Building permits — St.-Charles, Ontario

Do I need a building permit? What does it cost?

In the Municipality of St.-Charles, Ontario, building permit rules are set by By-law 2026-42 - Building By-Law (Construction, Demolition and Change of Use Permits and Inspections), verified 2026-09-25. Permit fees: Calculated per Schedule A: ((TCC/1000) x Rate) + Administrative Fee = Permit Fee; Rate = $10.00; or based on floor area/cost of construction, higher if both. Fees set in: Schedule A of this By-Law. Administered by: Chief Building Official (CBO) issues permits; building officials conduct inspections.

By-law 2026-42 - Building By-Law (Construction, Demolition and Change of Use Permits and Inspections) adopted bylaw
permit required for No person shall undertake any work unless a permit has been issued by the CBO; work means construction or demolition of a building or part thereof including changes of use. s. 3.1; s. 2.37
fee basis Calculated per Schedule A: ((TCC/1000) x Rate) + Administrative Fee = Permit Fee; Rate = $10.00; or based on floor area/cost of construction, higher if both. Schedule "A"; s. 7.1
fees location Schedule A of this By-Law s. 7.1; Schedule "A"
authority Chief Building Official (CBO) issues permits; building officials conduct inspections. s. 2.13; s. 3.1; s. 17.1
fine range additional administration fee equal to twice the value of the fee applicable under Schedule A or $250, whichever is greater s. 13.1