2022 Development Charges Background Study

Regional Municipality of Halton, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 387d0e1affe8 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

REGION OF HALTON 2022 Development Charges Background Study FOR WATER, WASTEWATER, ROADS & GENERAL SERVICES DEVELOPMENT CHARGES December 15, 2021 Table of Contents Page Executive Summary ....................................................................................................... i 1. Introduction ........................................................................................... 1-1 1.1 Purpose of this Document ....................................................................... 1-1 1.2 Development Charges Act, 1997 (DCA) Background Study Requirements ......................................................................................... 1-2 1.3 Development Charges Act, 1997 (DCA) Requirements .......................... 1-3 1.4 Changes to the DCA: Bill 108, 138, 137, and 213 ................................ 1-13 2. Current Region Policy .......................................................................... 2-1 2.1 Summary of Halton's Current DC By-laws .............................................. 2-1 3. Anticipated Development in Halton 2022-2031 .................................. 3-1 3.1 Requirements of the Act (DCA) .............................................................. 3-1 3.2 Anticipated Development ........................................................................ 3-1 4. Resultant Increase in the Need for Service ........................................ 4-1 4.1 Introduction ............................................................................................. 4-1 4.2 Services Potentially Involved .................................................................. 4-1 4.3 The Increase in the Need for Service ..................................................... 4-1 4.4 Credits Carried Forward .......................................................................... 4-5 4.5 Eligible Debt and Committed Excess Capacity ....................................... 4-6 4.6 Council's Assurance ............................................................................... 4-9 5. DCA Calculation Requirement ............................................................. 5-1 5.1 Introduction ............................................................................................. 5-1 5.2 Level of Service Cap ............................................................................... 5-2 5.3 Uncommitted Excess Capacity ............................................................... 5-3 5.4 Benefit to Existing Development ............................................................. 5-3 5.5 Grants, Subsidies and Other Contributions ............................................. 5-4 5.6 Post-period Benefit (Oversizing) ............................................................. 5-4 5.7 Residential vs. Non-Residential Benefit .................................................. 5-5 5.8 Summary of Estimated Capital Expenditures .......................................... 5-6 5.9 DC Reserve Fund Balances ................................................................... 5-7 6. DC Rules and Long-term Capital and Operating Cost Examples ..... 6-1 6.1 Introduction ............................................................................................. 6-1 6.2 The Amount of the DC Payable in Any Particular Case .......................... 6-2 6.3 DC Exemptions ....................................................................................... 6-2 6.4 Indexing of DCs ...................................................................................... 6-4 6.5 Interest .................................................................................................... 6-4 6.6 The Application of DCs to Redevelopment ............................................. 6-4 6.7 Summary of Halton DC Policies .............................................................. 6-5 6.8 Proposed DC Policy Changes ................................................................ 6-9 Table of Contents (Cont'd) Page 6.9 Existing DC Policies to Remain in Place ............................................... 6-11 6.10 By-law Structure ................................................................................... 6-20 6.11 Asset Management Plan ....................................................................... 6-21 6.12 Long Term Capital and Operating Cost Examination ............................ 6-22 7. By-law Adoption and Implementation ................................................. 7-2 7.1 Introduction ............................................................................................. 7-2 7.2 Consultation ............................................................................................ 7-2 7.3 The By-law Adoption Process ................................................................. 7-4 7.4 By-law Implementation ............................................................................ 7-5 Appendix A Anticipated Development in the Region 2022-2031 .......................... A-1 Appendix B The 2022-2031 Water and Wastewater Servicing Program and Development Charge Recoverable Costs .......................................... B-1 Appendix C Calculation of the Water and Wastewater DC Applicable to Development in Halton ........................................................................ C-1 Appendix D The 2022-2031 Roads Servicing Program and Development Charge Recoverable Costs ................................................................. D-1 Appendix E Calculation of Roads DC Applicable to Development in Halton ....... E-1 Appendix F Calculation of General Services DC Applicable to Development in Halton ................................................................................................ F-1 Appendix G Local Service Guidelines .................................................................... G-1 Appendix H Asset Management Plan and Long Term Capital and Operating Cost Examination ................................................................................ H-1 Appendix I Proposed Development Charge By-law (2022) .................................... I-1 Region of Halton 2022 DC Background Study List of Acronyms and Abbreviations Acronym Full Description of Acronym AMP Asset management plan BPE, 2011 Best Planning Estimates, 2011 DC Development charge DCA Development Charges Act, 1997, as amended GFA Gross floor area NFPOW No fixed place of work OLT Ontario Land Tribunal O. Reg. Ontario Regulation PPU Persons per unit ROPA Regional Official Plan Amendment SDE Single detached equivalent sq.ft. Square foot sq.m. Square metre TFA Total floor area TTS, 2016 Transportation Tomorrow Study, 2016 U.E.C. Uncommitted Excess Capacity WAH Work at Home Region of Halton 2022 DC Background Study Executive Summary Region of Halton 2022 DC Background Study i Executive Summary 1. Purpose of this Background Study 1.1. This background study (the Study) has been prepared pursuant to section 10 of the Development Charges Act, 1997 (DCA) as amended and, together with the proposed by-law, is being made available to the public more than 2 weeks prior to the public meeting, as required by section 12 of the DCA, which is expected to be held February 16, 2022. 1.2. The development charges (DCs) calculated represent those which can be recovered under the DCA, based on the Region's capital spending plans and other assumptions which are responsive to the requirements of the DCA. A decision is required by Council, after receiving input at the public meeting and the completed study and by-law, as to the magnitude of the charge it wishes to establish, for residential and non-residential development. 1.3. The Study is continuing with the current by-law structure of area specific water and wastewater DCs for the Greenfield versus Built Boundary areas and also continuing with the non-residential roads DC structure being split between retail and non-retail. 1.4. Decisions are also involved in finalizing DC policy and the by-law, including exemptions, indexing, applicability to the redevelopment of land, and the schedule of charges by type of land use. Key proposed changes are summarized below in section 4 of this Executive Summary. 1.5. It is the purpose of the public meeting and the continuing consultation activity to obtain input on all these matters. 1.6. The purpose of the Study is to propose the replacement of the following by-law with the proposed by-law (Appendix I):  By-law No. 36-17, as amended, "A by-law to establish water, wastewater, roads and general services Development Charges for the Regional Municipality of Halton (Built Boundary and Greenfield Areas)" (expiring on August 31, 2022) 1.7. The 2022 DC update process has been undertaken in advance of the expiry date of this by-law and reflects the Region's planning projections in the Best Planning Estimates approved by Council in 2011 (BPE, 2011). Region of Halton 2022 DC Background Study ii 1.8. Based on the BPE, 2011, the Region has planned for a total of 780,000 people (752,537 excluding the Census undercount) and 390,000 jobs by 2031. Through consultation with local municipalities, as part of the Sustainable Halton process, Halton Region further allocated growth targets by local municipality. 1.9. Further, the DCA (clause 10(2) (c.2)) require that the Study must include an asset management plan (AMP) for all assets with capital that is proposed to be funded under the DC by-law. Subsection 10(3) of the DCA provides a framework for this plan. This background study provides details of the AMP (Appendix H). 1.10. The Study and the proposed by-law do not include GO Transit servicing requirements. The Region imposes a DC for GO Transit purposes, pursuant to By-law No. 159-01 commencing November 14, 2001. This by-law (as amended by By-laws 78-12 and 38-17) has been extended by Provincial legislation/regulation 7 times including most recently in 2019. This latest extension maintains the GO Transit DC rates, subject to annual indexing in accordance with section 7 of the Ontario Regulation 82/98, or as may be amended from time to time. The Province has proposed an extension of the by-law to December 31st, 2022. Imposition of a revised GO Transit DC by-law to replace the current by-law would require a separate updating process. 1.11. Further, the Study does not address the Recovery DC By-law No. 37-17 (Residential Recovery of the Early Payment of Estimated Future Water, Wastewater and Roads DCs for the Recovery Area 2012-2021). This by-law was updated under a separate study and the new Recovery DC By-law No. 48-21 comes into force January 1, 2022. 2. Region-wide vs. Area Specific Costs 2.1. S.10 (2)(c.1) of the DCA, requires Council to consider the use of more than one DC by-law to reflect different needs for services in different areas. As such, the Region considered area specific charges. 2.2. At present, the regional roads and general services charges are imposed on a Region-wide basis, while the water and wastewater residential and non-residential charges are imposed on an area specific basis: Greenfield DC and Built Boundary DC. 2.3. ROPA 38, approved by Council, and the Provincial Growth Plan requires that by the year 2016 and each year thereafter, a minimum of 40 percent (%) of all residential development occurring annually in Halton must be within the Built Boundary area (Built Region of Halton 2022 DC Background Study iii Boundary for the Provincial Growth Plan for the Greater Golden Horseshoe, 2006) with the remaining in the Greenfield area (area outside the Built Boundary) but within the ROPA 38 Urban Area. Accordingly, continuing with an area specific charge for the Greenfield and Built Boundary areas to support the intensification development of the Growth Plan (detailed in Appendix B). 2.4. The area specific water and wastewater charges were calculated based on the distribution/collection infrastructure required to service growth planned within the Greenfield and Built Boundary areas. The DC rates relating to the water and wastewater capacity (e.g. plant expansions) are calculated on a Region-wide basis given the difficulty in identifying area specific infrastructure related to capacity projects. 3. The 2022 DC Calculation 3.1. An annualized cash flow method was undertaken to calculate the DCs, which considers available DC reserve fund balances, project costs adjusted for inflation, DC credits, outstanding (unfunded) capital costs, historic oversizing costs, financing costs associated with expenditure timing and anticipated DC revenues, with indexing over the planning horizon. In addition, the cash flow analysis provides for interest earnings on positive reserve fund balances and interest expenses on negative balances. Details of the DC calculation and cash flow methodology are included in Appendices C, E, and F. 3.2. The planning period for the calculation of the charges in the Study extends to 2031 for all services. 2031 was selected as the planning horizon as it is consistent with planning projections approved by Council (BPE, 2011) and the coverage of the Region's Official Plan (ROPA) 39. 3.3. The estimated servicing needs related to this anticipated development are detailed in Appendices B, D and F. Table ES-1 summarizes the capital infrastructure cost required over the planning horizon and the deductions made pursuant to the DCA. Region of Halton 2022 DC Background Study iv Table ES-1 Summary of Capital Costs for all Eligible Programs (2022 $, millions) 3.4. The non-residential roads infrastructure cost was further divided among different types of non-residential development between retail and non-retail development (Appendix D and E). 3.5. Table ES-2 distributes further the water/wastewater costs between Greenfield and Built Boundary areas. Table ES-2 Water & Wastewater Project Costs by Area (2022 $, millions) 3.6. The Region intends to implement the projects set out in this Study through its usual practice of preparing financial plans prior to the release of water and wastewater capacity. These plans will consider the projects in the Study to be financed under the plan and may use a combination of various financing techniques. The financial plan may also consider the staging of projects and, therefore, the timing and sequence of development to achieve the fiscal objectives of the Region under the Region's current Official Plan. Accordingly, the timing of some of the projects which are to be DC funded Less: Benefit to Post Subsidy, Gross Existing Period Dev Other Net Growth Services Cost Dev't Capacity Contbt'n Deduc't Total Res N-res W/WW (2023-2031): Water 562.2 $ 12.0 $ 46.9 $ - $ - $ 503.4 $ 373.9 $ 129.5 $ Wastewater 608.6 175.1 24.5 - - 408.9 300.8 108.1 Sub-Total 1,170.8 $ 187.1 $ 71.4 $ - $ - $ 912.3 $ 674.6 $ 237.6 $ Roads (2023-2031) 2,441.1 $ 400.0 $ 238.0 $ - $ - $ 1,803.0 $ 1,153.9 $ 649.1 $ General Service (2022-2031): Growth Studies 16.1 $ 6.3 $ - $ - $ 0.8 $ 9.0 $ 6.5 $ 2.5 $ Police* 83.6 19.5 27.5 - - 36.6 26.3 10.3 Paramedics 32.6 11.4 8.4 - - 12.8 11.3 1.5 Facilities 12.3 4.0 1.3 - - 7.0 6.0 1.1 Social Housing 100.1 50.1 - - - 50.1 50.1 - Waste Diversion 14.9 8.1 1.0 - 0.4 5.4 5.1 0.3 Waterfront Parks 37.6 14.9 14.8 - - 7.9 7.5 0.4 Sub-Total 297.2 $ 114.2 $ 53.1 $ - $ 1.2 $ 128.7 $ 112.7 $ 16.0 $ Total 3,909.1 $ 701.3 $ 362.6 $ - $ 1.2 $ 2,844.0 $ 1,941.3 $ 902.7 $ Note: May not add due to rounding * Includes discounted debt payments Service Capacity Distrb'n /Collct'n - Greenfield Distrb'n /Collct'n - Built bndry Total Capacity Distrb'n /Collct'n - Greenfield Distrb'n /Collct'n - Built bndry Total Water 562.2 $ 12.0 $ 46.9 $ 503.4 $ 139.8 $ 226.8 $ 7.3 $ 373.9 $ 44.1 $ 83.9 $ 1.5 $ 129.5 $ Wastewater 608.6 175.1 24.5 408.9 65.2 213.5 22.1 300.8 20.6 83.0 4.5 108.1 Total 1,170.8 $ 187.1 $ 71.4 $ 912.3 $ 205.0 $ 440.3 $ 29.4 $ 674.6 $ 64.7 $ 166.9 $ 6.0 $ 237.6 $ Note: May not add due to rounding Residential Share Non-residential Share Gross Cost Less: Benefit to Existing Dev't Less: Post Period Benefit Net Growth Region of Halton 2022 DC Background Study v may be modified from what is shown in the Study. These modifications may be necessitated by the specifics of the financial plans to be prepared for water, wastewater and road servicing. 3.7. The results of the calculation, in terms of the full charges involved, are summarized in Table ES-3 based on the costing and related assumptions contained in Appendices A to F. The area-specific calculated charges are reflected in the proposed by-law contained in Appendix I. Further, Tables ES-4 and ES-5 compare the proposed rates to the current DC rates as of April 1, 2021. 3.8. The areas to which proposed DCs apply are illustrated on Map ES-1. Region of Halton 2022 DC Background Study vi Table ES-3 Proposed Development Charges for All Services Residential Single and Semi-Detached 12,275.69 $ 4,503.37 $ 17,260.86 $ 5,717.59 $ Multiples - 3 or More Bedrooms 9,941.62 3,649.24 13,979.76 4,636.81 Multiples - Less than 3 Bedrooms 6,570.68 2,411.88 9,239.59 3,064.59 Apartments - 2 or More Bedrooms 5,962.77 2,190.39 8,384.99 2,785.24 Apartments - Less than 2 Bedrooms 4,414.81 1,621.75 6,208.20 2,062.18 Special Care/Need & Accessory Dwelling 3,576.39 1,315.93 5,028.04 1,673.48 Non-Residential per sq. ft. (TFA) Retail 3.897 $ 1.340 $ 5.245 $ 2.053 $ Non-Retail 3.897 $ 1.340 $ 5.245 $ 2.053 $ Development Categories Roads Growth Studies Police Paramedics Facilities Social Housing Waste Diversion Waterfront Parks Residential Single and Semi-Detached 30,365.68 $ 150.82 $ 603.71 $ 286.51 $ 98.01 $ 985.82 $ 95.72 $ 218.69 $ Multiples - 3 or More Bedrooms 24,582.32 122.10 488.73 231.94 79.34 798.06 77.49 177.04 Multiples - Less than 3 Bedrooms 16,247.09 80.70 323.01 153.30 52.44 527.46 51.21 117.01 Apartments - 2 or More Bedrooms 14,741.34 73.22 293.08 139.09 47.58 478.58 46.47 106.17 Apartments - Less than 2 Bedrooms 10,914.41 54.21 216.99 102.98 35.23 354.34 34.40 78.60 Special Care/Need & Accessory Dwelling 8,855.02 43.98 176.05 83.55 28.58 287.48 27.91 63.77 Non-Residential per sq. ft. (TFA) Retail 46.049 $ 0.060 $ 0.189 $ 0.025 $ 0.014 $ - $ 0.003 $ 0.008 $ Non-Retail 8.585 $ 0.060 $ 0.189 $ 0.025 $ 0.014 $ - $ 0.003 $ 0.008 $ Residential * Single and Semi-Detached 62,341.51 $ 43,025.92 $ Multiples - 3 or More Bedrooms 50,478.40 34,843.07 Multiples - Less than 3 Bedrooms 33,362.49 23,028.69 Apartments - 2 or More Bedrooms 30,273.29 20,901.16 Apartments - Less than 2 Bedrooms 22,414.17 15,475.09 Special Care/Need & Accessory Dwelling 18,170.77 12,555.75 Non-Residential per sq. ft. (TFA) Retail 55.490 $ 49.741 $ Non-Retail 18.026 $ 12.277 $ Note: May not add due to rounding Built Boundary Greenfield Greenfield Built Boundary Water Total *GO Transit DC, Recovery DC and Front-ending Recovery are beyond the scope of this study and have not been included in this calculation. Wastewater Built Boundary Development Categories Greenfield Development Categories Region of Halton 2022 DC Background Study vii Table ES-4 Change in Residential DCs (Per Single Detached Unit) Area Specific Water & Wastewater 18,965 $ 7,679 $ 29,537 $ 10,221 $ Roads 19,284 $ 19,284 $ 30,366 $ 30,366 $ General Services: - - - - Growth Studies 262 $ 262 $ 151 $ 151 $ Police 620 620 604 604 Paramedics 169 169 287 287 Facilities 146 146 98 98 Social Housing 941 941 986 986 Waste Diversion 65 65 96 96 Waterfront Parks 202 202 219 219 Sub-Total 40,655 $ 29,369 $ 62,342 $ 43,026 $ GO Transit 1 1,280 $ 1,280 $ 1,280 $ 1,280 $ Recovery By-law1 3,679 $ - $ 3,679 $ - $ Front-ending Recovery1 9,500 $ 9,500 $ 9,500 $ 9,500 $ Total 55,114 $ 40,149 $ 76,801 $ 53,806 $ Note: May not add due to rounding 1. GO Transit DC, Recovery DC and Front-ending Recovery are beyond the scope of this study. However, shown in this table for the purposes of presenting a total quantum. Service Greenfield Built Boundary As Of April 21, 2021 New Calculated Greenfield Built Boundary Region of Halton 2022 DC Background Study viii Table ES-5 Change in Non-residential DCs (per sq.ft. of TFA) Retail Non- Retail Retail Non- Retail Retail Non- Retail Retail Non- Retail Water & Wastewater 7.226 $ 7.226 $ 3.233 $ 3.233 $ 9.142 $ 9.142 $ 3.393 $ 3.393 $ Roads 30.279 $ 5.978 $ 30.279 $ 5.978 $ 46.049 $ 8.585 $ 46.049 $ 8.585 $ General Services: Growth Studies 0.146 $ 0.146 $ 0.146 $ 0.146 $ 0.060 $ 0.060 $ 0.060 $ 0.060 $ Police 0.182 0.182 0.182 0.182 0.189 0.189 0.189 0.189 Paramedics 0.028 0.028 0.028 0.028 0.025 0.025 0.025 0.025 Facilities 0.023 0.023 0.023 0.023 0.014 0.014 0.014 0.014 Waste Diversion 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 Waterfront Parks 0.011 0.011 0.011 0.011 0.008 0.008 0.008 0.008 Total 37.898 $ 13.597 $ 33.905 $ 9.604 $ 55.490 $ 18.026 $ 49.741 $ 12.277 $ Note: May not add due to rounding Service Greenfield As Of April 1, 2021 Greenfield Built Boundary New Calculated Built Boundary Region of Halton 2022 DC Background Study ix 3.9. As shown in the tables above, the new calculated water, wastewater, roads and general services DCs are increasing, resulting in an overall increase in the new DC rates, compared to the current rates. 3.10. The increase in water, wastewater and roads is mainly driven by revised cost estimates to reflect the current unit rates (including land acquisition), Municipal Class Environment Assessments Studies and design, reprogramming of projects post-2022 that for various reasons, for example, coordination and road conflicts, were not practical or possible to deliver and scope changes. 4. Other DC Policies 4.1. The rules for exemptions, relief and adjustments for the charge are detailed in Chapter 6 and included in the proposed by-law in Appendix I. The key proposed changes are:  Modify the current industrial exemption to allow an accessory building or structure that is incidental or subordinate in purpose to the existing industrial use an exemption of up to 278.7 sq.m. (3,000 sq.ft.), provided that the expansion does not exceed the mandatory exemption (see 6.8.1)  Add a new exemption of building or structures up to 278.7 sq.m. (3,000 sq.ft.) for lands used in connection with agricultural development for accessory industrial, retail or commercial use. (see 6.8.2) 4.2. The Region's Local Service Guidelines set out in general the size of water, wastewater and road infrastructure that constitutes a development charge project. The Local Services Guidelines are set out in Appendix G. 5. DC Recovery 5.1. Table ES-1 above summarizes the total capital program considered, the deductions made and the amounts, which form part of the calculation of the DCs. The program is focused on works which are development-related. Under the Study for all services combined, $2.8 billion of a total capital program of $3.9 billion is eligible for DC recovery over the 10 year planning period. 6. Consultation Process 6.1. Halton Region has undertaken an organized and comprehensive public consultation process through the Development Charges Advisory Committee (DCAC) Region of Halton 2022 DC Background Study x prior to the release of the Study. Once the Study is released Halton undertakes a public process prior to the public meeting under the DCA. 6.2. The consultation process will continue prior to Council considering the DC by-law through information posted on the Region's website and the statutory public meeting. This process is discussed in Chapter 7. 7. Council Approvals Sought 7.1. The Study and proposed DC by-law may subsequently be revised and submitted to Council. Accordingly, approval is being sought for:  the proposed DC by-law;  the Study, including the development forecast, the development-related capital program, the DC calculation and deductions, and associated policy proposals;  the undertaking to ensure the increase in the growth-related services will be met, by virtue of the approval of the capital forecast contained herein; and  the post-2031 capacity to be paid for subsequently by DCs or other similar charges. 8. By-law Adoption and Implementation 8.1. As summarized below, the public meeting is expected to be held February 16, 2022 as required by section 12 of the DCA. The final DC proposals are planned to be made to Council on March 23, 2022 and Council will consider approval of a by-law on April 20, 2022. Process Date 1. Release of DC Background Study to the Public December 15, 2021 2. Public Meeting under the DCA, 1997 February 16, 2022 3. Final DC Proposals to Council March 23, 2022 4. Proposed Passing of DC By-law(s) by Council April 20, 2022 5. Advertise Notice of passage of DC By-law(s) Within 20 days of passage 6. Last day for DC By-law(s) Appeal 40 days after passage Region of Halton 2022 DC Background Study xi 8.2. Although the by-law is scheduled to be passed on April 20, 2022, this Study proposes that the by-law come into force September 1st, 2022 to allow for a transitional period to the new rates prior to expiration of By-law No. 36-17 (August 31, 2022). 9. Acknowledgements 9.1. The preparation of the 2022 DC Background Study and by-law has been undertaken in consultation with the following:  Halton DCAC;  Halton Region Planning and Public Works, Legislative & Planning Services, Health and Social Services, as well as Halton Regional Police Service;  Consultants retained by the Region, including GM BluePlan Engineering Limited, Ellso Consulting Inc., Kagan Shastri LLP Lawyers, and Watson & Associates Economists Ltd. Region of Halton 2022 DC Background Study xii Map ES-1 Lands to Which Development Charges are Applicable Region of Halton 2022 DC Background Study Chapter 1 Introduction Region of Halton 2022 DC Background Study 1-1 1. Introduction 1.1 Purpose of this Document The Region of Halton has prepared a DC background study (the Study) and by-law for water, wastewater, roads and general services (i.e. growth studies, police, paramedic services, facilities, social housing, waste diversion, and waterfront parks) which through the DC process set out in the Study will lead to the replacement of By-law No. 36-17 (Halton Built Boundary and Greenfield Area Water, Wastewater, Roads and General Services Development Charges By-law, 2017). By-law No. 36-17, as amended, was approved by Council on June 14, 2017, and became effective September 1, 2017. The by-law will expire on August 31, 2022. The Study has been prepared, in the first instance, to meet the statutory requirements applicable to the Region's DC background study, as summarized in subsections 1.2 and 1.3 below. It also addresses the requirement for "rules" (contained in Chapter 6) and the proposed by-law to be made available as part of the approval process (included as Appendix I). In addition, the Study is designed to set out sufficient background on the legislation (Chapter 1), current Regional DC policy (Chapter 2) and the policies underlying the proposed by-law (Chapter 6), to make the exercise understandable to those who are involved. Finally, it also addresses post-adoption implementation requirements (Chapter 7). The Study reviews all relevant information required under the DCA to determine the DCs for water, wastewater, roads and general services (i.e. growth studies, police, paramedic services, facilities, social housing, waste diversion, and waterfront parks). With respect to the water and wastewater services, it has been prepared to calculate uniform plant capacity DCs and area specific distribution/collection charges for the Greenfield and Built Boundary areas, as identified in ROPA 38 (Chapters 4 and 5 and Appendix C). The non-residential roads DC calculation has been differentiated between retail and non-retail development (Appendix D and E). The chapters in the Study are supported by Appendices containing the data required to explain and substantiate the calculation of the charges. Region of Halton 2022 DC Background Study 1-2 Figure 1-1 outlines the proposed schedule to be followed with respect to the DC by-law adoption process. Figure 1-1 Schedule of Key DC Process Dates Process Date 1. Release of DC Background Study to the Public December 15, 2021 2. Public Meeting under the DCA, 1997 February 16, 2022 3. Final DC Proposals to Council March 23, 2022 4. Proposed Passing of DC By-law(s) by Council April 20, 2022 5. Advertise Notice of passage of DC By-law(s) Within 20 days of passage 6. Last day for DC By-law(s) Appeal 40 days after passage The Public Meeting under the DCA will be held on February 16, 2022, and Council will consider the DC by-law proposed in this background study on April 20, 2022. 1.2 Development Charges Act, 1997 (DCA) Background Study Requirements The DCA requires that a DC background study must be completed by Regional Council before passing a DC by-law. The mandatory inclusions in such a study are set out in s.10 of the DCA and in s.8 of O. Reg. 82/98, and are as follows: a) the estimates under paragraph 1 of subsection 5(1) of the anticipated amount, type and location of development (Chapter 3); b) the calculations under paragraphs 2 to 8 of subsection 5(1) for each service to which the DC by-law would relate (Chapter 4); c) an examination, for each service to which the DC by-law would relate, of the long- term capital and operating costs for capital infrastructure required for the service (Appendix H); Region of Halton 2022 DC Background Study 1-3 d) In regard to b), consideration by Council of the use of more than one DC by-law to reflect the different needs for services in different areas (unless the regulations prescribe a specific service or area). e) the following for each service to which the DC relates:  the total of the estimated capital costs relating to the service.  the allocation of the costs referred to in paragraph 1 of subsection 5(1) between costs that would benefit new development and costs that would benefit existing development.  the total of the estimated capital costs relating to the service that will be incurred during the term of the proposed DC by-law.  the allocation of the costs referred to in paragraph 3 of subsection 5(1) between costs that would benefit new development and costs that would benefit existing development.  the estimated and actual value of credits that are being carried forward relating to the service. (O. Reg. 82/98 s.8 and addressed in Chapter 4 of this report) f) for all services, an AMP shall be provided for all assets whose capital are proposed to be funded under the DC by-law (Appendix I). This plan shall demonstrate that all assets mentioned above are financially sustainable over their full lifecycle. g) The Study must be made available to the public at least 60 days prior to passing the DC by-law. The Study must be posted on the municipality's website (or if no website is provided by the municipality, made available in the municipal office). Further, the Study must remain on the municipality's website until the DC by-law is repealed or replaced. 1.3 Development Charges Act, 1997 (DCA) Requirements 1.3.1 Introduction 1. DCs are payments made by new development in Halton (and other municipalities) normally as part of the building permit approval and/or the subdivision agreement process. These payments are made by all such new development, unless specifically exempt by the DCA or the Region's DC by-law. 2. These payments are made for the initial capital requirements of providing services to new development anticipated over a specific planning period (i.e. to 2031 for Halton). Region of Halton 2022 DC Background Study 1-4 Region-funded services that are potentially eligible for DC funding are now listed in Section 2 of the DCA (see section 1.4 below). 3. "Capital" is defined in the DCA to include the municipal cost to acquire, lease, construct or improve land or facilities, including rolling stock (7+ year life), furniture and equipment (other than computer equipment), library materials, as well as related study and financing costs. 4. The monies collected under a DC by-law are maintained in separate reserve funds, one for each of the services or classes of services (discussed further in Section 1.4 below). It is also required that the monies only be expended for the purpose for which the DC was calculated. 5. In calculating the charge, it is necessary to:  establish a new growth forecast for population and housing, and for employees and floor area for a planning period;  determine and cost the additional services that such new growth will require and ensure that the capital program has Council approval;  make the cost deductions required by the DCA with respect to service level, benefit to existing development, excess capacity, grants, and other contributions, etc.;  calculate DCs by type of use and document this in a background study and by- law;  take a background study and proposed by-law through a public process, seeking Council approval thereof. 1.3.2 DC Prerequisites As per the DCA, the Region can impose DCs for: 1. A Regional service and funding responsibility:  Water supply services, including distribution and treatment services.  Wastewater services, including sewers and treatment services.  Storm water drainage and control services.  Services related to a highway.  Electrical power services.  Toronto-York subway extension. Region of Halton 2022 DC Background Study 1-5  Transit services.  Waste diversion services.  Policing services.  Fire protection services.  Ambulance services.  Library services.  Long-term Care services  Parks and Recreation services, but not the acquisition of land for parks.  Public Health services.  Childcare and early years services.  Housing services.  Provincial Offences Act services.  Services related to emergency preparedness.  Services related to airports, but only in the Regional Municipality of Waterloo.  Additional services as prescribed. 2. A service which will experience an increase in capital needs at least partially attributable to residential and/or non-residential growth in Halton for a period between 2022-2031. 3. A service for which Regional Council has or will (as part of the DC process) approve(d) a capital forecast which includes capital capacity expansion projects as per paragraph 2. 4. Such capital capacity expansion projects are not fully funded by grants, subsidies or developer contributions or other contributions. 5. Such capital projects involve the acquisition, lease, construction or improvement of land, buildings, including furniture and equipment, studies and borrowing costs (as well as library materials). 6. Such capital projects do not include computer equipment and rolling stock with an estimated useful life of less than 7 years. 7. Such capital costs don't serve to increase the future (per capita/employee) level of service beyond the average attained in Halton over the 2012-2021 period, or as legislated. Region of Halton 2022 DC Background Study 1-6 1.3.3. A Summary of Statutory DC Calculation Requirements The following tabular text sets out the method that must be used to determine DCs for non-transit services (note that under section 6.1 of O. Reg. 82/98, transit is a prescribed service and provides a forward-looking service standard along with added requirements to be included in a background study as per sections 8 (2), (3) and (4) of the O. Reg.). The underlining has been added to the quotations for clarification/emphasis and is not part of the statute or regulation quoted on the left side of the page. The DC calculation process is also summarized schematically in Figure 1-2 which follows. Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary 1. "The anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." s. 10 (2 ) (c.1) requires Council to consider the use of more than one DC by-law to reflect different needs from services in different area. Virtually all municipalities forecast all development (including DC-ineligible) in the first instance. That development is used as the denominator in the DC calculation with the full eligible cost of servicing all such development used as the numerator. That way, growth-related servicing costs are equitably spread over all benefiting development, the municipality does not recover DCs from exempt development and this would ensure that the requirements of s. 5 (6) 3 have been met. That is, capital costs have not been offloaded from one type of development to another. While consideration of the use of area-rating is a mandatory requirement of the DCA, adoption of area specific by-laws is a choice to be made by Council. 2. "The increase in the need for service attributable to the anticipated development must be estimated for each service to which the development charge by-law would relate." This step involves estimating the additional service requirement, individually for water, wastewater, roads, etc., that is needed by the development increment in paragraph 1. The anticipated development in paragraph 1 must correspond to the service attribution in paragraph 2. This involves removing statutorily ineligible development (i.e. municipalities, schools, specified industrial expansions, specified residential intensification and other statutorily exempt public uses) and the servicing cost thereof. However, this would be very difficult to accomplish, because numerous unspecified geographic locations are Region of Halton 2022 DC Background Study 1-7 Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary involved for such development, which makes the servicing cost difficult to identify. As a result, the total cost/total development approach outlined above is used and has the same effect on the DC quantum. 3. "The estimate under paragraph 2 may include an increase in need only if the council of the municipality has indicated that it intends to ensure that such an increase in need will be met."1 O. Reg. 82/98 s.3. "For the purposes of paragraph 3 of subsection 5(1) of the Act, the council of a municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council." The capital forecast underpinning the DC calculation must be formally approved by Council in one of the ways indicated in the Regulation. 4. "The estimate under paragraph 2 must not include an increase that would result in the level of service exceeding the average level of that service provided in the municipality over the 10- year period immediately preceding the preparation of the background study required under section 10.1 How the level of service and average level of service is determined may be governed by the regulations." This provision creates a "service level cap" equal to the cost of providing service to the "anticipated development," consistent with the 10-year historical average level of service. No planning period cap is provided by the Act, with the exception of Transit services. A Class of Service may be established which is composed of any number or combination of services and may include parts or portions of the services listed in subsection 2 (4) or parts or portions of the capital costs listed in subsection 5(3) (as per s.7). Two "level of service" considerations must be taken into account in satisfying compliance re the 10-year historical average level of service cap. These 1 The Act notes that the provisions may be further governed by regulations. Region of Halton 2022 DC Background Study 1-8 Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary O. Reg. 82/98 s.4(1) "For the purposes of paragraph 4 of subsection 5(1) of the Act, both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service." s. 4 (1.1) provides that in determining the quality of a service, the replacement cost, exclusive of any allowance for depreciation, shall be the amount used. s. 4 (2) addresses the service level in an excluded geographic area where a service is not provided. s. 4 (4) limits the service level in part of a municipality to the level otherwise applicable to the full municipality. s. 4 (3) modifies the service level cap where a higher level is required by another Act. considerations involve "quantity" (e.g. floor space/capita) and "quality" (e.g. cost per sq. m. of floor space). Potentially affects area specific charges and needs to be part of Council's consideration of area-rating as required by s. 10 (2) (c.1) of the DCA. Affects water and wastewater requirements in particular. 5. O. Reg. 206/04 amended s.4 of O. Reg. 82/98 by adding the following subsection: "(1.1) In determining the quality of a service under subsection (1), the replacement cost of municipal capital works, exclusive of any allowance for depreciation, shall be the amount used. (underlining added) The regulation clarifies that the quality level of service measure is to be based on the undepreciated replacement cost of municipal capital works. Region of Halton 2022 DC Background Study 1-9 Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary 6. "The increase in the need for service must be reduced by the extent to which an increase in service to meet the increased need would benefit existing development."1 Note: no regulatory clarification has been provided. Existing development benefits from:  the repair or unexpanded replacement of existing assets;  an increase in average service level or existing operational efficiency;  the elimination of a chronic servicing problem not created by growth;  providing services where none previously existed (e.g. water service). 7. "The capital costs necessary to provide the increased services must be estimated. The capital costs must be reduced by the reductions set out in subsection (2). What is included as a capital cost is set out in subsection (3)."1 O. Reg. 82/98 s.6 indicates that: Unless the person making the grant, subsidy, etc., was specific as to how it is to be applied, the contribution is to be shared between growth and non- growth project components in proportion to the way in which the costs were allocated in s. 5 (1) 6. s. 5 (3) defines capital costs to include:  the acquisition or lease of (an interest in) land;  construction, improvement, acquisition or lease (capital component only) costs for buildings/structures/facili ties; s. 5 (2) refers to capital grants, subsidies and other contributions made to a municipality or that Council anticipates will be made in respect of the capital costs. These costs exclude "local services" related to a plan of subdivision or a consent approval, to be installed or paid for by the owner (s. 2 (5)). Includes debt payments related to previously constructed growth-related works. 1 The Act notes that the provisions may be further governed by regulations Region of Halton 2022 DC Background Study 1-10 Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary  7+ year useful life rolling stock;  FFE, other than computer equipment;  library materials;  studies re above;  DC Background Studies; and  interest on related borrowings. 8. Previously this section required a mandatory 10% deduction be applied to the DC calculations This section has now been repealed as per the passage of Bill 197 (2020). This is discussed further in Section 1.4 of this study. 9. "Rules must be developed to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection (6)." s. 5 (6): "The rules developed under paragraph 9 of subsection (1) to determine if a development charge is payable in any particular case and to determine the amount of the charge are subject to the following restrictions: 1. The rules must be such that the total of the development charges that would be imposed upon the anticipated development is less than or equal to the capital costs determined under paragraphs 2 to 8 of subsection (1) for all the services to which the These are mandatory DC by-law inclusions as to how the charge is to be applied to development types and circumstances. These are 3 over-riding tests to be met by the DC by-law. A municipality cannot collect more than the calculated cost for each service (if the amount of development and resultant revenue outpaces the forecast, then address via a reserve fund deduction in the DC calculation in the next round or other appropriate means). Region of Halton 2022 DC Background Study 1-11 Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary development charge by-law relates. 2. If the rules expressly identify a type of development they must not provide for the type of development to pay development charges that exceed the capital costs, determined under paragraphs 2 to 8 of subsection (1), that arise from the increase in the need for services attributable to the type of development. However, it is not necessary that the amount of the development charge for a particular development be limited to the increase in capital costs, if any, that are attributable to that particular development. 3. If the development charge by-law will exempt a type of development, phase in a development charge, or otherwise provide for a type of development to have a lower development charge than is allowed, the rules for determining development charges may not provide for any resulting shortfall to be made up through higher development charges for other development." A municipality cannot offload the cost of servicing one type of development onto another type. e.g. Industrial servicing costs cannot be transferred to residential development. It is not necessary that the average municipal-wide per unit servicing costs funded by the DC reflect the needs of any particular development project. Provides further clarification on the inability of the by-law to offload cost recovery from one type of development to another, in this case from exempt or discounted development to non-exempt development. 10. "The rules may provide for full or partial exemptions for types of development and for the phasing in of development charges. The rules may also provide for the indexing of development Optional by-law inclusions such as authority to set rules on discretionary exemptions, phasing in of DCs and indexing of DCs. Region of Halton 2022 DC Background Study 1-12 Para- graph Subsection 5 (1) of the DCA (and associated Regulations) Commentary charges based on the prescribed index." Figure 1-2 The Process of Calculating a Development Charge under the Act that Must be Followed 8. Specified Local Services Anticipated Development 1. Estimated Increase in Need for Service 2. Ineligible Services Level of Service Cap Needs That Will Be Met Examination of the Long-term Capital and Operating Costs for Capital Infrastructure DC Needs By Service Less: Uncommitted Excess Capacity Less: Benefit To Existing Development Less: Grants, Subsidies and Other Contributions DC By-law(s) Spatial Applicability DC Net Capital Costs Costs for new development vs. existing development for the term of the by-law and the balance of the period Amount of the Charge By Type of Development (including apportionment of costs - residential and non-residential) Financing, Inflation and Investment Considerations 3. 4. 5. 6. 11. 12. 17. 18. 15. 16. 9. Tax Base, User Rates, etc. Subdivision Agreements and Consent Provisions Consideration of exemptions, phase-ins, etc. 1 3 2 Non-Transit Services Historic Service Standard 4a. Transit Services Forward-looking Service Standard 4b. Asset Management Plan for All Capital Projects to be Funded by DCs 7. Non-Transit Services "Financially Sustainable" 7a. Transit Services "Detailed Requirements" 7b. 10. Plus: Unfunded Works in Place which will Benefit Future Development Plus: Credit Obligations to Land- owners to be Recovered 13. 14. Region of Halton 2022 DC Background Study 1-13 1.4 Changes to the DCA: Bill 108, 138, 137, and 213 1.4.1 Bill 108: More Homes, More Choice Act - An Act to Amend Various Statutes with Respect to Housing, Other Development, and Various Matters On May 2, 2019, the Province introduced Bill 108, which proposed changes to the DCA. The Bill was introduced as part of the Province's "More Homes, More Choice: Ontario's Housing Supply Action Plan". The Bill received Royal Assent on June 6, 2019. While having received royal assent, many of the amendments to the DCA would not come into effect until they are proclaimed by the Lieutenant Governor (many of these changes were revised through Bill 197). At the time of writing, the following provisions have been proclaimed:  Effective January 1, 2020, rental housing and institutional developments will pay DCs in six equal annual payments commencing at occupancy. Non-profit housing developments will pay DCs in 21 equal annual payments. Interest may be charged on the instalments, and any unpaid amounts may be added to the property and collected as taxes.  Effective January 1, 2020, the DC amount for all developments occurring within 2 years of a Site Plan or Zoning By-law Amendment planning approval (for application submitted after this section is proclaimed), shall be determined based on the DC in effect on the day of Site Plan or Zoning By-law Amendment application. If the development is not proceeding via these planning approvals, then the amount is determined the earlier of the date of issuance of a building permit. On February 28, 2020, the Province released updated draft regulations related to the DCA and the Planning Act. A summary of these changes to take effect upon proclamation by the Lieutenant Governor is provided below: Changes to Eligible Services - Prior to Bill 108, the DCA provided a list of ineligible services whereby municipalities could include growth related costs for any service that was not listed. With Bill 108, the changes to the DCA would now specifically list the services that are eligible for inclusion in the by-law. Further, the initial list of eligible services under Bill 108 was limited to "hard services", with the "soft services" being removed from the DCA. These services would be considered as part of a new Region of Halton 2022 DC Background Study 1-14 community benefits charge (discussed below) imposed under the Planning Act. As noted in the next section this list of services has been amended through Bill 197. Mandatory 10% deduction - The amending legislation would have removed the mandatory 10% deduction for all services that remain eligible under the DCA. Remaining Services to be Included in a New Community Benefits Charge (CBC) Under the Planning Act - It is proposed that a municipality may, by by-law, impose a CBC against land to pay for the capital costs of facilities, services and matters required because of development or redevelopment in the area to which the by-law applies. The CBC was proposed to include formerly eligible DC services that are not included in the above listing, in addition to parkland dedication and bonus zoning contributions. 1.4.2 Bill 138: Plan to Build Ontario Together Act, 2019 On November 6, 2019, the Province released Bill 138 which provided further amendments to the DCA and Planning Act. This Bill received Royal Assent on December 10, 2019 and was proclaimed which resulted in sections related to the DCA (schedule 10) becoming effective on January 1, 2020. The amendments to the DCA included removal of instalment payments for commercial and industrial developments that were originally included in Bill 108. 1.4.3 Bill 197: COVID-19 Economic Recovery Act In response to the global pandemic that began affecting Ontario in early 2020, the Province released Bill 197 which provided amendments to a number of Acts, including the DCA and Planning Act. This Bill also revised some of the proposed changes identified in Bill 108. Bill 197 was tabled on July 8, 2020, received Royal Assent on July 21, 2020, and was proclaimed on September 18, 2020. The following provides a summary of the changes: 1.4.3.1 DC Related Changes List of DC Eligible Services As noted above, under Bill 108 some services were to be included under the DCA and some would be included under the CBC authority. Bill 197, however, revised this proposed change and has included all services (with some exceptions) under the DCA. These services are as follows: Region of Halton 2022 DC Background Study 1-15  Water supply services, including distribution and treatment services.  Wastewater services, including sewers and treatment services.  Storm water drainage and control services.  Services related to a highway.  Electrical power services.  Toronto-York subway extension.  Transit services.  Waste diversion services.  Policing services.  Fire protection services.  Ambulance services.  Library services.  Long-term Care services  Parks and Recreation services, but not the acquisition of land for parks.  Public Health services.  Childcare and early years services.  Housing services.  Provincial Offences Act services.  Services related to emergency preparedness.  Services related to airports, but only in the Regional Municipality of Waterloo.  Additional services as prescribed. Classes of Services - DC Pre-Bill 108/197 legislation (i.e. DCA, 1997) allowed for categories of services to be grouped together into a minimum of two categories (90% and 100% services). The Act (as amended) repeals and replaces the above with the four following subsections:  A DC by-law may provide for any eligible service or capital cost related to any eligible service to be included in a class, set out in the by-law.  A class may be composed of any number or combination of services and may include parts or portions of the eligible services or parts or portions of the capital costs in respect of those services. Region of Halton 2022 DC Background Study 1-16  A DC by-law may provide for a class consisting of studies in respect of any eligible service whose capital costs are described in paragraphs 5 and 6 of s. 5 of the DCA.  A class of service set out in the DC by-law is deemed to be a single service with respect to reserve funds, use of monies, and credits. As well, the removal of the 10% deduction for soft services under Bill 108 has been maintained. Note: additionally, a "sub-class" can include any group of services. 1.4.3.2 CBC Related Changes CBC Eligibility  The CBC is limited to lower-tier and single tier municipalities; upper-tier municipalities will not be allowed to impose this charge.  A CBC may be imposed with respect to the services listed in s. 2 (4) of the DCA (eligible services), "provided that the capital costs that are intended to be funded by the community benefits charge are not capital costs that are intended to be funded under a development charge by-law."  Halton Region is an upper tier municipality and therefore the discussion around the CBC is not discussed further in this report. 1.4.4 Bill 213: Better for People, Smarter for Business Act, 2020 On December 8, 2020, Bill 213 received Royal Assent. One of the changes of the Bill that took effect upon Royal Assent included amending the Ministry of Training, Colleges and Universities Act by introducing a new section that would exclude the payment of DCs for developments of land intended for use by a university that receives operating funds from the Government. Region of Halton 2022 DC Background Study Chapter 2 Current Region Policy Region of Halton 2022 DC Background Study 2-1 2. Current Region Policy 2.1 Summary of Halton's Current DC By-laws 2.1.1 Halton's current DC policies are based on the following by- laws:  By-law No. 36-17, as amended, established water, wastewater, roads and general services DCs for the Regional Municipality of Halton (Greenfield and Build Boundary Areas). This by-law was passed on June 14, 2017, came into force on September 1, 2017, and will expire on August 31, 2022. The areas to which this by-law applies are shown in Map 2-1. This includes the Greenfield area, Built Boundary area and Rural area. It should be noted that the Study does not address GO Transit DC By-law No. 159-01, as amended, because the Province, through Ontario Regulation 451/19, extended the existing by-law to December 31, 2022 and has done so periodically. Imposition of a revised GO Transit DC by-law to replace the current by-law will require a separate study process. Further the Study does not address the Recovery DC By-law No. 37-17 (Residential Recovery of the Early Payment of Estimated Future Water, Wastewater and Roads DCs for the Recovery Area). This by-law was updated under a separate study and the new Recovery DC By-law 48-21 comes into force January 1, 2022. Additionally, this Study does not address the residential Front-ending recovery payment which commenced on January 1, 2017, and was established under the front-ending provision (section 44) of the DCA. Region of Halton 2022 DC Background Study 2-2 Map 2-1 Schedule "A" to By-law No. 36-17 Map of Region of Halton Region of Halton 2022 DC Background Study 2-3 2.1.2 By-law No. 36-17 By-law No. 36-17 establishes the area specific residential and non-residential water, wastewater (both Greenfield and Built Boundary as shown in Map 2-1), roads and general services DCs for the Regional Municipality of Halton. The residential DCs applied to the Greenfield and Built Boundary areas are as follows: The non-residential charges applied to Greenfield and Built Boundary areas are as follows: The DCs were indexed on April 1, 2018 and each year thereafter, on April 1, in accordance with the Statistics Canada Quarterly Construction Price Statistics. In general, DCs shall be payable on the date a building permit is issued. In the case of residential development, the water services, wastewater services, and roads service components shall be payable with respect to an approval of a plan of subdivision or a consent at the time of execution of the subdivision agreement or the agreement entered into as a condition of a consent. With respect to high density apartment dwellings with a minimum of 4 storeys or containing more than 130 dwelling units per net hectare per approved plans under section 41 of the Planning Act, the water services, wastewater services, and roads services components along with the general services component of the DCs shall be payable on the date of building permit issuance. Residential Development Type Greenfield/ Built Boundary Water Wastewater Roads General Services Total Water Wastewater Roads General Services Total Greenfield 7,581.80 $ 8,966.66 $ 16,826.72 $ 2,098.56 $ 35,473.74 $ 8,689.18 $ 10,276.31 $ 19,284.39 $ 2,405.06 $ 40,654.94 $ Built Boundary 2,742.94 $ 3,957.47 $ 16,826.72 $ 2,098.56 $ 25,625.69 $ 3,143.56 $ 4,535.49 $ 19,284.39 $ 2,405.06 $ 29,368.50 $ Greenfield 6,079.53 $ 7,193.63 $ 13,446.01 $ 1,582.28 $ 28,301.45 $ 6,967.49 $ 8,244.31 $ 15,409.90 $ 1,813.39 $ 32,435.09 $ Built Boundary 2,183.68 $ 3,142.12 $ 13,446.01 $ 1,582.28 $ 20,354.09 $ 2,502.62 $ 3,601.05 $ 15,409.90 $ 1,813.39 $ 23,326.96 $ Greenfield 4,419.81 $ 5,230.15 $ 9,770.23 $ 1,171.26 $ 20,591.45 $ 5,065.36 $ 5,994.05 $ 11,197.25 $ 1,342.32 $ 23,598.98 $ Built Boundary 1,586.89 $ 2,283.57 $ 9,770.23 $ 1,171.26 $ 14,811.95 $ 1,818.67 $ 2,617.10 $ 11,197.25 $ 1,342.32 $ 16,975.34 $ Greenfield 3,723.95 $ 4,405.66 $ 8,245.42 $ 1,003.85 $ 17,378.88 $ 4,267.86 $ 5,049.15 $ 9,449.73 $ 1,150.46 $ 19,917.20 $ Built Boundary 1,344.48 $ 1,940.18 $ 8,245.42 $ 1,003.85 $ 12,533.93 $ 1,540.85 $ 2,223.56 $ 9,449.73 $ 1,150.46 $ 14,364.60 $ Greenfield 2,869.32 $ 3,394.63 $ 6,352.56 $ 766.83 $ 13,383.34 $ 3,288.40 $ 3,890.45 $ 7,280.40 $ 878.84 $ 15,338.09 $ Built Boundary 1,035.74 $ 1,494.56 $ 6,352.56 $ 766.83 $ 9,649.69 $ 1,187.02 $ 1,712.86 $ 7,280.40 $ 878.84 $ 11,059.12 $ Greenfield 2,369.06 $ 2,801.76 $ 5,257.95 $ 660.03 $ 11,088.80 $ 2,715.08 $ 3,210.98 $ 6,025.91 $ 756.43 $ 12,708.40 $ Built Boundary 857.60 $ 1,237.83 $ 5,257.95 $ 660.03 $ 8,013.41 $ 982.86 $ 1,418.62 $ 6,025.91 $ 756.43 $ 9,183.82 $ Special Care/Special Need Dwelling Charge in By-Law Current As Of April 1, 2021 Single & Semi-detached Dwelling Multiple Dwelling (less than 3 bedrooms) Apartment Dwelling (2 or more bedrooms) Multiple Dwelling (3 or more bedrooms) Apartment Dwelling (less than 2 bedrooms) Non-Residential Development Type Water Waste- water Roads General Services* Total Water Waste- water Roads General Services Total Greenfield Retail 2.762 $ 3.542 $ 26.420 $ 0.343 $ 33.067 $ 3.166 $ 4.060 $ 30.279 $ 0.393 $ 37.898 $ Greenfield Non-Retail 2.762 $ 3.542 $ 5.216 $ 0.343 $ 11.863 $ 3.166 $ 4.060 $ 5.978 $ 0.393 $ 13.597 $ Built Boundary Retail 1.072 $ 1.748 $ 26.420 $ 0.343 $ 29.583 $ 1.229 $ 2.004 $ 30.279 $ 0.393 $ 33.905 $ Built Boundary Non-Retail 1.072 $ 1.748 $ 5.216 $ 0.343 $ 8.379 $ 1.229 $ 2.004 $ 5.978 $ 0.393 $ 9.604 $ Charge in By-Law (per Sq. Ft.) Current As Of April 1, 2021 (per Sq. Ft.) Region of Halton 2022 DC Background Study 2-4 DC exemptions beyond the statutory provisions include public hospitals, places of worship, designated conservation authority uses, agricultural development (excluding associated residential or commercial), temporary venues/seasonal structures, temporary buildings, garden suites, and parking garages. 2.1.3 Summary of Current DC Policies Table 2-1 summarizes the DC policies included in the current DC by-law described above. Table 2-1 Summary of Existing Halton Region DC Policies DC Policies Description Residential Dwelling Categories - Residential charge is based on 6 categories of dwelling units, including: Single/Semi Detached, Multiple (3 or more bedrooms), Multiple (less than 3 bedrooms), Apartment (2 or more bedrooms), Apartment (less than 2 bedrooms), Special Care/Special Need/Accessory. Non-Residential Categories - Non-residential charge is based on total floor area (TFA) (sq.ft. /sq.m) and DCs categorized by: retail and non-retail. Exemption for Intensification of Existing Housing including a structure ancillary to it (Mandatory) - Enlargement of an existing unit; - Creating 1 or 2 additional units in a single detached or 1 additional unit in any other type of dwelling provided the TFA of the new unit(s) does not exceed the existing unit; - Creating the greater of 1 or 1% of the existing units; in a rental residential building; or - The above restrictions apply whether an additional unit is in the residential building or a structure ancillary to it. Exemption for Additional dwelling units in new residential buildings or a structure ancillary to it (Mandatory) - Creating 1 additional dwelling unit in a new residential building containing a single, semi-detached or row dwelling, (or in a building ancillary to each) provided the TFA of the additional 1 unit does not exceed the TFA of the initial unit. Temporary Residential Building Exemption - Garden Suite - Other - Garden Suite - through an agreement registered on title, exempt if removed within the period set by local municipality's temporary use by-law and if not DCs go onto property tax. - Other - through an agreement, exempt if securities posted in amount of DC payable at building permit and if the building is removed within 3 years of building permit issuance (or any extension provided in writing by the Treasurer), the security is returned. If not, security deposited to the DC reserve funds. Region of Halton 2022 DC Background Study 2-5 DC Policies Description Timing of DC Payment - Residential: o Collect water, wastewater and roads at subdivision or consent agreement (except for high density apartment); o Collect general services at building permit. - Non-residential: o Collect all DCs at building permit. - Notwithstanding the above, Region may enter into agreement under s.27 of the DCA to collect all or part of DCs earlier or later than they would otherwise be payable. Industrial Expansion Exemption (Mandatory) - If existing building is enlarged by 50% or less, expansion is exempt, and - Enlargement must be a bona fide increase in the size of the existing building, attached to and having direct entry to the existing building and used in connection with an industrial purpose. - Expansion calculated based on the cumulative areas of the existing building prior to expansion. - Expansion calculation is based on TFA which includes below grade floor area. Commercial Expansion Exemption - Provide an expansion exemption, for the first 278 m2 (3,000 sq.ft.) for an expansion of the existing commercial building (attached or detached) on the site; - Expansion or accessory building on the lot must be incidental to or subordinate in purpose and exclusively devoted to the commercial use in the existing building; - There must be at least 6 months since issuance of the last building permit on the lot. Municipal and School Board Exemptions (Mandatory) - DCs exempt for "Land owned by and used for the purposes of a municipality or a board as defined in the Education Act" per DCA. - Unless buildings or part thereof are used for commercial purposes. Demolition Credit - Credit calculated by multiplying the number/type of dwelling units or the non-residential TFA being demolished, by the relevant DC in effect on the date when the DC is payable. - Given where a building permit is issued within 5 years from the date of the demolition permit. - Does not apply if the building is exempt under the current by-law. - Where the building cannot be demolished until the new building is constructed, DCs are payable on issuance of a building permit and a refund is made, without interest, if the demolition is made within 12 months of building permit issuance. Region of Halton 2022 DC Background Study 2-6 DC Policies Description - Where a formal planning application (e.g. complete site plan application under the Planning Act) has been submitted to the local municipality but a building permit cannot be issued within the 5- year timeframe, the Treasurer, upon written request, may extend the credit. - Credit provided on a one-time basis unless there is an approved phasing plan. Conversion Credit - Credit calculated by multiplying the number/type of dwelling units or the non-residential TFA, being converted by the relevant DC in effect on the date when the DC is payable. - Does not apply if the original building (prior to conversion) is exempt under the current by-law. - Credit provided on a one-time basis unless there is an approved phasing plan. - Despite the above, where there is a conversion from a non-retail to a retail development an exemption of incremental DCs up to a conversion of either 10,000 sq.ft. (930 sq.m.) or 25% of TFA being converted, whichever is greater. Lot Coverage Relief - Provides a full DC exemption for non-residential when the non- residential development is greater than 1.0 times the lot size. Parking Garages Exemption - Parking garages (whether at, above or below grade) are exempt. Temporary Non- Residential Building (i.e. sales trailers) - Require securities posted in amount of DC payable at building permit. - If the building is removed within 3 years of building permit issuance (or any extension provided in writing by the Treasurer), the security is returned. If not, security deposited to the DC reserve funds. Agricultural Exemption - DCs are exempt when the use is considered a bona fide farming operation, including sod farms, breeding and boarding of horses, and green houses with no connection to the Regional water and wastewater. Residential and commercial uses in agricultural development are not exempt. - Staff review availability of Farm Business Registration (FBR) number in order to confirm the Agricultural use. Other Exemptions - Includes the following additional discretionary exemptions: o Hospitals (unless buildings or part thereof are used for commercial purposes); o Places of Worship; o Conservation Authorities (unless buildings or part thereof are used for commercial purposes); o Seasonal structures; Region of Halton 2022 DC Background Study 2-7 DC Policies Description o Temporary venue. Affordable Rental Housing - Greater of 25% or 10 units at or below affordable rent, as defined (for min. 20 years) in State of Housing Report. - Deferral of DCs by annual payments over 20 years commencing at BP - No interest Rental housing (excluding non-profit) (Mandatory) - Payment of DCs by 6 annual installments commencing at occupancy - Interest applies Non-profit housing (Mandatory) - Payment of DCs by 21 annual installments commencing at occupancy - No interest Institutional (Mandatory) - Payment of DCs by 6 annual installments commencing at occupancy - Interest applies Non-Residential Payment Deferral - Available for non-residential DCs through an agreement for all developments. - Deferral of DC's by annual payments over a 10year period commencing at building permit. - Interest applies Region of Halton 2022 DC Background Study Chapter 3 Anticipated Development in Halton Region of Halton 2022 DC Background Study 3-1 3. Anticipated Development in Halton 2022-2031 3.1 Requirements of the Act (DCA) Subsection 5(1) of the DCA sets out the method that must be used to determine DCs. The first step states that: "The anticipated amount, type and location of development, for which development charges can be imposed, must be estimated." Steps 2 and 5 go on to refer to "the increase in need for service attributable to the anticipated development..." Thus, the estimate of anticipated development is an important starting point to the process. The requirement of the DCA is for a development forecast that refers to residential, commercial, industrial and institutional development. Such development generates increased service needs, via its occupancy and use, which is measured in terms of households, population, and employment. This chapter, therefore, addresses both the anticipated increase in development and the users thereof. It covers all forms of development in order to spread the costs over the entirety of the benefiting development. Short- and longer-term time horizons are generally utilized for the DC process. The DCA limits the planning horizon for transit services to a 10-year planning horizon. All other services can utilize a longer planning period if the municipality has identified the growth-related capital infrastructure needs associated with the longer-term growth planning period. For the purpose of this DC process, a 10-year (2022-2031) planning horizon is used for all services as the currently approved master planning documents identify capital needs to 2031. 