Bylaw No. 2023.22 (Building By-law)

Ramara, Ontario · No. 2023.22 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 9c9f7daad1c4 · verified 2026-08-29 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

BILL NO. 2023.06 THE CORPORATION OF THE TOWNSHIP OF RAMARA BYLAW NO. 2023.22 THE CORPORATION OF THE TOWNSHIP OF RAMARA BYLAW NO. 2023.22 BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES BEING A BYLAW TO PROVIDE FOR THE ADMINISTRATION AND ENFORCEMENT OF THE BUILDING CODE ACT AND WITH RESPECT TO THE ESTABLISHMENT AND REQUIREMENT OF THE PAYMENT OF FEES FOR INFORMATION AND SERVICES WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; WHEREAS Section 3 (1) of the Building Code Act, S.O. 1992, Chapter 23, as amended, provides that the council of each municipality is responsible for the enforcement of the Building Code Act, 1992, as amended, in the municipality; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Subsection 8(3.1) of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, provides that Council may, in writing, delegate to the Chief Building Official the power to enter into agreements described in clause 8(3)(c) of the Act; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, authorizes Council to pass certain bylaws respecting construction, demolition, change of use, transfer of permits, permit application documents, forms, setting and refunding of fees, penalties, inspections, governing prescribed inspection programs, and other related matters; AND WHEREAS Section 442 of the Municipal Act, 1991, as amended to authorize the enforcement of agreements by the Municipality; AND WHEREAS Section 442 of the Municipal Act, 1991, as amended to authorize the enforcement of agreements by the Municipality; AND WHEREAS Section 442 of the Municipal Act, 1991, as amended to authorize the enforcement of agreements by the Municipality; AND WHEREAS Section 442 of the Municipal Act, 1991, as amended to authorize the enforcement of agreements by the Municipality; AND WHEREAS Section 442 of the Municipal Act, 1991, as amended to authorize the enforcement of agreements by the Municipality; AND WHEREAS the Township has an existing Building Bylaw, Bylaw 2011.20 as amended which will be repealed. AND WHEREAS the Township has an existing Building Bylaw, Bylaw 2011.20 as amended which will be repealed. AND WHEREAS the Township has an existing Building Bylaw, Bylaw 2011.20 as amended which will be repealed. AND WHEREAS the Township has an existing Building Bylaw, Bylaw 2011.20 as amended which will be repealed. AND WHEREAS the Township has an existing Building Bylaw, Bylaw 2011.20 as amended which will be repealed. AND WHEREAS the Township has an existing Building Bylaw, Bylaw 2011.20 as amended which will be repealed. NOW THEREFORE, the Council of the Corporation of the Township of Ramara hereby enacts as follows: NOW THEREFORE, the Council of the Corporation of the Township of Ramara hereby enacts as follows: CONTENTS 1. Citation 2. Definitions 2. Definitions 2. Definitions 3. Classes of Permits 3. Classes of Permits 3. Classes of Permits 3. Classes of Permits 4. Requirements for Applications 4. Requirements for Applications 4. Requirements for Applications 5. Plans and Specifications - General 5. Plans and Specifications - General 5. Plans and Specifications - General 5. Plans and Specifications - General 5. Plans and Specifications - General 5. Plans and Specifications - General 6. Plans and Specifications - Certified House Models 6. Plans and Specifications - Certified House Models 6. Plans and Specifications - Certified House Models 6. Plans and Specifications - Certified House Models 6. Plans and Specifications - Certified House Models 6. Plans and Specifications - Certified House Models 7. Revocation of Permit 7. Revocation of Permit 7. Revocation of Permit 8. Revisions to Application and Permit 8. Revisions to Application and Permit 8. Revisions to Application and Permit 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect 9. As Constructed Plans and Documents 10. Transfer of Permit 11. Alternative Solutions Proposals 12. Sewage System Maintenance Inspection Program 13. Fees 14. Refunds 15. Recovery of Fees 16. Notice of Inspections 17. Fences at Construction and Demolition Sites 18. Delegated Authority to Chief Building Official 19. Offences and Penalties 20. Date and Effect Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms Schedule A - Permit Fees Schedule B - Refunds Schedule C - Plans, Documents and Specifications Schedule D - Design of On-Site Sewage System Forms 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless 1. CITATION 1.1. This Bylaw may be cited as the "Building Bylaw". 1.2. All references made within this Bylaw shall be found within this Bylaw unless otherwise noted. 2. DEFINITIONS 2.1. The following words in this Bylaw shall have the meaning as follows; 2. DEFINITIONS 2.1. The following words in this Bylaw shall have the meaning as follows; 2. DEFINITIONS 2.1. The following words in this Bylaw shall have the meaning as follows; 2. DEFINITIONS 2.1. The following words in this Bylaw shall have the meaning as follows; 2. DEFINITIONS 2.1. The following words in this Bylaw shall have the meaning as follows; 2. DEFINITIONS 2.1. The following words in this Bylaw shall have the meaning as follows; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; a. Act means the Building Code Act, S.O. 1992, chapter 23, as amended; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; b. Alternative solution means a substitute for an acceptable solution as set out in Parts 3 to 12 of Division B of the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; c. Applicable law means the list of applicable laws as prescribed by the Building Code; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; d. Applicant means the owner of a building or property who applies for a permit or any authorized agent who applies for a permit on the owner's behalf or any person or corporation empowered by statute to cause the construction or demolition of a building or buildings and anyone acting under the authority of that person or corporation; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; e. Authorized agent means a person who has been authorized in writing to act on the owner's behalf for matters relating to an application for a permit; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; f. As constructed plans means construction plans and specifications that show the building and the location of the building on the property as the building has been constructed; g. Building means that as defined in Section 1(1) of the Act; g. Building means that as defined in Section 1(1) of the Act; g. Building means that as defined in Section 1(1) of the Act; g. Building means that as defined in Section 1(1) of the Act; g. Building means that as defined in Section 1(1) of the Act; g. Building means that as defined in Section 1(1) of the Act; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; h. Building Code means any regulations made under Section 34 of the Act and any amendments thereto; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; i. Certified House Model means a unique building design for a detached house containing not more than one dwelling in each house that is intended to be constructed on separate properties by the same person or company; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; j. Change of Use Permit means a permit issued under Subsection 10(1) of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; k. Chief Building Official means the person appointed by a Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; l. Complete application means an application that meets the minimum requirements set out in the Building Code and the requirements of this Bylaw; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; m. Conditional Permit means a building permit issued by the Chief Building Official under Subsection 8(3) of the Act; n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. n. Development Agreement means an agreement between the Chief Building Official and a permit holder to defer revocation or restate a revoked permit. This agreement can include strict timeframes for development and inspections, it shall be subject to additional fees and may also include a deposit. o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; o. Electronic Submission means filing of an application for the building permit, certified house model or an alternative solution, including all required forms, documents, drawings, specification, submitted through the electronic application procedure approved by the Chief Building Official; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; p. Inspector means a person appointed by Bylaw of The Corporation of the Township of Ramara for the purpose of enforcement of the Act; q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. q. Inspection(s) means an inspection preformed at a property of a particular element or assembly of a building as mandated to be inspected by either the Building Code, and/or the current edition of the Township of Ramara Building Bylaw. r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been r. Owner means the registered owner of the land or property for which a permit application is submitted, a permit has been issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; issued, or that contains an on-site sewage system for the purposes of the Sewage System Maintenance Inspection Program and includes the registered owner, and/or a lessee and/or a mortgagee in possession; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; s. Permit means permission or authorization in writing issued by the Chief Building Official to perform work or to occupy a building or part thereof, as regulated by the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; t. Permit holder means the owner to whom the permit has been issued or, where the permit has been transferred, the transferee, and shall be the person who assumes the primary responsibility for compliance with the Act and the Building Code; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; u. Sewage System Maintenance Inspection Program means that as defined by the Building Code Act, and that is implemented by the Township to govern inspections and related matters of existing on-site sewage systems; v. Township means The Corporation of the Township of Ramara; v. Township means The Corporation of the Township of Ramara; v. Township means The Corporation of the Township of Ramara; v. Township means The Corporation of the Township of Ramara; v. Township means The Corporation of the Township of Ramara; w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. w. Work means the construction, demolition or change of use of a building or part thereof as regulated by the Building Code and includes remedial efforts respecting the Sewage System Maintenance Inspection Program. