Adopted by Council: September 18, 2006
Approved by the OMB: October 22, 2007
In Force and Effect: September 18, 2006
Consolidation Version: May 22, 2026
Township of Seguin
ZONING BY-LAW 2006-125
TOWNSHIP OF SEGUIN
ZONING BY-LAW NO. 2006-125
Consolidated: May 22nd, 2026 - Township of Seguin
Consolidation Notes:
This version of the By-law has been updated to include all
amendments to the By-law passed by Council and/or
approved by the OMB from September 18, 2006, to May 22nd,
2026. Please contact the Planning Department for the most
recent amendments to the By-law.
i
TABLE OF CONTENTS
TABLE OF CONTENTS .............................................................................................................. I
HOW TO USE THIS BY-LAW ..................................................................................................... I
INTRODUCTION ...................................................................................................................... I
PURPOSE OF THIS ZONING BY-LAW ...................................................................................... I
HOW TO USE THIS BY-LAW .................................................................................................... II
SECTION 1
1
INTERPRETATION .................................................................................................................... 1
1.1
TITLE ......................................................................................................................... 1
1.2
ADMINISTRATION .................................................................................................... 1
1.3
CONFORMITY AND COMPLIANCE WITH BY-LAW ................................................. 1
1.4
INTERPRETATION ..................................................................................................... 1
1.5
BUILDING PERMITS AND MUNICIPAL LICENSE ....................................................... 1
SECTION 2
1
ADMINISTRATION .................................................................................................................. 1
2.1
ENFORCEMENT ....................................................................................................... 1
2.2
SEVERABILITY ........................................................................................................... 1
2.3
EFFECTIVE DATE ...................................................................................................... 1
2.4
REPEAL OF FORMER BY-LAWS ................................................................................ 1
2.5
TRANSITION PROVISIONS ........................................................................................ 2
SECTION 3
1
ESTABLISHMENT OF ZONES ................................................................................................... 1
3.1
ZONES ...................................................................................................................... 1
3.2
LANDS UNDER WATER ............................................................................................ 2
3.3
ISLANDS ................................................................................................................... 2
3.4
ZONE SYMBOLS ....................................................................................................... 2
3.5
ZONE SCHEDULES ................................................................................................... 2
3.6
DETERMINING ZONE BOUNDARIES ........................................................................ 2
3.7
SITE SPECIFIC ZONES ............................................................................................... 3
3.8
HOLDING ZONES .................................................................................................... 3
SECTION 4
1
GENERAL PROVISIONS .......................................................................................................... 1
4.1
ACCESSORY BUILDINGS, STRUCTURES AND USES ................................................. 1
4.1.1
Permitted Uses ......................................................................................... 1
4.1.2
Setback Requirements ........................................................................... 1
4.1.3
Lot Coverage, Accessory Structures ..................................................... 1
4.1.4
Building Height, Accessory Structures ................................................... 2
4.1.5
Accessory Buildings and Structure Encroachments ............................. 2
4.1.6
Garages or Other Accessory Buildings or Structures, Sports Courts and
Pools
2
4.1.6.1 Private Sewage System .......................................................................... 3
4.1.7
Commercial and Industrial Uses ............................................................ 3
4.1.8
Building Setbacks .................................................................................... 3
ii
4.1.9
Waterfront Accessory Structures ........................................................... 3
4.1.10
Guest Cabins ........................................................................................... 4
4.1.11
Human Habitation in Accessory Structures .......................................... 4
4.1.12 Accessory Structures, One and a Half or Two Storeys .......................... 4
4.1.13 Backyard Hens ......................................................................................... 4
4.1.14 Hobby Farms ..................................................................................... 5
4.2 ACCESSORY DWELLING UNITS AND SECONDARY DWELLING UNITS ........................ 5
4.2.1
Accessory Dwelling Units ........................................................................ 5
4.2.2
Secondary Dwelling Units ........................................................................ 5
4.3
ANTENNAE, TOWERS, SATELLITE DISHES, SOLAR ARRAYS ...................................... 6
4.4
BUFFER AREA ........................................................................................................... 6
4.5
CONSTRUCTION USES ............................................................................................. 6
4.6
DWELLING UNITS PER LOT ....................................................................................... 7
4.7
ENVIRONMENTAL PROTECTION AREA ................................................................... 7
4.8
FRONTAGE ON IMPROVED PUBLIC STREET, PRIVATE ROAD OR NAVIGABLE
WATERWAY........................................................................................................................ 7
4.9
GROUP HOMES ....................................................................................................... 8
4.10
HEIGHT EXCEPTIONS ............................................................................................... 8
4.11
HOME INDUSTRY ..................................................................................................... 9
4.12
HOME OCCUPATION ............................................................................................. 9
4.13
MINIMUM DISTANCE SEPARATION ....................................................................... 10
4.14
MINIMUM OPENING ELEVATION AND SHORELINE SETBACK .............................. 10
4.15
MULTIPLE USES ON ONE LOT ................................................................................ 11
4.16
MULTIPLE ZONES ON ONE LOT ............................................................................. 11
4.17
NON-COMPLYING LOTS, BUILDINGS AND STRUCTURES ..................................... 11
4.18
NON-CONFORMING USES ................................................................................... 13
4.19
OUTDOOR STORAGE ............................................................................................ 14
4.20
OUTDOOR WOODSTOVES ................................................................................... 15
4.21
PERMITTED YARD ENCROACHMENTS .................................................................. 15
4.22
PITS, QUARRIES AND PEAT EXTRACTION .............................................................. 16
4.23
PUBLIC USES .......................................................................................................... 16
4.24
REDUCTION OF REQUIREMENTS ........................................................................... 16
4.25
RESTRICTIONS ON DWELLING UNITS IN NON-RESIDENTIAL BUILDINGS ............... 17
4.26
SETBACK FROM NATURAL GAS PIPELINE ............................................................. 17
4.27
SETBACK FROM RAILWAYS ................................................................................... 17
4.28
SHORELINE STRUCTURES AND FACILITIES ............................................................. 17
4.28.1
Boathouses and Boatports .................................................................... 18
4.28.2
Docks and Boat Lifts .............................................................................. 20
4.28.3
Boat Launching Ramps & Marine Railways ........................................ 20
4.28.4
Reserved ................................................................................................ 20
4.28.5
Structures and Facilities in Narrow Waterways ................................... 20
4.28.6
Structures and Facilities in Environmental Protection (EP) Zones ...... 21
4.29
SIGHT TRIANGLES .................................................................................................. 21
4.30
SIGNS ..................................................................................................................... 21
4.31
TEMPORARY ACCOMMODATION ....................................................................... 21
4.32
THROUGH LOTS ..................................................................................................... 21
iii
4.33
TRAILER PARK AND PRIVATE RECREATIONAL USES ............................................. 22
4.34
RECREATIONAL VEHICLES AND TRAILERS ............................................................ 22
4.35
MODEL HOMES AND TEMPORARY SALES STRUCTURE ........................................ 22
4.36
NARROW WATERBODIES ...................................................................................... 23
4.37
STORAGE CONTAINERS ....................................................................................... 23
4.37.1 Storage Containers - Residential Properties ........................................... 23
SECTION 5
1
PARKING AND LOADING STANDARDS ................................................................................. 1
5.1
APPLICABILITY OF THIS SECTION ............................................................................ 1
5.2
PARKING ................................................................................................................. 1
5.2.1
Restriction On Use Of Land, Buildings And Structures .......................... 1
5.2.2
Residential Parking Requirements ......................................................... 1
5.2.3
Non-Residential Parking Requirements ................................................. 2
5.2.4
Calculation Of Parking and Loading Requirements ............................ 4
5.2.5
More Than One Use On A Lot ................................................................ 4
5.2.6
Barrier-Free Parking ................................................................................. 4
5.2.7
Exclusive Use Of A Parking or Loading Space ...................................... 5
5.2.8
Location Of Required Parking and Loading Spaces - C1 Zone ......... 5
5.2.9
Cash-In Lieu Of Parking .......................................................................... 5
5.2.10
Parking Required For Outdoor Patios .................................................... 6
5.2.11
Location Of Parking On A Lot Used For Residential Purposes ............. 6
5.2.12
Size Of Parking Spaces ........................................................................... 6
5.2.13
Width Of Aisles ........................................................................................ 6
5.2.14
Width Of Access Ramps And Driveways .............................................. 6
5.2.15
Width Of Driveways Accessing Individual Residential Dwellings ........ 6
5.2.16
Surface Treatment .................................................................................. 6
5.2.17
Parking Garages ..................................................................................... 7
5.2.18
Parking Area Location On A Non-Residential Lot ................................ 7
5.2.19
Illumination .............................................................................................. 7
5.2.20
Queuing Lane Requirements ................................................................. 7
5.3
PARKING AREA LOCATION ON A LOT .................................................................. 9
5.4
VEHICLE STORAGE AND DISPLAY .......................................................................... 9
5.5.1
Off-Street Loading Spaces ..................................................................... 9
5.5.2
Size Of Loading Space / Loading Area .............................................. 10
5.5.3
Location Of Loading Spaces ............................................................... 10
5.5.4
Access To Loading Spaces .................................................................. 10
SECTION 6
1
RESIDENTIAL ZONES .............................................................................................................. 1
6.1
GENERAL PROHIBITION .......................................................................................... 1
6.2
PERMITTED USES ...................................................................................................... 1
6.3
ZONE REQUIREMENTS ............................................................................................. 2
6.4
RESIDENTIAL ZONES - EXCEPTIONS ......................................................................... 4
SECTION 7
1
COMMERCIAL ZONES ........................................................................................................... 1
7.1
GENERAL PROHIBITION .......................................................................................... 1
7.2
PERMITTED USES ...................................................................................................... 1
iv
7.3
ZONE REQUIREMENTS ............................................................................................. 3
7.4
COMMERCIAL ZONES - EXCEPTIONS..................................................................... 5
SECTION 8
1
INDUSTRIAL ZONES ................................................................................................................ 1
8.1
GENERAL PROHIBITION .......................................................................................... 1
8.2
PERMITTED USES ...................................................................................................... 1
8.3
ZONE REQUIREMENTS ............................................................................................. 3
8.4
INDUSTRIAL ZONES - EXCEPTIONS .......................................................................... 5
SECTION 9
1
INSTITUTIONAL AND OPEN SPACE ZONES ............................................................................ 1
9.1
GENERAL PROHIBITION .......................................................................................... 1
9.2
PERMITTED USES ...................................................................................................... 1
9.3
ZONE REQUIREMENTS ............................................................................................. 2
9.4
INSTITUTIONAL AND OPEN SPACE ZONES - EXCEPTIONS ...................................... 3
SECTION 10 1
RURAL ZONES 1
10.1
GENERAL PROHIBITION .......................................................................................... 1
10.2
PERMITTED USES ...................................................................................................... 1
10.3
ZONE REQUIREMENTS ............................................................................................. 2
10.4
RURAL ZONES - EXCEPTIONS .................................................................................. 4
SECTION 11 1
ENVIRONMENTAL PROTECTION ZONES ................................................................................ 1
11.1
GENERAL PROHIBITION .......................................................................................... 1
11.2
PERMITTED USES ...................................................................................................... 1
11.3
ZONE REQUIREMENTS ............................................................................................. 2
11.4
ENVIRONMENTAL PROTECTION ZONES - EXCEPTIONS .......................... 3
SECTION 12 HOLD ZONES, TEMPORARY USE ZONES AND INTERIM CONTROL ZONES ........ 1
12.1
HOLDING PROVISIONS ........................................................................................... 1
12.1.1 List of Holding Provisions .......................................................................... 1
12.2
TEMPORARY USE ZONES ......................................................................................... 8
12.2.1. List of Temporary Use Zones .................................................................... 8
SECTION 13 DEFINITIONS ...................................................................................................... 1
SECTION 14 ENACTMENT ...................................................................................................... 1
14.1
FORCE AND EFFECT................................................................................................ 1
14.2
READINGS BY COUNCIL ......................................................................................... 1
14.3
CERTIFICATION ....................................................................................................... 1
SCHEDULE 'A' - Zone and Zone Boundary Maps 1 through 30, A-1, A-2, A-3, A-4
SCHEDULE 'B' - Minimum Distance Separation (MDS) Formulae Implementation Guidelines
Publication 707 Ministry of Agriculture, Food and Rural Affairs
Township of Seguin Zoning By-law
How To Use This By-law - This does not form part of this By-law
i
HOW TO USE THIS BY-LAW
INTRODUCTION
These pages explain the purpose of this Zoning By-law and how it should be used. These
pages do not form part of the Zoning By-law passed by Council and are intended only to
make the Zoning By-law more understandable and easier to reference.
PURPOSE OF THIS ZONING BY-LAW
The purpose of this Zoning By-law is to implement the policies of the Township of Seguin
Official Plan. The Official Plan contains general policies that affect the use of land
throughout the Municipality. These policies specify where certain land uses are permitted
and, in some instances, specify what regulations should apply to the development of
certain lands.
The Official Plan is a general document that is not intended to regulate every aspect of
the built-form on a private lot. In the Province of Ontario, this is the role of the Zoning By-
law. Once an Official Plan is in effect, any Zoning By-law passed by Council must conform
to the Official Plan. For example, if the Official Plan stated that lands in the vicinity of a
significant natural feature are to remain in their natural state, the Zoning By-law would
prohibit the erection of buildings or structures on those lands.
The statutory authority to zone land is granted by the Ontario Planning Act. The Planning
Act specifies what a By-law can regulate. A Zoning By-law can:
-
prohibit the use of land or buildings for any use that is not specifically permitted by
the By-law;
-
prohibit the erection or siting of buildings and structures on a lot except in locations
permitted by the By-law;
-
regulate the type of construction and the height, bulk, location, size, floor area,
spacing, and use of buildings or structures;
-
regulate the minimum frontage and depth of a parcel of land;
-
regulate the proportion of a lot that any building or structure may occupy;
-
regulate the minimum elevation of doors, windows or other openings in buildings or
structures;
-
require parking and loading facilities be provided and maintained for a purpose
permitted by the By-law; and,
Township of Seguin Zoning By-law
How To Use This By-law - This does not form part of this By-law
ii
-
prohibit the use of lands and the erection of buildings or structures on land that is:
-
subject to flooding;
-
the site of steep slopes;
-
rocky, low-lying, marshy or unstable;
-
contaminated;
-
a sensitive groundwater recharge area or head water area;
-
the location of a sensitive aquifer;
-
a significant wildlife habitat area, wetland, woodland, ravine, valley or area
of natural and scientific interest;
-
a significant corridor or shoreline of a lake, river or stream; or,
-
the site of a significant archaeological resource.
HOW TO USE THIS BY-LAW
In order to reference this By-law easily, a property owner should follow each of the steps
listed below to determine what permissions apply to their particular property.
1.
Locate the Property on a Map
Maps in a Zoning By-law are called 'Schedules'. The first step to using this By-law is
to refer to the zone schedules that are contained at the back of the By-law to
determine in which zone category your property is located. The zone category will
be indicated on the schedules by a symbol or abbreviation. For example, you may
see a symbol such as "SR1" beside your property. This would indicate that your
property is within the "Shoreline Residential One" Zone. The zone symbols or
abbreviations are explained on the first page of Section 3 of the By-law.
Section 3 also provides assistance to help you identify the zone boundaries on the
Schedules. For example, if your property appears close to a zone boundary and
you are not sure how to determine exactly where that boundary is located, refer
to Section 3.6 of the By-law.
2.
By-law Amendments
A Zoning By-law is not a static document; it is amended over time as demands and
policies governing land use change. Before proceeding any further, you should
verify that your property is not the subject of an earlier Zoning By-law amendment.
While the Township strives to keep this By-law up-to-date, more recent
amendments may not be included in the version of the By-law you are using. Staff
in the Township's Planning Department will be able to assist you to confirm if your
property has been subject to a more recent By-law amendment.
3.
Zone Provisions
Township of Seguin Zoning By-law
How To Use This By-law - This does not form part of this By-law
iii
The next step to using this By-law is to determine what uses are permitted on your
property. Subsection 2 in Sections 6 to 11 of the By-law identify the permitted uses
and zone requirements for each zone in the Municipality.
The definitions in Section 13 can assist you if you are not sure of the nature of a
permitted use or how it has been defined for the purposes of this By-law. Uses which
are not identified as permitted uses within a particular zone are not permitted in
that zone.
You have now identified the zone in which your property is located and have
identified what uses are permitted on your property. The next step is to determine
what standards may apply to the uses on your property. Subsection 3 in Sections 6
to 11 of the By-law identifies the zone requirements for each of the zone categories
in the Municipality including standards for minimum lot area, minimum frontage
requirements, minimum yard requirements, maximum lot coverage for buildings,
maximum permitted height of buildings and in some cases, the minimum required
landscaped open space on the lot.
4.
General Provisions
Now that you are aware of the uses permitted on your property and the specific
zone requirements that apply to those uses, reference should be made to Section
4 of this By-law. Section 4 contains a more general set of standards known as
'General Provisions' that apply to all properties in all zones throughout the
Municipality. For example, the general provisions contain standards that regulate
the location of accessory structures on a lot, height exceptions, and non-
conforming/non-complying uses that apply to all properties regardless of what
zone the property is located.
5.
Parking and Loading
Section 5 provides the parking and loading requirements for all uses permitted in
the Municipality. If you are considering changing the use of your property or
adding a new use to your property, you should review Section 5 to ensure that you
are aware of the parking requirements for the proposed use.
6.
Exceptions, Holding Zones and Temporary Uses
As noted in #2 above, By-laws are not static documents and lands may be subject
to a zone exception, a holding zone, or a temporary use. If a zone symbol is
followed by a dash (-) and a number the lands are subject to a site specific
exception. These can be found in Subsection 3 of the relevant Section. If the zone
symbol is followed by an (H) or a (T), the lands are subject to holding symbol or
temporary use, which can be found in Section 12.
Township of Seguin Zoning By-law
How To Use This By-law - This does not form part of this By-law
iv
What are Legal Non-Conforming and Legal Non-Complying For The Purposes Of This By-
law?
A legal non-conforming use is a use of land and/or building that legally existed on the
date
By-law 2006-125 comes into effect under the Planning Act. To be legal, the use must have
been permitted on the lands in accordance with the previous Zoning By-laws for the
Township.
A legal non-complying building or structure is a building or structure that was legally
erected in a location it was in when Zoning By-law 2006-125 comes into effect under the
Planning Act. To be legal, the location of the building or structure must have been
authorized on the lands in accordance with the Township's previous Zoning By-laws.
Alternatively, if the building or structure existed on the lands for a considerable number of
years, the building or structure may be legal if it was legally erected before the first By-law
for the Township of Seguin or the By-law for the original Township was passed.
Description of By-law Components
This By-law contains thirteen sections which together, provide the land uses and standards
applicable to all lands within the Municipality. These sections are as follows:
Section 1 - Interpretation
Section 2 - Administration
Section 3 - Establishment of Zones
Section 4 - General Provisions
Section 5 - Parking and Loading
Section 6 - Residential Zone Provisions
Section 7 - Commercial Zone Provisions
Section 8 - Industrial Zone Provisions
Section 9 - Institutional Zone Provisions
Section 10 - Rural Zone Provisions
Section 11 - Environmental Protection Zone Provisions
Section 12 - Holding Provisions and Temporary Use Zones
Section 13 - Definitions
Section 14 - Enactment
The purpose of each of these sections is described below.
Sections 1 and 2 - Interpretation and Administration
These sections of the By-law specify:
-
what lands are covered by the By-law;
Township of Seguin Zoning By-law
How To Use This By-law - This does not form part of this By-law
v
-
that every parcel of land in the area covered by the By-law is to conform and
comply with the By-law; and,
-
what penalties can be levied against a person or a corporation if they contravene
any provision in the By-law.
Section 3 - Establishment Of Zones
This section establishes the Zones that apply to the lands covered by the By-law. This
section also describes how to determine the location of the Zone boundaries on the
schedules.
Section 4 - General Provisions
This section contains a number of regulations that apply to certain types of uses, buildings
or structures regardless of where in the Municipality or in what zone they are located. For
example, this section contains provisions dealing with the construction of docks in any
zone, or provisions to regulate the operation of home industries.
Section 5 - Parking and Loading
Parking and loading facilities are required for almost all uses within the Municipality. This
section provides the requirements for these facilities including such regulations as the
number of spaces required for residential and commercial uses, minimum driveway width,
minimum parking space size and the location of parking facilities on a lot.
Sections 6 to 11 - Zone Provisions
Sections 6 to 11 identify the uses that are permitted in each Zone category. The effect of
these Zones is to only permit certain uses in various parts of the Municipality. The only uses
permitted in a zone are those that are specified in the By-law. If a use is not specifically
mentioned as a permitted use in a Zone then it is not permitted. Similarly, if a use is defined
in Section 13 of the By-law but does not appear as a permitted use in any zone, then it is
not a use permitted by the By-law.
Sections 6 to 11 also contain a number of regulations that control the placement, bulk
and height of a building on a lot. This includes regulations such as minimum lot size,
minimum frontage, maximum building height or the maximum coverage of a building on
a lot.
Section 12 - Holding Zones and Temporary Use Zones
This Section provides a consolidated list of properties that are subject to Holding Provisions
and Temporary Use Zones.
Section 13 - Definitions
Township of Seguin Zoning By-law
How To Use This By-law - This does not form part of this By-law
vi
It is necessary to define words in a Zoning By-law because it is a legal document. A By-
law must be drafted so that it can be enforced in a court of law. These definitions will help
provide clarity in the By-law and ensure that the By-law and its intent are applied
consistently.
Section 14 - Enactment
This section contains the signatures of the Mayor and the Clerk who signed the By-law
when it was passed by Council in accordance with Section 34 of the Planning Act, R.S.O.
1990 c.P. 13.
Township of Seguin Zoning By-law
CORPORATION OF THE TOWNSHIP OF SEGUIN
BY-LAW NUMBER 2006-125
WHEREAS it is considered desirable to prohibit the use of land and the erection and use of
buildings or structures except for certain purposes, and to regulate the type of
construction and the height, bulk location, size, floor area, character and use of buildings
in accordance with the provisions of Section 34 of the Planning Act, R.S.O. 1990, c.P. 13 as
amended;
NOW THEREFORE, the Council of the Corporation of the Township of Seguin enacts a
Zoning By-law for the Township of Seguin as follows:
Township of Seguin Zoning By-law
1-1
Section 1 - Interpretation
SECTION 1
INTERPRETATION
1.1
TITLE
This By-law may be referred to as the "Township of Seguin Zoning By-law"
and applies to all lands within the Township of Seguin.
1.2
ADMINISTRATION
This By-law shall be administered and enforced by municipal staff as
appointed by the Council of the Corporation of the Township of Seguin.
1.3
CONFORMITY AND COMPLIANCE WITH BY-LAW
No land, building or structure may be used, erected or altered except in
accordance with the provisions of this By-law.
No land, building or structure may be located or used such that the uses,
buildings or structures on other lands would no longer comply with the
provisions of this By-law.
1.4
INTERPRETATION
The provisions of this By-law are the minimum requirements except where a
maximum requirement applies.
Nothing in this By-law shall serve to relieve any person from any obligation to
comply with the requirements of any other By-law of the Township of Seguin
or any requirement of the Province of Ontario or Government of Canada
that may affect the use of lands, buildings or structures in the Municipality.
1.5
BUILDING PERMITS AND MUNICIPAL LICENSE
The requirements of this By-law must be met before a Building Permit,
Certificate of Occupancy, or approval of an application for a municipal
license is issued for the use of land or the use, erection, addition to or
alteration of any building or structure.
Township of Seguin Zoning By-law
2-1
Section 2 - Administration
SECTION 2
ADMINISTRATION
2.1
ENFORCEMENT
Any person who contravenes any provision of this By-law is guilty of an
offense and upon conviction is liable to the fine(s) as provided for under the
Planning Act, R.S.O. 1990, c.P. 13 as amended.
2.2
SEVERABILITY
A decision of a court that one or more of the provisions of this By-law are
invalid in whole or in part does not affect the validity, effectiveness or
enforceability of the other provisions or parts of the provisions of this By-law.
2.3
EFFECTIVE DATE
This By-law shall come into force the day it was passed if no appeals are
received. If an appeal(s) is received, this By-law, or portions thereof, shall
come into force upon the approval of the Ontario Municipal Board and in
accordance with the provisions of the Planning Act as amended.
2.4
REPEAL OF FORMER BY-LAWS
i)
By-law No. CT100-83, as amended, of the former Township of
Christie and the west half of the former Township of Monteith
is hereby repealed;
ii)
By-law No. Z200-97, as amended, of the former Township of
Humphrey in hereby repealed;
iii)
By-law No. 93-1000, as amended, of the former Township of
Foley is hereby repealed;
iv)
By-law No. R100-80, as amended, of the former Village of
Rosseau is hereby repealed;
v)
By-law No. 2005-073, as extended by By-law No. 2006-098, of
the Township of Seguin is hereby continued until the earlier of
July 3, 2007 or the day which this By-law is in full force and
effect pursuant to the Provisions of the Planning Act,
whereupon the said By-laws are repealed;
Township of Seguin Zoning By-law
2-2
Section 2 - Administration
2.5
TRANSITION PROVISIONS
2.5.1 This By-law does not apply to prevent the issuance of a Building
Permit for a Development for which an Approval under the Planning
Act has been granted for:
a)
a Minor Variance to a Zoning By-law or Interim Control By-law,
b)
an Amendment to a Zoning By-law ,
c)
an amendment or exemption to an Interim Control By-law, or,
d)
Site Plan approval;
where the said Development occurs in strict accordance with the
plans originally filed with the Township in support of the application
for Development.
2.5.2 For the purpose of subsection 2.5.1: (a) "Approval" means an
approval granted by Council, the Committee of Adjustment or the
Ontario Municipal Board to an application which had been
submitted before the date of passing of this By-law and which had
been approved or granted in accordance with the provisions of the
applicable Zoning By-law as it read on the day before the passing of
this By-law and has not expired as a result of failure to satisfy any time
limited condition of approval; (b) "Development" means the entire
development project or proposal which could otherwise have
proceeded under the applicable Zoning Bylaw as it read on the day
before the passing of this By-law, but for the need for an Approval;
(c) "Zoning By-law" means any of the zoning by-laws that were in
force and effect on the day before the passing of this By-law; and
"Interim Control By-law means By-law 2005-073, as amended by By-
law 2006-098 and all exempting by-laws carried forward therein.
2.5.3 Where a project qualifies under subsection 2.5.1, the Building Permit
for that project may be issued in accordance with the Approval if
the Development otherwise complied in all respects with the
provisions of the applicable Zoning By-law as it read on the day
before the passing of this By-law.
2.5.4 Nothing in this By-law applies so as to continue the exemption
provided by this section beyond the issuance of the building permit
upon which the exemption is founded and in no case does the
exemption mentioned in subsection 2.5.3 continue beyond the
repeal of this Section.
2.5.5 Despite this Section, the provisions of this By-law apply to the land in
question immediately upon the issuance of the Building Permit or
granting of the approval which the exemption is founded.
2.5.6 This Section is repealed on the later of: (a) one (1) year from the date
of passage of this By-law and, (b) on appeal, on the date that is 6
(six) months after the date that the applicable provisions of this By-
law are approved by the Ontario Municipal Board.
Township of Seguin Zoning By-law
2-3
Section 2 - Administration
2.5(A)
1.
Section 2.5.1, 2.5.2 and 2.5.3 of this By-law are hereby re-enacted,
retroactive to such date as such sections may have otherwise
"expired" or been "repealed" by the passage of time, but only
insofar as those sections apply to a "Qualifying Project" as defined
below.
2.
For purposes of this By-law, a Qualifying Project is a proposal for the
development or redevelopment of land (the "Proposal"), where an
"Approval" (as defined in section 2.5.2 of this By-law) had been
granted for the Proposal prior to April 22, 2008.
3.
Despite anything in this By-law to the contrary, a Qualifying Project
shall be eligible for a building permit for the Proposal based on
compliance with the "Zoning Bylaw" (as defined in section 2.5.2 of
this By-law) provided that:
a) The Approval for the Proposal is still valid and has not been
rescinded or overturned by Council or any court or any other
governmental authority, body or tribunal having jurisdiction to
do so;
b) The application for a building permit was filed within a
reasonable time after the granting of the Approval;
c) The application for a building permit complied with the Ontario
Building Code Act ("OBCA"), and all applicable regulations, at
the time the application was filed with the Township;
d) The delay in proceeding with the Qualifying Project is not the
result of the owner being at fault, or in default, with respect to
paying all applicable fees and satisfying all applicable
conditions of the Approval;
e) The "Development" (as defined in section 2.5.2 of this By-law)
proceeds in strict accordance with the plans originally filed with
the Township in support of the application for Development;
and
f) The owner proceeds with reasonable diligence, once a building
permit has been issued for all or part of the Qualifying Project.
4.
Once a building permit has been issued by the Township pursuant
to clause 3(f) hereof, the owner of a Qualifying Project shall be
entitled to receive such further building permit(s) as is or are
necessary to complete the Development, but only upon satisfying
the usual conditions with respect to the issuance of building permits
under the OBCA.
5.
If the owner wishes to make any change(s) to the approved plans
for a Qualifying Project, any such change(s) shall be in strict
compliance with the provisions of this By-law and, in that case, the
provisions of this By-law shall take priority over the provisions of the
Township of Seguin Zoning By-law
2-4
Section 2 - Administration
"Zoning By-law" (as defined in section 2.5.2 of this Bylaw) with
respect to any such change(s).
6.
Nothing in this Bylaw shall be construed to permit any Development
that does not strictly comply with the provisions of this Section.
2.5(B)
1. Despite sub-section 2.5.6, as it read when enacted by this By-law, for
the purposes of a Qualifying Project (as defined in Section 2.5(A) of
this By-law) subsection 2.5.6 is not repealed until such time as such
Qualifying Project has either received a building permit or has been
"abandoned".
2. A Qualifying Project shall be deemed to have been "abandoned" if
the Owner has not taken any action to proceed with the
Development for a period of six months or there has been no activity
on the Proposal for a period of six months.
Township of Seguin Zoning By-law
3-1
Section 3 - Establishment of Zones
SECTION 3
ESTABLISHMENT OF ZONES
3.1
ZONES
The Provisions of this By-law apply to all lands within the limits of the Township of
Seguin. All lands in the Township are contained within one or more of the following
Zones:
ZONE
SYMBOL
Residential Zones
Village Residential One Zone
R1
Village Residential Two Zone
R2
Shoreline Residential One Zone
SR1
Shoreline Residential Two Zone
SR2
Shoreline Residential Three Zone
SR3
Shoreline Residential Four Zone
SR4
Shoreline Residential Five Zone
SR5
Shoreline Residential Six Zone
SR6
Limited Service Residential Zone
LSR
Commercial Zones
Village Commercial Zone
C1
Marine Commercial Zone
C2
Highway Commercial Zone
C3
Resort Commercial Zone
C4
Camping Establishment Zone
C5
Industrial Zones
Village Industrial Zone
M1
General Industrial Zone
M2
Light Industrial Zone
M3
Airport Zone
AR
Airport Industrial Zone
AR1
Aggregate - Pit Zone
MP
Aggregate - Pit and Quarry
MQ
Institutional and Open Space Zones
Institutional Zone
I
Open Space Zone
OS1
Major Open Space Zone
OS2
Lakeside Zone
LS
Rural Zones
Township of Seguin Zoning By-law
3-2
Section 3 - Establishment of Zones
Rural Zone
RU
Rural Residential Zone
RR
Rural Industrial Zone
RI
Rural Commercial
RC
Environmental Protection Zones
Environmental Protection Zone
EP
Environmental Protection One Zone
EP1
3.2
LANDS UNDER WATER
All lands under water of the lakes and rivers within the Township are subject to this
By-law in addition to the requirements of both federal and provincial legislation. All
lands under water not zoned Environmental Protection (EP) shall be zoned Lakeside
(LS), and may be used in accordance with the zoning of abutting and appertaining
lands and the regulations of this By-law and specifically Section 4.28.
3.3
ISLANDS
All islands not identified as being within a Zone on the Zone Schedule shall be zoned
Environmental Protection (EP).
3.4
ZONE SYMBOLS
The Zone symbols may be used to refer to lots, buildings and structures and to the
use of lots, buildings and structures permitted by this By-law.
3.5
ZONE SCHEDULES
The Zones and Zone boundaries are shown on Schedule A, Maps 1 through 30,
A-1, A-2, A-3, A-4 that are attached to and form part of this By-law.
3.6
DETERMINING ZONE BOUNDARIES
When determining the location of zone boundaries as shown on any Schedule
forming part of this By-law, the following provisions shall apply:
i)
a boundary indicated as following a highway, street, lane, railway right-of-
way, utility corridor or watercourse shall be the edge of such highway, street,
lane, railway right-of-way, utility corridor or watercourse;
ii)
a boundary indicated as following a shoreline shall follow such shoreline,
and in the event of change in the shoreline, the boundary shall be construed
as moving with the actual shoreline;
Township of Seguin Zoning By-law
3-3
Section 3 - Establishment of Zones
iii)
a boundary indicated as following lot lines shown on a registered Plan of
Subdivision, or the municipal boundaries of the Township of Seguin shall
follow such lot lines;
iv)
where a boundary is indicated as running parallel to a street line and the
distance from the street line is not indicated, the boundary shall be deemed
to be parallel to such a street line and the distance from the street line shall
be determined according to the scale shown on the Schedule;
v)
where a lot falls into two or more Zones, each portion of the lot shall be used
in accordance with the permitted uses of this By-law for the applicable
Zone; and,
vi)
where none of the above provisions apply, the Zone boundary shall be
scaled from the legally approved Schedule(s).
3.7
SITE SPECIFIC ZONES
Where a Zone symbol on the attached Schedule(s) is followed by a dash, and a
number, such as R1-17, the symbol refers to a site-specific exception that applies
to the lands noted. Site-specific exceptions are listed in Sections 6 to 12 of this By-
law.
3.8
HOLDING ZONES
Notwithstanding any other provision in this By-law, where a Zone symbol is followed
by the letter (H), no person shall use the land to which the letter (H) applies for any
use other than the use which existed on the date this By-law was passed, until the
(H) is removed in accordance with the policies of the Official Plan and the
provisions of this By-law and/or the requirements of any amending By-law, and the
requirements of the Planning Act, as amended.
Township of Seguin Zoning By-law
4-1
Section 4 - General Provisions
SECTION 4
GENERAL PROVISIONS
4.1
ACCESSORY BUILDINGS, STRUCTURES AND USES
4.1.1
Permitted Uses
Where this By-law allows a use on a lot, a building or structure may be erected
in conjunction with that use. In addition, any accessory building or structure
may be included provided that a valid building permit for the main
building/use, if required, is issued or that the main building/use or structure is
already in existence on the lot. The exception is that a building permit may be
issued for an accessory dock prior to a main use being established on the
property as long as the property is able to have a main use complying with the
Zoning By-law built on it and the shore lands are owned by the abutting
property owner.
Accessory buildings and structures shall not be used for:
a)
any occupation for gain or profit conducted within or accessory to a
dwelling unit or lot except as specifically permitted in accordance with
this By-law; or
b)
human habitation except where specifically permitted by this By-law.
4.1.2
Setback Requirements
Except as otherwise provided by this By-law, any accessory building or structure
shall comply with the yard requirement of the zone within which it is located.
This provision shall not apply to prevent the construction of docks, marine
facilities, gazebos, saunas, boathouses, or pump houses as may otherwise be
permitted in this By-law.
4.1.3
Lot Coverage, Accessory Structures
The total lot coverage of all accessory buildings and structures, excluding
swimming pools, sports courts, hot tubs and jacuzzies shall not exceed 15
percent of the lot area in the R1 and R2 zones or 5 percent in the LSR and SR
zones.
Township of Seguin Zoning By-law
4-2
Section 4 - General Provisions
4.1.4
Building Height, Accessory Structures
The maximum height of an accessory building or structure shall be 4.5 metres
when the building or structure is located less than 20 metres from a Waterway,
Navigable or Shoreline.
The maximum height of an accessory building or structure shall be 6 metres
when the building or structure is located 20 metres or more from a Waterway,
Navigable or Shoreline, except as otherwise permitted in this By-law.
4.1.5
Accessory Buildings and Structure Encroachments
Notwithstanding the yard and setback provisions of this By-law to the contrary,
drop awnings, clothes poles, flag poles, garden trellises, retaining walls less than
1.0 metres in height, fences 2.0 metres or less in height, signs or similar uses
which comply with this By-law are permitted in any required yard or in the area
between the street line and the required yard. Fences shall not be permitted
in the required front yard of lots in the LSR and SR Zones.
4.1.6
Garages or Other Accessory Buildings or Structures, Sports Courts and Pools
Notwithstanding the yard and setback provisions of this By-law to the contrary,
with the exception of Section 4.14, a detached private garage or other
accessory building or structure, which includes sports courts, hot tubs, jacuzzies
and pools, may be erected and used in an interior side or rear yard, provided
that:
a)
Interior Side Yard
Where such accessory building or structure is located in an interior side
yard, it shall not be closer than 1.2 metres to the interior side lot line in
an R1 and R2 Zone or 5.0 metres in an LSR and SR Zone or the required
yard in all non-residential zones. Such accessory building or structure
shall be setback a minimum of 20 metres from a Waterway, Navigable
or Shoreline.
b)
Rear Yard
Where such accessory building or structure is located in a rear yard, it
shall not be closer than 1.2 metres to the rear lot line, except where the
rear lot line abuts a public or private road wherein the Rear Yard
requirement shall apply. Such accessory building or structure shall be
setback a minimum of 20 metres from a Waterway, Navigable or
Shoreline.
c)
Front Yard
For those lots which abut a lake or river, a permitted detached
accessory building or structure may be located in the front yard but shall
Township of Seguin Zoning By-law
4-3
Section 4 - General Provisions
be located no closer than 20.0 metres to the front lot line, unless
specifically permitted by this By-Law.
4.1.6.1
Private Sewage System
Notwithstanding the yard and setback provisions of this By-law to the contrary,
the minimum setbacks for a private sewage system shall be in accordance
with the Ontario Building Code, except for the minimum setback from a
Waterway, Navigable or Shoreline shall be 20 metres.
4.1.7
Commercial and Industrial Uses
Notwithstanding the foregoing provisions, no building or structure accessory to
a Commercial or Industrial use shall be erected closer than 1.5 metres to an
interior side lot line.
4.1.8
Building Setbacks
All accessory buildings and structures shall be setback at least 1.2 metres from
all other separate, accessory buildings and structures.
4.1.9
Waterfront Accessory Structures
Notwithstanding Sections 4.1.2 and 4.1.5, the following waterfront accessory
structures shall be permitted within the required front yard, provided that the
structures comply with the minimum required side yard, shoreline buffer area,
and lot coverage requirements.
a)
Pumphouse: within the required front yard the maximum floor area of a
pumphouse shall not exceed 10 square metres.
b)
Inclinator: within the required front yard the maximum attached landing
platform for an inclinator shall not exceed 10 square metres.
c)
Only one of a Gazebo or Pergola or Pavilion or Sauna shall be permitted
within the required front yard. Within the required front yard the
maximum floor area shall not exceed 24 square metres. The maximum
24 square metre floor area shall include any attached deck.
d)
Deck: within the required front yard the maximum area of an uncovered
deck attached to a permitted waterfront accessory structure, or a free-
standing deck shall be 12 square metres.
e)
Open stairs used for access to the original grade or, to a shoreline or,
other property line over uneven terrain and which do not exceed 1.2
metres in height above original grade or 1.1 metres in width and not
exceeding 10 square metres in total area will be deemed not to be a
structure for the purposes of lot coverage and will be an allowed
structure in the front yard. Section 4.1.9 of Zoning By-law 2006-125 is still
applicable to all other structures.
Township of Seguin Zoning By-law
4-4
Section 4 - General Provisions
f)
The owner shall have acquired the shore road allowance, where
existing, prior to the construction of any of the structures listed in this
section.
4.1.10
Guest Cabins
Guest cabins shall be permitted on lands within all SR Zones or the LSR Zone
subject to the following regulations:
a)
One guest cabin shall be permitted on a lot as an accessory use to the
residential dwelling.
b)
Guest cabins shall meet all required yards for the residential dwelling.
c)
The maximum floor area of a guest cabin shall be 60 square metres,
including all decks and balconies, except for guest cabins over
boathouses wherein the decks and balconies will only contribute to the
maximum dock/deck area as per Section 4.28.2.(e).
d)
The maximum height shall not exceed 6 metres.
e)
A guest cabin shall not include a kitchen or cooking facilities.
f)
Unless specifically permitted, a guest cabin shall be limited to 1 storey.
4.1.11
Human Habitation in Accessory Structures
The use of any accessory building or structure for a habitable room is not
permitted except in the case of a guest cabin or within the half storey of a one
and a half storey boathouse or within the half storey of a one and a half storey
detached garage, where permitted. Where human habitation is permitted in
an accessory building, the building shall not include a kitchen or cooking
facilities.
4.1.12
Accessory Structures, One and a Half or Two Storeys
Only one guest cabin, or a one and one-half storey boathouse, or a one and
one half storey detached garage, or a legal non-conforming or legal non-
complying two-storey boathouse, or a two-storey detached garage shall be
permitted per lot.