3.2 Anticipated Development The anticipated development in Halton over the 10-year planning horizon has been prepared based on the Halton Region Best Planning Estimates (BPE, 2011), updated in 2011. The Halton Region BPE, 2011 was developed by Regional staff in consultation with staff from local municipalities based on various demographic models, using parameters derived from Statistics Canada Census data. Region of Halton 2022 DC Background Study 3-2 The Halton Region BPE, 2011 population and employment forecast reflects the population and employment targets set out in Schedule 3 of the Provincial Growth Plan, Places to Grow and Regional Official Plan Amendment (ROPA) No. 39. Specifically, the Region is required to plan for a total of 780,000 people (752,537 excluding the Census undercount) and 390,000 jobs by 2031. Halton Region further allocated the provincial growth targets by local municipality as part of the Sustainable Halton process, which represents the growth management and land use response to the Province's Places to Grow Plan, the Provincial Policy Statement and the Greenbelt Plan. The anticipated growth between 2022 and 2031 was used as a basis to establish the increase in needs for water, wastewater, roads, police and general services, such as growth studies, paramedic services, facilities, social housing, waste diversion, and waterfront parks. In order to support the calculation of area specific water and wastewater charges, the growth to 2031 has also been presented on a Designated Greenfield Area (DGA) versus Built-Up Area (BUA) basis. The area specific charges are discussed in Chapter 6. Appendix A provides a detailed summary of the BPE, 2011 growth forecast. Tables 3-1 and 3-2 provide a summary of anticipated development in Halton Region. Region of Halton 2022 DC Background Study 3-3 Table 3-1 Summary of Anticipated Residential Development 1. Housing Units Total Housing Units 2021 2026 2031 Town of Oakville 81,580 88,109 93,550 City of Burlington 74,880 77,687 80,572 Town of Milton 55,711 68,375 80,293 Town of Halton Hills 22,284 28,279 34,141 Halton Region 234,455 262,450 288,556 Incremental Units 2022-2026 2027-2031 2022-2031 Town of Oakville 6,529 5,441 11,970 City of Burlington 2,807 2,885 5,692 Town of Milton 12,664 11,918 24,582 Town of Halton Hills 5,995 5,862 11,857 Halton Region 27,995 26,106 54,101 Source: Halton Region BPE, 2011. 2. Population Total Population1,2 2021 2026 2031 Town of Oakville 221,826 234,122 246,399 City of Burlington 178,847 182,034 186,169 Town of Milton 161,750 195,735 228,084 Town of Halton Hills 61,672 77,003 91,885 Halton Region 624,095 688,894 752,537 Incremental Population 2022-2026 2027-2031 2022-2031 Town of Oakville 12,296 12,277 24,573 City of Burlington 3,187 4,135 7,322 Town of Milton 33,985 32,349 66,334 Town of Halton Hills 15,331 14,882 30,213 Halton Region 64,799 63,643 128,442 1 Includes institutional population. 2 Excludes the Census undercount. Source: Halton Region BPE, 2011. Region of Halton 2022 DC Background Study 3-4 Table 3-2 Summary of Anticipated Non-Residential Development Total Employment 2021 2026 2031 Town of Oakville 120,796 122,578 128,359 City of Burlington 102,846 104,145 105,349 Town of Milton 81,106 96,631 114,330 Town of Halton Hills 22,936 32,356 41,962 Halton Region 327,684 355,710 390,000 Incremental Employment 2022-2026 2027-2031 Total Town of Oakville 1,782 5,781 7,563 City of Burlington 1,299 1,204 2,503 Town of Milton 15,525 17,699 33,224 Town of Halton Hills 9,420 9,606 19,026 Halton Region 28,026 34,290 62,316 Source: Halton Region BPE, 2011 Region of Halton 2022 DC Background Study Chapter 4 Resultant Increase in the Need for Service Region of Halton 2022 DC Background Study 4-1 4. Resultant Increase in the Need for Service 4.1 Introduction This chapter addresses the requirements of s. 5 (1) of the DCA with respect to the establishment of the estimated increased need for service attributable to the anticipated development, which underpins the DC calculation. These requirements were detailed in sections 1.2 and 1.3 and illustrated schematically in Figure 1-2. 4.2 Services Potentially Involved Table 4-1 below lists the full range of DC-related municipal services categories. A number of these services are not referenced in s. 2 (4) of the DCA as being eligible for inclusion in DCs. These are shown as "ineligible" on Table 4-1. In addition, two ineligible costs defined in s. 5 (3) of the DCA are "computer equipment" and "rolling stock with an estimated useful life of (less than) seven years...". Further, local water, wastewater and road works are recovered separately under subdivision agreements and related means (as are other local services). Appendix G sets out guidelines with respect to the size of water, wastewater, roads, and road related infrastructure that constitutes a DC project versus a local service. Services which are potentially eligible for inclusion in the Regional DC are indicated with an "R." This Study includes some of the rolling stock and computer equipment that is integral to, or part of, an eligible project included in the police and paramedic services programs. The supporting information is described in detail in Appendix F. 4.3 The Increase in the Need for Service The DC calculation commences with an estimate of "the increase in the need for service attributable to the anticipated development," for the services to be covered by the by- law. There must be some form of link or attribution between the anticipated development and the estimated increase in the need for service. While the need could conceivably be expressed generally in terms of units of capacity, s. 5 (1) 3 (and section 3 of the associated regulation), which requires Municipal Council indicate that it intends to ensure that such an increase in need will be met, suggests that a project-specific expression of need would normally be applicable. Region of Halton 2022 DC Background Study 4-2 Table 4-1 Development Charge-Related Categories Of Municipal Services and Halton Region Responsibilities Categories of Municipal Services Eligibility for Inclusion in the DC Calculation Service Components Maximum Potential DC Recovery % 1. Services Related to a Highway R/ Area Municipal Area Municipal/ Dev. Agreements Dev. Agreements R/ Area Municipal R/ Area Municipal/ Dev. Agreements R/Area Municipal 1.1 Arterial roads 1.2 Collector roads 1.3 Local roads 1.4 Traffic signals 1.5 Sidewalks and streetlights 1.6 Interchanges and Grade Separations 100 100 0 100 100 100 2. Other Transportation Services Area Municipal Area Municipal Area Municipal Area Municipal R/ Area Municipal R/ Area Municipal n/a n/a 2.1 Transit vehicles & facilities 2.2 Other transit infrastructure 2.3 Municipal parking spaces - indoor 2.4 Municipal parking spaces - outdoor 2.5 Works yards 2.6 Rolling stock1 2.7 Ferries 2.8 Airport 100 100 0 0 100 100 100 100 3. Stormwater Drainage2 and Control Services Area Municipal/ Municipal Act Area Municipal Area Municipal 3.1 Main channels and drainage trunks 3.2 Channel connections 3.3 Retention/detention ponds 100 100 100 4. Fire Protection Services Area Municipal Area Municipal Area Municipal 4.1 Fire stations 4.2 Fire pumpers, aerials, and rescue vehicles 4.3 Small equipment and gear 100 100 100 5. Parks Services (i.e. Parks and Open Space) Ineligible Area Municipal Area Municipal Area Municipal Area Municipal R/ Area Municipal Area Municipal Ineligible 5.1 Acquisition of land for parks, woodlots and ESAs 5.2 Development of area municipal parks 5.3 Development of district parks 5.4 Development of city-wide parks 5.5 Development of special purpose parks 5.6 Development of waterfront parks 5.7 Parks rolling stock1 and yards 5.8 Conservation authority facilities 0 100 100 100 100 100 100 0 6. Recreation Services Area Municipal Area Municipal 6.1 Arenas, indoor pools, fitness facilities, community centres, etc. (including land) 6.2 Recreation vehicles and equipment1 100 100 7. Library Services Area Municipal Area Municipal Area Municipal 7.1 Public library space (incl. furniture and equipment) 7.2 Library vehicles1 7.3 Library materials 100 100 100 8. Electrical Power Services Ineligible Ineligible Ineligible 8.1 Electrical substations 8.2 Electrical distribution system 8.3 Electrical system rolling stock1 0 0 0 9. Provision of Cultural, Entertainment and Tourism Facilities and Convention Centres Ineligible Ineligible 9.1 Cultural space (e.g. art galleries, museums, and theatres) 9.2 Tourism facilities and convention centres 0 0 10. Wastewater Services R R Dev. Agreements R 10.1 Treatment plants 10.2 Sewage trunks 10.3 Local systems 10.4 Vehicles and equipment 100 100 0 100 11. Water Supply Services R R Dev. Agreements R 11.1 Treatment plants 11.2 Distribution systems 11.3 Local systems 11.4 Vehicles and equipment 100 100 0 100 Region of Halton 2022 DC Background Study 4-3 Categories of Municipal Services Eligibility for Inclusion in the DC Calculation Service Components Maximum Potential DC Recovery % 12. Waste Management Services Ineligible Ineligible R 12.1 Collection, transfer vehicles and equipment 12.2 Landfills and other disposal facilities 12.3 Other waste diversion facilities, vehicles, and equipment 0 0 100 13. Police Services R R R R 13.1 Police detachments 13.2 Police rolling stock1 13.3 Small equipment and gear 13.4 Communications systems 100 100 100 100 14. Homes for the Aged R 14.1 Homes for the aged space 100 15. Child Care R 15.1 Child care space 100 16. Health R R 16.1 Health department space 16.2 Health department vehicles1 100 100 17. Social Services R R 17.1 Social service operating space 17.2 Social housing 0 100 18 Provincial Offences Act (POA) Area Municipal 18.1 POA space 100 19. Paramedic Services R R 19.1 Ambulance station space 19.2 Vehicles1 100 100 20. Hospital Provision Ineligible 20.1 Hospital capital contributions 0 21. Provision of Head- quarters for the General Administration of Municipalities and Area Municipal Boards Ineligible Ineligible Ineligible 21.1 Office space 21.2 Office furniture 21.3 Computer equipment 0 0 0 22. Emergency Preparedness Services No No No 22.1 Facility Space (incl. furniture and equipment) 22.2 Vehicles1 22.3 Equipment 100 100 100 23. Other Services R/ Area Municipal R/ Area Municipal 23.1 Studies in connection with acquiring buildings, rolling stock, materials and equipment, and improving land3 and facilities, including the DC background study cost 23.2 Interest on money borrowed to pay for growth-related capital 0-100 0-100 _____________________________________ Note: computer equipment excluded throughout 1 where a 7+ year life is involved 2 could also be provided as part of the Regional road works where required 3 same percentage as service component to which it pertains 4.3.1 Water and Wastewater Needs As part of the 2022 DC update process, the 2022 Development Charge Water/ Wastewater Technical Report has been prepared by GM BluePlan Engineering Limited which provides the basis for the development of the costs and implementation timing of water and wastewater projects between 2023 and 2031 which are required to service growth in Halton Region between 2022 and 2031. The project costs and implementation timing set out in the 2011 Halton Water and Wastewater Master Plan and updated as part of the 2017 Development Charge Water/Wastewater Technical Report served as key inputs to the Technical Report. This report incorporates the most up to date water and wastewater system and cost information, including additional technical infrastructure review and analysis which has been completed since the 2017 Region of Halton 2022 DC Background Study 4-4 Development Charge Water/Wastewater Technical update. This report identifies Halton's water and wastewater infrastructure requirements to service anticipated growth during the period between 2022 and 2031, and establishes the basis for allocating the related benefits for the purpose of DC calculations. Project costs were updated in the Technical Report to reflect best available estimated costs to construct as of January 1, 2022 using a unit cost approach, cost estimates from Class Environmental Assessment Studies, scoping studies or preliminary/detail design and/or cost indexing. Appendix B of this Study provides information on the Region's water and wastewater program, including overview of the programs, DC calculation assumptions and detailed project lists and related costs. The estimated cost of the program totals to $1.17 billion between 2023 and 2031 (in 2022$). The program cost and cost allocations are summarized in Chapter 5 (subsection 5.8). 4.3.2 Roads and Related Needs The 2022 Development Charge Transportation Technical Report has been prepared by EllSo Consulting Inc., using the 2011 Transportation Master Plan and 2017 Development Charge Transportation Technical Report as key inputs. Halton Region uses a demand forecasting model for its long term transportation planning. The model is used for network-wide analysis and overview including comparison of the network characteristics between the current year and the 2031 planning horizon. As noted in the 2022 Development Charges Transportation Technical Report, this model was updated for the DC Study. Adjustments include review of demand forecasting model based on 2016 Transportation Tomorrow Study data, review of screenline capacities to 2031, updating costing based on best available estimated costs to construct as of January 1, 2022, cost estimates from Class Environmental Assessment Studies, preliminary/detail design and/or cost indexing. The projects included in the Technical Report provides a sustainable and integrated capital plan that considered all modes of travel (automobile, transit, cycling, and walking) to accommodate growth in Halton Region to the year 2031 as established through Regional Official Plan Amendment (ROPA). ROPA 38 brought the Regional Official Plan into conformity with the Provincial Growth Plan for the Greater Golden Horseshoe and established a growth plan for Halton to accommodate 780,000 residents (752,537 excluding the Census undercount) and 390,000 jobs by 2031. Costs have been apportioned to growth/non-growth and residential/non-residential uses. Region of Halton 2022 DC Background Study 4-5 Appendix D of this Study provides information on the Region's roads program, including overview of the programs, DC calculation assumptions and detailed project lists and related costs. The estimated cost of the program totals to $2.44 billion between 2023 and 2031 (in 2022$). The program cost and cost allocations are summarized in Chapter 5. 4.3.3 General Service Needs Similar descriptive material for the general services (i.e. growth studies, police, paramedic services, facilities, social housing, waste diversion, and waterfront parks) is provided in Appendix F and related costs are summarized in Chapter 5. 4.4 Credits Carried Forward Section 8 paragraph 5 of O. Reg. 82/98 indicates that a DC background study must set out, "The estimated value of credits that are being carried forward relating to the service." Section 17 paragraph 4 of the same Regulation indicates that, "...The value of the credit cannot be recovered from future development charges," if the credit pertains to an ineligible service. This indicates that a credit for eligible services can be recovered from future DCs. A credit is, in effect, a Regional payment liability linked to the prior provision of infrastructure by a landowner. Credits need to be included in the DC calculation, in order to ensure that the necessary DC "funding room" has been provided. The Region's outstanding credit obligations are relating to the non-residential development credits that were recognized under the previous DCA, section 14 as required by O. Reg. 82/98, and to the credits resulting from capital contributions provided by developers under DC agreements. Table 4-2 summarizes the outstanding credits that have been incorporated into the DC calculations. Region of Halton 2022 DC Background Study 4-6 Table 4-2 Region of Halton Outstanding Non-residential DC Credit ($000s) 4.5 Eligible Debt and Committed Excess Capacity 4.5.1 Requirements of the Act Section 66 of the DCA states that, for the purposes of developing a DC by-law, a debt incurred with respect to an eligible service may be included as a capital cost, subject to any limitations or reductions in the DCA. Similarly, s.18 of O. Reg. 82/98 indicates that debt with respect to an ineligible service may be included as a capital cost, subject to several restrictions. It is therefore necessary to review the projects on which Regional long term debt is outstanding, in order to determine whether some or all of those costs are eligible for inclusion in the calculation of the charge. In order for such costs to be eligible, two conditions must apply. First, they must have funded excess capacity which is able to meet service needs attributable to the anticipated development. Second, the excess capacity must be "committed," that is, either before or at the time it was created, Regional Council must have expressed a clear intention that it would be paid for by DCs or other similar charges. For example, this may have been done as part of previous DC processes. This inclusion is referenced as Box 13 in Figure 1-2 ("Unfunded Works") and includes internal borrowing or long-term debt. 4.5.2 Halton's Unfunded Works Most of the Region's internal/external debt previously incurred, in support of growth within the planning horizon, is related to the water, wastewater, roads and police programs. External debt and internal borrowing from the Regional funds are used in order to temporarily finance the DC revenue shortfalls resulting from delayed timing of DC collection relative to growth-related capital expenditures. Additionally, the water, Cost Allocation Water Wastewater Roads Police Total Region-wide 1,648 $ 3,589 $ 145 $ 18 $ 5,400 $ Area Specific: Capacity 725 1,395 - - 2,120 Distrbt'n/Collct'n: Greenfield 923 2,194 - - 3,117 Built Boundary - - - - - 1. Credits resulting from Section 14, DC Agreements and Minutes of Settlement Total Credits Region of Halton 2022 DC Background Study 4-7 wastewater and roads program includes the funding shortfall in allocation programs for expenditures approved and forecasted up to 2022. The DC calculations for water, wastewater, roads and other general services, as set out in Appendices C, E, and F include unfunded works carried forward as summarized in Tables 4-3a and 4-3b. Table 4-3a Residential Unfunded Works Carried Forward ($000s) Cost Allocation Regional Debt/ Unfunded Works External Debt Total Water Capacity 6,342 $ - $ 6,342 $ Distribution: Greenfield (30,883) 33,730 2,847 Built Boundary 8,164 1,855 10,019 Subtotal (16,377) $ 35,585 $ 19,208 $ WasteWater Capacity 15,067 $ - $ 15,067 $ Collection: Greenfield 35,696 43,699 79,394 Built Boundary 9,234 4,192 13,426 Subtotal 59,996 $ 47,891 $ 107,887 $ Total 43,619 $ 83,476 $ 127,095 $ Roads 84,647 - 84,647 Police - 38,254 38,254 Gross 128,266 $ 121,731 $ 249,997 $ Note: May not add due to rounding Debt Carried in 2022 DC Update Region of Halton 2022 DC Background Study 4-8 Table 4-3b Non-Residential Unfunded Works Carried Forward ($000s) Debt payable to the Region represents the Regional interim financing previously provided for growth share of capital infrastructure costs, including a carrying cost, as set out in financial plans approved by Council (e.g. CS-73-08/PWE31-08 & CS-49- 09/PW20-09/LPS80-09) and the annual budgets. External debt is related to financing of Employment Land Servicing projects (CS-33-11/PW-53-11/LPS58-11), plant expansions to service growth in intensification area (e.g. Skyway WWTP) and Police Headquarters as approved by Council. 4.5.3 Historic Post-period Benefit (Oversizing) Costs As of 2021, a total of $20.8 million in Regional financing (including carrying costs), as shown in Table 4-4, has been used to fund the water, wastewater and road programs that benefit growth beyond the planning horizon of previous DC by-laws (i.e. Post-period Benefit/Oversizing). This total included $4.1 million for road oversizing and $16.7 million for the water and wastewater program. Since these costs benefit the planning Cost Allocation Regional Debt/ Unfunded Works External Debt Total Water Capacity 63,469 $ 951 $ 64,420 $ Distribution: Greenfield 66,121 13,589 79,711 Built Boundary 1,400 723 2,123 Subtotal 130,990 $ 15,264 $ 146,254 $ WasteWater Capacity 111,731 $ 552 $ 112,283 $ Collection: Greenfield 121,417 20,956 142,373 Built Boundary 7,754 1,967 9,720 Subtotal 240,901 $ 23,475 $ 264,376 $ Total 371,892 $ 38,739 $ 410,630 $ Roads 375,406 - 375,406 Police - 14,933 14,933 Gross 747,297 $ 53,672 $ 800,969 $ Note: May not add due to rounding Debt Carried in 2022 DC Update Region of Halton 2022 DC Background Study 4-9 horizon to 2031 based on BPE, 2011, they will be recovered from DCs and therefore included in the DC calculations. Table 4-4 Summary of Post-period Benefit Cost Carried Forward ($000's) 4.6 Council's Assurance In order for an increase in need for service to be included in the DC calculation, Regional Council must indicate "... that it intends to ensure that such an increase in need will be met" (s. 5 (1) 3). This can be done if the increase in service forms part of a Council-approved Official Plan, capital forecast or similar expression of the intention of Council (O. Reg. 82/98 section 3). Council's approval of the long-term capital forecast in Appendices B, D and F is therefore sought, which provides for the servicing of the development forecast contained in Appendix A. Cost Allocation Water Wastewater Roads Total Residential: Region-wide 6,267 $ 4,469 $ 2,374 $ 13,109 $ Area Specific: Capacity 138 1,873 - 2,011 Distrbt'n/Collct'n: Greenfield 6,129 2,596 - 8,725 Built Boundary - - - - Non-Residential: Region-wide 2,723 $ 3,278 $ 1,726 $ 7,726 $ Area Specific: Capacity 433 1,600 - 2,034 Distrbt'n/Collct'n: Greenfield 2,290 1,677 - 3,967 Built Boundary - - - - Total 8,990 $ 7,746 $ 4,099 $ 20,835 $ Note: May not add due to rounding Total Post-period Benefit (w. Interest) Region of Halton 2022 DC Background Study Chapter 5 DCA Calculation Requirements Region of Halton 2022 DC Background Study 5-1 5. DCA Calculation Requirement 5.1 Introduction Subsection 1.3.3 in the Introduction provided an overview of the method that must be used to determine DCs, including quotations directly from the DCA and associated Regulations. The intent of this chapter is to provide additional detail on the mandatory reductions to the increase in the need for service, as well as other adjustments to the capital cost to be incorporated in the DC calculation. For a detailed definition of "capital cost", including specific works that are eligible for inclusion in the capital cost estimate, refer to section 7 of the tabular text in subsection 1.3.3. Subsection 5 (1) of the DCA sets out the method that must be used to determine DCs. This method specifically calls for 4 different types of deductions to be made from municipal servicing costs which relate to the need for service attributable to new development anticipated over the planning period. These are:  level of service cap;  uncommitted excess capacity;  benefit to existing development; and  grants, subsidies and other contributions. Two other calculation adjustments are addressed herein as being implicit requirements. These are:  post-period benefit;  allocation of the total costs between residential and non-residential benefit. The basis for, and nature of, each of the DC calculation deductions is outlined below, with the total cost, by service, presented in subsection 5.8. There is no explicit requirement under the DCA calculation method set out in s. 5 (1) to net outstanding reserve fund balances as part of making the DC calculation; however, section 35 does restrict the way in which DC reserve funds are used in the future. An overview of Halton's DC reserve fund balances and the use of these funds in the DC calculation is provided in subsection 5.9. Region of Halton 2022 DC Background Study 5-2 5.2 Level of Service Cap Paragraph 4 of subsection 5 (1) of the DCA states that the estimate of the increase in the need for service attributable to the anticipated development, made under paragraph 2, must not include an increase that would result in the level of service exceeding the average level provided in the Region over the 10-year period preceding the preparation of the background study. Section 4 (3) of O. Reg. 82/98 provides for an exception, such that: "If the average level of service determined is lower than the standard level of service required under another Act, the standard level of service required under the other Act may be deemed...to be the average level of service." Section 4 of the Regulation also provides that:  both the quantity and quality of a service shall be taken into account in determining the average level of service.  a geographic Area of the municipality may be excluded in determining the average level of service, if the service is not provided there and the Area is identified in the by-law. However, the average level of service so determined, cannot exceed that which would be determined if the by-law applied to the whole municipality. A commonly used quantity measure is units per capita (e.g. lane kms, square feet, cubic metres of capacity, hectares, etc.), while quality can be measured in terms of cost per unit, engineering standards or recognized performance measurement systems, depending on circumstances. Appendix F provides detailed schedules that outline the level of service that has been established for each of the General Services, in terms of both quantity and quality. Any resulting deductions are also provided on a project- specific basis. With respect to water and wastewater servicing, the servicing standard is largely governed by regulatory requirements, and therefore no deductions have been made for this purpose (Appendix B and the Water and Wastewater Technical Report). For the road program, the level of service has been measured by lane km per capita, volume over capacity (v/c) ratios, as well as roadway network replacement values, which together indicated no increase in service level over the 2031-planning period. Region of Halton 2022 DC Background Study 5-3 Therefore, no deductions have been made (Appendix D and the Transportation Technical Report). In addition to the above, Appendix D has included an additional service standard calculation to show that the growth-related capital costs included in the calculations do not exceed the historical average service levels. 5.3 Uncommitted Excess Capacity Paragraph 5 of s. 5 (1) of the DCA requires a deduction from the increase in the need for service attributable to the anticipated development that can be met using the Region's "excess capacity", other than excess capacity which is "committed", i.e. where Council has indicated a clear intention that it would be paid for by DCs or other similar charges, before or at the time the capacity was created (s. 5 of O. Reg. 82/98). "Excess capacity" is undefined in the Act, but in this case must be able to meet some or all of the increase in need for service of the anticipated development, in order to potentially represent a deduction. The deduction of "excess capacity" from the future increase in the need for service, occurs as part of the conceptual planning and feasibility work associated with justifying and sizing new facilities, e.g. if a road widening to accommodate increased traffic is not required because sufficient capacity is already available or is being provided via transit, then that widening would not be included as an increase in need, in the first instance. The updated cost for Water/Wastewater and Transportation Master Plans (provided in the technical reports) and General Services Capital Programs have been prepared taking into consideration any excess capacity available in the system. Therefore, the long-term capital needs set out in this Study represent incremental capacity requirements as set out in Appendices B, D and F. 5.4 Benefit to Existing Development Benefit to existing development deductions have been addressed on a service-specific and project-specific basis. The allocation method related to transportation service focuses on the residual value of the existing asset through the use of Tangible Capital Asset values. The methodology employed is discussed in greater detail in Appendices B, D and F and in the Transportation and Water/Wastewater Technical Reports. The results are summarized in subsection 5.8. Region of Halton 2022 DC Background Study 5-4 5.5 Grants, Subsidies and Other Contributions Subsection (1) 7 of the DCA requires that the capital costs must be reduced by the reductions set out in subsection (2). Subsection 5 (2) states that: "The capital costs, determined under para. 7 of subsection (1), must be reduced, in accordance with the regulations, to adjust for capital grants, subsidies and other contributions made to a municipality or that the Council of the municipality anticipates will be made in respect of the capital costs." (underlining added) Section 6 of O. Reg. 82/98 indicates that any such grant, subsidy or other contribution (including developer contributions) must be used to reduce the s. 5 (1) 7 capital costs in the same proportion as the increase in need was reduced under s. 5 (1), paragraph 6, unless at the time it was made, the person making it expressed a clear intention that all or part be used to benefit existing or new development. In the latter case, a deduction to capital costs must be made, but only to the extent that the funds were intended to benefit new development. Any grants, subsidies, developer and other contributions anticipated have been reflected in Appendices B, D and F, in accordance with the provisions of the Act and Regulation. 5.6 Post-period Benefit (Oversizing) This is a term and a concept which is not specifically referenced in the DCA. It refers to the cost of development-related servicing capacity which is not required by development anticipated over the Region's 2022 and 2031 planning periods, which will clearly benefit development in a subsequent planning period and, in some cases, should therefore be (partially) funded by such subsequent development. For example if a sewage treatment plant is specifically sized to accommodate development to 2041, then the DC recovery of an appropriate portion of that cost should be deferred, such that it is funded by the development that ultimately benefits from it. This requirement is implicit in s. 5 (1) 2 of the DCA, which requires the charge to be based on "the increase in the need for service attributable to the anticipated development...", in this case development during 2022-2031. However, in the case of major facilities which have not been explicitly oversized, no post-period benefit deduction is provided. Region of Halton 2022 DC Background Study 5-5 With respect to water and wastewater programs, an appropriate deduction has been made for capacity to service development anticipated post-2031. The Post Period Benefit value are the same projects as were determined in the 2017 DC Update. The oversizing cost is calculated by the difference in cost for the recommended size of infrastructure and the size of infrastructure to meet the 2031 horizon. Identified oversizing is deducted from the 2031 DC recoverable costs and is to be recovered through subsequent DC by-law(s) covering the post 2031 period. For the road program, a deduction for post planning period benefit has been made for a number of major infrastructure improvements in the last 5 years (2027-2031) of the capital improvement plan. This deduction is proportional to the degree to which the v/c ratio on a major road improvement in 2031 is less than the average v/c on the associated screenline. The total cost attributed to post-period benefit is summarized for each service in subsection 5.8 and discussed in greater detail on a project specific basis in Appendices B, D and F, as well as in the Transportation and Water/Wastewater Technical Reports. 5.7 Residential vs. Non-Residential Benefit Subsection 5 (6) 2 of the DCA requires that every "type" of development that is expressly identified in the DC by-law cannot be required to pay DCs that exceed the capital costs arising from the increase in the need for service attributable to that particular type of development. In the first instance, this allocation involves a split between residential and non- residential benefit. Table 5-1 summarizes the ways in which these splits were made as part of the DC calculations contained herein. Additional detail supporting these methodologies, as well as project specific cost allocations between residential and non- residential, are provided in Appendices B, D and F, as well as in the Transportation and Water/Wastewater Technical Reports. Region of Halton 2022 DC Background Study 5-6 Table 5-1 Summary of Residential/ Non-residential Split Assumptions by Service 5.8 Summary of Estimated Capital Expenditures Based on the above guidelines, Table 5-2 summarizes the estimated Regional capital expenditures for the period 2022-2031 for the water, wastewater, roads, and general services. Splits Service Basis Residential Non-residential Water1 Capacity 76% 24% Greenfield 73% 27% Built Boundary 83% 17% Wastewater1 Capacity 76% 24% Greenfield 73% 27% Built Boundary 83% 17% Roads Per 2022 Technical Report 64% 36% Growth Studies Net population growth between 2022 and 2031 relative to employment growth for same period 72% 28% Police Net population growth between 2022 and 2031 relative to employment growth for same period 72% 28% Paramedics Net population growth between 2022 and 2031 relative to employment growth for same period, with residential weighted at three times employment. 88% 12% Facilities2 Based on review of specific usage of facility space, varies by program. 85% 15% Social Housing Fully allocated to residential since program is directly related to population. 100% 0% Waste Diversion Primarily allocated to residential use 95% 5% Waterfront Parks Primarily allocated to residential use 95% 5% 2 Weighted average res/nres split presented here for all program areas (ie Health, Social Services & Operations). Detail supporting each areas specific split is provided in Appendix F, part 5) Per 2022 Technical Report Per 2022 Technical Report 1 Detailed description for infrastructure categories (ie. Capacity, Greenfield, Built Boundary) are provided in Chapter 6 and Appendix B Region of Halton 2022 DC Background Study 5-7 Table 5-2 Summary of Capital Costs for all Eligible Programs (2022 $, millions) Table 5-3 summarizes the water/wastewater costs allocated between plant capacity, distribution/collection-Greenfield, and distribution/collection-Built Boundary areas. Table 5-3 Water & Wastewater Project Costs by Area (2022 to 2031) (2022 $, millions) 5.9 DC Reserve Fund Balances There is no explicit requirement under the DCA calculation method set out in s. 5 (1) to account for the outstanding reserve fund balance as part of making a DC calculation; however, section 35 does restrict the way in which the funds are used in the future, i.e. "The money in a reserve fund established for a service may be spent only for capital costs determined under paragraphs 2 to 8 of subsection 5(1)." The table below summarizes the projected balances of the Region's DC reserves as of the end of 2021. Less: Benefit to Post Subsidy, Gross Existing Period Dev Other Net Growth Services Cost Dev't Capacity Contbt'n Deduc't Total Res N-res W/WW (2023-2031): Water 562.2 $ 12.0 $ 46.9 $ - $ - $ 503.4 $ 373.9 $ 129.5 $ Wastewater 608.6 175.1 24.5 - - 408.9 300.8 108.1 Sub-Total 1,170.8 $ 187.1 $ 71.4 $ - $ - $ 912.3 $ 674.6 $ 237.6 $ Roads (2023-2031) 2,441.1 $ 400.0 $ 238.0 $ - $ - $ 1,803.0 $ 1,153.9 $ 649.1 $ General Service (2022-2031): Growth Studies 16.1 $ 6.3 $ - $ - $ 0.8 $ 9.0 $ 6.5 $ 2.5 $ Police* 83.6 19.5 27.5 - - 36.6 26.3 10.3 Paramedics 32.6 11.4 8.4 - - 12.8 11.3 1.5 Facilities 12.3 4.0 1.3 - - 7.0 6.0 1.1 Social Housing 100.1 50.1 - - - 50.1 50.1 - Waste Diversion 14.9 8.1 1.0 - 0.4 5.4 5.1 0.3 Waterfront Parks 37.6 14.9 14.8 - - 7.9 7.5 0.4 Sub-Total 297.2 $ 114.2 $ 53.1 $ - $ 1.2 $ 128.7 $ 112.7 $ 16.0 $ Total 3,909.1 $ 701.3 $ 362.6 $ - $ 1.2 $ 2,844.0 $ 1,941.3 $ 902.7 $ Note: May not add due to rounding * Includes discounted debt payments Service Capacity Distrb'n /Collct'n - Greenfield Distrb'n /Collct'n - Built bndry Total Capacity Distrb'n /Collct'n - Greenfield Distrb'n /Collct'n - Built bndry Total Water 562.2 $ 12.0 $ 46.9 $ 503.4 $ 139.8 $ 226.8 $ 7.3 $ 373.9 $ 44.1 $ 83.9 $ 1.5 $ 129.5 $ Wastewater 608.6 175.1 24.5 408.9 65.2 213.5 22.1 300.8 20.6 83.0 4.5 108.1 Total 1,170.8 $ 187.1 $ 71.4 $ 912.3 $ 205.0 $ 440.3 $ 29.4 $ 674.6 $ 64.7 $ 166.9 $ 6.0 $ 237.6 $ Note: May not add due to rounding Gross Cost Less: Benefit to Existing Dev't Less: Post Period Benefit Net Growth Residential Share Non-residential Share Region of Halton 2022 DC Background Study 5-8 Table 5-4 Summary of DC Reserve Fund Projected Balances at December 31, 2021 In addition, the Region's DC Reserve Fund continuity between 2017 and 2021 is provided by service in Tables 5-4a and 5-4b below. The resulting reserve balances have been incorporated into the related DC calculations as opening balances of the cash flows (Appendices C, E and F). DC Reserve Fund Residential Non-Residential Total Water and Wastewater 465 $ - $ 465 $ Roads 8,555 - 8,555 Growth Studies (71,114) (2,945,576) (3,016,690) Police 2,177,442 (6,370,577) (4,193,135) Paramedic Services (853,200) (800,854) (1,654,054) Facilities 1,717,869 (252,240) 1,465,629 Social Housing 7,236,810 n/a 7,236,810 Waste Diversion 1,023,185 (12,351) 1,010,834 Waterfront Parks (1,594,338) (292,838) (1,887,176) Total 9,645,674 $ (10,674,437) $ (1,028,763) $ Region of Halton 2022 DC Background Study 5-9 Table 5-4a Residential DC Reserve Fund Continuity Water Capacity - Residential (516260) 2017 2018 2019 2020 Projected 20211 Opening Balance 50,756,346 $ 50,850,902 $ 51,110,892 $ 54,151,398 $ 50,319,296 $ DC Revenues 2,983,007 857,013 1,931,542 5,868,263 (3,074,989) Interest Earnings 1,666,313 1,503,906 1,635,633 - - Expenditures Draws* (4,554,764) (2,100,929) (526,669) (9,700,365) (14,550,318) Closing Balance 50,850,902 $ 51,110,892 $ 54,151,398 $ 50,319,296 $ 32,693,989 $ Water Distribution - Greenfield - Residential (516270) 2017 2018 2019 2020 Projected 20211 Opening Balance 37,736,690 $ 19,588,520 $ 9,038,239 $ 2,226,219 $ (2,208,918) $ DC Revenues 134,587 1,510,095 430,205 25,302,763 33,649,384 Interest Earnings 1,011,389 433,245 167,148 - - Expenditures Draws* (19,294,145) (12,493,621) (7,409,373) (29,737,900) (5,864,537) Closing Balance 19,588,520 $ 9,038,239 $ 2,226,219 $ (2,208,918) $ 25,575,930 $ Water Distribution - Built Boundary - Residential (516280) 2017 2018 2019 2020 Projected 20211 Opening Balance (3,528,022) $ (4,267,522) $ (4,312,827) $ (2,918,281) $ (4,895,629) $ DC Revenues 876,173 524,801 1,709,302 252,976 2,430,578 Interest Earnings - - - - - Expenditures Draws* (1,615,674) (570,105) (314,756) (2,230,324) (1,422,478) Closing Balance (4,267,522) $ (4,312,827) $ (2,918,281) $ (4,895,629) $ (3,887,528) $ Wastewater Capacity - Residential (516360) 2017 2018 2019 2020 Projected 20211 Opening Balance (88,608,641) $ (33,921,556) $ (9,602,981) $ 430,274 $ (2,780,913) $ DC Revenues 3,296,501 594,112 942,229 2,398,026 21,571,143 Interest Earnings - - - - - Expenditures Draws* 51,390,584 23,724,464 9,091,026 (5,609,213) (22,583,207) Closing Balance (33,921,556) $ (9,602,981) $ 430,274 $ (2,780,913) $ (3,792,977) $ Wastewater Distribution - Greenfield - Residential (516370) 2017 2018 2019 2020 Projected 20211 Opening Balance 24,420,479 $ (209,983) $ (16,220,533) $ (25,877,599) $ (23,105,287) $ DC Revenues 186,160 1,149,435 417,400 34,222,217 45,618,210 Interest Earnings 322,707 - - - - Expenditures Draws* (25,139,329) (17,159,985) (10,074,467) (31,449,904) (61,644,586) Closing Balance (209,983) $ (16,220,533) $ (25,877,599) $ (23,105,287) $ (39,131,662) $ Wastewater Distribution - Built Boundary - Residential (516380) 2017 2018 2019 2020 Projected 20211 Opening Balance (13,159,314) $ (21,650,179) $ (22,854,441) $ (16,753,561) $ (17,332,178) $ DC Revenues 1,894,020 1,302,146 4,238,260 623,225 6,023,659 Interest Earnings - - - - - Expenditures Draws2 (10,384,886) (2,506,407) 1,862,620 (1,201,841) (148,767) Closing Balance (21,650,179) $ (22,854,441) $ (16,753,561) $ (17,332,178) $ (11,457,286) $ Region of Halton 2022 DC Background Study 5-10 Roads - Residential (516060) 2017 2018 2019 2020 Projected 20211 Opening Balance (39,996,081) $ (91,279,556) $ (51,637,259) $ (52,079,611) $ 75,895 $ DC Revenues 32,751,529 41,045,200 32,801,516 89,487,073 328,098,035 Interest Earnings - - - - 1,248 Expenditures Draws2 (84,035,004) (1,402,902) (33,243,869) (37,331,567) (328,166,623) Closing Balance (91,279,556) $ (51,637,259) $ (52,079,611) $ 75,895 $ 8,555 $ Growth Studies - Residential (516080) 2017 2018 2019 2020 Projected 20211 Opening Balance (2,965,030) $ (2,846,741) $ (3,171,981) $ (3,139,816) $ 1,473,828 $ DC Revenues 924,204 414,319 419,540 5,171,579 750,547 Interest Earnings - - - - 20,730 Expenditures Draws2 (805,916) (739,559) (387,375) (557,935) (2,316,219) Closing Balance (2,846,741) $ (3,171,981) $ (3,139,816) $ 1,473,828 $ (71,114) $ - Police - Residential (516040) 2017 2018 2019 2020 Projected 20211 Opening Balance (662,690) $ (555,660) $ (2,730,079) $ (3,911,359) $ 6,403,423 $ DC Revenues 1,474,855 983,103 995,601 12,250,747 1,741,570 Interest Earnings - - - 31,232 126,811 Expenditures Draws2 (1,367,825) (3,157,522) (2,176,881) (1,967,198) (6,094,361) Closing Balance (555,660) $ (2,730,079) $ (3,911,359) $ 6,403,423 $ 2,177,442 $ Paramedic Services - Residential (516015) 2017 2018 2019 2020 Projected 2021 Opening Balance (1,555,633) $ (1,361,331) $ (3,641,641) $ (3,646,527) $ (528,931) $ DC Revenues 346,018 268,691 272,114 3,346,596 476,267 Interest Earnings - - - - - Expenditures Draws2 (151,716) (2,549,000) (277,000) (229,000) (800,536) Closing Balance (1,361,331) $ (3,641,641) $ (3,646,527) $ (528,931) $ (853,200) $ Facilities - Residential (516025) 2017 2018 2019 2020 Projected 20211 Opening Balance (717,655) $ (623,329) $ (632,058) $ (637,839) $ 2,010,528 $ DC Revenues 334,759 232,005 234,953 2,890,707 417,142 Interest Earnings - - - 20,894 55,099 Expenditures Draws2 (240,433) (240,734) (240,734) (263,234) (764,900) Closing Balance (623,329) $ (632,058) $ (637,839) $ 2,010,528 $ 1,717,869 $ Social Housing - Residential (516035) 2017 2018 2019 2020 Projected 20211 Opening Balance 1,078,835 $ 1,493,605 $ 1,325,246 $ 549,240 $ 9,044,855 $ DC Revenues 1,980,975 1,493,152 1,512,158 18,599,064 2,640,967 Interest Earnings 33,795 38,489 11,835 271,551 240,616 Expenditures Draws2 (1,600,000) (1,700,000) (2,300,000) (10,375,000) (4,689,628) Closing Balance 1,493,605 $ 1,325,246 $ 549,240 $ 9,044,855 $ 7,236,810 $ Region of Halton 2022 DC Background Study 5-11 Waste Diversion - Residential (516420) 2017 2018 2019 2020 Projected 2021 Opening Balance - $ (48,304) $ (69,224) $ (157,210) $ 931,324 $ DC Revenues 50,210 102,811 104,138 1,278,132 207,531 Interest Earnings - - - 11,445 28,884 Expenditures Draws2 (98,514) (123,731) (192,124) (201,043) (144,554) Closing Balance (48,304) $ (69,224) $ (157,210) $ 931,324 $ 1,023,185 $ Waterfront Parks - Residential (516430) 2017 2018 2019 2020 Projected 20211 Opening Balance - $ (2,691,215) $ (4,845,111) $ (5,922,618) $ (1,955,734) $ DC Revenues 156,862 321,182 325,306 3,992,961 571,752 Interest Earnings - - - - - Expenditures Draws2 (2,848,078) (2,475,078) (1,402,813) (26,078) (210,356) Closing Balance (2,691,215) $ (4,845,111) $ (5,922,618) $ (1,955,734) $ (1,594,338) $ Source: 2020 DCRF, 2021 Approved Budget 1. The Region's 2021 year-end financial reporting has not been completed at the time of completing this study. Accordingly, the 2021 year-end balances represent the best information available at this time. 2. Expenditure Draws consist of transfer (to)/from capital project accounts and reserves, capital closures as well as development charge refunds. Region of Halton 2022 DC Background Study 5-12 Table 5-4b Non-Residential DC Reserve Fund Continuity Region of Halton 2022 DC Background Study 5-13 Water Capacity - Non-Residential (517260) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ - $ - $ - $ - $ DC Revenues 1,774,067 1,408,679 2,676,707 1,769,462 1,348,160 2,662,500 Interest Earnings 10,766 1,062 3,052 - - - Expenditures Draws* (1,784,833) (1,409,741) (2,679,759) (1,769,462) (1,348,160) (2,662,500) Closing Balance - $ - $ - $ - $ - $ - $ Water Distribution - Greenfield - Non-Residential (517270) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ - $ - $ - $ - $ DC Revenues 1,716,085 369,461 3,307,929 1,773,043 1,658,818 3,325,799 Interest Earnings 4,159 34,121 1,447 - 3,380 - Expenditures Draws* (1,720,244) (403,582) (3,309,376) (1,773,043) (1,662,198) (3,325,799) Closing Balance - $ - $ - $ - $ - $ - $ Water Distribution - Built Boundary - Non-Residential (517280) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ - $ - $ - $ - $ DC Revenues 217,290 403,199 3,603,357 155,394 78,339 150,395 Interest Earnings 3,452 5,032 13,116 1,062 406 - Expenditures Draws* (220,743) (408,231) (3,616,472) (156,456) (78,746) (150,395) Closing Balance - $ - $ - $ - $ - $ - $ Wastewater Capacity - Non-Residential (517360) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ - $ - $ - $ - $ DC Revenues 2,348,111 1,876,944 3,603,357 2,375,377 1,816,512 3,585,000 Interest Earnings 21,891 11,630 13,116 19,163 5,181 - Expenditures Draws* (2,370,002) (1,888,574) (3,616,472) (2,394,540) (1,821,693) (3,585,000) Closing Balance - $ - $ - $ - $ - $ - $ Wastewater Distribution - Greenfield - Non-Residential (517370) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ (770,112) $ - $ - $ - $ DC Revenues 1,749,846 421,663 4,132,336 2,214,934 2,072,232 4,156,853 Interest Earnings 598 - - - 11,254 - Expenditures Draws* (1,750,444) (1,191,775) (3,362,224) (2,214,934) (2,083,485) (4,156,853) Closing Balance - $ (770,112) $ - $ - $ - $ - $ Wastewater Distribution - Built Boundary - Non-Residential (517380) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ - $ - $ - $ - $ DC Revenues 489,392 871,432 544,582 478,618 272,301 522,713 Interest Earnings 7,445 9,681 3,216 12,963 1,856 - Expenditures Draws* (496,836) (881,113) (547,799) (491,582) (274,157) (522,713) Closing Balance - $ - $ - $ - $ - $ - $ Roads - Non-Residential (517030) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ - $ - $ - $ - $ DC Revenues 11,945,100 8,599,782 22,342,223 13,540,622 8,274,195 11,500,000 Interest Earnings 215,960 118,033 245,263 176,642 93,686 - Expenditures Draws2 (12,161,060) (8,717,815) (22,587,486) (13,717,264) (8,367,881) (11,500,000) Closing Balance - - - - - - Region of Halton 2022 DC Background Study 5-14 Growth Studies Reserve Fund - Non-Residential (517040) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance (1,391,346) $ (2,149,931) $ (2,341,184) $ (2,282,849) $ (2,202,472) $ (2,221,686) $ DC Revenues 180,896 143,783 366,224 245,649 188,752 116,524 Interest Earnings - - - - - - Expenditures Draws2 (939,482) (335,036) (307,888) (165,272) (207,966) (840,413) Closing Balance (2,149,931) $ (2,341,184) $ (2,282,849) $ (2,202,472) $ (2,221,686) $ (2,945,576) $ Police Reserve Fund - Non-Residential (517020) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance (1,344,415) $ (1,621,584) $ (2,204,882) $ (3,365,537) $ (4,177,907) $ (4,994,613) $ DC Revenues 262,595 202,137 457,888 308,368 236,202 145,007 Interest Earnings - - - - - - Expenditures Draws2 (539,764) (785,436) (1,618,543) (1,120,738) (1,052,907) (1,520,972) Closing Balance (1,621,584) $ (2,204,882) $ (3,365,537) $ (4,177,907) $ (4,994,613) $ (6,370,577) $ Paramedic Services - Non-Residential (517015) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance (129,758) $ (292,469) $ (305,893) $ (728,868) $ (719,705) $ (715,217) $ DC Revenues 16,289 16,007 69,025 46,163 35,488 21,827 Interest Earnings - - - - - - Expenditures Draws2 (179,000) (29,430) (492,000) (37,000) (31,000) (107,464) Closing Balance (292,469) $ (305,893) $ (728,868) $ (719,705) $ (715,217) $ (800,854) $ Facilities - Non-Residential (517025) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance (15,438) $ (18,594) $ (23,055) $ 15,095 $ 34,565 $ 38,241 $ DC Revenues 16,077 14,772 57,417 38,312 29,574 18,207 Interest Earnings - - - 424 867 - Expenditures Draws2 (19,233) (19,233) (19,266) (19,266) (26,766) (308,688) Closing Balance (18,594) $ (23,055) $ 15,095 $ 34,565 $ 38,241 $ (252,240) $ Waste Diversion - Non-Residential (517420) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ (4,219) $ (3,075) $ (4,746) $ (7,693) $ DC Revenues 777 8,534 5,700 4,424 2,713 Interest Earnings - - - - - Expenditures Draws2 (4,996) (7,390) (7,371) (7,371) (7,371) Closing Balance - $ (4,219) $ (3,075) $ (4,746) $ (7,693) $ (12,351) $ Waterfront Parks - Non-Residential (517430) 2016 2017 2018 2019 2020 Projected 20211 Opening Balance - $ - $ (147,749) $ (249,404) $ (304,353) $ (290,881) $ DC Revenues 2,623 28,718 19,084 14,844 9,114 Interest Earnings - - - - - Expenditures Draws2 (150,373) (130,373) (74,033) (1,373) (11,071) Closing Balance - $ (147,749) $ (249,404) $ (304,353) $ (290,881) $ (292,838) $ 1. The Region's 2021 year-end financial reporting has not been completed at the time of completing this study. Accordingly, the 2021 year-end balances represent the best information available at this time. 2. Expenditure Draws consist of transfer (to)/from capital project accounts and reserves, capital closures as well as development charge refunds. Source: 2020 DCRF, 2021 Approved Budget Region of Halton 2022 DC Background Study Chapter 6 DC Rules and Long-Term Capital and Operating Cost Examples Region of Halton 2022 DC Background Study 6-1 6. DC Rules and Long-term Capital and Operating Cost Examples 6.1 Introduction Subsection 5 (1) 9 of the DCA states that rules must be developed: "to determine if a development charge is payable in any particular case and to determine the amount of the charge, subject to the limitations set out in subsection 6." Paragraph 10 of the section goes on to state that the rules may provide for exemptions, phasing in and/or indexing of DCs. Subsection 5 (6) establishes the following restrictions on the rules:  The total of all DCs that would be imposed on anticipated development must not exceed the capital costs determined under s. 5 (1) paragraphs 2-8 for all services involved.  If the rules expressly identify a type of development, they must not provide for it to pay DCs that exceed the capital costs that arise from the increase in the need for service for that type of development. However, this requirement does not relate to any particular development.  If the rules provide for a type of development to have a lower DC than is allowed, the rules for determining DCs may not provide for any resulting shortfall to be made up by DCs imposed on other development. In order to address this requirement, the following conventions have been adopted:  Costs applicable to residential uses have been assigned to different types of residential units based on the average occupancy for each housing type constructed during the first 10-20 years of occupancy (as outlined in Appendix A).  The residential vs. non-residential split is made based on factors relevant to each service (e.g. water flow in the case of water and trip generation in the case of roads) as outlined in Appendices B, D and F. Region of Halton 2022 DC Background Study 6-2 With respect to "the rules", section 6 of the DCA states that a DC by-law must expressly address the matters referred to above re subsection 5(1) paragraph 9 and 10, as well as how the rules apply to the redevelopment of land. The rules for determining if DCs are payable in any particular case and for determining the amount of the DCs involved are outlined in Table 6-1 in this chapter and set out in the proposed by-law in Appendix I. Table 6-1 also compares Halton's proposed DC policies with its current policies. This chapter also includes a review of a water/wastewater DC rate structure (subsection 6.10), Asset Management Plan (subsection 6.11) and the long-term capital and operating cost examination (subsection 6.12). 6.2 The Amount of the DC Payable in Any Particular Case The quantum of the DC is as calculated in Appendices C, E and F and summarized in the Executive Summary and Schedules "B" and "C" of the proposed by-law in Appendix I. The rules for determining if DCs are payable in any particular case are addressed in this chapter and in the proposed by-law (Appendix I). These rules deal with matters such as: the list of services for which charges are being imposed, types of development approval triggering the need for the imposition of DCs, the requirements for the installation of local services in addition to payment of the DC, the method used in calculating DCs for individual developments, the quantum of the charge, the timing of calculation and payment, and the alternative means of payment. 6.3 DC Exemptions Subsection 5 (1) 10 of the DCA requires that "The rules may provide for full or partial exemptions for types of development." Subsection 6.2 of the DCA also requires that a DC by-law must set out an express statement indicating how, if at all, the rules provide for exemptions. The DCA mandates a number of exemptions or equivalent, as follows:  The following development cannot be charged for: o the enlargement of an existing dwelling unit; Region of Halton 2022 DC Background Study 6-3 o Creating 1 or 2 additional dwelling units in an existing residential building containing a single dwelling unit provided the TFA of the additional 1 or 2 units does not exceed the TFA of the existing unit. o Creating 1 additional dwelling unit in existing residential buildings each of which contain a single dwelling unit, that have one (semi-detached dwelling) or two (row dwelling) vertical walls, but no other parts, attached to other buildings, provided the TFA of the additional 1 unit does not exceed the TFA of the existing units. o Creating the greater of 1 or 1% of the existing units in a rental residential building which contains four or more dwelling units. o Creating 1 additional dwelling unit in any other existing residential building not in the classes of buildings listed above, provided the TFA of the additional 1 unit does not exceed the TFA of the smallest existing unit. o The above restrictions apply whether an additional dwelling unit is in the residential building or a structure ancillary to it. o Creating 1 additional dwelling unit in a new residential building containing a single dwelling unit provided the TFA of the additional unit does not exceed the TFA of the initial unit. o Creating 1 additional dwelling unit in a new residential building each of which contain a single dwelling unit, that have one (semi-detached dwelling) or two (row dwelling) vertical walls, but no other parts, attached to other buildings, provided the TFA of the additional unit does not exceed the TFA of the initial units. o Creating 1 dwelling unit in a building ancillary to a proposed new detached dwelling, semi-detached dwelling or row dwelling and that are permitted to contain a single dwelling unit, provided the TFA of the additional unit does not exceed the TFA of the initial unit.  An exemption applies to all land owned by and used for purposes of a municipality or a school board (Education Act);  An exemption for industrial development applies to the enlargement of the gross floor area (GFA) of an existing industrial building by up to 50%;  Bill 213: Better for People, Smarter for Business Act, 2020, introduced an exclusion from payment of DCs for Colleges and Universities that receive operating funds from the government). As such DC legislation does not apply and it is not necessary to include as a rule in the DC By-law. Region of Halton 2022 DC Background Study 6-4  Provincial and Federal Governments are not subject to the DCA and therefore do not have to pay DCs, but may agree to pay the charge or a "grant-in-lieu" thereof under the Municipal Grants Act or equivalent. The rules for exemptions, relief and adjustments for the charge are as set out in the proposed by-law in Appendix I. Table 6-1 outlines the Region's current and proposed DC policies. 6.4 Indexing of DCs The rules with respect to the indexing of the DCs are as set out in the proposed by-law in Appendix I, that is, that the charges are to be adjusted annually, as of April 1st of each year, commencing April 1, 2023 in accordance with the Statistics Canada Quarterly, Non-Residential Building "Construction Price Statistics" (Table 18-10-0135-01 or successor thereof)1 for the most recent year-over-year. This is consistent with the Region's current policy. 6.5 Interest The Region pays interest on a refund under subsection 18(3) and 25(2) of the DCA at a rate equal to the Bank of Canada rate on the date the by-law came into force and effect. Further, Report No. FN-08-20 (Re: Implications of Amendments to the Development Charges Act, 1997 S. O. 1997 c.27) approved the prime lending rate for the Region's bank as the interest to be applied to developments that are subject to subsection 26.1 and 26.2 and deferral agreements under section 27 of the DCA, unless identified in a Regional policy (as outline in Chapter 6). This policy may be updated from time to time or could be superseded by a prescribed maximum interest. 6.6 The Application of DCs to Redevelopment The rules with respect to redevelopment are as set out in Table 6-1 below and in the proposed by-law in Appendix I. The demolition policy provides a demolition credit in the 1 O. Reg. 82/98 referenced "The Statistics Canada Quarterly, Construction Price Statistics, catalogue number 62-007" as the index source. Since implementation, Statistics Canada has modified this index twice and the above-noted index is the most current. The draft by-law provided herein refers to O. Reg. 82/98 to ensure traceability should this index continue to be modified over time. Region of Halton 2022 DC Background Study 6-5 circumstance where a building permit is issued within 5 years from the date the associated demolition permit has been issued. The conversion credit is provided where there is a conversion of space in a residential or non-residential building to another use. The rules also include expansion exemptions for industrial development and for commercial (non-retail) development. 6.7 Summary of Halton DC Policies Based on the above, Table 6-1 summarizes the existing DC policies in the current DC By-law No. 36-17, and highlights proposed changes to the policies. The proposed changes are detailed in section 6.8. The existing DC policies that will remain unchanged are detailed in section 6.9. Table 6-1 Summary of Existing and Proposed DC Policies DC Policies Existing Policies Proposed Changes Industrial Expansion Exemption (Mandatory) - If existing building is enlarged by 50% or less, expansion is exempt, and - Enlargement must be a bona fide increase in the size of the existing building, attached to and having direct entry to the existing building and used in connection with an industrial purpose. - Expansion calculated based on the cumulative areas of the existing building prior to expansion. - Expansion calculation is based on TFA which includes below grade area. - Does not include retail warehouses. - As part of the 50% exemption, include up to 278.7 sq.m. (3,000 sq. ft.) for a separate accessory building - (see 6.8.1) Commercial (Non- Retail) Expansion Exemption - Provide expansion exemption for first 278.7 sq.m. (3,000 sq. ft.), for an expansion of the existing commercial building (attached or detached) on the site; - Existing commercial building, as defined under by-law, must be occupied and must be at least 6 months since issuance of last permit on the lot. - (see 6.9.1). - No change. Non-Residential Lot Coverage Relief - Provides a full DC exemption for the portion of the non-residential development that is greater than 1.0 times the lot area. - (see 6.9.2) - No change. Region of Halton 2022 DC Background Study 6-6 DC Policies Existing Policies Proposed Changes Demolition Credit - Credit calculated by multiplying the number/type of dwelling units or the non-residential TFA being demolished, by the relevant DC in effect on the date when the DC is payable. - Given where a building permit is issued within 5 years from the date of the demolition permit. - Does not apply if the building is exempt under the current by-law. - Where the building cannot be demolished until the new building is constructed, DCs are payable on issuance of a building permit and a refund is made, without interest, if the demolition is made within 12 months of building permit issuance. - Where a formal planning application (e.g. complete site plan application under the Planning Act) has been submitted to the local municipality but a building permit cannot be issued within the 5-year timeframe, the Treasurer, upon written request, may extend the credit. Credit provided on a one-time basis unless there is an approved phasing plan. - (see 6.9.3) - No change Conversion Credit - Credit calculated by multiplying the number/type of dwelling units or the non-residential TFA, being converted by the relevant DC in effect on the date when the DC is payable. - Does not apply if the original building (prior to conversion) is exempt under the current by-law. - Credit provided on a one-time basis unless there is an approved phasing plan. - Despite the above, where there is a conversion from a non-retail to a retail development an exemption of incremental DCs up to a conversion of either 10,000 sq.ft (930 sq.m) or 25% of TFA being converted, whichever is greater. - (see 6.9.4). - No Change Exemption for Intensification of Existing Housing including a structure ancillary to it (Mandatory) - Enlargement of an existing unit. - Creating 1 or 2 additional units in a single detached or 1 additional unit in any other type of dwelling provided the TFA of the new unit(s) does not exceed the existing unit. - Creating the greater of 1 or 1% of the existing units in a rental residential building. - No Change Region of Halton 2022 DC Background Study 6-7 DC Policies Existing Policies Proposed Changes - The above restrictions apply whether an additional unit is in the residential building or a structure ancillary to it - (see 6.9.5). Exemption for Additional dwelling units in new residential buildings or a structure ancillary to it (Mandatory) - Creating 1 additional dwelling unit in a new residential building containing a single, semi- detached or row dwelling, (or in a building ancillary to each) provided the TFA of the additional 1 unit does not exceed the TFA of the initial unit Creating 1 or 2 additional units in a single detached or 1 additional unit in any other type of dwelling provided the TFA of the new unit(s) does not exceed the existing unit. - (see 6.9.6). - No Change High Density Apartment - Collect all DCs at building permit provided development is an apartment dwelling with a minimum of 4 storeys or containing more than 130 units per net ha per plans approved under section 41 of the Planning Act. - (see 6.9.7). - No change. Affordable Rental Housing - Greater of 25% or 10 units at or below affordable rent, as defined (for min. 20 years) in the Region's State of Housing Report. - Deferral of DCs by annual payments over 20 years commencing at BP - No interest - (See 6.9.8) - No change. Rental housing (excluding non- profit) (Mandatory) - Payment of DCs by 6 annual installments commencing at occupancy - Interest applies - (see 6.9.9) - No change. Non-profit housing (Mandatory) - Payment of DCs by 21 annual installments commencing at occupancy - No interest - (see 6.9.10) - No change Institutional (Mandatory) - Payment of DCs by 6 annual installments commencing at occupancy - Interest applies - (see 6.9.11) - No change Non-Residential Payment Deferral - Available for non-residential DCs through an agreement for all developments. - No change. Region of Halton 2022 DC Background Study 6-8 DC Policies Existing Policies Proposed Changes - Deferral agreement with security by LC or agreement registered on title. - Deferral of DC's by annual payments over a 10- year period commencing at building permit - Interest applies. - (see 6.9.12). Non-Residential DC Categories - Categorize DC's by: Retail and Non-Retail. - (see 6.9.13). - No change. Temporary Non- Residential Building - Require securities posted in amount of DC payable at building permit. If the building is removed within 3 years of building permit issuance, the security is returned. If not, security deposited to the DC reserve funds. - (see 6.9.14). - No change. Municipal and School Board Exemptions (Mandatory) - DCs exempt for "Land owned by and used for the purposes of a municipality or a board as defined in the Education Act" per the DCA. - Unless buildings or part thereof are used for commercial/retail purposes. - (see 6.9.15). - No change. Parking Garages Exemption - Parking garages (whether at, above or below grade) are exempt. - (see 6.9.16). - No change. Temporary Residential Building Exemption- Garden Suite, Other - a) Garden Suite - through an agreement registered on title, exempt if removed within the period set by local's temporary use by-law and if not DC onto property tax. - b) Other - through an agreement, exempt if securities posted in amount of DC payable at building permit and if the building is removed within 3 years of building permit issuance, the security is returned. If not, security deposited to the DC reserve funds. - (see 6.9.17). - No change. Agricultural Exemption - DCs are exempt when the use is considered a bona fide farming operation, including sod farms, breeding and boarding of horses, and green houses with no connection to Regional water and wastewater. Residential, commercial and retail uses in agricultural development are not exempt. - Exempt first 278.7 sq.m. (3,000 sq.ft.) of accessory industrial/retail/ commercial TFA - (see 6.8.2). Region of Halton 2022 DC Background Study 6-9 DC Policies Existing Policies Proposed Changes - Confirm the Agricultural use based on the zoning and availability of Ontario Farm Business Registration Number (FBR#). Other Exemptions - Includes other discretionary exemptions: o Hospitals (unless buildings or part thereof are used for commercial/retail purposes); o Places of Worship Conservation Authorities (unless buildings or part thereof are used for commercial/retail purposes); o Seasonal structures; o Temporary venues; - (see 6.9.18). - No change. Timing of DC Payment - Residential: o Collect water, wastewater and roads at subdivision or consent agreement. (except for high density apartment at building permit); o Collect other services at building permit. o Collection is in accordance with Section 26 of the Act as may be applicable - Non-Residential: o Collect all DCs at building permit. o Collection is in accordance with Section 26 of the Act as may be applicable - Notwithstanding the above, the Region may enter into agreement under s.27 of DCA to collect all or part of DC earlier (i.e. allocation program) or later (i.e. non-residential deferral). (see 6.9.19). - No change. 