Winter Control Plan (Winter Maintenance Procedural Plan), May 2018

South Frontenac, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 3a3adcad0e81 · verified 2026-10-18 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Page 0 of 97 1.0 The Corporation of the Township of South Frontenac PUBLIC WORKS DEPARTMENT WINTER CONTROL PLAN Winter Maintenance Procedural Plan - May 2018 Page 1 of 97 Contents 1.0 Overview ........................................................................................................................................... 2 2.0 Resources .......................................................................................................................................... 3 2.1 Facilities: ................................................................................................................ 3 2.2 Fleet Inventory Listing: ........................................................................................... 4 2.3 Staffing: .................................................................................................................. 5 2.4 Material Availability: ............................................................................................. 6 3.0 Operational Procedures............................................................................................................... 7 3.1 Route Planning and Treatment Priorities: .............................................................. 7 3.2 Weather Monitoring: ............................................................................................... 8 3.3 Road Patrol: ........................................................................................................... 9 3.4 Snow and Ice Clearing: .......................................................................................... 9 3.5 Snow and Ice Treatment Procedures: .................................................................. 11 3.6 Contracted Routes: .............................................................................................. 13 3.7 Sidewalk Plowing and Sanding: ........................................................................... 13 3.8 Village Snow Removal: ........................................................................................ 14 3.9 Record Keeping: .................................................................................................. 15 3.10 Winter Maintenance Procedural Plan Distribution: ............................................... 17 3.11 Hours of Service Documentation .......................................................................... 17 4.0 Road Closures ............................................................................................................................... 21 4.1 Road Closures and Liaison with the OPP: ........................................................... 21 4.2 Winter Parking Restrictions .................................................................................. 21 5.0 Conclusion ..................................................................................................................................... 22 5.1 Final Statement: ................................................................................................... 22 6.0 Appendices .................................................................................................................................... 23 6.1 Appendix "A" ........................................................................................................ 23 6.2 Appendix "B" ........................................................................................................ 24 6.3 Appendix "C" ........................................................................................................ 25 6.4 Appendix "D" ........................................................................................................ 26 6.5 Appendix "E".........................................................................................27 6.6 Appendix "F"......................................................................................................... 66 6.7 Appendix "G" ........................................................................................................ 77 6.8 Appendix "H" ........................................................................................................ 79 6.9 Appendix "I" .......................................................................................................... 85 7.0 Appendix "J".........................................................................................86 7.1 Appendix "K" .......................................................................................87 Winter Maintenance Procedural Plan - May 2018 Page 2 of 97 1.0 Overview Winter operations are normally carried out within the Township of South Frontenac from approximately November 15th of the current year through April 15th of the following year. Winter events occurring before or after this time period will follow the procedures and guidelines outlined in this document. Service Delivery Responsibilities The Public Works Department is responsible for providing and delivering winter maintenance service for the municipal road operations within the boundaries of the Township of South Frontenac and neighboring municipalities through cross boundary agreements. This involves: Design of the Winter Maintenance Plan Annual review, production and distribution of the Winter Maintenance Plan Establishing treatment priorities for roadways Establish application rates for the different routes Ensuring availability of equipment, staff, and materials Maintenance of operation equipment Ensuring availability of weather forecast service and condition monitoring systems Monitoring of roadway condition Day to day direction of operations Monitoring performance Providing accurate and timely information to relevant parties as required Maintaining comprehensive records for winter maintenance operations and activities Where necessary liaise with other Highway Authorities, Emergency Services and Police Implementing annual reviews of the service To facilitate planning, winter operations activities encompass two categories: Scheduled - Guided by the Winter Operations Plan and the Minimum Maintenance Standards - Includes weather monitoring, winter road Patrol And winter preparation Event Response - Guided by activation triggers defined in the Minimum Maintenance Standards or by practical considerations - Includes snow plowing, de-icing and snow removal Winter Maintenance Procedural Plan - May 2018 Page 3 of 97 2.0 Resources Facilities: The Township of South Frontenac maintains 4 facilities to carry out winter operations during the winter control period. These facilities are as follows and house the following staff and contracted operators: Keeley Road Patrol Yard - 2490 Keeley Road, Sydenham Public Works Headquarters Employees include Public Works Manager, Operations Supervisor, Technical Supervisor, Facilities/Solid Waste Supervisor,1 Lead Hand, 1 Mechanic, 8 Driver Laborers, 6 Contracted Operators Hartington Patrol Yard - 5286 Hinchinbrooke Road, Hartington Employees include 1 Lead Hand, 4 Driver Laborers, 4 Contracted Operators, 1 Garbage/Light Equipment Operator Bedford Patrol Yard - 1389 Westport Road, Godfrey Employees include 1 Lead Hand, 3 Driver Laborers, 3 Contracted Operators Sunbury Patrol Yard - 3910 Battersea Road, Sunbury Employees include 1 Lead Hand, 2 Driver Laborers, 4 Contracted Operators Winter Maintenance Procedural Plan - May 2018 Page 4 of 97 Fleet Inventory Listing: The following vehicles are owned, operated and maintained by the Public Works Department which are typically harnessed, equipped and used in winter maintenance operations (does not include patrol vehicles). Equipment ID Description Class Year Location F-3 Chevrolet 2500 4X4 Plow Truck 2016 Sunbury F-41 Chevrolet 2500 4X4 Plow Truck 2016 Keeley Rd F-2 Chevrolet 2500 4X4 Plow Truck 2017 Westport Road F-8 Ford 250 4X4 Plow Truck 2013 Hartington FT-14 Sterling LT9513 Tandem Plow Truck 2001 Westport Road FT-16 Western Star Tandem Plow