Schedule "A" to By-law 2018-22 (Building Permit Fees, as amended by Resolution 2020-172)

St. Joseph, Ontario · No. 2020-172 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 43b89388847d · verified 2026-09-21 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

St. Joseph Valuation Formula Schedule "A" to By-law 2018 - 22 - As amended by Resolution 2020-172 category Permit fees will be set at the greater of the value Permit of the project, or a calculation based on size. (per sq.ft.) residential construction (valued under $1000} $ 30.00 residence, new construction (valued at $1000+) $30+($5 x each $1000 value) basement $50.00 I sq. ft. main floor I $150.00 I sq. ft. second floor $75.oo I sq. ft. residence, renovation/additions contract price or interior I estimated material exterior cost + 50% accessory buildings (sheds, bunkie-no plumbing, $30+($5 x each $1000 value) garages, farm buildings) interior unfinished $35.oo I sq.ft. interior finished $50/ sq. ft. second floor (garage etc.) $25/ sq. ft. tarp type building $20.00/ sq. ft. replace roofing with no structural changes $ 115 flat fee (includes one medium load (single axle dump truck or large trailer) to disposal site) replace siding, soffit/fascia with no structural $ 125 flat fee changes (includes one load (single axle dump truck or large trailer) to disposal site) I Decks, Porches {servicing a dwelling) $30+{$5 x each $1000 value) decks, porches (not covered/enclosed) $30/ sq. ft. decks, porches (covered/enclosed) $40/ sq. ft. carport $30/ sq. ft. commercial buildings (valued under $1000) $40 flat fee commercial buildine:s (valued at $1000+) $40+($5 x each SlOO/ sa. ft. occupancy permit (when required) $ 10.00 relocate or move a building $ 45.00 demolish (except dwelling and commercial) $ 75.00 demolish (single family dwelling, commercial) $ 75.00 installation of solar panels $150 flat fee construction of fence (no higher than 5' 10") $40 flat fee any project valued at $500,000+ set by Council/CBO change of use permit $75+permit partial permit 25% of total permit conditional permit 25% of total permit Work begun prior to issuance of a building permit 2 x building permit fee