2024 Consolidated DC Background Study (Hemson)

The Blue Mountains, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 6cfb5705618f · verified 2026-10-23 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Consolidated Report Prepared by Hemson for the Town of The Blue Mountains 2024 Development Charges Background Study April 1, 2026 1000 - 30 St. Patrick Street, Toronto, ON M5T 3A3 416 593 5090 | [email protected] | www.hemson.com Consolidated Study Foreword A. Changes Since June 20, 2024 The Town of the Blue Mountains passed DC By-law 2024-29 on April 15th, 2024, which was subsequently appealed to the Ontario Land Tribunal. This version of DC Background Study reflects the OLT order issued on March 23, 2026 (see case # OLT-24-000647). A summary of the changes made since the June 20, 2024, version is Table 1 below. In addition, Appendix G contains the updated DC By-law 2024-29 reflecting the updated treatment of hotel, motel and commercial resort units. Table 1: Summary of Changes following OLT Order Service Area Services / Areas Affected Town-wide Services Public Library Parks And Recreation Services Related to a Highway: Roads & Related Water - Distribution (Linear Infrastructure) Craigleith Castle Glen Osler Thornbury West Clarksburg Lora Bay - SA1 Lora Bay - SA2 Lora Bay - SA3 Camperdown Wastewater - Collection (Linear Infrastructure) Same as Water - Distribution above with the addition of: Thornbury East Water Supply (Plant Infrastructure) Entire Serviced Area Wastewater Treatment (Plant Infrastructure) Craigleith WWTP Thornbury WWTP Contents List of Acronyms 1 Executive Summary 2 1. Introduction 7 A. Legislative Context 8 B. Relevant Analysis 10 C. Consultation and Approval Process 10 2. The DC Methodology Aligns Development-Related Costs and Benefits 11 A. Both Town-Wide and Area-Specific Development Charges Are Proposed 11 B. Key Steps When Determining Development Charges for Future Development-Related Projects 13 3. Development Forecast 17 4. Historical Capital Service Levels 20 5. Development-Related Capital Forecast 22 A. Development-Related Capital Forecast is provided for Councilʼs Approval 22 B. The Development-Related Capital Forecast for General Services 23 C. The Development-Related Capital Forecast for Engineered Services 26 6. Development Charges are Calculated in Accordance with the Development Charges Act 29 A. Development Charges Calculation 29 B. Residential and Non-Residential Development Charges Rates 39 C. Comparison of Newly Calculated Development Charges with Charges Currently In-Force in The Blue Mountains 42 7. Cost of Growth Analysis 46 A. Asset Management Plan 46 B. Future Revenue Growth 47 C. Net Operating Costs for the Townʼs Services to Increase over the Forecast Period 48 D. Long-Term Capital Financing from Non-Development Charges Sources 50 8. Development Charges Administration 52 A. Development Chagres Recommendations 52 List of Appendices Appendix A - Development Forecast 54 Appendix B - General Services 75 Appendix C - Services Related to a Highway 128 Appendix D - Engineered Services 154 Appendix E - Reserves 187 Appendix F - Cost of Growth 190 Appendix G -2024-29 DC By-law 201 Appendix H - Local Service Guidelines 223 List of Acronyms | 1 List of Acronyms AMP Asset Management Plan ASDC Area Specific Development Charge BTE Benefit to Existing COG Cost of Growth DCA Development Charges Act DC Development Charges GFA Gross Floor Area MMAH Ministry of Municipal Affairs and Housing PPB Post-Period Benefit PPU Persons Per Unit Executive Summary | 2 Executive Summary A. Purpose of Development Charges (DC) Background Study Hemson Consulting Ltd. was retained by the Town of The Blue Mountains to complete a Development Charges (DC) Background Study (herein referred to as the "DC Study"). This DC Study provides the basis and background to update the Townʼs development charges to reflect the servicing needs of development. i. Study Consistent with Development Charges Legislation The Town of The Blue Mountains 2024 Development Charges Background Study is presented as part of the process to lead to the approval of new DC By-laws in compliance with the Development Charges Act (DCA). The study is prepared in accordance with the DCA and associated regulations. ii. Key Steps of the Development Charges Calculation The DCA in Ontario is the most prescriptive of all DC legislation in Canada with respect to recovering development-related costs. Several key steps are required to calculate DCs. These include: - Preparing a development (growth) forecast; - Establishing historical service levels; - Determining the increased needs for services arising from development; and - Determining how these costs are attributed to development types (i.e. residential and non-residential). Executive Summary | 3 iii. The Development-Related Capital Forecast is Subject to Change It is recommended that Council adopt the development-related capital forecast prepared for the purposes of the DC Background Study. However, the DC Study is a point-in-time analysis and there may be changes to project timing, scope, and costs through the Townʼs normal annual budget process. B. Development Forecast The forecasts are based on the Town achieving population and employment targets set out in the Grey Countyʼs Growth Management Strategy. A 10- year planning horizon (2024-2033) is utilized for all Town-wide General Services, while a planning horizon of 2024-Build-Out is used for Engineered Services. The table below provides a summary of the anticipated residential and non-residential growth over the respective planning periods. The development forecast is further discussed in Appendix A. Growth Total at 2033 Growth Total at Build- Out Residential Total Occupied Units Total Census Dwellings 7,827 3,050 10,877 7,390 15,217 Total Population Census Population 17,931 3,978 21,909 5,989 23,920 Population in New Dwellings (1) 5,587 14,533 Non-Residential Employment 4,891 275 5,166 1,453 6,344 Non-Residential Building Space (m2) 21,973 116,095 (1) Includes seasonal population Engineering Services 2024-Build-out General Services 2024-2033 Development Forecast 2023 Estimate Executive Summary | 4 C. Development-Related Capital Program The development-related capital program for General Services is planned over a 10-year period from 2024 to 2033. The gross costs amount to $123.5 million where $26.6 million is eligible for recovery through development charges net of anticipated grants and other recoveries. Details regarding the capital programs for each individual General Services are provided in Appendix B and C of this report. The development-related capital program for Engineered Services is planned over a period from 2024 to Build-Out. In total, $578.1 million is identified in gross project costs of which $335.0 million is eligible for recovery through development charges. Some costs are recovered on a Town-wide basis while others are payable only by certain geographic areas. Details regarding the capital programs for each individual engineered service are provided in Appendix C and D of this report. D. Calculated Development Charges Development charges rates have been established under the parameters and limitations of the DCA. A Town-wide uniform cost recovery approach is used to calculate development charges for the General Services and some Engineered Services. Water distribution and wastewater treatment are recovered from 2 areas while the linear infrastructure associated is recovered along eleven distinct service areas. The tables below provide the development charges for residential and non- residential development based on the development forecasts. Executive Summary | 5 Calculated Development Charges E. Cost of Growth Analysis An overview of the long-term capital and operating costs as well as the asset management-related annual provisions for capital facilities and infrastructure to be included in the DC by-law is provided in Appendix F of the DC Background Study. This examination is required as one of the provisions of the DCA. F. Policy Changes since 2019 DC Background Study As part of the Townʼs 2024 DC Background Study update, the following changes have been introduced: - Removal area specific Castle Glen Services Related to a Highway: Roads & Related charge and combining it with the Town-wide capital program; - Review of inclusion of Transit Services (not anticipated to be included in this Study but may be considered for future studies); - Reviewed DC By-law definitions and exemptions; and - Alignment with new legislative changes. Calculated t otal residentia l an d non-residenti al Town-wi de Deve lopment C harges by se rvice area. Executive Summary | 6 G. Key Recommendations - It is recommended that the Townʼs present practices regarding collection of development charges and by-law administration continue to the extent possible; - As required under the DCA, the Town should codify any rules regarding application of the by-laws and any exemptions within the development charges by-laws proposed for adoption; - It is recommended that Council adopt the development-related capital forecast included in this background study, subject to annual review through the Townʼs normal capital budget process; and - No substantial changes to the Townʼs prevailing local service definitions and policies are being considered. H. DC By-law available under Appendix G A copy of DC By-law 2024-29 is available under Appendix G and on the Townʼs website. Introduction | 7 1. Introduction The Development Charges Act, 1997 (DCA) and its associated Ontario Regulation 82/98 (O. Reg. 82/98) allow municipalities in Ontario to recover development-related capital costs from new development. The Town of The Blue Mountains Development Charges (DC) Background Study is presented as part of a process to establish a development charges by-law that complies with this legislation. The Town of The Blue Mountains is experiencing residential development pressure and is also an attractive location for a variety of recreational and seasonal oriented development. The anticipated development in The Blue Mountains will increase the demand on all Town services. The Town wishes to implement development charges to fund development-related capital projects so that development continues to be serviced in a fiscally responsible manner. When a development charges by-law is proposed, the DCA and O. Reg. 82/98 require that a development charges background study be prepared in support of the proposed charges with reference to: - A forecast of the amount, type and location of development anticipated in the Town; - The average capital service levels provided in the Town over the fifteen- year period immediately preceding the preparation of the background study; - A review of future capital projects, including an analysis of gross expenditures, funding sources, and net expenditures incurred, or to be incurred, by the Town or its local boards to provide for the expected development, including the determination of the development and non- development-related components of the capital projects; Introduction | 8 - An asset management plan that demonstrates that all assets are financially sustainable over their full life cycle; and - An examination of the long-term capital and operating costs resulting from the infrastructure required for each service to which the development charges relate. This study identifies the net capital costs attributable to development that is forecast to occur in the Town. The costs are apportioned to types of development (residential and non-residential) in a manner that reflects the increase in the need for each service attributable to each type of development. The study therefore calculates development charges for each type of development. The DCA provides for a period of public review and comment regarding the calculated development charges. This process includes considering and responding to comments received by members of the public about the calculated charges. Following completion of this process, and in accordance with the DCA and Councilʼs review of this study, it is intended that Council will pass a new development charges by-law for the Town. The remainder of this study sets out the information and analysis upon which the calculated development charges are based. A. Legislative Context The study is prepared in accordance with the DCA and associated regulations. In December 2023, the Minister of Municipal Affairs and Housing announced further changes to the DCA and the study took into consideration those amendments as well as those made available through the first reading of Bill 185: Cutting Red Tape to Build More Homes Act, 2024 which was on April 10, 2024 prior to the passage of By-law 2024-29. Introduction | 9 The amendments as per Bill 23: More Homes Built Faster Act, 2022 are noted below with notes based on Bill 185. Key legislative changes include: - Five-year mandatory phase-in of the calculated DC rates (beginning with a 20% reduction in Year 1, decreasing by 5% annually until Year 5); Note: this has been removed by Bill 185 and no longer applies to rates levied as of June 6, 2024. - Historical service level standards have been extended from a 10 to 15- year planning period; - DC by-laws now expire every 10 years instead of 5 years; - The amount of interest paid on DC deferrals and freeze is capped at prime plus 1%; - Costs associated with studies and affordable housing services are now ineligible for recovery through DCs; Note: development-related studies has been re-introduced as an eligible capital cost by Bill 185 and is included only in rates levied as of June 6, 2024. - Municipalities must spend or allocate 60% of available DC reserve funds per year for roads, water and wastewater services; and - Discounts for purpose built rentals based on the number of bedrooms. The DCA was also amended to exempt affordable and attainable housing developments from the payment of DCs. Affordable housing exemptions are now in force as of June 1, 2024. One final change through Bill 185 which came into effect upon Royal Assent on June 6, 2024 was the shortening of time to which DC deferrals apply under Section 26.2 from 2 years from Council approval to 18 months. Introduction | 10 B. Relevant Analysis The underlying assumptions and calculation methodologies contained in the DC Background Study have been informed by a range of inputs including the Townʼs capital budget, existing master plans, and discussions with Town staff. C. Consultation and Approval Process The following provides a summary of the consultation and approval process undertaken to complete the DC Background Study. Timeline of Consultation and Approval Process Activity Date Council Information Session January 16, 2024 Public Release of DC Background Study February 2, 2024 Developer Information Session February 6, 2024 Statutory Public Meeting March 12, 2024 Passage of 2024 DC By-law April 2, 2024 The DC Methodology Aligns Development-Related Costs and Benefits | 11 2. The DC Methodology Aligns Development-Related Costs and Benefits Several key steps are required when calculating any development charge. However, specific circumstances arise in each municipality which must be reflected in the calculation. In this study, therefore, we have tailored our approach to the Town of The Blue Mountainsʼ unique circumstances. The approach to the calculated development charges is focused on providing a reasonable alignment of development-related costs with the development that necessitates them. This study uses both a Town-wide and area-specific approach in the cost recovery calculations. The Background Study provides an update to the historical service levels and the cost of providing future development-related capital infrastructure. A. Both Town-Wide and Area-Specific Development Charges Are Proposed The Blue Mountains provides a range of services to the community it serves and has a sizeable inventory of facilities, land, infrastructure, and vehicles and equipment. The DCA provides the Town with flexibility when defining services that will be included in the development charges by-laws, provided that the other provisions of the Act and Regulations are met. The DCA also permits the Town to designate, in its by-laws, the areas within which the development charges shall be imposed. The charges may apply to all lands in the Town or to other designated development areas as specified in the by-laws. i. Services Based on a Town-Wide Approach For most services, a range of capital infrastructure is available throughout the Town. All Town residents and employees have access to this infrastructure. As new development occurs, new infrastructure will need to The DC Methodology Aligns Development-Related Costs and Benefits | 12 be added so that overall service levels in the Town are maintained. A widely accepted method of sharing the development-related capital costs for these services is to apportion them over all new development anticipated in the Town. The following services are included in the Town-wide development charges calculations: - Public Library - Fire Services - Police Department - Parks and Recreation - Services Related to a Highway: Public Works - By-law Enforcement - Solid Waste Management - Development Related Studies - Services Related to a Highway: Roads and Related These services form a reasonable basis in which to plan and administer the Town-wide development charges. It is noted that the analysis of each of these services examines the individual capital facilities and equipment that constitute it. The resulting development charges for these services would be imposed against all development anywhere in the Town. ii. Services Based on an Area-Specific Approach For some Town services, the need for and benefits of development-related capital works is more localized. For such services, an alternative "area- specific" approach to calculating development charges is used. Area-specific charges have been calculated for water supply, treatment and distribution, and sewage treatment and collection. Specific service areas for each water and wastewater project have been calculated. This approach is consistent with the Townʼs existing development charge structure for such services. The area-specific approach facilitates front-end financing arrangements for the designated services should the Town choose to use those provisions of the DCA. Area-specific charges also enable developer group agreements. The DC Methodology Aligns Development-Related Costs and Benefits | 13 B. Key Steps When Determining Development Charges for Future Development-Related Projects Several key steps are required when calculating development charges for future development-related projects. These are summarized in Figure 1 and discussed further in the following sections. i. Development Forecast The first step in the methodology requires that a development forecast be prepared for the 10-year study period from 2024 to 2033 and to build-out. The forecasts of future residential and non-residential development used in this study were prepared by Hemson Consulting in consultation with the Town of The Blue Mountains staff. The forecasts have been informed by Grey Countyʼs recent Growth Management Strategy (GMS) and adjusted for known and anticipated development proposals and accounts for historical households, seasonal development, and recent construction history. For the residential portion of the forecast, the forecast includes an estimate of population and dwelling units by type on both a Town-wide and service area basis. The non-residential portion of the forecast estimates the amount of building space to be developed in the Town over the planning periods. The forecast is based on the projected increase in employment levels and the anticipated amount of new building space required to accommodate it. ii. Service Categories and Historical Service Levels The DCA states that the increase in the need for service attributable to anticipated development: ... must not include an increase that would result in the level of service exceeding the average level of that service provided in the Municipality over the 15-year period immediately preceding the preparation of the background study...