4.1.13
Backyard Hens
Backyard hens are permitted, subject to the following:
a) Shall only be permitted in the R1, R2, RU and RR zones;
b) Hens and the enclosure only be permitted accessory to a single
detached dwelling;
c) A maximum of six hens shall be permitted;
Township of Seguin Zoning By-law
4-5
Section 4 - General Provisions
d) Roosters are not permitted; and
e) Free roaming hens shall not be permitted;
A backyard hen enclosure shall be:
f) A maximum of 10 square metres;
g) A maximum height of 3 metres;
h) Located in a Rear Yard;
i) A minimum of 3 metres from any lot line; and
j) A minimum of 60 metres from any Waterbody;
4.1.14 Hobby Farms
Hobby Farms shall be permitted as an Accessory use in the RU and RR zones
4.2 ACCESSORY DWELLING UNITS AND SECONDARY DWELLING UNITS
4.2.1
Accessory Dwelling Units
Where an accessory dwelling unit is a permitted use, an accessory dwelling
unit is only permitted provided to the following provisions are satisfied:
i)
The appropriate authority has approved the private sewage disposal
system to service the total sewage flow on the lot.
ii)
Occupancy of the accessory dwelling unit shall not be permitted until
an occupancy permit has been issued by the Township.
4.2.2
Secondary Dwelling Units
a) Where a secondary dwelling unit is permitted, the following provisions apply:
i)
Only one secondary dwelling unit shall be permitted per lot.
ii)
Where the secondary dwelling unit is on a lot serviced by private
services, the appropriate authority has approved the private sewage
disposal system to service the total sewage flow on the lot.
iii)
One additional dedicated parking space above the requirements of
this By-law for the related zone shall be provided for the secondary
dwelling unit.
iv)
Any expansion or extension to the structure related to the provision of a
secondary dwelling unit shall not increase the gross floor area of the
structure by more than 10%, and the secondary dwelling unit shall not
alter the streetscape character along the street.
b) Secondary dwelling units are only permitted in accessory buildings where the
following criteria are satisfied:
Township of Seguin Zoning By-law
4-6
Section 4 - General Provisions
i)
The accessory building must be located in the rear yard of the
lot.
ii)
Notwithstanding the provisions of Section 4.1.6, secondary
dwelling units shall only be permitted in accessory buildings that
comply with the minimum yard requirements for the principal
building of the zone in which it is located.
iii)
Within the R1 and R2 Zones, a secondary dwelling unit is
permitted where the appropriate authority has approved the
private sewage disposal system and well.
iv)
In any other zone where secondary dwelling units are permitted,
a secondary dwelling unit shall only be permitted in an accessory
building where the lot area is at least 1.2 hectares.
v)
In the R1, R2, RR, or RU zones, one self-contained, detached
Secondary Dwelling Unit may be permitted as a freestanding
accessory building, provided that:
-
Lot Area and Frontage: The total lot must meet at least twice
the minimum lot area and lot frontage requirements specified
in Tables 6.2 and 10.2 of the respective zone; and
-
Yard Compliance: Both the Secondary Dwelling Unit and the
Main Dwelling Unit must individually satisfy all minimum yard
requirements applicable to a principal building in the zone
where they are located.
4.3
ANTENNAE, TOWERS, SATELLITE DISHES, SOLAR ARRAYS
Radio and television antenna towers, satellite dishes, dish antennas, solar arrays, and
other similar structures are permitted in any zone provided they meet the minimum
requirements of the zone in which they exist and are not located in any front yard or
exterior side yard.
4.4
BUFFER AREA
Where a buffer area is required in any zone, it shall be located within that zone and
shall be the minimum width as specified in the regulations for that zone. Within
required buffer areas, a solid and continuous natural vegetative screen shall be
planted and/or maintained.
4.5
CONSTRUCTION USES
A shed, construction trailer, or storage container incidental to construction is
permitted in all zones within the Township on the lot where construction is occurring
and only for so long as it is necessary for the work in progress and until the work is
completed or abandoned. For the purpose of this Section, abandoned shall mean
Township of Seguin Zoning By-law
4-7
Section 4 - General Provisions
the discontinuation of work for more than 120 consecutive days, or the failure to
maintain a current building permit, and shall not exceed 18 months. For the purpose
of this section, a temporary storage container shall not count towards lot
coverage.
4.6
DWELLING UNITS PER LOT
Unless specifically permitted by this By-law, only one dwelling unit shall be permitted
per lot.
4.7
ENVIRONMENTAL PROTECTION AREA
Lands zoned Environmental Protection (EP) may be included in the calculation of lot
area and yard requirements except that, lands below the normal or controlled high
water mark shall not be included as part of the lot area. Setback requirements in this
By-law shall be measured from the limit of the normal or controlled high water mark.
4.8
FRONTAGE ON IMPROVED PUBLIC STREET, PRIVATE ROAD OR NAVIGABLE WATERWAY
a)
No person shall erect any building or structure in any Zone after the date of
passing of this By-law, unless the lot upon which such building or structure is to
be erected has frontage upon an improved public street.
b)
Notwithstanding Section 4.8 a), where an existing lot of record does not front
onto an improved public street, a building permit may be issued for a building
or structure provided:
i)
The lot in question meets all of the other requirements of this By-law and
has access by way of a legal private right-of-way; and,
ii)
The applicant, prior to a building permit being issued, enters into a
Private Road Agreement with the Township. This Agreement shall
indicate that:
1)
the owner acknowledges and agrees that the lot in question
does not front on an improved public street;
2)
the owner acknowledges and agrees that the Township does not
maintain or snow plow the private road;
3)
the owner acknowledges and agrees that the Township will not
take over or assume a private street as a public street unless it
has been built according to provincial standards and in
accordance with Township policy; and,
4)
the owner acknowledges and agrees not to request the
Township to assume or take over the private road.
Township of Seguin Zoning By-law
4-8
Section 4 - General Provisions
c)
Notwithstanding Section 4.8 (a), where a lot is accessed only by navigable
water, a building permit may be issued provided that:
i)
the lot in question meets all other requirements of this By-law and is a lot
as defined herein;
ii)
the applicant, prior to a building permit being issued, enters into an
agreement with the Township acknowledging that normal municipal
services are not available for the lot in question; and,
iii)
the Township has written confirmation of mainland parking exclusively
for the water access lot. The written confirmation shall be from the
owner of a private property or marina. The location of mainland parking
shall be:
1)
On a lot with direct access, or on lands within 500 m of a public
boat launch or marina; and
2)
On the same navigable waterbody as the lot where the building
permit is issued; and
3)
Directly accessed from an improved public street; or
4)
Directly accessed from a lot where the property owner has
access via a legal private right-of-way.
d) Notwithstanding the provisions of Sections 4.8 (a) a Hunt Camp shall be permitted
if it is located on a lot which has access from:
1)
an unimproved public road allowance; or
2)
a private road with written authorization; or
3)
Crown Land; or
4)
A navigable waterbody.
Access through any of these methods must include direct frontage onto an
improved
public
street
or
have
a
legal
private
right-of-way.
4.9
GROUP HOMES
In all zones where a group home is a permitted use, they shall be located no closer
than 300 metres to an existing or established group home.
4.10
HEIGHT EXCEPTIONS
a) Notwithstanding the height provisions of this By-law to the contrary, nothing in
this By-law shall apply to prevent the erection, alteration, or use of a silo, a
church spire, a belfry, a flag pole, a chimney, a water tank, a radio or
television tower or antenna, an air conditioner duct, a grain elevator,
incidental equipment required for processing, external equipment associated
with internal equipment or machinery and conveying equipment, which
exceeds the maximum height requirements provided the main or principal
Township of Seguin Zoning By-law
4-9
Section 4 - General Provisions
use is permitted within the Zone in which it is located and provided all other
applicable provisions of this By-law are complied with.
b) All cupolas or other ornamental roof structures shall have dimensions of a
maximum 1.0 meters width by 1.0 meters length and a maximum 1.2 meters
height.
4.11
HOME INDUSTRY
Where a Home Industry is a permitted use, the following provisions shall apply:
a)
a maximum of four (4) persons may be engaged in the home industry;
b)
such home industry may be located in part of a dwelling, or in any accessory
building located on a lot on which a dwelling is in existence, provided the total
gross floor area utilized by the home industry does not exceed a maximum of
150 square metres;
c)
there shall be no outside storage of goods, materials or articles;
d)
Notwithstanding Section 4.11(c) a maximum of three currently licensed motor
vehicles associated with the home industry may be parked or stored on the lot
but only within an interior side or rear yard;
e)
there shall be no emission of noise, odour or dust, which is not normally
attributed to the use of the land for residential uses;
f)
a home industry shall be accessory to and smaller in size than the main
residential dwelling; and,
g)
the home industry shall comply with the following minimum lot area, yard and
setback provisions:
i)
minimum lot area
2.0 hectares
ii)
minimum setback from all 30.0 metres
lot lines
iii)
minimum separation from 60.0 metres
dwelling in existence on
another lot
4.12
HOME OCCUPATION
Where a Home Occupation is a permitted use, the following provisions shall apply:
a)
no person, other than a person living on the premises, shall be engaged in the
occupation of providing merchandise and/or services to customers with the
exception of one assistant who is not a resident in the dwelling;
Township of Seguin Zoning By-law
4-10
Section 4 - General Provisions
b)
there shall be no goods, wares, or merchandise offered for sale or rent from
the dwelling which are not manufactured or processed on the premises. The
resale of products not manufactured or processed on the property is
prohibited;
c)
not more than 25 percent of the gross floor area of the dwelling shall be used
for the purposes of a home occupation, and such home occupation shall be
conducted entirely within the dwelling;
d)
there shall be no outside storage of goods or materials in conjunction with the
home occupation use; and
e)
a home occupation shall not include a boarding or lodging house, an eating
establishment, a kennel, or a group home.
4.13
MINIMUM DISTANCE SEPARATION
a)
No building shall be constructed in any zone outside of a settlement area
which does not conform to the MDS I and MDS II Formulas as provided by the
Ministry of Agriculture Food and Rural Affairs unless the building or structure is
proposed on an existing lot of record.
b)
Setbacks for new dwellings constructed on lots created after the approval of
this By-law, other than the lot containing the barn from barns containing
livestock shall be required in conformity with the MDS I Formula, attached to
and forming part of this By-law as Schedule B.
c)
New barns or expansions to existing barns shall require setbacks in conformity
with the MDS II Formula, attached to and forming part of this By-law as
Schedule B.
4.14
MINIMUM OPENING ELEVATION AND SHORELINE SETBACK
a)
Georgian Bay Shoreline
No buildings or structures shall be permitted with a finished grade level below
an elevation of 177.8 metres Canadian Geodetic Datum and no opening to
any building or structure shall be below the elevation of 178.3 metres Canadian
Geodetic Datum for all lands situated adjacent to the Georgian Bay Shoreline.
b)
Lake Joseph, Lake Rosseau and Little Lake Joseph
No buildings or structures shall be permitted with a finished grade level below
an elevation of 226.70 metres Canadian Geodetic Vertical Datum of 1928
(CGVD-28) for all lands situated adjacent to the Lake Joseph, Lake Rosseau
and Little Lake Joseph Shoreline.
Township of Seguin Zoning By-law
4-11
Section 4 - General Provisions
c)
All Shorelines
Notwithstanding any other provision of this By-law, no building or structure
except a boathouse, dock, wharf, pergola, pavilion, inclinator, uncovered
deck, or steam or sauna bath, gazebo, or pump house where permitted by this
By-law, shall be erected closer than 20 metres from any Waterway, Navigable
or Shoreline, and any modification of the shoreline through filling, excavation
or by other means is prohibited unless otherwise permitted by the Federal or
Provincial agencies.
4.15
MULTIPLE USES ON ONE LOT
Where any land, building or structure is used for more than one permitted use, the
applicable Zone Provisions of this By-law which serve to regulate each such use shall
be complied with.
4.16
MULTIPLE ZONES ON ONE LOT
Where a lot is divided into more than one Zone under the provisions of this By-law,
each such portion of the lot shall be used in accordance with the Permitted Uses and
zone requirements of this By-law for the applicable Zone as if it were a separate lot;
however, the required yard provisions of this By-law shall be determined for the lot as
a whole and shall not be increased or altered by the location of a Zone boundary
within the lot.
4.17
NON-COMPLYING LOTS, BUILDINGS AND STRUCTURES
a)
Buildings on Undersized Lots
Where a building or structure is located on a lot having less than the minimum
frontage and/or lot area, and/or having less than the minimum setback, front
yard and/or side yard and/or rear yard required by this By-law, the said building
or structure may be enlarged, reconstructed, replaced, repaired and/or
renovated provided that:
i)
the enlargement, replacement, reconstruction or renovation and/ or
repair does not reduce the front yard, and/ or side yard, and/ or rear
yard or increase the amount of floor area or volume or height in a
required yard;
ii)
the building or structure is being used for a purpose permitted within the
Zone in which it is located; and,
iii)
all other applicable Provisions of this By-law are complied with.
Township of Seguin Zoning By-law
4-12
Section 4 - General Provisions
b)
Reconstruction of Existing Building
Nothing in this By-law shall prevent the reconstruction of a legally existing
building that does not comply with the provisions in this By-law, provided that
no part of the building that is non-complying is increased in height or volume
and the reconstruction does not reduce the front yard and/or side yard and/or
rear yard.
c)
Notwithstanding the provisions of Section 4.17 a) and b), where a detached
dwelling encroaches into the required front yard of a waterfront lot, an
attached deck, porch, walkway or stairs may be constructed, enlarged,
reconstructed, repaired, replaced or renovated as a one-time occurrence,
and the dwelling may be constructed, reconstructed, enlarged, repaired,
replaced or renovated in that yard provided that the construction,
enlargement, repair, replacement or renovation is a one-time occurrence and
complies with the following provisions:
Table 4.1
Column 1
Column 2
Column 3
Column 4
Dwelling
Distance from
Shoreline
Maximum
Floor Area
Increase
(1)
Shoreline Width
Increase (max)
(2)
Height
Increase (max)
Less than 5 m
23 sq. m.
0%
1.0 m
≥5 m & <10 m
32.5 sq. m.
20%
2.0 m
≥10 m & <15 m
46 sq. m.
30%
2.5 m
≥15 m & < 20 m
56 sq. m.
60%
3.0 m
Footnotes for Table 4.1
(1)
Notwithstanding any other provisions of this By-law to the contrary, a deck,
porch, or screened porch attached to a dwelling shall be included in the
maximum floor area for the purposes of applying the provisions of Column 2 of
Table 4.1.
(2)
Shoreline width of the dwelling shall be measured along the exterior wall of the
building that faces the waterbody measured at right angles to the chord
frontage. The shoreline width provision shall not apply to new decks, or
unenclosed porches attached to a dwelling where the deck or unenclosed
porch is less than 1.2 meters in height.
Township of Seguin Zoning By-law
4-13
Section 4 - General Provisions
d)
Existing Undersized Lots
Where a lot, having a lesser lot area and/or lot frontage than required herein,
existed on the date of passing of this By-law, or where such a lot is created by
a public authority or correction of title, such a smaller lot may be used and a
permitted building or structure may be erected and/or used on such a smaller
lot provided that all other applicable provisions of this By-law are complied with
and provided that a sewage disposal system can be installed on the lands.
e)
Changes to Lot Size
Lots which have been increased in lot area and/or lot frontage following
adoption of this By-law, may also be used in accordance with the provisions of
this By-law.
4.18
NON-CONFORMING USES
a)
Continuation of Existing Uses
The provisions of this By-law shall not apply to prevent the use of any existing
lot, building or structure for any use prohibited by this By-law if such existing lot,
building or structure was lawfully used for such purposes prior to the effective
date of this By-law and provided that the lot, building or structure continues to
be used for that purpose.
b)
Exterior Extension
The exterior of any building or structure which was lawfully used prior to the
effective date of this By-law for a use not permitted within the Zone in which it
is located, shall not be enlarged, extended, reconstructed or otherwise
structurally altered, unless such building or structure is thereafter to be used for
a purpose permitted within such Zone, and complies with all requirements of
this By-law for such Zone unless these changes are necessary to provide for
flood proofing or insulation of the building. This provision shall not prohibit
normal or regular maintenance or replacement of exterior cladding.
c)
Interior Alteration
The interior of any building or structure which was lawfully used, prior to the
effective date of the By-law, for a purpose not permitted within the Zone in
which it is located, may be reconstructed or structurally altered for the existing
purpose for which such building or structure was lawfully used.
Township of Seguin Zoning By-law
4-14
Section 4 - General Provisions
d)
Restoration
Nothing in this By-law shall prevent the strengthening or restoration to a safe
condition of any existing, legal non-conforming building or structure or part
thereof, provided that the strengthening or restoration does not increase the
building height, size or volume, or change its location, or change the existing,
lawful use of such existing building or structure or unless these changes are
necessary to provide for flood proofing or insulation of the building.
e)
Reconstruction Of Existing Dwellings, Buildings And Structures
Nothing in this By-law shall apply to prevent the reconstruction of any existing
non-conforming dwelling, building or structure which is damaged by causes
beyond the control of the owner, other than flooding. The existing dwelling,
building or structure may be reconstructed in the same location on which it
existed on the date of the passage of this By-law even if such did not comply
with one or more of the provisions of this By-law, but the non-conformity may
not be further increased.
Dwellings, buildings and structures damaged or destroyed as the result of
natural flooding shall not be reconstructed except in accordance with the
provisions of this By-law.
f)
Building Permit Issued
The provisions of this By-law shall not prevent the use of any existing lot, building
or structure for any purpose prohibited by this By-law for which a building permit
has been issued under the Building Code Act, prior to the day of the passing
of this By-law, so long as the building or structure when erected is used and
continues to be used for the purpose for which it was erected and provided
the permit has not been revoked under the Building Code Act.
4.19
OUTDOOR STORAGE
Where outdoor storage is permitted by this By-law, the following provisions shall be met:
a)
such open storage is accessory to the use of the main building on the lot;
b)
open storage is behind the front or exterior wall of the main building facing any
street, and complies with all yard requirements;
c)
such open storage does not cover more than 15 percent of the lot area; and,
d)
any portion of a lot used for open storage is screened from adjacent uses and
streets adjoining the lot, by a building, planting strip, and/or fence of at least
2.0 metres in height from the ground.
Township of Seguin Zoning By-law
4-15
Section 4 - General Provisions
4.20
OUTDOOR WOODSTOVES
Outdoor wood stoves shall only be permitted on lands within a Rural (RU) zone and
shall be subject to the following regulations:
a)
Outdoor wood stoves shall be restricted to the required rear yard;
b)
Stoves shall be located no closer than 5.0 metres from any property line;
c)
Stoves shall be located no closer than 12.0 metres to any adjacent existing
residential dwelling;
d)
Stoves shall be located no less than 3.0 metres from any building or structure;
and,
e)
Stoves shall have a minimum flue or chimney pipe height of 4.5 metres.
4.21
PERMITTED YARD ENCROACHMENTS
a)
The following structures are permitted to encroach into any required yard:
TABLE 4.2
Column 1
Column 2
Column 3
STRUCTURE
YARDS IN WHICH
PROJECTION IS
PERMITTED
MAXIMUM ENCROACHMENT
FROM MAIN WALL INTO
REQUIRED YARD
Sills, belt courses, cornices,
eaves or canopies, gutters,
chimneys or pilasters
All yards
0.75m
Fire escapes and exterior
staircase
Rear yard
Side yard
0.9m over a maximum width
of 3.0m
Bay windows
Front yard
Rear yard
Exterior side yard
0.75m over a maximum
width of 3.6m
Balconies, decks
Front yard
Rear yard
Exterior side yard
1.8m
1.8m
1.8m
Verandahs, decks, steps,
landings, and open porches
not exceeding 1.2 metres
above finished grade to the
finished floor.
Front yard
Rear yard
3.0m
3.0m
Township of Seguin Zoning By-law
4-16
Section 4 - General Provisions
4.22
PITS, QUARRIES AND PEAT EXTRACTION
The making or establishment of pits or quarries and the extraction of peat is prohibited
within the area covered by this By-law, except in the locations permitted by this By-
law, and in accordance with the express provisions of this By-law. No person shall use
or occupy land or erect any building or structure or conduct any activity on land for
the purpose of processing, washing, screening, sorting or crushing of rock, sand,
gravel, or peat except as expressly provided for in this By-law.
4.23
PUBLIC USES
a)
Public Uses
The provisions of this By-law shall not apply to prohibit the use of any lot or the
erection or use of any building or structure for the purposes of a public use
provided by the Township, or any Public Authority including any Department
or Ministry of the Government of Canada or Ontario and, for the purposes of
this Section, shall include Hydro One Networks Inc., any telephone, telegraph
or cable TV company and any natural gas company, which company
possesses all the necessary powers, rights, licenses and franchises.
Electricity generation facilities and transmission and distribution systems are
permitted in all zones subject to any regulatory requirements for the utility
involved.
b)
Outside Storage
No goods, materials or equipment shall be stored outside the building or
structure located on the lot, except as may otherwise be permitted under this
By-law.
c)
Streets and Utility Installations
Nothing in this By-law shall prevent a public authority from providing or using
land as a street nor prevent the installation of a utility including a water main,
sanitary sewer, storm sewer, gas main, pipeline or overhead or underground
hydro, telephone or other utility supply or communication line.
4.24
REDUCTION OF REQUIREMENTS
No person shall change the purpose for which any land, building or structure is used
or erect any building, or structure, or construct an addition to any existing building or
structure, or sever any lands, if the effect of such action is to cause the original
adjoining, remaining or new building, structure or lot to be in contravention with this
By-law.
Township of Seguin Zoning By-law
4-17
Section 4 - General Provisions
4.25
RESTRICTIONS ON DWELLING UNITS IN NON-RESIDENTIAL BUILDINGS
Notwithstanding any other provision of this By-law to the contrary, no dwelling unit
shall be located within a portion of a non-residential building which has gasoline or
other flammable fluids stored in bulk for commercial purposes.
4.26
SETBACK FROM NATURAL GAS PIPELINE
No permanent buildings, structures or excavations shall be located closer than 7.0
metres from a gas pipeline right-of-way.
4.27
SETBACK FROM RAILWAYS
No habitable building shall be located closer than 30 metres to a main line railway
right-of-way. Refer to "Guidelines For New Development In Proximity To Railway
Operations For Canadian Municipalities" for other applicable requirements and
restrictions.
4.28
SHORELINE STRUCTURES AND FACILITIES
a)
Where an encroachment onto the bed of the waterbody is proposed,
permission to construct or install the in-water and/or shoreline structure or
facility shall only be permitted if approval to occupy the area has been
obtained from or meets the prescriptive requirements of the authority having
jurisdiction. Where a boathouse or boatport is permitted, the owner shall have
acquired the Shoreline Road Allowance, where existing, prior to the
construction of the boathouse or boatport. A Dock is permitted adjacent to an
opened or unopened Shoreline Road Allowance provided the upland lot that
is immediately adjacent to that portion of the Shoreline Road Allowance is
under the same ownership.
b)
No more than 25% or a maximum of 23 metres of the shoreline frontage of a
lot, whichever is less, of any one residentially zoned property shall be occupied
by in-water or shoreline structures and facilities, which includes boardwalks and
catwalks.
c)
All boathouses, docks, boardwalks, catwalks and marine facilities shall have a
minimum setback from the side lot lines as set out in Table 4.3 based on a
straight line projected into the water from the shoreline:
Table 4.3
Lot Frontage (metres)
Minimum Setback (metres)
< 31 m
6.0
31 - 60 m
9.0
>60 - 90 m
12.5
>90 - 120 m
15.0
> 120 m
20.0
Township of Seguin Zoning By-law
4-18
Section 4 - General Provisions
4.28.1
Boathouses and Boatports
a)
Where permitted by this By-law, a maximum of one boathouse or one
boatport shall be permitted per lot.
b)
The width of the boathouse measured parallel to the shoreline shall be
included in the 25% or 23 metre limit on the construction or installation
of in-water structures and facilities along the shoreline frontage of a lot
in accordance Section 4.28 (b).
c)
No portion of the first storey of any boathouse or part thereof shall be
used for human habitation including sleeping, a washroom, a hot tub,
a jacuzzi, a kitchen, cooking facility, or living area.
d)
Where a 1½ storey boathouse is permitted by this By-law, the ½ storey
above the first storey may be used for sleeping accommodation or
living area, but shall not include a kitchen or cooking facilities, and shall
be considered as a sleeping cabin in accordance with this By-law. The
maximum floor area for the ½ storey shall be 60 square metres.
e)
The first 3 metres of a boathouse supporting structure adjacent to the
shoreline shall be an open span
f)
A minimum of 50% of the total length of the boathouse supporting
structure that extends out from the shoreline shall be open span.
g)
The maximum building height for a 1 storey boathouse shall be 5.0
metres with a maximum height of 3.6 metres to the highest main roof
eave. The maximum building height for a 1½ storey boathouse shall be
6.7 metres with a maximum height to the highest main roof eave of 3.6
metres. For the purposes of this Section building height shall be the
distance above the top of the dock/deck boards. A gambrel or
mansard roof shall not be permitted on a boathouse.
h)
A maximum of 50% of each roof plane may be dormer.
i)
A maximum of 25% of the boathouse may be located inland of the
natural shoreline and the boathouse shall be located no further than 15
metres from the shoreline.
j)
Boathouse Regulations
i)
Boathouses shall only be permitted appurtenant to lots on the
following lakes and in accordance with the regulations of Tables
4.3 and 4.4:
- Lake Joseph
- Lake Rosseau
- Little Lake Joseph
- Portage Lake
- Georgian Bay
-
Whitefish Lake
-
Little Whitefish Lake
-
Horseshoe Lake
-
Otter Lake
Township of Seguin Zoning By-law
4-19
Section 4 - General Provisions
ii)
One and one half storey boathouses shall only be permitted
appurtenant to those lots that front onto the following lakes and
in accordance with Tables 4.3 and 4.4:
-
Lake Joseph
-
Lake Rosseau
-
Georgian Bay
-
Little Lake Joseph
-
Portage Lake
TABLE 4.4
Minimum
Lot
Frontage
Boathouse
Prohibited
Maximum Height/Slips
Maximum
Width
(metres)
(4) (5)
Maximum
Length
(metres)
(5)
1 Sty -
2 slips
1 ½ Sty
-
2 slips
1 ½ Sty
- 3 slips
< 60 m
(1)(6)
≥60 - 90 m
(2)
11
11
≥90 - 160 m
11
11
> 160 m
(3)
15.0
11
Notes:
(1) For an island or water access only lot that has a frontage greater than 30 metres
and less than 60 metres, a one storey - one slip boathouse is permitted, having a
maximum width of 6.8 metres and maximum length of 11 metres, and subject to the
other regulations of this By-law.
(2) At least one of the permitted slips shall be a boat port.
(3)Where a third slip is constructed, it shall be a boat port.
(4)A boatport shall be included in maximum boathouse width.
(5)Where an upper-level deck, or eaves or stairs/landings on a boathouse extends
more than 1 metre from boathouse wall, the deck or stairs/landing shall be included
in boathouse width and/or length.
(6) For a lot on a lake listed in Section 4.28.1 j) i) that has a frontage greater than 30
metres and less than 60 metres, 1 boat awning having a maximum area of 24 square
metres shall be permitted. A boat awning shall be permitted on a dock that is
located within the Environmental Protection (EP) Zone. Boat awnings shall not be
included in lot coverage or shoreline width calculations, but shall comply with all
other applicable shoreline accessory structure requirements of Zoning By-law 2006-
125.
(7) A Boathouse or Boatport shall contain the corresponding number of Boat Slips
as permitted in Table 4.4.
k)
All cupolas or other ornamental roof structures shall have dimensions of
a maximum 1.0 metres width by 1.0 metres length and a maximum 1.2
metres height.
l)
Where the by-law permits a boathouse a boatport shall be permitted in
lieu of a boathouse subject to the same regulations.
Township of Seguin Zoning By-law
4-20
Section 4 - General Provisions
4.28.2
Docks and Boat Lifts
a)
The width of all docks, excluding submersible boat lifts, measured
parallel to the shoreline shall be included in the 25% or 23 metre limit on
the construction or installation of in-water structures or facilities along
the shoreline frontage of a lot in accordance with Section 4.28 (b).
b)
The first 3 metres of a dock's supporting structures adjacent to the
shoreline shall be an open span unless approval from the authorities
having jurisdiction is provided.
c)
A minimum of 50% of the total length of a dock's supporting structure,
including any attached finger docks, shall be one or more open spans.
d)
The maximum length of a dock shall be 15 metres extending into the
waterbody. For lots on Georgian Bay, the maximum length shall be 20
metres.
e)
The maximum combined surface area of all docks, including any
attached fingers, and open decks above the water shall be 112 square
metres. On those lakes listed in Section 4.28.1 j) i) of this By-law where a
boathouse is a permitted structure, the maximum combined surface
area of all docks, including any attached fingers and open decks
above the water shall be 168 square metres. The dock area contained
within a boathouse or boatport shall not be included within the
maximum combined surface area of docks.
f)
Standalone gazebos, pergolas, canopies or other like or similar
structures shall not be permitted on a dock, boathouse or boatport.
g)
Boat lifts shall be located within or adjacent to the permitted dock
and/or boathouse.
h)
The maximum height of a dock above the normal or controlled water
level shall be 0.6 metres.
4.28.3
Boat Launching Ramps & Marine Railways
Boat launches and marine railways shall be included in the 25% or 23 metre
limit on the construction or installation of in-water structures or facilities along
the shoreline frontage of a lot in accordance with Section 4.28 (b)
4.28.4
Reserved
4.28.5
Structures and Facilities in Narrow Waterways
a)
No dock shall be permitted in a waterway less than 31 metres in width.
b)
No boathouse or boatport shall be permitted in a waterway less than 61
metres in width.
Township of Seguin Zoning By-law
4-21
Section 4 - General Provisions
c)
In a waterway equal to or greater than 31 metres but less than 61 metres
in width, a dock 3.1 metres in length may be constructed parallel to the
shoreline in accordance with the provisions of Section 4.28 (a), (b), (c).
4.28.6
Structures and Facilities in Environmental Protection (EP) Zones
The construction or installation of in-water shoreline structures and facilities shall
not be permitted in an Environmental Protection (EP) Zone except where the
structure meets the requirements of the Department of Fisheries and Oceans
or the requirements of other authorities having jurisdiction.
4.29
SIGHT TRIANGLES
On a corner lot, within the triangular space formed by the street lines and a line drawn
from a point in one street line to a point in the other street line, each point being as
specified below, no vehicle shall be parked and no structure or fence in excess of 1.0
metre in height shall be erected and no land shall be used for the growing of shrubs
or trees in excess of 1.0 metre in height. The triangular space is hereafter defined as
a sight triangle.
Minimum sight triangles:
Residential Zones
6.0 metres
Commercial Zones
8.0 metres
Rural and Agricultural Zones
10.0 metres
Adjacent to Provincial Highways
or Railways
30 metres
4.30
SIGNS
The provisions of this By-law shall not apply to prevent the erection, alteration or use
of any sign provided such sign complies with the Sign By-law(s) of the Township.
4.31
TEMPORARY ACCOMMODATION
Notwithstanding any other provision of this By-law to the contrary, where a Building
Permit for construction of a dwelling has been issued by the Township for the subject
lands, the residents may occupy a travel trailer with confirmation of method of
sewage disposal on a temporary basis but only during the period which the dwelling
is being constructed to a maximum of eighteen months.
4.32
THROUGH LOTS
Where a lot, which is not a corner lot, has lot frontage on more than one street, the
setback and front yard requirements contained herein shall apply on each street in
accordance with the provisions of this By-law.
Township of Seguin Zoning By-law
4-22
Section 4 - General Provisions
4.33
TRAILER PARK AND PRIVATE RECREATIONAL USES
Unless specifically permitted by this By-law, the establishment of trailer parks, mobile
home parks, summer camps, private clubs, commercial clubs, camping
establishments or private recreational parks shall be prohibited within the area
covered by this By-law.
4.34
RECREATIONAL VEHICLES AND TRAILERS
The parking and storage or use of recreational vehicles, motor homes, truck campers,
tent trailers, and travel trailers shall be prohibited in all Zones, except where otherwise
permitted. This by-law shall not prevent the parking or storage of a recreational vehicle,
motor home, truck camper, tent trailer, or travel trailer, where such parking or storage is
a permitted use.
This by-law shall not prevent the parking or storage of a maximum of two of the following:
recreational vehicles, motor homes, truck campers, tent trailers, or travel trailers, where
such parking or storage is accessory to a dwelling located on a Residential or Rural zoned
lot. Human habitation within a stored recreational vehicle, motor home, truck camper,
tent trailer or travel trailer is prohibited.
4.35
MODEL HOMES AND TEMPORARY SALES STRUCTURE
Model homes and a temporary sales structure shall be permitted subject to all of the
following:
a)
The lands on which the model homes are to be constructed have received
draft plan approval under the provisions of the Planning Act, as may be
amended from time to time.
b)
The lands are zoned to permit detached, semi-detached and/or street
townhouse dwellings.
c)
The location of the model homes shall comply with the provisions of this By-law
and the expected registered plan of subdivision.
d)
Up to 10% of the draft approved lots shall be permitted for model homes, up
to a maximum of four (4) model homes, shall be permitted on lands with draft
plan approval and a Model Home and a Pre-Servicing or similar agreement
has been executed with the Township.
e)
One (1) temporary sales structure may be located on lands which are the
subject of a draft approved plan of subdivision or condominium in any
Residential, Commercial or Industrial Zone provided that:
Township of Seguin Zoning By-law
4-23
Section 4 - General Provisions
i)
the temporary sales structure is located in accordance with the zone
provisions for the zone in which it is located;
ii)
a Temporary Sales Structure or similar Agreement has been executed with
the Town; and,
iii)
a minimum of 1 parking space shall be provided for each 20m2 of net floor
area of the sales structure.
4.36
NARROW WATERBODIES
Narrow waterbodies are areas on a river where the distance from shoreline to
shoreline is less than 50 metres or areas on a lake where the distance from shoreline
to shoreline is less than 150 metres. Narrow waterbodies are generally identified on
Schedule C of the Official Plan. Table 6.2 of this By-law identifies minimum lot
frontages and minimum lot areas for new lot creation on narrow waterbodies.
4.37
STORAGE CONTAINERS
Storage containers shall only be permitted within the following zones:
-
Rural (RU)
-
Rural Industrial (RI)
-
Rural Commercial (RC)
-
Highway Commercial (C3)
-
General Industrial (M2)
-
Light Industrial (M3)
-
Village Light Industrial (M1)
-
Aggregate Pit (MP)
-
Aggregate Pit and Quarry
(MQ)
-
Airport (AR)
-
Airport Industrial (AR1)
4.37.1 Storage Containers - Residential Properties
Storage Containers are permitted within the following Residential Zones:
- Rural Residential (RR)
- Village Residential One Zone (R1)
- Shoreline Residential Zones (SR1, SR2, SR3, SR4, SR5, SR6 and LSR)
Notwithstanding the provisions of this By-law, storage containers shall adhere to the
provisions of Section 4.1 and shall be used exclusively for the storage of goods and
materials, and may not be used to accommodate work areas, shops, office uses or
retail sales. Storage containers shall not be permitted within the front yard, or
between the exterior front wall of the primary structure and the front lot line, or the
exterior side yard.
Storage containers permitted in a Residential Zone per this provision shall be limited
to an area of 30 square metre
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-1
SECTION 5
PARKING AND LOADING STANDARDS
5.1
APPLICABILITY OF THIS SECTION
a)
The parking, loading and delivery space requirements of this section of the
By-law shall not apply to any building in existence at the date of passing of
this By-law so long as the floor area, as it existed at such date, is not increased
nor the building or structure is used for a purpose that requires more parking
spaces.
b)
If an addition is made to the building that increases the floor area, additional
parking and loading spaces shall be provided for the additional floor area
only as required by the regulations of this By-law.
c)
If the use of a building changes, the parking requirements of this By-law shall
be met.
5.2
PARKING
5.2.1
Restriction On Use Of Land, Buildings And Structures
No person shall use any land, building or structure in any Zone for any purpose
permitted by this By-law, unless parking spaces are provided in accordance
with the provisions of this Section of the By-law.
5.2.2
Residential Parking Requirements
The number of parking spaces required for residential uses shall be calculated
in accordance with the standards set out in Table 5.1:
TABLE 5.1
Column 1
Column 2
Type or Nature of Use
Minimum Off-Street Parking Requirements
Detached Dwelling
Semi Detached Dwelling
Duplex Dwelling
Linked Dwelling
2 parking spaces per dwelling unit.
Townhouse Dwelling
2 parking spaces per dwelling unit plus 0.25 spaces
per unit for visitors on a lot with four or more dwelling
units
Apartment Building
1.5 parking spaces per dwelling unit plus 0.25 parking
spaces for visitor parking in a designated visitor
parking area.
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-2
Column 1
Column 2
Type or Nature of Use
Minimum Off-Street Parking Requirements
Accessory Dwelling Unit
1 parking space per each 70m2 or portion thereof to a
maximum of 2 parking spaces
Group Home
1 parking space for every staff member in addition to
the required parking for the dwelling
Home Occupation
Parking spaces in addition to the required parking for
the residential use shall be provided in accordance
with the following:
0-10m2 floor area- no additional parking
spaces
>10m2 floor area- 1 parking space
Private Home Day Care
No requirement
5.2.3
Non-Residential Parking Requirements
The number of parking spaces required for non-residential uses shall be
calculated in accordance with the standards set out in Table 5.2:
TABLE 5.2
Column 1
Column 2
Type or Nature of Use
Minimum Off-Street Parking Requirements
Adult Day Centres And
Day Nurseries
1.5 parking spaces per staff member plus 1 parking
space per 30 m2 of net floor area
Museums
1 parking space per 100 m2 of net floor area where no
retail; 1 per 60 m2 where retail component.
Business Offices
1 parking space per 30 m2 of net floor area
Commercial
Fitness
Centres, Private Clubs
1 parking space per 15 m2 of net floor area
Financial Institutions
1 parking space per 25 m2 of net floor area
Funeral Homes
1 parking space per 20 m2 of net floor area.
Golf Courses
12 parking spaces per hole
Hospitals
1.5 parking spaces per bed
Hotels,
Motels,
Tourist
Cabins
1 parking space per guest room or cabin, plus 1 parking
space per 10 m2 of net floor area devoted to meeting,
dining and banquet facilities, plus 0.25 spaces per
guest room or cabin for visitor spaces.
Industrial Uses
a) If associated office and retail net floor areas are 15%
or less of the total net floor area:
Up to 5000 m2 - 1 parking space per 60 m2 net floor
area
5000 to 10,000 m2 - 83 parking spaces, plus 1 parking
space per 90 m2 of net floor area over 5000 m2
Over 10,000 m2 - 139 parking spaces, plus 1 parking
space per 170 m2 of net floor area over 10,000 m2
b) If associated office and retail net floor areas are
more than 15% of the total net floor area:
In addition to the standards contained above in (a),
the applicable net floor areas exceeding 15% shall
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-3
Column 1
Column 2
Type or Nature of Use
Minimum Off-Street Parking Requirements
be subject to the applicable office or retail parking
requirements.
Laundry or Dry Cleaning
Depots or Laundromats
1 parking space per 20 m2 of net floor area
Long Term Care Facilities
0.5 parking spaces per bed
Clinic
and
Veterinary
Hospital
1 parking space per 16.5 m2 net floor area
Motor
Vehicle
Body
Shops,
Motor
Vehicle
Repair Facilities, Motor
Vehicle Service Stations
3 parking spaces per service bay plus 1 parking space
per 20 m2 of net floor area for the office and any retail
use.
Motor Vehicle Gas Bars
1 space per 20 sq.m. net floor area exclusive of fuel
dispensing spaces
Motor
Vehicle
Rental,
Motor
Vehicle
Sales
(New
and
Used)
Establishments
1 space per 20 sq.m. net floor area exclusive of display
and storage parking
Park, Passive
5 spaces per hectare
Place of Assembly, Place
of Entertainment
the greater of 1 parking space per 6 seats capacity or
1 parking space per 10 m2 of net floor area whichever
is greater
Places of Worship
1 parking space per 6 persons design capacity of the
worship area capacity or 1 parking space for 10 m2 of
net floor area of the worship areas and any accessory
use areas, excluding residential uses.
Public Self-Storage
Warehouses
1 parking space per 30 m2 of net floor area within the
office; plus 1 parking space per 100 m2 of net floor area
of the building.
Recreational Uses
30 parking spaces per baseball field
30 parking spaces per soccer field
4 parking spaces per tennis court
Restaurants, Banquet
Halls
1 parking space per 15 m2 of net floor area
Retail Stores, Service
and Repair Shops,
Personal Service Shops,
Factory Outlets, Grocery
Stores, Supermarkets,
Merchandise Service
Shops, Video
Outlet/Rental Stores,
1 parking space per 20 m2 of net floor area
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-4
Column 1
Column 2
Type or Nature of Use
Minimum Off-Street Parking Requirements
Light Equipment Rental
Establishment
Schools
Elementary - 1 space per 100 m2 of gross floor area and
1 space per portable
Secondary - 1.5 spaces per 100 m2 of gross floor area
and 1 space per portable
Sports Arena
1 space per 6 seats of design capacity
Training Facility
1 parking space per 30 m2 of net floor area.
Warehouses,
Transportation Depots
a) If associated office or retail net floor areas are 15%
or less of the total net floor area:
Up to 7,000 m2 - 1 parking space per 90 m2 net floor
area or portion thereof
7,000 to 20,000 m2 - 78 parking spaces, plus 1 parking
space per 145 m2 of net floor area over 7000 m2
Over 20,000 m2 - 168 parking spaces, plus 1 parking
space per 170 m2 of net floor area over 20,000 m2
b) If associated office or retail net floor areas are more
than 15% of the total net floor area:
In addition to the standards contained above in (a),
the applicable net floor areas exceeding 15% shall
be subject to the applicable office or retail parking
requirements.