6.8 Proposed DC Policy Changes The proposed by-law will continue to include the current rules and policies as outlined above save and except for the following changes based on issues that were raised during the implementation of the current By-law No. 36-17. 6.8.1 Industrial Expansion Exemption (Mandatory) The Act requires a DC exemption to an existing industrial building expansion on the following basis: Region of Halton 2022 DC Background Study 6-10  If the GFA of the existing building is enlarged by 50% or less, the expansion would be exempt from DCs.  If the GFA of the existing industrial building is enlarged by more than 50%, DCs would be payable on the amount by which the enlargement exceeds 50% of the GFA before the enlargement.  For the purpose of applying the industrial expansion exemption the terms "GFA" and an "existing industrial building" are based on the definitions used in the O. Reg. 82/98 to the Act as amended. In applying the exemption, the following is required: o The GFA of an existing industrial building is enlarged where there is a bona fide increase in the size of the existing building and the enlarged area is attached to the existing industrial building, there is a direct means of ingress and egress between the existing and enlarged area and it is used for, or in connection with, an industrial purpose as set out in s. 1 (1) of O. Reg. 82/98. Further, the exemption does not apply where the enlarged area is attached to the existing industrial building by means only of a tunnel, bridge, canopy, corridor or other passage-way, or through a shared below-grade connection such as a service tunnel, foundation, footing or a parking facility; o GFA as defined in the DCA, includes above grade floor area only; o Under the current by-law, the Region uses TFA which includes below grade floor area, to calculate the industrial expansion exemption. The current mandatory industrial expansion does not include separate buildings, which are sometimes required for storage tanks and garbage enclosures. However, the commercial expansion (up to 3,000 sq. ft.) under the by-law does not require the expansion to be attached to the existing building, as long as it is incidental to or subordinate in purpose and exclusively devoted to the use in the existing building. It is being proposed to amend the expansion exemption of existing industrial buildings to allow up to 278.7 sq.m. (3,000 sq.ft.). located in a separate building to be exempt from DCs. This exemption can be used at the same time as the mandatory expansion however the overall DC exemption will be capped at 50% of existing industrial TFA. 6.8.2 Agricultural Exemption Under the current by-law, Agricultural uses are exempt when the use is considered to be a bona fide farming operation, which currently includes greenhouses that are not Region of Halton 2022 DC Background Study 6-11 connected to Regional water services or wastewater services, sod farms, and farms for the breeding and boarding of horses. Residential, commercial and retail uses in agricultural development are not exempt. In the interest of supporting the agricultural sector, it is being recommended to provide some relief for on-farm diversification. This will allow on-farm diversification to be exempt from DCs for:  First 278.7 sq.m. (3,000 sq.ft.) of accessory industrial/retail/commercial;  As long as at least 6 months have elapsed since the last building permit;  The owner provides written confirmation that the existing farming operation is continuing; and  Additionally, a bone fide farm operation may extend beyond multiple legal lots so long as the lots are adjoining and form part of the bona fide farm operation. In order to assist in confirming a bona fide farming operation for exemption, a review of the availability of a Farm Business Registration Number (FBR) is requested. 6.9 Existing DC Policies to Remain in Place 6.9.1 Commercial (Non-Retail) Expansion Exemption The current by-law provides for an expansion exemption on the first 278.7 sq.m. (3,000 sq.ft.) of the expansion of the existing commercial building (attached or detached) on the site. In order to apply for this exemption, the expansion building should meet the definition of commercial use (e.g. non-industrial, non-retail) in the by-law and the related building permit must be at least 6 months after the last building permit on the site and the existing building(s) must be occupied. 6.9.2 Non-Residential Lot Coverage Relief Under the current by-law, partial DC exemptions are provided for non-residential development which exceeds its lot size. This relief is provided when the following conditions are met:  For the portion of the TFA of non-residential development that is less than or equal to 1.0 times the area of the lot, the current non-residential DC applies;  For the portion of the TFA that is greater than 1.0 times the area of the lot, the DC does not apply. Region of Halton 2022 DC Background Study 6-12 6.9.3 Demolition Credit A demolition credit is currently provided where a residential or non-residential building has been (or is being) demolished. It is calculated by multiplying the number/type of dwelling units or the non-residential TFA being demolished, by the relevant DC in effect on the date when the DC is payable. A credit is given where a building permit is issued within 5 years from the date of the demolition permit and it does not apply if the building is exempt under the current by-law. A demolition credit is provided on a one-time basis unless there is a phasing plan in place approved by the Regional Treasurer or designate. In situations where a developer is engaged in a formal planning application (e.g. complete site plan application under the Planning Act) but is not in a position to get their building permit issued within the 5-year timeframe the Regional Treasurer or designate may approve a 12-month extension to the demolition credit, upon submission by the developer of a written request for an extension, including proof that a formal planning application has been accepted and is in process by the local municipality. In cases where the building cannot be demolished until the new building is constructed (i.e. redevelopment of the site where the businesses must continue to operate until the new building can be occupied), DCs are payable on issuance of a building permit and a refund is made, without interest, if the demolition is made within 12 months of building permit issuance. In situations where 12 months is not sufficient time to complete construction, occupy the new building and complete the full demolition of the original building, the policy allows for the Regional Treasurer or designate to approve an extension to the time allowed to obtain a refund beyond the 12 months. This approval is required prior to obtaining the first building permit for the new development, and is only considered upon submission of a written request by the developer. 6.9.4 Conversion Credit Under the current By-law, a conversion credit is provided where there is a proposed conversion of space in a residential or non-residential building. The current by-law provides for conversion credits under the following conditions:  Credit is applied for the portion of the building that is being converted;  Credit is calculated by multiplying the number and type of dwelling units or the non-residential TFA, being converted by the relevant DC in effect on the date when the DC is payable; Region of Halton 2022 DC Background Study 6-13  Credit shall not exceed, in total, the amount of DCs payable for the building permit;  Credit does not apply if the original building is exempt under the current by-laws;  Credit is provided on a one-time basis unless any excess credit is expressly permitted by a phasing plan for the redevelopment that is acceptable to and approved by the Region. Despite the above, where there is a conversion from non-retail to retail development an exemption will be provided for the incremental DC's for the greater of 10,000 sq. ft. (930 sq. m) or 25% of the TFA being converted. This exemption will be provided on a one- time basis. 6.9.5 Exemption for Intensification of Existing Housing or a structure ancillary to it (Mandatory) The Act requires a DC exemption related to the redevelopment of existing residential buildings, including structures ancillary to existing residential buildings, for the following:  Enlargement of an existing dwelling.  Creating 1 or 2 additional dwelling units in an existing residential building containing a single dwelling unit provided the TFA of the additional 1 or 2 units does not exceed the TFA of the existing unit.  Creating 1 additional dwelling unit in existing residential buildings each of which contain a single dwelling unit, that have one (semi-detached dwelling) or two (row dwelling) vertical walls, but no other parts, attached to other buildings, provided the TFA of the additional 1 unit does not exceed the TFA of the existing units.  Creating the greater of 1 or 1% of the existing units in a rental residential building which contains four or more dwelling units.  Creating 1 additional dwelling unit in any other existing residential building not in the classes of buildings listed above, provided the TFA of the additional 1 unit does not exceed the TFA of the smallest existing unit. The above restrictions apply whether as additional dwelling unit is in the residential building or a structure ancillary to it. Region of Halton 2022 DC Background Study 6-14 6.9.6 Exemption for Additional dwelling units in new residential buildings or a structure ancillary to it (Mandatory) The Act also requires a DC exemption related to the development of new residential buildings, including structures ancillary to new residential buildings for the following:  Creating 1 additional dwelling unit or ancillary dwelling in a new residential building containing a single dwelling unit provided the TFA of the additional unit does not exceed the TFA of the initial unit.  Creating 1 additional dwelling unit in a new residential building each of which contain a single dwelling unit, that have one (semi-detached dwelling) or two (row Dwelling) vertical walls, but no other parts, attached to other buildings, provided the TFA of the additional 1 unit does not exceed the TFA of the initial units.  Creating 1 dwelling unit in a building ancillary to a proposed new detached dwelling, semi-detached dwelling or row dwelling and which must only contain one dwelling unit, provided the TFA of the additional 1 unit does not exceed the TFA of the initial unit 6.9.7 Definition of High Density Apartment & Timing of Payment (Residential) Generally residential developments are required to pay their water, wastewater and roads DCs prior to building permit. For high density development with a minimum of 4 storeys or containing more than 130 dwelling units per net hectare per approved plans under s.41 of the Planning Act, these charges are deferred to the building permit stage. The intention of this policy is to promote high density residential development by addressing cash flow issues that are particular to multi-story residential developments. 6.9.8 Affordable Rental Housing Deferral To support development of affordable rental housing, the Region has a deferral policy which allows DC payments over 20 annual payments (commencing at building permit) for developments that can demonstrate specific affordability targets. The provisions are as follow:  At least 25% of the development or 10 units, whichever is greater, must be operated at or below the affordable rent threshold as defined in the Region's annual State of Housing Report;  Affordable requirements must be met for a minimum of 20 years; Region of Halton 2022 DC Background Study 6-15  No interest;  Unpaid DC's will be placed on tax roll. It should be noted that the provisions of this policy may be subject to the Region's financial plan requirements. 6.9.9 Rental Housing (excluding non-profit) (Mandatory) Section 26.1 of the DCA provides for a deferral of DCs over 6 annual payments commencing at occupancy for a building with 4 or more dwelling units all of which are intended for use as rented residential premises as defined in the DCA. These deferral agreements will be subject to interest based on the Region's current policy approved through Report No. FN-08-20 (DC interest and deferral policies) or at a rate not exceeding the prescribed maximum if applicable. It should be noted that the provisions of this policy may be subject to the Region's financial plan requirements. 6.9.10 Non-profit Housing (Mandatory) Section 26.1 of the DCA provides for a deferral of DCs over 21 annual payments commencing at occupancy for a building or structure intended for use as residential premises by a corporation without share capital to which the Corporations Act or the Canada not-for-profit Corporations Act applies, that is in good standing and whose primary purpose is to provide housing; or a non-profit housing co-operative that is in good standing under the Co-operative Corporations Act. These deferral agreements will not be subject to interest based on the Region's current policy approved through Report No. FN-08-20 (DC interest and deferral policies). It should be noted that the provisions of this policy may be subject to the Region's financial plan requirements. 6.9.11 Institutional (Mandatory) Section 26.1 of the DCA provides for a deferral of DCs over 6 annual payments commencing at occupancy for a building or structure intended for use as institutional as defined in the DCA. These deferral agreements will be subject to interest based on the Region's current policy approved through Report No. FN-08-20 (DC Interest and Deferral Policies) or at a rate not exceeding the prescribed maximum if applicable. Region of Halton 2022 DC Background Study 6-16 6.9.12 Non-Residential Payment Deferral The Region will continue to provide an option to defer non-residential DCs to all developments, redevelopments and building expansions. This policy has been in place since Council's approval in 1995 (Report No. CS-04-95). The intent of the policy is to help to alleviate cash flow problems relating to DC payments since such payment is required before a building is constructed and the revenues from it materialize. To provide businesses with greater flexibility, the deferral program permits payments to be made annually over a 10-year period at the prime lending rate of the Region's bank. The owner is required to enter into a deferral agreement and a security is required by way of providing a Letter of Credit or the agreement must be registered on title. For non-residential institutional development as defined in O. Reg. 82/98 section 26.1 of DCA may apply. 6.9.13 Non-Residential DC Categories In 2012, the Region established differentiated non-residential DC rates for retail and non-retail development in the interest of continued economic development in employment areas. The transportation DC was differentiated for retail and non-retail uses based on technical information that provides different trip generation rates relating to each category. The 2022 DC by-law will continue to differentiate Transportation DCs between retail and non-retail development based on a similar methodology detailed in Appendix D. 6.9.14 Temporary Non-Residential Building The current by-law provides exemptions for temporary non-residential buildings as long as the building is removed within a specified timeframe. This policy is designed for development that is required on a site before a permanent structure is erected (e.g. sales trailers). The applicant is required to post securities in the amount of the DC payable at building permit. If the building is removed within 3 years of building permit issuance, the security is returned. If not, the DC is collected by depositing the security into the appropriate DC reserve funds. 6.9.15 Municipal and School Board Exemptions (Mandatory) The Act requires that the following institutions be exempt from payment of DCs: Region of Halton 2022 DC Background Study 6-17  Buildings or structures owned by and used for the purposes of any area municipality or the Region; and  Buildings or structures owned by a public or separate board of education (as defined in the Education Act) and used only for school purposes;  Unless such buildings or parts thereof are used primarily for commercial or retail purposes. The current practice of exempting partnerships between a private entity and municipality or school board (providing municipal/school boards' services) is appropriate in light of the DCA requirement. In its review of such partnership development, the Region takes into consideration the land ownership and the nature of the services provided by the applicant. In order for the DC exemption to apply, the land must be owned by a municipality or a school board and the services provided should be for a municipal or a school board purpose authorized by the applicable legislation. 6.9.16 Parking Garages Exemption Under the current by-law parking garages, whether at, above or below grade, are exempt from DCs. 6.9.17 Temporary Residential Building Exemption The current by-law includes special policies for the following 2 types of temporary residential dwelling units:  Garden suite - a temporary accommodation for a family member, usually a senior.  Other - a temporary accommodation for resident workers. a) Temporary Dwelling - Garden Suites Under the Planning Act, garden suites are only permitted when a temporary use by-law (a form of zoning by-law) is enacted by the Council of the local municipality. The temporary by-law specifies the subject land and the duration of the usage of the garden suite. The initial period cannot exceed 3 years, but the timeframe can be extended by local Council. Regardless of the duration of the by-law, the Planning Act does not allow the garden suite to become a legal conforming use. The current policy for a garden suite type temporary dwelling unit is as follows: Region of Halton 2022 DC Background Study 6-18  The garden suite has been authorized by a temporary use by-law passed by the local municipality pursuant to sections 39 and 39.1 of the Planning Act and such by-law is in full force and effect;  The owner is required to enter into an agreement with the Region, to be registered on title, prior to building permit issuance;  Under the agreement, DCs are exempt if the owner removes the building within 60 days following the expiration of the temporary use by-law (or any extensions thereof), and provides evidence of the removal to the Region within 30 days following the removal (up to 90 days total). The onus of notifying the Region of the removal is on the applicant;  If the owner does not provide satisfactory evidence of removal within the timeframe, it will no longer be considered as a garden suite and the Region will add the DCs to the tax roll;  If the lot with the garden suite is sold, unless the purchaser agrees to assume the responsibility by entering into an identical agreement or remove the building, the entire amount of DC should be paid to the Region prior to the completion of the sales transaction;  The amount of DC payable is the DC rate for an accessory dwelling on the date that the building permit was issued. b) Temporary Dwelling - Other This policy applies in situations where a temporary use by-law is not available. Examples include a seasonal residential use or a short-term residential use to accommodate resident workers, such as farm workers. In most cases once these dwellings are removed, there are no plans for redevelopment on the site, and therefore the applicant cannot take advantage of the demolition credit. The current policy for this type of temporary dwelling unit is as follows:  Before the building permit issuance, the applicant must enter into an agreement with the Region and provide a security in the amount equal to the DCs otherwise payable;  The security may be in the form of cash or Letter of Credit;  A refund of cash or a return of Letter of Credit will be made, without interest, if the applicant submits an application for refund, accompanied by proof of the removal of the temporary building to the Region's satisfaction, within 3 years from the building permit issuance; Region of Halton 2022 DC Background Study 6-19  If there is no application received within the 3 years, the Region collects the DCs by depositing the security (or cash) into the Regional reserve funds on the day following the 3-year anniversary date. 6.9.18 Other Discretionary Exemptions Under the current by-law parking garages, whether at, above or below grade, are exempt from DCs.  The following are additional discretionary exemptions that are included in the current by-law:  Hospitals - Buildings used as hospitals governed by the Public Hospitals Act, R.S.O. 1990; c. P.40, unless such buildings or parts thereof are used primarily for commercial or retail purposes;  Place of Worship - Buildings that are exempt from taxation as a place of worship;  Conservation Authorities - Buildings/structures owned by and used for the purpose of a conservation authority, except for buildings/structures used primarily for recreational purposes for which the conservation authority charges admission and/or fees or any other commercial or retail purposes;  Seasonal Structures as defined in the by-law;  Temporary Venues as defined in the by-law. 6.9.19 Timing of DC Payment Unless 26.1 of the DCA applies, DCs for all services are currently calculated in accordance with section 26.2 of the DCA and payable on the day of building permit issuance, except for the water, wastewater and roads component for residential uses, which are currently payable upon execution of a subdivision agreement, rather than prior to building permit issuance, as the Region is required to have the necessary infrastructure constructed before the development occurs. For high density apartments and non-residential uses, all DCs are payable at building permit. Notwithstanding the above, an owner and the Region may enter into an agreement under section 27 of the DCA requiring all or part of the DCs to be paid before (i.e. residential allocation program) or after (i.e. non-residential deferral) they would otherwise be payable. The terms of such agreement may not amend or alter any other provisions or sections of the by-law. Region of Halton 2022 DC Background Study 6-20 6.9.20 Exemptions, Relief, Credits and Adjustments Not Cumulative It must be noted that only one of the applicable exemption(s), relief, credit(s) or adjustment(s) set out in the by-law shall be applicable to a development or redevelopment. Where the circumstances of a development or redevelopment are such that more than one type of exemption, relief, credit or adjustment could apply, only one type shall apply and it shall be the exemption, relief, credit or adjustment that results in the lowest DCs being payable. 6.10 By-law Structure Bill 73 has introduced 2 new sections where Council must consider the use of area specific charges:  Subsection 2 (9) of the Act now requires a municipality to implement area specific DCs for either specific services which are prescribed and/or for specific municipalities which are to be regulated.  Subsection 10 (2) c.1 of the DCA requires that "the development charges background study shall include consideration of the use of more than one DC by- law to reflect different needs for services in different areas". For the 2022 DC by-law update, consideration has been given to area specific charges as required under the DCA (as amended by Bill 73). In regard to the first item, there are no services or specific municipalities identified in the regulations which must be area rated. The second item requires Council to consider the use of area rating. The most common approach to structuring DC by-laws in Ontario is to implement a uniform or a municipal-wide charge. Currently Halton has Region-wide DC rates for all services except water/wastewater (W/WW). Since 1999, the Region's W/WW DCs have been charged on an area specific basis to recognize the higher average costs in servicing the Greenfield areas compared to the Built Boundary areas. The current area specific W/WW DC was established in 2012 (By-law No. 48-12), based on distribution/collection infrastructure required to service growth planned within the Built Boundary and Greenfield areas. The Built Boundary for the Greater Golden Horseshoe was established by the provincial Growth Plan based on the 2006 Built Boundary. The remainder of the Regional urban area (i.e. outside the Built Boundary) was classified as Greenfield area. The DC rates relating to the water and wastewater capacity (plant expansions for example) were calculated on a Region- Region of Halton 2022 DC Background Study 6-21 wide basis given the difficulty in identifying Area specific infrastructure related to capacity projects. The remaining services (roads, growth studies, police, paramedic services, facilities, social housing, waste diversion and waterfront parks) are not restricted to one specific area and are often used/required by all residents/business. For example, the entire road network is used by new development depending on their travel requirements. For the reasons noted above, the Region will continue to calculate the distribution/collection component of the W/WW DCs on an area specific basis and the capacity component of W/WW and all other services (transportation and general services) on a Region-wide basis. Table 6-2 below illustrates the by-law structure: Table 6-2 2022 DC By-law Structure 6.11 Asset Management Plan The recent changes to the DCA (new clause 10 (2) (c.2)) require that the background study must include an asset management plan (AMP) related to new infrastructure. Subsection 10 (3) of the DCA provides: The AMP shall,  deal with all assets whose capital costs are proposed to be funded under the DC by-law; 1. Water/Wastewater: Areas Applied Planning Period A. Capacity Region-wide 2022-2031 B. Distribution/Collection: Area-specific 2022-2031 (i) Greenfield (ii) Built Boundary 2. Roads Region-wide 2022-2031 3. Police Region-wide 2022-2031 4. Other General Services Region-wide 2022-2031 Region of Halton 2022 DC Background Study 6-22  demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle;  contain any other information that is prescribed; and  be prepared in the prescribed manner. At a broad level, the AMP provides for the long-term investment in an asset over its entire useful life along with the funding. For growth-related works, the majority of capital costs will be funded by DCs. Non-growth-related expenditures will then be funded from non-DC sources through the state of good repair program. During the useful life of the asset, there will be minor maintenance costs to extend the life of the asset along with additional program related expenditures to provide the full services to the residents. At the end of the life of the asset, it will be replaced by non-DC financing sources. Having a financial plan is critical for putting an AMP into action. By having a strong financial plan, municipalities can also demonstrate that they have made a concerted effort to integrate the AMP with financial planning and municipal budgeting and are making full use of all available infrastructure financing tools. It has been the Region's long-standing practice to prepare the Region's ten-year budget forecast based on the asset management plan. The ten-year budget forecast is updated through the annual budget process based on the latest information available including the existing long-term asset management plan, building condition assessments, results of studies such as master plans, optimization studies, etc. For the purpose of the 2022 DC by-law update, the ten-year budget forecast is to cover the planning horizon based on the long-term asset management plan, incorporating the infrastructure identified for the 2022 update and building condition assessments. As detailed in Appendix H, the analysis demonstrates that the Regional property tax and water and wastewater utility rate impacts are projected to stay at a level consistent to the current (2022) and previous budgets. 6.12 Long Term Capital and Operating Cost Examination Subsection 10(2)(c) of the Act requires that a DC background study include an examination for each service to which the DC by-law would relate, of the long-term capital and operating costs for capital infrastructure required for the service. One standard that could be used in scrutinizing the above-referenced costs is the current level of operating costs per capita. Another more detailed standard that goes Region of Halton 2022 DC Background Study 6-23 beyond the specific requirements of the Act would be the anticipated impact on tax and user rate levels, as determined by the application of a full fiscal impact model. As discussed in Appendix H, Halton's assessment is based on the latter method. The revenue to be generated by the DC by-law during its life of up to 5 years will be determined by the quantum of the charge, the amount and type of development occurring and the impact of the rules regarding exemptions, indexing, land redevelopment, etc. The net stream of revenue which results will determine the rate at which the Region is able to construct the works which underlie the DC. Consideration of these revenue streams would normally occur as part of the Region's annual Capital Budget and Forecasting process. Appendix H contains Halton's Long-Term Capital and Operating Cost examination. The Region intends to implement the projects set out in this Study through its usual practice of preparing financial plans prior to the release of water and wastewater capacity. These plans will consider the projects (including roads) to be financed under the Plan and may use a combination of various financing techniques. The financial plan may also consider the staging of projects and, therefore, the timing and sequence of development to achieve the fiscal objectives of the Region under the Region's current Official Plan. Accordingly, the timing of some of the projects which are to be DC funded may be modified from what is shown in this background study. These modifications may be necessitated by the specifics of the financial plans to be prepared for water, wastewater and road servicing. Region of Halton 2022 DC Background Study Chapter 7 By-law Adoption and Implementation Region of Halton 2022 DC Background Study 7-2 7. By-law Adoption and Implementation 7.1 Introduction This chapter outlines the comprehensive process that the Region has carried out as part of arriving at DC rates and policies which are fair and legally defensible, and have full regard for public comments and concerns and any possible economic or development implications. As part of this process, Regional staff in Public Works, Finance, Legislative and Planning Services, and other departments deployed substantial resources, in addition to engaging specialists in transportation, water/wastewater servicing, legal, economics and development charges to prepare separate inputs to the study. This chapter discusses the consultation and by-law adoption process. 7.2 Consultation Halton Region has followed an organized and comprehensive consultation process consisting of the Development Charges Advisory Committee (DCAC) which provided advice on the preparation of the DC background study and an extensive public consultation process to be carried out once the DC background study is released to the public. 7.2.1 Development Charges Advisory Committee (DCAC) The purpose of the DCAC is to provide advice and assistance with respect to the preparation of the DC background study by reviewing the methodology and assumptions used in formulating the DC policies. The terms of reference and selection criteria for the DCAC were updated and approved by Council in Report No. LPS14-21 / FN-04-21 (re: 2022 Development Charge (DC) Update Work Plan, Terms of Reference and Council Appointments to the 2021-2022 Development Charges Advisory Committee (DCAC)). The Committee consists of 15 members representing developers, builders, businesses, councillors and rate payers. As shown in the following table, the DCAC held 4 meetings during September and October 2021, involving discussions regarding the growth plan and capital costs, DC calculations, competitive analysis and DC policies. Region of Halton 2022 DC Background Study 7-3 Table 7-1 DCAC Consultation Process During this process relevant information was provided through staff presentations. Further supplementary information was also provided as requested by the Committee. The information presented at the DCAC, including supplementary information, technical reports, minutes and agendas, is available on Halton's website (www.halton.ca). The key items reviewed and feedback provided by the DCAC was highlighted in Regional Report No. FN-36-21 (re: Update on the Activity of the Development Charges Advisory Committee (DCAC)). 7.2.2 Public Consultation Process Once the DC background study is complete and released to the public, the work of the DCAC comes to an end and the broad public consultation occurs. As shown in the following table the DC background study is planned to be released to the public on December 15, 2021. Item Discussed Date 1. DC 101/Growth Plan September 24, 2021 2. DC Policies/Adjusted Growth/ General Services Capital Costs and Calculations October 8, 2021 3. Water/Wastewater & Transportation Capital Costs and Calculations October 21, 2021 4. Cost of Growth, Final Review and Competitiveness October 29, 2021 Region of Halton 2022 DC Background Study 7-4 Table 7-2 Summary of Public Consultation Process Process Date 1. Release of DC Background Study to the Public December 15, 2021 2. Public Meeting under the DCA, 1997 February 16, 2022 3. Final DC Proposals & Comments to Council March 23, 2022 4. Proposed Passing of DC By-law(s) by Council April 20, 2022 5. Advertise Notice of Passage of DC By-law(s) Within 20 days of passage 6. Last day for DC By-law(s) Appeal 40 days after passage Halton's website will continue to be updated to keep the public informed during the public consultation process on meeting dates and information provided during the process. Finally, consultation with the four local municipalities continually takes place through the Area Treasurers with the aim to promote consistency in DC policies among the Region and the local municipalities, which in turn would improve customer service and administrative efficiency. 7.3 The By-law Adoption Process Section 12 of the DCA indicates that before passing a DC by-law, Council must hold at least one public meeting, giving at least 20 days notice thereof, in accordance with the Regulation. Council must also ensure that the proposed by-law and background study are made available to the public at least 2 weeks prior to the (first) public meeting. Further, the DC study must be made available at least 60 days prior to the passage of the DC by-law. Any person who attends such a meeting may make representations related to the proposed by-law. If a proposed by-law is changed following such a meeting, the Council must determine whether a further meeting (under this section) is necessary (i.e. if the proposed by-law which is proposed for adoption has been changed in any respect, the Council should formally consider whether an additional public meeting is required, incorporating this determination as part of the final by-law or associated resolution). It is noted that Council's decision, once made, is final and not subject to review by a Court or the OLT. Region of Halton 2022 DC Background Study 7-5 As discussed in the previous sections, following the completion of the DCAC process and release of the DC background study on December 15, 2021, the Region will undertake an extensive public consultation process beyond standard practice and the requirement of the DCA. Further, as shown in Table 7-2, the Region's consultation process will continue until the by-law is adopted. The legislated Public Meeting will be held February 16, 2022. All of the public input will be reviewed and taken into consideration to finalize the Region's DC proposal. The final report containing the DC proposal will be presented to the Council on March 23, 2022. The DC by-law will then be considered for passage by Council on April 20, 2022, with the last date for appeal of the by-law then being 40 days after the passage of the by-law. 7.4 By-law Implementation 7.4.1 Introduction Once the Region has calculated the charge, prepared the complete background study, carried out the public process and passed a new by-law, the emphasis shifts to implementation matters. These include transitional arrangements, notices, potential appeals and complaints, credits, front-ending agreements, subdivision agreement conditions and finally the collection of revenues and funding of projects. The following section overviews requirements in each case. 7.4.2 Transitional Period Although the by-law is scheduled to be passed on April 20, 2022, this study proposes that the by-law come into force September 1, 2022 to allow for a transitional period to the new rates prior to expiration of By-law No. 36-17 on August 31, 2022. 7.4.3 Notice of Passage In accordance with s.13 of the DCA, when a DC by-law is passed, the municipal clerk shall give written notice of the passing and of the last day for appealing the by-law (the day that is 40 days after the day it was passed). Such notice must be given no later than 20 days after the day the by-law is passed (i.e. as of the day of newspaper publication or the mailing of the notice). Section 10 of O. Reg. 82/98 further defines the notice requirements, which are summarized as follows: Region of Halton 2022 DC Background Study 7-6  Notice may be given by publication in a newspaper, which is (in the Clerk's opinion) of sufficient circulation to give the public reasonable notice, or by personal service, fax or mail to every owner of land in the area to which the by- law relates.  s. 10 (4) lists the persons/organizations who must be given notice.  s.10 (5) lists the 8 items which the notice must cover. 7.4.4 By-law Pamphlet In addition to the "notice" information, the municipality must prepare a "pamphlet" explaining each DC by-law in force, setting out:  a description of the general purpose of the DCs;  the "rules" for determining if a charge is payable in a particular case and for determining the amount of the charge;  the services to which the DCs relate; and  a general description of the general purpose of the Treasurer's statement and where it may be obtained by the public. Where a by-law is not appealed to the OLT, the pamphlet must be readied within 60 days after the by-law comes into force. Later dates apply to appealed by-laws. The Region must give one copy of the most recent pamphlet without charge, to any person who requests one. 7.4.5 Appeals Sections 13 to 19 of the DCA set out requirements relative to making and processing of a DC by-law appeal and OLT Hearing in response to an appeal. Any person or organization may appeal a DC by-law to the OLT by filing with the municipal clerk a notice of appeal, setting out the objection to the by-law and the reasons supporting the objection. This must be done by the last day for appealing the by-law, which is 40 days after the by-law is passed. 7.4.6 Complaints A person required to pay a DC, or his agent, may complain to the Regional Council imposing the charge that:  the amount of the charge was incorrectly determined; Region of Halton 2022 DC Background Study 7-7  the credit to be used against the DC was incorrectly determined; or  there was an error in the application of the DC. Sections 20 to 25 of the DCA set out the requirements that exist, including the fact that a complaint may not be made later than 90 days after a DC (or any part of it) is payable. Further a complainant may appeal if the municipality does not deal with the complaint within 60 days of the complaint being filed with the clerk. A complainant may appeal the decision of Regional Council to the OLT. Region of Halton 2022 DC Background Study Appendix A Anticipated Development in the Region 2022-2031 Region of Halton 2022 DC Background Study A-1 Appendix A: Part 1 Residential Growth Forecasts 1. Residential Growth Forecasts Table A-1 provides an estimate for growth commencing in 2022, which is the starting point for this forecast and DC calculation. The forecast extends over a 10-year planning horizon from 2022 to 2031, and is based on the Halton Region BPE, 2011. Over the 2022-2031 planning period, the Region's population is forecasted to reach 752,537 persons (excludes Census undercount), an increase of 128,443 persons from 2022 to 2031.1 The 2031 target population and employment figures for the Halton Region BPE, 2011 are consistent with section 3 of the 2006 Growth Plan for the Greater Golden Horseshoe (Places to Grow) and ROPA 39. Local knowledge regarding development activity and designated vacant urban land supply, as well as Official Plan (OP) policies related to future housing mix, are reflected in the forecasts, with extensive input from the local municipalities. It is noted that based on a detailed review of the 2021 population and housing base for Halton Region, the Region is approximately 21,340 persons and 16,460 households below the 2021 estimates as per the Halton Region BPE, 2011. This residential shortfall has been adjusted for accordingly in the DC calculation (Table A-6a to Table A-6c). Figure A-1 graphs the anticipated annual increase in the number of occupied dwelling units over the forecast period, with additional details provided in Table A-2 for the 2011- 2020 period. Historical annual housing activity is based on Canadian Mortgage and Housing Corporation (CMHC) completion data, while the forecast of occupied dwelling units by type from 2021-2031 is based on the Halton Region BPE, 2011. Historically, housing activity in Halton averaged 3,743 residential completions per year during the 2016 to 2020 period, which is above the average residential housing activity experienced during the 2011-2015 period (i.e. 3,166 residential completions/year), and comparable to the 10-year average residential housing activity of 3,703 residential completions per year during the 2006-2015 period. In accordance with the Halton Region BPE, 2011, the level of housing construction activity during the short-term 1 The Statistics Canada population undercount represents the net number of persons who are missed (i.e. over-coverage less under-coverage) during Census enumeration. Region of Halton 2022 DC Background Study A-2 forecast period (i.e. 2022-2026) is forecast to average approximately 5,599 units annually, which is well above historical trends from 2006-2020. The relatively high level of forecast housing activity during the 2021-2025 period is largely a result of significant DGA development in North Oakville and Milton anticipated over this time period. Growth within Halton Region is projected to decline slightly thereafter to approximately 5,221 units/year from 2027-2031. This gradual decline corresponds with the buildout of large portions of the Region's currently designated residential lands, both DGA and BUA lands. With respect to housing activity by structure type, single detached and semi-detached units comprised 40% of total permits issued over the past 10 years (2011-2020). The remaining 60% of the completions issued over this time period were in the form of medium-density (28%) and high-density (32%) housing. The percentage of low-density and medium-density housing units over the forecast period (2022-2031) is projected to be 45% and 21%, respectively, while high-density units are projected to increase comprise 34%. Table A-3 sets out the persons per unit (PPU) data as per the 2016 Census by type and age of unit in Halton. In comparison to the 2017 DC Background Study, housing occupancies in new low, medium and high-density housing units are forecasted to increase. Over the 2022-2031 forecast period, the average PPU for new low-density housing units is 3.77. For medium- and high-density housing units, the forecast average PPU are 2.85 and 1.66, respectively. The analysis in Table A-3 reveal that low-, medium- and high-density dwelling occupancies for new units in Halton will gradually decline over the 10-year forecast period Table A-4 summarizes the PPU assumptions established for calculating DC rates for different types of dwelling units, based on Census data over the 2022-2031 period. The PPU assumption presented is used in calculating the which utilized a 10-year planning period. For multiple dwellings, average PPU levels are further summarized between units with less than and equal to or more than 3 bedrooms. For apartment dwellings, average PPU levels are summarized between units with less than and equal to or greater than 2 bedrooms. Table A-5 summarizes the Regional population forecast from 2022-2031. PPU assumptions used for the 10-year gross population forecast are based on Table A-4. The net population increase over the 10-year period is based on the BPE, 2011. Region of Halton 2022 DC Background Study A-3 Tables A-5a through A-5c summarizes the 10-year gross/net population forecast for the Halton's BUA (in accordance with ROPA 38), DGA and Rural Areas. Table A-6a provides the annual growth summary for the 10-year growth period from 2022-2031. This forecast is used for the DC calculation as it relates to general services. Adjustments have been made for the difference between the 2022 beginning balance based on Halton Region BPE, 2011 and actual residential development. Further, adjustments have been made to include institutional units due to institutional population related growth (e.g. long-term care development) being accounted for in residential growth. A unit deduction has also been made to account for the units that have already paid DCs but have not yet occupied, in addition to a deduction for oversubscription under the 2020 allocation program. Table A-6b provides the annual growth summary for the 10-year growth period from 2022-2031. This forecast is used for the DC calculation as it relates to roads services. Adjustments for actual growth, institutional units, prepaid units and over allocated units have been made as noted above. Table A-6c provides the annual growth summary for the 10-year growth period from 2022-2031. This forecast is used for the DC calculation as it relates to water and wastewater services. In Table A-6c, the annual growth forecast has been allocated between DGA and BUA lands. Rural areas have been deducted from the growth forecast as they are not serviceable by water and wastewater. Adjustments for, institutional units, prepaid unit and over allocated units have been made as noted above. The shortfall for water/wastewater is offset by the number of prepaid units as all residential units have prepaid units through existing agreements. Table A-1 Halton Region Residential Growth Forecast Summary Dwelling Units 2021 624,094 8,618 615,476 142,759 42,255 49,440 234,455 2026 688,895 9,531 679,363 153,615 48,655 60,180 262,449 2031 752,537 10,436 742,101 166,913 53,708 67,935 288,556 2022-2026 64,801 914 63,887 10,856 6,400 10,739 27,995 2022-2031 128,443 1,818 126,625 24,154 11,453 18,495 54,102 2022-2026 39% 23% 38% 100% 2022-2031 45% 21% 34% 100% Source: Population and housing forecasts explicitly based on June 2011 Halton Best Planning Estimates. 1 Population figure excludes net Census undercount. % Housing Mix Year Population 1 Institutional Population Population Net of Institutional Singles & Semis (Low- Density) Multiples (Medium- Density) Apartments (High-Density) Total Region of Halton 2022 DC Background Study A-4 Figure A-1 Halton Region Occupied Residential Dwelling Unit Forecast vs. Historical Completions Period Low Density Medium Density High Density Total 2006-2020 1,904 1,110 808 3,716 2021-2031 2,415 1,145 1.850 5,410 4,241 3,166 3,743 5,599 5,221 - 1,000 2,000 3,000 4,000 5,000 6,000 2006-2010 2011-2015 2016-2020 2021-2025 2026-2031 Completion Forecast Residential Units Period Historical Forecast Region of Halton 2022 DC Background Study A-5 Table A-2 Halton Region Historical Residential Housing Completions Years 2011-2020 Residential Completions Year Low Density Medium Density High Density Total (Singles & Semis) (Townhouses) (Apartments) 2011 1,389 1,018 491 2,898 2012 1,910 957 1,021 3,888 2013 1,315 1,298 599 3,212 2014 1,320 1,030 1,269 3,619 2015 1,079 553 599 2,231 Sub-total 7,013 4,856 3,979 15,848 Average (2011-2015) 1,403 971 796 3,170 % Breakdown 44.3% 30.6% 25.1% 100.0% 2016 1,288 718 1,403 3,409 2017 1,229 1,072 1,966 4,267 2018 1,744 1,562 1,186 4,492 2019 1,462 576 1,170 3,208 2020 991 932 1,415 3,338 Sub-total 6,714 4,860 7,140 18,714 Average (2016-2020) 1,343 972 1,428 3,743 % Breakdown 35.9% 26.0% 38.2% 100.0% 2011-2020 Total 13,727 9,716 11,119 34,562 Average 1,373 972 1,112 3,456 % Breakdown 39.7% 28.1% 32.2% 100.0% Source: Completions- Canada Mortgage and Housing Corporation (CMHC) Ontario Housing Market Report. Region of Halton 2022 DC Background Study A-6 Table A-3 Halton Region Summary of 10-year Housing Occupancy Rates by Dwelling Type in New Units (PPU), 2022-2031 Units PPU Population Units PPU Population 2022-2026 10,856 3.837 41,652 6,400 2.894 18,524 2027-2031 13,298 3.719 49,459 5,053 2.796 14,129 Total 10-year 24,154 3.772 91,111 11,453 2.851 32,652 Units PPU Population Units PPU Population 2022-2026 10,739 1.667 17,907 27,995 2.789 78,082 2027-2031 7,756 1.638 12,706 26,107 2.922 76,295 Total 10-year 18,495 1.655 30,613 54,102 2.853 154,377 Source: Halton Region Best Planning Estimates, June 2011. Forecast housing occupancy rates (persons per unit) by housing type are derived by Watson & Associates based on 2016 Statistics Canada custom tabulation. Municipality Forecast Period High Density Total TOTAL HALTON REGION TOTAL HALTON REGION Municipality Forecast Period Low Density Medium Density Region of Halton 2022 DC Background Study A-7 Table A-4 Halton Region 2022 Development Charge Study Housing occupancy Rates by Dwelling Type in New Units (PPU)1 2022-2031 2022-2031 2022-2031 Residential Unit Category (Built Boundary) (Greenfield) Single Family and Semi-Detached 3.772 3.750 3.777 Total Multiples 2 2 .8 5 1 2 .8 4 2 2 .8 5 6 Multiples- Less Than 3 Bedrooms 2.018 2.012 2.022 Multiples - 3 or More Bedrooms 3.054 3.044 3.059 Total Apartments 1 .6 5 5 1 .6 5 5 1 .6 5 8 Apartments - Less than 2 Bedrooms 1.356 1.355 1.359 Apartments - 2 or More Bedrooms 1.831 1.831 1.835 Special Care or Special Need 1.100 1.100 1.100 2 Multiples are defined as townhomes and apartments in duplexes. Region Wide Area Specific 1 Forecast occupancy rates (Persons Per Unit) by unit category and number of bedrooms are based on 2016 Statistics Canada custom tabulation provided by dwelling type and dwelling age. Region of Halton 2022 DC Background Study A-8 Table A-5 Halton Region 10 Year (Long Term) Growth Forecast 2022-2031 Population (Net of Institutional) Population to 2021 (1) 615,476 Occupants of Units 54,102 New Housing Units, multiplied by persons per unit (2) 2.853 2022 to 2031 gross population increase 154,377 154,377 Decline in Housing Units 234,455 Unit Occupancy, multiplied by ppu decline rate (3) -0.118 2022 to 2031 total decline in population -27,752 -27,752 Population Estimate to 2031 (4) 742,101 Net Population Increase, From 2022 To 2031 126,625 (1) Population and housing forecasts explicitly based on June 2011 Halton Best Planning Estimates. 2021 population estimate is net of institutional, which is estimated at 8,618. (2) Average number of persons per unit (ppu) is assumed to be: Persons % Distribution Weighted Persons Per Unit of Estimated Units Per Unit Average Single family & semi-detached 3.772 45% 1.684 Multiples except apartments 2.851 21% 0.604 Apartments 1.655 34% 0.566 Total 100% 2.853 (3) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (4) 2031 Population derived from Halton Region Best Planning Estimates, 2011. Note: 2031 population estimate is net of institutional population, which is estimated at 10,436 Source: Unit mix derived from Halton Region Best Planning Estimates, 2011. Forecast persons per unit by residential unit category based on 2016 Statistics Canada custom tabulation provided by dwelling type and dwelling age. Residential Unit Category Region of Halton 2022 DC Background Study A-9 Table A-5a Halton Region (Built Boundary) 10 Year (Long Term) Growth Forecast 2022-2031 Population (Net of Institutional) Population to 2021 (1) 440,580 Occupants of Units 23,242 New Housing Units, multiplied by persons per unit (2) 2.188 2022 to 2031 gross population increase 50,850 50,850 Decline in Housing Units 175,713 Unit Occupancy, multiplied by ppu decline rate (3) (0.046) 2022 to 2031 total decline in population (7,997) (7,997) Population Estimate to 2031 (4) 483,433 Net Population Increase, From 2022 To 2031 42,853 (1) Population and housing forecasts explicitly based on June 2011 Halton Best Planning Estimates. 2021 population estimate is net of institutional, which is estimated at 6,578. (2) Average number of persons per unit (ppu) is assumed to be: Persons % Distribution Weighted Persons Per Unit of Estimated Units Per Unit Average Single family & semi-detached 3.750 15% 0.571 Multiples except apartments 2.842 18% 0.512 Apartments 1.655 67% 1.104 Total 100% 2.188 (3) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (4) 2031 Population derived from Halton Region Best Planning Estimates, 2011. Note: 2031 population estimate is net of institutional population, which is estimated at 7,529. Source: Unit mix derived from on Halton Region Best Planning Estimates, 2011. Forecast persons per unit by residential unit category based on 2016 Statistics Canada custom tabulation provided by dwelling type and dwelling age. Region of Halton 2022 DC Background Study A-10 Table A-5b Halton Region (Greenfield) 10 Year (Long Term) Growth Forecast 2022-2031 Population (Net of Institutional) Population to 2021 (1) 151,897 Occupants of Units 31,023 New Housing Units, multiplied by persons per unit (2) 3.357 2022 to 2031 gross population increase 104,153 104,153 Decline in Housing Units 50,530 Unit Occupancy, multiplied by ppu decline rate (3) (0.377) 2022 to 2031 total decline in population (19,045) (19,045) Population Estimate to 2031 (4) 237,005 Net Population Increase, From 2022 To 2031 85,108 (1) Population and housing forecasts explicitly based on June 2011 Halton Best Planning Estimates. 2021 population estimate is net of institutional, which is estimated at 1,651. (2) Average number of persons per unit (ppu) is assumed to be: Persons % Distribution Weighted Persons Per Unit of Estimated Units Per Unit Average Single family & semi-detached 3.777 67% 2.529 Multiples except apartments 2.856 23% 0.669 Apartments 1.658 10% 0.160 Total 100% 3.357 (3) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (4) 2031 Population derived from Halton Region Best Planning Estimates, 2011. Note: 2031 population estimate is net of institutional population, which is estimated at 2,526 Source: Unit mix derived from on Halton Region Best Planning Estimates, 2011. Forecast persons per unit by residential unit category based on 2016 Statistics Canada custom tabulation provided by dwelling type and dwelling age. Region of Halton 2022 DC Background Study A-11 Table A-5c Halton Region (Rural) 10 Year (Long Term) Growth Forecast Population (Net of Institutional) Population to 2022 (1) 22,999 Occupants of Units -163 New Housing Units, multiplied by persons per unit (2) 3.830 2022 to 2031 gross population increase -626 -626 Decline in Housing Units 8,211 Unit Occupancy, multiplied by ppu decline rate (3) (0.087) 2022 to 2031 total decline in population (710) (710) Population Estimate to 2031 (4) 21,662 Net Population Increase, From 2022 To 2031 (1,336) (1) Population and housing forecasts explicitly based on June 2011 Halton Best Planning Estimates. 2021 population estimate is net of institutional, which is estimated at 389. (2) Average number of persons per unit (ppu) is assumed to be: Persons % Distribution Weighted Persons Per Unit of Estimated Units Per Unit Average Single family & semi-detached 3.892 97% 3.785 Multiples except apartments 2.842 0% 0.000 Apartments 1.655 3% 0.045 Total 100% 3.830 (3) Decline occurs due to aging of the population and family life cycle changes, lower fertility rates and changing economic conditions. (4) Source: Unit mix derived from on Halton Region Best Planning Estimates, 2011. Forecast persons per unit by residential unit category based on 2016 Statistics Canada custom tabulation provided by dwelling type and dwelling age. 2031 Population derived from Halton Region Best Planning Estimates, 2011. Note: 2031 population estimate is net of institutional population, which is estimated at 381 Region of Halton 2022 DC Background Study A-12 Table A-6a Halton Region Anticipated Annual Residential Growth for the Period 2022 to 2031 (for General Services Development Charge Calculation) 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 2022-2031 Region Wide BPE: Incremental Total New Units 5,599 5,599 5,599 5,599 5,599 5,221 5,221 5,221 5,221 5,221 54,102 Adjusted for SDE Units (3.772 PPU) 4,070 4,070 4,070 4,070 4,070 4,103 4,103 4,103 4,103 4,103 40,864 Add Unit Shortfall1 13,712 1,376 1,376 - - 16,463 Less Prepaid 2 (9,711) (9,711) Less Over Allocated 3 (1,706) (1,706) (1,706) (5,119) Add Institutional Population Unit 52 52 52 52 52 52 52 52 52 52 520 Adjusted for SDE Units (3.772 PPU) 6,416 3,791 3,791 4,122 4,122 4,155 4,155 4,155 4,155 4,155 43,017 1 Represents shortfall in units against BPEs. 2 Represents pre-paid DCs under 2020 Allocation Agreement. 3 Represents oversubscription under 2020 Allocation Program. Note: Figures may not add precisely due to rounding. Region of Halton 2022 DC Background Study A-13 Table A-6b Halton Region Anticipated Annual Residential Growth for the Period 2022 to 2031 (For Roads Development Charge Calculation) Adjustments 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 2022-2031 Dwelling Units per BPE: Urban Units 5,904 5,582 5,582 5,582 5,582 5,207 5,207 5,207 5,207 5,207 54,265 Rural Units (305) 17 17 17 17 15 15 15 15 15 (163) Incremental Total New Units per BPE 5,599 5,599 5,599 5,599 5,599 5,221 5,221 5,221 5,221 5,221 54,102 Adjusted for SDE Units (3.772 PPU) 4,070 4,070 4,070 4,070 4,070 4,103 4,103 4,103 4,103 4,103 40,864 Add Unit Shortfall1 13,712 1,376 1,376 - - - - - - - 16,463 Less Prepaid Units2 (10,501) (790) (790) (12,081) Less Over Allocated3 (1,706) (1,706) (1,706) (5,119) Add Institutional Population Unit 52 52 52 52 52 52 52 52 52 52 520 Adjusted for SDE Units (3.772 PPU) 5,626 3,001 3,001 4,122 4,122 4,155 4,155 4,155 4,155 4,155 40,647 1 Represents shortfall in SDE's against BPEs. 2 Represents pre-paid DCs under 2020 Allocation Agreement, non-allocation SDE earmarked to finance the 2020 Allocation Program. 3 Represents oversubscription under 2020 Allocation Program. Note: Figures may not add precisely due to rounding. Region of Halton 2022 DC Background Study A-14 Table A-6c Halton Region Anticipated Annual Residential Growth for the Period 2022 to 2031 (for Water & Wastewater Development Charge Calculation) Adjustments 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 2022-2031 GREENFIELD AREA DC Calculation Incremental Total New Units per BPE 3,590 3,268 3,268 3,268 3,268 2,872 2,872 2,872 2,872 2,872 31,023 Adjusted for SDE Units (3.777 PPU) 3,185 2,862 2,862 2,862 2,862 2,589 2,589 2,589 2,589 2,589 27,577 Add Unit Shortfall 1 12,336 12,336 Less Prepaid Units 2 (12,336) (12,336) Less Over Allocated 3 (1,706) (1,706) (1,706) (5,119) Add Institutional Population Unit 30 26 26 26 26 24 24 24 24 24 254 Net Greenfield Area 1,509 1,181 1,181 2,888 2,888 2,613 2,613 2,613 2,613 2,613 22,712 BUILT BOUNDARY DC Calculation: Incremental Total New Units per BPE 2,314 2,314 2,314 2,314 2,314 2,334 2,334 2,334 2,334 2,334 23,242 Adjusted for SDE Units (3.750 PPU) 1,265 1,265 1,265 1,265 1,265 1,447 1,447 1,447 1,447 1,447 13,560 Add Unit Shortfall 1 790 790 790 2,370 Less Allocated 2020 Program 2 (790) (790) (790) (2,370) Add Institutional Population Unit 26 26 26 26 26 28 28 28 28 28 270 Net Built Boundary 1,291 1,291 1,291 1,291 1,291 1,475 1,475 1,475 1,475 1,475 13,830 TOTAL REGION 2,800 2,472 2,472 4,179 4,179 4,088 4,088 4,088 4,088 4,088 36,542 1 Represents shortfall in SDE's against BPEs 2 Represents pre-paid DC's under 2012 and 2020 Allocation Agreement 3 Represents oversubscription under 2020 Allocation Program 4 Represents SDE's earmarked to finance the 2020 Allocation Program Note: Figures may not add precisely due to rounding. Region of Halton 2022 DC Background Study A-15 APPENDIX A - PART 2 NON-RESIDENTIAL GROWTH FORECASTS 2. NON-RESIDENTIAL GROWTH FORECASTS Table A-7 summarizes the Halton Region BPE, 2011 employment forecast by major employment sector from 2022-2031 in five-year increments. Major employment sectors include industrial, commercial/population related, and institutional employment. Work at home (WAH) employment and no fixed place of work (NFPOW) employment have also been separately identified but excluded from the non-residential growth forecast when calculating the non-residential DC. Statistics Canada defines no fixed place of work (NFPOW) employees as "persons who do not go from home to the same work place location at the beginning of each shift". Such persons include building and landscape contractors, travelling salespersons, independent truck drivers, etc. The impact on municipal services from WAH employees has already been included in the population forecast. The need for municipal services related to NFPOW employees has largely been included in the employment forecast by usual place of work i.e. employment and total floor area (TFA) in the retail and accommodation sectors generated from NFPOW construction employment. Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential TFA calculation. For these reasons, work-at-home and NFPOW employment has been excluded from the capital needs. Over the 10-year forecast period, Halton Region's existing employment base is forecast to increase by approximately 62,300 employees, which represents an annual forecast employment growth rate of 1.8%. The largest share of employment growth within Halton Region is forecast in the industrial sector, which is anticipated to comprise approximately 37% of total forecasted employment growth from 2022-2031. The commercial sector also represents a large share of forecasted employment growth across Halton Region, comprising approximately 30% of total employment growth over the 15-year employment forecast. Based on a detailed review of the Halton Region 2021 employment base, it is estimated that the Halton Region employment base is approximately 46,400 employees below the 2021 employment estimate as per the Halton Region BPE, 2011. This employment shortfall is concentrated in the industrial sector, followed by the commercial sector, Region of Halton 2022 DC Background Study A-16 while the institutional sector is estimated to be collectively tracking above the Halton Region BPE, 2011 employment forecast. In order to estimate the percentage of industrial employment shortfall which is anticipated to occur in existing versus new industrial space, a review of recent industrial employment trends within existing industrial building as well as a review of recent industrial vacancy rate trends was undertaken. Based on this review, it is estimated that no industrial shortfall should be accommodated within existing industrial buildings over the 2022-2031 forecast period. The remaining 100% of the 2021 industrial employment shortfall is forecast to be accommodated in new industrial space. With respect to the commercial and institutional sectors, 100% of the employment shortfall/surplus has been applied to new commercial/institutional space. This non-residential shortfall has been adjusted for accordingly in the DC calculation (Table A-11a to Table A-11c). Figure A-2 graphs the anticipated annual increase in the amount of TFA over the forecast period. Historical annual non-residential building activity (2007-2020) is based on Halton Region non-residential building permit data. Forecast TFA by sector is a derived total based on the Halton Region BPE, 2011. The incremental TFA increase for the Halton Region is an additional 45.4 million sq.ft. over the 10-year period. Industrial construction is expected to comprise approximately 71% of the added TFA, while commercial and institutional are anticipated to comprise 17% and 12%, respectively. Table A-8 summarizes both employment growth and TFA for Halton Region annually from 2022-2031. TFA estimates are calculated in square feet, based on the following Region-wide employee density assumptions:  1,390 sq.ft. per employee for industrial;  400 sq.ft. per employee for commercial; and  740 sq.ft. per employee for institutional employment. Forecast assumptions regarding average sq.ft. per employee by major sector and municipality remain unchanged from the previous 2017 Development Charges Background Study, with the exception of the industrial density assumption for the Town of Milton. The Town of Milton industrial average sq. ft. per employee was reduced to account for a greater share of prestige industrial development identified within the Agerton Secondary Plan. The employee density assumptions above reflect a "bottom- up" approach to the forecast. For example, the average sq.ft. per employee for industrial development in the BUA (800 to 1,750) is lower than the DGA and Rural Areas (800 to 2,000). In part, this accounts for the steady forecast of new industrial construction along Region of Halton 2022 DC Background Study A-17 the Highway 401 corridor in the warehousing and distribution sector. Typically, the average number of sq.ft. per employee within the warehousing and distribution sector is much higher than the industrial average. The result of using this "bottom-up" approach is that the average number of sq.ft. per employee varies from year to year depending on the weighting of employment growth by local municipality. As previously discussed, over the 2022-2031 forecast period, a total of 45.4 million sq.ft. of non-residential TFA is forecasted to be added to Halton Region accordance with the Halton Region BPE, 2011 employment forecast and the above-referenced floor space per worker (FSW) assumptions by major sector. In addition, to the non-residential TFA forecast derived from the 2022-2031 BPE forecast, an additional 50.5 million sq.ft. of non-residential TFA is forecast, associated with the 2021 employment shortfall illustrated in Table A-10b. Lastly, 0.75 million sq.ft. of TFA has been removed from the institutional employment forecast to account for institutional space related to special care facilities, which have already been captured in the population forecast. Tables A-8a to A-8c provides similar information for Halton Region by DGA, BUA and Rural Area. Table A-9 provides the employment sectors in the Halton Region BPE forecast revised to the following sectors: retail; and non-retail (office and other employment). Retail and office employment have been disaggregated from the commercial/population-related total based on 2016 Census allocations of 73% retail and 27% office. It is reasonable to assume that over the forecast period a greater percentage of commercial development will shift towards the office sector due to increased market demand for office development, largely in Oakville and Burlington, in addition to the rise of e-commerce. Therefore, a gradual shift of commercial employees has been allocated to the office sector over the growth forecast period (i.e. retail employees are 69% of the commercial total in 2021, and decrease to 67% by 2031; based on the 2022-2031 increment, 55% is allocated to retail, and 45% is allocated to office). Based on the revised employment sectors, the largest share of employment growth within Halton Region is forecast in the industrial employment sector, which is anticipated to comprise approximately 37% of total forecast employment growth from 2022-2031. The institutional sector is forecast to comprise 12% of total forecast employment growth from 2022-2031. Table A-9a summarizes both employment growth and TFA for Halton Region annually from 2022-2031 based on the revised employment sectors (i.e. retail vs. non-retail). Region of Halton 2022 DC Background Study A-18  Retail - As per Table A-9a, the average sq.ft. per employee for retail is approximately 470 sq.ft. per employee. The assumptions by municipality remain unchanged from the previous 2017 Development Charges Background Study.  Non-retail - The average sq.ft. per employee for non-retail (i.e. office, industrial, and institutional) is approximately 1,040 sq.ft. per employee, which is the weighted average for all non-retail employment by usual place of work (i.e. industrial, office and institutional development). Retail construction is expected to comprise approximately 11% of the added TFA (45.4 million), while non-retail is anticipated to comprise 89%. Tables A-9b through A-9d provides similar information for Halton Region by DGA, BUA and Rural Area. Tables A-10a through A-10c provides total non-residential TFA used for DC Calculations. Adjustments have been made for the difference between the 2022 beginning balance based on the Halton Region BPE, 2011 and actual non-residential development. Further, adjustments have been made to the institutional TFA forecast due to special care/special needs (e.g. long term care development) being accounted for in residential growth. Region of Halton 2022 DC Background Study A-19 Table A-7 Halton Region Anticipated Annual Non-residential Growth for the Period 2022 to 2031 Year Commercial Industrial Institutional Work at Home No Fixed Place of Work Total Employment 2021 119,285 111,832 34,735 29,206 32,625 327,683 2026 126,611 121,511 39,853 31,945 35,789 355,709 2031 137,976 135,065 42,241 35,429 39,289 390,000 2022-2026 7,325 9,679 5,119 2,739 3,164 28,026 2022-2031 18,691 23,232 7,506 6,223 6,664 62,316 Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Employment Region of Halton 2022 DC Background Study A-20 Figure A-2 Halton Region Anticipated Annual Non-residential Growth for the Period 2022 to 2031 3.7 m 3.9 m 2.9 m 4.1 m 4.9 m Historical Average 3.5 m Forecast Average 4.5 m 0.0 1.0 2.0 3.0 4.0 5.0 6.0 2007-2011 2012-2016 2017-2021 2022-2026 2027-2031 Total Floor Area (millions in sq.ft.) Historical Forecast Source: 2007-2021 derived from Halton Region non-residential DC database data by Watson & Associates Economists Ltd. Forecast derived based on Halton Region Best Planning Estimates, June 2011. Region of Halton 2022 DC Background Study A-21 Table A-8 Halton Region - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Commercial Industrial Institutional Work at Home No Fixed Place of Work Total Employment Commercial Industrial Institutional Total Floor Area (TFA) 2021 119,285 111,832 34,735 29,206 32,625 327,683 4 8 ,6 05 ,7 5 2 1 06 ,9 3 1 ,1 7 0 1 7 ,5 1 3 ,7 3 8 1 7 3 ,0 5 0 ,6 6 0 2022 120,606 113,763 35,743 29,757 33,419 333,288 4 9 ,1 3 8 ,2 00 1 09 ,9 7 0,04 9 1 8 ,2 9 7 ,2 7 7 1 7 7 ,4 0 5 ,5 2 6 2023 122,107 115,700 36,771 30,304 34,012 338,894 4 9 ,7 4 9 ,8 07 1 1 2 ,6 3 0,5 2 5 1 9 ,09 6 ,3 1 2 1 8 1 ,4 7 6 ,6 4 3 2024 123,608 117,637 37,798 30,851 34,604 344,499 5 0,3 6 1 ,4 1 4 1 1 5 ,2 9 1 ,000 1 9 ,8 9 5 ,3 4 7 1 8 5 ,5 4 7 ,7 6 1 2025 125,110 119,574 38,826 31,398 35,197 350,104 5 0,9 7 3 ,02 0 1 1 7 ,9 5 1 ,4 7 6 2 0,6 9 4 ,3 8 3 1 8 9 ,6 1 8 ,8 7 9 2026 126,611 121,511 39,853 31,945 35,789 355,709 5 1 ,5 8 4 ,6 2 7 1 2 0,6 1 1 ,9 5 1 2 1 ,4 9 3 ,4 1 8 1 9 3 ,6 8 9 ,9 9 6 2027 128,884 124,222 40,331 32,642 36,489 362,567 5 2 ,4 9 5 ,1 4 4 1 2 4 ,3 3 1 ,1 2 1 2 1 ,8 07 ,9 9 4 1 9 8 ,6 3 4 ,2 5 9 2028 131,157 126,932 40,808 33,339 37,189 369,425 5 3 ,4 05 ,6 6 1 1 2 8 ,05 0,2 9 1 2 2 ,1 2 2 ,5 7 0 2 0 3 ,5 7 8 ,5 2 2 2029 133,430 129,643 41,286 34,035 37,889 376,283 5 4 ,3 1 6 ,1 7 9 1 3 1 ,7 6 9 ,4 6 0 2 2 ,4 3 7 ,1 4 6 2 0 8 ,5 2 2 ,7 8 5 2030 135,703 132,354 41,763 34,732 38,589 383,141 5 5 ,2 2 6 ,6 9 6 1 3 5 ,4 8 8 ,6 3 0 2 2 ,7 5 1 ,7 2 2 2 1 3 ,4 6 7 ,0 4 8 2031 137,976 135,065 42,241 35,429 39,289 390,000 5 6 ,1 3 7 ,2 1 3 1 3 9 ,2 07 ,7 9 9 2 3 ,06 6 ,2 9 8 2 1 8 ,4 1 1 ,3 1 1 2021-2022 1,321 1,931 1,009 552 794 5,605 532,448 3,038,879 783,539 4,354,866 2022-2023 1,501 1,937 1,028 547 593 5,605 611,607 2,660,476 799,035 4,071,118 2023-2024 1,501 1,937 1,028 547 593 5,605 611,607 2,660,476 799,035 4,071,118 2024-2025 1,501 1,937 1,028 547 593 5,605 611,607 2,660,476 799,035 4,071,118 2025-2026 1,501 1,937 1,028 547 593 5,605 611,607 2,660,476 799,035 4,071,118 2026-2027 2,273 2,711 477 697 700 6,858 910,517 3,719,170 314,576 4,944,263 2027-2028 2,273 2,711 477 697 700 6,858 910,517 3,719,170 314,576 4,944,263 2028-2029 2,273 2,711 477 697 700 6,858 910,517 3,719,170 314,576 4,944,263 2029-2030 2,273 2,711 477 697 700 6,858 910,517 3,719,170 314,576 4,944,263 2030-2031 2,273 2,711 477 697 700 6,858 910,517 3,719,170 314,576 4,944,263 2022-2031 18,691 23,232 7,506 6,223 6,664 62,316 7,531,461 32,276,629 5,552,561 45,360,650 Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Notes: Figures may not add precisely due to rounding. Sq.Ft. per Employee Assumptions (2022-2031): Commercial 403 Industrial 1,389 Institutional 740 Note: Average sq. ft. per employee varies on annual basis. Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Incremental Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-22 Table A-8a Halton Region (Built Boundary) - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Commercial Industrial Institutional Work at Home No Fixed Place of Work Total Employment Commercial Industrial Institutional Total Floor Area (TFA) 2021 96,201 88,466 26,662 22,949 25,904 260,181 3 8 ,4 8 0,2 8 5 9 0,9 7 1 ,5 4 3 1 3 ,8 05 ,1 9 5 1 4 3 ,2 5 7 ,0 2 2 2022 96,617 88,625 26,862 23,046 26,019 261,168 3 8 ,6 4 6 ,6 06 9 1 ,1 6 9 ,9 1 7 1 3 ,9 3 8 ,4 9 6 1 4 3 ,7 5 5 ,0 1 9 2023 97,032 88,784 27,062 23,143 26,134 262,155 3 8 ,8 1 2 ,9 2 7 9 1 ,3 6 8 ,2 9 1 1 4 ,07 1 ,7 9 8 1 4 4 ,2 5 3 ,0 1 6 2024 97,448 88,942 27,262 23,240 26,250 263,142 3 8 ,9 7 9 ,2 4 9 9 1 ,5 6 6 ,6 6 5 1 4 ,2 05 ,1 00 1 4 4 ,7 5 1 ,0 1 3 2025 97,864 89,101 27,462 23,338 26,365 264,129 3 9 ,1 4 5 ,5 7 0 9 1 ,7 6 5 ,03 9 1 4 ,3 3 8 ,4 01 1 4 5 ,2 4 9 ,0 1 0 2026 98,280 89,260 27,661 23,435 26,480 265,116 3 9 ,3 1 1 ,8 9 1 9 1 ,9 6 3 ,4 1 2 1 4 ,4 7 1 ,7 03 1 4 5 ,7 4 7 ,0 0 7 2027 98,862 89,871 27,854 23,603 26,662 266,851 3 9 ,5 4 4 ,9 8 4 9 2 ,7 6 1 ,2 7 8 1 4 ,5 7 0,3 2 8 1 4 6 ,8 7 6 ,5 8 9 2028 99,445 90,481 28,046 23,770 26,844 268,586 3 9 ,7 7 8 ,07 6 9 3 ,5 5 9 ,1 4 3 1 4 ,6 6 8 ,9 5 2 1 4 8 ,0 0 6 ,1 7 2 2029 100,028 91,092 28,238 23,938 27,025 270,321 4 0,01 1 ,1 6 9 9 4 ,3 5 7 ,008 1 4 ,7 6 7 ,5 7 7 1 4 9 ,1 3 5 ,7 5 4 2030 100,611 91,702 28,430 24,106 27,207 272,056 4 0,2 4 4 ,2 6 2 9 5 ,1 5 4 ,8 7 3 1 4 ,8 6 6 ,2 01 1 5 0 ,2 6 5 ,3 3 6 2031 101,193 92,313 28,622 24,274 27,389 273,791 4 0,4 7 7 ,3 5 5 9 5 ,9 5 2 ,7 3 8 1 4 ,9 6 4 ,8 2 6 1 5 1 ,3 9 4 ,9 1 9 2021-2022 416 159 200 97 115 987 166,321 198,374 133,302 497,997 2022-2023 416 159 200 97 115 987 166,321 198,374 133,302 497,997 2023-2024 416 159 200 97 115 987 166,321 198,374 133,302 497,997 2024-2025 416 159 200 97 115 987 166,321 198,374 133,302 497,997 2025-2026 416 159 200 97 115 987 166,321 198,374 133,302 497,997 2026-2027 583 610 192 168 182 1,735 233,093 797,865 98,625 1,129,582 2027-2028 583 610 192 168 182 1,735 233,093 797,865 98,625 1,129,582 2028-2029 583 610 192 168 182 1,735 233,093 797,865 98,625 1,129,582 2029-2030 583 610 192 168 182 1,735 233,093 797,865 98,625 1,129,582 2030-2031 583 610 192 168 182 1,735 233,093 797,865 98,625 1,129,582 2022-2031 4,993 3,847 1,960 1,325 1,485 13,610 1,997,070 4,981,196 1,159,631 8,137,897 Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Notes: Figures may not add precisely due to rounding. Sq.Ft. per Employee Assumptions (2022-2031): Commercial 400 Industrial 1,295 Institutional 592 Note: Average sq. ft. per employee varies on annual basis. Incremental Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-23 Table A-8b Halton Region (Greenfield Area) - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Commercial Industrial Institutional Work at Home No Fixed Place of Work Total Employment Commercial Industrial Institutional Total Floor Area (TFA) 2021 22,178 20,902 7,521 5,829 6,138 62,567 8 ,8 7 1 ,2 9 6 1 9 ,6 3 3 ,7 08 2 ,8 8 1 ,2 7 3 3 1 ,3 8 6 ,2 7 7 2022 23,094 22,952 8,338 6,313 6,860 67,558 9 ,2 3 7 ,4 2 2 2 2 ,4 7 4 ,2 1 3 3 ,5 3 1 ,5 1 0 3 5 ,2 4 3 ,1 4 5 2023 24,165 24,725 9,163 6,760 7,334 72,147 9 ,6 6 6 ,03 1 2 4 ,9 2 4 ,8 5 0 4 ,1 9 3 ,1 2 0 3 8 ,7 8 4 ,0 0 0 2024 25,237 26,497 9,987 7,207 7,808 76,736 1 0,09 4 ,6 3 9 2 7 ,3 7 5 ,4 8 7 4 ,8 5 4 ,7 3 0 4 2 ,3 2 4 ,8 5 6 2025 26,308 28,270 10,811 7,654 8,282 81,325 1 0,5 2 3 ,2 4 7 2 9 ,8 2 6 ,1 2 4 5 ,5 1 6 ,3 4 0 4 5 ,8 6 5 ,7 1 1 2026 27,380 30,042 11,635 8,100 8,756 85,913 1 0,9 5 1 ,8 5 6 3 2 ,2 7 6 ,7 6 1 6 ,1 7 7 ,9 5 0 4 9 ,4 0 6 ,5 6 6 2027 29,068 32,133 11,920 8,628 9,272 91,022 1 1 ,6 2 7 ,3 7 1 3 5 ,1 8 0,1 8 5 6 ,3 9 2 ,5 7 3 5 3 ,2 0 0 ,1 2 9 2028 30,757 34,225 12,204 9,156 9,789 96,130 1 2 ,3 02 ,8 8 6 3 8 ,08 3 ,6 1 0 6 ,6 07 ,1 9 7 5 6 ,9 9 3 ,6 9 2 2029 32,446 36,316 12,488 9,684 10,305 101,239 1 2 ,9 7 8 ,4 01 4 0,9 8 7 ,03 4 6 ,8 2 1 ,8 2 0 6 0 ,7 8 7 ,2 5 5 2030 34,135 38,407 12,772 10,212 10,822 106,348 1 3 ,6 5 3 ,9 1 6 4 3 ,8 9 0,4 5 8 7 ,03 6 ,4 4 4 6 4 ,5 8 0 ,8 1 8 2031 35,824 40,499 13,056 10,740 11,338 111,456 1 4 ,3 2 9 ,4 3 1 4 6 ,7 9 3 ,8 8 3 7 ,2 5 1 ,06 7 6 8 ,3 7 4 ,3 8 1 2021-2022 915 2,051 818 485 723 4,991 366,126 2,840,505 650,237 3,856,869 2022-2023 1,072 1,772 824 447 474 4,589 428,608 2,450,637 661,610 3,540,855 2023-2024 1,072 1,772 824 447 474 4,589 428,608 2,450,637 661,610 3,540,855 2024-2025 1,072 1,772 824 447 474 4,589 428,608 2,450,637 661,610 3,540,855 2025-2026 1,072 1,772 824 447 474 4,589 428,608 2,450,637 661,610 3,540,855 2026-2027 1,689 2,091 284 528 516 5,109 675,515 2,903,424 214,624 3,793,563 2027-2028 1,689 2,091 284 528 516 5,109 675,515 2,903,424 214,624 3,793,563 2028-2029 1,689 2,091 284 528 516 5,109 675,515 2,903,424 214,624 3,793,563 2029-2030 1,689 2,091 284 528 516 5,109 675,515 2,903,424 214,624 3,793,563 2030-2031 1,689 2,091 284 528 516 5,109 675,515 2,903,424 214,624 3,793,563 2022-2031 13,645 19,597 5,535 4,911 5,200 48,889 5,458,135 27,160,175 4,369,795 36,988,105 Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Notes: Figures may not add precisely due to rounding. Sq.Ft. per Employee Assumptions (2022-2031): Commercial 400 Industrial 1,386 Institutional 789 Note: Average sq. ft. per employee varies on annual basis. Incremental Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-24 Table A-8c Halton Region (Rural Area) - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Commercial Industrial Institutional Work at Home No Fixed Place of Work Total Employment Commercial Industrial Institutional Total Floor Area (TFA) 2021 906 2,465 551 428 584 4,935 1 ,2 5 4 ,1 7 2 (3 ,6 7 4 ,08 1 ) 8 2 7 ,2 7 0 (1 ,5 9 2 ,6 3 9 ) 2022 896 2,186 543 398 540 4,562 1 ,2 5 4 ,1 7 2 (3 ,6 7 4 ,08 1 ) 8 2 7 ,2 7 0 (1 ,5 9 2 ,6 3 9 ) 2023 910 2,191 546 401 543 4,591 1 ,2 7 0,8 4 9 (3 ,6 6 2 ,6 1 6 ) 8 3 1 ,3 9 4 (1 ,5 6 0 ,3 7 3 ) 2024 924 2,197 550 404 547 4,621 1 ,2 8 7 ,5 2 6 (3 ,6 5 1 ,1 5 1 ) 8 3 5 ,5 1 8 (1 ,5 2 8 ,1 0 7 ) 2025 938 2,203 553 407 550 4,650 1 ,3 04 ,2 03 (3 ,6 3 9 ,6 8 6 ) 8 3 9 ,6 4 2 (1 ,4 9 5 ,8 4 2 ) 2026 951 2,209 556 410 554 4,680 1 ,3 2 0,8 8 0 (3 ,6 2 8 ,2 2 2 ) 8 4 3 ,7 6 5 (1 ,4 6 3 ,5 7 6 ) 2027 953 2,218 558 411 555 4,694 1 ,3 2 2 ,7 9 0 (3 ,6 1 0,3 4 2 ) 8 4 5 ,09 3 (1 ,4 4 2 ,4 5 9 ) 2028 955 2,227 559 412 557 4,709 1 ,3 2 4 ,6 9 9 (3 ,5 9 2 ,4 6 2 ) 8 4 6 ,4 2 1 (1 ,4 2 1 ,3 4 2 ) 2029 956 2,235 560 413 559 4,723 1 ,3 2 6 ,6 09 (3 ,5 7 4 ,5 8 2 ) 8 4 7 ,7 4 9 (1 ,4 0 0 ,2 2 4 ) 2030 958 2,244 561 415 560 4,738 1 ,3 2 8 ,5 1 8 (3 ,5 5 6 ,7 02 ) 8 4 9 ,07 7 (1 ,3 7 9 ,1 0 7 ) 2031 959 2,253 562 416 562 4,753 1 ,3 3 0,4 2 8 (3 ,5 3 8 ,8 2 2 ) 8 5 0,4 05 (1 ,3 5 7 ,9 8 9 ) 2021-2022 (11) (279) (9) (31) (44) (373) - - - - 2022-2023 14 6 3 3 3 29 16,677 11,465 4,124 32,266 2023-2024 14 6 3 3 3 29 16,677 11,465 4,124 32,266 2024-2025 14 6 3 3 3 29 16,677 11,465 4,124 32,266 2025-2026 14 6 3 3 3 29 16,677 11,465 4,124 32,266 2026-2027 2 9 1 1 2 15 1,909 17,880 1,328 21,117 2027-2028 2 9 1 1 2 15 1,909 17,880 1,328 21,117 2028-2029 2 9 1 1 2 15 1,909 17,880 1,328 21,117 2029-2030 2 9 1 1 2 15 1,909 17,880 1,328 21,117 2030-2031 2 9 1 1 2 15 1,909 17,880 1,328 21,117 2022-2031 53 (211) 10 (13) (22) (182) 76,256 135,259 23,135 234,649 Notes: Figures may not add precisely due to rounding. Industrial FSW for rural employment has not been calculated herein due to decline in industrial employment from 2022-2031. Sq.Ft. per Employee Assumptions (2022-2031): Commercial 1,439 Institutional 2,213 Note: Average sq. ft. per employee varies on annual basis. Incremental Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-25 Table A-9 Halton Region - Summary of Employment Growth Forecast by Retail and Non-Retail, 2022 to 2031 Retail Non-Retail Work @ Home No Fixed Place of Work Total Employment 2021 81,762 184,090 29,206 32,625 327,683 2026 86,036 201,939 31,945 35,789 355,709 2031 92,084 223,198 35,429 39,289 390,000 2022-2026 4,274 17,849 2,739 3,164 28,026 2022-2031 10,321 39,108 6,223 6,664 62,316 Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Year Employment Region of Halton 2022 DC Background Study A-26 Table A-9a Halton Region - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Retail Non-Retail Work @ Home No Fixed Place of Work Total Employment Retail Non-Retail Total Floor Area (TFA) 2021 81,762 184,090 29,206 32,625 327,683 3 7 ,2 8 4 ,7 00 1 3 5 ,7 6 5 ,9 6 0 1 7 3 ,0 5 0 ,6 6 0 2022 82,523 187,589 29,757 33,419 333,288 3 7 ,6 3 4 ,3 3 3 1 3 9 ,7 7 1 ,1 9 2 1 7 7 ,4 0 5 ,5 2 6 2023 83,407 191,170 30,304 34,012 338,894 3 8 ,04 5 ,3 5 1 1 4 3 ,4 3 1 ,2 9 3 1 8 1 ,4 7 6 ,6 4 3 2024 84,287 194,756 30,851 34,604 344,499 3 8 ,4 5 5 ,1 05 1 4 7 ,09 2 ,6 5 6 1 8 5 ,5 4 7 ,7 6 1 2025 85,164 198,346 31,398 35,197 350,104 3 8 ,8 6 3 ,5 9 7 1 5 0,7 5 5 ,2 8 1 1 8 9 ,6 1 8 ,8 7 9 2026 86,036 201,939 31,945 35,789 355,709 3 9 ,2 7 0,8 2 7 1 5 4 ,4 1 9 ,1 6 9 1 9 3 ,6 8 9 ,9 9 6 2027 87,269 206,167 32,642 36,489 362,567 3 9 ,8 4 3 ,3 5 8 1 5 8 ,7 9 0,9 02 1 9 8 ,6 3 4 ,2 5 9 2028 88,491 210,407 33,339 37,189 369,425 4 0,4 1 2 ,04 8 1 6 3 ,1 6 6 ,4 7 4 2 0 3 ,5 7 8 ,5 2 2 2029 89,700 214,659 34,035 37,889 376,283 4 0,9 7 6 ,8 9 8 1 6 7 ,5 4 5 ,8 8 7 2 0 8 ,5 2 2 ,7 8 5 2030 90,898 218,922 34,732 38,589 383,141 4 1 ,5 3 7 ,9 08 1 7 1 ,9 2 9 ,1 4 0 2 1 3 ,4 6 7 ,0 4 8 2031 92,084 223,198 35,429 39,289 390,000 4 2 ,09 5 ,07 8 1 7 6 ,3 1 6 ,2 3 3 2 1 8 ,4 1 1 ,3 1 1 2021-2022 761 3,499 552 794 5,605 349,633 4,005,233 4,354,866 2022-2023 884 3,582 547 593 5,605 411,017 3,660,100 4,071,118 2023-2024 880 3,586 547 593 5,605 409,755 3,661,363 4,071,118 2024-2025 876 3,590 547 593 5,605 408,492 3,662,626 4,071,118 2025-2026 872 3,593 547 593 5,605 407,229 3,663,888 4,071,118 2026-2027 1,233 4,228 697 700 6,858 572,531 4,371,732 4,944,263 2027-2028 1,221 4,240 697 700 6,858 568,690 4,375,572 4,944,263 2028-2029 1,210 4,252 697 700 6,858 564,850 4,379,413 4,944,263 2029-2030 1,198 4,264 697 700 6,858 561,010 4,383,253 4,944,263 2030-2031 1,186 4,275 697 700 6,858 557,170 4,387,093 4,944,263 2022-2031 10,321 39,108 6,223 6,664 62,316 4,810,378 40,550,273 45,360,650 Notes: Figures may not add precisely due to rounding. Sq.Ft. per Employee Assumptions (2022-2031): Retail 466 Non-Retail 1,037 Note: Average sq. ft. per employee varies on annual basis. Employment TFA Estimate (Sq.Ft.) Incremental Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Region of Halton 2022 DC Background Study A-27 Table A-9b Halton Region (Built Boundary) - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Retail Non-Retail Work @ Home No Fixed Place of Work Total Employment Retail Non-Retail Total Floor Area (TFA) 2021 65,636 145,692 22,949 25,904 260,181 2 9 ,5 8 1 ,7 1 8 1 1 3 ,6 7 5 ,3 04 1 4 3 ,2 5 7 ,0 2 2 2022 65,794 146,309 23,046 26,019 261,168 2 9 ,6 6 4 ,2 8 4 1 1 4 ,09 0,7 3 5 1 4 3 ,7 5 5 ,0 1 9 2023 65,951 146,926 23,143 26,134 262,155 2 9 ,7 4 6 ,4 9 9 1 1 4 ,5 06 ,5 1 7 1 4 4 ,2 5 3 ,0 1 6 2024 66,107 147,545 23,240 26,250 263,142 2 9 ,8 2 8 ,3 6 3 1 1 4 ,9 2 2 ,6 5 0 1 4 4 ,7 5 1 ,0 1 3 2025 66,262 148,165 23,338 26,365 264,129 2 9 ,9 09 ,8 7 5 1 1 5 ,3 3 9 ,1 3 5 1 4 5 ,2 4 9 ,0 1 0 2026 66,416 148,786 23,435 26,480 265,116 2 9 ,9 9 1 ,03 5 1 1 5 ,7 5 5 ,9 7 1 1 4 5 ,7 4 7 ,0 0 7 2027 66,553 150,034 23,603 26,662 266,851 3 0,07 9 ,1 8 7 1 1 6 ,7 9 7 ,4 02 1 4 6 ,8 7 6 ,5 8 9 2028 66,686 151,286 23,770 26,844 268,586 3 0,1 6 6 ,3 5 4 1 1 7 ,8 3 9 ,8 1 8 1 4 8 ,0 0 6 ,1 7 2 2029 66,817 152,540 23,938 27,025 270,321 3 0,2 5 2 ,5 3 6 1 1 8 ,8 8 3 ,2 1 8 1 4 9 ,1 3 5 ,7 5 4 2030 66,945 153,798 24,106 27,207 272,056 3 0,3 3 7 ,7 3 3 1 1 9 ,9 2 7 ,6 03 1 5 0 ,2 6 5 ,3 3 6 2031 67,070 155,059 24,274 27,389 273,791 3 0,4 2 1 ,9 4 5 1 2 0,9 7 2 ,9 7 3 1 5 1 ,3 9 4 ,9 1 9 2021-2022 158 616 97 115 987 82,566 415,431 497,997 2022-2023 157 618 97 115 987 82,215 415,782 497,997 2023-2024 156 619 97 115 987 81,863 416,134 497,997 2024-2025 155 620 97 115 987 81,512 416,485 497,997 2025-2026 154 621 97 115 987 81,161 416,836 497,997 2026-2027 137 1,249 168 182 1,735 88,152 1,041,431 1,129,582 2027-2028 134 1,252 168 182 1,735 87,167 1,042,416 1,129,582 2028-2029 131 1,255 168 182 1,735 86,182 1,043,400 1,129,582 2029-2030 128 1,258 168 182 1,735 85,197 1,044,385 1,129,582 2030-2031 125 1,261 168 182 1,735 84,212 1,045,370 1,129,582 2022-2031 1,433 9,367 1,325 1,485 13,610 840,227 7,297,670 8,137,897 Notes: Figures may not add precisely due to rounding. Sq.Ft. per Employee Assumptions (2022-2031): Retail 586 Non-Retail 779 Note: Average sq. ft. per employee varies on annual basis. Incremental Source: 2021-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011 Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-28 Table A-9c Halton Region (Greenfield Area) - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Retail Non-Retail Work @ Home No Fixed Place of Work Total Employment Retail Non-Retail Total Floor Area (TFA) 2021 15,520 35,080 5,829 6,138 62,567 6 ,7 9 5 ,9 3 1 2 4 ,5 9 0,3 4 5 3 1 ,3 8 6 ,2 7 7 2022 16,131 38,253 6,313 6,860 67,558 7 ,06 2 ,9 9 8 2 8 ,1 8 0,1 4 7 3 5 ,2 4 3 ,1 4 5 2023 16,848 41,205 6,760 7,334 72,147 7 ,3 7 6 ,4 01 3 1 ,4 07 ,5 9 9 3 8 ,7 8 4 ,000 2024 17,562 44,158 7,207 7,808 76,736 7 ,6 8 8 ,8 9 9 3 4 ,6 3 5 ,9 5 6 4 2 ,3 2 4 ,8 5 6 2025 18,274 47,115 7,654 8,282 81,325 8 ,000,4 9 2 3 7 ,8 6 5 ,2 1 9 4 5 ,8 6 5 ,7 1 1 2026 18,982 50,075 8,100 8,756 85,913 8 ,3 1 1 ,1 7 9 4 1 ,09 5 ,3 8 7 4 9 ,4 06 ,5 6 6 2027 20,078 53,044 8,628 9,272 91,022 8 ,7 9 3 ,7 9 7 4 4 ,4 06 ,3 3 2 5 3 ,2 00,1 2 9 2028 21,164 56,021 9,156 9,789 96,130 9 ,2 7 3 ,5 6 2 4 7 ,7 2 0,1 3 0 5 6 ,9 9 3 ,6 9 2 2029 22,242 59,008 9,684 10,305 101,239 9 ,7 5 0,4 7 2 5 1 ,03 6 ,7 8 3 6 0,7 8 7 ,2 5 5 2030 23,311 62,003 10,212 10,822 106,348 1 0,2 2 4 ,5 2 8 5 4 ,3 5 6 ,2 9 0 6 4 ,5 8 0,8 1 8 2031 24,371 65,008 10,740 11,338 111,456 1 0,6 9 5 ,7 3 1 5 7 ,6 7 8 ,6 5 1 6 8 ,3 7 4 ,3 8 1 2021-2022 611 3,173 485 723 4,991 267,067 3,589,802 3,856,869 2022-2023 717 2,951 447 474 4,589 313,403 3,227,452 3,540,855 2023-2024 714 2,954 447 474 4,589 312,498 3,228,357 3,540,855 2024-2025 711 2,957 447 474 4,589 311,592 3,229,263 3,540,855 2025-2026 709 2,959 447 474 4,589 310,687 3,230,168 3,540,855 2026-2027 1,095 2,969 528 516 5,109 482,619 3,310,945 3,793,563 2027-2028 1,086 2,978 528 516 5,109 479,764 3,313,799 3,793,563 2028-2029 1,078 2,987 528 516 5,109 476,910 3,316,653 3,793,563 2029-2030 1,069 2,995 528 516 5,109 474,056 3,319,507 3,793,563 2030-2031 1,060 3,004 528 516 5,109 471,202 3,322,361 3,793,563 2022-2031 8,850 29,927 4,911 5,200 48,889 3,899,799 33,088,305 36,988,105 Notes: Figures may not add precisely due to rounding. Sq.Ft. per Employee Assumptions (2022-2031): Retail 441 = Non-retail 1,106 = Note: Average sq. ft. per employee varies on annual basis. Incremental Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Source: 2016-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011 Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-29 Table A-9d Halton Region (Rural Intensification Areas) - Employment/Total Floor Area Forecast, 2022 to 2031 Cumulative Year Retail Non-Retail Work @ Home No Fixed Place of Work Total Employment Retail Non-Retail Total Floor Area (TFA) 2021 606 3,317 428 584 4,935 9 07 ,05 1 (2 ,4 9 9 ,6 8 9 ) (1 ,5 9 2 ,6 3 9 ) 2022 598 3,026 398 540 4,562 9 07 ,05 1 (2 ,4 9 9 ,6 8 9 ) (1 ,5 9 2 ,6 3 9 ) 2023 608 3,039 401 543 4,591 9 2 2 ,4 5 0 (2 ,4 8 2 ,8 2 3 ) (1 ,5 6 0,3 7 3 ) 2024 618 3,053 404 547 4,621 9 3 7 ,8 4 4 (2 ,4 6 5 ,9 5 1 ) (1 ,5 2 8 ,1 07 ) 2025 628 3,066 407 550 4,650 9 5 3 ,2 3 1 (2 ,4 4 9 ,07 3 ) (1 ,4 9 5 ,8 4 2 ) 2026 638 3,079 410 554 4,680 9 6 8 ,6 1 3 (2 ,4 3 2 ,1 8 9 ) (1 ,4 6 3 ,5 7 6 ) 2027 639 3,089 411 555 4,694 9 7 0,3 7 3 (2 ,4 1 2 ,8 3 2 ) (1 ,4 4 2 ,4 5 9 ) 2028 640 3,100 412 557 4,709 9 7 2 ,1 3 3 (2 ,3 9 3 ,4 7 4 ) (1 ,4 2 1 ,3 4 2 ) 2029 641 3,110 413 559 4,723 9 7 3 ,8 9 0 (2 ,3 7 4 ,1 1 5 ) (1 ,4 00,2 2 4 ) 2030 642 3,121 415 560 4,738 9 7 5 ,6 4 7 (2 ,3 5 4 ,7 5 4 ) (1 ,3 7 9 ,1 07 ) 2031 643 3,131 416 562 4,753 9 7 7 ,4 02 (2 ,3 3 5 ,3 9 1 ) (1 ,3 5 7 ,9 8 9 ) 2021-2022 (8) (291) (31) (44) (373) - - - 2022-2023 10 13 3 3 29 15,399 16,866 32,266 2023-2024 10 13 3 3 29 15,394 16,872 32,266 2024-2025 10 13 3 3 29 15,388 16,878 32,266 2025-2026 10 13 3 3 29 15,382 16,884 32,266 2026-2027 1 11 1 2 15 1,760 19,357 21,117 2027-2028 1 11 1 2 15 1,759 19,358 21,117 2028-2029 1 11 1 2 15 1,758 19,360 21,117 2029-2030 1 11 1 2 15 1,756 19,361 21,117 2030-2031 1 11 1 2 15 1,755 19,362 21,117 2022-2031 38 (186) (13) (22) (182) 70,351 164,298 234,649 Notes: Figures may not add precisely due to rounding. Non-retail FSW for rural employment has not been calculated herein due to decline in non-retail employment from 2022-2031. Sq.Ft. per Employee Assumptions (2022-2031): Retail 1,862 = Note: Average sq. ft. per employee varies on annual basis. Incremental Adjustments by employment sector have been made to account for Work at Home and No Fixed Place of Work Employment. Source: 2017-2031 employment derived explicitly from the Halton Region Best Planning Estimates, 2011. Employment TFA Estimate (Sq.Ft.) Region of Halton 2022 DC Background Study A-30 Table A-10a Halton Region Anticipated Annual Non-Residential Growth for the Period, 2022 to 2031 (for General Services Development Charge Calculation) Table A-10b Halton Region Anticipated Annual Non-Residential Growth for the Period, 2022 to 2031 (for Police and Roads Development Charge Calculation) Table A-10b Halton Region Anticipated Annual Non-Residential Growth for the Period, 2022 to 2031 (for Water& Wastewater Development Charge Calculation) 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 2022-2031 Incremental Total Sq.ft. per BPE 4,354,866 4,071,118 4,071,118 4,071,118 4,071,118 4,944,263 4,944,263 4,944,263 4,944,263 4,944,263 45,360,650 Less Institutional Population Related Sq.ft. (100,310) (102,201) (102,201) (102,201) (102,201) (47,490) (47,490) (47,490) (47,490) (47,490) (746,564) Total 4,254,555 3,968,917 3,968,917 3,968,917 3,968,917 4,896,773 4,896,773 4,896,773 4,896,773 4,896,773 44,614,086 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 2022-2031 Incremental Total Sq.ft. per BPE 4,354,866 4,071,118 4,071,118 4,071,118 4,071,118 4,944,263 4,944,263 4,944,263 4,944,263 4,944,263 45,360,650 Add Sq.ft. Shortfall 10,100,331 10,100,331 10,100,331 10,100,331 10,100,333 50,501,657 Less Institutional Population Related Sq.ft. (100,310) (102,201) (102,201) (102,201) (102,201) (47,490) (47,490) (47,490) (47,490) (47,490) (746,564) Total 4,254,555 3,968,917 3,968,917 3,968,917 3,968,917 14,997,104 14,997,104 14,997,104 14,997,104 14,997,106 95,115,744 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total 2022-2031 GREENFIELD AREA Incremental Total Sq.ft. per BPE 3,856,869 3,540,855 3,540,855 3,540,855 3,540,855 3,793,563 3,793,563 3,793,563 3,793,563 3,793,563 36,988,105 Add Sq.ft. Shortfall 5,535,578 5,535,578 5,535,578 5,535,578 5,535,580 27,677,892 Less Institutional Population Related Sq.ft. (49,697) (46,733) (46,861) (47,010) (47,150) (30,395) (30,088) (29,800) (29,520) (29,254) (386,507) Net Greenfied Area 3,807,172 3,494,122 3,493,994 3,493,846 3,493,705 9,298,746 9,299,053 9,299,342 9,299,621 9,299,889 64,279,489 BUILT BOUNDARY Incremental Total Sq.ft. per BPE 497,997 497,997 497,997 497,997 497,997 1,129,582 1,129,582 1,129,582 1,129,582 1,129,582 8,137,897 Add Sq.ft. Shortfall 4,564,753 4,564,753 4,564,753 4,564,753 4,564,754 22,823,766 Less Institutional Population Related Sq.ft. (50,614) (55,468) (55,340) (55,192) (55,051) (17,095) (17,402) (17,690) (17,970) (18,236) (360,057) Net Built Boundary 447,383 442,529 442,657 442,805 442,946 5,677,241 5,676,933 5,676,645 5,676,365 5,676,100 30,601,605 Total Region 4,254,555 3,936,651 3,936,651 3,936,651 3,936,651 14,975,987 14,975,987 14,975,987 14,975,987 14,975,989 94,881,095 Region of Halton 2022 DC Background Study B-1 Appendix B The 2022-2031 Water and Wastewater Servicing Program and Development Charge Recoverable Costs Region of Halton 2022 DC Background Study B-1 Appendix B: The 2022-2031 Water and Wastewater Servicing Program and Development Charge Recoverable Cost This Appendix discusses the water and wastewater servicing program and related DC recoverable costs included in this Study. Part 1 of this Appendix provides an overview of the 2022-2031 water and wastewater servicing program as set out in the proposed Water and Wastewater 2022 Capital Budget and the "2022 Development Charges Update Water/Wastewater Technical Report" dated September 2021 (Technical Report). Part 2 of this Appendix outlines the basis for allocating the related benefits for the purposes of DC calculations. Part 3 of this Appendix sets out the detailed 2023-2031 water and wastewater servicing program, including project descriptions, project cost, project-specific deductions for post-period benefit (oversizing) and benefit to existing development, and cost allocations for residential/non-residential benefit and Greenfield/Built Boundary. Region of Halton 2022 DC Background Study B-2 Appendix B - Part 1 Overview of Water and Wastewater Servicing Program (2022-2031) Region of Halton 2022 DC Background Study B-3 1. OVERVIEW OF WATER AND WASTEWATER SERVICING PROGRAM (2022-2031) As part of the 2022 DC update process, a Technical Report has been prepared by GM BluePlan Engineering Limited which provides the basis for the development of costs and implementation timing of water and wastewater projects required to service population and employment growth in Halton Region between 2022 and 2031 according to the 2011 BPEs. The project costs and implementation timing set out in the Technical Report are based on work undertaken as part of the Sustainable Halton Water and Wastewater Master Plan, 2012 DC Update Technical Report and the 2017 DC Update Technical Report as well as:  Updated information related to the current capacities of water and wastewater facilities  Updates to the water and wastewater hydraulic models  Recent construction costs and trends  Updated studies and technical reviews. This report identifies Halton's water and wastewater infrastructure requirements to service anticipated growth during the period between 2023 and 2031 (Appendix B - Parts 1 & 3), and establishes the basis for allocating the related benefits for the purpose of DC calculations (Appendix B - Part 2). An appropriate deduction has also been made from the capital expenditure program for capacity to service development anticipated post 2031. It should be noted that the water and wastewater capital program excludes projects that will be approved in the 2022 Capital Budget as these are subject to an approved financing plan, and any projected funding shortfall will be included in the reserve balances or unfunded capital. The estimated cost of the water and wastewater capital program totals to $1.17 billion between 2023 and 2031 (in 2022$). The following summarizes the water and wastewater servicing program set out in the Technical Report, with detailed projects shown in Maps B-1 and B-2. Region of Halton 2022 DC Background Study B-4 1.1. 2023-2031 Water Capital Program 1.1.1. Milton Water Servicing  Milton lake-based service area includes areas outside the Milton Core groundwater service area. The lake-based service area consists of new Zones TWL=267m, TWL=250 m and a portion of new Zone TWL 223.5 m.  Water supply to this service area is via the existing lake-based water purification plants (WPPs), (Burlington, Oakville, Burloak) and is pumped through the existing booster pumping stations (BPSs) and reservoirs to Milton.  The existing groundwater service area (Zone M5G) is expected to remain on groundwater through 2031. The next Water and Wastewater Master Plan will establish a long-term water servicing strategy for the Town of Milton. Components of the servicing strategy include:  Upgrades within Burlington and Oakville to supply water to the north.  Sub-trunk distribution network within Milton Greenfield growth including areas along Trafalgar corridor, south of Britannia and Tremaine Road.  Local infrastructure upgrades within the Milton Core to meet demand projections and fire flow needs related to intensification growth. 1.1.2. Oakville Water Servicing  North Oakville east of Sixteen Mile Creek will ultimately lie within Zone TWL=223.5m (with a small area within Zone TWL=250m) and will be predominantly serviced by the Oakville supply system with supplemental flow from Burloak/Burlington WPPs into the transmission network.  North Oakville west of Sixteen Mile Creek lies within existing Zone O3 and will be serviced via Zone O3 pumping from Oakville (Kitchen Zone O3 BPS) and Burlington (Washburn and Appleby Zone B3 BPSs) via Dundas Street crossing.  Oakville (Central Area) is generally located east of Bronte Creek and South of Dundas Street. These lands are serviced by Zones O1, O2 and parts of O3 and will continue to be serviced by the Oakville supply system. Components of the servicing strategy include:  Burloak WPP expansion to provide additional treated water supply for growth - common to all lakebased service areas experiencing growth. Region of Halton 2022 DC Background Study B-5  Sub-trunk distribution network within North Oakville Greenfield growth area.  Modifications to the Burnhamthorpe Water Tower.  Zone O2 interconnection along Wyecroft Road  Kitchen Zone O3 BPS expansion. 1.1.3. Burlington Water Servicing  The Burlington water servicing areas is within Zones B1 to B5 and B1A, generally south of the Hwy 407 and Dundas Street.  Water supply is provided mainly from the Burlington WPP through existing transmission watermains, BPSs and reservoirs in the Burlington system. Components of the servicing strategy include:  Trunk linear and BPS infrastructure in east Burlington.  Local infrastructure upgrades to meet demand projections and fire flow needs related to intensification growth. 1.1.4. North Aldershot Water Servicing  The North Aldershot Policy Area is located in the City of Burlington and occupies a portion of Zone B2 and Zones B3B, B4A, and B5A. Due to topography this area requires servicing via several pressure zones.  The North Aldershot water system is currently supplied by the City of Hamilton through an interconnection to their distribution system on Waterdown Road.  Currently, transmission, pumping and storage upgrades are recommended; however, this area will require a separate study to refine infrastructure upgrades. 1.1.5. Georgetown Water Servicing  Provide new lake-based water supply to new Greenfield growth area in southwest Georgetown as well as transfer South Georgetown and Stewarttown to lake-based supply. This will enable the groundwater system to remain within sustainable yields.  New lake-based pressure zone, Zone G6L, to be introduced.  Lake-based water supply will be from the existing lake-based WPPs and will be pumped through the existing BPSs and reservoirs throughout the distribution system.  Water treatment capacity provisions for Norval and Glen Williams (currently only parts of these areas are serviced). Region of Halton 2022 DC Background Study B-6 Components of the servicing strategy include:  Upgrades within Burlington, Oakville and Milton to supply water to the north.  Trafalgar Road Zone 6 Feedermains and sub-trunk distribution network within south Georgetown.  New Zone 6 Reservoir at 22nd Side Road.  Local infrastructure upgrades to meet demand projections and fire flow needs related to intensification growth. 1.1.6. Acton Water Servicing  Acton is supplied by local groundwater wells and operates under a single pressure zone, Zone A9G.  Increase transmission redundancy from the Third Line Reservoir. Components of the servicing strategy include:  Transmission watermains on No. 32 Side Road and Regional Road 25 to support growth. 1.2. 2023-2031 Wastewater Capital Program 1.2.1. Milton Wastewater Servicing  The wastewater strategy for Milton is to maintain conveyance to the Mid-Halton Wastewater Treatment Plant (WWTP) via the existing Boyne Trunk wastewater main and various Wastewater Pumping Stations (WWPSs).  Milton Greenfield growth will be serviced by various new trunk wastewater mains and WWPSs to convey flows to the Mid-Halton WWTP. Components of the servicing strategy include:  South Tremaine WWPS and Forcemain - servicing areas generally west of Regional Road 25 and south of Britannia Road, including Milton Education Village.  Trunk wastewater main infrastructure along Fifth Line and Lower Baseline.  Lower Baseline WWPS and Forcemains - servicing growth areas in Georgetown, Halton Hills 401 Corridor and Milton (Trafalgar Corridor and south of Britannia Road). Region of Halton 2022 DC Background Study B-7  Local infrastructure upgrades to meet flow projections related to intensification growth. 1.2.2. Oakville Wastewater Servicing  The wastewater strategy for Oakville is to maintain conveyance to the existing WWTPs within the Town.  Greenfield growth will be directed to the Mid-Halton WWTP.  Oakville Urban Growth Centre (UGC), which is anticipated to experience intensification growth will be serviced by the Rebecca Trunk wastewater main, which ultimately outlets to the Oakville Southwest WWTP. Components of the servicing strategy include:  Mid-Halton WWTP and North WWPS expansion to provide additional capacity for growth - common to all lake-based service areas in Milton and Georgetown experiencing growth.  Local WWPS and linear infrastructure upgrades through intensification program to meet flow projections related to intensification growth 1.2.3. Burlington Wastewater Servicing  The wastewater strategy for Burlington is to maintain conveyance to the Skyway WWTP via existing trunk wastewater mains and WWPSs throughout the City.  Growth flows within the Skyway WWTP catchment area are predominantly generated by intensification growth. Components of the servicing strategy include:  Trunk wastewater main upgrades parallel to the QEW just upstream of the Skyway WWTP.  Junction Street WWPS Capacity Upgrades. 1.2.4. North Aldershot Wastewater Servicing  The North Aldershot Policy Area is located in the City of Burlington.  The North Aldershot wastewater system is located in the service area of the Skyway WWTP in Burlington. The system is currently servicing the Bridgeview Area and lower portions of Waterdown Road and the East sector. Region of Halton 2022 DC Background Study B-8  Currently, new gravity wastewater mains are identified to service the area; however, this area will require a separate study to further refine these infrastructure upgrades. 1.2.5. Georgetown Wastewater Servicing  Georgetown is currently serviced exclusively by the stream-based Georgetown WWTP.  Upon completion of the lake-based trunk wastewater main infrastructure, the Georgetown WWTP will be decommissioned, and the service areas can be transferred to the Mid-Halton WWTP catchment area.  New Greenfield growth areas in southwest Georgetown will be serviced by the lake-based trunk wastewater main infrastructure. Components of this servicing strategy include:  New WWPS and forcemain to pump flows from Greenfield growth areas in southeast Georgetown.  Decommissioning of the Georgetown WWTP.  Lake-based infrastructure: trunk wastewater mains, WWPSs and forcemains along Fifth Line and Lower Base Line. 1.2.6. Acton Wastewater Servicing  The Wastewater strategy for Acton is to maintain conveyance to the Acton WWTP via existing and upgraded trunk wastewater mains and WWPSs. Components of this servicing strategy include:  Service updates at the Agnes Street WWPS and Black Creek wastewater mains. Region of Halton 2022 DC Background Study B-9 Map B-1 Water Development Capital Implementation Plan (2023-2031) Map B-2 Wastewater Development Capital Implementation Plan (2023-2031) Region of Halton 2022 DC Background Study B-10 Region of Halton 2022 DC Background Study B-11 APPENDIX B - PART 2 WATER AND WASTEWATER DC CALCULATION ASSUMPTIONS Region of Halton 2022 DC Background Study B-12 2. WATER AND WASTEWATER DC CALCULATION ASSUMPTIONS This section of Appendix B includes excerpts from GM BluePlan Engineering Limited's Technical Report that established DCA mandated assumptions for the DC calculation. Assuming local services are factored out, the statutory requirements of the calculation include:  the Level of Service being provided;  the Non-Growth or Benefit to Existing Development Deduction;  the Post-Period Benefit or Oversizing Deduction;  the Residential/Non-Residential Split; In addition, this section outlines the methodology followed to allocate project costs between the Greenfield and Built Boundary areas, in order to present area specific DC calculations in this Study. 2.1. Level of Service The 2022 DC Update Technical Report water demand criteria and the wastewater flow criteria remains consistent with the criteria developed by Halton Region for the 2017 DC Update Technical Report. The water demand and design criteria for system components are summarized in Table B-1 and Table B-2 respectively. Water demand from existing serviced areas is calculated from measured data. Table B-1 Water Demand Criteria L/cap/d* Residential 265 L/emp/d** Employment 225 Max Day Peaking Factor Peak Hour Peaking Factor Lake-Based Oakville, Burlington, Milton, Georgetown 1.9 3 Groundwater Based Milton, Georgetown, Acton 1.6 3 * Litres per capita per day ** Litres per employee per day Average Day Water Design Criteria Max Day and Peak Hour Water Design Criteria Region of Halton 2022 DC Background Study B-13 For areas with sufficient storage volume, the water supply requirements are based on Maximum Day Demands (MDD), while areas without sufficient storage base their water supply requirements on Peak Hour Demands (PHD). Water system capacity needs were developed on the considerations summarized in Table B-2. Table B-2 Water Design Criteria for System Components The wastewater system flow criteria for WWTPs and for system components are summarized in Table B-3. Wastewater generation from existing serviced areas is calculated from measured data. Component Condition / Description Design Criteria Feedermains Flow Capacity Convey maximum day demand while achieving water velocity guidelines Local Watermains Flow Capacity Convey the greater of: - Maximum day demand plus fire flow demand, or - Peak hour demand while achieving water velocity guidelines With adequate zone storage available Supply maximum day demand to zone and all subsequent zones Without adequate storage available Supply peak hour demand to zone and maximum day demand to all subsequent zones A - Equalization 25% of maximum day demand B - Fire Largest expected fire in zone (Based on land use) C - Emergency Minimum of 25% of (A+B) Total volume = A + B + C Minimum flow (Residential) 5,500 L/min for 2 hours @ minimum 140 kPa (20 Psi) Minimum Flow (Industrial / Commercial / Institutional) 15,000 L/min for 3 hours @ minimum 140 kPa (20 Psi) System Pressure Minimum and maximum operating conditions 280 kPa (40 Psi) to 700 kPa (100 Psi) Storage (reservoirs, water towers) Fire Flow Booster Pumping Stations Region of Halton 2022 DC Background Study B-14 Table B-3 Wastewater Flow Criteria The wastewater design criteria outlined in Table B-3 were used to estimate the current and future wastewater flows for each service area. Future flow rates for existing catchments and service areas were calculated by adding the projected increase in flows (calculated with the above criteria) to the measured flow from existing service areas. Wastewater capacity needs were developed on the following basis:  Wastewater mains and WWPS were sized for peak wet weather flow rate.  WWTP rated treatment capacity needs were sized based on the average day flow which includes an average level of the extraneous flow within the system. 2.2. Benefit to Existing Development The non-growth components of servicing strategies are usually identified for projects which benefit the existing service area. Examples of these components are upgrades to the existing systems or facilities necessary to maintain service levels to existing residential and non-residential users. These projects can also increase capacity to meet Average Day Flow L/cap/d* Residential 360 L/emp/d** Employment 310 * Litres per capita per day ** Litres per employee per day L/cap/d* Residential 215 x PF L/emp/d** Employment 185 x PF L/s/ha*** Inflow and Infiltration Design Allowance 0.286 * Litres per capita per day ** Litres per employee per day *** Litres per second per hectare Total peak flows for new development are calculated by multiplying total dry weather flows by the peaking factors (PF) specified in the Halton Linear Design Manual (based on Harmon formula) and adding the Inflow and Infiltration Design Allowance. Wastewater Treatment Plants Design Criteria System (Booster Pumping Stations and Wastewater Mains) Design Criteria Region of Halton 2022 DC Background Study B-15 growth in service areas through upgrades and expansions. When evaluating intensification, critical security/redundancy requirements and impacts on critical existing trunk infrastructure needed to be identified, as well as additional projects within the existing service area. Some Benefit to Existing (non-growth) components were identified in a small number of infrastructure capital projects that are primarily required to service growth in new urban areas. With triggers ranging from growth to security/redundancy requirements, the growth- related and non-growth related needs and corresponding capacity and costs for each of these projects have been separately identified in Tables B-7 and B-8. 2.3. Residential vs. Non-Residential Split The DC eligible share of the water and wastewater development capital implementation plan (2023 to 2031) has been split between benefit to residential development and benefit to non-residential development within each DC by-law category. The residential/non-residential split is calculated from the percentage of total anticipated demand/flow that will be generated by each class of development. This is the standard approach used by other municipalities for calculating the split and this approach was used for Halton Region's 2004, 2008, 2012 and 2017 DC Updates. The Capacity category is based on Region-wide calculated demands/flows. The Distribution-Greenfield category is based on demands/flows calculated from the Greenfield areas only, while the Distribution-Built Boundary category is based on demand/flows calculated for growth within the Urban Built Boundary (2006) only. The water project splits are based on maximum day demand created from the growth between years 2021 to year 2031. The wastewater project splits are based on average day flows for the growth from 2021 to 2031. The water and wastewater calculation and employment demand forecast does not include employees associated with working at home (WAH) because the impact on water and wastewater services from WAH employees is generated from the home which is already accounted for in the population/unit forecast. For No Fixed Place of Work (NFPOW) employees, the need for water and wastewater services related to these employees has largely been included in the employment forecast by usual place of work (i.e. employment and gross floor area (G.F.A.) in retail and accommodation sectors generated from NFPOW construction employment). Since these employees have no fixed work address, they cannot be captured in the non- Region of Halton 2022 DC Background Study B-16 residential G.F.A. calculation. Accordingly, NFPOW employees have been removed from the water and wastewater DC employment forecast and calculation as well as the forecasted water and wastewater demands. The WAH and NFPOW approach for the calculation of forecasted water demands and wastewater flows is consistent with the methodology in the 2017 DC Update Technical Report. Table B-4 summarizes the urban employment forecast excluding WAH, NFPOW and institutional population related employment, which is the basis for the water and wastewater demand and DC employment forecast. Table B-4 Urban Residential and Non-residential Growth The residential/non-residential contributions based on water demands and wastewater flows can be seen in Table B-5 and B-6 respectively. Year Pop/Empl. WAH NFPOW Institutional Employment Adjustment Total 2021 600,706 600,706 2031 730,493 730,493 2021 322,748 (28,777) (32,042) (5,399) 256,530 2031 385,247 (35,013) (38,727) (6,420) 305,086 Note: May not add due to rounding Residential Non-Residential Region of Halton 2022 DC Background Study B-17 Table B-5 Water Demand Project Splits for Halton Region Table B-6 Wastewater Project Splits for Halton Region Category Projected Increase in Water Demand, 2021-2031 (MLD*) Percentage Residential 65.3 76% Non-Residential 20.8 24% Total 86.1 100% Residential 43.3 73% Non-Residential 16.4 27% Total 59.6 100% Residential 22.1 83% Non-Residential 4.4 17% Total 26.5 100% *Million Litres per day Note: May not add due to rounding Capacity (Region Wide) Distribution (Greenfield) Distribution (Built Boundary) Category Projected Increase in Wastewater Generation, 2021-2031 (MLD*) Percentage Residential 46.7 76% Non-Residential 15.1 24% Total 61.8 100% Residential 31.0 72% Non-Residential 11.9 28% Total 42.8 100% Residential 15.8 83% Non-Residential 3.2 17% Total 19.0 100% *Million Litres per day Note: May not add due to rounding Capacity (Region Wide) Distribution (Greenfield) Distribution (Built Boundary) Region of Halton 2022 DC Background Study B-18 2.4. Existing Excess Capacity The servicing strategies were developed in accordance with servicing policies identified in the 2011 Master Plan. Strategies focused on major facilities are generally developed from the following:  Maximizing existing capacity in the facilities,  Scheduling facility capacity expansions when a threshold of approximately 90% of existing rated capacity has been reached,  Ensuring operational effectiveness, flexibility and security of supply,  Maintaining appropriate level of service The servicing strategies for facility expansions ensure that existing capacity remains, typically ranging from 5 to 10%. Existing capacity is required to provide and maintain an adequate level of service throughout the systems. Each DC period has benefitted from previous existing capacity remaining, and future expansion will provide the same benefit. Under this program there is no allowance for existing capacity remaining at the existing facilities. 2.5. Post-period Benefit (Oversizing) Since most water and wastewater infrastructure has a service life of up to 50+ years, it is good engineering practice to strategically size certain projects to meet potential growth beyond the 2031 planning horizon. The sizing and capacity set for 2031 must also provide a sufficient level of service to new growth areas, ensure efficient integration with existing infrastructure, and not negatively impact current system operations. Projects in the 2022 DC Update Technical Report that have been assigned a Post Period Benefit value are the same projects as were determined in the 2017 DC Update Technical Report. The oversizing cost is calculated by the difference in cost for the recommended size of infrastructure and the size of infrastructure to meet the 2031 horizon. Identified oversizing is deducted from the 2031 DC recoverable costs and is to be recovered through subsequent DC by-law(s) covering the post 2031 period. It should be noted that the 2002 Master Plan as well as the 2007 Master Plan Update considered infrastructure sizing to an urban boundary built out scenario (2031) and post 2021 considerations respectively. Some projects previously oversized to meet the 2031 Region of Halton 2022 DC Background Study B-19 horizon are now integrated into the current program based on the 2011 Master Plan and are not considered oversized based on the current 2031 by-law period. 2.6. DC Eligible Infrastructure Watermains, wastewater mains and water and wastewater infrastructure are DC eligible depending on criteria presented in the Local Service Guidelines. The linear infrastructure eligibility is summarized below and provided in more detail in Appendix G of this report. The minimum size for DC eligible watermains is:  Greater than 400 mm diameter internal to the development.  Greater than or equal to 400 mm diameter external to the development. The minimum size for DC eligible wastewater mains is:  Greater than 450 mm diameter. Further information is available in Appendix G: Local Service Guidelines. Please note that this information is subject to change. 2.7. DC By-law Structure For the 2022 DC Study, an area specific charge is being proposed for the Greenfield and Built Boundary areas to support the Region's Growth Plan. The area specific W/WW DC rates were calculated based on the distribution/collection infrastructure required to service growth planned within the Greenfield and Built Boundary areas. The DC rates relating to the water and wastewater capacity (plant expansions for example) are calculated on a Region-wide basis given the difficulty in identifying area specific infrastructure related to capacity projects. The area specific charge calculations are shown in Appendix C, E and F. The distribution/collection portion of the water and wastewater services (Appendix C) has been identified geographically to create an area specific charge for each type of development to be located in the Greenfield area vs the Built Boundary area. Since 1999, the Region's W/WW DCs have been charged on an area specific basis to recognize the higher average costs in servicing the Greenfield areas compared to the Built Boundary areas. The current area specific W/WW DC was established in 2017 Region of Halton 2022 DC Background Study B-20 (By-law No. 36-17), based on distribution/collection infrastructure required to service growth planned within the Built Boundary and Greenfield areas. The Built Boundary for the Greater Golden Horseshoe was established by the Provincial Growth Plan based on the 2006 Built Boundary. The remainder of the Regional urban area (i.e. outside the Built Boundary) was classified as Greenfield area. The table below illustrates the by-law structure based on area specific water (distribution) and wastewater (collection) charges: Accordingly, the total infrastructure program included in the revised Water and Wastewater Masterplan has been categorized to meet the DC by-law structure as follows:  Capacity  Distribution/Collection - Greenfield  Distribution/Collection - Built Boundary The definition of infrastructure to be included in each DC by-law structure category is described below. Capacity This category includes projects related to Region-wide needs of water supply/treatment and wastewater treatment. This category also includes projects that support the transfer/conveyance of capacity and the deferral/elimination of the need for immediate treatment plant or well field expansions. 1. Water/Wastewater: Areas Applied Planning Period Infrastructure Period A. Capacity Region-wide 2022-2031 2023-2031* B. Distribution/Collection: Area-specific 2022-2031 2023-2031* (i) Greenfield (ii) Built Boundary 2. Roads Region-wide 2022-2031 2023-2031* 3. Police Region-wide 2022-2031 2022-2031 4. Other General Services Region-wide 2022-2031 2022-2031 * The Capital requirements for 2022 are part of the current allocation and only the shortfall will be captured as part of the calculation Region of Halton 2022 DC Background Study B-21 The projects included under this definition are:  Studies  Projects related to water purification plants and groundwater well fields, such as o Burloak WPP expansion from 55 MLD to 165 MLD  Projects related to wastewater treatment plants, such as o Mid-Halton WWTP Expansion from 125 MLD to 175 MLD  Major trunk infrastructure that services broader greenfield and intensification areas such as: o Modifications to the Burnhamthorpe Water Tower o New Sewer Inlet to Skyway WWTP Distribution/Collection - Greenfield This category includes projects that support Greenfield growth outside the current Urban Built Boundary (2006) and within the Sustainable Halton Urban Boundary (2031). The projects under this definition can include:  Infrastructure located in the Greenfield service area  Infrastructure located within the Built Boundary that convey flow to or from future growth areas  Infrastructure includes, but is not limited to pipes, pumping stations and storage facilities Distribution/Collection - Built Boundary This category represents projects that support growth within the current Urban Built Boundary (2006). This includes growth to 2031 associated with infill within the Urban Built Boundary as well as intensification within the specific areas, such as the UGCs and corridors as identified under the 2011 Master Plan. Projects within this category include:  Infrastructure located within the Urban Built Boundary (2006).  Infrastructure servicing only infill growth and intensification within the Urban Built Boundary (2006).  Infrastructure identified under the UGCs and corridors servicing reviews. Region of Halton 2022 DC Background Study B-22 APPENDIX B - PART 3 THE DETAILED WATER AND WASTEWATER CAPITAL PROGRAM (2022-2031) Region of Halton 2022 DC Background Study B-23 3. THE DETAILED WATER AND WASTEWATER CAPITAL PROGRAM (2022-2031) Table B-7 sets out the 2023-2031 Water Capital Program. The table provides project descriptions, an expenditure forecast in single year increments from 2023-2027, a 2023- 2031 expenditure forecast in 5 and 4 year increments, a 2023-2031 consolidated forecast, project-specific deductions for post-period benefit (oversizing) and "Non- Growth" (Benefit to Existing Development) and a division of the net growth cost between residential and non-residential. The DC recoverable cost ("Net Growth") is then allocated between Capacity, Greenfield and Built Boundary benefiting areas. Table B-8 sets out similar information as described above for the 2023-2031 Wastewater Capital Program. The water and wastewater program costs ($2022, $000s) involved are summarized as follows. Service Capacity Distrb'n /Collct'n - Greenfield Distrb'n /Collct'n - Built bndry Total Capacity Distrb'n /Collct'n - Greenfield Distrb'n /Collct'n - Built bndry Total Water 562.2 $ 12.0 $ 46.9 $ 503.4 $ 139.8 $ 226.8 $ 7.3 $ 373.9 $ 44.1 $ 83.9 $ 1.5 $ 129.5 $ Wastewater 608.6 175.1 24.5 408.9 65.2 213.5 22.1 300.8 20.6 83.0 4.5 108.1 Total 1,170.8 $ 187.1 $ 71.4 $ 912.3 $ 205.0 $ 440.3 $ 29.4 $ 674.6 $ 64.7 $ 166.9 $ 6.0 $ 237.6 $ Note: May not add due to rounding Non-residential Share Residential Share Gross Cost Less: Benefit to Existing Dev't Less: Post Period Benefit Net Growth Region of Halton 2022 DC Background Study B-24 Region of Halton 2022 DC Background Study B-25 Region of Halton 2022 DC Background Study B-26 Region of Halton 2022 DC Background Study B-27 Region of Halton 2022 DC Background Study B-28 Region of Halton 2022 DC Background Study C-1 Appendix C Calculation of the Water and Wastewater DC Applicable to Development in Halton Region of Halton 2022 DC Background Study C-2 APPENDIX C: PART 1 OVERVIEW OF THE WATER AND WASTEWATER DC CALCULATION 1. OVERVIEW OF THE WATER AND WASTEWATER DC CALCULATION 1.1. DC Cash Flow Methodology 1.1.1. DC Reserve Fund Opening Balance - the full uncommitted DC reserve fund balance is shown as the opening balance in the cash flow calculation. The DC is calculated so as to fully consume that amount, leaving a nil reserve fund balance at the end of the period in 2031. Tables 5-4a and 5-4b in Chapter 5 provide detailed schedules of the DC reserve fund continuity. 1.1.2. Project Costs - the nominal cost is in 2022$, as per Appendix B. The inflated cost (commencing in 2018) allows for average inflation of 2.0%/year, consistent with the increase in the Statistics Canada Table 18-10-0135-01 Building Construction Price Indexes, by Non-residential buildings over the previous 10-year period. This rate may vary, up or down, in any year or sequence of years. It will be matched by the change in the DC quantum, which is determined by the same index. 1.1.3. DC Credits - are added to the development-related expenditures, as they represent the equivalent of Regional expenditures for works previously provided by developers which are not part of the capital program and must be funded (Chapter 4). 1.1.4. External Debt - represent debt charges resulting from external debt previously incurred to fund the growth share of the water and wastewater infrastructure costs (Chapter 4) included in the Total Unfunded Capital Costs. 1.1.5. Internal Debt - represents the outstanding balance owing to Regional Reserve for the previously funded growth share of water and wastewater infrastructure costs (Chapter 4) included in the Total Unfunded Capital Costs. Region of Halton 2022 DC Background Study C-3 1.1.6. Historical Post-period Benefit (Oversizing) - is the cost share of previously funded water and wastewater infrastructure that, under the existing DC by-laws, was considered to benefit growth beyond the eligible planning horizon. This cost share is recoverable under the 2022 DC by-law as these costs benefit the planning horizon to 2031 based on BPE, 2011 (Chapter 4). 1.1.7. SDE/Sq.Ft. Per Year - SDE are single-detached unit equivalents per year, i.e. the annual gross increase in serviced population divided by the average occupancy for single detached units. This is the number of serviced SDE's that are expected to be subject to the DC (36,542 in total) (Table A-6c). In the case of the non-residential DC calculation, the charge is per square foot of non-residential TFA and the costs are allocated over a total of 94,881,095 sq.ft. (Table A-10c). 1.1.8. DC Rates - A DC is calculated, such that when it is inflated at 2.0%/year, the cash flow will produce a zero reserve fund balance in 2031. 1.1.9. Anticipated Revenues - is the number of single detached equivalent units (SDE) or sq.ft. of non-residential TFA, multiplied by the required DC charge per SDE, or per square foot of non-residential TFA. 1.1.10. DC Reserve Fund Closing Balance Before Interest - The opening balance, less the inflated development-related expenditures, credits, debt charges, oversizing, and other commitments, plus the anticipated DC revenues. 