Sarnia Zoning By-law 85 of 2002 - Section 35 – Hazard 1 Zone (H1)

Sarnia, Ontario · No. 85 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 3725f801447e · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Part II: Section 35 - Hazard 1 Zone (HZD1) - Zoning By-law 35 - 1 S E C T I O N 3 5 HAZARD 1 ZONE (HZD1) Page 35.1 Permitted Uses 35 - 1 35.2 Zone Regulations 35 - 1 35.3 Site and Area Specific Regulations 35 - 1 35.1 Permitted Uses Facilities for flood and erosion control. Flood and erosion control works. Passive recreation uses. Residential (excluding dwellings or accessory buildings). Stormwater management facilities. 35.2 Zone Regulations (1) No placement or removal of fill shall be permitted, except as required for flood and/or erosion control and after the necessary written approvals have been obtained from the St. Clair Region Conservation Authority and the Ministry of Natural Resources, Chatham District. (2) No buildings or structures shall be permitted, except as required for flood and/or erosion control and after the necessary written approvals have been obtained from the St. Clair Region Conservation Authority and the Ministry of Natural Resources, Chatham District. 35.3 Site and Area Specific Regulations The following site and area specific zones shall be subject to the preceding permitted uses and zone regulations except where those permitted uses and regulations are varied by the provisions of these site and area specific zones. Page HZD1-1 35 - 2 35 - 2 Part II: Section 35 - Hazard 1 Zone (HZD1) - Zoning By-law 35.3.1 HZD1-1 (See Zoning Map Part 10) 35.3.1.1 Site Zone Regulations (1) No vegetation shall be removed from Lots 1-10, Registered Plan No. 772, in that part of the Hazard Zone located within 6m of the top of the bank of Cow Creek which is defined as the 178.9m contour elevation (Canadian Geodetic Datum).