Consolidated Report
Prepared by Hemson for the Town of The Blue Mountains
2024 Development Charges
Background Study
April 1, 2026
1000 - 30 St. Patrick Street, Toronto, ON M5T 3A3
416 593 5090 | [email protected] | www.hemson.com
Consolidated Study Foreword
A.
Changes Since June 20, 2024
The Town of the Blue Mountains passed DC By-law 2024-29 on April 15th,
2024, which was subsequently appealed to the Ontario Land Tribunal. This
version of DC Background Study reflects the OLT order issued on March 23,
2026 (see case # OLT-24-000647). A summary of the changes made since
the June 20, 2024, version is Table 1 below. In addition, Appendix G contains
the updated DC By-law 2024-29 reflecting the updated treatment of hotel,
motel and commercial resort units.
Table 1: Summary of Changes following OLT Order
Service Area
Services / Areas Affected
Town-wide Services
Public Library
Parks And Recreation
Services Related to a Highway: Roads
& Related
Water - Distribution (Linear Infrastructure)
Craigleith
Castle Glen
Osler
Thornbury West
Clarksburg
Lora Bay - SA1
Lora Bay - SA2
Lora Bay - SA3
Camperdown
Wastewater - Collection (Linear Infrastructure)
Same as Water - Distribution above
with the addition of:
Thornbury East
Water Supply (Plant Infrastructure)
Entire Serviced Area
Wastewater Treatment (Plant Infrastructure)
Craigleith WWTP
Thornbury WWTP
Contents
List of Acronyms
1
Executive Summary
2
1.
Introduction
7
A.
Legislative Context
8
B.
Relevant Analysis
10
C.
Consultation and Approval Process
10
2.
The DC Methodology Aligns Development-Related Costs and
Benefits
11
A.
Both Town-Wide and Area-Specific Development Charges Are
Proposed
11
B.
Key Steps When Determining Development Charges for Future
Development-Related Projects
13
3.
Development Forecast
17
4.
Historical Capital Service Levels
20
5.
Development-Related Capital Forecast
22
A.
Development-Related Capital Forecast is provided for
Councilʼs Approval
22
B.
The Development-Related Capital Forecast for General
Services
23
C.
The Development-Related Capital Forecast for Engineered
Services
26
6.
Development Charges are Calculated in Accordance with the
Development Charges Act
29
A.
Development Charges Calculation
29
B.
Residential and Non-Residential Development Charges Rates 39
C.
Comparison of Newly Calculated Development Charges with
Charges Currently In-Force in The Blue Mountains
42
7.
Cost of Growth Analysis
46
A.
Asset Management Plan
46
B.
Future Revenue Growth
47
C.
Net Operating Costs for the Townʼs Services to Increase over
the Forecast Period
48
D.
Long-Term Capital Financing from Non-Development Charges
Sources
50
8.
Development Charges Administration
52
A.
Development Chagres Recommendations
52
List of Appendices
Appendix A - Development Forecast
54
Appendix B - General Services
75
Appendix C - Services Related to a Highway
128
Appendix D - Engineered Services
154
Appendix E - Reserves
187
Appendix F - Cost of Growth
190
Appendix G -2024-29 DC By-law
201
Appendix H - Local Service Guidelines
223
List of Acronyms | 1
List of Acronyms
AMP
Asset Management Plan
ASDC
Area Specific Development Charge
BTE
Benefit to Existing
COG
Cost of Growth
DCA
Development Charges Act
DC
Development Charges
GFA
Gross Floor Area
MMAH
Ministry of Municipal Affairs and Housing
PPB
Post-Period Benefit
PPU
Persons Per Unit
Executive Summary | 2
Executive Summary
A. Purpose of Development Charges (DC) Background Study
Hemson Consulting Ltd. was retained by the Town of The Blue Mountains to
complete a Development Charges (DC) Background Study (herein referred
to as the "DC Study"). This DC Study provides the basis and background to
update the Townʼs development charges to reflect the servicing needs of
development.
i.
Study Consistent with Development Charges Legislation
The Town of The Blue Mountains 2024 Development Charges Background
Study is presented as part of the process to lead to the approval of new DC
By-laws in compliance with the Development Charges Act (DCA). The study
is prepared in accordance with the DCA and associated regulations.
ii.
Key Steps of the Development Charges Calculation
The DCA in Ontario is the most prescriptive of all DC legislation in Canada
with respect to recovering development-related costs. Several key steps are
required to calculate DCs. These include:
-
Preparing a development (growth) forecast;
-
Establishing historical service levels;
-
Determining the increased needs for services arising from development;
and
-
Determining how these costs are attributed to development types (i.e.
residential and non-residential).
Executive Summary | 3
iii.
The Development-Related Capital Forecast is Subject to Change
It is recommended that Council adopt the development-related capital
forecast prepared for the purposes of the DC Background Study. However,
the DC Study is a point-in-time analysis and there may be changes to
project timing, scope, and costs through the Townʼs normal annual budget
process.
B.
Development Forecast
The forecasts are based on the Town achieving population and employment
targets set out in the Grey Countyʼs Growth Management Strategy. A 10-
year planning horizon (2024-2033) is utilized for all Town-wide General
Services, while a planning horizon of 2024-Build-Out is used for Engineered
Services. The table below provides a summary of the anticipated residential
and non-residential growth over the respective planning periods. The
development forecast is further discussed in Appendix A.
Growth
Total
at 2033
Growth
Total
at Build-
Out
Residential
Total Occupied Units
Total Census Dwellings
7,827
3,050
10,877
7,390
15,217
Total Population
Census Population
17,931
3,978
21,909
5,989
23,920
Population in New Dwellings (1)
5,587
14,533
Non-Residential
Employment
4,891
275
5,166
1,453
6,344
Non-Residential Building Space (m2)
21,973
116,095
(1) Includes seasonal population
Engineering Services
2024-Build-out
General Services
2024-2033
Development Forecast
2023
Estimate
Executive Summary | 4
C.
Development-Related Capital Program
The development-related capital program for General Services is planned
over a 10-year period from 2024 to 2033. The gross costs amount to $123.5
million where $26.6 million is eligible for recovery through development
charges net of anticipated grants and other recoveries. Details regarding the
capital programs for each individual General Services are provided in
Appendix B and C of this report.
The development-related capital program for Engineered Services is
planned over a period from 2024 to Build-Out. In total, $578.1 million is
identified in gross project costs of which $335.0 million is eligible for
recovery through development charges. Some costs are recovered on a
Town-wide basis while others are payable only by certain geographic areas.
Details regarding the capital programs for each individual engineered service
are provided in Appendix C and D of this report.
D.
Calculated Development Charges
Development charges rates have been established under the parameters
and limitations of the DCA. A Town-wide uniform cost recovery approach is
used to calculate development charges for the General Services and some
Engineered Services. Water distribution and wastewater treatment are
recovered from 2 areas while the linear infrastructure associated is
recovered along eleven distinct service areas.
The tables below provide the development charges for residential and non-
residential development based on the development forecasts.
Executive Summary | 5
Calculated Development Charges
E.
Cost of Growth Analysis
An overview of the long-term capital and operating costs as well as the
asset management-related annual provisions for capital facilities and
infrastructure to be included in the DC by-law is provided in Appendix F of
the DC Background Study. This examination is required as one of the
provisions of the DCA.
F.
Policy Changes since 2019 DC Background Study
As part of the Townʼs 2024 DC Background Study update, the following
changes have been introduced:
-
Removal area specific Castle Glen Services Related to a Highway: Roads
& Related charge and combining it with the Town-wide capital program;
-
Review of inclusion of Transit Services (not anticipated to be included in
this Study but may be considered for future studies);
-
Reviewed DC By-law definitions and exemptions; and
-
Alignment with new legislative changes.
Calculated t
otal residentia
l an
d non-residenti
al Town-wi
de Deve
lopment C
harges by se
rvice area.
Executive Summary | 6
G.
Key Recommendations
-
It is recommended that the Townʼs present practices regarding collection
of development charges and by-law administration continue to the extent
possible;
-
As required under the DCA, the Town should codify any rules regarding
application of the by-laws and any exemptions within the development
charges by-laws proposed for adoption;
-
It is recommended that Council adopt the development-related capital
forecast included in this background study, subject to annual review
through the Townʼs normal capital budget process; and
-
No substantial changes to the Townʼs prevailing local service definitions
and policies are being considered.
H.
DC By-law available under Appendix G
A copy of DC By-law 2024-29 is available under Appendix G and on the
Townʼs website.
Introduction | 7
1. Introduction
The Development Charges Act, 1997 (DCA) and its associated Ontario
Regulation 82/98 (O. Reg. 82/98) allow municipalities in Ontario to recover
development-related capital costs from new development. The Town of The
Blue Mountains Development Charges (DC) Background Study is presented
as part of a process to establish a development charges by-law that
complies with this legislation.
The Town of The Blue Mountains is experiencing residential development
pressure and is also an attractive location for a variety of recreational and
seasonal oriented development. The anticipated development in The Blue
Mountains will increase the demand on all Town services. The Town wishes
to implement development charges to fund development-related capital
projects so that development continues to be serviced in a fiscally
responsible manner.
When a development charges by-law is proposed, the DCA and O. Reg.
82/98 require that a development charges background study be prepared in
support of the proposed charges with reference to:
-
A forecast of the amount, type and location of development anticipated in
the Town;
-
The average capital service levels provided in the Town over the fifteen-
year period immediately preceding the preparation of the background
study;
-
A review of future capital projects, including an analysis of gross
expenditures, funding sources, and net expenditures incurred, or to be
incurred, by the Town or its local boards to provide for the expected
development, including the determination of the development and non-
development-related components of the capital projects;
Introduction | 8
-
An asset management plan that demonstrates that all assets are
financially sustainable over their full life cycle; and
-
An examination of the long-term capital and operating costs resulting
from the infrastructure required for each service to which the
development charges relate.
This study identifies the net capital costs attributable to development that is
forecast to occur in the Town. The costs are apportioned to types of
development (residential and non-residential) in a manner that reflects the
increase in the need for each service attributable to each type of
development. The study therefore calculates development charges for each
type of development.
The DCA provides for a period of public review and comment regarding the
calculated development charges. This process includes considering and
responding to comments received by members of the public about the
calculated charges. Following completion of this process, and in accordance
with the DCA and Councilʼs review of this study, it is intended that Council
will pass a new development charges by-law for the Town.
The remainder of this study sets out the information and analysis upon
which the calculated development charges are based.
A.
Legislative Context
The study is prepared in accordance with the DCA and associated
regulations. In December 2023, the Minister of Municipal Affairs and
Housing announced further changes to the DCA and the study took into
consideration those amendments as well as those made available through
the first reading of Bill 185: Cutting Red Tape to Build More Homes Act,
2024 which was on April 10, 2024 prior to the passage of By-law 2024-29.
Introduction | 9
The amendments as per Bill 23: More Homes Built Faster Act, 2022 are
noted below with notes based on Bill 185. Key legislative changes include:
-
Five-year mandatory phase-in of the calculated DC rates (beginning with
a 20% reduction in Year 1, decreasing by 5% annually until Year 5); Note:
this has been removed by Bill 185 and no longer applies to rates levied as
of June 6, 2024.
-
Historical service level standards have been extended from a 10 to 15-
year planning period;
-
DC by-laws now expire every 10 years instead of 5 years;
-
The amount of interest paid on DC deferrals and freeze is capped at
prime plus 1%;
-
Costs associated with studies and affordable housing services are now
ineligible for recovery through DCs; Note: development-related studies
has been re-introduced as an eligible capital cost by Bill 185 and is
included only in rates levied as of June 6, 2024.
-
Municipalities must spend or allocate 60% of available DC reserve funds
per year for roads, water and wastewater services; and
-
Discounts for purpose built rentals based on the number of bedrooms.
The DCA was also amended to exempt affordable and attainable housing
developments from the payment of DCs. Affordable housing exemptions are
now in force as of June 1, 2024.
One final change through Bill 185 which came into effect upon Royal Assent
on June 6, 2024 was the shortening of time to which DC deferrals apply
under Section 26.2 from 2 years from Council approval to 18 months.
Introduction | 10
B.
Relevant Analysis
The underlying assumptions and calculation methodologies contained in the
DC Background Study have been informed by a range of inputs including the
Townʼs capital budget, existing master plans, and discussions with Town
staff.
C.
Consultation and Approval Process
The following provides a summary of the consultation and approval process
undertaken to complete the DC Background Study.
Timeline of Consultation and Approval Process
Activity
Date
Council Information Session
January 16, 2024
Public Release of DC Background Study
February 2, 2024
Developer Information Session
February 6, 2024
Statutory Public Meeting
March 12, 2024
Passage of 2024 DC By-law
April 2, 2024
The DC Methodology Aligns Development-Related Costs and Benefits | 11
2. The DC Methodology Aligns
Development-Related Costs and Benefits
Several key steps are required when calculating any development charge.
However, specific circumstances arise in each municipality which must be
reflected in the calculation. In this study, therefore, we have tailored our
approach to the Town of The Blue Mountainsʼ unique circumstances. The
approach to the calculated development charges is focused on providing a
reasonable alignment of development-related costs with the development
that necessitates them. This study uses both a Town-wide and area-specific
approach in the cost recovery calculations. The Background Study provides
an update to the historical service levels and the cost of providing future
development-related capital infrastructure.
A.
Both Town-Wide and Area-Specific Development
Charges Are Proposed
The Blue Mountains provides a range of services to the community it serves
and has a sizeable inventory of facilities, land, infrastructure, and vehicles
and equipment. The DCA provides the Town with flexibility when defining
services that will be included in the development charges by-laws, provided
that the other provisions of the Act and Regulations are met. The DCA also
permits the Town to designate, in its by-laws, the areas within which the
development charges shall be imposed. The charges may apply to all lands
in the Town or to other designated development areas as specified in the
by-laws.
i.
Services Based on a Town-Wide Approach
For most services, a range of capital infrastructure is available throughout
the Town. All Town residents and employees have access to this
infrastructure. As new development occurs, new infrastructure will need to
The DC Methodology Aligns Development-Related Costs and Benefits | 12
be added so that overall service levels in the Town are maintained. A widely
accepted method of sharing the development-related capital costs for these
services is to apportion them over all new development anticipated in the
Town.
The following services are included in the Town-wide development charges
calculations:
-
Public Library
-
Fire Services
-
Police Department
-
Parks and Recreation
-
Services Related to a Highway:
Public Works
-
By-law Enforcement
-
Solid Waste Management
-
Development Related Studies
-
Services Related to a Highway:
Roads and Related
These services form a reasonable basis in which to plan and administer the
Town-wide development charges. It is noted that the analysis of each of
these services examines the individual capital facilities and equipment that
constitute it. The resulting development charges for these services would be
imposed against all development anywhere in the Town.
ii.
Services Based on an Area-Specific Approach
For some Town services, the need for and benefits of development-related
capital works is more localized. For such services, an alternative "area-
specific" approach to calculating development charges is used. Area-specific
charges have been calculated for water supply, treatment and distribution,
and sewage treatment and collection. Specific service areas for each water
and wastewater project have been calculated. This approach is consistent
with the Townʼs existing development charge structure for such services.
The area-specific approach facilitates front-end financing arrangements for
the designated services should the Town choose to use those provisions of
the DCA. Area-specific charges also enable developer group agreements.
The DC Methodology Aligns Development-Related Costs and Benefits | 13
B.
Key Steps When Determining Development Charges for
Future Development-Related Projects
Several key steps are required when calculating development charges for
future development-related projects. These are summarized in Figure 1 and
discussed further in the following sections.
i.
Development Forecast
The first step in the methodology requires that a development forecast be
prepared for the 10-year study period from 2024 to 2033 and to build-out.
The forecasts of future residential and non-residential development used in
this study were prepared by Hemson Consulting in consultation with the
Town of The Blue Mountains staff. The forecasts have been informed by
Grey Countyʼs recent Growth Management Strategy (GMS) and adjusted for
known and anticipated development proposals and accounts for historical
households, seasonal development, and recent construction history.
For the residential portion of the forecast, the forecast includes an estimate
of population and dwelling units by type on both a Town-wide and service
area basis. The non-residential portion of the forecast estimates the amount
of building space to be developed in the Town over the planning periods.
The forecast is based on the projected increase in employment levels and
the anticipated amount of new building space required to accommodate it.
ii.
Service Categories and Historical Service Levels
The DCA states that the increase in the need for service attributable to
anticipated development:
... must not include an increase that would result in the level of
service exceeding the average level of that service provided in the
Municipality over the 15-year period immediately preceding the
preparation of the background study...(s. 5. (1) 4.)
The DC Methodology Aligns Development-Related Costs and Benefits | 14
Figure 1: Statutory Requirements of Development Charge Calculation
and Study Process
The DC Methodology Aligns Development-Related Costs and Benefits | 15
Historical 15-year average service levels thus form the basis for the development
charges calculation. A review of the Townʼs capital service levels for buildings,
land, vehicles, equipment, and others has therefore been prepared as a
reference to determine the portion of future capital projects that may be included
in the development charges calculation. The historical service levels used in this
study have been calculated based on the period from 2009 to 2023.
In accordance with the provisions of the DCA, for the engineered services of
water and wastewater, historical service levels are less applicable, and
reference is made to the Townʼs engineering standards as well as Provincial
health or environmental legislation.
iii.
Development-Related Capital Forecast and Analysis of Net Capital
Costs to Be Included in the Development Charges
A development-related capital forecast has been prepared by Town staff as
part of this study. The forecast identifies development-related projects and
their gross and net costs, after allowing for capital grants, subsidies, or other
contributions as required by the DCA s.5.(2). The capital forecast provides
another foundation upon which development charges are based. The DCA
requires that the increase in the need for service attributable to the anticipated
development may include an increase:
... only if the council of the municipality has indicated that it intends to
ensure that such an increase in need will be met. (s. 5. (1) 3.)
S. 5. (1) 4. and s. 5. (2). require that the development charges be calculated on
the lesser of the historical 15-year average service levels or the service levels
embodied in the plans of the Town. The development-related capital forecast
prepared for this study ensures that development charges are only imposed to
help pay for projects that have been or are intended to be purchased or built to
accommodate future anticipated development. It is not sufficient in the
calculation of development charges merely to have had the service in the past.
There must also be a demonstrated commitment to continue to emplace
facilities or infrastructure in the future. In this regard, Ontario Regulation 82/98,
s. 3 states that:
The DC Methodology Aligns Development-Related Costs and Benefits | 16
For the purposes of paragraph 3 of subsection 5 (1) of the Act, the
council of a municipality has indicated that it intends to ensure that
an increase in the need for service will be met if the increase in
service forms part of an Official Plan, capital forecast or similar
expression of the intention of the council and the plan, forecast or
similar expression of the intention of the council has been approved
by the council.
For some projects in the development-related capital forecast, a portion of
the project may confer benefits to existing residents. As required by the DCA,
s. 5. (1) 6., these portions of projects and associated net costs are to be a
funding responsibility of the Town from non-development charges sources.
The amount of financing for such non-growth shares is also identified as part
of the preparation of the development-related capital forecast.
There is also a requirement in the DCA to reduce the applicable
development charges by the amount of any "uncommitted excess capacity"
that is available for a service. Such capacity is available to partially meet
future servicing requirements. Adjustments are made in the analysis to meet
this requirement of the Act.
iv.
Attribution to Types of Development
The next step in the determination of development charges is the allocation of
the development-related net capital costs between the residential and the non-
residential sectors. In the Town of The Blue Mountains, the allocation is based
on the projected changes in dwelling units and employment over the planning
periods, the anticipated demand for services, and other relevant factors.
The residential component of the development charges is applied to
different housing types based on average occupancy factors. The non-
residential component is applied based on gross building space in square
metres.
Development Forecast | 17
3.
Development Forecast
The DCA requires the Town to estimate "the anticipated amount, type and
location of development" for which development charges may be imposed.
The development forecast must cover both residential and non-residential
development and be specific enough with regards to quantum, type,
location, and timing of development to allow the Town to prepare a
reasonable development-related capital program. Appendix A contains
additional materials related to the development forecast and the Townʼs
demographics.
Key demographic features of the Town of The Blue Mountains are the
seasonal fluctuations of its population and the corresponding recreational
nature of its residential development. For this reason, the Townʼs
development charges are based on a residential forecast which includes
seasonal population and dwellings not occupied by usual residents. This
rationale is based upon the need for the Town to build infrastructure to
accommodate peak demand levels associated with the development portion
of the Town, regardless of whether the use is permanent or seasonal.
The residential forecast incorporates 2021 Census and historical residential
permit data and accounts for seasonal housing development. The forecast
shows that the number of dwelling units (occupied dwellings, non-permanent
and hotel/motel units) will increase by 3,050 between 2024 and 2033. From
2024 to build-out, approximately 7,390 additional units are anticipated.
Approximately 67% of the development occurring over the 2024-2033 period
is projected to occur in the Craigleith service area. Castle Glen is the next
significant development area with approximately 10% of the anticipated new
units. Camperdown will experience 5% of the development. Other service
areas forecast to experience significant development include Lora Bay 7%,
Thornbury East 4%, and Thornbury West 4%.
Development Forecast | 18
The non-residential portion of the forecast is largely based upon
development applications received, known developer plans, and the
availability of servicing. The forecast is for approximately 21,973 square
metres of new non-residential gross floor area (GFA) to be added to the
Town between 2024 and 2033. During the period 2024 to build-out, GFA is
projected to increase by approximately 116,095 square metres.
Table 1 provides a summary of the Town-wide residential and non-
residential development forecast used in this analysis. Table 2 provides a
summary of the residential and non-residential area-specific development
forecast for the various water and wastewater servicing areas.
TABLE 1
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL
DEVELOPMENT FORECAST
Growth
Total
at 2033
Growth
Total
at Build-
Out
Residential
Total Occupied Units
Total Census Dwellings
7,827
3,050
10,877
7,390
15,217
Total Population
Census Population
17,931
3,978
21,909
5,989
23,920
Population in New Dwellings (1)
5,587
14,533
Non-Residential
Employment
4,891
275
5,166
1,453
6,344
Non-Residential Building Space (m2)
21,973
116,095
(1) Includes seasonal population
Engineering Services
2024-Build-out
General Services
2024-2033
Development Forecast
2023
Estimate
Development Forecast | 19
Summary o
f residentia
l a
nd non-
r
esident
i
al ASDC deve
lopment forecast.
Historical Capital Service Levels | 20
4. Historical Capital Service Levels
The DCA and O. Reg. 82/98 require that the development charges be set at
a level no higher than the average service level provided in the Town over
the 15-year period immediately preceding the preparation of the Background
Study, on a service-by-service basis.
For non-engineered services (Public Library, Parks and Recreation, etc.) the
legislative requirement is met by documenting service levels for the preceding
15 years: in this case, for the period from 2009 to 2023. Typically, service levels
for non-engineered services are measured as a ratio of inputs per capita or
inputs per population and employment. For engineered services such as Water
and Sewer, engineering standards are used in lieu of inputs per capita.
O. Reg. 82/98 requires that, when defining and determining historical service
levels, both the quantity and quality of service be taken into consideration. In
most cases, the service levels are initially established in quantitative terms. For
example, service levels for buildings are presented in terms of square feet per
unit. The qualitative aspect is introduced by consideration of the monetary
value of a facility or service. In the case of buildings, for example, the cost
would be shown in terms of dollars per square foot to replace or construct a
facility of the same quality. This approach helps to ensure that the
development-related capital facilities that are to be charged to new
development reflect not only the quantity (number and size) but also the quality
(value or cost) of services provided by the Town in the past. Both the
quantitative and qualitative aspects of service levels used in the current
analysis are based on information provided by Town staff. This information is
generally based on historical records and the Townʼs and surrounding
municipalities experience with costs to acquire or construct similar facilities,
equipment, and infrastructure.
Table 3 summarizes service levels for all services included in the
development charges calculations. Appendices B and C provide detailed
historical inventory data upon which the calculation of service levels is
based for the general and Roads and Related services, respectively.
Historical Capital Service Levels | 21
Summary
of historical service lev
els 2009-2023 for applicable service areas.
Development-Related Capital Forecast | 22
5. Development-Related Capital Forecast
The DCA requires that the Council of a municipality express its intent to
provide future capital facilities at the level incorporated in the development
charges calculation. As noted above in Section II, Ontario Regulation 82/98,
s. 3 states that:
For the purposes of paragraph 3 of subsection 5 (1) of the Act, the
council of a municipality has indicated that it intends to ensure that
an increase in the need for service will be met if the increase in
service forms part of an official plan, capital forecast or similar
expression of the intention of the council and the plan, forecast or
similar expression of the intention of the council has been approved
by the council.
A.
Development-Related Capital Forecast is provided for
Councilʼs Approval
Based on the development forecast summarized in Section 3 and detailed in
Appendix A, Town staff, in collaboration with the consultant, has identified a
development-related capital forecast that sets out those projects required to
service anticipated development. For all Town-wide services, the capital
forecast covers the 10-year period from mid-year 2024 to mid-year 2033. As
permitted by the DCA s. 5(1) 4., development charges for the engineered
services are based on a longer planning horizon, to build-out.
One of the recommendations contained in this background study is for
Council to adopt the development-related capital forecast created for the
purposes of the development charges calculation. It is assumed that future
capital budgets and forecasts will continue to bring forward the capital
projects presented herein as they will be needed to service anticipated
development in the Town. It is, however, acknowledged that changes to the
forecast presented here may occur through the Townʼs normal capital
budget process.
Development-Related Capital Forecast | 23
B.
The Development-Related Capital Forecast for General
Services
A summary of the development-related capital forecast for Town-wide
uniform services is presented in Table 4. The table shows that the gross
cost of the Townʼs general services capital forecast is estimated to be
$123.5 million. Approximately $50.00 million in grants are anticipated to
offset the cost of the Parks and Recreation program; therefore, the net
municipal cost for the Town is reduced to $73.5 million.
Of this $73.5 million net municipal cost, approximately 48%, or $35.0 million,
is related to capital works for Parks and Recreation. This capital program
recovers for new indoor recreation space with a gross cost of $80.0 million.
Parkland development in the amount of $2.1 million and park facilities and
equipment valued at $2.9 million are also included. The gross cost also
includes a $50.0 million grant for indoor recreation.
The next largest capital program is associated with Fire Services that
amounts to $13.7 million, or 19% of the total, and provides for a new fire hall,
personnel and emergency equipment and vehicles.
The capital forecast associated with Public Works envisions a new public
works facility, a new snow storage facility, as well as a new Satellite Office.
An additional provision of $1.5 million will fund various fleet and equipment
acquisitions. The total cost of the Public Works capital program is $12.4
million.
The next largest capital program belongs to Public Library. The program
provides funding for a new library space and material acquisitions. The total
Public Library capital program amounts to $9.1 million, or 12%.
Development-Related Capital Forecast | 24
Summa
ry of t
he develo
pment-r
elat
ed capita
l fo
reca
st f
or T
own-
wide
uni
form
ser
vice
s.
Development-Related Capital Forecast | 25
The portion of the Townʼs program that relates to the provision of
Development-related Studies amounts to $1.6 million.
The capital forecast associated with Solid Waste provides for new facilities,
fleet, and equipment. It represents 1.5% of the Townʼs general services
capital program and is valued at $1.10 million.
The Police Services capital program recovers for the debenture payments
related to the new Ontario Provincial Police station. The total Police capital
program amounts to approximately $373,700.
The By-law Enforcement capital program includes the recovery of a negative
reserve fund balance and provision for additional and equipment. The total
cost of the capital program is $249,500.
The capital forecast incorporates those projects identified to be related to
development anticipated in the next 10 years. It is not implied that all of
these costs are to be recovered from new development by way of
development charges (see the following Section 6). Portions of the capital
forecast may be related to replacement of existing facilities, shares of
projects that benefit the existing population, or development anticipated to
occur beyond the 2024 - 2033 planning period.
After these reductions, the remaining development-related capital costs are
brought forward to the development charges calculation. Further details on
the capital forecasts for each individual service category are available in
Appendix B and C.
Development-Related Capital Forecast | 26
C.
The Development-Related Capital Forecast for
Engineered Services
Table 5 provides the development-related capital recoveries for the
engineered services of Roads and Related, Water Supply and Treatment,
Sewage Treatment, and service area-specific Water distribution and Sewage
collection.
The Town-wide Roads and Related capital programs total $198.0 million and
provides servicing for anticipated development over the 2024 to build-out
period. Of the Roads capital program, just over $87.6 million has been
identified as recoverable under the DCA and is included in the development
charge calculation. Details of the capital program can be found in Appendix
C.2.
Also shown on Table 5 is the Water and Wastewater servicing costs. The
Water supply and treatment capital program is $29.3 million, of which $28.9
million is identified as development-related and recoverable from
development charges. These costs are to be recovered uniformly from all
development receiving municipal water servicing in the Town.
Sewage treatment is provided by two plants: Craigleith Sewage Treatment
Plant and Thornbury Sewage Plant. The capital cost associated with the
Craigleith Plant is $37.2 million with a share of $31.5 million identified as a
post-period benefit and removed from the DC rate. The remaining $5.6
million are recoverable against all development receiving servicing from the
Craigleith Plant. The Thornbury Plant will recover $25.2 million including
total gross cost of $85.1 million and benefit to existing share of $15.2 million,
available DC reserves of $4.3 million and a post period benefit amount of
$40.4 million. These development-related plant costs are to be recovered
across all applicable development in the areas serviced by the Thornbury
Treatment Plant.
Development-Related Capital Forecast | 27
Total
Service
Benefit
Benefit
Prior Growth
Post-
Net Capital
Total
Grants and
to Other
to Existing
(Available
Period
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Benefit
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
Roads and Related
$198,035.3
$29,998.5
$0.0
$26,594.6
$12,952.9
$40,904.6
$87,584.7
Water Supply and Treatment
$29,274.1
$0.0
$331.1
$58.2
$0.0
$0.0
$28,884.9
Craigleith Sewage Treatment Plant
$37,219.7
$0.0
$0.0
$94.7
$0.0
$31,479.9
$5,645.2
Thornbury Sewage Treatment Plant
$85,145.4
$0.0
$0.0
$15,245.2
$4,335.9
$40,412.6
$25,151.7
Total Town-Wide Engineered Services
$349,674.5
$29,998.5
$331.1
$41,992.7
$17,288.8
$112,797.0
$147,266.5
Service Area Specific (Water & Sewer)
Craigleith
$48,883.8
$0.0
$13,754.7
$0.0
$5,770.0
$0.0
$29,359.1
Water
$35,276.5
$0.0
$10,017.7
$0.0
$5,579.5
$0.0
$19,679.3
Sewer
$13,607.3
$0.0
$3,737.0
$0.0
$190.5
$0.0
$9,679.8
Castle Glen
$53,213.7
$0.0
$178.2
$0.0
($287.5)
$0.0
$53,323.1
Water
$42,995.8
$0.0
$91.9
$0.0
$0.0
$0.0
$42,903.9
Sewer
$10,217.9
$0.0
$86.3
$0.0
($287.5)
$0.0
$10,419.2
Osler
$6,923.0
$0.0
$0.0
$0.0
($282.0)
$0.0
$7,205.0
Water
$3,574.7
$0.0
$0.0
$0.0
$4.0
$0.0
$3,570.6
Sewer
$3,348.4
$0.0
$0.0
$0.0
($286.0)
$0.0
$3,634.4
Thornbury East
$5,230.4
$0.0
$4,794.9
$0.0
($440.7)
$0.0
$876.2
Water
$779.0
$0.0
$634.9
$0.0
($334.9)
$0.0
$479.0
Sewer
$4,451.4
$0.0
$4,160.0
$0.0
($105.8)
$0.0
$397.2
Thornbury West
$37,168.4
$0.0
$926.9
$0.0
($6,575.0)
$13,653.1
$29,163.5
Water
$22,162.7
$0.0
$0.0
$0.0
($3,024.0)
$7,329.6
$17,857.0
Sewer
$15,005.7
$0.0
$926.9
$0.0
($3,551.1)
$6,323.4
$11,306.5
Clarksburg
$17,231.6
$0.0
$0.0
$0.0
($512.7)
$0.0
$17,744.3
Water
$7,606.5
$0.0
$0.0
$0.0
$35.1
$0.0
$7,571.4
Sewer
$9,625.1
$0.0
$0.0
$0.0
($547.9)
$0.0
$10,173.0
Lora Bay SA1
$22,308.9
$0.0
$0.0
$2,599.2
($298.6)
$1,857.9
$18,150.4
Water
$13,701.9
$0.0
$0.0
$772.0
($456.8)
$1,193.1
$12,193.7
Sewer
$8,606.9
$0.0
$0.0
$1,827.2
$158.2
$664.8
$5,956.7
Lora Bay SA2
$204.9
$0.0
$0.0
$0.0
($3.4)
$0.0
$208.3
Water
$87.5
$0.0
$0.0
$0.0
($5.1)
$0.0
$92.6
Sewer
$117.4
$0.0
$0.0
$0.0
$1.8
$0.0
$115.7
Lora Bay SA3
$662.6
$0.0
$0.0
$0.0
($14.8)
$0.0
$677.5
Water
$387.3
$0.0
$0.0
$0.0
($22.7)
$0.0
$410.0
Sewer
$275.3
$0.0
$0.0
$0.0
$7.9
$0.0
$267.4
Camperdown
$36,580.2
$0.0
$0.0
$4,867.1
$668.4
$0.0
$31,044.6
Water
$18,152.4
$0.0
$0.0
$1,537.8
$25.5
$0.0
$16,589.1
Sewer
$18,427.8
$0.0
$0.0
$3,329.4
$642.9
$0.0
$14,455.5
Total Area Specific Engineered Services
$228,407.6
$0.0
$19,654.6
$7,466.3
($1,976.3)
$15,511.0
$187,752.0
TOTAL ROADS, WATER AND SEWER
$578,082.1
$29,998.5
$19,985.7
$49,459.0
$15,312.5
$128,308.0
$335,018.5
TABLE 5
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF ENGINEERING SERVICES DEVELOPMENT-RELATED INFRASTRUCTURE CAPITAL PROGRAM
FOR THE PERIOD 2024 TO BUILD-OUT
Development-Related Capital Forecast
Development-Related Capital Forecast | 28
Table 5 also provides a summary of the specific Water and Wastewater
servicing areas engineered servicesʼ capital programs. The development-
related capital expenditures for these areas range from just over $53.3
million in Castle Glen to $208,300 in Lora Bay Service Area 2. The variation
of costs between the service areas reflects different levels of development,
servicing needs, and servicing costs. Details of the Water and Wastewater
capital programs can be found in Appendix D.
Development Charges are Calculated in Accordance with the
Development Charges Act | 29
6. Development Charges are Calculated in
Accordance with the Development
Charges Act
This section summarizes the calculation of development charges for each
service category and the resulting total development charge by type of
development. For all services, the calculation of the per capita (residential)
and per square metre (non-residential) charges is reviewed.
For residential development, a total per capita amount is applied to different
unit types on the basis average occupancy factors. For non-residential
development, the calculated development charges rates are based on gross
floor area (GFA) of building space.
It is noted that the calculation of the development charges does not include
any provision for exemptions required under the DCA, for example, the
exemption for enlargements of up to 50 per cent on existing industrial
buildings. Such legislated exemptions, or other exemptions, which Council
may choose to provide, will result in a loss of development charges revenue
for the affected types of development. Any such revenue loss may not be
offset, however, by increasing other portions of the calculated charge.
A.
Development Charges Calculation
A summary of the residential and non-residential development charges for
the Town-wide general services is presented in Table 6. Further details of
the calculation for each individual general service category are available in
Appendix B and C.1.
Development Charges are Calculated in Accordance with the
Development Charges Act | 30
i.
10-Year Services
The capital forecast for Town-wide general services incorporates those
projects identified to be related to development anticipated in the 10-year
planning period. However, not all the capital costs are to be recovered from
new development by way of development charges. Table 6 shows that, of
the $73.5 total municipal cost, $7.6 million relates to replacement of existing
capital facilities, or to shares of projects that provide benefit to the existing
community. These portions of capital costs will require funding from other
non-development charge sources, such as fundraising and property taxes.
An additional share of $8.1 million has been identified as available DC
reserves and represents the revenues collected from previous development
charges. This portion has been netted out of the chargeable capital costs.
Another share of the forecast, $31.2 million, is either attributable to
development beyond the 2033 period (and can therefore be recovered under
future development charges studies) or represents a service level increase
in the Town and could be recovered from other funding sources.
The remaining $26.6 million is carried forward to the development charges
calculation. Of the development-related costs, $26.1 million has been
allocated to new residential development, and $450,400 has been allocated
to new non-residential development. This results in a development charge of
$4,680.34 per capita and $20.49 per square metre of non-residential
development for the provision of general services.
Development Charges are Calculated in Accordance with the
Development Charges Act | 31
10-Year Population Growth in New Units
5,587
10-Year Growth in Square Metres
21,973
Total DC
Service
Net
Replacement
Eligible
Municipal
& Benefit to
Available
Post-2033
Costs for
Cost
Existing
DC Reserves
Benefit
Recovery
($000)
($000)
($000)
($000)
($000)
%
($000)
%
($000)
1.0
PUBLIC LIBRARY
$9,108.0
$731.8
$3,095.6
$2,567.3
$2,713.4
100%
$2,713.4
0%
$0.00
Development Charge Per Capita
$485.66
Development Charge Per Sq.M
$0.00
2.0
FIRE SERVICES
$13,664.0
$3,150.0
$811.9
$5,264.9
$4,437.2
95%
$4,229.0
5%
$208.16
Development Charge Per Capita
$756.94
Development Charge Per Sq.M
$9.47
3.0
POLICE DEPARTMENT
$373.7
$0.0
$35.4
$0.0
$338.4
95%
$322.5
5%
$15.87
Development Charge Per Capita
$57.73
Development Charge Per Sq.M
$0.72
4.0
PARKS AND RECREATION
$35,028.9
$729.5
$3,492.5
$16,521.8
$14,285.1
100%
$14,285.1
0%
$0.00
Development Charge Per Capita
$2,556.85
Development Charge Per Sq.M
$0.00
5.0
BY-LAW ENFORCEMENT
$249.5
$0.0
$0.0
$169.4
$80.1
95%
$76.3
5%
$3.76
Development Charge Per Capita
$13.66
Development Charge Per Sq.M
$0.17
6.0
SOLID WASTE MANAGEMENT
$1,100.0
$360.0
$305.7
$0.0
$434.3
95%
$413.9
5%
$20.37
Development Charge Per Capita
$74.08
Development Charge Per Sq.M
$0.93
7.0
DEVELOPMENT RELATED STUDIES
$1,574.0
$611.6
$0.0
$0.0
$962.4
95%
$917.3
5%
$45.15
Development Charge Per Capita
$164.18
Development Charge Per Sq.M
$2.05
1.0
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
$12,395.0
$2,066.3
$333.9
$6,646.2
$3,348.6
95%
$3,191.5
5%
$157.09
Development Charge Per Capita
$571.24
Development Charge Per Sq.M
$7.15
TOTAL 10-YEAR SERVICES
$73,493.1
$7,649.1
$8,075.0
$31,169.6
$26,599.5
$26,149.1
$450.4
Development Charge Per Capita
$4,680.34
Development Charge Per Sq.M
$20.49
Share
Residential
Share
Non-Residential
TABLE 6
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
10-YEAR CAPITAL PROGRAM FOR GENERAL SERVICES
Development-Related Capital Program (2024 - 2033)
Development Charges are Calculated in Accordance with the
Development Charges Act | 32
ii.
Engineered Services - Roads and Related Services
Table 7 presents the calculated residential and non-residential development
charges for Town-wide roads and related infrastructure projects. The table
shows that, of the total net cost of the Town-wide capital program
estimated to be $198.0 million, $26.6 million is considered to replace
existing infrastructure or to benefit the existing population. The table shows
that local service component shares and current developer agreements total
$29.1 million and $923,180, respectively. A deduction is also made for the
available reserve fund balance of $13.0 million. A share is related to
development of $40.9 million and the remaining $87.6 million is carried
forward to the development charges calculation. Of the development-related
cost, 91%, or $79.6 million, has been allocated to new residential
development and 9%, or $8.0 million, has been allocated to new non-
residential development.
The resulting residential charge per capita for the provision of Town-wide
Roads and Related services is $5,478.84 and the non-residential charge is
$68.57 per square metre of gross floor area.
Development Charges are Calculated in Accordance with the Development Charges Act | 33
Town-wide
Population in New Units Growth
14,533
Employment Growth
1,453
Ultimate Growth in Square Meters
116,095
Total
Total
Local
Benefit
Prior Growth
Post
Net Capital
Improvement
Service
Current
to Existing
(Available
Period
Costs After
Cost
Component
Agreements
Share
DC Reserves)
Benefit
Discounts
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Town-wide Roads Projects
$198,035.28
$29,075.31
$923.18
$26,594.61
$12,952.88
$40,904.57
$87,584.73
90.9%
$79,623.98
9.1%
$7,960.75
Total
$198,035.28
$29,075.31
$923.18
$26,594.61
$12,952.88
$40,904.57
$87,584.73
$79,623.98
$7,960.75
Development Charge Per Capita
$5,478.84
Development Charge Per Square Metre of GFA
$68.57
Development-Related Capital Program
Residential
Non-Residential
Share
Share
TABLE 7
2024 TO BUILD-OUT
ROADS AND RELATED
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
TOWN OF THE BLUE MOUNTAINS
Development Charges are Calculated in Accordance with the
Development Charges Act | 34
iii.
Residential and Non-Residential Area-Specific Development
Charges Rates for Water and Wastewater Services
Keeping with past practices, the Town will continue to calculate and levy
water and wastewater charges on an area-specific basis. There are currently
eleven service areas that levy water and/or wastewater rates on an area-
specific basis.
Table 8 shows that the net municipal cost of the Water Supply and
Treatment is $29.3 million. No grants, subsidies or local services shares are
identified. Approximately $331,060 has been identified as replacement or
non-growth shares and is removed from the DC eligible costs as well as
$58,190 identified to benefit existing residents. The remaining development-
related costs eligible for DC funding, $28.9 million, is allocated 81% to the
residential sector ($23.4 million) and 19% to the non-residential sector ($5.5
million). This yields a development charge of $1,615.01 per capita and
$46.98 per square metre of non-residential development. These charges are
levied uniformly across all serviced residential and non-residential
development in the Town.
It should be noted that the "net costs" shown on each of the service area
capital programs are not entirely recoverable against future development
charges. Unserviced lots that will connect into the water system in the
future will pay a capital connection fee, equivalent to that of the DC water
rate.
Sewage treatment in The Blue Mountains is provided by two plants:
Craigleith Sewage Treatment Plant and Thornbury Sewage Plant. These two
plants are responsible for serving all units in the Town, and together, they
cover all eight service areas. The Craigleith Sewage Treatment Plant
provides services to Craigleith, Castle Glen and Osler, and the Thornbury
Sewage Plant services Camperdown, Swiss Meadows, Lora Bay, Clarksburg,
Thornbury East and Thornbury West.
Development Charges are Calculated in Accordance with the
Development Charges Act | 35
As shown in Table 9, the total cost associated with the Craigleith Sewage
Treatment Plant is $37.2 million, with a benefit to existing share of $94,660
and $31.5 million allocated to post period removed from the in-period
recovery. In total, 91%, or $5.1 million is allocated to the residential sector,
and 9%, or $504,800 is allocated to the non-residential sector. This results in
development charges of $542.06 per capita and $6.67 per square metre.
These rates are charged to development occurring within the three
applicable service areas.
Table 10 illustrates the calculation of the development charges for the
Thornbury Sewage Treatment Plant. Capital projects associated with the
plant total $85.1 million. Removed from the calculation are the benefit to
existing ($15.2 million), positive reserve fund balance ($4.3 million) and a
post-period allocation ($40.4 million) resulting in a development charge
eligible share of $25.2 million. The $25.2 million is allocated 90%, or $22.5
million against new residential development, and 10% or $2.6 million against
non-residential development. This results in development charges of
$4,485.89 per capita and $64.56 per square metre. These rates are charged
to development occurring within the five applicable service areas
(Camperdown, Swiss Meadows, Lora Bay, Clarksburg, Thornbury East and
West).
Full capital program and calculation details regarding area-specific water
and wastewater services can be found in Appendix D.
Development Charges are Calculated in Accordance with the Development Charges Act | 36
Residential Growth - Population in New Units
14,508
Residential - Existing Unserviced Population
1,284
Total Residential
15,792
Employment Growth
1,453
Ultimate Growth in Square Meters
116,095
Flows from Development
m3
%
Residential
7,181
81.1%
Non-Residential
1,672
18.9%
Total
8,853
100%
Total
Water Supply
Replacement/
Benefit
Prior Growth
Post Period
Net Capital
Total
Grants and
Non-Growth
to Existing
(Available
Allocation
Costs After
Cost
Subsidies
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
CRAIGLEITH
Water Supply
$28,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$28,000.00
81.1%
$22,712.73
18.9%
$5,287.27
Water Operations - Capital
$662.12
$0.00
$331.06
$58.19
$0.00
$0.00
$272.86
81.1%
$221.34
18.9%
$51.53
Environmental Assessments
$612.00
$0.00
$0.00
$0.00
$0.00
$0.00
$612.00
81.1%
$496.44
18.9%
$115.57
TOTAL CRAIGLEITH
$29,274.12
$0.00
$331.06
$58.19
$0.00
$0.00
$28,884.87
$23,430.51
$5,454.36
Charge Per Capita
$1,615.01
Charge Per Square Metre of GFA
$46.98
TABLE 8
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER SUPPLY
2024 TO BUILD-OUT
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Development Charges are Calculated in Accordance with the Development Charges Act | 37
Residential Growth - Population in New Units
9,483
Residential - Existing Unserviced Population (reflected in BTE)
1,706
Total Residential
11,189
Employment Growth
947
Ultimate Growth in Square Meters
75,665
Flows from Development
m3
%
Residential
3,082
91.1%
Non-Residential
303
8.9%
Total
3,385
100%
Total
Craigleith Sewage Treatment Plant
Replacement/
Benefit
Prior Growth
Post Period
Net Capital
(Serves: Craigleith, Castle Glen & Osler)
Total
Grants and
Non-Growth
to Existing
(Available
Allocation
Costs After
Cost
Subsidies
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
CRAIGLEITH SEWAGE TREATMENT PLANT
Total Sewage Treatment
$36,627.40
$0.00
$0.00
$0.00
$0.00
$31,479.90
$5,147.49
91.1%
$4,687.20
8.9%
$460.30
Recovery of Negative Reserve
$592.34
$0.00
$0.00
$94.66
$0.00
$0.00
$497.68
91.1%
$453.18
8.9%
$44.50
TOTAL CRAIGLEITH SEWAGE TREATMENT PLANT
$37,219.73
$0.00
$0.00
$94.66
$0.00
$31,479.90
$5,645.18
$5,140.37
$504.80
Charge Per Capita
$542.06
Charge Per Square Metre of GFA
$6.67
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
2024 TO BUILD-OUT
TABLE 9
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
CRAIGLEITH SEWAGE TREATMENT PLANT
Development Charges are Calculated in Accordance with the Development Charges Act | 38
Residential Growth - Population in New Units
5,025
Residential - Existing Unserviced Population (reflected in BTE)
1,911
Total Residential
6,936
Employment Growth
506
Ultimate Growth in Square Meters
40,429
Flows from Development
m3
Residential
1,910
89.6%
Non-Residential
221
10.4%
Total
2,131
Total
Replacement/
Benefit
Prior Growth
Post Period
Net Capital
Total
Grants and
Non-Growth
to Existing
(Available
Allocation
Costs After
Cost
Subsidies
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Total Sewage Treatment
$85,145.38
$0.00
$0.00
$15,245.22
$4,335.92
$40,412.55
$25,151.69
89.6%
$22,541.59
10.4%
$2,610.10
$85,145.38
$0.00
$0.00
$15,245.22
$4,335.92
$40,412.55
$25,151.69
$22,541.59
$2,610.10
Charge Per Capita
$4,485.89
Charge Per Square Metre of GFA
$64.56
(Serves: Camperdown, Swiss Meadows, Lora Bay, Clarksburg,
Thornbury East and West)
Residential
Non-Residential
Share
Share
Development-Related Capital Forecast
TABLE 10
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
THORNBURY SEWAGE TREATMENT PLANT
2024 TO BUILD-OUT
Development Charges are Calculated in Accordance with the
Development Charges Act | 39
B.
Residential and Non-Residential Development Charges
Rates
i.
Town-wide General Services
Table 11 summarizes the residential development charges rates. The
residential rate is $10,159.18 per capita after the cash flow analysis for the
Town-wide uniform charge.
The calculated rates by residential unit type and shown with the total Town-
wide charge per unit ranging from a high of $22,639 for a single or semi-
detached unit to a low of $15,237 for an apartment.
TABLE 11
TOWN OF THE BLUE MOUNTAINS
TOWN-WIDE DEVELOPMENT CHARGES
RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE
Service
Charge
Per Capita
Public Library
$485.66
$1,082
$971
$728
Fire Services
$756.94
$1,687
$1,514
$1,135
Police Department
$57.73
$129
$115
$87
Parks And Recreation
$2,556.85
$5,698
$5,114
$3,835
By-Law Enforcement
$13.66
$30
$27
$20
Solid Waste Management
$74.08
$165
$148
$111
Development Related Studies
$164.18
$366
$328
$246
Services Related To A Highway: Public Works
$571.24
$1,273
$1,142
$857
Services Related To A Highway: Roads & Related
$5,478.84
$12,209
$10,958
$8,218
Total Uniform Charge
$10,159.18
$22,639
$20,317
$15,237
(1) Based on PPU of:
2.23
2.00
1.50
Residential Charge By Unit Type (1)
Single & Semi-
Detached
Other Multiples
Apartments
Development Charges are Calculated in Accordance with the
Development Charges Act | 40
The non-residential Town-wide uniform charge displayed on Table 12 is
$89.06 for general and Roads and Related services.
ii.
Water and Wastewater Services
The residential and non-residential charges by service area for water
services are presented in Table 13. On a per capita basis, the water charge
ranges from a low of $3,128 in Thornbury East to a high of $18,014 in Osler.
The non-residential charge is calculated and levied on a per square metre of
GFA basis by service area. The charge for water service ranges from $65.14
in Thornbury East to $326.28 per square metre in Osler.