Truck 2017 Keeley Road FT-26 Sterling LT9513 Tandem Plow Truck 2003 Keeley Road FT-27 Sterling LT9513 Tandem Plow Truck 2002 Hartington FT-29 International 7600 Tandem Plow Truck 2005 Keeley Road FT-30 Sterling LT9513 Tandem Plow Truck 2004 Hartington FT-36 Sterling LT9513 Tandem Plow Truck 2006 Hartington FT-38 International 7600 Tandem Plow Truck 2007 Westport Road FT-42 Ford F550 4X4 1 ½ ton Plow Truck 2008 Keeley Road FT-43 Sterling LT9513 Tandem Plow Truck 2008 Keeley Road FT-44 Sterling LT9513 Tandem Plow Truck 2009 Hartington FT-45 Sterling LT9513 Tandem Plow Truck 2009 Sunbury FT-46 International 7600 Tandem Plow Truck 2010 Keeley Road FT-47 International 7600 Tandem Plow Truck 2010 Westport Road FT-53 International 7600 Tandem Plow Truck 2012 Sunbury FT-57 International 7600 Tandem Plow Truck 2014 Hartington FT-60 Mack Gu7 Tri-Axle Tri-Axle Plow Truck 2013 Keeley Road FT-69 International 7600 Tandem Plow Truck 2016 Keeley Road BT-90 John Deere 544K Loader 2011 Westport Road FT-94 Caterpillar 930G Loader 2006 Keeley Road 14-24 Hyundai HL-740 9A Loader 2014 Hartington Rented Loader 3yd Bucket Loader New Sunbury In case of extreme winter events: FG-22 Champion 740 Grader 2000 Westport Road FG-23 John Deere 870G Grader 2009 Hartington FG-24 John Deere 772 GP Grader 2012 Keeley Road 14-25 Trackless Blower/Blade/Sander 2014 TWP Wide 420 Caterpillar Backhoe Loader 2015 Keeley Road 580 Case Backhoe Loader 2016 Westport Road Location of Vehicles and Other Equipment Winter Maintenance Procedural Plan - May 2018 Page 5 of 97 Vehicles as listed in the table above are housed at their stated Patrol Yards. However, in the case of an emergency, these vehicles may be deployed to one of the other patrol sites but will be returned to their normal operational site once the emergency has ceased. Calibration Procedures Calibration of the sanding/salting equipment (Dickey-John, application rates for sanding and salting equipment) will be carried out annually before the start of the winter maintenance season and re-checked as deemed necessary. The calibration will normally be completed by a qualified technician or in house by a licensed mechanic. Staffing: The Township of South Frontenac's Public Works department uses the tiered organization structure shown in the following figure. Public Works Manager Responsible for management of the department and ultimately, the results of all winter operations Operations Supervisor Operations and Staffing Responsible for front line management and directing winter operations and staff include Lead Hands Lead Hands Roads & Streets, Parking Lots, certain Fire Halls, Cemeteries and Sidewalks Responsible for directing winter operations and staff including both the contracted operators & driver laborers Patrolman Roads & Streets, Sidewalks, Night Shift Responsible for monitoring the day-to-day winter operations night and weekend shifts, including the contracted operators & driver laborers Truck Drivers & Light Equipment Operators Responsible for performing winter operations as directed by the Lead Hands and patrolmen. List of Township Public Works Employees, Contract & Casual Contacts: The Township Public Works Department keeps a copy of all Township Public Works Employees, Full time and Part time driver's license and performs, at its discretion, a license verification and license abstract on each employee operating a township vehicle. Winter Maintenance Procedural Plan - May 2018 Page 6 of 97 This list will be held by the Township Public Works Department's administration for verification of employee name, location and signature. Training: The Township Public Works Department will endeavor to provide the following training to its staff: (a) Operators and staff will be trained in First Aid Training and CPR every Three (3) years (b) Operators and staff will be given WHMIS training Annually (c) Operators and staff will be provided with access and knowledge on Occupational Health and Safety, including the Township's Health & Safety Policies and Procedures (d) Operators will attend a Snow Plow Driver Course Annually (e) Operators will be given training on Traffic Control Safety (Book 7) Every Two (2) Years (f) Hours of work Material Availability: Salt is tendered as a part of the City of Kingston's tender early in the year once the previous winter maintenance season has ended. The successful suppliers must supply the Township on an as needed basis over the course of the winter season (November thru April). Storage Facilities are located at each of the Patrol Facilities and filled prior to the winter period. Environmentally sound Storage Facilities are monitored closely and usage is documented so that the facilities may be refilled prior to depletion. List of Storage Facilities/ # Routes per Yard/ Capacity: Facility Sunbury Keeley Road Hartington Westport Pre-mixed Capacity 7,000 tonnes 11,000 tonnes 6,000 tonnes 7,000 tonnes Local Roads 5 Routes 10 Routes 8 Routes 6 Routes Arterial Roads 1 Route (a) 3 Routes (b) 1 Route (a) 1 Route (a) South Frontenac applies three different material mixes on the road system. Road Type Salt Sand MgCl Number of Routes Local Roads (Former Township Roads) 5% 95% 0% 17 In house routes & 12 Contracted Routes Arterial Roads (Former County Rds. & Hwy 38) 30% 70% 0% (a)3 of 6 Arterial Rds. Arterial Roads (Former County Rds. & Hwy 38) 15% 70% 15% (b)3 of 6 Arterial Rds. ***Note- When freezing rain events occur, all routes are "sweetened" to help the clearing process Fuel Stock and Locations: Each of the 4 Patrol Yards has re-fueling facilities for diesel fuel. Gasoline is only available at Keeley Rd and Westport Rd yards. Fuel usage is monitored electronically. Winter Maintenance Procedural Plan - May 2018 Page 7 of 97 3.0 Operational Procedures Activity List Key activities are needed to provide a full winter maintenance service. The following is a brief summary of these activities: 3.1 Route Planning and Treatment Priorities 3.2 Weather Monitoring 3.3 Road Patrol 3.4 Snow and Ice Clearing 3.5 Snow and Ice Treatment 3.6 Contracted Routes 3.7 Sidewalk Plowing and Sanding 3.8 Village Snow Removal 3.9 Record Keeping 3.10 Winter Maintenance Procedural Plan Distribution 3.11 Hours of Service Documentation Route Planning and Treatment Priorities: General: Treatment priorities for the roadways within the Township of South Frontenac have been devised to ensure effective, efficient coverage within the timescales defined in the Minimum Maintenance Standards. This system of coverage is readily adaptable to prevailing conditions. For the purposes of this policy, the highways under the jurisdiction (for the purposes of winter maintenance) of the Township of South Frontenac are classified according to the Table in Section 1(2) of O. Reg. 239/02, as follows: Winter Maintenance Procedural Plan - May 2018 Page 8 of 97 Classification of Roadways Posted Speed Average Annual Daily Traffic (AADT) 100km 90km 80km 70km 60km 50km 40km 15000 or more 1 1 1 2 2 2 2 12000 - 14999 1 1 1 2 2 3 3 10000 - 11999 1 1 2 2 3 3 3 8000 - 9999 1 1 2 3 3 3 3 6000 - 7999 1 2 2 3 3 3 3 5000 - 5999 1 2 2 3 3 3 3 4000 - 4999 1 2 3 3 3 3 4 3000 - 3999 1 2 3 3 3 4 4 2000 - 2999 1 2 3 3 4 4 4 1000 - 1999 1 3 3 3 4 4 5 500 - 999 1 3 4 4 4 4 5 200 - 499 1 3 4 4 5 5 5 50 - 199 1 3 4 5 5 5 5 0 - 49 1 3 6 6 6 6 6 Please see Appendix "B" for Map of Road Classifications as Determined by Posted Speed and AADT (actual and/or estimated) (page 25). South Frontenac Township only has class 2 to 6 roads in their road system. Weather Monitoring: The information used in decision making will be a combination of a road weather forecast and manual road condition checks (monitored 3 times per calendar day). Information Provided/Available 24 Hour Weather Forecast - Environment Canada- Electronically Documented Hourly Weather Network forecast Winter Maintenance Procedural Plan - May 2018 Page 9 of 97 Weekend - Weather watch by Patrolmen Manual Road Check by Patrolman or designate using infra-red pavement temperature thermometers and visual inspection. The Operations Supervisor will discuss possible actions with the equipment operators and Lead Hands. Further discussions may ensue should the