(s. 5. (1) 4.) The DC Methodology Aligns Development-Related Costs and Benefits | 14 Figure 1: Statutory Requirements of Development Charge Calculation and Study Process The DC Methodology Aligns Development-Related Costs and Benefits | 15 Historical 15-year average service levels thus form the basis for the development charges calculation. A review of the Townʼs capital service levels for buildings, land, vehicles, equipment, and others has therefore been prepared as a reference to determine the portion of future capital projects that may be included in the development charges calculation. The historical service levels used in this study have been calculated based on the period from 2009 to 2023. In accordance with the provisions of the DCA, for the engineered services of water and wastewater, historical service levels are less applicable, and reference is made to the Townʼs engineering standards as well as Provincial health or environmental legislation. iii. Development-Related Capital Forecast and Analysis of Net Capital Costs to Be Included in the Development Charges A development-related capital forecast has been prepared by Town staff as part of this study. The forecast identifies development-related projects and their gross and net costs, after allowing for capital grants, subsidies, or other contributions as required by the DCA s.5.(2). The capital forecast provides another foundation upon which development charges are based. The DCA requires that the increase in the need for service attributable to the anticipated development may include an increase: ... only if the council of the municipality has indicated that it intends to ensure that such an increase in need will be met. (s. 5. (1) 3.) S. 5. (1) 4. and s. 5. (2). require that the development charges be calculated on the lesser of the historical 15-year average service levels or the service levels embodied in the plans of the Town. The development-related capital forecast prepared for this study ensures that development charges are only imposed to help pay for projects that have been or are intended to be purchased or built to accommodate future anticipated development. It is not sufficient in the calculation of development charges merely to have had the service in the past. There must also be a demonstrated commitment to continue to emplace facilities or infrastructure in the future. In this regard, Ontario Regulation 82/98, s. 3 states that: The DC Methodology Aligns Development-Related Costs and Benefits | 16 For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an Official Plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. For some projects in the development-related capital forecast, a portion of the project may confer benefits to existing residents. As required by the DCA, s. 5. (1) 6., these portions of projects and associated net costs are to be a funding responsibility of the Town from non-development charges sources. The amount of financing for such non-growth shares is also identified as part of the preparation of the development-related capital forecast. There is also a requirement in the DCA to reduce the applicable development charges by the amount of any "uncommitted excess capacity" that is available for a service. Such capacity is available to partially meet future servicing requirements. Adjustments are made in the analysis to meet this requirement of the Act. iv. Attribution to Types of Development The next step in the determination of development charges is the allocation of the development-related net capital costs between the residential and the non- residential sectors. In the Town of The Blue Mountains, the allocation is based on the projected changes in dwelling units and employment over the planning periods, the anticipated demand for services, and other relevant factors. The residential component of the development charges is applied to different housing types based on average occupancy factors. The non- residential component is applied based on gross building space in square metres. Development Forecast | 17 3. Development Forecast The DCA requires the Town to estimate "the anticipated amount, type and location of development" for which development charges may be imposed. The development forecast must cover both residential and non-residential development and be specific enough with regards to quantum, type, location, and timing of development to allow the Town to prepare a reasonable development-related capital program. Appendix A contains additional materials related to the development forecast and the Townʼs demographics. Key demographic features of the Town of The Blue Mountains are the seasonal fluctuations of its population and the corresponding recreational nature of its residential development. For this reason, the Townʼs development charges are based on a residential forecast which includes seasonal population and dwellings not occupied by usual residents. This rationale is based upon the need for the Town to build infrastructure to accommodate peak demand levels associated with the development portion of the Town, regardless of whether the use is permanent or seasonal. The residential forecast incorporates 2021 Census and historical residential permit data and accounts for seasonal housing development. The forecast shows that the number of dwelling units (occupied dwellings, non-permanent and hotel/motel units) will increase by 3,050 between 2024 and 2033. From 2024 to build-out, approximately 7,390 additional units are anticipated. Approximately 67% of the development occurring over the 2024-2033 period is projected to occur in the Craigleith service area. Castle Glen is the next significant development area with approximately 10% of the anticipated new units. Camperdown will experience 5% of the development. Other service areas forecast to experience significant development include Lora Bay 7%, Thornbury East 4%, and Thornbury West 4%. Development Forecast | 18 The non-residential portion of the forecast is largely based upon development applications received, known developer plans, and the availability of servicing. The forecast is for approximately 21,973 square metres of new non-residential gross floor area (GFA) to be added to the Town between 2024 and 2033. During the period 2024 to build-out, GFA is projected to increase by approximately 116,095 square metres. Table 1 provides a summary of the Town-wide residential and non- residential development forecast used in this analysis. Table 2 provides a summary of the residential and non-residential area-specific development forecast for the various water and wastewater servicing areas. TABLE 1 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT FORECAST Growth Total at 2033 Growth Total at Build- Out Residential Total Occupied Units Total Census Dwellings 7,827 3,050 10,877 7,390 15,217 Total Population Census Population 17,931 3,978 21,909 5,989 23,920 Population in New Dwellings (1) 5,587 14,533 Non-Residential Employment 4,891 275 5,166 1,453 6,344 Non-Residential Building Space (m2) 21,973 116,095 (1) Includes seasonal population Engineering Services 2024-Build-out General Services 2024-2033 Development Forecast 2023 Estimate Development Forecast | 19 Summary o f residentia l a nd non- r esident i al ASDC deve lopment forecast. Historical Capital Service Levels | 20 4. Historical Capital Service Levels The DCA and O. Reg. 82/98 require that the development charges be set at a level no higher than the average service level provided in the Town over the 15-year period immediately preceding the preparation of the Background Study, on a service-by-service basis. For non-engineered services (Public Library, Parks and Recreation, etc.) the legislative requirement is met by documenting service levels for the preceding 15 years: in this case, for the period from 2009 to 2023. Typically, service levels for non-engineered services are measured as a ratio of inputs per capita or inputs per population and employment. For engineered services such as Water and Sewer, engineering standards are used in lieu of inputs per capita. O. Reg. 82/98 requires that, when defining and determining historical service levels, both the quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative terms. For example, service levels for buildings are presented in terms of square feet per unit. The qualitative aspect is introduced by consideration of the monetary value of a facility or service. In the case of buildings, for example, the cost would be shown in terms of dollars per square foot to replace or construct a facility of the same quality. This approach helps to ensure that the development-related capital facilities that are to be charged to new development reflect not only the quantity (number and size) but also the quality (value or cost) of services provided by the Town in the past. Both the quantitative and qualitative aspects of service levels used in the current analysis are based on information provided by Town staff. This information is generally based on historical records and the Townʼs and surrounding municipalities experience with costs to acquire or construct similar facilities, equipment, and infrastructure. Table 3 summarizes service levels for all services included in the development charges calculations. Appendices B and C provide detailed historical inventory data upon which the calculation of service levels is based for the general and Roads and Related services, respectively. Historical Capital Service Levels | 21 Summary of historical service lev els 2009-2023 for applicable service areas. Development-Related Capital Forecast | 22 5. Development-Related Capital Forecast The DCA requires that the Council of a municipality express its intent to provide future capital facilities at the level incorporated in the development charges calculation. As noted above in Section II, Ontario Regulation 82/98, s. 3 states that: For the purposes of paragraph 3 of subsection 5 (1) of the Act, the council of a municipality has indicated that it intends to ensure that an increase in the need for service will be met if the increase in service forms part of an official plan, capital forecast or similar expression of the intention of the council and the plan, forecast or similar expression of the intention of the council has been approved by the council. A. Development-Related Capital Forecast is provided for Councilʼs Approval Based on the development forecast summarized in Section 3 and detailed in Appendix A, Town staff, in collaboration with the consultant, has identified a development-related capital forecast that sets out those projects required to service anticipated development. For all Town-wide services, the capital forecast covers the 10-year period from mid-year 2024 to mid-year 2033. As permitted by the DCA s. 5(1) 4., development charges for the engineered services are based on a longer planning horizon, to build-out. One of the recommendations contained in this background study is for Council to adopt the development-related capital forecast created for the purposes of the development charges calculation. It is assumed that future capital budgets and forecasts will continue to bring forward the capital projects presented herein as they will be needed to service anticipated development in the Town. It is, however, acknowledged that changes to the forecast presented here may occur through the Townʼs normal capital budget process. Development-Related Capital Forecast | 23 B. The Development-Related Capital Forecast for General Services A summary of the development-related capital forecast for Town-wide uniform services is presented in Table 4. The table shows that the gross cost of the Townʼs general services capital forecast is estimated to be $123.5 million. Approximately $50.00 million in grants are anticipated to offset the cost of the Parks and Recreation program; therefore, the net municipal cost for the Town is reduced to $73.5 million. Of this $73.5 million net municipal cost, approximately 48%, or $35.0 million, is related to capital works for Parks and Recreation. This capital program recovers for new indoor recreation space with a gross cost of $80.0 million. Parkland development in the amount of $2.1 million and park facilities and equipment valued at $2.9 million are also included. The gross cost also includes a $50.0 million grant for indoor recreation. The next largest capital program is associated with Fire Services that amounts to $13.7 million, or 19% of the total, and provides for a new fire hall, personnel and emergency equipment and vehicles. The capital forecast associated with Public Works envisions a new public works facility, a new snow storage facility, as well as a new Satellite Office. An additional provision of $1.5 million will fund various fleet and equipment acquisitions. The total cost of the Public Works capital program is $12.4 million. The next largest capital program belongs to Public Library. The program provides funding for a new library space and material acquisitions. The total Public Library capital program amounts to $9.1 million, or 12%. Development-Related Capital Forecast | 24 Summa ry of t he develo pment-r elat ed capita l fo reca st f or T own- wide uni form ser vice s. Development-Related Capital Forecast | 25 The portion of the Townʼs program that relates to the provision of Development-related Studies amounts to $1.6 million. The capital forecast associated with Solid Waste provides for new facilities, fleet, and equipment. It represents 1.5% of the Townʼs general services capital program and is valued at $1.10 million. The Police Services capital program recovers for the debenture payments related to the new Ontario Provincial Police station. The total Police capital program amounts to approximately $373,700. The By-law Enforcement capital program includes the recovery of a negative reserve fund balance and provision for additional and equipment. The total cost of the capital program is $249,500. The capital forecast incorporates those projects identified to be related to development anticipated in the next 10 years. It is not implied that all of these costs are to be recovered from new development by way of development charges (see the following Section 6). Portions of the capital forecast may be related to replacement of existing facilities, shares of projects that benefit the existing population, or development anticipated to occur beyond the 2024 - 2033 planning period. After these reductions, the remaining development-related capital costs are brought forward to the development charges calculation. Further details on the capital forecasts for each individual service category are available in Appendix B and C. Development-Related Capital Forecast | 26 C. The Development-Related Capital Forecast for Engineered Services Table 5 provides the development-related capital recoveries for the engineered services of Roads and Related, Water Supply and Treatment, Sewage Treatment, and service area-specific Water distribution and Sewage collection. The Town-wide Roads and Related capital programs total $198.0 million and provides servicing for anticipated development over the 2024 to build-out period. Of the Roads capital program, just over $87.6 million has been identified as recoverable under the DCA and is included in the development charge calculation. Details of the capital program can be found in Appendix C.2. Also shown on Table 5 is the Water and Wastewater servicing costs. The Water supply and treatment capital program is $29.3 million, of which $28.9 million is identified as development-related and recoverable from development charges. These costs are to be recovered uniformly from all development receiving municipal water servicing in the Town. Sewage treatment is provided by two plants: Craigleith Sewage Treatment Plant and Thornbury Sewage Plant. The capital cost associated with the Craigleith Plant is $37.2 million with a share of $31.5 million identified as a post-period benefit and removed from the DC rate. The remaining $5.6 million are recoverable against all development receiving servicing from the Craigleith Plant. The Thornbury Plant will recover $25.2 million including total gross cost of $85.1 million and benefit to existing share of $15.2 million, available DC reserves of $4.3 million and a post period benefit amount of $40.4 million. These development-related plant costs are to be recovered across all applicable development in the areas serviced by the Thornbury Treatment Plant. Development-Related Capital Forecast | 27 Total Service Benefit Benefit Prior Growth Post- Net Capital Total Grants and to Other to Existing (Available Period Costs After Cost Subsidies Service Areas Share DC Reserves) Benefit Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) Roads and Related $198,035.3 $29,998.5 $0.0 $26,594.6 $12,952.9 $40,904.6 $87,584.7 Water Supply and Treatment $29,274.1 $0.0 $331.1 $58.2 $0.0 $0.0 $28,884.9 Craigleith Sewage Treatment Plant $37,219.7 $0.0 $0.0 $94.7 $0.0 $31,479.9 $5,645.2 Thornbury Sewage Treatment Plant $85,145.4 $0.0 $0.0 $15,245.2 $4,335.9 $40,412.6 $25,151.7 Total Town-Wide Engineered Services $349,674.5 $29,998.5 $331.1 $41,992.7 $17,288.8 $112,797.0 $147,266.5 Service Area Specific (Water & Sewer) Craigleith $48,883.8 $0.0 $13,754.7 $0.0 $5,770.0 $0.0 $29,359.1 Water $35,276.5 $0.0 $10,017.7 $0.0 $5,579.5 $0.0 $19,679.3 Sewer $13,607.3 $0.0 $3,737.0 $0.0 $190.5 $0.0 $9,679.8 Castle Glen $53,213.7 $0.0 $178.2 $0.0 ($287.5) $0.0 $53,323.1 Water $42,995.8 $0.0 $91.9 $0.0 $0.0 $0.0 $42,903.9 Sewer $10,217.9 $0.0 $86.3 $0.0 ($287.5) $0.0 $10,419.2 Osler $6,923.0 $0.0 $0.0 $0.0 ($282.0) $0.0 $7,205.0 Water $3,574.7 $0.0 $0.0 $0.0 $4.0 $0.0 $3,570.6 Sewer $3,348.4 $0.0 $0.0 $0.0 ($286.0) $0.0 $3,634.4 Thornbury East $5,230.4 $0.0 $4,794.9 $0.0 ($440.7) $0.0 $876.2 Water $779.0 $0.0 $634.9 $0.0 ($334.9) $0.0 $479.0 Sewer $4,451.4 $0.0 $4,160.0 $0.0 ($105.8) $0.0 $397.2 Thornbury West $37,168.4 $0.0 $926.9 $0.0 ($6,575.0) $13,653.1 $29,163.5 Water $22,162.7 $0.0 $0.0 $0.0 ($3,024.0) $7,329.6 $17,857.0 Sewer $15,005.7 $0.0 $926.9 $0.0 ($3,551.1) $6,323.4 $11,306.5 Clarksburg $17,231.6 $0.0 $0.0 $0.0 ($512.7) $0.0 $17,744.3 Water $7,606.5 $0.0 $0.0 $0.0 $35.1 $0.0 $7,571.4 Sewer $9,625.1 $0.0 $0.0 $0.0 ($547.9) $0.0 $10,173.0 Lora Bay SA1 $22,308.9 $0.0 $0.0 $2,599.2 ($298.6) $1,857.9 $18,150.4 Water $13,701.9 $0.0 $0.0 $772.0 ($456.8) $1,193.1 $12,193.7 Sewer $8,606.9 $0.0 $0.0 $1,827.2 $158.2 $664.8 $5,956.7 Lora Bay SA2 $204.9 $0.0 $0.0 $0.0 ($3.4) $0.0 $208.3 Water $87.5 $0.0 $0.0 $0.0 ($5.1) $0.0 $92.6 Sewer $117.4 $0.0 $0.0 $0.0 $1.8 $0.0 $115.7 Lora Bay SA3 $662.6 $0.0 $0.0 $0.0 ($14.8) $0.0 $677.5 Water $387.3 $0.0 $0.0 $0.0 ($22.7) $0.0 $410.0 Sewer $275.3 $0.0 $0.0 $0.0 $7.9 $0.0 $267.4 Camperdown $36,580.2 $0.0 $0.0 $4,867.1 $668.4 $0.0 $31,044.6 Water $18,152.4 $0.0 $0.0 $1,537.8 $25.5 $0.0 $16,589.1 Sewer $18,427.8 $0.0 $0.0 $3,329.4 $642.9 $0.0 $14,455.5 Total Area Specific Engineered Services $228,407.6 $0.0 $19,654.6 $7,466.3 ($1,976.3) $15,511.0 $187,752.0 TOTAL ROADS, WATER AND SEWER $578,082.1 $29,998.5 $19,985.7 $49,459.0 $15,312.5 $128,308.0 $335,018.5 TABLE 5 TOWN OF THE BLUE MOUNTAINS SUMMARY OF ENGINEERING SERVICES DEVELOPMENT-RELATED INFRASTRUCTURE CAPITAL PROGRAM FOR THE PERIOD 2024 TO BUILD-OUT Development-Related Capital Forecast Development-Related Capital Forecast | 28 Table 5 also provides a summary of the specific Water and Wastewater servicing areas engineered servicesʼ capital programs. The development- related capital expenditures for these areas range from just over $53.3 million in Castle Glen to $208,300 in Lora Bay Service Area 2. The variation of costs between the service areas reflects different levels of development, servicing needs, and servicing costs. Details of the Water and Wastewater capital programs can be found in Appendix D. Development Charges are Calculated in Accordance with the Development Charges Act | 29 6. Development Charges are Calculated in Accordance with the Development Charges Act This section summarizes the calculation of development charges for each service category and the resulting total development charge by type of development. For all services, the calculation of the per capita (residential) and per square metre (non-residential) charges is reviewed. For residential development, a total per capita amount is applied to different unit types on the basis average occupancy factors. For non-residential development, the calculated development charges rates are based on gross floor area (GFA) of building space. It is noted that the calculation of the development charges does not include any provision for exemptions required under the DCA, for example, the exemption for enlargements of up to 50 per cent on existing industrial buildings. Such legislated exemptions, or other exemptions, which Council may choose to provide, will result in a loss of development charges revenue for the affected types of development. Any such revenue loss may not be offset, however, by