TABLE 12
TOWN OF THE BLUE MOUNTAINS
TOWN-WIDE DEVELOPMENT CHARGES
NON-RESIDENTIAL DEVELOPMENT CHARGES PER SQUARE METRE
Non-Res
Service
Public Library
$0.00
Fire Services
$9.47
Police Department
$0.72
Parks And Recreation
$0.00
By-Law Enforcement
$0.17
Solid Waste Management
$0.93
Development Related Studies
$2.05
Services Related To A Highway: Public Works
$7.15
Services Related To A Highway: Roads & Related
$68.57
Total Uniform Charge
$89.06
Charge Per
Square Metre
Development Charges are Calculated in Accordance with the
Development Charges Act | 41
The residential and non-residential charges by service area for wastewater
services are presented in Table 14. On a per capita basis, the wastewater
charge ranges from a low of $1,931 in Craigleith to a high of $18,898 in
Camperdown. The non-residential charge ranges from $24.99 in Craigleith to
$361.29 per square metre in Clarksburg.
TABLE 13
TOWN OF THE BLUE MOUNTAINS
AREA-SPECIFIC DEVELOPMENT CHARGES
RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE
WATER SERVICES
Water Service Area
Craigleith
$5,154
$11,485
$10,308
$7,731
$84.23
Castle Glen
$9,967
$22,210
$19,934
$14,950
$202.41
Osler
$18,014
$40,141
$36,027
$27,020
$326.28
Thornbury East
$3,128
$6,970
$6,256
$4,692
$65.14
Thornbury West
$11,891
$26,498
$23,782
$17,837
$199.71
Clarksburg
$9,395
$20,935
$18,789
$14,092
$267.83
Lora Bay - SA1
$6,903
$15,383
$13,807
$10,355
$118.77
Lora Bay - SA2
$5,624
$12,533
$11,249
$8,436
$95.53
Lora Bay - SA3
$5,624
$12,533
$11,249
$8,436
$95.53
Camperdown
N/A
$19,132
$18,763
$17,956
$151.84
Swiss Meadows
$0
$0
$0
$0
$0.00
(1) Based on PPU of:
2.23
2.00
1.50
Charge per
Capita
Single & Semi-
Detached
Rows and Other
Multiples
Apartments
Non-
Residential
Charge per
Square Metre
Residential Charge By Unit Type (1)
TABLE 14
TOWN OF THE BLUE MOUNTAINS
AREA-SPECIFIC DEVELOPMENT CHARGES
RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE
WASTEWATER SERVICES
Wastewater Service Area
Craigleith
$1,931
$4,304
$3,863
$2,897
$24.99
Castle Glen
$2,570
$5,728
$5,141
$3,855
$44.42
Osler
$17,233
$38,403
$34,467
$25,850
$290.96
Thornbury East
$5,617
$12,516
$11,234
$8,425
$79.62
Thornbury West
$10,403
$23,182
$20,806
$15,605
$161.27
Clarksburg
$13,514
$30,114
$27,028
$20,271
$361.29
Lora Bay - SA1
$7,048
$15,705
$14,095
$10,571
$99.63
Lora Bay - SA2
$5,413
$12,062
$10,826
$8,119
$125.21
Lora Bay - SA3
$5,450
$12,144
$10,899
$8,175
$96.23
Camperdown
$18,898
$24,408
$23,384
$21,141
$155.93
Swiss Meadows
$0
$0
$0
$0
$0.00
(1) Based on PPU of:
2.23
2.00
1.50
Non-
Residential
Charge per
Square Metre
Single & Semi-
Detached
Charge per
Capita
Residential Charge By Unit Type (1)
Rows and Other
Multiples
Apartments
Development Charges are Calculated in Accordance with the
Development Charges Act | 42
iii.
All Services
The total charges by service area are displayed in Table 15. The charges
include the Town-wide uniform charge for General and Roads and Related
Services of $10,159 per capita, and the Water and Wastewater charges by
service area. The total charges range from $10,159 in Swiss Meadows (an
area that does not receive Water or Wastewater servicing) to $45,406 per
capita in Osler. Table 15 also displays the non-residential charges per
square metre. This charge rages from $89.06 to $718.18 per square metre in
Swiss Meadows and Clarksburg, respectively.
C.
Comparison of Newly Calculated Development Charges
with Charges Currently In-Force in The Blue Mountains
Tables 16 and 17 present a comparison of the newly calculated Town-wide
development charges with currently imposed development charge rates. It
demonstrates that the residential development charge rate for a single or
semi-detached unit decreases by $1,408 per unit, or -5.9%, when compared
to the Townʼs current rate for single and semi-detached units. The
calculated non-residential charge for general Town-wide services of $89.06
is an increase of $8.67 from the current charge of $80.39. This represents a
10.8% increase.
TABLE 15
TOWN OF THE BLUE MOUNTAINS
AREA-SPECIFIC DEVELOPMENT CHARGES
RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE
ALL SERVICES
Total Charges
Craigleith
$17,244
$38,427
$34,489
$25,867
$198.28
Castle Glen
$22,697
$50,577
$45,393
$34,045
$335.89
Osler
$45,406
$101,183
$90,812
$68,109
$706.30
Thornbury East
$18,904
$42,125
$37,808
$28,356
$233.82
Thornbury West
$32,454
$72,319
$64,907
$48,680
$450.04
Clarksburg
$33,068
$73,688
$66,135
$49,601
$718.18
Lora Bay - SA1
$24,110
$53,727
$48,220
$36,165
$307.46
Lora Bay - SA2
$21,196
$47,234
$42,393
$31,795
$309.80
Lora Bay - SA3
$21,233
$47,316
$42,466
$31,850
$280.82
Camperdown
$29,057
$66,179
$62,464
$54,334
$396.83
Swiss Meadows
$10,159
$22,639
$20,317
$15,237
$89.06
(1) Based on PPU of:
2.23
2.00
1.50
Non-
Residential
Charge per
Square Metre
Single & Semi-
Detached
Residential Charge By Unit Type (1)
Rows and Other
Multiples
Apartments
Charge per
Capita
Development Charges are Calculated in Accordance with the
Development Charges Act | 43
TABLE 16
TOWN OF THE BLUE MOUNTAINS
COMPARISON OF CURRENT AND CALCULATED
RESIDENTIAL DEVELOPMENT CHARGES
Current
Service
Residential
Charge / Res B
Public Library
$1,734
$1,082
-$652
-37.6%
Fire Services
$605
$1,687
$1,082
178.8%
Police Department
$183
$129
-$54
-29.5%
Parks And Recreation
$4,050
$5,698
$1,648
40.7%
By-Law Enforcement
$54
$30
-$24
-44.4%
Solid Waste Management
$282
$165
-$117
-41.5%
Development Related Studies
$558
$366
-$192
-34.4%
Services Related To A Highway: Public Works
$1,459
$1,273
-$186
-12.7%
Services Related To A Highway: Roads & Related
$15,122
$12,209
-$2,913
-19.3%
Total Uniform Charge
$24,047
$22,639
-$1,408
-5.9%
Reflects rates as of January 1, 2024
Difference in Charge
Calculated
Single & Semi-
Detached
TABLE 17
TOWN OF THE BLUE MOUNTAINS
COMPARISON OF CURRENT AND CALCULATED
NON-RESIDENTIAL DEVELOPMENT CHARGES
Current
Calculated
Service
Non-Residential
Non-Residential
Charge
Charge
Public Library
$0.00
$0.00
$0.00
0.0%
Fire Services
$4.57
$9.47
$4.90
107.2%
Police Department
$1.38
$0.72
-$0.66
-47.8%
Parks And Recreation
$0.00
$0.00
$0.00
0.0%
By-Law Enforcement
$0.40
$0.17
-$0.23
N/A
Solid Waste Management
$2.15
$0.93
-$1.22
N/A
Development Related Studies
$4.22
$2.05
-$2.17
-51.4%
Services Related To A Highway: Public Works
$11.06
$7.15
-$3.91
-35.4%
Services Related To A Highway: Roads & Related
$56.61
$68.57
$11.96
21.1%
Total Uniform Charge
$80.39
$89.06
$8.67
10.8%
Reflects rates as of January 1, 2024
Difference in Charge
Non-Residential ($/Square Metre)
Development Charges are Calculated in Accordance with the
Development Charges Act | 44
When comparing the total charges (including Water and Wastewater) as
shown in Tables 18 and 19, Craigleith, Castle Glen, Thornbury West, Lora
Bay SA1 and Swiss Meadows residential rates declined, with the remaining
rates increasing as well as all non-residential rates increasing. The changes
in the rates relate to the remaining development of the area as well as the
nature of the capital projects.
Current
Service Area
Single & Semi-
Detached
Craigleith
$39,462
$38,427
-$1,035
-2.6%
Castle Glen
$51,753
$50,577
-$1,176
-2.3%
Osler
$86,934
$101,183
$14,249
16.4%
Thornbury East
$41,872
$42,125
$253
0.6%
Thornbury West
$73,583
$72,319
-$1,264
-1.7%
Clarksburg
$65,828
$73,688
$7,860
11.9%
Lora Bay - SA1
$63,316
$53,727
-$9,589
-15.1%
Lora Bay - SA2
$45,087
$47,234
$2,147
4.8%
Lora Bay - SA3
$44,514
$47,316
$2,802
6.3%
Camperdown
$46,525
$66,179
$19,654
42.2%
Swiss Meadows
$24,047
$22,639
-$1,408
-5.9%
Reflects rates as of January 1, 2024
Calculated
Single & Semi-
Detached
Difference in Charge
Residential ($/ Unit)
TOWN OF THE BLUE MOUNTAINS
COMPARISON OF CURRENT AND CALCULATED
TOTAL RESIDENTIAL DEVELOPMENT CHARGES
TABLE 18
Development Charges are Calculated in Accordance with the
Development Charges Act | 45
Current
Calculated
Service Area
Non-Residential
Non-Residential
Charge
Charge
Craigleith
$150.19
$198.28
$48.09
32.0%
Castle Glen
$214.73
$335.89
$121.16
56.4%
Osler
$614.21
$706.30
$92.09
15.0%
Thornbury East
$166.52
$233.82
$67.30
40.4%
Thornbury West
$308.13
$450.04
$141.91
46.1%
Clarksburg
$416.76
$718.18
$301.42
72.3%
Lora Bay - SA1
$253.98
$307.46
$53.48
21.1%
Lora Bay - SA2
$225.36
$309.80
$84.44
37.5%
Lora Bay - SA3
$190.03
$280.82
$90.79
47.8%
Camperdown
$245.52
$396.83
$151.31
61.6%
Swiss Meadows
$80.39
$89.06
$8.67
10.8%
Reflects rates as of January 1, 2024
Difference in Charge
Non-Residential ($/Square Metre)
TOWN OF THE BLUE MOUNTAINS
COMPARISON OF CURRENT AND CALCULATED
TOTAL NON-RESIDENTIAL DEVELOPMENT CHARGES
TABLE 19
Cost of Growth Analysis | 46
7. Cost of Growth Analysis
This section provides a brief examination of the long-term capital and
operating costs as well as the asset management-related annual provisions
for the capital facilities and infrastructure to be included in the DC By-law.
This examination is required as one of the provisions of the DCA. The
analysis for all other services is included in Appendix F.
A.
Asset Management Plan
The DCA requires that municipalities complete an Asset Management Plan
before the passing of a development charges by-law. A key function of the
Asset Management Plan is to demonstrate that all assets proposed to be
funded under the development charges by-law are financially sustainable
over their full life cycle. Further details relating to the Asset Management
Plan are discussed in Appendix F.
i.
Annual Capital Provisions for Tax and Rate Supported Assets
Table 20 summarizes the annual capital provisions required to replace the
development eligible and ineligible costs associated with the capital
infrastructure identified in the DC Background Study. The estimate is based on
information obtained through discussions with municipal staff regarding useful
life assumptions and the capital cost of acquiring and/or emplacing each asset.
Table 20 illustrates that, by 2034, the Town will need to fund an additional
$1.3 million per annum to properly fund the full life cycle costs of the new
Town-wide general assets supported under the proposed Development
Charges By-law. In contrast, for engineered services which have a longer
benefiting period to build-out, the calculated annual provision for DC the
assets supported under the proposed Development Charges By-law is $3.5
million and $4.1 million for Roads and Related and Water and Wastewater
assets, respectively.
Cost of Growth Analysis | 47
B.
Future Revenue Growth
The calculated annual funding provision should be considered within the
context of the Townʼs projected growth. Over the next 10 years (to 2033) the
Town is projected to increase by approximately 3,050 households, which
Cost of Growth Analysis | 48
represents a 39% increase over the existing base. Over the longer-term
planning horizon to build-out, the Town will add approximately 7,390
households. In addition, the Town will also add roughly 275 new employees
that will result in approximately 21,973 square metres of additional non-
residential building space. Over the longer planning period to build-out the
Town will add an additional 1,453 employees that will be accommodated in
116,095 square metres of new non-residential building space.
This growth will have the effect of increasing the overall assessment base
and additional user fee and charges revenues to offset the capital asset
provisions required to replace the infrastructure proposed to be funded
under the Development Charges By-law.
i.
Assets Are Deemed to be Financially Sustainable
It is anticipated that new assets identified through the 2024 DC Background
Study process will be incorporated into the Townʼs ongoing asset
management plan analyses.
The calculated annual provisions identified are considered to be financially
sustainable as it is expected that the increased capital asset management
requirements can be absorbed by the tax and user base over the long-term.
C.
Net Operating Costs for the Townʼs Services to Increase
over the Forecast Period
Table 21 summarizes the estimated increase in net operating costs that the
Town will experience for additions associated with the planned capital
program. The estimated changes in net operating costs are based on the
financial information from the Town (additional details are included in
Appendix F).
Cost of Growth Analysis | 49
As shown in Table 21, by 2033 the Townʼs net operating costs are estimated
to increase by about $7.3 million. The most significant portion of this
increase relates to Parks and Recreation as well as Roads and Related
service.
TABLE 21
TOWN OF THE BLUE MOUNTAINS
ESTIMATED NET OPERATING COST OF THE PROPOSED
DEVELOPMENT-RELATED CAPITAL PROGRAM
TAX SUPPORTED ASSETS
Cost Driver
Category
(in 2024$)
$
unit meaure
Quantity
Public Library
$1,000,000.0
- Additional library space (10,000 sq.ft)
$100 per sq.ft. added
10,000
$1,000,000.0
Fire Services
$360,000.0
- Additional fire hall space (4,000 sq.ft.)
$90 per sq.ft. added
4,000
$360,000.0
Police Department
$0.0
- Recovery of OPP Detachment Debt
N/A
$0.0
Parks and Recreation
$4,477,708.4
- Additional indoor recreation space
$23 per sq.ft. of new rec. space
190,476
$4,380,952
- New parkland devleopment and facilities
$22 per $1,000 of new infrastructure
$4,398
$96,756
By-Law Enforcement
$12,475.4
- Parking Lots and Vehicles and Equipment
$0.05 per $1.00 of new infrastructure
$249,509
$12,475.4
Solid Waste Management
$305,020.0
- Development-related waste management services
$100.00 per household
3,050
$305,020.0
Development Related Studies
$0.0
- Development-related studies
N/A
$0.0
Services Related To A Highway: Public Works
$247,900.0
- Buildings, Land and Fleet
$20 per $1,000 of new infrastructure
$12,395
$247,900
Services Related To A Highway: Roads & Related
$915,060.0
- Development-Related Roads Infrastructure
$300 per household
3,050
$915,060.0
TOTAL ESTIMATED OPERATING COSTS
$7,318,163.8
(in constant 2024 dollars)
Additional
Operating Costs at
2033
Cost of Growth Analysis | 50
D.
Long-Term Capital Financing from Non-Development
Charges Sources
Table 22 also summarizes the components of the development-related
capital forecast that will require funding from non-development charges
sources. Of the $73.5 million net capital forecast, about $5.6 million will
need to be financed from non-development charges sources over the next
10 years. In addition, $24.5 million relates to general service level increases
and to development in the post-2033 period. It is likely that most of these
monies could be recovered from future development charges.
Table 23 summarizes the engineering services development-related costs.
The total net municipal Town-wide and area-specific cost amounts to
$578.1 million with $335.0 million being recovered from the 2024 to build-out
horizon. Removed from the net municipal costs are grants and other
subsidies ($30.0 million), benefit to existing shares ($49.5 million) and a
post-build-out benefit of $128.3 million. Also removed from the cost is the
positive reserve fund balance of $15.3 million.
TABLE 22
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF TAX SUPPORTED FUNDING REQUIREMENTS
Total DC
Service
Net
Replacement
Eligible
Municipal
& Benefit to
Available
Post-2033
Costs for
Cost
Existing
DC Reserves
Benefit
Recovery
($000)
($000)
($000)
($000)
($000)
1.0
PUBLIC LIBRARY
$9,108.0
$731.8
$3,095.6
$2,567.3
$2,713.4
2.0
FIRE SERVICES
$13,664.0
$3,150.0
$811.9
$5,264.9
$4,437.2
3.0
POLICE DEPARTMENT
$373.7
$0.0
$35.4
$0.0
$338.4
4.0
PARKS AND RECREATION
$35,028.9
$729.5
$3,492.5
$16,521.8
$14,285.1
5.0
BY-LAW ENFORCEMENT
$249.5
$0.0
$0.0
$169.4
$80.1
6.0
SOLID WASTE MANAGEMENT
$1,100.0
$360.0
$305.7
$0.0
$434.3
7.0
DEVELOPMENT RELATED STUDIES
$1,574.0
$611.6
$0.0
$0.0
$962.4
1.0
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
$12,395.0
$2,066.3
$333.9
$6,646.2
$3,348.6
TOTAL 10-YEAR SERVICES
$73,493.1
$5,582.8
$7,741.1
$24,523.4
$23,250.8
Notes: (1) For total development-related capital program see Appendix B.
(2) Share of capital program to be funded from development charges if calculated rates are fully implemented
(3) Portion of development-related capital program identified as available DC reserves (to be funded from present Development Charge reserve fund balances).
(4) Post 2033 development-related net capital costs may be eligible for development charges in future DC by-laws, but interim financing of this share may be required
Development-Related Capital Program (2024 - 2033)
Cost of Growth Analysis | 51
TABLE 23
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF TAX SUPPORTED FUNDING REQUIREMENTS
ENGINEERING SERVICES
Total
Service
Benefit
Benefit
Prior Growth
Post-
Net Capital
Total
Grants and
to Other
to Existing
(Available
Period
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Benefit
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
Roads and Related
$198,035.3
$29,998.5
$0.0
$26,594.6
$12,952.9
$40,904.6
$87,584.7
Water Supply and Treatment
$29,274.1
$0.0
$331.1
$58.2
$0.0
$0.0
$28,884.9
Craigleith Sewage Treatment Plant
$37,219.7
$0.0
$0.0
$94.7
$0.0
$31,479.9
$5,645.2
Thornbury Sewage Treatment Plant
$85,145.4
$0.0
$0.0
$15,245.2
$4,335.9
$40,412.6
$25,151.7
Total Town-Wide Engineered Services
$349,674.5
$29,998.5
$331.1
$41,992.7
$17,288.8
$112,797.0
$147,266.5
Service Area Specific (Water & Sewer)
Craigleith
$48,883.8
$0.0
$13,754.7
$0.0
$5,770.0
$0.0
$29,359.1
Water
$35,276.5
$0.0
$10,017.7
$0.0
$5,579.5
$0.0
$19,679.3
Sewer
$13,607.3
$0.0
$3,737.0
$0.0
$190.5
$0.0
$9,679.8
Castle Glen
$53,213.7
$0.0
$178.2
$0.0
($287.5)
$0.0
$53,323.1
Water
$42,995.8
$0.0
$91.9
$0.0
$0.0
$0.0
$42,903.9
Sewer
$10,217.9
$0.0
$86.3
$0.0
($287.5)
$0.0
$10,419.2
Osler
$6,923.0
$0.0
$0.0
$0.0
($282.0)
$0.0
$7,205.0
Water
$3,574.7
$0.0
$0.0
$0.0
$4.0
$0.0
$3,570.6
Sewer
$3,348.4
$0.0
$0.0
$0.0
($286.0)
$0.0
$3,634.4
Thornbury East
$5,230.4
$0.0
$4,794.9
$0.0
($440.7)
$0.0
$876.2
Water
$779.0
$0.0
$634.9
$0.0
($334.9)
$0.0
$479.0
Sewer
$4,451.4
$0.0
$4,160.0
$0.0
($105.8)
$0.0
$397.2
Thornbury West
$37,168.4
$0.0
$926.9
$0.0
($6,575.0)
$13,653.1
$29,163.5
Water
$22,162.7
$0.0
$0.0
$0.0
($3,024.0)
$7,329.6
$17,857.0
Sewer
$15,005.7
$0.0
$926.9
$0.0
($3,551.1)
$6,323.4
$11,306.5
Clarksburg
$17,231.6
$0.0
$0.0
$0.0
($512.7)
$0.0
$17,744.3
Water
$7,606.5
$0.0
$0.0
$0.0
$35.1
$0.0
$7,571.4
Sewer
$9,625.1
$0.0
$0.0
$0.0
($547.9)
$0.0
$10,173.0
Lora Bay SA1
$22,308.9
$0.0
$0.0
$2,599.2
($298.6)
$1,857.9
$18,150.4
Water
$13,701.9
$0.0
$0.0
$772.0
($456.8)
$1,193.1
$12,193.7
Sewer
$8,606.9
$0.0
$0.0
$1,827.2
$158.2
$664.8
$5,956.7
Lora Bay SA2
$204.9
$0.0
$0.0
$0.0
($3.4)
$0.0
$208.3
Water
$87.5
$0.0
$0.0
$0.0
($5.1)
$0.0
$92.6
Sewer
$117.4
$0.0
$0.0
$0.0
$1.8
$0.0
$115.7
Lora Bay SA3
$662.6
$0.0
$0.0
$0.0
($14.8)
$0.0
$677.5
Water
$387.3
$0.0
$0.0
$0.0
($22.7)
$0.0
$410.0
Sewer
$275.3
$0.0
$0.0
$0.0
$7.9
$0.0
$267.4
Camperdown
$36,580.2
$0.0
$0.0
$4,867.1
$668.4
$0.0
$31,044.6
Water
$18,152.4
$0.0
$0.0
$1,537.8
$25.5
$0.0
$16,589.1
Sewer
$18,427.8
$0.0
$0.0
$3,329.4
$642.9
$0.0
$14,455.5
Total Area Specific Engineered Services
$228,407.6
$0.0
$19,654.6
$7,466.3
($1,976.3)
$15,511.0
$187,752.0
TOTAL ROADS, WATER AND SEWER
$578,082.1
$29,998.5
$19,985.7
$49,459.0
$15,312.5
$128,308.0
$335,018.5
Development-Related Capital Forecast
Development Charges Administration | 52
8. Development Charges Administration
A.
Development Chagres Recommendations
Some changes are recommended to the Townʼs current development charge
calculation. Through discussions with staff, and considering the
requirements of the DCA, the following recommendations were made:
-
That present practices regarding collection of DCs and by-law
administration continue to the extent possible, having regard to any
requirements of the DCA;
-
That under the DCA, the Town should codify any rules regarding
application of the by-laws and exemptions within the DC by-laws
proposed for adoption;
-
That Council adopt the development-related capital forecasts, and the
increase in the need for services attributable to the anticipated
development, as included in the 2024 DC Background Study, subject to
annual review through the Townʼs normal capital budget process.
-
That Council confirms its intention to fund the adopted capital forecast
to ensure that the increase in need for service will be met.
-
That Council determine that the future excess capacity identified in the
DC Background Study shall be paid for by the development charges
contemplated in the said DC Background Study, or other similar charges.
-
That Council has given consideration of the use of more than one
development charge by-law to reflect different needs for services in
different areas, also known as area rating or area-specific DCs. Both
Town-wide and area-specific rates are proposed.
Development Charges Administration | 53
-
That Council has determined that for the services, and associated
infrastructure proposed to be funded by DCs under the DC by-law, that
the charges be calculated on a Town-wide and area-specific basis.
-
That Council approve the Cost of Growth analysis, including the Asset
Management Plan, that deals with all assets whose capital costs are
intended to be funded under the development charge by-law and that
such assets are considered to be financially sustainable over their full
life-cycle.
Appendix A
Development Forecast
Appendix A | 54
Appendix A - Development Forecast
This appendix provides the details of the development forecast used to
prepare the 2024 Development Charges Background Study for the Town of
The Blue Mountains. The forecast method and key assumptions are
discussed and the results of the forecasts are presented in the following
series of tables:
Town-Wide Development Forecast
A.1
Historical Population
A.2
Historical Occupied Dwellings
A.3
Historical Employment Summary
A.4
Historical Annual Residential Building Permits
A.5
Historical Households by Period of Construction Showing Household Size
A.6
Forecast Population & Household Growth Summary
A.7
Forecast Employment Growth Summary
A.8
Growth in Households by Unit Type
A.9
Forecast Population in New Households by Unit Type
A.10
Non-Residential Space Forecast
Area-Specific Development Forecast
A.11 Forecast Area-Specific Residential Dwelling Units
A.12
Forecast Area-Specific Population in New Dwelling Units
A.13 Forecast Non-Residential Area-Specific Employment and Gross Floor
Area
The forecasts of population, households and employment prepared for the
purposes of the Townʼs 2024 DC Background Study have been informed by
the forecasts prepared for Grey Countyʼs Growth Management Strategy and
updated to reflect the most current available development information as
provided by Town staff. The residential forecasts are somewhat higher than
those contained in the Countyʼs updated Official Plan but remain lower than
Appendix A | 55
the number of known units associated with active development applications
in the Town. The adjustments account for potential fluctuations in
anticipated development that may occur over the five-year life of the DC By-
law. It is proposed that the rate of development in the Town continue to be
monitored and adjusted in subsequent DC study updates.
A.
Historical Development in the Town
Historical growth presented in this appendix are based on available data
sets from Statistics Canada and the Townʼs historical building permit data.
An adjusted population, which accounts for both Census and seasonal
population, is used for the purposes of the development charges study. For
development charges purposes, a 15-year historical period of 2009 to 2023
is used for calculating service levels.
Tables A.1 and A.2 demonstrate that the Town has experienced steady
population and dwelling unit growth over the historical 15-year planning
period of 2009 to 2023. Since 2008, the Town has increased from 6,541 total
private dwelling units (includes dwelling occupied by permanent residents
as well as dwellings not occupied by usual residents) to a total of an
estimated 9,102 private dwelling units in 2023, a 39% increase. Similarly, the
population in the Town, adjusted for seasonal population, has increased
from 14,040 persons in 2008 to 17,931, an increase of 28%.
Table A.3 shows the historical rate of employment growth in the Town. Since
2008 the Town has seen an increase from 3,341 employees in 2008 to 4,891
employees in 2023, an increase of 46%. Over this period, the activity rate
(proportion) of employees in the Town to census population has been
declining which is anticipated to continue.
Appendix A | 56
B.
Forecast Approach and Key Assumptions
The Development Charges Act (DCA) requires the Town to estimate "the
anticipated amount, type and location of development" for which development
charges may be imposed. The development forecast must cover both
residential and non-residential development and be specific enough with
regards to quantum, type, location, and timing of development to allow the
Town to prepare a reasonable development-related capital program.
The forecast for the purposes of the Townʼs 2024 DC Background Study is
informed by the assumptions and target established in Grey Countyʼs
Growth Management Strategy and updated to reflect available Census data
and known development applications. The residential forecast includes
estimates of dwelling units not occupied by usual residents (this includes
both seasonal dwellings and hotel units). As in previous by-laws, hotel units
or commercial resort units are treated as residential uses and are therefore
captured in the residential forecast. In particular, the forecast also estimates
permanent residential dwelling units (e.g. single and semi-detached, rows
and apartments) for residents that reside permanently in the Town.
Development charges are levied on residential development as a charge per
dwelling unit. Therefore, for the residential forecast, a projection of both the
population growth as well as the population in new housing is required.
-
The population growth determines the need for additional facilities
and provides the foundation for the development-related capital
program.
-
When calculating the development charge, however, the
development-related net capital costs are spread over the total
additional population that occupies new dwelling units. This
population in new units represents the population from which
development charges will be collected.
Appendix A | 57
Development charges are levied on non-residential development as a charge
per unit of gross floor area (GFA). The non-residential forecast includes
both a projection of employment growth as well as a projection of the floor
space associated with employment growth in the Town.
C.
Town-Wide Forecast Results
A Town-wide development forecast has been prepared for the future 10-
year planning period of 2024 to 2033 and to build-out. The forecast includes
estimates related to Census and seasonal population as well as occupied
dwellings and dwellings not occupied by usual residents (inclusive of
seasonal dwelling units).
i.
Residential Development Forecast
As shown in Table A.6, by 2033, it is estimated that the Town will reach an
adjusted population (including both Census and seasonal population) of
21,909 persons. This represents a growth of 3,978 persons in the ten-year
horizon from the current population of 17,931 in 2023. From 2024 to 2033, the
total number of private dwellings are anticipated to increase by a total of
1,913 additional units.
A summary of the anticipated housing growth by unit type is shown in Table
A.8. The forecast shows that the residential occupied dwelling units in the
Town will continue to be dominated by ground-related units including single
and semi-detached (34%) and row units (16 %). The higher-density built-
forms will account for 13%. The forecast also includes an estimate of
dwellings not occupied by usual residents, which will largely be ground-
related dwelling units, as well as hotel units. The hotel unit forecast
assumes that three hotels with 1,137 units will be constructed over the next
10-years.
Appendix A | 58
Table A.9 shows the forecast population that will reside in the total private
new dwelling units. The population in these units is estimated by applying
the following person per unit (PPU) factors:
-
Single and Semi-Detached
= 2.23
-
Rows and Other Multiples
= 2.00
-
Apartments and Non-Permanent Units
= 1.50
PPU factors are based on Census 2021 data as presented in Table A.5 as well
as a variety of sources were used to inform, and consideration was given to
the available data. Due to small sample sizes for Rows and Apartment unit
types, the relationship between the occupancy patterns of the unit types was
largely maintained from the 2019 DC Study and have been rounded.
Based on these factors, the forecast of population expected to reside in new
housing units over the 2024 to 2033 period is 5,587 additional persons.
ii.
Non-Residential Development Forecast
Non-residential development charges are calculated on a per square metre
of gross floor area (GFA) basis. Therefore, as per the DCA, a forecast of
non-residential building space has been developed.
Table A.10 summarizes the non-residential forecast of employment growth.
This results in an anticipated increase of 275 employees between 2024 and
2033. The forecast number of employees, multiplied by the employment
density assumption of 80 square metres per employee, is used to forecast
the additional gross floor area of space from 2024 to 2033. In total, the Town
is forecast to add 21,973 square metres of additional non-residential floor
space to 2033.
Appendix A | 59
D.
Area-Specific Forecast Results
The Town has identified several servicing areas for the purposes of
calculating area-specific Water and Wastewater development charges. As a
result, area-specific residential and non-residential forecasts have been
prepared for the following areas:
-
Craigleith
-
Camperdown
-
Castle Glenn
-
Swiss Meadows
-
Lora Bay
-
Clarksburg
-
Osler
-
Thornbury East
-
Thornbury West
-
Rural
The anticipated development in the defined servicing areas is based on the
build-out potential identified in the 2014 DC Background Study, updated for
the 2019 DC Background Study, and adjusted for completed building
permits.
i.
Area-Specific Residential Development Forecast
Table A.11 provides a summary of the area-specific unit forecast over the
10-year (2024-2033) and longer-term planning period (build-out). Over the
10-year and longer-term planning periods, the majority of the unit growth is
anticipated to occur in the Craigleith servicing area. Craigleith will account
for 67% of unit growth over the 10-year planning period and 39% of the total
growth to build-out. Although the 10-year planning period has only about
10% of growth anticipated in Castle Glen, to build-out nearly 27% is
anticipated. As Craigleith and Castle Glen develop, other servicing areas
including Camperdown, and Lora Bay will account for the majority of the
residential unit growth in the Town over the longer-term planning period.
Appendix A | 60
Table A.12 shows the forecast population that will residue in new dwelling
units. The PPU factors applied to each of the dwelling units is consistent
with the Town-wide forecast, and as such, the forecast population expected
to reside in new housing units over the 2024 to 2033 period is 5,575 persons,
generally consistent with the Town-wide estimate. Over the longer planning
period to build-out, the forecast population of new housing units is 14,533
persons.
ii.
Area-Specific Non-Residential Development Forecast
Table A.13 provides a summary of the area-specific non-residential
development forecast. Consistent with the residential forecast, much of the
non-residential employment growth (41 per cent) is anticipated to occur
within the Craigleith servicing area over the 10-year planning period.
Craigleith is forecast to maintain 41 per cent of employment growth over the
longer planning period to build-out. The remaining employment growth to
build-out will occur in Castle Glen (22 per cent) and Lora Bay (14 per cent)
with some minor allocations to Thornbury West (9 per cent), Camperdown (7
per cent), Clarksburg (3 per cent), Osler (2 per cent) and Thornbury East (2
per cent).
Over the 10-year planning period the servicing areas will add an additional
275 employees (which will occupy 21,973 square metres of non-residential
space) consistent with the Town-wide forecast and 1,453 employees over
the longer planning period to build-out (which will occupy 116,095 square
metres of non-residential space).
Appendix A | 61
APPENDIX A - TABLE A.1
TOWN OF THE BLUE MOUNTAINS
HISTORICAL POPULATION
Census
Annual
Seasonal
Annual
Adjusted
Annual
Mid-Year
Population
Growth
Population
Growth
Population
Growth
2006
6,830
6,710
13,540
2007
6,752
-78
7,035
325
13,787
247
2008
6,675
-77
7,365
330
14,040
253
2009
6,599
-76
7,700
335
14,299
259
2010
6,524
-75
8,040
340
14,564
265
2011
6,450
-74
8,388
348
14,838
274
2012
6,561
111
8,320
-68
14,881
44
2013
6,674
113
8,250
-70
14,924
43
2014
6,789
115
8,175
-75
14,964
40
2015
6,906
117
8,095
-80
15,001
37
2016
7,025
119
8,015
-80
15,040
39
2017
7,445
420
7,970
-45
15,415
375
2018
7,890
445
7,910
-60
15,800
385
2019
8,361
471
7,833
-78
16,194
394
2020
8,861
500
7,738
-95
16,599
405
2021
9,390
529
7,620
-118
17,010
412
2022
9,851
461
7,620
0
17,471
461
2023
10,311
460
7,620
0
17,931
460
Growth 2009-2023
3,636
255
3,891
Source: Statistics Canada, Census of Canada, Grey County GMS update 2022
Appendix A | 62
APPENDIX A - TABLE A.2
TOWN OF THE BLUE MOUNTAINS
HISTORICAL OCCUPIED DWELLINGS
Annual
Av. Household
Annual
Av. Household
Annual
Av. Household
Mid-Year
Growth
Size (PPU)
Growth
Size (PPU)
Growth
Size (PPU)
2006
2,935
2.33
2,684
2.50
5,619
6,062
2.23
2007
2,917
-18
2.31
2,814
130
2.50
5,731
6,254
192
2.20
2008
2,899
-18
2.30
2,946
132
2.50
5,845
6,541
287
2.15
2009
2,881
-18
2.29
3,080
134
2.50
5,961
6,631
90
2.16
2010
2,863
-18
2.28
3,216
136
2.50
6,079
6,730
99
2.16
2011
2,845
-18
2.27
3,355
139
2.50
6,200
6,987
257
2.12
2012
2,926
81
2.24
3,328
-27
2.50
6,254
7,156
169
2.08
2013
3,009
83
2.22
3,300
-28
2.50
6,309
7,248
92
2.06
2014
3,094
85
2.19
3,270
-30
2.50
6,364
7,322
74
2.04
2015
3,182
88
2.17
3,238
-32
2.50
6,420
7,364
42
2.04
2016
3,271
89
2.15
3,206
-32
2.50
6,477
7,416
52
2.03
2017
3,463
192
2.15
3,188
-18
2.50
6,651
7,729
313
1.99
2018
3,666
203
2.15
3,164
-24
2.50
6,830
7,849
120
2.01
2019
3,881
215
2.15
3,133
-31
2.50
7,014
7,962
113
2.03
2020
4,108
227
2.16
3,095
-38
2.50
7,203
8,210
248
2.02
2021
4,348
240
2.16
3,048
-47
2.50
7,396
8,511
301
2.00
2022
4,563
215
2.16
3,048
0
2.50
7,611
8,918
407
1.96
2023
4,779
215
2.16
3,048
0
2.50
7,827
9,102
184
1.97
Growth 2009-2023
1,880
102
2,561
Source: Statistics Canada, Census of Canada, Grey County GMS update 2022
(1) Total Private Dwellings has been adjusted to reflect dwelling counts provided by MPAC
Occupied
Dwellings
Dwellings Not
Occupied by
Usual Residents
Total Census
Dwellings
Total Private
Dwellings1
Appendix A | 63
APPENDIX A - TABLE A.3
TOWN OF THE BLUE MOUNTAINS
HISTORICAL EMPLOYMENT SUMMARY
Place of Work
Annual
Activity
Work at
Annual
Total w/ Work
Annual
Mid-Year
Employment (1)
Growth
Rate (2)
Home
Growth
At Home
Growth
2006
3,345
49.0%
725
4,070
2007
3,343
-2
49.5%
668
-57
4,011
-59
2008
3,341
-2
50.1%
615
-53
3,956
-55
2009
3,339
-2
50.6%
566
-49
3,905
-51
2010
3,337
-2
51.1%
521
-45
3,858
-47
2011
3,335
-2
51.7%
480
-41
3,815
-43
2012
3,432
97
52.3%
528
48
3,960
145
2013
3,531
99
52.9%
581
53
4,112
152
2014
3,633
102
53.5%
639
58
4,272
160
2015
3,738
105
54.1%
703
64
4,441
169
2016
3,847
109
54.8%
775
72
4,622
181
2017
4,010
163
53.9%
808
33
4,818
196
2018
4,179
169
53.0%
842
34
5,021
203
2019
4,353
174
52.1%
877
35
5,230
209
2020
4,534
181
51.2%
913
36
5,447
217
2021
4,720
186
50.3%
951
37
5,671
224
2022
4,863
143
49.4%
980
29
5,842
172
2023
4,891
28
47.4%
985
6
5,876
34
Growth 2009-2023
1,550
370
1,920
Source: Statistics Canada, Census of Canada
(1) Includes no fixed place of work employment, but excludes work at home
(2) Based on permenant "census population"
Appendix A | 64
APPENDIX A - TABLE A.4
TOWN OF THE BLUE MOUNTAINS
HISTORICAL ANNUAL RESIDENTIAL BUILDING PERMITS
Building Permits
Building Permits
Year
Singles/Semis
Rows
Apts.
Total
Singles/Semis
Rows
Apts.
Total
2006
294
0
46
340
86%
0%
14%
100%
2007
148
10
26
184
80%
5%
14%
100%
2008
85
20
0
105
81%
19%
0%
100%
2009
55
13
1
69
80%
19%
1%
100%
2010
68
14
0
82
83%
17%
0%
100%
2011
57
0
0
57
100%
0%
0%
100%
2012
56
3
0
59
95%
5%
0%
100%
2013
46
20
0
66
70%
30%
0%
100%
2014
66
3
0
69
96%
4%
0%
100%
2015
107
3
0
110
97%
3%
0%
100%
2016
181
11
3
195
93%
6%
2%
100%
2017
248
33
70
351
71%
9%
20%
100%
2018
29
0
0
29
100%
0%
0%
100%
2019
22
0
0
22
100%
0%
0%
100%
2020
32
0
2
34
94%
0%
6%
100%
2021
32
0
10
42
76%
0%
24%
100%
2022
224
41
19
284
79%
14%
7%
100%
2023
97
13
10
120
81%
11%
8%
100%
Growth 2009-2023
1,320
154
115
1,589
83%
10%
7%
100%
Source: Hemson Consulting Ltd., Town of The Blue Mountains. 2023
Note: 2023 building permits have been estimated based on available permit data and discussions with staff
Appendix A | 65
APPENDIX A - TABLE A.5
TOWN OF THE BLUE MOUNTAINS
HISTORICAL HOUSEHOLDS BY PERIOD OF CONSTRUCTION SHOWING HOUSEHOLD SIZE
Period of Construction
Period of Construction Summaries
Dwelling Unit Type
Pre 1945
1946-1960
1961-1970
1971-1980
1981-1990
1991-1995
1996-2000
2001-2005
2006-2010
2011-2016
2016-2021
Pre 2011
2011-2021
Total
Singles and Semis
Household Population
1,130
395
620
920
825
325
530
485
615
590
1,400
5,230
1,990
7,220
Households
505
205
285
440
350
150
220
250
280
235
600
2,405
835
3,240
Household Size
2.24
1.93
2.18
2.09
2.36
2.17
2.41
1.94
2.20
2.51
2.33
2.17
2.38
2.23
Rows
Household Population
0
0
55
140
260
55
40
40
80
65
85
590
150
740
Households
0
10
35
65
145
25
25
25
50
25
35
330
60
390
Household Size
n/a
n/a
1.57
2.15
1.79
2.20
1.60
1.60
1.60
2.60
2.43
1.79
2.50
1.90
Apartments (excl. Duplexes) - Total
Household Population
35
0
25
50
75
0
0
35
25
60
75
220
135
355
Households
20
15
20
45
50
10
20
30
20
40
60
210
100
310
Household Size
1.75
n/a
1.25
1.11
1.50
n/a
n/a
1.17
1.25
1.50
1.25
1.05
1.35
1.15
Duplexes
Household Population
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Households
0
0
10
10
0
0
10
0
0
0
0
30
0
30
Household Size
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
All Units
Household Population
1,165
395
700
1,110
1,160
380
570
560
720
715
1,560
6,040
2,275
8,315
Households
525
230
350
560
545
185
275
305
350
300
695
2,975
995
3,970
Household Size
2.22
1.72
2.00
1.98
2.13
2.05
2.07
1.84
2.06
2.38
2.24
2.03
2.29
2.09
Note: Population and household values in this table are based on National Household Survey response rates and may differ from Census values
Source: Statistics Canada, 2021 Census
Appendix A | 66
APPENDIX A - TABLE A.6
TOWN OF THE BLUE MOUNTAINS
FORECAST POPULATION & HOUSEHOLD GROWTH SUMMARY
Census
Annual
Seasonal
Annual
Adjusted
Annual
Annual
Av. Household
Annual
Av. Household
Annual
Av. Household
Mid-Year
Population
Growth
Population
Growth
Population
Growth
Growth
Size (PPU)
Growth
Size (PPU)
Growth
Size (PPU)
2023
10,311
460
7,620
0
17,931
460
4,779
215
2.16
3,048
0
2.50
7,827
215
2.29
2024
10,776
465
7,620
0
18,396
465
4,994
215
2.16
3,048
0
2.50
8,042
215
2.29
2025
11,240
465
7,620
0
18,860
465
5,210
215
2.16
3,048
0
2.50
8,258
215
2.28
2026
11,705
465
7,620
0
19,325
465
5,425
215
2.16
3,048
0
2.50
8,473
215
2.28
2027
12,170
465
7,620
0
19,790
465
5,640
215
2.16
3,048
0
2.50
8,688
215
2.28
2028
12,629
459
7,620
0
20,249
459
5,856
215
2.16
3,048
0
2.50
8,904
215
2.27
2029
13,087
458
7,620
0
20,707
458
6,071
215
2.16
3,048
0
2.50
9,119
215
2.27
2030
13,545
458
7,620
0
21,165
458
6,287
215
2.15
3,048
0
2.50
9,335
215
2.27
2031
14,003
458
7,620
0
21,623
458
6,502
215
2.15
3,048
0
2.50
9,550
215
2.26
2032
14,145
142
7,620
0
21,765
142
6,602
100
2.14
3,048
0
2.50
9,650
100
2.26
2033
14,289
144
7,620
0
21,909
144
6,692
90
2.14
3,048
0
2.50
9,740
90
2.25
Growth 2024-2033
3,978
0
3,978
1,913
0
1,913
Source: The Town of The Blue Mountains, Hemson Consulting 2023
Note: Estimates in this table will not match the Grey County GMS update prepared in 2022
Dwellings Not
Occupied by
Usual Residents
Total Private
Dwellings
Total Occupied
Dwellings
Appendix A | 67
APPENDIX A - TABLE A.7
TOWN OF THE BLUE MOUNTAINS
FORECAST EMPLOYMENT GROWTH SUMMARY
Place of Work
Annual
Work at
Annual
Total w/ Work
Annual
Mid-Year
Employment
Growth
Activity Rate
Home
Growth
At Home
Growth
2023
4,891
28
47.4%
985
6
5,876
34
2024
4,920
29
45.7%
991
6
5,911
35
2025
4,949
29
44.0%
997
6
5,946
35
2026
4,978
29
42.5%
1,003
6
5,981
35
2027
5,007
29
41.1%
1,009
6
6,016
35
2028
5,036
29
39.9%
1,014
6
6,050
35
2029
5,066
30
38.7%
1,021
6
6,087
36
2030
5,096
30
37.6%
1,027
6
6,123
36
2031
5,126
30
36.6%
1,033
6
6,159
36
2032
5,157
31
36.5%
1,039
6
6,196
37
2033
5,166
9
36.2%
1,041
2
6,207
11
Growth 2024-2033
275
55
330
Source: The Town of The Blue Mountains, Hemson Consulting 2023
Appendix A | 68
APPENDIX A - TABLE A.8
TOWN OF THE BLUE MOUNTAINS
GROWTH IN HOUSEHOLDS BY UNIT TYPE
Mid-Year
2024
118
54
43
215
55%
25%
20%
100%
0
215
2025
118
54
43
215
55%
25%
20%
100%
67
282
2026
118
54
43
215
55%
25%
20%
100%
0
215
2027
118
54
43
215
55%
25%
20%
100%
700
915
2028
118
54
43
215
55%
25%
20%
100%
0
215
2029
118
54
43
215
55%
25%
20%
100%
370
585
2030
118
54
43
215
55%
25%
20%
100%
0
215
2031
118
54
43
215
55%
25%
20%
100%
0
215
2032
55
25
20
100
55%
25%
20%
100%
0
100
2033
50
23
18
90
55%
25%
20%
100%
0
90
Growth 2024-2033
1,052
478
383
1,913
55%
25%
20%
100%
1,137
3,050
Source: Town of The Blue Mountains and Hemson Consulting, 2023
(1) Includes Commercial Resort Units (CRU), Hotel and other similar uses.
(2) Total units includes dwelling occupied by permanent residents, dwellings not occupied by usual residents and hotel units
Total Units (2)
Other: CRU &
Hotel (1)
Shares By Unit Type
Apartments
Rows & Other
Multiples
Singles/Semis
Rows & Other
Multiples
Apartments
Total Occupied
Dwellings
Singles/Semis
Annual Growth in Occupied Households
Total
Appendix A | 69
APPENDIX A - TABLE A.9
TOWN OF THE BLUE MOUNTAINS
FORECAST POPULATION IN NEW HOUSEHOLD BY UNIT TYPE
Occupied Households
Singles/Semis
Rows & Other
Multiples
Apartments
Total Occupied
2023
264
108
65
437
0
437
2024
264
108
65
437
0
437
2025
264
108
65
437
101
538
2026
264
108
65
437
0
437
2027
264
108
65
437
1050
1487
2028
264
108
65
437
0
437
2029
264
108
65
437
555
992
2030
264
108
65
437
0
437
2031
264
108
65
437
0
437
2032
123
50
30
203
0
203
2033
110
45
27
182
0
182
Growth 2024-2033
2,345
959
577
3,881
1,706
5,587
Person per unit (PPU)
2.23
2.00
1.50
1.50
Mid-Year
Other: CRU &
Hotel (1)
Total for DC
Study
Appendix A | 70
APPENDIX A - TABLE A.10
TOWN OF THE BLUE MOUNTAINS
NON-RESIDENTIAL SPACE FORECAST
Employment Density
80
m2 per employee
Place of Work
Annual
Total Growth
Mid-Year
Employment
Growth
Sq.M.