forecast suggest extreme weather conditions. The Operations Supervisor assesses the conditions on a continuing basis with the aid of the forecast and upon the completion of each route will consider the potential need for additional resources and deploy action accordingly. Road Patrol: Routine Road Patrol shall be carried out by driving on and visually inspected for events by the patrolman or lead hand. Employees electronically monitor the road and air by a Road Watch System that is mounted in the trucks which gives accurate information to air and road temperature. Each lead hand patrols and monitors his own area during his hours of work. Night and weekend patrol, Patrol According to the patrol route map. Please see Appendix "C" for Winter Control Patrol Route Map (page 26) Night Patrol will commence approximately November 15th, and end on April 15th or as decided by the Operations Supervisor. Night patrol hours will be from 6 pm and 6 am, 7 days a week. The Night Patrol personnel will monitor the weather forecasts, current weather conditions, and make winter call outs to the respective contractors for arterial roads from approximately 5 pm to 5 am. Lead Hands will be called in early morning hours, by the night patrolman, for local roads in their respective area to alert them of a change in a winter weather pattern or event and then make call outs to day time operators as required. Call out timing is determined as per the Minimum Maintenance Standards. Road Patrol Schedule and Calendar see Appendix H. Snow and Ice Clearing: Snow Clearing When the snow accumulation on a roadway is greater than the depth set out in Table 3, the Public Works Department will deploy winter maintenance forces to clear the snow as soon as practicable. Arterial roads are plowed by both contractors and in house operators to the severity of the event. Local roads are plowed once the drivers are called in by the patrolman or lead hand. Ideally, the plow routes would be completed prior to school bus traffic in the morning and later in the day to ease evening traffic. Winter Maintenance Procedural Plan - May 2018 Page 10 of 97 The municipality has adopted the minimum maintenance standards, http://www.ontariocanada.com/registry/view.do?postingId=4146 for snow and ice clearing practices. The municipality strives to maintain surface levels to a higher degree with dispatch often sooner than is called for in The Plan. After the snow has ended the Public Works Departments desire is to clear the snow until the depth is equal to or less than that set out in Table 1. Table 1 Snow Clearing Response to Snow Accumulation Surface Condition Class Depth Time Lag time Desired Condition Minimum Condition 2 5 cm 6 hours 12 hours Bare Centre/Track Bare 3 8 cm 12 hours 18 hours Bare Centre/Track Bare 4* 8 cm 16 hours 24 hours Centre/Track Bare Centre/Track Bare 5 10 cm 24 hours 24 hours Snow packed Snow packed 6 10 cm 24 hours 24 hours Snow packed Snow packed (*) Notwithstanding the desired and minimum conditions stated above for Class 4 Roads, in the case of loose top (gravel) roads, the desired and minimum conditions shall be "Snow packed" due to the nature of this type of road surface. The Township has the following number of centerline kilometers for the three different road surfaces. (Table 2) Table 2 - Centerline Distance Arterial Road Centerline Total Centerline Kilometers Surface Length (Km) Surface Type Length (Km) Asphalt 129.80 Asphalt 165.44 Surface Treatment 64.70 Surface Treatment 431.33 Local Road Centerline Gravel 207.30 Asphalt 35.64 Total Road Length 804.07 Surface Treatment 366.63 Gravel 207.30 Total Hard Top Length 596.77 Winter Maintenance Procedural Plan - May 2018 Page 11 of 97 Ice Clearing The Public Works Department shall, deploy winter maintenance forces to treat an icy roadway as soon as practicable after becoming aware that the roadway is icy; and treat the icy roadway within the time set out in Table 3. Table 3 Ice Clearing C L A S S R E S P O N S E T I M E 2 4 hours 3 8 hours 4 12 hours 5 14 hours 6 16 hours Snow and Ice Treatment Procedures: Central to the success of any plan are the personnel involved. The Public Works Department Winter Maintenance Operators, including contractors, will be responsible for the Winter Maintenance Operation 24 hours per day throughout the winter period for both arterial and local roads. Local roads are typically maintained from 4 am to 6 pm unless the event is in the form of freezing rain in which dispatch of forces are called promptly. Arterial roads are plowed 24 hours per day as required. Contractors typically plow from 5 pm to 5am with township forces plowing from 5 am to 5 pm with the exception of routes 503 and 504 being done by the contractor 24/7. Code of Practice: Road Salts Environmental Management https://www.canada.ca/en/environment-climate-change/services/pollutants/road-salts/code- practice-environmental-management.html Conventional Sander one way sanding/salting shall be the township standard unless it is freezing rain or considered to be an emergency circumstance. not more than 400 kg/Km of material is to be applied on local roads when travelling one way, extra application must be pre-approved by Lead Hand. Normal use is 5% salt. Winter Maintenance Procedural Plan - May 2018 Page 12 of 97 not more than 200 kg/Km of material is to be applied on Arterial roads when travelling both ways, extra application must be pre-approved by Lead Hand. the above application rates are considered to be the top limits and lower settings are to be used in appropriate conditions (i.e.: warm temperature, light snow conditions). ice treatments are typically stronger mixes with the salt percentage being at the discretion of the patrolman or lead hand with mix reflecting the severity of the ice. some events require different application rates, i.e. temperature, severity, wind etc. these application rates will be at the discretion of the lead hand or patrol man Procedures for Specific Weather Conditions: when freezing rain conditions coincide with rain then sanding/salting operations will commence as soon as possible or upon becoming knowledgeable of the conditions. during high wind conditions material may be held. The mix application becomes a sticky substance that traps snow blowing across the roadway, increasing the size of snowdrifts. in the event of a storm it is a township practice to distribute material on the roadway as soon as it becomes practical to allow the snow/ice accumulation to "melt up". It is essential to continue to plow the roadway without administering more material. Procedures for Once a Storm Event has ended or the Roadway Meets Minimum Maintenance Standards: once the storm has ended and roadways are cleared including shoulders. Routes will be patrolled and inspected by the lead hand and/or patrolman. The snow plow units will then be parked at their respective patrol yards. The operators will perform a visual inspection to be sure the unit is ready to go for the next event. each storm has individual characteristics and must be dealt with accordingly. Therefore, exceptions to this procedural plan may occasionally be necessary. While the township may implement winter maintenance procedures and follow Provincial Minimum Maintenance Standards it is also the responsibility of the traveling public to acknowledge adverse weather conditions and drive accordingly. (Highway Traffic Act) Winter Maintenance Procedural Plan - May 2018 Page 13 of 97 Contracted Routes: - The contracted routes are awarded by tender process. The Township currently has six (6) Arterial Road contracts and twelve (12) Local Road Contracts for the designated routes. Contract trucks will be called out by the Patrolman or Lead Hand or his/her designate and supervision will be by the Patrolman or Lead Hand or his/her designate. Contract trucks when called out shall complete one trip and return to the Patrol site. The Patrolman, lead Hand or his/her designate shall check the roadway prior to the contractor going out again to see if another trip is called for, if another trip is not called for the contractor will be sent home A list of Contractor Arterial and Local Routes can be