increasing other portions of the calculated charge. A. Development Charges Calculation A summary of the residential and non-residential development charges for the Town-wide general services is presented in Table 6. Further details of the calculation for each individual general service category are available in Appendix B and C.1. Development Charges are Calculated in Accordance with the Development Charges Act | 30 i. 10-Year Services The capital forecast for Town-wide general services incorporates those projects identified to be related to development anticipated in the 10-year planning period. However, not all the capital costs are to be recovered from new development by way of development charges. Table 6 shows that, of the $73.5 total municipal cost, $7.6 million relates to replacement of existing capital facilities, or to shares of projects that provide benefit to the existing community. These portions of capital costs will require funding from other non-development charge sources, such as fundraising and property taxes. An additional share of $8.1 million has been identified as available DC reserves and represents the revenues collected from previous development charges. This portion has been netted out of the chargeable capital costs. Another share of the forecast, $31.2 million, is either attributable to development beyond the 2033 period (and can therefore be recovered under future development charges studies) or represents a service level increase in the Town and could be recovered from other funding sources. The remaining $26.6 million is carried forward to the development charges calculation. Of the development-related costs, $26.1 million has been allocated to new residential development, and $450,400 has been allocated to new non-residential development. This results in a development charge of $4,680.34 per capita and $20.49 per square metre of non-residential development for the provision of general services. Development Charges are Calculated in Accordance with the Development Charges Act | 31 10-Year Population Growth in New Units 5,587 10-Year Growth in Square Metres 21,973 Total DC Service Net Replacement Eligible Municipal & Benefit to Available Post-2033 Costs for Cost Existing DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) % ($000) % ($000) 1.0 PUBLIC LIBRARY $9,108.0 $731.8 $3,095.6 $2,567.3 $2,713.4 100% $2,713.4 0% $0.00 Development Charge Per Capita $485.66 Development Charge Per Sq.M $0.00 2.0 FIRE SERVICES $13,664.0 $3,150.0 $811.9 $5,264.9 $4,437.2 95% $4,229.0 5% $208.16 Development Charge Per Capita $756.94 Development Charge Per Sq.M $9.47 3.0 POLICE DEPARTMENT $373.7 $0.0 $35.4 $0.0 $338.4 95% $322.5 5% $15.87 Development Charge Per Capita $57.73 Development Charge Per Sq.M $0.72 4.0 PARKS AND RECREATION $35,028.9 $729.5 $3,492.5 $16,521.8 $14,285.1 100% $14,285.1 0% $0.00 Development Charge Per Capita $2,556.85 Development Charge Per Sq.M $0.00 5.0 BY-LAW ENFORCEMENT $249.5 $0.0 $0.0 $169.4 $80.1 95% $76.3 5% $3.76 Development Charge Per Capita $13.66 Development Charge Per Sq.M $0.17 6.0 SOLID WASTE MANAGEMENT $1,100.0 $360.0 $305.7 $0.0 $434.3 95% $413.9 5% $20.37 Development Charge Per Capita $74.08 Development Charge Per Sq.M $0.93 7.0 DEVELOPMENT RELATED STUDIES $1,574.0 $611.6 $0.0 $0.0 $962.4 95% $917.3 5% $45.15 Development Charge Per Capita $164.18 Development Charge Per Sq.M $2.05 1.0 SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS $12,395.0 $2,066.3 $333.9 $6,646.2 $3,348.6 95% $3,191.5 5% $157.09 Development Charge Per Capita $571.24 Development Charge Per Sq.M $7.15 TOTAL 10-YEAR SERVICES $73,493.1 $7,649.1 $8,075.0 $31,169.6 $26,599.5 $26,149.1 $450.4 Development Charge Per Capita $4,680.34 Development Charge Per Sq.M $20.49 Share Residential Share Non-Residential TABLE 6 TOWN OF THE BLUE MOUNTAINS SUMMARY OF UNADJUSTED RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES 10-YEAR CAPITAL PROGRAM FOR GENERAL SERVICES Development-Related Capital Program (2024 - 2033) Development Charges are Calculated in Accordance with the Development Charges Act | 32 ii. Engineered Services - Roads and Related Services Table 7 presents the calculated residential and non-residential development charges for Town-wide roads and related infrastructure projects. The table shows that, of the total net cost of the Town-wide capital program estimated to be $198.0 million, $26.6 million is considered to replace existing infrastructure or to benefit the existing population. The table shows that local service component shares and current developer agreements total $29.1 million and $923,180, respectively. A deduction is also made for the available reserve fund balance of $13.0 million. A share is related to development of $40.9 million and the remaining $87.6 million is carried forward to the development charges calculation. Of the development-related cost, 91%, or $79.6 million, has been allocated to new residential development and 9%, or $8.0 million, has been allocated to new non- residential development. The resulting residential charge per capita for the provision of Town-wide Roads and Related services is $5,478.84 and the non-residential charge is $68.57 per square metre of gross floor area. Development Charges are Calculated in Accordance with the Development Charges Act | 33 Town-wide Population in New Units Growth 14,533 Employment Growth 1,453 Ultimate Growth in Square Meters 116,095 Total Total Local Benefit Prior Growth Post Net Capital Improvement Service Current to Existing (Available Period Costs After Cost Component Agreements Share DC Reserves) Benefit Discounts ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Town-wide Roads Projects $198,035.28 $29,075.31 $923.18 $26,594.61 $12,952.88 $40,904.57 $87,584.73 90.9% $79,623.98 9.1% $7,960.75 Total $198,035.28 $29,075.31 $923.18 $26,594.61 $12,952.88 $40,904.57 $87,584.73 $79,623.98 $7,960.75 Development Charge Per Capita $5,478.84 Development Charge Per Square Metre of GFA $68.57 Development-Related Capital Program Residential Non-Residential Share Share TABLE 7 2024 TO BUILD-OUT ROADS AND RELATED SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES TOWN OF THE BLUE MOUNTAINS Development Charges are Calculated in Accordance with the Development Charges Act | 34 iii. Residential and Non-Residential Area-Specific Development Charges Rates for Water and Wastewater Services Keeping with past practices, the Town will continue to calculate and levy water and wastewater charges on an area-specific basis. There are currently eleven service areas that levy water and/or wastewater rates on an area- specific basis. Table 8 shows that the net municipal cost of the Water Supply and Treatment is $29.3 million. No grants, subsidies or local services shares are identified. Approximately $331,060 has been identified as replacement or non-growth shares and is removed from the DC eligible costs as well as $58,190 identified to benefit existing residents. The remaining development- related costs eligible for DC funding, $28.9 million, is allocated 81% to the residential sector ($23.4 million) and 19% to the non-residential sector ($5.5 million). This yields a development charge of $1,615.01 per capita and $46.98 per square metre of non-residential development. These charges are levied uniformly across all serviced residential and non-residential development in the Town. It should be noted that the "net costs" shown on each of the service area capital programs are not entirely recoverable against future development charges. Unserviced lots that will connect into the water system in the future will pay a capital connection fee, equivalent to that of the DC water rate. Sewage treatment in The Blue Mountains is provided by two plants: Craigleith Sewage Treatment Plant and Thornbury Sewage Plant. These two plants are responsible for serving all units in the Town, and together, they cover all eight service areas. The Craigleith Sewage Treatment Plant provides services to Craigleith, Castle Glen and Osler, and the Thornbury Sewage Plant services Camperdown, Swiss Meadows, Lora Bay, Clarksburg, Thornbury East and Thornbury West. Development Charges are Calculated in Accordance with the Development Charges Act | 35 As shown in Table 9, the total cost associated with the Craigleith Sewage Treatment Plant is $37.2 million, with a benefit to existing share of $94,660 and $31.5 million allocated to post period removed from the in-period recovery. In total, 91%, or $5.1 million is allocated to the residential sector, and 9%, or $504,800 is allocated to the non-residential sector. This results in development charges of $542.06 per capita and $6.67 per square metre. These rates are charged to development occurring within the three applicable service areas. Table 10 illustrates the calculation of the development charges for the Thornbury Sewage Treatment Plant. Capital projects associated with the plant total $85.1 million. Removed from the calculation are the benefit to existing ($15.2 million), positive reserve fund balance ($4.3 million) and a post-period allocation ($40.4 million) resulting in a development charge eligible share of $25.2 million. The $25.2 million is allocated 90%, or $22.5 million against new residential development, and 10% or $2.6 million against non-residential development. This results in development charges of $4,485.89 per capita and $64.56 per square metre. These rates are charged to development occurring within the five applicable service areas (Camperdown, Swiss Meadows, Lora Bay, Clarksburg, Thornbury East and West). Full capital program and calculation details regarding area-specific water and wastewater services can be found in Appendix D. Development Charges are Calculated in Accordance with the Development Charges Act | 36 Residential Growth - Population in New Units 14,508 Residential - Existing Unserviced Population 1,284 Total Residential 15,792 Employment Growth 1,453 Ultimate Growth in Square Meters 116,095 Flows from Development m3 % Residential 7,181 81.1% Non-Residential 1,672 18.9% Total 8,853 100% Total Water Supply Replacement/ Benefit Prior Growth Post Period Net Capital Total Grants and Non-Growth to Existing (Available Allocation Costs After Cost Subsidies Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 CRAIGLEITH Water Supply $28,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28,000.00 81.1% $22,712.73 18.9% $5,287.27 Water Operations - Capital $662.12 $0.00 $331.06 $58.19 $0.00 $0.00 $272.86 81.1% $221.34 18.9% $51.53 Environmental Assessments $612.00 $0.00 $0.00 $0.00 $0.00 $0.00 $612.00 81.1% $496.44 18.9% $115.57 TOTAL CRAIGLEITH $29,274.12 $0.00 $331.06 $58.19 $0.00 $0.00 $28,884.87 $23,430.51 $5,454.36 Charge Per Capita $1,615.01 Charge Per Square Metre of GFA $46.98 TABLE 8 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER SUPPLY 2024 TO BUILD-OUT Development-Related Capital Forecast Residential Non-Residential Share Share Development Charges are Calculated in Accordance with the Development Charges Act | 37 Residential Growth - Population in New Units 9,483 Residential - Existing Unserviced Population (reflected in BTE) 1,706 Total Residential 11,189 Employment Growth 947 Ultimate Growth in Square Meters 75,665 Flows from Development m3 % Residential 3,082 91.1% Non-Residential 303 8.9% Total 3,385 100% Total Craigleith Sewage Treatment Plant Replacement/ Benefit Prior Growth Post Period Net Capital (Serves: Craigleith, Castle Glen & Osler) Total Grants and Non-Growth to Existing (Available Allocation Costs After Cost Subsidies Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 CRAIGLEITH SEWAGE TREATMENT PLANT Total Sewage Treatment $36,627.40 $0.00 $0.00 $0.00 $0.00 $31,479.90 $5,147.49 91.1% $4,687.20 8.9% $460.30 Recovery of Negative Reserve $592.34 $0.00 $0.00 $94.66 $0.00 $0.00 $497.68 91.1% $453.18 8.9% $44.50 TOTAL CRAIGLEITH SEWAGE TREATMENT PLANT $37,219.73 $0.00 $0.00 $94.66 $0.00 $31,479.90 $5,645.18 $5,140.37 $504.80 Charge Per Capita $542.06 Charge Per Square Metre of GFA $6.67 Development-Related Capital Forecast Residential Non-Residential Share Share 2024 TO BUILD-OUT TABLE 9 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES CRAIGLEITH SEWAGE TREATMENT PLANT Development Charges are Calculated in Accordance with the Development Charges Act | 38 Residential Growth - Population in New Units 5,025 Residential - Existing Unserviced Population (reflected in BTE) 1,911 Total Residential 6,936 Employment Growth 506 Ultimate Growth in Square Meters 40,429 Flows from Development m3 Residential 1,910 89.6% Non-Residential 221 10.4% Total 2,131 Total Replacement/ Benefit Prior Growth Post Period Net Capital Total Grants and Non-Growth to Existing (Available Allocation Costs After Cost Subsidies Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Total Sewage Treatment $85,145.38 $0.00 $0.00 $15,245.22 $4,335.92 $40,412.55 $25,151.69 89.6% $22,541.59 10.4% $2,610.10 $85,145.38 $0.00 $0.00 $15,245.22 $4,335.92 $40,412.55 $25,151.69 $22,541.59 $2,610.10 Charge Per Capita $4,485.89 Charge Per Square Metre of GFA $64.56 (Serves: Camperdown, Swiss Meadows, Lora Bay, Clarksburg, Thornbury East and West) Residential Non-Residential Share Share Development-Related Capital Forecast TABLE 10 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES THORNBURY SEWAGE TREATMENT PLANT 2024 TO BUILD-OUT Development Charges are Calculated in Accordance with the Development Charges Act | 39 B. Residential and Non-Residential Development Charges Rates i. Town-wide General Services Table 11 summarizes the residential development charges rates. The residential rate is $10,159.18 per capita after the cash flow analysis for the Town-wide uniform charge. The calculated rates by residential unit type and shown with the total Town- wide charge per unit ranging from a high of $22,639 for a single or semi- detached unit to a low of $15,237 for an apartment. TABLE 11 TOWN OF THE BLUE MOUNTAINS TOWN-WIDE DEVELOPMENT CHARGES RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE Service Charge Per Capita Public Library $485.66 $1,082 $971 $728 Fire Services $756.94 $1,687 $1,514 $1,135 Police Department $57.73 $129 $115 $87 Parks And Recreation $2,556.85 $5,698 $5,114 $3,835 By-Law Enforcement $13.66 $30 $27 $20 Solid Waste Management $74.08 $165 $148 $111 Development Related Studies $164.18 $366 $328 $246 Services Related To A Highway: Public Works $571.24 $1,273 $1,142 $857 Services Related To A Highway: Roads & Related $5,478.84 $12,209 $10,958 $8,218 Total Uniform Charge $10,159.18 $22,639 $20,317 $15,237 (1) Based on PPU of: 2.23 2.00 1.50 Residential Charge By Unit Type (1) Single & Semi- Detached Other Multiples Apartments Development Charges are Calculated in Accordance with the Development Charges Act | 40 The non-residential Town-wide uniform charge displayed on Table 12 is $89.06 for general and Roads and Related services. ii. Water and Wastewater Services The residential and non-residential charges by service area for water services are presented in Table 13. On a per capita basis, the water charge ranges from a low of $3,128 in Thornbury East to a high of $18,014 in Osler. The non-residential charge is calculated and levied on a per square metre of GFA basis by service area. The charge for water service ranges from $65.14 in Thornbury East to $326.28 per square metre in Osler. TABLE 12 TOWN OF THE BLUE MOUNTAINS TOWN-WIDE DEVELOPMENT CHARGES NON-RESIDENTIAL DEVELOPMENT CHARGES PER SQUARE METRE Non-Res Service Public Library $0.00 Fire Services $9.47 Police Department $0.72 Parks And Recreation $0.00 By-Law Enforcement $0.17 Solid Waste Management $0.93 Development Related Studies $2.05 Services Related To A Highway: Public Works $7.15 Services Related To A Highway: Roads & Related $68.57 Total Uniform Charge $89.06 Charge Per Square Metre Development Charges are Calculated in Accordance with the Development Charges Act | 41 The residential and non-residential charges by service area for wastewater services are presented in Table 14. On a per capita basis, the wastewater charge ranges from a low of $1,931 in Craigleith to a high of $18,898 in Camperdown. The non-residential charge ranges from $24.99 in Craigleith to $361.29 per square metre in Clarksburg. TABLE 13 TOWN OF THE BLUE MOUNTAINS AREA-SPECIFIC DEVELOPMENT CHARGES RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE WATER SERVICES Water Service Area Craigleith $5,154 $11,485 $10,308 $7,731 $84.23 Castle Glen $9,967 $22,210 $19,934 $14,950 $202.41 Osler $18,014 $40,141 $36,027 $27,020 $326.28 Thornbury East $3,128 $6,970 $6,256 $4,692 $65.14 Thornbury West $11,891 $26,498 $23,782 $17,837 $199.71 Clarksburg $9,395 $20,935 $18,789 $14,092 $267.83 Lora Bay - SA1 $6,903 $15,383 $13,807 $10,355 $118.77 Lora Bay - SA2 $5,624 $12,533 $11,249 $8,436 $95.53 Lora Bay - SA3 $5,624 $12,533 $11,249 $8,436 $95.53 Camperdown N/A $19,132 $18,763 $17,956 $151.84 Swiss Meadows $0 $0 $0 $0 $0.00 (1) Based on PPU of: 2.23 2.00 1.50 Charge per Capita Single & Semi- Detached Rows and Other Multiples Apartments Non- Residential Charge per Square Metre Residential Charge By Unit Type (1) TABLE 14 TOWN OF THE BLUE MOUNTAINS AREA-SPECIFIC DEVELOPMENT CHARGES RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE WASTEWATER SERVICES Wastewater Service Area Craigleith $1,931 $4,304 $3,863 $2,897 $24.99 Castle Glen $2,570 $5,728 $5,141 $3,855 $44.42 Osler $17,233 $38,403 $34,467 $25,850 $290.96 Thornbury East $5,617 $12,516 $11,234 $8,425 $79.62 Thornbury West $10,403 $23,182 $20,806 $15,605 $161.27 Clarksburg $13,514 $30,114 $27,028 $20,271 $361.29 Lora Bay - SA1 $7,048 $15,705 $14,095 $10,571 $99.63 Lora Bay - SA2 $5,413 $12,062 $10,826 $8,119 $125.21 Lora Bay - SA3 $5,450 $12,144 $10,899 $8,175 $96.23 Camperdown $18,898 $24,408 $23,384 $21,141 $155.93 Swiss Meadows $0 $0 $0 $0 $0.00 (1) Based on PPU of: 2.23 2.00 1.50 Non- Residential Charge per Square Metre Single & Semi- Detached Charge per Capita Residential Charge By Unit Type (1) Rows and Other Multiples Apartments Development Charges are Calculated in Accordance with the Development Charges Act | 42 iii. All Services The total charges by service area are displayed in Table 15. The charges include the Town-wide uniform charge for General and Roads and Related Services of $10,159 per capita, and the Water and Wastewater charges by service area. The total charges range from $10,159 in Swiss Meadows (an area that does not receive Water or Wastewater servicing) to $45,406 per capita in Osler. Table 15 also displays the non-residential charges per square metre. This charge rages from $89.06 to $718.18 per square metre in Swiss Meadows and Clarksburg, respectively. C. Comparison of Newly Calculated Development Charges with Charges Currently In-Force in The Blue Mountains Tables 16 and 17 present a comparison of the newly calculated Town-wide development charges with currently imposed development charge rates. It demonstrates that the residential development charge rate for a single or semi-detached unit decreases by $1,408 per unit, or -5.9%, when compared to the Townʼs current rate for single and semi-detached units. The calculated non-residential charge for general Town-wide services of $89.06 is an increase of $8.67 from the current charge of $80.39. This represents a 10.8% increase. TABLE 15 TOWN OF THE BLUE MOUNTAINS AREA-SPECIFIC DEVELOPMENT CHARGES RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES BY UNIT TYPE ALL SERVICES Total Charges Craigleith $17,244 $38,427 $34,489 $25,867 $198.28 Castle Glen $22,697 $50,577 $45,393 $34,045 $335.89 Osler $45,406 $101,183 $90,812 $68,109 $706.30 Thornbury East $18,904 $42,125 $37,808 $28,356 $233.82 Thornbury West $32,454 $72,319 $64,907 $48,680 $450.04 Clarksburg $33,068 $73,688 $66,135 $49,601 $718.18 Lora Bay - SA1 $24,110 $53,727 $48,220 $36,165 $307.46 Lora Bay - SA2 $21,196 $47,234 $42,393 $31,795 $309.80 Lora Bay - SA3 $21,233 $47,316 $42,466 $31,850 $280.82 Camperdown $29,057 $66,179 $62,464 $54,334 $396.83 Swiss Meadows $10,159 $22,639 $20,317 $15,237 $89.06 (1) Based on PPU of: 2.23 2.00 1.50 Non- Residential Charge per Square Metre Single & Semi- Detached Residential Charge By Unit Type (1) Rows and Other Multiples Apartments Charge per Capita Development Charges are Calculated in Accordance with the Development Charges Act | 43 TABLE 16 TOWN OF THE BLUE MOUNTAINS COMPARISON OF CURRENT AND CALCULATED RESIDENTIAL DEVELOPMENT CHARGES Current Service Residential Charge / Res B Public Library $1,734 $1,082 -$652 -37.6% Fire Services $605 $1,687 $1,082 178.8% Police Department $183 $129 -$54 -29.5% Parks And Recreation $4,050 $5,698 $1,648 40.7% By-Law Enforcement $54 $30 -$24 -44.4% Solid Waste Management $282 $165 -$117 -41.5% Development Related Studies $558 $366 -$192 -34.4% Services Related To A Highway: Public Works $1,459 $1,273 -$186 -12.7% Services Related To A Highway: Roads & Related $15,122 $12,209 -$2,913 -19.3% Total Uniform Charge $24,047 $22,639 -$1,408 -5.9% Reflects rates as of January 1, 2024 Difference in Charge Calculated Single & Semi- Detached TABLE 17 TOWN OF THE BLUE MOUNTAINS COMPARISON OF CURRENT AND CALCULATED NON-RESIDENTIAL DEVELOPMENT CHARGES Current Calculated Service Non-Residential Non-Residential Charge Charge Public Library $0.00 $0.00 $0.00 0.0% Fire Services $4.57 $9.47 $4.90 107.2% Police Department $1.38 $0.72 -$0.66 -47.8% Parks And Recreation $0.00 $0.00 $0.00 0.0% By-Law Enforcement $0.40 $0.17 -$0.23 N/A Solid Waste Management $2.15 $0.93 -$1.22 N/A Development Related Studies $4.22 $2.05 -$2.17 -51.4% Services Related To A Highway: Public Works $11.06 $7.15 -$3.91 -35.4% Services Related To A Highway: Roads & Related $56.61 $68.57 $11.96 21.1% Total Uniform Charge $80.39 $89.06 $8.67 10.8% Reflects rates as of January 1, 2024 Difference in Charge Non-Residential ($/Square Metre) Development Charges are Calculated in Accordance with the Development Charges Act | 44 When comparing the total charges (including Water and Wastewater) as shown in Tables 18 and 19, Craigleith, Castle Glen, Thornbury West, Lora Bay SA1 and Swiss Meadows residential rates declined, with the remaining rates increasing as well as all non-residential rates increasing. The changes in the rates relate to the remaining development of the area as well as the nature of the capital projects. Current Service Area Single & Semi- Detached Craigleith $39,462 $38,427 -$1,035 -2.6% Castle Glen $51,753 $50,577 -$1,176 -2.3% Osler $86,934 $101,183 $14,249 16.4% Thornbury East $41,872 $42,125 $253 0.6% Thornbury West $73,583 $72,319 -$1,264 -1.7% Clarksburg $65,828 $73,688 $7,860 11.9% Lora Bay - SA1 $63,316 $53,727 -$9,589 -15.1% Lora Bay - SA2 $45,087 $47,234 $2,147 4.8% Lora Bay - SA3 $44,514 $47,316 $2,802 6.3% Camperdown $46,525 $66,179 $19,654 42.2% Swiss Meadows $24,047 $22,639 -$1,408 -5.9% Reflects rates as of January 1, 2024 Calculated Single & Semi- Detached Difference in Charge Residential ($/ Unit) TOWN OF THE BLUE MOUNTAINS COMPARISON OF CURRENT AND CALCULATED TOTAL RESIDENTIAL DEVELOPMENT CHARGES TABLE 18 Development Charges are Calculated in Accordance with the Development Charges Act | 45 Current Calculated Service Area Non-Residential Non-Residential Charge Charge Craigleith $150.19 $198.28 $48.09 32.0% Castle Glen $214.73 $335.89 $121.16 56.4% Osler $614.21 $706.30 $92.09 15.0% Thornbury East $166.52 $233.82 $67.30 40.4% Thornbury West $308.13 $450.04 $141.91 46.1% Clarksburg $416.76 $718.18 $301.42 72.3% Lora Bay - SA1 $253.98 $307.46 $53.48 21.1% Lora Bay - SA2 $225.36 $309.80 $84.44 37.5% Lora Bay - SA3 $190.03 $280.82 $90.79 47.8% Camperdown $245.52 $396.83 $151.31 61.6% Swiss Meadows $80.39 $89.06 $8.67 10.8% Reflects rates as of January 1, 2024 Difference in Charge Non-Residential ($/Square Metre) TOWN OF THE BLUE MOUNTAINS COMPARISON OF CURRENT AND CALCULATED TOTAL NON-RESIDENTIAL DEVELOPMENT CHARGES TABLE 19 Cost of Growth Analysis | 46 7. Cost of Growth Analysis This section provides a brief examination of the long-term capital and operating costs as well as the asset management-related annual provisions for the capital facilities and infrastructure to be included in the DC By-law. This examination is required as one of the provisions of the DCA. The analysis for all other services is included in Appendix F. A. Asset Management Plan The DCA requires that municipalities complete an Asset Management Plan before the passing of a development charges by-law. A key function of the Asset Management Plan is to demonstrate that all assets proposed to be funded under the development charges by-law are financially sustainable over their full life cycle. Further details relating to the Asset Management Plan are discussed in Appendix F. i. Annual Capital Provisions for Tax and Rate Supported Assets Table 20 summarizes the annual capital provisions required to replace the development eligible and ineligible costs associated with the capital infrastructure identified in the DC Background Study. The estimate is based on information obtained through discussions with municipal staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset. Table 20 illustrates that, by 2034, the Town will need to fund an additional $1.3 million per annum to properly fund the full life cycle costs of the new Town-wide general assets supported under the proposed Development Charges By-law. In contrast, for engineered services which have a longer benefiting period to build-out, the calculated annual provision for DC the assets supported under the proposed Development Charges By-law is $3.5 million and $4.1 million for Roads and Related and Water and Wastewater assets, respectively. Cost of Growth Analysis | 47 B. Future Revenue Growth The calculated annual funding provision should be considered within the context of the Townʼs projected growth. Over the next 10 years (to 2033) the Town is projected to increase by approximately 3,050 households, which Cost of Growth Analysis | 48 represents a 39% increase over the existing base. Over the longer-term planning horizon to build-out, the Town will add approximately 7,390 households. In addition, the Town will also add roughly 275 new employees that will result in approximately 21,973 square metres of additional non- residential building space. Over the longer planning period to build-out the Town will add an additional 1,453 employees that will be accommodated in 116,095 square metres of new non-residential building space. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the Development Charges By-law. i. Assets Are Deemed to be Financially Sustainable It is anticipated that new assets identified through the 2024 DC Background Study process will be incorporated into the Townʼs ongoing asset management plan analyses. The calculated annual provisions identified are considered to be financially sustainable as it is expected that the increased capital asset management requirements can be absorbed by the tax and user base over the long-term. C. Net Operating Costs for the Townʼs Services to Increase over the Forecast Period Table 21 summarizes the estimated increase in net operating costs that the Town will experience for additions associated with the planned capital program. The estimated changes in net operating costs are based on the financial information from the Town (additional details are included in Appendix F). Cost of Growth Analysis | 49 As shown in Table 21, by 2033 the Townʼs net operating costs are estimated to increase by about $7.3 million. The most significant portion of this increase relates to Parks and Recreation as well as Roads and Related service. TABLE 21 TOWN OF THE BLUE MOUNTAINS ESTIMATED NET OPERATING COST OF THE PROPOSED DEVELOPMENT-RELATED CAPITAL PROGRAM TAX SUPPORTED ASSETS Cost Driver Category (in 2024$) $ unit meaure Quantity Public Library $1,000,000.0 - Additional library space (10,000 sq.ft) $100 per sq.ft. added 10,000 $1,000,000.0 Fire Services $360,000.0 - Additional fire hall space (4,000 sq.ft.) $90 per sq.ft. added 4,000 $360,000.0 Police Department $0.0 - Recovery of OPP Detachment Debt N/A $0.0 Parks and Recreation $4,477,708.4 - Additional indoor recreation space $23 per sq.ft. of new rec. space 190,476 $4,380,952 - New parkland devleopment and facilities $22 per $1,000 of new infrastructure $4,398 $96,756 By-Law Enforcement $12,475.4 - Parking Lots and Vehicles and Equipment $0.05 per $1.00 of new infrastructure $249,509 $12,475.4 Solid Waste Management $305,020.0 - Development-related waste management services $100.00 per household 3,050 $305,020.0 Development Related Studies $0.0 - Development-related studies N/A $0.0 Services Related To A Highway: Public Works $247,900.0 - Buildings, Land and Fleet $20 per $1,000 of new infrastructure $12,395 $247,900 Services Related To A Highway: Roads & Related $915,060.0 - Development-Related Roads Infrastructure $300 per household 3,050 $915,060.0 TOTAL ESTIMATED OPERATING COSTS $7,318,163.8 (in constant 2024 dollars) Additional Operating Costs at 2033 Cost of Growth Analysis | 50 D. Long-Term Capital Financing from Non-Development Charges Sources Table 22 also summarizes the components of the development-related capital forecast that will require funding from non-development charges sources. Of the $73.5 million net capital forecast, about $5.6 million will need to be financed from non-development charges sources over the next 10 years. In addition, $24.5 million relates to general service level increases and to development in the post-2033 period. It is likely that most of these monies could be recovered from future development charges. Table 23 summarizes the engineering services development-related costs. The total net municipal Town-wide and area-specific cost amounts to $578.1 million with $335.0 million being recovered from the 2024 to build-out horizon. Removed from the net municipal costs are grants and other subsidies ($30.0 million), benefit to existing shares ($49.5 million) and a post-build-out benefit of $128.3 million. Also removed from the cost is the positive reserve fund balance of $15.3 million. TABLE 22 TOWN OF THE BLUE MOUNTAINS SUMMARY OF TAX SUPPORTED FUNDING REQUIREMENTS Total DC Service Net Replacement Eligible Municipal & Benefit to Available Post-2033 Costs for Cost Existing DC Reserves Benefit Recovery ($000) ($000) ($000) ($000) ($000) 1.0 PUBLIC LIBRARY $9,108.0 $731.8 $3,095.6 $2,567.3 $2,713.4 2.0 FIRE SERVICES $13,664.0 $3,150.0 $811.9 $5,264.9 $4,437.2 3.0 POLICE DEPARTMENT $373.7 $0.0 $35.4 $0.0 $338.4 4.0 PARKS AND RECREATION $35,028.9 $729.5 $3,492.5 $16,521.8 $14,285.1 5.0 BY-LAW ENFORCEMENT $249.5 $0.0 $0.0 $169.4 $80.1 6.0 SOLID WASTE MANAGEMENT $1,100.0 $360.0 $305.7 $0.0 $434.3 7.0 DEVELOPMENT RELATED STUDIES $1,574.0 $611.6 $0.0 $0.0 $962.4 1.0 SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS $12,395.0 $2,066.3 $333.9 $6,646.2 $3,348.6 TOTAL 10-YEAR SERVICES $73,493.1 $5,582.8 $7,741.1 $24,523.4 $23,250.8 Notes: (1) For total development-related capital program see Appendix B. (2) Share of capital program to be funded from development charges if calculated rates are fully implemented (3) Portion of development-related capital program identified as available DC reserves (to be funded from present Development Charge reserve fund balances). (4) Post 2033 development-related net capital costs may be eligible for development charges in future DC by-laws, but interim financing of this share may be required Development-Related Capital Program (2024 - 2033) Cost of Growth Analysis | 51 TABLE 23 TOWN OF THE BLUE MOUNTAINS SUMMARY OF TAX SUPPORTED FUNDING REQUIREMENTS ENGINEERING SERVICES Total Service Benefit Benefit Prior Growth Post- Net Capital Total Grants and to Other to Existing (Available Period Costs After Cost Subsidies Service Areas Share DC Reserves) Benefit Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) Roads and Related $198,035.3 $29,998.5 $0.0 $26,594.6 $12,952.9 $40,904.6 $87,584.7 Water Supply and Treatment $29,274.1 $0.0 $331.1 $58.2 $0.0 $0.0 $28,884.9 Craigleith Sewage Treatment Plant $37,219.7 $0.0 $0.0 $94.7 $0.0 $31,479.9 $5,645.2 Thornbury Sewage Treatment Plant $85,145.4 $0.0 $0.0 $15,245.2 $4,335.9 $40,412.6 $25,151.7 Total Town-Wide Engineered Services $349,674.5 $29,998.5 $331.1 $41,992.7 $17,288.8 $112,797.0 $147,266.5 Service Area Specific (Water & Sewer) Craigleith $48,883.8 $0.0 $13,754.7 $0.0 $5,770.0 $0.0 $29,359.1 Water $35,276.5 $0.0 $10,017.7 $0.0 $5,579.5 $0.0 $19,679.3 Sewer $13,607.3 $0.0 $3,737.0 $0.0 $190.5 $0.0 $9,679.8 Castle Glen $53,213.7 $0.0 $178.2 $0.0 ($287.5) $0.0 $53,323.1 Water $42,995.8 $0.0 $91.9 $0.0 $0.0 $0.0 $42,903.9 Sewer $10,217.9 $0.0 $86.3 $0.0 ($287.5) $0.0 $10,419.2 Osler $6,923.0 $0.0 $0.0 $0.0 ($282.0) $0.0 $7,205.0 Water $3,574.7 $0.0 $0.0 $0.0 $4.0 $0.0 $3,570.6 Sewer $3,348.4 $0.0 $0.0 $0.0 ($286.0) $0.0 $3,634.4 Thornbury East $5,230.4 $0.0 $4,794.9 $0.0 ($440.7) $0.0 $876.2 Water $779.0 $0.0 $634.9 $0.0 ($334.9) $0.0 $479.0 Sewer $4,451.4 $0.0 $4,160.0 $0.0 ($105.8) $0.0 $397.2 Thornbury West $37,168.4 $0.0 $926.9 $0.0 ($6,575.0) $13,653.1 $29,163.5 Water $22,162.7 $0.0 $0.0 $0.0 ($3,024.0) $7,329.6 $17,857.0 Sewer $15,005.7 $0.0 $926.9 $0.0 ($3,551.1) $6,323.4 $11,306.5 Clarksburg $17,231.6 $0.0 $0.0 $0.0 ($512.7) $0.0 $17,744.3 Water $7,606.5 $0.0 $0.0 $0.0 $35.1 $0.0 $7,571.4 Sewer $9,625.1 $0.0 $0.0 $0.0 ($547.9) $0.0 $10,173.0 Lora Bay SA1 $22,308.9 $0.0 $0.0 $2,599.2 ($298.6) $1,857.9 $18,150.4 Water $13,701.9 $0.0 $0.0 $772.0 ($456.8) $1,193.1 $12,193.7 Sewer $8,606.9 $0.0 $0.0 $1,827.2 $158.2 $664.8 $5,956.7 Lora Bay SA2 $204.9 $0.0 $0.0 $0.0 ($3.4) $0.0 $208.3 Water $87.5 $0.0 $0.0 $0.0 ($5.1) $0.0 $92.6 Sewer $117.4 $0.0 $0.0 $0.0 $1.8 $0.0 $115.7 Lora Bay SA3 $662.6 $0.0 $0.0 $0.0 ($14.8) $0.0 $677.5 Water $387.3 $0.0 $0.0 $0.0 ($22.7) $0.0 $410.0 Sewer $275.3 $0.0 $0.0 $0.0 $7.9 $0.0 $267.4 Camperdown $36,580.2 $0.0 $0.0 $4,867.1 $668.4 $0.0 $31,044.6 Water $18,152.4 $0.0 $0.0 $1,537.8 $25.5 $0.0 $16,589.1 Sewer $18,427.8 $0.0 $0.0 $3,329.4 $642.9 $0.0 $14,455.5 Total Area Specific Engineered Services $228,407.6 $0.0 $19,654.6 $7,466.3 ($1,976.3) $15,511.0 $187,752.0 TOTAL ROADS, WATER AND SEWER $578,082.1 $29,998.5 $19,985.7 $49,459.0 $15,312.5 $128,308.0 $335,018.5 Development-Related Capital Forecast Development Charges Administration | 52 8. Development Charges Administration A. Development Chagres Recommendations Some changes are recommended to the Townʼs current development charge calculation. Through discussions with staff, and considering the requirements of the DCA, the following recommendations were made: - That present practices regarding collection of DCs and by-law administration continue to the extent possible, having regard to any requirements of the DCA; - That under the DCA, the Town should codify any rules regarding application of the by-laws and exemptions within the DC by-laws proposed for adoption; - That Council adopt the development-related capital forecasts, and the increase in the need for services attributable to the anticipated development, as included in the 2024 DC Background Study, subject to annual review through the Townʼs normal capital budget process. - That Council confirms its intention to fund the adopted capital forecast to ensure that the increase in need for service will be met. - That Council determine that the future excess capacity identified in the DC Background Study shall be paid for by the development charges contemplated in the said DC Background Study, or other similar charges. - That Council has given consideration of the use of more than one development charge by-law to reflect different needs for services in different areas, also known as area rating or area-specific DCs. Both Town-wide and area-specific rates are proposed. Development Charges Administration | 53 - That Council has determined that for the services, and associated infrastructure proposed to be funded by DCs under the DC by-law, that the charges be calculated on a Town-wide and area-specific basis. - That Council approve the Cost of Growth analysis, including the Asset Management Plan, that deals with all assets whose capital costs are intended to be funded under the development charge by-law and that such assets are considered to be financially sustainable over their full life-cycle. Appendix A Development Forecast Appendix A | 54 Appendix A - Development Forecast This appendix provides the details of the development forecast used to prepare the 2024 Development Charges Background Study for the Town of The Blue Mountains. The forecast method and key assumptions are discussed and the results of the forecasts are presented in the following series of tables: Town-Wide Development Forecast A.1 Historical Population A.2 Historical Occupied Dwellings A.3 Historical Employment Summary A.4 Historical Annual Residential Building Permits A.5 Historical Households by Period of Construction Showing Household Size A.6 Forecast Population & Household Growth Summary A.7 Forecast Employment Growth Summary A.8 Growth in Households by Unit Type A.9 Forecast Population in New Households by Unit Type A.10 Non-Residential Space Forecast Area-Specific Development Forecast A.11 Forecast Area-Specific Residential Dwelling Units A.12 Forecast Area-Specific Population in New Dwelling Units A.13 Forecast Non-Residential Area-Specific Employment and Gross Floor Area The forecasts of population, households and employment prepared for the purposes of the Townʼs 2024 DC Background Study have been informed by the forecasts prepared for Grey Countyʼs Growth Management Strategy and updated to reflect the most current available development information as provided by Town staff. The residential forecasts are somewhat higher than those contained in the Countyʼs updated Official Plan but remain lower than Appendix A | 55 the number of known units associated with active development applications in the Town. The adjustments account for potential fluctuations in anticipated development that may occur over the five-year life of the DC By- law. It is proposed that the rate of development in the Town continue to be monitored and adjusted in subsequent DC study updates. A. Historical Development in the Town Historical growth presented in this appendix are based on available data sets from Statistics Canada and the Townʼs historical building permit data. An adjusted population, which accounts for both Census and seasonal population, is used for the purposes of the development charges study. For development charges purposes, a 15-year historical period of 2009 to 2023 is used for calculating service levels. Tables A.1 and A.2 demonstrate that the Town has experienced steady population and dwelling unit growth over the historical 15-year planning period of 2009 to 2023. Since 2008, the Town has increased from 6,541 total private dwelling units (includes dwelling occupied by permanent residents as well as dwellings not occupied by usual residents) to a total of an estimated 9,102 private dwelling units in 2023, a 39% increase. Similarly, the population in the Town, adjusted for seasonal population, has increased from 14,040 persons in 2008 to 17,931, an increase of 28%. Table A.3 shows the historical rate of employment growth in the Town. Since 2008 the Town has seen an increase from 3,341 employees in 2008 to 4,891 employees in 2023, an increase of 46%. Over this period, the activity rate (proportion) of employees in the Town to census population has been declining which is anticipated to continue. Appendix A | 56 B. Forecast Approach and Key Assumptions The Development Charges Act (DCA) requires the Town to estimate "the anticipated amount, type and location of development" for which development charges may be imposed. The development forecast must cover both residential and non-residential development and be specific enough with regards to quantum, type, location, and timing of development to allow the Town to prepare a reasonable development-related capital program. The forecast for the purposes of the Townʼs 2024 DC Background Study is informed by the assumptions and target established in Grey Countyʼs Growth Management Strategy and updated to reflect available Census data and known development applications. The residential forecast includes estimates of dwelling units not occupied by usual residents (this includes both seasonal dwellings and hotel units). As in previous by-laws, hotel units or commercial resort units are treated as residential uses and are therefore captured in the residential forecast. In particular, the forecast also estimates permanent residential dwelling units (e.g. single and semi-detached, rows and apartments) for residents that reside permanently in the Town. Development charges are levied on residential development as a charge per dwelling unit. Therefore, for the residential forecast, a projection of both the population growth as well as the population in new housing is required. - The population growth determines the need for additional facilities and provides the foundation for the development-related capital program. - When calculating the development charge, however, the development-related net capital costs are spread over the total additional population that occupies new dwelling units. This population in new units represents the population from which development charges