2024
4,920
29
2,317
2025
4,949
29
2,317
2026
4,978
29
2,317
2027
5,007
29
2,317
2028
5,036
29
2,317
2029
5,066
30
2,397
2030
5,096
30
2,397
2031
5,126
30
2,397
2032
5,157
31
2,454
2033
5,166
9
742
Growth 2024-2033
275
21,973
Note: Employment Values Include No Fixed Place of Work Employment
Source: Statistics Canada, Census of Canada
Appendix A | 71
APPENDIX A - TABLE A.11
TOWN OF THE BLUE MOUNTAINS
FORECAST AREA-SPECIFIC RESIDENTIAL DWELLING UNITS
Residential Unit Growth
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
Craigleith
102
169
102
802
102
472
102
102
47
43
2,043
2,912
Singles & Semis
41
41
41
41
41
41
41
41
19
17
364
519
Rows
35
35
35
35
35
35
35
35
16
15
311
443
Apartments
26
26
26
26
26
26
26
26
12
11
231
329
Other(1)
0
67
0
700
0
370
0
0
0
0
1137
1,621
Camperdown
18
18
18
18
18
18
18
18
9
8
163
409
Singles & Semis
12
12
12
12
12
12
12
12
6
5
105
265
Rows
4
4
4
4
4
4
4
4
2
2
38
96
Apartments
2
2
2
2
2
2
2
2
1
1
19
48
Other(1)
0
0
0
0
0
0
0
0
0
0
0
-
Castle Glen
33
33
33
33
33
33
33
33
15
14
295
2,018
Singles & Semis
33
33
33
33
33
33
33
33
15
14
295
2,018
Rows
0
0
0
0
0
0
0
0
0
0
0
-
Apartments
0
0
0
0
0
0
0
0
0
0
0
-
Other(1)
0
0
0
0
0
0
0
0
0
0
0
-
Swiss Meadows
0
0
0
0
0
0
0
0
0
0
-
1
Singles & Semis
0
0
0
0
0
0
0
0
0
0
0
1
Rows
0
0
0
0
0
0
0
0
0
0
0
-
Apartments
0
0
0
0
0
0
0
0
0
0
0
-
Other(1)
0
0
0
0
0
0
0
0
0
0
0
-
Lora Bay
25
25
25
25
25
25
25
25
12
11
225
976
Singles & Semis
18
18
18
18
18
18
18
18
8
7
158
685
Rows
1
1
1
1
1
1
1
1
1
0
10
42
Apartments
6
6
6
6
6
6
6
6
3
3
57
249
Other(1)
0
0
0
0
0
0
0
0
0
0
0
-
Clarksburg
5
5
5
5
5
5
5
5
2
2
45
180
Singles & Semis
2
2
2
2
2
2
2
2
1
1
21
180
Rows
3
3
3
3
3
3
3
3
1
1
24
-
Apartments
0
0
0
0
0
0
0
0
0
0
0
-
Non-Permanent
0
0
0
0
0
0
0
0
0
0
0
-
Osler
1
1
1
1
1
1
1
1
1
0
11
4
Singles & Semis
1
1
1
1
1
1
1
1
1
0
11
4
Rows
0
0
0
0
0
0
0
0
0
0
0
-
Apartments
0
0
0
0
0
0
0
0
0
0
0
-
Other(1)
0
0
0
0
0
0
0
0
0
0
0
-
Thornbury East
14
14
14
14
14
14
14
14
6
6
121
161
Singles & Semis
2
2
2
2
2
2
2
2
1
1
21
28
Rows
3
3
3
3
3
3
3
3
1
1
24
32
Apartments
9
9
9
9
9
9
9
9
4
4
77
101
Non-Permanent
0
0
0
0
0
0
0
0
0
0
0
-
Thornbury West
15
15
15
15
15
15
15
15
7
6
135
715
Singles & Semis
7
7
7
7
7
7
7
7
3
3
63
335
Rows
8
8
8
8
8
8
8
8
4
3
72
380
Apartments
0
0
0
0
0
0
0
0
0
0
0
-
Other(1)
0
0
0
0
0
0
0
0
0
0
0
-
Rural
1
1
1
1
1
1
1
1
1
0
11
14
Singles & Semis
1
1
1
1
1
1
1
1
1
0
11
14
Rows
0
0
0
0
0
0
0
0
0
0
0
0
Apartments
0
0
0
0
0
0
0
0
0
0
0
0
Other(1)
0
0
0
0
0
0
0
0
0
0
0
0
Total
215
282
215
915
215
585
215
215
100
90
3,047
7,390
(1) "Other" relates to "Dwellings Not Occupied by Usual Residents" including CRU and Hotels
Total
2024-2033
Total
Build-out
Service Area
Appendix A | 72
APPENDIX A - TABLE A.12
TOWN OF THE BLUE MOUNTAINS
FORECAST AREA-SPECIFIC
POPULATION IN NEW DWELLINGS
Craigleith
3,486
4,969
Singles & Semis
2.23
811
1,157
Rows
2.00
622
886
Apartments
1.50
347
494
Other(1)
1.50
1,706
2,432
Camperdown
340
855
Singles & Semis
2.23
234
591
Rows
2.00
77
192
Apartments
1.50
29
72
Other(1)
1.50
-
-
Castle Glen
657
4,497
Singles & Semis
2.23
657
4,497
Rows
2.00
-
-
Apartments
1.50
-
-
Other(1)
1.50
-
-
Swiss Meadows
-
2
Singles & Semis
2.23
-
2
Rows
2.00
-
-
Apartments
1.50
-
-
Other(1)
1.50
-
-
Lora Bay
457
1,984
Singles & Semis
2.23
352
1,526
Rows
2.00
19
84
Apartments
1.50
86
374
Non-Permanent
1.50
-
-
Clarksburg
95
401
Singles & Semis
2.23
47
401
Rows
2.00
48
-
Apartments
1.50
-
-
Other(1)
1.50
-
-
Osler
23
9
Singles & Semis
2.23
23
9
Rows
2.00
-
-
Apartments
1.50
-
-
Other(1)
1.50
-
-
Thornbury - East
210
278
Singles & Semis
2.23
47
62
Rows
2.00
48
64
Apartments
1.50
115
152
Other(1)
1.50
-
-
Thornbury - West
284
1,507
Singles & Semis
2.23
141
747
Rows
2.00
143
760
Apartments
1.50
-
-
Other(1)
1.50
-
-
Rural
23
31
Singles & Semis
2.23
23
31
Rows
2.00
-
-
Apartments
1.50
-
-
Other(1)
1.50
-
-
Total
5,575
14,533
(1) "Other" relates to "Dwellings Not Occupied by Usual Residents", CRUs and Hotels.
Service Area
Total
2024-2033
Total
Build-out
PPU Factors
Appendix A | 73
APPENDIX A - TABLE A.13
TOWN OF THE BLUE MOUNTAINS
FORECAST NON-RESIDENTIAL AREA-SPECIFIC EMPLOYMENT AND GROSS FLOOR AREA
Non-Residential Growth
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
Craigleith
Employees
12
11.99
12
12
12
12
12
12
13
4
114
601
GFA (m 2)
958
958.34
958
958
958
991
991
991
1,015
307
9,088
48,020
Camperdown
Employees
2
1.98
2
2
2
2
2
2
2
1
19
99
GFA (m 2)
159
158.54
159
159
159
164
164
164
168
51
1,503
7,910
Castle Glen
Employees
6
6.26
6
6
6
6
6
6
7
2
59
314
GFA (m 2)
500
500.01
500
500
500
517
517
517
529
160
4,741
25,089
Swiss Meadows
Employees
-
-
-
-
-
-
-
-
-
-
-
-
GFA (m 2)
-
-
-
-
-
-
-
-
-
-
-
-
Lora Bay
Employees
4
4
4
4
4
4
4
4
4
1
39
205
GFA (m 2)
327
327
327
327
327
339
339
339
347
105
3,103
16,380
Clarksburg
Employees
1
1
1
1
1
1
1
1
1
0
7
39
GFA (m 2)
62
62
62
62
62
64
64
64
66
20
588
3,116
Osler
Employees
1
1
1
1
1
1
1
1
1
0
6
32
GFA (m 2)
51
51
51
51
51
53
53
53
54
16
482
2,557
Thornbury - East
Employees
1
1
1
1
1
1
1
1
1
0
6
30
GFA (m 2)
49
49
49
49
49
50
50
50
52
16
463
2,397
Thornbury - West
Employees
3
3
3
3
3
3
3
3
3
1
25
133
GFA (m 2)
211
211
211
211
211
219
219
219
224
68
2,005
10,627
Rural
Employees
-
-
-
-
-
-
-
-
-
-
-
-
GFA (m 2)
-
-
-
-
-
-
-
-
-
-
-
-
Total Employees
29
29
29
29
29
30
30
30
31
9
275
1,453
Total GFA (m2)
2,317
2,317
2,317
2,317
2,317
2,397
2,397
2,397
2,454
742
21,973
116,095
Service Area
Total
2024-2033
Total
Build-out
Appendix A | 74
Appendix B
Town-Wide General Services
Technical Appendix
Appendix B | 75
Appendix B - Introduction and Overview
The following appendix provides the detailed analysis undertaken to
establish the development charge rates for each of the services in the Town
of The Blue Mountains. Seven services have been analysed as part of the
Development Charges Study:
Appendix B.1
Public Library
Appendix B.2
Fire Services
Appendix B.3
Police Department
Appendix B.4
Parks and Recreation
Appendix B.5
By-law Enforcement
Appendix B.6
Solid Waste
Appendix B.7
Development Related Studies
The tables provide the background data and analysis undertaken to arrive at
the calculated development charge rates for that particular service. An
overview of the content and purpose of each of the tables is given below.
Table 1 Historical Service Levels
Table 1 presents the data used to determine the 15-year historical service
level. The DCA and O. Reg. 82/98 require that development charges be set
at a level no higher than the average service level provided in the Town over
the 15-year period immediately preceding the preparation of the background
study, on a service-by-service basis. For the purpose of this study, the
historical inventory period has been defined as 2009 to 2023.
O. Reg. 82/98 requires that, when defining and determining historical service
levels, both the quantity and quality of service be taken into consideration.
In most cases, the service levels are initially established in quantitative
Appendix B | 76
terms. For example, service levels for buildings are presented in terms of
square feet. The qualitative aspect is introduced by considering the
monetary value of the facility or service. In the case of buildings, for
example, the cost would be shown in terms of cost per square foot to
replace or construct a facility of the same quality. This approach helps to
ensure that the development-related capital facilities that are to be funded
by new growth reflect not only the quantity (number and size) but also the
quality (replacement value or cost) of service provided by the Town in the
past. Both the quantitative and qualitative aspects of service levels used in
the current analysis are based on information provided by municipal staff.
This information is generally based on historical records and experience with
costs to acquire or construct similar facilities, equipment and infrastructure.
Table 1 also shows the calculation of the "maximum allowable" funding
envelope, net of uncommitted excess capacity. The maximum allowable is
defined as the 15-year historical service level (expressed as $/capita or
$/population & employment) multiplied by the forecast increase in net
population, or net population and employment growth, over the planning
period. The resulting figure is the value of capital infrastructure that must be
constructed for that particular service so that the 15-year historical service
level is maintained.
There is also a requirement in the DCA to consider "excess capacity" within
the Townʼs existing infrastructure that may be available to partially meet the
future servicing requirements. If Council has expressed its intent before or
at the time the capacity was created to recoup the cost of providing the
capacity from new development, it is considered "committed excess
capacity" under the DCA, and the associated capital cost is eligible for
recovery. Should uncommitted excess capacity exist, it is determined
whether or not this capacity will be available to service new development
and, if so, deductions to the maximum allowable funding envelope are
required.
Appendix B | 77
Table 2 2024 - 2033 Development-Related Capital Program & the
Calculation of the Development Charge
The DCA requires that Council express its intent to provide future capital
facilities to support future growth. Based on the development forecasts
presented in Appendix A, Hemson Consulting, in collaboration with Town
staff, has developed a development-related capital program which sets out
the projects required to service anticipated development for the 10-year
period from 2024 to 2033.
To determine the share of the program that is eligible for recovery through
development charges, the project costs are reduced by any anticipated
grants and "replacement" shares.
A replacement share occurs when a new facility will, at least in part, replace
a facility that is demolished, redeployed or will otherwise not be available to
serve its former function. The replacement share of the capital program is
not deemed to be development-related and is therefore removed from the
development charge calculation. The capital cost for replacement shares will
require funding from non-development charge sources, typically property
taxes or user fees.
The capital program less any replacement or benefit to existing shares
yields the development related costs. Although deemed development-
related, not all of the net development-related capital program may be
recoverable from development charges in the period from 2024 to 2033. For
some of the services, due to funding envelope restrictions, a portion of the
costs is deemed to be recovered from other development-related sources
including future DC Background Studies. In some cases, a portion of the
other development related costs is either deemed "pre-built" service
capacity to be considered as committed excess capacity and recovered
under future development or is a service level increase.
Appendix B | 78
The remaining portion of the net capital program represents the
development-related cost that may be included in the development charge.
In all cases, as required, this amount is equal to or less than the maximum
allowable capital amount as calculated at the end of Table 1. The result is
the discounted development-related net capital cost that is eligible for
recovery against development over the period from 2024 to 2033.
Calculation of the Development Charge Rates
The section below the capital program displays the calculation of the
development charge rates.
The first step when determining the development charge rate is to allocate
the development-related net capital cost between the residential and non-
residential sectors. For all Town-wide uniform services with the exception of
Public Library and Parks and Recreation, the development-related costs
have been apportioned as 95 per cent residential and 5 per cent non-
residential. This apportionment is based on the anticipated shares of
dwelling unit and employment growth over the 10-year forecast period.
The development-related costs associated with the Public Library and Parks
and Recreation have been allocated 100 per cent to the residential sector
because the need for these services is generally driven entirely by
residential development.
The residential share of the 2024-2033 DC eligible costs is then divided by
the number of forecast dwellings. This gives the calculated residential
development charge per capita. The non-residential development-related
net capital costs are divided by the forecast increase in non-residential
gross floor area (GFA). This yields a charge per square metre of new non-
residential GFA.
Appendix B | 79
Appendix B.1
Public Library
Appendix B | 80
Appendix B.1 - Public Library
The Town of The Blue Mountains provides Library Services from the
Leonard E. Shore Memorial Library branch and the Craigleith Heritage
Depot. The libraries provide a wide range of resources in a variety of formats
as well as a number of programs to the residents of the Town of The Blue
Mountains.
Table B.1-1 2009-2023 Historical Service Levels
Table B.1-1 displays the Libraryʼs 15-year historical inventory for buildings,
land, materials, and furniture and equipment (excluding computer
equipment). The building space amounts to 10,600 square feet and is valued
at $7.59 million. The library buildings occupy approximately 0.66 hectares of
land worth $943,800. The collection materials are valued at $1.33 million and
the furniture and equipment associated with the library branches are valued
at $730,300.
The 2023 full replacement value of the inventory of capital assets amounts
to $10.59 million and the 15-year historical average service level is $682.06
per capita.
The historical service level multiplied by the 10-year forecast of population
growth results in a 10-year maximum allowable funding envelope of $2.71
million (3,978 population growth X historical service level of $682.06/capita).
Table B.1-2 2024 - 2033 Development-Related Capital Program &
Calculation of the Development Charge Rates
The Public Libraryʼs total 10-year forecast amounts to $9.11 million. The
capital program provides for additional library space, including costs
associated with land acquisition, furniture and equipment, and collection
materials.
Appendix B | 81
No grants, subsidies, or other recoveries are anticipated to fund any shares
of the above mentioned projects. A benefit to existing share of 9 per cent
has been identified for the addition library space and associated land with
$731,800 removed from the DC eligible amount for recovery. The net cost to
the municipality is therefore at $8.38 million.
A portion of the DC eligible costs, $3.10 million, will be funded by available
reserve funds. A share of $2.57 million is deemed as other development
related and will not be recovered under this development charges by-law,
but may be considered for funding from other revenue sources and in future
development charge studies, subject to service level restrictions.
The remaining $2.71 million is related to growth between 2024 and 2033 and
is allocated entirely against future residential development in the Town of
The Blue Mountains. This results in a development charge of $485.66 per
capita.
The following table summarizes the calculation of the Public Library
development charge.
15-year Hist.
Service Level
per Capita
Total
Net DC Recoverable
$/capita
$/m2
$682.06
$9,108,000
$2,713,368
$485.66
$0.00
PUBLIC LIBRARY SUMMARY
Development-Related Capital Program
2024 - 2033
Calculated
Development Charge
Appendix B | 82
APPENDIX B.1
TABLE B.1-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PUBLIC LIBRARY
BUILDINGS
# of Square Feet
UNIT COST
Branch Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Leonard E. Shore Memorial Library
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,400
$720
Craigleith Depot-Library Portion
-
-
-
-
-
-
-
100
100
100
100
100
150
150
150
$650
Total (sq.ft.)
10,400
10,400
10,400
10,400
10,400
10,400
10,400
10,500
10,500
10,500
10,500
10,500
10,550
10,550
10,550
Total ($000)
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,553.0
$7,553.0
$7,553.0
$7,553.0
$7,553.0
$7,585.5
$7,585.5
$7,585.5
LAND
# of Hectares
UNIT COST
Branch Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Leonard E. Shore Memorial Library
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
0.64
$1,430,000
Craigleith Depot-Library
-
-
-
-
-
-
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
$1,430,000
Total (ha)
0.64
0.64
0.64
0.64
0.64
0.64
0.66
0.66
0.66
0.66
0.66
0.66
0.66
0.66
0.66
Total ($000)
$915.2
$915.2
$915.2
$915.2
$915.2
$915.2
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
MATERIALS
# of Collection Materials
UNIT COST
Type of Collection
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/item)
Books
45,208
38,893
36,049
35,681
34,206
33,770
32,400
31,542
30,221
30,221
26,438
25,301
26,146
27,453
28,826
$40
Periodicals
94
100
71
73
66
84
78
85
71
71
63
58
44
46
49
$90
Media(video/dvd/cd)
2,820
3,408
4,093
4,093
3,267
3,154
3,081
3,059
2,970
2,970
2,552
2,699
1,993
2,093
2,197
$60
E-Books Owned
-
-
-
284
418
716
831
931
448
448
487
503
428
449
472
$50
E-Book and Audio Book Subscriptions
$0
$0
$0
$2,150
$2,150
$3,655
$3,655
$3,655
$4,300
$4,300
$12,743
$16,402
$16,399
$17,219
$18,080
Total (#)
48,122
42,401
40,213
40,131
37,957
37,724
36,390
35,617
33,710
33,710
29,540
28,561
28,611
30,042
31,544
Total ($000)
$1,986.0
$1,769.2
$1,693.9
$1,695.7
$1,593.3
$1,587.1
$1,533.1
$1,503.1
$1,420.1
$1,420.1
$1,253.4
$1,220.8
$1,207.2
$1,267.5
$1,330.9
FURNITURE & EQUIPMENT
Total Value of Furniture and Equipment ($)
Branch Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Furniture & Equipment for Facilities ($55 per sq.ft.)
$572,000
$572,000
$572,000
$572,000
$572,000
$572,000
$572,000
$577,500
$577,500
$577,500
$577,500
$577,500
$580,250
$580,250
$580,250
Loanable Technology
$0
$0
$0
$0
$0
$25,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
Shelving
Total ($000)
$572.0
$572.0
$572.0
$572.0
$572.0
$597.0
$722.0
$727.5
$727.5
$727.5
$727.5
$727.5
$730.3
$730.3
$730.3
Appendix B | 83
APPENDIX B.1
TABLE B.1-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
PUBLIC LIBRARY
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
0.59
INVENTORY SUMMARY ($000)
Buildings
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,488.0
$7,553.0
$7,553.0
$7,553.0
$7,553.0
$7,553.0
$7,585.5
$7,585.5
$7,585.5
Land
$915.2
$915.2
$915.2
$915.2
$915.2
$915.2
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
$943.8
Materials
$1,986.0
$1,769.2
$1,693.9
$1,695.7
$1,593.3
$1,587.1
$1,533.1
$1,503.1
$1,420.1
$1,420.1
$1,253.4
$1,220.8
$1,207.2
$1,267.5
$1,330.9
Furniture & Equipment
$572.0
$572.0
$572.0
$572.0
$572.0
$597.0
$722.0
$727.5
$727.5
$727.5
$727.5
$727.5
$730.3
$730.3
$730.3
Total ($000)
$10,961.2
$10,744.4
$10,669.1
$10,670.9
$10,568.5
$10,587.3
$10,686.9
$10,727.4
$10,644.4
$10,644.4
$10,477.7
$10,445.1
$10,466.7
$10,527.1
$10,590.5
Average
SERVICE LEVEL ($/capita)
Service
Level
Buildings
$523.67
$514.14
$504.67
$503.19
$501.74
$500.40
$499.17
$502.19
$489.98
$478.04
$466.42
$455.04
$445.94
$434.19
$423.04
$482.79
Land
$64.00
$62.84
$61.68
$61.50
$61.32
$61.16
$62.92
$62.75
$61.23
$59.73
$58.28
$56.86
$55.49
$54.02
$52.64
$59.76
Materials
$138.89
$121.48
$114.17
$113.95
$106.76
$106.06
$102.20
$99.94
$92.13
$89.88
$77.40
$73.55
$70.97
$72.55
$74.23
$96.94
Furniture & Equipment
$40.00
$39.27
$38.55
$38.44
$38.33
$39.90
$48.13
$48.37
$47.19
$46.04
$44.93
$43.83
$42.93
$41.80
$40.73
$42.56
Total ($/capita)
$766.57
$737.74
$719.07
$717.08
$708.15
$707.52
$712.41
$713.26
$690.52
$673.70
$647.03
$629.28
$615.33
$602.56
$590.63
$682.06
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
PUBLIC LIBRARY
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$682.06
Population Growth 2024 - 2033
3,978
Maximum Allowable Funding Envelope
$2,713,368
Appendix B | 84
Table
displa
ys
Library 10-year
capit
al program includin
g all
legisla
te deductions a
nd calcul
ate
d developme
nt charge r
ates.
Appendix B | 85
Appendix B.2
Fire Services
Appendix B | 86
Appendix B.2 - Fire Services
The Town of The Blue Mountains Fire Department is responsible for fire
prevention inspections, public education sessions, communications
(including dispatching), and fire suppression.
Table B.2-1 2009-2023 Historical Service Levels
The Town of The Blue Mountains Fire Department operates from two fire
halls, Craigleith and Thornbury. The combined area of the stations is 16,400
square feet valued at $8.2 million. The land area associated with the
buildings is approximately 2.46 hectares and is valued at $3.52 million. The
total cost of all furniture and equipment at both stations is approximately
$1.5 million. The 16 vehicles associated with the stations have a total
replacement cost of $8.22 million.
The current replacement value of all Fire Services capital infrastructure is
$21.44 million, which provides the Town with a 15-year historical average
service level of $1,043.26 per population and employment.
The calculated maximum allowable recoverable through development
charges over the 2024 to 2033 planning period is $4.44 million (4,253
population and employment growth X historical service level of
$1,043.26/pop and emp).
Table B.2-2 2024 - 2033 Development-Related Capital Program &
Calculation of the Development Charge
The Fire Services capital forecast recovers for a new Fire Hall of $8.70
million, including all associated land, furniture and equipment. Additionally,
Upgrades to Fire Hall 1 ($3.49 million) and a new Mobile Training Unit
($500,000) are eligible for recovery. The program also includes additional
emergency equipment ($950,000) and personnel equipment acquisitions
($24,000).
Appendix B | 87
In total, the 10-year capital program for Fire Services amounts to $13.66
million. No grants or subsidies are identified for this serviceʼs capital
program. Approximately $3.15 million has been identified as providing
benefit to existing development, which relates to the proposed new Fire Hall
and Mobile Training Unit. A portion of the costs, approximately $811,908,
will be funded by available reserve funds. A share of $5.26 million is deemed
as related to other development and will not be recovered under this
development charges by-law but may be considered for funding from other
sources and in future development charge studies, subject to service level
restrictions. The remaining $4.44 million is related to development between
2024 and 2033 and is allocated entirely against future development in the
Town of The Blue Mountains.
The 10-year development-related net capital cost is allocated 95 per cent, or
$4.23 million, against residential development, and 5 per cent, or $208,159,
against non-residential development. The allocation between residential and
non-residential development is based on shares of 10-year growth in
population in new units and employment. The resulting development charge
is $756.94 per capita and $9.47 per square metre.
The following table summarizes the calculation of the Fire Services
development charge.
15-year Hist.
Service Level
per Pop & Emp
Total
Net DC Recoverable
$/capita
$/m2
$1,043.26
$13,664,000
$4,437,189
$756.94
$9.47
FIRE SERVICES SUMMARY
2024 - 2033
Calculated
Development Charge
Development-Related Capital Program
Appendix B | 88
APPENDIX B.2
TABLE B.2-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
FIRE SERVICES
BUILDINGS
# of Square Feet
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq. ft.)
Craigleith Fire Hall - Hall #2
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
6,400
$500
Thornbury Fire Hall - Hall #1
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
$500
Total (sq.ft.)
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
16,400
Total ($000)
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
LAND
# of Hectares
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Craigleith Teed Fire Hall - Hall #2
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
$1,430,000
Thornbury Fire Hall - Hall #1
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
2.01
$1,430,000
Total (ha)
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
2.46
Total ($000)
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
FURNITURE & EQUIPMENT
Total Value of Furniture and Equipment ($)
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Number of Fire Fighters
51
51
51
51
51
51
51
51
51
51
51
51
59
52
52
$6,000
Personal Gear (i.e. Clothing, Bunker Gear etc.)
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$306,000
$354,000
$312,000
$312,000
Breathing Equipment
28
28
28
28
28
28
28
28
28
28
28
28
28
28
28
$13,000
Self Contained Breathing Apparatus, Air Bottles etc.
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
$364,000
Furniture & Equipment in Stations
Furniture & Equipment for Stations ($50 per sq.ft.)
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
$820,000
Total ($000)
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,538.0
$1,496.0
$1,496.0
VEHICLES
# of Vehicles
UNIT COST
Vehicle Type
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
75' Ariel
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$1,750,000
Marine Rescue Unit
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$45,000
Rough Terrain Vehicle (RTV)
-
-
-
-
-
-
-
-
1
1
1
-
-
-
-
$15,000
All Terrain Vehicle (ATV)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$15,000
Snowmobile
-
-
-
-
-
-
-
-
-
-
-
-
1
1
1
$15,000
Light Duty Vehicles
5
5
5
5
6
6
6
5
5
5
5
5
5
5
5
$50,000
Pumpers
3
3
3
3
3
3
3
4
4
5
5
5
5
5
5
$950,000
Tanks
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$700,000
Total (#)
13
13
13
13
14
14
14
14
15
16
16
15
16
16
16
Total ($000)
$6,310.0
$6,310.0
$6,310.0
$6,310.0
$6,360.0
$6,360.0
$6,360.0
$7,260.0
$7,275.0
$8,225.0
$8,225.0
$8,210.0
$8,225.0
$8,225.0
$8,225.0
Appendix B | 89
APPENDIX B.2
TABLE B.2-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
FIRE SERVICES
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
Historical Employment
3,339
3,337
3,335
3,432
3,531
3,633
3,738
3,847
4,010
4,179
4,353
4,534
4,720
4,863
4,891
Total Historical Population & Employment
17,638
17,901
18,173
18,313
18,455
18,597
18,739
18,887
19,425
19,979
20,547
21,132
21,730
22,333
22,822
INVENTORY SUMMARY ($000)
Buildings
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
$8,200.0
Land
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
$3,517.8
Furniture & Equipment
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,490.0
$1,538.0
$1,496.0
$1,496.0
Vehicles
$6,310.0
$6,310.0
$6,310.0
$6,310.0
$6,360.0
$6,360.0
$6,360.0
$7,260.0
$7,275.0
$8,225.0
$8,225.0
$8,210.0
$8,225.0
$8,225.0
$8,225.0
Total ($000)
$19,517.8
$19,517.8
$19,517.8
$19,517.8
$19,567.8
$19,567.8
$19,567.8
$20,467.8
$20,482.8
$21,432.8
$21,432.8
$21,417.8
$21,480.8
$21,438.8
$21,438.8
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$464.91
$458.07
$451.23
$447.77
$444.32
$440.93
$437.59
$434.16
$422.13
$410.43
$399.09
$388.03
$377.36
$367.17
$359.31
$420.17
Land
$199.44
$196.51
$193.58
$192.09
$190.62
$189.16
$187.73
$186.25
$181.09
$176.08
$171.21
$166.47
$161.89
$157.51
$154.14
$180.25
Furniture & Equipment
$84.48
$83.24
$81.99
$81.36
$80.74
$80.12
$79.51
$78.89
$76.70
$74.58
$72.52
$70.51
$70.78
$66.99
$65.55
$76.53
Vehicles
$357.75
$352.49
$347.23
$344.56
$344.62
$341.99
$339.40
$384.39
$374.51
$411.69
$400.31
$388.51
$378.51
$368.28
$360.40
$366.31
Total ($/pop & emp)
$1,106.58
$1,090.32
$1,074.03
$1,065.79
$1,060.30
$1,052.20
$1,044.23
$1,083.69
$1,054.45
$1,072.77
$1,043.13
$1,013.52
$988.54
$959.95
$939.40
$1,043.26
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
FIRE SERVICES
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$1,043.26
Population and Employment Growth 2024 - 2033
4,253
Maximum Allowable Funding Envelope
$4,437,189
Appendix B | 90
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
2.0 FIRE SERVICES
2.1
Buildings, Land & Furnishings
2.1.1
Provision for New Fire Hall (includes bulding, land and F&E)
2024
8,700,000
$
-
$
8,700,000
$
33%
2,900,000
$
5,800,000
$
799,908
$
4,437,189
$
562,903
$
2.1.2
Upgrades to Fire Hall 1 - 4,000sqft New Space
2028
3,490,000
$
-
$
3,490,000
$
0%
-
$
3,490,000
$
-
$
-
$
3,490,000
$
2.1.3
Mobile Training Unit
2030
500,000
$
-
$
500,000
$
50%
250,000
$
250,000
$
-
$
-
$
250,000
$
Subtotal Buildings, Land & Furnishings
12,690,000
$
-
$
12,690,000
$
3,150,000
$
9,540,000
$
799,908
$
4,437,189
$
4,302,903
$
2.2
Vehicles & Equipment
2.2.1
Emergency Equipment
Various
950,000
$
-
$
950,000
$
0%
-
$
950,000
$
-
$
-
$
950,000
$
Subtotal Vehicles & Equipment
950,000
$
-
$
950,000
$
-
$
950,000
$
-
$
-
$
950,000
$
2.3
Personel Equipment
2.3.1
Equipment for New Fire Fighter
2024
12,000
$
-
$
12,000
$
0%
-
$
12,000
$
12,000
$
-
$
-
$
2.3.2
Equipment for New Fire Fighter
2028
12,000
$
-
$
12,000
$
0%
-
$
12,000
$
-
$
-
$
12,000
$
Subtotal Personel Equipment
24,000
$
-
$
24,000
$
-
$
24,000
$
12,000
$
-
$
12,000
$
TOTAL FIRE SERVICES
13,664,000
$
-
$
13,664,000
$
3,150,000
$
10,514,000
$
811,908
$
4,437,189
$
5,264,903
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
95%
$4,229,030
2024 - 2033 Net Funding Envelope
$4,437,189
10-Year Growth Population in New Units
5,587
Unadjusted Development Charge Per Capita
$756.94
Uncommitted Reserve Fund Balance
Balance as at December 31, 2023
$811,908
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
5%
$208,159
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$9.47
TABLE B.2-2
APPENDIX B.2
TOWN OF THE BLUE MOUNTAINS
DC Eligible Costs
DEVELOPMENT-RELATED CAPITAL PROGRAM
FIRE SERVICES
Appendix B | 91
Appendix B.3
Police Department
Appendix B | 92
Appendix B.3 - Police Department
Policing for the Town of The Blue Mountains is provided by the Ontario
Provincial Police. The Blue Mountains detachment headquarters office is
found in Thornbury.
Table B.3-1 2009-2023 Historical Service Levels
The 15-year historical inventory of capital assets for the Police Department
includes 6,590 square feet of building space with a replacement value of
$3.30 million. The 0.67 hectares of land associated with the building space
are valued at $959,500. The total cost of furniture and equipment associated
with the stations, including personal police equipment and communications
equipment adds $197,700 to the value of the inventory.
The current replacement value of the Police Departmentʼs capital
infrastructure including buildings, land, vehicles and equipment is
approximately $4.45 million. This provides a 15-year average historical
service level of $228.13 per population and employment. This average
historical service level multiplied by the 10-year forecast growth in
population and employment, results in a 10-year maximum allowable
funding envelope of $970,282 (4,253 population and employment growth X
historical service level of $228.13/population and employment).
Table B.3-2 2024 - 2033 Development-Related Capital Program &
Calculation of the Development Charge
The Police capital program recovers for the debt related associated with the
Ontario Provincial Police Station in Thornbury. The total debt payments have
been included in the capital program in the amount of $373,738.
No grants or subsidies are identified for the Police Departmentʼs capital
program. A portion of the debt for the station ($35,353) will be funded
through the Townʼs Police Department DC reserve fund and are therefore
Appendix B | 93
reduced from the total development charge calculation. Altogether, the 10-
year capital forecast for Police amounts to $338,385, all of which is
considered to be development-related.
As shown in Table B.3-2, the total development-related cost is allocated
95% or $332,510, against new residential development, and 5%, or $15,874,
against non-residential development. This yields a development charge of
$57.73 per capita and $0.72 per square metre.
The following table summarizes the calculation of the Police Department
development charge.
15-year Hist.
Service Level
per Pop & Emp
Total
Net DC Recoverable
$/capita
$/m2
$228.13
$373,738
$338,385
$57.73
$0.72
Development-Related Capital Program
Development Charge
POLICE DEPARTMENT SUMMARY
2024 - 2033
Calculated
Appendix B | 94
APPENDIX B.3
TABLE B.3-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
POLICE DEPARTMENT
BUILDINGS
# of Square Feet
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq. ft.)
Thornbury OPP Detachment Office
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
3,600
$500
Allocated Space (Collingwood Detachment)
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
2,990
$500
Total (sq.ft.)
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
6,590
Total ($000)
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
LAND
# of Hectares
UNIT COST
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Thornbury OPP Detachment Office
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
$1,430,000
Overall Land Allocation (Collingwood Detachment)
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
$1,430,000
Total (ha)
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
0.67
Total ($000)
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
FURNITURE & EQUIPMENT
Total Value of Furniture & Equipment ($)
Station Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Furniture & Equipment for Stations and Police Officiers ($30 per sq.ft.)
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
$197,700
Total ($000)
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
Appendix B | 95
APPENDIX B.3
TABLE B.3-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
POLICE DEPARTMENT
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
Historical Employment
3,339
3,337
3,335
3,432
3,531
3,633
3,738
3,847
4,010
4,179
4,353
4,534
4,720
4,863
4,891
Total Historical Population & Employment
17,638
17,901
18,173
18,313
18,455
18,597
18,739
18,887
19,425
19,979
20,547
21,132
21,730
22,333
22,822
INVENTORY SUMMARY ($000)
Buildings
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
$3,295.0
Land
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
$959.5
Furniture & Equipment
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
$197.7
Total ($000)
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
$4,452.2
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$186.81
$184.07
$181.32
$179.93
$178.54
$177.18
$175.84
$174.46
$169.63
$164.92
$160.37
$155.92
$151.64
$147.54
$144.38
$168.84
Land
$54.40
$53.60
$52.80
$52.40
$51.99
$51.60
$51.20
$50.80
$49.40
$48.03
$46.70
$45.41
$44.16
$42.96
$42.04
$49.17
Furniture & Equipment
$11.21
$11.04
$10.88
$10.80
$10.71
$10.63
$10.55
$10.47
$10.18
$9.90
$9.62
$9.36
$9.10
$8.85
$8.66
$10.13
Total ($/pop & emp)
$252.42
$248.71
$245.00
$243.12
$241.25
$239.41
$237.59
$235.73
$229.20
$222.85
$216.69
$210.69
$204.89
$199.35
$195.09
$228.13
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
POLICE DEPARTMENT
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$228.13
Population and Employment Growth 2024 - 2033
4,253
Maximum Allowable Funding Envelope
$970,282
Appendix B | 96
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
3.0
POLICE DEPARTMENT
3.1 Recovery of OPP Detachment Debt
3.1.1
Total Payment
2024
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
35,353
$
2,021
$
-
$
3.1.2
Total Payment
2025
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.3
Total Payment
2026
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.4
Total Payment
2027
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.5
Total Payment
2028
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.6
Total Payment
2029
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.7
Total Payment
2030
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.8
Total Payment
2031
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.9
Total Payment
2032
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
3.1.10
Total Payment
2033
37,374
$
-
$
37,374
$
0%
-
$
37,374
$
-
$
37,374
$
-
$
Subtotal Recovery of OPP Detachment Debt
373,738
$
-
$
373,738
$
-
$
373,738
$
35,353
$
338,385
$
-
$
TOTAL POLICE DEPARTMENT
373,738
$
-
$
373,738
$
-
$
373,738
$
35,353
$
338,385
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
95%
$322,510
2024 - 2033 Net Funding Envelope
$970,282
10-Year Growth Population in New Units
5,587
Unadjusted Development Charge Per Capita
$57.73
Uncommitted Reserve Fund Balance
Balance as at December 31, 2023
$35,353
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
5%
$15,874
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$0.72
APPENDIX B.3
POLICE DEPARTMENT
DEVELOPMENT-RELATED CAPITAL PROGRAM
TABLE B.3-2
TOWN OF THE BLUE MOUNTAINS
DC Eligible Costs
Appendix B | 97
Appendix B.4
Parks and Recreation
Appendix B | 98
Appendix B.4 - Parks and Recreation
The Town of The Blue Mountains Recreation Department is responsible for
provision of indoor and outdoor recreation facilities, community space and
recreational programming. The Recreation Department provides indoor
recreation services through several major facilities, most notably the Beaver
Valley Community Centre.
Table B.4-1 2009-2023 Historical Service Levels
The 15-year historical inventory of capital assets for Indoor Recreation
includes 58,596 square feet of indoor recreation building space
accommodated within the Townʼs facilities. The largest of these facilities is
The Beaver Valley Community Centre at 41,600 square feet. The current
replacement value for the buildings is $24.21 million, and the 4.57 hectares
of land associated with the buildings is valued at $6.53 million. The furniture
and equipment found in the facilities has a total value of $1.76 million.
The Blue Mountainʼs inventory of developed parks amounts to 20.93
hectares valued at $7.32 million. It also includes 29.83 hectares of developed
open and natural parks valued at $4.32 million. The Townʼs inventory also
includes 42,600 metres of trails valued at $3.98 million.
The Parks department is responsible for various park amenities such
baseball diamonds, softball diamonds, soccer pitches, golf courses, tennis
courts, playgrounds, basketball courts, skateboard parks, pavilions, and dog
parks. The total value of park facilities is $8.59 million. Park vehicles and
equipment add an additional $1.50 million to the inventory.
The 2023 full replacement value of the inventory of capital assets for Parks
and Recreation services amounts to $58.21 million and the 15-year historical
average service level is $3,590.86 per capita.
Appendix B | 99
The historical service level multiplied by the 10-year forecast of population
growth results in a 10-year maximum allowable funding envelope of $14.28
million (3,978 net population growth X historical service level of
$3,590.86/capita).
Table B.4-2 2024 - 2033 Development-Related Capital Program &
Calculation of the Development Charge
The 2024-2033 gross development-related capital program for Parks and
Recreation amounts to $85.03 million.
The largest project in the capital program is a provision for indoor recreation
space for $80.00 million. The capital program provides $2.14 million for
various parkland development projects, the most significant of which are
Parkland and Waterfront development. Also included in the program is $2.26
million for new park facilities. Lastly, the Town anticipates acquiring
additional vehicles and equipment for a total cost of $630,900.
Of the gross cost, $50.00 million in grants and subsidies related to the new
indoor recreation space has been identified and is removed from the DC
eligible costs. Replacement or benefit to existing shares of $729,500 have
been identified for this service related to the Trail & Trailhead development,
Tennis court construction / Pickle Ball, and Trail Development at 50% BTE
and Additional Pavilion / Washrooms at 25% BTE. The DC eligible costs are
then reduced to $34.30 million, of which $14.28 million is eligible for
development charges funding within the 10-year planning period.
Approximately $3.49 million has been identified as available funding in the
development charges reserve and $16.52 million has been identified
recoverable from other development funding including consideration for
recovery in future DC background studies.
The full development-related share of the Parks and Recreation capital
program is allocated entirely against future residential development in the
Appendix B | 100
Town of The Blue Mountains. This results in a development charge of
$2,556.85 per capita.
The following table summarizes the calculation of the Parks development
charge.
15-year Hist.
Service Level
per Capita
Total
Net DC Recoverable
$/capita
$/m2
$3,590.86
$85,028,900
$14,285,145
$2,556.85
$0.00
2024 - 2033
Calculated
PARKS AND RECREATION SUMMARY
Development-Related Capital Program
Development Charge
Appendix B | 101
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
INDOOR RECREATION FACILITIES
BUILDINGS
# of Square Feet
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Beaver Valley Community Centre
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
41,600
$420
Craigleith Hall
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
1,056
$420
Ravenna Hall
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
1,600
$420
Tomahawk Operations Building
3,720
3,720
3,720
3,720
3,720
3,720
3,720
3,720
3,720
3,720
5,000
5,000
5,000
5,000
5,000
$400
Tomahawk Golf Maintenance Building
-
-
-
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
1,500
$400
Thornbury Harbour Office
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
$385
Thornbury Harbour Fish Cleaning Station
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
$385
Thornbury Harbour Washroom/Shower building
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
2,470
$385
Parks Satellite Ops (Bayview)
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
1,210
$385
Northwinds Beach Washrooms
355
355
355
355
355
355
355
355
355
355
355
355
355
355
355
$385
Cedar Grove (previously Bayview Park) (beach) Washrooms
175
175
175
175
175
175
175
175
175
175
175
175
175
175
175
$385
Bayview Park (grounds) Washrooms
580
580
580
580
580
580
580
580
580
580
580
580
580
580
580
$385
Little River Park (beach) Washrooms
290
290
290
290
290
290
290
290
290
290
290
290
290
290
290
$385
Lora Bay Washroom Building
185
185
185
185
185
185
185
185
185
185
185
185
185
185
185
$385
Nipissing Ridge Washroom Building
-
-
-
-
-
290
290
290
290
290
290
290
290
290
290
$385
Parks and Recreation Office Space in Town Hall
-
-
500
500
500
500
500
500
500
500
500
500
500
500
500
$385
Total (sq.ft.)
55,026
55,026
55,526
57,026
57,026
57,316
57,316
57,316
57,316
57,316
58,596
58,596
58,596
58,596
58,596
Total ($000)
$22,789.8
$22,789.8
$22,982.3
$23,582.3
$23,582.3
$23,693.9
$23,693.9
$23,693.9
$23,693.9
$23,693.9
$24,205.9
$24,205.9
$24,205.9
$24,205.9
$24,205.9
LAND
# of Hectares
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Beaver Valley Community Centre
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
2.02
$1,430,000
Craigleith Hall
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
$1,430,000
Ravenna Hall
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
$1,430,000
Chamber of Commerce
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
$1,430,000
Tomahawk Operations Building
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
$1,430,000
Tomahawk Golf Operations
-
-
-
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
$1,430,000
125 Peel Street
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$1,430,000
Parks and Recreation Office Space in Town Hall
-
-
-
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
$1,430,000
Total (ha)
4.04
4.04
4.04
4.57
4.57
4.57
4.57
4.57
4.57
4.57
4.57
4.57
4.57
4.57
4.57
Total ($000)
$5,771.1
$5,771.1
$5,771.1
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
$6,529.0
FURNITURE & EQUIPMENT
Total Value of Furniture & Equipment ($)
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Furniture & Equipment for Facilities ($30 per sq.ft.)
$1,650,780
$1,650,780
$1,665,780
$1,710,780
$1,710,780
$1,719,480
$1,719,480
$1,719,480
$1,719,480
$1,719,480
$1,757,880
$1,757,880
$1,757,880
$1,757,880
$1,757,880
Total ($000)
$1,650.8
$1,650.8
$1,665.8
$1,710.8
$1,710.8
$1,719.5
$1,719.5
$1,719.5
$1,719.5
$1,719.5
$1,757.9
$1,757.9
$1,757.9
$1,757.9
$1,757.9
Appendix B | 102
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
PARKLAND
DEVELOPED PARKS
# of Hectares of Developed Area
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Moreau Park (B.V.C.C.), 018-23100
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
4.45
$350,000
Bayview Park (Grounds), 016-08400
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
$350,000
Little River
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
$350,000
Lora Bay
-
-
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
$350,000
Council Beach
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.80
$350,000
Delphi Point
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
3.72
$350,000
Boyer Subdivision, 003-32363 Block 13 Plan 1113
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
$350,000
Northwinds Beach
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
$350,000
4 Heritage Corners Subdivision
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
1.41
$350,000
Nipissing Ridge (Georgian Woodlands)
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
0.93
$350,000
Hester St. Parkette, 017-12900 - See Special Facilities
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
$350,000
Hillcrest Park Clarksburg 012-11600
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
$350,000
Lions Park
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
0.77
$350,000
Cedar Grove
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
2.15
$350,000
Total (ha)
20.13
20.13
20.93
20.93
20.93
20.93
20.93
20.93
20.93
20.93
20.93
20.93
20.93
20.93
20.93
Total ($000)
$7,044.9
$7,044.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
$7,324.9
OPEN, NATURAL PARKS
# of Hectares of Developed Area
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Parkettes
Bruce Street Parkette
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
$62,000
Harbour Hill Parkette
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
$62,000
Timmons Parkette
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
0.34
$62,000
Open, Natural Parks
Craigleith Meadows
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
0.89
$62,000
Heathcote Park
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
3.64
$62,000
Jozo Blvd. Park
-
-
-
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
$62,000
15 Georgian Woodlands, 006-18501, Block A, Plan 822
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
$62,000
Golf Courses
Tomahawk
-
-
-
21.85
21.85
21.85
21.85
21.85
21.85
21.85
21.85
21.85
21.85
21.85
21.85
$175,000
Other
Jack Acres Memorial Park
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.27
0.27
0.27
0.27
0.27
0.27
0.27
$62,000
14 Wyandot Court Park
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
$62,000
Riverwalk Park
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
$62,000
Cenotaph Hwy #26
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
$62,000
32 Heathcote Former Hall Lands
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
0.28
$62,000
Smith Memorial
-
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
$62,000
School House Lane (Bannerman Property)
-
-
-
-
-
-
-
-
-
-
-
-
0.14
0.14
0.14
$62,000
Gamble Park
-
-
-
-
-
-
-
-
-
0.07
0.07
0.07
0.07
0.07
0.07
$62,000
Total (ha)
6.48
6.72
6.72
29.45
29.45
29.45
29.45
29.45
29.62
29.69
29.69
29.69
29.83
29.83
29.83
Total ($000)
$401.7
$416.6
$416.6
$4,294.9
$4,294.9
$4,294.9
$4,294.9
$4,294.9
$4,305.4
$4,309.8
$4,309.8
$4,309.8
$4,318.4
$4,318.4
$4,318.4
Appendix B | 103
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
PARKLAND
TRAIL DEVELOPMENT
# of Metres of Trail
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/m2)
37 Georgian Trail
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
20,500
$94
Bayview Trail
680
680
680
680
680
680
680
680
680
680
680
680
680
680
680
$94
Beaver River Trail
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
10,000
$94
Heathcote Trail
610
610
610
610
610
610
610
610
610
610
610
610
610
610
610
$94
Camperdown Road Trail
700
700
700
700
700
700
700
700
700
700
700
700
700
700
700
$94
Delphi Point Park Trail
460
460
460
460
460
460
460
460
460
460
460
460
460
460
460
$94
Drakes Path Trail
210
210
210
210
210
210
210
210
210
210
210
210
210
210
210
$94
Nipissing Ridge Trail
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
$94
Summit Green Trail
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
$94
Lora Bay Trail
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
1,200
$94
Alta Trail
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
1,400
$94
7th Line Trail
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
$94
Alpine Trail
620
620
620
620
620
620
620
620
620
620
620
620
620
620
620
$94
Craigleith Meadows Trail
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
2,000
$94
Heritage Trail
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
$94
Total (#)
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
42,600.0
Total ($000)
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
$3,983.1
Appendix B | 104
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
PARK FACILITIES
BASEBALL DIAMONDS
# of Diamonds
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Baseball Diamonds
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
$159,500
Total (#)
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Total ($000)
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
$478.5
SOFTBALL DIAMONDS
# of Diamonds
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Heritage Park
1
1
1
1
1
1
1
1
1
1
1
1
-
-
-
$82,500
Total (#)
1
1
1
1
1
1
1
1
1
1
1
1
-
-
-
Total ($000)
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$82.5
$0.0
$0.0
$0.0
SOCCER PITCHES
# of Pitches
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Bayview Park
1
1
1
1
-
-
-
-
-
-
-
-
-
-
-
$27,240
Tomahawk Recreation Complex
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
$198,000
Tomahawk Tyke Field
-
-
-
-
1
1
1
1
1
1
1
1
1
1
1
$99,000
Total (#)
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
Total ($000)
$621.2
$621.2
$621.2
$621.2
$693.0
$693.0
$693.0
$693.0
$693.0
$693.0
$693.0
$693.0
$693.0
$693.0
$693.0
Appendix B | 105
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
PARK FACILITIES
GOLF COURSES
# of Courses
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Tomahawk
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$1,500,000
Total (#)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total ($000)
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
$1,500.0
TENNIS COURTS/PICKELBALL COURTS
# of Courts
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Cameron Shores Tennis Club
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$165,000
Bayview Park
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$165,000
Nipissing Ridge (Georgian Woodlands)
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$165,000
Boyer Park
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$165,000
Tomahawk Pickleball Courts
-
-
-
-
-
-
-
-
-
-
-
-
4
4
4
$41,250
Total (#)
8
8
8
8
8
8
8
8
8
8
8
8
12
12
12
Total ($000)
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,320.0
$1,485.0
$1,485.0
$1,485.0
PLAYGROUNDS
# of Playgrounds
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Timmons Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$43,000
Ravenna Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$43,000
Hillcrest Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$43,000
Council Beach
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$43,000
Heritage Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$114,700
Northwinds Beach
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$114,700
Bayview Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$215,100
Moreau Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$215,100
Little River Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$215,100
Total (#)
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
Total ($000)
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
$1,046.7
Appendix B | 106
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
PARK FACILITIES
BASKETBALL COURTS
# of Courts
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
B.V.C.C. Basketball Court
1
1
1
1
1
1
1
1
1
1
1
-
-
-
-
$10,000
Timmons St. Basketball Court (1/2 court)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$10,000
Heritage Park 1/2 Court
-
-
-
-
-
-
-
-
-
1
1
1
1
1
1
$10,000
Total (#)
2
2
2
2
2
2
2
2
2
3
3
2
2
2
2
Total ($000)
$20.0
$20.0
$20.0
$20.0
$20.0
$20.0
$20.0
$20.0
$20.0
$30.0
$30.0
$20.0
$20.0
$20.0
$20.0
SKATEBOARD PARKS
# of Parks
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Moreau Park
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$75,900
Total (#)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total ($000)
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
$75.9
PAVILIONS
# of Pavilions
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Moreau Park Sun Shade
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$16,500
Tomahawk Sun Shades
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
$16,500
Lions Parks Pavilion
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$148,500
Delphi Point Pavilion
-
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$148,500
Thornbury Harbour Pavilion
-
-
-
-
1
1
1
1
1
1
1
1
1
1
1
$148,500
Tomahawk Pavillion
-
-
-
-
1
1
1
1
1
1
1
1
1
1
1
$148,501
Bayview Park Rotary Pavilion
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$220,000
Cedar Drove
-
-
1
1
1
1
1
1
1
1
1
1
1
1
1
$148,500
Total (#)
6
7
8
8
10
10
10
10
10
10
10
10
10
10
10
Total ($000)
$434.5
$583.0
$731.5
$731.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
$1,028.5
Appendix B | 107
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
PARK FACILITIES
DOG PARKS
# of Parks
UNIT COST
Park Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Moreau Park Dog park
-
-
-
-
1
1
1
1
1
1
1
1
1
1
1
$25,000
Heritage Park Dog Park
-
-
-
-
-
-
-
-
-
-
-
-
1
1
1
$25,000
Total (#)
-
-
-
-
1
1
1
1
1
1
1
1
2
2
2
Total ($000)
$0.0
$0.0
$0.0
$0.0
$25.0
$25.0
$25.0
$25.0
$25.0
$25.0
$25.0
$25.0
$50.0
$50.0
$50.0
SPECIAL FACILITIES
Total Value of Special Facilities
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Tomahawk Soccer Field Sheds
$15,000
$15,000
$15,000
$15,000
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
$25,000
Tomahawk Storage Container
$0
$0
$0
$0
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$5,000
$10,000
$10,000
$10,001
$10,002
Thornbury Harbour Docks
$1,760,000
$1,760,000
$1,760,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
$1,830,000
Thornbury Harbour Fuel Dock/System
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
$310,000
Labyrinth
$0
$0
$0
$0
$0
$0
$35,000
$35,000
$35,000
$35,000
$35,000
$35,000
$35,000
$35,000
$35,000
Parks Operations Storage Container
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$5,000
$5,000
$5,000
$5,000
$5,000
Total ($000)
$2,085.0
$2,085.0
$2,085.0
$2,155.0
$2,170.0
$2,170.0
$2,205.0
$2,205.0
$2,205.0
$2,205.0
$2,210.0
$2,215.0
$2,215.0
$2,215.0
$2,215.0
Appendix B | 108
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
PARKS AND RECREATION
VEHICLES AND EQUIPMENT
VEHICLES AND EQUIPMENT
Total Value of Vehicles and Equipment ($)
UNIT COST
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Backhoe
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
$110,000
Heavy Duty Pickup Truck
1
1
1
1
1
2
2
2
2
2
3
3
3
3
3
$60,000
Ice Resurfacer
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$95,000
Large Landscaping Equipment
5
5
5
5
5
6
7
7
9
9
9
9
9
9
9
$30,000
Light Duty Pickup Truck
8
8
8
8
8
7
7
7
9
8
7
7
8
8
8
$45,000
RTV
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
$25,000
Snow Removal Equipment
1
1
1
1
1
1
1
1
1
1
6
6
8
8
8
$10,000
Tractor
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$135,000
Attachment
3
3
3
3
3
3
4
4
4
4
4
5
5
5
5
$25,000
Trailer
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
$10,000
Small Equipment
54
54
54
54
54
54
54
54
54
54
54
54
54
54
54
$1,000
Total (#)
79
79
79
79
79
80
82
82
86
85
91
93
96
96
96
Total ($000)
$1,004.0
$1,004.0
$1,004.0
$1,004.0
$1,004.0
$1,049.0
$1,104.0
$1,104.0
$1,254.0
$1,209.0
$1,299.0
$1,434.0
$1,499.0
$1,499.0
$1,499.0
Appendix B | 109
APPENDIX B.4
TABLE B.4-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
PARKS AND RECREATION
RECREATION COMBINED
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
INVENTORY SUMMARY ($000)
Indoor Recreation
$30,211.6
$30,211.6
$30,419.1
$31,822.0
$31,822.0
$31,942.4
$31,942.4
$31,942.4
$31,942.4
$31,942.4
$32,492.8
$32,492.8
$38,856.3
$38,856.3
$38,856.3
Parkland
$37,399.0
$37,570.6
$38,714.6
$54,966.5
$54,966.5
$54,966.5
$54,966.5
$54,966.5
$55,088.1
$55,138.1
$55,138.1
$55,138.1
$55,238.2
$55,238.2
$55,238.2
Park Facilities
$7,664.3
$7,812.8
$7,961.3
$8,031.3
$8,440.1
$8,440.1
$8,475.1
$8,475.1
$8,475.1
$8,485.1
$8,490.1
$8,485.1
$8,592.6
$8,592.6
$8,592.6
Park Vehicles and Equipment
$1,004.0
$1,004.0
$1,004.0
$1,004.0
$1,004.0
$1,049.0
$1,104.0
$1,104.0
$1,254.0
$1,209.0
$1,299.0
$1,434.0
$1,499.0
$1,499.0
$1,499.0
Total ($000)
$76,278.9
$76,599.0
$78,099.0
$95,823.9
$96,232.6
$96,398.0
$96,488.0
$96,488.0
$96,759.5
$96,774.6
$97,420.0
$97,550.0
$104,186.1
$104,186.1
$104,186.1
Average
SERVICE LEVEL ($/capita)
Service
Level
Indoor Recreation
$2,112.85
$2,074.40
$2,050.15
$2,138.43
$2,132.27
$2,134.61
$2,129.35
$2,123.83
$2,072.16
$2,021.67
$2,006.53
$1,957.57
$2,284.32
$2,224.09
$2,167.01
$2,108.62
Parkland
$2,615.50
$2,579.69
$2,609.24
$3,693.74
$3,683.10
$3,673.25
$3,664.19
$3,654.69
$3,573.67
$3,489.76
$3,404.95
$3,321.87
$3,247.40
$3,161.78
$3,080.63
$3,296.90
Park Facilities
$536.01
$536.45
$536.57
$539.70
$565.54
$564.03
$564.97
$563.50
$549.80
$537.03
$524.29
$511.20
$505.15
$491.83
$479.21
$533.68
Park Vehicles and Equipment
$70.21
$68.94
$67.67
$67.47
$67.27
$70.10
$73.60
$73.40
$81.35
$76.5
$80.2
$86.4
$88.1
$85.8
$83.6
$76.04
Total ($/capita)
$5,334.56
$5,259.48
$5,263.62
$6,439.34
$6,448.18
$6,441.99
$6,432.10
$6,415.42
$6,276.97
$6,124.97
$6,015.99
$5,877.04
$6,124.99
$5,963.50
$5,810.45
$6,015.24
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
PARKS AND RECREATION
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$6,015.24
Population Growth 2024 - 2033
3,978
Maximum Allowable Funding Envelope
$23,929,804
Appendix B | 110
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
4.0 PARKS AND RECREATION
4.1
Indoor Recreation
4.1.1
Provision for Indoor Recreation Space
2030
80,000,000
$
50,000,000
$
30,000,000
$
0%
-
$
30,000,000
$
-
$
13,478,242
$
16,521,758
$
Subtotal Indoor Recreation
80,000,000
$
50,000,000
$
30,000,000
$
-
$
30,000,000
$
-
$
13,478,242
$
16,521,758
$
4.2 Parkland Development
4.2.1
Parkland Development
Various
717,000
$
-
$
717,000
$
0%
-
$
717,000
$
717,000
$
-
$
-
$
4.2.2
Waterfront Development
Various
717,000
$
-
$
717,000
$
0%
-
$
717,000
$
311,797
$
405,203
$
-
$
4.2.3
Trail & Trailhead Development
Various
358,000
$
-
$
358,000
$
50%
179,000
$
179,000
$
179,000
$
-
$
-
$
4.2.4
Parks Satellite Building
2024
350,000
$
-
$
350,000
$
0%
-
$
350,000
$
350,000
$
-
$
-
$
Subtotal Parkland Development
2,142,000
$
-
$
2,142,000
$
179,000
$
1,963,000
$
1,557,797
$
405,203
$
-
$
4.3 Park Facilities
4.3.1
Tennis Court Construction/Pickle Ball
2024
660,000
$
-
$
660,000
$
50%
330,000
$
330,000
$
330,000
$
-
$
-
$
4.3.2
Tennis Court Construction/Pickle Ball
2030
330,000
$
-
$
330,000
$
0%
-
$
330,000
$
-
$
330,000
$
-
$
4.3.3
Additional Pavillion / Washrooms
2025
450,000
$
-
$
450,000
$
25%
112,500
$
337,500
$
337,500
$
-
$
-
$
4.3.4
Trail Development
2028
216,000
$
-
$
216,000
$
50%
108,000
$
108,000
$
108,000
$
-
$
-
$
4.3.5
Additional Parking at Riverwalk
Various
600,000
$
-
$
600,000
$
0%
-
$
600,000
$
600,000
$
-
$
-
$
Subtotal Park Facilities
2,256,000
$
-
$
2,256,000
$
550,500
$
1,705,500
$
1,375,500
$
330,000
$
-
$
4.4 Vehicles and Equipment
4.4.1
Additional Playground Equipment
2024
71,700
$
-
$
71,700
$
0%
-
$
71,700
$
71,700
$
-
$
-
$
4.4.2
Provision for Large Equipment (Truck/Trailer, Mowers, RTV etc.)
