod Splash Pad 1 1 1 1 1 $42,600 Watson & Associates Economists Ltd. PAGE B-14 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-11 (cont'd) Service Standard Calculation - Parks and Recreation Services - Parkland Amenities City of Quinte West Service Standard Calculation Sheet Service: Parkland Amenities Unit Measure: No. of parkland amenities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Basketball Courts Tourist Park, Frankford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Harts Corner 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Montrose 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $100,000 Stonecrest 1 1 1 $60,000 Hanna Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $60,000 Beach Volleyball Courts Tourist Park, Frankford 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $50,000 Total 127 127 127 128 128 127 126 127 134 137 137 136 142 144 144 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0031 0.0031 0.0031 0.0030 0.0031 0.0031 0.0030 15 Year Average 2009-2023 Quantity Standard 0.0030 Quality Standard $327,790 Service Standard $983 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $983 Eligible Amount $3,822,359 Watson & Associates Economists Ltd. PAGE B-15 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-12 Service Standard Calculation - Parks and Recreation Services - Parkland Trails City of Quinte West Service Standard Calculation Sheet Service: Parkland Trails Unit Measure: linear km of Paths and Trails Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/ Linear Metre) Hiking Trails 32 32 32 32 32 32 32 32 33 33 33 33 33 33 33 $33,500 Paved Trails (3m wide in linear meters) 5 5 5 5 5 6 6 6 6 10 10 19 19 19 19 $250,000 Total 37 37 37 37 37 39 39 39 39 42 42 51 52 52 52 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0009 0.0010 0.0009 0.0011 0.0011 0.0011 0.0011 15 Year Average 2009-2023 Quantity Standard 0.0010 Quality Standard $79,430 Service Standard $79 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $79 Eligible Amount $308,744 Watson & Associates Economists Ltd. PAGE B-16 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-13 Service Standard Calculation - Parks and Recreation Services - Facilities City of Quinte West Service Standard Calculation Sheet Service: Recreation Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Golf Course Club House 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 1,250 $171 $192 Batawa Community Centre 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 $250 $279 North Wooler Community Centre 1,760 1,760 1,760 $316 $352 Centennial Community Centre 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 $436 $484 Lawn Bowling Club 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 1,700 $216 $242 Leopold Centre Storage 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $166 $187 Hut "Quansit" 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 3,750 $112 $127 Duncan McDonald Memorial Arena - Trento 68,800 68,800 68,800 73,000 73,000 73,000 73,000 73,000 73,000 73,000 73,000 73,000 73,000 73,000 73,000 $325 $362 Dr. McMullen Rec Centre Arena - Frankfor 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 26,800 $244 $273 Robert Patrick Marina 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 $649 $719 Fraser Park Marina 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 $649 $719 YMCA Quinte West 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 $478 $531 Trenton Port Marina 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 $1,032 $1,141 Youth Centre 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 4,256 $248 $277 Leopold Parks Depot 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 $302 $337 Consolidated Operations Centre - Parks 15,000 15,000 15,000 15,000 15,000 15,000 $326 $363 Total 188,966 188,966 188,966 191,406 191,406 191,406 196,906 196,906 196,906 195,906 195,906 195,906 195,906 195,906 195,906 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 4.4253 4.4407 4.4410 4.4919 4.4905 4.4898 4.6161 4.5937 4.5208 4.4366 4.3925 4.3191 4.2608 4.2025 4.1591 15 Year Average 2009-2023 Quantity Standard 4.4187 Quality Standard $394 Service Standard $1,739 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $1,739 Eligible Amount $6,760,815 Watson & Associates Economists Ltd. PAGE B-17 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-14 Service Standard Calculation - Parks and Recreation Services - Vehicles & Equipment Service: Parks & Recreation Vehicles and Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Dump Truck (Large) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $355,000 Dump Truck (Small) 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 $92,300 1/2 & 3/4 4x4 5 7 8 8 8 9 9 9 9 10 10 10 10 10 10 $122,000 Half Tons Reg cab 7 5 5 5 4 4 4 4 4 4 3 3 3 3 3 $64,000 Car 1 1 1 $28,200 Ford F550 Garbage Compact 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $234,200 Compacted Tractors (loader/backhoe) 11 11 11 11 10 10 10 10 10 10 10 10 10 10 10 $90,000 Zero Turn Mowers 3 3 3 4 5 4 4 4 4 4 4 4 4 4 4 $42,600 Front Mount Mowers 3 3 3 4 5 4 4 4 4 4 4 4 4 4 4 $56,800 Wide Area Mowers 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 $127,700 Ball Groomer Bike 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $42,500 Walk Behind Brush Hog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $21,300 Telehandler 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $177,400 Trailers 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 $49,700 Attachments - Winter Maintenance 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $18,500 Attachements - Landscape Maint. 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 $35,500 Hedge Timmer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,400 Pole Saw 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,800 Chain Saws 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $1,800 Leaf blower 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $1,700 Misc. Landscape Equipment 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 $1,400 Trimmers 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 $600 Irrigation pumps/travellers 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 $32,800 Weed harvester boat 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $47,500 Turf top dresser 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $49,700 Skid steer 1 1 1 1 1 1 1 1 1 1 $93,000 Ice Resurfacers 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $212,900 Total 106 106 107 108 110 109 109 109 109 110 109 109 109 109 109 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0025 0.0025 0.0025 0.0025 0.0026 0.0026 0.0026 0.0025 0.0025 0.0025 0.0024 0.0024 0.0024 0.0023 0.0023 15 Year Average 2009-2023 Quantity Standard 0.0025 Quality Standard $54,908 Service Standard $137 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $137 