Page 1 of 11
THE CORPORATION OF THE VILLAGE
OF SOUTH RIVER
Policy#1-2014
Being a Policy to define and explain The Village of South River Snow Clearing and Ice
Control Policy
PURPOSE OF THE POLICY
To establish and outline priorities, best practices and procedures to ensure public safety for snow
removal and ice control on streets, roadways and within the Village of South River.
POLICY STATEMENT
The goal of the Policy on Snow Clearing and Ice Control is to maintain the Village's streets,
roadways and sidewalks in such a manner so as to:
1. Provide safe and accessible operating condition for motorists and pedestrians;
2. Reduce the hazards of icy road conditions;
3. Minimize economic losses to the Village resulting from unsatisfactory winter driving
conditions;
4. Facilitate the handling of emergencies by Police, Fire and Ambulance services during the
winter
DEFINITIONS
1. "Snow Plowing" - the grading of accumulated snow from street/sidewalk surfaces to the
sides or middle of a street or to the side of a sidewalk. In general snow will be plowed to
both sides of roadways except where it is more practical to clear the same side
continually such as around parks, playgrounds, vacant lots, etc.
2. "Snow Removal" - the loading and hauling of snow from street surfaces to s snow
disposal site.
3. "Sanding" - the application of a sand/salt or other mixture to a roadway surface for the
purpose of improving traction, reduction of skidding and/or reduction of ice formation.
4. "As Required"- a statement which means the level of services is not set at a pre-
determined number of activity occurrences per season or year.
5. "Emergency Routes" - the streets most commonly used by the fire department, the
police and ambulance services.
6. "cm." - centimeter
7. "Resident" - owner, tenant, occupant, agent
Page 2 of 11
GUIDELINES
1. The Council of the Village of South River will annually establish an expenditure budget
for sanding, snow plowing and snow removal operations.
2. The Village of South River will take full advantage of the snow storage capacity of road
rights-of-way to minimize the expenditures associated with snow removal and hauling.
3. Although efforts will be made to minimize snow placed in driveways, it is the occupant's
responsibility to clear access to their driveways.
4. Residents are referred to the private sector for the provision of snow plowing and snow
removal services on private property, sidewalks and driveways.
5. Although this policy sets out the priorities and procedures for snow plowing/removal, the
Public Works Chief Operator, or his designate, may direct the Village of South River
staff and equipment to work in areas requiring immediate attention. This situation may be
due to localized drifting or accumulations, or emergency conditions.
6. When scheduling work under this policy the Public Works Chief Operator, or designate,
will endeavor to use the Village of South River's own equipment but may contract
outside services as required. Contractors will be hired as required to supplement the
Village truck, hauling snow during snow removal operations.
7. The work will be conducted on a seven day per week basis meaning that work may
commence on weekends and holidays.
8. The Village of South River has a small public works department and as such cannot
implement two or three full shifts in a twenty-four hour period. During the winter staff
will be "on-call" and brought into service as required. During a snow event the Public
Works Chief Operator, or designate, will check the weather and proceed to activate the
call-in procedure if the snow accumulation has reached five (5) centimeters (or two
inches).
RESPONSIBILITIES & AUTHORITY
The Public Works Chief Operator will be responsible for, and have the authority of Council to
ensure public safety, through the implementation of this policy. The Chief Operator may add
streets/sidewalks to each classification as new streets/sidewalks are constructed.
The Public Works Chief Operator has the authority to determine the equipment which is being
used, and will be under his/her direction in each situation where snow is being cleared or
removed from public property, streets, boulevards and sidewalks in the Village of South River.
The Public Works Chief Operator has Council's authority to make the necessary decisions
regarding how the snow removal process is completed in a safe and timely manner on all the
Village's streets and sidewalks by the public works crew, private contractors and residents.
The Public Works Chief Operator has Council's authority to charge back to the occupant the cost
to clean up snow removal which creates unsafe streets, sidewalks and sightlines by privately
hired contractors for private property.
The Public Works Chief Operator has Council's authority to ensure employee safety, through
radio communication and the possible use of other electronic devices, while performing the
Village's assigned duties.
Page 3 of 11
PRIORITIES AND PROCEDURES
For the purpose of snow clearing, the street system has been classified in four categories
(Primary I, Primary II, Primary III and Secondary). However, for a variety of reasons, some
streets/sidewalks that are designated as a particular priority may be plowed on an accelerated
basis together with streets in a higher priority. There may be extreme snowfall events which
exceed the capacity of the available equipment and manpower to carry out the work within the
time allotted, however, the order of priority will remain the same. The definitions listed below
describe the general rule.