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 2.2. Terms not defined in this Bylaw shall have the meaning as ascribed to them in the Act or the Building Code. 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include 3. CLASSES OF PERMITS 3.1. Building Permit This permit is required under Subsection 8(1) of the Act and may include plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. plumbing, heating, ventilation and air conditioning system, on-site sewage systems, farm buildings and designated structures as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code and signs as set out in Division A, Sentence 1.3.1.1.(1) of the Building Code. 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in 3.2. Demolition Permit This permit is required under Subsection 8(1) of the Act. 3.3. Change of Use Permit This permit is required under Subsection 10(1) of the Act when a change in use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. use of the building or parts thereof will result in an increase in hazard as determined under the Building Code even though no construction is proposed. 3.4. Conditional Permit 3.4. Conditional Permit 3.4. Conditional Permit This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. This permit may be issued by the Chief Building Official in accordance with Subsection 8(3) of the Act to authorize any stage of construction, even though all of the requirements under Subsection 8(2) of the Act have not been met. 3.5. Occupancy Permit 3.5. Occupancy Permit 3.5. Occupancy Permit This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. This permit is required under Division C, Subsection 1.3.3. of the Building Code where all or part of a building will be occupied. 4. REQUIREMENTS FOR APPLICATIONS 4. REQUIREMENTS FOR APPLICATIONS 4. REQUIREMENTS FOR APPLICATIONS 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.1. To obtain a permit, the owner or an authorized agent shall submit the applicable prescribed permit application form to the Chief Building Official. 4.2. If the property is owned by a corporation or business a copy of a certificate of incorporation is required to accompany the application. 4.2. If the property is owned by a corporation or business a copy of a certificate of incorporation is required to accompany the application. 4.2. If the property is owned by a corporation or business a copy of a certificate of incorporation is required to accompany the application. 4.2. If the property is owned by a corporation or business a copy of a certificate of incorporation is required to accompany the application. 4.2. If the property is owned by a corporation or business a copy of a certificate of incorporation is required to accompany the application. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.3. All forms prescribed by the Building Code and the Chief Building Official are available at the Township office, Township website or building permit software. 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: 4.4. Where an application is made for a Building Permit under Subsection 8.(1) of the Act, the application shall: a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; a. Include the completed permit application and schedule forms as prescribed by the Building Code; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; b. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; c. Identify and describe the work and use to be covered by the permit for which the application is made; d. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; d. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; d. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; d. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; e. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner, applicant, architect, professional engineer, designer, contractor, installer or constructor, where applicable; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; f. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Architects Act, as amended, and/or the Professional Engineers Act, as amended, and/or the Building Code, as amended, requires the designer be an architect and/or a professional engineer; g. Include all necessary completed forms as deemed required and prescribed by the Chief Building Official. g. Include all necessary completed forms as deemed required and prescribed by the Chief Building Official. g. Include all necessary completed forms as deemed required and prescribed by the Chief Building Official. g. Include all necessary completed forms as deemed required and prescribed by the Chief Building Official. g. Include all necessary completed forms as deemed required and prescribed by the Chief Building Official. 4.5. Where an application is made for a Demolition Permit under Subsection 8(1) of the Act, the application shall: 4.5. Where an application is made for a Demolition Permit under Subsection 8(1) of the Act, the application shall: 4.5. Where an application is made for a Demolition Permit under Subsection 8(1) of the Act, the application shall: 4.5. Where an application is made for a Demolition Permit under Subsection 8(1) of the Act, the application shall: 4.5. Where an application is made for a Demolition Permit under Subsection 8(1) of the Act, the application shall: 4.5. Where an application is made for a Demolition Permit under Subsection 8(1) of the Act, the application shall: h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; h. Include a completed permit application form as prescribed by the Building Code; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; i. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; j. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; j. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; j. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; j. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; j. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; k. State the names, addresses, telephone numbers, fax numbers and email addresses of the owner and of the architect, professional engineer, designer, contractor or constructor, where applicable; l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and l. Be accompanied by a completed Commitment to General Reviews form as prescribed by the Chief Building Official when the Building Code requires a professional engineer to undertake the general review of the demolition; and m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. m. Be accompanied by proof satisfactory to the Chief Building Official that arrangements have been made with the proper authorities, where applicable, for the disconnection and capping of all water, sewer, gas, electric, telephone or other utilities and services. 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: 4.6. Where application is made for a Change of Use Permit issued under Subsection 10(1) of the Act, the application shall: n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; n. Include a completed permit application form as prescribed by the Chief Building Official; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; o. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with the Building Code and any applicable law; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; p. Describe the building in which the occupancy is to be changed by a description that will readily identify and locate the building; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; q. Identify and describe in detail the current and proposed occupancies of the building or part of a building for which the application is made; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; r. Include plans and specifications which show the current and proposed occupancy of all parts of the building and which contain sufficient information to establish compliance with the requirements of the Building Code, including, but not limited to, floor plans, details of wall, ceiling and roof assemblies identifying required fire resistance ratings and load bearing capacities and details of the existing on-site sewage system, if any; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; s. Be accompanied by a report from a qualified person as prescribed by the Building Code confirming that the change of use will not result in an increase in hazard; t. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; and t. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; and t. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; and t. Be accompanied by all appropriate fees that are set out in Schedule A to this Bylaw; and u. State the name, address, telephone number and email address of the owner. u. State the name, address, telephone number and email address of the owner. u. State the name, address, telephone number and email address of the owner. u. State the name, address, telephone number and email address of the owner. u. State the name, address, telephone number and email address of the owner. u. State the name, address, telephone number and email address of the owner. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.7. Receipt of a submission for an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official, and the receipt of such application shall not guarantee its consideration. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.8. Consideration of, or declining to consider an application for a Conditional Permit shall be at the sole discretion of the Chief Building Official and, if a Conditional Permit is issued, it shall not be construed to authorize construction beyond the scope for which conditional approval is given. 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: 4.9. Where application is accepted at the discretion of the Chief Building Official for a Conditional Permit under Subsection 8(3) of the Act, the application shall: v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; v. Be preceded by an application for a Building Permit set out in subsection 4.3 and filed with the Chief Building Official; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; w. Be accompanied by the plans and specifications prescribed by this Bylaw and any associated information or approvals required to demonstrate compliance with any applicable law; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; x. Include a completed Conditional Permit application form as prescribed by the Chief Building Official; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; y. State in writing to the Chief Building Official the reasons why the applicant believes that unreasonable delays in construction would occur if a Conditional Permit is not granted; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; z. State the necessary approvals which must be obtained in respect of the proposed building and the date or time by which such approvals will be obtained; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; aa. Be accompanied by the Township's Conditional Permit Agreement form, authorized by Clause 8(3)(c) of the Act, which must be signed by the owner or an authorized agent who has the authority to bind the owner; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; bb. In the event that the conditions have not been satisfied beyond the date that is prescribed in a Conditional Permit Agreement, the agreement shall be considered as expired, all work shall stop and a request for an extension shall be made by the permit holder; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; cc. Be accompanied by a security deposit determined by the Chief Building Official and; dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. dd. In addition to fees prescribed for the Building Permit application, be accompanied by all Conditional Permit fee as set out in Schedule A to this Bylaw. 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: 4.10. To obtain an Occupancy Permit as required by Division C, Subsection 1.3.3. of the Building Code, the owner or authorized agent shall: ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ee. Notify the Chief Building Official of the completion of construction required to occupy or permit the occupancy of a building; ff. Describe the part of the building for which occupancy is requested; Describe the part of the building for which occupancy is requested; Describe the part of the building for which occupancy is requested; Describe the part of the building for which occupancy is requested; Describe the part of the building for which occupancy is requested; Describe the part of the building for which occupancy is requested; gg. Submit plans showing portion(s) of the floor area(s) to be occupied complete with location(s) of temporary exits if applicable; gg. Submit plans showing portion(s) of the floor area(s) to be occupied complete with location(s) of temporary exits if applicable; gg. Submit plans showing portion(s) of the floor area(s) to be occupied complete with location(s) of temporary exits if applicable; gg. Submit plans showing portion(s) of the floor area(s) to be occupied complete with location(s) of temporary exits if applicable; gg. Submit plans showing portion(s) of the floor area(s) to be occupied complete with location(s) of temporary exits if applicable; gg. Submit plans showing portion(s) of the floor area(s) to be occupied complete with location(s) of temporary exits if applicable; hh. Submit all general review reports where the Building Code requires the construction to be reviewed by an architect and/or a professional engineer; and hh. Submit all general review reports where the Building Code requires the construction to be reviewed by an architect and/or a professional engineer; and hh. Submit all general review reports where the Building Code requires the construction to be reviewed by an architect and/or a professional engineer; and hh. Submit all general review reports where the Building Code requires the construction to be reviewed by an architect and/or a professional engineer; and hh. Submit all general review reports where the Building Code requires the construction to be reviewed by an architect and/or a professional engineer; and hh. Submit all general review reports where the Building Code requires the construction to be reviewed by an architect and/or a professional engineer; and ii. Ensure a potable water supply where the building utilizes an on- site private water system. Ensure a potable water supply where the building utilizes an on- site private water system. Ensure a potable water supply where the building utilizes an on- site private water system. Ensure a potable water supply where the building utilizes an on- site private water system. Ensure a potable water supply where the building utilizes an on- site private water system. Ensure a potable water supply where the building utilizes an on- site private water system. jj. Submit a copy of Electrical Safety Authority (ESA) final completion certificate. Submit a copy of Electrical Safety Authority (ESA) final completion certificate. 4.11. A building shall not be occupied, permitted to be occupied or 4.11. A building shall not be occupied, permitted to be occupied or 4.11. A building shall not be occupied, permitted to be occupied or 4.11. A building shall not be occupied, permitted to be occupied or 4.11. A building shall not be occupied, permitted to be occupied or commissioned into service without the written authorization from the Chief Building Official or Inspector. commissioned into service without the written authorization from the Chief Building Official or Inspector. commissioned into service without the written authorization from the Chief Building Official or Inspector. commissioned into service without the written authorization from the Chief Building Official or Inspector. commissioned into service without the written authorization from the Chief Building Official or Inspector. commissioned into service without the written authorization from the Chief Building Official or Inspector. 5. PLANS AND SPECIFICATION - GENERAL 5. PLANS AND SPECIFICATION - GENERAL 5. PLANS AND SPECIFICATION - GENERAL 5. PLANS AND SPECIFICATION - GENERAL 5. PLANS AND SPECIFICATION - GENERAL 5. PLANS AND SPECIFICATION - GENERAL 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will 5.1. Sufficient information shall be submitted with each application for a permit to enable the Chief Building Official, in his/her sole discretion, to determine whether or not the proposed construction, demolition or change of use will conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. conform to the Act, the Building Code, this Bylaw and any other applicable law. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.2. Each application for a Construction, Demolition, Change of Use and Conditional Permit shall be accompanied with a complete sets of accurate and legible plans and specifications as set out in Schedule C to this Bylaw in order for an application to be deemed as complete. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.3. Unless otherwise permitted by the Chief Building Official, a Site Grading Plan will be required to accompany a permit application. A Site Grading Plan shall be prepared by a land surveyor or professional engineer. Site Grading Plans shall follow the specifications as set out in Schedule C to this Bylaw. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.4. Where a building greater than 15sqm is erected within 0.5m of a required yard as defined by the Township's Zoning Bylaw, the permit holder shall have the foundation located by an Ontario Land Surveyor after the site is excavated and provide written verification to the Township that the building complies with the required setbacks. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.5. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. 5.6. Paper submissions will be charged a paper submission fee as outlined in Schedule A of this Bylaw, the maximum acceptable paper plan size is 24" x 36". 5.6. Paper submissions will be charged a paper submission fee as outlined in Schedule A of this Bylaw, the maximum acceptable paper plan size is 24" x 36". 5.6. Paper submissions will be charged a paper submission fee as outlined in Schedule A of this Bylaw, the maximum acceptable paper plan size is 24" x 36". 5.6. Paper submissions will be charged a paper submission fee as outlined in Schedule A of this Bylaw, the maximum acceptable paper plan size is 24" x 36". 