Eligible Amount $533,568 Watson & Associates Economists Ltd. PAGE B-18 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-15 Service Standard Calculation - Library Services - Materials City of Quinte West Service Standard Calculation Sheet Service: Library Services - Collection Materials Unit Measure: No. of library collection items Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) All Physicals Materials 121,110 122,189 125,713 130,055 128,439 128,194 110,857 103,143 97,449 94,644 94,644 105,194 105,194 105,194 105,194 $38 Electronic Collection Material (# of subscriptions) 7 10 12 11 11 7 8 8 8 8 8 $9,200 RFID Gates 1 1 1 1 1 $42,600 RFID antenna pads 1 1 1 1 1 $21,300 Self Check Out Station 1 1 1 1 1 $11,400 Print payment station 1 1 1 1 1 $21,300 Total 121,110 122,189 125,713 130,055 128,446 128,204 110,869 103,154 97,460 94,651 94,656 105,206 105,206 105,206 105,206 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 2.8362 2.8715 2.9545 3.0521 3.0134 3.0073 2.5991 2.4065 2.2376 2.1435 2.1223 2.3195 2.2881 2.2568 2.2335 15 Year Average 2009-2023 Quantity Standard 2.5561 Quality Standard $39 Service Standard $99 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $99 Eligible Amount $385,552 Watson & Associates Economists Ltd. PAGE B-19 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-16 Service Standard Calculation - Library Services - Facilities City of Quinte West Service Standard Calculation Sheet Service: Library Services - Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. Trenton Branch - Main Building (City Hall) 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 20,000 $694 $842 Frankford Branch - Old Building 912 912 912 912 912 $694 $842 Frankford Branch - New Building 2,200 2,200 2,200 2,200 2,200 2,200 2,200 2,200 2,200 2,200 $694 $842 Total 20,912 20,912 20,912 20,912 20,912 22,200 22,200 22,200 22,200 22,200 22,200 22,200 22,200 22,200 22,200 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.4897 0.4914 0.4915 0.4908 0.4906 0.5207 0.5204 0.5179 0.5097 0.5028 0.4978 0.4894 0.4828 0.4762 0.4713 15 Year Average 2009-2023 Quantity Standard 0.4962 Quality Standard $842 Service Standard $418 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $418 Eligible Amount $1,624,027 Watson & Associates Economists Ltd. PAGE B-20 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-17 Service Standard Calculation - Ambulance Services - Facilities City of Quinte West Service Standard Calculation Sheet Service: Ambulance Facilities Unit Measure: sq.ft. of building area Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Bld'g Value ($/sq.ft.) Value/sq.ft. with land, site works, etc. 111 Millennium Drive, Belleville 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $413 $459 25 Frankford Crescent, Trenton 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000 $413 $459 244 St. Lawrence St West, Madoc 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 2,048 $413 $459 33 Chemaushgon Road, Bancroft 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 2,300 $893 $988 38 Farley Avenue, Belleville 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 $413 $459 127 River Street, Tweed 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 2,050 $413 $459 Total 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 25,398 Percentage attributable to Quinte West 28.0% 28.0% 28.0% 28.0% 28.5% 28.6% 28.7% 28.7% 29.0% 29.0% 29.5% 29.6% 29.6% 29.7% 29.9% Total 7,111 7,111 7,111 7,109 7,244 7,261 7,299 7,299 7,358 7,353 7,495 7,505 7,524 7,534 7,591 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.1665 0.1671 0.1671 0.1668 0.1699 0.1703 0.1711 0.1703 0.1689 0.1665 0.1680 0.1655 0.1636 0.1616 0.1612 15 Year Average 2009-2023 Quantity Standard 0.1670 Quality Standard $507 Service Standard $85 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $85 Eligible Amount $328,996 Watson & Associates Economists Ltd. PAGE B-21 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-18 Service Standard Calculation - Ambulance Services - Vehicles & Equipment City of Quinte West Service Standard Calculation Sheet Service: Ambulance Vehicles Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Ambulances 19 19 19 20 22 22 21 16 16 17 16 19 19 20 20 $329,000 Supervisor Emergency Vehicles 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $67,000 Ford Escape 2 2 2 2 2 2 $42,000 Cargo Van / Emergency Support Unit 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 $106,000 Total 25 25 25 26 28 28 27 22 22 24 23 26 26 27 27 Percentage attributable to Quinte West 28.0% 28.0% 28.0% 28.0% 28.5% 28.6% 28.7% 28.7% 29.0% 29.0% 29.5% 29.6% 29.6% 29.7% 29.9% Total 7.0 7.0 7.0 7.3 8.0 8.0 7.8 6.3 6.4 6.9 6.8 7.7 7.7 8.0 8.1 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0001 0.0001 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 15 Year Average 2009-2023 Quantity Standard 0.0002 Quality Standard $220,950 Service Standard $44 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $44 Eligible Amount $171,767 Watson & Associates Economists Ltd. PAGE B-22 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-19 Service Standard Calculation - Waste Diversion Services - Vehicles & Equipment City of Quinte West Service Standard Calculation Sheet Service: Waste Diversion - Vehicles & Equipment Unit Measure: No. of vehicles and equipment Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/Vehicle) Contracted Vehicles 6 6 6 6 6 6 6 7 7 7 7 $380,800 Total - - - - 6 6 6 6 6 6 6 7 7 7 7 Percentage attributable to Eligible Portion 0% 0% 0% 0% 0% 40% 40% 40% 40% 40% 40% 40% 40% 40% 40% Total Eligible Portion of Facilities - - - - - 2.4 2.4 2.4 2.4 2.4 2.4 2.8 2.8 3 3 Percentage attributable to Quinte West 0% 0% 0% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% Total Eligible Portion of Facilities - - - - - 1.1 1.1 1.1 1.1 1.1 1.1 1.3 1.3 1.3 1.3 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard (per 1,000) - - - - - 0.0259 0.0259 0.0257 0.0255 0.0251 0.0247 0.0285 0.0282 0.0278 0.0275 15 Year Average 2009-2023 Quantity Standard (per 1,000) 0.0177 Quality Standard $823 Service Standard $15 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $15 Eligible Amount $56,634 Watson & Associates Economists Ltd. PAGE B-23 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table B-20 Service Standard Calculation - Waste Diversion Services - Other City of Quinte West Service Standard Calculation Sheet Service: Waste Diversion - Other Unit Measure: No. of items Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Value ($/item) Green Bins 17,473 17,563 17,654 17,744 17,835 18,080 18,325 18,570 18,815 19,060 19,305 $50 Total - - - - 17,473 17,563 17,654 17,744 17,835 18,080 18,325 18,570 18,815 19,060 19,305 Percentage attributable to Eligible Portion 0% 0% 0% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Total Eligible Portion of