Warehouse, Retail
1 space per 30 m2 net floor area
Warehouse, Wholesale
1 space per 80 m2 net floor area
Uses permitted by this
By-law other than those
listed in this Table
1 parking space per 45 m2 of total floor area
5.2.4
Calculation Of Parking and Loading Requirements
Where the minimum number of parking and loading spaces is calculated on
the basis of a rate or ratio, the required number of spaces shall be rounded
to the next higher whole number.
5.2.5
More Than One Use On A Lot
The parking requirements for more than one use on a single lot or for a
building containing more than one use, shall be the sum total of the parking
requirements for each of the component uses, unless otherwise noted.
5.2.6
Barrier-Free Parking
Barrier-free parking spaces shall be provided in accordance with the
following table:
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-5
TABLE 5.3
Column 1
Column 2
Number of Parking Spaces in
Parking Lot
Number of Barrier Free Parking
Spaces
1 to 19
1
20 to 100
2 minimum
For each additional 100 or part
thereof
1
The number of barrier free parking spaces which must be provided in a
parking lot appurtenant to a Clinic shall be calculated in accordance with
the following table:
TABLE 5.4
Column 1
Column 2
Number of Parking Spaces in
Parking Lot
Number of Barrier Free Parking
Spaces
1 to 9
1
10 to 30
2 minimum
31 to 60
3 minimum
61 to 100
4 minimum
For each additional 30 or part
thereof
1 minimum to a maximum of 12
5.2.7
Exclusive Use Of A Parking or Loading Space
Any required parking or loading space shall be unobstructed and available
for parking purposes and used exclusively for that purpose at all times, unless
otherwise specified in this By-law.
5.2.8
Location Of Required Parking and Loading Spaces - C1 Zone
Required parking and loading spaces shall be located on the same lot as the
use that requires the parking. Notwithstanding the above, required parking
spaces for any use within the C1 Zone may be located on another lot within
150 metres of the lot on which parking would be required for a use, provided
the off-site parking is located on a lot in any Commercial Zone and subject
to the applicant/proponent executing an Off-site Parking Agreement with
the Township.
5.2.9
Cash-In Lieu Of Parking
Parking spaces required by Subsections 5.2.2 and 5.2.3 of this By-law shall not
be required subject to the owner/proponent obtaining Minor Variance
approval for the parking space deficiency and executing an Agreement with
the Township respecting the payment of cash-in-lieu for some or all of the
parking required in accordance this By-law.
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-6
5.2.10
Parking Required For Outdoor Patios
Parking spaces are not required for any outdoor patio that occupies less than
40% of the net floor area of the restaurant it serves. The required restaurant
parking shall apply to any patio area over 40%.
5.2.11
Location Of Parking On A Lot Used For Residential Purposes
The parking of motor vehicles associated with a residential use is only
permitted within a parking garage, surface parking area, private garage,
carport, or on a driveway accessing an individual dwelling unit.
5.2.12
Size Of Parking Spaces
a)
Where parking spaces are provided in a surface parking area, each
parking space shall have a width of not less than 2.75 metres and a
length of not less than 6.0 metres, with the exception of a barrier-free
parking space which shall have a width of not less than 3.7 metres and
a length of not less than 6.0 metres.
b)
Where parking spaces are provided in an enclosed or underground
parking garage, such parking spaces shall have a width of not less
than 2.6 metres and a length of not less than 5.8 metres.
c)
Where parking spaces are provided to serve water access lots, such
parking shall not be permitted within 20.0 metres of the high water
mark or within 6.0 metres of any lot line.
5.2.13
Width Of Aisles
The minimum width of an aisle providing access to a parking space within a
parking area shall be 6.0 metres, except in the case of angled off-street
parking accessed by a one-way aisle, which shall be a minimum width of 4.5
metres.
5.2.14
Width Of Access Ramps And Driveways
Access ramps and driveways accessing a parking area or parking lot shall be
a minimum of 3.0 metres in width for one-way traffic and a minimum of 6.0
metres in width for two-way traffic. For a Commercial, Industrial, Institutional
or Municipal Parking Lot, a minimum of 9.0 metres in width shall be provided.
5.2.15
Width Of Driveways Accessing Individual Residential Dwellings
i.
The maximum driveway width shall be the lesser of 8.0 metres or 50%
of the lot frontage
5.2.16
Surface Treatment
All required parking spaces and parking areas and all driveways to any
parking area or parking lot shall be maintained with a stable surface which is
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-7
treated with asphalt, concrete, concrete pavers, gravel or similar material
which is treated so as to prevent the raising of dust or loose particles.
5.2.17
Parking Garages
Parking garages shall comply with the Zone provisions for the main building
for the Zone in which it is located in accordance with this By-law. No setbacks
or yards shall be required for any portion of a parking garage if it is
constructed completely below the established grade. This exemption shall
also apply to ventilation shafts and housings, stairways and other similar
facilities associated with below grade parking garages that extend from
below established grade.
5.2.18
Parking Area Location On A Non-Residential Lot
Notwithstanding any other provisions of this By-law, parking areas shall be
setback a minimum of 1.5 metres from any building or structure.
5.2.19
Illumination
Where parking areas are illuminated, the lighting fixtures shall be provided in
accordance with the following provisions:
a)
No part of the lighting fixture shall be more than 9.0 metres above
grade; and,
b)
They shall be installed in such a manner that all light emitted by the
fixture, either directly from the lamp or a diffusing element, or indirectly
by reflection or refraction from any part of the fixture is projected below
the lamp and onto the lot the lighting is intended to serve.
5.2.20
Queuing Lane Requirements
Where drive-through service facilities are permitted, queuing lanes are
required and shall be exclusive of any other parking space and aisle
requirements contained within this By-law and shall be provided in
accordance with the provisions of this section.
5.2.20.1
Queuing Space Requirements
The minimum queuing space requirements within a designated queuing lane
shall be as set out in Table 5.5. In addition, one space shall be provided for
each point of service delivery.
TABLE 5.5
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-8
Column 1
Column 2
Column 3
Use Associated with
Drive-Through
Service Facility
Minimum
Required Ingress
Spaces
Minimum
Required Egress
Spaces
Financial Institution
3
1
Restaurant
10
2
Motor vehicle
service station or
Gas Bar
3
1
Motor vehicle
washing
establishment
2 per bay
2
All Other Uses
3
1
5.2.20.2
Location of Ingress and Egress Spaces
Required ingress spaces shall be located before the first point of contact and
required egress spaces shall be located after the final point of contact.
5.2.20.3
Length of Queuing lane
The length of the queuing lane associated with the drive-through service
facility shall be the total number of required ingress spaces and egress
spaces, plus one space for each point of service delivery and shall not form
part of the required parking spaces or aisles.
5.2.20.4
Multiple Queuing Lane Requirements
Where multiple queuing lanes are required on a lot, the queuing space
requirements shall be provided for each individual queuing lane in
compliance with the provisions of Section 5.2.20.1.
5.2.20.5
Size of Queuing Space
All queuing spaces shall be rectangular in shape, with a minimum length of
6.0 metres and a minimum width of 2.75 metres.
5.2.20.6
Setbacks for Order Boxes and Queuing Lanes
Queuing lanes and all order boxes using voice communication to order shall
be located no closer than 30 metres from any street line or any Residential
Zone.
5.2.20.7
Delineation Of Queuing Lane Requirements
Queuing lanes shall be unobstructed and shall be clearly delineated by
pavement markings or physical barriers, and shall be independent of the
balance of the parking area.
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-9
5.3
PARKING AREA LOCATION ON A LOT
Parking areas will be permitted in any required yard in accordance with the
following provisions:
TABLE 5.6
Column 1
Column 2
Zone
Yard in Which Required Parking Permitted
R1 and R2
All yards. For corner lots, no part of any parking spaces,
shall be located closer than 6.0 metres, measured from
the point of intersection of the two street lines.
SR1, SR2, SR3, SR4,
SR5, SR6, LSR
All yards except the front yard provided that no part of
any parking area, other than the ingress and egress points
used for access from the street, is located closer than 7.5
metres to any street line and no closer than 6.0 metres to
any other lot line.
Commercial,
Institutional, and
Industrial Zones
including AR and AR1
All yards provided that no part of any parking area, other
than the ingress or egress points, is located closer than 1.0
metres to any street line and no closer than 1.5 metres to
any other lot line and provided that no part of any
parking area is located in a minimum planting strip
adjacent to a street line as required by this By-law.
Rural Zones
All yards provided that no part of any parking area, other
than the ingress and egress points used for access from
the street, is located closer than 7.5 metres to any street
line and no closer than 5.0 metres to any other lot line.
5.4
VEHICLE STORAGE AND DISPLAY
Where a permitted use involves the storage and/or display of operational
motor vehicles, such as a motor vehicle dealership, such storage and/or
display shall be subject to the same provisions that would apply to any parking
area required by this By-law.
5.5 LOADING SPACE REQUIREMENTS
5.5.1
Off-Street Loading Spaces
Off-street loading spaces shall be provided in accordance with the standards
of this By-law for any use. Required loading spaces shall be located on the
same lot as the use that requires the loading space and shall be provided as
follows:
TABLE 5.7
Township of Seguin Zoning By-law
Section 5 - Parking & Loading Provisions
5-10
Column 1
Column 2
Gross Floor Area
Loading Space Requirements
370 m2 or less
0 loading spaces
371 m2 to 2,325 m2
1 loading space
2326 m2 or greater
2 loading spaces
5.5.2
Size Of Loading Space / Loading Area
Each loading space shall be a minimum of 12 metres long, 3.5 metres wide and
have a vertical clearance of at least 4.2 metres, except where only 1 loading
space is required the loading space may be reduced to a minimum of 6.0
metres long, 3.5 metres wide and have a vertical clearance of at least 3.0
metres.
5.5.3
Location Of Loading Spaces
a)
Required Loading spaces shall be provided on the same lot for the use
or building for which it is required, and the loading space(s) shall be
located within 20 metres of the use or building for which is it required;
and,
b)
Such loading space is not located in a required yard.
c)
Required loading spaces shall not be provided within a building.
d)
Loading spaces shall not obstruct any required parking spaces or
vehicular movement on the lot.
e)
In all Zones, with the exception of the M2 Zone, loading spaces are not
permitted in the front yard or exterior side yard and loading bay doors
are not permitted on any wall facing a street unless there is a planting
strip between the door and the street and the loading space and
loading bay door are located no closer than 20 metres from any street
line.
5.5.4
Access To Loading Spaces
Where a loading space(s) is required, the access to the loading space(s) shall
be provided by means of a driveway that is a minimum of 6.0 metres wide in
the Employment Zones and Institutional Zones and a minimum of 3.5 metres
wide in a Commercial Zone.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-1
SECTION 6
RESIDENTIAL ZONES
6.1
GENERAL PROHIBITION
No person shall, within any Residential Zone, use any land, or erect, alter or use any
building or structure except in accordance with the following provisions.
6.2
PERMITTED USES
Uses permitted in a Zone are noted by the symbol '✓' in the column applicable to
that Zone and corresponding with the row for a specific permitted use in Table 6.1. A
number(s) following the symbol '✓' , zone heading or identified permitted use,
indicates that one or more conditions apply to the use noted or, in some cases, to the
entire Zone. Special Conditions are listed in the Footnotes below the Permitted Use
Table, Table 6.1.
The Residential Zones Established by this By-law are as follows:
R1
Village Residential One
R2
Village Residential Two
SR1
Shoreline Residential One
SR2
Shoreline Residential Two
SR3
Shoreline Residential Three
SR4
Shoreline Residential Four
SR5
Shoreline Residential Five
SR6
Shoreline Residential Six
LSR
Limited Service Residential
Table 6.1
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Column 7
Column 8
Column 9
Column 10
ZONES
USE
R1
R2
SR1
SR2
SR3
SR4
SR5
SR6
LSR
Cottage
Dwelling Unit,
Secondary
Detached Dwelling
Duplex Dwelling
Group Home Type 1
Group Home Type 2
Home Occupation
Semi-detached
Dwelling
Townhouse
Footnotes for Table 6.1
Space Reserved
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-2
6.3
ZONE REQUIREMENTS
No person shall within any Residential Zone use any lot or erect, alter, use any building
or structure except in accordance with the following zone provisions. A number(s)
following the zone requirement, zone heading or description of the standard,
indicates an additional Zone requirement. These additional standards are listed in the
Footnotes at the end of each table.
TABLE 6.2
Column 1
Column
2
Column
3
Column
4
Column
5
Column
6
Column
7
Column
8
Column
9
ZONES
ZONE
REQUIREMENTS
R1
R2
SR1
SR2
SR3
SR4
SR5
SR6 &
LSR
Lot Area (Minimum)
1.0 ha
1.0 ha (3)
1.0 ha
1.0 ha
1.2 ha (4)
2.0 ha
2.0 ha
Existing
Lot Frontage
(Minimum):
60 m
60 m (3)
90 m
60 m
120 m (4)
150 m
200 m
Existing
Lot Coverage
(Maximum)
30%
30%
(1)(2)
(1)(2)
(1)(2)
(1)(2)
(1)(2)
(1)(2)
Required Yards:
Front Yard
(Minimum)
8 m
8 m
20 m
20 m
20 m
20 m
20 m
20 m
Exterior Side Yard
4.5 m
4.5 m
10 m
10 m
10 m
10 m
10 m
10 m
Rear Yard
8 m
8 m
10 m
10 m
10 m
10 m
10 m
10 m
Interior Side
Setback
(Minimum)
3 m
3 m (3)
5 m
5 m
5 m
5 m
5 m
5 m
Building Height
(Maximum)
10 m
10 m
10 m
10 m
10 m
10 m
10 m
10 m
Shoreline Buffer Area
(Minimum) front yard
90%
90%
90%
90%
90%
90%
90%
90%
Footnotes For Table 6.2
(1) Where buildings or structures are located wholly or partially within 60.0 metres of the shoreline
in the SR1, SR2, SR3, SR4, SR5, SR6, and LSR Zones, the maximum lot coverage, including any shore
road allowance within the straight line projection of the side lot line to the shoreline, shall be based
on the area of land within 60.0 metres of the shoreline and conform to Table 6.3.
Where buildings and structures are located more than 60.0 metres from the shoreline, the
permitted coverage for those buildings and structures shall be calculated based on the total lot
area, including any shore road allowance within the straight line projection of the side lot line to
the shoreline.
TABLE 6.3
Column 1
Column 2
Column 3
LOT FRONTAGE
MAXIMUM LOT
COVERAGE %
MAXIMUM DWELLING
GROSS FLOOR AREA
less than or equal to 30 m
10
1.25 times Column 2
>30 m to <60 m
8
1.25 times Column 2
61 m to 70 m
7.5
1.25 times Column 2
71 m to 80 m
7.25
1.25 times Column 2
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-3
81 m to 90 m
7
1.25 times Column 2
91 m to 100 m
6.75
1.25 times Column 2
101 m to 110 m
6.5
1.25 times Column 2
111 m to 120 m
6.25
1.25 times Column 2
121 m to 130 m
6
1.25 times Column 2
131 m to 140 m
5.75
1.25 times Column 2
141 m to 150 m
5.5
1.25 times Column 2
151 m to 160 m
5.25
1.25 times Column 2
>160 m
5
1.25 times Column 2
(2) Maximum dwelling size for the SR1, SR2, SR3, SR4, SR5, SR6 and LSR Zones shall be as
follows:
Maximum Gross Floor Area
700 sq. m.
(3) Zone Requirements for multi-unit dwellings in R2 Zone:
3.1 Notwithstanding the Zone requirements for the R2 Zone in Table 6.2 to the
contrary, the following requirements shall apply to semi-detached dwellings:
i)
Minimum Lot Area -
0.5 ha/unit
ii)
Minimum Lot Frontage -
30 m/unit
iii)
Minimum Interior Side Yard
- with attached wall -
Nil
3.2 Notwithstanding the zone requirements for the R2 Zone in Table 6.2 to the
contrary, the following requirements shall apply to townhouse dwelling units:
i)
Minimum Lot Area -
0.2 ha./unit
ii)
Minimum Lot Frontage -
12 m/unit
iii)
Minimum Interior Side Yard
- with attached wall -
Nil
iv)
Maximum number of units per lot -
5
(4) The minimum lot frontage and area for a new lot fronting on a narrow waterbody shall
be in accordance with the requirements of the Shoreline Residential Three (SR3) Zone.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-4
6.4
RESIDENTIAL ZONES - EXCEPTIONS
The provisions of this Section are modified as set out in Table 6.4 below.
-
Column 1 sets out the exception number of each zone exception which corresponds to an area of the Township
identified on the Zoning Schedules by the same number and zone, preceded by a dash and the, denoting an
exception. (i.e. SR-88)
-
Column 2 sets out the additional uses permitted in the zone exception, if applicable.
-
Column 3 sets out the uses permitted in the zone exception, if applicable.
-
Column 4 sets out the prohibited uses in the zone exception, if applicable.
-
Column 5 sets out the zone requirements for the zone exception, if applicable.
-
Column 6 sets out any additional provisions for the zone, if applicable.
All other provisions of the zone, unless specifically modified or amended by this Section, continue to apply to the lands
subject to this Section.
Table 6.4
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-1
Retail store
LSR-2
- Minimum lot frontage - 70.0 m
- Maximum lot frontage used for recreational
buildings or structures - 10.0 m
LSR-3
- Minimum lot frontage - 70.0 m
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-5
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR6-4
Sleep
cabin
SR6-5
Sleep
cabin
Commerci
al Studio
LSR-6
- Maximum gross floor area for each detached
dwelling - 464.5 sq.m
LSR-7
Amended
by By-Law
2010-056
- Minimum required front yard 12.8 m;
- Maximum gross floor area for a dwelling at the
12.8 m front yard 117 sq. m.
- Maximum gross floor area for a sleeping cabin -
29 sq. m.
- Minimum Side yard for a sleeping cabin 1.87m
LSR-8
- Minimum required front yard - 5.0 m
- Maximum cumulative width of shoreline
structures - 47.0 m
- Maximum length of a boathouse - 11.6 m
A boatport is
permitted to be
located in its existing
location only.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-6
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-9
- Minimum front yard: Lot 2 - 35.0 m
- Minimum Vegetative Buffer:
Lot 1 and 3 - 15.0 m
Lot 2 - 30.0 m
- Minimum setback for sewage system - 45.0 m
- Maximum dwelling ground floor area - 418.0
sq.m
- Maximum dwelling gross floor area - 750.0 sq.m
SR1-10
(By-law
2006-157)
(Amended
by By-law
2007-063)
- Minimum required front yard -
- 12.67 metres
- Minimum required front yard for an attached
deck - 9.0 metres
- Notwithstanding Section 6.3, Table 6.3 Maximum
Lot Coverage, a replacement dwelling for the
existing dwelling shall be permitted having a
maximum ground floor area of 170 square
metres and a new detached garage having a
maximum floor area of 53.6 square metres.
- Minimum Rear Yard - 7.3 metres
- (amended under 2007-063)
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-7
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-11
(By-law
2007-062
- Minimum required front yard - 30.0 m
- Minimum shoreline setback for a leaching bed -
90.0 m
- Only a dock, boathouse or pumphouse may
locate within the minimum front yard.
- The minimum front yard in Part 1, Plan 42R-17884
shall constitute a shoreline buffer area and shall
be used for no other purpose except:
o
A pumphouse not greater than 1.0 sq. m
o
A dock
o
A pathway not more than 2.0 m in width for
access to the shoreline
o
A pathway along the shoreline
A building existing as
of January 25th, 2003
is permitted to
expand, provided
that its setback from
the shoreline is not
reduced.
A leaching bed
existing as of January
25, 2003 is permitted
to be reconstructed
in its present location
or relocated within
the lot in which it is
located, provided
that its setback from
the shoreline is not
reduced.
LSR-12
(By-law
2007-039)
(By-law
2009-121
removed
Hold)
- Minimum required frontage 120 m
- Minimum required area 1.2 ha
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-8
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-13
(By-law
2007-028)
To allow for the replacement of the existing garage
in its current location as per registered survey 42R
6091, with the following dimensions:
Building
Garage
Ground Floor Area (m2)
63m2
Gross Floor Area (m2)
94m2
# of Stories
1.5
Length (m)
7.3m
Width(m)
9.0m
Height (m)
4.5m
East side yard
2.0m
SR1-14
(By-law
2007-034)
- Minimum front yard setback for an accessory
building- 12 m
- Maximum Lot Coverage for a lot having a
frontage of > 30 m to <60m frontage - 11%
LSR-15
(By-law
2007-036)
- Minimum front yard - 35 m
- Minimum Lot Frontage - 120 m
- Minimum Lot Area - 0.95 hectares
- No boathouses
shall be permitted
on the north shore of
Emerald Island
- All new dwellings
shall front on and be
oriented to the south
shoreline of Emerald
Island
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-9
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-16
(By-law
2007-038)
- Minimum front yard setback - 30 m
- Minimum Lot Frontage - 90 m
- Minimum Lot Area - 0.79 hectares
SRI-17
(By-law
2007-041)
- Minimum front yard setback for a cottage - 16.3
m
- Minimum front yard setback for a deck - 13.3 m
- Minimum side yard setback for a garage - 3.5 m
- Minimum rear yard setback for a garage - 9 m
- Minimum front yard setback for a sleeping cabin
- 10 m from north and south shorelines
SR1-18
(By-law
2007-062)
- Minimum lot frontage - 70 m
- Minimum lot area - .5 ha
SR1-19
(By-law
2007-062)
- Agriculture
- Equipment
Storage Building
- Livestock Facility
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-10
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-20
(By-law
2007-062)
- Maximum cumulative width of docks and/or
boathouses - 34.2%
- Maximum cumulative width of docks and/or
boathouses - 14.0 m
- Minimum required front yard setback for main
building - 12.4 m
- Minimum front yard setback for open deck - 5.2
m
- Minimum side yard setback from main building
to east side yard - 2.84 m
- Maximum lot coverage - 11%
- Maximum projection of an open deck from main
dwelling - 9 m
- Maximum projection into required front yard for
stairs connecting to an open deck - 12.0 m
LSR-21
(By-law
2007-036)
- Minimum front yard - 35 m within 30 m of side
yard
- Minimum front yard - greater than 30 m from
side yard - 25 m
- Minimum Lot Frontage - 120 m
- Minimum Lot Area - 0.95 ha
- No boathouses
shall be permitted
on the north shore
of Emerald Island
- All new dwellings
shall front on and
be oriented to the
south shoreline of
Emerald Island
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-11
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-22
(By-law
2007-086
Amended
by
2008-064)
- Maximum Lot Coverage within 60m of shoreline
- 7.3%
- Maximum Lot Coverage - 5%
- Maximum Dwelling Gross Floor Area - 747 square
metres
- Maximum Boathouse
- Height (Roof Ridge) - 7.8 metres
- Maximum Combined Surface area of docks and
boat
- lift - 227 sq.m.
Notwithstanding the
Maximum Lot
Coverage within 60
m standard in
Column 5, no
additional buildings
or structures that
would increase
coverage within 60m
of shoreline shall be
permitted
LSR-23
(By-law
2007-086)
- Maximum Lot Coverage within 60m of shoreline
- 8%
- Permitted Boathouse - 1 ½ storey, maximum 2
slips.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-12
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-24
(By-law
2007-086
Amended
by
2022-097)
- Maximum Lot Coverage within 60m of shoreline
- 7%
Notwithstanding Section 4.28.1 j), Table 4.4, on
those lands zoned Limited Service Residential
Exception "LSR-24", a 1 ½ storey boathouse with
attached boat port shall be permitted subject to
the following:
- Maximum of 3 boat slips, one of which shall be a
boat port including deck above.
- Maximum width and length of the boathouse
shall be 10.7 metres.
- Maximum width and length of the boat port
shall be 4.6 metres and 10.7 metres respectively,
excluding overhangs less than 0.6 metres.
- The Maximum floor area of the boathouse and
boat port shall be 162.6 square metres.
- Minimum Lot Area - 7 hectares
- Minimum Lot Frontage - 100 metres
(Lot is comprised of the LSR-24 and LSR-146
Zones)
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-13
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-25
(By-law
2007-086)
Notwithstanding Section 4.28.1 j), Table 4.4 and
Section 6.3, and Tables 6.2 and 6.3, a one (1) storey
2 slip boathouse shall be permitted, subject to the
other provisions of Section 4.28.
SR1-26
(By-law
2007-086)
Notwithstanding Section 6.3, Table 6.3, a 3 slip - 1 ½
storey boathouse, with one slip being a boatport,
shall be permitted.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-14
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-27
(By-law
2007-086)
- Maximum Lot Coverage within 60m of shoreline
- 8.2%
The
maximum
lot
coverage as set out in
Column 5 shall only
be
applicable
in
respect
of
the
demolition
of
the
existing dwelling and
provided
that
the
new single dwelling to
be
constructed
complies
with
the
yards, lot coverage,
gross floor area and
height of the existing
dwelling including the
addition under Permit
#2006-5229
SR1-28
(By-law
2007-086)
- Maximum Lot Coverage within 60m of shoreline
- 10.4%
- Maximum Dwelling Gross Floor Area - 1.3 times
Column 2 of Table 6.3
- Maximum Gross Floor Area - 717 sq. m.
The
Maximum
Lot
Coverage as set out
in Column 5 shall only
be
applicable
in
respect
of
the
demolition of the two
existing dwellings and
the construction of a
new single dwelling
on the foot print of the
main dwelling.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-15
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-29
OMB Order
2326
- Maximum Lot Coverage - 10.3% (within 60
metres of shoreline excluding docks and decks
associated with the boathouse)
SR1-30
(By-law
2007-105)
- Minimum Lot Frontage - 61.2 m
- Minimum Lot Area - .65 ha
SR1-31
OMB Order
2632
a) A 1 storey 1 slip boathouse or boat port and
dock not more than 11.5 m in cumulative width
for each lot shall be permitted;
b) The maximum width of a dock, access ramp
or finger dock shall not exceed 2.0 metres;
c) One boathouse per lot having a maximum
width of 4.5 metres and maximum length of 11.0
metres shall be permitted. The private offshore
dock facility and boathouse shall have a
minimum offshore setback of 3.0 metres, apart
from the access ramp;
There shall be a 33 metre development setback
from the high water mark of Turtle Bay/Little Lake
Joseph for all primary and accessory buildings and
structures and tile fields/filter beds
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-16
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-32
(By-law
2007-128
OMB Order
2728)
- Three boat slips allowed, one being a boat port
- Maximum cumulative frontage width of
shoreline structures including eaves and
overhangs - 27.1% (24.4 metres)
- Maximum length of boathouse/port structure -
11.5 metres
- Maximum width of one storey boathouse/port
structure - 14.3 metres
- Maximum height of a one storey boathouse 5.48
metres
- Maximum lot coverage - 11.6%
The
construction
is
limited to a flat roofed
boat port extension,
supported
by
steel
peers
and
no
additional
walls,
docks,
or
decks
above the boat port.
LSR-33
(By-law
2007-129)
- Notwithstanding Section 4.28(c), a dock may
project 9.4 metres past the straight line
projection of the easterly side lot line, but shall
be located no closer than 20 metres to its
intersection with the shoreline
LSR-34
(OMB)
- Maximum lot coverage - 13 per cent
LSR-35
(OMB)
- Maximum lot coverage - 10 per cent
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-17
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-36
(OMB)
- Lot Frontage (Minimum) - 120 m
- Lot Area (Minimum) - 1.2 ha
Notwithstanding Section 4.28, a 1 ½ storey, 3 slip
boathouse is permitted subject to the following
standards:
- Minimum Side Yard - 9 m
- Maximum Height from water to eave - 3.46 m
- Maximum cumulative surface area of docks and
decks - 203 sq. m.
SR1-37
(By-law
2007-147)
Notwithstanding Section 4.28, a one storey, one slip
boathouse is permitted subject to the following
standards:
- Maximum width - 4.6m
- Maximum length - 8.2 m
- Maximum Height from water to eave - 4 m
LSR-38
(By-law
2008-022)
- Notwithstanding Section 6.3, Table 6.3, a
Maximum Lot Coverage of 8% shall be permitted
on a lot having a frontage greater than 160 m.
- Minimum lot frontage of 180 m.
- No building or structures shall be permitted in a
'No development zone' defined as those lands
within 60 m of Lake Joseph and 82 m of the
northern side lot line
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-18
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-39
(By-law
2008-044)
Notwithstanding Section 6.3, Table 6.2, that a new
lot may be created having a Minimum lot area of
0.7 hectares
LSR-40
(By-law
2008-063)
Notwithstanding the Section 4.1.9 b) and c), on
those lands zoned LSR-40 a 1 storey 121 square
metre sleeping cabin, comprised of a 75.4 square
metre guest cabin with an 45.46 square metre
attached screened in porch on the east end with
no basement and a minimum of 30 metres from the
shoreline shall be permitted.
R1-41
(By-law
2008-078)
- That
notwithstanding
Section 4.1.1
a) Permitted Uses
(for accessory
structures), a
"seasonal retail
swimwear sales
establishment"
conducted in a
detached
accessory
structure, having
a floor area no
larger than 46.5
square metres,
located a
minimum of 4
metres from the
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-19
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-41
(Con't)
rear lot line with
no additional
parking spaces
required, is a
permitted use.
- That
notwithstanding
Section 4.1.1
a) Permitted Uses
(for accessory
structures), an
"artists studio"
conducted in an
existing detached
accessory
structure, having
a floor area no
larger than 27.8
square metres is a
permitted use.
SR1-42
(By-law
2008-080)
- Lot Area (Minimum) 0.8 ha
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-20
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-43
(By-law
2008-096)
(By-law
2008-081)
Amended)
- Maximum Lot Coverage within 60m of shoreline
14.5%
- Minimum Front Yard - 30 m
A new dwelling may
be constructed on
those lands zoned
LSR-43 providing the
new dwelling
complies with all the
zone requirements
and is located on the
footprint of the
existing cottage.
SR1-45
(By-law
2009-013)
- Minimum required front yard for a guest cabin is
13.5 m.
- Minimum side yard setback of 7.3 m for a
boathouse or dock from the west side lot line
extension.
- Maximum lot coverage of 9.1% within the first 60
m of the shoreline is permitted.
- Storage only is permitted in the area above the
first level of the one storey boathouse as
constructed as of the date of passing of this by-
law.
For the purpose of this
exception, storage
means a place for
the keeping of
articles related to the
residential use of the
property.
LSR-46
(By-law
2008-125)
- Maximum lot coverage within 60 metres of
shoreline is 7.25%
SR1-47
(By-law
2008-126)
- The Maximum permitted lot coverage within 60
metres of shoreline shall be 10.3%
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-21
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-48
(By-law
2009-096)
Removal of
Hold (H)
symbol)
(Hold
provision
added By-
law
2009-017)
(By-law
2008-137
amended)
- The maximum combined surface area of all
docks and open decks above the water shall be
230.5 square metres.
- The boathouse dock shall extend no further than
18.2 metres from the shoreline.
- The boathouse shall extend no further than 17.4
metres from the shoreline.
- All other provisions contained in Seguin Zoning
By-law 2006-125 for boathouses and
docks/decks shall apply to the subject lands.
LSR-49 (H)
(By-law
2008-142
Amended
by
By-law 2022-
098 &
Removal of
Hold (H)
symbol)
-Existing
boathouse
- Existing 8
square metre
Accessory
building
-18 square metre
Accessory
Building
-Waterfront
Accessory
Structures per
4.1.9
-Leaching
Bed
and
Septic
Tank
-
Detached
Dwelling
-Cottage
Despite Section 4.1.1
-Accessory buildings and structures are permitted
without a main use/building
Despite Sections 4.1.6c), 4.1.9, and 4.14 c) -Two
Accessory buildings are permitted in the front
yard.
The easterly shed is permitted reduced setbacks of
8 metres to the northern shoreline, 10 metres to
the eastern shoreline, and 14 metres to the
southern shoreline.
-For this Zone,
"Accessory
building(s)" means
those such as storage
sheds and an
outhouse
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-22
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-50
(By-law
2008-146)
The following exceptions are for a boathouse and
shoreline structures.
-
Maximum floor area 62.9 m2
-
Maximum Height to highest main roof eave
4m.
-
Maximum combined surface area of all docks
and decks above the water 263.2 m2.
-
Maximum 68% of roof area on east elevation
may be a dormer.
-
Maximum 75% of roof area on west elevation
may be a dormer.
-
To allow a 1 ½ storey - 2 slip boathouse on a lot
with 86.8 m of frontage.
- To recognize a total combined width of
shoreline structures of 40.74m.
R2-51
(By-law
2010-011)
(By-law
2008-164
amended)
1, five unit
townhouse on
each lot
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-23
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-52
(By-law
2009-096)
Removal of
Hold (H)
symbol)
(By-law
2009-017
amended)
-
Minimum front yard setback for septic
system components is 30 metres.
-
All other provisions of Zoning By-law 2006-
125 shall apply.
- Development to
proceed by way of
Site Plan Control
(Recommendation
s of the Site
Evaluation Report
prepared by
Michalski Neilsen
Associates dated
September 2008,
applies to the
construction of a
dwelling unit,
septic system, and
accessory
structures)
SR1-53
(By-law
2009-067)
- Maximum lot coverage is 7.75%.
- Minimum natural shoreline buffer within 20
metres of the shoreline is 85%.
- The minimum front yard setback for a dwelling is
7.9 metres.
- The maximum dwelling footprint is 185 square
metres.
- All other provisions of Zoning By-law 2006-125
shall apply to the subject lands.
- Development of a
single detached
dwelling shall be
subject to Site Plan
Control.
LSR-54
(By-law
2009-071)
2 sleeping cabins
are permitted on
the subject lands.
- The minimum front yard setback for the sleeping
cabins are 15.2 metres and 17.4 metres, as
shown on Schedule "C" to By-law 2009-071.
- All other provisions of the Zoning By-law shall
apply.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-24
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-55
(By-Law
2009-048)
i) Minimum setback for all buildings and structures
from the wetland shall be 50 metres with
vegetation removal permitted only to provide a
maximum 2 metre wide pathway to access the
shoreline made of natural materials;
ii) Development shall be subject to Site Plan
control pursuant to Section 41 of the Planning
Act R.S.O. 1990.
LSR-56
(By-law
2009-052)
i) The minimum setback for all buildings and
structures, including septic system components
from lake shorelines and watercourses, is 30
metres. All other provisions of Zoning By-law 2006-
125 shall apply.
ii) Development of buildings and structures,
including septic system components, access
lanes, parking areas, etc. shall be subject to Site
Plan control pursuant to Section 41 of the
Planning Act R.S.O. 1990.
SR1-57
(By-Law
2009-052)
i) The minimum setback for all buildings and
structures, including septic system components
from lake shorelines and watercourses, is 30
metres. All other provisions of Zoning By-law 2006-
125 shall apply.
ii) Development of buildings and structures,
including septic system components, access
lanes, parking areas, etc. shall be subject to Site
Plan control pursuant to Section 41 of the
Planning Act R.S.O. 1990.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-25
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-58
(By-law
2009-095)
i) Development of the consolidated parcel shall be
subject to Site Plan control pursuant to Section 41
of the Planning Act R.S.O. 1990.
ii) All other provisions of Zoning By-law 2006-125 shall
apply.
LSR-60
(By-Law
2010-022)
138 square metre
detached "family /
exercise" building
with attached wood
storage area.
Kitchen
not
permitted
in "family /
exercise"
building
- Maximum lot coverage = 7.5%
- All other provisions of the Zoning By-law shall
apply.
SR1-61
(By-Law
2010-019)
- 15 metre development setback from the
drainage courses on the severed and retained
lands be kept as a buffer area
- 30 metre development setback from Maple
Lake be kept as a riparian buffer area
- 15 metre dock setback on severed lot from
drainage course outfall into Maple Lake
- Severed lands be subject to site plan control
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-26
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R2-62
(By-Law
2010-065)
1) 4 residential
apartments in "4-
plex" building +
common laundry
and utility area
2) 2 residential
apartments in
"A-frame"
building.
3) Accessory
storage structure
(storage lockers)
- All other provisions of Zoning By-law 2006-125
shall apply.
- Development of the lands shall be subject to
Site Plan Control, pursuance to Section 41 of the
Planning Act.
- Minimum lot area =
0.47 hectares
LSR-63
(House
Keeping
By-law 2010-
056)
A dock may be
constructed and
used to access
an island
property and
parking area
developed.
No other
structures
shall be
permitted
SR1-64
(House
Keeping
By-law 2010-
056)
- Recreational trails
- Play facility area
- Private club
- Recreation, non-
intensive
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-27
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-65
(House
Keeping
By-law 2010-
056)
- Lots in this zone do not have direct frontage on
a waterbody.
- Minimum required front yard - 10 m
SR1-66
(House
Keeping
By-law 2010-
056)
- Single
detached
dwelling or
cottage
- Household
occupation
- Professional
office
- Guest cabin
not exceeding
60 square
metres of floor
area
- Accessory
building to any
permitted use
in accordance
with provisions
of this by-law
and the
Special Zone
Requirements
of this Zone.
- Accessory buildings are permitted provided that
no building or structures except a floating dock
or boathouse may be located within 20 metres
of the highwater mark of Lake Joseph or the
bank of the creek that bisects the property.
- No part of any leaching bed that discharges
effluent to the soil may be located constructed
or installed closer than 45 metres from the
highwater mark of Lake Joseph.
- A vegetative buffer not less than 20 metres in
width shall be provided along the shoreline of
Lake Joseph and the small creek that bisects
the property. The vegetative buffer shall be
used for no other purpose than for the
preservation of natural vegetation except in the
case of the vegetative buffer along Lake
Joseph where a floating dock or boathouse in
conformance with appropriate requirements of
the Ministry of Natural Resources and the
Department of Fisheries and Oceans and a
pathway not to exceed 2 metres in width for
access to the shoreline may be permitted.
- For the purposes of
the Zone, the
following definitions
apply:
- Leaching Bed -
means the soil
absorption system
constructed as
absorption trenches
or as a filter bed,
located wholly in
ground or raised
above ground, to
which effluent from
a septic tank is
applied for
treatment and
disposal.
- Sewage Disposal
System - means any
system that is
subject to Part VIII of
the Ontario Building
Code.
- Vegetative Buffer -
means a strip of
land devoted
exclusively to the
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-28
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
preservation of
natural vegetation.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-29
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-67
(House
Keeping
By-Law
2010-056)
- 20 cottages
- One
recreational
building or
structure which
is not to be
used for
human
habitation
- No permitted building or structure shall be
constructed within 24 metres of the high water
mark of Watson's Lake
- Each cottage shall be located in such a
manner as to have a minimum lake frontage of
45 metres
Lot 14, Concession 7;
Lot 13 and 14,
Concession 8; Lot 14,
Concession 9 and
that Part of Lot 13, in
Concession 7, of the
geographic Township
of Humphrey
described in
Instrument No. 41835
registered in the Land
Registry Office for the
Registry Division of
Parry Sound, shall be
deemed to be a lot.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-30
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-68
(House
Keeping By-
law 2010-
056)
No buildings or
structures are
permitted on the
portion of the
road allowance
between Lot 30
and 31 in
Concession 3
and more
particularly
described as
Parts 10 and 11
on Plan 42R-
14079 including
the Crown Lake
bed in front
thereof
excepting the
existing dock or
docks approved
by the Ministry of
Natural
Resources.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-31
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-69
(By-law
2010-069
Detached
garage
(accessory to
seasonal
dwelling located
at CON 12, PT of
LOTS 17 & 18, PSR
1070 Part 13).
- All other provisions of Zoning By-law 2006-125
shall apply.
LSR-70
(By-law
2010-078)
- Minimum front yard setback- 12 metres
- Maximum lot coverage - 7.32%
- Dwelling units per lot - 2 dwelling per lot (Terms
of this temporary use shall be addressed
through site plan control)
- All other provisions of the Zoning By-law shall
apply.
Development of the
lands shall be subject
to Site Plan Control,
pursuance to Section
41 of the Planning
Act.
SR1-71
(By-law
2010-090)
For the purpose of determining lot frontage
Pursuant to Zoning By-law 2006-125, lot frontage
and lot area for the subject lands shall be deemed
to be as they existed on the day prior to this
amending by-law being passed. Any shore road
allowance lands that are added to the subject
lands following the passage of this zoning by-law
amendment shall not be used in the calculation of
lot frontage or lot area
LSR-72
(By-law
2011-011)
- 2 slip, 1.5 storey
boathouse.
- Maximum shoreline structure cumulative width
of 22.2 metres
- Maximum boathouse projection of 21 metres
- Maximum dock length of 22.3 metres
- Maximum total dock and deck area of 216
square metres
Subject lands shall be
designated as a Site
Plan Control Area,
pursuant to Section
41 (2) of the Planning
Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-32
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
- The proposed boathouse slip entrances shall
only be oriented to the north or west.
Site Plan Control shall
also address
orientation of
boathouse slip
entrances.
LSR-73
(By-law
2010-115)
2nd Dwelling
LSR-75
(OMB )
- Maximum dock length - 16.0 metres
- Maximum cumulative surface area of docks
and decks - 209.7 sqm.
- Maximum Lot Coverage within 60 m of shoreline
- 7.1%
- Maximum Dwelling Gross Floor Area - 871 sqm.
- A 38.5 sqm enclosed porch shall be permitted in
addition to the Maximum Dwelling Gross Floor
Area
- On shore landing
and stairs
associated with
boathouse not to
be included in
calculation of
dock/deck area.
LSR-76
(By-law
2011-011)
- Boat
house
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-33
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-77
(By-law
2011-091
amended
by By-law
2012-008)
- The minimum lot frontage required for the LSR-77
Zone shall be 96.5 metres
- Notwithstanding Section 4.28.1 j) ii) Table 4.4, a 1
½ storey, 2 slip boathouse containing a covered
boat port shall be permitted.