Primary I- Major intersections, school zone, excessive horizontal/vertical curvatures
Primary II - Emergency routes, primary streets, schools and areas of excessive
horizontal/vertical curvature. This also includes Ottawa Avenue from Eagle Lake (the Fire Hall)
east to the railroad tracks
Primary III - Village owned parking lots (including the Municipal Office/Library, Arena, Water
Treatment Plant, Public Works Garage)
Secondary I- Residential Areas
Secondary II- The municipal road allowance in front of businesses
SECTION A: PLOWING OF STREETS AND SIDEWALKS
STREETS
1. The Village of South River will endeavor to undertake street sanding and snow
plowing/removal operations, as required, in the following priority. When snow begins to
accumulate, primary and secondary streets are cleared first to ensure that you, and
emergency service vehicles like fire trucks and ambulances, can safely travel to hospitals,
the school and places of work during or immediately after a snowfall. Residential streets
will be plowed only after snow accumulates in excess of 5 centimeters (2 inches). When
all streets require plowing, they are to be cleared within 24 hours after the end of the
storm. Heavy snowfalls or successive storms can sometimes extend this period longer
than 24 hours.
2. Response times may be extended due to severe weather conditions, equipment
breakdowns, parked cars impeding road access or heavy traffic.
3. Following a major snowfall, snow removal operations concentrate on maintaining
unobstructed sight lines at all major intersections. The downtown business area is a top
priority.
4. Snow removal is not based on the height of snowbanks. If a snowbank is not obstructing
traffic, it will not be removed.
5. The Village of South River is not responsible for snow removal at the end of private
driveways.
Page 4 of 11
6. The Village of South River is not responsible for lane markers, caution reflectors,
identification signs or decorative fencing etc which has been placed near the street on
municipally-owned road allowance.
7. Streets designated as Primary I, II or III shall be plowed on a continuous basis until
completed. Plowing shall be undertaken during the night as much as possible in order to
minimize the problems associated with traffic and parked vehicles.
Classification
Criteria/Procedure
Primary I: Major intersections, school
zone, excessive horizontal/vertical
curvatures
-
Sand as soon as reasonably possible
following notification of dangerous
conditions
Primary II: Emergency routes, primary
streets, schools and areas of excessive
horizontal/vertical curvature. This also
includes Ottawa Avenue from Eagle Lake
Road (the Fire Hall) east to the railroad
tracks
-
Snow plowing and sanding will
commence within 24 hours
following the end of a snowfall of 5
cm or greater.
-
Snow removal, as required to
maintain adequate and safe street
width for vehicular traffic.
Primary III: Village owned parking lots
(including the Municipal Office/Library,
Arena, Water Treatment Plant, Public
Works Garage)
-
Snow plowing, sanding and
removal will commence at the
discretion of the Chief Public
Works Operator
Secondary I: Residential Areas and/or
little used industrial streets
-
Snow removal, plowing and
sanding will commence when there
is severe rutting or drifting or the
streets have become impassable due
to accumulated snowfall(s).
Secondary II: Municipal road allowances
in front of businesses
-
Snow removal, plowing and
sanding will commence following
the completion of Primary and
Secondary I classifications, or at the
discretion of the Public Works
Chief Operator.
Highway #124
-
This highway is under the
jurisdiction of the Ministry of
Transportation (MTO) who is
responsible for the snow removal
and sanding contract.
SIDEWALKS
Most sidewalks are cleared only after snow accumulates in excess of five centimeters (2 inches),
and only after roads are cleared. Sidewalks located on primary and secondary streets, which
includes the school, are plowed first, followed by residential sidewalks. Sidewalk salting and
Page 5 of 11
sanding is done only on primary and secondary sidewalks when extremely slippery conditions
exist.
Sidewalks shall normally be maintained to a compacted snow surface.
To ensure the public's safety it is critical for the streets to have the snow cleared first. Clearing
the sidewalks before the streets would result in traffic not being able to move as soon as possible
following a storm and would mean windrows from the street plowing would fill in the sidewalks.
For this reason the sidewalks are cleared after the roads. Sidewalks in the Business area are
cleared first.
Some sidewalks do not meet the current sidewalk standard width and cannot be plowed with the
Village's existing sidewalk plowing equipment due to their narrow width. Some sidewalks are
located immediately alongside a building with a roofline which extends over the sidewalk. This
creates a dangerous situation where snow and ice may fall on passing pedestrians. For safety
reasons the section of sidewalk along the west side of Highway #124 between Marie Street and
Ottawa Avenue is not cleared during the winter months.