5.6. Paper submissions will be charged a paper submission fee as outlined in Schedule A of this Bylaw, the maximum acceptable paper plan size is 24" x 36". 6. PLANS AND SPECIFICATIONS - CERTIFED HOUSE MODELS 6. PLANS AND SPECIFICATIONS - CERTIFED HOUSE MODELS 6. PLANS AND SPECIFICATIONS - CERTIFED HOUSE MODELS 6. PLANS AND SPECIFICATIONS - CERTIFED HOUSE MODELS 6. PLANS AND SPECIFICATIONS - CERTIFED HOUSE MODELS 6. PLANS AND SPECIFICATIONS - CERTIFED HOUSE MODELS 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.1. An applicant may submit an application for review of a Certified House Model design to confirm substantial compliance of said design with the technical provisions of the Building Code and the Township's Zoning Bylaw. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.2. Approval of a Certified House Model design is only applicable to the subdivision for which it was submitted unless otherwise determined by the Chief Building Official. 6.3. Where an application is made for review of a Certified House Model, the application shall: 6.3. Where an application is made for review of a Certified House Model, the application shall: 6.3. Where an application is made for review of a Certified House Model, the application shall: 6.3. Where an application is made for review of a Certified House Model, the application shall: 6.3. Where an application is made for review of a Certified House Model, the application shall: 6.3. Where an application is made for review of a Certified House Model, the application shall: a. Comply with the requirements set out in Section 5; a. Comply with the requirements set out in Section 5; a. Comply with the requirements set out in Section 5; a. Comply with the requirements set out in Section 5; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; b. Include a completed Certified House Model application form as prescribed by the Chief Building Official; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; c. Except for a site plan and grading plan, be accompanied by the plans and specifications prescribed by this Bylaw for a Building Permit; d. Include completed forms as deemed required and prescribed by the Chief Building Official; and d. Include completed forms as deemed required and prescribed by the Chief Building Official; and d. Include completed forms as deemed required and prescribed by the Chief Building Official; and d. Include completed forms as deemed required and prescribed by the Chief Building Official; and d. Include completed forms as deemed required and prescribed by the Chief Building Official; and d. Include completed forms as deemed required and prescribed by the Chief Building Official; and e. Be accompanied by all fees that are set out in Schedule A to this Bylaw. e. Be accompanied by all fees that are set out in Schedule A to this Bylaw. e. Be accompanied by all fees that are set out in Schedule A to this Bylaw. e. Be accompanied by all fees that are set out in Schedule A to this Bylaw. e. Be accompanied by all fees that are set out in Schedule A to this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 6.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: 7. REVOCATION OF PERMITS 7.1. The Chief Building Official may revoke a permit where: a. work has not substantially commenced within 6 months of the date of issuance, or a. work has not substantially commenced within 6 months of the date of issuance, or a. work has not substantially commenced within 6 months of the date of issuance, or a. work has not substantially commenced within 6 months of the date of issuance, or a. work has not substantially commenced within 6 months of the date of issuance, or a. work has not substantially commenced within 6 months of the date of issuance, or a. work has not substantially commenced within 6 months of the date of issuance, or b. work has been suspended for more than 1 year. b. work has been suspended for more than 1 year. b. work has been suspended for more than 1 year. b. work has been suspended for more than 1 year. b. work has been suspended for more than 1 year. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.2. The Chief Building Official may give written notice to a permit holder of an intention to revoke a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.3. Where written notice is provided prior to revoking a permit, the Chief Building Official may, in his/her sole discretion, consider a written request by the permit holder to defer revocation of a permit. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.4. The Chief Building Official, having regard to any material changes to the Act, Building Code or other applicable law, may allow a deferral of revocation of a permit, subject to fees as outlined in Schedule A of this Bylaw. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.5. The Chief Building Official, may require the permit holder to enter into a development agreement enforceable by Section 442 by the Municipal Act to defer the revocation of, or restatement of a revoked permit. This development agreement shall be subject to additional fees under Schedule A of this Bylaw and may also require a deposit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 7.6. Subject to Section 25 of the Act, the Chief Building Official is under no obligation to defer revocation of a permit. 8. REVISIONS TO APPLICATION OR PERMIT 8. REVISIONS TO APPLICATION OR PERMIT 8. REVISIONS TO APPLICATION OR PERMIT 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.1. Where the design or scope of work authorized by an issued permit changes, the owner shall submit sufficiently detailed and revised plans and specifications, as set out in Section 5, that describe the proposed work prior to carrying out the proposed work. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.2. Sufficient material changes to the design or scope of work may constitute the need for a new application for permit as determined by the Chief Building Official in his/her sole discretion. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.3. A revision to a permit application, an issued permit or an approved Certified House Model design shall be accompanied by all fees as set out in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 8.4. Electronic submission of permit applications including forms, drawings, specifications and supporting documents is preferred and shall be in a format that is suitable to the Chief Building Official. Paper forms and plans will be charged a paper submission fee as outlined in Schedule A of this Bylaw. 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: 9. AS CONSTRUCTED PLANS AND DOCUMENTS 9.1. On completion of the construction, the Chief Building Official may require: a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or a. A set of as constructed plans be filed with the Chief Building Official; and/or b. A plan of survey showing the location of the building or buildings. b. A plan of survey showing the location of the building or buildings. b. A plan of survey showing the location of the building or buildings. b. A plan of survey showing the location of the building or buildings. b. A plan of survey showing the location of the building or buildings. b. A plan of survey showing the location of the building or buildings. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 9.2. As set out in Section 18 of the Act, an Inspector may require information, including plans, specifications, reports or documents, from any person in order to confirm compliance with any Building Code and/or applicable law requirement. 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a 10. TRANSFER OF PERMIT 10.1. Where a property changes ownership, the new owner shall apply for a transfer of permit. transfer of permit. transfer of permit. 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building 10.2. An issued permit may be transferred to a new owner by the Chief Building Official where the new owner provides: Official where the new owner provides: Official where the new owner provides: Official where the new owner provides: Official where the new owner provides: Official where the new owner provides: Official where the new owner provides: c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. c. Payment of fees for transfer of permit as set out in Schedule A of this Bylaw. 11. ALTERNATIVE SOLUTION PROPOSALS 11. ALTERNATIVE SOLUTION PROPOSALS 11. ALTERNATIVE SOLUTION PROPOSALS 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: 11.1. The Chief Building Official may authorize the use of an alternative solution where a designer provides, for each alternative solution that is proposed: d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; d. A completed alternative solution application form as prescribed by the Chief Building Official; e. A description of the proposed material, system or building design; A description of the proposed material, system or building design; A description of the proposed material, system or building design; A description of the proposed material, system or building design; f. A description of the applicable objectives, functional statements and acceptable solutions as set out in the Building Code; f. A description of the applicable objectives, functional statements and acceptable solutions as set out in the Building Code; f. A description of the applicable objectives, functional statements and acceptable solutions as set out in the Building Code; f. A description of the applicable objectives, functional statements and acceptable solutions as set out in the Building Code; f. A description of the applicable objectives, functional statements and acceptable solutions as set out in the Building Code; f. A description of the applicable objectives, functional statements and acceptable solutions as set out in the Building Code; g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and g. Supporting documentation, past performance or tests described in Division C, Section 2.1. of the Building Code or other evaluation demonstrating that the proposed material, system or building design will provide the level of performance required by Division A, Article 1.2.1.1. of the Building Code; and h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building h. The appropriate fee as set out in Schedule A to this Bylaw. 