1.1.11. Interest Earnings/Costs - provides for interest earnings on positive reserve fund balances at 3.0% per year and borrowing costs on negative balances at 3.0% per year. 1.1.12. DC Reserve Fund Closing Balance After Interest - is the DC reserve fund closing balance before interest, plus interest incurred during the year on the average balance. The water and wastewater DC rates have been calculated on an area specific basis and are presented in Parts 2 and 3 of Appendix C. Region of Halton 2022 DC Background Study C-4 APPENDIX C - PART 2 CASH FLOWS FOR RESIDENTIAL WATER AND WASTEWATER DCs Summary of Calculation Results - Per SDE Greenfield Built Boundary Greenfield Built Boundary Water 8,689 $ 3,144 $ 12,276 $ 4,503 $ Wastewater 10,276 4,535 17,261 5,718 Total 18,965 $ 7,679 $ 29,537 $ 10,221 $ Note: May not add due to rounding As of April 1, 2021 New Calculated Service Region of Halton 2022 DC Background Study C-5 Table C-1 Halton Region 2022 Development Charges Study Water - Capacity Residential Nominal Inflated (2%/Yr) 2022 32,693,989 - - (10,713,788) 2,800 2,936.48 8,223,282 10,040,635 40,244,117 1,094,072 41,338,189 2023 41,338,189 (1,557,000) (1,588,140) - (138,243) 2,472 2,995.21 7,405,489 47,017,295 1,325,332 48,342,627 2024 48,342,627 (11,320,000) (11,777,328) - 2,472 3,055.12 7,553,599 44,118,897 1,386,923 45,505,820 2025 45,505,820 (3,429,000) (3,638,882) - 4,179 3,116.22 13,021,982 54,888,920 1,505,921 56,394,841 2026 56,394,841 (122,245,000) (132,321,919) - 4,179 3,178.55 13,282,421 (62,644,657) (93,747) (62,738,404) 2027 (62,738,404) (122,000) (134,698) - 4,088 3,242.12 13,253,029 (49,620,073) (1,685,377) (51,305,450) 2028 (51,305,450) (730,000) (822,099) - 4,088 3,306.96 13,518,090 (38,609,459) (1,348,724) (39,958,183) 2029 (39,958,183) (122,000) (140,140) - 4,088 3,373.10 13,788,451 (26,309,871) (994,021) (27,303,892) 2030 (27,303,892) (122,000) (142,942) - 4,088 3,440.56 14,064,220 (13,382,614) (610,298) (13,992,912) 2031 (13,992,912) (122,000) (145,801) - 4,088 3,509.37 14,345,505 206,792 (206,792) 0 Total (139,769,000) (150,711,949) (10,713,788) (138,243) 36,542 118,456,067 10,040,635 373,290 DC Reserve Fund Closing Balance after Interest SDE per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues 2012 Allocation Front End Interim Payback DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Table C-2 Halton Region 2022 Development Charges Study Water - Greenfield Residential Nominal Inflated (2%/Yr) 2022 25,575,930 - - 25,342,171 1,509 9,339.21 14,094,388 65,012,490 1,358,826 66,371,316 2023 66,371,316 (15,407,000) (15,715,140) (1,971,260) (6,128,927) 1,181 9,525.99 11,252,296 53,808,286 1,802,694 55,610,980 2024 55,610,980 (62,978,000) (65,522,311) (1,971,260) 1,181 9,716.51 11,477,342 (405,249) 828,086 422,837 2025 422,837 (50,038,000) (53,100,726) (1,971,260) 2,888 9,910.84 28,618,092 (26,031,057) (384,123) (26,415,180) 2026 (26,415,180) (74,699,000) (80,856,600) (1,971,260) 2,888 10,109.06 29,190,454 (80,052,586) (1,597,016) (81,649,603) 2027 (81,649,603) (6,034,000) (6,662,024) (1,971,260) 2,613 10,311.24 26,944,093 (63,338,793) (2,174,826) (65,513,619) 2028 (65,513,619) (3,043,000) (3,426,912) (1,971,260) 2,613 10,517.47 27,482,975 (43,428,816) (1,634,137) (45,062,953) 2029 (45,062,953) (13,677,000) (15,710,574) (1,971,260) 2,613 10,727.82 28,032,634 (34,712,152) (1,196,627) (35,908,779) 2030 (35,908,779) (183,000) (214,414) (1,971,260) 2,613 10,942.37 28,593,287 (9,501,166) (681,149) (10,182,315) 2031 (10,182,315) (730,000) (872,418) (17,959,943) 2,613 11,161.22 29,165,153 150,478 (150,478) (0) Total (226,789,000) (242,081,118) (8,387,850) (6,128,927) 22,712 234,850,714 (3,828,749) DC Reserve Fund Closing Balance after Interest SDE per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-6 Table C-3 Halton Region 2022 Development Charges Study Water - Built Boundary Residential Nominal Inflated (2%/Yr) 2022 (3,887,528) - - (8,291,953) 1,291 1,566.89 2,023,204 (10,156,277) (210,657) (10,366,934) 2023 (10,366,934) (34,000) (34,680) (108,410) 1,291 1,598.23 2,063,668 (8,446,356) (282,199) (8,728,556) 2024 (8,728,556) (146,000) (151,898) (108,410) 1,291 1,630.20 2,104,941 (6,883,923) (234,187) (7,118,110) 2025 (7,118,110) (1,053,000) (1,117,452) (108,410) 1,291 1,662.80 2,147,040 (6,196,932) (199,726) (6,396,658) 2026 (6,396,658) (798,000) (863,781) (108,410) 1,291 1,696.06 2,189,981 (5,178,868) (173,633) (5,352,501) 2027 (5,352,501) (3,666,000) (4,047,560) (108,410) 1,475 1,729.98 2,551,182 (6,957,289) (184,647) (7,141,936) 2028 (7,141,936) (999,000) (1,125,036) (108,410) 1,475 1,764.58 2,602,206 (5,773,176) (193,727) (5,966,903) 2029 (5,966,903) - - (108,410) 1,475 1,799.87 2,654,250 (3,421,063) (140,819) (3,561,882) 2030 (3,561,882) (603,000) (706,511) (108,410) 1,475 1,835.86 2,707,335 (1,669,468) (78,470) (1,747,939) 2031 (1,747,939) - - (987,711) 1,475 1,872.58 2,761,481 25,832 (25,832) 0 Total (7,299,000) (8,046,918) (10,146,944) 13,830 23,805,287 (1,723,897) Year DC Reserve Fund Opening Balance Dev't Related Expenditures Total Unfunded Capital Costs DC Reserve Fund Closing Balance after Interest SDE per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Region of Halton 2022 DC Background Study C-7 Table C-4 Halton Region 2022 Development Charges Study Wastewater - Capacity Residential Nominal Inflated (2%/Yr) 2022 (3,792,977) - - (27,813,255) 2,800 2,124.72 5,950,032 21,644,633 (4,011,567) (117,068) (4,128,635) 2023 (4,128,635) (1,110,000) (1,132,200) - (1,872,582) 2,472 2,167.22 5,358,310 (1,775,107) (88,556) (1,863,663) 2024 (1,863,663) (8,929,000) (9,289,732) - 2,472 2,210.56 5,465,477 (5,687,918) (113,274) (5,801,192) 2025 (5,801,192) (1,528,000) (1,621,526) - 4,179 2,254.77 9,422,176 1,999,459 (57,026) 1,942,433 2026 1,942,433 (35,236,000) (38,140,580) - 4,179 2,299.87 9,610,620 (26,587,527) (369,676) (26,957,204) 2027 (26,957,204) (122,000) (134,698) - 4,088 2,345.86 9,589,353 (17,502,549) (666,896) (18,169,445) 2028 (18,169,445) (730,000) (822,099) - 4,088 2,392.78 9,781,140 (9,210,404) (410,698) (9,621,102) 2029 (9,621,102) (3,563,000) (4,092,767) - 4,088 2,440.64 9,976,762 (3,737,106) (200,373) (3,937,479) 2030 (3,937,479) (122,000) (142,942) - 4,088 2,489.45 10,176,298 6,095,876 32,376 6,128,252 2031 6,128,252 (13,889,000) (16,598,641) - 4,088 2,539.24 10,379,824 (90,565) 90,565 0 Total (65,229,000) (71,975,184) (27,813,255) (1,872,582) 36,542 85,709,991 21,644,633 (1,900,626) DC Reserve Fund Closing Balance after Interest SDE per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues 2012 Allocation Front End Interim Payback DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-8 Table C-5 Halton Region 2022 Development Charges Study Wastewater - Greenfield Residential Nominal Inflated (2%/Yr) 2022 (39,131,662) - - (42,605,532) 1,509 15,136.14 22,842,901 (58,894,294) (1,470,389) (60,364,683) 2023 (60,364,683) (3,670,000) (3,743,400) (2,553,862) (2,595,948) 1,181 15,438.86 18,236,698 (51,021,195) (1,670,788) (52,691,983) 2024 (52,691,983) (36,950,000) (38,442,780) (2,553,862) 1,181 15,747.64 18,601,431 (75,087,194) (1,916,688) (77,003,881) 2025 (77,003,881) (87,623,000) (92,986,229) (2,553,862) 2,888 16,062.59 46,381,598 (126,162,374) (3,047,494) (129,209,868) 2026 (129,209,868) (75,911,000) (82,168,508) (2,553,862) 2,888 16,383.84 47,309,230 (166,623,008) (4,437,493) (171,060,501) 2027 (171,060,501) (4,249,000) (4,691,239) (2,553,862) 2,613 16,711.52 43,668,532 (134,637,069) (4,585,464) (139,222,533) 2028 (139,222,533) - - (2,553,862) 2,613 17,045.75 44,541,903 (97,234,492) (3,546,855) (100,781,347) 2029 (100,781,347) (1,016,000) (1,167,065) (2,553,862) 2,613 17,386.67 45,432,741 (59,069,532) (2,397,763) (61,467,295) 2030 (61,467,295) - - (2,553,862) 2,613 17,734.40 46,341,396 (17,679,761) (1,187,206) (18,866,967) 2031 (18,866,967) (4,062,000) (4,854,466) (23,267,969) 2,613 18,089.09 47,268,224 278,822 (278,822) (0) Total (213,481,000) (228,053,686) (86,304,395) (2,595,948) 22,712 380,624,654 (24,538,962) DC Reserve Fund Closing Balance after Interest SDE per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-9 Table C-6 Halton Region 2022 Development Charges Study Wastewater - Built Boundary Residential Nominal Inflated (2%/Yr) 2022 (11,457,286) - - (11,221,876) 1,291 3,592.87 4,639,185 (18,039,977) (442,459) (18,482,436) 2023 (18,482,436) (1,697,000) (1,730,940) (245,008) 1,291 3,664.73 4,731,969 (15,726,414) (513,133) (16,239,547) 2024 (16,239,547) (2,344,000) (2,438,698) (245,008) 1,291 3,738.02 4,826,608 (14,096,644) (455,043) (14,551,687) 2025 (14,551,687) (6,791,000) (7,206,664) (245,008) 1,291 3,812.78 4,923,141 (17,080,218) (474,479) (17,554,697) 2026 (17,554,697) (2,247,000) (2,432,225) (245,008) 1,291 3,889.04 5,021,603 (15,210,326) (491,475) (15,701,802) 2027 (15,701,802) - - (245,008) 1,475 3,966.82 5,849,834 (10,096,975) (386,982) (10,483,957) 2028 (10,483,957) (8,992,000) (10,126,452) (245,008) 1,475 4,046.15 5,966,831 (14,888,587) (380,588) (15,269,175) 2029 (15,269,175) - - (245,008) 1,475 4,127.08 6,086,167 (9,428,015) (370,458) (9,798,473) 2030 (9,798,473) - - (245,008) 1,475 4,209.62 6,207,891 (3,835,590) (204,511) (4,040,101) 2031 (4,040,101) - - (2,232,241) 1,475 4,293.81 6,332,049 59,706 (59,706) 0 Total (22,071,000) (23,934,979) (15,414,180) 13,830 54,585,278 (3,778,833) DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance SDE per Year Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-10 APPENDIX C - PART 3 CASH FLOWS FOR NON-RESIDENTIAL WATER AND WASTEWATER DCs Summary of Calculation Results - Per sq.ft. (TFA) Non-Retail Retail Non-Retail Retail Non-Retail Retail Non-Retail Retail Water 3.166 $ 3.166 $ 1.229 $ 1.229 $ 3.897 $ 3.897 $ 1.340 $ 1.340 $ Wastewater 4.060 4.060 2.004 2.004 5.245 5.245 2.053 2.053 Total 7.226 $ 7.226 $ 3.233 $ 3.233 $ 9.142 $ 9.142 $ 3.393 $ 3.393 $ Service As of April 1, 2021 New Calculated Greenfield Built Boundary Greenfield Built Boundary Region of Halton 2022 DC Background Study C-11 Table C-7 Halton Region 2022 Development Charges Study Water - Capacity Non-residential Nominal Inflated (2%/Yr) DC Credits 2022 - - - (46,965) (65,561,228) (433,321) 4,254,555 1.219 5,187,355 (60,854,159) (912,812) (61,766,971) 2023 (61,766,971) (491,000) (500,820) (346,114) - 3,936,651 1.244 4,895,746 (57,718,159) (1,792,277) (59,510,436) 2024 (59,510,436) (3,574,000) (3,718,390) (91,262) - 3,936,651 1.269 4,993,661 (58,326,426) (1,767,553) (60,093,979) 2025 (60,093,979) (1,082,000) (1,148,227) (91,262) - 3,936,651 1.294 5,093,534 (56,239,933) (1,745,009) (57,984,942) 2026 (57,984,942) (38,603,000) (41,785,129) (91,262) - 3,936,651 1.320 5,195,405 (94,665,927) (2,289,763) (96,955,690) 2027 (96,955,690) (38,000) (41,955) (46,965) - 14,975,987 1.346 20,159,888 (76,884,722) (2,607,606) (79,492,328) 2028 (79,492,328) (230,000) (259,017) (2,668) - 14,975,987 1.373 20,563,086 (59,190,928) (2,080,249) (61,271,177) 2029 (61,271,177) (38,000) (43,650) (2,668) - 14,975,987 1.401 20,974,347 (40,343,148) (1,524,215) (41,867,363) 2030 (41,867,363) (38,000) (44,523) (2,668) - 14,975,987 1.429 21,393,834 (20,520,720) (935,821) (21,456,541) 2031 (21,456,541) (38,000) (45,414) (2,668) - 14,975,989 1.457 21,821,714 317,092 (317,092) 0 Total (44,132,000) (47,587,124) (724,501) (65,561,228) (433,321) 94,881,095 130,278,571 (15,972,397) DC Reserve Fund Closing Balance after Interest Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-12 Table C-8 Halton Region 2022 Development Charges Study Water - Greenfield Non-residential Nominal Inflated (2%/Yr) DC Credits 2022 - - - (68,347) (68,409,096) (2,289,790) 3,807,172 2.678 10,196,387 (60,570,846) (908,563) (61,479,409) 2023 (61,479,409) (5,700,000) (5,814,000) (371,027) (730,711) 3,494,122 2.732 9,545,136 (58,850,012) (1,804,941) (60,654,953) 2024 (60,654,953) (23,289,000) (24,229,876) (131,431) (730,711) 3,493,994 2.786 9,735,682 (76,011,290) (2,049,994) (78,061,283) 2025 (78,061,283) (18,506,000) (19,638,715) (131,431) (730,711) 3,493,846 2.842 9,929,973 (88,632,168) (2,500,402) (91,132,570) 2026 (91,132,570) (27,630,000) (29,907,601) (131,431) (730,711) 3,493,705 2.899 10,128,165 (111,774,148) (3,043,601) (114,817,749) 2027 (114,817,749) (2,232,000) (2,464,308) (68,347) (730,711) 9,298,746 2.957 27,495,973 (90,585,144) (3,081,043) (93,666,187) 2028 (93,666,187) (1,125,000) (1,266,933) (5,264) (730,711) 9,299,053 3.016 28,046,819 (67,622,276) (2,419,327) (70,041,603) 2029 (70,041,603) (5,058,000) (5,810,052) (5,264) (730,711) 9,299,342 3.076 28,608,643 (47,978,987) (1,770,309) (49,749,296) 2030 (49,749,296) (67,000) (78,501) (5,264) (730,711) 9,299,621 3.138 29,181,693 (21,382,079) (1,066,971) (22,449,050) 2031 (22,449,050) (270,000) (322,675) (5,264) (6,657,436) 9,299,889 3.201 29,766,183 331,759 (331,759) (0) Total (83,877,000) (89,532,661) (923,071) (80,912,223) (2,289,790) 64,279,489 192,634,654 (18,976,909) DC Reserve Fund Closing Balance after Interest Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-13 Table C-9 Halton Region 2022 Development Charges Study Water - Built Boundary Non-residential Nominal Inflated (2%/Yr) 2022 - - - (1,485,852) 447,383 0.121 54,173 (1,431,678) (21,475) (1,453,154) 2023 (1,453,154) (7,000) (7,140) (40,186) 442,529 0.124 54,657 (1,445,822) (43,485) (1,489,307) 2024 (1,489,307) (30,000) (31,212) (40,186) 442,657 0.126 55,766 (1,504,938) (44,914) (1,549,852) 2025 (1,549,852) (216,000) (229,221) (40,186) 442,805 0.129 56,901 (1,762,358) (49,683) (1,812,041) 2026 (1,812,041) (163,000) (176,436) (40,186) 442,946 0.131 58,057 (1,970,606) (56,740) (2,027,345) 2027 (2,027,345) (751,000) (829,165) (40,186) 5,677,241 0.134 759,001 (2,137,695) (62,476) (2,200,170) 2028 (2,200,170) (205,000) (230,863) (40,186) 5,676,933 0.136 774,139 (1,697,080) (58,459) (1,755,539) 2029 (1,755,539) - - (40,186) 5,676,645 0.139 789,582 (1,006,142) (41,425) (1,047,567) 2030 (1,047,567) (123,000) (144,114) (40,186) 5,676,365 0.142 805,334 (426,533) (22,112) (448,645) 2031 (448,645) - - (366,127) 5,676,100 0.145 821,402 6,630 (6,630) (0) Total (1,495,000) (1,648,151) (2,173,464) 30,601,605 4,229,013 (407,398) Year DC Reserve Fund Opening Balance Dev't Related Expenditures Total Unfunded Capital Costs DC Reserve Fund Closing Balance after Interest Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Region of Halton 2022 DC Background Study C-14 Table C-10 Halton Region 2022 Development Charges Study Wastewater - Capacity Non-Residential Nominal Inflated (2%/Yr) DC Credits 2022 - - - (92,272) (115,876,249) (1,600,205) 4,254,555 1.546 6,575,535 (110,993,191) (1,664,898) (112,658,088) 2023 (112,658,088) (350,000) (357,000) (653,595) - 3,936,651 1.576 6,205,889 (107,462,794) (3,301,813) (110,764,607) 2024 (110,764,607) (2,819,000) (2,932,888) (180,951) - 3,936,651 1.608 6,330,007 (107,548,439) (3,274,696) (110,823,134) 2025 (110,823,134) (482,000) (511,502) (180,951) - 3,936,651 1.640 6,456,607 (105,058,981) (3,238,232) (108,297,212) 2026 (108,297,212) (11,126,000) (12,043,140) (180,951) - 3,936,651 1.673 6,585,739 (113,935,564) (3,333,492) (117,269,056) 2027 (117,269,056) (38,000) (41,955) (92,272) - 14,975,987 1.706 25,554,845 (91,848,438) (3,136,762) (94,985,201) 2028 (94,985,201) (230,000) (259,017) (3,593) - 14,975,987 1.741 26,065,942 (69,181,869) (2,462,506) (71,644,375) 2029 (71,644,375) (1,125,000) (1,292,271) (3,593) - 14,975,987 1.775 26,587,261 (46,352,978) (1,769,960) (48,122,939) 2030 (48,122,939) (38,000) (44,523) (3,593) - 14,975,987 1.811 27,119,006 (21,052,048) (1,037,625) (22,089,673) 2031 (22,089,673) (4,386,000) (5,241,676) (3,593) - 14,975,989 1.847 27,661,390 326,448 (326,448) 0 Total (20,594,000) (22,723,973) (1,395,363) (115,876,249) (1,600,205) 94,881,095 165,142,222 (23,546,432) DC Reserve Fund Closing Balance after Interest Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-15 Table C-11 Halton Region 2022 Development Charges Study Wastewater - Greenfield Non-Residential Nominal Inflated (2%/Yr) DC Credits 2022 - - - (176,340) (125,147,228) (1,677,337) 3,807,172 3.699 14,083,594 (112,917,310) (1,693,760) (114,611,070) 2023 (114,611,070) (1,427,000) (1,455,540) (776,388) (1,139,011) 3,494,122 3.773 13,184,064 (104,797,946) (3,291,135) (108,089,081) 2024 (108,089,081) (14,367,000) (14,947,427) (346,100) (1,139,011) 3,493,994 3.849 13,447,253 (111,074,366) (3,287,452) (114,361,818) 2025 (114,361,818) (34,075,000) (36,160,663) (346,100) (1,139,011) 3,493,846 3.926 13,715,614 (138,291,978) (3,789,807) (142,081,784) 2026 (142,081,784) (29,521,000) (31,954,480) (346,100) (1,139,011) 3,493,705 4.004 13,989,363 (161,532,013) (4,554,207) (166,086,220) 2027 (166,086,220) (1,652,000) (1,823,941) (176,340) (1,139,011) 9,298,746 4.084 37,978,366 (131,247,146) (4,460,000) (135,707,147) 2028 (135,707,147) - - (6,579) (1,139,011) 9,299,053 4.166 38,739,214 (98,113,523) (3,507,310) (101,620,833) 2029 (101,620,833) (395,000) (453,731) (6,579) (1,139,011) 9,299,342 4.249 39,515,223 (63,704,931) (2,479,886) (66,184,817) 2030 (66,184,817) - - (6,579) (1,139,011) 9,299,621 4.334 40,306,740 (27,023,667) (1,398,127) (28,421,794) 2031 (28,421,794) (1,580,000) (1,888,246) (6,579) (10,377,411) 9,299,889 4.421 41,114,058 420,027 (420,027) (0) Total (83,017,000) (88,684,028) (2,193,684) (144,636,728) (1,677,337) 64,279,489 266,073,489 (28,881,711) DC Reserve Fund Closing Balance after Interest Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Historical Oversizing Dev't Related Expenditures Total Unfunded Capital Costs Region of Halton 2022 DC Background Study C-16 Halton Region 2022 Development Charges Study Wastewater - Built Boundary Non-residential Nominal Inflated (2%/Yr) 2022 - - - (8,670,031) 447,383 0.507 226,842 (8,443,189) (126,648) (8,569,837) 2023 (8,569,837) (347,000) (353,940) (109,272) 442,529 0.517 228,868 (8,804,181) (260,610) (9,064,791) 2024 (9,064,791) (480,000) (499,392) (109,272) 442,657 0.528 233,513 (9,439,943) (277,571) (9,717,514) 2025 (9,717,514) (1,391,000) (1,476,140) (109,272) 442,805 0.538 238,263 (11,064,663) (311,733) (11,376,396) 2026 (11,376,396) (461,000) (499,001) (109,272) 442,946 0.549 243,106 (11,741,563) (346,769) (12,088,333) 2027 (12,088,333) - - (109,272) 5,677,241 0.560 3,178,207 (9,019,399) (316,616) (9,336,015) 2028 (9,336,015) (1,842,000) (2,074,391) (109,272) 5,676,933 0.571 3,241,595 (8,278,083) (264,211) (8,542,295) 2029 (8,542,295) - - (109,272) 5,676,645 0.582 3,306,259 (5,345,308) (208,314) (5,553,622) 2030 (5,553,622) - - (109,272) 5,676,365 0.594 3,372,218 (2,290,676) (117,664) (2,408,341) 2031 (2,408,341) - - (995,570) 5,676,100 0.606 3,439,502 35,591 (35,591) 0 Total (4,521,000) (4,902,865) (10,539,781) 30,601,605 17,708,374 (2,265,728) Dev't Related Expenditures Total Unfunded Capital Costs Table C-12 DC Reserve Fund Closing Balance after Interest Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Region of Halton 2022 DC Background Study Appendix D The 2022-2031 Roads Servicing Program and Development Charge Recoverable Costs Region of Halton 2022 DC Background Study D-2 APPENDIX D: PART 1 OVERVIEW OF ROADS CAPITAL PROGRAM (2022-2031) 1. OVERVIEW OF ROADS CAPITAL PROGRAM (2022-2031) "Halton Region 2022 Transportation Development Charges Technical Report" by EllSo Consulting Inc. (the Technical Report), sets out the methodology involved in detail, in identifying the Region's 2022-2031 development-related transportation capital program. A project-specific listing is contained in Part 3 of this Appendix. Halton Region uses a demand forecasting model for its long-term transportation planning. The Halton Region Model has been updated to include the release of the TTS, 2016 data and 2016 Census information. The updated model maintains the core functions, procedures, and updated network. Within the context of the 2022 Transportation DC Technical Report, the model is used for network-wide analysis and overview, including comparison of the network characteristics between 2016 and the 2031 planning horizon. The Region undertook a Transportation Master Plan in 2011 - the Halton Region Transportation Master Plan (2031) - The Road to Change (2011 TMP). The 2011 TMP developed a sustainable and integrated plan that considered all modes of travel (automobile, transit, cycling and walking) to accommodate growth in Halton Region to the year 2031, as established through Regional Official Plan Amendment (ROPA) 38. The 2011 TMP provides strategies, policies and tools required to meet the Region's transportation needs in a safe and cost-effective manner. The 2011 TMP was developed in accordance with the requirements of the Municipal Class Environmental Assessment (MCEA) process. Through this process existing problems/opportunities were defined, alternative solutions evaluated, and an optimum transportation system was identified to the year 2031. A technical review of the transportation network and capital projects identified in the 2011 TMP was undertaken which focused on the following key elements:  Updating the transportation demand forecasting model with current travel pattern characteristics (based on 2016 Transportation Tomorrow Survey and 2016 Census); Region of Halton 2022 DC Background Study D-3  Validating the long range Transportation Capital Implementation Plan to 2031 (i.e. project scope, timing, need and cost) as identified in the 2011 TMP, including minor timing shifts of previously identified infrastructure projects.  Updated costing from recently completed and on-going Municipal Class Environmental Assessment (MCEA) Studies;  Updated Costing from on-going detailed design projects;  Updated Costing for Master Plan Costed projects (formerly referred to as Benchmarked projects) based on recent regional data and construction tenders, and tenders from neighbouring municipalities; and  Updates to costing for annual programs and studies, based on industry and regional experience. The resultant Capital Roads Plan includes the following types of projects:  Reconstruction (no widening)  Road Widening without Reconstruction  Road Widening with Reconstruction  New Alignment  Traffic Management  Provincial Freeway Interchanges  Railway Grade Separations  Structures (bridges and culverts)  Studies and Programs These initiatives are presented in Map D-1 below. The estimated cost of the program totals to $2.44 billion between 2022 and 2031 (in 2022$). Region of Halton 2022 DC Background Study D-4 MAP D-1: ROADS DC PROJECTS (2023-2031) Region of Halton 2022 DC Background Study D-5 APPENDIX D - PART 2 ROADS DC CALCULATION ASSUMPTIONS 2. ROADS DC CALCULATION ASSUMPTIONS This appendix includes excerpts from EllSo Consulting Inc's 2022 Transportation Development Charges Technical Report (the Technical Report) that established DCA mandated assumptions for the DC calculation. 2.1. Benefit to Existing Development 2.1.1. Road Reconstruction (No Widening) Costs of road reconstruction without widening have been allocated to Benefit to Existing (BTE), and therefore 100% of the cost has been removed from the DC calculation, as these projects are not considered to involve significant capacity-related improvements. 2.1.2. Road Widening without Reconstruction Road widening projects are undertaken to accommodate increased traffic volumes associated with new growth; however, existing lanes are typically resurfaced as part of the widening. As a result, existing residents (Non-Growth) benefit from the renewal of the road surface, as well as improved intersections, signals, and other assets that exist in the corridor. The following sub-sections present the calculation of BTE for existing pavement replacement and other cost components from which there would be a benefit to non- growth. 2.1.2.1. Value of Resurfacing Existing Pavement The BTE of the resurfacing is considered to be the Used Value of the pavement, which is to be resurfaced to its original (unused) condition. The corresponding benefit to Growth is the cost associated with new lanes, plus any Residual Value remaining in existing roads. First, the value of resurfacing the existing lanes was calculated with the following equation: Value of Resurfacing Existing Lanes = Master Plan (MP) cost for resurfacing ($/km) x length of project (km) (1) Region of Halton 2022 DC Background Study D-6 To allocate this value between Growth and Non-Growth, the Residual Value of the existing lanes was based on the net book value remaining in the asset per accounting and reporting of Tangible Capital Assets (TCA). More specifically, the current condition of the road surface was determined based on the Region's road asset inventory, and the cumulative depreciation to the proposed year of construction was estimated based on a linear rate of depreciation. The asset's proportions of Residual Value and Used Value were then calculated using the following equations: The BTE of resurfacing the existing lanes was then calculated with the following equation: 2.1.2.2. Additional Cost Components Since roads are widened primarily to accommodate Growth, the Engineering and Contingency costs were allocated entirely to Growth. However, modifications to intersections and signals associated with the widening, benefit both Growth and Non- Growth, and were allocated 50% BTE. Where widening work includes rehabilitation of existing bridges, grade separations and culverts, the BTE would typically reflect the existing asset value, with TCA-based calculations similar to those done for pavement. However, because the amounts were small relative to the total project cost, BTE of 100% was allocated for simplicity. For projects where costs were available from more detailed studies (i.e., Municipal Class Environmental Assessment studies), these values were used in place of the Master Plan cost estimates. The costs were broken down into Engineering, Design, Property, Utility Relocates and Construction. Engineering, Design, Property and Utility Relocates were assigned 0% BTE. These factors are consistent with the factors applied where base cost breakdowns were used. Further, Construction costs were assigned 13% BTE, based on the average BTE calculated for widening projects where the Master Plan cost breakdowns were used. % Used Value = 100% - % Residual Value (3) % Residual Value = Original Book Value - Cumulative Depreciation x 100% (2) Original Book Value BTE Resurfacing Existing Lanes = % Used Value x Value of Resurfacing Existing Lanes (4) Region of Halton 2022 DC Background Study D-7 2.1.2.3. Overall BTE The resulting BTE for each project was obtained by summing the BTE credit for existing pavement value with the credits for each additional cost component, as described in the following equation: Where 2.1.3. Road Widening with Reconstruction Road widening projects are primarily undertaken to accommodate increased traffic volumes associated with new growth. In some cases, the increased development changes the character of the corridor from rural to urban, so road widening projects may be accompanied by reconstruction of the roadway to an urban cross-section. When widening projects include reconstruction of existing lanes, existing residents (Non- Growth) benefit from the renewal of the roadway, intersection improvements, signals and other assets, as well as the engineering and design associated with reconstruction. The following sub-sections present the calculation of BTE for existing pavement replacement and other cost components from which there would be a benefit to non- growth from a road widening with reconstruction of the existing lanes. 2.1.3.1. Value of Reconstructing Existing Pavement and Sub-Base The BTE of the reconstruction of existing lanes is calculated using the methodology previously explained for road widenings in Equation (1). Then the proportions of BTE = (5) BTE Resurfacing Existing Lanes + BTE Intersection Modifications + BTE New Signals and Signal Modifications + BTE Bridge Rehabilitation + BTE Grade Separation Rehabilitation + BTE Culvert Rehabilitation BTE Resurfacing Existing Lanes = BTE Intersection Modifications = BTE New Signals and Signal Mod= BTE Bridge Rehabilitation = BTE Grade Separation Rehabilita= BTE Culvert Rehabilitation = 100% x Cost of Grade Separation Rehabilitation % Used Value x Value of Resurfacing Existing Lanes 50% x Cost of Intersection Modifications 50% x Cost of New Signals and Signal Modifications 100% x Cost of Bridge Rehabilitation 100% x Cost of Culvert Rehabilitation Region of Halton 2022 DC Background Study D-8 Residual and Used Values of the existing lanes were calculated using Equations (2) and (3). The BTE of reconstructing the existing lanes was then calculated using Equation (6), below. 2.1.3.2. Additional Cost Components Since projects involving widening with reconstruction benefit both Growth and Non- Growth, the following cost components have been assigned 50% BTE:  Engineering and Design  Contingency  Intersection and Signal Modifications Where widening work includes rehabilitation of existing bridges, grade separations and culverts, the BTE would typically reflect the existing asset value, with TCA-based calculations similar to those done for pavement. However, because the amounts were small relative to the total project cost, BTE of 100% were assigned for simplicity. For projects where costs were available from more detailed studies (i.e., Municipal Class Environmental Assessment studies), these values were used in place of the Master Plan cost estimates. Engineering and Design were assigned 50% BTE, and costs for Property and Utility Relocates were assigned 0% BTE. These factors are consistent with the factors applied where Master Plan costing was used. Further, Construction costs were assigned 25% BTE, based on the average BTE calculated for this project type for projects where the detailed cost breakdown was used. 2.1.3.3. Overall BTE The resulting BTE for each project was obtained by summing the BTE for existing pavement value with the BTE for each additional cost component, as shown in Equation (7) below. TE Reconstructing Existing Lanes = % Used Value x Value of Reconstructing Existing Lanes (6) Region of Halton 2022 DC Background Study D-9 Where 2.1.4. New Alignments New alignments are constructed to accommodate the increased capacity needs associated with Growth. As such, the costs of new alignment projects were allocated 0% BTE (100% to Growth). 2.1.5. Traffic Management The Roads Capital Program 2022-2031 includes several projects in the Traffic Management category, for example:  Traffic signal (new, modifications)  New intersections or improvements to existing intersections (i.e., turn lanes) These projects are required to accommodate the additional traffic created by growth and for existing development. As such, traffic management projects were allocated 50% to Growth and 50% to Existing. 2.1.6. Provincial Freeway Interchanges The Region attributes the cost of provincial freeway interchange projects 100% to Growth. BTE = (7) BTE Reconstructing Existing Lanes + BTE Intersection Modifications + BTE New Signals and Signal Modifications + BTE Bridge Rehabilitation + BTE Grade Separation Rehabilitation + BTE Culvert Rehabilitation + BTE Engineering Design and Contingency BTE Reconstructing Existing Lan = BTE Intersection Modifications = BTE New Signals and Signal Mod= BTE Bridge Rehabilitation = BTE Grade Separation Rehabilita= BTE Culvert Rehabilitation = BTE Engineering Design and Con= % Used Value x Value of Reconstructing Existing Lanes 50% x Cost of Intersection Modifications 50% x Cost of New Signals and Signal Modifications 100% x Cost of Bridge Rehabilitation 100% x Cost of Grade Separation Rehabilitation 100% x Cost of Culvert Rehabilitation 50% x Cost of Engineering Design and Contingency Region of Halton 2022 DC Background Study D-10 Some projects in the Roads Capital Program may involve the Region's share of costs for new or improved interchanges on the provincial freeway system. These improvements create new access points and reduce congestion at upstream and downstream interchanges. The projects are implemented to provide additional capacity in the road network to serve Growth. An existing road user might benefit from these interchanges (if the trip length is reduced) but the benefit is offset in most cases by the increased traffic congestion created by growth. For new or improved freeway interchanges, the provincial share is typically to accommodate long distance travel and to improve operational issues at existing interchanges, with the Region's share of costs to accommodate transportation pressures due to growth only. The Region attributes the regional share of provincial freeway interchange project costs 100% to Growth. 2.1.7. Railway Grade Separations There are 17 existing and planned railway crossings in Halton Region. One of these crossings is of an abandoned line (Steeles Avenue between Regional Road 25 and Ontario Street), ten are already grade separated and five are planned for grade separation by 2031, under the current Regional Roads Capital Projects. The remaining crossing (Guelph Line between McLaren Rd and Campbell Ave) does not currently meet the grade separation warrant by 2031. 2.1.7.1. Widening of Existing Railway Grade Separations Railway grade separations are widened to accommodate increased capacity needs associated with Growth; however, Non-Growth benefits from a renewal of the existing deck of the grade separation structure. The BTE of the rehabilitation of the existing grade separation deck structure is calculated using the same methodology as explained for road widenings. For grade separations, the value of the existing deck replacement has been calculated using the Master Plan cost for deck reconstruction, as shown in Equation (8). Then the proportions of Residual and Used Values were calculated using equations (9) and (10) Value of Existing Deck = (8) MP cost for deck reconstruction ($/m 2 ) x existing surface area (m 2 ) % Used Value = 100% - % Residual Value (10) % Residual Value = Original Book Value - Cumulative Depreciation x 100% (9) Original Book Value Region of Halton 2022 DC Background Study D-11 The BTE of reconstructing the existing deck was then calculated using Equation (11). Since railway grade separations are primarily widened to accommodate Growth, no BTE deductions are allocated for other cost components, such as engineering, design, and construction. 2.1.7.2. Construction of New Grade Separations Where there is currently a level crossing in place, construction of a grade-separation benefits Growth by increasing the capacity of the roadway, but also benefits existing development in terms of safety improvement and the elimination for existing road users of the possibility of delays due to train movements. The number of train movements per day times the average annual daily traffic is correlated to a Benefit to Existing for the grade separation. Consistent with the 2012 and 2017 DC Technical Study methodology for new railway grade separations, the Region allocates a BTE credit to the full grade separation cost according to Table D-1. The allocation applied at each level rail crossing is based on the actual product (daily train movements times roadway traffic) and a prorating between the ranges. Table D-1 Grade Separation Benefit to Existing Daily Train Movements x Daily Roadway Traffic Benefit to Existing 200,000 5% 400,000 10% 600,000 15% 800,000 20% 1,000,000 25% 2.1.8. Structures (Bridges and Culverts) The capital roads plan may include rehabilitation and replacement of road-related structures, such as bridges. In cases where the structures are being replaced or installed to allow for roadway capacity increases, such as new roads or road widening, the residual value method has been applied to determine BTE. New structures are BTE Reconstruction of Existing Deck = % Used Value x Value of Rehabilitating Existing Deck (11) Region of Halton 2022 DC Background Study D-12 constructed when roads are widened or realigned to accommodate growth. As such, costs of new structures are allocated 100% to Growth. 2.1.9. Studies and Programs The Region allocates costs for studies and programmes as presented in Table D-2 below. Table D-2 Cost Allocating for Studies and Programmes Studies and Programs Growth BTE Transportation Master Plan 100% 0% Active Transportation Master Plan 100% 0% Data Management Group 100% 0% Transportation Tomorrow Survey 100% 0% Cordon Counts (TTS, 2016) 100% 0% Traffic and Screenline Counts 50% 50% Urban Design Guidelines 100% 0% Development Charges Transportation Background Study 100% 0% Travel Demand Management 50% 50% Active Transportation Initiatives 50% 50% Other Growth-Related Studies 100% 0% Operational Improvement and Studies 0% 100% 2.1.10. Summary of Cost Allocation Halton Region's allocation of cost to Growth as presented in this appendix is summarized in Table D-3. Further Table D-13 presents the cost allocation between Growth and Non-Growth for the 2023-2031 Roads Capital Projects, per the methodology presented in this chapter. Region of Halton 2022 DC Background Study D-13 Table D-3 Cost Allocation Summary 2.2. Previous 10-Year Service Level The DCA requires that the future level of service created by the infrastructure capacity improvement program that generated DCs does not exceed the average level of service that has been provided in the previous 10-year period. The level of service is measured in terms of both Quantity (lane km per capita) and Quality (undepreciated replacement cost, as well as volume/capacity ratios (v/c) or operating speed on regional roads). Project Type Growth Share (%) Road Reconstruction (no Widening) 0% 100% with the following deductions: deduction for existing roadway based on the used value of the existing lanes and the Master Plan* cost of resurfacing  50% deduction for intersection modifications and additions  50% deduction for signal modifications  100% deduction for rehabilitation of bridges, grade separations and culverts  If non-Master Plan costing is used, a 13% deduction is assigned to construction costs 100% with the following deductions:  deduction for existing roadway based on the used value of the existing lanes and the Master Plan cost of reconstruction  50% deduction for engineering and contingency costs  50% deduction for intersection modifications and additions  50% deduction for signal modifications  100% deduction for rehabilitation of bridges, grade separations and culverts  if non-Master Plan costing is used, a 50% deduction is assigned for engineering and design, and a 25% deduction is assigned to construction costs New Roads and Alignments 100% Traffic Management 50% Provincial Freeway Interchanges 100% Grade Separations - Widening 100% less deduction for rehabilitation of the existing structure, based on used value of the structure and the Master Plan cost of rehabilitation Grade Separations - New 100% less BTE per Table D-1 Structures - Widening 100% less deduction for rehabilitation of the existing structure, based on used value of the structure and the Master Plan cost of rehabilitation Structures - New 100% Studies and Programs BTE based on type of study or program * Master Plan Costed projects (formerly referred to as Benchmarked projects) Road Widening (no Reconstruction) Road Widening with Reconstruction Region of Halton 2022 DC Background Study D-14 Based on the Service Level analysis for Quantity and Quality, there is no increase in the 10-year service level, as discussed below. The 10-year Service Level review is consistent with the methodologies presented in the 2012 and 2017 DC Transportation Technical Study. 2.2.1. Service Level - Quantity The lane km per capita of DC eligible roads was calculated as 1.94 lane km per 1,000 population in 2017 and estimated at 1.86 lane km per 1,000 population in 2021 (with an estimated population of 624,094). The average for the 10-year period is 1.93 lane km per 1,000 population. Table D-4a presents the lane km and population for the past 10 years from 2012 to 2021. Table D-4a Historical Population and Regional Roadway Lane Kilometres (2012-2021) Year Lane kms (1) Population (2) Lane kms per 1,000 population 2012 980.40 509,929 1.92 2013 1,013.60 519,144 1.95 2014 1,047.60 527,866 1.98 2015 1,080.20 536,287 2.01 2016) 1,097.20 565,000 1.94 2017 1,108.91 573,000 1.94 2018 1,115.84 584,000 1.91 2019 1,131.41 598,000 1.89 2020 1,154.42 611,000 1.89 2021 (2) 1,163.43 624,094 1.86 - - Average = 1.93 Notes: (1) Lane kms are from Halton Region Roads Needs Study (2) Lane kms and Population are estimated for 2021 The DC eligible roads calculation for 2031 is 1.89 lane kilometres per 1,000 population (2031 population of 752,537 and 1,428.4 lane kilometres). This value is lower than the average for 2012 to 2021 presented in Table D-4a (1.93). Therefore, there is no Quantity increase over the previous 10-year service level. 2.2.2. Service Level - Quality (Regional Roadway Network Replacement Value) Ontario Regulation 82/98, an amendment to the DCA, states in subsection 4 (1) under Level of Service that: Region of Halton 2022 DC Background Study D-15 For the purposes of paragraph 4 of subsection 5(1) of the Act, both the quantity and quality of a service shall be taken into account in determining the level of service and the average level of service. O. Reg. 82/98, s. 4(1). (1.1) In determining the quality of a service under subsection (1), the replacement cost of municipal capital works, exclusive of any allowance for depreciation, shall be the amount used. O. Reg. 206/04, s. 1. This regulation is to ensure the design standards and replacement cost of Regional roadways is not exceeded in the 10-year history analysed through the DC process. As reported in previous DC Technical Reports, the Region is shifting to a more urban municipality where the rural lane kilometres represented about 70% of the network in 2002, to where there is an almost even split between the Region's rural and urban lane kilometres in 2011. By 2031, the urban lane kilometres will make up almost 90% of the Region's lane-kilometres. The road design characteristics that make up the base costs have not changed. The change is purely a result of increases in unit costing, a market condition, not through any changes to design or materials. Therefore, the Quality (Replacement Value) has not changed or improved as a result of regional undertakings. 2.2.3. Service Level - Quality (Additional Measures) The transportation network was also measured based on the volume/capacity (v/c) and Mean Speed for Provincial, Regional, and Local roads, as well as Network-wide. 2.2.3.1 Volume to Capacity Ratio If the v/c is increasing, it means that the roads are more congested, the operating speed is generally lower and a typical trip takes longer to accomplish. Hence the service level is lower if the v/c is increasing. The base year (TTS, 2016) performance measures result in a Regional Road Mean v/c of 0.67 and a Total Network (Provincial, Regional and Local) Mean v/c of 0.70, as shown in Table D-5. Region of Halton 2022 DC Background Study D-16 The 2031 road network, with all infrastructure capacity improvements in place, yields a projected Mean v/c of 0.65 and 0.69 for the regional roads and Total Network, respectively. The level of service will essentially remain the same for both networks. Hence, the previous 10-year period service level has not been exceeded. 2.2.3.2 Mean Speed The base year (TTS, 2016) performance measures result in a Regional Road Mean Speed of 53 km/h and a Total Network (Provincial, Regional and Local) Mean Speed of 51 km/h, as shown in Table D-5. The 2031 road network, with all infrastructure capacity improvements in place, yields a projected Mean Speed of 56 km/h and 53 km/h for the regional roads and Total Network, respectively. The level of service will essentially remain the same for both networks. Hence, the previous 10-year period service level has not been exceeded. 2.2.4. Service Level - Quality and Quantity (Additional Measures) In addition to the Quality and Quantity standards noted above, the Region has carried out an additional analysis to calculate historical 10- year average level of service to determine the eligible recovery amount. According to the DCA, the 10-year historical average service level defines an upper limit on the road improvements that are eligible to be included in the development charge. The growth-related share of the capital works to be included in the development charge may be no higher than this upper limit or "service level cap". As shown in Table D-4b below, the Region currently owns and maintains 1,161 lane km of road network. The amount provided over the historical 10-year period equates to an average level of investment of $15,642 per capita, resulting in a D.C. eligible recovery amount of $1,980,668,250 over the 2022-2031 forecast period. The eligible recovery amount includes the cost of roads, bridges, culverts, intersections and land. Region of Halton 2022 DC Background Study D-17 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Roads Quantity - lane km of roadways 2022 Value (incl land) Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/lane km) Lane-km 980 1,014 1,048 1,080 1,103 1,109 1,116 1,131 1,154 1,161 7,998,000 $ Total 980 1,014 1,048 1,080 1,103 1,109 1,116 1,131 1,154 1,161 Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0019 0.0019 0.0020 0.0020 0.0020 0.0020 0.0019 0.0019 0.0019 0.0019 10 Year Average 2012-2021 Quantity Standard 0.0019 Quality Standard 8,232,632 $ Service Standard 15,642 $ DC Amount (before deductions) 10-year Forecast Population (net) 126,625 $ per Capita 15,642 $ Eligible Amount 1,980,668,250 $ Table D-4b Region of Halton 2022 DC Background Study D-18 Summary The 2031 Service Level created by the DC eligible infrastructure improvements has been assessed on both a Quality and Quantity basis and compared to the average service levels in the previous 10-year period. As discussed above, there are minor changes between 2016 and 2031 which, within the context of the model accuracy, are insignificant. Overall, the planned capital projects do not result in a tangible increase in service level over the previous 10-year period; therefore, there is no basis for a level of service deduction. Region of Halton 2022 DC Background Study D-19 Table D-5 Road Jurisdictions (Centroid Connectors Excluded) 2.3. Traffic Flow Through Analysis Travel on the Regional Road network includes trips that are Internal; Internal/External or Through. "Through" trips are defined as the trips, which travel through the Region without stopping (i.e. both trip origin and destination are outside the Region). Future "through" trips have been produced from the Travel Demand Forecasting Model based on the analysis of origin/destination patterns of the traffic zones that are external to the Region, including zones in the rest of the GTA, Hamilton, Guelph, Waterloo, and Wellington. The current and future capacity potential of provincial highways in Halton Region relative to the existing and forecasted through trips has been assessed. In general, there is sufficient capacity on the provincial highway system in Halton Region to accommodate "through" trips now and in the future. People travelling between Hamilton and Peel Region, for instance, certainly have the capacity available on provincial Provincial Regional Local Total Total length (km) 146 321 1,146 1,613 Lane km 432 497 1,298 2,227 Mean v/c 0.92 0.67 0.57 0.70 Mean speed (km/h) 55 53 45 51 Total length (km) 153 361 1,160 1,674 Lane km 519 773 1,351 2,643 Mean v/c 0.87 0.65 0.60 0.69 Mean speed (km/h) 62 56 39 53 Total length (km) 7 40 14 61 Lane km 87 276 53 416 Mean v/c -0.05 -0.02 0.02 -0.01 Mean speed (km/h) 7 3 -6 1 Total length (km) 4.75% 12.43% 1.21% 3.76% Lane km 20.13% 55.59% 4.05% 18.67% Mean v/c -4.97% -2.50% 4.25% -1.44% Mean speed (km/h) 12.08% 6.40% -12.55% 2.23% One-way links - 2016 One-way links - 2031 One-way links - Change (2016 vs 2031) One-way links - % Change Region of Halton 2022 DC Background Study D-20 highways to make this long distance trip. In fact, people making "through" trips in the PM peak may choose to use Halton Regional roads for part of their trip. Reasons might include incidents or congestion on the provincial highways. To the extent that some "through" trips use regional roads and hence add to the pressure to improve the Regional Road network, this effect is more than offset by the larger number of internal or internal/external trips that use the provincial highways and hence reduce the pressure to improve the Regional Road network. The function of 407 ETR is considered the same as a provincial highway in accommodating longer distance (through) trips in that the province still owns the corridor and has built "expansion triggers" into the agreement with the private operator to ensure that additional capacity will be provided as growth in travel occurs. In reviewing the total road network in Halton Region, it is clear that provincial facilities have or can be expanded to provide sufficient capacity for all "through" trips up to the 2031-planning horizon. The impact that some "through" trips cause by choosing to use regional roads is more than offset by internal and internal/external trips that choose to use provincial facilities and hence reduce the pressure for regional road improvements. The Region creates the capacity in its road network to accommodate internal and internal/external trips. Some of these trips choose to use the provincial facilities, which create the opportunity for some through trips to use the regional road system. To gauge these effects, a simulation of PM peak hour road use within Halton Region was conducted and the vehicle km for each trip pattern on provincial, regional and municipal roads is summarized in Table D-6. On an absolute basis there are 55,383 vehicle-kilometres of "through" trips on regional roads vs. 85,524 vehicle-kilometres of internal Halton trips on provincial roads and 460,863 vehicle-kilometres of trips on provincial roads where either the trip origin or destination is in Halton Region in 2031. These figures have been highlighted in Table D-6 for ease of reference. Based on the assessment in this section, it is recommended that there be no deduction in DC Charges for "through" trips. Region of Halton 2022 DC Background Study D-21 Table D-6 PM Peak Hour Road Use within Halton Region 2016 Simulation Trips Provincial Regional Local Total Reg+Local Vehicle km by Jurisdiction (Excludes centroid connectors) Internal 59,633 63,971 149,408 204,866 418,246 354,275 Inbound 32,685 187,213 138,218 106,951 432,382 245,170 Outbound 25,458 173,649 96,108 94,270 364,027 190,378 Through N/A 485,276 48,742 40,793 574,812 89,535 Total 117,776 910,109 432,477 446,881 1,789,467 879,357 Distribution of vehicle km Internal 51% 7% 35% 46% 23% 40% Inbound 28% 21% 32% 24% 24% 28% Outbound 22% 19% 22% 21% 20% 22% Through 53% 11% 9% 32% 10% Total 100% 100% 100% 100% 100% 100% Mean travel distance per trip (km) Internal 1.1 2.5 3.4 7.0 5.9 Inbound 5.7 4.2 3.3 13.2 7.5 Outbound 6.8 3.8 3.7 14.3 7.5 2031 Simulation Trips Provincial Regional Local Total Reg+Local Vehicle km by Jurisdiction (Excludes centroid connectors) Internal 86,569 85,524 290,058 297,697 673,280 587,756 Inbound 33,142 200,897 142,321 121,734 464,953 264,055 Outbound 31,479 259,966 133,532 126,046 519,543 259,577 Through N/A 617,011 55,383 83,706 756,101 139,090 Total 151,190 1,163,398 621,295 629,184 2,413,877 1,250,478 Distribution of vehicle km Internal 57% 7% 47% 47% 28% 47% Inbound 22% 17% 23% 19% 19% 21% Outbound 21% 22% 21% 20% 22% 21% Through 53% 9% 13% 31% 11% Total 100% 100% 100% 100% 100% 100% Mean travel distance per trip (km) Internal 1.0 3.4 3.4 7.8 6.8 Inbound 6.1 4.3 3.7 14.0 8.0 Outbound 8.3 4.2 4.0 16.5 8.2 Change (2031-2016) Trips Provincial Regional Local Total Reg+Local Vehicle km by Jurisdiction (Excludes centroid connectors) Internal 26,936 21,553 140,650 92,831 255,034 233,481 Inbound 457 13,685 4,103 14,783 32,570 18,886 Outbound 6,021 86,317 37,424 31,775 155,516 69,199 Through N/A 131,735 6,641 42,913 181,289 49,554 Total 33,414 253,289 188,818 182,303 624,410 371,121 Distribution of vehicle km Internal 81% 9% 74% 51% 41% 63% Inbound 1% 5% 2% 8% 5% 5% Outbound 18% 34% 20% 17% 25% 19% Through 52% 4% 24% 29% 13% Total 100% 100% 100% 100% 100% 100% Mean travel distance per trip (km) Internal -0.1 0.8 0.0 0.8 0.8 Inbound 0.3 0.1 0.4 0.8 0.5 Outbound 1.4 0.5 0.3 2.2 0.8 Region of Halton 2022 DC Background Study D-22 2.4. Residential and Non-Residential Splits 2.4.1. Calculation of Split based on Number of Trips Associated with New Residents and Employment In the past, Growth-Related DCs were allocated between residential and non-residential land uses based on trips attributed to Population and Employment Growth. Through the 2017 DC Transportation Technical Report jobs in the Work-at-Home (WAH) and No- Fixed-Place-of-Work (NFPOW) category was considered such that jobs generate trips from a "residential" unit as opposed to a non-residential facility. This approach was applied in the 2022 DC Transportation Technical Report consistent with the methodology used in the 2017 DC Transportation Technical Report. Table D-8 summarizes the employment forecast excluding WAH, NFPOW employment, which is the basis for the transportation trip generation and DC employment forecast. Since the impact on transportation services from WAH employees is generated from the home and the population/unit forecast already includes these individuals, the calculations do not include employees associated with WAH. For NFPOW employees, the need for service related to these employees has largely been included in the employment forecast by usual place of work (i.e., employment and Gross Floor Area (GFA)) in the retail and accommodation sectors generated from NFPOW construction employment). Furthermore, since these employees have no fixed work address, they cannot be captured in the non-residential gross floor area calculation. Accordingly, NFPOW employees have been removed from the employment forecast and calculation. Table D-7 Residential and Non-Residential Growth For the period 2022-2031, the anticipated levels of growth in Residential and Non- Residential categories are: Year Pop. / Empl. WAH NFPOW Total 2021 624,094 - - 624,094 2031 752,537 - - 752,537 2021 327,683 (29,206) (32,625) 265,852 2031 390,000 (35,429) (39,289) 315,282 Residential Non Residential Residential and Non-Residential Growth Region of Halton 2022 DC Background Study D-23 Residential: 752,537 - 624,094 = 128,443 Non-Residential: 315,282 - 265,852 = 49,430 Table D-8 contains the trip rates derived from the Region's travel demand model to represent a mean trip rate for Halton Region for Residential and Non-Residential trips. These trip rates include WAH and NFPOW as generating trips from "Residential". Table D-8 Mean Trip Rates Using the updated trip rates and the growth projections, as modified, the Residential/Non-Residential split can be calculated as shown below. This equation shows that the employment trip rate was adjusted by 10% to better balance trip characteristics between these trip types in the AM and PM conditions. Residential Share = (128,443 x 0.595) x 100 = 63.9% (128,443 x 0.595) + (49.430 x 0.962)/1.1 AM Peak Factor) Based on the above calculation, the Residential/Non-Residential split is calculated at 64% and 36%, respectively. 2.4.2. Non-Residential Distribution Among Retail / Non-Retail The non-residential DC share (36%) may be further divided among different types of non-residential land uses to reflect the differences in associated trip-making behaviour. The non-residential DC share was distributed among 2 different land use types:  Retail  Non-Retail Trip type Trip Rate - Residential Trip Rate - Non-Res Origins in Halton Region (2022) (2022) Work 0 0.56 Home 0.091 0 Other 0.157 0.26 Destinations in Halton Region Home 0.208 0 Non-Home 0.139 0.142 Total Origins + Destinations 0.595 0.962 Region of Halton 2022 DC Background Study D-24 The methodology for allocating the non-residential DC share among the non-residential land use categories followed the steps as outlined below:  Obtain the automobile Peak hour of generator trip rate for each land use type  Adjust the automobile trip rates to account for transit trips as appropriate for each land use. These rates reflect targets established by the TMP, with adjustments made to reflect travel behaviour differences associated with each land use type.  Adjust the automobile trip rates for Pass-by and Diverted trips as appropriate for each land use category.  Define the forecasted Growth for each land use for 2022-2031  Calculate the total number of automobile trips associated with Growth of each land use by multiplying the adjusted trip generation rate by the Growth forecasted for 2022-2031.  Calculate the total non-residential trips by summing the number of automobile trips generated by each land use type.  Calculate the percentage of trips contributed by each land use type by dividing the number of trips for that land use type by the total non-residential trips.  Prorate the percentages such that they sum to the non-residential share by multiplying by the non-residential component. Following the above methodology, the Peak hour of generator trip rate and adjustments were made as presented in Table D-9. The allocation among the 2 non-residential land uses was derived and with the growth for each land use type defined, the individual land use trip contribution could then be determined as presented in Table D-10. Region of Halton 2022 DC Background Study D-25 Table D-9 Weighted Trip Generation Rates Table D-10 Calculation of Retail / Non-Retail Split (1) Category (2) Rate1 (3) Transit/ Pass-By Trip Reduction (4) Net Rate (Auto) (5) Category Weight2 (6) Trip Gen. X GFA Weight (100%-3) x (2) (4x5) Retail Trade (eg. Shopping Centre) 4.50 10% 4.05 48% 1.93 Finance & Insurance (eg. Bank and Financial Office) 3.48 13% 3.03 11% 0.35 Entertainment/Recreation (eg. Cinemas, fitness, recreation) 6.40 0% 6.40 7% 0.45 Food Services (eg. Restaurant, fast food) 19.53 54% 8.94 22% 1.99 Other Services (eg. auto care/personal services) 4.06 4% 3.88 12% 0.45 Total Retail 5.17 Industrial (eg. Light, Warehouse, Manufacturing) 0.90 0% 0.89 91% 0.82 Institutional (eg. Schools, Community centres, hospitals, place of worship) 3.26 21% 2.58 1% 0.03 Office (eg. general office, medical office) 2.05 16% 1.73 7% 0.13 Accommodation (eg. hotel/motel) 0.76 0% 0.76 0% 0.00 Total Non-Retail 0.98 May not add due to rounding 1 Derived from Institute of Transportatoin Engineers Trip Generation Manual 2 Weighting derived from Halton Region Employment Survey Retail Non-Retail (1) (2) (3) (4) (5) (6) Category Sq. Ft Peak Trip Rates Peak Trips (1) x (2) % Trips Revenue (Uninflated) (Total Revenues x (4)) $DC (5) / (1) Retail 6,281,583 5.17 32,461,889 27% 289,258,056 $ 46.049 $ Non-Retail 88,834,161 0.98 86,787,941 73% 762,673,010 8.585 $ Total 95,115,744 119,249,830 1,051,931,066 $ Region of Halton 2022 DC Background Study D-26 2.5. Grants, Subsidies and Developer Contributions The transportation improvement costs, which are to form the basis for DCs in Halton Region, must include deductions for any financial considerations through grants, subsidies or developer contributions. Where contributions have been provided, the cost was subtracted from the gross cost of the project. Where projects in the Roads Capital Projects involve new or improved interchanges with the provincial freeway system, only costs to be borne by the Region are included in the DC calculation and the sharing of these costs between Existing development and Growth is as set out in the BTE methodology. 2.6. Post-period Benefit (Oversizing) Post period benefit (Oversizing) has been applied where clear upsizing for future benefit is involved. Post period benefit deductions allowed during the current DC update will be recovered in DC updates for the post-2031 period. Correspondingly, the current DC update will recover post period benefit deductions allowed in earlier DC updates. Post period benefit was determined by consideration of the recommended timing of the project relative to the planning period for the DC Background Study and is consistent with the methodologies presented in the 2012 & 2017 DC Transportation Technical Study. Post planning period capacity for major infrastructure improvements is calculated only for projects with the last five years (2027 to 2031, inclusive) of the capital improvement plan. This calculation is proportional to the degree to which the v/c on the major improvement in 2031 is less than the average v/c on the associated screenline. As an example, if a road widening scheduled for 2029 results in a v/c of 0.75 in 2031 and the average v/c on the associated screenline in 2031 is 0.85, then a deduction for excess capacity is appropriate. The deduction applied to the project's DC chargeable component would be: .85 - .75 x 100 = 12%. .85 Region of Halton 2022 DC Background Study D-27 APPENDIX D - PART 3 THE DETAILED ROADS AND RELATED CAPITAL PROGRAM 3. THE DETAILED ROADS AND RELATED CAPITAL PROGRAM 3.1 Table D-11 sets out the 2022-2031 Roads Capital Program. The table provides project descriptions, a 2022-2026 annualized expenditure forecast, 2022-2031 consolidated forecasts, project-specific deductions for post-period benefit (oversizing) and "Non-Growth" (Benefit to Existing Development). The DC recoverable cost ("Net Growth") is then allocated between Residential and Non-residential benefit. The Region-wide roads program costs ($2022, $000s) involved are summarized as follows: Service Roads 2,441,079 $ 400,035 $ 238,006 $ 1,803,038 $ 1,153,937 $ 649,101 $ Note: May not add due to rounding Residential Share Gross Cost Less: Benefit to Existing Less: Post-Period Benefit Net Growth Residential Share Region of Halton 2022 DC Background Study D-28 Region of Halton 2022 DC Background Study D-29 Region of Halton 2022 DC Background Study D-30 Region of Halton 2022 DC Background Study D-31 Region of Halton 2022 DC Background Study D-32 Region of Halton 2022 DC Background Study D-33 Region of Halton 2022 DC Background Study D-34 Region of Halton 2022 DC Background Study Appendix E Calculation of Roads DC Applicable to Development in Halton Region of Halton 2022 DC Background Study E-2 APPENDIX E: PART 1 OVERVIEW OF ROADS DC CALCULATION 1. OVERVIEW OF ROADS DC CALCULATION 1.1. DC Cash Flow Methodology 1.1.1. DC Reserve Fund Opening Balance - the full uncommitted DC reserve fund balance is shown as the opening balance in the cash flow calculation. The DC is calculated so as to fully consume that amount, leaving a nil reserve fund balance at the end of the period in 2031. Tables 5-4a and 5-4b in Chapter 5 provide detailed schedules of the DC reserve fund continuity. 1.1.2. Project Costs - The nominal cost is in 2022$, as per Appendix D. The inflated cost (commencing in 2018) allows for average inflation of 2%/year, as approximated by the increase in the Statistics Canada Table 18-10-0135-01 Building Construction Price Indexes, by Non-residential buildings over the previous 10-year period. This rate may vary, up or down, in any year or sequence of years. It will be matched by the change in the DC quantum, which is determined by the same index. 1.1.3. DC Credits - are added to the development-related expenditures, as they represent the equivalent of Regional expenditures for works previously provided by developers which are not part of the capital program and must be funded (Chapter 4). 1.1.4. External Debt Charges - represent debt charges resulting from external debt previously incurred to fund the non-residential share of the road infrastructure costs (Chapter 4) included in the Total Unfunded Capital Costs. 1.1.5. Internal Debt Charges - represent the balance owing to the Regional reserve for previously incurred Regional funding of the non-residential share of the road infrastructure costs (Chapter 4) included in the Total Unfunded Capital Costs. 1.1.6. Historical Post-period Benefit (Oversizing) - is the cost share of previously funded roads infrastructure that, under the existing DC by-laws, was considered to benefit growth beyond the eligible planning horizon. This cost share is recoverable under the 2022 DC by-law as these costs benefit the planning horizon to 2031 based on the 2011 Best Planning Estimates (Chapter 4). 1.1.7. SDE/Sq.Ft. Per Year - are single-detached unit equivalents per year, i.e. the annual gross increase in population divided by the average occupancy for single detached units. This is the number of SDE's that are expected to be subject to the Roads DC (40,647 in total) (Table A-6b). Region of Halton 2022 DC Background Study E-3 In the case of the non-residential DC calculation, the charge is per square foot of non-residential TFA and the costs are allocated over a total of 95,115,744 sq.ft. (Table A-10b). 1.1.8. DC Rates - A DC is calculated, such that when it is inflated at 2%/year, the cash flow will produce a zero balance in 2031. 1.1.9. Anticipated Revenues - is the number of SDE or sq.ft. of non-residential TFA, multiplied by the required DC charge per SDE, or per square foot of non-residential TFA. 1.1.10. DC Reserve Fund Closing Balance Before Interest - The opening balance, less the inflated development-related expenditures, credits, debt charges and other commitments, plus the anticipated DC revenues. 1.1.11. Interest Earnings/Costs - provides for interest earnings on positive reserve fund balances at 3.5% per year and borrowing costs on negative balances at 3.5% per year. 1.1.12. DC Reserve Fund Closing Balance After Interest - is the DC reserve fund closing balance before interest, plus interest incurred during the year on the average balance. The cash flow calculations for roads are presented in Parts 2 and 3 of this appendix. The non-residential roads DC rate has also been calculated based on a retail/non-retail split and are presented in Part 3 (Table E-3) of this Appendix. Region of Halton 2022 DC Background Study E-4 APPENDIX E - PART 2 CASH FLOWS FOR REGION-WIDE RESIDENTIAL ROADS DCs SUMMARY OF CALCULATION RESULTS Per SDE New Calculated $30,366 Existing Charge (As of April 2021) $19,284 Region of Halton 2022 DC Background Study E-5 Table E-1 Halton Region 2022 Development Charges Study Roads - Residential Dev't Related Expenditures Nominal Inflated (2%/Yr) DC Credits Historical Oversizing 2022 8,555 - - (84,647,227) - 5,626 30,365.68 170,841,930 86,203,258 1,293,177 87,496,435 2023 87,496,435 (40,585,000) (41,396,700) - - - (2,373,559) 3,001 30,972.99 92,963,964 136,690,140 3,362,799 140,052,939 2024 140,052,939 (105,913,000) (110,191,885) - - - - 3,001 31,592.45 94,823,244 124,684,298 3,971,059 128,655,356 2025 128,655,356 (115,082,000) (122,125,939) - - - - 4,122 32,224.30 132,832,405 139,361,822 4,020,258 143,382,080 2026 143,382,080 (187,765,000) (203,242,875) - - - - 4,122 32,868.78 135,489,053 75,628,258 3,285,155 78,913,413 2027 78,913,413 (230,596,000) (254,596,617) - - - - 4,155 33,526.16 139,289,397 (36,393,807) 637,794 (35,756,013) 2028 (35,756,013) (72,869,000) (82,062,329) - - - - 4,155 34,196.68 142,075,185 24,256,843 (172,488) 24,084,356 2029 24,084,356 (85,559,000) (98,280,397) - - - - 4,155 34,880.62 144,916,689 70,720,647 1,422,075 72,142,722 2030 72,142,722 (110,353,000) (129,296,128) - - - - 4,155 35,578.23 147,815,022 90,661,617 2,442,065 93,103,682 2031 93,103,682 (205,215,000) (245,250,921) - - - - 4,155 36,289.79 150,771,323 (1,375,916) 1,375,916 0 Total (1,153,937,000) (1,286,443,791) - (84,647,227) - (2,373,559) 40,647 332,496 1,351,818,212 21,637,810 DC Rates w. Inflation (2%/Yr) DC Reserve Fund Closing Balance after Interest Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance SDE per Year Unfunded Capital External Debt Charges Region of Halton 2022 DC Background Study E-6 APPENDIX E - PART 3 CASH FLOWS FOR REGION-WIDE NON-RESIDENTIAL ROADS DCs SUMMARY OF CALCULATION RESULTS Per Sq.ft. TFA New Calculated: Retail $46.049 Non-Retail $8.585 Existing Charge (As of April 2021): Retail $30.279 Non-Retail $5.978 Region of Halton 2022 DC Background Study E-7 Table E-2 Halton Region 2022 Development Charges Study Roads - Non-residential Dev't Related Expenditures Nominal Inflated (2%/Yr) DC Credits Unfunded Capital 2022 (0) - (28,968) (47,436,000) (327,969,811) - (1,725,584) 4,254,555 11.059 47,053,185 (330,107,178) (4,951,608) (335,058,786) 2023 (335,058,786) (22,835,000) (23,291,700) (28,968) 3,968,917 11.28 44,772,053 (313,607,401) (9,729,993) (323,337,394) 2024 (323,337,394) (59,576,000) (61,982,870) (28,968) 3,968,917 11.51 45,667,494 (339,681,738) (9,945,287) (349,627,025) 2025 (349,627,025) (64,737,000) (68,699,422) (28,968) 3,968,917 11.74 46,580,844 (371,774,571) (10,821,024) (382,595,595) 2026 (382,595,595) (105,620,000) (114,326,485) (28,968) 3,968,917 11.97 47,512,461 (449,438,587) (12,480,513) (461,919,099) 2027 (461,919,099) (129,712,000) (143,212,529) - 14,997,104 12.21 183,123,102 (422,008,527) (13,258,914) (435,267,441) 2028 (435,267,441) (40,986,000) (46,156,893) - 14,997,104 12.45 186,785,564 (294,638,770) (10,948,593) (305,587,364) 2029 (305,587,364) (48,127,000) (55,282,795) - 14,997,104 12.70 190,521,275 (170,348,884) (7,139,044) (177,487,927) 2030 (177,487,927) (62,074,000) (72,729,584) - 14,997,104 12.96 194,331,700 (55,885,811) (3,500,606) (59,386,417) 2031 (59,386,417) (115,434,000) (137,954,316) - 14,997,106 13.22 198,218,365 877,632 (877,632) (0) Total (649,101,000) (723,636,595) (144,840) (47,436,000) (327,969,811) - (1,725,584) 95,115,744 121.10 1,184,566,043 (83,653,213) DC Reserve Fund Closing Balance after Interest Anticipated Revenues DC Reserve Fund Closing Balance before Interest Interest Earnings (3%) / Costs (3%) Year DC Reserve Fund Opening Balance Sq. Ft. per Year DC Rates w. Inflation (2%/Yr) Historical Oversizing Internal Debt Charges External Debt Charges Region of Halton 2022 DC Background Study E-8 Halton Region 2022 Development Charges Study Roads - Non-residential Revenue (Uninflated) Sq. Ft Calculated Rate Total Non-Residential 1,051,931,066 $ 95,115,744 11.059 $ Non-Residential Category Trip Gen.