found in Appendix F. Sidewalk Plowing and Sanding: The Public Works Department is responsible for plowing and sanding snow from sidewalks. The priority for winter maintenance of sidewalks is to keep them safe and clear of hazards caused by snow and ice accumulation. The following table describes the maintenance quality standards for snow and ice control on sidewalks within the Township. Sidewalk Depth of Snow Accumulation for Service Standard Time to Clear Snow from the end of Snow event or Time to Treat Icy Conditions Treatment standard Bare Surface Snow Packed All 0-2.5 cm No maintenance scheduled, sand applied as necessary All 2.5-5 cm 10 hours All locations All 5-10 cm 12 hours All locations All 10+ cm 24 hours All locations Typically during a winter storm event, roadways are maintained first and sidewalks, although priority are dependent on staff availability due to the severity of the weather event. Sidewalk maintenance generally involves clearing of the snow by plow or snow blower followed with an application of sand or other material for traction. Public Works strives to clear sidewalks in the areas around schools first before proceeding with the remainder of sidewalks. Winter Maintenance Procedural Plan - May 2018 Page 14 of 97 Sidewalk clearing is done by tendered contractors on 4 sidewalk plow routes. There is a designated snow removal unit for each of the 4 routes. In addition to the Minimum Maintenance Standards as set out by the Township the following procedures are provided as a guideline for winter maintenance operations for sidewalk plowing and sanding. Appendix "G" List of Winter Maintained Sidewalks (page 77). Village Snow Removal: Removal of snow will take place on streets taking into consideration public safety, snow storage capability, emergency detour routes, street parking requirements, vehicle and pedestrian traffic volumes and parking lot capacity. Snow is removed in accordance with the Snow Removal listing below: 1) Sydenham Arterial (Evening) 2) Verona Arterial (Evening) 3) Harrowsmith Arterial (Daytime) 4) Battersea Complete (Daytime) 5) Sydenham Local (Daytime) 6) Verona Local (Daytime) 7) Bellrock Complete (Daytime) 8) Hartington Complete (Daytime) 9) Harrowsmith Local (Daytime) 10) Perth Road Complete (Daytime) 11) Inverary Complete (Daytime) 12) Sunbury Complete (Daytime) Village snow removal usually commences as soon as is practicable after a storm. Normal practice for removal is when snow windrows reach a height of 45cm and width at the base of 60cm. Deviation from windrow removal may occur due to parked vehicles on streets within the Villages. As equipment is required to windrow snow for removal purposes, this operation may require the removal of vehicles parked in contravention of the "No Parking By-Law". The most efficient snow removal operation requires the use of road snow blowers, road graders, ¾ ton trucks. This work is carried out in the time frames noted in the Snow Removal Listing above. Typically the municipality does not remove any snow after 1 am in any Village. Salt or winter sand is applied to the street after snow removal to fully restore safe conditions. Winter Maintenance Procedural Plan - May 2018 Page 15 of 97 Snow is hauled to a designated snow storage site (Snow Dump), located in the village of Harrowsmith, on the West Side of Centennial Park Drive behind tennis courts. This storage site has been approved by the Ministry of Environment as an acceptable snow disposal location. This snow disposal platform is constructed of limestone base that is sloped to the rear, with a berm around the two sides and rear, 2m high by 2.5m in depth. Record Keeping: Supervisor Responsibilities: The Operations Supervisor will ensure that all Lead Hands, Patrolman, and Operators, including contractors, receive the appropriate Winter Control training prior to the Winter Maintenance Period and keep a record of this training. The Operations Supervisor will make certain that Operators are knowledgeable in how to complete a circle check of their vehicle(s). The Operations Supervisor also will maintain a record of the following: Hours of Work Record - the Lead Hand/Supervisor or his/her designate will be responsible for scheduling his Operators in such a manner that the Operators' hours of work will comply with the maximum hours of service as per the Highway Traffic Act, Amendment of Regulation under Order of Council O.Reg 555/06, dated December 13, 2006. Material Usage Records - the Supervisor will review any adjustments to the records with the lead hand. The Supervisor will use the Dickey-John & GPS information when reviewing the material usage which will be used when a discrepancy exists with a manual entry. Lead Hand Responsibilities: The Lead Hand or his/her designate will maintain a Daily Log and Patrol Record which will contain details of phone calls, decisions made and associated times. This log will be held on file by the Operations Supervisor. As an example, the Lead hands or his/her designate is responsible for at a minimum the following documentation: Lead Hand's Diary and Patrolmen's Diary - will be kept up to-date on a daily basis and once the diary is completed it will be retained by the Lead Hand for a retention period of ten (10) years. The Lead Hand's diary will be made accessible for documentation in the event of a damage claim. Entries in the diary will be clear, concise and legible. Winter Maintenance Procedural Plan - May 2018 Page 16 of 97 Winter Patrol Record - the Lead Hand or his/her designate will complete this record for roads patrolled. This document will provide the date patrolled, roads completed, time, weather and road conditions, any accidents that are observed, who it was patrolled by and when the patrol was completed. Material Usage Records - the Lead Hand or his/her designate must ensure that usage of material is recorded for each call out and reviewed for accuracy. Adjustments to these records must be completed and agreed upon by the Supervisor. Winter Operation Record - the Lead Hand must complete a Winter Operation Record for each call out event. This record will provide date, operator identification, call out person, the quantity of sand and/or salt used, time in and time out. The Lead Hand and/or Patrolman will record weather conditions. GPS will identify route taken, type of application used, kilometers from start to finish, which Patrol operated from, application amount of material applied and road & air temperature. Operator Responsibilities: Operators must inspect their vehicle and sanding/salting equipment prior to every individual call out operation. The Operator will ensure that their vehicle and sanding/salting equipment is cleaned sufficiently after each individual call out operation. The Operators at a minimum must complete the following records: Vehicle Inspection Report (Circle Check) Hours of Work Record Sand and Salt Use Vehicle Inspection Report (Circle Check) - The Operator must perform a circle check prior to leaving the yard for each call out and complete a Vehicle Inspection Report. The Supervisor will keep this report on file for potential audit purposes. No Operator will knowingly leave the yard if their vehicle or equipment has an identified mechanical/operational failure resulting from the completion of the circle check. Failure to complete the circle check and/or the Vehicle Inspection Report may result in a fine issued to the Operator as well as the Township. Failure to comply with the Vehicle Inspection Report and the vehicle is found to be mechanically faulty on the roadway may result in a fine issued to the Operator as well as the Township. If the vehicle develops a minor mechanical failure while in operation but is determined to not be a safety hazard, the Operator is allowed to return the vehicle to the Patrol Yard for repair. If the vehicle develops a major mechanical failure (as outlined in the Vehicle Inspection Report) while in operation, the Operator must find a safe place to pull over and contact immediate supervisor for further instruction. Winter Maintenance Procedural Plan - May 2018 Page 17 of 97 Hours of Work Record - must show driving time, down time, time