Facilities - - - - 17,473 17,563 17,654 17,744 17,835 18,080 18,325 18,570 18,815 19,060 19,305 Population 42,701 42,553 42,550 42,611 42,625 42,631 42,656 42,864 43,556 44,157 44,600 45,358 45,979 46,617 47,103 Per Capita Standard - - - - 0.4099 0.4120 0.4139 0.4140 0.4095 0.4094 0.4109 0.4094 0.4092 0.4089 0.4098 15 Year Average 2009-2023 Quantity Standard 0.3011 Quality Standard $50 Service Standard $15 D.C. Amount (before deductions) 10 Year Forecast Population 3,887 $ per Capita $15 Eligible Amount $58,538 Watson & Associates Economists Ltd. PAGE C-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix C Long-Term Capital and Operating Cost Examination Watson & Associates Economists Ltd. PAGE C-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix C: Long-Term Capital and Operating Cost Examination As a requirement of the D.C.A. under subsection 10(2)(c), an analysis must be undertaken to assess the long-term capital and operating cost impacts for the capital infrastructure projects identified within the D.C. As part of this analysis, it was deemed necessary to isolate the incremental operating expenditures directly associated with these capital projects, factor in cost savings attributable to economies of scale or cost sharing where applicable and prorate the cost on a per unit basis (i.e., sq.ft. of building space, per vehicle, etc.). This was undertaken through a review of the City's 2023 Financial Information Return. In addition to the operational impacts, over time the initial capital projects will require replacement. This replacement of capital is often referred to as lifecycle cost. By definition, lifecycle costs are all the costs which are incurred during the life of a physical asset, from the time its acquisition is first considered, to the time it is taken out of service for disposal or redeployment. The method selected for lifecycle costing is the sinking fund method which provides that money will be contributed annually and invested, so that those funds will grow over time to equal the amount required for future replacement. Table C-1 depicts the annual operating impact resulting from the proposed gross capital projects at the time they are all in place. It is important to note that, while municipal program expenditures will increase with growth in population, the costs associated with the new infrastructure (i.e., facilities) would be delayed until the time these works are in place. Watson & Associates Economists Ltd. PAGE C-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Table C-1 Operating and Capital Expenditure Impacts for Future Capital Expenditures ANNUAL LIFECYCLE EXPENDITURES ANNUAL OPERATING EXPENDITURES TOTAL ANNUAL EXPENDITURES 1. Services Related to a Highway 1,556,620 526,512 2,083,133 2. Fire Protection Services 6,347 9,771 16,118 3. Policing Services 6,270 4,519 10,789 4. Parks and Recreation Services 95,089 86,418 181,507 5. Library Services 46,991 29,268 76,258 6. Ambulance 28,101 126,712 154,812 7. Waste Diversion 7,906 25,068 32,974 8. Wastewater Services 4,199,405 2,675,626 6,875,030 9. Water Services 642,216 2,538,047 3,180,263 Total 6,588,943 6,021,941 12,610,884 SERVICE/CLASS Watson & Associates Economists Ltd. PAGE D-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix D Local Service Policy Watson & Associates Economists Ltd. PAGE D-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix D: Local Service Policy Some of the need for services generated by additional development consists of local services related to a plan of subdivision. As such, they will be required as a condition of subdivision agreements or consent conditions. The following local service guidelines are proposed to delineate the jurisdiction for capital cost recovery (i.e. local service or D.C.s). 1. Roads a. Local streets and collector roads internal to development - Direct developer responsibility under s.59 of the D.C.A. (as a local service). b. Roads (collector and arterial) external to development - Include in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. (dependent on local circumstances). c. Stream crossing and rail crossing road works, excluding underground utilities but including all other works within lands to be dedicated to the City or rail corridors - include in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. (dependent on local circumstances). 2. Traffic Signals a. Traffic signalization within or external to development - Include in D.C. calculation to the extent permitted under s.5(1) of the D.C.A. 3. Intersection Improvements a. New roads (collector and arterial) and road (collector and arterial) improvements - Include as part of road costing, to limits of ROW. b. Intersections improvements within specific developments and all works necessary to connect to entrances (private and specific subdivision) to the roadway - Direct developer responsibility under s.59 of D.C.A. (as a local service). c. Intersections with county roads and provincial highways - Include in D.C. calculation to the extent that they are City responsibility. Watson & Associates Economists Ltd. PAGE D-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx d. Intersection improvements on other roads due to development growth increasing traffic - Include in D.C. calculation. 4. Streetlights a. Streetlights on external roads - Include in D.C. calculation (linked to collector road funding source). b. Streetlights within specific developments - Direct developer responsibility under s.59 of D.C.A. (as a local service). 5. Sidewalks a. Sidewalks on provincial and county roads - Include in area municipal D.C. or, in exceptional circumstances, may be local improvement or direct developer responsibility through local service provisions (s.59 of D.C.A.). b. Sidewalks on area municipal roads - Linked to collector road funding source. c. Other sidewalks external to development (which are a local service within the area to which the plan relates) - Direct developer responsibility as a local service provision (under s.59 of D.C.A.). 6. Traffic Control Systems a. Include in D.C. calculation. 7. Land Acquisition for Road Allowances a. Land acquisition for arterial roads - Dedication under the Planning Act subdivision provisions (s.51) through development lands; in areas with limited or no development, include in D.C. calculation (to the extent eligible). b. Land acquisition for collector roads - Dedication under the Planning Act subdivision provision (s.51) through development lands (up to 27 metre right-of-way); in areas with limited or no development, include in D.C. calculation (to the extent eligible). Watson & Associates Economists Ltd. PAGE D-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 8. Land Acquisition for Easements a. Easement costs external to subdivisions shall be included in D.C. calculation. 