% Revenue (Uninflated) Sq. Ft DC Rate $ Retail 27% 289,258,056 $ 6,281,583 46.049 $ Non-Retail 73% 762,673,010 $ 88,834,161 8.585 $ Table E-3 Region of Halton 2022 DC Background Study Appendix F Calculation of General Services DC Applicable to Development in Halton Region of Halton 2022 DC Background Study APPENDIX F: CALCULATION OF GENERAL SERVICES DEVELOPMENT CHARGES APPLICABLE TO DEVELOPMENT IN HALTON (2022 TO 2031) (i.e. Growth Studies, Police, Paramedic Services, Facilities, Social Housing, Waste Diversion and Waterfront Parks) 1. DC Calculation Overview 2. Growth Studies 3. Halton Regional Police Service 4. Paramedic Services 5. Facilities 6. Social Housing 7. Waste Diversion 8. Waterfront Parks Region of Halton 2022 DC Background Study F-1 F.1 DC CALCULATION OVERVIEW Region of Halton 2022 DC Background Study F-2 F.1 SUMMARY OF THE CHARGE The DCs in this section have been calculated on the same cash flow basis as described in Appendix B. The charges are determined for the services in this section to produce a zero reserve fund balance at the end of 2031 for each of the services involved. The following (Table F-1) summarizes the estimated total project cost over the next 10- year planning horizon (2022-2031) for all services). Table F-2 summarizes the proposed DCs. Table F-1 Summary of Capital Project Costs for General Services ($2022, $000s) Table F-2 Proposed General Services Development Charges Residential Non- Residential Growth Studies 16,050 $ 6,275 $ - $ - $ 795 $ 8,980 $ 6,459 $ 2,521 $ Police* 83,586 19,508 27,521 - - 36,557 26,293 10,264 Paramedics 32,635 11,431 8,400 - - 12,804 11,330 1,474 Facilities 12,306 3,950 1,316 - - 7,040 5,972 1,068 Social Housing 100,100 50,050 - - - 50,050 50,050 - Waste Diversion 14,942 8,095 1,027 - 430 5,391 5,116 275 Waterfront Parks 37,620 14,868 14,848 - - 7,905 7,510 395 Total 297,239 $ 114,176 $ 53,112 $ - $ 1,225 $ 128,727 $ 112,729 $ 15,998 $ Note: May not add due to rounding * Includes discounted debt payments Services Total Cost 2022-2031 Less: Net Growth Net Growth Non-Growth Post Period Benefit Grants, Subsidies & Contributions Other Deductions Services Residential (SDE) Non- Residential (Sq.Ft.) Growth Studies 150.82 $ 0.060 $ Police 603.71 0.189 Paramedics 286.51 0.025 Facilities 98.01 0.014 Social Housing 985.82 Waste Diversion 95.72 0.003 Waterfront Parks 218.69 0.008 Total 2,439.28 $ 0.299 $ Region of Halton 2022 DC Background Study F-3 F.2 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR GROWTH STUDIES Region of Halton 2022 DC Background Study F-4 F.2 GROWTH STUDIES The Region of Halton will be required to undertake a number of studies over the 2022- 2031 period related to its proposed capital program for accommodating new development. These studies include growth studies (DC, feasibility, financing and service allocation studies), and Official Plan update and implementation studies. Section 7 of the DCA states that a DC by-law may provide for any DC eligible service or the capital costs with respect to those services. Further, a class may be composed of any number or combination of services and may include parts or portions of each DC eligible service. With respect to growth-related studies, Section 7(3) of the D.C.A. states that: "For greater certainty, a development charge by-law may provide for a class consisting of studies in respect of any service listed in subsection 2 (4) whose capital costs are described in paragraphs 5 and 6 of subsection 5 (3)." These provisions allow for services to be grouped together to create a class for the purposes of the DC by-law and DC reserve funds. The DC calculations and by-law provided herein include a class for growth studies. This class of service includes all services included in the DC by-law. No deduction has been made for benefit to existing development for the growth studies, as these are directly related to meeting the needs of growth. Official Plan studies are required to manage growth and development within the Region; however, not all components are related exclusively to growth (e.g. healthy communities, environmentally sensitive and natural areas, etc.). For this reason, and based on practice elsewhere, a 50% deduction for benefit to existing development has been made for Official Plan update and implementation studies. There is no post-period benefit (oversizing) resulting from these projects. An additional deduction has been made to reflect the share of the Growth Studies (5%) and Regional Official Plan Updates (10%) to recognize services that are no longer DC eligible. The residential/non-residential cost allocation was based on the ratio of forecast net population growth (including institutional population) from 2022-2031 to population plus employment growth (excluding work at home and no fixed place of work) for the same period: Region of Halton 2022 DC Background Study F-5 126,625 additional persons = 71.9% residential and 28.1% non-residential 126,625 persons + 49,429 additional employees Region of Halton 2022 DC Background Study F-6 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Growth Studies SERVICE: Growth Studies 2022 $ Less: Increased Service Needs Gross Benefit to Eligible Post Grants, Subsidies & Net Costs Attributable to Timing Capital Existing Increase Period Other Contributions Benefiting Residential Non-Res. Anticipated Development Cost Development/ in Need Benefit Attrib. to New Sub New Share Share 2022-2031 Est. U.E.C. Development Total Development 71.9% 28.1% Cost to be Incurred During Term of Proposed By-law Growth Studies 2022 350,000 $ - $ 350,000 $ 350,000 $ 17,500 $ 332,500 $ 239,147 $ 93,353 $ Growth Studies 2023 500,000 75,000 425,000 425,000 17,500 407,500 293,090 114,410 Regional OP Updates 2023 100,000 50,000 50,000 50,000 5,000 45,000 32,366 12,634 Growth Studies 2024 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2024 1,100,000 550,000 550,000 550,000 55,000 495,000 356,024 138,976 Growth Studies 2025 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2025 2,200,000 1,100,000 1,100,000 1,100,000 110,000 990,000 712,047 277,953 Growth Studies 2026 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2026 1,700,000 850,000 850,000 850,000 85,000 765,000 550,218 214,782 Cost to be Incurred Post By-law Term By-law Term (i.e. beyond 2026) Growth Studies 2027 350,000 $ - $ 350,000 $ 350,000 $ 17,500 $ 332,500 $ 239,147 $ 93,353 $ Regional OP Updates 2027 1,200,000 600,000 600,000 600,000 60,000 540,000 388,389 151,611 Growth Studies 2028 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2028 1,700,000 850,000 850,000 850,000 85,000 765,000 550,218 214,782 Growth Studies 2029 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2029 1,700,000 850,000 850,000 850,000 85,000 765,000 550,218 214,782 Growth Studies 2030 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2030 1,200,000 600,000 600,000 600,000 60,000 540,000 388,389 151,611 Growth Studies 2031 350,000 - 350,000 350,000 17,500 332,500 239,147 93,353 Regional OP Updates 2031 1,500,000 750,000 750,000 750,000 75,000 675,000 485,487 189,513 Total Estimated Capital Cost 16,050,000 $ 6,275,000 $ 9,775,000 $ - $ - $ 9,775,000 $ 795,000 $ 8,980,000 $ 6,458,771 $ 2,521,229 $ Other Deductions (to recognize benefit to non-D.C. services) Table F-3 Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-7 Halton Region 2022 Development Charges Background Study Cash Flow - Growth Studies - Residential $150.82 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (71,114) $ (239,147) $ (239,147) 6,416 $ 150.82 $ 967,653 $ 657,391 $ 19,722 $ 677,113 2023 677,113 (325,456) (331,965) 3,791 153.83 583,244 928,392 27,852 956,244 2024 956,244 (595,171) (619,216) 3,791 156.91 594,909 931,938 27,958 959,896 2025 959,896 (951,194) (1,009,415) 4,122 160.05 659,729 610,210 18,306 628,517 2026 628,517 (789,365) (854,435) 4,122 163.25 672,924 447,006 13,410 460,417 2027 460,417 (627,537) (692,851) 4,155 166.51 691,799 459,364 13,781 473,145 2028 473,145 (789,365) (888,954) 4,155 169.84 705,635 289,827 8,695 298,522 2029 298,522 (789,365) (906,733) 4,155 173.24 719,748 111,536 3,346 114,883 2030 114,883 (627,537) (735,259) 4,155 176.70 734,143 113,766 3,413 117,179 2031 117,179 (724,634) (866,005) 4,155 180.24 748,825 0 0 0 Total $ (6,458,771) $ (7,143,978) 43,017 $ 7,078,610 $ 136,483 Note: Numbers may not add due to rounding Table F-4 DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% Region of Halton 2022 DC Background Study F-8 Halton Region Cash Flow - Growth Studies - Non-Residential $0.060 3% / 3% per Sq. Ft. per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (2,945,576) $ (93,353) $ (93,353) 4,254,556 $0.060 $ 253,352 $ (2,785,577) $ (83,567) $ (2,869,144) 2023 (2,869,144) (127,044) (129,585) 3,968,917 0.061 241,069 (2,757,660) (82,730) (2,840,390) 2024 (2,840,390) (232,329) (241,715) 3,968,917 0.062 245,890 (2,836,215) (85,086) (2,921,302) 2025 (2,921,302) (371,306) (394,033) 3,968,917 0.063 250,808 (3,064,526) (91,936) (3,156,462) 2026 (3,156,462) (308,135) (333,535) 3,968,917 0.064 255,824 (3,234,172) (97,025) (3,331,197) 2027 (3,331,197) (244,963) (270,459) 14,997,104 0.066 986,001 (2,615,655) (78,470) (2,694,125) 2028 (2,694,125) (308,135) (347,010) 14,997,104 0.067 1,005,721 (2,035,413) (61,062) (2,096,476) 2029 (2,096,476) (308,135) (353,950) 14,997,104 0.068 1,025,836 (1,424,590) (42,738) (1,467,327) 2030 (1,467,327) (244,963) (287,014) 14,997,104 0.070 1,046,353 (707,989) (21,240) (729,228) 2031 (729,228) (282,866) (338,051) 14,997,104 0.071 1,067,280 0 0 0 Total $ (2,521,229) $ (2,788,704) 95,115,744 $ 6,378,134 $ (643,854) Note: Numbers may not add due to rounding Table F-5 2022 Development Charges Background Study Year DC Reserve Fund Opening Balance Sq. Ft. of Gross Floor Area Anticipated Revenues Annual Surplus/ (Deficit) DC Reserve Fund Closing Balance after Interest Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% Region of Halton 2022 DC Background Study F-9 F.3 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR HALTON REGIONAL POLICE SERVICE Region of Halton 2022 DC Background Study F-10 F.3 HALTON REGIONAL POLICE SERVICE 1. Facilities In 2021, the Halton Regional Police Service (HRPS) was operating out of 10 locations with a TFA of 313,607 sq.ft. excluding administrative space. The average cost per sq.ft. of this TFA is estimated to be $485 (2022$) including land, building, equipment, site work, etc. Building values were updated from 2017 and land values are based on a 33% lot coverage. As permitted by the DCA, the capital program for Police will incorporate the needs of growth to 2031. The Region has identified two growth-related capital expenditures over the next 10 years:  Debt for new Police Headquarters, 2485 North Service Road, Oakville - The Region issued a 30-year sinking fund debenture in the amount of $62.50 million for the construction of the new HRPS Headquarters of which the majority of the space will be allocated to operational (non-administrative) space. The growth- related principal and discounted growth-related interest payments have been included in the capital program for police services. The sq.ft. of operations space in the new headquarters expanded on and replaced the existing 90,814 sq.ft. of operations space in the old headquarters building (including the HRPS portion of shared space at the Halton Regional Centre). The Region has provided payments to the sinking fund since 2016. The amounts included in the calculations reflect the outstanding payments. The total outstanding principal amount is approximately $54.93 million. Of this amount, $16.52 million has been identified as the share of the facility that benefits existing development. A further deduction of $17.04 million was provided to reflect the share of the facility that would benefit growth post-2031. The outstanding growth-related interest payments, discounted to 2022 dollars totals approximately $6.46 million. Deductions have been applied for benefit to existing development ($4.52 million) and the share of the costs that benefit growth post 2031 ($2.01 million). In total, $23.88 million has been included in the DC calculations for this project.  Unfunded debt for the District 1 facility has also been included in the DC calculations. The total gross capital cost estimate for the growth-related Principal Region of Halton 2022 DC Background Study F-11 and discounted interest are $13.56 million. This amount was reduced by a deduction for the share of the costs that benefit growth post-2031. The resultant growth-related costs for this facility is $5.08 million. The allocation of the net DC recoverable costs between residential and non-residential development has been made in proportion to the ratio of new population to new employment over the next 10 years calculated as follows: 126,625 additional persons = 71.9% residential and 28.1% non-residential 126,625 persons + 49,429 additional employees 2. Vehicles and Equipment The number of police vehicles in the HRPS fleet has increased from 352 in 2016 to 374 in 2021. This inventory includes marked and unmarked cruisers, vans, pickup trucks, etc. The value of these vehicles includes equipment. For example, cruisers are equipped with radio/transmitter, computer/workstation, roof lights and siren with control console. The inclusion of police cars as part of DC's is considered to be permissible based on having an equivalent useful life of 7 years or more. Fleet expansions are clearly growth- related, and the police service is given special treatment in the DCA along with sewer, water, and roads. The vehicles have an anticipated useful lifetime of beyond 7 years, based on one shift per day use, which is the normal basis for determining use. The 7 years is a DC minimum threshold. The vehicles are actually used "24/7" and, as a result, are only used in a patrol function for several years. Many are subsequently used for non-patrol car functions (e.g. training) or replacement vehicles while vehicles are being repaired or are even sold and used by others. The Police inventory of equipment also includes equipment for individual officers. The value of the equipment varies from a base amount of $6,500 for all sworn officers to $20,800 for members of the K-9 Unit. The Region intends to continue to increase its inventory of vehicles, generally consistent with the increase in uniform staff. Over the next 10 years, it is estimated that 26 vehicles will be added to the fleet, including 15 marked and unmarked cruisers. In addition, it is estimated that the force will increase by 170 officers during the 2022- 2031 period. Region of Halton 2022 DC Background Study F-12 No deduction for benefit to existing development has been made, as the eligible increase in need will only maintain current levels of service and not provide any change in service provision or measurable benefit to existing development. No post-period benefit deduction has been made for the related capital needs. The net DC recoverable costs have been allocated 71.9% to residential development and 28.1% to non-residential development, consistent with the approach taken for facilities. 3. Radio Trunking Equipment As the Region continues to grow, it is necessary to make improvements to the radio system. Over the next 10 years, the Region will be required to make further investments in radio trunking equipment. The Region anticipates the need to invest in LTE/PSBN technology to enhance connectivity with additional officers and vehicles. This need is driven by increases in population, employment, building density, Regional infrastructure, commercial activities (signage, etc.) and increases in the number of officers. For example, radio coverage declines over time as buildings obstruct sight lines so, as the number of buildings increase, the Region will need to enhance connectivity. A total of $4.8 million has been allocated for system improvements (2022-2031). While this technological investment is a shift from the previous approach to erecting towers, the initial investment was funded from non-DC reserves. As a result, the additional investments in LTE/PSBN are considered to be largely growth-related and therefore will be subject to a 10% benefit to existing (BTE) deduction that reflects the fact while the Region's goal is to maintain 95% "in building" and 97% "out of building" radio coverage, it has not always done so. This reduction in coverage was partially offset in the past, by the installation of cell phones in police vehicles. In addition, HRPS will require one radio for each uniformed officer added and one mobile workstation for each additional police vehicle. No deduction is made for BTE for these expenditures. There is no post-period benefit (oversizing) resulting from these expenditures beyond the reduction required to remain within the service level cap. The net DC recoverable costs have been allocated 71.9% to residential development and 28.1% to non-residential development, based on the ratio of new population to new employment. Region of Halton 2022 DC Background Study F-13 4. Commitments to Carry into DC In previous DC background studies, the Region identified various projects for which unfunded commitments were to be carried into the DC. Prior to year-end, the Region has provided the necessary adjustments to the reserve fund to ensure there are no outstanding commitments to carry into the DC calculations. Region of Halton 2022 DC Background Study F-14 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Police Facilities Type of Capital Asset: Non-Administrative Space Quantity - Sq.ft. of Floor Space 2022 Value 2022 Value (incl land) Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) ($/sq.ft.) Sq. Ft. Cost Facilities: Police HQ - 1151 Bronte Road, Oakville - Non-Admin 80,101 80,101 80,101 80,101 80,101 80,101 332 $ 436 $ 480,605 209,543,774 $ Police HQ - 1151 Bronte Road, Oakville - Shared Facilities 10,713 10,713 10,713 10,713 10,713 10,713 332 436 64,278 28,025,208 Police HQ - 2485 North Service Road West, Oakville 167,161 167,161 167,161 167,161 427 530 668,645 354,381,689 Police HQ - Safety Village & Police Classroom 3,456 3,456 3,456 3,456 3,456 3,456 3,456 3,456 3,456 3,456 156 260 34,560 8,985,600 District 1 - Div 11 - 217 Guelph Street, Georgetown 10,200 10,200 10,200 10,200 10,200 10,200 10,200 10,200 10,200 10,200 323 406 102,000 41,412,000 District 1 - Div 12 - 490 Childs Drive, Milton 20,899 20,899 20,899 20,899 20,899 20,899 20,899 20,899 20,899 20,899 323 420 208,990 87,775,800 District 2 - Div 20 - 95 Oak Walk Drive, Oakville 70,002 70,002 70,002 70,002 70,002 70,002 70,002 70,002 70,002 70,002 408 511 700,020 357,710,220 District 3 - Div 30 - 3800 Southampton Blvd, Burlington 39,669 39,669 39,669 39,669 39,669 39,669 39,669 39,669 39,669 39,669 408 511 396,690 202,708,590 Store Front Offices: District 1 - Div 10 - Unit #3, 315 Queen Street, Acton 1,350 1,350 1,350 1,350 1,350 1,350 1,350 323 406 9,450 3,836,700 District 1 - Div 10 - 22 Main Street South, Acton 1,000 1,000 1,000 323 406 3,000 1,218,000 District 1 - Div 12 - Office at Campbellville Fire Station 120 120 120 120 120 120 120 120 120 120 323 420 1,200 504,000 District 1 - Div 12 - Office at Premium Outlet Mall 247 247 247 247 247 247 247 323 420 1,729 726,180 District 2 - 352 Kerr Street, Oakville 300 300 300 300 300 300 300 300 300 300 323 427 3,000 1,281,000 District 2 - Marine Unit, 2340 Ontario Street, Oakville 800 800 800 800 800 800 800 800 800 800 323 427 8,000 3,416,000 District 3 - 460 Brant Street, Burlington 534 534 534 534 534 534 323 427 3,204 1,368,108 Total 238,144 238,144 238,391 238,391 238,391 238,391 314,204 313,854 313,854 313,607 485.18 $ 2,685,371 1,302,892,870 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.4649 0.4552 0.4500 0.4424 0.4347 0.4262 0.5443 0.5351 0.5281 0.5203 10 Year Average 2012-2021 Quantity per capita 0.4801 Quality ($/sq.ft.) 485.18 $ Combined Quantity/Quality Level ($/capita) 232.94 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 232.94 $ Eligible Amount 29,495,491 $ Weighted Average Table F-6 Region of Halton 2022 DC Background Study F-15 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Police Type of Capital Asset: Vehicles 2022 Value Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($Vehicle) # of Vehicles Cost Vehicles: Marked & Unmarked Cruisers (various models) 119 119 121 132 134 152 152 152 152 152 80,000 $ 1,385 110,800,000 $ Marked Non-Cruisers (various models) 9 9 9 9 9 49,000 45 2,205,000 Plain / Unmarked Passenger Vehicles 111 123 124 127 127 158 158 159 160 160 44,200 1,407 62,189,400 Marked Cruisers - Supervisors 6 6 6 6 6 6 6 6 6 6 85,000 60 5,100,000 Standard Commercial Vans 8 8 8 8 8 6 6 6 6 6 45,500 70 3,185,000 Specialized Commercial Vans 9 9 9 9 9 9 9 9 9 9 95,000 90 8,550,000 Passenger Vans (Reallocated) 36 36 36 37 38 - - - - - 36,000 183 6,588,000 Pick up Trucks (Reallocated) 6 6 6 6 7 - - - - - 48,000 31 1,488,000 Open Trailer 5 5 5 5 5 9 9 9 9 9 6,000 70 420,000 Enclosed Trailer - customized 1 1 1 1 1 1 1 1 1 1 51,700 10 517,000 Enclosed Trailer - standard 1 1 2 2 2 10,000 8 80,000 Specialized Trucks 3 3 3 3 4 8 8 8 8 8 101,900 56 5,706,400 Mobile Command Unit (old, retired in 2015) 1 1 1 1 - - - - - 222,200 4 888,800 Mobile Command Unit (new, large) - - - - 1 1 1 1 1 1 640,500 6 3,843,000 Mobile Command Unit (new, small) - - - - 1 1 1 1 1 1 436,600 6 2,619,600 Motorcycle 6 7 7 7 7 7 7 7 7 5 43,100 67 2,887,700 Boats - Large 1 1 1 1 1 1 1 1 1 1 330,000 10 3,300,000 Boats - Small 2 2 2 2 2 2 2 2 2 2 30,000 20 600,000 Tactical Response Unit/EDU 1 1 1 1 1 1 1 1 1 1 250,000 10 2,500,000 Armoured Rescue Vehicle - - - - - 1 1 1 1 1 313,000 5 1,565,000 Total 315 328 331 346 352 373 373 375 376 374 63,515 $ 3,543 225,032,900 $ - - - - - - - - - - Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0006 0.0006 0.0006 0.0006 0.0006 0.0007 0.0006 0.0006 0.0006 0.0006 10 Year Average 2012-2021 Quantity per capita 0.0006 Quality ($/vehicle) 63,515 $ Combined Quantity/Quality Level ($/capita) 38.11 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 38.11 $ Eligible Amount 4,825,536 $ Quantity - No. of Vehicles Weighted Average Table F-7 Region of Halton 2022 DC Background Study F-16 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Police Type of Capital Asset Equipment for Officers 2022 Value Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/officer) # of Officers Cost Sworn Officers: Tactical Respond Unit 14 14 14 14 14 14 14 19 19 19 19,800 $ 155 3,069,000 $ K-9 Unit 5 5 6 7 7 7 7 7 7 7 20,800 65 1,352,000 Motorcycle Unit 20 20 20 20 20 20 20 20 20 20 9,900 200 1,980,000 Other Sworn Officers 604 620 627 636 641 654 663 672 691 705 6,500 6,513 42,334,500 Subtotal - Authorized Strength 643 659 667 677 682 695 704 718 737 751 6,933 48,735,500 Other Officers: Summons, Escort, Special Cst 30 31 31 31 31 31 31 31 31 31 3,700 309 1,143,300 Special Cst in Training 20 20 20 20 20 20 20 20 20 20 3,700 200 740,000 Police Cadets 6 6 6 6 6 6 6 6 6 6 3,400 60 204,000 Auxiliary Cst 51 65 65 65 65 65 65 65 65 65 3,500 636 2,226,000 Subtotal - Other Officers 107 122 122 122 122 122 122 122 122 122 1,205 4,313,300 Total 750 781 789 799 804 817 826 840 859 873 6,519 $ 8,138 53,048,800 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0014 10 Year Average 2012-2021 Quantity per capita 0.0015 Quality ($/officer) 6,519 $ Combined Quantity/Quality Level ($/capita) 9.78 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 9.78 $ Eligible Amount 1,238,137 $ Weighted Average Table F-8 Region of Halton 2022 DC Background Study F-17 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Police Type of Capital Asset Radio Trunking Equipment Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Radio Equipment: Value of Radio Trunking - Motorola 22,065,218 $ 24,167,510 $ 24,241,230 $ 24,092,290 $ 23,408,733 $ 22,775,314 $ 21,773,962 $ 21,610,342 $ 21,057,970 $ 20,645,069 $ Value of Radio Trunking - Motorola - End User Equipment 7,502,907 7,553,628 7,484,042 7,346,957 7,138,506 6,917,268 6,613,139 6,368,152 6,205,378 6,083,704 Mobile Workstation Equipment - 2020 - - - - - - 4,815 448,876 1,512,309 1,551,411 Mobile Workstation Equipment - 2013 - 1,887,160 1,982,796 1,946,477 1,891,251 1,832,637 1,752,062 1,687,156 1,644,031 1,611,795 Mobile Workstation Equipment - 2007 2,314,677 - - - - - - - - - Total 31,882,801 $ 33,608,297 $ 33,708,068 $ 33,385,724 $ 32,438,489 $ 31,525,218 $ 30,143,978 $ 30,114,526 $ 30,419,689 $ 29,891,979 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 62.24 $ 64.25 $ 63.62 $ 61.96 $ 59.15 $ 56.36 $ 52.22 $ 51.35 $ 51.19 $ 49.59 $ 10 Year Average 2012-2021 Combined Quantity/Quality Level ($/capita) 57.19 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 57.19 $ Eligible Amount 7,241,684 $ Value of Radio Trunking Equipment Table F-9 Region of Halton 2022 DC Background Study F-18 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Police SERVICE: Police 2022$ Increased Service Needs Gross Benefit to Grants, Subsidies & Less:Other Net Costs Attributable to Capital Existing Eligible Post Other Contributions (e.g.10% Benefiting Residential Non-Res. Anticipated Development Cost Development/ Increase Period Attrib. to New Sub Statutory New Share Share 2022-2031 Timing Est. U.E.C. in Need Benefit Development Total Deduction) Development 71.9% 28.1% Cost to be Incurred During Term of Proposed By-law (i.e. 2022-2026) Debt for New HQ - 2485 North Service Road, Oakville - Principal 2022+ 54,931,856 $ 16,523,579 $ 38,408,278 $ 17,043,863 $ 21,364,414 $ 21,364,414 $ 15,366,132 $ 5,998,283 $ Debt for New HQ - 2485 North Service Road, Oakville - Growth Related Discounted Interest 2022+ 6,462,200 1,943,839 4,518,361 2,005,045 2,513,316 2,513,316 1,807,676 705,640 Unfunded Debt for District 1 - Growth Related Principal 2023+ 10,659,483 10,659,483 6,662,177 3,997,306 3,997,306 2,875,021 1,122,285 Unfunded Debt for District 1 - Growth Related Discounted Interest 2023+ 2,896,177 2,896,177 1,810,110 1,086,066 1,086,066 781,142 304,924 Technology - LTE/ PSBN Project 2022 728,000 72,800 655,200 - 655,200 655,200 471,246 183,954 Equipment 2022 91,000 91,000 91,000 91,000 65,451 25,549 Additional Vehicles 2022 755,200 755,200 755,200 755,200 543,170 212,030 Radio Equipment 2022 84,000 84,000 84,000 84,000 60,416 23,584 Technology - LTE/ PSBN Project 2023 728,000 72,800 655,200 - 655,200 655,200 471,246 183,954 Equipment 2023 84,500 84,500 84,500 84,500 60,776 23,724 Additional Vehicles 2023 - - - - - - Radio Equipment 2023 48,000 48,000 48,000 48,000 34,523 13,477 Technology - LTE/ PSBN Project 2024 728,000 72,800 655,200 - 655,200 655,200 471,246 183,954 Technology - P25 / LTE - Backhaul 2024 1,400,000 700,000 700,000 - 700,000 700,000 503,468 196,532 Equipment 2024 175,500 175,500 175,500 175,500 126,227 49,273 Additional Vehicles 2024 328,400 328,400 328,400 328,400 236,198 92,202 Radio Equipment 2024 84,000 84,000 84,000 84,000 60,416 23,584 Technology - LTE/ PSBN Project 2025 700,000 70,000 630,000 - 630,000 630,000 453,121 176,879 Equipment 2025 169,000 169,000 169,000 169,000 121,551 47,449 Additional Vehicles 2025 - - - - - - Radio Equipment 2025 48,000 48,000 48,000 48,000 34,523 13,477 Technology - LTE/ PSBN Project 2026 518,000 51,800 466,200 - 466,200 466,200 335,309 130,891 Equipment 2026 97,500 97,500 97,500 97,500 70,126 27,374 Additional Vehicles 2026 328,400 328,400 328,400 328,400 236,198 92,202 Radio Equipment 2026 84,000 84,000 84,000 84,000 60,416 23,584 Table F-10 Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-19 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Police SERVICE: Police 2022$ Increased Service Needs Gross Benefit to Grants, Subsidies & Less:Other Net Costs Attributable to Capital Existing Eligible Post Other Contributions (e.g.10% Benefiting Residential Non-Res. Anticipated Development Cost Development/ Increase Period Attrib. to New Sub Statutory New Share Share 2022-2031 Timing Est. U.E.C. in Need Benefit Development Total Deduction) Development 71.9% 28.1% Cost to be Incurred Post Term of Proposed By-law (i.e. beyond 2026) Equipment 2027 97,500 $ 97,500 $ 97,500 $ 97,500 $ 70,126 $ 27,374 $ Additional Vehicles 2027 - - - - - - Radio Equipment 2027 48,000 48,000 48,000 48,000 34,523 13,477 Equipment 2028 97,500 97,500 97,500 97,500 70,126 27,374 Additional Vehicles 2028 328,400 328,400 328,400 328,400 236,198 92,202 Radio Equipment 2028 84,000 84,000 84,000 84,000 60,416 23,584 Equipment 2029 97,500 97,500 97,500 97,500 70,126 27,374 Additional Vehicles 2029 - - - - - - Radio Equipment 2029 48,000 48,000 48,000 48,000 34,523 13,477 Equipment 2030 97,500 97,500 97,500 97,500 70,126 27,374 Additional Vehicles 2030 328,400 328,400 328,400 328,400 236,198 92,202 Radio Equipment 2030 84,000 84,000 84,000 84,000 60,416 23,584 Equipment 2031 97,500 97,500 97,500 97,500 70,126 27,374 Additional Vehicles 2031 - - - - - - Radio Equipment 2031 48,000 48,000 48,000 48,000 34,523 13,477 Total Estimated Capital Cost 83,585,515 $ 19,507,617 $ 64,077,898 $ 27,521,196 $ - $ 36,556,703 $ - $ 36,556,703 $ 26,293,026 $ 10,263,676 $ Level of Service Summary Eligible Amount Police Facilities 29,495,491 $ Vehicles 4,825,536 Equipment for Officers 1,238,137 Radio Trunking Equipment 7,241,684 Total 42,800,847 $ Table F-10 (continued) Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-20 Halton Region 2022 Development Charges Study Cash Flow Calculation - Police - Residential $603.71 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ 2,177,442 $ (1,140,282) $ (1,140,282) $ (1,828,077) 6,416 $ 603.71 $ 3,873,512 $ 3,082,595 $ 92,478 $ 3,175,073 2023 3,175,073 (566,545) (577,876) (2,262,166) 3,791 615.79 2,334,727 2,669,758 80,093 2,749,851 2024 2,749,851 (1,397,554) (1,454,016) (2,537,106) 3,791 628.10 2,381,421 1,140,151 34,205 1,174,355 2025 1,174,355 (609,196) (646,484) (2,599,454) 4,122 640.66 2,640,896 569,314 17,079 586,393 2026 586,393 (702,050) (759,921) (2,617,268) 4,122 653.48 2,693,714 (97,083) (2,912) (99,995) 2027 (99,995) (104,649) (115,541) (2,617,268) 4,155 666.55 2,769,270 (63,534) (1,906) (65,440) 2028 (65,440) (366,740) (413,009) (2,617,268) 4,155 679.88 2,824,656 (271,062) (8,132) (279,194) 2029 (279,194) (104,649) (120,209) (2,617,268) 4,155 693.48 2,881,149 (135,523) (4,066) (139,589) 2030 (139,589) (366,740) (429,695) (2,617,268) 4,155 707.35 2,938,772 (247,780) (7,433) (255,213) 2031 (255,213) (104,649) (125,066) (2,617,268) 4,155 721.49 2,997,547 0 0 0.00 Total $ (5,463,056) $ (5,782,099) $ (24,930,413) 43,017 $ 28,335,665 $ 199,405 Note: Numbers may not add due to rounding Table F-11 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% Total Debt Payments DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-21 Halton Region 2022 Development Charges Study Cash Flow Calculation - Police - Non-Residential $0.189 3% / 3% per Sq. Ft. per Year Inflated at (2%) Starting in 2018 RF Interest Earnings / (Cost) 2022 $ (6,370,577) $ (445,118) $ (445,118) $ (713,603) 4,254,556 $ 0.189 $ 802,863 $ (6,726,435) $ (201,793) $ (6,928,228) 2023 (6,928,228) (221,155) (225,578) (883,053) 3,968,917 0.192 763,941 (7,272,919) (218,188) (7,491,106) 2024 (7,491,106) (545,546) (567,586) (990,378) 3,968,917 0.196 779,219 (8,269,850) (248,096) (8,517,946) 2025 (8,517,946) (237,804) (252,360) (1,014,716) 3,968,917 0.200 794,804 (8,990,218) (269,707) (9,259,924) 2026 (9,259,924) (274,050) (296,641) (1,021,670) 3,968,917 0.204 810,700 (9,767,535) (293,026) (10,060,561) 2027 (10,060,561) (40,851) (45,102) (1,021,670) 14,997,104 0.208 3,124,609 (8,002,725) (240,082) (8,242,807) 2028 (8,242,807) (143,160) (161,221) (1,021,670) 14,997,104 0.213 3,187,101 (6,238,597) (187,158) (6,425,755) 2029 (6,425,755) (40,851) (46,925) (1,021,670) 14,997,104 0.217 3,250,843 (4,243,506) (127,305) (4,370,811) 2030 (4,370,811) (143,160) (167,734) (1,021,670) 14,997,104 0.221 3,315,860 (2,244,356) (67,331) (2,311,687) 2031 (2,311,687) (40,851) (48,820) (1,021,670) 14,997,104 0.226 3,382,177 0 0 0 Total $ (2,132,544) $ (2,257,085) $ (9,731,770) 95,115,744 $ 20,212,116 $ (1,852,684) Note: Numbers may not add due to rounding Table F-12 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% Total Debt Payments DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Sq. Ft. of Gross Floor Area Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-22 F.4 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR PARAMEDIC SERVICES Region of Halton 2022 DC Background Study F-23 F.4 PARAMEDIC SERVICES 1. Paramedic Facilities In 2021, the Region was operating out of 17 buildings located throughout Halton. The average cost per square foot for the stations in the inventory is $781, including land, site works, and FFE but excluding vehicles. The replacement value of the facilities was based on three recently constructed stations; one in Oakville and two in Milton. As discussed in section F.3, land values have been estimated based on recent appraisal information and an assumption of 33% lot coverage. The Region's capital plans involve an expansion to the Paramedic Services Headquarters. Design work will be undertaken in 2022 with construction scheduled for 2024. The current facility, shared with Woodlands Operations Centre is 57,960 sq.ft. The portion of the existing facility that is attributable to Paramedic services is 18,537 sq.ft. which includes shared space (i.e. hallways, washrooms and other common areas shared with the Operations service). The Region is planning to construct a 40,000 sq.ft. expansion to accommodate current Paramedic staff as well as the additional staff and space required for growth. As a result, the portion of the space that is considered replacement and therefore benefits existing development is 46.34% (18,537 sq.ft./40,000 sq.ft.) The expansion of this facility for Paramedic services is to be undertaken in 2022 and will accommodate growth out to 2035. As the forecast period for the capital works is 2022-2031, the number of years outside of the forecast period is 4, which results in a post-period benefit of 33.33% (4 years/12 years). A further deduction for post-period benefit has been made as the eligible cost for this project exceeds the service level cap. The allocation of costs attributable to growth between residential and non-residential development has been made based on the ratio of forecast increased population to employment, with population weighted at 3 times employment, in order to reflect the disproportional use of this service by residents, in comparison to employees. This reflects the fact that employees are in the Region 1,500-2,000 hours/year, in comparison with residents who are generally in the Region in excess of 5,000 hours/year and include a larger number of seniors' requirements. Therefore, the calculation for the residential share is: Region of Halton 2022 DC Background Study F-24 126,625 additional persons x 3 = 88.5% residential and 11.5% non-residential 126,625 x 3 + 49,429 additional employees 2. Vehicles and Equipment The Region's inventory of vehicles for Paramedic services includes ambulance vehicles, emergency response units, support service vehicles and an emergency support unit. These vehicles have been valued based on 2022$ (including equipment) and reflect recent purchase experience. The Region will require additional (i.e. non-replacement) ambulance vehicles to provide service to new development. The 10-year capital program includes the acquisition of 26 additional ambulances, 9 additional emergency response units, and one transit high top van. Typically these vehicles are kept in service for 4½ to 6 years for ambulances and 3 to 4 years for emergency response units. Ambulances and emergency response units are included in the calculation because these vehicles have an anticipated useful lifetime beyond 7 years, based on one shift per day use, which is the normal basis for determining use. The 7 years is a DC minimum threshold. The vehicles are actually used "24/7" and as a result, are used for the equivalent of 7 years or more. In addition, many are subsequently used as replacement vehicles, donated to St. John's Ambulance, or are sold and used by others for additional years. The benefit to existing development has been assessed as 5% for vehicles and equipment, as these are required almost exclusively for additional calls; however, by placing these vehicles in new or relocated stations, they may provide a marginally improved level of service to the general area in which they are located. There is no post-period benefit (oversizing) resulting from these projects beyond the reduction for service level cap. The allocation of DC recoverable costs between residential and non-residential development is 88.5% and 11.5%, respectively, consistent with the approach used for ambulance Paramedic services stations. Region of Halton 2022 DC Background Study F-25 Halton Region 2022 Development Charges Background Study Average Level of Service Table F-13 Service: Paramedic Services Type of Capital Asset: Stations Quantity - Sq.Ft. of Floor Space 2022 Value (incl land) Weighted Average Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) Sq Ft. Cost Ambulance Services Headquarters (1179 Bronte) (T6703A) 15,187 15,187 15,187 15,187 15,187 15,187 15,187 15,187 15,187 15,187 700 $ 803 $ 151,870 121,951,610 $ Ambulance Services Headquarters (1179 Bronte) (T6703A) (common/core area) 3,350 3,350 3,350 3,350 3,350 3,350 3,350 3,350 3,350 3,350 380 483 33,500 16,180,500 Acton (T6704A) 2,525 2,525 2,525 2,525 2,525 2,525 2,525 2,525 2,525 2,525 700 783 25,250 19,770,750 Burlington West (Aldershot, 1018 Willowbrook) 2,230 2,230 2,230 2,230 2,230 2,230 2,230 2,230 2,230 2,230 700 803 22,300 17,906,900 Burlington Central (455 Cumberland Ave) 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 1,900 700 803 19,000 15,257,000 Milton Central (T6707A) 4,740 4,740 4,740 4,740 4,740 4,740 4,740 4,740 4,740 4,740 700 796 47,400 37,730,400 Oakville Northeast (T6708A) 3,120 3,120 3,120 3,120 3,120 3,120 3,120 3,120 3,120 3,120 700 803 31,200 25,053,600 Milton Campbelleville (Reid Sideroad) (T6709A) 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 2,340 700 796 23,400 18,626,400 Burlington East (Corporate Drive) (T6706A) 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 700 803 20,000 16,060,000 Burlington North (Brant Street) (T6705A) under construction 2006 3,066 3,066 3,066 3,066 3,066 3,066 3,066 3,066 3,066 3,066 700 803 30,660 24,619,980 53 Maple Avenue (Georgetown) 3,912 3,912 3,912 3,912 3,912 3,912 3,912 3,912 3,912 3,912 700 783 39,120 30,630,960 Station 12 Oakville SE (1080 Cornwall Rd) 3,063 3,063 3,063 3,063 3,063 3,063 3,063 3,063 3,063 3,063 700 803 30,630 24,595,890 Station 14 Oakville NW (3019 Pine Glen Rd) - - - 6,094 6,094 6,094 6,094 6,094 6,094 6,094 700 803 42,658 34,254,374 Oakville South Service Rd. storage - - - 4,478 4,478 4,478 4,478 4,478 4,478 4,478 700 803 31,346 25,170,838 Davis Road 2,050 2,050 2,050 - - - - - - - 700 803 6,150 4,938,450 Oakville SW (289 Woodside Drive) 3,127 3,127 700 803 6,254 5,021,801 Urban Milton (6650 Fifth Line) 3,127 3,127 700 796 6,254 4,978,025 South Milton (7815 Louis St. Laurent Avenue) 4,400 4,400 700 796 8,800 7,004,800 Total 49,483 49,483 49,483 58,005 58,005 58,005 58,005 58,005 68,659 68,659 781 $ 575,792 449,752,278 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0966 0.0946 0.0934 0.1077 0.1058 0.1037 0.1005 0.0989 0.1155 0.1139 10 Year Average 2012-2021 Quantity per capita 0.1031 Quality ($/sq.ft.) 781.10 $ Combined Quantity/Quality Level ($/capita) 80.53 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 80.53 $ Eligible Amount 10,197,323 $ Table F-13 2022 Value, incl. site works, etc. ($/sq.ft.) Region of Halton 2022 DC Background Study F-26 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Paramedic Services Type of Capital Asset Vehicles Quantity - No. of Vehicles 2022 Value Weighted Average Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/vehicle) # of Vehicles Cost Ambulance Vehicles 30 31 31 32 32 33 35 36 36 36 284,400 $ 332 94,420,800 $ ERU Paramedic (SUV) 6 6 6 6 6 5 6 7 7 9 144,200 64 9,228,800 ERU Management (SUV) 2 2 2 3 4 4 6 6 6 6 148,100 41 6,072,100 SSU Transit Connect 1 1 1 1 1 1 1 1 1 1 51,000 10 510,000 SSU Transit High Top Van - 1 1 1 1 51,000 4 204,000 SSU Cube Van 1 1 1 1 1 1 1 1 1 1 98,100 10 981,000 ESU Emergency Support Unit 1 1 1 1 1 1 1 1 1 1 391,700 10 3,917,000 Total 41 42 42 44 45 45 51 53 53 55 244,870 $ 471 115,333,700 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Service Level Per 1,000 persons 0.0800 0.0803 0.0793 0.0817 0.0821 0.0804 0.0884 0.0904 0.0892 0.0912 10 Year Average 2012-2021 Quantity per 1,000 persons 0.0843 Quality ($/Vehicle) 244,870 $ Combined Quantity/Quality Level ($/1,000 persons) 20,643 $ Combined Quantity/Quality Level ($/capita) 20.64 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 20.60 $ Eligible Amount 2,608,475 $ Notes: Power Cots are included in the replacement cost of vehicles Spare ambulances are included in the Service Standard Table F-14 Region of Halton 2022 DC Background Study F-27 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Paramedic Services SERVICE: Paramedic Services Increased Service Needs Gross Benefit to Eligible Post Grants, Subsidies & Net Costs Non- Attributable to Timing Capital Existing Increase Period Other Contributions Benefiting Residential Residential Anticipated Development Cost Development/ in Need Benefit Attrib. to New Sub New Share Share 2022-2031 Est. U.E.C. Development Total Development 88.5% 11.5% Cost to be Incurred During Term of Proposed By-law Paramedics Services New HQ (Design) 2022 1,500,000 $ 695,000 $ 805,000 $ 500,000 $ - $ 305,000 $ 305,000 $ 269,883 $ 35,117 $ Ambulance (Qty 2) 2022 569,000 28,000 541,000 - 541,000 541,000 478,711 62,289 Ambulance (Qty 3) 2023 853,000 43,000 810,000 - 810,000 810,000 716,739 93,261 Emergency Response Unit- Paramedics (Qty 1) 2023 144,000 7,000 137,000 - 137,000 137,000 121,226 15,774 Emergency Response Unit- Management (Qty 2) 2023 296,000 15,000 281,000 - 281,000 281,000 248,646 32,354 Master Plan 2023 175,000 9,000 166,000 - 166,000 166,000 146,887 19,113 Ambulance (Qty 1) 2024 284,000 14,000 270,000 - 270,000 270,000 238,913 31,087 Emergency Response Units- Paramedics (Qty 1) 2024 144,000 7,000 137,000 - 137,000 137,000 121,226 15,774 Paramedics Services New HQ (Construction) 2024 22,200,000 10,288,000 11,912,000 7,400,000 - 4,512,000 4,512,000 3,992,499 519,501 Ambulance (Qty 3) 2025 853,000 43,000 810,000 - 810,000 810,000 716,739 93,261 Emergency Response Unit- Paramedics (Qty 1) 2025 144,000 7,000 137,000 - 137,000 137,000 121,226 15,774 SSU Transit High Top Van (Qty 1) 2025 51,000 3,000 48,000 - 48,000 48,000 42,473 5,527 Ambulance (Qty 3) 2026 853,000 43,000 810,000 - 810,000 810,000 716,739 93,261 Cost to be Incurred Post By-law Term (I.e. beyond 2026) Ambulance (Qty 3) 2027 853,000 $ 43,000 $ 810,000 $ - $ 810,000 $ 810,000 $ 716,739 $ 93,261 $ Emergency Response Unit- Paramedics (Qty 1) 2027 144,000 7,000 137,000 - 137,000 137,000 121,226 15,774 Ambulance (Qty 3) 2028 853,000 43,000 810,000 - 810,000 810,000 716,739 93,261 Emergency Response Unit- Management (Qty 1) 2028 148,000 7,000 141,000 - 141,000 141,000 124,766 16,234 Ambulance (Qty 3) 2029 853,000 43,000 810,000 - 810,000 810,000 716,739 93,261 Ambulance (Qty 2) 2030 569,000 28,000 541,000 - 541,000 541,000 478,711 62,289 Emergency Response Unit- Management (Qty 2) 2030 296,000 15,000 281,000 - 281,000 281,000 248,646 32,354 Ambulance (Qty 3) 2031 853,000 43,000 810,000 500,000 - 310,000 310,000 274,307 35,693 Total Estimated Capital Cost 32,635,000 $ 11,431,000 $ 21,204,000 $ 8,400,000 $ - $ 12,804,000 $ 12,804,000 $ 11,329,779 $ 1,474,221 $ Level of Service Summary Eligible Amount Stations 10,197,323 $ Vehicles 2,608,475 Total 12,805,798 $ Table F-15 Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-28 Halton Region 2022 Development Charges Study Cash Flow Calculation - Paramedics - Residential $286.51 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (853,200) $ (748,594) $ (748,594) 6,416 $ 286.51 $ 1,838,268 $ 236,474 $ 7,094 $ 243,568 2023 243,568 (1,233,498) (1,258,168) 3,791 292.24 1,108,001 93,401 2,802 96,203 2024 96,203 (4,352,639) (4,528,485) 3,791 298.08 1,130,161 (3,302,122) (99,064) (3,401,186) 2025 (3,401,186) (880,438) (934,328) 4,122 304.04 1,253,301 (3,082,213) (92,466) (3,174,679) 2026 (3,174,679) (716,739) (775,821) 4,122 310.12 1,278,367 (2,672,134) (80,164) (2,752,298) 2027 (2,752,298) (837,965) (925,181) 4,155 316.33 1,314,224 (2,363,255) (70,898) (2,434,153) 2028 (2,434,153) (841,504) (947,670) 4,155 322.65 1,340,508 (2,041,315) (61,239) (2,102,554) 2029 (2,102,554) (716,739) (823,307) 4,155 329.11 1,367,318 (1,558,543) (46,756) (1,605,300) 2030 (1,605,300) (727,357) (852,215) 4,155 335.69 1,394,665 (1,062,850) (31,885) (1,094,735) 2031 (1,094,735) (274,307) (327,823) 4,155 342.40 1,422,558 (0) (0) (0) Total $ (11,329,779) $ (12,121,592) 43,017 $ 13,447,369 $ (472,577) Note: Numbers may not add due to rounding Table F-16 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-29 Halton Region 2022 Development Charges Study Cash Flow Calculation - Paramedics - Non-Residential $0.025 3% / 3% per Sq. Ft. per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (800,854) $ (97,406) $ (97,406) 4,254,556 $ 0.025 $ 105,570 $ (792,690) $ (23,781) $ (816,471) 2023 (816,471) (160,502) (163,712) 3,968,917 0.025 100,452 (879,730) (26,392) (906,122) 2024 (906,122) (566,361) (589,242) 3,968,917 0.026 102,461 (1,392,903) (41,787) (1,434,691) 2025 (1,434,691) (114,562) (121,574) 3,968,917 0.026 104,510 (1,451,754) (43,553) (1,495,307) 2026 (1,495,307) (93,261) (100,949) 3,968,917 0.027 106,601 (1,489,655) (44,690) (1,534,345) 2027 (1,534,345) (109,035) (120,384) 14,997,104 0.027 410,862 (1,243,867) (37,316) (1,281,183) 2028 (1,281,183) (109,496) (123,310) 14,997,104 0.028 419,079 (985,414) (29,562) (1,014,976) 2029 (1,014,976) (93,261) (107,128) 14,997,104 0.029 427,460 (694,644) (20,839) (715,483) 2030 (715,483) (94,643) (110,889) 14,997,104 0.029 436,010 (390,363) (11,711) (402,074) 2031 (402,074) (35,693) (42,656) 14,997,104 0.030 444,730 (0) (0) (0) Total $ (1,474,221) $ (1,577,251) 95,115,744 $ 2,657,735 $ (279,631) Note: Numbers may not add due to rounding Table F-17 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Sq. Ft. of Gross Floor Area Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-30 F.5 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR FACILITIES (HEALTH, CHILD CARE, HOUSING, AND PUBLIC WORKS) Region of Halton 2022 DC Background Study F-31 F.5 FACILITIES (HEALTH, CHILD CARE, HOUSING, AND PUBLIC WORKS) Similar to Growth Studies, facilities is a class of service established as per Section 7 of the DCA. This class of service is comprised of Health, Child Care and Early Years, Housing Services, and Services Related to a Highway. 1. Health Department Floor Space The Health Department provides Public Health programs to residents and businesses of the Region of Halton including communicable disease and infection control, dental health, baby and parent health, healthy environments, heart health and cancer prevention, tobacco use prevention, mental health promotion and services, substance abuse prevention, sexual health, immunization, rabies control, injury prevention, food safety and health promotion. An increase in population will require an increase in staffing to deliver these programs (field operations over and above headquarters administration). Program staff is currently accommodated at 7 satellite offices throughout the Region as well as the Halton Regional Centre. Space at the Regional Centre that is used for general headquarters administration of the Health Department has not been included in the inventory. In 2017, the average value of the TFA occupied by the Health Department was assumed to be $268/sq.ft. including an allowance for furniture, fixtures and site work but excluding land. This amount has been increased to $328 to reflect 2022$, based on changes in the non-residential construction cost index. The average value of health department facility space in 2022$ is $430 including land, site works and FFE. The Region anticipates the need to increase workstations for staff by approximately 1.43% per year for the next 10 years. These workstations are for different types of staff including public health inspectors, public health nurses, registered nurses, dieticians, etc. It is anticipated that each additional workstation would require an average of 222 gross square feet of floor space including both workstation space and a share of support space requirements such as meeting rooms, etc. This requirement may be accommodated through the use of space at the Regional Centre Campus expansion currently in progress as well as leased space for field offices. The cost of providing additional space is forecast to be $430 per sq.ft., Region of Halton 2022 DC Background Study F-32 including land, furnishings, fixtures, parking areas, etc., based on information derived from the Accommodation Plan and increased to 2022$. No deduction has been made for benefit to existing development, as the capital program is intended to provide new floor space at or below the current level of service. There is also no post-period benefit (oversizing) resulting from the capital program. While the focus of the Health Department's programs is directed to residents of the Region, a portion is related to non-residential uses (e.g. health hazard investigation and food safety). The Region has reviewed its allocation of staffing to the various programs as well as the relative demand for these services between residential and non- residential uses. As a result, it was determined that 12% of program staff can be allocated to non-residential needs. Therefore, the calculated DC recoverable costs have been allocated 88% to residential growth and 12% to non-residential development. 2. Social Service Space (Child Care and Housing) The Social Service Department of Halton is responsible for children's services (including day care), housing services, income and employment services and services to seniors. The demand for these population-related services is expected to increase as the Region grows. As per the recent changes to the legislation, only facility space relating to child care and housing have been included in the DC calculations. Income and employment services as well as services to seniors have been removed from the level of service calculations as well as the capital needs forecast. The Social Services Department operates out of the Halton Regional Centre and 690 Dorval Drive, as well as several satellite offices. Space at the Regional Centre that is used for general administration of the Social Services Department has not been included in the inventory. As with Health Department floor space, the average value of the existing TFA occupied by the Social Services Department has been established at $328/sq.ft., excluding an allowance for site work, furnishings and fixtures, and land. Including these additional items, the average value of the Region's Social Services facilities is $429. An average annual increase in staffing workstations of 1.43% is anticipated. The capital cost for accommodating additional program employees has been calculated using the same space requirement and cost per sq.ft. assumptions used above (i.e. 222 sq.ft. per workstation and $430 per sq.ft.). Region of Halton 2022 DC Background Study F-33 No deduction has been made for benefit to existing development as the capital program is intended to provide new floor space at the current level of service. There is also no post-period benefit (oversizing) resulting from the capital program. As the programs involved relate predominantly to residents of Halton Region, the DC recoverable costs have been allocated 95% to residential development and 5% to non-residential development. 3. Operations Centre Space (Public Works) The Region of Halton maintains 2 operations facilities: North Operations Centre and Woodlands Operations Centre, with a TFA of 78,793 sq.ft. at an average value of $317/sq.ft., including land, site works and FFE. Over the forecast period, 2022-2031, the Region plans to expand the Woodland Operations Centre. As stated in the Paramedics services discussion, the Woodlands facility is a shared facility between Paramedics and Operations. The Region plans to construct a 40,000 sq.ft expansion to the existing 57,960 sq. ft. facility. The capital program includes the cost of design work in 2022 as well as construction scheduled for 2024. Currently, Operations occupies approximately 39,423 sq.ft. of this facility including a portion of shared space. Paramedic services will vacate their current space and move to the additional space while Operations will expand into this space and the Region will expend approximately $7.45 million to retrofit both the former Paramedic space and a portion of the existing Operations space to increase capacity and improve functionality. It is assumed that 50% of the cost of this retrofit is growth-related with the balance benefiting existing development. This project is to be undertaken in 2022 and will accommodate growth to 2035. As a result, post-period benefit deductions totaling approximately $1.32 million have been made to these capital projects. The residential/non-residential split of the net growth-related costs are allocated to 75% to residential development and 25% to non-residential development. This is consistent with the approach undertaken in the 2017 DC study. Region of Halton 2022 DC Background Study F-34 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Health Department Type of Capital Asset Non-Administrative Space 2022 Value 2022 Value with land, site works, etc. 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) ($/sq.ft.) Sq Ft. Cost 93 Main St. South, Georgetown 2,700 - - - - - - - - - 328 $ 411 $ 2,700 1,109,700 $ 280 Guelph Street, Georgetown - 3,758 3,758 3,758 3,758 3,758 3,758 - - - 328 411 22,549 9,267,465 19 Willow St. N., Acton 948 1,573 1,573 1,573 1,573 1,573 1,573 - - - 328 411 10,386 4,268,646 3350 Fairview Street, Burlington 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 3,230 328 432 32,300 13,953,600 217 Main St. East, Milton 5,010 5,010 5,010 5,010 5,010 5,010 5,010 - - - 328 425 35,070 14,904,750 Halton Regional Centre 15,261 15,261 15,261 15,261 15,261 15,261 15,261 15,261 15,261 15,261 328 432 152,610 65,927,520 Halton Regional Centre (share of common area) 14,129 14,129 14,129 14,129 14,129 14,129 14,129 14,129 14,129 14,129 328 432 141,290 61,037,280 690 Dorval Dr., Oakville - Comm Health 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 10,084 328 432 100,840 43,562,880 690 Dorval Dr., Oakville - Comm Health (share of common area) 4,419 4,419 4,419 4,419 4,419 4,419 4,419 4,419 4,419 4,419 328 432 44,190 19,090,080 372 Queen St, Acton 1,121 1,121 1,121 1,121 1,121 1,121 1,121 1,121 1,121 1,121 328 411 11,210 4,607,310 232 South Service Road, Oakville 3,615 3,615 3,615 3,615 3,615 3,615 3,615 3,615 3,615 3,615 328 432 36,150 15,616,800 Total 60,517 62,200 62,200 62,200 62,200 62,200 62,200 51,859 51,859 51,859 430 $ 589,295 253,346,031 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.1181 0.1189 0.1174 0.1154 0.1134 0.1112 0.1078 0.0884 0.0873 0.0860 10 Year Average 2012-2021 Quantity per capita 0.1064 Quality ($/sq.ft.) 430 $ Combined Quantity/Quality Level ($/capita) 45.74 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 45.74 $ Eligible Amount 5,792,189 $ Description Weighted Average Quantity - Sq. Ft. Table F-18 Region of Halton 2022 DC Background Study F-35 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Social Services (Children and Housing) Type of Capital Asset: Non-Administrative Space 2022 Value 2022 Value with land, site works, etc. 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) ($/sq.ft.) Sq Ft. Cost Halton Regional Centre 430 430 430 430 430 430 430 430 430 430 328 $ 432 $ 4,301 1,857,856 $ Halton Regional Centre (share of common area) 398 398 398 398 398 398 398 398 398 398 328 432 3,975 1,717,372 690 Dorval Dr., Oakville - HCHC 4,168 4,168 4,168 4,168 4,168 4,168 4,168 4,168 4,168 4,168 328 432 41,680 18,005,760 690 Dorval Dr., Oakville - NPH (Non-Profit Housing) 1,962 1,962 1,962 1,962 1,962 1,962 1,962 1,962 1,962 1,962 328 432 19,620 8,475,840 690 Dorval Dr., Oakville - Child Services 8,892 8,892 8,892 8,892 8,892 8,892 8,892 8,892 8,892 8,892 328 432 88,920 38,413,440 690 Dorval Dr., Oakville (share of common area) 6,583 6,583 6,583 6,583 6,583 6,583 6,583 6,583 6,583 6,583 328 432 65,830 28,438,560 440 Elizabeth Dr., Burlington 3,652 3,652 3,652 3,652 3,652 3,652 3,652 3,652 3,652 3,652 328 432 36,524 15,778,368 470 Bronte St., Milton 3,525 3,525 3,525 3,525 3,525 3,525 328 425 21,150 8,988,750 280 Guelph Street, Georgetown - 759 759 759 759 759 759 - - - 328 411 4,554 1,871,516 65 Maple Ave., Georgetown - Child Care 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 3,840 328 411 38,400 15,782,400 1256 Sedgewick Cres., Oakville - Child Care 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 3,948 328 432 39,480 17,055,360 344 Margaret Dr., Oakville - Child Care 4,325 4,325 4,325 4,325 4,325 4,325 4,325 4,325 4,325 4,325 328 432 43,250 18,684,000 Total 41,723 42,482 42,482 42,482 42,482 42,482 38,957 38,198 38,198 38,198 429 $ 407,684 175,069,222 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0814 0.0812 0.0802 0.0788 0.0775 0.0759 0.0675 0.0651 0.0643 0.0634 10 Year Average 2012-2021 Quantity per capita 0.0735 Quality ($/sq.ft.) 429.42 $ Combined Quantity/Quality Level ($/capita) 31.56 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 31.56 $ Eligible Amount 3,996,625 $ Weighted Average Quantity - Sq. Ft. Description Table F-19 Region of Halton 2022 DC Background Study F-36 Halton Region 2022 Development Charges Background Study Average Level of Service Table F-20 Service: Facilities (Operations) Type of Capital Asset Operations Space for Roads Program Quantity - Sq. Ft. of Floor Space 2022 Value 2022 Value with land, site works, etc. Weighted Average 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) ($/sq.ft.) Sq Ft. Cost North Operations Centre 39,370 39,370 39,370 39,370 39,370 39,370 39,370 39,370 39,370 39,370 178 $ 274 $ 393,700 107,873,800 $ Woodlands Operations Centre 32,298 32,298 32,298 32,298 32,298 32,298 32,298 32,298 32,298 32,298 229 332 322,980 107,229,360 Woodlands Operations Centre (share of common area) 7,125 7,125 7,125 7,125 7,125 7,125 7,125 7,125 7,125 7,125 380 483 71,250 34,413,750 Total 78,793 78,793 78,793 78,793 78,793 78,793 78,793 78,793 78,793 78,793 317 $ 787,930 249,516,910 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.1538 0.1506 0.1487 0.1462 0.1437 0.1409 0.1365 0.1343 0.1326 0.1307 10 Year Average 2012-2021 Quantity per capita 0.1418 Quality ($/sq.ft.) 316.67 $ Combined Quantity/Quality Level ($/capita) 44.90 $ ` DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 44.90 $ Eligible Amount 5,686,015 $ Description Table F-20 Region of Halton 2022 DC Background Study F-37 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Facilities SERVICE: Facilities 2022$ Increased Service Needs Gross Benefit to Eligible Post Grants, Subsidies & Net Costs Non- Attributable to Timing Capital Existing Increase Period Other Contributions Benefiting Residential Residential Anticipated Development Cost Development/ in Need Benefit Attrib. to New Sub New Share Share 2022-2031 Est. U.E.C. Development Total Development Cost to be Incurred During Term of Proposed By-law PW Operations Centre Expansion 2022 Transportation 500,000 $ 250,000 $ 250,000 $ 83,000 $ 167,000 $ 167,000 $ 125,250 $ 41,750 $ Office Space for Health Program Staff 2022 Public Health 253,481 253,481 253,481 253,481 223,063 30,418 Office Space for Social Services (Children Services and Housing) Program Staff 2022 Child Care and Housing 159,518 159,518 159,518 159,518 151,542 7,976 Office Space for Health Program Staff 2023 Public Health 257,106 257,106 257,106 257,106 226,253 30,853 Office Space for Social Services (Children Services and Housing) Program Staff 2023 Child Care and Housing 161,799 161,799 161,799 161,799 153,709 8,090 Office Space for Health Program Staff 2024 Public Health 260,782 260,782 260,782 260,782 229,489 31,294 Office Space for Social Services (Children Services and Housing) Program Staff 2024 Child Care and Housing 164,113 164,113 164,113 164,113 155,907 8,206 PW Operations Centre Expansion 2024 Transportation 7,400,000 3,700,000 3,700,000 1,233,000 2,467,000 2,467,000 1,850,250 616,750 Office Space for Health Program Staff 2025 Public Health 264,512 264,512 264,512 264,512 232,770 31,741 Office Space for Social Services (Children Services and Housing) Program Staff 2025 Child Care and Housing 166,460 166,460 166,460 166,460 158,137 8,323 Office Space for Health Program Staff 2026 Public Health 268,294 268,294 268,294 268,294 236,099 32,195 Office Space for Social Services (Children Services and Housing) Program Staff 2026 Child Care and Housing 168,840 168,840 168,840 168,840 160,398 8,442 Cost to be Incurred Post By-law Term (I.e. beyond 2026) Office Space for Health Program Staff 2027 Public Health 272,131 $ 272,131 $ 272,131 $ 272,131 $ 239,475 $ 32,656 $ Office Space for Social Services (Children Services and Housing) Program Staff 2027 Child Care and Housing 171,255 171,255 171,255 171,255 162,692 8,563 Office Space for Health Program Staff 2028 Public Health 276,022 276,022 276,022 276,022 242,900 33,123 Office Space for Social Services (Children Services and Housing) Program Staff 2028 Child Care and Housing 173,704 173,704 173,704 173,704 165,018 8,685 Office Space for Health Program Staff 2029 Public Health 279,969 279,969 279,969 279,969 246,373 33,596 Office Space for Social Services (Children Services and Housing) Program Staff 2029 Child Care and Housing 176,188 176,188 176,188 176,188 167,378 8,809 Office Space for Health Program Staff 2030 Public Health 283,973 283,973 283,973 283,973 249,896 34,077 Office Space for Social Services (Children Services and Housing) Program Staff 2030 Child Care and Housing 178,707 178,707 178,707 178,707 169,772 8,935 Office Space for Health Program Staff 2031 Public Health 288,034 288,034 288,034 288,034 253,470 34,564 Office Space for Social Services (Children Services and Housing) Program Staff 2031 Child Care and Housing 181,263 181,263 181,263 181,263 172,200 9,063 Total Estimated Capital Cost 12,306,152 $ 3,950,000 $ 8,356,152 $ 1,316,000 $ - $ 7,040,152 $ 7,040,152 $ 5,972,043 $ 1,068,109 $ Level of Service Summary Eligible Amount Health Facilities 5,792,189 $ Social Services 3,996,625 Facility Ops 5,686,015 Total 15,474,830 $ Table F-21 Service to Which the Project Relates Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-38 Halton Region 2022 Development Charges Background Study Cash Flow Calculation - Facilities - Residential $98.01 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ 1,717,869 $ (499,856) $ (499,856) 6,416 $ 98.01 $ 628,842 $ 1,846,855 $ 55,406 $ 1,902,261 2023 1,902,261 (379,963) (387,562) 3,791 99.97 379,029 1,893,728 56,812 1,950,539 2024 1,950,539 (2,235,646) (2,325,966) 3,791 101.97 386,610 11,183 335 11,518 2025 11,518 (390,907) (414,834) 4,122 104.01 428,734 25,418 763 26,181 2026 26,181 (396,497) (429,181) 4,122 106.09 437,308 34,308 1,029 35,337 2027 35,337 (402,167) (444,025) 4,155 108.21 449,574 40,886 1,227 42,113 2028 42,113 (407,918) (459,382) 4,155 110.37 458,566 41,297 1,239 42,536 2029 42,536 (413,751) (475,270) 4,155 112.58 467,737 35,003 1,050 36,053 2030 36,053 (419,668) (491,708) 4,155 114.83 477,092 21,437 643 22,080 2031 22,080 (425,669) (508,714) 4,155 117.13 486,634 - - - Total $ (5,972,043) $ (6,436,498) 43,017 $ 4,600,126 $ 118,503 Note: Numbers may not add due to rounding Table F-22 Development Related Expenditures Nominal Project Cost Development Related Expenditures DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-39 Halton Region 2022 Development Charges Background Study Cash Flow Calculation - Facilities - Non-Residential $0.014 3% / 3% per Sq. Ft. per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (252,240) $ (80,144) $ (80,144) 4,254,556 $ 0.014 $ 61,150 $ (271,234) $ (8,137) $ (279,371) 2023 (279,371) (38,943) (39,722) 3,968,917 0.015 58,185 (260,907) (7,827) (268,735) 2024 (268,735) (656,250) (682,762) 3,968,917 0.015 59,349 (892,148) (26,764) (918,912) 2025 (918,912) (40,064) (42,517) 3,968,917 0.015 60,536 (900,893) (27,027) (927,919) 2026 (927,919) (40,637) (43,987) 3,968,917 0.016 61,747 (910,160) (27,305) (937,465) 2027 (937,465) (41,218) (45,508) 14,997,104 0.016 237,985 (744,988) (22,350) (767,338) 2028 (767,338) (41,808) (47,082) 14,997,104 0.016 242,745 (571,676) (17,150) (588,826) 2029 (588,826) (42,406) (48,711) 14,997,104 0.017 247,599 (389,937) (11,698) (401,636) 2030 (401,636) (43,012) (50,396) 14,997,104 0.017 252,551 (199,480) (5,984) (205,464) 2031 (205,464) (43,627) (52,139) 14,997,104 0.017 257,603 (0) (0) (0) Total $ (1,068,109) $ (1,132,967) 95,115,744 $ 1,539,450 $ (154,243) Note: Numbers may not add due to rounding Table F-23 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Sq. Ft. of Gross Floor Area Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-40 F.6 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR SOCIAL HOUSING Region of Halton 2022 DC Background Study F-41 F.6 SOCIAL HOUSING The Region of Halton administers approximately 5,358 social housing units, including:  2,210 units owned/operated by Halton Community Housing Corporation (HCHC) - Halton Region is the sole shareholder in this corporation;  336 units at the Oakville Seniors Citizen's Residence (OSCR);  Approximately 227 units where the Region provided capital for privately-owned market rent buildings where the Region enters into agreements with the owners to provide affordable housing;  Approximately 1,221 units owned by private non-profit organizations that include housing co-operatives, which receive funding from the Region; and  Rent supplement units, portable housing benefits and supportive housing units funded regionally or by senior levels of government. In establishing the historic level of service for social housing in the Region, only HCHC, OSCR, and recently constructed private sector projects that received significant funding from the Region were considered. The historic level of service is 0.0046 units per capita. The Region's 2022 Budget and Business Plan for the Social Housing program was prepared based on the 2006 Comprehensive Housing Strategy and the 2014 Comprehensive Housing Strategy Update, and provided for an increased Region contribution to 2024. This contribution amount is reassessed annually during the budget process. The Region has indicated its intention to fund, on average, approximately 37 to 45 units per year over the 2022-2031 period. The specifics of who would construct, own, and operate the units have not yet been determined. The Region may potentially develop some units directly or they may be community based. Thus, the 2022-2031 capital program included in the DC calculation involves the addition of approximately 400 units at a total cost of approximately $100 million. Based on the current service level of 0.0046 units per capita and an average contribution of $250,000 per unit, the level of service provides for an average level of investment of $1,150 per capita. This, applied to the anticipated population growth of 126,625 results in a DC eligible amount of approximately $145.62 million over the 10- year forecast period. Based on this eligible amount, and the average contribution Region of Halton 2022 DC Background Study F-42 amount of $250,000, the number of eligible units for the forecast period equates to approximately 582. In determining an appropriate deduction for benefit to existing development, consideration was based on the existing and future demand for social housing units among the existing population and the potential for occupants of new development to access the units. Factors were considered such as size of the wait list, average wait times, annual availability (turn-over) of existing units and the current gap in social housing to meet the needs of the existing population as identified by the Region. On this basis, a 50% deduction for benefit to existing development has been made. It is expected that as the service gap is addressed over time, this deduction would be reduced in future studies. There is no post-period benefit (oversizing) resulting from the capital program. As this service is directly related to population, the DC recoverable costs have been allocated fully to residential development. Region of Halton 2022 DC Background Study F-43 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Social Housing Type of Capital Asset Housing Units Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 10-32(EVEN) Holmesway Place (ACTON) 12 12 12 12 12 12 12 12 12 12 34-44(EVEN) Holmesway Place (ACTON) 6 6 6 6 6 6 6 6 6 6 8 Durham Street 89 89 89 89 89 89 89 89 89 89 17 Elizabeth Drive 52 52 52 52 52 52 52 52 52 52 46 Holmesway Place (ACTON) 12 12 12 12 12 12 12 12 12 12 3 Hyde Park Drive 24 24 24 24 24 24 24 24 24 24 11 Sargent Road 38 38 38 38 38 38 38 38 38 38 1478-1494 Elm Road 54 54 54 54 54 54 54 54 54 54 271 Kerr Street 242 242 242 242 242 242 242 242 242 242 287-359 Margaret Drive 48 48 48 48 48 48 48 48 48 48 284-320 (EVEN) Maurice Drive 60 60 60 60 60 60 60 60 60 60 1220 Glen Valley Road 55 55 55 55 55 55 55 55 55 55 2250 Golden Briar Trail 88 88 88 88 88 88 88 88 88 88 2301 Sheridan Garden Drive 51 51 51 51 51 51 51 51 51 51 2299 Bray's Lane 56 56 56 56 56 56 56 56 56 56 1531 Sixth Line 32 32 32 32 32 32 32 32 32 32 1150 Dorval Drive 50 50 50 50 50 50 50 50 50 50 4100 Longmoor Drive 109 109 109 109 109 109 109 109 109 109 5250 Pinedale Avenue 141 141 141 141 141 141 141 141 141 141 254-278, 282-360 Burloak Drive 54 54 54 54 54 54 54 54 54 54 1300 Maple Crossing Boulevard 91 91 91 91 91 91 91 91 91 91 2300 Walkers Line 57 57 57 57 57 57 57 57 57 57 513-515 Walkers Line & 4105 Longmoor Drive 129 129 129 129 129 129 129 129 129 129 410 John Street 126 126 126 126 126 126 126 126 126 126 708 & 710 Brant Court 16 16 16 16 16 16 16 16 16 16 111 Ontario Street North 36 36 36 36 36 36 36 36 36 36 40 Ontario Street South 88 88 88 88 88 88 88 88 88 88 2220 Lakeshore Rd W &2222 Lakeshore Rd. W. (OSCR) 336 336 336 336 336 336 336 336 336 336 St. Andrews/Bonnie Place 120 120 120 120 120 120 120 120 120 120 New Horizons 65 65 65 65 65 65 65 65 65 65 Ontario Street 80 80 80 80 80 80 80 80 80 80 2021 & 2031 Merchants Gate 147 147 147 Rotary Gardens - 1285 Sedgewick Crescent 28 28 28 28 28 Mint Condos 16 31 31 31 31 31 31 Senses Condos 8 8 8 8 8 8 8 Paradigm Condos 15 15 15 15 15 15 15 Appleby Condos 10 10 10 10 10 10 Jasper Condos 10 10 10 10 10 10 Catherton 34 Westwood II 37 37 37 37 37 37 37 37 Habitat (Queensway Drive) 18 18 Victoria Park 18 Total 2,417 2,417 2,454 2,493 2,528 2,556 2,556 2,703 2,721 2,773 Quantity - # of units Table F-24 Region of Halton 2022 DC Background Study F-44 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Social Housing Type of Capital Asset Housing Units Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0047 0.0046 0.0046 0.0046 0.0046 0.0046 0.0044 0.0046 0.0046 0.0046 10 Year Average 2012-2021 Quantity per capita 0.0046 Quality ($/unit) 250,000 * Combined Quantity/Quality Level ($/capita) 1,150 DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 1,150 $ Eligible Amount 145,618,750 $ * The cost to the Region of providing Social Housing units is variable; but for these particular units, the average contribution is assumed to be $250,000 per unit Table F-24 (continued) Region of Halton 2022 DC Background Study F-45 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Social Housing SERVICE: Social Housing 2022 $ Increased Service Needs Gross Benefit to Eligible Post Grants, Subsidies & Net Costs Non- Attributable to Timing Capital Existing Increase Period Other Contributions Benefiting Residential Residential Anticipated Development Cost Development/ in Need Benefit Attrib. to New Sub New Share Share 2022-2031 Est. U.E.C. Development Total Development 100% 0% Cost to be Incurred During Term of Proposed By-law Contribution to additional units 2022 9,450,000 $ 4,725,000 $ 4,725,000 $ 4,725,000 $ 4,725,000 $ 4,725,000 $ - $ Contribution to additional units 2023 9,450,000 4,725,000 4,725,000 4,725,000 4,725,000 4,725,000 - Contribution to additional units 2024 11,200,000 5,600,000 5,600,000 5,600,000 5,600,000 5,600,000 - Contribution to additional units 2025 10,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - Contribution to additional units 2026 10,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - Cost to be Incurred Post By-law Term (I.e. beyond 2026) Contribution to additional units 2027 10,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ - $ Contribution to additional units 2028 10,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - Contribution to additional units 2029 10,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - Contribution to additional units 2030 10,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - Contribution to additional units 2031 10,000,000 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 - Total Estimated Capital Cost 100,100,000 $ 50,050,000 $ 50,050,000 $ - $ - $ 50,050,000 $ 50,050,000 $ 50,050,000 $ - $ Level of Service Summary Eligible Amount Service Cap $145,618,750 Table F-25 Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-46 $985.82 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ 7,236,810 $ (4,725,000) $ (4,725,000) 6,416 $985.82 $ 6,325,194 $ 8,837,004 $ 265,110 $ 9,102,114 2023 9,102,114 (4,725,000) (4,819,500) 3,791 1,005.54 3,812,457 8,095,072 242,852 8,337,924 2024 8,337,924 (5,600,000) (5,826,240) 3,791 1,025.65 3,888,707 6,400,390 192,012 6,592,402 2025 6,592,402 (5,000,000) (5,306,040) 4,122 1,046.16 4,312,412 5,598,774 167,963 5,766,737 2026 5,766,737 (5,000,000) (5,412,161) 4,122 1,067.09 4,398,660 4,753,237 142,597 4,895,834 2027 4,895,834 (5,000,000) (5,520,404) 4,155 1,088.43 4,522,039 3,897,469 116,924 4,014,393 2028 4,014,393 (5,000,000) (5,630,812) 4,155 1,110.20 4,612,480 2,996,060 89,882 3,085,942 2029 3,085,942 (5,000,000) (5,743,428) 4,155 1,132.40 4,704,729 2,047,243 61,417 2,108,660 2030 2,108,660 (5,000,000) (5,858,297) 4,155 1,155.05 4,798,824 1,049,187 31,476 1,080,663 2031 1,080,663 (5,000,000) (5,975,463) 4,155 1,178.15 4,894,800 (0) (0) (0) Total $ (50,050,000) $ (54,817,345) 43,017 $ 46,270,302 $ 1,310,233 Note: Numbers may not add due to rounding Table F-26 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Halton Region 2022 Development Charges Study Cash Flow Calculation - Social Housing - Residential Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-47 F.7 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR WASTE DIVERSION Region of Halton 2022 DC Background Study F-48 F.7 WASTE DIVERSION The Region is responsible for waste diversion and disposal in Halton including waste collection. The Region's key waste diversion activities include blue box (recyclables), green cart (compostable), and yard waste. Diversion accounted for over 59 % of waste managed by the Region in 2021. The Region's waste diversion assets are comprised of facilities, vehicles, and equipment. 