off, etc. Requirements for the Completion of Documents: Please note that the above noted records which are to be completed by the Lead Hands and Operator(s) are not to be considered discretionary but mandatory. Full and accurate completion of these documents, according to the applicable procedures, ensures that staff is protected from personal liability by providing solid documentation that Township procedure has been followed. However, it is duly noted that the Lead Hands/Operator will not sustain "personal liability" for recording Township information. In a case of a legal proceeding the Lead Hands/Operator information will be covered by the Township and the Township Solicitor. Always retain the original copy of documents regardless of their appearance. If a document requires correction then a line is to be placed through the incorrect information without making it illegible and continue writing on the original document. Initial corrections or change in the color of ink in the case where you change writing pens. Please assure that your writing is legible for others to read. Winter Maintenance Procedural Plan Distribution: The Winter Maintenance Procedure Plan is a key document and will be issued to those shown in the distribution list in Appendix "H" Distribution List (page 79). The Winter Maintenance Procedural Plan is a living document. Amendments and updates will be issued by the Area Supervisor or his/her designate. Hours of Service Documentation Position Week Arrival Departure Lead Hand Mon to Fri 7:oo am 3:30 pm Driver Mon to Fri 7:00 am 3:30 pm Light Equipment Operator Mon to Fri 7:00 am 3:30 pm Night patrolman (2 staff rotating shift) Mon to Sun 6:00 pm 6:00 am Daytime Weekend Patrol Shift (staff#1) Saturday 6:00 am 12:00 pm (noon) Daytime Weekend Patrol Shift (staff#2) Saturday 12:00 pm (noon) 6:00 pm Daytime Weekend Patrol Shift (staff#3) Sunday 6:00 am 12:00 pm (noon) Daytime Weekend Patrol Shift (staff#4) Sunday 12:00 pm (noon) 6:00 pm Winter Maintenance Procedural Plan - May 2018 Page 18 of 97 Hours of service are documented daily as per the Ontario Highway Traffic Act. South Frontenac Township uses the 7 day/70 hrs cycle Hours of Service Ontario Regulation 555/06 Application - Highway Traffic Act 190 (2) No person shall drive a commercial motor vehicle on a highway except in accordance with this section and the regulations made under this section. 190 (6) No operator shall permit a person to drive a commercial motor vehicle on a highway except in accordance with this section or the regulations made under this section. For any driver, means a 24-hour period that starts at midnight or at such other hour designated by the operator for the driver On-duty time 2) A driver is on duty when he or she drives a commercial motor vehicle for an operator or performs any other work for an operator, including time spent, a) inspecting, servicing, repairing, cleaning and warming up a commercial motor vehicle; b) travelling in a commercial motor vehicle as a co-driver, when the time is not spent in the sleeper berth; c) participating in the loading and unloading of a commercial motor vehicle; d) inspecting and checking the load of a commercial motor vehicle; e) waiting for a commercial motor vehicle to be serviced, loaded, unloaded and dispatched f) waiting for a commercial motor vehicle or its load to be inspected; and g) waiting at an en-route point because of an accident or other unplanned occurrence or situation 2. (1) There are four categories of duty status time for the purpose of this regulation; 1. Off-duty time, other than time spent in a sleeper berth. Winter Maintenance Procedural Plan - May 2018 Page 19 of 97 2. Off-duty time spent in a sleeper berth. 3. On-duty time spent driving. 4. On-duty time, other than time spent driving. A declared state of emergency by head of Municipality; "emergency" means a situation or an impending situation that constitutes a danger of major proportions to life or property, whether caused by forces of nature, an accident, an intentional act or otherwise; In a declared emergency the regulation is not in effect during the emergency but comes back into effect the minute the emergency is over. Daily Driving Time 5. (1) After a driver has accumulated 13 hours of driving time in a day, the driver shall not drive again on the same day. (2) After a driver has accumulated 14 hours of on-duty time in a day, the driver shall not drive again on the same day. Daily Off-Duty Time 6. (1) A driver shall take at least 10 hours of off-duty time in a day. (2) Off-duty time under subsection (1) that is in addition to the mandatory eight consecutive hours of off-duty time required by Section 9 may be distributed throughout the day in blocks on no less than 30 minutes each. (3) The off-duty time referred to in subsection (2) shall be at least two hours and may be added to the mandatory eight consecutive hours of off-duty time but cannot form part of it. Mandatory Off-Duty Time 9. (1) After a driver has accumulated 13 hours of driving time from the end of the most recent period of eight or more consecutive hours of off-duty time, the driver shall not drive again unless he or she takes at least eight consecutive hours of off-duty time. Cycle Requirements 7 or 14-day cycle; (you are following the 7 day cycle which is the best for your operation) Winter Maintenance Procedural Plan - May 2018 Page 20 of 97 12. (1) An operator shall require that all drivers follow either a 7-day or 14-day cycle, as designated by the operator for each driver. (2) A driver shall follow the cycle designated for him or her by the operator. (3) An operator shall not change a driver's cycle except as provided by section 14. A driver who is following a 7-day cycle shall not drive again in that cycle after accumulating 70 hours of on-duty time during any period of seven days or during the period beginning on the day of which the cycle was reset under section 14, whichever is less Mandatory 24 Hours Off-Duty 13. (1) SuPatrol Bect to section 14, a driver shall not drive unless the driver has taken at least 24 consecutive hours of off-duty time in the preceding 14 days. (in other words if a driver is driving continuously day after day, they must take 24 hours off every 14 days) Recap: 1. A driver must stop driving after accumulating 13 hours of driving in a 24 hour day 2. A driver cannot drive after accumulating 14 hours of on duty time in a day 3. A driver cannot drive after accumulating 70 hours in a 7 day cycle 4. A driver cannot drive continuously without being off duty 24 hours once in the preceding 14 days Ref: Http://www.mto.gov.on.ca/english/trucks/handbook/secion1-7-4.shtml Winter Maintenance Procedural Plan - May 2018 Page 21 of 97 4.0 Road Closures Road Closures and Liaison with the OPP: When visibility declines to a point that it is hazardous to the driving public or snowplow operators to be on the roadway, snowplowing or ice control operations may be suspended. Suspended operations shall be resumed when visibility improves. When weather conditions have rendered a route or roadway unsafe for use and the Public Works Manager or his/her designate determines the road must be closed to all traffic then this decision shall be provided to the Ontario Provincial Police and Emergency Services. The closure of a road in these circumstances must be carried out in conjunction with the Ontario Provincial Police. Accordingly, close liaison must be maintained with the Police to confirm a decision to close a route. Routes closed by Township instruction must be re-opened on Township instruction. The Public Works Manager, Supervisor, Lead Hand, Patrolmen, Emergency Services (Fire and Ambulance), Ontario Provincial Police, Elected Officials and CAO, must be informed as soon as possible of roads closed by weather conditions. The Township will provide "Road Closure" signs and/or barricades to alert the public of the closed road. If at all possible, detours or diversion routes will be decided upon as a result of such a closure. In the event that a detour or diversion is not possible or will further endanger the travelling public by re-routing the traffic to a lesser travelled road, the