Sarnia Zoning By-law 85 of 2002 - Section 39 – Holding Zones (H)

Sarnia, Ontario · No. 85 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 09945a9c31c0 · verified 2026-10-19 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Part II: Section 39 - Holding Zones (H) - Zoning By-law 39 - 1 S E C T I O N 3 9 HOLDING ZONES (H) 39.1 General Purpose of (H) Zone Notwithstanding any other provisions of this By-law, where a zoning symbol shown on any Zoning Map has the suffix (H), as provided for pursuant to Section 35 of the Planning Act, as the same may be amended from time to time, no land thereby affected shall be used and no building or structure shall be erected, located or used thereon until such time as the suffix (H) has been removed by By-law. 39.2 Holding Zones 39.2.1 Holding Zone - Suburban Residential 1 (SR1) Zone and Suburban Residential 1-7 (SR1-7) Zone Where the Suburban Residential 1 (SR1) or the Suburban Residential 1-7 Zone (SR1-7) zoning symbols are shown on Zoning Map Part 8 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following conditions are fulfilled to the satisfaction of the City of Sarnia: (a) That the concerns of the St. Clair Region Conservation Authority with respect to floodline determination and floodproofing and erosion control are satisfied; and (b) A detailed soil study is prepared by the owner which satisfies the Part 8 Director under the Environmental Protection Act with respect to septic tank approval for all lots. 39.2.2 Holding Zone - Urban Residential 4-15 (UR4-15) Zone and Open Space 1 (OS1) Zone Where the Urban Residential 4-15 (UR4-15) Zone or the Open Space 1 (OS1) Zone is shown on Zoning Map Part 24 with the suffix (H), no building or structure or use shall be permitted until such time as the suffix (H) is removed by By-law. As the site was formerly a landfill, the removal of the (H) symbol shall only occur when the following conditions are fulfilled to the satisfaction of the City of Sarnia: (a) No development is permitted until the year 2019; unless approved by the Ministry of the Environment; and 39 - 2 Part II: Section 39 - Holding Zones (H) - Zoning By-law (b) Prior to any development being permitted in the year 2019 the Ministry of the Environment, or their successor, must advise the City that they are satisfied that the lands are appropriate for development. 39.2.3 Holding Zone CC1-1 - Zone North of Quinn Drive Where the Commercial Centre 1-1 (CC1-1) zoning symbol is shown on Zoning Map Part 32 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That the owner(s) satisfy the City with respect to the provision of a stormwater management facility for the lands. 39.2.4 Holding Zone LI1 - Zone South of Confederation Line Where the Light Industrial 1 (LI1) zoning symbol is shown on Zoning Map Part 72 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That the owner(s) satisfy the City with respect to the provision of a stormwater management facility for the lands. 39.2.5 Holding LI1-7 - Zone South of Confederation Line Where the Light Industrial 1-7 (LI1-7) zoning symbol is shown on Zoning Map Part 72 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That the owner(s) satisfy the City with respect to the provision of a stormwater management facility for the lands. 39.2.6 Holding Zone LI2 - Zone South of Confederation Line Where the Light Industrial 2 (LI2) zoning symbol is shown on Zoning Map Part 72 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That the owner(s) satisfy the City with respect to the provision of a stormwater management facility for the lands. Part II: Section 39 - Holding Zones (H) - Zoning By-law 39 - 3 39.2.7 Holding Zone HI1 - Zone East of Highway No. 40 Where the Heavy Industrial 1 (HI1) zoning symbol is shown on Zoning Map Part 77 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That the owner(s) satisfy the City with respect to the provision of a stormwater management facility for the lands. 39.2.8 Holding Zone BP1-1 - Zone East of Airport Road (131/2002) Where the Business Park 1-1 (BP1-1) zoning symbol is shown on Zoning Map Part 34 with the suffix (H), no building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That full municipal services, including an internal access road off of Airport Road are available or are approved and under construction, to service the lands. 39.2.9 Holding Zone UR4-15 - Zone North of Confederation Line (143/2004) Where the Urban Residential 4-15 (UR4-15) zoning symbol is shown on Zoning Map Part 63 with the suffix (H), no development, building or structure shall be permitted until such time as the suffix (H) is removed by By-law. The removal of the (H) shall only occur when the following condition has been fulfilled to the satisfaction of the City: (a) That sanitary sewer capacity to fully service the subject lands is either confirmed through an analysis of the City's existing sanitary sewer system, or can be made available by the City.