All other boathouse
and dock provisions
of Sections
4.28.1 and
4.28.2 shall apply.
R1-78
(By-Law
2012-002
Amended
by By-law
2014-086)
- Notwithstanding
Section 4.28.1 j)
ii) Table 4.4 of the
Zoning By-law, a 1
storey, 2 slip
boathouse shall
be permitted.
- 2 storey garage
having a
maximum height
of 7.64 metres, a
maximum ground
floor area of 71
square metres
and a maximum
gross floor area of
142 square
metres.
- Maximum boathouse length = 8.8 metres.
- Maximum boathouse width = 13.8 metres.
- Maximum boathouse dock area = 128.5 square
metres.
- Maximum boathouse setback to north interior
side lot line = 28.3 metres.
- Maximum boathouse dock setback to north
interior side lot line = 27.3 metres.
- 2 boats may be moored in one of the 2
permitted slips.
- All other
boathouse and
dock provisions of
Sections 4.28.1 and
4.28.2 of the
Zoning By-law shall
apply.
- Development of
the lands shall be
subject to Site Plan
Control, pursuant
to Section 41 of
the Planning Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-34
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-79
(By-law
2012-006)
Lot frontage for these lands shall be
measured from the intersection of the north
side lot line and shoreline of Lake Rosseau,
southerly
to
the
intersection
of
the
projection of the south side lot line and
shoreline of Lake Rosseau
Minimum lot
frontage:
90 metres.
SR1-80
(By-Law
2012-062)
Single storey, 2 slip
boathouse
- Minimum lot frontage = 63 metres.
- Minimum lot area = 0.52 hectares.
- Minimum front yard setback = 15.2 metres.
- Minimum shoreline structure side yard setback =
14.2 metres.
SR1-81
(By-Law
2020-104
Ameded
By-Law
2012-063)
"Kitchen" facilities
shall be permitted
within the "Original
Cottage/ Guest
Wing".
A "wet bar" shall
be permitted within
the upper ½ storey
of the existing 1.5
storey boathouse.
Existing 1.5 storey
detached garage,
containing an
"office" "wet bar"
and "bathroom"
uses within the
Maximum Main Cottage lot coverage = 467 sq.m
Maximum Main Cottage gross floor area = 635.2
Minimum Main Cottage front yard setback = 31 m
Minimum Main Cottage deck front yard setback =
28 m
Maximum Guest Wing lot coverage = 154 sq.m.
Maximum Guest Wing gross floor area = 207.9 sq.m.
Minimum Guest Wing front yard setback = 20 m
Minimum Guest Wing deck front yard setback = 19
m
Maximum lot coverage within 60 metres of the
shoreline = 12.4%
The lands shall be
subject to Site Plan
Control, pursuant to
Section 41 of the
Planning Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-35
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
upper ½ storey shall
be permitted.
R1-82
(By-law
2012-094)
Seasonal retail
clothing sales
establishment
conducted within a
detached
accessory structure.
LSR-83
(By-law
2012-103)
A 100 square metre
"guest cabin" shall
be permitted within
the second storey
of the existing 2
storey, 3 slip
boathouse.
Prior to the issuance of a building permit for a new
dwelling unit on the subject lands, all kitchen
facilities shall be removed from the second storey
of the existing 2 storey, 3 slip boathouse.
SR1-84
(By-law
2013-048)
-
One cottage with a total footprint of 263.7
square metres and a total gross floor area of
262.3 square metres, having a minimum 13.4
metre front yard setback shall be permitted on
lot 17, Plan M-50, upon lots 14,15,16, and 17,
Plan M-50 being merged in title to form one lot.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-36
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-85
(By-law
2013-070)
1) "Boathouse #1",
being an
existing 1.5
storey
boathouse,
containing 2
exterior boat
ports, 1 interior
boat slip and
storage space
within the 1st
floor, and living
accommodatio
ns within the
upper ½ storey.
-
Maximum
existing
boathouse main
roof eave
height shall be
4.5 metres.
-
Maximum
existing
boathouse main
roof mid-point
height shall be
5.5 metres.
-
Dimensions of
Boathouse #1
as existed on
the date of
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-37
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-85
Cont'd
passing of this
By-law shall be
deemed to
comply.
2) "Boathouse #2",
being an
existing 1.5
storey
boathouse,
containing
storage space
on the 1st floor
and living
accommodatio
ns including
kitchen facilities
in the upper ½
storey".
LSR-86
(OMB
Decision
PL131080)
- Notwithstanding Table 6.2 and Section 4.1.2, a
6.0 square metre deck is permitted with a front
yard setback of 1.2 metres.
- Notwithstanding Section 4.28(b) a maximum of
35.9 metres of the shoreline frontage may be
occupied by above water structures and
facilities.
- Notwithstanding Section 4.28.2(e) the maximum
combined surface area of all docks and open
decks above water shall be 407.1 square metres.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-38
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-87
(By-law
2013-084)
- Minimum lot area 1.0 hectare
- Minimum lot frontage 135 metres
- Minimum front yard requirement 16.3 metres
(existing)
- Minimum interior side yard requirement 4 metres
(existing)
- Lands subject to Site Plan Control (Section 41
Planning Act RSO 1990)
LSR-88
(By-law
2013-084)
- Minimum lot area 1.0 hectare
- Minimum lot frontage 120 metres
- Minimum westerly interior side yard 3 metres
- Lands subject to Site Plan Control (Section 41
Planning Act RSO 1990)
SR1-89
(OMB
Decision
PL130560)
- Maximum lot coverage = 5.85%.
- Maximum boathouse width = 15.7 metres.
- Maximum surface area of all docks and decks =
209.3 square metres.
- Maximum boathouse upper ½ storey floor area =
64.75 square metres.
- All other boathouse provisions shall apply.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-39
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-90
(OMB
Decision
PL100376)
- Minimum Lot area of 0.5 hectares is deemed to
comply
LSR-91
(By-law
2014-051)
Existing 1 ½ Storey
Guest Cabin
- 223.47 m2
maximum
building floor area
not including
decks
- 40.13m2
maximum deck
area
- 122m2 maximum
building foot print
- 9m maximum
building height
Existing Boathouse
- 16.3 m2 maximum
boatport
attached by one
wall to the existing
boathouse
- Maximum 3.23m
boathouse and
- Minimum 13.6m Existing Guest Cabin front yard
setback
- Minimum 11.3m Existing Guest Cabin attached
deck front yard setback
- Minimum 8m Existing Guest Cabin deck landing
front yard set back
- Maximum 10.37 percent lot coverage within 60m
of the shoreline
- Minimum 2.5m existing dock and existing
boathouse setback from the straight line
projection of the south lot line into the water from
the shoreline
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-40
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
boatport eave
height
- Maximum 65
percent of the
boathouse and
boatport located
inland of natural
shoreline
SR1-92
(OMB
Decision
PL120684
- Maximum boathouse width = 12.9 metres.
- Maximum surface area of all docks and decks =
211 square metres.
- All other boathouse provisions shall apply.
- Subject lands shall
be subject to Site
Plan Control,
pursuant to Section
41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-41
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-93
(By-law
2014-060)
Office and Retail
use within single
storey, 64 square
metre detached
structure
- Minimum front yard setback for detached
structure = 8 metres.
- Minimum side yard setback for detached
structure = 1.5 metres.
- The parking requirements for residential, office,
and retail uses as prescribed in Section 5.2.3 of
Zoning By-law 2006-125 shall apply.
- Development shall
be subject to Site
Plan Control
pursuant to Section
41 of the Planning
Act.
SR1-94 (H)
(By-law
2025-024)
2 Slip, one-storey,
flat-roofed boatport
Within 20m of
Shoreline:
- 2m wide
walkway to
dock
- Stormwater
management
facilities
- Landscape
irrigation
system
Boathouse
- Maximum lot coverage - 9.99%
- Maximum height of sports court building and
observation deck structure - 6.4m
- Maximum sports court pillar height - 10m
- Maximum 3.05m high chain link fence between
sports court pillars
- Maximum height of entrance gate 3.9 m,
maximum gate pillar height 3.05m and maximum
length 8.9m between supporting gate pillars all
within the rear yard.
- Maximum dock
area 168m2
- No roof or cover
over the sports court
building and
observation deck
- The Boatport shall
be the only aspect
of this application
subject to the (H)
provision.
SR1-95
(By-law
2014-089)
- Maximum lot coverage within 60 metres of the
shoreline = 10%.
- Maximum dwelling gross floor area = 720 square
metres.
- Maximum dwelling height = 6.5 metres.
- Minimum front yard setback = 25 metres.
- Development of the
lands shall be
subject to Site Plan
Control, pursuant to
Section 41 of the
Planning Act.
SR1-96
(By-law
2014-090)
- Maximum lot coverage within 60 metres of the
shoreline = 8.5%
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-42
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-97
(By-law
2015-069)
- Maximum lot coverage within 60 metres of the
shoreline = 9.42%
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
SR1-98
(By-law
2015-085)
- A second
dwelling having a
maximum floor
area of 350
square metres,
and a minimum
shoreline setback
of 30 metres.
- All other provisions
of Zoning By-law
2006-125 shall apply
to the subject lands.
LSR-99
(By-law
2016-002 &
By-law 2016-
074)
- 1.5 Storey, 2 slip +
1 port boathouse
- All other shoreline accessory structure
requirements as prescribed under Section 4.28,
4.28.1 and 4.28.2 of Zoning By-law 2006-125 shall
apply.
- Minimum front yard setback of the main dwelling
= 16.76 metres
- Eaves and canopies of the main dwelling may
extend into the front yard setback to a maximum
of 6.29 metres
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
R1-100
(By-law
2016-016)
- Minimum lot frontage = 46.6 metres.
SR3-101
(By-law
2016-031)
- Maximum lot coverage within 60 metres of
shoreline = 5%
- Development shall
be subject to site
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-43
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
- Maximum cottage ground floor area = 232.25
square metres
- Maximum dock/deck area = 50 square metres
- Maximum shoreline width of docks = 10%
plan control,
pursuant to Section
41 of the Planning
Act
SR3-102
(By-law
2016-031)
- 2 cottages on one lot
- Maximum lot coverage within 60 metres of
shoreline = 5%
- Maximum total ground floor area for both
cottages = 232.25 square metres
- Maximum dock/deck area = 50 square metres
- Maximum shoreline width of docks = 10%
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act
SR1-103
(By-law
2016-032)
1 Storey, 2 slip
boathouse
- Maximum boathouse floor area = 119 square
metres.
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
LSR-104
(By-law
2016-037)
- Minimum front yard setback = 30 metres.
- Maximum lot coverage = 9.95%.
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
SR1-105
(By-law
2016-046)
1 storey, 1 slip
boathouse and
attached boat port
- Maximum permitted lot coverage within 60
metres of the shoreline = 11.4%
- Development shall
be subject to site
plan control,
pursuant to Section
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-44
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
41 of the Planning
Act.
LSR-106
(By-law
2017-006)
Existing Equipment
Storage Building
LSR-107
(By-law
2017-017)
- 1.5 storey, 2 slip
boathouse with
attached boat
port, having
guest
accommodation
s within the upper
½ storey.
- Existing
"Secondary
Cottage"
(existing as of the
date of passage
of this by-law).
- 2 existing "single
storey guest
cabins" (existing
as of the date of
passage of this
by-law).
- "Primary cottage" maximum gross floor area =
700 square metres, and minimum front yard
setback = 20 metres
- Minimum lot area and frontage for subject lands
= "existing" (existing as of the date of passage
of this by-law)
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
- All other provisions
of Zoning By-law
2006-125 shall apply
to the subject lands.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-45
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-108
(By-law
2017-025)
- Minimum dwelling front yard setback = 25
metres.
- Minimum septic system front yard setback = 50
metres.
- Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act. The site plan
agreement shall
implement the
recommendations
of the "Site
Evaluation Report,
Seely Bay, Lake
Joseph" study
prepared by
Beacon
Environmental,
dated February
2017.
LSR-109
(By-Law
2017-026)
Notwithstanding
Section 4.28.5 a) of
Zoning By-law 2006-
125, a dock shall be
permitted on the
Shadow River
adjacent to "Lot A"
(Consent B-2016-
0014-R), and the
dock shall comply
with the
requirements of
Section 4.28.5 c) of
Notwithsta
nding
Section
4.28.5 c) of
Zoning By-
law 2006-
125, a
dock shall
not be
permitted
on the
Shadow
River
- Minimum front yard setback for septic system =
40 metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act. The site plan
agreement shall
implement the
recommendations
of the "Site
Evaluation Report,
Smith Property -
Shadow River, Town
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-46
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Zoning By-law 2006-
125.
adjacent
to "Lot C"
(Consent
B-2016-
0016-R).
of Rosseau" study
prepared by
Beacon
Environmental,
dated September
2016.
LSR-110
(By-law
2017-025,
By-Law
2022-046)
- Minimum septic system front yard setback = 50
metres.
- Maximum Boathouse width = 14.5m
LSR-111
By-law 2017-
063
The northerly interior side yard setback for all
habitable buildings shall be no less than 98.4
metres.
SR1-112
By-law 2017-
064
- The westerly side yard setback from Lot 7, Plan
278 for all boathouse and dock structures shall
be no less than 20 metres.
- The minimum frontage for a single storey
boathouse with boatport structure shall be 58.6
metres.
- The maximum lot coverage for all structures
within 60 metres of the shoreline shall be 12.75%.
- The maximum width of the boathouse with
boatport and dock shall be 20.1 metres.
LSR-113
(By-Law
2018-008)
A second single
storey cottage on
one lot
- Minimum lot size = 4.59 hectares
- Maximum lot coverage within 60 metres of the
shoreline = 4.1%
- Minimum second cottage shoreline setback =
22.5 metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act. The site plan
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-47
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
- Minimum second cottage deck shoreline
setback = 18.2 metres
- Maximum second cottage height = 8.67 metres
- Maximum second cottage gross floor area =335
square metres
agreement shall
implement the
recommendations
of the "Site
Evaluation Report,
Burnt Island, Lake
Joseph" study
prepared by
Michalski Nielsen
dated May 2009.
LSR-114
(By-Law
2018-010)
- Minimum shoreline setback for septic system =
50 metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act. The site plan
agreement shall
implement the
recommendations
of the "Site
Evaluation Report,
Scully Road, Lake
Joseph, Township of
Seguin" study
prepared by
Beacon
Environmental
dated November
2017.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-48
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-115
(By-Law
2018-019)
- Maximum floor area for guest cabin within
upper ½ storey of garage = 73.2 square metres.
SR2-116
By-Law
2019-004
single
detached
dwelling,
accessory
buildings and
structures
- Minimum Lot Size for 12-14 Kellington Point Road
- 0.44ha
- Minimum Lot Frontage - 63.6m
SR2-117
(By-Law
2019-004)
single
detached
dwelling,
accessory
buildings and
structures
- Minimum Lot Size for 16 Kellington Point Road-
0.21ha
- Minimum Lot Frontage - 29.6m
SR1-118
(By-Law
2021-058)
boat
launching
ramp or
other
structure
used for
launching
motorized
watercraft
(dock
permitted)
- Minimum wetland setback for septic system
components = 30 metres
- Minimum wetland setback for buildings = 20
metres
Development
(including shoreline
accessory
structures) shall be
subject to site plan
control, pursuant to
Section 41 of the
Planning Act. The
site plan agreement
shall implement the
recommendations
of the amended
"Scoped
Environmental
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-49
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Impact Study,
McTaggart Lake"
prepared by
Beacon
Environmental
dated October
2018.
SR1-119
(By-Law
2019-047)
- Maximum lot coverage within 60 metres of
shoreline = 7.61%.
- Maximum total lot coverage = 8%.
- Maximum dwelling gross floor area = 610 square
metres.
- Maximum dwelling footprint = 565.50 square
metres.
- Minimum shoreline structure west interior side
yard setback = 10.5 metres.
Development shall
be subject to Site
Plan Control,
pursuant to Section
41 of the Planning
Act.
LSR-120
(By-Law
2019-088)
- Minimum front yard setback for septic sewage
system = 30 metres
Development of the
subject lands shall
be subject to Site
Plan Control,
pursuant to Section
41 of the Planning
Act.
LSR-121
By-law 2019-
086
- Maximum lot coverage within 60 metres of the
shoreline = 8.8%.
Development of the
subject lands shall
be subject to Site
Plan Control,
pursuant to Section
41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-50
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-122
(LPAT
Decision
PL 171271)
(By-law
2019-096)
- Notwithstanding Section s4.1.8, 4.17, and the
definition of "gazebo" in Section 13, a maximum
20.5 square metre "gazebo" shall be permitted in
the shoreline buffer area and the gazebo may
be attached to a dwelling on the east side of
the dwelling only.
- Notwithstanding Section 4.28, a maximum of two
(2) cantilevered boat awnings shall be permitted
on an existing dock. The maximum
area of one awning shall be 26.0 square metres
and the maximum area of the other awning shall
be 22.3 square metres.
- The minimum eastern side yard setback to the
boat awning shall be 5 metres.
LSR-123
(By-Law
2020-003
Amended
by By-Law
2022-058)
Secondary Dwelling
- Secondary dwelling maximum floor area =
170.6 square metres
- Secondary dwelling maximum height = 5 metres
- Secondary dwelling minimum shoreline setback
= 120 metres
- The second dwelling shall be setback a
minimum of 57 metres from the west interior side
lot line.
- All other provisions
of Zoning By-law
2006-125 shall
apply to the
subject lands
- For the purposes of
this zone, the
maximum building
height applicable
to the second
dwelling unit shall
be measured from
the average
existing grade, as
existing at the
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-51
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
date of this by-
law's passage.
- Development of a
secondary
dwelling shall be
subject to Site Plan
Control, pursuant
to Section 41 of
the Planning Act.
SR1-124
(By-Law
2020-004)
- Maximum lot coverage within 60 metres of the
shoreline = 10.5%.
- Maximum dwelling gross floor area = 368 square
metres
- Minimum front yard setback = 26 metres
- Development of
the subject lands
shall be subject to
Site Plan Control,
pursuant to
Section 41 of the
Planning Act.
SR1-125
(By-Law
2020-024)
- Minimum lot frontage = 39.6 metres
- Minimum lot area = 0.55 hectares
SR1-126
(By-law
2020-024)
- Minimum lot frontage = 62 metres
- Minimum lot area = 0.79 hectares
SR1-127
LPAT
Decision
PL200266
By-law
- Minimum front yard setback for cottage = 9
metres
- Minimum front yard setback for holding tank =
15 metres
- Development of
the subject lands
shall be subject to
Site Plan Control,
pursuant to
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-52
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
2020-056
- Minimum rear yard setback for cottage = 8
metres
- Maximum height of dwelling = one and a half-
storey
Section 41 of the
Planning Act.
LSR-128
(By-law
2020-075
-"Entertainment
Pavilion" containing
gaming areas,
media areas, fitness
studio, wine cellar,
1 bar with 1 sink
and dishwasher,
washroom facilities,
mechanical and
storage areas.
- Maximum Entertainment Pavilion floor area =
291 sq.m.
- Maximum Entertainment Pavilion terrace area =
207 sq.m.
- Maximum Entertainment Pavilion basement
area = 148 sq.m.
- Minimum Entertainment Pavilion front yard
setback = 66 metres
- Maximum Entertainment Pavilion height = 6.5
metres.
- Development of
the subject lands
shall be subject to
Site Plan Control,
pursuant to
Section 41 of the
Planning Act.
LSR-129
(By-law
2020-068)
- Maximum lot coverage within 60 metres of the
shoreline = 6.03%
- Maximum boathouse width = 15.09 metres
- Maximum dock/deck area = 215.93 square
metres
- Development of
the subject lands
shall be subject to
Site Plan Control,
pursuant to
Section 41 of the
Planning Act.
LSR-130
(By-Law
2020-111
OLT
Decision
PL200606)
Sports Barn
recreational
accessory structure,
containing sports
courts and gaming
areas, bar area
with sink,
washrooms, and
other ancillary
- Maximum sports barn height = 9.4 metres to
accommodate a Clerestory upper roof design
feature.
- Maximum sports barn floor area = 782 square
metres.
- Minimum sports barn front yard setback = 178
metres.
- Minimum sports barn shoreline setback = 123
metres.
- Development shall
be subject to Site
Plan Control,
pursuant to
Section 41 of the
Planning Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-53
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
mechanical and
storage areas.
- Minimum sports barn interior side yard setback
(north-east corner of building) = 12.5 metres
- Minimum sports bard interior side yard setback
(south-east corner of building) = 9.6 metres
LSR-131
(By-Law
2021-076)
- Maximum Lot Coverage within 60 metres of the
high water mark - 12%
LSR-132
(By-Law
2021-074)
A
guest
cabin
is
permitted that:
- Is a total of 150
square metres
(1,616 square feet)
in gross floor area;
- Is located 13.3
metres from the
shoreline and has
an attached deck
that is located 9.7
metres from the
shoreline;
- Is 8.9 metres in
height;
- Is 1.5 storeys; and,
- A maximum lot
coverage of 9.4%
is permitted within
60 metres of the
high water mark.
A maximum lot
coverage of 7.4%
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-54
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
is permitted on the
lot.
LSR-133
(By-Law
2022-021)
- Minimum lot frontage = 180 metres
-
Minimum lot area = 2.5 hectares
LSR-134
(By-Law
2022-021)
Amended
By-law
2025-048
- Minimum lot frontage = 155 metres
- Minimum lot area = 7 hectares
Section 6.3 Table 6.3 Maximum Lot Coverage
within 60 Metres of the Shoreline = 8.8%
Section 6.3, Table 6.2
Minimum Dwelling Front Yard Setback = 25 metres
Development shall be
subject to site plan
control, pursuant to
Section
41
of
the
Planning
Act,
to
implement
a
re-
revegetation plan for
the lands within 20
metres
of
the
shoreline
SR1-135
(By-Law
2022-022)
- Maximum accessory building or structure lot
coverage: 6.3%
- Maximum permitted lot coverage for all
buildings or sturctures:16.4%
- A total development area of buildings and
structures that are eligible for the lot area
calculation shall be 270 square metres.
Rear yard setback of
1.2 metres shall be
permitted
for
a
detached garage.
R2-135 (H)
By-law
2025-052
Dwelling,
Secondary
Dwelling, Duplex
Dwelling, Linked
Dwelling,
Semi-
detached
Section 13
- New definitions added "Dwelling, Multiple Units"
"means a building divided horizontally and/or
vertically into separate dwellings between 3 to 5
units. Each dwelling unit will have an
independent entrance either directly from
Holding
provision
applies to the entire
site to preclude any
new use on the lands
until
certain
undertakings
are
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-55
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Dwelling,
Townhouse
Dwelling,
Multiple
Units
Dwelling, Detached
Temporary
Employee
Accommodation
Each Parcel shall
independently
comply with Table
6.1 of Section 6.2
outside the building or through a shared
vestibule."
"Parcel" "means a parcel of land: a) the whole of
which can be legally conveyed without approval
pursuant to the Planning Act (with no part of which
can be transferred without such an approval), and
which is not described in a registered
condominium description, OR a parcel of land
described as a whole registered description by the
Condominium Act except for a vacant land
condominium, in which a unit is considered a lot."
"Temporary Employee Accommodation"
"shall mean a Vehicular Trailer containing
temporary sleeping accommodation for
employees in up to 22 bedrooms (44
persons maximum) in conjunction with
washroom facilities contained in the same
trailer or separate trailer on-site. This use
shall be serviced by a private or communal
septic system and potable water supply."
In lieu of the corresponding provisions in the
R2 Zone, the following shall apply as they
relate to a Parcel within the the lands
subject to this by-law exception (where
there is conflict between the provisions of
the Town's Comprehensive Zoning By-law
and the provisions of the R2-X provisions,
the latter prevails:
complete to ensure
the
orderly
development of the
site.
These
undertakings
would
be secured through
conditions
of
approval associated
with
the
implementing
draft
plan
of
subdivision
and/or draft plan of
condominium.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-56
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
a) Based on servicing limits, the total
number of residential units in the R2-X
Zone shall not exceed 176 units and the
number of Dwelling, Secondary units
shall not exceed 26 (1 per Dwelling,
Semi and 1 per Dwelling, Detached
and 1 per Dwelling, Township .
Secondary dwellings will not be
permitted in conjunction with Dwelling,
Multiple Units.
b) No sewage treatment system will
connect more than 5 dwelling units or
10,000 liters per day, whichever is less.
c) Up to a maximum of ten (10) model
homes, shall be permitted on lands with
draft plan approval and a Model Home
and a Pre-Servicing or similar
agreement has been executed with
the Township.
d) Section 6.3 (3) does not apply.
e) All permitted uses by this by-law
exception shall occur within a Plan of
Condominium where it is serviced by a
public road or by a private road, where
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-57
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
private road is within a condominium
development.
f)
Each parcel in a plan of condominium
unit will be serviced by a private
communal water and private
communal tertiary septic system, or
private tertiary septic system if a
Dwelling, Detached or Detached, Semi.
g) For any Parcel created through Plan of
Condominium containing more than 2
dwellings, the following shall apply to
the boundaries of that Parcel
the lot line abutting any public road will be
deemed the front lot line and the minimum
setback to this lot line shall be 10 metres for all
structures.
Minimum Lot, Block, and/or Unit frontages do not
apply
Dwelling, Multiple Units will be separated a
minimum of 20 metres
The maximum width of a driveway shall be 8 m.
If lots are established by a Draft Plan of Subdivision,
all lots will be required to meet the provisions of
the R2 Zone and Table 6.2, save and except:
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-58
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Lots containing Dwelling Duplex, Dwelling Linked,
Dwelling Townhouse and Dwelling Multiple
Units will have a minimum Lot Area of 0.6 ha
and Lot Frontage of 50 m. Up to five (5) lots will
be permitted to have a minimum lot frontage
of 15 m.
Lots containing Dwelling Semi-detached units will
be permitted to have a minimum Lot Area of
0.5 ha and Minimum Lot Frontage of 30 m. Up
to five (5) lots will be permitted to have a
minimum lot frontage of 15 m.
Lots containing Dwelling Detached units will be
permitted to have a minimum Lot Area of 0.32
ha and Minimum Lot Frontage of 30 m. Up to
five (5) lots will be permitted to have a
minimum lot frontage of 15 m.
Each freehold lot will be serviced by its own private
well and private tertiary septic system.
h) Not withstanding any other provision of
Section 4.31 Temporary Accommodation,
Temporary Employee Accommodation is
permitted in the R2-X Zone.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-59
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-136
(By-Law
2022-020)
- Minimum setback from rail line for Detached
Dwelling - 75 metres
- Minimum Road frontage of 45 metres
- Minimum Lot area of 0.97 Hectares.
Development shall be
subject to Site Plan
Control pursuant to
Section
41
of
the
Planning Act. Site
Plan Approval shall
implement
the
recommendations of
the
"Scoped
Environmental Impact
Study", prepared by
Riverstone
Environmental
Solutions,
dated
September, 2021, and
the
Noise
Impact
Study - Rankin Lake
Road, prepared by
J.E.
Coulter
Associates
Limited,
dated December 14,
2021.
R2-136 (H)
By-law
2025-052
Dwelling,
Secondary
- Detached
Dwelling
- Home
Occupation
Section 4.2.2 b) iv)
- In any other zone where secondary dwelling
units are permitted, a secondary dwelling unit
shall only be permitted in an accessory building
where the lot area is at least 0.4 hectares.
Section 6.3, Table 6.2
- Lot Area (minimum 0.4 ha
- Lot Frontage (minimum) 40 m with up to 3 lots in
the R2-136 permitted to have a minimum
Holding
provision
applies to the entire
site to preclude any
new use on the lands
until
certain
undertakings
were
complete to ensure
the
orderly
development of the
site.
These
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-60
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
frontage of 15 m as long as they achieve a
minimum lot area of 0.4 ha
- Front Yard (Minimum) 10 m
- Exterior Side Yard 10 m
- Interior Side Yard (Minimum) 5 m
Based on servicing limits, the total number of
residential units in the R2-136 Zone shall not exceed
11 and the number of Dwelling, Secondary units
shall not exceed 11.
undertakings
would
be secured through
conditions
of
approval associated
with
the
implementing
draft
plan
of
subdivision
and/or draft plan of
condominium.
LSR-137
(2022-059)
A 2 storey
detached garage.
- A 2 storey detached garage shall have a
maximum permitted height of 6.22 metres to
the mid-point and 7.34 metres to the peak.
Notwithstanding
the provisions of
Section 4.1.12, only
one 1.5 storey
guest cabin or one
1.5 storey
boathouse or one
2 storey detached
garage shall be
permitted.
SR1-137
By-law
2025-058
Section 6.3, Table 6.2
Minimum lot frontage = 42.2 metres
- Minimum lot area = 0.59 hectares
R1-138
(2022-062)
- Minimum Lot Frontage of 20 metres
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-61
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-138
By-law
2025-058
Section 6.3, Table 6.2
Minimum lot frontage = 63.7 metres
- Minimum lot area = 0.89 hectares
SR1-139
(By-Law
2022-060)
The maximum
permitted width of all
shoreline structures
shall be 35.1 metres.
SR1-140
(By-Law
2022-069)
No docks
permitted
within the
EP Zones
- The leaching bed shall be setback 30 m from the
high-water mark of Heaslip Lake.
- A minimum lot frontage of 215 metres.
- A dock shall only be permitted in the location
described in the "Updated Site Evaluation Report
- Wetselaar Property", prepared by Riverstone
Environmental Solutions, dated February 9, 2022
- Development shall
be subject to Site
Plan Control
pursuant to Section
41 of the Planning
Act.
- Site Plan Approval
shall implement
the
recommendations
of the "Updated
Site Evaluation
Report - Wetselaar
Property",
prepared by
Riverstone
Environmental
Solutions, dated
February 9, 2022,
as peer reviewed
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-62
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-141
(By-Law
2022-079)
- A minimum Lot frontage of 45 metres
- A minimum Lot area of 0.42 hectares
LSR-142
(By-Law
2022-083)
4.28.1 - g),
j) ii)
flat roofed
boathouse
1 ½ storey
boathouse
4.1.10 b), c), d) - Guest Cabin
- Minimum Front Yard Setback - 0 metres
- Maximum Floor Area - 78 square metres
- Maximum Height - 4. 9 metres
4.28 b) - Maximum shoreline structure width
- 26 metres
4.28.1, Table 4.4 - Maximum shoreline structure
width
- 1 sty - 2 internal slip, 11 x 10 metre boathouse is
permitted
4.28.2, e) - Maximum dock/deck surface area
- 186 square metres
Section 6.3, Table 6.2
- Maximum Lot Coverage - 10.5%
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
LSR-143
(By-Law
2022-090)
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
Site Plan Approval
shall implement the
recommendations of
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-63
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
the "Scoped
Environmental
Impact Study"
prepared by
Riverstone
Environmental
Solutions Inc., dated
August 2022.
Site Plan Control shall
also require the
completion and
implementation of an
engineered design
report which ensures
development is not
adversely impacted
by the floodplain to
the satisfaction of the
Municipality.
LSR-144
(By-Law
2022-097)
Minimum Lot Area - 6.5 hectares
Minimum Lot Frontage on Lake Joseph - 300
metres
LSR-145
(By-Law
2022-097)
Minimum Lot Area - 5 hectares
Minimum Lot Frontage on Lake Joseph - 135 metres
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-64
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-146
(By-Law
2022-097)
Buildings
and
Structures
(including
docks)
Minimum Lot Area - 7 hectares
Minimum Lot Frontage - 100 metres
(Lot is comprised of the LSR-24 and LSR-146 Zones)
Prohibited uses
were added as a
condition of
approval of
consent application
B-2021-0016/17-H to
ensure that the
water quality and
potential impacts of
development on
Fraser Lake are
addressed and
protected in
accordance with
the Township's
Official Plan.
SR1-147
(By-law
2022-121)
Notwithstanding the provisions of Section 4.1.12
and 4.1.10 c), d), and f), a one and a half storey
guest cabin is permitted within a portion of the
accessory structure (detached garage) existing at
the date of the passing of this By-law, subject to
the following:
-
maximum floor area - 92.9 square metres
-
maximum height - 5.4 metres
SR1-148
(By-law
2022-124)
Maximum Lot Coverage for Accessory Structures
of 6%
Maximum Lot Coverage of 9.6%
A detached garage
with a guest cabin in
the upper half storey
is permitted subject
to the following:
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-65
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Maximum height of
8.0 metres
Minimum setback of
3 metres from the
eastern interior lot
line.
Minimum setback
from the rear lot line
of 7.2 metres
Minimum setback of
7.1 metres from the
front lot line
(shoreline)
SR1-149
(By-law
2022-136)
Sauna and
accessory uses
to 22 Fraser
Road, as more
particularly
described as PT
RDAL IN FRONT
OF LT 90 CON A
HUMPHREY
CLOSED BY
R068478 PT 15
42R4279; PT LT
90 CON A
HUMPHREY PT F
42R4016 T/W
Cottage
Dwelling,
Detached
Leaching
Bad/
Septic
Tank
Minimum Lot Area - 0.19 hectares
These lands are
subject to an
agreement under
Section 118 of the
Land Titles Act with 22
Fraser Road, as more
particularly described
as PT RDAL IN FRONT
OF LT 90 CON A
HUMPHREY CLOSED
BY R0 68478 PT 15
42R4279; PT LT 90
CON A HUMPHREY PT
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-66
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R0118809;
SEGUIN)
F 42R4016 T/W
R0118809; SEGUIN)
LSR-150
(By-law-
2023-001)
- Minimum front yard setback for principal
building = 17.0 metres
SR1-151
(By-law
2023-014)
Despite Section 6.3 Table 6.2
- Minimum Lot Frontage = 68 Metres
Despite Sections 4.1.6, 6.3 Table 6.2
- The Minimum Front Yard Setback for structures
(with the exception of permitted waterfront
accessory structures) shall be 25 metres, with
allowance for decking, if attached to a main
dwelling, between 25 metres and 20 metres of
the shoreline
Shoreline Structures
- Despite Section 4.28 c) and Table 4.2, a dock
shall be permitted, limited to the located in the
area described as "Transect B" on Schedule "C"
to By-law 2023-014
- Despite Section 4.28.2 d), the maximum length
of a dock shall be 17 metres, with a maximum
width of 4 metres
- These lands are
subject to a
development
agreement
pursuant to Section
51(26) of the
Planning Act that
implements the
recommendations
of the Site
Evaluation Report
(SER) submitted by
Michalski Nielsen
Associates Limited,
dated August 21,
2022.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-67
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-152 (H)
(By-law
2023-16)
Despite Sections 4.1.6.1, 4.14 c), and 6.3 Table 6.2
- The minimum Front Yard Setback for a Leaching
Bed/Private Sewage System, and a Cottage or
Detached Dwelling shall be 30 metres.
Despite
Section
4.1.9,
Waterfront
Accessory
Structures on Severed Lots 1 and 2 of B/2022/27-30-
F
- Shall be limited to a total area of 40 m2 per lot.
Despite Section 4.14 c), Structures on Severed Lot 3
of B/2022/27-30-F
- Shall be setback 30 metres to the north of the
creek labeled as "Lake Outlet (approx.)" on
Schedule "D" to By-law 2023-106
Despite Sections 4.28.2 d), Shoreline Structures on
Severed Lots 1 and 2 of B/2022/27-30-F
- Shall generally be located in the area described
as "Dock Envelope (approx.)" on Schedule "D"
to By-law 2023-106
- The maximum length of a dock shall be 10
metres, with a maximum width of 4 metres. The
first 3 metres immediately abutting the shoreline
shall be a maximum of 1.5 metres wide
Despite Section 4.8 b) i)
- A registered Condominium access is considered
a legal private right-of-way
That Parts 2 and 6
of 42R-22584 and
the Retained lands
of B-2022-
0027/28/29/30-F
which are zoned as
SR1-152.1(H), shall
be zoned as one
for planning
purposes.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-68
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-152.1 (H)
That Parts 2 and 6
of 42R-22584 and
the Retained lands
of B-2022-
0027/28/29/30-F
which are zoned as
SR1-152 (H), shall
be zoned as one
for planning
purposes as it
relates to permitted
uses in Table 6.1.
LSR-153
(By-law
2023-034)
Despite Sections 4.1.6.1
- The minimum Setback from a waterway for a
Leaching Bed/Private Sewage System shall be
30 metres.
- The minimum Setback from a waterway for a
driveway shall be 30 metres.
Exception to Section
4.1.1 to permit an
existing
accessory
structure
"writers
cabin" before a main
use.
LSR-154
(By-law
2023-042)
Section 6.3, Table 6.2
Maximum Lot Coverage of 17.8%
Section 4.1.3
Maximum Lot Coverage
for accessory
structures of 8.3%
Notwithstanding Section 4.28.5, a boat port shall
be permitted within a waterway less than 61
metres in width
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-69
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Notwithstanding Section 4.28.5, a dock shall be
permitted within a waterway less than 31 metres in
width
SR1-155
(2023-065)
Despite Section 6.3, Table 6.2,
Development shall be setback a minimum of 20
metres from the watercourses, 30 metres from
wetlands and 20 metres from rock barren
communities, as identified as Schedule "C" to By-
law 2023-065
- These lands are
subject to an
agreement
pursuant to Section
51(26) of the
Planning Act that
implements the
recommendations
of the Site
Evaluation
Report/Environmen
tal Impact Study
submitted by
RiverStone
Environmental
Solutions Inc. dated
December 27,
2022.
SR1-156
2023-067
Section 6.3, Table 6.2: Maximum Lot Coverage of
13.15%
Section 4.28.1 j) Table 4.4:
Maximum boathouse width of 14 metres
Section 6.3, Table 6.2: Minimum Front Yard Setback
of 45 metres for a dwelling
Section 4.28, Table 4.3: Minimum Westerly Side
Yard Setback of 19 metres for a boathouse
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-70
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1-157
By-law 2023-
066
Despite Section 6.3, Table 6.2,
- Minimum Lot Frontage = 30 Metres
- Development shall be setback a minimum of 30
metres from the wetland and restricted to the
building envelop as identified in Schedule "C" to
By-law 2023-066
Despite Section 4.1.9, the only permitted uses
within the identified 30 metre wetland
buffer, as identified in Schedule "C" to By-law 2023-
066, are as
follows:
- A walking trail restricted to a maximum of 2
metres in width, using bark chip or other permeable
material
- One amenity space of maximum 5 metres by 5
metres in size. This could include a deck, gazebo or
patio.
-
These lands
are subject to
an
agreement
pursuant to
Section 51(26)
of the
Planning Act
that
implements
the
recommenda
tions of the
Scoped
Environmental
Impact Study
submitted by
Michalski
Nielsen dated
October 11,
2022.
LSR-158
By-law 2023-
077
Section 4.28.2 d)
- Maximum length of a dock shall be 17 metres
Section 4.28.1 i)
Boathouse shall be located no further than 16
metres from the shoreline
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-71
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-159
2023-089
Notwithstanding
the
requirements
of
Section 4.2.2 a) iii)
A secondary dwelling with a gross floor area of 82
square metres
LSR-160
2023-101
Despite Sections:
4.1.4, 4.1.10 c), d) - A Guest Cabin shall be
permitted subject to
- Minimum Front Yard Setback - 74 metres
- Maximum Floor Area - 103 square metres
- Maximum Height - 5. 9 metres
4.21 - a 0 m maximum projection from the Main
Wall shall be permitted for Verandahs, decks, steps,
and open porches.
4.28 b), 4.28.1 b), and 4.28.2 a) - the maximum
width of all in-water or shoreline structures and
facilities shall be 17 metres
4.28.1, Table 4.4 - A 1 storey, 2 internal slip
boathouse is permitted
4.28.2, e) - a Maximum dock/deck surface area of
213 square metres is permitted, inclusive of
boathouse roof,
Section 6.3, Table 6.2 -
A Cottage or Detached Dwelling is permitted,
subject to:
- A Maximum Lot Coverage of 9.76%
- A Maximum Dwelling Gross Floor Area of 540 m2
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-72
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
- A maximum height of 8.2 metres
R1-161
By-law 2023-
111
Minimum Lot Area - 0.29 hectares
Minimum Lot Frontage - Nil
R1-162
By-law 2023-
111
Minimum Lot Area - 0.12 hectares
Minimum Lot Frontage - 40 metres
LSR-163
By-law 2023-
131
Maximum building height permitted for a detached
garage = 5.5 metres
Minimum front yard setback for a detached
garage = 60 metres
Maximum lot coverage = 8.5%
LSR-164
By-law
2024-002
1 Storey, 2 Slip
Boathouse
Minimum setback for a boathouse from the
southern side lot line - 1.56 metres
SR1-165
By-law 2024-
004
Despite Sections:
4.21 - no projection from the Main Wall into the front
yard shall be permitted for Verandahs, decks, and
open porches.
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act to implement the
recommendations of
the Scoped
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-73
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
4.28 c), - the minimum dock setback from the
westerly side lot line shall be 8 metres.
Section 5.3, Tabel 5.6 - a parking area shall be
permitted 0 metres from the rear lot line
Section 6.3, Table 6.2 -
A Cottage or Detached Dwelling is permitted,
subject to:
- A minimum Front Yard setback of 17 metres.
A minimum rear yard setback of 1.2 metres.
Environmental
Assessment,
completed by
Riverstone
Environmental
Solutions Inc., as
amended.