9. Storm Water Management a. Quality and quantity Works, direct developer responsibility through local service provisions (s. 59 of D.C.A.). 10. Water a. Treatment facilities to be included within the DC. b. Pumping stations external to development and works associated with zone boundaries to be included within the D.C., subject to local circumstances c. Watermains external to subdivisions included in the DC. d. Marginal costs of waterworks within the subdivision included above the minimum size. The minimum size is the size of a service of sufficient size, as determined by the City, to service a subdivision provided that the minimum size is not less than 200 mm nominal diameter. e. Connections to trunk mains and pumping stations to service specific areas, to be direct developer responsibility, subject to local circumstances 11. Wastewater a. Treatment facilities to be included within the DC. b. Pumping stations external to development to be included within the D.C., subject to local circumstances c. Sanitary sewers external to subdivisions included in the DC. d. Marginal costs of waterworks within the subdivision included above the minimum size and extra depth to accommodate external lands. The minimum size is the size of a service of sufficient size, as determined by Watson & Associates Economists Ltd. PAGE D-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx the City, to service a subdivision provided that the minimum size is not less than 150 mm nominal diameter. e. Connections to trunk mains and pumping stations to service specific areas, to be direct developer responsibility, subject to local circumstances. Watson & Associates Economists Ltd. PAGE E-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Appendix E Proposed Development Charge By-law Watson & Associates Economists Ltd. PAGE E-0 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx The Corporation of the City of Quinte West DRAFT By-Law Number 24-XXX Being a By-law to Establish Development Charges For The Corporation of The City of Quinte West. Whereas the City of Quinte West will experience growth through development and re­development; And Whereas development and re-development requires the provision of physical and social services by the City of Quinte West; And Whereas Council desires to ensure that the capital cost of meeting growth-related demands for or burden on municipal services does not place an excessive financial burden on the City of Quinte West or its existing taxpayers while at the same time ensuring new taxpayers contribute no more than the net capital cost attributable to providing the current level of municipal services; And Whereas the Development Charges Act, 1997 (the "Act") provides that the Council of a municipality may by by-law impose development charges against land to pay for increased capital costs required because of increased needs for services; And Whereas the Council of the City of Quinte West had before it a report entitled Development Charges Background Study dated June 13, 2024, prepared by Watson & Associates Economists Ltd., wherein it is indicated that the development of any land within the City of Quinte West will increase the need for services as defined herein; And Whereas the Council of The Corporation of the City of Quinte West has given notice of and held a public meeting on the 17th day of July, 2024 in accordance with the Act and the regulations thereto; And Whereas by resolution adopted by Council of the City of Quinte West on August 14, 2024, Council has indicated its intent that the future excess capacity identified in the Development Charges Background Study, dated June 13, 2024, prepared by Watson & Associates Economists Ltd., shall be paid for by development charges or other similar charges; Watson & Associates Economists Ltd. PAGE E-1 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Now Therefore Be It Enacted By The Council For The Corporation Of The City of Quinte West As Follows: 1. INTERPRETATION 1.1 In this By-law the following items shall have the corresponding meanings: "Act" means the Development Charges Act, as amended, or any successor thereof; "Apartment unit" means any residential unit within a building containing more than four dwelling units where the units are connected by an interior corridor. Despite the foregoing, an apartment includes stacked townhouse dwellings; "Bedroom" means a habitable room which can be used as sleeping quarters, but does not include a bathroom, living room, dining room or kitchen; "Board of Education" has the same meaning as set out in the Education Act, R.S.O. 1990, c. E.2, as amended, or any successor thereof; "Building Code Act" means the Building Code Act, S.O. 1992, as amended, or any successor thereof; "Capital cost" means costs incurred or proposed to be incurred by the municipality or a local board thereof directly or by others on behalf of and as authorized by the municipality or local board, (a) to acquire land or an interest in land, including a leasehold interest, (b) to improve land, (c) to acquire, lease, construct or improve buildings and structures, (d) to acquire, construct or improve facilities including, (i) furniture and equipment other than computer equipment, and (ii) material acquired for circulation, reference or information purposes by a library board as defined in the Public Libraries Act, R.S.O. 1990, Chap. P.44, as amended, or any successor thereof; and Watson & Associates Economists Ltd. PAGE E-2 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx (iii) rolling stock with an estimated useful life of seven years or more, and (e) interest on money borrowed to pay for costs in (a) to (e); (f) to undertake studies in connection with any matter under the Act and any of the matters in clauses (a) to (d) above, including the development charge background study required for provision of services designated in this by-law within or outside of the City. "Commercial" means any use of land, structures or buildings for the purposes of buying or selling commodities and services, but does not include industrial or agricultural uses, but does include hotels, motels, motor inns and boarding, lodging and rooming houses; "Commercial core area - Trenton" means the geographic location designated on Schedule "B" of this By-law; "Commercial core area - Frankford" means the geographic location designated on Schedule "C" of this By-law; "Council" means the Council of the municipality; "Development" means the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that the effect of increasing the size of usability thereof, and includes redevelopment; "Development Charge" means a charge imposed with respect to this By-law; "Dwelling unit" means any part of a building or structure used, designed or intended to be used as a domestic establishment in which one or more persons may sleep and are provided