1. Facilities Blue Box and green cart materials collected by the Region's contractors are taken to one of several locations including the Region owned transfer station at the Halton Waste Management Site (HWMS) and 2 private transfer stations under contract to the Region. As well, recyclable materials are also sent to a private facility in North York. In addition, a number of other buildings at the HWMS have been apportioned to waste diversion. For example, yard waste is processed at a Region owned container station located there. Further, a share of the administrative building has been allocated to diversion. The service level calculation also includes a share of the City of Hamilton's Central Waste Processing facility which has been under contract to process Halton's compostable material since 2008. Halton waste has accounted for up to 40% of the processing capacity at this facility annually. In 2021, the Region did not renew their contract with the City of Hamilton and instead entered into a contract to send their organics material to the StormFisher processing facilities in Drumbo and London. The size of this facility is significantly smaller than the Hamilton facility as the technologies utilized to process the materials allow for less space while processing the same amount of materials. As a result, the replacement cost of the facility is higher than the Hamilton facility. Region of Halton 2022 DC Background Study F-49 2. Vehicles The Region contracts out the collection of diverted waste from residential households as well as designated downtown commercial areas. Under the current contract, combined vehicles are used to pick up blue box and green cart materials that are placed at the curbside. Separate vehicles are used to collect yard waste and bulk waste. These vehicles along with their estimated replacement value are included in the service level calculation table. These vehicles are typically kept in service for 8 years. In addition, the Region owns a number of waste management vehicles most of which are used to supervise collection and therefore, involved in both waste diversion and disposal. For this reason, the vehicles with a useful life of 7 years or more have been included in the calculation and have been assigned a percentage that approximates the portion that is applicable to waste diversion only. 3. Carts and Containers The Region of Halton provides containers to all households for curbside and multi- residential collection of blue box materials and organic waste including blue bins, green carts and kitchen catchers for low and medium density units and blue carts, blue bags, green totes and kitchen catchers for apartment units. The historical service level for these items has been calculated and included in the service level cap. 4. Capital Program The Region's 10-year capital program for Waste Diversion includes:  Unfunded growth-related amounts for vehicles previously purchased.  The study and construction of a transfer station and organics processing facility at the Halton Waste Management Site. This facility would process all Halton's green cart waste eliminating the need to contract this service to an external provider. This facility would also replace the current transfer station at the Halton Waste Management site which accepts both green cart and blue box material. The transfer station component of the new facility would be designed to offload both blue box and green cart material. The transfer station and organics processing facility would be sized to accommodate future growth. While this project is planned to meet the needs of growth, a portion represents replacement of existing facilities. For this reason, a 67.83% attribution to 'benefit to existing Region of Halton 2022 DC Background Study F-50 development' has been made based on the assumed growth versus the current population. It is assumed that both components will be sized to meet the needs of growth to 2041.  An allowance for contracted vehicles used for the collection of blue box, green cart and other diverted materials. As noted earlier, the Region contracts with private operators for the collection of waste. The contract price reflects, in part, the capital cost of vehicles purchased by the private operator. The vehicles required for diversion have been included in the service level calculation. As the Region continues to grow, more vehicles will be required and this cost will be reflected in the contract prices. The capital cost was calculated by multiplying the number of waste diversion vehicles per capita in 2021 by the forecast population increase for the next 10 years to arrive at an estimate of the number of vehicles required. This estimate was multiplied by the average cost per waste collection vehicle.  An automated wheeled cart study and a solid waste management strategy. As the Region's waste diversion programs, including collection, are predominantly provided to and utilized by residential development, the net recoverable share of the costs applied to residential development are 95%. The remaining 5% share of the costs are allocated to non-residential development. Region of Halton 2022 DC Background Study F-51 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Waste Diversion Type of Capital Asset Facility Space Quantity - Sq. Ft. of Floor Space 2022 Value 2022 Value incl. Land, Site Works, etc Diversion Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) ($/sq.ft.) % Sq Ft. Cost 5400 Regional Rd 25, Milton 15,057 15,057 15,057 15,057 15,057 19,008 19,008 19,008 19,008 19,008 127 $ 226 $ 100% 170,326 38,493,787 $ Leferink Transfer Station - 55 Armstrong Ave, Halton Hills 8,411 8,411 8,411 8,411 8,411 8,411 8,411 8,411 8,411 8,411 162 273 100% 84,110 22,962,030 Norjohn Transfer Station - 5030 Mainway, Burlington1 53,128 53,128 53,128 53,128 53,128 53,128 53,128 53,128 53,128 53,128 122 236 100% 531,280 125,382,080 Centralized Compost Facility (Hamilton)2 43,375 46,215 46,913 47,051 46,821 46,821 46,821 46,821 46,821 122 249 100% 417,662 103,997,889 StormFisher Processing Facility - Drumbo/London Drumbo - 806548 Oxford Road N0J 1G0 London - 1087 Green Valley Road N6N 1E4 4,546 376 543.00 100% 4,546 2,468,478 GFL/Canada Fibers Processing Facility - 124 Arrow Road, North York 22,946 22,946 22,946 22,946 127 255.00 100% 91,784 23,404,920 Total 119,971 122,811 123,509 123,647 123,417 127,369 150,315 150,315 150,315 108,039 244 $ 1,299,709 316,709,184 $ Population 512,259 512,259 512,259 512,259 512,259 512,259 512,259 512,259 512,259 512,259 Per Capita Service Level 0.2342 0.2397 0.2411 0.2414 0.2409 0.2486 0.2934 0.2934 0.2934 0.2109 10 Year Average 2012-2021 Quantity per capita 0.2537 Quality ($/sq.ft.) 243.68 $ Combined Quantity/Quality Level ($/capita) 61.82 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 61.82 $ Eligible Amount 7,828,067 $ 1Norjohn floor space excludes floor area attributed to waste disposal. 2 Centralized Compost Facility is 115,000 sq.ft. in area. Area included is based on Halton's utilization of the facility. Weighted Average of Diversion Table F-27 Region of Halton 2022 DC Background Study F-52 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Waste Diversion Type of Capital Asset: Vehicles Quantity - Number of Vehicles 2022 Value Diversion Weighted Average Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/vehicle) % Vehicles Cost Waste Management - Recycling - - 1/2 Ton Ext Cab 4x4 P/U 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 39,000 $ 75% 7.50 292,500 $ 1/2 Ton Ext Cab 4x4 P/U 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 39,000 75% 7.50 292,500 1/2 Ton Ext Cab 4x4 P/U 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 39,000 75% 7.50 292,500 1/2 Ton Ext Cab 4x4 P/U 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 39,000 75% 7.50 292,500 1/2 Ton Pick Up Truck - - - - 0.75 0.75 0.75 0.75 0.75 0.75 43,000 75% 4.50 193,500 F150 Ext Cab 4x4 P/U Truck - 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 45,000 75% 6.75 303,750 Ford Escape Hybrid - - - 1.00 1.00 1.00 1.00 1.00 1.00 1.00 42,900 100% 7.00 300,300 Escape 4X4 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 34,000 100% 10.00 340,000 Haul-All 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 167,000 75% 7.50 1,252,500 1/2 Ton Pick Up Truck 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 39,000 75% 7.50 292,500 Contract Trucks - - Combined Recyclable and Organic Waste (top side loading with no capaction, average weight 2.8 tonnes) 40.00 40.00 40.00 40.00 330,000 100% 160.00 52,800,000 Split Rearpackers (average load 5.8 tonnes) 27.00 27.00 27.00 27.00 27.00 29.00 330,000 100% 164.00 54,120,000 Yard Waste (sideloading vehicles 5 tonnes) 5.00 5.00 5.00 5.00 8.00 8.00 8.00 8.00 8.00 8.00 330,000 100% 68.00 22,440,000 Metal Items and Appliances (standard cube van with tailgate lifting mechanism) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 46,000 100% 12.00 552,000 48 Yard Front-End Recycling (Formerly sideloader with 4-5 tonne capacity) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 330,000 100% 10.00 3,300,000 40 Yard Roll-Off Truck - Recycling HWMS Container Station 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 330,000 50% 5.00 1,650,000 Total 53.00 53.75 53.75 54.75 45.50 45.50 45.50 45.50 46.50 48.50 281,797 $ 492 138,714,550 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 10 Year Average 2012-2021 Quantity per capita 0.0001 Quality ($/vehicle) 281,797 $ Combined Quantity/Quality Level ($/capita) 28.18 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 28.18 $ Eligible Amount 3,568,254 $ Table F-28 Region of Halton 2022 DC Background Study F-53 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Waste Diversion Type of Capital Asset: Carts & Containers Quantity - Items 2022 Value Diversion Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/item) % Item Cost Blue Bins (16 gallon) 155,317 - - - - - - - - - 6.79 $ 100% 155,317 1,054,602 $ Blue Bins (22 gallon) - 157,911 160,217 161,707 163,945 166,253 170,948 173,162 175,131 177,247 5.86 100% 1,506,520 8,833,270 Blue Carts (Apartments) (6 gallon) 880 880 880 880 880 - - - - - 4.74 100% 4,400 20,856 Blue Carts (Apartments) (95 gallon) 4,219 4,305 4,486 4,666 4,968 5,243 5,472 5,650 5,776 5,886 69.05 100% 50,673 3,498,694 Blue Bags 29,534 30,133 31,402 32,661 34,774 36,704 38,306 39,552 40,435 41,204 1.29 100% 354,708 458,718 Blue Wheeled Carts (Comm. & BIA) - - - - 3,000 3,200 3,599 3,599 3,799 3,999 69.05 100% 21,196 1,463,482 Orange Binds - - - - - - - 3,960 5,000 5,000 5.48 100% 13,960 76,498 Green Carts 155,317 157,911 160,217 161,707 163,945 166,253 170,948 173,162 175,131 177,247 15.18 100% 1,661,837 25,224,992 Kitchen Catchers 184,851 188,044 191,619 194,368 198,719 202,957 209,254 212,714 215,566 218,451 2.74 100% 2,016,545 5,516,420 Green Totes (Apartments) (95 gallon/360L) 499 791 841 1,091 1,189 1,387 1,587 1,783 1,983 2,283 73.06 100% 13,434 981,439 Greent Cart (120L) 135 435 435 579 879 1,179 61.97 100% 3,642 225,678 Total 530,617 539,975 549,662 557,079 571,555 582,433 600,550 614,162 623,701 632,497 8.16 $ 5,802,231 47,354,649 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Per Capita Service Level 1.0358 1.0322 1.0375 1.0339 1.0422 1.0412 1.0404 1.0471 1.0495 1.0494 10 Year Average 2012-2021 Quantity per capita 1.0409 Quality ($/item) 8.16 $ Combined Quantity/Quality Level ($/capita) 8.50 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 8.50 $ Eligible Amount 1,075,712 $ Weighted Average of Diversion Table F-29 Region of Halton 2022 DC Background Study F-54 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Waste Diversion SERVICE: Waste Diversion 2022$ 2022$ 2022$ Increased Service Needs Gross Diversion Ineligible Gross Benefit to Eligible Post Grants, Subsidies & Net Costs Non- Attributable to Timing Capital % Capital Capital Existing Increase Period Other Contributions Benefiting Residential Residential Anticipated Development Cost Cost Cost Development/ in Need Benefit Attrib. to New Sub New Share Share 2022-2031 (Elligible) U.E.C. Development Total Development 95% 5% Previous period unfunded Vehicles (unfunded portion of DC recoverable share)* 2022 338,253 $ 100% - 338,253 $ 338,253 $ 338,253 $ 338,253 $ 315,830 $ 22,422 $ Cost to be Incurred During Term of Proposed By-law Transfer Station - Organics - Study 2022 784,000 $ 100% - 784,000 $ 196,000 $ 588,000 $ 588,000 $ 588,000 $ 558,600 $ 29,400 $ Transfer Station - Organics - Construction 2023 7,100,000 100% - 7,100,000 4,816,000 2,284,000 1,027,000 1,257,000 1,257,000 1,194,150 62,850 Provision for additional vehicles 2022-2026 2,805,000 100% - 2,805,000 1,402,500 1,402,500 1,402,500 1,402,500 1,332,375 70,125 Automated Wheeled Cart Study 2022 610,000 50% 305,000 305,000 152,500 152,500 152,500 152,500 144,875 7,625 Cost to be Incurred Post By-law Term (I.e. beyond 2026) Provision for additional vehicles 2027-2031 2,805,000 $ 100% - 2,805,000 $ 1,402,500 $ 1,402,500 $ 1,402,500 $ 1,402,500 $ 1,332,375 $ 70,125 $ Solid Waste Management Strategy 2030 500,000 75% 125,000 375,000 125,000 250,000 250,000 250,000 237,500 12,500 Total Estimated Capital Cost 14,942,253 $ 430,000 $ 14,512,253 $ 8,094,500 $ 6,417,753 $ 1,027,000 $ - $ 5,390,753 $ 5,390,753 $ 5,115,705 $ 275,047 $ * The cost shown represents the DC Recoverable Share still to be funded through development charges including interest charges. Level of Service Summary Eligible Amount Facilities 7,828,067 Vehicles 3,568,254 Carts & Containers 1,075,712 Total 12,472,033 $ Table F-30 Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-55 Halton Region 2022 Development Charges Study Cash Flow Calculations - Waste Diversion - Residential $95.72 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ 1,023,185 $ (1,285,780) $ (1,285,780) 6,416 $ 95.72 $ 614,185 $ 351,590 $ 10,548 $ 362,137 2023 362,137 (1,460,625) (1,489,838) 3,791 97.64 370,195 (757,505) (22,725) (780,230) 2024 (780,230) (266,475) (277,241) 3,791 99.59 377,599 (679,872) (20,396) (700,268) 2025 (700,268) (266,475) (282,785) 4,122 101.58 418,741 (564,313) (16,929) (581,242) 2026 (581,242) (266,475) (288,441) 4,122 103.62 427,116 (442,567) (13,277) (455,844) 2027 (455,844) (266,475) (294,210) 4,155 105.69 439,096 (310,958) (9,329) (320,287) 2028 (320,287) (266,475) (300,094) 4,155 107.80 447,878 (172,503) (5,175) (177,678) 2029 (177,678) (266,475) (306,096) 4,155 109.96 456,836 (26,939) (808) (27,747) 2030 (27,747) (503,975) (590,487) 4,155 112.16 465,972 (152,262) (4,568) (156,829) 2031 (156,829) (266,475) (318,462) 4,155 114.40 475,292 0 0 0 Total $ (5,115,705) $ (5,433,434) 43,017 $ 4,492,909 $ (82,660) Note: Numbers may not add due to rounding Table F-31 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-56 Halton Region 2022 Development Charges Study Cash Flow Calculation - Waste Diversion - Non-Residential $0.003 3% / 3% per Sq. Ft. per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (12,351) $ (73,472) $ (73,472) 4,254,556 $ 0.003 $ 13,261.48 $ (72,562) $ (2,177) $ (74,739) 2023 (74,739) (76,875) (78,413) 3,968,917 0.003 12,618.57 (140,533) (4,216) (144,749) 2024 (144,749) (14,025) (14,592) 3,968,917 0.003 12,870.94 (146,470) (4,394) (150,864) 2025 (150,864) (14,025) (14,883) 3,968,917 0.003 13,128.36 (152,619) (4,579) (157,197) 2026 (157,197) (14,025) (15,181) 3,968,917 0.003 13,390.92 (158,987) (4,770) (163,757) 2027 (163,757) (14,025) (15,485) 14,997,104 0.003 51,611.45 (127,630) (3,829) (131,459) 2028 (131,459) (14,025) (15,794) 14,997,104 0.004 52,643.68 (94,610) (2,838) (97,448) 2029 (97,448) (14,025) (16,110) 14,997,104 0.004 53,696.55 (59,862) (1,796) (61,658) 2030 (61,658) (26,525) (31,078) 14,997,104 0.004 54,770.48 (37,966) (1,139) (39,105) 2031 (39,105) (14,025) (16,761) 14,997,104 0.004 55,865.89 (0) (0) (0) Total $ (275,047) $ (291,770) 95,115,744 $ 333,858 $ (29,737) Note: Numbers may not add due to rounding Table F-32 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Sq. Ft. of Gross Floor Area Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-57 F.8 CALCULATION ASSUMPTIONS AND LEVEL OF SERVICE FOR WATERFRONT PARKS Region of Halton 2022 DC Background Study F-58 F.8 WATERFRONT PARKS The Halton Region Official Plan identifies 2 Regional Waterfront Parks: Burlington Beach, and Burloak Park. These 2 locations provide approximately 16 acres of developed parkland along the waterfront in Burlington and Oakville. These parks have been developed to some degree including amenities such as washrooms, playground structures, trails, pavilions etc. Bronte Harbour was developed by the Region and transferred to Town of Oakville in 2017. Development of waterfront parks includes additional expenses not incurred at other municipal parks particularly related to shoreline protection including retaining walls, breakwalls and other barriers such as groynes. The Region has expended funds over a number of years to develop waterfront parks. For example, the Region:  contributed $10.3 million for the development of Burlington Beach since 2016  invested over $6.2 million for infrastructure, studies and pavilions at Burlington Beach prior to 2008; expended over $7.7 million for the development of Burloak Park. In assigning an average cost per acre for the development of the waterfront parks, the 2017 value per acre of $600,000 was indexed to 2022 values using the non-residential building construction cost index. As a result, an average park development cost per acre of $735,000 has been assumed in calculating the average quality level of service. The average level of service provided over the previous 10 years has been an investment by the Region of approximately $44.84 per capita. In addition to parkland development, existing amenities have been identified at Bronte Harbour (banquet facility, public washrooms, and marina offices) as well as Burlington Beach and Burloak Park. The average level of service provided over the previous 10 years equates to an investment by the Region of approximately $17.62 per capita. In total, the level of service calculations provide for a DC eligible amount of approximately $7.91 million. Region of Halton 2022 DC Background Study F-59 The capital program for park development over the next 10 years includes development at both Regional Waterfront Parks: Burloak and Burlington Beach. These capital costs are based on the approved development master plans for each park. Implementation of the plan is expected to take place incrementally, over a number of years. Timing will be dependent, in part, on the opportunities for acquisition of the remaining privately held properties. Further, a portion of Burlington Beach is located largely on lands under the control of the Government of Canada and will require Federal approval prior to proceeding. It is anticipated that development of Burloak park will be complete in 2024 and development of Burlington Beach will be complete around 2027. The remaining development costs at Burloak park total $1.15 million. The remaining development costs for Burlington Beach total $13.47 million plus $23.00 million for the relocation of the hydro tower to facilitate development of these areas. Similar to the previous study, a 25% deduction for BTE has been applied to the parkland development costs and a 50% deduction for BTE has been applied to the hydro tower. Post period benefit deductions totaling $14.85 million have been made to ensure the net growth-related costs remain within the service level ceiling. The net DC recoverable costs have been allocated 95% to residential development and 5% to non-residential development, consistent with the approach taken for waterfront park development. Region of Halton 2022 DC Background Study F-60 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Waterfront Parks Type of Capital Asset Parkland Development Quantity - No. of Developed Parkland Acres 2017 Value 2022 Value Weighted Average Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/acre) ($/acre) # of Acres Cost Burlington Beach Waterfront Park 0.49 0.49 0.49 0.87 0.99 0.99 1.64 1.95 2.04 2.04 600,000 $ 735,000 $ 12 8,804,359 $ Burloak Waterfront Park 13.15 13.15 14.06 14.06 14.06 14.06 14.06 14.06 14.06 14.06 600,000 735,000 139 102,006,240 Bronte Harbour 30.28 30.28 30.28 30.28 30.28 30.28 600,000 735,000 182 133,534,800 Total 43.92 43.92 44.83 45.21 45.33 45.33 15.70 16.01 16.10 16.10 735,000 $ 332 244,345,399 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Service Level Per 1,000 persons 0.086 0.084 0.085 0.084 0.083 0.081 0.027 0.027 0.027 0.027 10 Year Average 2012-2021 Quantity per 1,000 persons 0.0610 Quality ($/Acre) 735,000 $ Combined Quantity/Quality Level ($/1,000 persons) 44,835 $ Combined Quantity/Quality Level ($/capita) 44.84 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 44.84 $ Eligible Amount 5,677,865 $ Table F-33 Region of Halton 2022 DC Background Study F-61 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Waterfront Parks Type of Capital Asset Waterfront Parks Amenities Quantity - Sq.ft. 2022 Value Weighted Average Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($/sq.ft.) Sq.ft. of Amenities Cost Bronte Harbour Banquet Facility 33,260 32,460 32,460 32,460 32,460 32,460 - - - - 252 $ 195,560 49,186,795 $ Public Washroom and Boaters Shower 3,810 3,810 3,810 3,810 3,810 3,810 - - - - 51 22,860 1,162,698 Marina Offices 667 667 667 667 667 667 - - - - 292 4,002 1,169,128 Total 37,737 36,937 36,937 36,937 36,937 36,937 - - - - 232 $ 222,422 51,518,620 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Service Level Per 1,000 persons 73.6678 70.6107 69.7193 68.5519 67.3499 66.0322 0.0000 0.0000 0.0000 0.0000 10 Year Average 2012-2021 Quantity per 1,000 persons 41.5932 Quality ($/sq.ft) 232 $ Combined Quantity/Quality Level ($/1,000 persons) 9,634 $ Combined Quantity/Quality Level ($/capita) 9.63 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 9.63 $ Eligible Amount 1,219,911 $ Table F-34a Region of Halton 2022 DC Background Study F-62 Halton Region 2022 Development Charges Background Study Average Level of Service Service: Waterfront Parks Type of Capital Asset Waterfront Parkland Amenities Quantity - No. of Items 2022 Value Weighted Average Description 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 ($) Amenities Cost Burlington Beach Contribution to Wharf 1 1 1 1 1 1 1 1 1 1 3,060,000 $ 10 30,600,000 $ Spencer Smith Park - Gazebo - - - - - 1 1 1 1 1 810,000 5 4,050,000 Spencer Smith Park - Promenade Improvement - - - - - 1 1 1 1 1 1,130,000 5 5,650,000 Burloak Park Gazebo 1 1 1 1 1 1 1 1 1 1 92,000 10 920,000 Playground 1 1 1 1 1 1 1 1 1 1 122,000 10 1,220,000 Eastern Gateway "Boat" Plaza - - - - - - 1 1 1 1 420,000 4 1,680,000 Windows to the Lake Parking Area - - - - - - 1 1 1 1 60,000 4 240,000 East look out plaza - - - - - - 1 1 1 1 200,000 4 800,000 West look out plaza - - - - - - 1 1 1 1 59,000 4 236,000 Boat Launch - - - - - - 1 1 1 1 20,000 4 80,000 East Picnic Area - - - - - - 1 1 1 1 59,000 4 236,000 West Picnic Area - - - - - - 1 1 1 1 43,000 4 172,000 Entrance feature 1 55,000 1 55,000 Total 3 3 3 3 3 5 12 12 12 13 665,783 $ 69 45,939,000 $ Population 512,259 523,108 529,796 538,818 548,434 559,379 577,222 586,510 594,272 602,747 Service Level Per 1,000 persons 0.0059 0.0057 0.0057 0.0056 0.0055 0.0089 0.0208 0.0205 0.0202 0.0216 10 Year Average 2012-2021 Quantity per 1,000 persons 0.0120 Quality ($/item) 665,783 $ Combined Quantity/Quality Level ($/1,000 persons) 7,989 $ Combined Quantity/Quality Level ($/capita) 7.99 $ DC Amount (before deductions) Forecast Population (net) 126,625 $ per Capita 7.99 $ Eligible Amount 1,011,657 $ Table F-34b Region of Halton 2022 DC Background Study F-63 Halton Region 2022 Development Charges Background Study Infrastructure Costs Covered in the DC Calculation - Waterfront Parks SERVICE: Waterfront Parks 2022$ Increased Service Needs Gross Benefit to Eligible Post Grants, Subsidies & Net Costs Non- Attributable to Timing Capital Existing Increase Period Other Contributions Benefiting Residential Residential Anticipated Development Cost Development/ in Need Benefit Attrib. to New Sub New Share Share 2022-2031 Est. U.E.C. Development Total Development 95% 5% Cost to be Incurred During Term of Proposed By-law Burloak Phase 3 - Design 2022 150,000 $ 150,000 $ 150,000 $ 150,000 $ 142,500 $ 7,500 $ Burloak Phase 3 - Construction 2024 1,000,000 1,000,000 1,000,000 1,000,000 950,000 50,000 Burlington Beach - Recreational Works 2023 2,382,000 595,500 1,786,500 1,786,500 1,786,500 1,697,175 89,325 Burlington Beach - Environmental Restoration 2023 1,838,000 459,500 1,378,500 1,378,500 1,378,500 1,309,575 68,925 Burlington Beach - Hydro Tower 2023 23,000,000 11,500,000 11,500,000 7,910,000 3,590,000 3,590,000 3,410,500 179,500 Cost to be Incurred Post By-law Term (I.e. beyond 2026) Burlington Beach - Recreational Works 2027 6,151,000 $ 1,537,750 $ 4,613,250 $ 4,613,250 $ Burlington Beach - Environmental Restoration 2027 3,099,000 774,750 2,324,250 2,324,250 Total Estimated Capital Cost 37,620,000 $ 14,867,500 $ 22,752,500 $ 14,847,500 $ - $ 7,905,000 $ 7,905,000 $ 7,509,750 $ 395,250 $ Level of Service Summary Eligible Amount Parkland Development 5,677,865 $ Amenitites 2,231,568 Total 7,909,433 $ Table F-35 Less: Potential DC Recoverable Cost Region of Halton 2022 DC Background Study F-64 $218.69 3% / 3% SDE per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (1,594,338) $ (142,500) $ (142,500) 6,416 $ 218.69 $ 1,403,180 $ (333,657) $ (10,010) $ (343,667) 2023 (343,667) (6,417,250) (6,545,595) 3,791 223.07 845,755 (6,043,507) (181,305) (6,224,812) 2024 (6,224,812) (950,000) (988,380) 3,791 227.53 862,670 (6,350,522) (190,516) (6,541,038) 2025 (6,541,038) - - 4,122 232.08 956,665 (5,584,373) (167,531) (5,751,904) 2026 (5,751,904) - - 4,122 236.72 975,798 (4,776,106) (143,283) (4,919,389) 2027 (4,919,389) - - 4,155 241.46 1,003,169 (3,916,220) (117,487) (4,033,707) 2028 (4,033,707) - - 4,155 246.29 1,023,232 (3,010,475) (90,314) (3,100,789) 2029 (3,100,789) - - 4,155 251.21 1,043,697 (2,057,093) (61,713) (2,118,805) 2030 (2,118,805) - - 4,155 256.24 1,064,570 (1,054,235) (31,627) (1,085,862) 2031 (1,085,862) - - 4,155 261.36 1,085,862 0 0 0 Total $ (7,509,750) $ (7,676,475) 43,017 $ 10,264,598 $ (993,786) Note: Numbers may not add due to rounding Table F-36 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Halton Region 2022 Development Charges Study Cash Flow Calculations - Waterfront Parks - Residential Year DC Reserve Fund Opening Balance Single Detached Unit Equivalents (Building Permits) Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study F-65 Halton Region 2022 Development Charges Study Cash Flow Calculation - Waterfront Parks - Non-Residential $0.008 3% / 3% per Sq. Ft. per Year Inflated at (2%) Starting in 2023 RF Interest Earnings / (Cost) 2022 $ (292,838) $ (7,500) $ (7,500) 4,254,556 $ 0.008 $ 32,403 $ (267,936) $ (8,038) $ (275,974) 2023 (275,974) (337,750) (344,505) 3,968,917 0.008 30,832 (589,647) (17,689) (607,337) 2024 (607,337) (50,000) (52,020) 3,968,917 0.008 31,448 (627,908) (18,837) (646,745) 2025 (646,745) - - 3,968,917 0.008 32,077 (614,668) (18,440) (633,108) 2026 (633,108) - - 3,968,917 0.008 32,719 (600,389) (18,012) (618,401) 2027 (618,401) - - 14,997,104 0.008 126,105 (492,296) (14,769) (507,065) 2028 (507,065) - - 14,997,104 0.009 128,627 (378,437) (11,353) (389,791) 2029 (389,791) - - 14,997,104 0.009 131,200 (258,591) (7,758) (266,348) 2030 (266,348) - - 14,997,104 0.009 133,824 (132,525) (3,976) (136,500) 2031 (136,500) - - 14,997,104 0.009 136,500 (0) (0) (0.00) Total $ (395,250) $ (404,025) 95,115,744 $ 815,735 $ (118,872) Note: Numbers may not add due to rounding Table F-37 Development Related Expenditures Nominal Project Cost Development Related Expenditures Project Cost Inflated at 2% DC Reserve Fund Closing Balance after Interest Year DC Reserve Fund Opening Balance Sq. Ft. of Gross Floor Area Anticipated Revenues Annual Surplus/ (Deficit) Region of Halton 2022 DC Background Study Appendix G Local Service Guidelines Region of Halton 2022 DC Background Study G-1 Appendix G: Local Service Policy Below is the current local servicing policy (note: this may change from time to time based on comprehensive review such as ROPA) 1.1. Water and Wastewater The following guideline sets out in general the size of water and wastewater infrastructure that constitutes a DC project. Other infrastructure will be treated as a local service, which is the direct responsibility of a landowner under a development agreement. 1.1.1. Watermains  Internal to the development (servicing of vacant lands) o Greater than 400 mm: DC main o 400 mm or less: Developer responsibility within subdivision agreement  External to the development (mains on existing roads but requiring a local connection) o 400 mm or greater: DC main o Less than 400 mm: Developer responsibility within subdivision agreement An exception to these policies is feeder mains required to connect from a well or reservoir to the network. All feeder mains are considered to be DC projects regardless of the size of the main. External watermains of any size required for a development to be connected to an existing local main are considered to be the developers' responsibility. 1.1.2. Booster Stations and Reservoirs  - All water booster pumping station and reservoir projects are considered to be DC projects. Region of Halton 2022 DC Background Study G-2 1.1.3. Wastewater Mains  Internal or external (i.e., local connection) to the development o Greater than 450 mm: DC main o 450 mm or less: Developer responsibility within subdivision agreement 1.1.4. Lift Stations  Lift stations internal to a development and fed by mains which qualify for the DC project list are considered to be DC projects. Lift stations fed by mains that do not qualify for the DC project list are the responsibility of the developer.  Existing lift stations that have to be expanded as part of a new development are the responsibility of the benefiting developer and will be dealt with as part of the subdivision agreement. The above policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, these policy guidelines, the location and type of services required and their relationship to the proposed development and existing and proposed development in the area, and subsection 59(2) of the DCA. 1.2. Roads The following guideline sets out in general the size of road and related infrastructure that constitutes a DC project versus a local service, which is the direct responsibility of a landowner under a development agreement. 1.2.1. Collector Roads  Collector Roads Internal to Development - Direct developer responsibility under s.59 of the DCA (as a local service)  Collector Roads External to Development - If local service within the area to which the plan relates, direct developer responsibility under s.59 of the DCA; otherwise, include in DC calculation to the extent permitted under s.5(1) of the DCA (dependent on local circumstances) Region of Halton 2022 DC Background Study G-3 1.2.2. Arterial Roads  New Arterial Roads and Arterial Road Improvements - Include as part of road costing funded through DCs 1.2.3. Traffic Signals and Intersection Improvements  New Arterial Roads and Arterial Road Improvements - Include as part of road costing funded through DCs  Local Streets/Private Entrances/Entrances to Specific Developments - Direct developer responsibility under s.59 of the DCA (as a local service)  New Minor Arterial/Collector Road Intersections with Regional Roads - Include as part of Regional DC calculation as per Procedures for Development Related Construction on Regional Roads, Major and Minor Intersection Works  Existing Minor Arterial/Collector Road Intersections with Regional Roads - Include as part of Regional DC calculation as per Procedures for Development Related Construction on Regional Roads, Major and Minor Intersection Works  Intersection Improvements/Signalization on Other Roads Due to Development Growth Increasing Traffic - Include in DC calculation, based on 10 year standards (excluding private entrance signals), as required under s.5(1) of the DCA 1.2.4. Streetlights  Streetlights on Regional (Arterial) Roads - Include in Regional DC (based on 10 year standards as per s.5(1) of the DCA), or, in exceptional circumstances, may be direct developer responsibility through local service provisions (s.59 of the DCA) 1.2.5. Sidewalks/Multi-Use Paths  Sidewalks/Multi-Use Paths on Regional (Arterial) Roads - Include in area municipal DC (based on 10 year standards as per s.5(1) of the DCA), or, in exceptional circumstances, may be direct developer responsibility through local service provision (s.59 of DCA)  Other Sidewalks/Multi-Use Paths External to Development (which are a local service related to a plan of subdivision or within the area to which the plan relates) - Direct developer responsibility as a local service provision (under s.59 of DCA) Region of Halton 2022 DC Background Study G-4 1.2.6. Bikelanes/Bikepaths  Bikelanes Within Road Allowances - Include in DC road costs (Regional and area municipal), consistent with the service standard provisions of the DCA, s.5(1)  Bikepaths Outside Road Allowances - Include in area municipal DCs consistent with the service standard provisions of the DCA, s.5(1) 1.2.7. Noise Abatement Measures  Internal to Development - Direct developer responsibility through local service provisions (s.59 of DCA)  External to Development - Noise walls required as a result of growth, include in Regional / area municipal DCs 1.2.8. Traffic Control Systems  Include in DC calculation appropriate shares, based on 10 year standards, as required under s.5(1) of the DCA 1.2.9. Land Acquisition for Road Allowances  Land Acquisition for Arterial Roads - Dedication under the Planning Act subdivision provisions (s.51) through development lands; in areas with limited or no development, include in Regional DC (to the extent eligible)  Land Acquisition for Major Intersections and Grade Separations (beyond normal dedication requirements) - Include in the DC to the extent eligible. The above policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development and any existing and proposed development in the surrounding area, these policy guidelines, the location and type of services required and their relationship to the proposed development and existing and proposed development in the area, and subsection 59(2) of the DCA. Region of Halton 2022 DC Background Study Appendix H Asset Management Plan and Long Term Capital and Operating Cost Examination Region of Halton 2022 DC Background Study H-1 Appendix H: Asset Management Plan and Long-term Capital and Operating Cost Examination This appendix presents the examination required under s. 10 (2) (c) of the DCA of the asset management plan (AMP) and long-term capital and operating costs for capital infrastructure required for each service to which the by-law relates. 1. Asset Management Plan As outlined in subsection 6.12, the recent changes to the DCA (new clause 10(2)(c.2)) require that the background study must include an AMP related to new infrastructure. Subsection 10 (3) of the DCA provides: The AMP shall, (a) deal with all assets whose capital costs are proposed to be funded under the DC by- law; (b) demonstrate that all the assets mentioned in clause (a) are financially sustainable over their full life cycle; (c) contain any other information that is prescribed; and (d) be prepared in the prescribed manner. It has been the Region's long standing practice to prepare the Region's 10-year budget forecast based on the AMP. The 10-year budget forecast is updated through the annual budget process based on the latest information available including the existing long- term AMP, building condition assessments, results of studies such as master plans, optimization studies etc. For the purpose of the 2022 DC by-law update, the 10-year budget forecast cover the planning horizon based on the long-term AMP, incorporating the infrastructure identified for the 2022 DC update, and building condition assessments. The long-term budget forecast (2022-2031) shown in table H-1 (a and b) and H-2 (a and b) has been prepared based on:  2022 Budget and Business Plan Forecast Region of Halton 2022 DC Background Study H-2  Master Plans (e.g. W/WW and Transportation, Paramedic Services Master Plan (MO-14-15), Waterfront MasterPlan (LPS54-15 & LPS59-15) and Museum Masterplan (LPS62-14))  Current AMP  Asset Conditions (e.g. 2013 Infrastructure Condition Report Card - PW-24- 15/FN-39-15/LPS109-15)  Building Condition Assessments  Capital Needs Assessments  Asset Failure Data (e.g. water main breakages)  Optimization studies (e.g. Annual Transportation Progress Report - PW-19-15)  Refined costs estimates (e.g. based on detailed design)  Construction schedules The forecast also incorporates the following assumptions:  Growth Assumptions o forecasted assessment growth is 1.7% per year to reflect moderate growth o water and wastewater customer growth is estimated to be 1.5%, the 2022 Budget assumes no consumption growth to reflect the continued impact of water efficiency and conservation and 2022 to 2031 forecast maintains the current projected consumption for first half and a gradual decline during the second half  Provincial Subsidies o Subsidy identified for many programs does not keep pace with the increase in cost and demand for service o In particular, public health funding model has changed from the previous 100% and 75% cost-share model to 70% in 2020 and since then the Region contributes more than 30% of funding requirements  Demands for Services particularly in Social Services and Health Services o Increased demands are reflected in the 2022 Budget due to Covid-19 long term impacts because of more cost towards personal protective equipment, technology, additional cleaning and disinfecting materials  Performance of the Region's Investment Portfolio o A continued low interest rate environment will make it challenging to generate the current level of returns  Growth-related Infrastructure Region of Halton 2022 DC Background Study H-3 o Future Allocation Programs will continue to be subject to an update of the DC by-law and Development Financing Plan  Future Liabilities o Halton Region budgets reserve transfers for Tangible Capital Assets based on anticipated future capital replacement requirements  Cost Increases The Operating Forecast has been prepared to maintain the tax impact for Regional services at or below inflation based on the following key assumptions:  General inflation of 2.0%  Interest on reserves of 3.0%  Debt financing rate of 5.0%  Assessment growth of 1.7% per year  Provincial subsidies will maintain current funding formulas  Water customer growth of 1.2% to 1.5%  Water consumption growth of -0.9% to 0% Table H-1 illustrates Halton's tax-supported budget and forecast over the next 10 from the 2022 Budget and Business Plan. The Tax forecast to 2031 projects that tax rate increases are close to the rate of inflation, which is consistent with the 10 year tax forecast in the current (2022) and previous budgets. Table H-2 illustrates Halton's rate-supported budget and forecast over the 10 years from the 2022 Budget and Business Plan. Included in this business plan are the impacts of the proposed water and wastewater servicing program to service anticipated growth in the forecast period. The forecast to 2031 projects that the rate increases are in the 2.8% to 3.3 % range, which is consistent with the 10-year rate forecast in the current (2022) and previous budgets. Region of Halton 2022 DC Background Study H-4 2022 Capital Budget & Forecast Summary of Tax Capital Budget & Financing ($000s) Gross Cost 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Program Expenditures Transportation 2,637,646 $ 196,567 $ 96,722 $ 220,459 $ 244,553 $ 369,711 $ 436,221 $ 195,099 $ 201,374 $ 229,171 $ 447,769 $ Planning 166,235 12,845 16,790 37,510 13,220 12,720 21,470 13,720 13,220 12,220 12,520 Waste Management 47,805 4,809 6,471 10,524 15,532 1,169 1,166 5,041 2,195 799 99 Energy, Fleet and Facilities 85,013 10,788 3,709 5,262 3,707 34,363 4,193 6,725 3,676 7,724 4,866 Information Technology 65,641 7,747 7,912 7,624 7,582 6,400 6,097 6,839 5,735 4,621 5,084 Paramedic Services 35,651 1,894 3,613 1,723 6,124 2,463 3,974 3,851 2,703 3,387 5,919 Economic Development 8,000 - - 8,000 - - - - - - - Services for Seniors 6,929 959 650 650 650 650 650 650 650 770 650 Capital & Dev't Financing 3,557 350 350 350 380 350 350 377 350 350 350 Public Health 434 51 51 51 17 34 17 - 34 51 128 Children's Services 500 50 50 50 50 50 50 50 50 50 50 Communications & Customer Service 30 - - 15 - - - - 15 - - Police 74,905 11,752 9,317 8,496 9,714 7,352 7,950 5,650 4,850 5,125 4,700 Total 3,132,346 $ 247,813 $ 145,635 $ 300,714 $ 301,529 $ 435,261 $ 482,138 $ 238,002 $ 234,852 $ 264,268 $ 482,135 $ Financing Tax Reserves 1,544,402 $ 144,362 $ 93,248 $ 173,957 $ 167,530 $ 216,967 $ 210,064 $ 102,883 $ 117,120 $ 134,570 $ 183,700 $ Rate Reserves 14,185 602 560 1,068 758 8,283 883 345 515 369 805 Dev't Charges - Resid. 1,561,694 99,220 49,105 124,264 132,445 209,349 270,380 134,241 116,695 128,860 297,134 Dev't Charges - Non Res. 6,394 511 624 1,368 738 606 755 476 464 411 440 External Rcvry/Other 572 57 57 57 57 57 57 57 57 57 57 Debentures 5,100 3,060 2,040 - - - - - - - - Total 3,132,346 $ 247,813 $ 145,635 $ 300,714 $ 301,529 $ 435,261 $ 482,138 $ 238,002 $ 234,852 $ 264,268 $ 482,135 $ Includes financing cost. Schedule may not add due to rounding. Table H-1a 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Requested Budget Net Program Impact ($000's) 228,503 $ 237,687 $ 247,204 $ 257,076 $ 267,164 $ 275,850 $ 284,464 $ 293,375 $ 302,606 $ 311,723 $ Annual Water Consumption m3 (000s) 52,913 52,913 52,913 52,913 52,913 52,421 51,934 51,452 50,974 50,500 Residential Bill (226 m3 p.a.) 1,023 $ 1,057 $ 1,093 $ 1,129 $ 1,167 $ 1,204 $ 1,242 $ 1,280 $ 1,320 $ 1,359 $ Annual % Rate Increase 2.8% 3.3% 3.3% 3.3% 3.3% 3.2% 3.1% 3.1% 3.1% 2.9% Rate Impact: State-of-Good-Repair 2.0% 2.1% 2.2% 2.2% 2.0% 1.6% 1.5% 1.5% 1.5% 1.3% Operating Expenses 0.8% 1.3% 1.2% 1.1% 1.3% 1.2% 1.2% 1.2% 1.2% 1.2% Consumption Change 0.0% 0.0% 0.0% 0.0% 0.0% 0.5% 0.5% 0.5% 0.5% 0.5% Table H-2b Forecast Forecast Ten Year Operating Budget Forecast For Rate Supported Services Forecast Forecast Forecast Forecast Forecast Forecast Forecast Region of Halton 2022 DC Background Study H-5 2022 Capital Budget & Forecast Summary of Rate Capital Budget & Financing ($000s) Gross Cost 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Development Water 590,084 $ 27,843 $ 23,253 $ 128,835 $ 74,553 $ 275,518 $ 12,843 $ 14,793 $ 18,895 $ 3,387 $ 10,164 $ Wastewater 653,807 45,229 14,578 92,912 172,863 208,506 6,061 11,794 15,527 160 86,177 Sub-total 1,243,891 73,072 37,831 221,747 247,416 484,024 18,904 26,587 34,422 3,547 96,341 State-Of-Good-Repair Water 561,119 67,020 76,451 71,858 44,024 59,833 35,711 50,292 58,041 53,977 43,912 Wastewater 806,137 65,893 91,455 72,347 67,176 54,896 81,476 78,673 76,188 97,680 120,353 Sub-total 1,367,256 132,913 167,906 144,205 111,200 114,729 117,187 128,965 134,229 151,657 164,265 Total 2,611,147 $ 205,985 $ 205,737 $ 365,952 $ 358,616 $ 598,753 $ 136,091 $ 155,552 $ 168,651 $ 155,204 $ 260,606 $ Financing External Rcvry/Other 12,350 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ 1,235 $ Dev't Charges - Res. 800,343 54,270 23,475 147,823 150,459 313,151 14,193 22,955 18,379 3,281 52,357 Rate Capital Reserves 1,542,016 131,678 172,705 172,335 151,170 176,863 115,952 127,730 142,421 150,422 200,740 Capital Invstmnt Rvl. Fnd. 256,438 18,802 8,322 44,559 55,752 107,504 4,711 3,632 6,616 266 6,274 Total 2,611,147 $ 205,985 $ 205,737 $ 365,952 $ 358,616 $ 598,753 $ 136,091 $ 155,552 $ 168,651 $ 155,204 $ 260,606 $ Includes financing cost. Schedule may not add due to rounding. Table H-2a 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Requested Budget Net Program Impact ($000's) 228,503 $ 237,687 $ 247,204 $ 257,076 $ 267,164 $ 275,850 $ 284,464 $ 293,375 $ 302,606 $ 311,723 $ Annual Water Consumption m3 (000s) 52,913 52,913 52,913 52,913 52,913 52,421 51,934 51,452 50,974 50,500 Residential Bill (226 m3 p.a.) 1,023 $ 1,057 $ 1,093 $ 1,129 $ 1,167 $ 1,204 $ 1,242 $ 1,280 $ 1,320 $ 1,359 $ Annual % Rate Increase 2.8% 3.3% 3.3% 3.3% 3.3% 3.2% 3.1% 3.1% 3.1% 2.9% Rate Impact: State-of-Good-Repair 2.0% 2.1% 2.2% 2.2% 2.0% 1.6% 1.5% 1.5% 1.5% 1.3% Operating Expenses 0.8% 1.3% 1.2% 1.1% 1.3% 1.2% 1.2% 1.2% 1.2% 1.2% Consumption Change 0.0% 0.0% 0.0% 0.0% 0.0% 0.5% 0.5% 0.5% 0.5% 0.5% Table H-2b Forecast Forecast Ten Year Operating Budget Forecast For Rate Supported Services Forecast Forecast Forecast Forecast Forecast Forecast Forecast Region of Halton 2022 DC Background Study H-6 2. LONG RANGE CAPITAL AND OPERATING COST EXAMINATION This appendix presents the examination required under s. 10 (2) (c) of the DCA of the long-term capital and operating costs for capital infrastructure required for each service to which the by-law relates. 2.1. Tax-supported Services The Region's proposed DC by-law includes charges for the following tax-supported services:  Roads  Growth Studies  Police Services  Paramedic Services  Facilities  Social Housing  Waste Diversion  Waterfront Parks The examination of the growth and non-growth capital program and it's impacts on the operating budget have been shown in the section above. The expected tax rate increases are a reflection of the increased budget provisions to support the roads capital program as well as new ambulance stations, comprehensive housing strategy (social housing), expansion of police and Regional facilities. 2.2. Rate-supported Services The Region's proposed DC by-law includes charges for the following rate-supported services:  Water  Wastewater The impacts of the proposed water and wastewater servicing program to service anticipated growth in the forecast period is demonstrated in section 1 above. The Region intends to implement the projects set out in this Study through its usual practice of preparing financial plans prior to the release of water and wastewater capacity. These plans will consider the projects (including roads) to be financed under the Plan and may use a combination of various financing techniques. The financial plan Region of Halton 2022 DC Background Study H-7 may also consider the staging of projects and, therefore, the timing and sequence of development to achieve the fiscal objectives of the Region under the Region's current Official Plan. Accordingly, the timing of some of the projects which are to be DC funded may be modified from what is shown in this background study. These modifications may be necessitated by the specifics of the financial plans to be prepared for water, wastewater and road servicing. The infrastructure implementation and financial plan will commence following the passing of the 2022 DC by-law. Region of Halton 2022 DC Background Study Appendix I Proposed Development Charge By-law (2022) Region of Halton 2022 DC Background Study I-1 THE REGIONAL MUNICIPALITY OF HALTON By-law No. XX-22 A BY-LAW TO ESTABLISH WATER, WASTEWATER, ROADS AND GENERAL SERVICES DEVELOPMENT CHARGES FOR THE REGIONAL MUNICIPALITY OF HALTON (BUILT BOUNDARY AND GREENFIELD AREAS) AND TO REPEAL BY-LAW NO. 36-17. WHEREAS subsection 2(1) of the Act provides that the council of a municipality may by by-law impose development charges against land to pay for increased capital costs required because of increased needs for services arising from the development of the land in the area to which the by-law applies; AND WHEREAS Council has before it the Study; AND WHEREAS the Study and the proposed development charges by-law were made available to the public, Council gave notice to the public and held a meeting open to the public, through its Statutory Public Meeting and Hearing Committee, pursuant to section 12 of the Act on ____ , and Council considered the Study, received written submissions and heard comments and representations concerning the Study from all persons who applied to be heard; AND WHEREAS at a meeting open to the public held on ____, Council adopted the recommendations in Report No.____ , thereby updating its capital budget and forecast where appropriate and thereby indicating that it intends that the increase in the need for services to service the anticipated development will be met; AND WHEREAS at a meeting open to the public held on _____, Council adopted the recommendations in Report No.____ thereby expressing its intention that development- related post 2031 capacity identified in the Study shall be paid for by development charges or other similar charges; AND WHEREAS at a meeting open to the public held on ____ , Council approved the Study and adopted the recommendations in Report No. _____ thereby determining that no further public meetings were required under section 12 of the Act. NOW THEREFORE THE COUNCIL OF THE REGIONAL MUNICIPALITY OF HALTON HEREBY ENACTS AS FOLLOWS: Region of Halton 2022 DC Background Study I-2 Definitions 1. THAT in this By-law: (a) "accessory commercial building" means a building that is naturally or normally incidental to or subordinate in purpose and is exclusively devoted to the principal commercial use on the lot; (b) "accessory dwelling" means a dwelling unit that is naturally or normally incidental to or subordinate in purpose and is exclusively devoted to a single detached dwelling or a semi-detached dwelling; (c) "Act" means the Development Charges Act, 1997, S.O. 1997, c. 27, as amended or successor legislation; (d) "agricultural development" means development of land and buildings that support a bona fide farming operation, which may include a farming operation that includes separate adjoining lots, including greenhouses which are not connected to Regional water services or wastewater services, sod farms and farms for the breeding and boarding of horses, and includes, but is not limited to, barns, silos and other ancillary buildings to such agricultural development but excluding any component thereof that are residential use, an industrial, a commercial use or a retail development, including but not limited to the breeding, boarding and/or grooming of household pets; (e) "air-supported structure" means a structure consisting of a pliable membrane that achieves and maintains its shape and support by internal air pressure; (f) "apartment dwelling" means a building containing more than one dwelling unit where the units are connected by an interior corridor. Despite the foregoing, an apartment dwelling includes, those stacked townhouse dwellings and/or back-to- back townhouse dwellings that are developed on a block approved for development at a minimum density of sixty (60) units per net hectare pursuant to plans and drawings approved under section 41 of the Planning Act; (g) "back-to-back townhouse dwelling" means a building containing four or more dwelling units separated vertically by a common wall, including a rear common wall, that do not have rear yards; Region of Halton 2022 DC Background Study I-3 (h) "bedroom" means a habitable room of at least seven square metres (7 m2), including a den, study, loft, or other similar area, but does not include a living room, dining room, kitchen or other space; (i) "board of education" means an English-language district school board, an English-language separate district school board, a French-language district school board and a French-language separate district school board; (j) "building" means a permanent enclosed structure occupying an area greater than ten square metres (10 m²) and despite the foregoing includes, but is not limited to: (i) an above-grade storage tank; (ii) an air-supported structure; (iii) an industrial tent; (iv) a roof-like structure over a gas-bar or service station; and (v) an area attached to and/or ancillary to a retail development delineated by one or more walls or part walls, a roof-like structure or any of them; (k) "Built Boundary" means that part of the Region shown as Built Boundary on Schedule "A" to this By-law and includes that part of the Region shown as Natural Heritage System that is within the Built Boundary area shown on Schedule "A" to this By-law; (l) "charitable dwelling" means a part of a residential building or a part of the residential portion of a mixed-use building maintained and operated by a corporation approved under the Long-Term Care Homes Act, 2007 S.O. 2007, c.8, as amended or successor legislation as a home or joint home, an institution, or nursing home for persons requiring residential, specialized or group care and includes a children's residence under the Child and Family Services Act, R.S.O. 1990, c. C.11, as amended or successor legislation, and a home for special care under the Homes for Special Care Act, R.S.O. 1990, c. H.12, as amended or successor legislation; (m)"commercial use" means land, buildings or portions thereof used, designed or intended for a non-residential use that is not retail or industrial, and includes uses Region of Halton 2022 DC Background Study I-4 which serve academic, medical/dental, and cultural needs that are not located within or part of a retail development; (n) "correctional group home" means a residential building or the residential portion of a mixed-use building containing a single housekeeping unit supervised on a twenty-four (24) hour basis on site by agency staff on a shift rotation basis, and funded wholly or in part by any government or its agency, or by public subscription or donation, or by any combination thereof, and licensed, approved or supervised by the Ministry of Correctional Services as a detention or correctional facility under any general or special act as amended or successor legislation. A correctional group home may contain an office provided that the office is used only for the operation of the correctional group home in which it is located; (o) "Council" means the Council of the Region; (p) "development" means the construction, erection or placing of one or more buildings on land or the making of an addition or alteration to a building that has the effect of increasing the size or usability and/or changing the use thereof and development shall include redevelopment; (q) "dwelling unit" means either (i) a room or suite of rooms used, designed or intended for residential use by one or more persons living together, in which culinary and sanitary facilities are provided for the exclusive use of such person or persons, or (ii) in the case of a special care/special need dwelling, either (1) a room or suite of rooms used, designed or intended for use by one person with or without exclusive sanitary and/or culinary facilities, or (2) a room or suite of rooms used, designed or intended for use by more than one person with no more than two persons sharing a bedroom and with sanitary facilities directly connected and accessible to each room, or (3) every seven square metres (7 m2) of area within a room or suite of rooms used, designed or intended for use by more than one person as a bedroom; (r) "existing industrial building" shall have the same meaning as the term is defined in the Regulation, and shall not include self-storage facilities and retail warehouses; (s) "garden suite" means a building containing one (1) dwelling unit where the garden suite is detached from and ancillary to an existing single detached Region of Halton 2022 DC Background Study I-5 dwelling or semi-detached dwelling on the lands and such building is designed to be portable; (t) "grade" means the average level of proposed finished ground adjoining a building at all exterior walls; (u) "Greenfield" means that part of the Region shown as Greenfield on Schedule "A" to this By-law and includes that part of the Region shown as Natural Heritage System that is within the Greenfield area shown on Schedule "A" to this By-law; (v) "group home" means a residential building or the residential portion of a mixed- use building containing a single housekeeping unit which may or may not be supervised on a twenty-four (24) hour basis on site by agency staff on a shift rotation basis, and funded wholly or in part by any government or its agency, or by public subscription or donation, or by any combination thereof and licensed, approved or supervised by the Province of Ontario for the accommodation of persons under any general or special act as amended or successor legislation; (w) "high density apartment" means an apartment dwelling of a minimum of four (4) storeys or containing more than one hundred thirty (130) dwelling units per net hectare pursuant to plans and drawings approved under Section 41 of the Planning Act; (x) "industrial" means non-retail uses where the land or buildings, or portions thereof are intended or designed for manufacturing, producing, processing, storing or distribution of something, including research or development in connection with manufacturing, producing or processing something, and the retail sale by a manufacturer, producer or processor of something that they have manufactured, produced or processed, if the retail sales are at the site where the manufacturing, production or processing takes place, as well as office space that is ancillary to the producing, processing, storing or distribution of something at the site, but shall not include self-storage facilities or retail warehouses; (y) "institutional development" means development of a building or structure, or portions thereof, intended for use, (a) as a long-term care home within the meaning of subsection 2(1) of the Long-Term Care Homes Act, 2007; Region of Halton 2022 DC Background Study I-6 (b) as a retirement home within the meaning of subsection 2(1) of the Retirement Homes Act, 2010, S.O. 2010, c. 11; (c) by any of the following post-secondary institutions for the objects of the institution: (i) a university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario, (ii) a college or university federated or affiliated with a university described in subclause (i), or (iii) an Indigenous Institute prescribed for the purposes of section 6 of the Indigenous Institutes Act, 2017, S.O. 2017, c. 34, Sched. 