will be collected. Appendix A | 57 Development charges are levied on non-residential development as a charge per unit of gross floor area (GFA). The non-residential forecast includes both a projection of employment growth as well as a projection of the floor space associated with employment growth in the Town. C. Town-Wide Forecast Results A Town-wide development forecast has been prepared for the future 10- year planning period of 2024 to 2033 and to build-out. The forecast includes estimates related to Census and seasonal population as well as occupied dwellings and dwellings not occupied by usual residents (inclusive of seasonal dwelling units). i. Residential Development Forecast As shown in Table A.6, by 2033, it is estimated that the Town will reach an adjusted population (including both Census and seasonal population) of 21,909 persons. This represents a growth of 3,978 persons in the ten-year horizon from the current population of 17,931 in 2023. From 2024 to 2033, the total number of private dwellings are anticipated to increase by a total of 1,913 additional units. A summary of the anticipated housing growth by unit type is shown in Table A.8. The forecast shows that the residential occupied dwelling units in the Town will continue to be dominated by ground-related units including single and semi-detached (34%) and row units (16 %). The higher-density built- forms will account for 13%. The forecast also includes an estimate of dwellings not occupied by usual residents, which will largely be ground- related dwelling units, as well as hotel units. The hotel unit forecast assumes that three hotels with 1,137 units will be constructed over the next 10-years. Appendix A | 58 Table A.9 shows the forecast population that will reside in the total private new dwelling units. The population in these units is estimated by applying the following person per unit (PPU) factors: - Single and Semi-Detached = 2.23 - Rows and Other Multiples = 2.00 - Apartments and Non-Permanent Units = 1.50 PPU factors are based on Census 2021 data as presented in Table A.5 as well as a variety of sources were used to inform, and consideration was given to the available data. Due to small sample sizes for Rows and Apartment unit types, the relationship between the occupancy patterns of the unit types was largely maintained from the 2019 DC Study and have been rounded. Based on these factors, the forecast of population expected to reside in new housing units over the 2024 to 2033 period is 5,587 additional persons. ii. Non-Residential Development Forecast Non-residential development charges are calculated on a per square metre of gross floor area (GFA) basis. Therefore, as per the DCA, a forecast of non-residential building space has been developed. Table A.10 summarizes the non-residential forecast of employment growth. This results in an anticipated increase of 275 employees between 2024 and 2033. The forecast number of employees, multiplied by the employment density assumption of 80 square metres per employee, is used to forecast the additional gross floor area of space from 2024 to 2033. In total, the Town is forecast to add 21,973 square metres of additional non-residential floor space to 2033. Appendix A | 59 D. Area-Specific Forecast Results The Town has identified several servicing areas for the purposes of calculating area-specific Water and Wastewater development charges. As a result, area-specific residential and non-residential forecasts have been prepared for the following areas: - Craigleith - Camperdown - Castle Glenn - Swiss Meadows - Lora Bay - Clarksburg - Osler - Thornbury East - Thornbury West - Rural The anticipated development in the defined servicing areas is based on the build-out potential identified in the 2014 DC Background Study, updated for the 2019 DC Background Study, and adjusted for completed building permits. i. Area-Specific Residential Development Forecast Table A.11 provides a summary of the area-specific unit forecast over the 10-year (2024-2033) and longer-term planning period (build-out). Over the 10-year and longer-term planning periods, the majority of the unit growth is anticipated to occur in the Craigleith servicing area. Craigleith will account for 67% of unit growth over the 10-year planning period and 39% of the total growth to build-out. Although the 10-year planning period has only about 10% of growth anticipated in Castle Glen, to build-out nearly 27% is anticipated. As Craigleith and Castle Glen develop, other servicing areas including Camperdown, and Lora Bay will account for the majority of the residential unit growth in the Town over the longer-term planning period. Appendix A | 60 Table A.12 shows the forecast population that will residue in new dwelling units. The PPU factors applied to each of the dwelling units is consistent with the Town-wide forecast, and as such, the forecast population expected to reside in new housing units over the 2024 to 2033 period is 5,575 persons, generally consistent with the Town-wide estimate. Over the longer planning period to build-out, the forecast population of new housing units is 14,533 persons. ii. Area-Specific Non-Residential Development Forecast Table A.13 provides a summary of the area-specific non-residential development forecast. Consistent with the residential forecast, much of the non-residential employment growth (41 per cent) is anticipated to occur within the Craigleith servicing area over the 10-year planning period. Craigleith is forecast to maintain 41 per cent of employment growth over the longer planning period to build-out. The remaining employment growth to build-out will occur in Castle Glen (22 per cent) and Lora Bay (14 per cent) with some minor allocations to Thornbury West (9 per cent), Camperdown (7 per cent), Clarksburg (3 per cent), Osler (2 per cent) and Thornbury East (2 per cent). Over the 10-year planning period the servicing areas will add an additional 275 employees (which will occupy 21,973 square metres of non-residential space) consistent with the Town-wide forecast and 1,453 employees over the longer planning period to build-out (which will occupy 116,095 square metres of non-residential space). Appendix A | 61 APPENDIX A - TABLE A.1 TOWN OF THE BLUE MOUNTAINS HISTORICAL POPULATION Census Annual Seasonal Annual Adjusted Annual Mid-Year Population Growth Population Growth Population Growth 2006 6,830 6,710 13,540 2007 6,752 -78 7,035 325 13,787 247 2008 6,675 -77 7,365 330 14,040 253 2009 6,599 -76 7,700 335 14,299 259 2010 6,524 -75 8,040 340 14,564 265 2011 6,450 -74 8,388 348 14,838 274 2012 6,561 111 8,320 -68 14,881 44 2013 6,674 113 8,250 -70 14,924 43 2014 6,789 115 8,175 -75 14,964 40 2015 6,906 117 8,095 -80 15,001 37 2016 7,025 119 8,015 -80 15,040 39 2017 7,445 420 7,970 -45 15,415 375 2018 7,890 445 7,910 -60 15,800 385 2019 8,361 471 7,833 -78 16,194 394 2020 8,861 500 7,738 -95 16,599 405 2021 9,390 529 7,620 -118 17,010 412 2022 9,851 461 7,620 0 17,471 461 2023 10,311 460 7,620 0 17,931 460 Growth 2009-2023 3,636 255 3,891 Source: Statistics Canada, Census of Canada, Grey County GMS update 2022 Appendix A | 62 APPENDIX A - TABLE A.2 TOWN OF THE BLUE MOUNTAINS HISTORICAL OCCUPIED DWELLINGS Annual Av. Household Annual Av. Household Annual Av. Household Mid-Year Growth Size (PPU) Growth Size (PPU) Growth Size (PPU) 2006 2,935 2.33 2,684 2.50 5,619 6,062 2.23 2007 2,917 -18 2.31 2,814 130 2.50 5,731 6,254 192 2.20 2008 2,899 -18 2.30 2,946 132 2.50 5,845 6,541 287 2.15 2009 2,881 -18 2.29 3,080 134 2.50 5,961 6,631 90 2.16 2010 2,863 -18 2.28 3,216 136 2.50 6,079 6,730 99 2.16 2011 2,845 -18 2.27 3,355 139 2.50 6,200 6,987 257 2.12 2012 2,926 81 2.24 3,328 -27 2.50 6,254 7,156 169 2.08 2013 3,009 83 2.22 3,300 -28 2.50 6,309 7,248 92 2.06 2014 3,094 85 2.19 3,270 -30 2.50 6,364 7,322 74 2.04 2015 3,182 88 2.17 3,238 -32 2.50 6,420 7,364 42 2.04 2016 3,271 89 2.15 3,206 -32 2.50 6,477 7,416 52 2.03 2017 3,463 192 2.15 3,188 -18 2.50 6,651 7,729 313 1.99 2018 3,666 203 2.15 3,164 -24 2.50 6,830 7,849 120 2.01 2019 3,881 215 2.15 3,133 -31 2.50 7,014 7,962 113 2.03 2020 4,108 227 2.16 3,095 -38 2.50 7,203 8,210 248 2.02 2021 4,348 240 2.16 3,048 -47 2.50 7,396 8,511 301 2.00 2022 4,563 215 2.16 3,048 0 2.50 7,611 8,918 407 1.96 2023 4,779 215 2.16 3,048 0 2.50 7,827 9,102 184 1.97 Growth 2009-2023 1,880 102 2,561 Source: Statistics Canada, Census of Canada, Grey County GMS update 2022 (1) Total Private Dwellings has been adjusted to reflect dwelling counts provided by MPAC Occupied Dwellings Dwellings Not Occupied by Usual Residents Total Census Dwellings Total Private Dwellings1 Appendix A | 63 APPENDIX A - TABLE A.3 TOWN OF THE BLUE MOUNTAINS HISTORICAL EMPLOYMENT SUMMARY Place of Work Annual Activity Work at Annual Total w/ Work Annual Mid-Year Employment (1) Growth Rate (2) Home Growth At Home Growth 2006 3,345 49.0% 725 4,070 2007 3,343 -2 49.5% 668 -57 4,011 -59 2008 3,341 -2 50.1% 615 -53 3,956 -55 2009 3,339 -2 50.6% 566 -49 3,905 -51 2010 3,337 -2 51.1% 521 -45 3,858 -47 2011 3,335 -2 51.7% 480 -41 3,815 -43 2012 3,432 97 52.3% 528 48 3,960 145 2013 3,531 99 52.9% 581 53 4,112 152 2014 3,633 102 53.5% 639 58 4,272 160 2015 3,738 105 54.1% 703 64 4,441 169 2016 3,847 109 54.8% 775 72 4,622 181 2017 4,010 163 53.9% 808 33 4,818 196 2018 4,179 169 53.0% 842 34 5,021 203 2019 4,353 174 52.1% 877 35 5,230 209 2020 4,534 181 51.2% 913 36 5,447 217 2021 4,720 186 50.3% 951 37 5,671 224 2022 4,863 143 49.4% 980 29 5,842 172 2023 4,891 28 47.4% 985 6 5,876 34 Growth 2009-2023 1,550 370 1,920 Source: Statistics Canada, Census of Canada (1) Includes no fixed place of work employment, but excludes work at home (2) Based on permenant "census population" Appendix A | 64 APPENDIX A - TABLE A.4 TOWN OF THE BLUE MOUNTAINS HISTORICAL ANNUAL RESIDENTIAL BUILDING PERMITS Building Permits Building Permits Year Singles/Semis Rows Apts. Total Singles/Semis Rows Apts. Total 2006 294 0 46 340 86% 0% 14% 100% 2007 148 10 26 184 80% 5% 14% 100% 2008 85 20 0 105 81% 19% 0% 100% 2009 55 13 1 69 80% 19% 1% 100% 2010 68 14 0 82 83% 17% 0% 100% 2011 57 0 0 57 100% 0% 0% 100% 2012 56 3 0 59 95% 5% 0% 100% 2013 46 20 0 66 70% 30% 0% 100% 2014 66 3 0 69 96% 4% 0% 100% 2015 107 3 0 110 97% 3% 0% 100% 2016 181 11 3 195 93% 6% 2% 100% 2017 248 33 70 351 71% 9% 20% 100% 2018 29 0 0 29 100% 0% 0% 100% 2019 22 0 0 22 100% 0% 0% 100% 2020 32 0 2 34 94% 0% 6% 100% 2021 32 0 10 42 76% 0% 24% 100% 2022 224 41 19 284 79% 14% 7% 100% 2023 97 13 10 120 81% 11% 8% 100% Growth 2009-2023 1,320 154 115 1,589 83% 10% 7% 100% Source: Hemson Consulting Ltd., Town of The Blue Mountains. 2023 Note: 2023 building permits have been estimated based on available permit data and discussions with staff Appendix A | 65 APPENDIX A - TABLE A.5 TOWN OF THE BLUE MOUNTAINS HISTORICAL HOUSEHOLDS BY PERIOD OF CONSTRUCTION SHOWING HOUSEHOLD SIZE Period of Construction Period of Construction Summaries Dwelling Unit Type Pre 1945 1946-1960 1961-1970 1971-1980 1981-1990 1991-1995 1996-2000 2001-2005 2006-2010 2011-2016 2016-2021 Pre 2011 2011-2021 Total Singles and Semis Household Population 1,130 395 620 920 825 325 530 485 615 590 1,400 5,230 1,990 7,220 Households 505 205 285 440 350 150 220 250 280 235 600 2,405 835 3,240 Household Size 2.24 1.93 2.18 2.09 2.36 2.17 2.41 1.94 2.20 2.51 2.33 2.17 2.38 2.23 Rows Household Population 0 0 55 140 260 55 40 40 80 65 85 590 150 740 Households 0 10 35 65 145 25 25 25 50 25 35 330 60 390 Household Size n/a n/a 1.57 2.15 1.79 2.20 1.60 1.60 1.60 2.60 2.43 1.79 2.50 1.90 Apartments (excl. Duplexes) - Total Household Population 35 0 25 50 75 0 0 35 25 60 75 220 135 355 Households 20 15 20 45 50 10 20 30 20 40 60 210 100 310 Household Size 1.75 n/a 1.25 1.11 1.50 n/a n/a 1.17 1.25 1.50 1.25 1.05 1.35 1.15 Duplexes Household Population 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Households 0 0 10 10 0 0 10 0 0 0 0 30 0 30 Household Size n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a All Units Household Population 1,165 395 700 1,110 1,160 380 570 560 720 715 1,560 6,040 2,275 8,315 Households 525 230 350 560 545 185 275 305 350 300 695 2,975 995 3,970 Household Size 2.22 1.72 2.00 1.98 2.13 2.05 2.07 1.84 2.06 2.38 2.24 2.03 2.29 2.09 Note: Population and household values in this table are based on National Household Survey response rates and may differ from Census values Source: Statistics Canada, 2021 Census Appendix A | 66 APPENDIX A - TABLE A.6 TOWN OF THE BLUE MOUNTAINS FORECAST POPULATION & HOUSEHOLD GROWTH SUMMARY Census Annual Seasonal Annual Adjusted Annual Annual Av. Household Annual Av. Household Annual Av. Household Mid-Year Population Growth Population Growth Population Growth Growth Size (PPU) Growth Size (PPU) Growth Size (PPU) 2023 10,311 460 7,620 0 17,931 460 4,779 215 2.16 3,048 0 2.50 7,827 215 2.29 2024 10,776 465 7,620 0 18,396 465 4,994 215 2.16 3,048 0 2.50 8,042 215 2.29 2025 11,240 465 7,620 0 18,860 465 5,210 215 2.16 3,048 0 2.50 8,258 215 2.28 2026 11,705 465 7,620 0 19,325 465 5,425 215 2.16 3,048 0 2.50 8,473 215 2.28 2027 12,170 465 7,620 0 19,790 465 5,640 215 2.16 3,048 0 2.50 8,688 215 2.28 2028 12,629 459 7,620 0 20,249 459 5,856 215 2.16 3,048 0 2.50 8,904 215 2.27 2029 13,087 458 7,620 0 20,707 458 6,071 215 2.16 3,048 0 2.50 9,119 215 2.27 2030 13,545 458 7,620 0 21,165 458 6,287 215 2.15 3,048 0 2.50 9,335 215 2.27 2031 14,003 458 7,620 0 21,623 458 6,502 215 2.15 3,048 0 2.50 9,550 215 2.26 2032 14,145 142 7,620 0 21,765 142 6,602 100 2.14 3,048 0 2.50 9,650 100 2.26 2033 14,289 144 7,620 0 21,909 144 6,692 90 2.14 3,048 0 2.50 9,740 90 2.25 Growth 2024-2033 3,978 0 3,978 1,913 0 1,913 Source: The Town of The Blue Mountains, Hemson Consulting 2023 Note: Estimates in this table will not match the Grey County GMS update prepared in 2022 Dwellings Not Occupied by Usual Residents Total Private Dwellings Total Occupied Dwellings Appendix A | 67 APPENDIX A - TABLE A.7 TOWN OF THE BLUE MOUNTAINS FORECAST EMPLOYMENT GROWTH SUMMARY Place of Work Annual Work at Annual Total w/ Work Annual Mid-Year Employment Growth Activity Rate Home Growth At Home Growth 2023 4,891 28 47.4% 985 6 5,876 34 2024 4,920 29 45.7% 991 6 5,911 35 2025 4,949 29 44.0% 997 6 5,946 35 2026 4,978 29 42.5% 1,003 6 5,981 35 2027 5,007 29 41.1% 1,009 6 6,016 35 2028 5,036 29 39.9% 1,014 6 6,050 35 2029 5,066 30 38.7% 1,021 6 6,087 36 2030 5,096 30 37.6% 1,027 6 6,123 36 2031 5,126 30 36.6% 1,033 6 6,159 36 2032 5,157 31 36.5% 1,039 6 6,196 37 2033 5,166 9 36.2% 1,041 2 6,207 11 Growth 2024-2033 275 55 330 Source: The Town of The Blue Mountains, Hemson Consulting 2023 Appendix A | 68 APPENDIX A - TABLE A.8 TOWN OF THE BLUE MOUNTAINS GROWTH IN HOUSEHOLDS BY UNIT TYPE Mid-Year 2024 118 54 43 215 55% 25% 20% 100% 0 215 2025 118 54 43 215 55% 25% 20% 100% 67 282 2026 118 54 43 215 55% 25% 20% 100% 0 215 2027 118 54 43 215 55% 25% 20% 100% 700 915 2028 118 54 43 215 55% 25% 20% 100% 0 215 2029 118 54 43 215 55% 25% 20% 100% 370 585 2030 118 54 43 215 55% 25% 20% 100% 0 215 2031 118 54 43 215 55% 25% 20% 100% 0 215 2032 55 25 20 100 55% 25% 20% 100% 0 100 2033 50 23 18 90 55% 25% 20% 100% 0 90 Growth 2024-2033 1,052 478 383 1,913 55% 25% 20% 100% 1,137 3,050 Source: Town of The Blue Mountains and Hemson Consulting, 2023 (1) Includes Commercial Resort Units (CRU), Hotel and other similar uses. (2) Total units includes dwelling occupied by permanent residents, dwellings not occupied by usual residents and hotel units Total Units (2) Other: CRU & Hotel (1) Shares By Unit Type Apartments Rows & Other Multiples Singles/Semis Rows & Other Multiples Apartments Total Occupied Dwellings Singles/Semis Annual Growth in Occupied Households Total Appendix A | 69 APPENDIX A - TABLE A.9 TOWN OF THE BLUE MOUNTAINS FORECAST POPULATION IN NEW HOUSEHOLD BY UNIT TYPE Occupied Households Singles/Semis Rows & Other Multiples Apartments Total Occupied 2023 264 108 65 437 0 437 2024 264 108 65 437 0 437 2025 264 108 65 437 101 538 2026 264 108 65 437 0 437 2027 264 108 65 437 1050 1487 2028 264 108 65 437 0 437 2029 264 108 65 437 555 992 2030 264 108 65 437 0 437 2031 264 108 65 437 0 437 2032 123 50 30 203 0 203 2033 110 45 27 182 0 182 Growth 2024-2033 2,345 959 577 3,881 1,706 5,587 Person per unit (PPU) 2.23 2.00 1.50 1.50 Mid-Year Other: CRU & Hotel (1) Total for DC Study Appendix A | 70 APPENDIX A - TABLE A.10 TOWN OF THE BLUE MOUNTAINS NON-RESIDENTIAL SPACE FORECAST Employment Density 80 m2 per employee Place of Work Annual Total Growth Mid-Year Employment Growth Sq.M. 2024 4,920 29 2,317 2025 4,949 29 2,317 2026 4,978 29 2,317 2027 5,007 29 2,317 2028 5,036 29 2,317 2029 5,066 30 2,397 2030 5,096 30 2,397 2031 5,126 30 2,397 2032 5,157 31 2,454 2033 5,166 9 742 Growth 2024-2033 275 21,973 Note: Employment Values Include No Fixed Place of Work Employment Source: Statistics Canada, Census of Canada Appendix A | 71 APPENDIX A - TABLE A.11 TOWN OF THE BLUE MOUNTAINS FORECAST AREA-SPECIFIC RESIDENTIAL DWELLING UNITS Residential Unit Growth 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Craigleith 102 169 102 802 102 472 102 102 47 43 2,043 2,912 Singles & Semis 41 41 41 41 41 41 41 41 19 17 364 519 Rows 35 35 35 35 35 35 35 35 16 15 311 443 Apartments 26 26 26 26 26 26 26 26 12 11 231 329 Other(1) 0 67 0 700 0 370 0 0 0 0 1137 1,621 Camperdown 18 18 18 18 18 18 18 18 9 8 163 409 Singles & Semis 12 12 12 12 12 12 12 12 6 5 105 265 Rows 4 4 4 4 4 4 4 4 2 2 38 96 Apartments 2 2 2 2 2 2 2 2 1 1 19 48 Other(1) 0 0 0 0 0 0 0 0 0 0 0 - Castle Glen 33 33 33 33 33 33 33 33 15 14 295 2,018 Singles & Semis 33 33 33 33 33 33 33 33 15 14 295 2,018 Rows 0 0 0 0 0 0 0 0 0 0 0 - Apartments 0 0 0 0 0 0 0 0 0 0 0 - Other(1) 0 0 0 0 0 0 0 0 0 0 0 - Swiss Meadows 0 0 0 0 0 0 0 0 0 0 - 1 Singles & Semis 0 0 0 0 0 0 0 0 0 0 0 1 Rows 0 0 0 0 0 0 0 0 0 0 0 - Apartments 0 0 0 0 0 0 0 0 0 0 0 - Other(1) 0 0 0 0 0 0 0 0 0 0 0 - Lora Bay 25 25 25 25 25 25 25 25 12 11 225 976 Singles & Semis 18 18 18 18 18 18 18 18 8 7 158 685 Rows 1 1 1 1 1 1 1 1 1 0 10 42 Apartments 6 6 6 6 6 6 6 6 3 3 57 249 Other(1) 0 0 0 0 0 0 0 0 0 0 0 - Clarksburg 5 5 5 5 5 5 5 5 2 2 45 180 Singles & Semis 2 2 2 2 2 2 2 2 1 1 21 180 Rows 3 3 3 3 3 3 3 3 1 1 24 - Apartments 0 0 0 0 0 0 0 0 0 0 0 - Non-Permanent 0 0 0 0 0 0 0 0 0 0 0 - Osler 1 1 1 1 1 1 1 1 1 0 11 4 Singles & Semis 1 1 1 1 1 1 1 1 1 0 11 4 Rows 0 0 0 0 0 0 0 0 0 0 0 - Apartments 0 0 0 0 0 0 0 0 0 0 0 - Other(1) 0 0 0 0 0 0 0 0 0 0 0 - Thornbury East 14 14 14 14 14 14 14 14 6 6 121 161 Singles & Semis 2 2 2 2 2 2 2 2 1 1 21 28 Rows 3 3 3 3 3 3 3 3 1 1 24 32 Apartments 9 9 9 9 9 9 9 9 4 4 77 101 Non-Permanent 0 0 0 0 0 0 0 0 0 0 0 - Thornbury West 15 15 15 15 15 15 15 15 7 6 135 715 Singles & Semis 7 7 7 7 7 7 7 7 3 3 63 335 Rows 8 8 8 8 8 8 8 8 4 3 72 380 Apartments 0 0 0 0 0 0 0 0 0 0 0 - Other(1) 0 0 0 0 0 0 0 0 0 0 0 - Rural 1 1 1 1 1 1 1 1 1 0 11 14 Singles & Semis 1 1 1 1 1 1 1 1 1 0 11 14 Rows 0 0 0 0 0 0 0 0 0 0 0 0 Apartments 0 0 0 0 0 0 0 0 0 0 0 0 Other(1) 0 0 0 0 0 0 0 0 0 0 0 0 Total 215 282 215 915 215 585 215 215 100 90 3,047 7,390 (1) "Other" relates to "Dwellings Not Occupied by Usual Residents" including CRU and Hotels Total 2024-2033 Total Build-out Service Area Appendix A | 72 APPENDIX A - TABLE A.12 TOWN OF THE BLUE MOUNTAINS FORECAST AREA-SPECIFIC POPULATION IN NEW DWELLINGS Craigleith 3,486 4,969 Singles & Semis 2.23 811 1,157 Rows 2.00 622 886 Apartments 1.50 347 494 Other(1) 1.50 1,706 2,432 Camperdown 340 855 Singles & Semis 2.23 234 591 Rows 2.00 77 192 Apartments 1.50 29 72 Other(1) 1.50 - - Castle Glen 657 4,497 Singles & Semis 2.23 657 4,497 Rows 2.00 - - Apartments 1.50 - - Other(1) 1.50 - - Swiss Meadows - 2 Singles & Semis 2.23 - 2 Rows 2.00 - - Apartments 1.50 - - Other(1) 1.50 - - Lora Bay 457 1,984 Singles & Semis 2.23 352 1,526 Rows 2.00 19 84 Apartments 1.50 86 374 Non-Permanent 1.50 - - Clarksburg 95 401 Singles & Semis 2.23 47 401 Rows 2.00 48 - Apartments 1.50 - - Other(1) 1.50 - - Osler 23 9 Singles & Semis 2.23 23 9 Rows 2.00 - - Apartments 1.50 - - Other(1) 1.50 - - Thornbury - East 210 278 Singles & Semis 2.23 47 62 Rows 2.00 48 64 Apartments 1.50 115 152 Other(1) 1.50 - - Thornbury - West 284 1,507 Singles & Semis 2.23 141 747 Rows 2.00 143 760 Apartments 1.50 - - Other(1) 1.50 - - Rural 23 31 Singles & Semis 2.23 23 31 Rows 2.00 - - Apartments 1.50 - - Other(1) 1.50 - - Total 5,575 14,533 (1) "Other" relates to "Dwellings Not Occupied by Usual Residents", CRUs and Hotels. Service Area Total 2024-2033 Total Build-out PPU Factors Appendix A | 73 APPENDIX A - TABLE A.13 TOWN OF THE BLUE MOUNTAINS FORECAST NON-RESIDENTIAL AREA-SPECIFIC EMPLOYMENT AND GROSS FLOOR AREA Non-Residential Growth 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Craigleith