2024
172,100
$
-
$
172,100
$
0%
-
$
172,100
$
172,100
$
-
$
-
$
4.4.3
Provision for Small Equipment (Chainsaw, Push Mowers, etc.)
2024
35,800
$
-
$
35,800
$
0%
-
$
35,800
$
35,800
$
-
$
-
$
4.4.4
Additional Playground Equipment
2027
71,700
$
-
$
71,700
$
0%
-
$
71,700
$
71,700
$
-
$
-
$
4.4.5
Provision for Large Equipment (Truck/Trailer, Mowers, RTV etc.)
2029
172,100
$
-
$
172,100
$
0%
-
$
172,100
$
172,100
$
-
$
-
$
4.4.6
Provision for Small Equipment (Chainsaw, Push Mowers, etc.)
2029
35,800
$
-
$
35,800
$
0%
-
$
35,800
$
35,800
$
-
$
-
$
4.4.7
Additional Playground Equipment
2030
71,700
$
-
$
71,700
$
0%
-
$
71,700
$
-
$
71,700
$
-
$
Subtotal Vehicles and Equipment
630,900
$
-
$
630,900
$
-
$
630,900
$
559,200
$
71,700
$
-
$
TOTAL PARKS AND RECREATION
85,028,900
$
50,000,000
$
35,028,900
$
729,500
$
34,299,400
$
3,492,497
$
14,285,145
$
16,521,758
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
100%
$14,285,145
2024 - 2033 Net Funding Envelope
$14,285,145
10-Year Growth Population in New Units
5,587
Unadjusted Development Charge Per Capita
$2,556.85
Uncommitted Reserve Fund Balance
Balance as at December 31, 2023
$3,492,497
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
0%
$0
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$0.00
PARKS AND RECREATION
TABLE B.4-2
TOWN OF THE BLUE MOUNTAINS
DEVELOPMENT-RELATED CAPITAL PROGRAM
APPENDIX B.4
DC Eligible Costs
Appendix B | 111
Appendix B.5
By-Law Enforcement
Appendix B | 112
Appendix B.5 - By-Law Enforcement
The By-law Enforcement Division oversees municipal law enforcement in
The Blue Mountains. Their responsibilities involve promoting community
standards awareness and enforcing town by-laws including parking, animal
control and many others.
Table B.5-1 2009-2023 Historical Service Levels
The Town of The Blue Mountains By-Law department includes the Town
Hall with an area of 500 square feet valued at $192,500. The land area
associated with the buildings is approximately 0.03 hectares and is valued at
$42,900. The total cost of all furniture and equipment is approximately
$7,500. The nine vehicles associated with the By-Law department have a
total value of $145,000.
The current replacement value of all By-Law capital infrastructure is
$387,900 which provides the Town with a 15-year historical average service
level of $18.83 per population and employment.
The calculated maximum allowable recoverable through development
charges over the 2024 to 2033 planning period is $80,088 (4,253 population
and employment growth X historical service level of $18.83/population and
employment).
Table B.5-2 2024 - 2033 Development-Related Capital Program &
Calculation of the Development Charge
The By-Law capital forecast includes the recovery of negative reserve fund
balance amounting to $124,509. The acquisition of additional By-Law
vehicles and equipment, totaling $125,000, is also eligible for recovery
through development charges.
Appendix B | 113
In total, the 10-year capital program for By-Law Services amounts to
$249,509. No grants or subsidies are identified for this serviceʼs capital
program. In addition, no replacement shares have been identified. A share of
$169,421 is deemed as a post-period benefit and will not be recovered under
this development charges by-law, but may be considered in future
development charge studies, subject to service level restrictions. The
remaining $80,088 is related to development between 2024 and 2033 and is
allocated entirely against future development in the Town of The Blue
Mountains.
The 10-year development-related net capital cost is allocated 95%, or
$76,331, against residential development, and 5%, or $3,757, against non-
residential development. The allocation between residential and non-
residential development is based on shares of 10-year growth in population
in new units and employment. The resulting development charge is $13.66
per capita and $0.17 per square metre.
The following table summarizes the calculation of the By-Law Services
development charge.
15-year Hist.
Service Level
per Pop & Emp
Total
Net DC Recoverable
$/capita
$/m2
$18.83
$249,509
$80,088
$13.66
$0.17
BY-LAW ENFORCEMENT SUMMARY
2024 - 2033
Calculated
Development-Related Capital Program
Development Charge
Appendix B | 114
APPENDIX B.5
TABLE B.5-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
BY-LAW ENFORCEMENT
BUILDINGS
UNIT COST
Lot Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Town Hall Office Space
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
$385
Total (#)
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
Total ($000)
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
LAND
UNIT COST
Lot Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Town Hall Office Space
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
$1,430,000
Total (#)
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
Total ($000)
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
FURNITURE & EQUIPMENT
UNIT COST
Lot Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.m.)
Town Hall Office Space ($15/sq.f.t)
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
$15
Total (#)
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
Total ($000)
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
BY-LAW VEHICLES
UNIT COST
Vehicle Type
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Light Duty Vehicles
1
2
2
2
2
3
3
3
3
3
3
3
3
3
3
$45,000
Equipment for Officers
4
4
4
4
4
4
4
4
4
4
4
4
5
5
5
$1,000
Lift Kit
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$5,000
Total (#)
6
7
7
7
7
8
8
8
8
8
8
8
9
9
9
Total ($000)
$54.0
$99.0
$99.0
$99.0
$99.0
$144.0
$144.0
$144.0
$144.0
$144.0
$144.0
$144.0
$145.0
$145.0
$145.0
# of Vehicles
# of Square Feet
# of Hectares
Total Value of Furniture & Equipment ($)
Appendix B | 115
APPENDIX B.5
TABLE B.5-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
BY-LAW ENFORCEMENT
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
Historical Employment
3,339
3,337
3,335
3,432
3,531
3,633
3,738
3,847
4,010
4,179
4,353
4,534
4,720
4,863
4,891
Total Historical Population & Employm
17,638
17,901
18,173
18,313
18,455
18,597
18,739
18,887
19,425
19,979
20,547
21,132
21,730
22,333
22,822
INVENTORY SUMMARY ($000)
Buildings
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
$192.5
Land
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
$42.9
Furniture & Equipment
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
$7.5
By-Law Vehicles
$54.0
$99.0
$99.0
$99.0
$99.0
$144.0
$144.0
$144.0
$144.0
$144.0
$144.0
$144.0
$145.0
$145.0
$145.0
Total ($000)
$296.9
$341.9
$341.9
$341.9
$341.9
$386.9
$386.9
$386.9
$386.9
$386.9
$386.9
$386.9
$387.9
$387.9
$387.9
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$10.91
$10.75
$10.59
$10.51
$10.43
$10.35
$10.27
$10.19
$9.91
$9.64
$9.37
$9.11
$8.86
$8.62
$8.43
$9.86
Land
$2.43
$2.40
$2.36
$2.34
$2.32
$2.31
$2.29
$2.27
$2.21
$2.15
$2.09
$2.03
$1.97
$1.92
$1.88
$2.20
Furniture & Equipment
$0.43
$0.42
$0.41
$0.41
$0.41
$0.40
$0.40
$0.40
$0.39
$0.38
$0.37
$0.35
$0.35
$0.34
$0.33
$0.38
By-Law Vehicles
$3.06
$5.53
$5.45
$5.41
$5.36
$7.74
$7.68
$7.62
$7.41
$7.21
$7.01
$6.81
$6.67
$6.49
$6.35
$6.39
Total ($/pop + emp)
$16.83
$19.10
$18.81
$18.67
$18.53
$20.80
$20.65
$20.48
$19.92
$19.37
$18.83
$18.31
$17.85
$17.37
$17.00
$18.83
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
BY-LAW ENFORCEMENT
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$18.83
Population and Employment Growth 2024 - 2033
4,253
Maximum Allowable Funding Envelope
$80,088
Appendix B | 116
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
5.0 BY-LAW ENFORCEMENT
5.1
Negative Reserve Fund Balance
5.1.1
Recovery of Negative Reserve Fund Balance
2024
124,509
$
-
$
124,509
$
0%
-
$
124,509
$
-
$
80,088
$
44,421
$
Subtotal
124,509
$
-
$
124,509
$
-
$
124,509
$
-
$
80,088
$
44,421
$
5.2
Vehicles & Equipment
5.2.1
By-Law Vehicle
2028
50,000
$
-
$
50,000
$
0%
-
$
50,000
$
-
$
-
$
50,000
$
5.2.2
Equipment for additional officer
2028
5,000
$
-
$
5,000
$
0%
-
$
5,000
$
-
$
-
$
5,000
$
5.2.3
By-Law Vehicle
2033
50,000
$
-
$
50,000
$
0%
-
$
50,000
$
-
$
-
$
50,000
$
5.2.4
Equipment for additional officer
2033
5,000
$
-
$
5,000
$
0%
-
$
5,000
$
-
$
-
$
5,000
$
5.2.5
Various Equipment
Various
15,000
$
-
$
15,000
$
0%
-
$
15,000
$
-
$
-
$
15,000
$
Subtotal Vehicles & Equipment
125,000
$
-
$
125,000
$
-
$
125,000
$
-
$
-
$
125,000
$
TOTAL BY-LAW ENFORCEMENT
249,509
$
-
$
249,509
$
-
$
249,509
$
-
$
80,088
$
169,421
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
95%
$76,331
2024 - 2033 Net Funding Envelope
$80,088
10-Year Growth Population in New Units
5,587
Unadjusted Development Charge Per Capita
$13.66
Uncommitted Reserve Fund Balance
Balance as at December 31, 2023
-$124,509
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
5%
$3,757
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$0.17
APPENDIX B.5
TABLE B.5-2
TOWN OF THE BLUE MOUNTAINS
DEVELOPMENT-RELATED CAPITAL PROGRAM
BY-LAW ENFORCEMENT
DC Eligible Costs
Appendix B | 117
Appendix B.6
Solid Waste Management
Appendix B | 118
Appendix B.6 - Solid Waste Management
As of January 1, 2016, the Development Charges Act permits the inclusion of
capital costs associated with all waste management operations with the
exception of incineration and landfill activities. These shares of facilities,
land, vehicles and equipment have been removed from the development
charges calculation.
Table B.6-1 2009-2023 Historical Service Levels
The Town of The Blue Mountains provides a variety of waste-related
services at the processing sites, including diversion, landfill and processing.
As landfills are ineligible under the DCA, shares have been removed from
the identified capital assets to account for the portion of each item in the
inventory that relates to landfill operations. These shares were reviewed and
determined in consultation with Town staff.
The total eligible size of the Townʼs solid waste buildings amounts to 1,361
square feet, valued at $823,600. The land related to the eligible portions of
buildings total 1.63 hectares, valued at $2.34 million.
Of the vehicles and equipment used to provide Solid Waste services to the
Town, a total of nine represent the share of vehicles related to the eligible
operations of diversion, collection and processing. The replacement costs of
these vehicles total $1.97 million.
The total value of the inventory of capital assets for Solid Waste in 2023 was
$5.13 million, resulting in a 15-year historical average service level of
$254.57 per population and employment. The historical service level,
multiplied by the 10-year population and employment growth, results in a
10-year maximum allowable funding envelope of $1.08 million (4,253 X
$254.57 per population and employment).
Appendix B | 119
Table B.6-2 2024 - 2033 Development-Related Capital Program and
Calculation of the Development Charges
The 10-year development-related capital plan for Solid Waste Management
includes provisions for a scale house and scale, a collection truck, organic
recycling bins, and organics processing equipment for a total of $1.10
million. No grants, subsidies or other recoveries are identified and as such,
the total is carried forward to the net municipal costs.
A total benefit to existing share of $360,000 has been identified for the
proposed scale house and scale ($185,000) and organics processing
equipment ($175,000) and is removed from the calculation. A portion of the
costs, approximately $305,747, will be funded by available reserve funds.
The total 2024-2033 development related cost of $434,253 is allocated 95%,
or $413,881, to the residential sector. The remaining 5%, or $20,372, is
allocated to non-residential development. This yields a development charge
of $74.08 per capita and $0.93 per square metre.
The following table summarizes the calculation of the Solid Waste
development charge.
15-year Hist.
Service Level
per Pop & Emp
Total
Net DC Recoverable
$/capita
$/m2
$254.57
$1,100,000
$434,253
$74.08
$0.93
Development-Related Capital Program
Development Charge
SOLID WASTE MANAGEMENT SUMMARY
2024 - 2033
Calculated
Appendix B | 120
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
SOLID WASTE MANAGEMENT
BUILDINGS (1)
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Solid Waste Ops
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
2,500
$385
Less: Non-DC Eligible Waste Functions
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
(1,675)
$385
Scale House
100
100
100
100
100
100
100
100
100
100
100
100
100
101
102
$385
Less: Non-DC Eligible Waste Functions
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
(67)
$385
Compost Pad
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
$300,000
Solid Waste Office Space in Town Hall
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
$385
Total (sq.ft.)
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,359
1,360
1,361
Total ($000)
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$823.2
$823.6
(1) 33% of the identified assets relate to DC eligible waste diversion services.
LAND
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Waste Receiving Area
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
4.86
$1,430,000
Less: Non-DC Eligible Waste Functions
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
(3.26)
$1,430,000
Solid Waste Office Space in Town Hall
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
$1,430,000
Total (ha)
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
Total ($000)
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
(1) 33% of the identified assets relate to DC eligible waste diversion services
VEHICLES & EQUIPMENT
UNIT COST
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Light Duty Pick-up Truck
1
1
1
1
1
1
1
1
1
1
1
1
1
2
3
$45,000
Less: Non-DC Eligible Waste Functions
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(1.34)
(2.01)
$45,000
Large Equipment
1
1
1
1
1
1
1
1
1
1
1
1
1
2
3
$220,000
Less: Non-DC Eligible Waste Functions
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(1.34)
(2.01)
$220,000
Contractor Pick-Up
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$45,000
Less: Non-DC Eligible Waste Functions
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$45,000
Contractor Trucks
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
$330,000
Less: Non-DC Eligible Waste Functions
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$330,000
Scales
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$30,000
Less: Non-DC Eligible Waste Functions
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
(0.67)
$30,000
RTV
-
-
-
-
-
-
-
-
-
-
-
1
1
1
1
$20,000
Less: Non-DC Eligible Waste Functions
-
-
-
-
-
-
-
-
-
-
-
(0.67)
(0.67)
(0.67)
(0.67)
$20,000
Total (#)
7
7
7
7
7
7
7
7
7
7
7
7
7
8
9
Total ($000)
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,799.0
$1,799.0
$1,886.4
$1,973.9
(1) 33% of the identified assets relate to DC eligible waste diversion services.
# of Vehicles & Equipment
APPENDIX B.6
TABLE B.6-1
# of Square Feet
# of Hectares
Appendix B | 121
APPENDIX B.6
TABLE B.6-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
SOLID WASTE MANAGEMENT
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
Historical Employment
3,339
3,337
3,335
3,432
3,531
3,633
3,738
3,847
4,010
4,179
4,353
4,534
4,720
4,863
4,891
Total Historical Population & Employment
17,638
17,901
18,173
18,313
18,455
18,597
18,739
18,887
19,425
19,979
20,547
21,132
21,730
22,333
22,822
INVENTORY SUMMARY ($000)
Buildings (1)
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$822.8
$823.2
$823.6
Land
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
$2,336.3
Vehicles & Equipment
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,792.4
$1,799.0
$1,799.0
$1,886.4
$1,973.9
Total ($000)
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,951.5
$4,958.1
$4,958.1
$5,045.9
$5,133.8
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings (1)
$46.65
$45.97
$45.28
$44.93
$44.59
$44.25
$43.91
$43.57
$42.36
$41.19
$40.05
$38.94
$37.87
$36.86
$36.09
$42.17
Land
$132.46
$130.51
$128.56
$127.58
$126.60
$125.63
$124.68
$123.70
$120.27
$116.94
$113.71
$110.56
$107.52
$104.61
$102.37
$119.71
Vehicles & Equipment
$101.62
$100.13
$98.63
$97.87
$97.12
$96.38
$95.65
$94.90
$92.27
$89.71
$87.23
$85.13
$82.79
$84.47
$86.49
$92.69
Total ($/pop + emp)
$280.73
$276.61
$272.47
$270.38
$268.30
$266.25
$264.24
$262.16
$254.90
$247.84
$240.99
$234.62
$228.17
$225.94
$224.95
$254.57
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
SOLID WASTE MANAGEMENT
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$254.57
Net Population and Employment Growth 2024 - 2033
4,253
Maximum Allowable Funding Envelope
$1,082,736
Appendix B | 122
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
6.0 SOLID WASTE MANAGEMENT
6.1
Land, Buildings and Facilities
6.1.1
Scale House and Scale
2025
370,000
$
-
$
370,000
$
50%
185,000
$
185,000
$
185,000
$
-
$
-
$
Subtotal Land, Buildings and Facilities
370,000
$
-
$
370,000
$
185,000
$
185,000
$
185,000
$
-
$
-
$
6.2
Fleet & Equipment
6.2.1
Collection Truck
2025
300,000
$
-
$
300,000
$
0%
-
$
300,000
$
-
$
300,000
$
-
$
6.2.2
Organic Recycling Bins for New Households
Various
80,000
$
-
$
80,000
$
0%
-
$
80,000
$
-
$
80,000
$
-
$
Subtotal Fleet & Equipment
380,000
$
-
$
380,000
$
-
$
380,000
$
-
$
380,000
$
-
$
6.3
Other Equipment
6.3.1
Organics Processing Equipment
2025
350,000
$
-
$
350,000
$
50%
175,000
$
175,000
$
120,747
$
54,253
$
-
$
Subtotal Other Equipment
350,000
$
-
$
350,000
$
175,000
$
175,000
$
120,747
$
54,253
$
-
$
TOTAL SOLID WASTE MANAGEMENT
1,100,000
$
-
$
1,100,000
$
360,000
$
740,000
$
305,747
$
434,253
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
95%
$413,881
2024 - 2033 Net Funding Envelope
$1,082,736
10-Year Growth Population in New Units
5,587
Unadjusted Development Charge Per Capita
$74.08
Uncommitted Reserve Fund Balance
Balance as at December 31, 2023
$305,747
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
5%
$20,372
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$0.93
TOWN OF THE BLUE MOUNTAINS
DEVELOPMENT-RELATED CAPITAL PROGRAM
SOLID WASTE MANAGEMENT
DC Eligible Costs
APPENDIX B.6
TABLE B.6-2
Appendix B | 123
Appendix B.7
Development Related Studies
Appendix B | 124
Appendix B.7 - Development Related
Studies
As of December 13, 2023, the Minister of Municipal Affairs and Housing has
indicated a review of the removal of development-related studies from
recovery under the DCA.
Table B.7-1 2024 - 2033 Development-Related Capital Program and
Calculation of the Development Charges
As shown on Table B.7-1, the 2024-2033 development-related gross cost for
General Government is $1.57 million. Development-related studies, such as
Development Charges updates, Craigleith Community Parkland, Official Plan
updates, Zoning By-law updates, and other planning studies have been
included. A recovery of $125,062 in past commitments is also included in the
capital program for recovery through DCs.
Recognizing that not all studies under this service are entirely necessitated
by new development in the Town, benefit to existing shares have been
identified and reduced from the net municipal costs. In total, the benefit to
existing shares amount to $611,550 and this amount will not be recovered
through development charges.
The remaining amount of $962,412 is eligible for development charges
funding in the 10-year planning period. This amount is included in the
development charge calculation and is allocated 95%, or $917,263 to the
residential sector and 5%, or $45,149 to the non-residential sector based on
shares of 10-year growth in net population and employment. The resulting
per capita charge is $164.18. The non-residential charge is $2.05 per square
metre.
The following table summarizes the calculation of the Development -Related
Studies development charge.
Appendix B | 125
Total
Net DC Recoverable
$/capita
$/m2
$1,573,962
$962,412
$164.18
$2.05
DEVELOPMENT RELATED STUDIES
2024 - 2033
Calculated
Development-Related Capital Program
Development Charge
Appendix B | 126
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
7.0 DEVELOPMENT RELATED STUDIES
7.1 Negative Reserve Fund Balance
7.1.1
Recovery of Negative Reserve Fund Balance
2025
125,062
$
-
$
125,062
$
0%
-
$
125,062
$
-
$
125,062
$
$
Subtotal Negative Reserve Fund Balance
125,062
$
-
$
125,062
$
-
$
125,062
$
-
$
125,062
$
-
$
7.2 Development-Related Studies
7.2.1
Official Plan Update
2024
100,400
$
-
$
100,400
$
50%
50,200
$
50,200
$
-
$
50,200
$
-
$
7.2.2
Natural Heritage Study
2024
107,500
$
-
$
107,500
$
50%
53,750
$
53,750
$
-
$
53,750
$
-
$
7.2.3
Craigleith Community Parkland
2024
75,000
$
-
$
75,000
$
0%
-
$
75,000
$
-
$
75,000
$
-
$
7.2.4
Zoning By-law Update
2025
57,400
$
-
$
57,400
$
50%
28,700
$
28,700
$
-
$
28,700
$
-
$
7.2.5
Development Charge Background Study
2024
75,400
$
-
$
75,400
$
0%
-
$
75,400
$
-
$
75,400
$
-
$
7.2.6
Development Charge Background Study
2033
75,400
$
-
$
75,400
$
0%
-
$
75,400
$
-
$
75,400
$
-
$
7.2.7
Official Plan Update
2029
100,400
$
-
$
100,400
$
50%
50,200
$
50,200
$
-
$
50,200
$
-
$
7.2.8
Zoning By-law Update
2030
57,400
$
-
$
57,400
$
50%
28,700
$
28,700
$
-
$
28,700
$
-
$
7.2.9
Provision for Additional Studies
Various
800,000
$
-
$
800,000
$
50%
400,000
$
400,000
$
-
$
400,000
$
$
Subtotal Development-Related Studies
1,448,900
$
-
$
1,448,900
$
611,550
$
837,350
$
-
$
837,350
$
-
$
TOTAL DEVELOPMENT RELATED STUDIES
1,573,962
$
-
$
1,573,962
$
611,550
$
962,412
$
-
$
962,412
$
-
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
95%
$917,263
Uncommitted Reserve Fund Balance
10-Year Growth Population in New Units
5,587
Balance as at December 31, 2023
-$125,062
Unadjusted Development Charge Per Capita
$164.18
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
5%
$45,149
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$2.05
DEVELOPMENT RELATED STUDIES
DC Eligible Costs
APPENDIX B.7
TABLE B.7-1
TOWN OF THE BLUE MOUNTAINS
DEVELOPMENT-RELATED CAPITAL PROGRAM
Appendix B | 127
Appendix C
Services Related to a Highway
Technical Appendix
Appendix C | 128
Appendix C - Engineering Infrastructure
Services Related to a Highway
This appendix provides the detailed analysis undertaken to establish the
development charges rates for the Services Related to a Highway: Public
Works and Roads and Related service category in the Town of The Blue
Mountains. This service category includes the road network, streetlights,
intersection improvements, traffic signalization, storm drainage (within the
ROW), sidewalks, facilities, fleet and equipment and other related
structures.
The capital planning and management of all transportation infrastructure in
the Town of The Blue Mountains is carried out by the Infrastructure and
Public Works department.
The structure of the Public Works table follows the description provided in
Appendix B. Details on the tables included for Roads and Related service are
included in Appendix C.2 below.
Appendix C | 129
Appendix C.1
Services Related to a Highway:
Public Works
Appendix C | 130
Appendix C.1 - Services Related to a
Highway: Public Works
The Town of The Blue Mountains Public Works Department is responsible
for the operation and maintenance of Town infrastructure. Also included in
this category is Town-wide fleet as relate to the eligible services under
section 2(4) of the DCA but excluding those listed under other service
inventories.
Table C.1-1 2009-2023 Historical Service Levels
The 15-year historical inventory of capital assets for Public Works includes
15,160 square feet of building space with a replacement value of $5.89
million. The 3.06 hectares of land associated with the Public Works buildings
are valued at $4.38 million, furniture and equipment amount to $227,400,
and the 25 vehicles in the municipal fleet add an additional $5.76 million to
the value of the capital assets.
The total value of the Public Works capital infrastructure is estimated to be
$16.26 million. The 15-year historical average service level is $787.32 per
population and employment and this, multiplied by the 10-year forecast
population and employment growth (4,253), results in a maximum allowable
funding envelope of $3.35 million.
Table C.1-2 2024 - 2033 Development-Related Capital Program and
Calculation of the Unadjusted Development Charges
The Public Works capital program relates largely to the provision of new
building space for public works operations in the Town. A new public works
facility for $8.27 million is anticipated in 2025. A new snow storage facility in
2025 ($455,000) and a new satellite office in 2027 ($2.18 million) are also
included in the capital program. A provision of $1.50 million is also included
for new vehicles and equipment.
Appendix C | 131
Altogether, the Public Works capital program totals $12.40 million. No
grants, subsidies or required discounts are identified for this service. A share
of $2.07 million is identified as providing benefit to existing development
related to the proposed Public Works Facility. Available DC reserve funds
total $333,920 and will be used to fund a portion of the capital program.
Additionally, $6.65 million has been identified as other development related
costs, and will be considered for funding from other sources including in
subsequent development charges studies.
After these adjustments, the DC costs eligible for recovery over the 2024 to
2033 planning period amount to $3.35 million and are allocated 95%, or
$3.19 million, against new residential development, and 5%, or $157,092,
against non-residential development. This yields an unadjusted
development charge of $571.24 per capita and $7.15 per square metre.
The following table summarizes the calculation of the Public Works
development charge.
15-year Hist.
Service Level
per Pop & Emp
Total
Net DC Recoverable
$/capita
$/m2
$787.32
$12,395,000
$3,348,626
$571.24
$7.15
Development-Related Capital Program
Development Charge
2024 - 2033
Calculated
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS SUMMARY
Appendix C | 132
APPENDIX C.1
TABLE C.1-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
BUILDINGS
# of Square Feet
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/sq.ft.)
Public Works Facility (Old Ravenna) #1
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
2,700
$500
Public Works Facility (New Ravenna) #2
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
4,500
$500
Public Works Facility (Storage Ravenna) #3
1,800
1,800
1,800
1,800
1,800
1,800
2,820
2,820
2,820
2,820
2,820
2,820
2,820
2,820
2,820
$290
Public Works Facility (Sand Dome) #4 (Town Share)
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
2,400
$290
Portable Office - Trailer
960
960
960
960
960
960
800
800
800
800
800
800
800
800
800
$140
Portable Office - Trailer
-
-
-
-
360
360
360
360
360
360
360
360
360
360
360
$140
Public Works Space in Town Hall
-
-
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
1,100
$500
Storage trailer / Lock Up
-
-
-
-
-
-
480
480
480
480
480
480
480
480
480
$140
Total (sq.ft.)
12,360
12,360
13,460
13,460
13,820
13,820
15,160
15,160
15,160
15,160
15,160
15,160
15,160
15,160
15,160
Total ($000)
$4,952.4
$4,952.4
$5,502.4
$5,502.4
$5,552.8
$5,552.8
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
LAND
# of Hectares
UNIT COST
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/ha)
Public Works Facility Ravenna
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
$1,430,000
County Public Works Facility (Sand Dome, shared)
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
$1,430,000
Storage Pad (50% of total)
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
$1,430,000
Snow Storage (prev. school site) (10% of total site)
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
0.38
$1,430,000
Public Works Space in Town Hall
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
0.08
$1,430,000
Total (ha)
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
3.06
Total ($000)
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
FURNITURE & EQUIPMENT
Total Value of Furniture & Equipment ($)
Facility Name
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Furniture & Equipment for Facilities ($15 per sq.ft.)
$185,400
$185,400
$201,900
$201,900
$207,300
$207,300
$227,400
$227,400
$227,400
$227,400
$227,400
$227,400
$227,400
$227,400
$227,400
Total ($000)
$185.4
$185.4
$201.9
$201.9
$207.3
$207.3
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
Appendix C | 133
APPENDIX C.1
TABLE C.1-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
MUNICIPAL FLEET
# of Fleet
UNIT COST
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Tractor and Attachments
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$500,000
Graders
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
$460,000
Back-hoes
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$175,000
Light Duty Vehicles
4
4
4
4
5
5
4
4
5
5
5
5
5
5
5
$45,000
Heavy Duty Vehicles
2
2
2
2
2
2
2
2
2
2
1
1
1
1
1
$60,000
Plows
6
6
6
6
6
4
4
4
5
5
8
8
8
8
8
$325,000
Brush Chipper
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$95,000
Grader Rollers
-
-
-
-
-
-
-
1
2
2
2
2
2
2
2
$25,000
Sidewalk Plows (Contracted)
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
$250,000
Total (#)
21
21
21
21
22
20
19
20
23
23
25
25
25
25
25
Total ($000)
$5,075.0
$5,075.0
$5,075.0
$5,075.0
$5,120.0
$4,470.0
$4,425.0
$4,450.0
$4,845.0
$4,845.0
$5,760.0
$5,760.0
$5,760.0
$5,760.0
$5,760.0
Appendix C | 134
APPENDIX C.1
TABLE C.1-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
Historical Employment
3,339
3,337
3,335
3,432
3,531
3,633
3,738
3,847
4,010
4,179
4,353
4,534
4,720
4,863
4,891
Total Historical Population & Employment
17,638
17,901
18,173
18,313
18,455
18,597
18,739
18,887
19,425
19,979
20,547
21,132
21,730
22,333
22,822
INVENTORY SUMMARY ($000)
Buildings
$4,952.4
$4,952.4
$5,502.4
$5,502.4
$5,552.8
$5,552.8
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
$5,893.4
Land
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
$4,375.8
Furniture & Equipment
$185.4
$185.4
$201.9
$201.9
$207.3
$207.3
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
$227.4
Municipal Fleet
$5,075.0
$5,075.0
$5,075.0
$5,075.0
$5,120.0
$4,470.0
$4,425.0
$4,450.0
$4,845.0
$4,845.0
$5,760.0
$5,760.0
$5,760.0
$5,760.0
$5,760.0
Total ($000)
$14,588.6
$14,588.6
$15,155.1
$15,155.1
$15,255.9
$14,605.9
$14,921.6
$14,946.6
$15,341.6
$15,341.6
$16,256.6
$16,256.6
$16,256.6
$16,256.6
$16,256.6
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Buildings
$280.78
$276.65
$302.79
$300.46
$300.88
$298.59
$314.50
$312.03
$303.39
$294.98
$286.83
$278.88
$271.21
$263.88
$258.24
$289.61
Land
$248.09
$244.44
$240.79
$238.95
$237.11
$235.30
$233.51
$231.68
$225.26
$219.02
$212.97
$207.07
$201.37
$195.93
$191.74
$224.22
Furniture & Equipment
$10.51
$10.36
$11.11
$11.02
$11.23
$11.15
$12.14
$12.04
$11.71
$11.38
$11.07
$10.76
$10.46
$10.18
$9.96
$11.01
Municipal Fleet
$287.73
$283.50
$279.27
$277.13
$277.43
$240.36
$236.14
$235.61
$249.42
$242.51
$280.34
$272.57
$265.07
$257.91
$252.39
$262.49
Total ($/pop & emp)
$827.11
$814.96
$833.96
$827.56
$826.65
$785.39
$796.29
$791.36
$789.78
$767.89
$791.21
$769.28
$748.13
$727.91
$712.33
$787.32
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
15-Year Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$787.32
Population and Employment Growth 2024 - 2033
4,253
Maximum Allowable Funding Envelope
$3,348,626
Appendix C | 135
Gross
Grants/
Net
Ineligible Costs
Total
Project Description
Timing
Project
Subsidies/Other
Municipal
BTE
Replacement
DC Eligible
Available
2024-
Other Dev.
Cost
Recoveries
Cost
%
& BTE Shares
Costs
DC Reserves
2033
Related
1.0 SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
1.1
Buildings and Facilities
1.1.1
Public Works Facility
2025
8,265,000
$
-
$
8,265,000
$
25%
2,066,250
$
6,198,750
$
333,920
$
2,523,626
$
3,341,204
$
1.1.2
Snow Storage Facility
2025
455,000
$
-
$
455,000
$
0%
-
$
455,000
$
-
$
-
$
455,000
$
1.1.3
Satellite Office (3,000 sq ft)
2027
2,175,000
$
-
$
2,175,000
$
0%
-
$
2,175,000
$
-
$
-
$
2,175,000
$
Subtotal Buildings and Facilities
10,895,000
$
-
$
10,895,000
$
2,066,250
$
8,828,750
$
333,920
$
2,523,626
$
5,971,204
$
1.2
Fleet and Equipment
1.2.1
Snow Plow
2025
475,000
$
-
$
475,000
$
0%
-
$
475,000
$
-
$
475,000
$
-
$
1.2.2
Small Equipment
2025
50,000
$
-
$
50,000
$
0%
-
$
50,000
$
-
$
50,000
$
-
$
1.2.3
Large Equipment
2024
150,000
$
-
$
150,000
$
0%
-
$
150,000
$
-
$
150,000
$
-
$
1.2.4
Large Equipment
2024
150,000
$
-
$
150,000
$
0%
-
$
150,000
$
-
$
150,000
$
-
$
1.2.5
Large Equipment
2024
150,000
$
-
$
150,000
$
0%
-
$
150,000
$
-
$
-
$
150,000
$
1.2.6
Snow Plow
2029
475,000
$
-
$
475,000
$
0%
-
$
475,000
$
-
$
-
$
475,000
$
1.2.7
Small Equipment
2029
50,000
$
-
$
50,000
$
0%
-
$
50,000
$
-
$
-
$
50,000
$
Subtotal Fleet and Equipment
1,500,000
$
-
$
1,500,000
$
-
$
1,500,000
$
-
$
825,000
$
675,000
$
TOTAL SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
12,395,000
$
-
$
12,395,000
$
2,066,250
$
10,328,750
$
333,920
$
3,348,626
$
6,646,204
$
Residential Development Charge Calculation
Residential Share of 2024 - 2033 DC Eligible Costs
95%
$3,191,534
2024 - 2033 Net Funding Envelope
$3,348,626
10-Year Growth Population in New Units
5,587
Unadjusted Development Charge Per Capita
$571.24
Uncommitted Reserve Fund Balance
Balance as at December 31, 2023
$333,920
Non-Residential Development Charge Calculation
Non-Residential Share of 2024 - 2033 DC Eligible Costs
5%
$157,092
10-Year Growth in Square Metres
21,973
Unadjusted Development Charge Per Square Metre
$7.15
DC Eligible Costs
DEVELOPMENT-RELATED CAPITAL PROGRAM
SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS
TOWN OF THE BLUE MOUNTAINS
TABLE C.1-2
APPENDIX C.1
Appendix C | 136
Appendix C.2
Services Related to a Highway:
Roads and Related
Appendix C | 137
Appendix C.2 - Services Related to a
Highway: Roads and Related
The development-related Roads and Related infrastructure projects are
required to service the demands of new development up to the build-out of
the Town to approximately 7,390 units and 1,453 employees. This forecast is
discussed in more detail in Appendix A.
Tables C.2-1 to C.2-4 provide details of the projects included in the Town-
wide Roads and Related engineering infrastructure development charges
calculation. The content of the tables is as follows:
Table C.2-1 2009-2023 Historical Service Levels
Table C.2-2 Roads and Related Capital Program - 2024 to Build-out
Table C.2-3 Allocation of Capital Program and Determination of DC
Recoverable Share
Table C.2-4 Summary of Town-wide Residential and Non-Residential
Development Charges
Table C.2-1 2009-2023 Historical Service Levels
Table C.2-1 demonstrates that the Townʼs current road infrastructure
comprises approximately 225 kilometres of arterial, collectors, and local
roads, which are valued at $321.11 million.
The total value of bridges and culverts in the Town amounts to $74.63
million. The three traffic signals and are valued at $341,000 and sidewalks
total $6.57 million. Finally, 1,057 streetlights total $6.41 million.
The total inventory of capital assets for Roads and Related services has a
replacement value of $409.06 million. This produces a 15-year historical
Appendix C | 138
service level of $21,570.40 per capita and employee. The resulting maximum
allowable funding envelope is $344.82 million, which is brought forward to
the development charge calculation.
Table C.2-2 2024 - Build-Out Capital Program
The development-related capital program for transportation infrastructure
was developed by HDR Inc. in consultation with Town staff and Hemson
Consulting. The projects identified in the capital program are required to
service the demands of new development between 2024 and build-out,
subject to annual capital budget reviews. The entire capital program is
related to development Town-wide and has been allocated to development
as such.
The total gross cost of the Roads and Related capital program is $205.38
million and provides for the undertaking of various road reconstructions,
urbanizations, new road lengths, and various engineering studies. Table C.2-
2 shows all costs included in each capital project in order to reach the total
gross cost to be brought forward to the development charges calculation.
Table C.2-3 Allocation of Capital Program and Determination of DC
Recoverable Share
Table C.2-3 illustrates the determination of the development charge Town-
wide. The entire $205.38 million capital program will not be fully recovered
from future development charges and $29.08 million is identified as a local
service component. Approximately $26.59 million has been identified as a
benefit to existing share. A further share of $40.90 million is removed from
the DC eligible portion as it relates to costs Town-wide and in Thornbury
West not anticipated to be built-out within the planning horizon. As such,
the DC eligible portion is reduced to $100.54 million. This amount is then
brought forward to the development charges calculations.
Appendix C | 139
Table C.2-4 Summary of Town-wide Residential and Non-Residential
Development Charges
Table C.2-4 displays the calculation of the Town-wide residential and non-
residential development charges. Of the $100.54 million eligible share, an
additional $12.95 million is recovered from existing DC reserve fund balance.
The result is a development-related and development charges recoverable
share of the capital program of $87.58 million. The development-related cost
has been allocated 91% ($79.62 million) to new residential development and
9% ($7.96 million) to new non-residential development. The allocation of
costs is based on projected changes in population and employment growth
over the planning period. This results in a residential development charge of
$5,478.84 per capita and a non-residential charge of $68.57 per square
metre. These charges will be levied on all development occurring within the
Town of The Blue Mountains.
The Roads and Related capital program has been calculated using an
average cost method (i.e. the analysis is not cash-flowed) as it is anticipated
that the Roads program can be undertaken at approximately the same
timing and rate as anticipated development. If a particular development
requires a road project to be undertaken at an earlier time then anticipated
by the Town, or the Town has insufficient monies in the DC reserve, it may
be necessary for the Town and the developer to examine alternative front-
end financing arrangements.