11.2. Where an alternative solution has been authorized, the Chief Building Official may impose conditions and/or limitations. Official may impose conditions and/or limitations. 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be 11.3. Alternative solutions authorized by the Chief Building Official shall be applicable only to the location as described in the application and are not transferrable to any other permit. applicable only to the location as described in the application and are not transferrable to any other permit. applicable only to the location as described in the application and are not transferrable to any other permit. 12. SEWAGE SYSTEM MAINTENANCE INSPECTION PROGRAM 12. SEWAGE SYSTEM MAINTENANCE INSPECTION PROGRAM 12. SEWAGE SYSTEM MAINTENANCE INSPECTION PROGRAM 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance 12.1. An on-site sewage system or building serviced by an on-site sewage system, that is located wholly or partly within an area set out in the Building Code shall be subject to the Sewage System Maintenance Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. Inspection Program. Implementation and enforcement of this program is outlined in the Township Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program, as amended. 13. FEES 13. FEES 13. FEES 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; 13.1. Fees and deposits shall be determined by the Chief Building Official as set out in Schedule A to this Bylaw and are due and payable by the applicant; i. upon submission of an application for permit, i. upon submission of an application for permit, i. upon submission of an application for permit, i. upon submission of an application for permit, j. prior to approval of a revision to a permit, or j. prior to approval of a revision to a permit, or j. prior to approval of a revision to a permit, or j. prior to approval of a revision to a permit, or j. prior to approval of a revision to a permit, or k. upon request of a service. k. upon request of a service. k. upon request of a service. 13.2. For the purpose of calculating the cost of permits, the following method 13.2. For the purpose of calculating the cost of permits, the following method 13.2. For the purpose of calculating the cost of permits, the following method 13.2. For the purpose of calculating the cost of permits, the following method 13.2. For the purpose of calculating the cost of permits, the following method shall be used; l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. l. Floor are a means all nominally horizontal surfaces, either within or around the exterior of a building, and is meant to include, but not limited to, balconies, decks, landings, ramps, levels, storeys, and mezzanines. This does not apply to service catwalks, exterior unenclosed patios or walks not elevated above the finished grade. m. No deductions shall be made for openings in floors such as stairwells, elevators shafts, service shafts or ducts. m. No deductions shall be made for openings in floors such as stairwells, elevators shafts, service shafts or ducts. m. No deductions shall be made for openings in floors such as stairwells, elevators shafts, service shafts or ducts. m. No deductions shall be made for openings in floors such as stairwells, elevators shafts, service shafts or ducts. m. No deductions shall be made for openings in floors such as stairwells, elevators shafts, service shafts or ducts. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. n. A basement or crawlspace contained in whole below grade and with no interior finishes or where no use is purposed shall not have a permit fee applied. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. o. All walkout basements in dwellings shall have half of their total area calculated for the applicable permit fee. p. A fee for heating shall only be charged when no other associated construction is proposed. p. A fee for heating shall only be charged when no other associated construction is proposed. p. A fee for heating shall only be charged when no other associated construction is proposed. p. A fee for heating shall only be charged when no other associated construction is proposed. q. No permit fee shall be less than $150.00. q. No permit fee shall be less than $150.00. q. No permit fee shall be less than $150.00. q. No permit fee shall be less than $150.00. q. No permit fee shall be less than $150.00. q. No permit fee shall be less than $150.00. q. No permit fee shall be less than $150.00. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. r. A building of an unusual shape, or where the project is unique in nature, and where the application of Schedule A of the Bylaw is impractical, the Chief Building Official at his/her discretion, may determine the value of the building permit fee based on an hourly rate and/or inspection required to be performed. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.3. Any development charges, levies and fees that are deemed applicable law shall be calculated and payable to the Township prior to permit issuance. 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all 13.4. For classes of permits not described in Section 3 or where no fee exists in Schedule A to this Bylaw, a reasonable fee shall be determined by the Chief Building Official at his/her sole discretion by considering all administration, plan review and inspection costs. administration, plan review and inspection costs. administration, plan review and inspection costs. administration, plan review and inspection costs. administration, plan review and inspection costs. 13.5. Where fees are due as a result of revisions after a permit has been 13.5. Where fees are due as a result of revisions after a permit has been 13.5. Where fees are due as a result of revisions after a permit has been 13.5. Where fees are due as a result of revisions after a permit has been 13.5. Where fees are due as a result of revisions after a permit has been 13.5. Where fees are due as a result of revisions after a permit has been 13.5. Where fees are due as a result of revisions after a permit has been issued, no inspections associated with the said revisions shall be passed until: issued, no inspections associated with the said revisions shall be passed until: issued, no inspections associated with the said revisions shall be passed until: issued, no inspections associated with the said revisions shall be passed until: s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and s. The revisions are approved by the Chief Building Official or Inspector; and t. Additional fees have been paid in full. t. Additional fees have been paid in full. t. Additional fees have been paid in full. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.6. Where work occurs prior to the issuance of a permit, an additional surcharge equalling 100% of the permit fee described in this Section, shall be payable by the applicant. 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review 13.7. The permit fees as set out in Schedule A to this Bylaw applies to a single submission of complete plans and specifications and a single inspection of each prescribed stage of construction as set out in the Building Code and this Bylaw. Additional service fees as set out in Schedule A to this Bylaw may be invoiced when additional resources are utilized to review additional drawings and/or to re-inspect work. additional drawings and/or to re-inspect work. additional drawings and/or to re-inspect work. additional drawings and/or to re-inspect work. 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage 13.8. Every owner of an on-site sewage system located in an area as set out in Section 12 shall pay the service fee as set out in the Township's Building Services, Standard Operational Guideline SOG.22.09 - On-Site Sewage Maintenance Inspection Program upon delivery of maintenance inspection services. Maintenance Inspection Program upon delivery of maintenance inspection services. 14. REFUNDS 14. REFUNDS 14. REFUNDS 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief 14.1. In the case of withdrawal of an application or the abandonment of all or portion of the work, or the non-commencement of any project, the Chief Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. Building Official shall determine the amount of the refund of paid permit fees that may be returned to the applicant, without interest, in accordance with Schedule B of this Bylaw. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.2. All request for refunds must be made in writing, addressed to the Chief Building Official and must be received within six months of the date of issuance or last inspection. 14.3. Any authorized permit fee refund shall be returned to the person identified 14.3. Any authorized permit fee refund shall be returned to the person identified 14.3. Any authorized permit fee refund shall be returned to the person identified 14.3. Any authorized permit fee refund shall be returned to the person identified 14.3. Any authorized permit fee refund shall be returned to the person identified 14.3. Any authorized permit fee refund shall be returned to the person identified on the receipt. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.4. Fees for Conditional Permits are non-refundable. 