SECTION B: USE OF SALT TREATED SAND ON VILLAGE STREETS
The Village of South River does use road salt on occasion. Road salt is only
effective when temperatures are in the approximate range of zero to minus 12
degrees Celsius.
The Village uses treated sand to provide a reasonable level of safety on our street system without
significant impact to the environment.
Salt treated sand is used in the Village of South River to provide a reasonable level of safety on
our streets. Salt is added to the sand (5% by weight) to enhance its performance as follows:
i)
It serves to keep sand fluid and workable when stockpiled throughout the cold winter
months so that the stockpiles do not freeze and become unusable, and
ii)
The salt has the effect of keeping the sand fluid and workable enough that it can be
handled in the conveying and spreading apparatus used in the trucks that apply the
treated sand to the streets, and
iii)
The presence of the small quantity of salt in the mixture allows the material, under
reasonable weather conditions, to stick to the icy surface of the street, thus reducing
the tendency for the sand to be blown off the pavement surface by the wind and
passing vehicles.
SECTION C: SNOW REMOVAL AND HAULING
REMOVAL OF WINDROWS
Windrows of snow plowed across private approaches and/or walks and resulting from street
plowing or sidewalk clearing shall not be removed by the Village of South River.
Page 6 of 11
REMOVAL OF HIGH PILES
The Public Works Department shall monitor visibility at intersections on a regular basis
throughout the winter months and any identified high piles at crosswalks, lane entrances and
intersections shall be reduced so as to improve the line of sight for motorists and pedestrians.
Priority shall normally be given to high piles located on streets designated as Primary.
Priority shall be given to high piles located at intersections in the vicinity of the elementary
school.
Every effort shall be made to relocate the snow within the adjacent boulevard storage areas, but
loading and hauling may be necessary in many instances.
In years of significantly above-normal snow accumulations, it may be impractical to undertake
the reduction of all high piles within the Village. On those occasions, efforts shall be
concentrated on piles in areas of high traffic volumes.
High piles located adjacent to private approaches shall not be removed.
REMOVAL OF BOULEVARD WINDROWS
Windrows of snow shall normally be removed on streets designated as primary where the
following criteria are met:
i)
Bridges
ii)
Where lack of adequate storage results in a reduction in the number of available
traffic lanes thereby prohibiting the reasonable movement of vehicular traffic under
normal winter driving conditions.
iii)
Where lack of adequate storage prohibits the reasonable movement of pedestrians
using the adjacent sidewalk.
iv)
Traffic safety devices such as guardrails
v)
Fronting commercial business areas with on-street parking
vi)
Windrows present significant barriers to street/sidewalk access
vii)
Windrows of snow shall be removed, upon request, from boulevards in front of
churches in order to facilitate weddings, funerals and other very special religious
events.
viii)
Windrows of snow on boulevards adjacent to schools shall not be removed unless the
lack of adequate storage has resulted in the adjacent sidewalk becoming obstructed so
as to prevent the reasonable movement of pedestrian traffic.
ix)
Notwithstanding any of the above, the Village of South River shall take advantage of
mechanical blowing of snow to adjacent properties to accommodate snow storage
wherever possible, rather than resorting to hauling.
Recommended by Public Works Committee Resolution #______________ dated ________
Adopted by Council Resolution #_____________ dated ___________________
Page 7 of 11
Frequently Asked Questions
1. How does the village know when to activate its winter operations program?
The Village of South River activates its winter operations program in response to weather
conditions affecting roads, such as snowfall, wind- blown snow, sleet, freezing rain, frost
and black ice.
Weather conditions are closely monitored by municipal staff around the clock, seven
days a week, using a customized weather service, Ontario Ministry of Transportation
highway reports and date generated from local remote weather stations.
Municipal staff regularly patrol municipal roads throughout the village to assess the need
for plowing and sanding.
The Village contracts its snow plowing service to private contractors through the tender
process prior to the winter season. Successful contractors must be prepared to remove
snow beginning November 1st until April 15th. The contractor will begin plowing early in
the morning after the snow accumulation reaches 5 centimeters (2 inches) or can be
called in by the Public Works Chief Operator.
During freezing rain events municipal staff will begin the sanding process as soon as it is
safe for them to travel safely to the municipal garage.