The following is a summary of the Town-wide Roads and Related calculated
development charges rates:
Appendix C | 140
Total
Net DC Recoverable
$/capita
$/m2
$198,035,280
$87,584,734
$5,478.84
$68.57
Development Charge
Calculated
TOWN-WIDE ROADS AND RELATED SUMMARY
2024-Build-Out
Development-Related Capital Program
Appendix C | 141
APPENDIX C.2
TABLE C.2-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
SERVICES RELATED TO A HIGHWAY: ROADS & RELATED
ROADS
UNIT COST
Type of Road
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/km)
Arterial - Urban - 2 Lane
2.1
2.1
2.1
2.1
2.1
2.1
2.1
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
$3,740,000
Arterial - Urban - 3 Lane
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
$4,051,300
Collectors - Urban - 2 Lane
5.0
5.0
5.0
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
$3,132,800
Collectors - Urban - 3 Lane
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
$3,349,500
Collectors - Rural - 2 Lane
5.1
5.1
5.1
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
$1,897,500
Collectors - Rural - 3 Lane
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
$2,200,000
Collectors - Rural - 4 Lane
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
$2,538,800
Local - Urban - 2 Lane
15.4
15.4
16.2
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
$0
Local - Rural - 2 Lane - Asphalt
51.2
51.2
51.2
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.6
38.6
$1,897,500
Local - Rural - 2 Lane - Surface Treatment
55.6
55.6
55.6
46.9
46.9
46.9
46.9
46.9
46.9
46.9
46.9
46.9
46.9
46.9
46.9
$1,584,000
Local - Rural - 2 Lane - Gravel
126.3
126.3
126.3
117.9
117.9
117.9
117.9
117.9
117.9
117.9
117.9
117.9
117.9
117.9
117.9
$1,250,700
Local - Rural - 2 Lane - Earth
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
$0
Total (km)
262.2
262.2
263.0
224.8
224.8
224.7
224.7
224.7
224.7
224.7
224.7
224.7
224.7
224.7
224.7
Total ($000)
$379,519.4
$379,519.4
$379,519.4
$321,253.0
$321,253.0
$320,984.7
$320,984.7
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
BRIDGES & CULVERTS
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Structures/Culverts >3m span
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
$67,109,000
Culverts 1.2m to 3.0m Span
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
$7,523,204
Total ($000)
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
# of Kilometres
Total Value of Bridges & Culverts ($)
Appendix C | 142
APPENDIX C.2
TABLE C.2-1
TOWN OF THE BLUE MOUNTAINS
INVENTORY OF CAPITAL ASSETS
SERVICES RELATED TO A HIGHWAY: ROADS & RELATED
TRAFFIC SIGNALS
UNIT COST
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Signalized Intersections
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
$220,000
Cross-walk Signals
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
$60,500
Total (#)
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
Total ($000)
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$341.0
$341.0
$341.0
$341.0
SIDEWALKS
UNIT COST
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/m)
Sidewalks
25,463
25,463
25,463
25,463
26,028
26,028.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
$244
Total (m)
25,463.0
25,463.0
25,463.0
25,463.0
26,028.0
26,028.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
26,915.0
Total ($000)
$6,218.1
$6,218.1
$6,218.1
$6,218.1
$6,356.0
$6,356.0
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
STREETLIGHTS
UNIT COST
Description
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
($/unit)
Cobra on utility owned pole
426
426
426
426
426
426
426
426
448
448
423
423
423
423
423
$1,925
Cobra on municipal owned pole
135
135
135
137
137
137
140
140
141
141
145
145
145
145
145
$7,590
Decorative Luminaire on municipal pole
360
382
382
396
396
396
403
403
403
403
489
489
489
489
489
$9,185
Total (#)
921
943
943
959
959
959
969
969
992
992
1,057
1,057
1,057
1,057
1,057
Total ($000)
$5,151.3
$5,353.4
$5,353.4
$5,497.1
$5,497.1
$5,497.1
$5,584.2
$5,584.2
$5,634.1
$5,634.1
$6,406.3
$6,406.3
$6,406.3
$6,406.3
$6,406.3
# of Traffic Signals
# of Linear Metres
# of Streetlights
Appendix C | 143
APPENDIX C.2
TABLE C.2-1
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF SERVICE LEVELS
SERVICES RELATED TO A HIGHWAY: ROADS & RELATED
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Historical Population
14,299
14,564
14,838
14,881
14,924
14,964
15,001
15,040
15,415
15,800
16,194
16,599
17,010
17,471
17,931
Historical Employment
3,339
3,337
3,335
3,432
3,531
3,633
3,738
3,847
4,010
4,179
4,353
4,534
4,720
4,863
4,891
Total Historical Population & Employment
17,638
17,901
18,173
18,313
18,455
18,597
18,739
18,887
19,425
19,979
20,547
21,132
21,730
22,333
22,822
INVENTORY SUMMARY ($000)
Roads
$379,519.4
$379,519.4
$379,519.4
$321,253.0
$321,253.0
$320,984.7
$320,984.7
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
$321,109.3
Bridges & Culverts
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
$74,632.2
Traffic Signals
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$280.5
$341.0
$341.0
$341.0
$341.0
Sidewalks
$6,218.1
$6,218.1
$6,218.1
$6,218.1
$6,356.0
$6,356.0
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
$6,572.6
Streetlights
$5,151.3
$5,353.4
$5,353.4
$5,497.1
$5,497.1
$5,497.1
$5,584.2
$5,584.2
$5,634.1
$5,634.1
$6,406.3
$6,406.3
$6,406.3
$6,406.3
$6,406.3
Total ($000)
$465,801.5
$466,003.5
$466,003.5
$407,880.9
$408,018.8
$407,750.6
$408,054.3
$408,178.8
$408,228.7
$408,228.7
$409,000.9
$409,061.4
$409,061.4
$409,061.4
$409,061.4
Average
SERVICE LEVEL ($/pop & emp)
Service
Level
Roads
$21,517.14
$21,201.02
$20,884.27
$17,542.34
$17,407.37
$17,260.03
$17,129.23
$17,001.45
$16,530.57
$16,072.45
$15,628.36
$15,195.30
$14,777.38
$14,378.06
$14,070.28
$17,106.35
Bridges & Culverts
$4,231.33
$4,169.16
$4,106.88
$4,075.37
$4,044.01
$4,013.13
$3,982.72
$3,951.48
$3,842.04
$3,735.56
$3,632.34
$3,531.69
$3,434.56
$3,341.75
$3,270.21
$3,824.15
Traffic Signals
$15.90
$15.67
$15.44
$15.32
$15.20
$15.08
$14.97
$14.85
$14.44
$14.04
$13.65
$16.14
$15.69
$15.27
$14.94
$15.11
Sidewalks
$352.54
$347.36
$342.17
$339.54
$344.41
$341.78
$350.75
$348.00
$338.36
$328.98
$319.89
$311.03
$302.47
$294.30
$288.00
$329.97
Streetlights
$292.06
$299.05
$294.59
$300.18
$297.87
$295.59
$298.00
$295.66
$290.04
$282.01
$311.79
$303.15
$294.82
$286.85
$280.71
$294.82
Total ($/capita & emp)
$26,408.97
$26,032.26
$25,643.34
$22,272.75
$22,108.85
$21,925.61
$21,775.67
$21,611.43
$21,015.45
$20,433.04
$19,906.04
$19,357.31
$18,824.91
$18,316.23
$17,924.15
$21,570.40
TOWN OF THE BLUE MOUNTAINS
CALCULATION OF MAXIMUM ALLOWABLE
SERVICES RELATED TO A HIGHWAY: ROADS & RELATED
Build-out Funding Envelope Calculation
15 Year Average Service Level 2009 - 2023
$21,570.40
Population and Employment Growth 2024 - Build-out
15,986
Maximum Allowable Funding Envelope
$344,824,414
Appendix C | 144
APPENDIX C.2
TABLE C.2-2
TOWN OF THE BLUE MOUNTAINS
ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT
Length
(km)
#
Lanes
Surface
Type
Cross-
Section
Improvement
Type
Road
Width
(m)
Shoulder
Width (m)
Pedestrian
Route
Streetlight
Street
Tree
BM Road Cost
($1000's/km)
Road
Cost
Pedestrian
Route Cost
Streetlight
Cost
Street Tree
Cost
Stormwater
Manageme
nt (5%)
Total
Cost
AREA 1 - CRAIGLEITH
1373
Arrowhead Road
Highway 26
Margaret Drive
0.73
2
asphalt
rural
RSS
8.5
-
W
SSL
T
$4,341
$3,168,930
$323,390
$326,310
$102,200
$158,447
$465,400 GEO
$4,544,677
1392
Lakeshore Road West
Chamonix Crescent
St Moritz Crescent
0.16
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$694,560
$66,240
$71,520
$22,400
$34,728
$0
$0
$889,448
1393
Lakeshore Road West
Aspen Way
Chamonix Crescent
0.15
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$651,150
$62,100
$67,050
$21,000
$32,558
$0
$0
$833,858
1408/1409 Lakeshore Road East
Grey Road 19
Highway 26
1.27
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$5,513,070
$525,780
$567,690
$177,800
$275,654
$0
$0
$7,059,994
1418
Brophy's Lane
Highway 26
Brophy's Lane (450m North)
0.45
2
gravel
rural
RSS
8.5
-
W
SSL
T
$4,341
$1,953,450
$199,350
$201,150
$63,000
$97,673
$0
$0
$2,514,623
1419
Brophy's Lane
West Limit
Brophy's Lane
0.21
2
gravel
rural
RSS
8.5
-
W
SSL
T
$4,341
$911,610
$93,030
$93,870
$29,400
$45,581
$0
$0
$1,173,491
1416
Brophy's Lane
Brophy's Lane
Brophy's Lane
0.05
2
gravel
rural
RSS
8.5
-
W
SSL
T
$4,341
$217,050
$22,150
$22,350
$7,000
$10,853
$0
$0
$279,403
1415
Brophy's Lane
Brophy's Lane
Longpoint Road
0.79
2
gravel
rural
RSS
8.5
-
W
SSL
T
$4,341
$3,429,390
$349,970
$353,130
$110,600
$171,470
$0
$0
$4,414,560
1438
Craigmore Crescent
Grey Road 19
Tyrolean Lane
0.25
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,085,250
$103,500
$111,750
$35,000
$54,263
$0
$0
$1,389,763
1439
Tyrolean Lane
Craigmore Crescent
Arlberg Crescent
0.22
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$955,020
$91,080
$98,340
$30,800
$47,751
$0
$0
$1,222,991
1440
Tyrolean Lane
Arlberg Crescent
0.288 km E of Arlberg Crescent
0.29
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,258,890
$120,060
$129,630
$40,600
$62,945
$0
$0
$1,612,125
1441
Tyrolean Lane
0.288 km E of Arlberg Crescent
Kandahar Lane
0.21
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$911,610
$86,940
$93,870
$29,400
$45,581
$0
$0
$1,167,401
1442
Kandahar Lane
Farm Gate Road
Grey Road 19
0.15
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$651,150
$62,100
$67,050
$21,000
$32,558
$0
$0
$833,858
1443
Kandahar Lane
Arlberg Crescent
Kelly's Way
0.18
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$781,380
$74,520
$80,460
$25,200
$39,069
$0
$0
$1,000,629
1444
Kandahar Lane
Tyrolean Lane
Arlberg Crescent
0.21
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$911,610
$86,940
$93,870
$29,400
$45,581
$0
$0
$1,167,401
1480
Drakes Path
Grey Road 19
Wintergreen Place
0.40
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,736,400
$165,600
$178,800
$56,000
$86,820
$0
$0
$2,223,620
1486
Wintergreen Place
Jozo Weider Boulevard
Drakes Path
0.20
2
asphalt
urban
RSS
8.5
-
S
SSL
T
$4,341
$868,200
$82,800
$89,400
$28,000
$0
$0
$0
$1,068,400
1483
Jozo Weider Blvd
55m S of Fairway Court
Gord Canning Drive
0.26
2
asphalt
rural
RSS
8.5
-
2S
SSL
T
$4,341
$1,128,660
$215,280
$116,220
$36,400
$56,433
$0
$0
$1,552,993
1484
Jozo Weider Blvd
Gord Canning Drive
Grey Road 19
0.25
2
asphalt
rural
RSS
8.5
-
2S
SSL
T
$4,341
$1,085,250
$207,000
$111,750
$35,000
$54,263
$31,000
INT
$1,524,263
1990
Monterra Road
Grey Road 19
Brooker Boulevard
0.10
2
asphalt
rural
0
0
0
W
0
0
$0
$0
$44,300
$0
$0
$0
$0
$0
$44,300
1991
Monterra Road
Brooker Boulevard
Grand Cyprus Lane
0.60
2
asphalt
rural
0
0
0
W
0
0
$0
$0
$265,800
$0
$0
$0
$0
$0
$265,800
1992
Monterra Road
Grand Cypress Lane
Grey Road 21
0.79
2
asphalt
rural
0
0
0
W
0
0
$0
$0
$349,970
$0
$0
$0
$0
$0
$349,970
1374
Arrowhead Road
Alta Road
Margaret Drive
0.28
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$125,160
$0
$0
$0
$0
$125,160
1939
Arrowhead Road
Alta Road
Alpine Springs Court
0.21
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$93,870
$0
$0
$0
$0
$93,870
1940
Arrowhead Road
Alpine Springs Court
Arrowhead Crescent
0.26
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$116,220
$0
$0
$0
$0
$116,220
1941
Arrowhead Road
Arrowhead Crescent
Arrowhead Crescent
0.19
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$84,930
$0
$0
$0
$0
$84,930
1942
Arrowhead Road
Arrowhead Crescent
Arrowhead Road
0.15
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$67,050
$0
$0
$0
$0
$67,050
1943
Sleepy Hollow Road
Arrowhead Road
Craigleith Road
0.15
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$67,050
$0
$0
$0
$0
$67,050
1960
Craigleith Road
Sleepy Hollow Road
Wyandot Court
0.22
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$98,340
$0
$0
$0
$0
$98,340
1961
Craigleith Road
Wyandot Court
Craigleith Walk
0.41
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$183,270
$0
$0
$0
$0
$183,270
1400
Craigleith Road
Craigleith Walk
Ski Trail Drive
0.44
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$196,680
$0
$0
$0
$0
$196,680
1401
Craigleith Road
Ski Trail Drive
Grey Road 19
0.27
2
asphalt
urban
0
0
0
0
SSL
0
$0
$0
$0
$120,690
$0
$0
$0
$0
$120,690
$0
AREA 2 - CAMPERDOWN
1920
Clark Street
Hoffman St
Grey Road 2
0.31
2
asphalt
rural
REC
7
-
S
SSL
0
$3,114
$965,340
$128,340
$138,570
$0
$0
$232,700
INT
$1,464,950
1921
Clark Street
Arthur Taylor Lane
Hoffman St
0.87
2
asphalt
rural
REC
7
-
S
SSL
0
$3,114
$2,709,180
$360,180
$388,890
$0
$0
$0
$0
$3,458,250
1919
Clark Street
Arthur Taylor Lane
Forest Ave
0.31
2
asphalt
rural
0
0
-
S
SSL
0
$0
$0
$128,340
$138,570
$0
$0
$0
$0
$266,910
1918
Clark Street
Forest Ave
Jubilee Drive
0.22
2
asphalt
rural
0
0
-
S
SSL
0
$0
$0
$91,080
$98,340
$0
$0
$0
$0
$189,420
1917
Clark Street
Jubilee Drive
William St
0.19
2
asphalt
rural
0
0
-
S
SSL
0
$0
$0
$78,660
$84,930
$0
$0
$0
$0
$163,590
1356
Old Lakeshore Road
Camperdown Road
East End
1.23
2
gravel
rural
RSS
8.5
-
W
SSL
T
$4,341
$5,339,430
$544,890
$549,810
$172,200
$266,972
$0
$0
$6,873,302
1369
Hidden Lake Road
James St
Highway 26
0.27
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,172,070
$111,780
$120,690
$37,800
$58,604
$0
$0
$1,500,944
1370
Hidden Lake Road
James St
600m south west
0.60
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$2,604,600
$248,400
$268,200
$84,000
$130,230
$0
$0
$3,335,430
Road
Section ID
Road Name
From
To
Improvement Costs
Special
Cost
Existing Conditions
Recommended Improvements
Appendix C | 145
APPENDIX C.2
TABLE C.2-2
TOWN OF THE BLUE MOUNTAINS
ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT
Length
(km)
#
Lanes
Surface
Type
Cross-
Section
Improvement
Type
Road
Width
(m)
Shoulder
Width (m)
Pedestrian
Route
Streetlight
Street
Tree
BM Road Cost
($1000's/km)
Road
Cost
Pedestrian
Route Cost
Streetlight
Cost
Street Tree
Cost
Stormwater
Manageme
nt (5%)
Total
Cost
Road
Section ID
Road Name
From
To
Improvement Costs
Special
Cost
Existing Conditions
Recommended Improvements
AREA 3 - CASTLE GLEN
1062
12th Side Road
4th Line
3rd Line
1.37
1.5
gravel
rural
REC
7
1.5
P
0
0
$3,114
$4,266,180
$0
$0
$0
$0
$0
$0
$4,266,180
1064
12th Side Road
3rd Line
Mission Road
2.07
1.5
gravel
rural
REC
7
1.5
P
0
0
$3,114
$6,445,980
$0
$0
$0
$0
$0
$0
$6,445,980
1066
12th Side Road
Mission Road
Grey Road 19
2.12
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$6,601,680
$0
$0
$0
$0
$1,085,900
STR
$7,687,580
1254
4th Line
Grey Road 19
12th Side Road
1.85
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$5,760,900
$0
$0
$0
$0
$0
$0
$5,760,900
1256
4th Line
12th Side Road
Grey Road 119
1.85
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$5,760,900
$0
$0
$0
$0
$0
$0
$5,760,900
1272
2nd Line
Grey Road 19
970m South
0.97
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$3,020,580
$0
$0
$0
$0
$176,300 GEO
$3,196,880
1270
2nd Line Seasonal
970m South GR 19
6th Sideroad
1.08
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$3,363,120
$0
$0
$0
$0
$0
$0
$3,363,120
1264
3rd Line
Grey Road 19
340m S of Grey Road 19
0.97
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$3,020,580
$0
$0
$0
$0
$0
$0
$3,020,580
n/a
3rd Line (unopened)
340m S of Grey Road 19
640m N of 6th Sideroad
0.87
0
none
unopened
REC
7
1.5
P
0
0
$3,114
$2,709,180
$0
$0
$0
$0
$0
$0
$2,709,180
1262
3rd Line
Grey Road 19
640m N of 6th Sideroad
0.64
2
gravel
rural
REC
7
1.5
P
0
0
$3,114
$1,992,960
$0
$0
$0
$0
$0
$0
$1,992,960
AREA 6 - LORA BAY
1300
Christie Beach Road
Highway 26
39th Side Road
0.70
2
surface tr.
rural
RSS
8.5
0
S & B
SSL
T
$4,341
$3,038,700
$444,500
$312,900
$98,000
$151,935
$0
$0
$4,046,035
1302
Christie Beach Road
39th Side Road
Sunset Blvd
0.79
2
surface tr.
rural
RSS
8.5
0
S & B
SSL
T
$4,341
$3,429,390
$501,650
$353,130
$110,600
$171,470
$0
$0
$4,566,240
1306
39th Side Road
Christie Beach Road
Sunset Blvd
1.1
2
surface tr.
rural
RSS
8.5
0
S & B
SSL
T
$4,341
$4,775,100
$698,500
$491,700
$154,000
$238,755
$0
$0
$6,358,055
1313
10th Line
High Bluff Lane
Highway 26
0.22
2
gravel
rural
RSS
8.5
0
S & B
SSL
T
$4,341
$955,020
$139,700
$98,340
$30,800
$47,751
$0
$0
$1,271,611
1314
10th Line
Lake Drive
High Bluff Lane
0.34
2
gravel
rural
RSS
8.5
0
S & B
SSL
T
$4,341
$1,475,940
$215,900
$151,980
$47,600
$73,797
$0
$0
$1,965,217
AREA 9 - THORNBURY EAST - ARTERIAL ROADS
1902
King Street East
Mill Street
McAuley Street South
0.22
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$1,071,400
$202,400
$0
$0
$0
$0
$0
$1,273,800
1901
King Street East
McAuley Street South
Elgin Street
0.22
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$1,071,400
$202,400
$0
$0
$0
$0
$0
$1,273,800
1900
King Street East
Elgin Street
Wellington Street
0.22
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$1,071,400
$202,400
$0
$0
$0
$0
$0
$1,273,800
1889
King Street East
Wellington Street
Gray Street
0.22
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$1,071,400
$202,400
$0
$0
$0
$0
$0
$1,273,800
1888
King Street East
Grey Street
79m East of Gray Street
0.08
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$389,600
$73,600
$0
$0
$0
$0
$0
$463,200
1904
Bridge St
Bruce Street
Hester Street
0.05
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$243,500
$46,000
$0
$0
$0
$0
$0
$289,500
1905
Bridge St
65m East Hester Street
Mill Street
0.13
2
asphalt
urban
RSS
11
-
2WS
0
0
$4,870
$633,100
$119,600
$0
$0
$0
$0
$0
$752,700
Appendix C | 146
APPENDIX C.2
TABLE C.2-2
TOWN OF THE BLUE MOUNTAINS
ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT
Length
(km)
#
Lanes
Surface
Type
Cross-
Section
Improvement
Type
Road
Width
(m)
Shoulder
Width (m)
Pedestrian
Route
Streetlight
Street
Tree
BM Road Cost
($1000's/km)
Road
Cost
Pedestrian
Route Cost
Streetlight
Cost
Street Tree
Cost
Stormwater
Manageme
nt (5%)
Total
Cost
Road
Section ID
Road Name
From
To
Improvement Costs
Special
Cost
Existing Conditions
Recommended Improvements
AREA 9 - THORNBURY EAST - LOCAL ROADS
None
AREA 10 - THORNBURY WEST - COLLECTOR ROADS
1923
Peel Street South
Alfred Street West
Alice Street West
0.27
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,172,070
$111,780
$120,690
$37,800
$58,604
$0
$0
$1,500,944
1924
Peel Street South
Alice Street West
Baring Street
0.15
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$651,150
$62,100
$67,050
$21,000
$32,558
$0
$0
$833,858
1925
Peel Street South
Baring Street
Arthur Street West
0.18
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$781,380
$74,520
$80,460
$25,200
$39,069
$0
$0
$1,000,629
1319
Peel Street North
Highway 26
High Bluff Lane
0.13
2
gravel
rural
RSS
7.5
-
MT
SSL
T
$4,129
$536,770
$57,590
$58,110
$18,200
$26,839
$0
$0
$697,509
1320
Peel Street North
High Bluff Lane
Cameron Street
0.37
2
gravel
rural
RSS
7.5
-
MT
SSL
T
$4,129
$1,527,730
$163,910
$165,390
$51,800
$76,387
$0
$0
$1,985,217
1796
Victoria Street South
Duncan Street West
Warbler Way
0.22
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$955,020
$91,080
$98,340
$30,800
$47,751
$31,000
BH
$1,253,991
4174
Victoria Street South
Warbler Way
Napier
0.20
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$868,200
$82,800
$89,400
$28,000
$43,410
$28,200
BH
$1,140,010
1797
Victoria Street South
Napier Street West
Pyatt Ave
0.16
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$694,560
$66,240
$71,520
$22,400
$34,728
$22,600
BH
$912,048
1798
Victoria Street South
Pyatt Ave
Thorncroft Court
0.09
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$390,690
$37,260
$40,230
$12,600
$19,535
$12,700
BH
$513,015
1799
Victoria Street South
Thorncroft Court
Ashbury Court
0.11
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$477,510
$45,540
$49,170
$15,400
$23,876
$15,500
BH
$626,996
4181
Victoria Street South
Ashbury Court
Victoria Street South
0.07
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$303,870
$28,980
$31,290
$9,800
$15,194
$9,900
BH
$399,034
1800
Victoria Street South
Alfred Street West
Alice Street West
0.22
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$955,020
$91,080
$98,340
$30,800
$47,751
$31,000
BH
$1,253,991
1801
Victoria Street South
Alice Street West
Louisa Street West
0.22
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$955,020
$91,080
$98,340
$30,800
$47,751
$31,000
BH
$1,253,991
1802
Victoria Street South
Louisa Street West
Beaver Street South
0.07
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$303,870
$28,980
$31,290
$9,800
$15,194
$31,000
BH
$420,134
1821
Duncan Street West
Victoria Street South
Bruce Street South
0.45
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,953,450
$186,300
$201,150
$63,000
$97,673
$0
$0
$2,501,573
1822
Duncan Street West
Bruce Street South
Russell Street East
0.05
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$217,050
$20,700
$22,350
$7,000
$10,853
$0
$0
$277,953
1210
10th Line
Duncan Street West
Russel Street
0.46
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,996,860
$190,440
$205,620
$64,400
$99,843
$0
$0
$2,557,163
1211
10th Line
Albert Street
Duncan Street West
0.13
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$564,330
$53,820
$58,110
$18,200
$28,217
$1,085,900
STR
$1,808,577
1212
10th Line
33rd Sideroad
Albert Street
0.40
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,736,400
$165,600
$178,800
$56,000
$86,820
$0
$0
$2,223,620
1213
10th Line
Peel Street South
Beaver Street South
0.62
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$2,691,420
$256,680
$277,140
$86,800
$134,571
$0
$0
$3,446,611
1214
10th Line
Grey Road 113
Peel Street South
0.15
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$651,150
$62,100
$67,050
$21,000
$32,558
$0
$0
$833,858
1820
Duncan Street West
10th Line
Victoria Street South
0.34
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,475,940
$140,760
$151,980
$47,600
$73,797
$0
$0
$1,890,077
1823
Napier Street West
Beaver Street South
Albert Street
0.25
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,085,250
$103,500
$111,750
$35,000
$54,263
$0
$0
$1,389,763
1824
Napier Street West
Albert Street
Victoria Street South
0.44
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,910,040
$182,160
$196,680
$61,600
$95,502
$0
$0
$2,445,982
1825
Napier Street West
Victoria Street South
Orchard Drive
0.28
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,215,480
$115,920
$125,160
$39,200
$60,774
$0
$0
$1,556,534
1826
Napier Street West
Bruce Street South
Orchard Drive
0.17
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$737,970
$70,380
$75,990
$23,800
$36,899
$0
$0
$945,039
Appendix C | 147
APPENDIX C.2
TABLE C.2-2
TOWN OF THE BLUE MOUNTAINS
ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT
Length
(km)
#
Lanes
Surface
Type
Cross-
Section
Improvement
Type
Road
Width
(m)
Shoulder
Width (m)
Pedestrian
Route
Streetlight
Street
Tree
BM Road Cost
($1000's/km)
Road
Cost
Pedestrian
Route Cost
Streetlight
Cost
Street Tree
Cost
Stormwater
Manageme
nt (5%)
Total
Cost
Road
Section ID
Road Name
From
To
Improvement Costs
Special
Cost
Existing Conditions
Recommended Improvements
AREA 10 - THORNBURY WEST - LOCAL ROADS
1805
Lansdowne Street South
Alice Street West
Louisa Street West
0.22
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$955,020
$91,080
$98,340
$30,800
$47,751
$0
$0
$1,222,991
1806
Lansdowne Street South
Louisa Street West
Arthur Street West
0.12
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$520,920
$49,680
$53,640
$16,800
$26,046
$0
$0
$667,086
1810
Albert Street
10th Line
Napier Street West
0.33
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,432,530
$136,620
$147,510
$46,200
$71,627
$0
$0
$1,834,487
1812
Albert Street
Napier Street West
Albert Street
0.34
2
gravel
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,475,940
$140,760
$151,980
$47,600
$73,797
$0
$0
$1,890,077
1814
Albert Street
Beaver Street South
Alfred Street West
0.09
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$390,690
$37,260
$40,230
$12,600
$19,535
$0
$0
$500,315
1854
Beaver Street South
Victoria Street South
Louisa Street West
0.09
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$390,690
$37,260
$40,230
$12,600
$19,535
$0
$0
$500,315
1853
Beaver Street South
Louisa Street West
Alice St West
0.28
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,215,480
$115,920
$125,160
$39,200
$60,774
$0
$0
$1,556,534
1833
Beaver Street South
10th Line
Napier Street West
0.07
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$303,870
$28,980
$31,290
$9,800
$15,194
$0
$0
$389,134
1834
Beaver Street South
Napier Street West
Albert Street
0.41
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$1,779,810
$169,740
$183,270
$57,400
$88,991
$0
$0
$2,279,211
2460
Alfred St West
Victoria Street South
Beaver Street South
0.37
2
asphalt
rural
0
8.5
-
S
SSL
0
$0
$0
$153,180
$165,390
$0
$0
$0
$0
$318,570
1840
Alice Street West
Peel Street South
Baring Street
0.08
1
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$347,280
$33,120
$35,760
$11,200
$17,364
$0
$0
$444,724
1842
Alice Street West
Baring Street
Lansdowne Street South
0.66
2
surface tr.
rural
RSS
8.5
-
S
SSL
T
$4,341
$2,865,060
$273,240
$295,020
$92,400
$143,253
$0
$0
$3,668,973
1844
Alice Street West
Beaver Street South
Victoria Street South
0.22
2
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$955,020
$91,080
$98,340
$30,800
$47,751
$0
$0
$1,222,991
1857
Louisa Street West
Beaver Street South
Victoria Street South
0.06
1.5
asphalt
rural
RSS
8.5
-
S
SSL
T
$4,341
$260,460
$24,840
$26,820
$8,400
$13,023
$0
$0
$333,543
AREA 10 - THORNBURY WEST - ARTERIAL ROADS
2012
Arthur Street West
Peel Street West
Lansdowne Street
0.57
2
asphalt
rural
RSS
11
-
2WS
SSL
0
$4,870
$2,775,900
$524,400
$254,790
$0
$138,795
$0
$0
$3,693,885
PROPOSED ACTIVE TRANSPORTATION PROJECTS
n/a
Active Transportation Network (TMP)
159.3
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$24,639,000
$0
$24,639,000
TOTAL
$145,348,130
$12,827,080
$11,742,690
$2,919,000
$4,615,578
$27,929,100
$205,381,578
Appendix C | 148
APPENDIX C.2
TABLE C.2-3
TOWN OF THE BLUE MOUNTAINS
Post-Period
Length
(km)
Surface
Type
Cross-
Section
Surface Type &
Cross Section
Benefit
AREA 1 - CRAIGLEITH
1373
Arrowhead Road
Highway 26
Margaret Drive
0.73
asphalt
rural
asphalt-rural
$4,544,677
$0
$0
$454,468
$0
$4,090,209
1392
Lakeshore Road West
Chamonix Crescent
St Moritz Crescent
0.16
asphalt
rural
asphalt-rural
$889,448
$889,448
$0
$0
$0
$0
1393
Lakeshore Road West
Aspen Way
Chamonix Crescent
0.15
asphalt
rural
asphalt-rural
$833,858
$833,858
$0
$0
$0
$0
1408/1409 Lakeshore Road East
Grey Road 19
Highway 26
1.27
asphalt
rural
asphalt-rural
$7,059,994
$0
$0
$705,999
$0
$6,353,994
1418
Brophy's Lane
Highway 26
Brophy's Lane (450m North)
0.45
gravel
rural
asphalt-rural
$2,514,623
$2,514,623
$0
$0
$0
$0
1419
Brophy's Lane
West Limit
Brophy's Lane
0.21
gravel
rural
asphalt-rural
$1,173,491
$1,173,491
$0
$0
$0
$0
1416
Brophy's Lane
Brophy's Lane
Brophy's Lane
0.05
gravel
rural
asphalt-rural
$279,403
$279,403
$0
$0
$0
$0
1415
Brophy's Lane
Brophy's Lane
Longpoint Road
0.79
gravel
rural
asphalt-rural
$4,414,560
$4,414,560
$0
$0
$0
$0
1438
Craigmore Crescent
Grey Road 19
Tyrolean Lane
0.25
asphalt
rural
asphalt-rural
$1,389,763
$0
$0
$138,976
$0
$1,250,786
1439
Tyrolean Lane
Craigmore Crescent
Arlberg Crescent
0.22
asphalt
rural
asphalt-rural
$1,222,991
$0
$0
$122,299
$0
$1,100,692
1440
Tyrolean Lane
Arlberg Crescent
0.288 km E of Arlberg Crescent
0.29
gravel
rural
gravel-rural
$1,612,125
$0
$0
$161,212
$0
$1,450,912
1441
Tyrolean Lane
0.288 km E of Arlberg Crescent
Kandahar Lane
0.21
asphalt
rural
asphalt-rural
$1,167,401
$0
$0
$116,740
$0
$1,050,660
1442
Kandahar Lane
Farm Gate Road
Grey Road 19
0.15
asphalt
rural
asphalt-rural
$833,858
$0
$0
$83,386
$0
$750,472
1443
Kandahar Lane
Arlberg Crescent
Kelly's Way
0.18
asphalt
rural
asphalt-rural
$1,000,629
$0
$0
$100,063
$0
$900,566
1444
Kandahar Lane
Tyrolean Lane
Arlberg Crescent
0.21
asphalt
rural
asphalt-rural
$1,167,401
$0
$0
$116,740
$0
$1,050,660
1480
Drakes Path
Grey Road 19
Wintergreen Place
0.40
gravel
rural
asphalt-urban
$2,223,620
$0
$0
$222,362
$0
$2,001,258
1486
Wintergreen Place
Jozo Weider Boulevard
Drakes Path
0.20
asphalt
urban
asphalt-urban
$1,068,400
$0
$0
$106,840
$0
$961,560
1483
Jozo Weider Blvd
55m S of Fairway Court
Gord Canning Drive
0.26
asphalt
rural
asphalt-rural
$1,552,993
$0
$465,898
$108,710
$0
$978,386
1484
Jozo Weider Blvd
Gord Canning Drive
Grey Road 19
0.25
asphalt
rural
asphalt-rural
$1,524,263
$0
$457,279
$106,698
$0
$960,285
1990
Monterra Road
Grey Road 19
Brooker Boulevard
0.10
asphalt
rural
asphalt-rural
$44,300
$0
$0
$33,225
$0
$11,075
1991
Monterra Road
Brooker Boulevard
Grand Cyprus Lane
0.60
asphalt
rural
asphalt-rural
$265,800
$0
$0
$199,350
$0
$66,450
1992
Monterra Road
Grand Cypress Lane
Grey Road 21
0.79
asphalt
rural
asphalt-rural
$349,970
$0
$0
$262,478
$0
$87,493
1943
Sleepy Hollow Road
Arrowhead Road
Craigleith Road
0.15
asphalt
urban
asphalt-urban
$67,050
$0
$0
$50,288
$0
$16,763
1960
Craigleith Road
Sleepy Hollow Road
Wyandot Court
0.22
asphalt
urban
asphalt-urban
$98,340
$0
$0
$73,755
$0
$24,585
1961
Craigleith Road
Wyandot Court
Craigleith Walk
0.41
asphalt
urban
asphalt-urban
$183,270
$0
$0
$137,453
$0
$45,818
1400
Craigleith Road
Craigleith Walk
Ski Trail Drive
0.44
asphalt
urban
asphalt-urban
$196,680
$0
$0
$147,510
$0
$49,170
1401
Craigleith Road
Ski Trail Drive
Grey Road 19
0.27
asphalt
urban
asphalt-urban
$120,690
$0
$0
$90,518
$0
$30,173
subtotal
$37,799,592
$10,105,381
$923,177
$3,539,068
$0
$23,231,966
Net Growth
Related
Existing Conditions
Benefit to
Existing Share1
Current
Agreements
Local Service
Component
Road
Section ID
Road Name
From
To
Total
Improvement
Cost
Appendix C | 149
APPENDIX C.2
TABLE C.2-3
TOWN OF THE BLUE MOUNTAINS
Post-Period
Length
(km)
Surface
Type
Cross-
Section
Surface Type &
Cross Section
Benefit
Net Growth
Related
Existing Conditions
Benefit to
Existing Share1
Current
Agreements
Local Service
Component
Road
Section ID
Road Name
From
To
Total
Improvement
Cost
AREA 2 - CAMPERDOWN
1920
Clark Street
Hoffman St
Grey Road 2
0.31
asphalt
rural
asphalt-rural
$1,464,950
$0
$0
$219,743
$0
$1,245,208
1921
Clark Street
Arthur Taylor Lane
Hoffman St
0.87
asphalt
rural
asphalt-rural
$3,458,250
$0
$0
$518,738
$0
$2,939,513
1919
Clark Street
Arthur Taylor Lane
Forest Ave
0.31
asphalt
rural
asphalt-rural
$266,910
$0
$0
$40,037
$0
$226,874
1918
Clark Street
Forest Ave
Jubilee Drive
0.22
asphalt
rural
asphalt-rural
$189,420
$0
$0
$28,413
$0
$161,007
1917
Clark Street
Jubilee Drive
William St
0.19
asphalt
rural
asphalt-rural
$163,590
$0
$0
$24,539
$0
$139,052
1356
Old Lakeshore Road
Camperdown Road
East End
1.23
gravel
rural
gravel-rural
$6,873,302
$0
$0
$343,665
$0
$6,529,636
1369
Hidden Lake Road
James St
Highway 26
0.27
gravel
rural
gravel-rural
$1,500,944
$1,500,944
$0
$0
$0
$0
1370
Hidden Lake Road
James St
600m south west
0.6
gravel
rural
gravel-rural
$3,335,430
$3,335,430
$0
$0
$0
$0
subtotal
$17,252,795
$4,836,374
$0
$1,175,133
$0
$11,241,288
AREA 3 - CASTLE GLEN
1062
12th Side Road
4th Line
3rd Line
1.37
gravel
rural
gravel-rural
$4,266,180
$0
$0
$213,309
$0
$4,052,871
1064
12th Side Road
3rd Line
Mission Road
2.07
gravel
rural
gravel-rural
$6,445,980
$6,445,980
$0
$0
$0
$0
1066
12th Side Road
Mission Road
Grey Road 19
2.12
gravel
rural
gravel-rural
$7,687,580
$7,687,580
$0
$0
$0
$0
1254
4th Line
Grey Road 19
12th Side Road
1.85
gravel
rural
gravel-rural
$5,760,900
$0
$0
$288,045
$0
$5,472,855
1256
4th Line
12th Side Road
Grey Road 119
1.85
gravel
rural
gravel-rural
$5,760,900
$0
$0
$288,045
$0
$5,472,855
1272
2nd Line
Grey Road 19
970m South
0.97
gravel
rural
gravel-rural
$3,196,880
$0
$0
$159,844
$0
$3,037,036
1270
2nd Line Seasonal
970m South GR 19
6th Sideroad
1.08
gravel
rural
gravel-rural
$3,363,120
$0
$0
$168,156
$3,194,964
$0
1264
3rd Line
Grey Road 19
340m S of Grey Road 19
0.97
gravel
rural
gravel-rural
$3,020,580
$0
$0
$151,029
$0
$2,869,551
n/a
3rd Line (unopened)
340m S of Grey Road 19
640m N of 6th Sideroad
0.87
none
unopened
gravel-rural
$2,709,180
$0
$0
$135,459
$0
$2,573,721
1262
3rd Line
Grey Road 19
640m N of 6th Sideroad
0.64
gravel
rural
gravel-rural
$1,992,960
$0
$0
$99,648
$1,893,312
$0
subtotal
$44,204,260
$14,133,560
$0
$1,503,535
$5,088,276
$23,478,889
AREA 6 - LORA BAY
1300
Christie Beach Road
Highway 26
39th Side Road
0.70
surface tr.
rural
surface tr. rural
$4,046,035
$0
$0
$404,604
$0
$3,641,432
1302
Christie Beach Road
39th Side Road
Sunset Blvd
0.79
surface tr.
rural
surface tr. rural
$4,566,240
$0
$0
$456,624
$0
$4,109,616
1306
39th Side Road
Christie Beach Road
Sunset Blvd
1.10
surface tr.
rural
surface tr. rural
$6,358,055
$0
$0
$321,969
$0
$6,036,086
1313
10th Line
High Bluff Lane
Highway 26
0.22
gravel
rural
gravel-rural
$1,271,611
$0
$0
$127,161
$0
$1,144,450
1314
10th Line
Lake Drive
High Bluff Lane
0.34
gravel
rural
gravel-rural
$1,965,217
$0
$0
$196,522
$0
$1,768,695
subtotal
$18,207,158
$0
$0
$1,506,879
$0
$16,700,278
Appendix C | 150
APPENDIX C.2
TABLE C.2-3
TOWN OF THE BLUE MOUNTAINS
Post-Period
Length
(km)
Surface
Type
Cross-
Section
Surface Type &
Cross Section
Benefit
Net Growth
Related
Existing Conditions
Benefit to
Existing Share1
Current
Agreements
Local Service
Component
Road
Section ID
Road Name
From
To
Total
Improvement
Cost
AREA 9 - THORNBURY EAST - ARTERIAL ROADS
1902
King Street East
Mill Street
McAuley Street South
0.22
asphalt
urban
asphalt-urban
$1,273,800
$0
$0
$849,115
$0
$424,685
1901
King Street East
McAuley Street South
Elgin Street
0.22
asphalt
urban
asphalt-urban
$1,273,800
$0
$0
$849,115
$0
$424,685
1900
King Street East
Elgin Street
Wellington Street
0.22
asphalt
urban
asphalt-urban
$1,273,800
$0
$0
$849,115
$0
$424,685
1889
King Street East
Wellington Street
Gray Street
0.22
asphalt
urban
asphalt-urban
$1,273,800
$0
$0
$849,115
$0
$424,685
1888
King Street East
Grey Street
79m East of Gray Street
0.08
asphalt
urban
asphalt-urban
$463,200
$0
$0
$308,769
$0
$154,431
1904
Bridge St
Bruce Street
Hester Street
0.05
asphalt
urban
asphalt-urban
$289,500
$0
$0
$192,981
$0
$96,519
1905
Bridge St
65m East Hester Street
Mill Street
0.13
asphalt
urban
asphalt-urban
$752,700
$0
$0
$501,750
$0
$250,950
subtotal
$6,600,600
$0
$0
$4,399,960
$0
$2,200,640
AREA 9 - THORNBURY EAST - LOCAL ROADS
subtotal
$0
$0
$0
$0
$0
$0
AREA 10 - THORNBURY WEST - COLLECTOR ROADS
1923
Peel Street South
Alfred Street West
Alice Street West
0.27
gravel
rural
gravel-rural
$1,500,944
$0
$0
$150,094
$1,350,849
$0
1924
Peel Street South
Alice Street West
Baring Street
0.15
gravel
rural
gravel-rural
$833,858
$0
$0
$83,386
$750,472
$0
1925
Peel Street South
Baring Street
Arthur Street West
0.18
asphalt
rural
asphalt-rural
$1,000,629
$0
$0
$100,063
$900,566
$0
1319
Peel Street North
Highway 26
High Bluff Lane
0.13
gravel
rural
gravel-rural
$697,509
$0
$0
$69,751
$0
$627,758
1320
Peel Street North
High Bluff Lane
Cameron Street
0.37
gravel
rural
gravel-rural
$1,985,217
$0
$0
$198,522
$0
$1,786,695
1796
Victoria Street South
Duncan Street West
Warbler Way
0.22
surface tr.
rural
surface tr. rural
$1,253,991
$0
$0
$125,399
$0
$1,128,592
4174
Victoria Street South
Warbler Way
Napier
0.20
surface tr.
rural
surface tr. rural
$1,140,010
$0
$0
$114,001
$0
$1,026,009
1797
Victoria Street South
Napier Street West
Pyatt Ave
0.16
surface tr.
rural
surface tr. rural
$912,048
$0
$0
$91,205
$0
$820,843
1798
Victoria Street South
Pyatt Ave
Thorncroft Court
0.09
surface tr.
rural
surface tr. rural
$513,015
$0
$0
$51,301
$0
$461,713
1799
Victoria Street South
Thorncroft Court
Ashbury Court
0.11
asphalt
rural
asphalt-rural
$626,996
$0
$0
$62,700
$0
$564,296
4181
Victoria Street South
Ashbury Court
Victoria Street South
0.07
asphalt
rural
asphalt-rural
$399,034
$0
$0
$39,903
$0
$359,130
1821
Duncan Street West
Victoria Street South
Bruce Street South
0.45
asphalt
rural
asphalt-rural
$2,501,573
$0
$0
$250,157
$0
$2,251,415
1822
Duncan Street West
Bruce Street South
Russell Street East
0.05
asphalt
rural
asphalt-rural
$277,953
$0
$0
$27,795
$0
$250,157
1210
10th Line
Duncan Street West
Russel Street
0.46
gravel
rural
asphalt-rural
$2,557,163
$0
$0
$255,716
$2,301,447
$0
1211
10th Line
Albert Street
Duncan Street West
0.13
gravel
rural
asphalt-rural
$1,808,577
$0
$0
$180,858
$1,627,719
$0
1212
10th Line
33rd Sideroad
Albert Street
0.40
gravel
rural
asphalt-rural
$2,223,620
$0
$0
$222,362
$2,001,258
$0
1213
10th Line
Peel Street South
Beaver Street South
0.62
asphalt
rural
asphalt-rural
$3,446,611
$0
$0
$344,661
$3,101,950
$0
1214
10th Line
Grey Road 113
Peel Street South
0.15
asphalt
rural
asphalt-rural
$833,858
$0
$0
$83,386
$750,472
$0
1820
Duncan Street West
10th Line
Victoria Street South
0.34
asphalt
rural
asphalt-rural
$1,890,077
$0
$0
$189,008
$1,701,069
$0
1823
Napier Street West
Beaver Street South
Albert Street
0.25
asphalt
rural
asphalt-rural
$1,389,763
$0
$0
$138,976
$1,250,786
$0
1824
Napier Street West
Albert Street
Victoria Street South
0.44
asphalt
rural
asphalt-rural
$2,445,982
$0
$0
$244,598
$1,163,591
$1,037,793
1825
Napier Street West
Victoria Street South
Orchard Drive
0.28
asphalt
rural
asphalt-rural
$1,556,534
$0
$0
$155,653
$0
$1,400,881
1826
Napier Street West
Bruce Street South
Orchard Drive
0.17
asphalt
rural
asphalt-rural
$945,039
$0
$0
$94,504
$0
$850,535
subtotal
$32,739,995
$0
$0
$3,273,999
$16,900,179
$12,565,816
Appendix C | 151
APPENDIX C.2
TABLE C.2-3
TOWN OF THE BLUE MOUNTAINS
Post-Period
Length
(km)
Surface
Type
Cross-
Section
Surface Type &
Cross Section
Benefit
Net Growth
Related
Existing Conditions
Benefit to
Existing Share1
Current
Agreements
Local Service
Component
Road
Section ID
Road Name
From
To
Total
Improvement
Cost
AREA 10 - THORNBURY WEST - LOCAL ROADS
1805
Lansdowne Street South
Alice Street West
Louisa Street West
0.22
surface tr.
rural
surface tr. rural
$1,222,991
$0
$0
$122,299
$0
$1,100,692
1806
Lansdowne Street South
Louisa Street West
Arthur Street West
0.12
surface tr.
rural
surface tr. rural
$667,086
$0
$0
$66,709
$0
$600,377
1810
Albert Street
10th Line
Napier Street West
0.33
gravel
rural
gravel-rural
$1,834,487
$0
$0
$183,449
$1,651,038
$0
1812
Albert Street
Napier Street West
Albert Street
0.34
gravel
rural
gravel-rural
$1,890,077
$0
$0
$189,008
$1,701,069
$0
1814
Albert Street
Beaver Street South
Alfred Street West
0.09
surface tr.
rural
surface tr. rural
$500,315
$0
$0
$50,031
$450,283
$0
1833
Beaver Street South
10th Line
Napier Street West
0.07
surface tr.
rural
surface tr. rural
$389,134
$0
$0
$38,913
$350,220
$0
1834
Beaver Street South
Napier Street West
Albert Street
0.41
surface tr.
rural
surface tr. rural
$2,279,211
$0
$0
$227,921
$2,051,289
$0
1840
Alice Street West
Peel Street South
Baring Street
0.08
asphalt
rural
surface tr. rural
$444,724
$0
$0
$44,472
$400,252
$0
1842
Alice Street West
Baring Street
Lansdowne Street South
0.66
surface tr.
rural
surface tr. rural
$3,668,973
$0
$0
$366,897
$3,302,076
$0
subtotal
$12,896,996
$0
$0
$1,289,700
$9,906,227
$1,701,069
AREA 10 - THORNBURY WEST - ARTERIAL ROADS
2012
Arthur Street West
Peel Street West
Lansdowne Street
0.57
asphalt
rural
asphalt-rural
$3,693,885
$0
$0
$2,462,590
$0
$1,231,295
subtotal
$3,693,885
$0
$0
$2,462,590
$0
$1,231,295
PROPOSED ACTIVE TRANSPORTATION PROJECTS
n/a
Active Transportation Network (TMP) - Town Roads
$11,730,000
$0
$0
$3,543,634
$0
$8,186,366
0
Active Transportation Network (TMP) - County Roads
$12,910,000
$0
$0
$3,900,112
$9,009,888
$0
subtotal
$24,640,000
$0
$0
$7,443,745
$9,009,888
$8,186,366
TOTAL TOWN-WIDE
$198,035,280
$29,075,314
$923,177
$26,594,610
$40,904,570
$100,537,609
Appendix C | 152
Town-wide
Population in New Units Growth
14,533
Employment Growth
1,453
Ultimate Growth in Square Meters
116,095
Total
Total
Local
Benefit
Prior Growth
Post
Net Capital
Improvement
Service
Current
to Existing
(Available
Period
Costs After
Cost
Component
Agreements
Share
DC Reserves)
Benefit
Discounts
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Town-wide Roads Projects
$198,035.28
$29,075.31
$923.18
$26,594.61
$12,952.88
$40,904.57
$87,584.73
90.9%
$79,623.98
9.1%
$7,960.75
Total
$198,035.28
$29,075.31
$923.18
$26,594.61
$12,952.88
$40,904.57
$87,584.73
$79,623.98
$7,960.75
Development Charge Per Capita
$5,478.84
Development Charge Per Square Metre of GFA
$68.57
Development-Related Capital Program
Residential
Non-Residential
Share
Share
APPENDIX C.2
TABLE C.2-4
TOWN OF THE BLUE MOUNTAINS
TOWN-WIDE ROADS AND RELATED
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
Appendix C | 153
Appendix D
Water and Wastewater Services
Technical Appendix
Appendix D | 154
Appendix D - Water and Wastewater
Services Technical Appendix
Overview of Servicing Areas
The Town of The Blue Mountains Water Services administers, operates and
maintains the municipal water treatment and distribution systems within the
Town. Town-wide water supply and treatment services are provided through
the Thornbury Water Treatment Plant. The functions of Wastewater Services
are the treatment of wastewater generated by the Town and are provided at
the Craigleith and Thornbury sewage treatment plants. The development-
related capital program for water and wastewater infrastructure was
developed by HDR Inc. in consultation with Town staff and Hemson
Consulting. To note, the subtotal costs were largely provided by HDR Inc.
and the components like construction works, legal, engineering, design,
contingency shares were carried forward from the 2019 DC Study but have
not been individually reviewed.
This appendix provides an outline of the water and wastewater
development-related capital projects the Town will require in order to meet
the servicing needs of new residential and non-residential development.
This includes both Town-wide and area-specific supply, treatment and
distribution.
There are nine distinct service areas in the Town:
1. Craigleith
2. Castle Glen
3. Osler
4. Thornbury East
5. Thornbury West
6. Clarksburg
7. Lora Bay
8. Camperdown
9. Swiss Meadows
Appendix D | 155
It should be noted that developments occurring within the Swiss Meadows
service area do not receive municipal water or wastewater servicing. Therefore,
for the purposes of the area-specific development charge calculations, only the
capital programs for the first eight service areas have been analysed.
Area-Specific Cost Recovery
Keeping with past practices in which the Town levies its Water and
Wastewater DC, the Town will continue to calculate and levy both
residential and non-residential charges on an area-specific basis.
The area-specific cost recovery approach is used to calculate development
charges for both residential and non-residential water and wastewater rates.
Each area-specific charge accounts for costs associated with: water supply,
sewage treatment, water distribution and sewage collection.
The Townʼs water supply development-related capital costs have been
allocated to development in all service areas, thus establishing a uniform
water supply cost. The sewage treatment cost components have been
allocated to the areas serviced by the Townʼs two sewage treatment plants:
Craigleith Sewage Treatment Plant
-
Craigleith
-
Castle Glen
-
Osler
Thornbury Sewage Treatment Plant
-
Camperdown
-
Lora Bay
-
Clarksburg
-
Thornbury East
-
Thornbury West
Appendix D | 156
The two other cost components of the water and sewer infrastructure to be
calculated and recovered on a service area basis include:
-
water distribution systems costs, including water mains, booster
pumping and storage
-
sewer collection systems costs, including collectors, forcemains and
pumping
The capital programs are designed to accommodate build-out of the service
areas based on known applications and potential for additional development
as permitted under the Townʼs Official Plan and various amendments.
The development charge rates have been calculated based on the servicing
capacity of each of the specific projects. The servicing capacity of the works
is identified in the various tables included in this appendix. The use of
servicing capacity in the development charge calculations ensures that,
should servicing capacity differ from projected growth, development does
not pay for any excess capacity that may be generated by the works. The
approach also provides that any servicing shortages will be met by the Town
construction projects at a similar or higher cost. The Town is committed to
an ongoing program of monitoring water and sewer system capacities and
will consider development charge rate adjustments as required.
Area-Specific Capital Programs and DC Rate Calculations
Tables D.1-D.23 display the capital programs and resulting development
charges for the various service areas. The tables display the details of the
projects, anticipated timing, total costs and the allocation of the DC eligible
costs to the residential and non-residential sectors. The analysis takes into
consideration the uncommitted development charge reserve fund balance
under the "Prior Growth" column. The tables also provide the calculation of
the equivalent unit development charge rates.
Appendix D | 157
Tables D.1-D.2:
Water Supply and Treatment Capital Program and
Calculated Rates
Tables D.3-D.5:
Sewage Treatment Capital Program and Calculated
Rates
Tables D.6-D.7:
Craigleith Area-Specific Water and Sewer Capital
Program and Rates
Tables D.8-D.9:
Castle Glen Area-Specific Water and Sewer Capital
Program and Rates
Tables D.10-D.11: Osler Area-Specific Water and Sewer Capital Program
and Rates
Tables D.12-D.13: Thornbury East Area-Specific Water and Sewer Capital
Program and Rates
Tables D.14-D.15: Thornbury West Area-Specific Water and Sewer Capital
Program and Rates
Tables D.16-D.17: Clarksburg Area-Specific Water and Sewer Capital
Program and Rates
Tables D.18-D.21: Lora Bay Area-Specific Water and Sewer Capital
Programs and Rates
Tables D.22-D.23: Camperdown Area-Specific Water and Sewer Capital
Programs and Rates
Pursuant to Paragraph 8, Item 5, of Ontario Regulation 82/98, the
development-related capital program contained herein includes credits or
potential credits for a number of projects. The costs of these works are fully
reflected in development-related capital forecasts in order to recoup the
costs from other benefitting owners. The monies will be used to meet any
legitimate credit requests.
Appendix D | 158
Town-wide Water and Wastewater DC Rates
Water Supply and Treatment
As shown in Table D.2, the cost of providing water services in the Town is
extensive; the Town-wide development-related capital program for the
water system is $29.27 million to service growth to build-out of the Townʼs
currently designated lands. The program provides for works associated with
providing additional water supply (estimated at the time of DC Study to be a
share of the Town of Collingwoodʼs capacity), operations building,
consolidated environmental assessments and other study updates.