14.5. The deposit referred to in Section 7.5 of this Bylaw shall be refunded, less any outstanding chargers, only upon completion of a final inspection. 14.5. The deposit referred to in Section 7.5 of this Bylaw shall be refunded, less any outstanding chargers, only upon completion of a final inspection. 14.5. The deposit referred to in Section 7.5 of this Bylaw shall be refunded, less any outstanding chargers, only upon completion of a final inspection. 14.5. The deposit referred to in Section 7.5 of this Bylaw shall be refunded, less any outstanding chargers, only upon completion of a final inspection. 14.5. The deposit referred to in Section 7.5 of this Bylaw shall be refunded, less any outstanding chargers, only upon completion of a final inspection. 14.5. The deposit referred to in Section 7.5 of this Bylaw shall be refunded, less any outstanding chargers, only upon completion of a final inspection. 14.6. No refund shall be given equal to or less than the minimum fee of 14.6. No refund shall be given equal to or less than the minimum fee of 14.6. No refund shall be given equal to or less than the minimum fee of $150.00. 15. RECOVERY OF FEES $150.00. 15. RECOVERY OF FEES $150.00. 15. RECOVERY OF FEES $150.00. 15. RECOVERY OF FEES 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 15.1. In addition to every other remedy available by law, fees that are due and unpaid may be added to the tax roll of the property of the owner, and may be collected with municipal taxes. 16. NOTICE OF INSPECTIONS 16. NOTICE OF INSPECTIONS 16. NOTICE OF INSPECTIONS 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.1. The permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the required stages of construction as prescribed by Division C, Sentence 1.3.5.1.(2) of the Building Code. 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) 16.2. In addition to Subsection 16.1, the permit holder or an authorized agent shall notify the Chief Building Official of readiness to inspect the following stages of construction as prescribed by Division C, Sentence 1.3.5.2.(1) of the Building Code: of the Building Code: of the Building Code: u. Commencement of construction of the building; u. Commencement of construction of the building; u. Commencement of construction of the building; u. Commencement of construction of the building; u. Commencement of construction of the building; u. Commencement of construction of the building; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; v. Substantial completion of structural framing for each storey, if the building is a type of building that is within the scope of parts of the Building Code other than Division B, Part 9; w. Commencement of the construction of any: w. Commencement of the construction of any: w. Commencement of the construction of any: i. masonry fireplaces and masonry chimneys; ii. i. masonry fireplaces and masonry chimneys; ii. i. masonry fireplaces and masonry chimneys; ii. i. masonry fireplaces and masonry chimneys; ii. i. masonry fireplaces and masonry chimneys; ii. factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; factory-built fireplaces and allied chimneys; or iii. stoves, ranges, space heaters and add-on furnaces using solid fuels and allied chimneys; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; x. Substantial completion of heating, ventilating, air-conditioning and air-contaminant extraction equipment; y. Substantial completion of exterior cladding; y. Substantial completion of exterior cladding; y. Substantial completion of exterior cladding; z. Substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa; z. Substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa; z. Substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa; z. Substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa; z. Substantial completion of the pool deck and dressing rooms for a public pool or public spa and readiness for inspection of the emergency stop system for a public pool or public spa; aa. Completion and availability of drawings of the building as constructed; aa. Completion and availability of drawings of the building as constructed; aa. Completion and availability of drawings of the building as constructed; aa. Completion and availability of drawings of the building as constructed; aa. Completion and availability of drawings of the building as constructed; aa. Completion and availability of drawings of the building as constructed; bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. bb. Completion of a building for which an occupancy permit is required under Division C, Article 1.3.3.4. & 1.3.3.5. of the Building Code. cc. Completion of site grading with accordance with the approved Site Grading Plan. cc. Completion of site grading with accordance with the approved Site Grading Plan. cc. Completion of site grading with accordance with the approved Site Grading Plan. cc. Completion of site grading with accordance with the approved Site Grading Plan. 16.3. Requests for inspections shall be; 16.3. Requests for inspections shall be; 16.3. Requests for inspections shall be; 16.3. Requests for inspections shall be; 16.3. Requests for inspections shall be; 16.3. Requests for inspections shall be; 16.3. Requests for inspections shall be; dd. Booked using the building permit software or dd. Booked using the building permit software or dd. Booked using the building permit software or dd. Booked using the building permit software or dd. Booked using the building permit software or dd. Booked using the building permit software or dd. Booked using the building permit software or dd. Booked using the building permit software or ee. Requested through the Township's inspection line, providing the following information; ee. Requested through the Township's inspection line, providing the following information; ee. Requested through the Township's inspection line, providing the following information; ee. Requested through the Township's inspection line, providing the following information; ee. Requested through the Township's inspection line, providing the following information; ee. Requested through the Township's inspection line, providing the following information; ee. Requested through the Township's inspection line, providing the following information; i. Civic address ii. i. Civic address ii. i. Civic address ii. i. Civic address ii. Type of inspection Type of inspection iii. Requested date of inspection iv. Contact details iii. Requested date of inspection iv. Contact details iii. Requested date of inspection iv. Contact details iii. Requested date of inspection iv. Contact details iii. Requested date of inspection iv. Contact details iii. Requested date of inspection iv. Contact details iii. Requested date of inspection iv. Contact details 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.4. Upon receipt of notice of readiness to inspect as set out in this Section, the Chief Building Official or an Inspector shall undertake a site inspection, no later than two (2) business days after receipt of the notice. 16.5. The time period referred to in Subsection 16.4 shall begin on the business 16.5. The time period referred to in Subsection 16.4 shall begin on the business 16.5. The time period referred to in Subsection 16.4 shall begin on the business 16.5. The time period referred to in Subsection 16.4 shall begin on the business 16.5. The time period referred to in Subsection 16.4 shall begin on the business day following the day on which the notice is received. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.6. The permit holder shall facilitate safe access for inspection of the work. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.7. The permit holder shall make available to the Inspector a legible paper copy of the reviewed plans and documents issued in support of a permit on site. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 16.8. Re-inspections of deficient or incomplete work shall be subject to an additional service fee as set out in Schedule A to this Bylaw, these shall be paid prior to any further inspections being undertaken. 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a 17. FENCES AT CONSTRUCTION AND DEMOLITION SITES 17.1. Where, in the opinion of the Chief Building Official or Inspector, a construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences construction or demolition site presents a hazard to the public, the Chief Building Official or Inspector may require the owner to erect such fences as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. as the Chief Building Official or Inspector deems appropriate to the circumstances to prevent unauthorized entry to the site. 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: 17.2. In considering the hazard presented by the construction or demolition site which is to be fenced, the Chief Building Official or Inspector shall have regard for: ff. The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; The proximity of the building site to other buildings that are occupied; gg. The proximity of the construction or demolition site to lands accessible to the public; gg. The proximity of the construction or demolition site to lands accessible to the public; gg. The proximity of the construction or demolition site to lands accessible to the public; gg. The proximity of the construction or demolition site to lands accessible to the public; hh. The hazards presented by the construction or demolition activities and materials; hh. The hazards presented by the construction or demolition activities and materials; hh. The hazards presented by the construction or demolition activities and materials; hh. The hazards presented by the construction or demolition activities and materials; ii. The effectiveness of site fences; and jj. The duration of the hazard. 