LSR-166
By-law
2024-023
Maximum Lot Coverage = 8.8%
Maximum Lot Coverage within 60 metres of the
Shoreline = 10%
Maximum Dwelling Gross Floor Area = 345.8 square
metres
Minimum Front Yard Setback for a Dwelling = 33.4
metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act to require the
implementation of a
revegetation plan
prepared by a
qualified professional.
LSR-167
By-law 2024-
029
Equipment Storage
Building
Minimum Front Yard Setback for Equipment
Storage Building = 200 metres
Maximum Lot Coverage for Property = 5.3%
Maximum building height for Equipment Storage
Building = 6.5 metres
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-74
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-168
By-law 2024-
036
Section 6.3, Tables 6.2 and 6.3
- Maximum Lot Coverage
within 60 metres of the Shoreline = 8.42%
- Maximum Dwelling Gross Floor Area = 675 square
metres
- Maximum Height = 6.5 metres
- Minimum Front Yard Setback for a Dwelling = 23
metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act to require the
implementation of a
revegetation plan
and site plan as
submitted by HLD
Muskoka.
LSR-169
By-law 2024-
037
A "Entertainment
Pavilion", which is
defined as an
Accessory Building
which is to be used
as an
entertainment
space and is limited
to one bar with one
sink and one
dishwasher, one
washroom facility,
and mechanical
and storage areas.
The
Entertainm
ent
Pavilion is
prohibited
to contain
a Guest
Cabin, or
any
sleeping or
bedroom
or
overnight
accommo
dations.
Cooking
appliance
s and a
kitchen,
Sections 4.1.6 and 4.1.11 -
- An Entertainment Pavilion is permitted subject to a
maximum Gross Floor Area of 104 square metres,
maximum exterior coverage of 115 square metres,
and a minimum front yard setback to Lake Joseph
of 73.05 metres.
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act to require
vegetation retention
around the
Entertainment
Pavilion.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-75
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
which
include a
stove or
range, are
prohibited
LSR-170
By-law 2024-
054
Despite Section 4.8, a Cottage, or Single Detached
Dwelling may be permitted on a lot that fronts onto
crown lands.
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act
SR3-171
By-Law
2024-071
- A
Cottage,
Dwelling,
Guest
Cabin or
non-
waterfront
Accessory
Structure
under
226.70
metres
CGVD-28
- A
Waterfront
Landing
which
provides
access for
more than
one
Section 4.28, 4.28.2
- A Floating or pole dock shall be permitted,
subject to a minimum setback of 15 metres from
side lot lines, and a 12-metre setback from the
watercourse.
- the maximum dock width shall be 2.5 metres
wide.
Section 11.2, Table 11.2 - Only a floating dock in
the EP zone is permitted.
For the purposes of this site-specific zoning, a
floating dock shall not rest on the lake's bed, other
than shoreline connections.
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act to require the
implementation of:
- The FRICorp Natural
Heritage Features
and Areas
Assessment and
Rationale, as
amended and peer-
reviewed.
- A single 2-metre
wide shoreline
pathway through the
EP zone, made out of
natural materials.
- the submission of a
vegetation/landscapi
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-76
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
property
to the
lake.
ng plan, maintaining
a natural shoreline
buffer
- the dock's
placement outside of
the watercourse's
sediment deposit
area.
LSR-172
By-law
2024-076
1 Storey Boathouse
1.5 Storey
Boathouse
Section 6.3
- Minimum Front Yard Setback for Cottage = 18.1
metres
- Maximum Lot Coverage within 60 metres of the
Shoreline = 8.6%
- Maximum Lot Coverage (entire lot) = 7.4%
Section 4.21
- Maximum Deck Projection from the 20 metre
Shoreline Front Yard Setback = 4.3 metres
- Maximum Eaves Projection from the 20 metre
Shoreline Front Yard Setback = 4.3 metres
Section 4.1.5
- Maximum Accessory Structure Encroachment
Height (Retaining Wall) = 2.4 metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act, to ensure
development
proceeds as
depicted and
recommended in the
following drawings
and plans:
- Environmental
Impact Study
prepared by
RiverStone
Environmental
Solutions Inc., dated
August 2010
- Site Plan prepared
by Virginia Burt
Designs, dated
February 2024
- Tree Inventory and
Management Plan
prepared by Virginia
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-77
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
Burt Designs, dated
December 2023.
SR1-173
By-Law
2025-086
Section 6.3, Tables 6.2 and 6.3
- Maximum Lot Coverage
within 60 metres of the Shoreline = 9.49%
- Maximum Dwelling Gross Floor Area = 550 square
metres
Section 4.28.2 e)
- Maximum combined surface area of docks =
180.7 square metres
SR1-174
By-law 2024-
102
2 Guest Cabins
4.1.10 a), c), d) and f) - Guest Cabin
- Maximum of 2 Guest Cabins
- Maximum Floor Area - 135.3 square metres
- Maximum Height - 5.5 metres for a 2 Storey
Guest Cabin
Section 4.1.6 c) and Section 6.3, Table 6.2 - Guest
Cabin
- Minimum Front Yard Setback - 102.8 metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act, to ensure
development
proceeds as
depicted in the
following plan:
-Site Plan prepared
by MB Home Designs,
dated June 17, 2024
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-78
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-175
By-law 2024-
110
Sections 4.1.6 c), 4.14 c), and 6.3
- Minimum Front Yard Setback for a Detached
Carport -15.5 metres
- Maximum Lot Coverage within 60 metres of the
Shoreline - 9.75%
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act, to ensure the
revegetation and
retention of the
shoreline buffer.
SR1-176
By-law 2024-
122
- A maximum of 2
Guest Cabins, one
of which shall be
located within the
½ storey of a
Boathouse
- A maximum of 2
Boathouses, one of
which shall be a 1-
storey, two internal
slip boathouse. The
other boathouse
may be up to a 1 ½
storey boathouse
with a maximum of
three-slips (one of
which shall be a
boat port). Each
shall independently
comply with Table
4.4 of Section 4.28.1
Section 6.3
- Minimum Front Yard Setback for a
Cottage/Detached Dwelling: 66 metres
- Maximum Building Height for a Cottage/
Detached Dwelling: 12.75 metres
Sections 4.28 b), 4.28.1 d), 4.28.2 a) and e)
- Maximum cumulative width of boathouses,
docks, and shoreline structures and facilities: 44
metres
- Maximum combined surface area of all docks
and open decks: 336 square metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act, to ensure the
revegetation and
retention of the
shoreline buffer.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-79
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-177
By-law 2025-
001
- Sections 4.28.1,
Table 4.4
- One boathouse
on the lot is
permitted. A 1 ½
storey Boathouse,
with either one
internal Boatslip
and one external
Boatport slip, or two
internal Boatslips, is
permitted.
Section 6.3 - Table 6.3 - Maximum Lot Coverage
within 60 metres of the Shoreline - 8.89%
- Maximum Dwelling Gross Floor Area - 599 square
metres
Section 4.21 - Maximum projection from the front
wall into the 20-metre front yard setback for
balconies, decks, verandahs, steps, landings and
porches - 0 metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act, to implement
the following:
- that development
generally adheres to
the Justin Sherry,
Project 2021-168 Site
Plan, as amended.
- Re-vegetation and
vegetation retention
plan
- plantings and
buffering on southerly
interior lot line
- slope, stormwater
management and
construction
mitigation report to
be completed by a
qualified professional.
LSR-178
By-law
2025-013
Section 6.3 - Tables 6.2 and 6.3
- Maximum Lot Coverage within 60 metres of the
Shoreline - 13.2%
- Maximum Lot Coverage - 9.7%
- Maximum Dwelling Gross Floor Area - 427.1
square metres
Development shall
be subject to site
plan control,
pursuant to Section
41 of the Planning
Act, to implement a
re-revegetation plan
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-80
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
for the lands within 20
metres of the
shoreline
R1-180
By-Law
2025-027
Section 6.3 - Table 6.3 - - Minimum Lot Frontage -
20 metres
- Minimum Lot Area - 0.5 hectares
Development is
subject to a 51(26)
agreement of the
Planning Act.
LSR-181
By-law
2025-045
Section 6.3 - Table 6.3
- Maximum Lot Coverage within 60 metres of the
Shoreline - 8.6%
Section 4.28.1
-Maximum Height to Highest Main Roof Eave - 4.3
metres
-Maximum Boathouse Width - 15 metres
-Maximum Number of Boat Slips - 3 (2 enclosed
Boathouse slips, 1 Boatport open slip)
Section 4.28.2
-Maximum Combined Surface Area of Docks and
Decks Over the Water - 180 square metres
Section 4.28.5
-Dock and Boathouse permitted in a narrow
waterway
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-81
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
R1-182
By-law
2025-049
Sections 4.1.10, 4.1.11, 4.1.12 and 4.28.1 d)
- A 93 square metre Guest Cabin is permitted in the
second storey of the boathouse.
Section 4.28.1, Table 4.4
- A three-slip boathouse is permitted; one slip shall
be a boatport slip
- A maximum boathouse dimension of 25 metres by
11.1 metres is permitted
Sections 4.28 b), 4.28.1 b), d) and g), 4.28.2 a), d),
e), and Table 4.4
- The minimum setback from the easterly interior side
yard for shoreline structures is 50 metres
- A maximum cumulative width of boathouses,
docks, and shoreline structures and facilities of 28
metres is permitted
- A 2-storey, gambrel roof boathouse is permitted
- A maximum dock length of 17.7 metres is
permitted
- The maximum boathouse height is 4.7 metres for
the easterly two-slip portion, and the maximum
height for the single-slip boathouse is 6.2 metres
Section 4.1.3
- Maximum accessory building and structure lot
coverage - 5%
Section 6.3, Table 6.2
- Maximum Lot Coverage - 5%
Development shall be
subject to site plan
control, pursuant to
Section
41
of
the
Planning
Act,
to
ensure the retention
of
shoreline
revegetation
and
ensure development
generally proceeds in
accordance
with
Schedule C to By-law
2025-049.
The boathouse shall
be
developed
in
general accordance
with
the
drawings
included in Schedule
C to By-law 2025-049,
being drawing A0.10
by
Kilgerman
Architecture Design,
P.C.,
as
dated
02/20/2025.
Any
modification
shall
require
an
amendment to the
Zoning By-law.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-82
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
LSR-183
By-law
2025-091
1 storey, two slip
boatport
Section 6.3 - Table 6.3
- Maximum Lot Coverage within 60 metres of the
Shoreline - 10.65%
- Maximum Lot Coverage (Entire Lot) - 10.55%
SR1-184 (H)
By-law
2026-002
Table 6.4, Section 6.4
-
Minimum setback for buildings and
structures from an EP zone = 30 Metres
-
Minimum setback for buildings and
structures from the shoreline = 20 metres
-
Access shall occur from a year-round
municipally maintained and owned street
Development shall be
subject to site plan
control, pursuant to
Section
41
of
the
Planning
Act,
to
implement
the
following:
- That development
adheres
to
and
implements
the
recommendations of
the
Scoped
Environmental Impact
Study, 11 McNeice
Farm Rd, November
2024, as completed
by
Riverstone
Environmental
Solutions Inc.
- Re-vegetation and
vegetation retention
within 30 metres of the
EP zone.
- ensuring the dock is
located
outside
of
Type 1 Fish Habitat.
Township of Seguin Zoning By-law
Section 6 - Residential Zones
6-83
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special
Provisions
SR1- 185
By-Law 2026-
026
1 storey. One slip
boathouse
Section 6.3 - Table 6.3
- Maximum Lot Coverage within 60 Metres of the
Shoreline - 8.8 %
- Maximum Lot Coverage (Entire Lot) - 8.3%
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-1
SECTION 7
COMMERCIAL ZONES
7.1
GENERAL PROHIBITION
No person shall, within any Commercial Zone, use any land, or erect, alter or use any
building or structure except in accordance with the following provisions.
7.2
PERMITTED USES
Uses permitted in a Zone are noted by the symbol '✓' in the column applicable to that
Zone and corresponding with the row for a specific permitted use in Table 7.1. A
number(s) following the symbol '✓', zone heading or identified permitted use, indicates
that one or more conditions apply to the use noted or, in some cases, to the entire Zone.
Special Conditions are listed in the Footnotes below the Permitted Use Table, Table 7.1.
The Commercial Zones established by the By-law are as follows:
C1
Village Commercial
C2
Marine Commercial
C3
Highway Commercial
C4
Resort Commercial
C5
Camping Establishment
Table 7.1
Column 1
Column
2
Column
3
Column
4
Column
5
Column
6
ZONES
USE
C1
C2
C3
C4
C5
Camping Establishment
Clinic
Commercial Outfitters
Operation
Convenience Store
Cabin Rental
Establishment
Drive-Through Service
Facility
Dry Cleaning or Laundry
Outlet
Dwelling Unit, Accessory
(2)
(2)
(2)
Dwelling, Accessory
Equipment Rental
Establishment
Factory Outlet
Farmers Market
Financial Institution
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-2
Column 1
Column
2
Column
3
Column
4
Column
5
Column
6
ZONES
USE
C1
C2
C3
C4
C5
Fitness Centre
Funeral Home
Grocery Store
Hotel
(1)
Laundromat
Marina
Marine Sales and Service
Establishment
Merchandise Service
Shop
Motel
(1)
Motor Vehicle Gas Bar
Motor Vehicle Rental
Establishment
Motor Vehicle Repair
Facility
Motor Vehicle Sales
Establishment
Motor Vehicle Service
Centre
Motor Vehicle Used Sales
Establishment
Office
Office, Accessory
Open Storage Area,
Accessory
Outside Display or Sales
Area, Accessory
Parking Lot, Commercial
Personal Service Shop
Place of Assembly
Place of Entertainment
Private Club
Restaurant
Retail Store
Retail Store, Accessory
Sales, Service and Repair
Shop
Summer Camp
(1)
Tourist Camp
(1)
Tourist Information Centre
Veterinary Clinic
Video Outlet/Rental Store
Workshop
Footnotes For Table Above
(1)
Only permitted if existing as of the date of passing of this By-law.
(2)
Where an Accessory Dwelling is a permitted use, only one of an Accessory
Dwelling or Accessory Dwelling Unit shall be permitted.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-3
7.3
ZONE REQUIREMENTS
No person shall, within any Commercial Zone, use any lot or erect, alter, use any building
or structure except in accordance with the following zone provisions. A number(s)
following the zone requirement, zone heading or description of the standard, indicates
an additional zone requirement. These additional standards are listed in the Footnotes
at the end of each table.
TABLE 7.2
Footnotes for Table 7.2
(1) Within the Commercial Zones maximum lot coverage shall be calculated
based on the lot area within the Commercial Zone.
(2) A minimum of 90 percent of the front yard shall be used as a shoreline buffer
area.
Column 1
Column
2
Column
3
Column
4
Column
5
Column
6
REQUIREMENTS
ZONES
C1
C2
C3
C4
C5
Lot Area (Minimum)
1.0 ha
1.0 ha
1.0 ha
2.0 ha
2.0 ha
Lot Frontage (Minimum)
40 m
90 m
45 m
90 m
90 m
Lot Coverage(Maximum)
(1)
50%
35%
35%
20%
20%
Required Yards
Front Yard (Minimum)
Nil
20 m
12 m
20 m
20 m
Exterior Side Yard
(Minimum)
5 m
15 m
10 m
15 m
15 m
Rear Yard (Minimum)
8 m
8 m
15 m
20 m
20 m
Interior Side Yard
(Minimum)
3 m
5 m
5 m
15 m
15 m
Gasoline Pump Island
Setbacks (Minimum)
From any lot line
4.5 m
6 m
From any sight triangle
3 m
3 m
Building Height (Maximum)
10.5 m
10.5 m
10.5 m
10.5 m
10.5 m
Landscaping Area
(Minimum)
Nil
10%
20%
20% (2)
20% (2)
Planting Strip Width
(Minimum)
4.5 m
3 m
3 m
3 m
From a side lot line
1.5 m
From a rear lot line
3 m
Planting Strip Location
(3)
(3)
(3)
(3)
(3)
Maximum Number of
Accommodation Units
1 unit
for
each
2.0 m of
lot
frontag
e (4)
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-4
(3) A planting strip shall be required along any portion of a rear lot line
and any portion of a side lot line which abut a Residential Zone or
which abut a lot containing a Residential use.
(4) Does not apply to individual fractional ownership cottages.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-5
7.4
COMMERCIAL ZONES - EXCEPTIONS
In Table 7.3
-
Column 1 sets out the exception number of each zone exception which corresponds to an area of
the Township identified on the Zoning Schedules by the same number and zone, preceded by a dash
and the, denoting an exception. (i.e. SR-88)
-
Column 2 sets out the additional uses permitted in the zone exception, if applicable.
-
Column 3 sets out the only uses permitted in the zone exception, if applicable.
-
Column 4 sets out the prohibited uses in the zone exception, if applicable.
-
Column 5 sets out the new or modified standards for the zone exception, if applicable.
-
Column 6 sets out any additional provisions for the zone exception, if applicable.
All other provisions of the zone, unless specifically modified or amended by this Section, continue to
apply to the lands subject to this Section.
TABLE 7.3
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C1-1
Dwelling, Accessory
Retail store
Bed and Breakfast
Maximum number of
permitted uses allowed
on a lot - 2
Maximum number of
units permitted in an
existing structure - 2
C1-2
Retail store on the
first floor
Dwelling, Accessory
on the second floor
Office on the
second floor
Maximum number of
storeys - 2
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-6
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C1-4
Repealed
by C1-18
(By-law
2010-049)
Office
Minimum required
number of parking
spaces - 3
Maximum number of
parking spaces that may
be provided in a tandem
parking space - 2
C5-5
Hunting camp
Single detached
dwelling
Maximum gross ground
floor area - 46.45 sq.m
Maximum number of
hunt camp users at any
one time - 4
No indoor plumbing
facilities shall be provided.
C5-6
(By-law
2011-013
amending
2007-086)
Summer Camp
Meeting and
retreat facility
All accessory uses
Maximum gross floor area
of all enclosed buildings,
total for all C5-6 zones -
14,000 sq. m.
Maximum gross floor area
of all camp cabins for all
C5-6 zones - 4,500 sq.m.
Minimum required front
yard - 15.0 m
Minimum required
parking spaces for all C5-
6 zones - 100 spaces
Maximum Building Height
for all C5-6 zones - 10.5 m
Overnight
accommodation is
permitted only within an
accommodation building
designed and available
for year round use, a
detached accessory
dwelling, a guest cabin, a
camp cabin, or a tent,
where they are permitted.
"Tent" in the C5-6 zones
shall mean the erection
and temporary use of a
tent to accommodate
staff and guests who are
otherwise
accommodated in an
accommodation building
on site.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-7
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6
(continued)
Notwithstanding Section
4.28.2, for all C5-6 zones,
the Maximum combined
surface area for all docks
shall be 485 sq. m.
"Cabin, Camp" in the C5-
6 zones shall mean a one
storey building that
contains no cooking
facilities, that may contain
washroom facilities, that is
used for staff or guest
accommodation from
May to October only, that
is not built or occupied as
a dwelling unit and that is
not designed or available
for year-round habitation
or use.
"Meeting and retreat
facility" in the C5-6 zones
shall mean an
establishment which is
situated on land that is
owned, used, and
occupied by a religious,
charitable, or other not-
for-profit corporation; is
owned and operated by
a religious, charitable, or
other not-for-profit
corporation; provides
accommodation and
meeting facilities to
organized groups year
round and
accommodation for staff;
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-8
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6
(continued)
(By-law
2011-013
amending
2007-086)
does not provide
accommodation or
services to the general
traveling and vacationing
public; has common
dining and recreational
facilities; and offers
recreational, educational,
social, and cultural
programs to the permitted
guests.
"Summer Camp" in the
C5-6 zones shall mean an
establishment which is
situated on land that is
owned, used and
occupied by a religious,
charitable, or other not-
for-profit corporation; is
owned and operated by
a religious, charitable, or
other not-for-profit
corporation; is a "Class A
Camp" as defined in
Regulation 568, made
under the Health
Protection and Promotion
Act; provides
accommodation to
registered individuals for
extended stays from May
to October only, and
accommodation for staff;
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-9
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6
(continued)
does not provide
accommodation or
services to the general
traveling and vacationing
public; has common
dining and recreational
facilities; and offers
recreational, educational,
social, and cultural
programs to the permitted
guests.
In the definitions of
"summer camp" and
"Meeting and retreat
facility", the provisions "is
situated on land that is
owned, used, and
occupied by a religious,
charitable, or other not-
for-profit corporation" and
"is owned and operated
by a religious, charitable,
or other not-for-profit
corporation" do not apply
at any time that the total
gross floor area of all
enclosed buildings in all
zones does not exceed
7000 sq.m., and in any
event cease to apply after
December 31, 2026.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-10
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6
(continued)
Notwithstanding Section
4.1.8, unenclosed
structures for passive use
by staff or guests, such as
gazebos or chapels, are
permitted to encroach
into the required front
yard.
Pedestrian boardwalks
and bridges are permitted
to encroach into the
required front yard but not
into the abutting Lakeside
Zone.
Notwithstanding Section
4.17, a legally existing
building within the
required front yard may
be extended to further
encroach into the front
yard, provided the
extension is to the rear of
the existing building and
does not increase building
height.
Clearing of vegetation is
not permitted within the
required front yard,
except to enable
construction of permitted
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-11
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
buildings and structures, to
provide for pedestrian
pathways, or to remove
dead or decaying
vegetation.
Sections 3.6 v) and 4.16
shall not apply to those
lands zoned C5-6 or any of
its sub-zone exceptions.
C5-6-A
(By-law
2007-086)
C5-6-A
(continued)
Park, Private
Horseback riding
Cabin, Camp
Accommodation
buildings designed
and available for
year round use
Tents
Buildings and
structures for guest
and staff
recreational use
Common meeting,
dining, recreational,
educational, social,
cultural,
administrative,
maintenance, and
storage buildings
designed and
available for year
round use
Maximum gross floor
area, all enclosed
buildings - 12,000 sq.m
Maximum gross floor area
per building - 1250 sq.m.
Maximum number of
camp cabins - 41
Maximum length of time
that a tent may be
erected - 7 days
All provisions of the C5-6
Zone shall also apply to
this Zone.
From May to October, an
accommodation building
may also be used for any
other permitted use.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-12
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6-B
(By-law
2007-086)
Agriculture
Commercial
Greenhouse
Equipment storage
building
Forestry
Hunt Camp
Kennel
Livestock facility
Horticultural nursery
Accessory produce
outlet
Produce storage
building
Park, Private
Horseback riding
Tents
Buildings and
structures for guest
and staff
recreational use
Maximum length of time
that a tent may be
erected - 7 days
All provisions of the C5-6
Zone shall also apply to
this Zone.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-13
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6-C
(By-law
2007-086)
Detached dwelling
Home occupation
Guest Cabin
Agriculture
Forestry
Park, Private
Horseback riding
Accommodation
buildings designed
and available for
year round use
Buildings and
structures for guest
and staff
recreational use
Common
administrative,
maintenance, and
storage buildings
designed and
available for year-
round use
Maximum gross floor area
of all enclosed buildings -
750 sq.m
Maximum gross floor area
per building - 350.0 sq.m
Maximum lot coverage -
10%
All provisions of the C5-6
Zone shall also apply to
this Zone.
From May to October, an
accommodation building
may be used for any other
permitted use.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-14
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6-D1
(By-law
2007-086)
Park, Private
Horseback riding
Cabin, Camp
Tents
Buildings and
structures for guest
and staff
recreational use
Common
administrative,
maintenance, and
storage buildings
designed and
available for year
round use
Maximum gross floor
area, all enclosed
buildings - 1,500 sq.m
Maximum gross floor area
per enclosed building -
350.0 sq.m
Maximum number of
camp cabins - 10
Maximum length of time
that a tent may be
erected - 7 days
Maximum lot coverage -
10%
All provisions of the C5-6
Zone shall also apply to
this Zone.
C5-6-D2
(By-law
2007-086)
Tents
Buildings, except
for minor
accessory
buildings
Maximum number of
docks - 1
Maximum length of time
that a tent may be
erected - 3 days
Maximum lot coverage -
0.3%
All provisions of the C5-6
Zone shall also apply to
this Zone.
For this Zone, "minor
accessory buildings"
means those such as
outhouses or storage
sheds.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-15
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-6-D3
(By-law
2007-086)
Detached dwelling,
accessory
Park, Private
Horseback riding
Common
administrative,
maintenance, and
storage buildings
designed and
available for year
round use
Maximum number of
detached dwellings,
accessory - 3
Maximum gross floor
area, all enclosed
buildings - 750.0 sq.m
Maximum gross floor area
per building - 250.0 sq.m
Maximum lot coverage -
10%
All provisions of the C5-6
Zone shall also apply to
this Zone.
C5-6-E
(By-law
2007-086)
Agriculture
Forestry
Resource
Management
Flood protection
uses
Conservation uses
Passive Recreation
Bank stabilization
All provisions of the C5-6
Zone shall also apply to
this Zone.
C1-7
Minimum required
number of parking
spaces - As existed on
November 7, 2005
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-16
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C3-8
(By-law
2010-056
amending
2007-062)
Office, Accessory
Retail store and/or
Service shop limited
to hot tubs, fire
places and
accessory products
Private club whose
purpose is limited to
the instruction of
martial arts and is
non-profit
Service and repair
shop
Maximum gross floor area
- 600.0 sq.m
Maximum
height
of
building - 2 storey
Minimum required
number of parking
spaces - 28
C1-9
Single detached
dwelling
A single detached
dwelling shall be
permitted prior to a
commercial use being
established on the lot.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-17
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C3-10
By-Law
2018-088
- Hotel
- Motel
- Motor Vehicle
Repair Facility
- Motor Vehicle
Service Station
- Retail Store
- Service and
Repair Shop
- Tourist
Establishment
- Warehouse and
Storage Building
- Merchandise
Service Shop
- Motor Vehicle
Rental
Establishment
- Motor Vehicle
Sales
Establishment
- Personal Services
Shop
- Public Self Storage
- Fitness Centre
- Workshop
- Office
- Dry Cleaner/
Laundry Outlet
C4-11
Amended
per by-law
2010-056
Fitness Centre,
Accessory
Maximum number of
tourist establishment units
permitted - 147
-
All lands in the C4-11
zone are deemed to
be one lot for
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-18
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C4-11
(continued)
Hotel or motel
containing tourist
establishment units
Office
Restaurant
Retail Store
Wellness Centre
Personal Service
Establishment,
Accessory
Recreation facility,
Accessory
Private Club,
Accessory
Maximum lot coverage -
21.5%
Minimum required front
yard for community-
related accessory
amenity buildings,
excluding a swimming
pool, a cabana, a pump
house and a family
centre - 130.0 m
Minimum gross floor area
of tourist establishment
unit - 92.9 sq. m.
Maximum gross floor area
of tourist establishment
unit - 250.83 sq. m.
Minimum required rear
yard - 10.0 m
Minimum required yard
for fitness centre,
accessory from the
northwest corner of the
property - 7.0 m
Minimum required yard
from Barnwood Drive -
5.3 m
Minimum side yard - 5 m
unless as otherwise
specified by this by-law.
development
purposes.
-
No new docks or
extensions to existing
docks shall be
permitted.
-
A restaurant is
permitted within a
pool cabana only.
-
All required rear yards
shall be used as a
landscaping area
only. For the purposes
of this zone, a
driveway is permitted
within a landscaping
area.
For this purposes of this
zone, "tourist
establishment unit" means
a self-contained unit that
is available for rental at
least one week per
calendar year and
includes sleeping facilities,
private sanitary facilities,
and may contain cooking
facilities, and which forms
part of a "tourist
establishment".
C3-12
By-law
2007-054
Notwithstanding the Zone
Requirements of Table
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-19
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
7.2, the following special
standards shall apply:
Front yard (min) - 3m
Rear yard (min) - 5m
C3-13
(By-law
2007-062)
Notwithstanding the Zone
Requirements of Table
7.2, the following special
standards shall apply:
Minimum required front
yard - 3.0 m
Minimum required rear
yard - 5.0 m
C3-14
(By-law
2008-043
By-law
2015-015
removed
Hold)
Lot Area (Minimum) - 0.14
ha
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-20
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C2-15
(By-law
2008-065)
Minimum required south
side yard for the following
existing structures:
Light Standard - 0.15 m
Dock - 4.0 m
Fuel Tanks - 4.7 m
C4-16
(By-law
2010-011)
Existing Tourist
Camp consisting
of 38 spaces for
mobile camper
trailers, motorized
mobile homes, or
other tourist
vehicles for
recreational or
vacation use.
Existing private seasonal
marine docking and boat
launch facilities solely for
users of the resort/tourist
camp.
C1-17
(By-law
2010-011)
Four (4) dwelling
units in the
principal building
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-21
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C1-18
(By-law
2010-049
Amended
by By-Law
2021-068)
Office on the
ground floor
Maximum 31 square
metres of retail use
on the ground floor
One (1) "Accessory
Dwelling Unit" on
the second floor.
Minimum required
number of parking
spaces - 3
Maximum number of
parking spaces that may
be provided in a tandem
parking space - 2"
C4-19
(By-law
2010-056)
- Utility buildings
accessory to a
golf course
Buildings and
structures
accessory to
tourist
establishment
units located in
C4-11 Zone
Minimum interior side
yard for principal
buildings and structures-
5 metres
Minimum interior side
yard for accessory
buildings and structures 2
metres
C2-20
(By-law
2010-056)
a) One accessory
dwelling unit
that is part of
an office
building
b) One accessory
dwelling
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-22
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-21
(By-law
2010-056)
No building, structure or
land shall be erected or
altered except in
accordance with the
following regulations:
Minimum
Lot
Frontage
170 m
Minimum Lot Area 4 ha
Maximum Lot Coverage
5%
Setbacks
Minimum Front Yard 3.5 m
Minimum
Exterior
Side
Yard 14 m
Minimum
Interior
Side
Yard 15 m
Minimum Rear Yard 5 m
Maximum Height 10 m
-
Place of worship is a
permitted use
-
Accessory buildings
to any permitted use
are permitted
Maximum permitted
height of 14 m for the
building known as
"Stanley House" as
located on the survey
prepared by Douglas
Magee dated
November 25, 1991
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-23
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C2-22
(By-law
2010-056)
Convenience
Store
Retail Store
Stained Glass
Workshop and
Classroom
Cabin Rental
Establishment
Bed and
Breakfast
Establishment
For the purposes of this
zone, "Stained Glass
Workshop and Classroom"
means a facility used for
making stained glass
products and teaching
the art of stained glass
making.
C3-23
(By-law
2011-040)
Accessory
dwelling
Zero meter front yard
setback for the existing
commercial building
(and additions thereto)
adjacent to Little Beaver
Blvd.
C3-24
(By-law
2012-046
Amended
by By-law
2012-071)
Boat storage
building
Outdoor
Storage
Minimum rear yard
setback = 5 metres.
Minimum east interior side
yard setback = 9.14
metres.
Minimum front yard
setback = 15 metres.
The required front yard
shall be maintained as a
natural vegetative buffer,
save and except for
Development of the lands
shall be subject to Site
Plan Control pursuant to
Section 41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-24
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
construction of an
entrance and driveway.
C3-25
See HOLD
(OMB
Decision
PL070771)
hotel, motel
building supply
auto dealer
restaurant
- car, truck and/or
bus parking depot
light industrial uses
contractors yard
warehousing
retail uses
- seasonal camping
establishment with
an accessory
dwelling
- institutional uses
C5-26
(By-law
2015-053)
- Non-motorized
off-road vehicles
and outdoor
recreational
activities
including but not
limited to
mountain biking
events/races, x-
country ski
events/races, x-
country running
events/races as
charitable
events, and
snowmobile
trails.
- No new buildings or
structures except for one
new maximum 560
square metre pole barn
for camp storage uses.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-25
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C5-27
(By-law
2015-053)
- Non-motorized
off-road vehicles
and outdoor
recreational
activities
including but not
limited to
mountain biking
events/races, x-
country ski
events/races, x-
country running
events/races as
charitable
events, and
snowmobile
trails.
- Motorized
Vehicle Rock
Crawl
Competition.
- No new buildings or
structures.
C4-28
(By-Law
2018-044)
-
- Restaurant,
accessory
washrooms
outdoor 40 seat
patio as
approved by
Minor Variances
A-2014-0011-F,
A-2013-009-F
and
A-2012-0003-F.
- A hotel
condominium
containing a
maximum of 12
- Minimum front yard
setback of 6 metres
and southerly side
yard setback of 3.4
metres for the five
waterfront
condominium units.
- Maximum gross floor
area of 280 sq.m,
maximum of 3 storeys,
maximum width of 7.3
metres and maximum
height of 9.78 metres
for only one of the five
waterfront units.
For the purposes of this
by-law, an
"accommodation unit"
means a room or
combination of rooms
intended to be used as
temporary lodging or
sleeping
accommodation and
which may include a
condominium unit.
For the purposes of this
by-law, a "condominium
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-26
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
accommodation
units each
containing no
more than 2
bedrooms.
- accessory
boathouses
consisting of a
maximum of five
slips
- Exception to the
above is that the most
southerly unit (Unit 1)
shall have a maximum
gross floor area of 187
sq.m, maximum of two
storeys, and a
maximum height of
6.52 metres.
--------------------------
- Minimum front yard
setback of 52.6
metres and side yard
setback of 13.2
metres for the seven
rear units.
- Maximum gross floor
area of 241 sq.m,
maximum of 3 storeys,
maximum width of 7.3
metres and maximum
height of 9.78 metres
for any one of the
seven units.
--------------------------
- Accessory boathouses
with a maximum total
of 5 slips.
- Front yard setback of 0
metres.
- Southerly side yard
setback of 3.5 metres.
- Maximum total width
of 36.5 metres and a
length of 11.6 metres
for all five boathouses.
unit" means a unit, as
defined in the
Condominium Act, 1998,
set out in a description
and declaration
registered under section 2
of the Condominium Act,
1998.
For the purposes of this by-
law, a "hotel
condominium" means a
building or group of
buildings that is used as a
hotel with a defined
number of
accommodation units,
and where such
accommodation units
constitute a condominium
unit intended for use by
the general public or the
owner of the
condominium unit.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-27
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
- maximum of gross floor
area of 84.7 sq.m,
maximum of 1 storey,
maximum width of 7.3
metres and maximum
height of 5 metres of
any one boathouse.
--------------------------
- Natural shoreline
buffer of +/-50%.
C4-29
(By-Law
2018-048)
- Notwithstanding
Section 4.28 a) of
Zoning By-law
2006-125, a 1.5
Storey, 2 slip
boathouse is
permitted.
-
Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the Planning
Act.
C3-30
(By-law
2018-049)
- Contractor's
Yard,
accessory
building and
enclosed
outdoor
storage area
- Dwelling,
accessory.
-
- Contractor's Yard
area shall be no
greater than 780
square metres.
- Minimum northerly side
yard setback for the
Contractor's Yard shall
be 10 metres or the
tree drip line,
whichever is greater.
- Minimum setback from
Bartlett Drive for the
Contractor's Yard shall
be 30 metres.
- Minimum setback from
Oastler Park Drive for
the Contractor's Yard
shall be 30 metres.
- Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the
Planning Act.
- For the purposes of the
By-law, the
Contractor's Yard will
be in accordance with
Section 4.11 Home
Industry of Zoning By-
law, save and except
the Special Zone
Requirements noted in
Column 5.
- The operator of the
Contractor's Yard shall
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-28
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
- The Contractor's Yard
shall be enclosed with
a 3.0 metre high board
on board wooden
fence.
- The 144 sq.m
accessory shop shall
be located wholly
within the Contractor's
Yard area.
- Maximum height of
the accessory building
shall be 5 metres.
reside on-site in the
dwelling.
- Access to the
Contractor's Yard from
Bartlett Drive is subject
to half load municipal
road restrictions.
C4-31
(By-law
2019-061)
Cabin Rental
establishment
that includes:
- 2
housekeeping
cabins;
- 5 cabins; and
- Permitted
accessory
uses
- Fitness
Centre;
- Hotel;
- Motel;
- Place of
Entertainment
- Minimum Front Yard
for Office/Tuck Shop
Accessory Building
(Building H) shall be
15.21 metres
- Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the
Planning Act.
- Recreational Carrying
Capacity of subject
property shall not
exceed eight (8) units
as calculated in
accordance with
Seguin Official Plan
Policy B.3.3
C2-32
(By-law
2019-028)
LPAT
Decision
PL190217
Setbacks
Minimum Front Yard:
6.1 metres to the
restaurant;
2.6 metres to the second-
floor patio
8.6 metres to the retail
store.
For the purpose of this
by-law, a boardwalk
along the entire frontage
is permitted.
- For the purpose of this
by-law, 33% of the
required parking is
permitted by boat
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-29
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Minimum Side Yard
Projection:
3.8 metres for a dock.
7.2 meres for a boathouse
Parking
14 parking spaces may
be used by boats along
the docks.
Parking areas shall be
located a minimum
of 0 metres from any
building or structure
and 0 metres from
the northerly lot line
adjacent to Marina
Road.
Boathouse
The maximum height to
the highest roof eave shall
be 4.1 metres.
- The maximum width
shall be 14.3 metres.
The maximum length
shall be 11.43 metres.
provided that the
spaces are found in
front of the lot requiring
such spaces.
C3-33
(By-law
2019-003)
Clinic;
Commercial
Outfitters
Operation;
Convenience Store;
Any use
requiring in
excess of
50,000 litres of
water per
day and/or
any use
As per Section 4.16 of
Zoning By-law 2006-125,
no part of the property
zoned as SR4 shall be
used for or to service the
part of the property
zoned C3-33. All C3-33
Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the
Planning Act.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-30
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Drive-Through
Service Facility;
Dry Cleaning or
Laundry Outlet;
Dwelling Unit,
Accessory;
Equipment Rental
Establishment;
Factory Outlet;
Farmers Market;
Fitness Centre;
Funeral Home;
Grocery Store;
Hotel;
Laundromat;
Marine Sale and
Service
Establishment;
Merchandise
Service Shop;
Motel; Motor
Vehicle Gas Bar;
Motor Vehicles
Rental
Establishment;
Motor Vehicle
Repair Facility;
Motor Vehicle Sales
Establishment;
Motor Vehicle Used
Sales Establishment;
Office; Office
Accessory; Open
generating in
excess of
10,000 litres of
wastewater
per day. This
applies only
to uses which
utilize an on-
site
subsurface
sewage
disposal
system.
infrastructure such as
wells, septic systems,
stormwater management
ponds, shall be situated
within the area zoned C3-
33.
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-31
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Storage Area,
Accessory; Outside
Display or Sales
Area, Accessory;
Parking Lot,
Commercial;
Person Service
Shop; Place of
Assembly; Place of
Entertainment;
Private Club;
Restaurant; Retail
Store; Retail Store,
Accessory; Sales,
Service and Repair
Shop; Tourist
Information Centre;
Veterinary Clinic;
Video Outlet/Rental
Store; Workshop
C3-34
(By-law
2021-063)
- Concrete
Batching Plant
- Bulk Storage
Facility
Building Height
(maximum) = 18.0 m
C3-35
(By-law
2022-063)
Warehouse,
Public Self -
Storage
Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the
Planning Act.
C3-36
(By-law
2023-028)
Open
Storage
Area, Accessory
Outdoor Storage
Despite Section 7.3 - Table
7.2:
- Structures shall be
setback 14 metres from
the exterior side lot line,
Development
shall
be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, which
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-32
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
and 10 metres from the
interior side lot line.
- A Planting Strip width of
5 metres will be
required adjacent to
the exterior lot line,
except for a driveway
to the property.
- A Planting Strip width of
6 metres will be
required adjacent to
the side lot line.
- No driveway shall be
permitted onto Clear
Lake Road.
- Only one driveway
onto Lake Joseph Road
shall be permitted.
Despite Section 5.2.18:
No parking shall be
permitted in the interior
side yard.
shall
require
the
implementation of:
- A stormwater
management report;
- A Scoped
Environmental Impact
Assessment as
completed by
Riverstone
Environmental Solutions
Inc.
C3-37
(By-law
2024-098
-Public Self
Storage
-Warehouse,
Public Self
Storage
Development
shall
be
subject to site plan control,
pursuant to Section 41 of
the Planning Act to require
the implementation of:
-
A
stormwater
management report
- A traffic brief
Township of Seguin Zoning By-law
Section 7 - Commercial Zones
7-33
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
C3-38 (H)
By-Law
2025-052
- Warehouse,
Public Self
Storage Unit
-Contractors Yard
-Light Equipment
Rental
Establishment
- Equipment
Storage Building
- Workshop
Holding provision applies
to
the
entire
site
to
preclude any new use on
the
lands
until
certain
undertakings
are
complete to ensure the
orderly development of
the
site.
These
undertakings
would
be
secured
through
conditions
of
approval
associated
with
the
implementing draft plan of
subdivision and/or draft
plan of condominium.
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-1
SECTION 8
INDUSTRIAL ZONES
8.1
GENERAL PROHIBITION
No person shall, within any Industrial Zone, use any land, or erect, alter or use any
building or structure except in accordance with the following provisions.
8.2
PERMITTED USES
Uses permitted in a Zone are noted by the symbol '✓' in the column applicable to
that Zone and corresponding with the row for a specific permitted use in Table 8.1.
A number(s) following the symbol '✓' , zone heading or identified permitted use,
indicates that one or more conditions apply to the use noted or, in some cases, to
the entire Zone. Special Conditions are listed in the Footnotes below the Permitted
Use Table, Table 8.1.