Employees 12 11.99 12 12 12 12 12 12 13 4 114 601 GFA (m 2) 958 958.34 958 958 958 991 991 991 1,015 307 9,088 48,020 Camperdown Employees 2 1.98 2 2 2 2 2 2 2 1 19 99 GFA (m 2) 159 158.54 159 159 159 164 164 164 168 51 1,503 7,910 Castle Glen Employees 6 6.26 6 6 6 6 6 6 7 2 59 314 GFA (m 2) 500 500.01 500 500 500 517 517 517 529 160 4,741 25,089 Swiss Meadows Employees - - - - - - - - - - - - GFA (m 2) - - - - - - - - - - - - Lora Bay Employees 4 4 4 4 4 4 4 4 4 1 39 205 GFA (m 2) 327 327 327 327 327 339 339 339 347 105 3,103 16,380 Clarksburg Employees 1 1 1 1 1 1 1 1 1 0 7 39 GFA (m 2) 62 62 62 62 62 64 64 64 66 20 588 3,116 Osler Employees 1 1 1 1 1 1 1 1 1 0 6 32 GFA (m 2) 51 51 51 51 51 53 53 53 54 16 482 2,557 Thornbury - East Employees 1 1 1 1 1 1 1 1 1 0 6 30 GFA (m 2) 49 49 49 49 49 50 50 50 52 16 463 2,397 Thornbury - West Employees 3 3 3 3 3 3 3 3 3 1 25 133 GFA (m 2) 211 211 211 211 211 219 219 219 224 68 2,005 10,627 Rural Employees - - - - - - - - - - - - GFA (m 2) - - - - - - - - - - - - Total Employees 29 29 29 29 29 30 30 30 31 9 275 1,453 Total GFA (m2) 2,317 2,317 2,317 2,317 2,317 2,397 2,397 2,397 2,454 742 21,973 116,095 Service Area Total 2024-2033 Total Build-out Appendix A | 74 Appendix B Town-Wide General Services Technical Appendix Appendix B | 75 Appendix B - Introduction and Overview The following appendix provides the detailed analysis undertaken to establish the development charge rates for each of the services in the Town of The Blue Mountains. Seven services have been analysed as part of the Development Charges Study: Appendix B.1 Public Library Appendix B.2 Fire Services Appendix B.3 Police Department Appendix B.4 Parks and Recreation Appendix B.5 By-law Enforcement Appendix B.6 Solid Waste Appendix B.7 Development Related Studies The tables provide the background data and analysis undertaken to arrive at the calculated development charge rates for that particular service. An overview of the content and purpose of each of the tables is given below. Table 1 Historical Service Levels Table 1 presents the data used to determine the 15-year historical service level. The DCA and O. Reg. 82/98 require that development charges be set at a level no higher than the average service level provided in the Town over the 15-year period immediately preceding the preparation of the background study, on a service-by-service basis. For the purpose of this study, the historical inventory period has been defined as 2009 to 2023. O. Reg. 82/98 requires that, when defining and determining historical service levels, both the quantity and quality of service be taken into consideration. In most cases, the service levels are initially established in quantitative Appendix B | 76 terms. For example, service levels for buildings are presented in terms of square feet. The qualitative aspect is introduced by considering the monetary value of the facility or service. In the case of buildings, for example, the cost would be shown in terms of cost per square foot to replace or construct a facility of the same quality. This approach helps to ensure that the development-related capital facilities that are to be funded by new growth reflect not only the quantity (number and size) but also the quality (replacement value or cost) of service provided by the Town in the past. Both the quantitative and qualitative aspects of service levels used in the current analysis are based on information provided by municipal staff. This information is generally based on historical records and experience with costs to acquire or construct similar facilities, equipment and infrastructure. Table 1 also shows the calculation of the "maximum allowable" funding envelope, net of uncommitted excess capacity. The maximum allowable is defined as the 15-year historical service level (expressed as $/capita or $/population & employment) multiplied by the forecast increase in net population, or net population and employment growth, over the planning period. The resulting figure is the value of capital infrastructure that must be constructed for that particular service so that the 15-year historical service level is maintained. There is also a requirement in the DCA to consider "excess capacity" within the Townʼs existing infrastructure that may be available to partially meet the future servicing requirements. If Council has expressed its intent before or at the time the capacity was created to recoup the cost of providing the capacity from new development, it is considered "committed excess capacity" under the DCA, and the associated capital cost is eligible for recovery. Should uncommitted excess capacity exist, it is determined whether or not this capacity will be available to service new development and, if so, deductions to the maximum allowable funding envelope are required. Appendix B | 77 Table 2 2024 - 2033 Development-Related Capital Program & the Calculation of the Development Charge The DCA requires that Council express its intent to provide future capital facilities to support future growth. Based on the development forecasts presented in Appendix A, Hemson Consulting, in collaboration with Town staff, has developed a development-related capital program which sets out the projects required to service anticipated development for the 10-year period from 2024 to 2033. To determine the share of the program that is eligible for recovery through development charges, the project costs are reduced by any anticipated grants and "replacement" shares. A replacement share occurs when a new facility will, at least in part, replace a facility that is demolished, redeployed or will otherwise not be available to serve its former function. The replacement share of the capital program is not deemed to be development-related and is therefore removed from the development charge calculation. The capital cost for replacement shares will require funding from non-development charge sources, typically property taxes or user fees. The capital program less any replacement or benefit to existing shares yields the development related costs. Although deemed development- related, not all of the net development-related capital program may be recoverable from development charges in the period from 2024 to 2033. For some of the services, due to funding envelope restrictions, a portion of the costs is deemed to be recovered from other development-related sources including future DC Background Studies. In some cases, a portion of the other development related costs is either deemed "pre-built" service capacity to be considered as committed excess capacity and recovered under future development or is a service level increase. Appendix B | 78 The remaining portion of the net capital program represents the development-related cost that may be included in the development charge. In all cases, as required, this amount is equal to or less than the maximum allowable capital amount as calculated at the end of Table 1. The result is the discounted development-related net capital cost that is eligible for recovery against development over the period from 2024 to 2033. Calculation of the Development Charge Rates The section below the capital program displays the calculation of the development charge rates. The first step when determining the development charge rate is to allocate the development-related net capital cost between the residential and non- residential sectors. For all Town-wide uniform services with the exception of Public Library and Parks and Recreation, the development-related costs have been apportioned as 95 per cent residential and 5 per cent non- residential. This apportionment is based on the anticipated shares of dwelling unit and employment growth over the 10-year forecast period. The development-related costs associated with the Public Library and Parks and Recreation have been allocated 100 per cent to the residential sector because the need for these services is generally driven entirely by residential development. The residential share of the 2024-2033 DC eligible costs is then divided by the number of forecast dwellings. This gives the calculated residential development charge per capita. The non-residential development-related net capital costs are divided by the forecast increase in non-residential gross floor area (GFA). This yields a charge per square metre of new non- residential GFA. Appendix B | 79 Appendix B.1 Public Library Appendix B | 80 Appendix B.1 - Public Library The Town of The Blue Mountains provides Library Services from the Leonard E. Shore Memorial Library branch and the Craigleith Heritage Depot. The libraries provide a wide range of resources in a variety of formats as well as a number of programs to the residents of the Town of The Blue Mountains. Table B.1-1 2009-2023 Historical Service Levels Table B.1-1 displays the Libraryʼs 15-year historical inventory for buildings, land, materials, and furniture and equipment (excluding computer equipment). The building space amounts to 10,600 square feet and is valued at $7.59 million. The library buildings occupy approximately 0.66 hectares of land worth $943,800. The collection materials are valued at $1.33 million and the furniture and equipment associated with the library branches are valued at $730,300. The 2023 full replacement value of the inventory of capital assets amounts to $10.59 million and the 15-year historical average service level is $682.06 per capita. The historical service level multiplied by the 10-year forecast of population growth results in a 10-year maximum allowable funding envelope of $2.71 million (3,978 population growth X historical service level of $682.06/capita). Table B.1-2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge Rates The Public Libraryʼs total 10-year forecast amounts to $9.11 million. The capital program provides for additional library space, including costs associated with land acquisition, furniture and equipment, and collection materials. Appendix B | 81 No grants, subsidies, or other recoveries are anticipated to fund any shares of the above mentioned projects. A benefit to existing share of 9 per cent has been identified for the addition library space and associated land with $731,800 removed from the DC eligible amount for recovery. The net cost to the municipality is therefore at $8.38 million. A portion of the DC eligible costs, $3.10 million, will be funded by available reserve funds. A share of $2.57 million is deemed as other development related and will not be recovered under this development charges by-law, but may be considered for funding from other revenue sources and in future development charge studies, subject to service level restrictions. The remaining $2.71 million is related to growth between 2024 and 2033 and is allocated entirely against future residential development in the Town of The Blue Mountains. This results in a development charge of $485.66 per capita. The following table summarizes the calculation of the Public Library development charge. 15-year Hist. Service Level per Capita Total Net DC Recoverable $/capita $/m2 $682.06 $9,108,000 $2,713,368 $485.66 $0.00 PUBLIC LIBRARY SUMMARY Development-Related Capital Program 2024 - 2033 Calculated Development Charge Appendix B | 82 APPENDIX B.1 TABLE B.1-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PUBLIC LIBRARY BUILDINGS # of Square Feet UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Leonard E. Shore Memorial Library 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,400 $720 Craigleith Depot-Library Portion - - - - - - - 100 100 100 100 100 150 150 150 $650 Total (sq.ft.) 10,400 10,400 10,400 10,400 10,400 10,400 10,400 10,500 10,500 10,500 10,500 10,500 10,550 10,550 10,550 Total ($000) $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,553.0 $7,553.0 $7,553.0 $7,553.0 $7,553.0 $7,585.5 $7,585.5 $7,585.5 LAND # of Hectares UNIT COST Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Leonard E. Shore Memorial Library 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64 $1,430,000 Craigleith Depot-Library - - - - - - 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 $1,430,000 Total (ha) 0.64 0.64 0.64 0.64 0.64 0.64 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66 Total ($000) $915.2 $915.2 $915.2 $915.2 $915.2 $915.2 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 MATERIALS # of Collection Materials UNIT COST Type of Collection 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/item) Books 45,208 38,893 36,049 35,681 34,206 33,770 32,400 31,542 30,221 30,221 26,438 25,301 26,146 27,453 28,826 $40 Periodicals 94 100 71 73 66 84 78 85 71 71 63 58 44 46 49 $90 Media(video/dvd/cd) 2,820 3,408 4,093 4,093 3,267 3,154 3,081 3,059 2,970 2,970 2,552 2,699 1,993 2,093 2,197 $60 E-Books Owned - - - 284 418 716 831 931 448 448 487 503 428 449 472 $50 E-Book and Audio Book Subscriptions $0 $0 $0 $2,150 $2,150 $3,655 $3,655 $3,655 $4,300 $4,300 $12,743 $16,402 $16,399 $17,219 $18,080 Total (#) 48,122 42,401 40,213 40,131 37,957 37,724 36,390 35,617 33,710 33,710 29,540 28,561 28,611 30,042 31,544 Total ($000) $1,986.0 $1,769.2 $1,693.9 $1,695.7 $1,593.3 $1,587.1 $1,533.1 $1,503.1 $1,420.1 $1,420.1 $1,253.4 $1,220.8 $1,207.2 $1,267.5 $1,330.9 FURNITURE & EQUIPMENT Total Value of Furniture and Equipment ($) Branch Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Furniture & Equipment for Facilities ($55 per sq.ft.) $572,000 $572,000 $572,000 $572,000 $572,000 $572,000 $572,000 $577,500 $577,500 $577,500 $577,500 $577,500 $580,250 $580,250 $580,250 Loanable Technology $0 $0 $0 $0 $0 $25,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 Shelving Total ($000) $572.0 $572.0 $572.0 $572.0 $572.0 $597.0 $722.0 $727.5 $727.5 $727.5 $727.5 $727.5 $730.3 $730.3 $730.3 Appendix B | 83 APPENDIX B.1 TABLE B.1-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS PUBLIC LIBRARY 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 0.59 INVENTORY SUMMARY ($000) Buildings $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,488.0 $7,553.0 $7,553.0 $7,553.0 $7,553.0 $7,553.0 $7,585.5 $7,585.5 $7,585.5 Land $915.2 $915.2 $915.2 $915.2 $915.2 $915.2 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 $943.8 Materials $1,986.0 $1,769.2 $1,693.9 $1,695.7 $1,593.3 $1,587.1 $1,533.1 $1,503.1 $1,420.1 $1,420.1 $1,253.4 $1,220.8 $1,207.2 $1,267.5 $1,330.9 Furniture & Equipment $572.0 $572.0 $572.0 $572.0 $572.0 $597.0 $722.0 $727.5 $727.5 $727.5 $727.5 $727.5 $730.3 $730.3 $730.3 Total ($000) $10,961.2 $10,744.4 $10,669.1 $10,670.9 $10,568.5 $10,587.3 $10,686.9 $10,727.4 $10,644.4 $10,644.4 $10,477.7 $10,445.1 $10,466.7 $10,527.1 $10,590.5 Average SERVICE LEVEL ($/capita) Service Level Buildings $523.67 $514.14 $504.67 $503.19 $501.74 $500.40 $499.17 $502.19 $489.98 $478.04 $466.42 $455.04 $445.94 $434.19 $423.04 $482.79 Land $64.00 $62.84 $61.68 $61.50 $61.32 $61.16 $62.92 $62.75 $61.23 $59.73 $58.28 $56.86 $55.49 $54.02 $52.64 $59.76 Materials $138.89 $121.48 $114.17 $113.95 $106.76 $106.06 $102.20 $99.94 $92.13 $89.88 $77.40 $73.55 $70.97 $72.55 $74.23 $96.94 Furniture & Equipment $40.00 $39.27 $38.55 $38.44 $38.33 $39.90 $48.13 $48.37 $47.19 $46.04 $44.93 $43.83 $42.93 $41.80 $40.73 $42.56 Total ($/capita) $766.57 $737.74 $719.07 $717.08 $708.15 $707.52 $712.41 $713.26 $690.52 $673.70 $647.03 $629.28 $615.33 $602.56 $590.63 $682.06 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE PUBLIC LIBRARY 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $682.06 Population Growth 2024 - 2033 3,978 Maximum Allowable Funding Envelope $2,713,368 Appendix B | 84 Table displa ys Library 10-year capit al program includin g all legisla te deductions a nd calcul ate d developme nt charge r ates. Appendix B | 85 Appendix B.2 Fire Services Appendix B | 86 Appendix B.2 - Fire Services The Town of The Blue Mountains Fire Department is responsible for fire prevention inspections, public education sessions, communications (including dispatching), and fire suppression. Table B.2-1 2009-2023 Historical Service Levels The Town of The Blue Mountains Fire Department operates from two fire halls, Craigleith and Thornbury. The combined area of the stations is 16,400 square feet valued at $8.2 million. The land area associated with the buildings is approximately 2.46 hectares and is valued at $3.52 million. The total cost of all furniture and equipment at both stations is approximately $1.5 million. The 16 vehicles associated with the stations have a total replacement cost of $8.22 million. The current replacement value of all Fire Services capital infrastructure is $21.44 million, which provides the Town with a 15-year historical average service level of $1,043.26 per population and employment. The calculated maximum allowable recoverable through development charges over the 2024 to 2033 planning period is $4.44 million (4,253 population and employment growth X historical service level of $1,043.26/pop and emp). Table B.2-2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The Fire Services capital forecast recovers for a new Fire Hall of $8.70 million, including all associated land, furniture and equipment. Additionally, Upgrades to Fire Hall 1 ($3.49 million) and a new Mobile Training Unit ($500,000) are eligible for recovery. The program also includes additional emergency equipment ($950,000) and personnel equipment acquisitions ($24,000). Appendix B | 87 In total, the 10-year capital program for Fire Services amounts to $13.66 million. No grants or subsidies are identified for this serviceʼs capital program. Approximately $3.15 million has been identified as providing benefit to existing development, which relates to the proposed new Fire Hall and Mobile Training Unit. A portion of the costs, approximately $811,908, will be funded by available reserve funds. A share of $5.26 million is deemed as related to other development and will not be recovered under this development charges by-law but may be considered for funding from other sources and in future development charge studies, subject to service level restrictions. The remaining $4.44 million is related to development between 2024 and 2033 and is allocated entirely against future development in the Town of The Blue Mountains. The 10-year development-related net capital cost is allocated 95 per cent, or $4.23 million, against residential development, and 5 per cent, or $208,159, against non-residential development. The allocation between residential and non-residential development is based on shares of 10-year growth in population in new units and employment. The resulting development charge is $756.94 per capita and $9.47 per square metre. The following table summarizes the calculation of the Fire Services development charge. 15-year Hist. Service Level per Pop & Emp Total Net DC Recoverable $/capita $/m2 $1,043.26 $13,664,000 $4,437,189 $756.94 $9.47 FIRE SERVICES SUMMARY 2024 - 2033 Calculated Development Charge Development-Related Capital Program Appendix B | 88 APPENDIX B.2 TABLE B.2-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS FIRE SERVICES BUILDINGS # of Square Feet UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Craigleith Fire Hall - Hall #2 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 6,400 $500 Thornbury Fire Hall - Hall #1 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $500 Total (sq.ft.) 