Of this $29.27 million, $331,060 of replacement or non-growth related costs
and $58,190 in benefit to existing shares. The remaining DC eligible share of
$28.88 million for Town-wide water supply and treatment is allocated to the
residential and non-residential sectors based on shares of population and
employment growth. A share of 81%, or $23.43 million is allocated to the
residential sector, resulting in a charge of $1,615.01 per capita. The
remainder, $5.45 million is allocated to the non-residential sector, yielding a
charge of $46.98 per square metre.
Additional area-specific charges are calculated and then added together
with the uniform water supply and treatment costs for a total water services
charge to be applied to new development in each service area. Residential
charges are calculated based on unit type. Non-residential charges are
calculated as a charge per square metre of new non-residential GFA.
It should be noted that the "net costs" shown on each of the service area
capital programs are not entirely recoverable against future development
charges. Unserviced lots that will connect into the water system in the
future will pay a capital connection fee, equivalent to that of the DC water
rate.
Appendix D | 159
Town-wide Wastewater Treatment
As shown in Tables D.3, D.4 and D.5, the cost of providing wastewater
services in the Town is also extensive; the Town-wide development-related
capital program for the wastewater system is $121.77 million to service
growth to build-out of the Townʼs currently designated lands. The program
provides for works related to both the Craigleith and Thornbury Sewage
Treatment Plants.
After removing the replacement or non-growth shares, and considering
available reserve fund balances, the cost of the wastewater services
forecast is reduced to $5.64 million for the Craigleith STP and $25.15 million
for the Thornbury STP, which is brought forward to the development charges
calculation.
The net municipal cost of the sanitary sewers, sewage treatment plants, and
forcemains are then allocated to the residential and non-residential sector
based on shares of population and employment growth. The resulting
development charges associated with the Craigleith Sewage Treatment
Plant are $542.06 per capita and $6.67 per square metre. The Thornbury
Sewage Treatment Plant yields development charges of $4,485.89 per capita
and $64.56 per square metre.
Additional area-specific charges are calculated and added together with the
uniform treatment costs for a total wastewater services charge to be applied
to new development in each service area.
Summary of Calculated Area-Specific Development Charges
The following tables provide a summary of the area-specific water and
wastewater charges as well as the total applicable charge to each area
including both area-specific and Town-wide uniform rates.
Appendix D | 160
Summary of Area-Specific Rate Calculations
Summary of A
rea-Sp
ecific Resid
ential R
ate Calcu
lations fo
r Single
& Se
mi Detache
d Unit
s
Summary of A
rea-Sp
ecific Resid
entia
l Rate Ca
lculations
for
Rows,
Other Mul
tiples
and H
otels U
nits
Summary of A
rea-Sp
ecific Resid
entia
l Rate Ca
lculations
for
Apart
ment Units
Appendix D | 161
Summary of Total DC Rates by Service Area
The following table provides a summary of the applicable development
charges, including Town-wide and area-specific charges, for each service
area.
Summary of A
rea-Sp
ecific Non-R
eside
ntial Rat
e Calculat
ions
per s
quare metr
e
Summary of To
tal DC Rat
es both
reside
ntial a
nd non-
residen
tial by Ser
vice Ar
ea incl
uding T
own-wid
e and a
rea-s
pecific
charges
.
Appendix D | 162
Land
Acquisition
Construction
Works
Town Project
Management
Legal, C of A,
Advertising, Misc.
Engineering
Contingencies
Sub-Total
Net Growth-
Related Share
2%
1%
15%
15%
Additional water Supply
Collingwood Share (10%)
-
$
27,000,000
$
-
$
-
$
1,000,000
$
-
$
28,000,000
$
-
$
-
$
28,000,000
$
Water Operations
Operations Building (215 m2)
-
$
497,831
$
9,957
$
4,978
$
74,675
$
74,675
$
662,115
$
331,058
$
58,193
$
272,864
$
Total Water Operations
-
$
497,831
$
9,957
$
4,978
$
74,675
$
74,675
$
662,115
$
331,058
$
58,193
$
272,864
$
Environmental Assessments
Environmental Assessments & Updates
-
$
-
$
12,240
$
-
$
-
$
-
$
612,002
$
-
$
-
$
612,002
$
Total Water-Related Studies
-
$
-
$
12,240
$
-
$
-
$
-
$
612,002
$
-
$
-
$
612,002
$
Total Water Supply & Treatment
-
$
27,497,831
$
22,197
$
4,978
$
1,074,675
$
74,675
$
29,274,118
$
331,058
$
58,193
$
28,884,866
$
Development-Related Capital Forecast
Replacement/
Non-Growth
Share
Benefit to
Existing
Unserviced
Units Share
Water Supply & Treatment
APPENDIX D
TABLE D.1
TOWN OF THE BLUE MOUNTAINS
WATER SUPPLY AND TREATMENT CAPITAL PROGRAM
TOWN-WIDE WATER SUPPLY AND TREATMENT
Appendix D | 163
APPENDIX D
TABLE D.2
Residential Growth - Population in New Units
14,508
Residential - Existing Unserviced Population
1,284
Total Residential
15,792
Employment Growth
1,453
Ultimate Growth in Square Meters
116,095
Flows from Development
m3
%
Residential
7,181
81.1%
Non-Residential
1,672
18.9%
Total
8,853
100%
Total
Water Supply
Replacement/
Benefit
Prior Growth
Post Period
Net Capital
Total
Grants and
Non-Growth
to Existing
(Available
Allocation
Costs After
Cost
Subsidies
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
CRAIGLEITH
Water Supply
$28,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$28,000.00
81.1%
$22,712.73
18.9%
$5,287.27
Water Operations - Capital
$662.12
$0.00
$331.06
$58.19
$0.00
$0.00
$272.86
81.1%
$221.34
18.9%
$51.53
Environmental Assessments
$612.00
$0.00
$0.00
$0.00
$0.00
$0.00
$612.00
81.1%
$496.44
18.9%
$115.57
TOTAL CRAIGLEITH
$29,274.12
$0.00
$331.06
$58.19
$0.00
$0.00
$28,884.87
$23,430.51
$5,454.36
Charge Per Capita
$1,615.01
Charge Per Square Metre of GFA
$46.98
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER SUPPLY
2024 TO BUILD-OUT
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Appendix D | 164
Cumulative
Capacity
(m³/day)
Studies
Land
Acquisition
Construction
Works
Town Project
Management
Legal, C of A,
Advertising,
Misc.
Engineering
Contingencies
Sub-Total
Post Period
Allocation
Net Growth-
Related Share
2%
1%
20%
15%
Sewage Treatment
Craigleith Sewage Treatment Plant
Stage III
11,473
-
$
1,234,456
$
25,647,058
$
512,941
$
256,471
$
5,129,412
$
3,847,059
$
36,627,396
$
-
$
-
$
31,479,902
$
5,147,495
$
Total Sewage Treatment
-
$
1,234,456
$
25,647,058
$
512,941
$
256,471
$
5,129,412
$
3,847,059
$
36,627,396
$
-
$
-
$
31,479,902
$
5,147,495
$
Total
-
$
1,234,456
$
25,647,058
$
512,941
$
256,471
$
5,129,412
$
3,847,059
$
36,627,396
$
-
$
-
$
31,479,902
$
5,147,495
$
Cumulative
Capacity
(m³/day)
Studies
Land
Acquisition
Construction
Works
Town Project
Management
Legal, C of A,
Advertising,
Misc.
Engineering
Contingencies
Sub-Total
Post Period
Allocation
Net Growth-
Related Share
2%
1%
15%
15%
Sewage Treatment
Thornbury Sewage Treatment Plant
Phase 1 (Outstanding Debt)
3,580
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
Phase 1A - Actuals & Tender (incl. neg. reserve)
5,330
-
$
-
$
29,000,000
$
29,000,000
$
4,335,919
$
11,313,724
$
-
$
13,350,357
$
New Effluent Outfall - Need to Phase 1A Capacity
-
$
-
$
14,500,000
$
1,500,000
$
16,000,000
$
-
$
3,931,498
$
9,462,261
$
2,606,240
$
Phase 1B (Tertiary Treatment)
7,080
-
$
-
$
9,498,618
$
189,972
$
94,986
$
1,424,793
$
1,424,793
$
12,633,162
$
-
$
-
$
3,438,071
$
9,195,090
$
Phase 2 (+Secondary Treatment)
10,080
-
$
-
$
18,997,235
$
379,945
$
189,972
$
2,849,585
$
2,849,585
$
25,266,323
$
-
$
-
$
25,266,323
$
-
$
Phase 3B (Expand Capacity)
13,080
-
$
-
$
1,688,643
$
33,773
$
16,886
$
253,296
$
253,296
$
2,245,895
$
-
$
-
$
2,245,895
$
-
$
Total Sewage Treatment
-
$
-
$
73,684,496
$
603,690
$
301,845
$
4,527,674
$
6,027,674
$
85,145,380
$
4,335,919
$
15,245,222
$
40,412,551
$
25,151,688
$
Total
-
$
-
$
73,684,496
$
603,690
$
301,845
$
4,527,674
$
6,027,674
$
85,145,380
$
4,335,919
$
15,245,222
$
40,412,551
$
25,151,688
$
Development-Related Costs (2024 - Build-Out)
Prior Growth
Benefit to
Existing
Unserviced
Units Share
Thornbury Sewage Treatment Services
APPENDIX D
TABLE D.3
TOWN OF THE BLUE MOUNTAINS
SEWAGE TREATMENT PLANT CAPITAL PROGRAM
SEWAGE TREATMENT COSTS
Development-Related Costs (2024 - Build-Out)
Replacement/
Non-Growth
Share
Benefit to
Existing
Unserviced
Units Share
Craigleith Sewage Treatment Services
Appendix D | 165
APPENDIX D
TABLE D.4
Residential Growth - Population in New Units
9,483
Residential - Existing Unserviced Population (reflected in BTE)
1,706
Total Residential
11,189
Employment Growth
947
Ultimate Growth in Square Meters
75,665
Flows from Development
m3
%
Residential
3,082
91.1%
Non-Residential
303
8.9%
Total
3,385
100%
Total
Craigleith Sewage Treatment Plant
Replacement/
Benefit
Prior Growth
Post Period
Net Capital
(Serves: Craigleith, Castle Glen & Osler)
Total
Grants and
Non-Growth
to Existing
(Available
Allocation
Costs After
Cost
Subsidies
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
CRAIGLEITH SEWAGE TREATMENT PLANT
Total Sewage Treatment
$36,627.40
$0.00
$0.00
$0.00
$0.00
$31,479.90
$5,147.49
91.1%
$4,687.20
8.9%
$460.30
Recovery of Negative Reserve
$592.34
$0.00
$0.00
$94.66
$0.00
$0.00
$497.68
91.1%
$453.18
8.9%
$44.50
TOTAL CRAIGLEITH SEWAGE TREATMENT PLANT
$37,219.73
$0.00
$0.00
$94.66
$0.00
$31,479.90
$5,645.18
$5,140.37
$504.80
Charge Per Capita
$542.06
Charge Per Square Metre of GFA
$6.67
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
2024 TO BUILD-OUT
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
CRAIGLEITH SEWAGE TREATMENT PLANT
Appendix D | 166
APPENDIX D
TABLE D.5
Residential Growth - Population in New Units
5,025
Residential - Existing Unserviced Population (reflected in BTE)
1,911
Total Residential
6,936
Employment Growth
506
Ultimate Growth in Square Meters
40,429
Flows from Development
m3
Residential
1,910
89.6%
Non-Residential
221
10.4%
Total
2,131
Total
THORNBURY SEWAGE TREATMENT PLANT
Replacement/
Benefit
Prior Growth
Post Period
Net Capital
Total
Grants and
Non-Growth
to Existing
(Available
Allocation
Costs After
Cost
Subsidies
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
THORNBURY SEWAGE TREATMENT PLANT
Total Sewage Treatment
$85,145.38
$0.00
$0.00
$15,245.22
$4,335.92
$40,412.55
$25,151.69
89.6%
$22,541.59
10.4%
$2,610.10
$85,145.38
$0.00
$0.00
$15,245.22
$4,335.92
$40,412.55
$25,151.69
$22,541.59
$2,610.10
Charge Per Capita
$4,485.89
Charge Per Square Metre of GFA
$64.56
(Serves: Camperdown, Swiss Meadows, Lora Bay, Clarksburg,
Thornbury East and West)
Residential
Non-Residential
Share
Share
Development-Related Capital Forecast
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
THORNBURY SEWAGE TREATMENT PLANT
2024 TO BUILD-OUT
Appendix D | 167
APPENDIX D
TABLE D.6
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
CRAIGLEITH SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Castle Glen
Share
Osler
Share
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
10%
2%
Craigleith Water Distribution
Feeder Main From Thornbury Water Treatment Plant to Arrowhead Booster Pumping Station
PVC
450/350mm
10,700
$1,734
18,548,525
$
278,228
$
2,782,279
$
1,854,852
$
370,970
$
-
$
23,834,854
$
(3,953,483)
$
19,881,371
$
6,853,627
$
292,612
$
-
$
12,735,131
$
Arrowhead Rd/Craigleith Rd/Grey Rd
19/Happy Valley Rd
Arrowhead BPS
Happy Valley Reservoir
PVC
350mm
4,369
$1,579
6,898,716
$
103,481
$
1,034,807
$
689,872
$
137,974
$
-
$
8,864,850
$
(1,458,255)
$
7,406,595
$
-
$
-
$
-
$
7,406,595
$
Grey Road 19
Mountain Drive
6th Street
PVC
300mm
1,846
$1,738
3,207,577
$
48,114
$
481,136
$
320,758
$
64,152
$
-
$
4,121,736
$
(684,907)
$
3,436,829
$
1,184,765
$
50,583
$
-
$
2,201,481
$
Subtotal Craigleith Water Distribution
28,654,817
$
429,822
$
4,298,223
$
2,865,482
$
573,096
$
-
$
36,821,441
$
(6,096,646)
$
30,724,795
$
8,038,392
$
343,195
$
-
$
22,343,208
$
Craigleith Water Storage and Pumping
Arrowhead Water Booster Pumping Station Expansion Phase 1
1,321,722
$
19,826
$
198,258
$
132,172
$
26,434
$
-
$
1,698,413
$
-
$
1,698,413
$
585,487
$
24,997
$
-
$
1,087,929
$
Arrowhead Water Booster Pumping Station Expansion Phase 2
2,220,493
$
33,307
$
333,074
$
222,049
$
44,410
$
-
$
2,853,334
$
-
$
2,853,334
$
983,619
$
41,995
$
-
$
1,827,720
$
Subtotal Craigleith Water Storage and Pumping
3,542,215
$
53,133
$
531,332
$
354,222
$
70,844
$
-
$
4,551,747
$
-
$
4,551,747
$
1,569,106
$
66,992
$
-
$
2,915,649
$
Total Craigleith Water Projects
32,197,032
$
482,955
$
4,829,555
$
3,219,703
$
643,941
$
-
$
41,373,187
$
(6,096,646)
$
35,276,542
$
9,607,497
$
410,187
$
-
$
25,258,857
$
Development-Related Costs (2024 - Build-Out)
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Revised Sub-
Total
Castle Glen
Share
Osler
Share
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Craigleith Wastewater Collection
Long Point Road
Highway 26
Brophy's Lane (WWTP)
PVC
525mm
525
$1,610
845,276
$
12,679
$
126,791
$
126,791
$
16,906
$
-
$
1,128,444
$
(191,238)
$
937,206
$
292,037
$
12,468
$
-
$
632,701
$
Grey Rd 19
Grey Rd 19
310m North
PVC
375mm
310
$1,632
505,934
$
7,589
$
75,890
$
75,890
$
10,119
$
-
$
675,422
$
(111,742)
$
563,680
$
175,645
$
7,499
$
-
$
380,536
$
Grey Road 19
Mountain Drive
6th Street
PVC
375mm
1,846
$1,528
2,820,391
$
42,306
$
423,059
$
423,059
$
56,408
$
-
$
3,765,222
$
(642,405)
$
3,122,818
$
973,082
$
41,545
$
-
$
2,108,190
$
Subtotal Craigleith Wastewater Collection
4,171,601
$
62,574
$
625,740
$
625,740
$
83,432
$
-
$
5,569,088
$
(945,385)
$
4,623,704
$
1,440,764
$
61,513
$
-
$
3,121,427
$
Craigleith Wastewater Pump Stations
Main Wastewater Pumping Station: Stage II (Additional Pump), 100HP
93 l/s
525,724
$
7,886
$
78,859
$
78,859
$
10,514
$
-
$
701,842
$
-
$
701,842
$
-
$
-
$
-
$
701,842
$
Main Wastewater Pumping Station: Stage III (Replace existing pumps)
108l/s
1,051,449
$
15,772
$
157,717
$
157,717
$
21,029
$
-
$
1,403,685
$
-
$
1,403,685
$
-
$
-
$
-
$
1,403,685
$
Craigleith Wastewater Treatment Plant Lowlift Sewage Pumping Station
224 l/s
5,152,101
$
77,282
$
772,815
$
772,815
$
103,042
$
-
$
6,878,055
$
-
$
6,878,055
$
2,143,228
$
91,504
$
-
$
4,643,322
$
Subtotal Craigleith Wastewater Pump Stations
6,729,275
$
100,939
$
1,009,391
$
1,009,391
$
134,585
$
-
$
8,983,582
$
-
$
8,983,582
$
2,143,228
$
91,504
$
-
$
6,748,849
$
Total Craigleith Wastewater Projects
10,900,876
$
163,513
$
1,635,131
$
1,635,131
$
218,018
$
-
$
14,552,670
$
(945,385)
$
13,607,285
$
3,583,992
$
153,017
$
-
$
9,870,276
$
Less: Shared Works
Less: Shared Works
Appendix D | 168
Water:
Residential Growth - Population in New Units
4,969
Residential - Pop Existing Unserviced Units
87
Total Residential
5,056
Wastewater:
Residential Growth - Population in New Units
4,969
Residential - Pop Existing Unserviced Units
1,365
Total Residential
6,334
Employment Growth
601
Ultimate Growth in Square Meters
48,020
Total
Craigleith Service Area
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
(Available
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Craigleith Water Distribution
$30,724.79
$0.00
$8,381.59
$0.00
$4,859.59
$17,483.61
90.9%
$15,894.49
9.1%
$1,589.12
Craigleith Water Storage and Pumping
$4,551.75
$0.00
$1,636.10
$0.00
$719.93
$2,195.72
90.9%
$1,996.15
9.1%
$199.57
Total Water Projects
$35,276.54
$0.00
$10,017.68
$0.00
$5,579.52
$19,679.34
$17,890.64
$1,788.69
Charge Per Capita
$3,538.83
Charge Per Square Metre of GFA
$37.25
Wastewater Projects
Craigleith Wastewater Collection
$4,623.70
$0.00
$1,502.28
$0.00
$190.48
$2,930.95
90.9%
$2,664.55
9.1%
$266.40
Craigleith Wastewater Pump Stations
$8,983.58
$0.00
$2,234.73
$0.00
$0.00
$6,748.85
90.9%
$6,135.43
9.1%
$613.42
Total Wastewater Projects
$13,607.29
$0.00
$3,737.01
$0.00
$190.48
$9,679.80
$8,799.98
$879.82
Charge Per Capita
$1,389.37
Charge Per Square Metre of GFA
$18.32
Charge
Per Capita
Water
Water
Storage and Pumping
$3,538.83
$7,886
$7,078
$5,308
Distribution and Pumping
$37.25
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$4,976.59
$11,090
$9,954
$7,465
Total Water Services
$56.83
Wastewater
Wastewater
Collection and Pumping
$1,389.37
$3,096
$2,779
$2,084
Collection and Pumping
$18.32
Treatment
$3,300.17
$7,354
$6,600
$4,950
Treatment
$43.17
Total Wastewater Services
$4,689.54
$10,450
$9,379
$7,034
Total Wastewater Services
$61.49
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Apartments
Non-Residential: Craigleith
Service Area
Charge per
Square Metre
Residential: Craigleith Service Area
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and Other
Multiples
APPENDIX D
TABLE D.7
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
CRAIGLEITH SERVICE AREA
WATER AND WASTEWATER SERVICING
Appendix D | 169
APPENDIX D
TABLE D.8
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
CASTLE GLEN SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works:
Osler
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Castle Glen Water Distribution
Grey Road 19
6th Street
Osler Bluff Road/Grey Road 19
PVC
300mm
1,273
$1,580
2,011,167
$
30,168
$
301,675
$
301,675
$
40,223
$
-
$
2,684,908
$
(441,183)
$
2,243,724
$
91,872
$
-
$
2,151,852
$
Grey Road 19
Osler Bluff Road/Grey Road 19
Water Reervoir west of 3rd Line
PVC
300mm
5,634
$1,485
8,363,951
$
125,459
$
1,254,593
$
1,254,593
$
167,279
$
-
$
11,165,874
$
(1,955,858)
$
9,210,016
$
-
$
-
$
9,210,016
$
Subtotal Castle Glen Water Distribution
10,375,118
$
155,627
$
1,556,268
$
1,556,268
$
207,502
$
-
$
13,850,782
$
(2,397,041)
$
11,453,740
$
91,872
$
-
$
11,361,868
$
Castle Glen Water Storage and Pumping
Reservoir
2800m3
5,046,956
$
75,704
$
757,043
$
757,043
$
100,939
$
-
$
6,737,686
$
-
$
6,737,686
$
-
$
-
$
6,737,686
$
Pumping Station to Service Castle Glen Reservoir
4000m3/d
5,257,246
$
78,859
$
788,587
$
788,587
$
105,145
$
-
$
7,018,423
$
-
$
7,018,423
$
-
$
-
$
7,018,423
$
Pumping Station to Service Castle Glen
5000m3/d
6,126,179
$
91,893
$
918,927
$
918,927
$
122,524
$
-
$
8,178,449
$
-
$
8,178,449
$
-
$
-
$
8,178,449
$
Subtotal Castle Glen Water Storage and Pumping
16,430,381
$
246,456
$
2,464,557
$
2,464,557
$
328,608
$
-
$
21,934,558
$
-
$
21,934,558
$
-
$
-
$
21,934,558
$
Castle Glen Share of Craigleith Water Distribution
Share of Craigleith Water Distribution
-
$
-
$
-
$
-
$
-
$
-
$
8,038,392
$
-
$
8,038,392
$
-
$
-
$
8,038,392
$
Subtotal Castle Glen Share of Craigleith Water Distribution
-
$
-
$
-
$
-
$
-
$
-
$
8,038,392
$
-
$
8,038,392
$
-
$
-
$
8,038,392
$
Castle Glen Share of Craigleith Water Storage and Pumping
Share of Craigleith Water Booster Pumping Station Expansion
-
$
-
$
-
$
-
$
-
$
-
$
1,569,106
$
-
$
1,569,106
$
-
$
-
$
1,569,106
$
Subtotal Castle Glen Share of Craigleith Water Storage and Pumping
-
$
-
$
-
$
-
$
-
$
-
$
1,569,106
$
-
$
1,569,106
$
-
$
-
$
1,569,106
$
Total Castle Glen Water Projects
26,805,498
$
402,082
$
4,020,825
$
4,020,825
$
536,110
$
-
$
45,392,837
$
(2,397,041)
$
42,995,796
$
91,872
$
-
$
42,903,924
$
-
$
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works:
Osler
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Castle Glen Wastewater Collection
Grey Road 19
6th Street
Osler Bluff Road/Grey Road 19
PVC
375mm
1,273
$1,487
1,893,270
$
28,399
$
283,991
$
283,991
$
37,865
$
-
$
2,527,516
$
(420,034)
$
2,107,482
$
86,294
$
-
$
2,021,188
$
Grey Road 19
Grey Road 19
Osler Bluff Road/2nd Line
PVC
250mm
2,950
$1,360
4,013,024
$
60,195
$
601,954
$
601,954
$
80,260
$
-
$
5,357,387
$
(885,331)
$
4,472,056
$
-
$
-
$
4,472,056
$
Subtotal Castle Glen Wastewater Collection
5,906,294
$
88,594
$
885,944
$
885,944
$
118,126
$
-
$
7,884,903
$
(1,305,365)
$
6,579,538
$
86,294
$
-
$
6,493,245
$
Castle Glen Share of Craigleith Wastewater Collection
Share of Craigleith Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
1,440,764
$
-
$
1,440,764
$
-
$
-
$
1,440,764
$
Subtotal Castle Glen Share of Craigleith Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
1,440,764
$
-
$
1,440,764
$
-
$
-
$
1,440,764
$
Castle Glen Share of Craigleith Wastewater Pump Stations
Craigleith Wastewater Treatment Plant Lowlift Sewage Pumping Station
-
$
-
$
-
$
-
$
-
$
-
$
2,143,228
$
-
$
2,143,228
$
-
$
-
$
2,143,228
$
Subtotal Castle Glen Share of Craigleith Wastewater Pump Stations
-
$
-
$
-
$
-
$
-
$
-
$
2,143,228
$
-
$
2,143,228
$
-
$
-
$
2,143,228
$
Other Wastewater Projects
Environmental Assessment Update
-
$
-
$
-
$
-
$
-
$
-
$
54,400
$
-
$
54,400
$
-
$
-
$
54,400
$
Subtotal Other Wastewater Projects
-
$
-
$
-
$
-
$
-
$
-
$
54,400
$
-
$
54,400
$
-
$
-
$
54,400
$
Total Castle Glen Wastewater Projects
5,906,294
$
88,594
$
885,944
$
885,944
$
118,126
$
-
$
11,523,296
$
(1,305,365)
$
10,217,931
$
86,294
$
-
$
10,131,637
$
Appendix D | 170
Water & Wastewater:
Residential Growth - Population in New Units
4,497
Residential - Pop Existing Unserviced Units
173
Total Residential
4,670
Employment Growth
314
Ultimate Growth in Square Meters
25,089
Total
Castle Glen Service Area
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
(Available
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Castle Glen Water Distribution
$11,453.74
$0.00
$91.87
$0.00
$0.00
$11,361.87
90.9%
$10,329.16
9.1%
$1,032.70
Castle Glen Water Storage and Pumping
$21,934.56
$0.00
$0.00
$0.00
$0.00
$21,934.56
90.9%
$19,940.88
9.1%
$1,993.68
Castle Glen Share of Craigleith Water Distribution
$8,038.39
$0.00
$0.00
$0.00
$0.00
$8,038.39
90.9%
$7,307.77
9.1%
$730.63
Castle Glen Share of Craigleith Water Storage and Pumping
$1,569.11
$0.00
$0.00
$0.00
$0.00
$1,569.11
90.9%
$1,426.49
9.1%
$142.62
Total Water Projects
$42,995.80
$0.00
$91.87
$0.00
$0.00
$42,903.92
$39,004.30
$3,899.62
Charge Per Capita
$8,351.99
Charge Per Square Metre of GFA
$155.43
Wastewater Projects
Castle Glen Wastewater Collection
$6,579.54
$0.00
$86.29
$0.00
-$287.53
$6,780.77
90.9%
$6,164.46
9.1%
$616.32
Castle Glen Share of Craigleith Wastewater Collection
$1,440.76
$0.00
$0.00
$0.00
$0.00
$1,440.76
90.9%
$1,309.81
9.1%
$130.95
Castle Glen Share of Craigleith Wastewater Pump Stations
$2,143.23
$0.00
$0.00
$0.00
$0.00
$2,143.23
90.9%
$1,948.43
9.1%
$194.80
Other Wastewater Projects
$54.40
$0.00
$0.00
$0.00
$0.00
$54.40
90.9%
$49.46
9.1%
$4.94
Total Wastewater Projects
$10,217.93
$0.00
$86.29
$0.00
-$287.53
$10,419.17
$9,472.15
$947.02
Charge Per Capita
$2,028.27
Charge Per Square Metre of GFA
$37.75
Charge
Per Capita
Water
Water
Distribution and Pumping
$8,351.99
$18,612
$16,704
$12,528
Distribution and Pumping
$155.43
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$9,789.75
$21,816
$19,580
$14,685
Total Water Services
$175.01
Wastewater
Wastewater
Collection and Pumping
$2,028.27
$4,520
$4,057
$3,042
Collection and Pumping
$37.75
Treatment
$3,300.17
$7,354
$6,600
$4,950
Treatment
$43.17
Total Wastewater Services
$5,328.44
$11,874
$10,657
$7,992
Total Wastewater Services
$80.92
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Residential: Castle Glen Service Area
Non-Residential: Castle Glen
Service Area
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge per
Square Metre
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and
Other Multiples
Apartments
CASTLE GLEN SERVICE AREA
APPENDIX D
TABLE D.9
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
Appendix D | 171
APPENDIX D
TABLE D.10
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
OSLER SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for in
Roads Projects
& Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
12%
10%
2%
Osler Water Distribution
TOBM/Clearview Townline
Grey Road 19
Poplar Sideroad
PVC
250mm
595
$705
938,299
$
14,074
$
112,596
$
93,830
$
18,766
$
-
$
1,177,565
$
(206,380)
$
971,185
$
-
$
-
$
971,185
$
Poplar Sideroad
TOBM/Clearview Townline
West End of Road
PVC
200mm
768
$655
1,034,102
$
15,512
$
124,092
$
103,410
$
20,682
$
-
$
1,297,798
$
(249,835)
$
1,047,963
$
-
$
-
$
1,047,963
$
TOBM/Clearview Townline
Poplar Sideroad
Shaw's Road
PVC
200mm
235
$655
346,051
$
5,191
$
41,526
$
34,605
$
6,921
$
-
$
434,294
$
(78,438)
$
355,856
$
-
$
-
$
355,856
$
TOBM/Clearview Townline
Shaw's Road
Valley Road
PVC
200mm
277
$655
392,172
$
5,883
$
47,061
$
39,217
$
7,843
$
-
$
492,176
$
(90,793)
$
401,383
$
-
$
-
$
401,383
$
TOBM/Clearview Townline
Valley Road
Orchard Place
PVC
200mm
219
$655
314,387
$
4,716
$
37,726
$
31,439
$
6,288
$
-
$
394,556
$
(74,470)
$
320,086
$
-
$
-
$
320,086
$
Subtotal Osler Water Distribution
3,025,012
$
45,375
$
363,001
$
302,501
$
60,500
$
-
$
3,796,390
$
(699,916)
$
3,096,474
$
-
$
-
$
3,096,474
$
Osler Share of Craigleith Water Distribution
Share of Craigleith Water Distribution
-
$
-
$
-
$
-
$
-
$
-
$
343,195
$
-
$
343,195
$
-
$
-
$
343,195
$
Subtotal Osler Share of Craigleith Water Distribution
-
$
-
$
-
$
-
$
-
$
-
$
343,195
$
-
$
343,195
$
-
$
-
$
343,195
$
Osler Share of Craigleith Water Storage and Pumping
Share of Craigleith Water Booster Pumping Station Expansion
-
$
-
$
-
$
-
$
-
$
-
$
66,992
$
-
$
66,992
$
-
$
-
$
66,992
$
Subtotal Osler Share of Craigleith Water Storage and Pumping
-
$
-
$
-
$
-
$
-
$
-
$
66,992
$
-
$
66,992
$
-
$
-
$
66,992
$
Other Water Projects
Environmental Assessment Update
-
$
-
$
-
$
-
$
1,333
$
66,667
$
68,000
$
-
$
68,000
$
-
$
-
$
68,000
$
Subtotal Other Water Projects
-
$
-
$
-
$
-
$
1,333
$
66,667
$
68,000
$
-
$
68,000
$
-
$
-
$
68,000
$
Total Osler Water Projects
3,025,012
$
45,375
$
363,001
$
302,501
$
61,834
$
66,667
$
4,274,578
$
(699,916)
$
3,574,662
$
-
$
-
$
3,574,662
$
0
-$
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for in
Roads Projects
& Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works:
Clearview
Township
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
12%
10%
2%
Osler Wastewater Collection
TOBM/Clearview Townline
Grey Road 19
Poplar Sideroad
PVC
200mm
595
$690
842,880
$
12,643
$
101,146
$
84,288
$
16,858
$
-
$
1,057,815
$
(178,169)
$
879,646
$
-
$
-
$
879,646
$
Poplar Sideroad
TOBM/Clearview Townline
West End of Road
PVC
200mm
768
$690
1,080,003
$
16,200
$
129,600
$
108,000
$
21,600
$
-
$
1,355,404
$
(225,505)
$
1,129,899
$
-
$
-
$
1,129,899
$
TOBM/Clearview Townline
Poplar Sideroad
Shaw's Road
PVC
200mm
235
$690
355,074
$
5,326
$
42,609
$
35,507
$
7,101
$
-
$
445,618
$
(72,102)
$
373,515
$
-
$
-
$
373,515
$
TOBM/Clearview Townline
Shaw's Road
Valley Road
PVC
200mm
277
$690
401,895
$
6,028
$
48,227
$
40,189
$
8,038
$
-
$
504,378
$
(83,869)
$
420,509
$
-
$
-
$
420,509
$
TOBM/Clearview Townline
Valley Road
Orchard Place
PVC
200mm
219
$690
339,567
$
5,094
$
40,748
$
33,957
$
6,791
$
-
$
426,156
$
(68,358)
$
357,798
$
-
$
-
$
357,798
$
Subtotal Osler Wastewater Collection
3,019,419
$
45,291
$
362,330
$
301,942
$
60,388
$
-
$
3,789,371
$
(628,004)
$
3,161,367
$
-
$
-
$
3,161,367
$
Osler Share of Craigleith Wastewater Collection
Share of Craigleith Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
61,513
$
-
$
61,513
$
-
$
-
$
61,513
$
Subtotal Osler Share of Craigleith Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
61,513
$
-
$
61,513
$
-
$
-
$
61,513
$
Osler Share of Craigleith Wastewater Pump Stations
Craigleith Wastewater Treatment Plant Lowlift Sewage Pumping Station
-
$
-
$
-
$
-
$
-
$
-
$
91,504
$
-
$
91,504
$
-
$
-
$
91,504
$
Subtotal Osler Share of Craigleith Wastewater Pump Stations
-
$
-
$
-
$
-
$
-
$
-
$
91,504
$
-
$
91,504
$
-
$
-
$
91,504
$
Other Wastewater Projects
Environmental Assessment Update
-
$
-
$
-
$
-
$
667
$
33,333
$
34,000
$
-
$
34,000
$
-
$
-
$
34,000
$
Subtotal Other Wastewater Projects
-
$
-
$
-
$
-
$
667
$
33,333
$
34,000
$
-
$
34,000
$
-
$
-
$
34,000
$
Total Osler Wastewater Projects
3,019,419
$
45,291
$
362,330
$
301,942
$
61,055
$
33,333
$
3,976,388
$
(628,004)
$
3,348,384
$
-
$
-
$
3,348,384
$
Appendix D | 172
Water & Wastewater:
Residential Growth - Population in New Units
9
Residential - Pop Existing Unserviced Units
165
Total Residential
174
Employment Growth
32
Ultimate Growth in Square Meters
2,557
Total
Osler Service Area
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
(Available
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Osler Water Distribution
$3,096.47
$0.00
$0.00
$0.00
$4.04
$3,092.43
80.0%
$2,473.95
20.0%
$618.49
Osler Water Storage and Pumping
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
80.0%
$0.00
20.0%
$0.00
Osler Share of Craigleith Water Distribution
$343.20
$0.00
$0.00
$0.00
$0.00
$343.20
80.0%
$274.56
20.0%
$68.64
Osler Share of Craigleith Water Storage and Pumping
$66.99
$0.00
$0.00
$0.00
$0.00
$66.99
80.0%
$53.59
20.0%
$13.40
Other Water Projects
$68.00
$0.00
$0.00
$0.00
$0.00
$68.00
80.0%
$54.40
20.0%
$13.60
Total Water Projects
$3,574.66
$0.00
$0.00
$0.00
$4.04
$3,570.62
$2,856.50
$714.12
Charge Per Capita
$16,398.51
Charge Per Square Metre of GFA
$279.30
Wastewater Projects
Osler Wastewater Collection
$3,161.37
$0.00
$0.00
$0.00
($286.00)
$3,447.37
80.0%
$2,757.90
20.0%
$689.47
Osler Share of Craigleith Wastewater Collection
$61.51
$0.00
$0.00
$0.00
$0.00
$61.51
80.0%
$49.21
20.0%
$12.30
Osler Share of Craigleith Wastewater Pump Stations
$91.50
$0.00
$0.00
$0.00
$0.00
$91.50
80.0%
$73.20
20.0%
$18.30
Other Wastewater Projects
$34.00
$0.00
$0.00
$0.00
$0.00
$34.00
80.0%
$27.20
20.0%
$6.80
Total Wastewater Projects
$3,348.38
$0.00
$0.00
$0.00
($286.00)
$3,634.39
$2,907.51
$726.88
Charge Per Capita
$16,691.37
Development Charge Per Square Metre of GFA
$284.29
Charge
Per Capita
Water
Water
Distribution and Pumping
$16,398.51
$36,542
$32,797
$24,598
Distribution and Pumping
$279.30
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$17,836.27
$39,746
$35,673
$26,755
Total Water Services
$298.88
Wastewater
Wastewater
Collection and Pumping
$16,691.37
$37,195
$33,383
$25,037
Collection and Pumping
$284.29
Treatment
$3,300.17
$7,354
$6,600
$4,950
Treatment
$43.17
Total Wastewater Services
$19,991.54
$44,549
$39,983
$29,987
Total Wastewater Services
$327.46
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
OSLER SERVICE AREA
APPENDIX D
TABLE D.11
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
Residential: Osler Service Area
Non-Residential: Osler Service
Area
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge per
Square Metre
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and
Other Multiples
Apartments
Appendix D | 173
APPENDIX D
TABLE D.12
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
THORNBURY EAST SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Road Name From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Thornbury
West Share
Lora Bay
Share
Clarksburg
Share
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Thornbury East Water Storage and Pumping
Thornbury Water Reservoir Debt
779,031
$
-
$
-
$
-
$
-
$
-
$
779,031
$
-
$
779,031
$
634,925
$
-
$
-
$
-
$
144,107
$
Subtotal Thornbury East Water Storage and Pumping
779,031
$
-
$
-
$
-
$
-
$
-
$
779,031
$
-
$
779,031
$
634,925
$
-
$
-
$
-
$
144,107
$
Total Thornbury East Water Projects
779,031
$
-
$
-
$
-
$
-
$
-
$
779,031
$
-
$
779,031
$
634,925
$
-
$
-
$
-
$
144,107
$
Development-Related Costs (2024 - Build-Out)
Less:
Road Name From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Thornbury
West Share
Lora Bay
Share
Clarksburg
Share
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Thornbury East Wastewater Collection
Forcemain
Mill St SPS
Thornbury WWTP
HDPE
300
1,350
$450
1,925,143
$
28,877
$
288,772
$
288,772
$
38,503
$
-
$
2,570,066
$
(396,341)
$
2,173,726
$
633,187
$
1,028,113
$
370,121
$
-
$
142,304
$
Uprades to Mill St /Bay St Sewage Pumping Station Phase 1
1,587,093
$
23,806
$
238,064
$
238,064
$
31,742
$
-
$
2,118,769
$
-
$
2,118,769
$
617,179
$
1,002,121
$
360,763
$
-
$
138,706
$
Uprades to Mill St /Bay St Sewage Pumping Station Phase 2
119,032
$
1,785
$
17,855
$
17,855
$
2,381
$
-
$
158,908
$
-
$
158,908
$
46,288
$
75,159
$
27,057
$
-
$
10,403
$
Subtotal Thornbury East Wastewater Collection
3,631,268
$
54,469
$
544,690
$
544,690
$
72,625
$
-
$
4,847,743
$
(396,341)
$
4,451,403
$
1,296,655
$
2,105,393
$
757,942
$
-
$
291,413
$
Total Thornbury East Wastewater Projects
3,631,268
$
54,469
$
544,690
$
544,690
$
72,625
$
-
$
4,847,743
$
(792,682)
$
4,451,403
$
1,296,655
$
2,105,393
$
757,942
$
-
$
291,413
$
Less Shared Works:
Less Shared Works:
Appendix D | 174
Water:
Residential Growth - Population in New Units
278
Residential - Pop Existing Unserviced Units
10
Total Residential
288
Wastewater:
Residential Growth - Population in New Units
278
Residential - Pop Existing Unserviced Units
41
Total Residential
319
Employment Growth
30
Ultimate Growth in Square Meters
2,397
Total
Thornbury East Service Area
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
(Available
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Thornbury East Water Storage and Pumping
$779.03
$0.00
$634.92
$0.00
($334.88)
$478.98
90.9%
$435.45
9.1%
$43.54
Total Water Projects
$779.03
$0.00
$634.92
$0.00
($334.88)
$478.98
$435.45
$43.54
Charge Per Capita
$1,512.85
Charge Per Square Metre of GFA
$18.16
Wastewater Projects
Thornbury East Wastewater Collection
$4,451.40
$0.00
$4,159.99
$0.00
($105.79)
$397.20
90.9%
$361.10
9.1%
$36.10
Total Wastewater Projects
$4,451.40
$0.00
$4,159.99
$0.00
($105.79)
$397.20
$361.10
$36.10
Charge Per Capita
$1,130.92
Charge Per Square Metre of GFA
$15.06
Charge
Per Capita
Water
Water
Storage and Pumping
$1,512.85
$3,371
$3,026
$2,269
Distribution and Pumping
$18.16
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$2,950.61
$6,575
$5,902
$4,426
Total Water Services
$37.74
Wastewater
Wastewater
Collection and Pumping
$1,130.92
$2,520
$2,262
$1,696
Collection and Pumping
$15.06
Treatment
$10,792.91
$24,051
$21,586
$16,189
Treatment
$178.31
Total Wastewater Services
$11,923.83
$26,571
$23,848
$17,885
Total Wastewater Services
$193.37
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Residential: Thornbury East Service Area
Non-Residential: Thornbury
East Service Area
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge per
Square Metre
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and Other
Multiples
Apartments
THORNBURY EAST SERVICE AREA
APPENDIX D
TABLE D.13
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
Appendix D | 175
APPENDIX D
TABLE D.14
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
THORNBURY WEST SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works
Benefit to
Existing
Unserviced
Units Share
Post-Period
Costs
Net Growth-
Related Share
1.5%
15%
15%
2%
Thornbury West Water Distribution
Peel Street South
10th Line
Alfred Street West
PVC
250mm
71
$1,950
138,450
$
2,077
$
20,768
$
20,768
$
2,769
$
-
$
184,831
$
(26,517)
$
158,314
$
-
$
-
$
158,314
$
-
$
Peel Street South
Alfred Street West
Alice Street West
PVC
250mm
270
$1,691
456,586
$
6,849
$
68,488
$
68,488
$
9,132
$
-
$
609,542
$
(131,984)
$
477,558
$
-
$
-
$
477,558
$
-
$
Peel Street South
Alice Street West
Baring Street
PVC
250mm
150
$1,983
297,429
$
4,461
$
44,614
$
44,614
$
5,949
$
-
$
397,068
$
(75,219)
$
321,849
$
-
$
-
$
321,849
$
-
$
Peel Street South
Baring Street
Arthur Street West
PVC
250mm
180
$1,808
325,490
$
4,882
$
48,823
$
48,823
$
6,510
$
-
$
434,529
$
(87,989)
$
346,540
$
-
$
-
$
346,540
$
-
$
Lansdowne Street South
Alice Street
Louisa Street
PVC
150mm
220
$1,458
320,844
$
4,813
$
48,127
$
48,127
$
6,417
$
-
$
428,327
$
(103,485)
$
324,842
$
-
$
-
$
-
$
324,842
$
Lansdowne Street South
Louisa Street
Arthur Street West
PVC
150mm
120
$1,762
211,431
$
3,171
$
31,715
$
31,715
$
4,229
$
-
$
282,261
$
(59,228)
$
223,033
$
-
$
-
$
-
$
223,033
$
Beaver Street South
10th Line
Napier Street
PVC
150mm
70
$1,547
108,279
$
1,624
$
16,242
$
16,242
$
2,166
$
-
$
144,552
$
(33,933)
$
110,619
$
-
$
-
$
110,619
$
-
$
Beaver Street South
Napier Street
Albert Street
PVC
150mm
410
$1,323
542,248
$
8,134
$
81,337
$
81,337
$
10,845
$
-
$
723,901
$
(188,810)
$
535,091
$
-
$
-
$
535,091
$
-
$
Alice Street West
Lansdowne Street
Baring Street
PVC
250mm
664
$1,526
1,013,288
$
15,199
$
151,993
$
151,993
$
20,266
$
-
$
1,352,739
$
(322,434)
$
1,030,305
$
-
$
-
$
-
$
1,030,305
$
Alice Street West
Baring Street
Peel Street
PVC
250mm
84
$1,808
151,900
$
2,278
$
22,785
$
22,785
$
3,038
$
-
$
202,786
$
(42,255)
$
160,531
$
-
$
-
$
-
$
160,531
$
Alfred Street
Albert Street
Peel Street
PVC
200mm
676
$1,260
851,658
$
12,775
$
127,749
$
127,749
$
17,033
$
-
$
1,136,964
$
(219,130)
$
917,834
$
-
$
-
$
-
$
917,834
$
Alfred Street
50m East of Beaver Street
Beaver Street
PVC
200mm
50
$1,844
92,182
$
1,383
$
13,827
$
13,827
$
1,844
$
-
$
123,063
$
(18,885)
$
104,178
$
-
$
-
$
-
$
104,178
$
Alfred Street
Albert Street
Beaver Street
PVC
200mm
70
$2,023
141,593
$
2,124
$
21,239
$
21,239
$
2,832
$
-
$
189,026
$
(25,049)
$
163,977
$
-
$
-
$
-
$
163,977
$
Baring Street
Peel Street
Alice Street West
PVC
150mm
113
$1,515
171,214
$
2,568
$
25,682
$
25,682
$
3,424
$
-
$
228,571
$
(40,359)
$
188,212
$
-
$
-
$
-
$
188,212
$
Baring Street
Alice Street West
Alfred Street West
PVC
150mm
221
$1,343
296,757
$
4,451
$
44,513
$
44,513
$
5,935
$
-
$
396,170
$
(75,033)
$
321,137
$
-
$
-
$
-
$
321,137
$
Baring Street (unopened)
Alfred Street West
10th Line Road
PVC
150mm
336
$1,277
429,201
$
6,438
$
64,380
$
64,380
$
8,584
$
-
$
572,984
$
(111,676)
$
461,308
$
-
$
-
$
-
$
461,308
$
Albert Street
Napier Street West
Beaver Street South
PVC
150mm
338
$1,321
446,482
$
6,697
$
66,972
$
66,972
$
8,930
$
-
$
596,054
$
(154,840)
$
441,214
$
-
$
-
$
441,214
$
-
$
Albert Street
Beaver Street South
Alfred Street West
PVC
150mm
88
$1,400
123,167
$
1,848
$
18,475
$
18,475
$
2,463
$
-
$
164,428
$
(41,031)
$
123,397
$
-
$
-
$
123,397
$
-
$
Albert Street
Napier Street West
10th Line Road
PVC
150mm
329
$1,337
439,718
$
6,596
$
65,958
$
65,958
$
8,794
$
-
$
587,023
$
(151,292)
$
435,731
$
-
$
-
$
435,731
$
-
$
Napier Street West
Beaver Street South
Albert Street
PVC
150mm
248
$1,289
319,757
$
4,796
$
47,963
$
47,963
$
6,395
$
-
$
426,875
$
(114,526)
$
312,349
$
-
$
-
$
312,349
$
-
$
Napier Street West
Albert Street
Victoria Street
PVC
150mm
437
$1,313
573,877
$
8,608
$
86,082
$
86,082
$
11,478
$
-
$
766,126
$
(200,208)
$
565,918
$
-
$
-
$
282,959
$
282,959
$
10th Line Road
Peel Street
Beaver Street
PVC
250mm
615
$1,571
966,172
$
14,493
$
144,926
$
144,926
$
19,323
$
-
$
1,289,840
$
(301,577)
$
988,263
$
-
$
-
$
988,263
$
-
$
10th Line Road
Beaver Street South
Albert Street
PVC
250mm
404
$1,533
619,360
$
9,290
$
92,904
$
92,904
$
12,387
$
-
$
826,845
$
(200,392)
$
626,453
$
-
$
-
$
626,453
$
-
$
10th Line Road
Albert Street
Duncan Street West
PVC
250mm
134
$1,687
226,071
$
3,391
$
33,911
$
33,911
$
4,521
$
-
$
301,805
$
(68,408)
$
233,397
$
-
$
-
$
233,397
$
-
$
10th Line Road
Duncan Street West
Russell Street
PVC
250mm
820
$1,573
1,289,921
$
19,349
$
193,488
$
193,488
$
25,798
$
-
$
1,722,044
$
(350,417)
$
1,371,627
$
-
$
-
$
1,371,627
$
-
$
Duncan Street
10th Line Road
Victoria Street
PVC
250mm
336
$1,626
546,239
$
8,194
$
81,936
$
81,936
$
10,925
$
-
$
729,229
$
(164,947)
$
564,282
$
-
$
-
$
564,282
$
-
$
Subtotal Thornbury West Water Distribution
11,099,313
$
166,490
$
1,664,897
$
1,664,897
$
221,986
$
-
$
14,817,583
$
(3,309,622)
$
11,507,961
$
-
$
-
$
7,329,646
$
4,178,316
$
Thornbury West Water Storage
Upgrading of Elevated Tank in Thornbury (3,000 total current capacity of 740)
2260m3
7,505,443
$
112,582
$
1,125,816
$
1,125,816
$
150,109
$
-
$
10,019,766
$
-
$
10,019,766
$
-
$
-
$
-
$
10,019,766
$
Subtotal Thornbury West Water Storage
7,505,443
$
112,582
$
1,125,816
$
1,125,816
$
150,109
$
-
$
10,019,766
$
-
$
10,019,766
$
-
$
-
$
-
$
10,019,766
$
Thornbury West Share of Thornbury East Reservoir Debt
Thornbury West Share of Thornbury East Reservoir Debt
-
$
-
$
-
$
-
$
-
$
-
$
634,925
$
-
$
634,925
$
-
$
-
$
-
$
634,925
$
Subtotal Thornbury West Share of Thornbury East Reservoir Debt
-
$
-
$
-
$
-
$
-
$
-
$
634,925
$
-
$
634,925
$
-
$
-
$
-
$
634,925
$
Total Thornbury West Water Projects
18,604,756
$
279,071
$
2,790,713
$
2,790,713
$
372,095
$
-
$
(3,309,622)
$
22,162,652
$
-
$
-
$
7,329,646
$
14,833,006
$
Appendix D | 176
APPENDIX D
TABLE D.14
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
THORNBURY WEST SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works:
Lora Bay
Benefit to
Existing
Unserviced
Units Share
Post-Period
Costs
Net Growth-
Related Share
1.5%
15%
15%
2%
Thornbury West Wastewater Collection
Peel Street South
10th Line
Alfred Street West
PVC
200mm
71
$2,052
145,707
$
2,186
$
21,856
$
21,856
$
2,914
$
-
$
194,519
$
(28,243)
$
166,276
$
-
$
-
$
166,276
$
-
$
Peel Street South
Alfred Street West
Alice Street West
PVC
200mm
270
$1,374
370,888
$
5,563
$
55,633
$
55,633
$
7,418
$
-
$
495,136
$
(114,121)
$
381,015
$
-
$
-
$
381,015
$
-
$
Peel Street South
Alice Street West
Baring Street
PVC
200mm
150
$1,656
248,397
$
3,726
$
37,260
$
37,260
$
4,968
$
-
$
331,610
$
(68,231)
$
263,379
$
-
$
-
$
263,379
$
-
$
Peel Street South
Baring Street
Arthur Street West
PVC
200mm
180
$1,548
278,580
$
4,179
$
41,787
$
41,787
$
5,572
$
-
$
371,904
$
(79,516)
$
292,388
$
-
$
-
$
292,388
$
-
$
Lansdowne Street South
Alice Street West
Louisa Street West
PVC
200mm
220
$1,455
320,105
$
4,802
$
48,016
$
48,016
$
6,402
$
-
$
427,340
$
(95,314)
$
332,026
$
-
$
-
$
332,026
$
-
$
Lansdowne Street South
Louisa Street
Arthur Street West
PVC
200mm
120
$1,833
219,973
$
3,300
$
32,996
$
32,996
$
4,399
$
-
$
293,664
$
(57,699)
$
235,965
$
-
$
-
$
235,965
$
-
$
Beaver Street South
10th Line
Napier Street West
PVC
200mm
70
$2,069
144,820
$
2,172
$
21,723
$
21,723
$
2,896
$
-
$
193,335
$
(38,140)
$
155,195
$
-
$
-
$
155,195
$
-
$
Beaver Street South
Napier Street West
Albert Street
PVC
200mm
410
$1,362
558,482
$
8,377
$
83,772
$
83,772
$
11,170
$
-
$
745,574
$
(167,534)
$
578,040
$
-
$
-
$
578,040
$
-
$
Alice Street West
400m East of Baring Street
Baring Street
PVC
200mm
400
$1,314
525,572
$
7,884
$
78,836
$
78,836
$
10,511
$
-
$
701,639
$
(163,773)
$
537,866
$
-
$
-
$
-
$
537,866
$
Minto Street (unopened)
Highway 26
Alice Street
PVC
300mm
290
$1,435
416,182
$
6,243
$
62,427
$
62,427
$
8,324
$
-
$
555,603
$
(93,918)
$
461,685
$
-
$
-
$
-
$
461,685
$
Minto Street (unopened)
Alice Street
Alfred Street
PVC
250mm