Township will be held harmless from any motorist continuing forward on the "closed road" once so notified. The Township Public Works Department will be responsible for contacting the local media to notify the travelling public of the closed road(s). Winter Parking Restrictions The parking of vehicles on Township roads and village streets from 1:00 a.m. to 7:00 a.m. is not permitted from December 1, 2017 to March 31, 2018. Winter Maintenance Procedural Plan - May 2018 Page 22 of 97 5.0 Conclusion Final Statement: The Winter Maintenance Procedural Plan laid out above is to establish goals and procedural guidelines for the Township of South Frontenac Public Works Department employees regarding winter maintenance of snow and ice control. It is not to be construed to create any duty to a specific individual or employee but is to act as a guideline for winter maintenance operations for the Township of South Frontenac. This plan is also designed for the public as well as township staff` to better understand the winter control operations being done by the municipality. Winter Maintenance Procedural Plan - May 2018 Page 23 of 97 6.0 Appendices 6.1 Appendix "A" Map of South Frontenac Winter Maintenance Procedural Plan - May 2018 Page 24 of 97 6.2 Appendix "B" Road Classification Map Winter Maintenance Procedural Plan - May 2018 Page 25 of 97 6.3 Appendix "C" Winter Operations Patrol Route Map Winter Maintenance Procedural Plan - May 2018 Page 26 of 97 6.4 Appendix "D" Final Winter Control Plan, Winter Control Plow Route Map Winter Maintenance Procedural Plan - May 2018 Page 27 of 97 6.5 Appendix "E" Winter Maintenance Procedural Plan - May 2018 Page 28 of 97 Winter Maintenance Procedural Plan - May 2018 Page 29 of 97 Winter Maintenance Procedural Plan - May 2018 Page 30 of 97 Winter Maintenance Procedural Plan - May 2018 Page 31 of 97 Winter Maintenance Procedural Plan - May 2018 Page 32 of 97 Winter Maintenance Procedural Plan - May 2018 Page 33 of 97 Winter Maintenance Procedural Plan - May 2018 Page 34 of 97 Winter Maintenance Procedural Plan - May 2018 Page 35 of 97 Winter Maintenance Procedural Plan - May 2018 Page 36 of 97 Winter Maintenance Procedural Plan - May 2018 Page 37 of 97 Winter Maintenance Procedural Plan - May 2018 Page 38 of 97 Winter Maintenance Procedural Plan - May 2018 Page 39 of 97 Winter Maintenance Procedural Plan - May 2018 Page 40 of 97 Winter Maintenance Procedural Plan - May 2018 Page 41 of 97 Winter Maintenance Procedural Plan - May 2018 Page 42 of 97 Winter Maintenance Procedural Plan - May 2018 Page 43 of 97 Winter Maintenance Procedural Plan - May 2018 Page 44 of 97 Winter Maintenance Procedural Plan - May 2018 Page 45 of 97 Winter Maintenance Procedural Plan - May 2018 Page 46 of 97 Winter Maintenance Procedural Plan - May 2018 Page 47 of 97 Winter Maintenance Procedural Plan - May 2018 Page 48 of 97 Winter Maintenance Procedural Plan - May 2018 Page 49 of 97 Winter Maintenance Procedural Plan - May 2018 Page 50 of 97 Winter Maintenance Procedural Plan - May 2018 Page 51 of 97 Winter Maintenance Procedural Plan - May 2018 Page 52 of 97 Winter Maintenance Procedural Plan - May 2018 Page 53 of 97 Winter Maintenance Procedural Plan - May 2018 Page 54 of 97 Winter Maintenance Procedural Plan - May 2018 Page 55 of 97 Winter Maintenance Procedural Plan - May 2018 Page 56 of 97 Winter Maintenance Procedural Plan - May 2018 Page 57 of 97 Winter Maintenance Procedural Plan - May 2018 Page 58 of 97 Winter Maintenance Procedural Plan - May 2018 Page 59 of 97 Winter Maintenance Procedural Plan - May 2018 Page 60 of 97 Winter Maintenance Procedural Plan - May 2018 Page 61 of 97 Winter Maintenance Procedural Plan - May 2018 Page 62 of 97 Winter Maintenance Procedural Plan - May 2018 Page 63 of 97 Winter Maintenance Procedural Plan - May 2018 Page 64 of 97 Winter Maintenance Procedural Plan - May 2018 Page 65 of 97 Insert Snow plow Route W combined Winter Maintenance Procedural Plan - May 2018 Page 66 of 97 Appendix "F" Snow Plow Routes and Road Names in House and Contractor SNOW PLOW ROUTES KEELEY YARD W105 Unit #26 W126 Unit #46 W110 Unit #29 W128 Unit #42 W116 Unit #69 W130 Unit #60 W117 Unit #16 W143 Unit #43 W101 SIDE WALKS (SYDENHAM) W102 Unit #41 PORTLAND YARD W201 Unit #36 W227 Unit #27 W207 Unit #44 W237 SIDEWALKS (VERONA) W236 Unit #57 W238 SIDEWALKS (H'SMITH) W242 Unit #8 BEDFORD YARD W313 Unit #14 W338 Unit #38 W314 Unit #47 W308 Unit #2 SUNBURY YARD W429 Unit #45 W408 Unit #41 W423 Unit #53 W401 SIDEWALKS (SUNBURY/BATTERSEA) W402 SIDEWALKS (INVERARY) Winter Maintenance Procedural Plan - May 2018 Page 67 of 97 SNOW PLOW ROUTES KEELEY YARD IN HOUSE W105 #26 - Orser Rd (Rd 9 to Stagecoach Rd). Stagecoach Rd, Railton Rd, Lambert Rd, Campbell Rd, Amey Rd, Scanlan Rd, Fellows Rd, Murvale Rd, Murton Rd, Forest Rd, Country Woods Drive, Loughborough Drive, Sumac Rd, Vienna Cresent, Dailey Rd, Cliffside Drive, Kingsmere Drive W110 #29 - Keeley Rd, Park Valley Rd, Meadow Ridge Drive, Wilmer Rd, Ritchie Rd, McFadden Rd, Norway Rd, Charlie Green Rd, Eel Bay Rd, Shales Rd, Perth Rd Cresent, Hogan Rd, Morrison rd. W116 #69 - Wheatley Street, Bedford Rd, Salmon Lk Rd, Canoe Lk Rd (from rd. 19 to Snug Harbour Church), Cemetary Rd, Walker Rd, Alton Rd East, Fox Ridge Drive, Deer Runway Drive, Clearwater Rd, Botting Rd, Sills Bay Rd, Freeman Rd, Gould Lk Rd, Cottage Lane, Rosedale rd. W117 #16 - North Shore Cresent, North Shore Rd, Leland Rd, Opinicon Rd, Indian Lk Rd, Maple Leaf Rd, MacGillivery Rd, Billy Green Rd W126 #46 - Latimer Rd, Holmes Rd West, Old Boy Rd, Davidson Rd West, Round Lk Rd, Lower Round Lk Rd, Duff Rd, Lakeside Rd, Greenfield Rd, Four Season Drive, Silverwood Estate Drive, Johns Way Rd, Heska Cresent W128 #42 - Coupland Rd, Rickards Rd, Walsh Rd, Asselstine Rd, Ritchie Rd North, Trotter Rd, Hidden Valley Rd, Dean Smith Rd, Hewlett Packard Rd, Keon Rd W130 #60 - Rutledge Rd (Rd 9 East), Perth Rd W143 #43 - Sydenham Rd, Rutledge Rd (Rd 9 West), Mill St (to Beer Store), Stagecoach Rd (from Rd 5 to Firehall), Harrowsmith Rd, Wilton Rd, Yarker Rd, Colebrooke Rd West W102 #41- Sydenham Cemetery, Darling Rd, Cat Trail Parking, Buck & Loughborough Lk Boat Ramp & Dry Hydrant Winter Maintenance Procedural Plan - May 2018 Page 68 of 97 SNOW PLOW ROUTES HARTINGTON YARD IN HOUSE W201 #36 - Quinn Rd West, Henderson Rd, Florida Rd, Gorr Rd, Quinn Rd East Boyce rd., Quarry rd. & Fire Hydrant, Watson Rd, Tom Watson, Cedarwood Drive, Valleyview Drive, Forest Hill Place, Maple Drive, Davey Drive, Carleton Drive, Lakeview Drive, Pine Ridge Drive, Bank Street, Revell Rd, McMahon Drive, Verona St South W207 #44 - Hinchinbrooke Rd, Craig Rd, Arena Boundary, Snider Rd, Miller Rd, Verona Sands Rd, Cross Rd, First Lk Rd, Leveque Rd, Clair Rd, Mary Moore Rd, York Rd W236 #57 - Trousdale Rd, Holleford Rd, New Morin Rd, Vanluven Rd, Jamieson Rd, Alton Rd, Loughborough/Portland Boundary Rd, Redmond Rd, John Martin Rd, O'reilly Rd, Bell Rd W227 #27 - Petworth Rd, Kerr Rd, River Rd, Long Swamp Rd, Garrison Court, Camden/Portland Boundary Rd, McConnell Rd, Clarke Rd, Wallace Rd, Bracken Rd, Mclean Rd, Bradford Rd, Whittey Rd, Wolfe Swamp Rd, Ellerbeck Rd W242 #8 - Burnett Rd, Genge Street, Water Street, Cemetery Rd, Salmon Drive, Killdeer Drive, Easy Street, Verona Street North, Short Street, Station Street, Walker Street, Robinson Rd, Harrowsmith Cemetery, Hartington Parking Lot, Parking Lot Verona, Verona Dry Hydrant, Verona Cemetery Winter Maintenance Procedural Plan - May 2018 Page 69 of 97 SNOW PLOW ROUTES WESTPORT ROAD YARD IN HOUSE W313 #14 - White Lk Rd, Green Bay Rd, Burns Rd, Garrett Rd, Firehall Rd, Burridge Rd, Dewitt Rd, Sweetman Rd W314 #47 - Buck Bay Rd, Bobs Lk Rd, Bradshaw Rd, Steele Rd, Pine Shores Lane, Anderson Rd, Fish Creek Rd, White Lk Rd West W338 #38 - Canoe Lk Rd, James Wilson Rd East, Devil Lk Rd, Hanna Rd, 12 Concession Rd, Lee Rd, Iawah Rd W308 #2 - Burridge Lk Rd, Haughton Rd, Breese Rd, Hanna Rd (last 300 m), Tobin Rd, James Wilson Rd (last 600m), Hickey Rd, Bradshaw Firehall, Burridge Firehall, Fermoy Hall, Glendower Hall Winter Maintenance Procedural Plan - May 2018 Page 70 of 97 SNOW PLOW ROUTES SUNBURY YARD IN HOUSE W429 # 45 - Battersea