This is the exact embedded text of the captured official document.
Snapshot 3725f801447e · verified 2026-10-19 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Part II: Section 35 - Hazard 1 Zone (HZD1) - Zoning By-law
35 - 1
S E C T I O N 3 5
HAZARD 1 ZONE (HZD1)
Page
35.1
Permitted Uses
35 - 1
35.2
Zone Regulations
35 - 1
35.3
Site and Area Specific Regulations
35 - 1
35.1 Permitted Uses
Facilities for flood and erosion control.
Flood and erosion control works.
Passive recreation uses.
Residential (excluding dwellings or accessory buildings).
Stormwater management facilities.
35.2 Zone Regulations
(1)
No placement or removal of fill shall be permitted, except as required for flood
and/or erosion control and after the necessary written approvals have been
obtained from the St. Clair Region Conservation Authority and the Ministry of
Natural Resources, Chatham District.
(2)
No buildings or structures shall be permitted, except as required for flood and/or
erosion control and after the necessary written approvals have been obtained
from the St. Clair Region Conservation Authority and the Ministry of Natural
Resources, Chatham District.
35.3 Site and Area Specific Regulations
The following site and area specific zones shall be subject to the preceding
permitted uses and zone regulations except where those permitted uses and
regulations are varied by the provisions of these site and area specific zones.
Page
HZD1-1
35 - 2
35 - 2
Part II: Section 35 - Hazard 1 Zone (HZD1) - Zoning By-law
35.3.1 HZD1-1
(See Zoning Map Part 10)
35.3.1.1 Site Zone Regulations
(1)
No vegetation shall be removed from Lots 1-10, Registered Plan No. 772, in that
part of the Hazard Zone located within 6m of the top of the bank of Cow Creek
which is defined as the 178.9m contour elevation (Canadian Geodetic Datum).