220
$1,516
333,425
$
5,001
$
50,014
$
50,014
$
6,668
$
-
$
445,122
$
(71,131)
$
373,991
$
-
$
-
$
-
$
373,991
$
Alfred Street
200m East of Beaver Street
Beaver Street South
PVC
250mm
200
$1,553
310,565
$
4,658
$
46,585
$
46,585
$
6,211
$
-
$
414,604
$
(65,003)
$
349,601
$
-
$
-
$
-
$
349,601
$
Alfred Street
Albert Street
Minto Street (unopened)
PVC
250mm
225
$1,498
337,063
$
5,056
$
50,559
$
50,559
$
6,741
$
-
$
449,979
$
(71,967)
$
378,012
$
-
$
-
$
-
$
378,012
$
Alfred Street
150m East of Peel Street
Peel Street South
PVC
200mm
150
$1,656
248,397
$
3,726
$
37,260
$
37,260
$
4,968
$
-
$
331,610
$
(49,370)
$
282,240
$
-
$
-
$
-
$
282,240
$
Baring Street
Peel Street South
Alice Street
PVC
200mm
113
$1,663
187,963
$
2,819
$
28,194
$
28,194
$
3,759
$
-
$
250,931
$
(39,475)
$
211,456
$
-
$
-
$
-
$
211,456
$
Baring Street
Alice Street West
120m south of Alice Street
PVC
200mm
120
$1,630
195,604
$
2,934
$
29,341
$
29,341
$
3,912
$
-
$
261,131
$
(41,347)
$
219,784
$
-
$
-
$
-
$
219,784
$
Baring Street (unopened)
Alfred Street
10th Line
PVC
200mm
315
$1,397
440,173
$
6,603
$
66,026
$
66,026
$
8,803
$
-
$
587,631
$
(94,567)
$
493,064
$
-
$
-
$
-
$
493,064
$
Albert Street
Napier Street West
Beaver Street South
PVC
250mm
338
$1,426
482,061
$
7,231
$
72,309
$
72,309
$
9,641
$
-
$
643,551
$
(145,073)
$
498,478
$
-
$
-
$
498,478
$
-
$
Albert Street
Beaver Street South
Alfred Street West
PVC
250mm
88
$1,913
168,322
$
2,525
$
25,248
$
25,248
$
3,366
$
-
$
224,710
$
(46,335)
$
178,375
$
-
$
-
$
178,375
$
-
$
Albert Street
Napier Street West
10th Line
PVC
200mm
329
$1,377
452,978
$
6,795
$
67,947
$
67,947
$
9,060
$
-
$
604,725
$
(136,314)
$
468,411
$
-
$
-
$
468,411
$
-
$
Napier Street West
Victoria Street South
Albert Street
PVC
200mm
437
$1,345
587,765
$
8,816
$
88,165
$
88,165
$
11,755
$
-
$
784,666
$
(178,442)
$
606,224
$
-
$
-
$
303,112
$
303,112
$
Napier Street West
Albert Street
Beaver Street South
PVC
200mm
248
$1,405
348,515
$
5,228
$
52,277
$
52,277
$
6,970
$
-
$
465,267
$
(105,846)
$
359,421
$
-
$
-
$
359,421
$
-
$
Victoria Street South
Napier Street West
Pyatt Ave
PVC
250mm
155
$2,936
455,031
$
6,825
$
68,255
$
68,255
$
9,101
$
-
$
607,467
$
(175,458)
$
432,009
$
-
$
-
$
-
$
432,009
$
Victoria Street South
Pyatt Ave
Thorncroft Court
PVC
250mm
93
$3,039
282,585
$
4,239
$
42,388
$
42,388
$
5,652
$
-
$
377,251
$
(89,442)
$
287,809
$
-
$
-
$
-
$
287,809
$
Victoria Street South
Thorncroft Court
Alfred Street West
PVC
250mm
180
$2,806
504,993
$
7,575
$
75,749
$
75,749
$
10,100
$
-
$
674,166
$
(185,254)
$
488,912
$
-
$
-
$
-
$
488,912
$
Victoria Street South
Napier Street West
Duncan Street West
PVC
200mm
419
$2,695
1,129,046
$
16,936
$
169,357
$
169,357
$
22,581
$
-
$
1,507,276
$
(438,845)
$
1,068,431
$
-
$
-
$
-
$
1,068,431
$
10th Line Road
Peel Street South
50m SE of Baring Street (unopene
PVC
200mm
420
$1,358
570,542
$
8,558
$
85,581
$
85,581
$
11,411
$
-
$
761,673
$
(172,048)
$
589,625
$
-
$
-
$
589,625
$
-
$
10th Line Road
Beaver Street South
Albert Street
PVC
200mm
404
$1,372
554,204
$
8,313
$
83,131
$
83,131
$
11,084
$
-
$
739,863
$
(166,030)
$
573,833
$
-
$
-
$
573,833
$
-
$
10th Line Road
Albert Street
Duncan Street West
PVC
200mm
134
$1,563
209,450
$
3,142
$
31,418
$
31,418
$
4,189
$
-
$
279,616
$
(62,213)
$
217,403
$
-
$
-
$
217,403
$
-
$
10th Line Road
Duncan Street West
200m South of Duncan Street
PVC
200mm
200
$1,623
324,520
$
4,868
$
48,678
$
48,678
$
6,490
$
-
$
433,234
$
(87,791)
$
345,443
$
-
$
-
$
345,443
$
-
$
Duncan Street West
10th Line Road
275m East of 10th Line Road
PVC
200mm
275
$1,365
375,321
$
5,630
$
56,298
$
56,298
$
7,506
$
-
$
501,053
$
(116,002)
$
385,051
$
-
$
-
$
385,051
$
$
Subtotal Thornbury West Wastewater Collection
11,727,228
$
175,908
$
1,759,084
$
1,759,084
$
234,545
$
-
$
15,655,850
$
(3,444,443)
$
12,211,407
$
-
$
-
$
6,323,436
$
5,887,971
$
Thornbury West Trunk Sewer Works
Huron Street
Elma Street North
25 m east Bruce Street
PVC
600mm
247
$2,935
724,825
$
10,872
$
108,724
$
108,724
$
14,496
$
-
$
967,641
$
(191,153)
$
776,488
$
480,538
$
-
$
-
$
295,950
$
Huron Street
Victoria
Elma Street North
PVC
600mm
222
$3,117
691,957
$
10,379
$
103,793
$
103,793
$
13,839
$
-
$
923,762
$
(202,571)
$
721,191
$
446,317
$
-
$
-
$
274,874
$
Subtotal Thornbury West Trunk Sewer Works
1,416,781
$
21,252
$
212,517
$
212,517
$
28,336
$
-
$
1,891,403
$
(393,724)
$
1,497,679
$
926,854
$
-
$
-
$
570,824
$
Thornbury West Share of Thornbury East Wastewater Collection
Share of Thornbury East Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
1,296,655
$
-
$
1,296,655
$
-
$
-
$
-
$
1,296,655
$
Subtotal Thornbury West Share of Thornbury East Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
1,296,655
$
-
$
1,296,655
$
-
$
-
$
-
$
1,296,655
$
Total Thornbury West Wastewater Projects
13,144,010
$
197,160
$
1,971,601
$
1,971,601
$
262,880
$
-
$
(3,838,167)
$
15,005,741
$
926,854
$
-
$
6,323,436
$
7,755,450
$
Appendix D | 177
Water:
Residential Growth - Population in New Units
1,507
Residential - Pop Existing Unserviced Units
73
Total Residential
1,580
Wastewater:
Residential Growth - Population in New Units
1,507
Residential - Pop Existing Unserviced Units
230
Total Residential
1,737
Employment Growth
133
Ultimate Growth in Square Meters
10,627
Total
Thornbury West Service Area
Benefit
Benefit
Prior Growth
Post-Period
Net Capital
Total
Grants and
to Other
to Existing
(Available
Benefit
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Thornbury West Water Distribution
$11,507.96
$0.00
$0.00
$0.00
($3,023.95)
$7,329.65
$7,202.27
90.9%
$6,547.64
9.1%
$654.63
Thornbury West Water Storage
$10,019.77
$0.00
$0.00
$0.00
$0.00
$0.00
$10,019.77
90.9%
$9,109.05
9.1%
$910.72
Thornbury West Share of Thornbury East Reservoir Debt
$634.92
$0.00
$0.00
$0.00
$0.00
$0.00
$634.92
90.9%
$577.22
9.1%
$57.71
Total Water Projects
$22,162.65
$0.00
$0.00
$0.00
($3,023.95)
$7,329.65
$17,856.96
$16,233.91
$1,623.06
Charge Per Capita
$10,276.16
Charge Per Square Metre of GFA
$152.73
Wastewater Projects
Thornbury West Wastewater Collection
$12,211.41
$0.00
$0.00
$0.00
($3,551.08)
$6,323.44
$9,439.05
90.9%
$8,581.12
9.1%
$857.93
Thornbury West Trunk Sewer Works
$1,497.68
$0.00
$926.85
$0.00
$0.00
$0.00
$570.82
90.9%
$518.94
9.1%
$51.88
Thornbury West Share of Thornbury East Wastewater Collection
$1,296.65
$0.00
$0.00
$0.00
$0.00
$0.00
$1,296.65
90.9%
$1,178.80
9.1%
$117.86
Total Wastewater Projects
$15,005.74
$0.00
$926.85
$0.00
($3,551.08)
$6,323.44
$11,306.53
$10,278.86
$1,027.67
Charge Per Capita
$5,917.29
Charge Per Square Metre of GFA
$96.71
Charge
Per Capita
Water
Water
Distribution and Pumping
$10,276.16
$22,899
$20,552
$15,414
Distribution and Pumping
$152.73
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$11,713.92
$26,103
$23,428
$17,571
Total Water Services
$172.31
Wastewater
Wastewater
Collection and Pumping
$5,917.29
$13,186
$11,835
$8,876
Collection and Pumping
$96.71
Treatment
$10,792.91
$24,051
$21,586
$16,189
Treatment
$178.31
Total Wastewater Services
$16,710.20
$37,237
$33,421
$25,065
Total Wastewater Services
$275.02
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Residential: Thornbury West Service Area
Non-Residential: Thornbury
West Service Area
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge per
Square Metre
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and
Other Multiples
Apartments
THORNBURY WEST SERVICE AREA
APPENDIX D
TABLE D.15
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
Appendix D | 178
APPENDIX D
TABLE D.16
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
CLARKSBURG SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Clarksburg Water Distribution
Marsh St (CR 13)
Russel St
Clark St
PVC
300mm
635
1,104,124
$
16,562
$
165,619
$
165,619
$
22,082
$
100,000
$
1,574,005
$
(236,634)
$
1,337,371
$
-
$
-
$
1,337,371
$
Clark St
Marsh St
CR 2
PVC
300 mm
2,125
3,517,145
$
52,757
$
527,572
$
527,572
$
70,343
$
-
$
4,695,389
$
(1,074,384)
$
3,621,005
$
-
$
-
$
3,621,005
$
Marsh St (CR 13)
Clark St
Matilda St
PVC
250 mm
840
$1,672
1,404,493
$
21,067
$
210,674
$
210,674
$
28,090
$
-
$
1,874,998
$
(313,808)
$
1,561,190
$
-
$
-
$
1,561,190
$
CR 13
10th Line
200m south
PVC
200 mm
200
$1,408
281,590
$
4,224
$
42,239
$
42,239
$
5,632
$
-
$
375,923
$
(69,529)
$
306,395
$
-
$
-
$
306,395
$
Matilda St (CR 13)
Marsh St
10th Line
PVC
200 mm
545
$1,336
728,115
$
10,922
$
109,217
$
109,217
$
14,562
$
-
$
972,033
$
(191,517)
$
780,516
$
-
$
-
$
780,516
$
Subtotal Clarksburg Water Distribution
7,035,467
$
105,532
$
1,055,320
$
1,055,320
$
140,709
$
100,000
$
9,492,349
$
(1,885,871)
$
7,606,477
$
-
$
-
$
7,606,477
$
Total Clarksburg Water Projects
7,035,467
$
105,532
$
1,055,320
$
1,055,320
$
140,709
$
100,000
$
9,492,349
$
(1,885,871)
$
7,606,477
$
-
$
-
$
7,606,477
$
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Clarksburg Wastewater Collection
Clark St
Marsh St
CR 2
PVC
200 mm
2,125
$1,312
2,787,755
$
41,816
$
418,163
$
418,163
$
55,755
$
-
$
3,721,653
$
(846,984)
$
2,874,669
$
-
$
-
$
2,874,669
$
Marsh St (CR 13)
Clark St
Matilda St
PVC
200 mm
840
$1,365
1,146,380
$
17,196
$
171,957
$
171,957
$
22,928
$
-
$
1,530,417
$
(259,183)
$
1,271,234
$
-
$
-
$
1,271,234
$
Matilda St (CR 13)
Marsh St
10th Line
PVC
200 mm
545
$1,411
769,258
$
11,539
$
115,389
$
115,389
$
15,385
$
-
$
1,026,959
$
(174,186)
$
852,773
$
-
$
-
$
852,773
$
CR 13
10th Line
200m south
PVC
200 mm
200
$1,551
310,119
$
4,652
$
46,518
$
46,518
$
6,202
$
-
$
414,009
$
(66,199)
$
347,810
$
-
$
-
$
347,810
$
Marsh St (CR 13)
Clark St
George St
PVC
200 mm
135
$2,027
273,667
$
4,105
$
41,050
$
41,050
$
5,473
$
-
$
365,345
$
(57,024)
$
308,321
$
-
$
-
$
308,321
$
George St
Marsh St
Mary St SPS
PVC
200 mm
135
$1,558
210,337
$
3,155
$
31,550
$
31,550
$
4,207
$
-
$
280,799
$
(45,359)
$
235,441
$
-
$
-
$
235,441
$
Subtotal Clarksburg Wastewater Collection
5,497,515
$
82,463
$
824,627
$
824,627
$
109,950
$
-
$
7,339,183
$
(1,448,935)
$
5,890,247
$
-
$
-
$
5,890,247
$
Clarksburg Pumping Stations and Forcemains
HDPE
150 mm
620
$1,555
963,809
$
14,457
$
144,571
$
144,571
$
19,276
$
100,000
$
1,386,685
$
(178,885)
$
1,207,800
$
-
$
-
$
1,207,800
$
Sewage Pumping Station
1,785,480
$
26,782
$
267,822
$
267,822
$
35,710
$
-
$
2,383,615
$
-
$
2,383,615
$
-
$
-
$
2,383,615
$
Subtotal Clarksburg Pumping Stations and Forcemains
2,749,289
$
41,239
$
412,393
$
412,393
$
54,986
$
100,000
$
3,770,301
$
(178,885)
$
3,591,416
$
-
$
-
$
3,591,416
$
Clarksburg Share of Thornbury East Wastewater Collection
Share of Thornbury East Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
143,443
$
-
$
143,443
$
-
$
-
$
143,443
$
Subtotal Clarksburg Share of Thornbury East Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
143,443
$
-
$
143,443
$
-
$
-
$
143,443
$
Total Thornbury West Wastewater Projects
8,246,804
$
123,702
$
1,237,021
$
1,237,021
$
164,936
$
100,000
$
11,252,926
$
(1,627,820)
$
9,625,106
$
-
$
-
$
9,625,106
$
Forcemain From Mary St SPS to Russell St via George St and Marsh St
Appendix D | 179
Water:
Residential Growth - Population in New Units
401
Residential - Pop Existing Unserviced Units
484
Total Residential
885
Wastewater:
Residential Growth - Population in New Units
401
Residential - Pop Existing Unserviced Units
623
Total Residential
1,024
Employment Growth
39
Ultimate Growth in Square Meters
3,116
Total
Clarksburg Service Area
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
(Available
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Clarksburg Water Distribution
$7,606.48
$0.00
$0.00
$0.00
$35.11
$7,571.37
90.9%
$6,883.19
9.1%
$688.18
Total Water Projects
$7,606.48
$0.00
$0.00
$0.00
$35.11
$7,571.37
$6,883.19
$688.18
Charge Per Capita
$7,779.57
Charge Per Square Metre of GFA
$220.85
Wastewater Projects
Clarksburg Wastewater Collection
$5,890.25
$0.00
$0.00
$0.00
($547.86)
$6,438.10
90.9%
$5,852.93
9.1%
$585.17
Clarksburg Pumping Stations and Forcemains
$3,591.42
$0.00
$0.00
$0.00
$0.00
$3,591.42
90.9%
$3,264.98
9.1%
$326.43
Clarksburg Other Sewer Works
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Clarksburg Share of Thornbury East Wastewater Collection
$143.44
$0.00
$0.00
$0.00
$0.00
$143.44
90.9%
$130.41
9.1%
$13.04
Total Wastewater Projects
$9,625.11
$0.00
$0.00
$0.00
($547.86)
$10,172.96
$9,248.32
$924.64
Charge Per Capita
$9,028.00
Charge Per Square Metre of GFA
$296.73
Charge
Per Capita
Water
Water
Distribution and Pumping
$7,779.57
$17,336
$15,559
$11,669
Distribution and Pumping
$220.85
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$9,217.33
$20,540
$18,435
$13,826
Total Water Services
$240.43
Wastewater
Wastewater
Collection and Pumping
$9,028.00
$20,118
$18,056
$13,542
Collection and Pumping
$296.73
Treatment
$10,792.91
$24,051
$21,586
$16,189
Treatment
$178.31
Total Wastewater Services
$19,820.91
$44,169
$39,642
$29,731
Total Wastewater Services
$475.04
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Residential: Clarksburg Service Area
Non-Residential: Clarksburg
Service Area
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge per
Square Metre
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and
Other Multiples
Apartments
CLARKSBURG SERVICE AREA
APPENDIX D
TABLE D.17
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
Appendix D | 180
APPENDIX D
TABLE D.18
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
LORA BAY SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Subtotal
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Service Area
1
Ineligible
Shraes
Service Area
2
Service Area
3
1.5%
15%
15%
2%
Lora Bay Water Distribution
Sunset Boulevard West
Christie Beach Road 39th Sideroad
PVC
200mm
1,415
$1,245
1,761,001
$
26,415
$
264,150
$
264,150
$
35,220
$
-
$
2,350,937
$
(461,873)
$
1,889,063
$
1,889,063
$
1,057,875
$
-
$
-
$
39th Sideroad
Christie Beach Road Sunset Boulevard
PVC
200mm
1,102
$1,271
1,401,153
$
21,017
$
210,173
$
210,173
$
28,023
$
-
$
1,870,539
$
(499,220)
$
1,371,319
$
1,371,319
$
383,969
$
-
$
-
$
Christie Beach Road
39th Sideroad
Sunset Boulevard
PVC
200mm
790
$1,223
966,083
$
14,491
$
144,912
$
144,912
$
19,322
$
-
$
1,289,721
$
(355,384)
$
934,337
$
934,337
$
523,229
$
-
$
-
$
Christie Beach Road
39th Sideroad
Arthur Street
PVC
300mm
500
$1,566
782,938
$
11,744
$
117,441
$
117,441
$
15,659
$
-
$
1,045,223
$
(239,626)
$
805,596
$
805,596
$
-
$
-
$
-
$
Meaford TOBM Townline
Hwy 26
100m south of Hwy 26
PVC
300mm
100
$1,241
124,054
$
1,861
$
18,608
$
18,608
$
2,481
$
65,000
$
230,612
$
(37,778)
$
192,834
$
192,834
$
-
$
-
$
$
Subtotal Lora Bay Water Distribution
5,035,229
$
75,528
$
755,284
$
755,284
$
100,705
$
65,000
$
6,787,031
$
(1,593,882)
$
5,193,150
$
5,193,150
$
1,965,073
$
-
$
-
$
Lora Bay Water Storage and Pumping
Lora Bay Booster Pump Station
6,729,275
$
100,939
$
1,009,391
$
1,009,391
$
134,585
$
-
$
8,983,582
$
-
$
8,983,582
$
8,508,789
$
-
$
87,462
$
387,331
$
Subtotal Lora Bay Water Storage and Pumping
6,729,275
$
100,939
$
1,009,391
$
1,009,391
$
134,585
$
-
$
8,983,582
$
-
$
8,983,582
$
8,508,789
$
-
$
87,462
$
387,331
$
Total Lora Bay Water Projects
11,764,504
$
176,468
$
1,764,676
$
1,764,676
$
235,290
$
65,000
$
15,770,613
$
(1,593,882)
$
14,176,731
$
13,701,938
$
1,965,073
$
87,462
$
387,331
$
Development-Related Costs (2024 - Build-Out)
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Subtotal
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Service Area
1
Ineligible
Shraes
Service Area
2
Service Area
3
1.5%
15%
15%
2%
Lora Bay Wastewater Collection
Sunset Boulevard West
Christie Beach Road 39th Sideroad
PVC
200mm
1,415
$1,315
1,860,206
$
27,903
$
279,031
$
279,031
$
37,204
$
-
$
2,483,375
$
(410,466)
$
2,072,909
$
2,072,909
$
849,893
$
-
$
-
$
39th Sideroad
Christie Beach Road Sunset Boulevard
PVC
200mm
1,102
$1,334
1,470,478
$
22,057
$
220,572
$
220,572
$
29,410
$
-
$
1,963,088
$
(452,199)
$
1,510,890
$
1,510,890
$
664,791
$
-
$
$
Subtotal Lora Bay Wastewater Collection
3,330,684
$
49,960
$
499,603
$
499,603
$
66,614
$
-
$
4,446,463
$
(862,664)
$
3,583,799
$
3,583,799
$
1,514,684
$
-
$
-
$
Lora Bay Share of Thornbury West Wastewater Works
Share of Thornbury West Wastewater Works
-
$
-
$
-
$
-
$
-
$
-
$
926,854
$
-
$
926,854
$
806,805
$
-
$
35,897
$
84,152
$
Subtotal Lora Bay Share of Thornbury West Wastewater Works
-
$
-
$
-
$
-
$
-
$
-
$
926,854
$
-
$
926,854
$
806,805
$
-
$
35,897
$
84,152
$
Lora Bay Share of Thornbury East Wastewater Collection
Share of Thornbury East Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
2,105,393
$
-
$
2,105,393
$
1,832,695
$
-
$
81,542
$
191,156
$
Subtotal Lora Bay Share of Thornbury East Wastewater Collection
-
$
-
$
-
$
-
$
-
$
-
$
2,105,393
$
-
$
2,105,393
$
1,832,695
$
-
$
81,542
$
191,156
$
Lora Bay Pumping Stations and Forcemains
Christie Beach Sewage Pump Station and Forcemain (Sunset West )
11.5 L/s
1,785,480
$
26,782
$
267,822
$
267,822
$
35,710
$
-
$
2,383,615
$
-
$
2,383,615
$
2,383,615
$
977,282
$
-
$
$
Subtotal Lora Bay Pumping Stations and Forcemains
1,785,480
$
26,782
$
267,822
$
267,822
$
35,710
$
-
$
2,383,615
$
-
$
2,383,615
$
2,383,615
$
977,282
$
-
$
-
$
Total Lora Bay Wastewater Projects
5,116,164
$
76,742
$
767,425
$
767,425
$
102,323
$
-
$
9,862,326
$
(862,664)
$
8,999,661
$
8,606,913
$
2,491,966
$
117,439
$
275,309
$
Lora Bay Shared Works
Lora Bay Shared Works
Appendix D | 181
Water:
Residential Growth - Population in New Units
1,870
Residential - Pop Existing Unserviced Units
226
Total Residential
2,096
Wastewater:
Residential Growth - Population in New Units
1,870
Residential - Pop Existing Unserviced Units
244
Total Residential
2,114
Employment Growth
193
Ultimate Growth in Square Meters
15,439
Total
Lora Bay - Service Area 1
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
Post Period
(Available
Costs After
Cost
Subsidies
Service Areas
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Lora Bay Water Distribution
$5,193.15
$0.00
$0.00
$771.99
$1,193.08
($456.80)
$3,684.88
90.9%
$3,349.95
9.1%
$334.93
Lora Bay Water Storage and Pumping
$8,508.79
$0.00
$0.00
$0.00
$0.00
$0.00
$8,508.79
90.9%
$7,735.41
9.1%
$773.38
Other Water Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Completed Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Total Water Projects
$13,701.94
$0.00
$0.00
$771.99
$1,193.08
($456.80)
$12,193.66
$11,085.36
$1,108.31
Charge Per Capita
$5,288.35
Charge Per Square Metre of GFA
$71.79
Wastewater Projects
Lora Bay Wastewater Collection
$3,583.80
$0.00
$0.00
$849.89
$664.79
$158.24
$1,910.88
90.9%
$1,737.19
9.1%
$173.68
Lora Bay Share of Thornbury West Wastewater Works
$806.80
$0.00
$0.00
$0.00
$0.00
$0.00
$806.80
90.9%
$733.47
9.1%
$73.33
Lora Bay Share of Thornbury East Wastewater Collection
$1,832.69
$0.00
$0.00
$0.00
$0.00
$0.00
$1,832.69
90.9%
$1,666.12
9.1%
$166.58
Lora Bay Pumping Stations and Forcemains
$2,383.62
$0.00
$0.00
$977.28
$0.00
$0.00
$1,406.33
90.9%
$1,278.51
9.1%
$127.82
Other Wastewater Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Completed Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Total Wastewater Projects
$8,606.91
$0.00
$0.00
$1,827.17
$664.79
$158.24
$5,956.71
$5,415.29
$541.42
Charge Per Capita
$2,561.77
Charge Per Square Metre of GFA
$35.07
Charge
Per Capita
Water
Water
Distribution and Pumping
$5,288.35
$11,785
$10,577
$7,933
Distribution and Pumping
$71.79
Supply and Treatment
$1,615.01
$3,599
$3,230
$2,423
Supply and Treatment
$46.98
Total Water Services
$6,903.36
$15,384
$13,807
$10,356
Total Water Services
$118.77
Wastewater
Wastewater
Collection and Pumping
$2,561.77
$5,709
$5,124
$3,843
Collection and Pumping
$35.07
Treatment
$4,485.89
$9,996
$8,972
$6,729
Treatment
$64.56
Total Wastewater Services
$7,047.66
$15,705
$14,096
$10,572
Total Wastewater Services
$99.63
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Residential: Lora Bay - Service Area 1
Non-Residential: Lora Bay -
Service Area 1
Single & Semi-
Detached
Rows and Other
Multiples
Apartments
Charge per
Square Metre
APPENDIX D
TABLE D.19
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
LORA BAY - SERVICE AREA 1
Development-Related Capital Forecast
Residential
Non-Residential
Share
Share
Charge By Size of Unit (1)
Appendix D | 182
Water:
Residential Growth - Population in New Units
21
Residential - Pop Existing Unserviced Units
-
Total Residential
21
Wastewater:
Residential Growth - Population in New Units
21
Residential - Pop Existing Unserviced Units
92
Total Residential
113
Employment Growth
2
Ultimate Growth in Square Meters
173
Total
Lora Bay - Service Area 2
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
Post Period
(Available
Costs After
Cost
Subsidies
Service Areas
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Lora Bay Water Distribution
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Lora Bay Water Storage and Pumping
$87.46
$0.00
$0.00
$0.00
$0.00
($5.13)
$92.59
90.9%
$84.17
9.1%
$8.42
Other Water Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Completed Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Total Water Projects
$87.46
$0.00
$0.00
$0.00
$0.00
($5.13)
$92.59
$84.17
$8.42
Charge Per Capita
$4,009.32
Charge Per Square Metre of GFA
$48.55
Wastewater Projects
Lora Bay Wastewater Collection
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Lora Bay Share of Thornbury West Wastewater Works
$35.90
$0.00
$0.00
$0.00
$0.00
$1.78
$34.12
90.9%
$31.02
9.1%
$3.10
Lora Bay Share of Thornbury East Wastewater Collection
$81.54
$0.00
$0.00
$0.00
$0.00
$0.00
$81.54
90.9%
$74.13
9.1%
$7.41
Lora Bay Pumping Stations and Forcemains
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Other Wastewater Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Completed Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Total Wastewater Projects
$117.44
$0.00
$0.00
$0.00
$0.00
$1.78
$115.66
$105.15
$10.51
Charge Per Capita
$927.05
Charge Per Square Metre of GFA
$60.65
Charge By Size of Unit (1)
Charge
Per Capita
Water
Water
Distribution and Pumping
$4,009.32
$8,934
$8,019
$6,014
Distribution and Pumping
$48.55
Supply and Treatment
$1,615.01
$3,599
$3,230
$2,423
Supply and Treatment
$19.58
Total Water Services
$5,624.33
$12,533
$11,249
$8,437
Total Water Services
$68.13
Wastewater
Wastewater
Collection and Pumping
$927.05
$2,066
$1,854
$1,391
Collection and Pumping
$60.65
Treatment
$4,485.89
$9,996
$8,972
$6,729
Treatment
$178.31
Total Wastewater Services
$5,412.94
$12,062
$10,826
$8,120
Total Wastewater Services
$238.96
(1) Based on an Occupancy Factor of:
2.23
2.00
1.50
Charge per
Square Metre
Residential: Lora Bay - Service Area 2
Non-Residential: Lora Bay -
Service Area 2
Single & Semi-
Detached / Non-
Permenant
Rows and Other
Multiples
Apartments
Share
Share
APPENDIX D
TABLE D.20
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
LORA BAY - SERVICE AREA 2
Development-Related Capital Forecast
Residential
Non-Residential
Appendix D | 183
Water:
Residential Growth - Population in New Units
93
Residential - Pop Existing Unserviced Units
-
Total Residential
93
Wastewater:
Residential Growth - Population in New Units
93
Residential - Pop Existing Unserviced Units
159
Total Residential
252
Employment Growth
10
Ultimate Growth in Square Meters
768
Total
Lora Bay - Service Area 3
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
Post Period
(Available
Costs After
Cost
Subsidies
Service Areas
Share
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
($000)
%
$000
%
$000
Water Projects
Lora Bay Water Distribution
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Lora Bay Water Storage and Pumping
$387.33
$0.00
$0.00
$0.00
$0.00
($22.71)
$410.04
90.9%
$372.77
9.1%
$37.27
Other Water Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Completed Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Total Water Projects
$387.33
$0.00
$0.00
$0.00
$0.00
($22.71)
$410.04
$372.77
$37.27
Charge Per Capita
$4,009.32
Charge Per Square Metre of GFA
$48.55
Wastewater Projects
Lora Bay Wastewater Collection
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Lora Bay Share of Thornbury West Wastewater Works
$84.15
$0.00
$0.00
$0.00
$0.00
$7.87
$76.28
90.9%
$69.35
9.1%
$6.93
Lora Bay Share of Thornbury East Wastewater Collection
$191.16
$0.00
$0.00
$0.00
$0.00
$0.00
$191.16
90.9%
$173.78
9.1%
$17.37
Lora Bay Pumping Stations and Forcemains
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Other Wastewater Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Completed Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
90.9%
$0.00
9.1%
$0.00
Total Wastewater Projects
$275.31
$0.00
$0.00
$0.00
$0.00
$7.87
$267.44
$243.13
$24.31
Charge Per Capita
$963.78
Charge Per Square Metre of GFA
$31.67
Charge
Per Capita
Water
Water
Distribution and Pumping
$4,009.32
$8,934
$8,019
$6,014
Distribution and Pumping
$48.55
Supply and Treatment
$1,615.01
$3,599
$3,230
$2,423
Supply and Treatment
$19.58
Total Water Services
$5,624.33
$12,533
$11,249
$8,437
Total Water Services
$68.13
Wastewater
Wastewater
Collection and Pumping
$963.78
$2,148
$1,928
$1,446
Collection and Pumping
$31.67
Treatment
$4,485.89
$9,996
$8,972
$6,729
Treatment
$178.31
Total Wastewater Services
$5,449.67
$12,144
$10,900
$8,175
Total Wastewater Services
$209.98
(1) Based on an Equivalent Factor of:
2.23
2.00
1.50
Share
Share
Charge per
Square Metre
Residential: Lora Bay - Service Area 3
Non-Residential: Lora Bay -
Service Area 3
Charge By Size of Unit (1)
Single & Semi-
Detached / Non-
Permenant
Rows and Other
Multiples
Apartments
Residential
Non-Residential
APPENDIX D
TABLE D.21
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING
LORA BAY - SERVICE AREA 3
Development-Related Capital Forecast
Appendix D | 184
APPENDIX D
TABLE D.22
TOWN OF THE BLUE MOUNTAINS
WATER AND WASTEWATER CAPITAL PROGRAM
CAMPERDOWN SERVICE AREA
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Camperdown Water Distribution and Storage
Camperdown Road Watermain
-
$
-
$
-
$
-
$
-
$
-
$
6,354,304
$
(591,713)
$
5,762,591
$
-
$
245,257
$
5,517,334
$
Camperdown Reservoir Including Water Booster Pumping Station
-
$
-
$
-
$
-
$
-
$
-
$
12,389,813
$
-
$
12,389,813
$
-
$
1,292,507
$
11,097,306
$
Subtotal Camperdown Water Distribution and Storage
-
$
-
$
-
$
-
$
-
$
-
$
18,744,117
$
(591,713)
$
18,152,404
$
-
$
1,537,764
$
16,614,640
$
Total Camperdown Water Projects
-
$
-
$
-
$
-
$
-
$
-
$
18,744,117
$
(591,713)
$
18,152,404
$
-
$
1,537,764
$
16,614,640
$
Development-Related Costs (2024 - Build-Out)
Less:
Less:
Road Name
From
To
Type
Size
Length
Cost /
Metre
Construction
Works
Legal, C of A,
Advertising,
Misc.
Engineering,
Design &
Contract
Admin.
Contingencies
Town Project
Management
Special Costs
Sub-Total
LESS: Costs
Accounted for
in Roads
Projects &
Ashpahlt
Assumptions
Revised Sub-
Total
Shared Works
Benefit to
Existing
Unserviced
Units Share
Net Growth-
Related Share
1.5%
15%
15%
2%
Camperdown Wastewater Collection
Old Lakeshore Road
Camperdown Rd Private Rd
200mm
1,225
$1,736
2,126,229
$
31,893
$
318,934
$
318,934
$
42,525
$
-
$
2,838,516
$
(654,338)
$
2,184,178
$
-
$
-
$
2,184,178
$
Camperdown Road Related Sewer Works
-
$
-
$
-
$
-
$
-
$
-
$
163,262
$
-
$
163,262
$
-
$
54,961
$
108,301
$
Delphi PS, Lakeshore PS and Sewer Trunks
-
$
-
$
-
$
-
$
-
$
-
$
16,080,359
$
-
$
16,080,359
$
-
$
3,274,391
$
12,805,968
$
Subtotal Camperdown Wastewater Collection
2,126,229
$
31,893
$
318,934
$
318,934
$
42,525
$
-
$
19,082,137
$
(654,338)
$
18,427,799
$
-
$
3,329,352
$
15,098,447
$
Total Camperdown Wastewater Projects
2,126,229
$
31,893
$
318,934
$
318,934
$
42,525
$
-
$
19,082,137
$
(654,338)
$
18,427,799
$
-
$
3,329,352
$
15,098,447
$
Notes:
1) The Camperdown water distribution and wastewater collection projects have been completed and have been largely financing by developers in the Camperdown service area. The service provision agreement between the
Town and the Camperdown developers provides for the payment of development charge credits based on the cost of the works shown above and the benefitting units and resulting rates shown on Table 23.
Appendix D | 185
Equivalent Units to Be Serviced by Works2
Water:
Existing Fronting Units
699
Existing Non-Fronting Units
11
Growth
1,068
Total
1,778
Development Charge Related Units
1,068
Wastewater:
Existing Fronting Units
158
Existing Non-Fronting Units
351
Growth
1,003
Total
1,512
Development Charge Related Units
1,003
Employment Growth
99
Ultimate Growth in Square Meters
7,910
Total
Camperdown Service Area
Benefit
Benefit
Prior Growth
Net Capital
Total
Grants and
to Other
to Existing
(Available
Costs After
Cost
Subsidies
Service Areas
Share
DC Reserves)
Discount
($000)
($000)
($000)
($000)
($000)
($000)
Water Projects
Camperdown Water Distribution and Storage
$18,152.40
$0.00
$0.00
$1,537.76
$25.53
$16,589.11
Other Camperdown Water Projects
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Water Projects
$18,152.40
$0.00
$0.00
$1,537.76
$25.53
$16,589.11
Charge Per Capita
$15,532.87
Charge Per Square Metre of GFA
$104.86
Wastewater Projects
Camperdown Wastewater Collection
$18,427.80
$0.00
$0.00
$3,329.35
$642.91
$14,455.54
Total Wastewater Projects
$18,427.80
$0.00
$0.00
$3,329.35
$642.91
$14,455.54
Charge Per Capita
$14,412.30
Charge Per Square Metre of GFA
$91.37
Notes:
1) The Camperdown water distribution and wastewater collection projects have been completed and have been largely financing by developers in the Camperdown service area.
2) The service provision agreement between the Town and the Camperdown developers provides for the payment of development charge credits based on the cost
of the works set out on Table 22, the benefitting units shown below, and the resulting rates calculated above.
3) The non-residential charge allocation is based on a 5% allocation of the net growth-related costs and assumed additional gfa of:
7,910
Charge
Per Capita
Water
Water
Distribution and Pumping
$15,532.87
$15,533
$15,533
$15,533
Distribution and Pumping
$104.86
Supply and Treatment
$1,437.76
$3,204
$2,876
$2,157
Supply and Treatment
$19.58
Total Water Services
$16,970.63
$18,737
$18,409
$17,690
Total Water Services
$124.44
Wastewater
Wastewater
Collection and Pumping
$14,412.30
$14,412
$14,412
$14,412
Collection and Pumping
$91.37
Treatment
$10,792.91
$24,051
$21,586
$16,189
Treatment
$178.31
Total Wastewater Services
$25,205.21
$38,463
$35,998
$30,601
Total Wastewater Services
$269.68
(1) Based on a PPU Factor of:
2.23
2.00
1.50
Note: As per Camperdown Developer Group Agreement, Water Distribution and Wastewater Collection and Treatment charges do not change between dwelling units
CAMPERDOWN SERVICE AREA
APPENDIX D
TABLE D.23
TOWN OF THE BLUE MOUNTAINS
SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES
WATER AND WASTEWATER SERVICING1
Residential: Camperdown Service Area
Non-Residential: Camperdown
Service Area
Development-Related Capital Forecast
Residential
Non-Residential
$/capita
$/m2
Charge per
Square Metre
Charge
Charge3
Charge By Size of Unit (1)
Single & Semi-
Detached
Rows and
Other Multiples
Apartments
Appendix D | 186
Appendix E
Reserve Fund Balances
Appendix E | 187
Appendix E - Development Charges
Reserve Funds Uncommitted Balances
The Development Charges Act requires that a reserve fund be established
for each service for which development charges are collected. Table E.1
presents the uncommitted reserve fund balances that are available to help
fund the growth-related net capital costs identified in this study. The
opening balances of the development charges reserve funds as of December
31, 2023, are shown.
As shown on Table E.1, the December 31, 2023, total reserve fund balance
was approximately $99,818. General Government (now referred to as
Development Related Studies) included in the capital program and rate
calculation in anticipation of the passing of Bill 185, Cutting Red Tape to
Build More Homes Act, 2024 which will permit for the collection of DCs for
development-related capital costs.
The application of each of the balances in each of the reserve funds is
discussed in the appendix section related to each service. The reserve funds
are assigned to projects in the initial years of the capital program for the
services in which the reserves are a positive balance. This has the effect of
reducing and deferring capital costs brought forward to the development
charge calculation and the cash flow analysis. Where there is a negative
balance, the amount is brought forward to the DC capital forecast for
recovery through future development charges.
Appendix E | 188
APPENDIX E
TABLE E.1
TOWN OF THE BLUE MOUNTAINS
DEVELOPMENT CHARGE RESERVE FUND BALANCE BY ACCOUNT
YEAR ENDING DECEMBER 31, 2023
Reserve Fund
Service
Balance as at
Dec. 31, 2023
Library
$3,095,581
General Government*
($125,062)
Fire and Rescue
$811,908
Police
$35,353
Parks and Recreation
$3,492,497
By-Law
($124,509)
Solid Waste Management
$305,747
Public Works
$333,920
Roads and Related Area
$12,952,875
Water Supply
$3,937,416
Clarksburg Water
$35,109
Thornbury East Water
($334,877)
Thornbury West Water
($3,023,954)
Craigleith Water
$5,579,522
Camperdown Water
$25,533
Osler Water
$4,043
Lora Bay Water
($484,640)
Thornbury West Sewer
($3,551,079)
Thornbury East Sewer
($105,789)
Camperdown Sewer
$642,908
Lora Bay Sewer
$167,883
Craigleith Sewer
$190,478
Clarksburg Sewer
($547,857)
Osler Sewer
($286,003)
Sewer - Castle Glen
($287,530)
Thornbury Sewer Capacity
($22,047,318)
Craigleith Sewer Capacity
($592,338)
Total Development Charge Reserves
$99,818
Appendix E | 189
Appendix F
Cost of Growth
Appendix F | 190
Appendix F - Cost of Growth
Asset Management Plan
The DCA requires that municipalities complete an Asset Management
Plan before passing a development charges by-law. A key function of
the Asset Management Plan, as required by the legislation, is to
demonstrate that all assets funded under the development charges by-
law are financially sustainable over their full life cycle.
Asset Types
A summary of the future municipal-owned assets and estimated useful
life assumptions for eligible DC services considered as part of the study
are outlined in Table F.1 and F.2. Although all capital assets considered
in the study have been identified, not all assets necessitate future
replacement or ongoing maintenance activities. The exception and the
justification is as follows:
-
Some of the works identified may represent one-time expenditures
and may be temporary in nature. Therefore, the assets would not be
required to be replaced and no ongoing operation and maintenance
costs exist. Such assets are identified as "not a long-term asset" in
the table.
-
Some projects do not relate to the emplacement of a tangible capital
asset - some examples include the acquisition of land or the
undertaking of environmental assessments or other development-
related studies. These projects/costs do not necessarily require
future replacement or ongoing maintenance. Such projects are
identified as "not infrastructure" in the table.
Appendix F | 191
It should be noted that the capital cost estimates prepared for each of
the projects identified in this section include grouped costs of various
individual elements, which, as a stand-alone item, may have its own
useful life (ex. New buildings include: HVAC, structural elements, roof,
etc.). Accordingly, the average useful life assumptions noted below are
applicable to all project components.
Table F.1 - Summary of Municipal Assets Considered General Services
Capital Project Description
Estimated Useful Life (Years)
Recovery of Negative DC Reserve
Fund Balances
Not a Long-Term Asset
Land acquisition
Not Infrastructure
Studies / Design etc.
Not Infrastructure
Debenture Payments
Not Infrastructure
Buildings and Facilities
40 years
Library Collection Materials
7 years
Fire Mobile Training Unit
15 years
Fire Services Equipment
11 years
Park Development General
20 years
Parks Facilities (Courts)
10 years
Parks Trail Development
20 years
Parks Playground Equipment
15 years
Parks Large Equipment
7 years
Public Works Equipment
7 years
Paved Parking Lots
25 years
By-law Vehicles & Equipment
7 years
Solid Waste Collection Trucks
7 years
Organic Recycling Bins
10 years
Organics Processing Equipment
10 years
Appendix F | 192
Table F.2 - Summary of Municipal Assets Considered Engineered Services
Capital Project Description
Estimated Useful Life (Years)
Environmental Assessment Studies
Not Infrastructure
Buildings and Facilities
40 years
Roads
30 years
Active Transportation
20 years
Water Supply Plants
50 years
Pumping and Storage Stations
50 years
Linear Infrastructure
99 years
No annual provisions have been identified for Development-Related
Studies as they are not infrastructure and therefore have no long-term
financial requirements.
Annual Provision
When assets require rehabilitation or are due for replacement, the
source of funds is limited to reserves or contributions from operating.
Capital expenditures to carry out the rehabilitation and replacement of
aging infrastructure are not growth-related and are therefore not eligible
for funding through development charge revenues or other developer
contributions.
Based on the information obtained from Town staff regarding useful life
assumptions and the capital cost of acquiring and/or emplacing each
asset, a provision for infrastructure replacement has been calculated for
both the Town-wide general and engineered services. Provisions for
infrastructure replacement are initially calculated for each asset based
on their useful life and the anticipated cost of replacement. The
aggregate of all individual provisions form the required annual capital
provision. In calculating the annual provisions, assumptions are made to
account for inflation (2.0 per cent) and interest (3.5 per cent).
Appendix F | 193
Consistent with the requirements of the DCA, assets that are proposed
to be funded under the DC By-law have been included in the analysis.
As a result, the total calculated annual provision for development charge
related infrastructure has been netted down to consider the
replacement of existing infrastructure or benefit-to-existing
development. However, for reference, the annual replacement
provisions associated with the non-development charge funded costs,
including costs related to benefit-to-existing and post-period benefit
have also been calculated.
Table F.3 provides an overview of the capital provisions required to
replace the capital infrastructure proposed to be funded under the
development charges by-law for both General and Engineered Services.
As shown in Table F.3, by 2034, the Town will need to fund an additional
$1.29 million per annum in order to properly fund the full life-cycle costs
of the new general services assets related to the General Services
supported under the DC By-law. In contrast, for engineered services
which have a longer benefiting period to build-out, the calculated annual
provision for DC the assets supported under the proposed Development
Charges By-law is $3.55 million and $4.13 million for Roads and Related
and Water and Wastewater assets, respectively.
Appendix F | 194
Summary of Asset Management Requirements for General
Appendix F | 195
Financial Sustainability of the Program
Future Revenue Growth
The calculated annual funding provision should be considered within the
context of the Townʼs projected growth. Over the next 10 years (to
2033) the Town is projected to increase by approximately 3,050
households, which represents a 39% increase over the existing base.
Over the longer-term planning horizon to build-out, the Town will add
approximately 7,390 households. In addition, the Town will also add
roughly 275 new employees that will result in approximately 21,973
square metres of additional non-residential building space. Over the
longer planning period to build-out the Town will add an additional
1,453 employees that will be accommodated in 116,095 square metres
of new non-residential building space.
This growth will have the effect of increasing the overall assessment
base and additional user fee and charges revenues to offset the capital
asset provisions required to replace the infrastructure proposed to be
funded under the proposed Development Charges By-law.
Long-Term Capital and Operating Impact Analysis
As shown in Table F.4, by 2033, the Townʼs net operating costs are
estimated to increase by $7.32 million for property tax supported
services. Increases in net operating costs will be experienced as new
facilities such as community centres are opened. Water and Wastewater
operating impacts are assumed to be funded from water and
wastewater rates and are not included in the analysis.
Tables F.5 and F.6 summarize the components of the development-
related capital forecast that will require funding from non-DC sources.
Appendix F | 196
In total, $5.58 million and $49.46 million will need to be financed from
non-DC sources over the 2024-2033 and 2024-Build-out planning
periods respectively. In addition, $137.32 million in interim DC financing
related to post-period shares of projects may be required or these costs
may be recovered from other growth funding tools.
Council is made aware of these factors so that they understand the
operating and capital costs that will not be covered by DCs as it adopts
the development-related capital forecast set out in the study.
Assets Are Deemed to be Financially Sustainable
It is anticipated that new assets identified through the 2024 DC
Background Study process will be incorporated into the Townʼs ongoing
asset management plan analyses.
The calculated annual provisions identified are considered to be
financially sustainable as it is expected that the increased capital asset
management requirements can be absorbed by the tax and user base
over the long-term.
Appendix F | 197
Estimated
net opera
ting cost of the proposed
development-related capital program for tax s
upported assets by category in $202
4 by 2033.
Appendix F | 198
Summarizes
the comp
onents of the development-
related capital forecast that will require fu
nding fr
om non-
DC
sources for
General
Services
.