The Industrial Zones established by this By-law are as follows:
M1
Village Industrial
M2
General Industrial
M3
Light Industrial
MP
Aggregate Pit
MQ
Aggregate Pit and Quarry
AR
Airport
AR1
Airport Industrial
Table 8.1
Column 1
Column 2
Column
3
Column
4
Column
5
Column
6
Column
7
Column
8
ZONES
USE
M1
M2
M3
MP
MQ
AR
AR1
Adult Video Store
Airport
Bulk Storage Facility
Contractor's Yard
Dry Cleaning or
Laundry Plant
Dwelling, Accessory
Dwelling Unit,
Accessory
Equipment Storage
Building
Factory Outlet
Farm Implement
Sales and Service
Gasoline Pump
Island, Accessory
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-2
Column 1
Column 2
Column
3
Column
4
Column
5
Column
6
Column
7
Column
8
ZONES
USE
M1
M2
M3
MP
MQ
AR
AR1
Light Equipment
Rental Establishment
Maintenance
Garage, Accessory
Manufacturing and
Processing
Manufacturing and
Processing Facility
(Cannabis -
Designated)
(1)
(1)
(1)
(1)
Manufacturing and
Processing Facility
(Cannabis -
Licensed)
(1)
(1)
(1)
(1)
Merchandise
Service Shop
Motor Vehicle Body
Shop
Motor Vehicle
Repair Facility
Office. Accessory
Open Storage Area
Pit, Sand and Gravel
Quarry
Research
Establishment
Restaurant
Sanitary Landfill Site
Training Facility
Transportation
Depot
Warehouse
Warehouse, Public
Self-Storage
Warehouse,
Wholesale
Waste Landfill,
Existing
Waste Processing
Facility, Existing
Waste Transfer
Facility, Existing
Wind Turbine
Generator
Workshop
Footnotes for Table 8.1
(1) Designated and Licensed Cannabis Manufacturing and Processing Facilities only
permitted by Zoning By-law Amendment.
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-3
8.3
ZONE REQUIREMENTS
No person shall, within any Industrial Zone, use any lot or erect, alter, use any building
or structure except in accordance with the following zone provisions. A number(s)
following the zone requirement, zone heading or description of the standard,
indicates an additional zone requirement. These additional standards are listed in
the Footnotes at the end of each table.
Table 8.2
Column 1
Column
2
Column
3
Column
4
Column
5
Column
6
Column
7
Column
8
ZONES
STANDARD
M1
M2
M3
MP
MQ
AR
AR1
Lot Area (Minimum):
1.0 ha
2.0 ha
1.0 ha
10.0 ha
10.0 ha
1.0 ha
1.0 ha
Lot Frontage (Minimum)
40 m
60 m
50 m
120 m
120 m
45 m
45 m
Lot Coverage (Maximum)
30%
30%
30%
20%
20%
20%
30%
Required Yards:
(4)
(4)
(4)
(4)
(4)
Front Yard (Minimum)
10 m
15 m
12 m
30 m
50 m
12 m
12 m
Exterior Side Yard
(Minimum)
7.5 m
15 m
12 m
15 m
50 m
12 m
12 m
Rear Yard (Minimum)
10 m
15 m
12 m
30 m
50 m
15 m
15 m
Interior Side Yard
(Minimum)
7.5 m
10 m
10 m
30 m
30 m
5 m
5 m
Excavation Setbacks
(Minimum)
(3)
(3)
Building Height
(Maximum)
12 m
12 m (1)
12 m (1)
12 m (1)
12 m (1)
15 m
15 m
Landscaping Area
(Minimum)
15%
10%
10%
5%
5%
15%
15%
Planting Strip Width
(Minimum)
3 m
6 m
6 m
15 m
15 m
7.5 m
7.5 m
Planting Strip Location
(2)
(2)
(2)
(2)
(2)
(2)
Footnotes For Table 8.2
(1)
The maximum height for an accessory detached dwelling shall be 10 metres.
(2)
A planting strip having a minimum width of 3.0 metres shall be required along each
front lot line and along any portion of a rear lot line, which abuts a Residential Zone
line or a lot containing a Residential use, and along any portion of a side lot line
which abuts a Residential zone or a lot containing a Residential use.
(3)
As required by the Aggregate Resources Act.
(4)
Designated and Licensed Cannabis Manufacturing and Processing Facilities with
Air Treatment Control must:
(a) have a setback a minimum of:
(i)
15 m from property lines,
(ii)
75 m from an abutting residence or cottage or residentially-zoned
land if the said facility is located in the Rural and Resource Area as
established in the Seguin Official Plan,
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-4
(iii)
75 m from a Settlement Area boundary as established in the Seguin
Official Plan if the said facility is located in the Rural and Resource
Area, and
(iv)
75 m from land dedicated, zoned, or otherwise identified as
Institutional (I) Zones, public parkland, Open Space (OS) Zones, or
Shoreline Areas as established in the Seguin Official Plan;
(b) be located completely within a building;
(c) not have any outdoor storage; and,
(d) not be located in a dwelling.
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-5
8.4
INDUSTRIAL ZONES - EXCEPTIONS
The provisions of this Section are modified as set out in Table 8.3 below.
-
Column 1 sets out the exception number of each zone exception which corresponds to an area of the
Township identified on the Zoning Schedules by the same number and zone, preceded by a dash and
the, denoting an exception. (i.e. SR-88)
-
Column 2 sets out the additional uses permitted in the zone exception, if applicable.
-
Column 3 sets out the only uses permitted in the zone exception, if applicable.
-
Column 4 sets out the prohibited uses in the zone exception, if applicable.
-
Column 5 sets out the new or modified standards for the zone exception, if applicable.
-
Column 6 sets out any additional provisions for the zone exception, if applicable.
All other provisions of the zone, unless specifically modified or amended by this Section, continue to apply to
the lands subject to this Section.
TABLE 8.3
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
M1-1
Industrial uses that
generate any
effluent other
than domestic
waste less than
4,500 litres per
day.
MP-2
Open Storage Area,
Accessory
Motor Vehicle
Repair Facility
For the purposes of this by-
law, the lot described as
For the purposes of this
zone a "Portable Ready Mix
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-6
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
(Amended
per By-law
2010-056)
Portable Ready Mix
Plant
Washout Facility,
Accessory
Part of Lot 1 Concession 11,
former Township of
Humphrey, now Township of
Seguin, District of Parry
Sound, particularly
described as, Part of Lot 1,
Concession 1 and including
Parts 1 to 9 and 14 to 29 on
Plan PSR 1761 and Parts A
and B on Plan PSR 1761 shall
be considered as one lot
for development purposes.
Plant" means an operation
that includes a structure
that is not affixed to the
ground on a permanent
basis, but may be allowed
to remain permanently, is
dust controlled, and
manufactures materials to
produce ready mix
concrete as the final
product. In addition,
accessory uses to the
ready-mix plant may be
permitted, these uses may
consist of aggregate
stockpiles, office area,
generator and fuel storage,
washout facility, heavy
equipment (i.e. loader),
boiler, block forms and
overnight storage of ready-
mix trucks. All of which will
be adequately buffered
from any streets or
adjacent properties. Uses
shall not be permitted to
include vehicle
maintenance or repairs.
M3-3
Dwelling Unit -
Accessory
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-7
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
MQ-4
(By-law
2008-045)
Lot Frontage (Minimum) -
60 metres
MQ-5
(By-Law
2010-056)
MQ-5 cont.
Portable Ready Mix
Plant
Motor Vehicle
Repair Facility
For the purposes of this by-
law, the lot described as
Part of Lot 1 Concession 11,
former Township of
Humphrey, now Township of
Seguin, District of Parry
Sound, particularly
described as, Part of Lot 1,
Concession 1 and including
Parts 1 to 9 and 14 to 29 on
Plan PSR 1761 and Parts A
and B on Plan PSR 1761 shall
be considered as one lot
for development purposes.
For the purposes of this
zone a "Portable Ready Mix
Plant" means an operation
that includes a structure
that is not affixed to the
ground on a permanent
basis, but may be allowed
to remain permanently, is
dust controlled, and
manufactures materials to
produce ready mix
concrete as the final
product. In addition,
accessory uses to the
ready-mix plant may be
permitted, these uses may
consist of aggregate
stockpiles, office area,
generator and fuel storage,
washout facility, heavy
equipment (i.e. loader),
boiler, block forms and
overnight storage of ready-
mix trucks. All of which will
be adequately buffered
from any streets or
adjacent properties. Uses
Township of Seguin Zoning By-law
Section 8 -Industrial Zones
8-8
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
shall not be permitted to
include vehicle
maintenance or repairs.
M1-6
(By-law 2013-
055)
Warehouse
M1-7
- Contractors
yard
- Workshop
- Single family
dwelling.
- No person other than the
person(s) living on the
premises shall be
engaged in the
operation of the
workshop and
contractors yard.
M1-8
- Contractors
yard
- Saw mill
- Single family
dwelling.
- No person other than the
person(s) living on the
premises shall be
engaged in the
operation of the
contractors yard and
sawmill.
M1-9
(By-law 2023-
033)
Minimum lot area = 0.35
hectares
Township of Seguin Zoning By-law
Section 9 - Institutional and Open Space
9-1
SECTION 9
INSTITUTIONAL AND OPEN SPACE ZONES
9.1
GENERAL PROHIBITION
No person shall, within any Institutional or Open Space Zone, use any land, or erect, alter
or use any building or structure except in accordance with the following provisions.
9.2
PERMITTED USES
Uses permitted in a Zone are noted by the symbol '✓' in the column applicable to that
Zone and corresponding with the row for a specific permitted use in Table 9.1. A
number(s) following the symbol '✓' , zone heading or identified permitted use, indicates
that one or more conditions apply to the use noted or, in some cases, to the entire Zone.
Special Conditions are listed in the Footnotes below the Permitted Use Table, Table 9.1.
The Institutional and Open Space Zones established by this By-law are as follows:
I
Institutional
OS1
Open Space One
OS2
Open Space Two
LS
Lakeside
Table 9.1
Column 1
Column 2
Column 3
Column 4
Column 5
ZONES
USE
I
OS1
OS2
LS
Adult Day Centre
Cemetery
Community Centre
Conservation
Crisis Care Facility
Day Care Centre
Dwelling Unit, Accessory
(1)
Dwelling, Accessory
Emergency Service Facility
Forestry
Golf Course
Hospital
Library
Long Term Care Facility
Museum
Park, Provincial
Park
Place of Worship
Township of Seguin Zoning By-law
Section 9 - Institutional and Open Space
9-2
Column 1
Column 2
Column 3
Column 4
Column 5
ZONES
USE
I
OS1
OS2
LS
School
Sports Arena
Wellness Centre
Uses accessory to a permitted
use on the appertaining lands
in accordance with Section
4.28
Footnotes for Table 9.1
(1)
Where an Accessory Dwelling is also a permitted use, only one of an
Accessory Dwelling or an Accessory Dwelling Unit shall be permitted.
9.3
ZONE REQUIREMENTS
No person shall, within any Institutional or Open Space Zone, use any lot or erect, alter,
use any building or structure except in accordance with the following zone provisions. A
number(s) following the zone requirement, zone heading or description of the standard,
indicates an additional zone requirement. These additional standards are listed at the
end of each table.
Table 9.2
Column 1
Column 2
Column 3
Column 4
Column 5
ZONES
STANDARD
I
OS1
OS2
LS
Lot Area (Minimum)
0.8
Nil
4.0 ha
NIL
Lot Frontage (Minimum)
45 m
Nil
150 m
NIL
Other lots
Golf course
Other uses
Coverage (Maximum)
35%
20%
5%
(2)
Required Yards:
Front Yard (Minimum)
10 m
20 m
20 m
Nil
Exterior Side Yard (Minimum)
6.5 m
15 m
15 m
Nil
Rear Yard (Minimum)
7.5 m
15 m
15 m
Nil
Interior Side Yard (Minimum)
5 m
15 m
6 m
2 m
Building Height (Maximum)
12 m
10 m
10 m
Nil
Landscaping Area (Minimum)
30%
Nil
Planting Strip Location
(1)
Nil
Footnotes For Table 9.2
(1)
A planting strip shall be required along any portion of a rear lot line and any portion
of a side lot line which abut a Residential Zone or a Residential use.
(2)
Subject to the provisions in the appertaining zone and the requirements of Section
4.28.
Township of Seguin Zoning By-law
Section 9 - Institutional and Open Space
9-3
9.4
INSTITUTIONAL AND OPEN SPACE ZONES - EXCEPTIONS
The provisions of this Section are modified as set out in Table 9.3 below.
-
Column 1 sets out the exception number of each zone exception which corresponds to an area of the Township
identified on the Zoning Schedules by the same number and zone, preceded by a dash and the, denoting an
exception. (i.e. SR-88)
-
Column 2 sets out the additional uses permitted in the zone exception, if applicable.
-
Column 3 sets out the only uses permitted in the zone exception, if applicable.
-
Column 4 sets out the prohibited uses in the zone exception, if applicable.
-
Column 5 sets out the new or modified standards for the zone exception, if applicable.
-
Column 6 sets out any additional provisions for the zone exception, if applicable.
All other provisions of the zone, unless specifically modified or amended by this Section, continue to apply to the
lands subject to this Section.
TABLE 9.3
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
OS2-1
Golf course
School, commercial
OS2-2
Accessory
buildings and
structures related
to the golf course
Fitness Centre
Minimum setback to the
limits of a public road or
private road, excluding
fairways and walkways -
30.0 m
Minimum setback to a
dwelling unit, excluding
fairways and walkways -
30.0 m
For the purposes of this
Zone, "indoor and outdoor
private recreational facility
or structure" means a
building or place within the
condominium designed for
the active and passive
recreational pursuits of
persons during their leisure
time and, without limiting
the foregoing, may include
a golf course, driving range,
Township of Seguin Zoning By-law
Section 9 - Institutional and Open Space
9-4
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
OS2-2
(cont'd)
Maximum building height -
the lesser of 10.5 m or 2
storeys
Maximum ground floor
area, all buildings and
structures - 1700.0 sq.m
Minimum required number
of parking spaces - 50
Minimum setback from the
high water mark - 30.0 m
Minimum percentage of
the yard between all
buildings and structures and
the high water mark to be
maintained in a natural
vegetated state - 100%
pro shop, club house and
associated restaurant.
For the purposes of this
Zone, "private road" means
a road which is in private
condominium ownership
and is maintained as such.
I-3
Detached Dwellings
for staff
Multiple Dwelling
Office
Park
Restaurant
Minimum Lot Frontage
200 m
Minimum Lot Area - 8.0 ha
Minimum Lot Depth - 100 m
Maximum Lot Coverage -
35%
Minimum Required Yards:
Front
15.0 m
Interior side
5.0 m
Exterior side
15.0 m
Rear
5.0 m
OS2-4
(By-Law
2010-056)
Private Park
Dock - not
exceeding 3
Boat Launching
Ramp
Township of Seguin Zoning By-law
Section 9 - Institutional and Open Space
9-5
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone Requirements
Other Special Provisions
metres in width
and 15 metres in
length and
approved by
MNR
OS1-5
(By-law
2012-095)
(By-Law
2022-046)
Conservation
uses.
OS1-6
See HOLD
(OMB
Decision
PL070771)
seasonal camping
establishment
OS1-7
(By-Law
2019-087)
Conservation
uses.
OS2-8
By-Law 2025-
080
- All Buildings
- All Structures
- Docks
- Community
Centre
- Dwelling Unit
- Golf Course
- Park, Provincial
Minimum lot frontage =
Existing
Minimum lot area = Existing
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-1
SECTION 10
RURAL ZONES
10.1
GENERAL PROHIBITION
No person shall, within any Rural Zone, use any land, or erect, alter or use any
building or structure except in accordance with the following provisions.
10.2
PERMITTED USES
Uses permitted in a Zone are noted by the symbol '✓' in the column applicable
to that Zone and corresponding with the row for a specific permitted use in Table
10.1. A number(s) following the symbol '✓' , zone heading or identified permitted
use, indicates that one or more conditions apply to the use noted or, in some
cases, to the entire Zone. Special Conditions are listed in the Footnotes below the
Permitted Use Table, Table 10.1.
The Rural Zones established by this By-law are as follows:
RU
Rural
RR
Rural Residential
RI
Rural Industrial
RC
Rural Commercial
Table 10.1
Column 1
Column
2
Column
3
Column
4
Column
5
ZONES
USE
RU
RR
RI
RC
Agriculture
Bed and Breakfast Operations
Camping Establishments
Cemetery
Commercial Greenhouse
Contractor's Yard
Convenience Store
Custom Workshop
Dwelling Unit, Accessory
(1)
(1)
Dwelling Unit, Secondary
Dwelling, Detached
Emergency Service Facility
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-2
Column 1
Column
2
Column
3
Column
4
Column
5
ZONES
USE
RU
RR
RI
RC
Equipment Storage Building
Forestry
Gasoline
Pump
Island,
Accessory
Group Home Type 1
Group Home Type 2
Home Industry
Home Occupation
Hunt Camp
Kennel
Livestock Facility
Marine Sales and Service
Establishment
Nursery, Horticultural
Produce Outlet, Accessory
Produce Storage Building
Recreation Trails
Recreational
Vehicle
Sales
and Service Establishment
Saw Mill
Workshop
Veterinary Clinic
Footnotes for Table 10.1
(1)
Where an Accessory Dwelling is also a permitted use, only one
of an Accessory Dwelling or an Accessory Dwelling Unit shall
be permitted.
10.3
ZONE REQUIREMENTS
No person shall, within any Rural Zone, use any lot or erect, alter, use any building
or structure except in accordance with the following zone provisions. A number(s)
following the zone requirement, zone heading or description of the standard,
indicates an additional Zone requirement. These additional standards are listed
at the end of each table.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-3
Table 10.2
Column 1
Column
2
Column
3
Column
4
Column
5
ZONES
STANDARD
RU
RR
RI
RC
Lot Area (Minimum)
4.0 ha
1.2 ha
2.0 ha
2.0ha
Lot Frontage (Minimum)
150 m
90 m
150 m
120 m
Coverage (Maximum)
5%
5%
5%
5%
Required Yards (Minimum):
(1)(2)
(1)(2)
(1)(2)
(1)(2)
Front Yard
15 m
10 m
15 m
15 m
Exterior Side Yard
15 m
10 m
15 m
15 m
Interior Side Yard
10 m
5 m
10 m
10 m
Rear Yard
15 m
10 m
15 m
15 m
Building Height (Maximum)
10 m
10 m
10 m
10 m
Footnotes For Table 10.2
(1)
All non-residential buildings shall have a minimum setback of 20 m
from a lot line abutting a Residential Zone or a lot containing a
residential use.
(2)
Hunt Camps where permitted shall meet the following regulations:
a)
Lot Area (minimum)
25 hectares
b)
Street Setback (minimum)
100 metres
c)
Lot Line Setback (minimum)
50 metres
d)
Gross Floor Area (maximum)
70 square metres
(3)
Kennels
where
permitted
shall
meet
the
following
requirements:
a)
Lot Area (minimum)
5 hectares
b)
Setback from lot line (minimum) 60 metres
c)
Setback from dwelling
on another lot
(minimum)
120 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-4
10.4
RURAL ZONES - EXCEPTIONS
The provisions of this Section are modified as set out in Table 10.3 below.
- Column 1 sets out the exception number of each zone exception which corresponds to an area of the Township identified
on the Zoning Schedules by the same number and zone, preceded by a dash and the, denoting an exception. (i.e. SR-88)
- Column 2 sets out the additional uses permitted in the zone exception, if applicable.
- Column 3 sets out the only uses permitted in the zone exception, if applicable.
- Column 4 sets out the prohibited uses in the zone exception, if applicable.
- Column 5 sets out the new or modified standards for the zone exception, if applicable.
- Column 6 sets out any additional provisions for the zone exception, if applicable.
All other provisions of the zone, unless specifically modified or amended by this Section, continue to apply to
the lands subject to this Section.
Table 10.3
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RC-1
RC-1
- Building supply
outlet
- Contractors yard
- Farmer's market
- Marina
- Marina sales and
service
establishment
- Restaurant
Development of the lands
shall be subject to Site Plan
Control, pursuant to
Section 41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-5
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
(continued)
- Retail store
- Service and repair
shop
- Veterinary clinic
- Warehouse
- Workshop
- Battery Storage
Facility
RC-2
Commercial self-
storage facility
Storage of wood
poles, electrical
equipment, line and
bucket trucks,
commercial heavy
equipment, truck
trailers
RI-3
Dwelling, accessory
Industrial use
Outside display or
sales area
Retail store, accessory
Permitted location for
outside display or sales
area - The required yard
between the main
building and Highway
69/400
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-6
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RC-4
(Amended by
By-law 2012-079
and 2017-046
and 2017-087
and
2018-020)
-
Recreational
vehicle sales
and service
establishment
-
Retail store,
accessory
-
Service and
repair shop
-
Snowmobile
dealer
-
Storage,
accessory
-
Workshop
-
Marine Sales
and Service
Establishment
Maximum lot coverage =
6%
- All other provisions of
the Rural Commercial
(RC) Zone shall apply
Development shall be
subject to Site Plan Control,
pursuant to Section 41 of
the Planning Act
RR-5
Minimum elevation for a
dwelling unit - 3.65 m
above the CN Rail track
on adjacent lands
Minimum landscape
buffer required adjacent
to CN Rail track- 30.0 m
Any dwellings constructed
on the property shall be
constructed using a brick
veneer or acoustic
masonry equivalent.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-7
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RC-7
Retail Warehouse
RI-8
Water-taking use
The Holding (H) provision
shall be removed subject
to the following: the
completion of a
hydrological study to the
satisfaction of the
Township, which shall
identify the volume of
water to be extracted daily
and advise that there will
be no negative impacts on
the ground water supplies
in the area; the registration
of a Site Plan Agreement
on title; and the acquisition
of a Permit to Take Water
should the use propose to
extract more than 50,000
L/day of water.
RU-9
Accessory Building
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-8
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-10
(By-law
2007-062)
The erection of one
detached dwelling on
lands not fronting upon
and improved public street
shall be permitted
RU-11
(By-law
2007-125)
- Minimum front yard
setback for a Hunt
Camp- 30 m
- Minimum Lot Coverage
Area - 23 ha
RR-12
(By-law
2009-101)
- permit the outdoor
processing, storage
and sale of
firewood by the
owner of the
property
- permit the storage
of logs, parking of
the owner's vehicles
and logging
equipment in
accordance with
the outdoor storage
requirements of
Section 4.19 of the
Zoning By-law 2006-
125.
subject to site plan control
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-9
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-13
(By-law
2009-102)
1) Outdoor boat
storage + boat
storage structures
2) vehicle and boat
trailer parking
- Minimum front yard
setback from Bradshaw
Road = 30 metres
- Maximum vehicle
parking and boat
storage area = 1.2
hectares
- All other provisions of
Zoning By-law 2006-125
shall apply.
Development of the
subject lands shall be
subject to Site
Development of the
subject lands shall be
subject to Site Plan Control
pursuant to Section 41 of
the Planning Act.
RU-14
(By-law
2010-064)
Driving Range
- Maximum of 17 tee
boxes
- Driving range use,
Parking areas and
accessory structures to
be located in
accordance with
approved Site Plan.
Development of the
subject lands shall be
subject to Site Plan Control
pursuant to Section 41 of
the Planning Act.
RU-15
(By-law 2012-006)
-Existing 390 square
metre Contractor's
workshop
-446 square metre
Contractor's
Implement shed
-accessory
Permitted uses shall not
occupy an area greater
than 0.85 hectares.
The precise boundary of
the RU-15 Zone shall be
delineated on the site
plan drawing.
Development shall be
subject to Site Plan Control
pursuant to Section 41 of
the Planning Act.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-10
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
outdoor storage of
landscaping and
construction materials
-accessory outdoor
machinery storage
RU-16
(By-law 2012-
0007)
-Minimum lot frontage =
48.4 metres
-Minimum lot area = 0.67
hectares
RR-17
(By-law 2013-084)
- Minimum lot frontage 70
metres
RR-18
(By-law 2013-084)
- Home occupation
within an existing
accessory building
- Minimum lot frontage 80
metres
RU-19
(By-law 2014-043)
- Indoor and outdoor
watercraft, utility
trailer, and
watercraft
accessories storage.
- Marine service
facilities, including
watercraft
winterization and
commissioning,
minor marine
mechanical repair,
shrink-wrapping,
- Minimum required side
yard setback from west
interior side lot line to
boundary of RU-19 Zone
= 25 metres.
- Minimum required front
yard setback from front
lot line to boundary of
RU-19 Zone = 235 metres.
- Maximum indoor and
outdoor marine storage
and marine service
- Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-11
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
and minor
watercraft and utility
trailer servicing.
facility activity area = 0.7
hectares.
- Maximum number of
buildings: 3
- Maximum gross floor
area for all buildings and
structures within the RU-
19 Zone = 820 square
metres.
- The precise boundary of
the RU-19 Zone shall be
delineated on the site
plan drawing.
RR-20
(By-law 2014-055)
Minimum lot area of 0.25
hectares deemed to
comply
RU-21
(By-law 2016-076)
- Only one secondary
dwelling unit is permitted
in addition to the
principal dwelling and
that the maximum
square footage of the
secondary dwelling unit
shall be no greater than
148.9 sq.m (1,603 sq.ft).
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-12
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-22
(By-law 2016-082)
Minimum east interior
side yard setback for
single detached dwelling
= 300 metres to
boundary of adjacent
MQ Zone.
RI-23
(Amended by
By-law 2017-030
By-law 2018-029)
- Contractors yard +
accessory outdoor
storage area
- Retail Store
- Office
- Equipment storage
building
- Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the Planning
Act.
RC-24
- Warehouse, Public
Self Storage
Outdoor Storage,
Accessory
- Front yard setback = 12
metres
- Exterior side yard
setback = 12 metres
- Maximum permitted lot
coverage for
Warehouse, Public Self
Storage = 12%
- Maximum permitted
Outdoor Storage = 2000
square metres
- All other provisions of
Zoning By-law 2006-125
shall apply to the
subject lands
- Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the Planning
Act.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-13
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RR-25
(By-law 2018-015)
- Minimum lot area = 0.2
Hectares
- Minimum lot frontage =
36 metres
- Maximum lot coverage
= 8.6%
- Minimum front yard
setback = 2.4 metres
- Minimum dwelling side
yard setback = 2.4
metres
- Minimum dwelling deck
side yard setback = 3.4
metres
RR-26
(By-law 2018-025)
Detached garage
(accessory to dwelling
located at CON 1 PT
LOT 35 RP
PSR1071;PART 9
TOGETHER WITH R-O-
W;PCL 14393 S/S
HORSESHOE LK - 4903-
040-004-01808 )
- All other provisions of
Zoning By-law 2006-125
shall apply.
RR-27
(By-law 2018-038)
- Minimum lot area = 1.15
Hectares
RR-28
(By-law 2018-100)
- Minimum lot area = 0.7
hectares
- Minimum lot frontage =
82 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-14
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-29
(By-law 2018-107)
- Minimum setback for
septic sewage disposal
system to shoreline of
Sucker Lake = 300
metres
RR-30
(By-law 2019-026)
- Minimum setback for
single detached
dwelling to identified
wetland features = 30
metres.
- All other requirements
of the Rural Residential
(RR) Zone shall apply.
- Development shall be
subject to Site Plan
Control pursuant to
Section 41 of the
Planning Act. Site Plan
Approval shall
implement the
recommendations of
the "Site Evaluation
Report", prepared by
Beacon Environmental
Ltd. dated January
2019.
RU-31
(By-law 2019-041)
- Minimum setback for
septic sewage disposal
system to shoreline of
Seguin River = 300
metres
RU-34
(By-law 2019-102)
- Minimum lot frontage =
83.8 metres
RU-35
(By-law 2019-102)
- Minimum lot frontage =
85.2 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-15
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-36
(By-law 2019-102)
- Minimum lot frontage =
78.8 metres
RR-37
(By-law 2020-065)
- Minimum lot frontage =
52.12 metres
- Minimum lot area = 0.81
hectares
- Minimum septic system
setback to Tucker Lake
= 300 metres
RU-38
(By-law 2020-065)
- Minimum lot frontage =
55.5 metres
RU-39
(By-law 2021-025)
- Minimum lot frontage =
100 metres
- Minimum lot area = 2
hectares
RR-40
(By-law 2022-023)
- Hunt Camp
- Minimum lot frontage =
70 metres
- Minimum setback for
development to rail line
=300 metres
- Minimum setback for
septic sewage disposal
system to shoreline of
Otter Lake= 300 metres
Development shall be
subject to Site Plan Control
pursuant to Section 41 of
the Planning Act. Site Plan
Approval shall implement
the recommendations of
the "Scoped
Environmental Impact
Study", prepared by
Michalski Nielsen
Associates Limited, dated
October, 2021.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-16
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RI-41
(By-law 2022-046)
- Storage Building
Limited to 700 square
metres in size
RR-42
(By-law 2022-061)
Minimum Lot Frontage of
35 metres on Rose Point
Road
RU-43
(By-law 2022-073)
- Secondary
dwelling unit within
accessory building.
- Despite Section 4.1.4,
the accessory building
with a secondary
dwelling unit is subject to
a maximum height of 5.5
metres.
- Despite Section 4.2.2, a)
iii) the secondary
dwelling unit is permitted
a maximum floor area of
130 square metres.
- Despite Section 4.2.2, b)
i), an accessory building
with a secondary unit is
permitted between the
Provincial Highway and
the primary dwelling
unit, subject to a
setback of 45 metres
from the Provincial
Highway.
- A minimum interior side
yard setback of 14
metres.
RU-44
(By-law 2022-076)
- Minimum lot frontage =
108 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-17
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-45
(By-law 2022-076)
- Minimum lot area = 2.4
hectares
- Minimum Interior Side-
yard Setback to existing
shed = 5 metres
RU-46
(By-law 2022-096)
- Minimum lot frontage =
70 metres
RR-47
(By-law 2022-096)
- Minimum lot frontage =
60 metres
- Minimum lot area = 0.8
hectares
RR-49
By-Law 2024-064
Despite Section
10.2, Table 10.1,
the following
Additional uses
may be permitted:
-
Public Self
Storage
-
Warehouse,
Public Self
Storage
-
Outdoor
Storage
-
Private
Sewage
System which
services
Public
Self
Storage units
Despite
Section
10.3
-
Table 10.2, a maximum of
85 units within a Public Self
Storage or Warehouse
Public Self Storage building
shall be permitted, subject
to:
-
A
maximum
Building Height of 6 metres
-
A
Planting
Strip
width of 6 metres wide
between the self-storage
use and Residential Zones,
and 3 metres on other lot
lines
-
All other provisions
of the M1 zone (table 8.2)
shall apply
Development
shall
be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, which
shall require, but is not
limited to, the implantation
of:
- The conceptual Planting
Schedule as prepared
by Tulloch Engineering,
Project No. 230672;
- The Preliminary
Stormwater
management Report,
prepared by Tulloch
Engineering, Project No.
230672;
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-18
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
- An entrance
permit/paving of the
driveways;
- Dark Sky friendly lighting;
- Fencing ( a combination
of wooden privacy and
chain-link) for screening
and to secure access to
the storage facility
RR-50
By-law 2022-136
- Minimum Lot Area -
0.43 hectares
RR-51
By-law 2023-052
Despite Section 10.3, Table
10.2
- The minimum lot area is
0.65 hectares;
-
The
minimum
lot
frontage is 84 metres
-
A
minimum
development setback for
a main use and leaching
bed and septic tank shall
be 300 metres from Scott
Lake and Otter Lake; and
- - Development shall
be setback a minimum
of 15 metres from the
water courses and 20
metres from the
wetland, as identified
Development shall
proceed in accordance
with the recommendations
of the Scoped
Environmental Impact
Study, as completed by
Beacon Environmental and
dated March 21,2022.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-19
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
on Schedule "C" to By-
law 2023-052.
RU-53
2023-061
Notwithstanding the
requirements of
Section 4.2.2:
to allow for an
additional
secondary
dwelling unit on
the property
- Minimum setback for
septic
sewage
disposal
system to the shoreline of
Whitefish
Lake
=
300
metres
RR-54
By-law 2023-065
Despite Section 10.3, Table
10.2,
Development shall be
setback a minimum of 20
metres from the
watercourses, 30 metres
from wetlands and 20
metres from rock barren
communities, as identified
as Schedule "C" to By-law
2023-065
These lands are subject to
a agreement pursuant to
Section 51(26) of the
Planning Act that
implements the
recommendations of the
Site Evaluation
Report/Environmental
Impact Study submitted by
RiverStone Environmental
Solutions Inc. dated
December 27, 2022.
RU-55
By-law 2023-090
and By-law 2023-
126
A Container, Storage
prior to the issuance
of a building permit
for a main/primary
building
Minimum
westerly
side
yard
setback
for
a
Container, Storage of 2
metres
Minimum lot frontage =
117 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-20
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RR-56
By-law 2023-097
Secondary dwelling
unit within an
accessory building.
Despite
Sections
4.1.4,
4.1.6 a) , 10.3, Table 10.2,
and 4.2.2 b) i), ii), and iv),
One secondary dwelling
unit
in
an
accessory
structure
shall
be
permitted subject to:
-
A maximum height
of 7.3 metres
-
An
interior
side
yard setback of 1.5 metres
-
All other provisions
of Section 10.3, Table 10.2
and Section 4.2.2 shall
apply
RR-57
By-law 2023-108
A Dwelling Unit,
Secondary not
located within the
primary dwelling or
within an accessory
building on the
property
Despite Sections:
4.2.2 a) iii), b) i), ii) and iv)
- a standalone Dwelling
Unit, Secondary with a
Ground Floor Area of 45
m2 is permitted in the
Interior Side Yard
Section 10.3, Table 10.2, 7%
maximum Lot Coverage is
permitted.
RU-58
By-law 2024-005
Minimum setback for a
horse barn and manure
storage to shoreline of
Oastler Lake = 300 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-21
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-59
By-law 2024-040
Despite Section 10.3, Table
10.2: Structures and septic
system shall be setback a
minimum of 20 metres from
the EP Zone
Development shall be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, to
implement the
recommendations of an
Environmental Impact
Study prepared by
RiverStone Environmental
Solutions Inc., dated
August 2023
RR-60
By-law 2024-040
Despite Section 10.3, Table
10.2: Structures and septic
system shall be setback a
minimum of 20 metres from
the EP Zone
Development shall be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, to
implement the
recommendations of an
Environmental Impact
Study prepared by
RiverStone Environmental
Solutions Inc., dated
August 2023.
RU-61
2024-045
Septic
system
shall
be
setback a minimum of 300
metres from the shoreline
of Gilbank Lake
Development shall be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, to
implement the
recommendations of an
Environmental Impact
Study prepared by
RiverStone Environmental
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-22
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Solutions Inc., dated
January 2024.
RU-64
By-law 2024-085
A driveway off of
the easterly 120
metres
of
frontage on Lot
84, Concession A,
Humphrey.
Driveways in EP
and LS zones.
Table 10.2, Section 10.3
- Minimum Lot Frontage -
75 metres.
- Minimum setback for
Buildings and Structures
from an EP zone - 50
metres
RU-65
By-law 2024-104
Table 10.2, Section 10.3
-Minimum
setback
for
Buildings and Structures
from an EP zone = 50
metres
- Minimum setback for
Buildings and Structures
from the shoreline of Clear
Lake = 300 metres
RU-66
By-law 2024-104
Table 10.2, Section 10.3
-Minimum
setback
for
Buildings and Structures
from an EP zone = 50
metres
RU-67
Table 10.2, Section 10.3
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-23
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
By-law 2025-009
Minimum Lot Frontage = 25
metres
RR-68
By-Law 2025-015
Development
shall
be
subject to site plan control,
pursuant to Section 41 of
the
Planning
Act,
to
implement
the
recommendations of an
Environmental
Impact
Study
prepared
by
RiverStone Environmental
Solutions
Inc.,
dated
October 2024.
RR-69
By-Law 2025-015
Development
shall
be
subject to site plan control,
pursuant to Section 41 of
the
Planning
Act,
to
implement
the
recommendations of an
Environmental
Impact
Study
prepared
by
RiverStone Environmental
Solutions
Inc.,
dated
October 2024.
RU-70
By-Law 2025-088
Section 10.3, Table 10.2
-Minimum lot area of 2.2
hectares
-Minimum lot frontage of
97 metres
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-24
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
-Minimum interior side yard
setback of 5 metres for an
existing storage shed
Section 4.11 g)
-minimum interior side yard
setback of 15 metres and
minimum
front
yard
setback of 18 metres for an
existing dwelling with a
home industry use
RR-71
By-Law 2026-002
- Access shall occur from a
year-round
municipally
maintained and owned
street.
Development shall be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, to
implement the following:
- that development
adheres to and
implements the
recommendations of the
Scoped Environmental
Impact Study, 11 Mcneice
Farm Road, November
2024, as completed by
Riverstone Environmental
Solutions Inc.
RU-73
By-Law 2026-020
Section 10.3, Table 10.2
-Minimum lot area of 1.3
hectares
These lands are subject to
an agreement pursuant to
Section 51(26) of the
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-25
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
-Minimum lot frontage of
134 metres
Planning Act to implement
the following:
-future adherence to the
recommendations
contained in the Scoped
Environmental Impact
Study prepared by Beacon
Environmental Limited,
dated January 15, 2026,
and in the Land Use
Compatibility Study
prepared by Thornton
Tomasetti, dated January
16, 2026.
RU-74
By-Law 2026-020
Section 10.3, Table 10.2
-Minimum lot area of 1.8
hectares
-Minimum lot frontage of
135 metres
These lands are subject to
an agreement pursuant to
Section 51(26) of the
Planning Act to implement
the following:
-future adherence to the
recommendations
contained in the Scoped
Environmental Impact
Study prepared by Beacon
Environmental Limited,
dated January 15, 2026,
and in the Land Use
Compatibility Study
prepared by Thornton
Tomasetti, dated January
16, 2026.
Township of Seguin Zoning By-law
Section 10 -Rural Zones
10-26
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional Permitted
Uses
Only Uses Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
RU-75
By-law 2026-020
Section 10.3, Table 10.2
-Minimum lot area of 2
hectares
-Minimum lot frontage of
135 metres
These lands are subject to
an agreement pursuant to
Section 51(26) of the
Planning Act to implement
the following:
-future adherence to the
recommendations
contained in the Scoped
Environmental Impact
Study prepared by Beacon
Environmental Limited,
dated January 15, 2026,
and in the Land Use
Compatibility Study
prepared by Thornton
Tomasetti, dated January
16, 2026.
RU-76
By-Law 2026-016
Section 4.1.4
Maximum
Accessory
Building
Height
for
Workshop - 6.1 metres
RU-77
By-Law 2026-019
Notwithstanding the
requirements of
Section 4.2.2 a) i):
a total of two
secondary dwelling
units are permitted on
the property
Table 10.2, Section 10.3
Minimum Lot Frontage = 90
metres
Minimum setback for a
septic system to the
shoreline of
Whitefish Lake = 300 metres
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-1
SECTION 11
ENVIRONMENTAL PROTECTION ZONES
11.1
GENERAL PROHIBITION
No person shall, within any Environmental Protection Zone, use any land, or erect,
alter or use any building or structure except in accordance with the following
provisions.
11.2
PERMITTED USES
Uses permitted in a Zone are noted by the symbol '✓' in the column applicable
to that Zone and corresponding with the row for a specific permitted use in Table
11.1. A number(s) following the symbol '✓' , zone heading or identified permitted
use, indicates that one or more conditions apply to the use noted or, in some
cases, to the entire Zone. Special Conditions are listed in the Footnotes below the
Permitted Use Table, Table 11.1.
The Environmental Zones established by this By-law are as follows:
EP
Environmental Protection
EP1
Environmental Protection One
Table 11.1
Column 1
Column 2
Column 3
ZONE
USE
EP
EP1
Agriculture, Existing
Archaeological Site
Conservation Use
Historical Site
Recreation, Non-Intensive
Resource Management
Recreational Trail
Footnotes for Table 11.1
1) A dock meeting the requirements of the Department of Fisheries and
Oceans or the requirements of other authorities having jurisdiction shall
be permitted in an EP or EP1 Zone where the dock is accessory to a
permitted use on the appertaining lands and meets the requirements of
Section 4.28.
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-2
11.3
ZONE REQUIREMENTS
No person shall, within any Environmental Protection Zone, use any lot or erect,
alter, use any building or structure except in accordance with the following zone
provisions. A number(s) following the zone requirement, zone heading or
description of the standard, indicates an additional Zone requirement. These
additional standards are listed in the Footnotes at the end of each table.
Table 11.2
Column 1
Column 2
Column 3
ZONES
STANDARDS
EP
EP1
Lot Area (Minimum)
Nil
Nil
Lot Frontage (Minimum)
Nil
Nil
Coverage (Maximum)
5%
5%
Building Setbacks (Minimum):
Front Yard
9 m
9 m
Exterior Side Yard
9 m
9 m
Interior Side Yard
6 m
6 m
Rear Yard
9 m
9 m
Building Height (Maximum)
8 m
8 m
Footnotes For Table 11.2
Space Reserved
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-3
11.4
ENVIRONMENTAL PROTECTION ZONES - EXCEPTIONS
The provisions of this Section are modified as set out in Table 11.3 below.
-
Column 1 sets out the exception number of each zone exception which corresponds to an area
of the Township identified on the Zoning Schedules by the same number and zone, preceded by a
dash and the, denoting an exception. (i.e. SR-88)
-
Column 2 sets out the additional uses permitted in the zone exception, if applicable.
-
Column 3 sets out the only uses permitted in the zone exception, if applicable.
-
Column 4 sets out the prohibited uses in the zone exception, if applicable.
-
Column 5 sets out the new or modified standards for the zone exception, if applicable.
-
Column 6 sets out any additional provisions for the zone exception, if applicable.
