| permit required for | Construction, demolition, change of use, and transfer of permit | regulating construction, demolition, change of use and transfer of permit |
| fee basis | Calculated per Town's Fees and Charges By-law; if based on prescribed value, total cost of all work including material, labour, equipment, overhead, professional services, excluding land | s. 5.1(a) |
| fees location | Town's Fees and Charges By-law | s. 2.1 |
| authority | Chief Building Official; Inspector | s. 1.5, s. 1.8, s. 1.10, s. 8.3 |
| fine range | double the prescribed fee | s. 5.2 |
scout note
Cited under the Building Code Act, S.O. 1992 c.23; scanned 13-page PDF (Canon iR-ADV scan, June 2015), governs permit applications/classes, inspections, transfer of permits, refunds, and includes a Chief Building Official/Inspector Code of Conduct schedule. Building permit fees themselves sit in the separately-tracked Fees and Charges By-law (Schedule R, By-law 112-2025) which the pipeline already has. No amendments to 50-2015 found; it is the document linked from the town's Laserfiche 'frequently requested by-laws' folder (doc id 555912, repo r-000189e9a5e0) as the current building by-law.