Appendix F | 199
Summarizes
the comp
onents of the development-
related capital forecast that will require fu
nding from non-DC so
urces
for En
gineered
Service
s.
Appendix F | 200
Appendix G
2024-29 DC By-Law
Appendix F | 201
Page 1 of 21
The Corporation of the Town of The Blue Mountains
By-Law Number 2024 - 29
Being a By-law to establish Development Charges
for the Corporation of the Town of The Blue Mountains
WHEREAS subsection 2(1) of the Development Charges Act, 1997, c. 27 (hereinafter called "the
Act") provides that the council of a municipality may pass By-laws for the imposition of
development charges against land for increased capital costs required because of the needs for
services arising from development in the area to which the by-law applies;
AND WHEREAS the Council of The Corporation of the Town of The Blue Mountains ("Town of
The Blue Mountains ") has given Notice in accordance with Section 12 of the Act, of its
intention to pass a by-law under Section 2 of the said Act;
AND WHEREAS the Council of the Town of The Blue Mountains has heard all persons who
applied to be heard no matter whether in objection to, or in support of, the development
charge proposal at a public meeting held on March 12, 2024;
AND WHEREAS the Council of the Town of The Blue Mountains had before it a report entitled
Development Charges Background Study dated February 2, 2024 (the "Study") prepared by
Hemson Consulting Ltd., wherein it is indicated that the development of any land within the
Town of The Blue Mountains will increase the need for services as defined herein;
AND WHEREAS copies of the Study were made available on February 2, 2024 and copies of the
proposed development charges by-law were made available on February 26, 2024 to the public
in accordance with Section 12 of the Act;
AND WHEREAS the Council of the Town of The Blue Mountains on March 12, 2024 approved
the Study, dated February 2, 2024, in which certain recommendations were made relating to
the establishment of a development charge policy for the Town of The Blue Mountains
pursuant to the Act;
AND WHEREAS by resolution adopted by Council of The Corporation of the Town of The Blue
Mountains on March 12, 2024, Council determined that the increase in the need for services
attributable to the anticipated development as contemplated in the Study dated February 2,
2024, as amended, including any capital costs, will be met by updating the capital budget and
forecast for the Town of The Blue Mountains, where appropriate;
AND WHEREAS by resolution adopted by Council on March 12, 2024, Council approved the
Study, as amended, and determined that no further public meetings were required under
Section 12 of the Act;
AND WHEREAS by resolution adopted by Council of The Corporation of the Town of The Blue
Mountains on March 12, 2024, Council determined that the future excess capacity identified in
the Study, as amended, dated February 2, 2024, shall be paid for by the development charges
contemplated in the said Study, or other similar charges;
AND WHEREAS the Council of the Town of The Blue Mountains has given consideration of the
use of more than one development charge by-law to reflect different needs for services in
different areas, also known as area rating or area specific development charges, and has
determined that for the services, and associated infrastructure proposed to be funded by
development charges under this by-law, that it is fair and reasonable that the charges be
calculated on an area-specific and Town-wide uniform basis;
Page 2 of 21
AND WHEREAS the Study dated February 2, 2024, as amended, includes an Asset Management
Plan that deals with all assets whose capital costs are intended to be funded under the
development charge by-law and that such assets are considered to be financially sustainable
over their full life-cycle;
AND WHEREAS the Council of the Town of The Blue Mountains will give consideration to
incorporate the Asset Management Plan outlined in the Study, as amended, within the Town of
The Blue Mountains' ongoing practices and current and/or future corporate Asset Management
Strategies.
Now Therefore Council of The Corporation of the Town of The Blue Mountains hereby enacts as
follows:
Definitions
1.
In this By-law,
"Act" means the Development Charges Act, 1997, S.O. 1997, c.27;
"agricultural use" means lands, buildings, or structures, excluding any portion thereof
used as a dwelling unit, used, designed or intended to be used for the purpose of a bona
fide farming operation including, but not limited to, animal husbandry, bee keeping,
dairying, fallow, field crops, fish farming, forestry, fruit farming, horticulture, livestock,
market gardening, pasturage, poultry keeping, the growing, raising, packing, treating,
storing, and sale of produce produced on the premises, and other activities customarily
carried on in the field of agriculture, including the cultivation of cannabis;
"air-supported structure" means an air supported structure as defined in the
Building Code Act;
"apartment" means any dwelling unit within a building containing more than three
dwelling units where the units are connected by an interior corridor, and includes a
"commercial resort unit", "hotel" or "motel" unit;
"board" means a board of education, public school board, secondary school board,
Catholic school board, Protestant school board, or a board as defined in Subsection 1(1) of
the Education Act, R.S.O. 1990, c.E.2, as amended;
"building or structure" means a structure occupying an area greater than ten square
metres consisting of a wall, roof, and floor or any of them or a structural system serving
the function thereof including an air-supported structure, excluding a farm building;
"Building Code Act" means the Building Code Act, S.O. 1992, c.23, as amended, and all
Regulations thereto including the Ontario Building Code, 1997, as amended;
"cannabis production facility" means the use of land, buildings or structures for the
processing, testing, destruction, packaging and shipping of cannabis and for the purposes
of the by-law is defined as a non-residential use;
"class" means a grouping of services combined to create a single service for the purposes
of this By-law and as provided in Section 7 of the Development Charges Act.
"commercial conference centre meeting space use" means land, buildings or structures
used, designed or intended to be used for commercial meetings such as civic,
educational, political, religious and social functions including convention centre and
facility meeting space;
"commercial maintenance facility use" means ski lift facilities, service and
maintenance facility related to a ski resort or service and maintenance facility
related to a golf course. This use shall be considered a commercial use;
Page 3 of 21
"commercial recreational facility use" means land, buildings or structures used,
designed or intended to be used for commercial indoor recreational use excluding
institutional public hall use. This use shall be considered a commercial use;
"commercial restaurant use" means land, buildings or structures used, designed or
intended to be used for the purpose of offering food or beverages for sale to the public
for consumption and includes such uses as a restaurant, drive-in restaurant, drive-thru
restaurant, take-out restaurant, dining room, lunch room, bake shop, cafeteria, coffee
shop, ice cream parlour, snack bar, or tavern including related storage. This use shall be
considered a commercial use;
"commercial other use" means land, buildings or structures used, designed, or intended
to be used for the purpose of an office, buying, selling, leasing and renting articles,
commodities, goods, merchandise, substances or wares, including related storage or the
supplying of services as distinguished form such uses as manufacturing or assembling of
goods including all non-residential uses not otherwise defined and excluding commercial
conference centre meeting space use, commercial maintenance facility use, and
commercial restaurant use. This use shall be considered a commercial use;
"commercial resort unit" means one room or a group of rooms in a building used or
designed or intended to be used by one or more persons, as a single commercial
accommodation unit within a commercial resort unit complex (i) in which food
preparation and sanitary facilities are provided for the exclusive use of such person or
persons; (ii) which has a private entrance from a common hallway or entrance either
inside or outside the building; (iii) which is part of a rental or lease management program
which consists of a minimum of ten such units in one building or group of buildings; (iv)
which is not used or designated as a principal residence; and (v) which has been
established to provide accommodation for gain or profit;
"commercial resort unit with separate designated lock off unit" means a commercial
resort unit having a single adjacent room or suite with a shared door in the common wall
between the main part of the unit and the adjacent room or suite, with a private entrance
from the common hallway or entrance either inside or outside the building for each of the
main part of the unit and the adjacent room or suite, with each of the main part of the
unit and the adjacent room or suite designated as separate condominium units in
accordance with a declaration and description, and where the gross floor area of the
adjacent room or suite does not exceed 46.5 square metres;
"Council" means the Council of The Corporation of the Town of The Blue Mountains;
"development" means any use or proposed use in respect of land that requires one or
more of the actions referred to in Section 7 of this By-law, including the construction,
erection or placing of one or more buildings or structures on land or the making of an
addition or alteration to a building or structure that has the effect of increasing the size or
usability thereof, and includes redevelopment;
"development charge" means a charge imposed pursuant to this By-law;
"dwelling unit" means one or more habitable rooms designed or intended to be used
together as a single and separate housekeeping unit by one or more persons, containing
its own culinary facilities, or facilities for the installation of cooking equipment, and
sanitary facilities, including a commercial resort unit and a commercial resort unit with
separate designated lock off unit;
"farm building" means a farm building as defined in the Building Code Act;
"floor" includes a paved, concrete, wooden, gravel, or dirt floor;
"grade" means the average level of proposed or finished ground adjoining a building or
structure at all exterior walls;
Page 4 of 21
"gross floor area" means the sum total of the total areas of all floors in a building,
structure, or dwelling unit whether at, above, or below-grade, measured between the
exterior faces of the exterior walls of the building or structure or from the centre line of a
common wall separating two uses, or from the outside edge of a floor where the outside
edge of the floor does not meet an exterior or common wall, and:
(a) includes the floor area of a mezzanine and air-supported structure and the space
occupied by interior walls partitions;
(b) excludes any parts of the building or structure used for the parking and loading of
vehicles;
(c) excludes the floor area of a hallway directly adjacent to a Commercial Resort Unit, a
hotel unit or a motel unit; and
(d) where a building or structure does not have any walls, the gross floor area of the
building or structure shall be the total of the area of all floors, including the ground
floor, that are directly beneath the roof of the building or structure;
"hotel unit" means one or more habitable rooms used, designed or intended to be used
as a sleeping accommodation unit by one or more persons, and may be used by the
travelling or vacationing public or for recreational purposes, but not containing its own
culinary facilities and for the purposes of the by-law is defined as an apartment;
"industrial other use" shall have the same meaning as the term "existing industrial
building" in Ont. Reg. 82/98 made under the Act excluding intensive industrial use;
"institutional development" means development of a building or structure intended for
use:
(i)
As a long-term care home within the meaning of Subsection 2 (1) of the Long-
Term Care Homes Act, 2007;
(ii)
As a retirement home within the meaning of Subsection 2 (1) of the Retirement
Homes Act, 2010;
(iii)
By any of the following post-secondary institutions for the objects of the
institution:
1.
A university in Ontario that receives direct, regular, and ongoing operating
funding from the Government of Ontario,
2.
A college or university federated or affiliated with a university described
in subclause (1), or
3.
An Indigenous Institute prescribed for the purposes of Section 6 of the
Indigenous Institutes Act, 2017;
(iv)
As a memorial home, clubhouse, or athletic grounds by an Ontario branch of the
Royal Canadian Legion; or
(v)
As a hospice to provide end of life care.
"institutional public hall use" means land, buildings or structures used, designed or
intended to be used for a non-commercial meetings and recreation including arena or
community centre;
"institutional other use" means land, buildings or structures used, designed or intended
to be used for a non-commercial purpose by any organization, group, or association for
religious, charitable, education, health or welfare purposes excluding institutional public
hall use and institutional church use;
Page 5 of 21
"intensive industrial use" shall have the same meaning as the term "existing industrial
building" in Ont. Reg. 82/98 made under the Act where the use, due to the nature of its
operation or materials used therein, would be considered obnoxious by reason of or
emissions such as smoke, noise, dust, fumes, odours, or vibrations;
"local board" means municipal service board, municipal business corporation,
transportation commission, public library board, board of health, police services board,
planning board, or any other board, commission, committee, body or local authority
established or exercising any power under any general or special act with respect to the
affairs or purposes of the Town, but excluding a board, a conservation authority, any
municipal business corporation not deemed to be a local board under O. Reg. 168/03
made under the Municipal Act, 2001, S. O. 2001, c.25, and any corporation created under
the Electricity Act, 1998, S. O. 1998, c. 15, Sch. "A";
"mezzanine" means a mezzanine as defined in the Building Code Act;
"motel unit" means one or more habitable rooms used, designed or intended to be used
as a sleeping accommodation unit by one or more persons, and may be used by the
travelling or vacationing public or for recreational purposes, but not containing its own
culinary facilities, and for the purposes of the by-law is defined as an apartment;
"non-profit housing development" means the development of a building or structure
intended for use as a residential premises (including emergency transitional housing) and
developed by,
(a) a corporation to which the Not-for-Profit Corporations Act, 2010 applies, that is in
good standing under that Act and whose primary object is to provide housing,
(b) a corporation without share capital to which the Canada Not-for-profit Corporations
Act applies, that is in good standing under that Act and whose primary object is to
provide housing, or
(c) a non-profit housing co-operative that is in good standing under the Co-operative
Corporations Act. 2022, c. 21, Sched. 3, s. 4.
"non-residential use" means land, buildings or structures or portions thereof used,
designed or intended to be used for a purpose other than for residential use;
"Ontario Building Code" means the Building Code Act, 1992, S.O. 1992, c.23 as amended
or superseded;
"other multiple" mean residential buildings not including single detached dwellings, semi-
detached dwellings or apartment dwellings;
"owner" means the owner of land or any person authorized by such owner to make one
or more applications described in Section 7 of this By-law for the development of such
land;
"place of worship" means land, buildings or structures used, designed, or intended to be
used for a place of worship or for the purpose of a cemetery or burial ground and exempt
from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended;
"Planning Act" means the Planning Act, R.S.O. 1990, c. P.13, as amended or superseded;
"private ski club lodge use" means base lodge associated with a private ski club resort
that does not provide night skiing;
"protracted" means in relation to a temporary building or structure the persistence of its
construction, erection, placement on land, alteration or of an addition to it for a
continuous period exceeding eight months;
Page 6 of 21
"Public Works" includes, but is not limited to, lands, buildings, structures, equipment and
fleet;
"redevelopment" means the construction, erection or placing of one or more buildings or
structures on land where all or part of a building or structure has previously been
demolished on such land, changing the use of a building or structure from residential to
non-residential or from non-residential to residential or changing a building or structure
from one type of residential development to another or from one type of non-residential
development to another;
"rental housing" means development of a building or structure with four or more dwelling
units all of which are intended for use as rented residential premises;
"residential use" means land, buildings or structures or portions thereof used, designed
or intended to be used for human habitation as a home, residence or living
accommodation for one or more individuals and includes commercial resort units, hotel
or motel units;
"Roads & Related Services" include, but are not limited to, land, bridges, culverts,
structures, drainage ditches, highways, roadways, sidewalks, signal lights, storm sewers
and street lights;
"Sanitary Sewage System" means all land, buildings, structures, works, facilities and
things related to sanitary sewer services including, but not limited to, all works for the
collection, transmission, treatment, and disposal of sewage;
"semi-detached dwellings" mean a residential building divided vertically into dwelling
units each of which has a separate entrance and access at grade;
"services" means services designated in this By-law including Schedule B to this By-law or
in agreement under Section 44 of the Act, or both;
"Service Area" means lands in one of Service Areas 1 to 12 as shown on Schedule "A" to
this By-law being Service Area 1 Craigleith, 2 Castle Glen, 3 Osler, 4 Thornbury Easy, 5
Thornbury West, 6 Clarksburg, 7 Lora Bay SA1, 8 Lora Bay SA2, 9 Lora Bay SA3, 10
Camperdown and 11 Swiss Meadows;
"Service Area 12" means all lands in the geographic area of the Town of The Blue
Mountains that are not located in Service Area 1 to 11 inclusive as shown on Schedule "A"
to this By-law;
"single detached dwellings" mean residential buildings, each of which contain a single
dwelling unit, that are not attached to other buildings;
"temporary building or structure" means a building or structure constructed or erected or
placed on land for a continuous period not exceeding eight months, or an addition or
alteration to a building or structure that has the effect of increasing the gross floor area
thereof for a continuous period not exceeding eight months;
"Town" means the Corporation of the Town of The Blue Mountains, including the former
Town of Thornbury and the former Township of Collingwood;
"Waterworks System" means all land, buildings, structures, works, facilities and things
related to water services including, but not limited to, all works for the production,
treatment, storage, supply, transmission and distribution of water.
Rules
2.
For the purpose of complying with Section 6 of the Act:
Page 7 of 21
(a) the area to which this By-law applies shall be the area described in Section 3 of this
By-law;
(b) the rules developed under paragraph 9 of Subsection 5(1) of the Act for determining
if a development charge is payable in any particular case and for determining the
amount of the charge shall be as set forth in Sections 4 through 17, inclusive, and
Section 27 of this By-law;
(c) the exemptions, partial exemptions and credits provided for by such rules shall be
the exemptions, partial exemptions and credits set forth in Sections 18 through 22,
inclusive, of this By-law, the indexing of charges shall be in accordance with Section
15 of this By-law, and there shall be no phasing in of development charges as
provided in Subsection 16(1) of this By-law; and
(d) the redevelopment of land shall be in accordance with the rules set forth in Section
22 of this By-law.
Lands Affected
3.
This By-law applies to all lands in the geographic area of the Town, whether or not the
land is exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended.
In addition to this By-law, lands in the Town may also be subject to area-specific
development charges by-laws.
Designation of Services
4.
It is hereby declared by Council that all development within the area to which this By-
law applies will increase the need for services.
5.
The development charge applicable to a development as determined under this By- law
shall apply without regard to the services required or used by an individual
development.
6.
Development charges shall be imposed for the following categories of services (refer to
Schedules B and C) to pay for the increased capital costs required because of increased
needs for services arising from development:
(a)
Public Library Services;
(a)
Fire Services;
(b)
Police Department Services;
(c)
Parks & Recreation Services;
(d)
By-law Enforcement Services;
(e)
Solid Waste Management Services;
(f)
Development Related Studies, subject to paragraph 28 of this By-law;
(g)
Services Related to a Highway: Public Works;
(h)
Services Related to a Highway: Roads & Related Services;
(i)
Waterworks System; and
(j)
Sanitary Sewage System.
Page 8 of 21
Approvals for Development
7.
Development charges shall be imposed against all lands, buildings or structures
within the area to which this By-law applies if the development of such lands,
buildings or structures requires any of the following approvals:
(a)
the passing of a zoning by-law or of an amendment to a zoning by-law under Section
34 of the Planning Act;
(b)
the approval of a minor variance under Section 45 of the Planning Act, R.S.O. 1990,
c. C.26, as amended, or Section 9 of the Condominium Act, 1998, S. O. 1998, C. 19,
as amended, or its predecessor Act
(c)
a conveyance of land to which a by-law passed under Subsection 50(7) of the
Planning Act applies;
(d)
the approval of a plan of subdivision under Section 51 of the Planning Act;
(e)
a consent under Section 53 of the Planning Act;
(f)
the approval of a description under Section 50 of the Condominium Act; or
(g)
the issuing of a permit under the Building Code Act, 1992 in relation to a building or
structure.
8.
No more than one development charge under this by-law for each service designated in
Section 6 shall be imposed upon any lands, buildings or structures to which this By-law
applies even though two or more of the actions described in Section 7 are required
before the lands, buildings or structures can be developed.
9.
Notwithstanding Section 8 and Section 13, if two or more of the actions described in
Section 7 occur at different times, additional development charges shall be imposed in
respect of any increased or additional development permitted by that action.
10. Where a development requires an approval described in Section 7 after the issuance of a
building permit and no development charge has been paid, then the development charge
shall be paid prior to the granting of the approval required under Section 7.
11. If a development does not require a building permit but does require one or more of the
approvals described in Section 7, then the development charge shall nonetheless be
payable in respect of any increased or additional development permitted by such approval
required for the increased or additional development being granted.
12. Nothing in this By-law prevents Council from requiring, as a condition of an agreement
under Section 51 or Section 53 of the Planning Act, that the owner, at his or her own
expense, install such local services related to a plan of subdivision or within the area to
which the plan relates, as Council may require in accordance with the local service policies
of the Town in effect at the time, or that the owner pay for local connections to storm
drainage facilities installed at the owner's expense, or administrative, processing, or
inspection fees.
Basis for Calculation of Development Charges
13. The development charge with respect to the development of any land, buildings or
structures shall be calculated as follows:
(1) in the case of residential development, or the residential portion of a mixed-use
development, based upon the number and type of dwelling units and the Service Area in
which the development occurs;
(2) in the case of non-residential development, or the non-residential portion of a mixed-
Page 9 of 21
use development, based upon the gross floor area of such development, the Service
Area in which the development occurs, and the type of development; and,
(3) in the case of a type of development not described above, based upon the number
and type of units and/or gross floor area portions of such development and the
Service Area in which the development occurs.
Amount of Development Charges
14. The amount of the development charge shall be imposed as follows:
(1) the development charges described in Schedules C-1, C-2 and C-3 to this By- law shall be
imposed on residential development of lands, buildings or structures, including a
dwelling unit accessory to a non-residential use and, in the case of a mixed- use building
or structure, on the residential component of the mixed-use building or structure,
calculated for each dwelling unit by type;
(2) the development charges described in Schedule D to this By-law shall be imposed on the
non-residential development of land, buildings, or structures and, in the case of a mixed-
use building or structure, on the non-residential portion of the mixed-use building or
structure, and calculated on the gross floor area of the non-residential use; and,
(3) in the case of a type of development not described above, the development charges
described in Schedules C-1, C-2 and C-3 and D, as the case may be, shall be imposed on
the portions of the development.
Indexing of Development Charges
15. The development charges imposed pursuant to this By-law may be adjusted annually
without amendment to this By-law, commencing January 1, 2025 and on January 1 of
each year thereafter, in accordance with the most recently available Statistics Canada
Quarterly, Construction Price Statistics.
Phasing, Timing of Calculation and Payment
16. (1) The development charges set out in this By-law are not subject to phasing in and
are payable in full, subject to the exemptions and credits herein, from the date
this By-law comes into force.
(2) Subject to Subsection (3), Subsection (4), Section 21, and Section 22, the
development charge shall be calculated as of and shall be payable on the date the
first building permit is issued in relation to a building or structure on land to which
the development charge applies.
(3) Notwithstanding Subsection (2) the Town-wide Roads & Related Services, , Sanitary
Sewage System, and Waterworks System services components of the development
charges for residential developments that require approval of a plan of subdivision
under Section 51 of the Planning Act or a consent under Section 53 of the Planning
Act and for which a subdivision agreement or consent agreement is executed by
the owner shall be calculated and shall be payable immediately upon the owner
executing the agreement, pursuant to Section 26 of the Act. The terms of such
agreement shall then prevail over the other provisions of this section.
(4) If at the time of issuance of a building permit or permits for any development for
which payments have been made pursuant to subsection 16(2) and subsection
16(3), the total number and type of dwelling units for which building permits have
been and are being issued, or the gross floor area used or intended to be used for a
non-residential purpose for which building permits have been and are being issued,
Page 10 of 21
is greater than that used for the calculation and payment referred to in subsection
(1), an additional payment shall be required and shall be calculated by multiplying
the applicable charge shown in Schedules C-1, C-2 and C-3 or D, by:
(a) in the case of residential development, the difference between the number and
type of dwelling units for which building permits have been and are being issued
and the number and type of dwelling units for which payments have been made
pursuant to subsection 16(2), subsection 16(3) and this subsection; and
(b) in the case of non-residential development, the difference between the gross
floor area used or intended to be used for a non-residential purpose for which
building permits have been and are being issued and the gross floor area used
or intended to be used for a non-residential purpose for which payments have
been made pursuant to subsection 16(2), subsection 16(3) and this subsection.
(5) Subject to subsection 16(7), if, following the issuance of all building permits for all
development in a subdivision or for all development on a block within that
subdivision that had been intended for future development and for which payments
have been made pursuant to subsection 16(2) and subsection 16(3), the total
number and type of dwelling units for which building permits have been issued, or
the gross floor area used or intended to be used for a non-residential purpose for
which building permits have been issued, is less than that used for the calculation
and payment referred to in subsection 16(2) and subsection 16(3), a refund shall
become payable by the Town to the person who originally made the payment
referred to in subsection 16(2) and subsection 16(3) which refund shall be calculated
by multiplying the applicable development charge in effect at the time such
payments were made by:
(a) in the case of residential development, the difference between the number of
dwelling units by type for which payments were made pursuant to subsection
16(2) and subsection 16(3) and the number of dwelling units by type for which
building permits were issued; and
(b) in the case of non-residential development, the difference between the gross
floor area used or intended to be used for a non-residential purpose for which
payments were made pursuant to subsection 16(2) and subsection 16(3) and
the gross floor area used or intended to be used for a non-residential purpose
for which building permits were issued.
(6) Subsections 16(4) and 16(5) shall apply with necessary modifications to a
development for which development charges have been paid pursuant to a
condition of consent or pursuant to an agreement respecting same.
(7) Notwithstanding subsections 16(1) to 16(6), the Town may require and where so
required an owner shall enter into an agreement, including the provision of security
for the owner's obligations under the agreement, pursuant to section 27 of the Act
and, without limiting the generality of the foregoing, such an agreement may
require the early payment of the development charges hereunder. The terms of
such agreement shall then prevail over the provisions of this By-law.
(8) Any refunds payable pursuant to subsections 16(5) and 16(6) shall be calculated and
paid without interest.
(9) Notwithstanding subsections 16(1) to 16(6), development charges for rental housing
and institutional developments in accordance with Section 26.1 of the Development
Charges Act, 1997, are due inclusive of interest established from the date the
development charge would have been payable in accordance with section 26 of the
Development Charges Act, 1997, in 6 equal annual payments beginning on the date
that is the earlier of:
Page 11 of 21
a. the date of the issuance of a permit under the Building Code Act,
1992 authorizing occupation of the building; and
b. the date the building is first occupied.
and continuing on the following five anniversaries of that date.
(10) Where the development of land results from the approval of a site plan or zoning by-
law amendment application received on or after January 1, 2020, and the approval of
the application occurred within two years of building permit issuance, the
development charges under subsection 16(2) shall be calculated on the rates set out
in Schedule B on the date of the planning application, including interest. Where both
planning applications apply, development charges under subsection 16(2) shall be
calculated on the rates in effect on the day of the later planning application, including
interest. This paragraph will apply in accordance with the legislation, subject to
amendment.
Payment by Money or the Provision of Services
17. (1) Payment of development charges shall be by cash or by cheque.
(2) In the alternative to payment by the means provided in Subsection (1), the Town
may, by an agreement entered into with the owner under Section 38 of the Act,
accept the provision of services in full or partial satisfaction of the development
charge otherwise payable provided that:
(a) if the Town and the owner cannot agree as to the reasonable cost of the
work performed, the reasonable cost of the work shall be determined by the
Town's Treasurer; and
(b) if the credit exceeds the amount of the charge for the service to which the
work relates,
(i)
the excess amount shall not be credited against the charge for any other
service, unless the Town has so agreed in an agreement under Section
38 of the Act; and
(ii)
in no event shall the Town be required to make a cash payment to the
credit holder.
(3) Nothing in this By-law prevents Council from requiring, as a condition of any
approval given under the Planning Act that the owner, at the owner's expense,
installs such local services as Council may require in accordance with the local
service policies of the Town in effect at the time.
Statutory Exemptions
Rules for Exemption Relating to the Creation of Additional Dwelling Units
18. (1)
Exemptions will be provided in accordance with section 2 of the Act for additional
residential units subject to changes to legislation.
Rules for Exemption Relating to Non-Profit Housing
(2)
As defined and exempt by the Act, development charges will not be payable for non-
profit housing.
Rules for Exemption Relating to Colleges and Universities
(3)
Land, buildings or structures that are exempt from taxation under the enabling
legislation of a college established under the Ontario Colleges of Applied Arts and
Page 12 of 21
Technology Act, 2002, and used for the purposes set out under such enabling
legislation;
(4) Land, buildings or structures owned by a university that receives regular and ongoing
operating funds from the Government of Ontario for the purposes of post-secondary
education.
Rules for Exemption Relating to Inclusionary Zoning
(5) Inclusionary zoning residential units in respect of residential units that are affordable
housing units as defined by the Act required to be included in a development or
redevelopment pursuant to a by-law passed under section 34 of the Planning Act to
give effect to the policies described in subsection 16 (4) of that Act. 2022, c. 21, Sched.
3, s. 4 .
Rules for Exemption Relating to Municipalities
(6) Land, buildings or structures owned by and used for the purposes of a
municipality and exempt from taxation under Section 3 of the Assessment Act,
R.S.O. 1990, c.A.31, as amended;
(7) Lands, buildings or structures owned by and used for the purposes of a board and
exempt from taxation under Section 3 of the Assessment Act,
Rules for Exemption Relating to Industrial Enlargement
19. (1) If a development includes the enlargement of the gross floor area of an existing
industrial building, the amount of the development charge that is payable is the
following:
(a) if the gross floor area is enlarged by 50 per cent or less, the amount of the
development charge in respect of the enlargement is zero; and
(b) if the gross floor area is enlarged by more than 50 per cent, development
charges are payable on the amount by which the enlargement exceeds 50 per
cent of the gross floor area before the enlargement.
(2) For the purpose of this Section only the terms "gross floor area" and "existing
industrial building" shall have the same meaning as those terms have in Ont. Reg
82/98 made under the Act.
(3) In this Section, for greater certainty in applying the exemption herein:
(a) the gross floor area of an existing industrial building shall be determined as
of the date this By-law comes into force; and
(b) the gross floor area of an existing industrial building is enlarged where there
is a bona fide increase in the size of the existing building and the enlarged
area is attached to existing industrial building and is used for or in connection
with an industrial purpose as set out in Subsection 1(1) of O. Reg. 82/98.
Without limiting the generality of the foregoing, the exemption in this
Section shall not apply where the enlarged area is attached to the existing
industrial building by means only of a tunnel, bridge, canopy, corridor or
other passageway, or through a shared below grade connection such as a
service tunnel, foundation, footing or a parking facility.
(4) For the purpose of interpreting the definition of "existing industrial building"
contained in O. Reg. 82/98, regard shall be had for the classification of the lands
in question pursuant to the Assessment Act, R. S. O. 1990, c. A.31, as amended,
and in particular: whether the lands fall within a tax class such that taxes on the
Page 13 of 21
land are payable at an industrial rate; and, whether more than 50% of the gross
floor area of the building or structure on the land has an industrial property code
for assessment purposes.
Categories of Non-Statutory Exempt Uses
20. The following categories of uses are hereby designated as being exempt from
the payment of development charges:
(1)
buildings or structures used as public hospitals governed by the Public
Hospitals Act, R.S.O. 1990, c.P.40, as amended;
(2)
land, buildings or structures used for place of worship use and exempt from
taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended; and
(3)
land, buildings or structures for agricultural use which do not receive
municipal sanitary sewer or water supply services.
Temporary Buildings or Structures
22. (1) Subject to Subsections (2) and (3), temporary buildings or structure shall be exempt
from the payment of development charges.
(2) In the event that a temporary building or structure becomes protracted, it shall
be deemed not to be nor ever to have been a temporary building or structure,
and the development charges required to be paid under this By-law shall become
payable on the date the temporary building or structure becomes protracted.
(3) Prior to the Town issuing a building permit for a temporary building or structure,
the Town may require an owner to enter into an agreement, including the
provision of security for the owner's obligation under the agreement, pursuant to
Section 27 of the Act providing for all or part of the development charge required
by Subsection (2) to be paid after it would otherwise be payable. The terms of
such agreement shall then prevail over the provisions of this By-law.
Rules for the Redevelopment of Land
23. (1) Despite any other provision of this By-law, where as a result of the
redevelopment of land, a building or structure existing on the same land has
been demolished in order to facilitate redevelopment, or converted from one
principal use to another principal use on the same land, the development
charges otherwise payable with respect to such redevelopment shall be reduced
by the following amounts:
(a) in the case of a residential building or structure, an amount equivalent to the
applicable development charge for the Residential Type of the existing
dwelling that has been or will be demolished or converted to another principal
use; or
(b) in the case of a non-residential building or structure, an amount calculated by
multiplying the applicable development charge by the Gross Floor Area that
has been or will be demolished or converted to another principal use; or
(c) in the case of a mixed-use building or structure, by an amount calculated by
the residential unit type for the existing residential use portion and by gross
floor area for the non-residential use portion, of the unit that has been or will
be demolished or converted to another principal use.
(2) The amount of any reduction or credit permitted shall not exceed, in total, the
Page 14 of 21
amount of the development charges otherwise payable with respect to the re-
development.
(3) Any reduction or credit applicable hereunder shall only apply provided that a
building permit for the redevelopment has been issued within five (5) years of the
date of the issuance of a permit for the demolition of any building or structure on
the same lands.
(4) If the lands are unserviced at the time it is demolished, water or wastewater
development charges will not be credited. Water or wastewater development
charges (or the equivalent) will be due upon servicing.
(5) For greater certainty, and without limiting the generality of the foregoing, no
credit shall be allowed where the demolished building or structure or part thereof
prior to the demolition or conversion would have been exempt from the payment
of development charges pursuant to this By-law (e.g. temporary structures).
Rules with Respect to Existing Agreements
24.
If there is a conflict between this By-law and an agreement made between the Town
and the owner or former owner of land before the coming into force of this By- law
and the owner or former owner of the land agreed to pay all or a portion of a charge
related to development under the agreement with respect to the land or provided
services in lieu of payment, then the provisions of the agreement prevail over the By-
law to the extent of the conflict. The extent of the conflict shall be determined on a
service by service basis. Notwithstanding the allocation of total development charges
within an existing agreement, the development charges may be reallocated by the
Town to services set out in this By-law.
Reserve Funds
25. (1) Development charge payments received by the Town pursuant to this By-law shall
be maintained in a separate reserve fund or funds for each service to which the
development charge relates and shall be spent only for the capital costs
determined under paragraphs 2 to 8 of Subsection 5(1) of the Act.
(2) Notwithstanding anything herein to the contrary, the Town may borrow money
from a reserve fund and repay the amount used plus interest at a rate not less than
the Bank of Canada rate updated on the first business day of every January, April,
July, and October.
Interest
26. The Town shall pay interest on a refund under Subsection 18(3) and Subsection 25(2) of
the Act at a rate equal to the Bank of Canada rate on the date this By-law comes into
force.
Front Ending Agreements
27. The Town may enter into agreements under Section 44 of the Act.
Schedules
28. The following Schedules to this By-law form an integral part of this By-law.
Schedule A
Service Area Boundaries
Schedule B
Designated Services
Page 15 of 21
Schedule C
Development Charges per Residential Dwelling Unit
Schedule D
Development Charges per Square Metre of Non-Residential Gross
Floor Area
By-law Registration
29. A certified copy of this By-law may be registered in the by-law register in the Land
Registry Office against all land in the Town and may be registered against title to any
land to which this By-law applies.
Date By-law Effective
30. This By-law comes into force and effect from and after date of its enactment.
Date By-law Expires
31. This By-law expires ten years after the date on which it comes into force unless repealed at
an earlier date by Council.
Repeal
32. By-law No.2019-17 is hereby repealed effective on the date this By-law comes into
force.
Headings for Reference Only
33. The headings inserted in this By-law are for convenience of reference only and shall
not affect the construction or interpretation of this By-law.
Severability
34. If, for any reason, any provision, Section, Subsection or paragraph of this By-law is held
invalid, it is hereby declared to be the intention of Council that all the remainder of this
By-law shall continue in full force and effect until repealed, re- enacted or amended, in
whole or in part or dealt with in any other way.
And further that this By-law shall come into force and take effect upon the enactment thereof.
Enacted and passed this 15th day of April, 2024
"Original Signed"
Andrea Matrosovs, Mayor
"Original Signed"
Corrina Giles, Clerk
THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024- 29
Schedule A
Page 16 of 21
THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS
By-law No. 2024 - 29
Schedule B
Designated Services
Categories of Services
1. Public Library
2. Fire Services
3. Police Department
4. Parks and Recreation
5. By-law Enforcement
6. Solid Waste Management
7. Development Related Studies
8. Services Related to a Highway: Public Works
9. Services Related to a Highway: Roads and Related Services
10. Waterworks System
11. Sanitary Sewage System
Page 17 of 21
Page 18 of 21
THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS
By-law No. 2024 - 29
Schedule C-1
DEVELOPMENT CHARGES FOR "SINGLE AND SEMI-DETACHED" DWELLING UNITS
Municipal Service
Service Area
Parks &
By-law
Solid Waste
Public
Roads
Sanitary
Sub-Total
Development
Total
Recreation
Enforcement Management
Works*
& Related*
Sewer
Charge
Rel. Studies**
Charge
1.
Craigleith
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$11,485
$4,304
$38,061
$366
$38,427
2.
Castle Glen
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$22,210
$5,728
$50,211
$366
$50,577
3.
Osler
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$40,141
$38,403
$100,817
$366
$101,183
4.
Thornbury East
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$6,970
$12,516
$41,759
$366
$42,125
5.
Thornbury West
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$26,498
$23,182
$71,953
$366
$72,319
6.
Clarksburg
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$20,935
$30,114
$73,322
$366
$73,688
7.
Lora Bay - SA1
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$15,384
$15,705
$53,362
$366
$53,728
8.
Lora Bay - SA2
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$12,533
$12,062
$46,868
$366
$47,234
9.
Lora Bay - SA3
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$12,533
$12,144
$46,950
$366
$47,316
10. Camperdown
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$19,132
$24,408
$65,813
$366
$66,179
11. Swiss Meadows
$1,082
$1,687
$129
$5,698
$30
$165
$1,273
$12,209
$0
$0
$22,273
$366
$22,639
* Services Related to a Highway
** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act.
Library
Fire
Water
Police
Page 19 of 21
THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS
By-law No. 2024 - 29
Schedule C-2
DEVELOPMENT CHARGES FOR "OTHER MULTIPLES" DWELLING UNITS
Municipal Service
Service Area
Parks &
By-law
Solid Waste
Public
Roads
Sanitary
Sub-Total
Development
Total
Recreation
Enforcement Management
Works*
& Related*
Sewer
Charge
Rel. Studies**
Charge
1.
Craigleith
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$10,308
$3,863
$34,161
$328
$34,489
2.
Castle Glen
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$19,934
$5,141
$45,065
$328
$45,393
3.
Osler
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$36,027
$34,467
$90,484
$328
$90,812
4.
Thornbury East
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$6,256
$11,234
$37,480
$328
$37,808
5.
Thornbury West
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$23,782
$20,806
$64,579
$328
$64,907
6.
Clarksburg
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$18,789
$27,028
$65,807
$328
$66,135
7.
Lora Bay - SA1
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$13,807
$14,096
$47,892
$328
$48,220
8.
Lora Bay - SA2
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$11,249
$10,826
$42,065
$328
$42,393
9.
Lora Bay - SA3
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$11,249
$10,899
$42,138
$328
$42,466
10. Camperdown
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$18,763
$23,384
$62,136
$328
$62,464
11. Swiss Meadows
$971
$1,514
$115
$5,114
$27
$148
$1,142
$10,958
$0
$0
$19,989
$328
$20,317
* Services Related to a Highway
** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act.
Library
Fire
Police
Water
Page 20 of 21
THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS
By-law No. 2024 - 29
Schedule C-3
DEVELOPMENT CHARGES FOR "APARTMENT" DWELLING UNITS
Municipal Service
Service Area
Parks &
By-law
Solid Waste
Public
Roads
Sanitary
Sub-Total
Development
Total
Recreation
Enforcement Management
Works*
& Related*
Sewer
Charge
Rel. Studies**
Charge
1.
Craigleith
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$7,731
$2,897
$25,621
$246
$25,867
2.
Castle Glen
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$14,950
$3,855
$33,799
$246
$34,045
3.
Osler
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$27,020
$25,850
$67,863
$246
$68,109
4.
Thornbury East
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$4,692
$8,425
$28,110
$246
$28,356
5.
Thornbury West
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$17,837
$15,605
$48,434
$246
$48,680
6.
Clarksburg
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$14,092
$20,271
$49,355
$246
$49,601
7.
Lora Bay - SA1
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$10,356
$10,572
$35,919
$246
$36,165
8.
Lora Bay - SA2
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$8,436
$8,119
$31,549
$246
$31,795
9.
Lora Bay - SA3
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$8,436
$8,175
$31,604
$246
$31,850
10. Camperdown
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$17,956
$21,141
$54,088
$246
$54,334
11. Swiss Meadows
$728
$1,135
$87
$3,835
$20
$111
$857
$8,218
$0
$0
$14,991
$246
$15,237
* Services Related to a Highway
** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act.
Library
Fire
Police
Water
Page 21 of 21
THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS
By-law No. 2024 - 29
Schedule D
DEVELOPMENT CHARGES PER SQUARE METRE OF NON-RESIDENTIAL GROSS FLOOR AREA
Municipal Service
Service Area
Parks &
By-law
Solid Waste
Public
Roads
Sanitary
Sub-Total
Development
Total
Recreation
Enforcement Management
Works*
& Related*
Sewer
Charge
Rel. Studies**
Charge
1.
Craigleith
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$84.23
$24.99
$196.23
$2.05
$198.28
2.
Castle Glen
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$202.41
$44.42
$333.84
$2.05
$335.89
3.
Osler
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$326.28
$290.96
$704.25
$2.05
$706.30
4.
Thornbury East
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$65.14
$79.62
$231.77
$2.05
$233.82
5.
Thornbury West
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$199.71
$161.27
$447.99
$2.05
$450.04
6.
Clarksburg
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$267.83
$361.29
$716.13
$2.05
$718.18
7.
Lora Bay - SA1
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$118.77
$99.63
$305.41
$2.05
$307.46
8.
Lora Bay - SA2
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$95.53
$125.21
$307.75
$2.05
$309.80
9.
Lora Bay - SA3
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$95.53
$96.23
$278.77
$2.05
$280.82
10. Camperdown
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$151.84
$155.93
$394.78
$2.05
$396.83
11. Swiss Meadows
$0.00
$9.47
$0.72
$0.00
$0.17
$0.93
$7.15
$68.57
$0.00
$0.00
$87.01
$2.05
$89.06
* Services Related to a Highway
** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act.
Library
Fire
Police
Water
Appendix H
Local Service Definitions
Appendix H | 223
Appendix H - Local Service
Definitions
General Policy Guidelines on Development Charge and Local
Service funding for Town Related Works
The following guidelines set out in general terms the size and nature of
engineered infrastructure that is included in the Town of The Blue
Mountains 2024 Development Charges Study. For a project to be eligible to
be funded completely or in part by development charges, the following will
apply:
1.
The project will be identified in the most current Town of The Blue
Mountains Development Charges Study.
2.
If any infrastructure does not add any additional capacity over and
above the capacity requirement for that development, these projects
are assumed to be the sole responsibility of the developer.
3.
Infrastructure that provides servicing or capacity for more than one
development is not necessarily fully or partially funded from
development charges. If a project is considered fully or partially local
in nature, the Town will require the benefiting land owners to fund the
works directly.
The following policy guidelines are general principles by which staff will be
guided in considering development applications. However, each application
will be considered on its own merits having regard to, among other factors,
the nature, type and location of the development in any existing
development and proposed development in its surrounding area these policy
guidelines, the location and type of services required and their relationship
Appendix H | 224
to the proposed development and to existing and proposed development in
the area, and subsection 59(2) of the Development Charges Act, 1997
These local service policy guidelines are subject to review and amendment
by the Town which may be independent of an amendment or update to the
Townʼs development charge by-laws.
The detailed engineering requirements for all work and/or development are
governed by the Town of The Blue Mountains, or if not specified in the
Official Plan, by the approved detailed engineering standards.
"Local service" funding is being specifically considered for the services of:
1. Roads and Related Services
2. Water Services
3. Wastewater Services
4. Parkland Development
i.
Roads and Related
a)
Arterial Roads:
New arterial roads and arterial road improvements are included as part of
road costing funded through DCs. Only the oversizing component would be
recovered through DCs and local road equivalent costs are considered to be
a local service.
b)
Collector Roads:
The local component of a collector road internal to a development is a direct
developer responsibility under s.59 of the DCA as a local service. The
oversized share of a collector road internal to a development is development
charge recoverable.
Collector roads external to a development are a local service if the works are
within the area to which the plan relates and therefore a direct developer
Appendix H | 225
responsibility under s.59 of the DCA. Otherwise, the works are included in
the DC calculation to the extent permitted under s.5(1) of the DCA.
c)
Local Roads:
Local roads, within a development are local services and a direct developer
responsibility under s.59 of the DCA.
d)
Additional Works:
Traffic Signals and Intersection Improvements due to development and
development-related traffic increases are to be included in the DC
calculations, as part of the arterial, collector and local road components.
e)
Subdivision/Site Entrances and Related:
Entrances and all related costs (including, but not limited to: signalization,
turn lanes, utilities and extensions, etc.), no matter the class of road, are a
local service and a direct developer responsibility under s.59 of the DCA.
f)
Streetlights:
Streetlights internal to a development or site are a direct developer
responsibility through local service provisions (s.59 of the DCA).
Streetlights external to a development but related to the subject lands are a
direct developer responsibility through local service provisions (s.59 of the
DCA).
New streetlights in other areas related to development are included in the
DC calculation to the extent permitted under s.5(1) of the DCA.
g)
Sidewalks:
Sidewalks internal to a development or site are a direct developer
responsibility through local service provisions (s.59 of the DCA).
Sidewalks external to a development but required and related to the subject
lands are a direct developer responsibility through local service provisions
(s.59 of the DCA).
Appendix H | 226
New sidewalks in other areas related to development are included in the DC
calculation to the extent permitted under s.5(1) of the DCA.
h)
Bike or Transit Lanes:
Bike or transit lanes, where requested, internal to a development or site are
a direct developer responsibility through local service provisions (s.59 of the
DCA).
Bike or transit lanes external to a development but required and related to
the subject lands are a direct developer responsibility through local service
provisions (s.59 of the DCA).
New bike or transit lanes in other areas related to development are included
in the DC calculation to the extent permitted under s.5(1) of the DCA.
i)
Noise Abatement Measures:
Noise abatement measures internal to a development are a direct developer
responsibility through local service provisions (s.59 of the DCA).
Noise abatement measures external to a development but required and
related to, or mitigate impacts from, the development of the subject lands,
are a direct developer responsibility through local service provisions (s.59 of
the DCA).
j)
Street Tree Planting:
Street tree planting, as required by Municipal Standards, is considered a
local area service and a direct responsibility of the developer.
k)
Land Acquisition for Road Allowances:
Land acquisition for planned road allowances within development lands is a
dedication under the Planning Act provisions.
Land acquisition for planned road allowances outside of development lands,
and that is not a dedication under the Planning Act , is included in the DC
calculation to the extent permitted under s.5(1) of the DCA.
Appendix H | 227
Additional land acquisition for bridges or grade separations (beyond normal
dedication requirements) is included in the DC calculation, to the extent in
which it is eligible and identified, if applicable, in the Development Charges
Background Study.
For further clarification, all improvements to a road to facilitate development
are considered local services and are to be paid by the developer unless
they fall into one of the following categories:
The improvement is designated as required for traffic flow improvement for
an area greater than the development, is defined as a road improvement
required by the Town, and is identified through the Class Environmental
Assessment process or a Town Transportation Study. Such an improvement
would be listed in the Development Charges Background Study.
The improvement is designated as required by Town Staff to serve a greater
area than the development and is identified in the capital forecast and is
listed in the Development Charges Background Study.
ii.
Water Services
All water supply, storage, treatment facilities and booster pumping stations
may be included in the development charge calculation.
Watermains within the development that are larger than 300mm are to be
included in the development charge calculation. The amount of cost
contribution for watermains within a development shall be calculated using
tendered unit prices and shall be the difference between the cost of the
actual pipe diameter and the cost of a 300mm pipe diameter including a 12%
engineering fee. Only watermain and valves will be included in the
calculation. Any costs related to the depth of pipe are the responsibility of
the developer.
Water mains within the development that are 300mm and under are deemed
to be a local service and are a direct funding responsibility of the developer.
Appendix H | 228
Connections to trunk mains and pumping stations to service specific areas
are to be a direct developer responsibility.
Trunk watermains, generally outside the development area, identified by a
Class Environmental Assessment, Servicing Study or by Town Staff will be
included in the development charge calculation.
iii.
Wastewater Services
All sanitary sewage treatment facilities are to be included in the
development charge calculation.
Major sanitary trunk sewers, external to the development, and major
pumping stations serving more than one development are to be included in
the development charge calculation. These services will be identified
through a Class Environmental Assessment, Servicing Study or by Town
staff.
Sewer collectors within the development that are 450 mm and under are
deemed to be a local service and are a direct funding responsibility of the
developer. Sanitary sewers within the development that are larger than
450mm that also service upstream properties will have cost sharing
calculated on the tendered unit prices and shall be the difference between
the cost of the actual pipe diameter and the cost of a 450mm pipe including
a 12% engineering fee. All other appurtenances with respect to oversizing
and any costs related to the depth of pipe are the responsibility of the
developer.
Connections to collectors and pumping stations to service specific areas are
to be a direct developer responsibility.
Sewage pumping stations within the development or local pumping stations
serving a small localized area are deemed to be a local service and are a
direct funding responsibility of the developer or developers on a flow area or
proportional basis, or by agreement between the developers.
Appendix H | 229
Upgrades to, or the construction of permanent pumping stations that are
required as a result of an approved serviceability study that service more
than one developer, will be funded under one of the following possible
approaches:
a) Through a development cost sharing agreement amongst the
benefiting land owners. This is the Townʼs preferred approach; or
b) Through a Town facilitated developer cost sharing arrangement, such
as an area-specific development charge or other similar mechanism.
Under this approach, the Town will require one or more of the
benefitting land owners to front-end finance the cost of the works.
iv.
Parkland Development
For the purpose of parkland development, local service includes the
requirement for the owner to undertake preparation of a conceptual park
plan including proposed grading to demonstrate that the proposed park size,
configuration and topography will allow for the construction of park facilities
to the satisfaction of the Town.
The municipality also requires the owner to dedicate parkland or provide
cash-in-lieu, consistent with the Planning Act provisions. All of these costs
are deemed a direct responsibility of the owner and have not been included
in the development charge calculation.
With respect to other parkland development costs, the municipal policy is to
include all other components of parkland development in the DC calculation,
including detailed design and contract administration, finished grading,
sodding, park furniture, electrical, water, sanitary sewer, signage, plant
material, walkways, play courts, parking lots, sports fields, playground
equipment, water play equipment, recreational trails, park shelters and
lighting.
Appendix H | 230
a)
Recreational Trails:
The costs of the following items shall be the direct developer responsibility
as a local service
a. All costs associated with any recreational trails to be constructed
within the development (as incorporated in Section D6 of the
Official Plan); and
b. Rough grading and any associated infrastructure (bridges and
abutments, guard and hand rails, retaining walls) of all
recreational trails and multi-use paths that are considered part of
the Townʼs Public Walkways Network (as incorporated in Section
D6 of the Official Plan) within the development.
The costs of new trails/walkways in other areas related to development
shall be paid through DCs.
b)
Parkland:
The costs for parkland development as set out in the relevant development
agreement shall be the direct developerʼs responsibility as a local service.
The costs of the following items shall be paid through DCs:
a. All costs associated with program facilities and non-local parkland
in addition to all associated site works beyond the base parkland
development.
Appendix H | 231