Rd, Moreland Dixon Rd, Sunbury Rd W423 #53 - Holmes Rd East, Davidson Rd East, Lakefield Drive, Copper Kettle Drive, Maple Crest Drive, Kam Ave, Kahala Court, Sandstone Court, Milburn Rd, Ormsbee Rd, Ida Hill North, Abernathy Rd, Washburn Rd, Sonneveld Rd, Factory Rd, Ida Hill Rd South, Princess Rd, McGarvey Rd, Frontenac Rd, Mount Chesney Rd, Bear Creek Rd, Hitchcock Rd, Stone Point Rd, Maple Hill Way Rd W408 #3 - Eddie Lane, Dixon Rd, Willowbrooke Dr, Summerside Dr, Water St, Sarah St, Cross St, Concession St, Canal Rd, Brewer Lk Rd Winter Maintenance Procedural Plan - May 2018 Page 71 of 97 SNOW PLOW ROUTES CONTRACTOR LOCAL ROADS 24/7 Plow Route 1- Portland Avenue, William Street, Amelia Street, Brewery Street, Cross Street, Point Rd, Morgan Rd, Switzer Rd Plow Route 2- Draper Lake Rd, Little Long Lake Rd (East&West) Plow Route 3- Wilson Rd, Babcock Rd, Lagoon Rd, Peters Rd, Kingston Rd, Maria Street, Park Street, William Street, Railway Street, Notre Dame Street, Ottawa Street, Harrowsmith Church Street, Colebrooke Rd East, Centennial Park Rd, Graham Rd Plow Route 4- Depot Street, Percy Street, Goodrich Street, Bellrock Mill Street (East&West), Bellrock Pepper Street(East&West), Nolan Rd, Meeks Rd, Bellrock Pero Rd, Deerhurst Rd, Leveque Rd North Plow Route 5- Hinchinbrooke Rd North, Masonville Rd, Mallen Rd, Mustard Rd, Reynolds Rd Plow Route 6- Ramparts Rd, Loughborough View Dr, United St, Bradden Rd, Harris Rd, Larry York Rd, Kellar Rd, Sandhill Cemetery Rd Plow Route 7- Wellington Street, Burnt Hills Rd, Carrying Place Rd, Rideau Rd, Sands Rd, Randy Clarke Rd Plow Route 8- Round Lk Rd (from rd. 12 to Latimer), Middle Woodland Drive, Autumn Ridge Drive, Collins Drive, Sleeth Lane (In 50 M from Lower Round Lk Rd), Lake Rd, Ernie Rd Plow Route 9- Fair Grounds Rd, Division Street, Arthur Rd, Corkey Rd (In 100m from Latimer Rd), Spooner Rd West, Deer Creek Drive, Fawn Brooke Drive, White Tail Court, Plow Route 10- Bunker Hill Rd, Deyos Rd, James Wilson Rd (to civic #697 from Deyo, Rd), Timmerman Rd (in 200m from James Wilson Rd) Plow Route 11- Henry Rd, White Rd, New Rd (in 800m from Rd8) Plow Route 12- Massassauga Rd, Roushorn Rd, Frye Rd, Clear Lk Rd, Bedford Mils Rd Winter Maintenance Procedural Plan - May 2018 Page 72 of 97 MULROONEY TRUCKING - CONTRACTOR ROUTES Route # Patrol Yard W130 Keeley Yard W143 Keeley Yard 503A Hartington Yard 503B Hartington Yard 504A Bedford Yard 504B Bedford Yard 506 Keeley Yard 429 Storrington Yard 461 Storrington Yard 151 Keeley Yard Spares Keeley Yard Winter Maintenance Procedural Plan - May 2018 Page 73 of 97 SNOW PLOW ROUTES KEELEY RD YARD CONTRACTOR ARTERIAL ROADS MULROONEY NIGHTS 5:00PM TO 5AM ROUTE W130 Rutledge Rd (from RD 9 East), Perth Rd ROUTE W143 Sydenham Rd, Rutledge Rd West, Mill Street (to Beer Store), Stagecoach Rd ( from Rd 5 to Firehall), Harrowsmith Rd, Wilton Rd, Yarker Rd, Colebrooke Rd West ROUTE 506 Wheatley Street, Bedford Rd, Salmon Lk Rd. Canoe Lk Rd (from Rd19 to Snug Harbour Church) Winter Maintenance Procedural Plan - May 2018 Page 74 of 97 SNOW PLOW ROUTES HARTINGTON YARD ARTERIAL RD CONTRACTOR MULROONEY NIGHTS 24/7 ROUTE 503 Rd 38, Bellrock Rd Winter Maintenance Procedural Plan - May 2018 Page 75 of 97 SNOW PLOW ROUTE WESTPORT RD YARD ATERIAL RD CONTRACTORS MULROONEY 24/7 ROUTE 504 Westport Rd, Burridge Rd (in to Green Bay Rd) Desert Lk Rd, Bauer Drive, Winter Maintenance Procedural Plan - May 2018 Page 76 of 97 SNOW PLOW ROUTES SUNBURY YARD ARTERIAL RD CONTRACTOR MULROONEY NIGHTS 5:00PM TO 5:00AM ROUTE 429 Battersea Rd, Moreland Dixon Rd, Sunbury Rd Winter Maintenance Procedural Plan - May 2018 Page 77 of 97 6.7 Appendix "G" Winter Maintained Sidewalks Village Street Side of Road Length (m) From To Battersea Battersea Road East 124 Battersea Cross Sarah Street Battersea Road West 138 Wellington St Battersea Water St Battersea Road West 207 Battersea Water St Sarah Street Wellington St South 169 Battersea Road Battersea Cross Battersea Cross St East 76 Battersea Road Wellington St Battersea Water St West 114 Battersea Road Sarah Street Bellrock Main Street West 335 Bellrock Road First Lake Road Mill Street North 203 Bellrock Road Mill Street Leveque Street East 88 Mill Street Leveque Street Harrowsmith Road 38 East 85 Colebrook Road E Harrowsmith Rd Road 38 East 71 Harrowsmith Rd Church St (Harrow) Road 38 East 50 Church St (Harrow) 50m N of Church St Road 38 West 50 Church St (Harrow) 50m N of Church St Road 38 West 150 Colebrook Road Maria Street Road 38 West 137 Maria Street Church St (Harrow) Colebrook Road North 92 Road 38 Notre Dame St Colebrook Road North 49 Notre Dame St Notre Dame St Colebrook Road South 640 Road 38 Notre Dame St Harrowsmith Rd North 228 William Street William Street Harrowsmith Rd North 94 William Street Road 38 Harrowsmith Rd South 226 William Street William Street Harrowsmith Rd South 105 William Street Road 38 Church St (Harrow) North 152 Road 38 William Street Church St (Harrow) North 83 Notre Dame St Road 38 Church St (Harrow) South 83 Notre Dame St Road 38 William Street East 190 Church Street William Street Maria Street South 95 Road 38 Notre Dame St Notre Dame St West 151 Maria Street Colebrooke Kingston Rd East 128 Colebrook Rd E Road 38 Robinson Rd East 85 Colebrook Rd W Wilton Rd Wilton Rd West 299 Hwy 38 Catholic School Hartington Road 38 West 99 Boyce Road Boyce Road Boyce Road South 184 Road 38 Boyce Road Holleford Road North 149 Road 38 Road 38 Winter Maintenance Procedural Plan - May 2018 Page 78 of 97 Inverary Perth Road 10 East 325 Holmes Road Fairgrounds Rd Perth Road 10 East 241 Fairgrounds Rd Latimer Road Perth Road 10 West 187 Division Street Latimer Road Latimer Road South 119 Perth Road 10 Fairgrounds Rd Latimer Road South 125 Perth Road 10 Division Street Perth Rd Village Perth Road Cres West 150 Perth Road 10 Wilmer Road Perth Road Cres East 450 Wilmer Road Perth Road 10 Wilmer Road South 50 Perth Road 10 Perth Road 10 Sunbury Battersea Road East 505 Moreland Dixon Sunbury Road Battersea Road West 213 Moreland Dixon Moreland Dixon Battersea Road West 283 Moreland Dixon Sunbury Road Sydenham Amelia Street East 196 Brewery Street Syd William Amelia Street West 185 Brewery Street Syd William St Brewery Street South 256 Syd William St Sydenham Mill Wheatley Street West 260 Rutledge Road Sydenham Cross Wheatley Street West 249 Sydenham Cross George Street Syd William St North 415 Brewery Street Sydenham Mill Syd William St South 45 Syd Church St Rutledge Road Sydenham Cross North 125 Wheatley Sydenham Mill George Street North 377 Portland Sydenham Mill George Street South 296 Bedford Road Wheatley Sydenham Mill East 85 Rutledge Road Sydenham Cross Sydenham Mill East 247 Sydenham Cross Syd William St Sydenham Mill West 154 Rutledge Road Brewery Street Sydenham Mill West 293 Brewery Street Syd William St Rutledge Road South 300 Syd William St Stage Coach Rd Rutledge Road North 298 Syd William St Stage Coach Rd Morgan Dr West 300 Rutledge Rd End Rutledge Road North 148 Stage Coach Rd Wheatley St Stage Coach Rd West 242 Rutledge Road Syd Church St Syd William St North 63 Syd Church St Brewery Street Syd William St South 68 Syd Church St Brewery Street Verona Road 38 East 147 Sand Road George Street Road 38 East 293 George Street Water Street Road 38 East 139 Water Street Carleton Drive Road 38 East 508 Carleton Drive Pine Ridge Rd Road 38 West 174 Sand Road Walker Street Road 38 West 111 Walker Street Bank Street Road 38 West 783 Bank Street Pine Ridge Rd Road 38 West 103 Pine Ridge Rd Pine Ridge Rd Water Street North 101 Road 38 Cemetery Road Water Street North 21 Cemetery Road Cemetery Road Winter Maintenance Procedural Plan - May 2018 Page 79 of 97 Genge Street South 92 Road 38 Road 38 Winter Maintenance Procedural Plan - May 2018 Page 80 of 97 6.8 Appendix "H" Road Patrol Schedule and Calendar ◄ October 2017 November 2017 December 2017 - Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 6 7 8 9 10 11 13 14 15 16 17 18 19 Night- Patrol A 20 Nights- Patrol A 21 Nights- Patrol A 22 Nights- Patrol B 23 Nights- Patrol B 24 Nights- Patrol B 25 Morn- Patrol C Afternoon- Patrol D Night- Patrol A 26 Morn- Patrol E Afternoon-Patrol F Night- Patrol A 