Sarnia Zoning By-law 85 of 2002 - Section 30 – Resource Extraction 1 Zone( RE1)

Sarnia, Ontario · No. 85 · summary & facts

This is the exact embedded text of the captured official document. Snapshot deb1cc1f9951 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Part II: Section 30 - Resource Extraction 1 Zone (RE1) - Zoning By-law 30 - 1 S E C T I O N 3 0 RESOURCE EXTRACTION 1 ZONE (RE1) Page 30.1 Permitted Uses 30 - 1 30.2 Zone Regulations 30 - 1 30.3 Site and Area Specific Regulations 30 - 2 30.1 Permitted Uses (1) Accessory uses and buildings. (2) Resource extraction operations. 30.2 Zone Regulations (1) Lot Area: (minimum) 4,000m2 (2) Lot Frontage: (minimum) 15m (3) Front Yard Depth: (minimum) 6m (4) Side Yard Width: (minimum) 6m (each side) (5) Rear Yard Depth: (minimum) 6m (6) Lot Coverage: (maximum) 30% (7) Landscaped Open Space: (minimum) 5% (8) Open Storage: (maximum) 90% 30 - 2 Part II: Section 30 - Resource Extraction 1 Zone (RE1) - Zoning By-law 30.3 Site and Area Specific Regulations The following site and area specific zones shall be subject to the preceding permitted uses and zone regulations except where those permitted uses and regulations are varied by the provisions of these site and area specific zones. 30.3.1 RE1-1 (See Zoning Map Part 36) 30.3.1.1 Permitted Uses (1) Accessory uses and buildings. (2) Exploration and extraction of oil. 30.3.1.2 Site Zone Regulations (1) Lot Area: (minimum) 1.5 ha (2) Lot Frontage: (minimum) 26m (3) Side Yard Width: (minimum) 5m (each side)