with culinary and sanitary facilities for their exclusive use; "Existing" means the number, use and size that existed as of the date this by-law was passed; Watson & Associates Economists Ltd. PAGE E-3 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx "Farm building" means that part of a bona fide farming operation encompassing barns, silos and other ancillary development to an agricultural use, but excluding a residential use; "Gross floor area" means: (a) in the case of a residential building or structure, the total area of all floors above grade of a dwelling unit measured between the outside surfaces of exterior walls or between the outside surfaces of exterior walls and the centre line of party walls dividing the dwelling unit from any other dwelling unit or other portion of a building; and (b) in the case of a non-residential building or structure, or in the case of a mixed-use building or structure in respect of the non-residential portion thereof, the total area of all building floors above or below grade measured between the outside surfaces of the exterior walls, or between the outside surfaces of exterior walls and the centre line of party walls dividing a non- residential use and a residential use, except for: (i) a room or enclosed area within the building or structure above or below that is used exclusively for the accommodation of heating, cooling, ventilating, electrical, mechanical or telecommunications equipment that service the building; (ii) loading facilities above or below grade; and (iii) a part of the building or structure below grade that is used for the parking of motor vehicles or for storage or other accessory use; "Industrial" means lands, buildings or structures used or designed or intended for use for manufacturing, processing, fabricating or assembly of raw goods, warehousing or bulk storage of goods, and includes office uses and the sale of commodities to the general public where such uses are accessory to an industrial use, but does not include the sale of commodities to the general public through a warehouse club or a self-storage warehouse; "Institutional" means land, buildings; structures or any part thereof used by any organization, group or association for promotion of charitable, educational or Watson & Associates Economists Ltd. PAGE E-4 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx benevolent objectives and not for profit or gain. For the purposes of Section 3.16, "institutional development" means development of a building or structure intended for use: (a) as a long-term care home within the meaning of subsection 2 (1) of the Long-Term Care Homes Act, 2007; (b) as a retirement home within the meaning of subsection 2 (1) of the Retirement Homes Act, 2010; (c) by any institution of the following post-secondary institutions for the objects of the institution: (i) a university in Ontario that receives direct, regular and ongoing operation funding from the Government of Ontario; (ii) a college or university federated or affiliated with a university described in subclause (i); or (iii) an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institute Act, 2017; (d) as a memorial home, clubhouse or athletic grounds by an Ontario branch of the Royal Canadian Legion; or (e) as a hospice to provide end of life care; "Local Board" means a school board, public utility commission, transportation commission, public library board, board of park management, local board of health, board of commissioners of police, planning board, or any other board, commission, committee, body or local authority established or exercising any power or authority under any general or special Act with respect to any of the affairs or purposes, including school purposes, of the City of Quinte West or any part or parts thereof; "Local services" means those services, facilities or things which are under the jurisdiction of the municipality and are related to a plan of subdivision or within the area to which the plan relates in respect of the lands under Sections 41, 51 or Watson & Associates Economists Ltd. PAGE E-5 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 53 of the Planning Act, R.S.O. 1990, c.P. 13, as amended, or any successor thereof; "Multiple dwellings" means all dwellings other than single-detached, semi- detached and apartment unit dwellings; "Municipality" means the Corporation of the City of Quinte West; "Non-profit housing development" means development of a building or structure intended for use as residential premises by: (a) a corporation to which the Canada Not-for-profit Corporation Act, 2010 applies, that is in good standing under that Act and whose primary objective is to provide housing, (b) a corporation without share capital wo which the Canada Not-for-profit Corporation Act, 2010 applies, that is in good standing under that Act and whose primary object is to provide housing, or (c) a non-profit housing co-operative that is in good standing under the Co- operative Corporations Act, 2022; "Non-residential use" means a building or structure of any kind whatsoever used, designed or intended to be used for other than a residential use; "Official Plan" means the Official Plan adopted for the City, as amended and approved; "Owner" means the owner of land or a person who has made application for an approval for the development of land upon which a development charge is imposed; "Place of worship" means that part of a building or structure that is exempt from taxation as a place of worship under the Assessment Act, R.S.O. 1990, c. A.31, as amended, or any successor thereof; "Rate" means the interest rate established weekly by the Bank of Canada based on Treasury Bills having a term of 91 days; "Regulation" means any regulation made pursuant to the Act; Watson & Associates Economists Ltd. PAGE E-6 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx "Rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises; "Residential Dwelling" means a building, occupied or capable of being occupied as a home, residence or sleeping place by one or more persons, containing one or more Dwelling Units but not including motels, hotels, tents, truck campers, tourist trailers, mobile camper trailers or boarding, lodging or rooming houses; "Residential use" means the use of a building or structure or portion thereof for one or more Dwelling Units. This also includes a Dwelling Unit on land that is used for an Agricultural Use; "Row dwelling" means a building containing three or more attached dwelling units in a single row, each of which dwelling units has an independent entrance from the outside and is vertically separated from any abutting dwelling unit; "School, private" means a private school defined under the Education Act or any successor thereto, being "an institution at which instruction is provided at any time between