17.3. Every fence required under this Bylaw shall: The duration of the hazard. 17.3. Every fence required under this Bylaw shall: The duration of the hazard. 17.3. Every fence required under this Bylaw shall: The duration of the hazard. 17.3. Every fence required under this Bylaw shall: kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; kk. create a continuous barrier to sufficiently deter unauthorized entry to the construction or demolition site to the satisfaction of the Chief Building Official or Inspector; ll. be erected and maintained in a nominally vertical plane and maintained in good repair; and be erected and maintained in a nominally vertical plane and maintained in good repair; and be erected and maintained in a nominally vertical plane and maintained in good repair; and mm. be a minimum of 1.2 m in height. 18. DELEGATED AUTHORITY TO CHIEF BUILDING OFFICIAL 18. DELEGATED AUTHORITY TO CHIEF BUILDING OFFICIAL 18. DELEGATED AUTHORITY TO CHIEF BUILDING OFFICIAL 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the 18.1. The Council of the Township of Ramara hereby delegates to the Chief Building Official the power to enter into Agreements prescribed by the Township and described in clause 8(3)(c) of the Act relating to the issuance of a Conditional Permit. issuance of a Conditional Permit. issuance of a Conditional Permit. 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect 18.2. Where the Township enters into an Agreement with a Registered Code Agency, the Chief Building Official is authorized, as set out in subsection 4.1(3) of the Act, to appoint the Registered Code Agency to perform one or more of the functions prescribed in Section 15.15 of the Act in respect of the construction of a building or class of buildings. of the construction of a building or class of buildings. of the construction of a building or class of buildings. of the construction of a building or class of buildings. of the construction of a building or class of buildings. 19. OFFENCES AND PENALTIES 19. OFFENCES AND PENALTIES 19. OFFENCES AND PENALTIES 19. OFFENCES AND PENALTIES 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 19.1. Every person who contravenes any provision of this Bylaw is guilty of an offence and on conviction is liable to a fine as provided for in Section 36 of the Act. 20. REPEAL, DATE AND EFFECT 20. REPEAL, DATE AND EFFECT 20. REPEAL, DATE AND EFFECT 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED 20.1. THAT Bylaw 2011.20 as amended is hereby repealed 20.2. THIS Bylaw shall come into force and take effect on the date of passing. BYLAW READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 27 DAY OF MARCH, 2023. THIS 27 DAY OF MARCH, 2023. The Corporation of the Township of Ramara The Corporation of the Township of Ramara The Corporation of the Township of Ramara Original Signed By ________________________________ BASIL CLARKE, MAYOR ________________________________ BASIL CLARKE, MAYOR Original Signed By ________________________________ JENNIFER CONNOR, CLERK ________________________________ JENNIFER CONNOR, CLERK Status: Passed SCHEDULE A - PERMIT FEES TO BYLAW NO. 2023. Minimum Flat sq ft sq m Single detached portable classroom $380 Multiple attached portable classrooms $440 All other assembly occupancies $440 $1.60 $17.22 All institutional occupancies $440 $1.21 $13.02 Single detached. CSA. semi or townhouse $440 $1.60 $17.22 Park model trailers (CSA Z241) $440 Hotels & motels $440 $1.60 $17.22 Multi-residential apartment buildings $440 $1.60 $17.22 Attached or semi-detached garage or carport $220 $1.60 $17.22 Detached carport or garage $220 $1.21 $13.02 Accessory utility building (ie. garden shed, gazebo) $190 $1.21 $13.02 Unenclosed deck or porch only $334 Enclosed, partially or unenclosed deck, porch, or sunroom $440 $1.21 $13.02 New $440 $1.43 $15.39 Shell only $440 $1.21 $13.02 Partitioned/finished, and mezzanine $440 $1.21 $13.02 Sales trailer (wheels on, readily moveable) $380 New $440 $1.43 $15.39 Shell only (including unfinished basement) $440 $1.21 $13.02 Partitioned/finished, and mezzanine $440 $1.21 $13.02 New $440 $1.38 $14.85 Shell only (including unfinished basement) $440 $1.10 $11.84 Partitioned/finished, and mezzanine $440 $1.05 $11.30 Gas station/canopy, car wash $440 $1.10 $11.84 Parking garage (underground, open air) $440 $1.05 $11.30 Repair garage $440 $1.21 $13.02 Rack storage systems $440 $0.83 $8.93 Farm building $440 $0.41 $4.41 Communication tower mechanical building or dish antenna >5sm $330 Crane runway $385 Section A: CONSTRUCTION of new buildings, additions to existing buildings Group A: Assembly Group B: Institutional Group C: Residential Group E: Mercantile Group F: Industrial Group D: Business and Personal Services Designated Structures Minimum Flat sq ft sq m Exterior storage tank (not regulated by TSSA) $385 Pedestrian bridge appurtenant to a building lineal $385 $3.30 $10.83 Demountable structures $385 $0.83 $8.93 Retaining wall per lineal unit $197 $5.50 $18.04 Permanent wall and ground sign > 7.5m High $275 Fabric covered building or air supported structure $440 $0.55 $5.92 Tents - less than 30 days $275 Moving or relocating building (including new foundations) $770 Shoring lineal $385 $1.21 $3.97 Underpinning lineal $385 $1.21 $3.97 All $440 $1.21 $13.02 All $440 $1.21 $13.02 All $440 $1.21 $13.02 Below grade stair $330 All $440 $1.21 $13.02 All $485 $1.05 $11.30 All $485 $0.83 $8.93 Demising wall (to create multiple units) $385 Electromagnetic locking device (each) $275 Single/semi-detached/accessory $385 All buildings $550 $0 HVAC - New, alterations, extensions <=500 sq.ft. building area $176 HVAC - New, alterations, extensions >500 sq.ft. building area $352 HVAC - New, alterations, extensions <=3000 sq.ft. building area $550 HVAC - New, alterations, extensions >3000 sq.ft. building area $880 Commercial exhaust hoods and suppression systems $341 Fire alarm system $341 Replacement annunciator/control panel only $341 Sprinkler system $341 Single, Semi or Townhouse Section A: CONSTRUCTION of new buildings, additions to existing buildings All Occupancies Group D: Business and Personal Service Section B: ALTERATION or repair to existing building and CHANGE OF USE Group A: Assembly Group B: Institutional Group C: Residential All Other Occupancies Group E: Mercantile Group F: Industrial All Occupancies Section C: DEMOLITION (complete or partial) Single, Semi or Townhouse with partywalls All Other Occupancies Section D: MECHANICAL and FIRE PROTECTION WORK $0 Minimum Flat sq ft sq m In-rack sprinkler system $341 Standpipe system $341 Emergency power $660 Emergency lighting (per storey) $165 Solid fuel burning appliance or chimney $275 $0 Service connection (per lot) $275 Plumbing works (fixtures, appliances, drains) for new dwelling $495 Plumbing works in existing dwellings or addition per fixture $150 $28 Per fixture, appliance, floor drain, backflow preventer, roof hopper $28 Water, service, and inside and outside drains - new building per lineal $1.65 $5.41 Conversion from septic system to sewer $275 Manhole, catch basin, or area drain per piece $46 New residential system $660 New commercial system $1,045 New holding tank $440 New/alterations to leaching bed only $550 New/alteration to septic tank or minor repair to part of a system $440 Review of clearances only $220 $0 Solar domestic hot water systems (serving individual dwellings) $385 Solar hot water systems (serving all other buildings) $550 Solar photovoltaic systems (serving individual dwellings) $385 Solar photovoltaic systems (serving all other buildings) $550 Geothermal systems $550 Wind turbine >3kW, <=10kW $385 Wind turbine >10kW $2,035 Covenants agreement (limiting distance) $3,300 Reactivation of a building permit application $83 Occupancy permit - multi unit residential per unit $220 All Occupancies All Other Occupancies Section F: ON-SITE SEWAGE SYSTEMS Single, Semi or Townhouse Section E: PLUMBING Section D: MECHANICAL and FIRE PROTECTION WORK Section G: GREEN ENERGY SYSTEMS $0 Minimum Flat sq ft sq m Revision to a buiding permit $110 Transfer of a building permit $253 Work w/o a gross floor area not identified above per $1000 construction value $21 Peer review - hourly Consultant Rate Conditional building permit (in addition to securities ) $3,300 Surcharge for constructing without a permit (based on fees above) 100% Reinspection due to defective work $55 Non-working hours inspection $204 Six-month building permit extension $83 Alternative solution review fee $500 + $185/hr Special investigation fee - Residential (maximum $5,000) $185/hr Special investigation fee - Non-residential (maximum $12,000) $185/hr $0 Statistics Canada monthly report $22 Agency approval letter (liquor license, daycare, lodging) $165 Registering and de-registering orders on title $121 Paper permit application submission per application $100 Document scanning up to 11x17 per page $2 Document scanning greater than 11x17 per page $15 Section H: MISCELLANEOUS AND OTHER SERVICES Section I: ADMINISTRATIVE SCHEDULE B - REFUNDS TO BYLAW NO. 2023. STATUS OF PERMIT OR APPLICATION ELIGIBLE REFUND % 1. Application filed, administrative function has been preformed 80% 2. Administrative and zoning functions have been performed 70% 3. Administrative, zoning and plans review functions have been preformed 50% 4. Permit issued, no field inspections have been performed 30% For every inspection carried out deduct 5% 5. Permit fees $150.00 or less 0% Notwithstanding the above, no refund shall be made for an amount less than $150.00. Interpretation of this schedule will be at the sole discretion of the Chief Building Official. SCHEDULE C - PLANS, DOCUMENTS AND SPECIFICATIONS TO BYLAW NO. 2023 SECTION 1 Class of Permit Type of Permit Required Drawings and Supporting Documents Building New and Additions - Site Grading Plan - Architectural - Structural - Mechanical - Plumbing (exemption for part 9 buildings) - Electrical - On-Site Sewage System (new/ upgrade or verification of existing) - Supporting documents confirming compliance with applicable law and required approvals Interior Alterations and Renovations - Site Plan - Architectural - Structural - Mechanical - Plumbing (exemption for part 9 buildings) - Electrical - On-Site Sewage System (new/ upgrade or verification of existing) - Supporting documents confirming compliance with applicable law and required approvals Designated Structures - Site Grading Plan - Architectural - Structural - Mechanical - Plumbing (exemption for Part 9 buildings) - Electrical - On-Site Sewage System (new/ upgrade or verification of existing) - Supporting documents confirming compliance with applicable law and required approvals Temporary Buildings - Site Grading Plan - Architectural - Structural - Mechanical - Plumbing (exemption for part 9 buildings) - Electrical - On-Site Sewage System (new/ upgrade or verification of existing) - Supporting documents confirming compliance with applicable law and required approvals Demolition Part 9 Buildings - Site Plan - Supporting documents confirming compliance with applicable law and required approvals Part 3 Buildings - Site Plan - Structural plans by P.Eng - Supporting documents confirming compliance with applicable law and required approvals Change of Use - Site Plan - Architectural - Supporting documents confirming compliance with applicable law and required approvals Conditional - Site Grading Plan - Supporting documents confirming compliance with applicable law and required approvals - Letter with reasons for delay Occupancy - Supporting documents confirmation compliance with applicable law and required approvals SECTION 2 1. Site Grading Plan - Lot description including Registered Plan Number; - Dimensioned property limits and building outline location with all setbacks shown; - Finished floor elevations; for basement, first floor, garage floor - Finished and original grades over septic tile beds; - Elevation of underside of footings; - Top of foundation wall (all locations); - Any proposed window well locations - Existing and proposed lot grades for each of the corners of the lot and intermediate points of grade change; - Existing trees to be maintained; - Driveway locations, widths and proposed grades; - Finished road grades adjacent to lot; - Location of entrances and location of walkways; number of front and rear entry step risers; - Arrows indicating the direction of all surface drainage and swales, with swale detail (Note: The Township requires a minimum swale depth of 0.25m); - Location and elevation of swales; - Patios, decks and/or porches (including height of floor); - Terraces, retaining walls; - Location of accessories (propane tanks, air conditioning units, generators, hot tubs, pools etc.); - Location and dimensions of all easements; - All yard catch basins with rim and invert elevations; - Curb cut locations; - Hydrants, street lights, Bell and cable TV pedestals, hydro transformers; - Location and type of any private sewage disposal system and reserve areas and - private wells (including area of influence) or water/sewer lines if applicable - Location of neighbouring wells and sewage disposal systems; - Location of all road features along frontage and flankage of lots (curb lines, catch basins, sidewalks, etc.); - Lot grading certificate by Developer's Engineer in accordance with the Subdivision Agreement requirements; - Site benchmark as shown on approved Engineering Drawings; - Proposed driveway culverts with size, type, invert and slope information; - Engineered fill level is to be shown where applicable; - Minimum setback from building to Average Annual High Water (AAHW) mark - of all water bodies within the Lake Simcoe watershed (where applicable); - Minimum naturalized buffer from the highwater mark (where applicable); - Accessory buildings. 2. Site Plan - Lot description including Registered Plan Number; - Dimensioned property limits and building outline location with all setbacks shown; - Existing trees to be maintained; - Driveway and parking locations; - Location of entrances and location of walkways; number of front and rear entry step risers; - Patios, decks and/or porches; - Terraces, retaining walls; - Location of accessories (propane tanks, air conditioning units, generators, hot tubs, pools etc.); - Location and dimensions of all easements; - Hydrants, street lights, Bell and cable TV pedestals, hydro transformers; - Location and type of any private sewage disposal system and reserve areas and - private wells (including area of influence) or water/sewer lines if applicable - Location of neighbouring wells and sewage disposal systems; - Location of all road features along frontage and flankage of lots (curb lines, catch basins, sidewalks, etc.); - Accessory buildings 3. Architectural - Existing and proposed floor plans indicating room and space identification, fire separations, size and dimensions, structural framing of floors and locations of all openings. - Roof plan showing structural framing, roof slope, drainage, roofing construction details, including engineered stamped truss layout and plans if applicable. - Building elevations showing grade height, floor and ceiling heights, overall building height from average grade, eave heights from average grade, exterior finish materials, window heights and sizes and spatial separation requirements and calculations. - Construction details of walls, floors, ceilings, roofs, stairs, guards, fireplaces and other significant design details including heights, materials, including LVL and pre-manufactured railing specifications and TJI layout if applicable. - Location and details of all barrier free facilities and paths of travel. - Building Code and energy efficiency metrics. - Any additional drawings, information and specifications as determined by the Chief Building Official. - The scale to which the plan is drawn. 4. Structural - Foundation plans, floor and roof framing plans, footing, column and beam schedules, structural details and material specifications. Including engineered truss layout and plans, TJI layout and LVL specifications. - Design specifications, live and dead loading, wind and snow loading, earthquake loading, geotechnical report design basis. - All reinforced concrete work including thickness and strength of concrete and size, spacing, minimum cover and type of reinforcing steel. - Roof and floor truss drawings sealed by a professional engineer. - Guard design, where applicable. - Any additional drawings, information and specifications as determined by the Chief Building Official. - The scale to which the plan is drawn. 5. Mechanical - Heating, ventilating and air conditioning designs and plans, equipment layout and schedules. - Heat loss and gain calculations, ventilation design summary and the sizing of heating and cooling equipment, where applicable. - Methods employed to maintain integrity of fire separations such as damper and fire stopping locations and specifications. - Any additional drawings, information and specifications as determined by the Chief Building Official. - The scale to which the plan is drawn, where applicable. 6. Plumbing - Piping and drainage plans of all above ground and underground plumbing systems. - Sprinkler and standpipe drawings including floor plans, riser diagrams and fire department connections. - Methods employed to maintain integrity of fire separations such as damper and fire stopping locations and specifications. - Any additional drawings, information and specifications as determined by the Chief Building Official. - The scale to which the plan is drawn, where applicable. 7. Electrical - Location and specification of lighting, emergency lighting, exit signs, emergency power and fire alarm and detection systems and carbon monoxide detection. - Methods employed to maintain integrity of fire separations such as damper and fire stopping locations and specifications. - Any additional drawings, information and specifications as determined by the Chief Building Official. - The scale to which the plan is drawn, where applicable. 8. On-site Sewage System - Depth to bedrock. - Depth to zones of saturation. - Soil properties, including soil permeability. - Soil conditions including potential for flooding. - A scaled site plan showing: - Legal description, lot size, property dimensions, rights-of-way, easements and municipal/utility corridors. - Location and clearances of items listed in Column 1 of Tables 8.2.1.5., 8.2.1.6.A., 8.2.1.6.B., and 8.2.1.6.C. of Division C of the Building Code. - Location of the proposed on-site sewage system on the property. - Any additional drawings, information and specifications as determined by the Chief Building Official. 9. Supporting Documents The applicant shall submit the following supporting documents to confirm compliance with applicable law and other required approvals when applicable; - Township Planning Department - Township Infrastructure Department - Lake Simcoe Conservation Authority - County of Simcoe, Transportation and Engineering - Ministry of Transportation - Ministry of Environment, Conservations and Parks - Ministry of Agriculture, Food and Rural Affairs - Ministry of Education - Ministry of Children, Community and Social Services - Ministry of Natural Resources and Forestry - Electrical Safety Authority (ESA) - Technical Standards and Safety Authority (TSSA) A full list of applicable law is available on the Township's Website or Section 1.4.1.3. of the Ontario Building Code. Note: The Chief Building Official may require more or less of any specified drawing or documents to suit the application being considered.