In the Township of Stone Mills, Ontario, building permit rules are set by By-law 2020-1053 - Building By-law (Construction, Demolition, Change of Use and Transfer of Permits and Inspections) and 1 other bylaw, verified 2026-09-25. Permit required for: construct or demolish a building or change the use of a building. Fees set in: Township of Stone Mills' 'Tariff of Fees Bylaw' (By-Law Number 2020-1051). Administered by: Chief Building Official.
By-law 2020-1053 - Building By-law (Construction, Demolition, Change of Use and Transfer of Permits and Inspections)
adopted bylaw
permit required for
construct or demolish a building or change the use of a building
s. 3.1
fee basis
flat fee, or combination of flat fee plus graduated fee for amount of floor area; construction/conditional fees are greater of Chief Building Official's cost estimate or applicant's reported cost estimate multiplied by set building fee percentage; demolition/change of use/septic flat fee
s. 4.3; s. 4.5
fees location
Township of Stone Mills' 'Tariff of Fees Bylaw' (By-Law Number 2020-1051)
s. 1.2; s. 4.1
authority
Chief Building Official
s. 3.1; s. 6.1
scout note
Township of Stone Mills's Building By-law under Building Code Act 1992, provides for construction, demolition, change-of-use and transfer-of-permit applications and inspections.
Fees and Charges By-law 2024-1237, Building Department Schedule "D"
adopted bylaw
fee basis
1.1% of the reported or estimated vaulation of work, with a minimum fee being $100.00
Building Permit
scout note
2024 consolidated fees by-law, Building Department Schedule D: building permit fee (1.1% of construction value, min $100), plus demolition/occupancy/plumbing/sign/change-of-use/solar permit fees and minimum valuation-per-sq.ft. table.