the hours of 9 a.m. and 4 p.m. on any school day for five or more pupils who are of, or over compulsory school age in any of the subjects of the elementary or secondary school courses of study"; "Semi-detached dwelling" means a dwelling unit in a residential building consisting of two dwelling units having one vertical wall, but not other parts, attached or another dwelling unit where the residential unit are not connected by an interior corridor; "Servicing agreement" means an agreement between a landowner and the municipality relative to the provision of municipal services to specified land within the municipality; "Single detached dwelling unit" means a residential building consisting of one dwelling unit and not attached to another structure; "Stacked townhouse dwelling unit" means row dwelling units, one on top of each other; "City" means the area within the geographic limits of the City of Quinte West; and Watson & Associates Economists Ltd. PAGE E-7 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx "Zoning By-law" means the Zoning By-laws of the City of Quinte West or any successor thereof passed pursuant to Section 34 of the Planning Act, R.S.O. 1990, c.P.13, as amended. 2. DESIGNATION OF SERVICES/CLASSES 2.1 The services and classes for which development charges are imposed under this By­law are as follows: (a) Roads and Related Services; (b) Fire Protection Services; (c) Police Services; (d) Transit Services; (e) Parks and Recreation Services; (f) Library Services; (g) Ambulance Services; (h) Waste Diversion Services; (i) Growth-Related Studies (j) Water Services; and (k) Wastewater Services. 3. APPLICATION OF BY-LAW RULES 3.1 Development charges shall be payable in the amounts set out in this By-law where: (a) the lands are located in the area described in section 3.2; and (b) the development of the lands requires any of the approvals set out in Subsection 3.5 (a). Watson & Associates Economists Ltd. PAGE E-8 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Area to Which By-law Applies 3.2 Subject to section 3.3, this By-law applies to all lands in the City of Quinte West whether or not the land or use thereof is exempt from taxation under s.13 or the Assessment Act. 3.3 Notwithstanding clause 3.2 above, this by-law shall not apply to lands that are owned by and used for the purposes of: (a) the municipality or a local board thereof; (b) a board of education; (c) the Corporation of the County of Hastings, County of Northumberland or a local board thereof; (d) Lower Trent Conservation or Quinte Conservation; (e) a public hospital under the Public Hospitals Act; (f) a place of worship exempt under section 3 of the Assessment Act. or (g) land vested in or leased to a university that receives regular and ongoing operating funds from the government for the purposes of post-secondary education if the Development in respect of which Development Charges would otherwise be payable is intended to be occupied and used by the university. 3.4 Notwithstanding clause 3.2 above, the Water and Wastewater development charges shown in Schedule "A" only apply in areas where the respective service will be available. 3.5 Approvals for Development (a) Development charges shall be imposed on all lands, buildings or structures that are developed for residential or non-residential uses if the development requires: Watson & Associates Economists Ltd. PAGE E-9 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx (i) the passing of a zoning by-law or of an amendment to a zoning by- law under section 34 of the Planning Act, R.S.O. 1990 c.P. 13, as amended; (ii) the approval of a minor variance under section 45 of the Planning Act, R.S.O. 1990 c.P. 13, as amended; (iii) a conveyance of land to which a by-law passed under subsection 50 (7) of the Planning Act, R.S.O. 1990 c.P. 13, as amended applies; (iv) the approval of a plan of subdivision under section 51 of the Planning Act, R.S.O. 1990 c.P. 13, as amended; (v) a consent under section 53 of the Planning Act, R.S.O. 1990 c.P. 13, as amended; (vi) the approval of a description under section 50 of the Condominium Act, S.O. 1998, C.19, as amended, or any successor thereof; or (vii) the issuing of a permit under the Building Code Act, S.O. 1992, C.23, as amended in relation to a building or structure. (b) No more than one development charge for each service/class designated in section 2.1, shall be imposed upon any lands, buildings or structures to which this By-law applies even though two or more of the actions described in subsection 3.5(a) are required before the lands, buildings or structures can be developed. (c) Despite subsection 3.5 (b), if two or more of the actions described in Subsection 3.5 (a) occur at different times, additional development charges shall be imposed if the subsequent action has the effect of increasing the need for services. Local Service Installation 3.6 Nothing in this By-law prevents Council from requiring, as a condition of an agreement under Section 41, 51 or 53 of the Planning Act, R.S.0. 1990, c.P. 13, as amended, that the owner, at his or her own expense, shall install or pay for Watson & Associates Economists Ltd. PAGE E-10 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx such local services, within the Plan of Subdivision or Condominium or within the area to which the plan or site plan control agreement relates, as Council may require. Exemptions 3.7 Notwithstanding provisions of this By-law, no Development Charges shall be imposed with respect to Developments or portions of Developments as follows: (a) The enlargement of an existing Dwelling Unit; (b) a second residential Dwelling Unit in an existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row-Townhouse Dwelling on a parcel of land on which Residential Use, other than ancillary Residential Use, is permitted, if all Buildings and structures ancillary to the existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row- Townhouse Dwelling cumulatively contain no more than one residential Dwelling Unit; (c) a third residential Dwelling Unit in an existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row-Townhouse Dwelling on a parcel of land on which Residential Use, other than ancillary Residential Use, is permitted, if no Building or structure ancillary to the existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row-Townhouse Dwelling contains any residential Dwelling Units; (d) one residential Dwelling Unit in a Building or structure ancillary to an existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row-Townhouse Dwelling on a parcel of land, if the existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row-Townhouse Dwelling contains no more than two residential Dwelling Units and no other Building or structure ancillary to the existing or new Single Detached Dwelling, Semi-Detached