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 16,400 Total ($000) $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 LAND # of Hectares UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Craigleith Teed Fire Hall - Hall #2 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 $1,430,000 Thornbury Fire Hall - Hall #1 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 2.01 $1,430,000 Total (ha) 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 2.46 Total ($000) $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 FURNITURE & EQUIPMENT Total Value of Furniture and Equipment ($) UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Number of Fire Fighters 51 51 51 51 51 51 51 51 51 51 51 51 59 52 52 $6,000 Personal Gear (i.e. Clothing, Bunker Gear etc.) $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $306,000 $354,000 $312,000 $312,000 Breathing Equipment 28 28 28 28 28 28 28 28 28 28 28 28 28 28 28 $13,000 Self Contained Breathing Apparatus, Air Bottles etc. $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 $364,000 Furniture & Equipment in Stations Furniture & Equipment for Stations ($50 per sq.ft.) $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 $820,000 Total ($000) $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,538.0 $1,496.0 $1,496.0 VEHICLES # of Vehicles UNIT COST Vehicle Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) 75' Ariel 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,750,000 Marine Rescue Unit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $45,000 Rough Terrain Vehicle (RTV) - - - - - - - - 1 1 1 - - - - $15,000 All Terrain Vehicle (ATV) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $15,000 Snowmobile - - - - - - - - - - - - 1 1 1 $15,000 Light Duty Vehicles 5 5 5 5 6 6 6 5 5 5 5 5 5 5 5 $50,000 Pumpers 3 3 3 3 3 3 3 4 4 5 5 5 5 5 5 $950,000 Tanks 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $700,000 Total (#) 13 13 13 13 14 14 14 14 15 16 16 15 16 16 16 Total ($000) $6,310.0 $6,310.0 $6,310.0 $6,310.0 $6,360.0 $6,360.0 $6,360.0 $7,260.0 $7,275.0 $8,225.0 $8,225.0 $8,210.0 $8,225.0 $8,225.0 $8,225.0 Appendix B | 89 APPENDIX B.2 TABLE B.2-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS FIRE SERVICES 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 Historical Employment 3,339 3,337 3,335 3,432 3,531 3,633 3,738 3,847 4,010 4,179 4,353 4,534 4,720 4,863 4,891 Total Historical Population & Employment 17,638 17,901 18,173 18,313 18,455 18,597 18,739 18,887 19,425 19,979 20,547 21,132 21,730 22,333 22,822 INVENTORY SUMMARY ($000) Buildings $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 $8,200.0 Land $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 $3,517.8 Furniture & Equipment $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,490.0 $1,538.0 $1,496.0 $1,496.0 Vehicles $6,310.0 $6,310.0 $6,310.0 $6,310.0 $6,360.0 $6,360.0 $6,360.0 $7,260.0 $7,275.0 $8,225.0 $8,225.0 $8,210.0 $8,225.0 $8,225.0 $8,225.0 Total ($000) $19,517.8 $19,517.8 $19,517.8 $19,517.8 $19,567.8 $19,567.8 $19,567.8 $20,467.8 $20,482.8 $21,432.8 $21,432.8 $21,417.8 $21,480.8 $21,438.8 $21,438.8 Average SERVICE LEVEL ($/pop & emp) Service Level Buildings $464.91 $458.07 $451.23 $447.77 $444.32 $440.93 $437.59 $434.16 $422.13 $410.43 $399.09 $388.03 $377.36 $367.17 $359.31 $420.17 Land $199.44 $196.51 $193.58 $192.09 $190.62 $189.16 $187.73 $186.25 $181.09 $176.08 $171.21 $166.47 $161.89 $157.51 $154.14 $180.25 Furniture & Equipment $84.48 $83.24 $81.99 $81.36 $80.74 $80.12 $79.51 $78.89 $76.70 $74.58 $72.52 $70.51 $70.78 $66.99 $65.55 $76.53 Vehicles $357.75 $352.49 $347.23 $344.56 $344.62 $341.99 $339.40 $384.39 $374.51 $411.69 $400.31 $388.51 $378.51 $368.28 $360.40 $366.31 Total ($/pop & emp) $1,106.58 $1,090.32 $1,074.03 $1,065.79 $1,060.30 $1,052.20 $1,044.23 $1,083.69 $1,054.45 $1,072.77 $1,043.13 $1,013.52 $988.54 $959.95 $939.40 $1,043.26 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE FIRE SERVICES 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $1,043.26 Population and Employment Growth 2024 - 2033 4,253 Maximum Allowable Funding Envelope $4,437,189 Appendix B | 90 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 2.0 FIRE SERVICES 2.1 Buildings, Land & Furnishings 2.1.1 Provision for New Fire Hall (includes bulding, land and F&E) 2024 8,700,000 $ - $ 8,700,000 $ 33% 2,900,000 $ 5,800,000 $ 799,908 $ 4,437,189 $ 562,903 $ 2.1.2 Upgrades to Fire Hall 1 - 4,000sqft New Space 2028 3,490,000 $ - $ 3,490,000 $ 0% - $ 3,490,000 $ - $ - $ 3,490,000 $ 2.1.3 Mobile Training Unit 2030 500,000 $ - $ 500,000 $ 50% 250,000 $ 250,000 $ - $ - $ 250,000 $ Subtotal Buildings, Land & Furnishings 12,690,000 $ - $ 12,690,000 $ 3,150,000 $ 9,540,000 $ 799,908 $ 4,437,189 $ 4,302,903 $ 2.2 Vehicles & Equipment 2.2.1 Emergency Equipment Various 950,000 $ - $ 950,000 $ 0% - $ 950,000 $ - $ - $ 950,000 $ Subtotal Vehicles & Equipment 950,000 $ - $ 950,000 $ - $ 950,000 $ - $ - $ 950,000 $ 2.3 Personel Equipment 2.3.1 Equipment for New Fire Fighter 2024 12,000 $ - $ 12,000 $ 0% - $ 12,000 $ 12,000 $ - $ - $ 2.3.2 Equipment for New Fire Fighter 2028 12,000 $ - $ 12,000 $ 0% - $ 12,000 $ - $ - $ 12,000 $ Subtotal Personel Equipment 24,000 $ - $ 24,000 $ - $ 24,000 $ 12,000 $ - $ 12,000 $ TOTAL FIRE SERVICES 13,664,000 $ - $ 13,664,000 $ 3,150,000 $ 10,514,000 $ 811,908 $ 4,437,189 $ 5,264,903 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 95% $4,229,030 2024 - 2033 Net Funding Envelope $4,437,189 10-Year Growth Population in New Units 5,587 Unadjusted Development Charge Per Capita $756.94 Uncommitted Reserve Fund Balance Balance as at December 31, 2023 $811,908 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 5% $208,159 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $9.47 TABLE B.2-2 APPENDIX B.2 TOWN OF THE BLUE MOUNTAINS DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM FIRE SERVICES Appendix B | 91 Appendix B.3 Police Department Appendix B | 92 Appendix B.3 - Police Department Policing for the Town of The Blue Mountains is provided by the Ontario Provincial Police. The Blue Mountains detachment headquarters office is found in Thornbury. Table B.3-1 2009-2023 Historical Service Levels The 15-year historical inventory of capital assets for the Police Department includes 6,590 square feet of building space with a replacement value of $3.30 million. The 0.67 hectares of land associated with the building space are valued at $959,500. The total cost of furniture and equipment associated with the stations, including personal police equipment and communications equipment adds $197,700 to the value of the inventory. The current replacement value of the Police Departmentʼs capital infrastructure including buildings, land, vehicles and equipment is approximately $4.45 million. This provides a 15-year average historical service level of $228.13 per population and employment. This average historical service level multiplied by the 10-year forecast growth in population and employment, results in a 10-year maximum allowable funding envelope of $970,282 (4,253 population and employment growth X historical service level of $228.13/population and employment). Table B.3-2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The Police capital program recovers for the debt related associated with the Ontario Provincial Police Station in Thornbury. The total debt payments have been included in the capital program in the amount of $373,738. No grants or subsidies are identified for the Police Departmentʼs capital program. A portion of the debt for the station ($35,353) will be funded through the Townʼs Police Department DC reserve fund and are therefore Appendix B | 93 reduced from the total development charge calculation. Altogether, the 10- year capital forecast for Police amounts to $338,385, all of which is considered to be development-related. As shown in Table B.3-2, the total development-related cost is allocated 95% or $332,510, against new residential development, and 5%, or $15,874, against non-residential development. This yields a development charge of $57.73 per capita and $0.72 per square metre. The following table summarizes the calculation of the Police Department development charge. 15-year Hist. Service Level per Pop & Emp Total Net DC Recoverable $/capita $/m2 $228.13 $373,738 $338,385 $57.73 $0.72 Development-Related Capital Program Development Charge POLICE DEPARTMENT SUMMARY 2024 - 2033 Calculated Appendix B | 94 APPENDIX B.3 TABLE B.3-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS POLICE DEPARTMENT BUILDINGS # of Square Feet UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq. ft.) Thornbury OPP Detachment Office 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 $500 Allocated Space (Collingwood Detachment) 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 2,990 $500 Total (sq.ft.) 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 6,590 Total ($000) $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 LAND # of Hectares UNIT COST Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Thornbury OPP Detachment Office 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $1,430,000 Overall Land Allocation (Collingwood Detachment) 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 $1,430,000 Total (ha) 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 0.67 Total ($000) $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 FURNITURE & EQUIPMENT Total Value of Furniture & Equipment ($) Station Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Furniture & Equipment for Stations and Police Officiers ($30 per sq.ft.) $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 $197,700 Total ($000) $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 Appendix B | 95 APPENDIX B.3 TABLE B.3-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS POLICE DEPARTMENT 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 Historical Employment 3,339 3,337 3,335 3,432 3,531 3,633 3,738 3,847 4,010 4,179 4,353 4,534 4,720 4,863 4,891 Total Historical Population & Employment 17,638 17,901 18,173 18,313 18,455 18,597 18,739 18,887 19,425 19,979 20,547 21,132 21,730 22,333 22,822 INVENTORY SUMMARY ($000) Buildings $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 $3,295.0 Land $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 $959.5 Furniture & Equipment $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 $197.7 Total ($000) $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 $4,452.2 Average SERVICE LEVEL ($/pop & emp) Service Level Buildings $186.81 $184.07 $181.32 $179.93 $178.54 $177.18 $175.84 $174.46 $169.63 $164.92 $160.37 $155.92 $151.64 $147.54 $144.38 $168.84 Land $54.40 $53.60 $52.80 $52.40 $51.99 $51.60 $51.20 $50.80 $49.40 $48.03 $46.70 $45.41 $44.16 $42.96 $42.04 $49.17 Furniture & Equipment $11.21 $11.04 $10.88 $10.80 $10.71 $10.63 $10.55 $10.47 $10.18 $9.90 $9.62 $9.36 $9.10 $8.85 $8.66 $10.13 Total ($/pop & emp) $252.42 $248.71 $245.00 $243.12 $241.25 $239.41 $237.59 $235.73 $229.20 $222.85 $216.69 $210.69 $204.89 $199.35 $195.09 $228.13 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE POLICE DEPARTMENT 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $228.13 Population and Employment Growth 2024 - 2033 4,253 Maximum Allowable Funding Envelope $970,282 Appendix B | 96 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 3.0 POLICE DEPARTMENT 3.1 Recovery of OPP Detachment Debt 3.1.1 Total Payment 2024 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ 35,353 $ 2,021 $ - $ 3.1.2 Total Payment 2025 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.3 Total Payment 2026 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.4 Total Payment 2027 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.5 Total Payment 2028 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.6 Total Payment 2029 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.7 Total Payment 2030 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.8 Total Payment 2031 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.9 Total Payment 2032 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ 3.1.10 Total Payment 2033 37,374 $ - $ 37,374 $ 0% - $ 37,374 $ - $ 37,374 $ - $ Subtotal Recovery of OPP Detachment Debt 373,738 $ - $ 373,738 $ - $ 373,738 $ 35,353 $ 338,385 $ - $ TOTAL POLICE DEPARTMENT 373,738 $ - $ 373,738 $ - $ 373,738 $ 35,353 $ 338,385 $ - $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 95% $322,510 2024 - 2033 Net Funding Envelope $970,282 10-Year Growth Population in New Units 5,587 Unadjusted Development Charge Per Capita $57.73 Uncommitted Reserve Fund Balance Balance as at December 31, 2023 $35,353 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 5% $15,874 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $0.72 APPENDIX B.3 POLICE DEPARTMENT DEVELOPMENT-RELATED CAPITAL PROGRAM TABLE B.3-2 TOWN OF THE BLUE MOUNTAINS DC Eligible Costs Appendix B | 97 Appendix B.4 Parks and Recreation Appendix B | 98 Appendix B.4 - Parks and Recreation The Town of The Blue Mountains Recreation Department is responsible for provision of indoor and outdoor recreation facilities, community space and recreational programming. The Recreation Department provides indoor recreation services through several major facilities, most notably the Beaver Valley Community Centre. Table B.4-1 2009-2023 Historical Service Levels The 15-year historical inventory of capital assets for Indoor Recreation includes 58,596 square feet of indoor recreation building space accommodated within the Townʼs facilities. The largest of these facilities is The Beaver Valley Community Centre at 41,600 square feet. The current replacement value for the buildings is $24.21 million, and the 4.57 hectares of land associated with the buildings is valued at $6.53 million. The furniture and equipment found in the facilities has a total value of $1.76 million. The Blue Mountainʼs inventory of developed parks amounts to 20.93 hectares valued at $7.32 million. It also includes 29.83 hectares of developed open and natural parks valued at $4.32 million. The Townʼs inventory also includes 42,600 metres of trails valued at $3.98 million. The Parks department is responsible for various park amenities such baseball diamonds, softball diamonds, soccer pitches, golf courses, tennis courts, playgrounds, basketball courts, skateboard parks, pavilions, and dog parks. The total value of park facilities is $8.59 million. Park vehicles and equipment add an additional $1.50 million to the inventory. The 2023 full replacement value of the inventory of capital assets for Parks and Recreation services amounts to $58.21 million and the 15-year historical average service level is $3,590.86 per capita. Appendix B | 99 The historical service level multiplied by the 10-year forecast of population growth results in a 10-year maximum allowable funding envelope of $14.28 million (3,978 net population growth X historical service level of $3,590.86/capita). Table B.4-2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The 2024-2033 gross development-related capital program for Parks and Recreation amounts to $85.03 million. The largest project in the capital program is a provision for indoor recreation space for $80.00 million. The capital program provides $2.14 million for various parkland development projects, the most significant of which are Parkland and Waterfront development. Also included in the program is $2.26 million for new park facilities. Lastly, the Town anticipates acquiring additional vehicles and equipment for a total cost of $630,900. Of the gross cost, $50.00 million in grants and subsidies related to the new indoor recreation space has been identified and is removed from the DC eligible costs. Replacement or benefit to existing shares of $729,500 have been identified for this service related to the Trail & Trailhead development, Tennis court construction / Pickle Ball, and Trail Development at 50% BTE and Additional Pavilion / Washrooms at 25% BTE. The DC eligible costs are then reduced to $34.30 million, of which $14.28 million is eligible for development charges funding within the 10-year planning period. Approximately $3.49 million has been identified as available funding in the development charges reserve and $16.52 million has been identified recoverable from other development funding including consideration for recovery in future DC background studies. The full development-related share of the Parks and Recreation capital program is allocated entirely against future residential development in the Appendix B | 100 Town of The Blue Mountains. This results in a development charge of $2,556.85 per capita. The following table summarizes the calculation of the Parks development charge. 15-year Hist. Service Level per Capita Total Net DC Recoverable $/capita $/m2 $3,590.86 $85,028,900 $14,285,145 $2,556.85 $0.00 2024 - 2033 Calculated PARKS AND RECREATION SUMMARY Development-Related Capital Program Development Charge Appendix B | 101 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION INDOOR RECREATION FACILITIES BUILDINGS # of Square Feet UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Beaver Valley Community Centre 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 41,600 $420 Craigleith Hall 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 1,056 $420 Ravenna Hall 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 $420 Tomahawk Operations Building 3,720 3,720 3,720 3,720 3,720 3,720 3,720 3,720 3,720 3,720 5,000 5,000 5,000 5,000 5,000 $400 Tomahawk Golf Maintenance Building - - - 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 1,500 $400 Thornbury Harbour Office 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 1,460 $385 Thornbury Harbour Fish Cleaning Station 325 325 325 325 325 325 325 325 325 325 325 325 325 325 325 $385 Thornbury Harbour Washroom/Shower building 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 2,470 $385 Parks Satellite Ops (Bayview) 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 1,210 $385 Northwinds Beach Washrooms 355 355 355 355 355 355 355 355 355 355 355 355 355 355 355 $385 Cedar Grove (previously Bayview Park) (beach) Washrooms 175 175 175 175 175 175 175 175 175 175 175 175 175 175 175 $385 Bayview Park (grounds) Washrooms 580 580 580 580 580 580 580 580 580 580 580 580 580 580 580 $385 Little River Park (beach) Washrooms 290 290 290 290 290 290 290 290 290 290 290 290 290 290 290 $385 Lora Bay Washroom Building 185 185 185 185 185 185 185 185 185 185 185 185 185 185 185 $385 Nipissing Ridge Washroom Building - - - - - 290 290 290 290 290 290 290 290 290 290 $385 Parks and Recreation Office Space in Town Hall - - 500 500 500 500 500 500 500 500 500 500 500 500 500 $385 Total (sq.ft.) 55,026 55,026 55,526 57,026 57,026 57,316 57,316 57,316 57,316 57,316 58,596 58,596 58,596 58,596 58,596 Total ($000) $22,789.8 $22,789.8 $22,982.3 $23,582.3 $23,582.3 $23,693.9 $23,693.9 $23,693.9 $23,693.9 $23,693.9 $24,205.9 $24,205.9 $24,205.9 $24,205.9 $24,205.9 LAND # of Hectares UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Beaver Valley Community Centre 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 2.02 $1,430,000 Craigleith Hall 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 $1,430,000 Ravenna Hall 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $1,430,000 Chamber of Commerce 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $1,430,000 Tomahawk Operations Building 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $1,430,000 Tomahawk Golf Operations - - - 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 $1,430,000 125 Peel Street - - - - - - - - - - - - - - - $1,430,000 Parks and Recreation Office Space in Town Hall - - - 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 $1,430,000 Total (ha) 4.04 4.04 4.04 4.57 4.57 4.57 4.57 4.57 4.57 4.57 4.57 4.57 4.57 4.57 4.57 Total ($000) $5,771.1 $5,771.1 $5,771.1 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 $6,529.0 FURNITURE & EQUIPMENT Total Value of Furniture & Equipment ($) Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Furniture & Equipment for Facilities ($30 per sq.ft.) $1,650,780 $1,650,780 $1,665,780 $1,710,780 $1,710,780 $1,719,480 $1,719,480 $1,719,480 $1,719,480 $1,719,480 $1,757,880 $1,757,880 $1,757,880 $1,757,880 $1,757,880 Total ($000) $1,650.8 $1,650.8 $1,665.8 $1,710.8 $1,710.8 $1,719.5 $1,719.5 $1,719.5 $1,719.5 $1,719.5 $1,757.9 $1,757.9 $1,757.9 $1,757.9 $1,757.9 Appendix B | 102 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARKLAND DEVELOPED PARKS # of Hectares of Developed Area UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Moreau Park (B.V.C.C.), 018-23100 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 4.45 $350,000 Bayview Park (Grounds), 016-08400 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 $350,000 Little River 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 $350,000 Lora Bay - - 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $350,000 Council Beach 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 $350,000 Delphi Point 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 $350,000 Boyer Subdivision, 003-32363 Block 13 Plan 1113 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09 $350,000 Northwinds Beach 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 $350,000 4 Heritage Corners Subdivision 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41 $350,000 Nipissing Ridge (Georgian Woodlands) 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 $350,000 Hester St. Parkette, 017-12900 - See Special Facilities 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 $350,000 Hillcrest Park Clarksburg 012-11600 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 $350,000 Lions Park 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 $350,000 Cedar Grove 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 2.15 $350,000 Total (ha) 20.13 20.13 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.93 20.93 Total ($000) $7,044.9 $7,044.