20; (d) as a memorial home, clubhouse, or athletic grounds by an Ontario branch of the Royal Canadian Legion; or (e) as a hospice to provide end of life care; (z) "interest rate" means the annual rate or rates of interest as established through the development charge interest policy, as may be revised from time to time; (aa) "local municipality" means The Corporation of the City of Burlington, The Corporation of the Town of Oakville, The Corporation of the Town of Milton or The Corporation of the Town of Halton Hills; (bb) "lot" means a lot, block or parcel of land capable of being legally and separately conveyed; (cc) "mezzanine" means an intermediate floor assembly between the floor and ceiling of any room or storey and includes an interior balcony; (dd) "mixed-use" means the use, design or intended use of the same land or building for a combination of non-residential development and residential development; (ee) "mobile home" means any dwelling that is designed to be made mobile, and constructed or manufactured to provide a residence for one or more persons, but does not include a travel trailer or tent trailer; Region of Halton 2022 DC Background Study I-7 (ff) "multiple dwelling" means a building containing more than one dwelling unit or one or more dwelling units above the first storey of a building containing a non-residential use but a multiple dwelling does not include an accessory dwelling, a single detached dwelling, a semi-detached dwelling, an apartment dwelling, or a special care/special need dwelling; (gg) "Natural Heritage System" means that part of the Region shown as Natural Heritage System on Schedule "A" to this By-law and areas identified as Natural Heritage System on Schedule "A" to this By-law reflect part of the Region's Natural Heritage System. The Natural Heritage System is shown on Schedule "A" to this By-law for illustrative purposes only and does not impact the categorization of the land to which the Natural Heritage System overlay is shown as either Rural Area, Greenfield Area or Built Boundary for the purposes of this By-law; (hh) "net hectare" means the total land area of a lot after conveyance or dedication of public road allowances, park and school sites and other lands for public use; (ii) "non-profit housing development" means development of a building or structure intended for use as residential premises by, (a) a corporation to which the Not-for-Profit Corporations Act, 2010, S.O. 2010, c. 15 applies, that is in good standing under that Act and whose primary object is to provide housing; (b) a corporation without share capital to which the Canada Not-for-Profit Corporations Act, S.C. 2009, c. 23 applies, that is in good standing under that Act and whose primary object is to provide housing; or (c) a non-profit housing co-operative that is in good standing under the Co- operative Corporations Act, R.S.O. 1990, c. C.35, O. Reg. 454/19, s. 3; (jj) "non-residential development" means land, buildings or portions thereof used, designed or intended for a non-residential use; (kk) "non-residential use" means the use of land, buildings or portions thereof for any purpose other than for a residential use; Region of Halton 2022 DC Background Study I-8 (ll) "non-retail development" means any non-residential development which is not a retail development, and shall include offices that are not part of a retail development; (mm) "nursing home" means a residential building or the residential portion of a mixed-use building licensed as a nursing home by the Province of Ontario; (nn) "owner" means the owner of land or a person who has made application for an approval for the development of land; (oo) "place of worship" means any building or part thereof that is exempt from taxation as a place of worship pursuant to paragraph 3 of section 3 of the Assessment Act, R.S.O. 1990, c. A.31, as amended or successor legislation; (pp) "Planning Act" means the Planning Act, R.S.O. 1990, c. P.13, as amended or successor legislation; (qq) "recreational vehicle parks" means land where mobile homes may be situated and occupancy of mobile homes is not permitted throughout the calendar year by either municipal land use or provincial regulations; (rr) "redevelopment" means the construction, erection or placing of one or more buildings on land where all or part of a building on such land has previously been demolished, or changing the use of all or part of a building from a residential use to a non-residential use or from a non-residential use to a residential use, or changing all or part of a building from one type of residential use to another type of residential use or from one type of non- residential use to another type of non-residential use; (ss) "Region" refers to the geographic area of the Regional Municipality of Halton or the corporation of The Regional Municipality of Halton, as the context requires; (tt) "Regulation" means O. Reg. 82/98, as amended or successor regulation; (uu) "rental housing" means development of a building or structure or portion thereof with four or more dwelling units that are intended for use as rented residential premises; Region of Halton 2022 DC Background Study I-9 (vv) "residential development" means land, buildings or portions thereof used, designed or intended for residential use and includes but not limited to a single detached dwelling, a semi-detached dwelling, a multiple dwelling, an apartment dwelling, a garden suite, a special care/special need dwelling, an accessory dwelling, a mobile home and the residential portion of a mixed-use building but shall not include a mobile home that is located on recreational vehicle parks; (ww) "residential use" means the use of land, buildings or portions thereof as living accommodation for one or more persons; (xx) "restricted flow" means a restriction on the demand for water or the discharge of wastewater of three and twenty-two one-hundredths cubic metres (3.22 m3) per hectare per day imposed on lands described in Schedules "D-1" and "D-2" to this By-law; (yy) "retail" means lands, buildings, structures or any portions thereof, used, designed or intended to be used for the sale, lease or rental or offer for sale, lease or rental of any manner of goods, commodities, services or entertainment to the public, for consumption or use, whether directly or through membership, but shall exclude commercial, industrial, hotels/motels/bed and breakfast facilities, mobile home situated on recreational vehicle parks, as well as offices not located within or as part of a retail development, and self-storage facilities; (zz) "retail development" means a development of land or buildings which are designed or intended for retail; (aaa) "retirement home or lodge" means a residential building or the residential portion of a mixed-use building which provides accommodation primarily for retired persons or couples where each private bedroom or living accommodation has a separate private bathroom and separate entrance from a common hall but where common facilities for the preparation and consumption of food are provided, and common lounges, recreation rooms and medical care facilities may also be provided; (bbb) "roads services" includes, but is not limited to, road construction, widening, rehabilitation, resurfacing and reconstruction, grade separations, Region of Halton 2022 DC Background Study I-10 intersections, signalization, signage, bridges, overpasses, interchanges, and noise attenuation barriers; (ccc) "Rural Area" means that part of the Region shown as Rural on Schedule "A" to this By-law and includes that part of the Region shown as Natural Heritage System within the Rural Area shown on Schedule "A" to this By-law; (ddd) "seasonal structure" means a building placed or constructed on land and used, designed or intended for use for a non-residential purpose during a single season of the year where such building is designed to be easily demolished or removed from the land at the end of the season; (eee) "semi-detached dwelling" means a building divided vertically into two dwelling units each of which has a separate entrance and access to grade; (fff) "services" means services designated in this By-law or in an agreement under section 44 of the Act; (ggg) "single detached dwelling" means a completely detached building containing only one (1) dwelling unit; (hhh) "special care/special need dwelling" means a residential building or portion thereof: (i) containing two or more dwelling units which units have a common entrance from street level; (ii) where the occupants have the right to use in common with other occupants halls, stairs, yards, common rooms and accessory buildings; (iii) that is designed to accommodate persons with specific needs, including but not limited to, independent permanent living arrangements; and (iv) where support services, such as meal preparation, grocery shopping, laundry, housekeeping, nursing, respite care and attendant services are provided at various levels; Region of Halton 2022 DC Background Study I-11 and includes, but is not limited to, retirement homes or lodges, charitable dwellings, nursing homes, group homes (including correctional group homes) and hospices; (iii) "stacked townhouse dwelling" means a building containing two or more dwelling units where each dwelling unit is separated horizontally from another dwelling unit by a common wall; (jjj) "storey" means that portion of a building between the surface of a floor and the floor, ceiling or roof immediately above it with the first storey being that with the floor closest to grade and having its ceiling more than six feet (6 ft.) (one and eighty three hundredths metres 1.83 m.) above grade; (kkk) "Study" means the report entitled "2022 Development Charges Background Study for Water, Wastewater, Roads & General Services Development Charges" dated December 15, 2021, and any amendments thereafter or addenda thereto; (lll) "temporary building" means a building used, designed or intended for use for a non-residential purpose, other than a seasonal structure and a temporary venue, or for a residential purpose, other than a garden suite, that is constructed or placed upon land and which is demolished or removed from the land within three (3) years of building permit issuance, and includes, but is not limited to, sales trailers, office trailers and industrial tents provided they meet the criteria in this definition; (mmm) "temporary venue" means a building that is placed or constructed on land and is used, designed or intended for use for a particular event where the event has a duration of one (1) week or less and the building is erected immediately before beginning of the event and is demolished or removed from the land immediately following the end of the event; (nnn) "total floor area": (a) includes the sum of the total areas of the floors in a building whether at, above or below grade, measured: (i) between the exterior faces of the exterior walls of the building; (ii) from the centre line of a common wall separating two uses; or Region of Halton 2022 DC Background Study I-12 (iii) from the outside edge of a floor where the outside edge of the floor does not meet an exterior or common wall; and (b) includes the area of a mezzanine; (c) excludes those areas used exclusively for parking garages or structures; and (d) where a building has only one wall or does not have any walls, the total floor area shall be the total of the area directly beneath any roof-like structure of the building; (ooo) "wastewater services" means all facilities, buildings, services and things related to sanitary services, including but not limited to, all works for the collection, transmission, treatment and disposal of sewage; and (ppp) "water services" means all facilities, buildings, services and things related to the provision of water, including but not limited to, all works for the collection, production, treatment, storage, supply, transmission and distribution of water. Rules 2. THAT for the purpose of complying with section 6 of the Act: (a) the area to which this By-law applies shall be the area described in section 4 of this By-law; (b) the rules developed under paragraph 9 of subsection 5(1) of the Act for determining if development charges are payable under this By-law in any particular case and for determining the amount of the charges shall be as set forth in sections 7 through 21, inclusive, of this By-law; (c) the rules for exemptions, relief, credits and adjustments shall be as set forth in sections 22 through 32, inclusive, of this By-law; (d) the indexing of charges shall be in accordance with section 19 of this By-law; (e) there shall be no phasing-in; (f) there shall only be a demolition credit in accordance with section 31 of this By- law; Region of Halton 2022 DC Background Study I-13 (g) in addition to the rules set out in the Act and this By-law, the rules for the calculation of the development charge payable under this By-law for the lands described in Schedules "D-1" and "D-2" to this By-law are set out in Schedule "E" to this By-law; and (h) except as set out in the Act and this By-law, there are no other credits, exemptions, relief or adjustments in respect of any land in the area to which this By-law applies. Schedules 3. THAT the following Schedules to this By-law form an integral part of this By-law: Schedule "A" Map of the Regional Municipality of Halton; Schedule "B-1" Built Boundary Residential Development Charges; Schedule "B-2" Greenfield Residential Development Charges; Schedule "C-1" Built Boundary Non-Residential Development Charges; Schedule "C-2" Greenfield Non-Residential Development Charges; Schedule "D-1" "D-2" Descriptions of Lands to which Schedule "E" Applies; and Schedule "E" Rules Applicable to the Lands described in Schedules "D-1" and "D-2". Lands Affected 4. THAT this By-law applies to all lands in the geographic area of the Region, being all of the lands shown on Schedule "A" to this By-law. For greater certainty, the lands described in Schedule "D-1" and "D-2" are lands also shown on Schedule "A". 5. THAT the boundaries on Schedule "A" to this By-law are fixed when they are formed by a combination of such well defined features such as roads, railways, electrical transmission lines, municipal and property boundaries, original township lot or concession lines, streams and topographic features. 6. THAT where: Region of Halton 2022 DC Background Study I-14 (a) the boundaries on Schedule "A" to this By-law are not fixed in accordance with the section 5 of this By-law, the boundary shall be determined by the Region's Director of Planning Services and/or Chief Planning Officer; and (b) a parcel of land is within two or more areas shown on Schedule "A" to this By- law, the development charges applicable to the area in which each part of the parcel is located shall be applied. Other Development Charges 7. THAT the development of land in the Region may be subject to one or more development charges by-laws of the Region and the development charges under this By-law are in addition to any other development charges that may be applicable to such development. Designation of Services 8. THAT it is hereby declared by Council that all development of land within the area to which this By-law applies will increase the need for services. 9. THAT the development charges under this By-law applicable to a development shall apply without regard to the services required or used by a particular development. 10. THAT development charges under this By-law shall be imposed for the following categories of services to pay for the increased capital costs required because of increased needs for services arising from development: (a) water services; (b) wastewater services; (c) roads services; (d) growth studies; (e) police services; (f) paramedic services; (g) social housing; (h) waterfront parks; (i) facilities; and (j) waste diversion. Region of Halton 2022 DC Background Study I-15 Approvals for Development 11. THAT development charges under this By-law shall be imposed against all lands or buildings within the area to which this By-law applies if the development of such lands or buildings requires any of the following: (a) the passing of a zoning by-law or of an amendment thereto under section 34 of the Planning Act; (b) the approval of a minor variance under section 45 of the Planning Act; (c) a conveyance of land to which a by-law passed under subsection 50(7) of the Planning Act applies; (d) the approval of a plan of subdivision under section 51 of the Planning Act; (e) a consent under section 53 of the Planning Act; (f) the approval of a description under section 9 of the Condominium Act, 1998, S.O. 1998, c. 19, as amended or successor legislation; or (g) the issuance of a permit under the Building Code Act, 1992, S.O. 1992, c. 23, as amended or successor legislation, in relation to a building. 12. THAT no more than one development charge under this By-law for each service designated in section 10 of this By-law shall be imposed upon any lands or buildings to which this By-law applies even though two or more of the actions described in section 11 of this By-law are required before the lands or buildings can be developed or redeveloped. 13. THAT notwithstanding sections 12 and 20 of this By-law, if (a) two or more of the actions described in section 11 of this By-law occur at different times, or (b) a second or subsequent building permit is issued, resulting in increased, additional or different development, then additional development charges under this By-law, shall be imposed and shall be paid in respect of such increased, additional or different development permitted by such action or permit. Region of Halton 2022 DC Background Study I-16 14. THAT where a development requires an approval described in section 11 of this By-law after the issuance of a building permit and no development charges have been paid, then development charges under this By-law shall be paid prior to the granting of the approval required under section 11 of this By-law. 15. THAT nothing in this By-law prevents Council from requiring, in an agreement under section 51 of the Planning Act or as a condition of consent or an agreement respecting same under section 53 of the Planning Act, that the owner, at his or her own expense, install such local services related to or within the area to which a plan of subdivision relates, as Council may require, in accordance with the Region's applicable local services policies in effect at the time. Calculation of Development Charges under this By-law 16. THAT the development charges under this By-law with respect to the development of any land or buildings shall be calculated as follows: (a) in the case of residential development including a dwelling unit accessory to a non-residential development, or the residential portion of a mixed-use development, based upon the number and type of dwelling units; or (b) in the case of non-residential development, or the non-residential portion of a mixed-use development, based upon the total floor area of such development. Amount of Charge - Residential 17. THAT, subject to section 7 of this By-law, for development for residential purposes, development charges shall be imposed on all residential development, including a dwelling unit accessory to a non-residential development and the residential component of a mixed-use building, according to the number and type of dwelling units on lands within that part of the Region shown on Schedule "A" to this By-law as: (a) Built Boundary - the development charges payable shall be the Total Urban Charges shown on Schedule "B-1" to this By-law; (b) Greenfield Area - the development charges payable shall be the Total Urban Charges shown on Schedule "B-2" to this By-law; and (c) Rural - the development charges payable shall be as follows: Region of Halton 2022 DC Background Study I-17 (i) the Total Rural Charges shown on Schedule "B-1" to this By-law; (ii) where at the time a building permit is issued for the development, a connection of the building to: (1) Built Boundary water services is proposed, the Specific Urban Charge for water services shown on Schedule "B-1" to this By-law shall be payable; and (2) Greenfield water services is proposed, the Specific Urban Charge for water services shown on Schedule "B-2" to this By-law shall be payable; and (iii) at the time a building permit is issued for the development, a connection of the building to: (1) Built Boundary wastewater services is proposed, the Specific Urban Charge for wastewater services shown on Schedule "B-1" to this By-law shall be payable; and (2) Greenbelt wastewater services is proposed, the Specific Urban Charge for wastewater services shown on Schedule "B-2" to this By-law shall be payable. Amount of Charge - Non-Residential 18. THAT, subject to section 7 of this By-law, for development for non-residential purposes, development charges shall be imposed on all non-residential development, and, in the case of a mixed-use building, on the non-residential component of the mixed-use building, according to the total floor area of the non- residential component on lands within that part of the Region shown on Schedule "A" to this By-law as: (a) Built Boundary - the development charges payable shall be the Total Urban Charges shown on Schedule "C-1" to this By-law; (b) Greenfield Area - the development charges payable shall be the Total Urban Charges shown on Schedule "C-2" to this By-law; and (c) Rural - the development charges payable shall be as follows: Region of Halton 2022 DC Background Study I-18 (i) the Total Rural charges shown on Schedule "C-1" to this By-law; (ii) where at the time a building permit is issued for the development, a connection of the building to: (1) Built Boundary water services is proposed, the Specific Urban Charge for water services shown on Schedule "C-1" to this By-law shall be payable; and (2) Greenfield water services is proposed, the Specific Urban Charge for water services shown on Schedule "C-2" to this By-law shall be payable; and (iii) at the time a building permit is issued for the development, a connection of the building to: (1) Built Boundary wastewater services is proposed, the Specific Urban Charge for wastewater services shown on Schedule "C-1" to this By-law shall be payable; and (2) Greenbelt wastewater services is proposed, the Specific Urban Charge for wastewater services shown on Schedule "C-2" top this By-law shall be payable. Indexing of Development Charges 19. THAT the development charges set out in Schedules "B-1", "B-2", "C-1" and "C-2" of this By-law shall be adjusted without amendment to this By-law on April 1st of each year, commencing April 1st, 2023, in accordance with the requirements of section 7 of the Regulation, or as may be amended from time to time. Timing of Calculation and Payment 20. (1) THAT the development charges under this By-law shall be calculated in accordance with the provisions of section 26.2 of the Act, as may be amended. (2) THAT subject to subsection (3), the development charges under this By-law shall be payable upon a building permit being issued for the proposed development in accordance with subsection 26 of the Act, or if said development is of the type identified in subsection 26.1 of the Act, specifically Region of Halton 2022 DC Background Study I-19 development that is institutional, non-profit housing or rental housing, annual instalments shall be paid in accordance with subsection 26.1 of the Act. (3) THAT with respect to an approval of a plan of subdivision under section 51 of the Planning Act or a consent under section 53 of the Planning Act, development charges shall be payable at the time of execution of the subdivision agreement or an agreement entered into as a condition of a consent. (4) THAT development charges payable under this By-law shall be calculated in the case of residential development, including a dwelling unit accessory to a non-residential development, or the residential portion of a mixed-use development, based upon the proposed number and type of dwelling units. (5) THAT, if at the time of issuance of a building permit or permits for any residential development for which payments have been made pursuant to subsection (1), the total number and/or type of dwelling units for which building permits have been and are being issued is greater than that used for the calculation and payment referred to in subsection (1), an additional payment shall be required and shall be calculated by multiplying the applicable development charges shown in Schedule "B" to this By-law, as may be appropriate, by the difference between the number and type of dwelling units for which building permits have been and are being issued and the number and type of dwelling units for which payments have been made pursuant to subsection (1) and this subsection. (6) THAT subject to subsection (8), if following the issuance of all building permits for all development in a subdivision and for all development in a block within that subdivision that had been intended for future development and for which payments have been made pursuant to subsections (2) or (3), the total number and/or type of dwelling units for which building permits have been issued is less than that used for the calculation and payment referred to in subsection (1), a refund shall become payable by the Region to the person who originally made the payment referred to in subsections (2) or (3), which refund shall be calculated by multiplying the amounts of the development charges in effect at the time such payments were made by the difference between the number and type of dwelling units for which payments were Region of Halton 2022 DC Background Study I-20 made and the number and type of dwelling units for which building permits were issued. (7) THAT subsections (5) and (6) shall apply with necessary modifications to a development for which development charges have been paid pursuant to a condition of consent or pursuant to an agreement respecting same. (8) THAT any refunds payable by the Region pursuant to section shall be calculated and paid without interest. (9) THAT despite subsection (2), in the case of a high-density apartment that is not of the type development identified in subsection 26.1 of the Act, the development charges under this By-law shall be payable on the date a building permit is issued in relation to the high density apartment on lands to which the development charges under this By-law apply. (10)THAT notwithstanding subsections (1) to (9), inclusive, the Region may require and, where so required, an owner shall enter into an agreement, including the provision of security for the owner's obligations under the agreement, pursuant to section 27 of the Act. The terms of such agreement shall then prevail over the provisions of this section dealing with the timing of payments but may not amend or alter any other provisions or sections of this By-law. Payment by Money 21. THAT payment of development charges under this By-law shall be by certified cheque, or bank draft. Rules with Respect to Exemptions for Intensification of Housing 22. THAT notwithstanding the provisions of this By-law, development charges shall not be imposed with respect to developments or portions of developments relating to existing residential buildings including structures ancillary to existing residential buildings as follows: Region of Halton 2022 DC Background Study I-21 Item Name of Class of Existing Residential Building Description of Class of Existing Residential Buildings Maximum Number of Additional Dwelling Units Restrictions 1. Existing single detached dwellings Existing residential buildings, each of which contains a single dwelling unit, that are not attached to other buildings. Two The total gross floor area of the additional dwelling unit or units must be less than or equal to the gross floor area of the dwelling unit already in the building. 2. Existing semi- detached dwellings or row dwellings Existing residential buildings, each of which contains a single dwelling unit, that have one or two vertical walls, but no other parts, attached to other buildings. One The gross floor area of the additional dwelling unit must be less than or equal to the gross floor area of the dwelling unit already in the building. 3. Existing rental residential buildings Existing residential rental buildings, each of which contains four or more dwelling units. Greater of one and 1% of the existing units in the building None 4. Other existing residential buildings An existing residential building not in another class of residential building described in this table. One The gross floor area of the additional dwelling unit must be less than or equal to the gross floor area of the smallest dwelling unit already in the building. 23. THAT notwithstanding the provisions of this By-law development charges shall not be imposed with respect to developments or portions of developments that would result in the creation of a second dwelling unit in prescribed classes of new residential buildings, including structures ancillary to residential buildings, subject to the following restrictions: Item Name of Class of Proposed New Residential Buildings Description of Class of Proposed New Residential Buildings Restrictions 1. Proposed new detached dwellings Proposed new residential buildings that would not be attached to other buildings and that are permitted to contain a second dwelling unit, that being either of the two dwelling units, if the units have the same gross floor area, or the smaller of the dwelling units. The proposed new detached dwelling must only contain two dwelling units. The proposed new detached dwelling must be located on a parcel of land on which no other detached dwelling, semi-detached dwelling or row dwelling would be located. Region of Halton 2022 DC Background Study I-22 Item Name of Class of Proposed New Residential Buildings Description of Class of Proposed New Residential Buildings Restrictions 2. Proposed new semi- detached dwellings or row dwellings Proposed new residential buildings that would have one or two vertical walls, but no other parts, attached to other buildings and that are permitted to contain a second dwelling unit, that being either of the two dwelling units, if the units have the same gross floor area, or the smaller of the dwelling units. The proposed new semi-detached dwelling or row dwelling must only contain two dwelling units. The proposed new semi-detached dwelling or row dwelling must be located on a parcel of land on which no other detached dwelling, semi- detached dwelling or row dwelling would be located. 3. Proposed new residential buildings that would be ancillary to a proposed new detached dwelling, semi- detached dwelling or row dwelling Proposed new residential buildings that would be ancillary to a proposed new detached dwelling, semi-detached dwelling or row dwelling and that are permitted to contain a single dwelling unit. The proposed new detached dwelling, semi-detached dwelling or row dwelling, to which the proposed new residential building would be ancillary, must only contain one dwelling unit. The gross floor area of the dwelling unit in the proposed new residential building must be equal to or less than the gross floor area of the detached dwelling, semi-detached dwelling or row dwelling to which the proposed new residential building is ancillary. 24. THAT the provisions of sections 22 and 23 above shall be amended without need for an amendment to this By-law such that, if any amendments are made to section 2 of the Regulation as may be applicable and as may be amended from time to time, that the said sections shall continue to incorporate in this By-law any required exceptions. Rules with Respect to Expansion of Existing Industrial Building 25. (1) THAT if a development includes the enlargement of the total floor area of an existing industrial building, the amount of the development charges under this By-law that is payable shall be calculated as follows: (a) if the total floor area is enlarged by fifty percent (50%) or less, the amount of the development charges under this By-law in respect of the enlargement is zero; or (b) if the total floor area is enlarged by more than fifty percent (50%), development charges under this By-law are payable on the amount Region of Halton 2022 DC Background Study I-23 by which the enlargement exceeds fifty percent (50%) of the total floor area before the enlargement. (2) THAT for the purpose of interpreting the definition of "existing industrial building" contained in the Regulation, regard shall be had to the classification of the lands in question pursuant to the Assessment Act, R.S.O. 1990, c. A.31 as amended or successor legislation and in particular: (a) whether the lands fall within a tax class such that taxes on the lands are payable at the industrial tax rate; and (b) whether more than fifty percent (50%) of the total floor area of the building has an industrial property code for assessment purposes. (3) THAT for greater certainty in applying the exemption in this section, the total floor area of an existing industrial building is enlarged where there is a bona fide increase in the size of the existing industrial building, the enlarged area is attached to the existing industrial building, there is a direct means of ingress and egress from the existing industrial building to and from the enlarged area for persons, goods and equipment and the existing industrial building and the enlarged area are used for or in connection with an industrial purpose as set out in subsection 1(1) of the Regulation. Without limiting the generality of the foregoing, the exemption in this section shall not apply where the enlarged area is attached to the existing industrial building by means only of a tunnel, bridge, canopy, corridor or other passage-way, or through a shared below-grade connection such as a service tunnel, foundation, footing or a parking facility. (4) THAT notwithstanding section 25(3), where an expansion on the same lot includes an enlargement of an existing industrial building and/or the construction of an accessory building or structure that is incidental to or subordinate in purpose and exclusively devoted to the existing industrial use, then no development charges shall be payable with respect to that portion of the accessory building or structure that is up to and including 278.7 sq. m. (3,000 sq. ft.), where; Region of Halton 2022 DC Background Study I-24 (i) the total expansion which is exempted from the payment of development charges, including the total of the enlargement of the existing industrial building and the accessory building or structure may be up to but shall not exceed 50% of the total floor area of the existing industrial building; (ii) at least six months must have elapsed since the last building permit has been issued for a building containing an industrial use on the lot; and (iii) the owner provides proof satisfactory to the Region's Commissioner of Finance and/or Treasurer or designate that the existing industrial building(s) is (or are) being used for an industrial use on the date an application is made for a building permit for the building expansion or the accessory industrial building or structure. Rules with Respect to Commercial Expansion 26. THAT no development charges shall be payable under this By-law for that portion of an expansion of an existing commercial building on the lot and/or an accessory commercial building that is up to and including 278.7 sq. m. (3,000 sq. ft.) on the same lot provided that the expansion must be incidental to or subordinate in purpose and exclusively devoted to the commercial use in the existing building or an accessory commercial building and that; (i) at least six months must have elapsed since the last building permit has been issued for a building containing a commercial use on the lot; and (ii) the owner provides proof satisfactory to the Region's Commissioner of Finance and/or Treasurer or designate that the existing commercial building(s) is (or are) being used for a commercial use on the date an application is made for a building permit for the building expansion or the accessory commercial building. Region of Halton 2022 DC Background Study I-25 Lot Coverage Relief 27. THAT where there is a non-residential development, the development charges payable pursuant to this By-law shall be calculated in accordance with the following: (a) for the portion of the total floor area of such development that is less than or equal to one (1.0) times the area of the lot, one hundred percent (100%) of the non-residential development charges payable pursuant to this By-law are applicable to that portion; (b) for the portion of the total floor area of such development that is greater than one (1.0) times the area of the lot, no development charges shall be payable; and (c) for the purposes of this section, where a building or buildings exist on the lot on the date of building permit issuance, the lot coverage shall be calculated as if no building(s) existed on the lot on that date. Exemptions for Certain Buildings 28. (1) THAT the following are exempt from the payment of development charges under this By-law: (i) land and buildings owned by and used for the purposes of any local municipality, the Region or any local board unless such buildings or parts thereof are used, designed or intended for use primarily for or in connection with any commercial use or retail development or both; (ii) land buildings owned by and used for the purposes of a board of education unless such buildings or parts thereof are used, designed or intended for use primarily for or in connection with any commercial use and/or retail development; (iii) land and buildings used as hospitals governed by the Public Hospitals Act, R.S.O. 1990, c. P.40, as amended or successor legislation unless such buildings or parts thereof are used, designed or intended for use primarily for or in connection with any commercial use and/or retail development; Region of Halton 2022 DC Background Study I-26 (iv) land and buildings owned by and used for the purposes of a conservation authority unless such buildings or parts thereof are used primarily for or in connection with any commercial use and/or retail development; (v) land and buildings used exclusively as a place of worship; (vi) seasonal structures; (vii) temporary venues; and (viii) land and buildings that are used in connection with agricultural development, including up to 278.7 square metres (3,000 sq. ft.) for any industrial, retail or commercial component therein that is accessory to the bona fide farm operation provided that with regards to any industrial, retail or commercial component at least six months must have elapsed since the last building permit has been issued for a building containing an industrial, retail, or commercial use on the lot. (2) THAT for the purposes of this section only, "local board" means a municipal service board, transportation commission, public library board, board of health, police services board, planning board, or any other board, commission, committee, body or local authority established or exercising any power under any Act with respect to the affairs or purposes of one or more municipalities but excluding a school board, a conservation authority and any municipal services corporation that is not deemed to be a local board under O. Reg. 599/06 made under the Municipal Act, 2001, S.O. 2001, c. 25, as amended or successor legislation and any corporation created under the Electricity Act, 1998, S.O. 1998, c. 15, Schedule A, as amended or successor legislation. Rules with Respect to Temporary Buildings 29. THAT notwithstanding any other provision of this By-law, a temporary building shall be exempt at the time the building permit is issued for such building from the payment of development charges under this By-law provided that: Region of Halton 2022 DC Background Study I-27 (a) prior to the issuance of the building permit for the temporary building, the owner shall have: (i) entered into an agreement with the Region under section 27 of the Act in a form and having a content satisfactory to the Region's Commissioner of Finance and/or Treasurer or designate agreeing to pay the development charges otherwise payable under this By- law in respect of the temporary building if, within three (3) years of building permit issuance or any extension permitted in writing by the Region's Commissioner of Finance and/or Treasurer or designate, the owner has not provided to the Region evidence, to the satisfaction of the Region's Commissioner of Finance and/or Treasurer or designate, that the temporary building was demolished or removed from the lands within three (3) years of building permit issuance or any extension herein provided; and (ii) provided to the Region securities in the form of a certified cheque, bank draft or a letter of credit acceptable to the Region's Commissioner of Finance and/or Treasurer or designate in the full amount of the development charges otherwise payable under this By-law as security for the owner's obligations under the agreement described in clause (a)(i) and subsection (c). (b) Within three (3) years of building permit issuance or any extension granted in accordance with the provisions in clause (a)(i), the owner shall provide to the Region evidence, to the satisfaction of the Region's Commissioner of Finance and/or Treasurer or designate, that the temporary building was demolished or removed from the lands within three (3) years of building permit issuance or any extension herein provided, whereupon the Region shall return the securities provided pursuant to clause (a)(ii) without interest. (c) If the owner does not provide satisfactory evidence of the demolition or removal of the temporary building in accordance with subsection (b), the temporary building shall be deemed conclusively not to be a temporary building for the purposes of this By-law and the Region shall, without prior notification to the owner, draw upon the securities provided pursuant to Region of Halton 2022 DC Background Study I-28 clause (a)(ii) and transfer the amount so drawn into the appropriate development charges reserve funds. (d) The timely provision of satisfactory evidence of the demolition or removal of the temporary building in accordance with subsection (b) shall be solely the owner's responsibility. Rules with Respect to Garden Suites 30. THAT notwithstanding any other provisions of this By-law, a garden suite shall be exempt at the time a building permit is issued for the garden suite from the payment of development charges under this By-law provided that: (a) (i) a by-law has been passed by the applicable local municipality under sections 39 and 39.1 of the Planning Act authorizing the temporary use of the garden suite; and (ii) prior to the issuance of the building permit for the garden suite, the owner shall have entered into an agreement with the Region under section 27 of the Act in a form and having a content satisfactory to the Region's Commissioner of Finance and/or Treasurer or designate, to be registered on title to the lands under section 37 of this By-law as a charge, agreeing to pay the development charges otherwise payable under this By-law in respect of the garden suite if the garden suite is not removed from the lands within sixty (60) days of the expiry of the by-law, including any extensions thereof, described in subsection (a) or if, before that date, the lands on which the garden suite is situate are sold provided the development charges shall not be payable upon such sale if the purchaser has entered into an agreement with the Region under this subsection and the by-law, including any extensions thereof, described in subsection (a) has not expired; (b) Within ninety (90) days of the expiry of the by-law, including any extensions thereof, described in subsection (a), the owner shall provide to the Region evidence, to the satisfaction of the Region's Commissioner of Finance and/or Treasurer or designate, that the garden suite was removed from the lands within sixty (60) days of the expiry of the by-law, including any extensions thereof, described in subsection (a), whereupon the Region shall provide to the owner a release of the agreement described in subsection (b) and the owner shall apply Region of Halton 2022 DC Background Study I-29 to the land registrar to delete from title to the lands any notice of the agreement registered against title to the lands under section 36 of this By-law. (c) If the owner does not provide satisfactory evidence of the removal of the garden suite in accordance with subsection (b), the garden suite shall be deemed conclusively not to be a garden suite for the purposes of this By-law and the Region may, without prior notification to the owner, add the development charges payable under this By-law to the tax roll for the lands to be collected in the same manner as taxes. (d) For the purpose of subsection (c), the development charges payable under this By-law shall be the development charges payable under this By-law for an accessory dwelling on the date the building permit was issued for the garden suite. (e) The timely provision of satisfactory evidence of the removal of the garden suite in accordance with subsection (b) shall be solely the owner's responsibility. Rules with Respect to Redevelopment - Demolitions 31. THAT in the case of a demolition of all or part of a building: (a) a credit shall be allowed against the development charges otherwise payable pursuant to this By-law, provided that where a demolition permit has been issued and has not been revoked and a building permit has been issued for the redevelopment within five (5) years from the date the demolition permit was issued; (b) the credit shall be calculated based on the portion of the building used for a residential use that has been demolished by multiplying the number and type of dwelling units demolished, or in the case of a building used for a non- residential use that has been demolished by multiplying the non-residential total floor area demolished, by the relevant development charges under this By-law in effect on the date when the development charges are payable pursuant to this By-law with respect to the redevelopment; (c) no credit shall be allowed where the demolished building or part thereof would have been exempt pursuant to this By-law; Region of Halton 2022 DC Background Study I-30 (d) where the amount of any credit pursuant to this section exceeds, in total, the amount of the development charges otherwise payable under this By-law with respect to the redevelopment, the excess credit shall be reduced to zero and shall not be carried forward unless the carrying forward of such excess credit is expressly permitted by a phasing plan for the redevelopment that is acceptable to the Region's Commissioner of Finance and/or Treasurer or designate; (e) despite Subsection 31(a) above, where the building cannot be demolished until the new building has been erected, the owner shall notify the Region in writing and pay the applicable development charges for the new building in full and if the existing building is demolished not later than twelve (12) months from the date a building permit is issued for the new building, the Region shall provide a refund calculated in accordance with this section to the owner without interest. If more than twelve (12) months is required to demolish the existing building, the owner shall make a written request to the Region and the Region's Commissioner of Finance and/or Treasurer or designate may extend the time in which the existing building must be demolished in his or her sole and absolute discretion and upon such terms and conditions as he or she considers necessary or desirable and such decision shall be made prior to the issuance of the first building permit for the new building; (f) despite Subsection 31(a), where an owner has submitted an application pursuant to the provisions of the Planning Act, and such application has been accepted by the local municipality before the expiration of any demolition credits as noted in Subsection 31(a), but a building permit has not been issued within the timeframes provided for in the applicable Subsection, the owner may request in writing to the Region's Commissioner of Finance and/or Treasurer and the Region's Commissioner of Finance and/or Treasurer, or such designate, may extend the time for the expiration of the demolition credits solely upon such terms and conditions as he or she considers necessary or desirable and such decision shall be made prior to the issuance of the first building permit for the new building, provided that in no case shall any single extension be for a period greater than one (1) year from the date of the request from the owner seeking an extension pursuant to this Subsection. Region of Halton 2022 DC Background Study I-31 Rules with Respect to Redevelopment - Conversions 32. THAT in the case of a conversion of all or part of a building: (a) a credit shall be allowed against the development charges otherwise payable under this By-law; (b) the credit shall be calculated based on the portion of the building that is being converted by multiplying the number and type of dwelling units being converted or the non-residential total floor area being converted by the relevant development charges under this By-law in effect on the date when the development charges are payable pursuant to this By-law with respect to the redevelopment; (c) where the amount of any credit pursuant to this section exceeds, in total, the amount of the development charges otherwise payable under this By-law with respect to the redevelopment, the excess credit shall be reduced to zero and shall not be carried forward unless the carrying forward of such excess credit is expressly permitted by a phasing plan for the redevelopment that is acceptable to the Region's Commissioner of Finance and/or Treasurer or designate; (d) despite subsections (a) to (c) above, where there is a conversion of an existing non-retail development to a retail development, a credit shall be provided in accordance with this By-law on a one-time basis such that the incremental development charges otherwise payable pursuant to this By-law shall be reduced by the greater of: (i) the development charges that would be payable on the first 929 sq. m. (10,000 sq. ft.) of the total non-retail floor area being converted to a retail development; or (ii) twenty-five percent (25%) of the development charges otherwise payable on the total non-retail floor area being converted to retail development (iii) unless any excess credits is expressly permitted as part of a phasing plan for the redevelopment that is acceptable and approved by the Region; (e) notwithstanding subsections (a) to (d) above, no credit shall be allowed where the building or part thereof prior to conversion would have been exempt pursuant to this By-law or any predecessor thereof. Region of Halton 2022 DC Background Study I-32 Exemptions, Relief, Credits and Adjustments Not Cumulative 33. THAT only one (1) of the applicable exemption(s), relief, credit(s) or adjustment(s) set out in sections 22 to 32, inclusive, of this By-law shall be applicable to a development. Where the circumstances of a development are such that more than one (1) type of exemption, relief, credit or adjustment could apply, only one (1) type of exemption, relief, credit or adjustment shall apply and it shall be the exemption, relief, credit or adjustment that results in the lowest development charges being payable under this By-law. Interest 34. THAT the Region shall pay interest on a refund under subsections 18(3), 25(2) and section 36 of the Act at a rate equal to the Bank of Canada rate on the date this By-law comes into force. Front Ending Agreements 35. THAT the Region may enter into one or more agreements under section 44 of the Act. Repeals 36. THAT By-law No. 36-17, being a by-law to establish water, wastewater, roads and general services development charges for The Regional Municipality of Halton (Built Boundary and Greenfield Areas) is hereby repealed on the date this By-law comes into force and effect. Registrations 37. THAT a certified copy of this By-law and a copy or notice of any agreement authorized by this By-law may be registered in the Land Registry Office (No. 20) as against title to any land to which this By-law or any such agreement applies in accordance with the provisions of this By-law or Sections 42 and 56 of the Act, or any predecessor thereto. Date By-law Effective 38. THAT this By-law comes into force and effect on _____. Region of Halton 2022 DC Background Study I-33 Headings for Reference Only 39. THAT the headings inserted in this By-law are for convenience of reference only and shall not affect the construction or interpretation of this By-law. Severability 40. THAT if, for any reason, any provision, section, subsection, paragraph or clause of this By-law is held invalid, it is hereby declared to be the intention of Council that all the remainder of this By-law shall continue in full force and effect until repealed, re-enacted or amended, in whole or in part or dealt with in any other way. Short Title 41. THAT the short title of this By-law is the "Water, Wastewater, Roads and General Services Development Charges By-law, 2022". READ and PASSED this ____th day of ______. _________________________ REGIONAL CHAIR _________________________ Regional Clerk Region of Halton 2022 DC Background Study I-34 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "A" TO BY-LAW NO. XX-22 Region of Halton 2022 DC Background Study I-35 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "B-1" TO BY-LAW NO. XX-22 BUILT BOUNDARY URBAN AND RURAL RESIDENTIAL DEVELOPMENT CHARGES PER DWELLING UNIT* Single and Semi Detached Dwelling Multiple Dwelling (3 or More Bedrooms) Multiple Dwelling (Less Than 3 Bedrooms) Apartment Dwelling (2 or More Bedrooms) Apartment Dwelling (Less Than 2 Bedrooms) Special Care/ Special Need and Accessory Dwelling Region-Wide (Urban and Rural): General Services: Growth Studies 150.82 $ 122.10 $ 80.70 $ 73.22 $ 54.21 $ 43.98 $ Police 603.71 488.73 323.01 293.08 216.99 176.05 Paramedics 286.51 231.94 153.30 139.09 102.98 83.55 Facilities 98.01 79.34 52.44 47.58 35.23 28.58 Social Housing 985.82 798.06 527.46 478.58 354.34 287.48 Waste Diversion 95.72 77.49 51.21 46.47 34.40 27.91 Waterfront Parks 218.69 177.04 117.01 106.17 78.60 63.77 Sub-Total 2,439.28 $ 1,974.70 $ 1,305.13 $ 1,184.19 $ 876.75 $ 711.32 $ Roads: 30,365.68 $ 24,582.32 $ 16,247.09 $ 14,741.34 $ 10,914.41 $ 8,855.02 $ Total (Urban and Rural) 32,804.96 $ 26,557.02 $ 17,552.22 $ 15,925.53 $ 11,791.16 $ 9,566.34 $ Specific Urban Charges: Water 4,503.37 $ 3,649.24 $ 2,411.88 $ 2,190.39 $ 1,621.75 $ 1,315.93 $ Wastewater 5,717.59 4,636.81 3,064.59 2,785.24 2,062.18 1,673.48 Total 10,220.96 $ 8,286.05 $ 5,476.47 $ 4,975.63 $ 3,683.93 $ 2,989.41 $ Total Urban Charges 43,025.92 $ 34,843.07 $ 23,028.69 $ 20,901.16 $ 15,475.09 $ 12,555.75 $ Total Rural Charges 32,804.96 $ 26,557.02 $ 17,552.22 $ 15,925.53 $ 11,791.16 $ 9,566.34 $ * Residential development charges are subject to indexing in accordance with section 19 of the By-law Region of Halton 2022 DC Background Study I-36 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "B-2" TO BY-LAW NO. XX-22 GREENFIELD URBAN AND RURAL RESIDENTIAL DEVELOPMENT CHARGES PER DWELLING UNIT* Single and Semi Detached Dwelling Multiple Dwelling (3 or More Bedrooms) Multiple Dwelling (Less Than 3 Bedrooms) Apartment Dwelling (2 or More Bedrooms) Apartment Dwelling (Less Than 2 Bedrooms) Special Care/ Special Need and Accessory Dwelling Region-Wide (Urban and Rural): General Services: Growth Studies 150.82 $ 122.10 $ 80.70 $ 73.22 $ 54.21 $ 43.98 $ Police 603.71 488.73 323.01 293.08 216.99 176.05 Paramedics 286.51 231.94 153.30 139.09 102.98 83.55 Facilities 98.01 79.34 52.44 47.58 35.23 28.58 Social Housing 985.82 798.06 527.46 478.58 354.34 287.48 Waste Diversion 95.72 77.49 51.21 46.47 34.40 27.91 Waterfront Parks 218.69 177.04 117.01 106.17 78.60 63.77 Sub-Total 2,439.28 $ 1,974.70 $ 1,305.13 $ 1,184.19 $ 876.75 $ 711.32 $ Roads: 30,365.68 $ 24,582.32 $ 16,247.09 $ 14,741.34 $ 10,914.41 $ 8,855.02 $ Total (Urban and Rural) 32,804.96 $ 26,557.02 $ 17,552.22 $ 15,925.53 $ 11,791.16 $ 9,566.34 $ Specific Urban Charges: Water 12,275.69 $ 9,941.62 $ 6,570.68 $ 5,962.77 $ 4,414.81 $ 3,576.39 $ Wastewater 17,260.86 13,979.76 9,239.59 8,384.99 6,208.20 5,028.04 Total 29,536.55 $ 23,921.38 $ 15,810.27 $ 14,347.76 $ 10,623.01 $ 8,604.43 $ Total Urban Charges 62,341.51 $ 50,478.40 $ 33,362.49 $ 30,273.29 $ 22,414.17 $ 18,170.77 $ Total Rural Charges 32,804.96 $ 26,557.02 $ 17,552.22 $ 15,925.53 $ 11,791.16 $ 9,566.34 $ * Residential development charges are subject to indexing in accordance with section 19 of the By-law Region of Halton 2022 DC Background Study I-37 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "C-1" TO BY-LAW NO. XX-22 BUILT BOUNDARY URBAN AND RURAL NON-RESIDENTIAL DEVELOPMENT CHARGES* PER SQUARE FOOT OF TOTAL FLOOR AREA Retail Non-Retail Region-Wide Charges (Urban and Rural): General Services: Growth Studies 0.060 $ 0.060 $ Police 0.189 0.189 Paramedics 0.025 0.025 Facilities 0.014 0.014 Waste Diversion 0.003 0.003 Waterfront Parks 0.008 0.008 Sub-Total 0.299 $ 0.299 $ Roads: 46.049 $ 8.585 $ Total 46.348 $ 8.884 $ Specific Urban Charges: Water 1.340 $ 1.340 $ Wastewater 2.053 2.053 Total 3.393 $ 3.393 $ Total Urban Charges 49.741 $ 12.277 $ Total Rural Charges 46.348 $ 8.884 $ PER SQUARE METRE OF TOTAL FLOOR AREA Retail Non-Retail Region-Wide Charges (Urban and Rural): General Services: Growth Studies 0.646 $ 0.646 $ Police 2.034 2.034 Paramedics 0.269 0.269 Facilities 0.151 0.151 Waste Diversion 0.032 0.032 Waterfront Parks 0.086 0.086 Sub-Total 3.218 $ 3.218 $ Roads: 495.667 $ 92.408 $ Total (Urban and Rural) 498.885 $ 95.626 $ Specific Urban Charges: Water 14.423 $ 14.423 $ Wastewater 22.098 22.098 Total 36.521 $ 36.521 $ Total Urban Charges 535.406 $ 132.147 $ Total Rural Charges 498.885 $ 95.626 $ *Non-residential development charges are subject to indexing in accordance with section 19 of the By-Law Region of Halton 2022 DC Background Study I-38 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "C-2" TO BY-LAW NO. XX-22 GREENFIELD URBAN AND RURAL NON-RESIDENTIAL DEVELOPMENT CHARGES* PER SQUARE FOOT OF TOTAL FLOOR AREA Retail Non-Retail Region-Wide Charges (Urban and Rural): General Services: Growth Studies 0.060 $ 0.060 $ Police 0.189 0.189 Paramedics 0.025 0.025 Facilities 0.014 0.014 Waste Diversion 0.003 0.003 Waterfront Parks 0.008 0.008 Sub-Total 0.299 $ 0.299 $ Roads: 46.049 $ 8.585 $ Total 46.348 $ 8.884 $ Specific Urban Charges: Water 3.897 $ 3.897 $ Wastewater 5.245 5.245 Total 9.142 $ 9.142 $ Total Urban Charges 55.490 $ 18.026 $ Total Rural Charges 46.348 $ 8.884 $ PER SQUARE METRE OF TOTAL FLOOR AREA Retail Non-Retail Region-Wide Charges (Urban and Rural): General Services: Growth Studies 0.646 $ 0.646 $ Police 2.034 2.034 Paramedics 0.269 0.269 Facilities 0.151 0.151 Waste Diversion 0.032 0.032 Waterfront Parks 0.086 0.086 Sub-Total 3.218 $ 3.218 $ Roads: 495.667 $ 92.408 $ Total (Urban and Rural) 498.885 $ 95.626 $ Specific Urban Charges: Water 41.947 $ 41.947 $ Wastewater 56.457 56.457 Total 98.404 $ 98.404 $ Total Urban Charges 597.289 $ 194.030 $ Total Rural Charges 498.885 $ 95.626 $ *Non-residential development charges are subject to indexing in accordance with section 19 of the By-Law Region of Halton 2022 DC Background Study I-39 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "D-1" TO BY-LAW NO. XX-22 Schedule "E" applies to all or part of the following lands: Parcel D-1.2 Block 12, Plan M-537 Parcel D-1.3 Block 13, Plan M-530 Parcel D-1.4 Block 32, Plan M-537 A - Pt Block 32, Parts 2, 3, 6, and 8, 20R-17841 B - Pt Block 32, Parts 1, 4, 5, and 7, 20R-17841 Parcel D-1.5 Part Block 34, Plan M-537; RP 20R17950 Parts 2, 3, 4 Parcel D-1.11 Blocks 12 & 20, Plan M-530 and Parts 3 & 4, 20R9270 (includes what was previously D-1.13 on By-law 48-12) Parcel D-1.12 Block 14, Plan M-530 Parcel D-1.14 Part E1/2 Lot 4, Conc. 2 (Parts 1, 2, 3 & 6, 20R-9733) B - Block 3, Plan M-952 C - Block 16, Plan M-952 E - Pt Block 4, Plan M-952; RP 20R16880 Part 2 F1 - Pt Block 4, Plan M-952; 20R19423 Parts 5 to 7 G - Block 17, Plan M-952 Parcel D-1.15 Part Lots 3 and 4, Conc. 3 A - Pt Lots 3 and 4, Conc. 3; Parts 2, 12 to 15, 17 & 18, 20R-10272 (2701 Highpoint - includes what was previously D-2.7 on By-law 48-12 B - Pt Lot 3, Conc. 3; Parts 9, 10, 14, 15, 20R-13631 Region of Halton 2022 DC Background Study I-40 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "D-2" TO BY-LAW NO. XX-22 Schedule "E" applies to all or part of the following lands: Parcel D-2.1 Part Lots 2 & 3, Conc. 3 (Parts 1, 3 and 10, 20R-12697) Parcel D-2.2 Block 7, Plan M-537 Parcel D-2.3 Blocks 5 & 6, Plan M-537 Parcel D-2.4 Blocks 17 to 29, inclusive, Plan M-537 Parcel D-2.5 Block 16, Plan M-537 Parcel D-2.6 Blocks 1 to 4, inclusive, Plan M-537 Region of Halton 2022 DC Background Study I-41 THE REGIONAL MUNICIPALITY OF HALTON SCHEDULE "e" TO BY-LAW NO. XX-22 Rules Applicable to the Lands described in Schedule "D-1" and "D-2" Where the development of the lands described in Schedules "D-l" and "D-2" to this By- law requires a building permit or sections 13 or 14 of this By-law or section 3 of this Schedule "E" applies, the following are additional rules for the calculation of the water and wastewater development charges payable under this By-law for the lands described in those Schedules: 1. For the development of lands described in Schedules "D-1" and "D-2" to this By-law that are occupied by one or more buildings: (a) if the water services and wastewater services components of the development charge imposed by By-law No. 65-99, By-law No. 117-99, By-law No. 102-03, By-law No. 62-08, By-law No. 48-12, By-law No. 36-17 as amended or this By-law have been paid, then no further water and wastewater development charges are payable under this By-law for any change in the use of the existing building provided that, subject to the exemptions in the Act and this By-law, any addition to the existing building or any new building erected on the lands shall pay the charge imposed by this By-law; or (b) if the lands are subject to a restricted flow and if the development of the lands or any change in use of any existing building on the lands impose a water or wastewater demand (including the demand imposed by any existing building on the lands) in excess of the restricted flow, then the water and wastewater development charges under this By-law shall be imposed as follows: (i) where there has been a change in use, the charge shall be imposed on the total floor area of the existing building; or (ii) where there has been an addition to such building or an additional building has been constructed on the lands, the charge shall be imposed on the aggregate total floor area of the existing building and the total floor area of the addition or of any additional building, Region of Halton 2022 DC Background Study I-42 provided that where the charge is imposed a credit shall be recognized in respect of the existing portion of any existing building (in the case of clause 1(b)(i)) or the aggregate total floor area of the existing building and the total floor area of the addition or of any additional building (in the case of clause 1(b)(ii)) of twenty-four and seven-tenths percent (24.7%) in the case of an industrial development and a credit of fifteen and eleven one- hundredths percent (15.11%) in the case of a retail or commercial development of the charge imposed under this By-law and provided that the total demand for water services and wastewater services shall be determined through a water usage report using Sentence 8.2.1.3(2) and Table 8.2.1.3.B from O. Reg. 332/12; or (c) if the lands are subject to a restricted flow and if the development of the lands or any change in use of any existing building on the lands does not impose a water or wastewater demand that is greater than the restricted flow, then no water and wastewater development charges are payable under this By-law. The total demand for water services and wastewater services shall be determined through a water usage report using Sentence 8.2.1.3(2) and Table 8.2.1.3.B from O. Reg. 332/12. 2. For the development of lands described in Schedule "D-l" to this By-law that are vacant: (a) if the development does not impose a water or wastewater demand that is greater than the restricted flow, then no water or wastewater development charge is payable under this By-law; or (b) if the development imposes a water or wastewater demand in excess of the restricted flow, then the water and wastewater development charges under this By-law shall be imposed and a credit shall be recognized of twenty-four and seven-tenths percent (24.7%) in the case of an industrial development and a credit of fifteen and eleven one-hundredths percent (15.11%) in the case of a retail or commercial development of the charge imposed under this By-law; Region of Halton 2022 DC Background Study I-43 (c) provided that the total demand for water services and wastewater services shall be determined through a water usage report using Sentence 8.2.1.3(2) and Table 8.2.1.3.B from O. Reg. 332/12. 3. If a development of the lands described in Schedules "D-1" and "D-2"of this By- law does not require a building permit but does require one or more of the approvals described in section 11 of this By-law, including without limiting the generality of the foregoing, the issuing of any other permit under the Building Code Act, 1992, S.O. 1992, c. 23, as amended or successor legislation, then, notwithstanding section 20 of this By-law, the water and wastewater development charges shall nonetheless be payable in respect of any development permitted by such approval where such development imposes an increased demand for water services or wastewater services. 4. Once lands or any portion thereof as described in Schedules "D-1" and "D-2" are developed, or have any credits or portion of credits that may be available pursuant to paragraph 1(b) or 2(b) of this Schedule "E" applied against any development, said lands shall be removed from Schedules "D-1" and "D-2", without need for an amendment to this By-law, and the provisions of Schedule "E" shall no longer continue apply to same.