2. How many streets does the village plow?
The Village of South River is responsible for the plowing of all the streets within its
boundaries. A summary breakdown, using 2009 data, shows the Village's existing road
system consists of 24.6 lane km of paved roads, 6.8 lane km of surface treated roads and
0.12 lane km of gravel roads. The Township of Machar plows the snow on Eagle Lake
Road from the northern boundary to the intersection of Ottawa Avenue and Eagle Lake
Road on our behalf. The Ministry of Transportation is responsible to contract the plowing
and sanding of Highway #124.
A "lane kilometer" is a true measure of a road network that must be cleared or
maintained. For example, snowplows clear only the right hand side of a road during each
"pass" along a route. Therefore, a two km road is equal to four "lane" or "maintenance"
km.
3. How many Public Works staff does the village employee?
The Village of South River employees three full time public works staff who work 40
hours per week (not including overtime accumulated during the winter season) and one
part-time employee who works 16 hours each week. The Village also contracts out the
street plowing to a private contractor through the tender process every three years. The
Village acts as back-up to the private contractor should the contractor be unable to fulfill
the terms of his contract.
Page 8 of 11
In addition to snow removal duties the public works department is also responsible for
the water distribution system which includes the repair of water main breaks and water
service freeze-ups. During years of extreme and prolonged cold water service freeze-ups
are plentiful and require a coordination with other utilities before digging. Staff are also
responsible for the Ministry of Natural Resources dam and must keep an eye on the water
level and pull or add logs to the dam to keep it within the water level ban which have
been set by MNR.
4. Why is it taking so long for the Village to plow my street?
The Village of South River municipal staff work very hard to ensure that the Village's
streets are clear and passable within 24 hours, following the end of a winter storm.
The Village's heaviest travelled routes, primary streets, are plowed first following the end
of a winter storm. Primary streets include Major intersections, school zone, excessive
horizontal/vertical curvatures, emergency routes. This includes Ottawa Avenue from
Eagle Lake (the Fire Hall) east to the railroad tracks. It also includes village owned
parking lots (including the Municipal Office/Library, Arena, Water Treatment Plant,
Public Works Garage).
Residential streets are plowed after the completion of the primary streets. Residents who
live near the start of the route will have their streets plowed earlier than those who live
near the end of the route.
Response times may be extended due to severe weather conditions, equipment
breakdowns, parked cars impeding road access, heavy traffic, accidents or a combinations
of any of the above.
5. When does the village remove snow?
Following a major snowfall, snow removal operations concentrate on maintaining
unobstructed sight lines at all major intersections under the jurisdiction of the
municipality. The Downtown Business area is top priority. Once this area has been
cleared, municipal staff will move into residential neighbourhoods to clear intersections
with an obstructed view and streets which have narrowed to one lane.
Snow removal is not based on the height of snowbanks. If a snowbank is not obstructing
traffic, it will not be removed.
The Village of South River is not responsible for snow removal at the end of private
driveways. Residents are referred to the private sector for the provision of snow
plowing/removal services on private property, sidewalks and driveways.
6. Why does the snow plow leave a windrow to block my driveway?
Plow operators do not intentionally block driveways. It is not practical for plow operators
to lift their blades at every driveway. The plow operator also has limited control over the
amount and direction of snow that comes off the plow. When clearing your driveway, try
Page 9 of 11
to pile the snow on the right side (standing in your driveway and looking towards the
street). This can help reduce the amount of snow that is pushed onto your driveway when
a snow plow passes. The Village does not clear driveways.
7. Why does the plow always drop more snow on my side of the street?
The first pass of a snowplow always picks up more snow than the second pass, often
resulting in more snow on one side of the street than the other. Snowplow routes are
designed to maximize the speed and efficiency of snow clearing operations. Many factors
are taken into consideration when planning a route, including width of right-of-way on
local streets, geographic features and destination points.
8. Why does the plow always drop more snow on my corner lot?
Unfortunately, corner lots usually have more snow on front and side yards than other
properties, as they are located at the intersection of two roads which have a higher
combined snow accumulation than one road.
9. When does the Village clear the sidewalks?
It is critical for the streets to have the snow cleared first. Clearing the sidewalks before
the streets would result in traffic not being able to move as soon as possible following a
storm and would mean windrows from the street plowing would fill in the sidewalks. For
this reason the sidewalks are cleared after the roads. Sidewalks in the Business area are
cleared first.