Dwelling, or Row-Townhouse Dwelling contains any residential Dwelling Units; or (e) in an existing rental residential Building, which contains four or more residential Dwelling Units, the creation of the greater of one residential Dwelling Unit or one per cent of the existing residential Dwelling Units. Watson & Associates Economists Ltd. PAGE E-11 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 3.8 Exemption for Industrial Development: (a) Notwithstanding any other provision of this by-law, no development charge is payable with respect to an enlargement of the gross floor area of an existing industrial building where the gross floor area is enlarged by 50 percent or less. (b) If the gross floor area of an existing industrial building is enlarged by greater than 50 percent, the amount of the development charge payable in respect of the enlargement is the amount of the development charge that would otherwise be payable multiplied by the fraction determined as follows: (i) determine the amount by which the enlargement exceeds 50 percent of the gross floor area before the enlargement; (ii) divide the amount determined under subsection 3.8 (b) (i) by the amount of the enlargement; (c) that for greater certainty in applying the exemption in this section, the gross floor area of an existing industrial building is enlarged where there is a bona fide increase in the size of the existing industrial building, the enlarged area is attached to the existing industrial building, there is a direct means of ingress and egress from the existing industrial building to and from the enlarged areas for persons, goods, and equipment, and the existing industrial building and the enlarged area are used for or in connection with an industrial purpose as set out in subsection 1.1 of this by-law. Without limiting the generality of the foregoing, the exemption in this section shall not apply where the enlarged area is attached to the existing industrial building by means only of a tunnel, bridge, canopy, corridor, or other passageway, or through a shared below-grade connection such as a service tunnel, foundation, footing, or a parking facility; 3.9 Other Exemptions Watson & Associates Economists Ltd. PAGE E-12 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx (a) Notwithstanding the provision of this by-law, development charges shall not be imposed with respect to: (i) Where a lot levy, impost fee or development charge was collected as a condition for a lot created by consent pursuant to Section 53 of Planning Act, R.S.O. 1990 c.P. 13, as amended, then the amount collected shall be deducted from the Development Charges payable at the time a building permit is issued. (ii) A grant equal to the calculated charge for residential and non- residential development within the commercial core areas as defined by Schedules "B" and "C" may be provided subject to the development complying with the guidelines and other requirements included in Community Improvement Plan(s) approved under Section 28 of the Planning Act, R.S.O. c.P. 13, 1990, as amended. (iii) Affordable residential units required pursuant to section 34 and 16(4) of the Planning Act (Inclusionary Zoning); (iv) Affordable and attainable residential units as follows: (1) As of the date on which section 4.1 of the Act is proclaimed into force, affordable residential units that meet the criteria set out in subsection 4.1 (2) or 4.1 (3) of the Act shall be exempt from Development Charges (2) As of the date on which subsection 4.1 (4) of the Act is proclaimed into force, attainable residential units that meet the criteria set out in subsection 4.1 (4) of the Act shall be exempt from Development Charges 3.10 Discounts for Rental Housing: (a) Three or more bedrooms - 25% reduction; (b) Two bedrooms - 20% reduction; and (c) All other bedroom quantities - 15% reduction. Watson & Associates Economists Ltd. PAGE E-13 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx Amount of Charges Residential 3.11 The development charges set out in Schedule "A" shall be imposed on residential uses of lands, buildings or structures, including a dwelling unit accessory to a non­residential use and, in the case of a mixed-use building or structure, on the residential uses in the mixed-use building or structure, according to the type of residential unit, and calculated with respect to each of the services according to the type of residential use. Non-Residential 3.12 The development charges described in Schedule "A" to this by-law shall be imposed on non-residential uses of lands, buildings or structures, and, in the case of a mixed-use building or structure, on the non-residential uses in the mixed-use building or structure and calculated with respect to each of the services according to the total floor area of the non-residential use. Reduction of Development Charges for Redevelopment 3.13 Despite any other provisions of this By-law, where, as a result of the redevelopment of land, a building or structure existing on the same land within 3 years prior to the date of payment of development charges in regard to such redevelopment was, or is to be demolished, in whole or in part, or converted from one principal use to another principal use on the same land, in order to facilitate the redevelopment, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, or in the case of a mixed- use building or structure, the residential uses in the mixed-use building or structure, an amount calculated by multiplying the applicable development charge under subsection 3.11 by the number, according to type, of dwelling units that have been or will be demolished or converted to another principal use; and (b) in the case of a non-residential building or structure or, in the case of mixed-use building or structure, the non-residential uses in the mixed-use Watson & Associates Economists Ltd. PAGE E-14 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx building or structure, an amount calculated by multiplying the applicable development charges under subsection 3.12, by the gross floor area that has been or will be demolished or converted to another principal use; provided that such amounts shall not exceed, in total, the amount of the development charges otherwise payable with respect to the redevelopment. Time of payment of Development Charges 3.14 Development charges imposed under this By-law are calculated, payable, and collected upon issuance of a building permit for the development. 3.15 Notwithstanding subsection 3.14, Development Charges for rental housing and institutional developments are due and payable in 6 installments commencing with the first installment payable on the date of occupancy, and each subsequent installment, including interest, payable on the anniversary date each year thereafter. 