Development Charges Pamphlet (rates in effect Sept 1, 2025 to Aug 31, 2026)

Tecumseh, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 78513871d76a · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

This pamphlet summarizes The Corporation of the Town of Tecumseh's policy with respect to development charges. The information contained herein is intended only as a guide. Applicants should review the approved By-law No. 2024-063 and consult with the Manager Building Services/Chief Building Official to determine the charges that may apply to specific development proposals. Development Charge By-law No. 2024-063 is available for inspection in Town Hall during regular office hours, Monday to Friday, between 8:30 am and 4:30 pm and available on the Town's website at www.tecumseh.ca The CorporaƟon of the Town of Tecumseh DEVELOPMENT CHARGES PAMPHLET EffecƟve September 1, 2024 to August 31, 2044 (Updated as of September 1, 2025) Purpose of Development Charges The general purpose for which development charges are imposed by the Town is to assist in providing the infrastructure required by future development in the municipality by establishing a viable capital funding source to meet the Town's financial requirement. The Council of the Town of Tecumseh passed By- law No. 2024-063 on July 23, 2024, under subsection 2(1) of the Development Charges Act, 1997. Development Charge By-law No. 2024-063 includes both development charges which are applicable on a Municipal-Wide basis and on an Urban Service Area basis which is payable in addition to the Municipal wide charge. Development Charge Rules The rules for determining if a development charge is payable in a particular case and for determining the amount of the charge, are as follows: 1. The development charge by-law applies to all lands in the Town of Tecumseh; 2. Development charges are payable prior to issuance of a building permit; 3. Notwithstanding the provisions of By-law No. 2024-063, development charges shall not be imposed with respect to: a) the development of non-residential farm buildings constructed for bona fide farming uses; b) one or more enlargements of an existing industrial building or one or more industrial buildings on the same lot or parcel of land, up to a maximum of fifty percent (50%) of the combined gross floor area of the existing industrial building. An enlargement shall include expansion of the existing industrial building as well as new industrial buildings on the same parcel of land. If the gross floor area is enlarged by more than 50 per cent, the amount of the development charge in respect of the enlargement is the amount of the development charge that would be payable multiplied by the fraction determined as follows: 4. A credit shall be due to an Owner, upon the finalization of the building permit for the con- struction of a residential or non-residential building or structure on the Owner's land pro- vided that the finalization of the building per- mit occurs within the six years immediately subsequent to the date of the issuance of the demolition permit. Development Charge Time of Payment 1. Development charges imposed under this section are payable upon issuance of the first building permit with respect to each dwelling unit, building or structure. 2. Notwithstanding #1. above, development charges for rental housing and institutional developments are due and payable in 6 equal annual payments commencing with the first instalment payable on the date of occupancy, and each subsequent instalment, including interest at the interest rate as provided in the Town's D.C. Interest Rate Policy, as may be revised from time to time. 3. Where the development of land results from the approval of a site plan or zoning by-l aw amendment application received on or after January 1, 2020, and the approval of the application occurred within two years of building permit issuance, the development charges under Sections 7 and 8 shall be cal- culated on the rates set out in Schedules "B- 1" and "B-2" of the DC By-law on the date of the planning application, including interest. Where both planning applications apply devel- opment charges under Sections 3.6, 3.7, and 3.8 shall be calculated on the rates, including interest at the interest rate as provided in Section 26.3 of the Act, as set out in Sched- ules "B-1", and "B-2" on the date of the later planning application. 1. Determine the amount by which the en- largement exceeds 50 percent of the gross floor area before the enlargement. 2. Divide the amount determined under paragraph 1 by the amount of the en- largement. Pursuant to 3.5 (b) of this by-law, the total eligible gross floor area exemption for the enlargement of an industrial building provided for by this section shall be fifty percent of: i) the gross floor area that existed prior to the first enlargement for which an ex- emption from the payment of develop- ment charges was eligible to be granted pursuant to this By-law or any previous Town of Tecumseh Development Charg- es By-Law enacted pursuant to the De- velopment Charges Act, 1997, as amended or its predecessor legislation; or ii) the gross floor area of the existing indus- trial building where there has not been an enlargement in accordance with item i. above. c) the issuance of a building permit in accordance with Section 2(3) of the Act. d) Rules with Respect to Exemptions for Intensification of Existing Housing * See note below. * refer to 3.5 d) of DC By-law for details with respect to subsection d). ADDITIONAL EXEMPTIONS Please refer to Section 3.5 e) through h) for additional information related to exemptions. *Boundary of the Urban Service Area is shown on Schedule "C" of By-law 2024-063. TOWN OF TECUMSEH DEVELOPMENT CHARGES Effective: SEPTEMBER 1, 2024 to AUGUST 31, 2034 Residential, Commercial, Institutional & Industrial Development RESIDENTIAL (Per Dwelling Unit) NON RESIDENTIAL Single- Detached Dwelling & Semi- Detached Dwelling Apartments 2 Bedrooms + Apartments Bachelor & 1 Bedroom Other Multiples Per ft² of Gross Floor Area TOTAL MUNICIPAL WIDE DEVELOPMENT CHARGE (Urban and Rural) $22,767 $15,125 $10,647 $16,270 $6.09 Additional Charge Affecting Urban Service Area * (see Schedule C-1 of By-Law 2019-63) $13,389 $8,896 $6,261 $9,563 $5.23 TOTAL URBAN AREA DEVELOPMENT CHARGE $36,156 $24,021 $16,908 $25,839 $11.32 Special Care / Special Dwelling Units $8,455 $4,972 $13,427 Purpose of the Treasurer's Statement The purpose of the annual Statement of the Treasurer is to document the continuity of each development charge reserve fund, including services covered, development charge collections, interest earnings, funding transfers, borrowing and landowner credit transactions. The Treasurer's annual statement may be reviewed by the public at Town Hall during regular office hours, Monday to Friday, be- tween 8:30 am and 4:30 pm. Further Information For additional information, please contact: Tom Kitsos Director Financial Services & Chief Financial Officer Town of Tecumseh 917 Lesperance Road Tecumseh, ON N8N 1W9 Phone: 519-735-2184, Ext 125 Email: [email protected] Services Covered Development charges have been imposed for the following categories of Town services in order to pay for the increased capital costs required as a result of the increased needs for services arising from development: Municipal Wide:  Fire Protection  Police  Services Related to a Highway  Administration Studies Engineering Related  Library  Parks and Recreation  Growth Studies  Water Urban wide:  Wastewater Services Indexing of Development Charges The schedule of development charges will be adjusted annually as of September 1st each year (on the anniversary of the date of adoption of By-law No. 2024-063), in accordance with the Statistics Canada Quarterly Construction Price Index. Rates identified in chart above are in effect from September 1, 2025 to August 31, 2026.