Some sidewalks do not meet the current sidewalk standard width and cannot be plowed
with the Village's existing sidewalk plowing equipment due to their narrow width. Some
sidewalks are located immediately alongside a building with a roofline which extends
over the sidewalk. This creates a dangerous situation where snow and ice may fall on
passing pedestrians. For safety reasons the section of sidewalk along the west side of
Highway #124 between Marie Street and Ottawa Avenue is not cleared during the winter
months.
10. Why does the Village blow snow on my yard?
Village staff work very hard not to blow snow onto the yards of residents however, with
the sidewalk plowing equipment weather conditions and the safety of pedestrians and
sidewalk plow operator often dictates the direction the snow is blown. During a storm or
when wind is blowing snow from snowbanks or from open spaces combined with the
blown snow generated by the sidewalk plow visibility can be reduced to poor or zero.
The chute of the blower is then turned in the same direction as the blowing wind in order
to allow the operator to see if there are pedestrians ahead on the sidewalk or a large item
which is blocking the sidewalk (such as a vehicle). Not turning the blower could result in
injury to either a pedestrian or the sidewalk snow plow operator.
In years of excessive snow accumulation when snow falls on successive days the Village
will take full advantage of the snow storage capacity of street right-of-way to minimize
the expenditures associated with snow removal and hauling.
Page 10 of 11
Notwithstanding any of the above, the Village of South River shall take advantage of
mechanical blowing of snow to adjacent properties to accommodate snow storage
wherever possible, rather than resorting to hauling.
11. Why does the Village plow when it is not snowing?
Between winter storms, the plow is assigned to push back snow that has accumulated on
the road shoulder, as well as snowbanks where necessary. This assignment widens local
streets in preparation for additional snow accumulations.
During milder temperatures the snow plow may also be assigned to remove some of the
snow build-up from the streets evening out the driving surface.
12. Should I worry if the hydrant near my home has not been dug out?
No. Each hydrant is marked with a yellow marker for easy recognition as well as mapped on the
Global Information System (GIS) system for easy identification and location. The Public Works'
Department clear the hydrants several times each winter which prevents snow packed build-up
from the passing plow. Any fire related event would mean a tanker would begin the process of
fire suppression while hoses are being hooked to the hydrants. The safety of the residents
and property in this community is always a top priority.
13. What should I do if my mailbox has been damaged?
If your mailbox has been damaged and you believe the damage is the result of plowing
operations, please contact the Village of South River Municipal Office at 705-386-2573. You will
be asked to submit a claim for property damage.
The Village of South River will not be responsible for other items placed at the end of driveways
on municipally-owned road allowance. Items such as, but not limited to, driveway markers,
reflectors, decorative pillars, fencing, decorative signage, etc. should be removed from the end
of the property at the start of the winter snow removal season to allow snow removal and snow
clearing operations to take place smoothly and efficiently.
14. What is the Village doing to minimize the environmental impact of road salt?
The Village of South River does use road salt on occasion. Road salt is only effective when
temperatures are in the approximate range of zero to minus 12 degrees Celsius.
The Village uses treated sand to provide a reasonable level of safety on our street system
without significant impact to the environment. See Section B of the Snow Removal Policy.
15. Am I allowed to plow snow from my property onto the opposite side of the street?
It is not permitted to push snow onto banks or properties on the opposite side of the road.
Accumulated snow from private plowing can interfere with sightlines and results in buildup of
icy sections on the road. Throwing snow directly onto public sidewalks and roads is strictly
prohibited. Citizens found in contravention can be charged under the Ontario Highway Traffic
Act.
It is also prohibited to push snow from private property and place it beside snowbanks which
are the result of the snowplow removing snow from the street. This practice means the plow
Page 11 of 11
will It can also interfere with sightlines and results in buildup of icy sections on the road or is
collected in the blade of the snow plow and deposited further down the street creating
additional accumulation for private residents to remove from the end of the driveways.
16. How can I help?
-
Pile snow on the right side of your driveway (when facing the road) when shoveling. This
helps minimize the ridge of snow created by the snowplow at the end of your driveway.
-
Remove plowed snow at the end of your driveway (see above bullet). Snowplow
operators must push snow to the curb or shoulder, possibly covering recently shoveled
driveways.
-
Remove snow from fire hydrants and drainage catch basins near your property
-
Park vehicles off the street. By-law # prohibits parking of vehicles on village streets
between ____________________ from November 1 to _________.
-
Be patient. We live in a part of Ontario that normally receives a great deal of snow. If
you have a complaint regarding snow removal kindly come into the office and fill out a
Complaint Form. The complaint will be reviewed at the next Public Works Committee
meeting and necessary action, if any, will be taken.