27 Nights- Patrol A 28 Nights- Patrol A 29 Nights- Patrol B 30 Nights- Patrol B Notes: Daily 6pm to 6 am - Patrol A/B Saturday Morning 6am - 12 pm Patrol C Saturday Afternoon 12 pm - 6 pm - Patrol D Sunday Morning 6am - 12 pm Patrol E Sunday Afternoon 12 pm - 6 pm - Patrol F Winter Maintenance Procedural Plan - May 2018 Page 81 of 97 ◄ November 2017 December 2017 January 2018 - Sun Mon Tue Wed Thu Fri Sat 1 Nights- Patrol B 2 Morn- Patrol C Aft- Patrol D Night- Patrol B 3 Morn- Patrol E Aft- Patrol F Night- Patrol A 4 Nights- Patrol A 5 Nights- Patrol A 6 Nights- Patrol B 7 Nights- Patrol B 8 Nights- Patrol B 9 Morn- Patrol C Aft- Patrol D Night- Patrol A 10 Morn- Patrol E Aft- Patrol F Night- Patrol A 11 Nights- Patrol A 12 Nights- Patrol A 13 Nights- Patrol B 14 Nights- Patrol B 15 Nights- Patrol B 16 Morn- Patrol C Aft- Patrol D Night- Patrol B 17 Morn- Patrol E Aft- Patrol F Night- Patrol A 18 Nights- Patrol A 19 Nights- Patrol A 20 Nights- Patrol B 21 Nights- Patrol B 22 Nights- Patrol B 23 Morn- Patrol C Aft- Patrol D Night- PATROL A 24 Morn- Patrol E Aft- Patrol F Night- Patrol A 25 Morn-Patrol Draw Aft - Patrol Draw Nights- Patrol A 26 Morn- Patrol Draw Aft- Patrol Draw Nights- Patrol A 27 Nights- Patrol B 28 Nights- Patrol B 29 Nights- Patrol B 30 Morn- Patrol C Aft- Patrol D Night- Patrol B 31 Morn- Patrol E Aft- Patrol F Night- Patrol A Notes: Daily 6pm - 6am - Patrol A/B Saturday Morning 6am - 12 pm Patrol C Saturday Afternoon 12 pm - 6 pm - Patrol D Sunday Morning 6am - 12 pm Patrol E Sunday Afternoon 12 pm - 6 pm - Patrol F Winter Maintenance Procedural Plan - May 2018 Page 82 of 97 ◄ Dec 2017 January 2018 Feb 2018 - Sun Mon Tue Wed Thu Fri Sat 1 Morn- Patrol Draw After- Patrol Draw Nights- Patrol A 2 Nights- Patrol A 3 Nights- Patrol B 4 Nights- Patrol B 5 Nights- Patrol B 6 Morn- Patrol C Aft- Patrol D Night- Patrol A 7 Morn- Patrol E Aft- Patrol F Night- Patrol A 8 Nights- Patrol A 9 Nights- Patrol A 10 Nights- Patrol B 11 Nights- Patrol B 12 Nights- Patrol B 13 Morn- Patrol C Aft- Patrol D Night- Patrol B 14 Morn- Patrol E Aft- Patrol F Night- Patrol A 15 Nights- Patrol A 16 Nights- Patrol A 17 Nights- Patrol B 18 Nights- Patrol B 19 Nights- Patrol B 20 Morn- Patrol C Aft- Patrol D Night- Patrol A 21 Morn- Patrol E Aft- Patrol F Night- Patrol A 22 Nights- Patrol A 23 Nights- Patrol A 24 Nights- Patrol B 25 Nights- Patrol B 26 Nights- Patrol B 27 Morn- Patrol C Aft- Patrol D Night- Patrol B 28 Morn- Patrol E Aft- Patrol F Night- Patrol A 29 Nights- Patrol A 30 Nights- Patrol A 31 Nights- Patrol A Notes: Daily 6pm - 6am - Patrol A/B Saturday Morning 6am - 12 pm Patrol C Saturday Afternoon 12 pm - 6 pm - Patrol D Sunday Morning 6am - 12 pm Patrol E Sunday Afternoon 12 pm - 6 pm - Patrol F Winter Maintenance Procedural Plan - May 2018 Page 83 of 97 ◄ Jan 2018 February 2018 Mrz 2018 - Sun Mon Tue Wed Thu Fri Sat 1 Nights- Patrol B 2 Nights- Patrol B 3 Morn- Patrol C Aft- Patrol D Night- Patrol A 4 Morn- Patrol E Aft- Patrol F Night- Patrol A 5 Nights- Patrol A 6 Nights- Patrol A 7 Nights- Patrol B 8 Nights- Patrol B 9 Nights- Patrol B 10 Morn- Patrol C Aft- Patrol D Night- Patrol B 11 Morn- Patrol E Aft- Patrol F Night- Patrol A 12 Nights- Patrol A 13 Nights- Patrol A 14 Nights- Patrol B 15 Nights- Patrol B 16 Nights- Patrol B 17 Morn- Patrol C Aft- Patrol D Night- Patrol A 18 Morn- Patrol E Aft- Patrol F Night- Patrol A 19 Morn- Patrol Draw Aft- Patrol Draw Nights-Patrol A 20 Nights- Patrol A 21 Nights- Patrol B 22 Nights- Patrol B 23 Nights- Patrol B 24 Morn- Patrol C Aft- Patrol D Night- Patrol B 25 Morn- Patrol E Aft- Patrol F Night- Patrol A 26 Nights- Patrol A 27 Nights- Patrol A 28 Nights- Patrol A Notes: Daily 6pm - 6 am - Patrol A/B Saturday Morning 6am - 12 pm Patrol C Saturday Afternoon 12 pm - 6 pm - Patrol D Sunday Morning 6am - 12 pm Patrol E Sunday Afternoon 12 pm - 6 pm - Patrol F Winter Maintenance Procedural Plan - May 2018 Page 84 of 97 ◄ Feb 2018 March 2018 Apr 2018 - Sun Mon Tue Wed Thu Fri Sat Notes: Daily 6pm - 6 am - Patrol A/B Saturday Morning 6am - 12 pm Patrol C Saturday Afternoon 12 pm - 6 pm - Patrol D Sunday Morning 6am - 12 pm Patrol E Sunday Afternoon 12 pm - 6 pm - Patrol F 1 Nights- Patrol B 2 Nights- Patrol B 3 Morn- Patrol C Aft- Patrol D Night- Patrol A 4 Morn- Patrol E Aft- Patrol F Night- Patrol A 5 Nights- Patrol A 6 Nights- Patrol A 7 Nights- Patrol B 8 Nights- Patrol B 9 Nights- Patrol B 10 Morn- Patrol C Aft- Patrol D Night Patrol B 11 Morn- Patrol E Aft- Patrol F Night- Patrol A 12 Nights- Patrol A 13 Nights- Patrol A 14 Nights- Patrol B 15 Nights- Patrol B 16 Nights- Patrol B 17 Morn- Patrol C Aft- Patrol D Night- PATROL A 18 Morn- Patrol E Aft- Patrol F Night- Patrol A 19 Nights- Patrol A 20 Nights- Patrol A 21 Nights- Patrol B 22 Nights- Patrol B 23 Nights- Patrol B 24 Morn- Patrol C Aft- Patrol D Night- PATROL B 25 Morn- Patrol E Aft- Patrol F Night- Patrol A 26 Nights- Patrol A 27 Nights- Patrol A 28 Nights- Patrol B 29 Nights- Patrol B 30 Morn- Patrol Draw Aft- Patrol Draw Nights- Patrol B 31 Morn- Patrol C Aft- Patrol D Night- Patrol A Winter Maintenance Procedural Plan - May 2018 Page 85 of 97 ◄ Mrz 2018 April 2018 Mai 2018 - Sun Mon Tue Wed Thu Fri Sat 1 Morn- Patrol E Aft- Patrol F Night- Patrol A 2 Morn- Patrol Draw Aft- Patrol Draw Nights- Patrol A 3 Nights- Patrol A 4 Nights- Patrol B 5 Nights- Patrol B 6 Nights- Patrol B 7 Morn- Patrol C Aft- Patrol D Night- Patrol B 8 Morn- Patrol E Aft- Patrol F Night- Patrol A 9 Nights- Patrol A 10 Nights- Patrol A 11 Nights- Patrol B 12 Nights- Patrol B 13 Nights- Patrol B 14 Morn- Patrol C Aft- Patrol D Night- Patrol A 15 16 17 18 19 20 21 22 23 - 24 25 26 27 - 28 29 30 Notes: Daily 6pm - 6 am - Patrol A/B Saturday Morning 6am - 12 pm Patrol C Saturday Afternoon 12 pm - 6 pm - Patrol D Sunday Morning 6am - 12 pm Patrol E Sunday Afternoon 12 pm - 6 pm - Patrol F ***Note: Patrol Subject to Change Winter Maintenance Procedural Plan - May 2018 Page 86 of 97 6.9 Appendix "I" Distribution / Contact List Name Position Phone/Email Mark Segsworth Public Works Manager Phone: 613-376-3027 X 3322 [email protected] Brian Kirk Public Works Operations Supervisor Phone: 613-376-3027 X 4347 [email protected] David Holliday Public Works Technical Supervisor Phone: 613-376-3027 X 3333 [email protected] Jamie Brash Public Works Facilities/Solid Waste Supervisor Phone: 613-376-3027 X 3350 [email protected] Ed Legrow Public Works Lead Hand Phone: 613-376-3027 X4329 [email protected] Dennis McEwen Public Works Lead Hand Phone: 613-376-3027 X 4348 [email protected] Bill Jones Public Works Lead Hand Phone: 613-376-3027 X 4363 [email protected] Trevor Greene Public Works Lead Hand Phone: 613-376-3027 X 4360 [email protected] Winter Maintenance Procedural Plan - May 2018 Page 87 of 97 7.0 Appendix "J" Surrounding Municipality Contact List Municipality Name Phone City of Kingston Darrell Townsend Phone: 613-546-4291 Kyle Bolton Phone: 613-546-4291 Bill Linnen Phone: 613-546-4291 Stone Mills Township Jeff Thompson Phone: 613-378-1435 Jason Ashley Phone: 613-378-1435 Central Frontenac Township Brad Thake Phone: 613-279-2935 Steve Gould Phone: 613-279-2935 Rick Commodore Phone: 613-279-2935 Rideau Lakes Township Dan Chant Phone: 613-928-2251 Clarence Donnelly Phone: 613-928-2251 After Hours Phone: 613-802-2104 Bruce Steacy Phone: 613-928-2251 Harry Merkley Phone: 613-928-2251 Tay Valley Township Steve Keeley Phone: 613-267-5353 Bob Ritchie Phone: 613-267-5353 Carl Wright Phone: 613-267-5353 Loyalist Township Scott Lawler Phone: 613-386-7351 Dave McPherson Phone: 613-386-7351 Bill Craig Phone: 613-386-7351 Winter Maintenance Procedural Plan - May 2018 Page 88 of 97 7.1 Appendix "K" Village Sidewalks Winter Maintenance Procedural Plan - May 2018 Page 89 of 97 Winter Maintenance Procedural Plan - May 2018 Page 90 of 97 Winter Maintenance Procedural Plan - May 2018 Page 91 of 97 Winter Maintenance Procedural Plan - May 2018 Page 92 of 97 Winter Maintenance Procedural Plan - May 2018 Page 93 of 97 Winter Maintenance Procedural Plan - May 2018 Page 94 of 97 Winter Maintenance Procedural Plan - May 2018 Page 95 of 97 Winter Maintenance Procedural Plan - May 2018 Page 96 of 97 End of Document