All other provisions of the zone, unless specifically modified or amended by this Section, continue to
apply to the lands subject to this Section.
TABLE 11.3
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
EP-1
Accessory storage
building
Minimum required yards
for accessory storage
building - existing
Maximum height of
storage building - 6.0 m
and 1 storey
Maximum area of storage
building - 180.0 sq.m
Any fill required is restricted
to the accessory building
footprint and driveway.
The storage building shall
be designed by a qualified
professional engineer and
shall be constructed with a
slab on grade foundation.
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-4
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
EP-1 (cont'd)
Maximum length of
storage building - 12.0 m
Maximum width of
storage building - 15.0 m
Minimum elevation of
accessory building,
including slab on grade
foundation - 0.31 m
above the highest
elevation in the building
envelope of the
accessory building
The entire area zoned EP-1
shall be deemed to be one
lot for the purposes of this
By-law.
The remainder of the site is
to remain in a natural
vegetated state.
EP-2
Landscaped golf
course facilities
such as cart paths,
boardwalks, tees,
greens and fairways
EP-3
(Amended by
By-law 2012-
008)
-
Boathouse
-
Dock
-
Septic
System
-
Driveway
- Maximum 2 slip
boathouse
- Maximum height of
boathouse 4 metres
- Minimum west side
yard setback for all
shoreline structures: 2
metre straight line
projection from
shoreline into water.
Lands subject to the
provisions of this Zone are to
be preserved in their natural
state save and except for
removal of hazard trees
and minor limbing of trees
for viewing corridors.
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-5
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
EP-3 (cont'd)
- Minimum east side yard
setback for all shoreline
structures: 20 metres at
shoreline only
- Boathouse and dock
shall otherwise comply
with all other provisions
of Zoning By-Law 2006-
125
EP-5
All buildings
or structures
EP-6
(By-Law
2009-048)
no docking facilities are
permitted within the
boundaries of the
wetland
EP-7
(By-Law
2009-082)
1) A 1.5 Storey, 2
slip boathouse +
1 port having a
total dock &
deck area of 160
square metres.
2) A dock having
a length of 20
metres and an
area of 104
square metres.
The boathouse and dock
shall be located in
accordance with the
recommendations of the
"Fisheries Evaluation
Report" prepared by
Michalski Nielsen &
Associates (March 5,
2009), and constructed in
accordance with plans
prepared by Wayne
Swadron Architect,
"Drawing A-1.0 Site Plan
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-6
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Boat House and Trail,
November 2008" and
"Drawing A-1.0 Site Plan,
November 2008".
EP-8
(By-Law 2010-
056)
A dock may be
constructed and
a parking area
developed on
Parts 1 and 2 of
Reference Plan
No. 42R-11182 in
Part of Lot 131,
Concession A,
geographic
Township of
Foley, Little Otter
Lake
No other
structures on
the lot are
permitted
EP-9
(By-law 2011-
011)
2 slip, 1.5 storey
boathouse
As noted in LSR-72, Table
6.4
As noted in LSR-72, Table 6.4
EP-10
(By-Law 2011-
043)
Existing single family
dwelling above the
maximum seasonal
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-7
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
flood elevation of
101 metres.
EP-11
(By-law-2012-
070)
Single storey, 2
slip boathouse
Maximum boathouse and
dock projection = 17.5
metres.
All other requirements of
Sections 4.28, 4.28.1, and
4.28.2 of Zoning By-law
2006-125 shall apply.
EP-12
(By-law 2012-
074)
All buildings,
structures,
docks
Site alteration and removal
of vegetation is not
permitted.
Southern boundary limit this
EP Zone is 50 metres from
present water's edge.
EP-13
(By-law 2012-
086)
Single storey, 2
slip boathouse in
the location
identified in the
"Fish Habitat
Assessment"
Report prepared
by Riverstone
Environmental
Solutions Inc.
dated
September 19,
2012.
All other requirements of
Sections 4.28, 4.28.1, and
4.28.2 of Zoning By-law
2006-125 shall apply.
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-8
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
EP-14
(By-law 2012-
089)
Single storey, 1
slip boathouse
with 1 boat port.
Minimum boathouse and
dock side yard setback
= 7.62 metres.
All other requirements of
Sections 4.28, 4.28.1, and
4.28.2 of Zoning By-law
2006-125 shall apply.
EP-15
(OMB Decision
PL100376)
A dock may be
constructed and
a parking area
developed on
Part Lot 125,
Concession A,
geographic
Township of
Foley, Rankin
Lake for the sole
purpose of
access to one
dwelling on
Slocum Island.
Parking Lot setbacks
from Rankin Lake shall
be a minimum of 20
metres and a minimum
of 0.4 metres from all
other lot lines.
Lands shall be subject to site
plan control pursuant to
Section 41 of the Planning
Act.
EP-16
(By-law 2013-
091)
Single storey, 1
slip boathouse
and 1 boat port.
- Maximum shoreline
structure cumulative
width = 23.6 metres
- Maximum total dock
and deck area = 170.9
metres
All other requirements of
Sections 4.28, 4.28.1, and
4.28.2 of Zoning By-law
2006-125 shall apply.
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-9
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
EP-17
(By-law
2014-090)
Single storey, single
slip boathouse +
covered boat port.
All shoreline accessory
structure requirements as
prescribed under Section
4.28, 4.28.1, and 4.28.2 of
Zoning By-law 2006-125 shall
apply.
EP-18
(By-law
2014-094)
1.5 storey, 2 slip
boathouse
All shoreline accessory
structure requirements as
prescribed under Section
4.28, 4.28.1, and 4.28.2 of
Zoning By-law 2006-125 shall
apply.
EP-19
(By-law 2015-
069)
1 Storey, 1 slip
boathouse and 1
boat port
- All other shoreline
accessory structure
requirements as
prescribed under
Section 4.28, 4.28.1 and
4.28.2 of Zoning By-law
2006-125 shall apply.
- Development shall be
subject to site plan
control, pursuant to
Section 41 of the
Planning Act.
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-10
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
EP-20
(By-law 2015-
081)
1.5 Storey, 2 slip
boathouse
- All other shoreline
accessory structure
requirements as
prescribed under
Section 4.28, 4.28.1 and
4.28.2 of Zoning By-law
2006-125 shall apply.
- Development shall be
subject to site plan
control, pursuant to
Section 41 of the Planning
Act.
EP-21
(By-law 2016-
032)
1 Storey, 2 slip
boathouse
- Maximum boathouse
floor area = 119 square
metres
-
Development shall be
subject to site plan
control, pursuant to
Section 41 of the
Planning Act.
EP-22
(By-law 2016-
046)
1 storey, 1 slip
boathouse and
attached boat port
- All other shoreline
accessory structure
requirements as
prescribed under
section 4.28, 4.28.1 and
4.28.2 of Zoning By-law
2006-125 shall apply.
-
Development shall be
subject to site plan
control, pursuant to
Section 41 of the
Planning Act.
EP-23
By-law 2023-131
1 storey, 1 slip
boathouse and 1
boat port
- All other shoreline
accessory structure
requirements as
prescribed under
section 4.28, 4.28.1 and
4.28.2 of Zoning By-law
2006-125 shall apply.
-
Development shall be
subject to site plan
control, pursuant to
Section 41 of the
Planning Act to
implement the
recommendations of the
Fish Habitat Assessment
prepared by RiverStone
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-11
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Environmental Solutions
Inc., dated September 8,
2023
EP-24
By-law 2024-039
1 storey, 2
internal slip
boathouse
All other shoreline
accessory structure
requirements as
prescribed under sections
4.28, 4.28.1 and 4.28.2 of
Zoning By-law 2006-125
shall apply.
Development shall be
subject to site plan control,
pursuant to Section 41 of
the Planning Act to
implement the
recommendations of the
Fish Habitat Assessment
prepared by RiverStone
Environmental Solutions Inc.,
dated September 8, 2023
EP-25
By-Law 2025-020
- Sections 4.28.1 -
Table 4.4, 4.28.6
- One boathouse is
permitted. A 1
storey Boathouse,
with either one
internal Boatslip
and one external
Boatport slip, or two
internal Boatslips, is
permitted
Section 4.28 c), Table 4.3 -
Minimum Setback from
Westerly Interior Side Lot
Line - 22 metres to the
Boathouse or Boatport
Development shall be
subject to site plan control,
pursuant to Section 41 of
the Planning Act, to
implement the following:
- that development
generally adheres to the
Planscape Site Plan, Project
177100, November 11, 2024,
as amended.
- Re-vegetation and
vegetation retention, and
buffering on Westerly
Interior Side Lot Line
- the Fish Habitat Impact
Assessment, completed by
Beacon Environmental,
Township of Seguin Zoning By-law
Section 11 - Environmental Protection Zones
11-12
Column 1
Column 2
Column 3
Column 4
Column 5
Column 6
Exception
Number
Additional
Permitted Uses
Only Uses
Permitted
Uses
Prohibited
Special Zone
Requirements
Other Special Provisions
Project 218336, as updated,
and peer reviews by
Riverstone.
EP-26
By-Law 2025-091
1 storey, two slip
boat port
All other shoreline
accessory structure
requirements as
prescribed under section
4.28, 4.28.1 and 4.28.2 of
Zoning By-law 2006-125
shall apply.
EP-27
By-Law 2026-010
4 Metre wide
private road
EP-28
By-Law 2026-031
Sections 11.2 and 11.3:
- An adjacent Driveway in
a RR zone is permitted,
subject to a minimum
setback of 10 metres from
the EP-28 zone
- Buildings and Structures
shall be setback 30 metres
from the EP-28 zone
Development
within
120
metres of the EP-28 zone
shall be subject to site plan
control, pursuant to Section
41 of the Planning Act, to
implement the following:
- the recommendations of
the Michalski Neilsen
Associates Limited Scoped
Environmental Impact Study
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
1
SECTION 12 HOLD ZONES, TEMPORARY USE ZONES AND INTERIM
CONTROL ZONES
12.1
HOLDING PROVISIONS
Notwithstanding any other provision in this By-law, where a Zone symbol is followed
by the letter "H" and a number (for example M2-(H1) or R1-(H2) no person shall use
the land to which the letter (H) applies for any use other than the use which existed
on the date this By-law was passed, until the (H) is removed in accordance with the
policies of the Official Plan and the Planning Act, as amended.
Council may pass a By-law pursuant to Section 36 of the Planning Act to remove
the Holding (H) Symbol, thereby placing the lands in the zone indicated by the zone
symbol, when all of the applicable requirements have been met.
Zones with Holding Provisions are identified in Table 12.1 below in this Section.
12.1.1 List of Holding Provisions
The following holding provisions apply to the properties specified:
TABLE 12.1
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
RI-8(H)
(Removed by
By-Law 2010-
056)
Parts 1 and 2,
Parcel 21543,
Plan 42R-8057
located in Lot 7,
Concession 11 in
the Geographic
Township of
Conger
-
The completion of a
hydrogeological study
which is to be completed to
the satisfaction of the
Municipality. The study must
identify the volume of water
to be extracted daily and
advise that there will be no
negative impacts on the
groundwater supplies in the
area.
-
The completion of a Site
Plan Agreement
-
If the water taking use
proposes to extract more
than 50,000 litres of water
per day, a permit to take
water must also be
obtained from the Ministry
of the Environment.
Nov. 7, 2005
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
2
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
R1-8(H)
(cont'd)
MQ-LF(H)
RU-LF(H)
-
Hydrogeological report
confirming no
contamination of ground
water or water supply.
RR (H)
Removed by
By-law 2023-
091
(a) Pt. Lots 34
Concession 1
(Christie)
-
The completion of a
Subdivision Agreement
September
18, 2006
SR1-18(H)
(By-law
2007-062)
Removed by
By-law 2023-
053
(a) Pt. Lots 26, 27
and 28,
Concessions 1
and 2 (Foley)
The completion of a Subdivision
Agreement
May 7, 2007
M3(H)
Pt. Lots 142 and
143, Concession
A, geographic
Township of Foley
Site Plan Agreement
December 11,
2007
SR1-31(H)
(By-law
2008-086)
Part of Lots 14
and 15,
Concession 1, in
for former
Township of
Humphrey, being
Parts 2, 3, 9-11,
13, 17, 18, 20 &
Part 17 Parcel
26210 S/S Little
Lake Joseph
-
Site Plan Approval
RU(H)
(By-law
2008-080)
Part Lots 13 to 16,
Concession 13;
geographic
Township of
Humphrey
-
Site Plan Approval
specifying that the sewage
treatment system is located
at least 300 metres from
Turtle Lake
June 16, 2008
LSR-49(H)
(By-law
2008-142)
(Removed by
By-law 2022-
098)
Part Lot 27, Con.
3; PCL 8542;
geographic
Township of Foley
811-117
McMichael
-
Site Plan Approval
-
Scoped Environmental
Impact Statement
-
Confirmation from North
Bay-Mattawa Conservation
Authority that septic system
has been installed in
October 6, 2008
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
3
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
LSR-49(H)
Cont'd
Island (Salmon
Lake)
accordance with OBCC
Ruling 08-02-1176 and all
other requirements
applicable
-
Written confirmation of legal
mainland parking
exclusively for water access
lot (McMichael Island)
-
That the existing Bunkie and
storage shed structures on
McMichael Island be
removed.
C3-25(H)
(OMB
Decision
PL070771)
Part of Lot 147,
Concession A,
designated as
Parts 1 and 2 on
Plan 42R-16933,
in the former
Township of
Foley, now in the
Township of
Seguin
Completion of the following to
the satisfaction the Township of
Seguin:
- a final land use planning
report;
- a final traffic and roads report;
- a detailed storm water
management and grading
plan;
- a detailed water and sanitary
sewer plan;
- a noise and vibration study
addressing any issues
associated with railway
corridors;
- a detailed environmental site
evaluation report which will
include defining the function
and requirements of buffers
adjacent to any EP zone;
- the required agreements for
the extension and
development of municipal
services from the Town of Parry
Sound have been secured;
- a site plan and development
agreement pursuant to
Section 41 of the Planning Act,
RSO 1990; and
- a market impact study
demonstrating acceptable
impacts on existing
commercial concentrations in
the Town of Parry Sound for
any commercial development
with a gross floor area of 3720
square metres or greater;
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
4
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
Cont'd
C3-25(H)
(OMB
Decision
PL070771)
- subdivision or condominium
approval
OS1(H)
OS1-6(H)
(OMB
Decision
PL070771)
Part of Lot 147,
Concession A,
designated as
Parts 1 and 2 on
Plan 42R-16933,
in the former
Township of
Foley, now in
the Township
of Seguin
Completion of the following to
the satisfaction the Township of
Seguin:
- a final land use planning
report;
- a final traffic and roads report;
- a detailed storm water
management and grading
plan;
- a detailed water and sanitary
sewer plan;
- the required agreements for
the extension and
development of municipal
services from the Town of Parry
Sound have been secured;
- a noise and vibration study
addressing any issues
associated with railway
corridors;
- a detailed environmental site
evaluation report which will
include defining the function
and requirements of buffers
adjacent to any EP zone;
- a site plan and development
agreement pursuant to
Section 41 of the Planning Act,
RSO 1990;
- subdivision or condominium
approval
R2(H)
(By-law
2016-044)
Removed by
By-Laws
2018-050,
2018-051,
2019-052,
2019-079)
Concession B
Part Lot 105,
Humphrey
- The completion of site
specific site evaluation
reports
- The completion of a site plan
control agreement for each
lot to the satisfaction of the
Township
July 18, 2016
RI-23(H)
Humphrey Con B
Pt Lots 76;And 77
- Completion of a "Traffic
Impact Study", to be
April 3rd 2017
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
5
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
(By-law 2017-
030)
Removed by
by-law
2018-029
prepared by a qualified Traffic
Engineer registered in the
MTO's RAQs system, which
must be reviewed and
approved by MTO.
- Issuance of a "Commercial
Entrance Permit" by the
Ontario Ministry of
Transportation.
C4-28(H)
(By-law 2018-
044)
Foley Con 10 Pt
Lot 34 Pt; Rdal RP
42R3719 Parts 3
And; 4 RP
42R7609 Parts 1
And 5; Georgian
Bay
-
Site Plan Control
Agreement to address
such things as drainage,
erosion or slope stability
plan, tree preservation
plan and rehabilitation
plan for the former
lodge and cabin sites
and privacy fencing
along the southerly lot
line.
-
Approval of a Plan of
Condominium.
-
Approval of an
amendment to the
existing Environmental
Compliance Approval
(ECA) or approval of a
new application for
Environmental
Compliance Approval
(ECA).
-
Endangered or
Threatened Species
consultation and permits
with the Ministry of
Natural Resources, as
required.
-
Department of Fisheries
and Oceans
authorization, as
required.
June 18th,
2018
C3-33 (H)
By-law 2019-
003)
CON A & B PT
LOT 146 & A
RP;42R4931 PART
OF PARTS 5 6
AND 7, in the
geographic
Township as
Foley, known
-
Site Plan Agreement
-
Site Evaluation Report
-
Mine Hazard
Rehabilitation Plan
-
Any agreements for the
extension and
development of
July 2nd 2019
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
6
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
municipally as 18
Oastler Park Drive
municipal services from
the Town of Parry Sound
have been secured, if
required.
C4-31 (H)
(By-law
2019-061)
CON 10 PT LOT 31
PLAN 42R-2631
PART 1 2 3 4 5 6
PART 3 4 6 BEING
ROW
Prior to issuance of a building
permit for reconstruction or
replacement of any existing
cabin, or construction of any
new cabin, the Owner shall
complete the following
technical studies, to the
satisfaction of the Township:
- Scoped Environmental
Impact Study (EIS),
addressing the requirements
of Section B.15 c) of the
Seguin Official Plan.
October 7th
2019
R1(H)
(By-law 2022-
062)
Part of PT LT 106
CON A
HUMPHREY W OF
PT 3 42R9365
EXCEPT HWY 876,
RO64552,
RO115418,
RO128455,
RO184581,
RO198515, PTS
1&2 42R11366 &
PTS 1,2&3
42R19904
TOWNSHIP OF
SEGUIN
Approval of a Draft Plan of
Subdivision and execution of a
Subdivision Agreement
May 16th, 2022
R1-138(H)
(By-Law 2022-
062)
Part of PT LT 106
CON A
HUMPHREY W OF
PT 3 42R9365
EXCEPT HWY 876,
RO64552,
RO115418,
RO128455,
RO184581,
RO198515, PTS
1&2 42R11366 &
PTS 1,2&3
42R19904
Approval of a Draft Plan of
Subdivision and execution of a
Subdivision Agreement
May 16th, 2022
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
7
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
TOWNSHIP OF
SEGUIN
SR1-18.1 (H)
(By-law 2023-
026)
PCL 22958 SEC
SS; LT 26 CON 1
FOLEY; LT 27 CON
1 FOLEY; LT 28
CON 1 FOLEY;
BROKEN LT 29
CON 1 FOLEY; PT
RDAL IN FRONT LT
28 & 29 CON 1
FOLEY PT RDAL IN
FRONT OF LT 26,
27 & 28 CON 1
FOLEY PT 1 & 2
42R10343;
SEGUIN
That Evidence be provided of
an avoidance assessment and
prepared by a qualified
consultant confirming that
avoidance can be achieved or
a permit or authorization
authorizing the destruction or
damage of habitat, within the
land subject to the "H", in
accordance with the
requirements of the
Endangered Species Act, 2007.
March 6th
SR1-152(H)
(By-law 2023-
016
LT 13-14 CON 8
FOLEY EXCEPT PT
1 42R15250; PT
RDAL IN FRONT
OF LT 14 CON 8
FOLEY CLOSED
BY RO157269 PT 1
42R13910;
SEGUIN
- That a condominium
description be registered on
title to provide condominium
access
February 6,
2023
SR1-94 (H)
(By-Law
2025-024)
155 Burgess Road
HUMPHREY CON
2 PT LOT 8 PT
SHORE RD
ALLOW AND RP
42R19779 PART 1
ROSSEAU LAKE;
Seguin
The purpose of the Holding
Provision
is
to
prohibit
the
construction of a Boatport until
the
Holding
Provision
is
removed.
- The Holding Provision shall not
be removed until such a time as
the relevant and applicable
provisions
of
the
restrictive
covenant
prohibiting
the
construction of a boatport is
removed from title
April 22, 2025
C3-38
(H),
R2-135
(H),
R2-136 (H)
PART
LOTS
142,143 CON B
FOLEY, PARTS 1
TO 14 42R22726
SUBJECT TO AN
EASEMENT
IN
GROSS
OVER
PART 5 42R22726
AS IN GB42490
SUBJECT TO AN
Holding provision applies to the
entire site to preclude any new
use on the lands until certain
undertakings are complete to
ensure the orderly development
of the site. These undertakings
would
be
secured
through
conditions
of
approval
associated
with
the
implementing
draft
plan
of
July 7, 2025
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
8
Column 1
Column 2
Column 3
Column 4
Zone
Designation
Property/Legal
Description
Condition for Removal
Date Enacted
EASEMENT OVER
PARTS
2,3,14
42R22726 AS IN
RO15701
TOWNSHIP
OF
SEGUIN
subdivision and/or draft plan of
condominium.
RR-71 (H) and
SR1-184 (H)
By-Law 2026-
002
PT LT 32-33 CON
10 FOLEY AS IN
RO105472N OF
SHORE RDAL
AROUND BOYNE
RIVER AND S OF
RDAL AROUND
UNNAMED LAKE;
S/T RO105472;
SEGUIN
That a road be assumed by the
Township to provide access to
the zones, or an agreement be
entered into with the Township
of Seguin, ensuring a road will be
constructed to the satisfaction
of Council.
January 12,
2026
12.2
TEMPORARY USE ZONES
Where on Schedules to this By-law, a zone symbol is preceded by the letter "T" and
a dash and followed by a zone designation and a number (for example
T-SR3-1), one or more additional uses are permitted on the lands noted until the
permission granted by the Site-Specific Temporary Use By-law expires. Table 12.2
identifies the Temporary Use Zones within the Municipality.
12.2.1. List of Temporary Use Zones
TABLE 12.2
Column 1
Column 2
Column 3
Column 4
Column 5
Zone
Designation
Property/Legal
Description
Temporary
Uses
Date
Enacted
Date Expires
T-SR3-1
Part 1 of Plan 42R-
7071, Parts of Lots 24
and 25, Concession
7, Former Township of
Foley
Garden Suite
August 23,
2004
August 23,
2014
All zones on
Georgian
Bay
(By-law
2013-021)
All lands in Seguin
Township having
frontage on
Georgian Bay
Notwithstandin
g the provisions
of Section 4.28
or
other
applicable
sections
regulating
docks,
of
Zoning By-law
April 2, 2016
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
9
No.
2006-125,
as
amended,
any
property
fronting
the
waters
of
Georgian Bay
may
use,
locate
or
construct
a
dock
in
the
front yard of
the
property
and only to the
extent
deemed
necessary
by
the Township of
Seguin
to
restore
water
access, due to
low
water
levels contrary
to
the
requirements
of Zoning By-
law No. 2006-
125,
as
amended,
subject
to
complying with
the terms and
conditions set
out in this by-
law.
Owners
seeking to use
the provision of
this by-law are
required
to
obtain
a
building permit
for
a
temporary
building
from
the
Chief
Building Official
of the Township
of Seguin.
T-C3-3
(By-law
2018-072)
CON B, PT LOT 139,
geographic Township
Contractors
Yard consisting
of two office
September
17, 2018
December
31, 2018
Township of Seguin Zoning By-law
12-
Section 12 - Hold Zones and Temporary Use Zones and Interim Control Zones
10
of Foley, 242 Oastler
Park Drive
trailers, five
travel trailers,
related
incidents and
associated
vehicular
parking.
T-C3-4
(By-law
2019-025)
CON B, PT LOT 139,
geographic Township
of Foley, 242 Oastler
Park Drive
Contractors
Yard consisting
of two office
trailers,
five
travel
trailers,
related
incidents
and
associated
vehicular
parking.
April 1st,
2019
December
31st, 2019
T-LSR-5
By-Law
2026-001
PCL 9278 SEC SS; PT
BLK A PL M95 PT 2, 7
PSR182 EXCEPT AN
ALLOWANCE OF ONE
CHAIN IN
PERPENDICULAR
WIDTH FOR A ROAD
ALONG THE SHORE
OF LAKE JOSEPH; T/W
PT 10, 12 PSR182 AS IN
LT46587; S/T PT 2
42R18051 AS IN
GB13553; SEGUIN,
8B Kenozha Road
Two cottages
resulting in
-Lot Coverage
within 60
metres of the
shoreline of
13.2%,
-Total Lot
Coverage of
11.3%
-Gross Floor
Area of 453
square metres
January 12,
2026
January 12,
2029
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
1
SECTION 13 DEFINITIONS
Accessory means a use, building or structure located on the same lot as the principal
building or use, the use of which is incidental or secondary to that of the main building or
use.
Adult Day Centre means a premises, used to deliver a daily program of structured and
supervised activities and care for seniors or persons with disabilities.
Adult Video Store means a premise:
a)
used for the carrying on of the business of the provision of adult prerecorded tapes,
discs, cartridges or similar materials, or
b)
in which adult prerecorded tapes, discs, cartridges or similar materials are provided
in the pursuance of a business and to which premises entry by persons under the age
of 18 is prohibited, or in result of which premises it is advertised or notice is given that
such entry is prohibited, or
c)
in which adult videotapes are provided in the pursuance of a business and in respect
of which it is advertised, or
d)
notice is given either by signs or other advertising devices on or in the premises, or
otherwise, that the premises are an "adult video store", an "adult videotape store",
an "adult video rental store", or are otherwise described by words of like meaning.
Agriculture means general farming and shall include:
a)
the breeding and rearing of livestock, poultry, fowl and fur-bearing animals;
b)
the general cultivation of land and associated production, processing and storing of
field crops, fruits, and vegetables;
c)
agro-forestry and maple syrup production; and,
d)
but shall not include a livestock operation of more than 300 animals or nutrient units.
Aircraft Hangar means a building or structure used for the storage and maintenance of
aircraft.
Airport means the use of land, including water, runway or other facility designed, used or
intended to be used for the landing and taking off of aircraft including all necessary
taxiways, aircraft storage, tie-down areas, hangar and other buildings and structures.
Air Treatment Control (Cannabis - Designated, Licensed) means an industrial multi-stage
carbon filtration system, or similar technology, which reduces and/or treats the emission of
pollen, dust and odours expelled from a facility, and which filtration system is operated at all
times in accordance with the specifications as set out within a report prepared by a qualified
person and approved by the Township of Seguin.
Aisle means an area of a parking area that is used to access individual parking spaces.
Alter when used in reference to a building, structure or part thereof, means:
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
2
a) to change any one or more of the external dimensions of such building or structure; or
b) to change the type of construction of the exterior walls or roof of such building or
structure; or
c) to change the use of such building or structure; or
d) to change the number of uses or dwelling units contained therein.
"Alter", when used in reference to a lot, means:
e)
to change the boundary of such lot with respect to a street or lane; or
f)
to change any dimension or area, relating to such lot, which is covered herein by a
zone provision; or
g)
to change the use of such lot; or
h)
to change the number of uses located thereon.
"Altered" and "alteration" shall have corresponding meanings.
Archaeological Resources means artifacts, sites and marine archaeological sites, which are
identified and evaluated through archaeological fieldwork undertaken in accordance with
the Ontario Heritage Act.
Attached means a building or structure that is physically connected to, and dependent on,
another building for structural support via shared walls, roofs, foundation and floors.
Automotive Store means an establishment primarily engaged in the retail sale of vehicle parts,
accessories and tools. Accessory uses may include service bays for performing repair or
maintenance work on vehicles.
Balcony means a partially enclosed cantilevered platform extending horizontally from one
or more exterior walls of a building and used as a deck.
Backyard Hens means the keeping of hens in an accessory enclosure to a detached
dwelling on the same lot, and does not include accessory livestock, or agricultural uses
otherwise defined by the Township of Seguin Zoning By-law.
Bed and Breakfast Establishment means a dwelling or part of a dwelling in which not more
than 2 bedrooms are used or maintained for the accommodation of the travelling or
vacationing public, in which the owner supplies lodgings with or without meals for hire or pay
but does not include a group home.
Boarding Kennel means a commercial establishment for the keeping, breeding, boarding or
training of domestic animals but shall not include the keeping of animals in a veterinary clinic
for the purpose of observation, and/or recovery necessary to veterinary treatment.
Boathouse means either a one storey boathouse or a one and a half storey boathouse, and
shall contain one or more Boat Slips.
Boathouse, One Storey means an accessory building or structure which is designed and used
only for the sheltering of boats or other forms of water transportation and for the storage of
equipment which is incidental to the use of the main building or boats.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
3
Boathouse, One and a Half Storey means an accessory building or structure which has a first
storey, designed and used for the sheltering of boats or other forms of water transportation
and for the storage of equipment which is incidental to the use of the main building or
boating, and a half storey above, may be designed and used for storage, and/or human
habitation in accordance with Section 4.28.1.
Boatport means an accessory building or structure, which is not enclosed by more than one
wall, which is designed and used only for the sheltering of boats or other forms of water
transportation, and shall contain one or more Boat Slips.
Boat Awning means a temporary or seasonal awning that provides boat shelter that is
located on a dock, and is either located over a boat slip or cantilevered from one side of a
dock.
Boat Slip means the space within a dock assigned for the mooring of one watercraft having
a minimum width of 3.0 metres and a minimum length of 6.0 metres.
Body Rub means the kneading, manipulating, rubbing, massaging, touching or stimulating by
any means of a person's body or part thereof, but does not include medical or therapeutic
treatment given by a person otherwise duly qualified, licensed or registered to do so under the
laws of the Province of Ontario.
Body Rub Parlour means any premises or part thereof where body rubs are provided, offered
or solicited in pursuance of a business.
Buffer Area means a landscaped or naturally vegetated strip of land devoted exclusively to
the provision of visual amenity and a physical barrier between adjacent uses.
Building means a structure occupying an area greater than 10 m2 and consisting of any
combination of walls, roof and floor or any structural system serving the function thereof,
including all associated plumbing, works, fixtures and service systems. This definition shall also
include a private sewage system.
Building, Accessory means a detached building located on the same lot as the main
building, the use of which is incidental or secondary to that of the main building and includes
a guest cabin, a private garage, a boathouse, a tool shed, a storage building, a dock, a
deck, a gazebo, and a sauna.
Building, Apartment means a building containing three or more dwelling units that share a
common external access to the outside through a common vestibule and a common
corridor system or a combination thereof.
Building Area means that portion of the lot area permitted to be covered by one or more
building envelopes.
Building Envelope means the buildable area of a lot, defined by all required yards and
buildable area of a lot, within which a building can be erected, as established in this By-law.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
4
Building Height means the vertical distance between the average finished grade at the front
of the lot on which the building is situated and:
a) the highest point of the roof surface of a flat, domed roof or shed roof;
b) the deck line of a mansard roof; or
c) the median level between eaves and ridge of a gable, gambrel or hip roof. When
applied to boathouses and boatports the height shall be measured from the normal or
controlled high water mark.
Building Main means the building which contains the principal use of the lot on which such
building is located.
Building Separation means the least horizontal distance permitted between the nearest
portions of any building envelopes on a lot.
Building Setback means the least horizontal distance permitted between a lot line of a lot
and the nearest portion of any building envelope on such lot.
Building Setback, Private Road means the least horizontal distance permitted between a
private road and the nearest point of any building or structure.
Building Setback, Public Road means the least horizontal distance permitted between a
public road right-of-way and the nearest point of any building or structure.
Building Supply Outlet means a premises in which building or construction materials and
home improvement materials are offered for retail sale.
Bulk Storage Facility means a premises where petroleum, gasoline, fuel, oil, gas or flammable
liquid or fluid is stored or warehoused.
Bunkhouse means a building, accessory to a farm, designed or used during the planting,
growing or harvesting season, for the accommodation of agricultural workers and consisting
of at least one bathroom and not fewer than two rooms providing therein living, dining and
sleeping accommodation in appropriate individual or combination rooms.
Cabin means a separate building designed to provide only sleeping accommodation for
the travelling or vacationing public and shall not include cooking facilities or washroom
facilities.
Cabin, Camp means a one storey building that contains no cooking facility, that may
contain washroom facilities and is not designed or available for year round use.
Cabin, Housekeeping means a separate building designed to provide sleeping
accommodations and facilities for the preparation and cooking of food for the travelling or
vacationing public.
Cabin Rental Establishment means a tourist establishment comprised of two or more
housekeeping cabins owned by the same person and rented to members of the travelling
or vacationing public.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
5
Camping Establishment means a parcel of land used or maintained as an overnight tent
and trailer park where people are accommodated temporarily in tents, Park Model Trailers,
recreational vehicles and trailers, or other similar facilities, whether or not a fee or charge is
paid for the rental thereof, but does not include a mobile home park.
Camping Ground means an open area provided for the use of outdoor camping in tents or
similar facilities. This definition shall not include a tourist camp or mobile home park.
Carport means a building or structure which is not wholly enclosed, and is used for the
parking or storage of one or more motor vehicles.
Cemetery means land that is set apart or used for the interment of human remains and may
include a columbarium or mausoleum but does not include any building for public assembly.
Chord Frontage means a straight line joining the two points where the side lot lines intersect
the front lot line.
Clinic means a premises where members of the medical professions provide medical,
dental, and/or therapeutic diagnosis and treatment to the general public but does not
include a public or private hospital or office located in the medical professional's residence.
Commercial Greenhouse means a building or structure enclosed by glass or similar material
and used for the cultivation of plants and may include the sale of plans to the general public.
Commercial Outfitters Operation means an establishment which operates throughout all or
part of a year offering supplies or services to persons in connection with angling, hunting,
camping or other similar recreational purposes.
Community Centre means a multi-purpose facility operated by or on behalf of the Township
that provides facilities for a variety of indoor recreational, cultural, or community service
activities for use by the general public.
Concrete Batching Plant means an industrial facility used for the production of concrete, or
concrete products, used in building or construction, and includes facilities for the administration
or management of the business, the stockpiling of bulk materials used in the production process
or of finished products manufactured on the premises and the storage and maintenance of
required equipment, but does not include the retail sale of finished concrete products.
Conservation Use means a use dedicated towards the preservation of fish and wildlife
habitat including woodlot management, and structures for flood/erosion control. This use
shall not include administration and/or operational facilities.
Construct means to build, erect, place, reconstruct or relocate and may include:
a)
any preliminary operation such as excavating, filling or draining; or
b)
altering any existing building or structure by an addition, enlargement, extension or
other structural change; or
c)
any work which requires a building permit.
"Constructed" and "construction" shall have corresponding meanings.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
6
Contractors Yard means a premises in which the shop or assembly work of a contractor or
tradesperson is performed and includes the storage of any related equipment and/or
materials.
Convenience Store means a retail store that shall provide a variety of household necessities,
groceries and other convenience items primarily to the local community.
Cooking Facility An area or equipment within a building designed and equipped for the
preparation and cooking of food, including appliances such as a stove, range or oven.
Corporation means the Corporation of the Township of Seguin.
Cottage means a residential dwelling unit used or intended to be used as a seasonal
recreational building pursuant to Section 9.36 of the Ontario Building Code.
Council means the Council of The Corporation of the Township of Seguin.
Crisis Care Facility shall mean a residential facility that is licensed and funded by the Province
of Ontario, Government of Canada or an appointed agency, for the short term, temporary
care of persons requiring immediate emergency shelter and aid who are living under
supervision in a single housekeeping unit and who by reason of their emotional, mental,
social or physical condition or legal status, require a group living arrangement for their well-
being.
Custom Workshop means:
1)
a building or part of a building used by a trade, craft or guild for the manufacture
and sale on the premises in limited quantities of made-to-measure clothes or articles,
and
2)
includes upholstering but does not include furniture manufacture, woodworking or
metal spinning, or any manufacturing or any shop or factory otherwise classified or
defined in this By-law.
Daycare, Private Home means the use of a dwelling unit for the temporary care of five or
fewer children who are under ten years of age, in exchange for reward or compensation
and where such care is provided in a private residence, other than the home of a parent or
guardian of any such child, for a continuous period not exceeding twenty-four hours.
Day Care Centre means a premises where more than 5 children are provided with temporary
care and/or guidance for a continuous period not exceeding 24 hours and are licensed in
accordance with the Day Nurseries Act.
Deck means a non-roofed structure which is designed for lounging or sunbathing.
Density means the ratio of dwelling units to 1 net hectare of lot area.
Detached when used in reference to a building, means a building which is not dependent
on any other building for structural support or enclosure.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
7
Dock means a structure extending along the shoreline or out from the shoreline into a body
of water, to which boats may be moored and includes connecting ramps, stairs and/or
walkways.
Dormer means a window or windows that is set vertically on a sloping roof above the first
storey and has its own roof, which may be flat, arched, or peaked. Types of dormers include
a hipped, shed, eyebrow and gable. Where dormers make up more than 50% of the roof
plane, they shall be considered the main roof. A recessed dormer shall not be permitted on
a boathouse.
Dormer, Recessed means a dormer that has one or more walls that are set into the roof,
rather than protruding from the main roof plane.
Dormitory means a building designed or used for the accommodation of students and
consisting of at least one bathroom and not fewer than two rooms providing therein living,
dining and sleeping accommodation in appropriate individual or combination rooms.
Drive-Through Service Facility means a building or structure or part thereof where goods
and/or services are offered to the public within a parked or stationery vehicle by way of a
service window or kiosk, where goods, money or materials are exchanged. Kiosks within a
parking garage or associated with a surface parking area are not considered to be drive-
through service uses.
Driveway means a defined area providing access for motor vehicles from a public or private
street or a lane to facilities such as a parking area, parking lot, loading space, private
garage, building or structure.
Driving Range means a public or private area operated for the purpose of developing
golfing techniques, including miniature golf courses, but excluding golf courses.
Dry Cleaning or Laundry Outlet means a premises used for the purpose of receiving articles
or goods of fabric to be subjected to the process of laundering or dry cleaning at another
location and may include facilities for the pressing or ironing of such articles.
Dry Cleaning or Laundry Plant means a premises in which the business of laundry of dry
cleaning is housed and where the cleaning, drying, ironing and finishing of such goods is
conducted.
Dwelling Unit means a room or rooms which function as a housekeeping unit used or
intended to be used as a domicile by one or more persons, in which a kitchen, living quarters
and sanitary facilities are provided for the exclusive use of the residents and with a private
entrance from outside the building or from a common hallway or stairway.
Dwelling Unit, Accessory means a dwelling unit which is part of and accessory to a permitted
non-residential principal use.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
8
Dwelling Unit, Secondary means a second self-contained residential dwelling unit which is
subordinate to a principal residential dwelling, with its own cooking facility, sanitary facility
and sleeping area, which is located within a detached, semi-detached, or townhouse
dwelling, or within the upper storey or the main floor of an accessory structure.
Dwelling, Accessory means a use, separate building, or structure, which is usually incidental,
subordinate, exclusively devoted to and located on the same lot as the principal use,
building or structure but not including a building or structure which is used as a dwelling unless
specifically permitted.
Dwelling, Detached means a building containing only one principal dwelling unit.
Dwelling, Duplex means a dwelling divided horizontally into two separate dwelling units,
each such dwelling unit having an independent entrance either directly from outside the
building or through a common vestibule.
Dwelling, Garden Suite means a detached residential structure containing bathroom and
kitchen facilities that is an accessory use to an existing dwelling unit and that is designed to
be portable.
Dwelling, Linked means a building divided vertically into two separate dwelling units above
ground, with the foundation for each dwelling unit being connected by a wall below grade
to the foundation for the other dwelling unit and with each dwelling unit having an
independent entrance from outside the building.
Dwelling, Mobile Home means a transportable, factory-built dwelling unit manufactured in
accordance with CAN/C.S.A. Standard Z240 MH Series 92, Z240 MH Series 86 or C.S.A. A-277,
and is intended to provide permanent residence but does not include a Park Model Trailer
or recreational vehicle or trailer as otherwise defined in this by-law.
Dwelling, Semi-detached means a building divided vertically by a common wall above
finished grade into two separate dwelling units, each such dwelling unit having an
independent entrance either directly from outside the building or through a common
vestibule.
Dwelling, Townhouse means a building divided vertically both above and below grade into
three or more separate dwelling units, each such dwelling unit having two independent
entrances directly from outside the building.
Eave Height, Boathouse or Boat Port means the Vertical distance between the top of the
dock/deck boards and the main roof eave line.
Eave line means the top edge of the roof sheeting/deck.
Emergency Service Facility shall mean a building that houses emergency personnel, their
supplies and vehicles and may include an ambulance response facility, fire station or police
station.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
9
Entrance, when used with reference to a lot, means an unobstructed passageway used to
provide vehicular access from the travelled portion of a street, private road, or lane to a
driveway.
Entrance Separation means the least horizontal distance permitted between the nearest
portions of any entrances on a lot.
Entrance Setback means the least horizontal distance permitted between an intersection of
the street lines and the nearest portion of any entrance, measured along the limit of the
travelled portion of the street or lane.
Entrance Width means the horizontal distance permitted between the extremities of an
entrance, measured along the limit or the traveled portion of the street or lane.
Equipment Rental Establishment means a building or part thereof where residential,
commercial and industrial equipment is kept for rental to the general public and includes
such items as lawn and garden tools, floor cleaning equipment, masonry tools, painting and
decorating equipment, moving tools, plumbing tools, power tools and other similar items.
Equipment Storage Building means a building or buildings used for the purpose of equipment
storage.
Established Building Line means the average distance between the street line and existing
buildings on one side of a continuous 300 metre strip of land where five or more lots having
street access upon the said side of the street have been built upon.