3.16 Notwithstanding subsection 3.14, Development Charges for non-profit housing developments are due and payable in 21 installments commencing with the first installment payable on the date of occupancy, and each subsequent installment, including interest, payable on the anniversary date each year thereafter. 3.17 Where the development of land results from the approval of a Site Plan or Zoning By-law Amendment received on or after January 1, 2020, and the approval of the application occurred within the prescribed amount of time of building permit issuance, the Development Charges under Subsections 3.11 and 3.12 shall be calculated on the rates set out in Schedule "A" on the date of the planning application, including interest. Where both planning applications apply Development Charges under Subsections 3.11 and 3.12 shall be calculated on the rates, including interest, set out in Schedules "A" on the date of the later planning application. 3.18 Interest for the purposes of sections 3.15 to 3.17 shall be determined as the base rate plus 1 %, where: (a) The base rate shall be equal to the average prime rate on: Watson & Associates Economists Ltd. PAGE E-15 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx (i) October 15 of the previous year, if the adjustment date is January 1, (ii) January 15 of the same year, if the adjustment date is April 1, (iii) April 15 of the same year, if the adjustment date is July 1, and (iv) July 15 of the same year, if the adjustment date is October 1. (b) The average prime rate, on a particular date means, the mean, rounded to the nearest hundredth of a percentage point, of the annual rates of interest announced by each of the Royal Bank of Canada, The Bank of Nova Scotia, the Canadian Imperial Bank of Commerce, the Bank of Montreal and The Toronto-Dominion Bank to be its prime or reference rate of interest in effect on that date for determining interest rates on Canadian dollar commercial loans by that bank in Canada. 3.19 For the purposes of section 3.14 to 3.17, interest calculated under section 3.18 shall not apply where the calculated charges calculated under section 3.17 are the same as the charges that would be calculated under subsection 3.14. 3.20 Despite sections 3.14 to 3.17, Council from time to time, and at any time, may enter into agreements providing for all or any part of a development charge to be paid before or after it would otherwise be payable, in accordance with section 27 of the Act. 4. PAYMENT BY SERVICES 4.1 Despite the payment required under subsections 3.11 and 3.12, Council may, by agreement, give a credit towards a development charge in exchange for work that relates to a service to which a development charge relates under this By-law. 5. INDEXING 5.1 Development Charges imposed pursuant to this By-law shall be adjusted annually, without amendment to this By-law, on December 31st of each year (commencing in 2025), in accordance with the prescribed index in the Act. Watson & Associates Economists Ltd. PAGE E-16 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 6. SCHEDULES 6.1 The following schedules shall form part of this By-law: Schedule "A" Residential and Non-Residential Development Charges Schedule "B" Map of Commercial Core Area - Trenton Schedule "C" Map of Commercial Core Area - Frankford 7. CONFLICTS 7.1 Where the City and an owner or former owner have entered into an agreement with respect to land within the area to which this By-law applies, and a conflict exists between the provisions of this By-law and such agreement, the provisions of the agreement shall prevail to the extent that there is a conflict. 7.2 Notwithstanding section 7.1, where a development which is the subject of an agreement to which section 7.1 applies, is subsequently the subject of one or more of the actions described in subsection 3.5(a), an additional development charge in respect of the development permitted by the action shall be calculated, payable and collected in accordance with the provisions of this By-law if the development has the effect of increasing the need for services, unless such agreement provides otherwise. 8. SEVERABILITY 8.1 If, for any reason, any provision of this By-law is held to be invalid, it is hereby declared to be the intention of Council that all the remainder of this By-law shall continue in full force and effect until repealed, re-enacted, amended or modified. 9. HEADINGS FOR REFERENCE ONLY 9.1 The headings inserted in this By-law are for convenience only and shall not affect the construction of interpretation of this By-law. 10. DATE BY-LAW IN FORCE 10.1 This By-law shall come into force and effect on ____________. Watson & Associates Economists Ltd. PAGE E-17 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx 11. DATE BY-LAW EXPIRES 11.1 This By-law will expire ten years after the effective date, unless it is repealed by Council at an earlier date. 12. EXISTING BY-LAW REPEALED 12.1 By-law Number 20-124 is hereby repealed as of the date and time of this By-law coming into effect. 13. SHORT TITLE 13.1 This By-law may be cited as the "City of Quinte West Development Charges By- law 2024." Read a First, Second and Third Time and Finally Passed This _____ Day of _____, 2024. ____________________________________ , Mayor ____________________________________ , City Clerk Watson & Associates Economists Ltd. PAGE E-18 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx SCHEDULE "A" to BY-LAW 24-XXX SCHEDULE OF DEVELOPMENT CHARGES NON-RESIDENTIAL Single and Semi- Detached Dwelling Other Multiples Apartments - 2 Bedrooms + Apartments - Bachelor and 1 Bedroom (per sq.m. of Gross Floor Area) Municipal Wide Services Services Related to a Highway 9,638 6,922 7,375 4,192 51.02 Fire Protection Services 170 122 130 74 0.97 Policing Services 775 557 593 337 4.31 Transit Services 85 61 65 37 0.43 Parks and Recreation Services 535 384 409 233 0.65 Library Services 280 201 214 122 0.32 Ambulance 246 177 188 107 1.40 Waste Diversion 72 52 55 31 0.00 Growth-Related Studies 150 108 115 65 0.75 Total Municipal Wide Services 11,951 8,584 9,144 5,198 59.85 Urban Services Wastewater Services 21,674 15,566 16,585 9,427 113.45 Water Services 3,900 2,801 2,984 1,696 19.81 Total Urban Services 25,574 18,367 19,569 11,123 133.26 TOTAL RURAL AREA 11,951 8,584 9,144 5,198 59.85 TOTAL WATER ONLY SERVICED AREA 15,851 11,385 12,128 6,894 79.65 TOTAL URBAN AREA (WATER AND WASTEWATER SERVICES) 37,525 26,951 28,713 16,321 193.10 RESIDENTIAL Service Watson & Associates Economists Ltd. PAGE E-19 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx SCHEDULE "B" TO BY-LAW 24-XXX MAP OF COMMERCIAL CORE AREA - TRENTON Schedule B Watson & Associates Economists Ltd. PAGE E-20 H:\Quinte West\2023 DC\Report\2024 Development Charge Background Study - FINAL.docx SCHEDULE "C" TO BY-LAW 24-XXX MAP OF COMMERCIAL CORE AREA - FRANKFORD Schedule C