Existing for the purposes of Section 4.18 of this By-law means existing as of the date of the
passing of By-laws No. CT100-83, Z200-97 (Humphrey), 93-1000 (Foley), R100-80 (Rosseau) and
CT100-83 (Christie and Monteith). "Existing" as set out in Section 6.3, Table 6.2, Column 9
includes those frontages and areas as approved by Council in the approval of a subdivision
or provisional consent pursuant to Sections 51 or 53 of the Planning Act.
Existing means on the date of the passing of this By-law.
Factory Outlet means a premises, accessory to a permitted industrial use, where the products
manufactured by that industry are kept for wholesale or retail sale on the same lot as the
principal industrial use.
Fairground means land devoted to outdoor entertainment on a seasonal or temporary basis
and may include grandstands, barns, and other accessory buildings normally associated
with such a use.
Farmers Market means an establishment or premises where farm related products and/or
arts and crafts are sold at retail from either open air areas designated for individual retailers
or within designated buildings or structures.
Farm Implement Sales and Service means the use of land, buildings or structures for the sale,
storage or repair of equipment and machinery directly associated with the operation of a
farm.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
10
Farm Produce Sales Outlet means a structure from which the products of an agricultural
operation are sold at retail as an accessory use and on the same lot as the principal
agricultural use.
Financial Institution means a premises where financial services are offered to the public and
may include an automated banking machine.
Finished Grade means the average surface elevation at the outside walls of any building or
structure, which is determined by taking the arithmetic mean of the levels of the finished
ground surface at every location of change of grade at the outside walls of the building or
structure.
Fishing Camp means building or structure occupied on a temporary basis for the purpose of
conducting activities related to fishing.
Fitness Centre means a building in which facilities are provided for recreational athletic
activities including but not limited to body-building and exercise classes, and may include
associated facilities such as a change room and showers, sauna and solarium.
Floor Area means the horizontal area of a storey or ½ storey, measured between the interior
faces of the exterior walls at the floor level of such storey or ½ storey.
Floor Area, Dwelling Unit Area means the aggregate of the floor areas of all habitable rooms
in a dwelling unit.
Floor Area, Ground means the area of a lot occupied by a building or structure measured
to the interior face of the exterior walls, excluding in the case of a dwelling any private
garage, breezeway, porch or verandah.
Floor Area, Gross means the aggregate of all floor areas of a building or structure including
a walkout basement. Areas that do not contribute to Gross Floor Area are attached
garages, non-habitable attics, stairwells, landings (maximum 10 square metres), elevators,
cold cellars/crawl spaces, mechanical rooms (maximum 20 square metres), and areas of
unfinished, non-habitable non-walkout basements.
Floor Area, Gross Leasable means the gross floor area of a building excluding:
a) any part of such building used as a dwelling unit; and
b) any part of such building used for the parking or storage of motor vehicles; and
c) any part of such building used for equipment to heat such building or a portion thereof;
and
d) any part of such building used as a mall, if such mall serves as a common area between
stores; and
e) the thickness of any exterior walls of such building.
Floor Area, Net means the aggregate of the floor area of a building above or below
established grade, but excluding car parking areas within the building, stairways, elevator
shafts, service/mechanical rooms and penthouses, washrooms, garbage/recycling rooms,
staff locker and lunch rooms, loading areas, any space with a floor to ceiling height of less
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
11
than 1.8 metres and any part of a basement that is unfinished, is used solely for storage
purposes and is not accessible to the public.
Floor Space Index means the gross floor area of all buildings on a lot divided by the lot area.
Forestry means the raising and/or harvesting of timber for the purpose of producing
commercial or non-commercial wood products but shall not include the manufacturing or
processing of such products.
Free-standing means a structure that is unenclosed and not attached to a dwelling or other
building.
Funeral Home means a premises designed for the purpose of furnishing funeral supplies and
service to the public and includes facilities intended for the preparation of corpses for
interment or cremation.
Garage, Private means an enclosed building or part thereof, designed and used for the
storage of one or more motor vehicles, and may include washroom facilities.
Garage Projections, Main Building shall mean the greatest horizontal distance between the
front of the garage and the front wall of the main building.
Garage Projections, Porch or Verandah shall mean the greatest horizontal distance between
the front of the porch or verandah and the front wall of the main building.
Garage Width means the width of a private garage measured between the interior faces of
the walls of the private garage.
Garbage Enclosure, Private shall mean a solid opaque wall or fence comprised of concrete
block, brick, wood, stucco, or metal, with a gate, that screens a garbage container(s).
Gasoline Pump Island means a structure which intended to provide gasoline for vehicles or
aircraft.
Gasoline Pump Island, Accessory means a gasoline pump island used to dispense gasoline
solely to vehicles owned or leased by the occupant of the lot where such gasoline pump
island is located. This definition shall not include an automobile service station or any other
facility for the sale of fuels.
Gazebo means a free standing, roofed accessory structure which is not enclosed, except by
means of screening or glass and which is utilized for recreational purposes in conjunction
with the main building.
Golf Course means a public or private premises which is used for the purpose of playing golf.
This definition may include a par-3 golf course, a driving range, a miniature golf course or
any similar use and may include maintenance buildings, pro shop, accessory retail,
clubhouse, restaurant and banquet hall as accessory uses.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
12
Grocery Store means a retail establishment engaged in the business of selling groceries,
meat, fruit and vegetables to the general public, and having a minimum gross floor area of
300 m2 and a maximum gross floor area of 2230 m2.
Group Home Type 1 means a single housekeeping unit in a residential dwelling in which 3 to
6 unrelated residents excluding staff or receiving family, live as a family under responsible
supervision consistent with the requirements of its residents and includes a home licensed or
approved under the Provincial statute as a Special Care Residential Home, Supportive
Housing Program, Adult Community Mental Health Program, Children's Residence,
Accommodation Services for the Developmentally Handicapped, Satellite Residences for
Seniors and Homes for Physically Disabled Seniors, in compliance with municipal by-laws.
Group Home Type 2 means a single housekeeping unit in a residential dwelling or dwelling
unit within a commercial building occupied by 4 to 10 unrelated residents excluding staff or
receiving family, which shall be maintained and operated primarily for:
-
persons who have been placed on probation under the provisions of the Probation
Act, the Criminal Code of Canada, or any Act passed to replace the forgoing Act,
the Criminal Code of Canada, or any Act passed to replace the foregoing Acts;
-
persons who have been released on parole under the provisions of the Ministry of
Correctional Services Act, or Parole Board of Canada or any Act passed to replace
the foregoing Acts;
-
persons who have been charged under the Young Offenders Act but who have
been placed in open or secure custody;
-
persons who require temporary care, and transient or homeless persons;
-
persons requiring treatment and rehabilitation for addiction to drugs or alcohol; or,
-
persons housed in a group home that satisfies all the requirements of a Group Home
Type 1 except that it accommodates in excess of 6 residents.
Guest Cabin means a dwelling unit for guest accommodation accessory to an existing
dwelling and which contains no kitchen.
Habitable Room means a room designed for living, dining, sleeping, kitchen, or washroom
facilities, for persons. This definition may include a den, library, vestibule, entry, hallways or
enclosed sun room but shall not include any private garage, carport, porch, verandah,
unfinished attic, unfinished basement or unfinished cellar.
Historical Site means a parcel of land or building which marks or is associated with some
event or person of historical importance, and is appropriately designated as such by the
Township or any other appropriate public agency.
Hobby Farm means a premises on which an accessory barn, stable or animal shelter may be
erected to house livestock kept for recreational purposes or for home consumption by the
occupants of the dwelling.
Home Industry means a small-scale occupation which is accessory to a detached dwelling
or agricultural operation and which is operated in whole or in part within an accessory
building to the primary use. A home industry does not include a motor vehicle repair shop.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
13
Home Occupation means an occupation or business which is conducted entirely within a
dwelling unit and which is clearly subordinate or incidental to the principal use of the
dwelling unit for residential purposes.
Hospital means any institution, building or other premises established for the treatment of
persons afflicted with or suffering from sickness, disease or injury for the treatment of
convalescent or chronically ill persons that is approved under the Public Hospitals Act as a
public hospital.
Hotel means a premises in which temporary lodging or sleeping accommodation are
provided to the general public and may include accessory services such as restaurants,
meeting
facilities,
recreation
facilities,
convention,
banquet
facilities
and
staff
accommodations.
Hunt Camp means a building or structure occupied on a temporary basis for the purpose of
conducting activities related to hunting and/or fishing.
Inclinator means an exterior platform elevating device enclosed by a guard which rides an
elevated surface rail system, which is designed to transport people, materials or goods on a
inclined surface.
Industrial Use means a premises used primarily for the purpose of manufacturing,
processing, fabrication, assembly, treatment, packaging, and incidental storage of goods
and materials and may include accessory sales and distribution of such products.
Kitchen means a room or part of a room where food is stored, prepared and cooked, and
which has a cooking facility and a sink.
Landscaping Area means that portion of the lot area of a lot required for the growth and
maintenance of grass, flowers, bushes, trees and other landscaping. This definition may
include any surfaced walk, surfaced patio, play facility, or similar area but shall not include
any driveway or ramp (whether surfaced or not) nor any curb, retaining wall, parking area,
delivery space, loading space, swimming pool nor any open space beneath or within a
building or structure.
Lane means a public thoroughfare, whether or not improved for use, and which affords only
a secondary means of access for vehicular traffic to abutting lots and which is not intended
for general traffic circulation.
Laundromat means a premises where coin-operated laundry machines, using only water
and detergent, are made available to the public for the purpose of cleaning laundry.
Leaching Bed means an absorption system constructed as absorption trenches or as a filter
bed, located wholly in ground or raised above ground, to which effluent from a septic tank
is directed for treatment and disposal.
Library shall mean a building containing printed, electronic and pictorial material for public
use for purposes of study, reference and recreation.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
14
Light Equipment Rental Establishment means a premises in which light machinery, equipment
and tools are offered or kept for rent, lease or hire under agreement for compensation.
Live Adult Entertainment Parlour means any premises or part thereof in which services,
including activities, facilities, performances, exhibitions, viewings and encounters, designed to
appeal to erotic or sexual appetites or inclinations, are provided by one or more entertainers
in pursuance of a business.
Livestock Facility means a building or structure where animals or poultry are housed, including
beef feed lots and associated manure storage.
Loading Space means an unobstructed area of land which is used for the temporary parking
of one or more commercial motor vehicles while merchandise or material are being loaded or
unloaded from such vehicle.
Lodge means a premises with at least five guest rooms or cabins, that caters to the
vacationing public and may include accessory services such as restaurants, meeting
facilities, recreation facilities, banquet facilities and accommodation for staff, but shall not
include any establishment otherwise defined or classified in this By-law.
Long Term Care Facility means a nursing home under the Nursing Homes Act as amended,
an approved charitable home for the aged under the Charitable Institutions Act as
amended, or a home under the Homes for the Aged and Rest Homes Act as amended.
Lot means a parcel of land which is capable of being legally conveyed in accordance with
Section 50 of the Planning Act R.S.O. 1990 c.P. 13 or is described in accordance with a
registered Plan of Condominium.
Lot Area means the total area within the lot lines of a lot.
Lot, Corner means a lot situated at the intersection of two street lines which contain an angle
of not more than 135 degrees. Where such street lines are curved, the angle of intersection
of the street lines shall be deemed to be the angle formed by the intersection of the tangents
to the street lines, drawn through the extremities of the side lot lines. In the latter case, the
corner of the lot shall be deemed to be that point on the street line nearest to the point of
intersection of the said tangents.
Lot Coverage means the area of a lot covered by all buildings and structures excluding
docks, and decks less than 1.2 metres in height but including all permitted structures
appurtenant to a lot such as a boathouse. The portion of the overhang that projects more
than 1 metre from the building or structure face shall be counted in lot coverage.
Lot, Existing means a lot which existed as of the date of the passing of this By-law.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
15
Lot Frontage means the horizontal distance between the two lot lines which intersect the
front lot line of a lot, except:
i)
where the front lot line is not perpendicular to the side lot lines and the said lot lines
are parallel, lot frontage means the horizontal perpendicular distance between the
side lot lines or;
ii)
where the front lot line is not a straight line and the side lot lines are not parallel, the
lot frontage is to be measured by a line 8 metres back from and parallel to the chord
of the lot frontage, and for the purpose of this paragraph, the chord of the lot
frontage is a straight line joining the two points where the side lot lines intersect the
front lot line; and,
iii)
on an island that has not been subdivided, the lot frontage shall be the greatest
distance between any two points of the shoreline, and,
iv)
Where a lot has two or more frontages on a shoreline the longer shoreline frontage
shall be deemed to be the by-law frontage.
Lot, Interior means a lot, other than a corner lot or a through lot, which has street access.
Lot, Through means a lot, other than a corner lot, which has street access on two or more
street lines.
Lot, Waterfront means a lot in any zone which abuts on a body of water or on a shoreline
road allowance laid out along the shore of a body of water.
Lot Line means any boundary of a lot or the vertical projection thereof.
Lot Line, Exterior means any lot line other than a front lot line which is also a street line.
Lot Line, Front means, in the case of an interior lot, the lot line dividing the lot from the street.
In the case of a corner lot, the shorter lot line abutting a street shall be deemed to be the
front lot line except, where the lot lines abutting a street are the same length, the lot line
used for the principal entrance to the lot shall be deemed to be the front lot line. In the case
of a through lot, the lot line used for the principal entrance to the lot shall be deemed to be
the front lot line. In the case of a waterfront lot, the lot line that abuts the body of water shall
be deemed to be the front lot line or the lot line shall be the outer limit of the shoreline road
allowance along the shore of the body of water.
Lot Line, Rear means, except for corner lots, any lot line which is not a front lot line, an exterior
lot line or a side lot line. For corner lots, "Rear Lot Line" means a lot line which intersects an
exterior lot line.
Lot Line, Side means, except for corner lots, a lot line which intersects a front lot line or an
exterior lot line. For corner lots, "Side Lot Line" means a lot line, other than an exterior lot line,
which intersects the front lot line.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
16
Maintenance Garage, Accessory means a premises where vehicles owned or leased by the
occupant of the same premises are repaired or maintained, and is an accessory use to the
main use on the property.
Manufacturing and Processing means the use of land, buildings or structures for the assembly
or development of a product.
Manufacturing and Processing (Cannabis - Designated) means the use of land, buildings or
structures for cultivating, propagating, harvesting, drying, storing, packaging and distribution
of cannabis which is authorized by a valid registration certificate and document for
designated person issued by the Federal Minister of Health, pursuant to the Cannabis
Regulations, SOR/2018-144, as amended, under the Cannabis Act, S.C. 2018, c. 16, as
amended, or its successor.
Manufacturing and Processing (Cannabis - Licensed) means the use of land, buildings or
structures for cultivating, propagating, producing, harvesting, drying, storing, processing,
research, analytical testing, destroying, packaging, sale, and distribution of cannabis which
is authorized by a valid license issued by the Federal Minister of Health, pursuant to the
Cannabis Regulations, SOR/2018- 144, as amended, and the Industrial Hemp Regulations,
SOR/2018-145, under the Cannabis Act, S.C. 2018, c. 16, as amended, or its successor.
Marina means a building or lot where boat storage, boat repair, boat rental, pier, dock,
pump out or jetty facilities or any combination of the foregoing are available and may
include gasoline pump facilities for the fueling of marine vessels and the sale and service of
marine or other recreational vehicles as well as accessories thereto.
Marine Facility means a premises used for launching, docking, or storage of boats/vessels
and accessory equipment but shall not include any facilities for the servicing or repairing of
such boats or watercraft nor may any building or structure be used for human habitation.
Marine Sales and Service Establishment means a premises where boats, marine watercraft
and boat accessories are built, stored, serviced, repaired or kept for sale, or where facilities
for the servicing of boats and other marine watercraft are provided.
Merchandise Service Shop means an establishment wherein larger articles or goods such as
appliances, furniture or similar items may be repaired or serviced. This definition shall not
include any manufacturing operation or establishment used for the service or repair of
vehicles.
Mobile Home Park means land which has been provided and designed for the location of two
or more occupied mobile home dwellings.
Motel means a premises used to provide temporary accommodation to the travelling public
with the rooms being accessed from the outside and may include accessory services such
as
restaurants,
meeting
facilities,
recreation
facilities,
banquet
facilities
and
accommodation for staff.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
17
Motor Vehicle means an automobile, truck, motorcycle, and any other vehicle propelled or
driven otherwise than by muscular power, but does not include steam railways, or other
motor vehicles running only upon rails, or a motorized snow vehicle, traction engine, farm
tractor, self-propelled implement of husbandry or road building machine within the meaning
of the Highway Traffic Act.
Motor Vehicle Gas Bar means a premises where gasoline or other motor fuels and oil are
kept for sale and delivery directly into a motor vehicle, and does not include a motor vehicle
repair facility, car wash or a motor vehicle service centre.
Motor Vehicle Body Shop means a premises used for the painting or repairing of motor
vehicle bodies, exterior and under-carriage, and in conjunction with which there may be a
towing service or motor vehicle rental establishment but shall not include salvage yard.
Motor Vehicle Rental Establishment shall mean a premises where motor vehicles are kept for
rent, lease or hire under agreement for compensation and may also include an office used
to administer the rental of such motor vehicles and accessory facilities for the repair or
maintenance of vehicles.
Motor Vehicle Repair Facility means a premises used to conduct repairs of motor vehicles of
a mechanical or structural nature and may include an associated towing service, motor
vehicle service station and motor vehicle rentals but does not include a motor vehicle body
shop.
Motor Vehicle Sales Establishment shall mean a premises where new and/or used motor
vehicles are kept for display, lease or sale, and may include an associated motor vehicle
service centre.
Motor Vehicle Service Centre means an establishment primarily engaged in the retail sale of
fuels or lubricants for vehicles. Accessory uses may include the sale of vehicles or accessories
and minor maintenance or repair operations for such vehicles, other than bodywork or
painting.
Motor Vehicle Used Sales Establishment shall mean a premises where only used motor
vehicles are kept for display, lease or sale.
Motor Vehicle Washing Establishment means an establishment having facilities for washing
vehicles by production line methods which may include a conveyor system or similar
mechanical devices. This definition may also include a self-service operation.
Museum means a building or buildings used, or to be used for the preservation of a collection
of paintings or other works of art, or of objects of natural history, or of mechanical, scientific
or philosophical inventions, instruments, models or designs, and dedicated to the recreation
of the public, together with any libraries, reading rooms, laboratories and other offices and
premises used or to be used in connection therewith.
Natural Area shall mean an area within which no person shall alter the surface of the land; or
alter, disturb, destroy, remove, cut or trim any vegetation, whether living or dead, or alter,
disturb, destroy, or remove any wildlife habitat, whether in use or not.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
18
Non-Complying means a use, building or structure which is permitted by this By-law but which
does not satisfy the regulations of the zone in which it is located.
Non-Conforming means a use that is not an identified permitted use for the zone in which it
is located.
Noxious Use means a use which, from its nature or operation, creates a nuisance or is liable
to become a nuisance or offensive by the creation of noise or vibration, or by reason of the
emission of gas, fumes, dust or objectionable odour, or by reason of the matter, waste or
other material generated by the use, and shall include any uses which may be declared to
be a noxious or offensive trade or business under the Public Health and Promotion Act, as
amended.
Nursery, Commercial means land used partly as a horticultural nursery but which also offers or
keeps for wholesale or retail sale other articles, goods or materials.
Nursery, Horticultural means land used for the growing of sod, flowers, bushes, trees or other
gardening, landscaping or orchard stock for wholesale or retail sale.
Office means a premises used for conducting the affairs of businesses, professions, services,
industries, governments, or like activities, in which the chief product of labour is the
processing and/or storage of information rather than the production and distribution of
goods.
Office, Accessory means an office accessory to another use on the same property.
Open Span means the portion of a dock that is not fixed onto a structure resting on or
attached to the bottom of a waterbody.
Open Storage Area means land used for the outside storage of equipment, goods or
materials in conjunction with a non-residential uses located on the same lot. This definition
shall not include a parking area, a delivery space or a loading space or any use otherwise
defined in this By-law.
Outside Display or Sales Area means an outdoor open space area where product or
merchandise is displayed and/or sold and/or where services are provided in conjunction
with a business located within a building or structure on the same lot.
Park means an open space area, owned, operated or maintained in whole or in part, by a
public authority as a recreational area for public use, including passive and active forms of
recreation, designed to serve the neighbourhood and community.
Park, Private means a private open space area used for passive and active forms of
recreation.
Park, Provincial means a Provincial Park, Conservation Reserve or any other park facility
managed by or on behalf of the Ministry of Natural Resources.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
19
Parking Area means an open area of land not located on a public street, private street or
lane which is used for the parking of four or more motor vehicles, but shall not include any
area where motor vehicles for sale or repair are kept or stored.
Parking Garage means a building or part thereof, used for the storage or parking of motor
vehicles.
Parking Lot, Commercial means an area of land used for the parking of motor vehicles for a
fee, with such use forming the principal use of a lot.
Parking Lot, Municipal means an area of land used for the parking of motor vehicles that is
owned and/or controlled by a public authority.
Parking Lot, Private means an area of land used for the private parking of motor vehicles
with such use being the principal use of a lot.
Parking Space means an unobstructed space for the parking of a motor vehicle.
Personal Service Shop means a premises where health and grooming services are provided.
Pit, Sand and Gravel means any open excavation made for the removal of any soil, earth,
clay, marl, sand, gravel or unconsolidated rock or mineral to supply such material for
construction, industrial or manufacturing purposes. This definition shall not include:
a) any excavation incidental to the construction of a building or structure for which a
building permit has been issued; or
b) any asphalt plant, cement manufacturing plan or concrete batching plant; or
c) any wayside pit.
Place of Assembly means a premises used for the gathering of groups of people and may
include facilities for the preparation and consumption of food or drink but shall not include
a place of worship or place of entertainment.
Place of Entertainment shall mean a premises where entertainment is offered for gain or profit
such as a cinema, billiard or pool rooms, bowling alley or similar activity for the enjoyment of
the general public but shall not include body-rub parlours or an adult entertainment parlour,
or any place of entertainment otherwise defined by this By-law.
Place of Worship means premises used by one or more religious groups for the practice of
religious services.
Planting Strip means an area which shall be used for no purpose other than planting a row
of trees or a continuous unpierced hedgerow of evergreens or shrubs, not less than 1.5
metres high, immediately adjacent to the lot line or portion thereof along which such
planting strip is required herein. The remainder of such planting strip shall be used for no
purpose other than planting trees, shrubs, flowers, grass or similar vegetation.
Planting Strip Width means the least horizontal dimension of a planting strip measured
perpendicularly to the lot line abutting such planting strip.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
20
Play Facility Area means that portion of a lot dedicated to children's outdoor equipment
and associated play area.
Porch, Enclosed means a roofed, un-insulated space that is enclosed by windows, weather
wall or other similar product and is not directly open to the rest of the building.
Porch, open (also veranda) means a roofed exterior space that is not enclosed by any walls,
windows or screens but may have a guard as required by section 9.8. of the Ontario Building
Code.
Porch, Screened means a roofed, exterior space that is enclosed by screens and guards as
required by section 9.8. of the Ontario Building Code.
Portable Ready Mix Plant means a use that includes a structure that is not affixed to the
ground on a permanent basis, but may be allowed to remain permanently, is dust controlled,
and manufactures materials to produce ready mix concrete as the final product.
Premises shall mean the area of a building and/or lot occupied by a business or enterprise.
In a multiple tenancy building occupied by more than one business, each business area shall
be considered a separate premises.
Privacy Yard means a yard adjoining an exterior wall of a dwelling unit or mobile home, clear
and unobstructed by any public or common pedestrian access, driveway or surface parking
area, other than a private driveway serving only such dwelling unit or mobile home.
Private Club means a non-profit, non-commercial organization which carries on cultural,
social, athletic or recreational activities and includes the premises of a fraternal or charitable
organization.
Private Road means a private thoroughfare not under the jurisdiction of the Corporation or
the Province of Ontario.
Produce Outlet, Accessory means a retail store accessory to a principal use on the same site
for the sale of produce from that property.
Produce Storage Building means a building or part thereof used for the storage of agricultural
produce and may include facilities for distribution or an accessory retail store.
Provincial Highway means a street under the jurisdiction of the Ministry of Transportation.
Public Authority means any department, appointed agency or commission of the
Government of Canada, Province of Ontario or the Township of Seguin.
Public Self Storage Unit means a premises where individual, indoor storage areas are made
available to the public for the temporary storage or keeping of goods.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
21
Public Transit Depot means the use of land and/or buildings for the loading and unloading
of passengers on and off of trains and/or buses and for the storage or parking of trains and
buses, including ticket offices, restaurants, luggage checking facilities, and other related
uses.
Public Use means any use of land, buildings or structures by or on behalf of a public authority.
Quarry means a place where consolidated rock has been or is being removed by means of
an open excavation and processed to supply material for construction, industrial or
manufacturing purpose but does not include a wayside quarry or open pit mine.
Queuing Lane means an area of land that is used exclusively for motor vehicles whose
occupants are waiting to be provided with goods, materials or services.
Reconstruct means the repair, restoration or replacement of a building or structure.
Recreation, Non-Intensive means recreational development and uses, including related
facilities, operations and programs, which involve a relatively low degree of human activity,
maintenance or management and which can reasonably be expected to have minimal
negative effects on the form, functions or integrity of environmental areas when assessed either
individually or cumulatively. The uses may include trails, nature viewing and interpretative
opportunities, but do not include uses primarily dependent on the use of motorized vehicles.
Recreational Trail means a strip of land used for passive recreational uses, seasonal
recreational uses, or snowmobiling which connects to different areas in the Township.
Recreational Vehicles and Trailers means a vehicle or trailer which provides short term
occupancy intended and used exclusively for travel, recreation and vacationing, designed
to be towed or propelled by a motor vehicle or self-propelled, and includes such vehicles
commonly known as recreational vehicles ("RVs"), Park Model trailers, travel trailers, camper
trailers, truck campers, motor homes, houseboats or other similar vehicles but does not
include a mobile home.
Recreational Vehicle Sales and Service Establishment means buildings, lands, or structures
or part thereof used for the sale and service of recreation vehicles including snowmobiles,
boats and all terrain vehicles.
Research Establishment means a building or structure or part of a building or structure used
for scientific research, tests or investigations, data collection and manipulation or technical
development of information, products or devices for scientific application.
Restore means the repair of a building or structure to a safe condition deemed necessary by
the Chief Building Official. Restore shall not include its replacement.
Resource Management means the preservation, protection and improvement of the natural
environment through comprehensive management and maintenance, under professional
direction for both the individual and society's use, both in the present and the future.
Resource Management Uses also means the management, development and cultivation of
timber resources to ensure the continuous production of wood or wood products, the
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
22
provision of proper environmental conditions for wildlife, the protection against floods and
erosion, the protection and production of water supplies and the preservation of the
recreational resource.
Restaurant means a premises in which the principal business is the preparation and serving
of food and refreshments to the public for consumption at tables within or outside the
building and which may include the preparation of food in a ready-to-consume state for
consumption off the premises.
Retail Store means a building or part of a building in which goods, wares, merchandise,
substances, articles or things are offered or kept for retail sale or rental to the public. This
definition shall not include any establishment otherwise defined in this By-law.
Retail Store, Accessory means a retail store accessory to a permitted non-residential use.
Retail Warehouse means a premises where the entire floor area of the use is occupied by a
single user with integrated storage and retail sale of goods to the general public in a
warehouse format and which serves a regional trade area.
Sales, Service and Repair Shop means a premises used for the sales, service or repair of
household articles, goods or materials.
Salvage Yard means an area outside of an enclosed building where motor vehicles are
disassembled and dismantled, or where vehicles in an inoperable condition or used motor
vehicle parts are stored or re-sold.
Sauna means an accessory building or structure wherein facilities are provided for the
purpose of a sauna bath, either dry or wet and may include a change/relaxation room,
storage areas and a washroom, but shall not include a kitchen, hot tub, jacuzzi or sleeping
facilities.
Sawmill means a building, structure or areas where timber is cut or sawed to finished lumber
but does not include any other form of wood processing equipment.
School means a Provincially approved institution for academic instruction and may include
a public, private or separate school, a vocational school, or a post secondary school such
as a college or university.
School, Commercial means a school conducted for profit or gain, which is not under the
jurisdiction of a Board as defined in the Education Act.
Services Designed to Appeal to Erotic or Sexual Appetites or Inclinations means:
i)
services characterized by any person or persons involved or engaging in specific sexual
activities or by an emphasis on the display of specified body area; or
ii)
services in respect of which the word "nude", "naked", "topless", "bottomless", "sexy", or
any other word or any other picture, symbol or representation having like meaning or
implication is used in any advertisement, or in respect of which is advertised the availability
of "table dancing" or any other form of entertainment held out to be, by reason of its
sexual content, not suitable for minors.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
23
Setback means the distance between a lot line and the nearest main wall of any building or
structure.
Shoreline means the line at which the normal or controlled high water mark of a lake or river
meets the land.
Shoreline Buffer Area means lands within the required front yard of a waterfront lot, free of
buildings and structures, used solely for the growing, preservation and maintenance of
natural vegetation.
Sight Triangle means the triangular space on a lot formed by two intersecting street lines and
a line drawn from a point in one street line across such lot to a point in the other street line,
each such point being the specified distance from the point of intersection of the street lines
(measured along the street lines). Where the two street lines do not intersect at a point, the
point of intersection of the street lines shall be deemed to be the intersection of the
projection of the street lines or the intersection of the tangent to the street lines.
Specified Body Areas means one or more of the following:
i)
in the case of a female person, her nipples and areolae; and
ii)
in the case of all persons, the pubic, perianal, perianal areas, the genitals, anus and the
buttocks.
Specified Sexual Activities means one or more of the following: actual or simulated sexual
intercourse, masturbation, urination, defecation, ejaculation, sodomy, including bestiality, anal
intercourse, oral sexual intercourse, direct physical stimulation of genital organs, and
flagellation, bondage or torture in the context of a sexual relationship or activity.
Sports Arena shall mean a building or part of a building, in which the principal facilities
provide for recreational activities such as curling, skating, hockey, lacrosse, broomball or
other similar athletic activities, and which facilities may include dressing rooms, concession
booths for the provision of food and refreshments to the general public, bleachers,
equipment for making artificial ice and other such accessory facilities.
Storage Container means an accessory structure that is pre-manufactured, transportable,
enclosed container (including a shipping container/"sea-can", rail container, or similar
intermodal freight container), that:
a) is placed or kept on a lot primarily for the storage of goods, materials, equipment or similar
items, and is not used for habitation, business occupancy, or the provision of services to the
public;
b) is largely unmodified, such that it substantially retains its original structural form and
appearance as a freight container, including a metal shell and cargo-type doors, and does
not include additions such as porches, decks, permanent roofs/canopies, bay windows, or
similar appurtenances;
c) may be located on the ground, on a foundation, on skids, or on a vehicle or trailer, whether
or not the vehicle or trailer is licensed or capable of being moved; and
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
24
d) does not include a shipping container or similar unit that is incorporated into, or forms part of,
the construction of a building for residential, commercial, industrial, institutional, or
agricultural use, where the unit is converted or integrated as a building element.
Storey means that portion of a building or structure between any floor level and the floor,
ceiling or roof immediately above.
Storey, Attic means that portion of a building situated wholly or partly within the roof but
which is not a one-half storey.
Storey, Basement means any storey below the first storey which is at least 50% above finished
grade along wall face at the front of the building.
Storey, Cellar means any crawlspace or storey below the first storey which is more than 50%
below finished grade (measured from finished floor to finished ceiling).
Storey, First means the storey with its floor closest to finished grade and having its ceiling at
least 1.5 metres above finished grade, but is not a basement.
Storey, Half means the portion of a building situated within the roof or having its floor level
not lower than four feet below the line where the roof/dormer and exterior enclosing walls
meet; and when used with reference to a one and a half storey boathouse, means that
portion of the boathouse situated between a sloping roof and a floor above the first storey
below, of a boathouse.
Street means a highway as defined under The Highway Traffic Act, or the Municipal Act or a
road which has been opened and assumed and is maintained by the Corporation of the
Township of Seguin. This definition shall not include a lane or a private right-of-way. "Street
allowance" shall have a corresponding meaning.
Street Access means, when referring to a lot, that such lot has a lot line or portion thereof
which is also a street line.
Street, Improved Public means a street, road or highway under the jurisdiction of the Province
of Ontario or the Municipality which has been opened and assumed and is maintained so
as to allow normal vehicular access to adjacent properties.
Street Line means the limit of a street allowance and is the dividing line between a lot and a
street.
Street Setback means the least horizontal distance required between the centerline of a
street allowance and the nearest part of any building envelope on a lot (measured at right
angles to such centreline).
Structure means anything constructed, the use of which requires location on or in the ground,
or attached to something having location on or in the ground. This definition shall include
swimming pools, hot tubs, and Jacuzzis.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
25
Summer Camp means an establishment which is situated on land that is owned and
operated by a religious, charitable, or other not-for-profit corporation; is a "Class A Camp"
as defined in Regulation 568, made under the Health Protection and Promotion Act; provides
accommodation to registered individuals for extended stays during the summer, and
accommodation for staff; does not provide accommodation or services to the general
travelling and vacationing public; has common dining and recreational facilities; and offers
recreational, educational, social, and cultural programs to the permitted guests.
Tourist Camp means an establishment providing accommodation for overnight camping in
tents or the parking of recreational vehicles and trailers, Park Model trailers, or other tourist
vehicles for recreational or vacation use whether or not a fee is charged or paid for such
accommodation use. This definition shall not include a mobile home park.
Tourist Establishment means any premises operated to provide sleeping accommodation for
the travelling public or sleeping accommodation for the use of the public engaging in
recreational activities, and includes the services and facilities in connection with which
sleeping accommodation is provided, but does not include:
(a) a camping establishment, mobile home park, summer camp or tourist
camp as defined in this By-law, or
(b) a camp operated by a charitable corporation approved under the
Charitable Institutions Act, or
(c) a summer camp within the meaning of the regulations made under the
Health Protection and Promotion Act, or
(d) a club owned by its members and operated without profit or gain.
Tourist Information Centre means an office used to provide information and assistance to the
tourist or vacationing public, and may include an accessory retail store within the same
building.
Trailer, Vehicular shall mean any vehicle so constructed that it is suitable for being attached
to a motor vehicle for the purpose of being drawn or propelled by the motor vehicle and is
capable of being used for the transport of goods, materials, equipment or livestock
notwithstanding that such vehicle is jacked up or that its running gear is removed.
Trailer, Park Model means a recreational dwelling unit constructed in conformance with
CAN/CSA-Z241 "Park Model Trailer" that is built on a single chassis mounted on wheels, is
designed to allow relocation from time to time, and is designed as living quarters for seasonal
occupancy and may be connected to facilities necessary for operation of installed fixtures
and appliances, and having a gross floor area including lofts,not exceeding 50 square
metres when in the setup mode and having a width greater than 2.6 metres while in the
transit mode. The maximum floor area of an attached deck on a Park Model Trailer shall be
no longer than the length of the trailer and 2.4 metres in width. Park Model Trailers shall only
be permitted within the Resort Commercial (C4) and Camping Establishment (C5) Zones.
Training Facility means a premises used for continuing education or other educational
activities by the owner or members of the public.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
26
Transportation Depot means a building or structure where goods or wares are temporarily
stored prior to shipment and where trucks, buses or other fleet vehicles are stored, serviced,
repaired, kept for hire, loaded or unloaded.
Tuck Shop means an establishment where food, tobacco, drugs, periodicals or similar items of
household necessity are kept for retail sale to residents of the same lot upon which such
establishment is located.
Use means the purpose for which any portion of a lot, building or structure is designed,
arranged, intended, occupied or maintained.
Use, Accessory means a use which is incidental, subordinate and exclusively devoted to a
main building or main use and located on the same lot therewith.
Use, Main means the principal use of a lot.
Veterinary Clinic means a building or part of a building where animals or pets are given
medical or surgical treatment or grooming, within which there may be shelter facilities
provided for short-term overnight medical treatment but shall not include an animal kennel.
This definition shall not include any facilities for the cremation or disposal of dead animals.
Video Outlet/Rental Store means an establishment where pre-recorded video tape, video
discs, game cartridges, DVD's or other similar pre-recorded materials are offered for rent or
sale and where video cameras or video players/recorders may be offered for rent, but shall
not include the sale of electronic video equipment and other electronic home
entertainment products or an Adult Video Store.
Walkway, Private means a walkway created through the registration of a plan of
condominium.
Warehouse means a premises used for the storage and distribution of goods, wares,
merchandise, substances or articles but shall not include facilities for a trucking terminal.
Warehouse, Public Self Storage means a premises used for the temporary storage of
household items and secured storage areas or lockers which are generally accessible by
means of individual loading doors.
Warehouse, Wholesale means a warehouse or portion thereof in which goods, wares,
merchandise or articles are stored or kept for sale in large bulk or quantity for supply from
the premises primarily to a person other than the ultimate consumer. For greater clarity, the
display of items for sale is permitted provided it is accessory to a primary warehouse or
wholesale use and is limited to the net floor area provided for in this By-law.
Washroom Facility, or Washroom means an area within a building equipped for personal
hygiene, which includes a toilet and a sink, and may include showers or baths.
Waste Landfill means a landfill site where garbage, refuse, domestic or industrial waste,
exclusive of liquid industrial waste, is disposed of or dumped.
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
27
Waste Processing Facility means a facility that receives, stores and/or processes waste
materials for the purpose of creating new products or materials.
Waste Transfer Facility means a facility where waste materials are collected for shipment and
may be sorted and/or prepared for transportation.
Washout Facility means a premises used for the washing of aggregate, sand and gravel
materials.
Waterfront Landing means land used for parking vehicles, docks and docking of boats, to
facilitate water access to one or more shoreline residential properties. 1 see footnote
Waterway means a drainage corridor comprising either a natural stream, open drain or
floodway, or any combination thereof, that serves to drain lands.
Waterway, Navigable means any waterbody, natural or man made, capable of carrying a
water borne vessel. This includes waters capable of being used for commerce,
transportation or recreation and there is no limit on the size of stream considered navigable
in accordance with the Navigable Waters Protection Act.
Water Setback means the horizontal distance between the normal or controlled high water
mark of a waterbody and the nearest part of any building envelope on a lot.
Wayside Pit or Quarry means a temporary pit or quarry opened and used by or for a public
authority solely for the purpose of a particular project or contract of road construction and
not located on the road right-of-way.
Wellness Centre means a private clinic that offers both physical and psychological medical
treatment, including acupuncture, massage therapy, holistic healing, personal counseling,
physiotherapy, and other similar services.
Width, Boathouse when used with reference to a boathouse, width means the longest
perpendicular measurement along a horizontal plane from any point on the outside of one
side wall of a boathouse to any point on the outside of the opposite side wall. For the
purpose of this definition, a side wall means the outside wall of a boathouse which is closest
to being perpendicular to the shoreline and the opposite wall. A boatport shall be included
in the overall width of a boathouse.
Width, Sauna Building when used with reference to a sauna, width means the longest
perpendicular measurement along a horizontal plan from any point on the outside of one
wall of a sauna building to any point on the outside of the opposite side wall. For the purpose
of this definition a side wall of a sauna in the front yard of a waterfront lot means the outside
wall of a sauna building which is closest to being perpendicular to the shoreline and the
opposite wall.
1 Footnote: This section not applicable to property roll no.: 4903-040-007-00100.Currently under appeal (OMB case no. PL141142
Conway Jones).
Township of Seguin Zoning By-law
13-
Section 13 - Definitions
28
Workshop means a building or structure where manufacturing is performed by tradesmen
requiring manual or mechanical skills and may include a carpenter's shop, a locksmith's
shop, a gunsmith's shop, a plumbing and electrical contractor or a heating /air conditioning
contractor's shop, a commercial welder's shop, or similar uses.
Yard means an open, uncovered space on a lot, appurtenant to a building or structure and
unoccupied by buildings or structures except as specifically permitted in this By-law.
Yard, Exterior Side means the yard of a corner lot extending from the exterior lot line to the
nearest side wall of the main building or structure on the lot but does not include any portion
of the front or rear yards.
Yard, Front means a yard extending across the full width of the lot between the front lot line
and the nearest front wall of the main building or structure located on the lot.
Yard, Rear means a yard extending across the full width of the lot between the rear lot line
and the nearest rear wall of the main building or structure located on the lot but does not
include any portion of the exterior side yard.
Yard, Interior Side means a yard extending from the side lot line to the nearest side wall of
the main building or structure on the lot but does not include any portion of the front or rear
yards.
Zone means a designated area of land use shown on Schedule A to this By-law and includes
any special zone used in this By-law.
Township of Seguin Zoning By-law
14-1
Section 14 - Enactment
SECTION 14 ENACTMENT
14.1
FORCE AND EFFECT
This By-law shall come into force and effect on the date it is passed by the Council of
the Corporation of the Township of Seguin subject to the applicable provisions of the
Planning Act, R.S.O. 1990, c.P. 13 as amended.
14.2
READINGS BY COUNCIL
This By-law read a first time on the 18th day of September, 2006.
This By-law read a second time on the 18th day of September, 2006.
This By-law read a third time and finally passed on the 18th day of September, 2006.
MAYOR: (Original signed by David Conn)
(Municipal Seal)
CLERK: (Original signed by Craig Jeffery)
14.3
CERTIFICATION
I hereby certify that the foregoing is a true copy of Zoning By-law No. _________
as enacted by the Council of the Corporation of the Township of Seguin, on the
___________ day of _____________, 2006.
CLERK: ________________________