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 $7,324.9 OPEN, NATURAL PARKS # of Hectares of Developed Area UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Parkettes Bruce Street Parkette 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 $62,000 Harbour Hill Parkette 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 $62,000 Timmons Parkette 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 $62,000 Open, Natural Parks Craigleith Meadows 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 $62,000 Heathcote Park 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 3.64 $62,000 Jozo Blvd. Park - - - 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 $62,000 15 Georgian Woodlands, 006-18501, Block A, Plan 822 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 $62,000 Golf Courses Tomahawk - - - 21.85 21.85 21.85 21.85 21.85 21.85 21.85 21.85 21.85 21.85 21.85 21.85 $175,000 Other Jack Acres Memorial Park 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.27 0.27 0.27 0.27 0.27 0.27 0.27 $62,000 14 Wyandot Court Park 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 $62,000 Riverwalk Park 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 $62,000 Cenotaph Hwy #26 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 $62,000 32 Heathcote Former Hall Lands 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 $62,000 Smith Memorial - 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 $62,000 School House Lane (Bannerman Property) - - - - - - - - - - - - 0.14 0.14 0.14 $62,000 Gamble Park - - - - - - - - - 0.07 0.07 0.07 0.07 0.07 0.07 $62,000 Total (ha) 6.48 6.72 6.72 29.45 29.45 29.45 29.45 29.45 29.62 29.69 29.69 29.69 29.83 29.83 29.83 Total ($000) $401.7 $416.6 $416.6 $4,294.9 $4,294.9 $4,294.9 $4,294.9 $4,294.9 $4,305.4 $4,309.8 $4,309.8 $4,309.8 $4,318.4 $4,318.4 $4,318.4 Appendix B | 103 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARKLAND TRAIL DEVELOPMENT # of Metres of Trail UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/m2) 37 Georgian Trail 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 20,500 $94 Bayview Trail 680 680 680 680 680 680 680 680 680 680 680 680 680 680 680 $94 Beaver River Trail 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 $94 Heathcote Trail 610 610 610 610 610 610 610 610 610 610 610 610 610 610 610 $94 Camperdown Road Trail 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 $94 Delphi Point Park Trail 460 460 460 460 460 460 460 460 460 460 460 460 460 460 460 $94 Drakes Path Trail 210 210 210 210 210 210 210 210 210 210 210 210 210 210 210 $94 Nipissing Ridge Trail 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 $94 Summit Green Trail 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 $94 Lora Bay Trail 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 $94 Alta Trail 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400 $94 7th Line Trail 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 $94 Alpine Trail 620 620 620 620 620 620 620 620 620 620 620 620 620 620 620 $94 Craigleith Meadows Trail 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 $94 Heritage Trail 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 $94 Total (#) 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 42,600.0 Total ($000) $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 $3,983.1 Appendix B | 104 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES BASEBALL DIAMONDS # of Diamonds UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Baseball Diamonds 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $159,500 Total (#) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Total ($000) $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 $478.5 SOFTBALL DIAMONDS # of Diamonds UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Heritage Park 1 1 1 1 1 1 1 1 1 1 1 1 - - - $82,500 Total (#) 1 1 1 1 1 1 1 1 1 1 1 1 - - - Total ($000) $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $82.5 $0.0 $0.0 $0.0 SOCCER PITCHES # of Pitches UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Bayview Park 1 1 1 1 - - - - - - - - - - - $27,240 Tomahawk Recreation Complex 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $198,000 Tomahawk Tyke Field - - - - 1 1 1 1 1 1 1 1 1 1 1 $99,000 Total (#) 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 Total ($000) $621.2 $621.2 $621.2 $621.2 $693.0 $693.0 $693.0 $693.0 $693.0 $693.0 $693.0 $693.0 $693.0 $693.0 $693.0 Appendix B | 105 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES GOLF COURSES # of Courses UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Tomahawk 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $1,500,000 Total (#) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Total ($000) $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 $1,500.0 TENNIS COURTS/PICKELBALL COURTS # of Courts UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Cameron Shores Tennis Club 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $165,000 Bayview Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $165,000 Nipissing Ridge (Georgian Woodlands) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $165,000 Boyer Park 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $165,000 Tomahawk Pickleball Courts - - - - - - - - - - - - 4 4 4 $41,250 Total (#) 8 8 8 8 8 8 8 8 8 8 8 8 12 12 12 Total ($000) $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,320.0 $1,485.0 $1,485.0 $1,485.0 PLAYGROUNDS # of Playgrounds UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Timmons Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,000 Ravenna Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,000 Hillcrest Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,000 Council Beach 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $43,000 Heritage Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $114,700 Northwinds Beach 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $114,700 Bayview Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $215,100 Moreau Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $215,100 Little River Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $215,100 Total (#) 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 Total ($000) $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 $1,046.7 Appendix B | 106 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES BASKETBALL COURTS # of Courts UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) B.V.C.C. Basketball Court 1 1 1 1 1 1 1 1 1 1 1 - - - - $10,000 Timmons St. Basketball Court (1/2 court) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $10,000 Heritage Park 1/2 Court - - - - - - - - - 1 1 1 1 1 1 $10,000 Total (#) 2 2 2 2 2 2 2 2 2 3 3 2 2 2 2 Total ($000) $20.0 $20.0 $20.0 $20.0 $20.0 $20.0 $20.0 $20.0 $20.0 $30.0 $30.0 $20.0 $20.0 $20.0 $20.0 SKATEBOARD PARKS # of Parks UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Moreau Park 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $75,900 Total (#) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Total ($000) $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 $75.9 PAVILIONS # of Pavilions UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Moreau Park Sun Shade 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $16,500 Tomahawk Sun Shades 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $16,500 Lions Parks Pavilion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $148,500 Delphi Point Pavilion - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $148,500 Thornbury Harbour Pavilion - - - - 1 1 1 1 1 1 1 1 1 1 1 $148,500 Tomahawk Pavillion - - - - 1 1 1 1 1 1 1 1 1 1 1 $148,501 Bayview Park Rotary Pavilion 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Cedar Drove - - 1 1 1 1 1 1 1 1 1 1 1 1 1 $148,500 Total (#) 6 7 8 8 10 10 10 10 10 10 10 10 10 10 10 Total ($000) $434.5 $583.0 $731.5 $731.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 $1,028.5 Appendix B | 107 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION PARK FACILITIES DOG PARKS # of Parks UNIT COST Park Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Moreau Park Dog park - - - - 1 1 1 1 1 1 1 1 1 1 1 $25,000 Heritage Park Dog Park - - - - - - - - - - - - 1 1 1 $25,000 Total (#) - - - - 1 1 1 1 1 1 1 1 2 2 2 Total ($000) $0.0 $0.0 $0.0 $0.0 $25.0 $25.0 $25.0 $25.0 $25.0 $25.0 $25.0 $25.0 $50.0 $50.0 $50.0 SPECIAL FACILITIES Total Value of Special Facilities Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Tomahawk Soccer Field Sheds $15,000 $15,000 $15,000 $15,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 Tomahawk Storage Container $0 $0 $0 $0 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $10,000 $10,000 $10,001 $10,002 Thornbury Harbour Docks $1,760,000 $1,760,000 $1,760,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 $1,830,000 Thornbury Harbour Fuel Dock/System $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 $310,000 Labyrinth $0 $0 $0 $0 $0 $0 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 Parks Operations Storage Container $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,000 $5,000 $5,000 $5,000 $5,000 Total ($000) $2,085.0 $2,085.0 $2,085.0 $2,155.0 $2,170.0 $2,170.0 $2,205.0 $2,205.0 $2,205.0 $2,205.0 $2,210.0 $2,215.0 $2,215.0 $2,215.0 $2,215.0 Appendix B | 108 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS PARKS AND RECREATION VEHICLES AND EQUIPMENT VEHICLES AND EQUIPMENT Total Value of Vehicles and Equipment ($) UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Backhoe 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 $110,000 Heavy Duty Pickup Truck 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 $60,000 Ice Resurfacer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $95,000 Large Landscaping Equipment 5 5 5 5 5 6 7 7 9 9 9 9 9 9 9 $30,000 Light Duty Pickup Truck 8 8 8 8 8 7 7 7 9 8 7 7 8 8 8 $45,000 RTV 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 $25,000 Snow Removal Equipment 1 1 1 1 1 1 1 1 1 1 6 6 8 8 8 $10,000 Tractor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $135,000 Attachment 3 3 3 3 3 3 4 4 4 4 4 5 5 5 5 $25,000 Trailer 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 $10,000 Small Equipment 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 $1,000 Total (#) 79 79 79 79 79 80 82 82 86 85 91 93 96 96 96 Total ($000) $1,004.0 $1,004.0 $1,004.0 $1,004.0 $1,004.0 $1,049.0 $1,104.0 $1,104.0 $1,254.0 $1,209.0 $1,299.0 $1,434.0 $1,499.0 $1,499.0 $1,499.0 Appendix B | 109 APPENDIX B.4 TABLE B.4-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS PARKS AND RECREATION RECREATION COMBINED 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 INVENTORY SUMMARY ($000) Indoor Recreation $30,211.6 $30,211.6 $30,419.1 $31,822.0 $31,822.0 $31,942.4 $31,942.4 $31,942.4 $31,942.4 $31,942.4 $32,492.8 $32,492.8 $38,856.3 $38,856.3 $38,856.3 Parkland $37,399.0 $37,570.6 $38,714.6 $54,966.5 $54,966.5 $54,966.5 $54,966.5 $54,966.5 $55,088.1 $55,138.1 $55,138.1 $55,138.1 $55,238.2 $55,238.2 $55,238.2 Park Facilities $7,664.3 $7,812.8 $7,961.3 $8,031.3 $8,440.1 $8,440.1 $8,475.1 $8,475.1 $8,475.1 $8,485.1 $8,490.1 $8,485.1 $8,592.6 $8,592.6 $8,592.6 Park Vehicles and Equipment $1,004.0 $1,004.0 $1,004.0 $1,004.0 $1,004.0 $1,049.0 $1,104.0 $1,104.0 $1,254.0 $1,209.0 $1,299.0 $1,434.0 $1,499.0 $1,499.0 $1,499.0 Total ($000) $76,278.9 $76,599.0 $78,099.0 $95,823.9 $96,232.6 $96,398.0 $96,488.0 $96,488.0 $96,759.5 $96,774.6 $97,420.0 $97,550.0 $104,186.1 $104,186.1 $104,186.1 Average SERVICE LEVEL ($/capita) Service Level Indoor Recreation $2,112.85 $2,074.40 $2,050.15 $2,138.43 $2,132.27 $2,134.61 $2,129.35 $2,123.83 $2,072.16 $2,021.67 $2,006.53 $1,957.57 $2,284.32 $2,224.09 $2,167.01 $2,108.62 Parkland $2,615.50 $2,579.69 $2,609.24 $3,693.74 $3,683.10 $3,673.25 $3,664.19 $3,654.69 $3,573.67 $3,489.76 $3,404.95 $3,321.87 $3,247.40 $3,161.78 $3,080.63 $3,296.90 Park Facilities $536.01 $536.45 $536.57 $539.70 $565.54 $564.03 $564.97 $563.50 $549.80 $537.03 $524.29 $511.20 $505.15 $491.83 $479.21 $533.68 Park Vehicles and Equipment $70.21 $68.94 $67.67 $67.47 $67.27 $70.10 $73.60 $73.40 $81.35 $76.5 $80.2 $86.4 $88.1 $85.8 $83.6 $76.04 Total ($/capita) $5,334.56 $5,259.48 $5,263.62 $6,439.34 $6,448.18 $6,441.99 $6,432.10 $6,415.42 $6,276.97 $6,124.97 $6,015.99 $5,877.04 $6,124.99 $5,963.50 $5,810.45 $6,015.24 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE PARKS AND RECREATION 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $6,015.24 Population Growth 2024 - 2033 3,978 Maximum Allowable Funding Envelope $23,929,804 Appendix B | 110 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 4.0 PARKS AND RECREATION 4.1 Indoor Recreation 4.1.1 Provision for Indoor Recreation Space 2030 80,000,000 $ 50,000,000 $ 30,000,000 $ 0% - $ 30,000,000 $ - $ 13,478,242 $ 16,521,758 $ Subtotal Indoor Recreation 80,000,000 $ 50,000,000 $ 30,000,000 $ - $ 30,000,000 $ - $ 13,478,242 $ 16,521,758 $ 4.2 Parkland Development 4.2.1 Parkland Development Various 717,000 $ - $ 717,000 $ 0% - $ 717,000 $ 717,000 $ - $ - $ 4.2.2 Waterfront Development Various 717,000 $ - $ 717,000 $ 0% - $ 717,000 $ 311,797 $ 405,203 $ - $ 4.2.3 Trail & Trailhead Development Various 358,000 $ - $ 358,000 $ 50% 179,000 $ 179,000 $ 179,000 $ - $ - $ 4.2.4 Parks Satellite Building 2024 350,000 $ - $ 350,000 $ 0% - $ 350,000 $ 350,000 $ - $ - $ Subtotal Parkland Development 2,142,000 $ - $ 2,142,000 $ 179,000 $ 1,963,000 $ 1,557,797 $ 405,203 $ - $ 4.3 Park Facilities 4.3.1 Tennis Court Construction/Pickle Ball 2024 660,000 $ - $ 660,000 $ 50% 330,000 $ 330,000 $ 330,000 $ - $ - $ 4.3.2 Tennis Court Construction/Pickle Ball 2030 330,000 $ - $ 330,000 $ 0% - $ 330,000 $ - $ 330,000 $ - $ 4.3.3 Additional Pavillion / Washrooms 2025 450,000 $ - $ 450,000 $ 25% 112,500 $ 337,500 $ 337,500 $ - $ - $ 4.3.4 Trail Development 2028 216,000 $ - $ 216,000 $ 50% 108,000 $ 108,000 $ 108,000 $ - $ - $ 4.3.5 Additional Parking at Riverwalk Various 600,000 $ - $ 600,000 $ 0% - $ 600,000 $ 600,000 $ - $ - $ Subtotal Park Facilities 2,256,000 $ - $ 2,256,000 $ 550,500 $ 1,705,500 $ 1,375,500 $ 330,000 $ - $ 4.4 Vehicles and Equipment 4.4.1 Additional Playground Equipment 2024 71,700 $ - $ 71,700 $ 0% - $ 71,700 $ 71,700 $ - $ - $ 4.4.2 Provision for Large Equipment (Truck/Trailer, Mowers, RTV etc.) 2024 172,100 $ - $ 172,100 $ 0% - $ 172,100 $ 172,100 $ - $ - $ 4.4.3 Provision for Small Equipment (Chainsaw, Push Mowers, etc.) 2024 35,800 $ - $ 35,800 $ 0% - $ 35,800 $ 35,800 $ - $ - $ 4.4.4 Additional Playground Equipment 2027 71,700 $ - $ 71,700 $ 0% - $ 71,700 $ 71,700 $ - $ - $ 4.4.5 Provision for Large Equipment (Truck/Trailer, Mowers, RTV etc.) 2029 172,100 $ - $ 172,100 $ 0% - $ 172,100 $ 172,100 $ - $ - $ 4.4.6 Provision for Small Equipment (Chainsaw, Push Mowers, etc.) 2029 35,800 $ - $ 35,800 $ 0% - $ 35,800 $ 35,800 $ - $ - $ 4.4.7 Additional Playground Equipment 2030 71,700 $ - $ 71,700 $ 0% - $ 71,700 $ - $ 71,700 $ - $ Subtotal Vehicles and Equipment 630,900 $ - $ 630,900 $ - $ 630,900 $ 559,200 $ 71,700 $ - $ TOTAL PARKS AND RECREATION 85,028,900 $ 50,000,000 $ 35,028,900 $ 729,500 $ 34,299,400 $ 3,492,497 $ 14,285,145 $ 16,521,758 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 100% $14,285,145 2024 - 2033 Net Funding Envelope $14,285,145 10-Year Growth Population in New Units 5,587 Unadjusted Development Charge Per Capita $2,556.85 Uncommitted Reserve Fund Balance Balance as at December 31, 2023 $3,492,497 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 0% $0 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $0.00 PARKS AND RECREATION TABLE B.4-2 TOWN OF THE BLUE MOUNTAINS DEVELOPMENT-RELATED CAPITAL PROGRAM APPENDIX B.4 DC Eligible Costs Appendix B | 111 Appendix B.5 By-Law Enforcement Appendix B | 112 Appendix B.5 - By-Law Enforcement The By-law Enforcement Division oversees municipal law enforcement in The Blue Mountains. Their responsibilities involve promoting community standards awareness and enforcing town by-laws including parking, animal control and many others. Table B.5-1 2009-2023 Historical Service Levels The Town of The Blue Mountains By-Law department includes the Town Hall with an area of 500 square feet valued at $192,500. The land area associated with the buildings is approximately 0.03 hectares and is valued at $42,900. The total cost of all furniture and equipment is approximately $7,500. The nine vehicles associated with the By-Law department have a total value of $145,000. The current replacement value of all By-Law capital infrastructure is $387,900 which provides the Town with a 15-year historical average service level of $18.83 per population and employment. The calculated maximum allowable recoverable through development charges over the 2024 to 2033 planning period is $80,088 (4,253 population and employment growth X historical service level of $18.83/population and employment). Table B.5-2 2024 - 2033 Development-Related Capital Program & Calculation of the Development Charge The By-Law capital forecast includes the recovery of negative reserve fund balance amounting to $124,509. The acquisition of additional By-Law vehicles and equipment, totaling $125,000, is also eligible for recovery through development charges. Appendix B | 113 In total, the 10-year capital program for By-Law Services amounts to $249,509. No grants or subsidies are identified for this serviceʼs capital program. In addition, no replacement shares have been identified. A share of $169,421 is deemed as a post-period benefit and will not be recovered under this development charges by-law, but may be considered in future development charge studies, subject to service level restrictions. The remaining $80,088 is related to development between 2024 and 2033 and is allocated entirely against future development in the Town of The Blue Mountains. The 10-year development-related net capital cost is allocated 95%, or $76,331, against residential development, and 5%, or $3,757, against non- residential development. The allocation between residential and non- residential development is based on shares of 10-year growth in population in new units and employment. The resulting development charge is $13.66 per capita and $0.17 per square metre. The following table summarizes the calculation of the By-Law Services development charge. 15-year Hist. Service Level per Pop & Emp Total Net DC Recoverable $/capita $/m2 $18.83 $249,509 $80,088 $13.66 $0.17 BY-LAW ENFORCEMENT SUMMARY 2024 - 2033 Calculated Development-Related Capital Program Development Charge Appendix B | 114 APPENDIX B.5 TABLE B.5-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS BY-LAW ENFORCEMENT BUILDINGS UNIT COST Lot Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Town Hall Office Space 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 $385 Total (#) 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 Total ($000) $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 LAND UNIT COST Lot Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Town Hall Office Space 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 $1,430,000 Total (#) 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 Total ($000) $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 FURNITURE & EQUIPMENT UNIT COST Lot Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.m.) Town Hall Office Space ($15/sq.f.t) 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 $15 Total (#) 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 Total ($000) $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 BY-LAW VEHICLES UNIT COST Vehicle Type 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Light Duty Vehicles 1 2 2 2 2 3 3 3 3 3 3 3 3 3 3 $45,000 Equipment for Officers 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 $1,000 Lift Kit 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $5,000 Total (#) 6 7 7 7 7 8 8 8 8 8 8 8 9 9 9 Total ($000) $54.0 $99.0 $99.0 $99.0 $99.0 $144.0 $144.0 $144.0 $144.0 $144.0 $144.0 $144.0 $145.0 $145.0 $145.0 # of Vehicles # of Square Feet # of Hectares Total Value of Furniture & Equipment ($) Appendix B | 115 APPENDIX B.5 TABLE B.5-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS BY-LAW ENFORCEMENT 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 Historical Employment 3,339 3,337 3,335 3,432 3,531 3,633 3,738 3,847 4,010 4,179 4,353 4,534 4,720 4,863 4,891 Total Historical Population & Employm 17,638 17,901 18,173 18,313 18,455 18,597 18,739 18,887 19,425 19,979 20,547 21,132 21,730 22,333 22,822 INVENTORY SUMMARY ($000) Buildings $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 $192.5 Land $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 $42.9 Furniture & Equipment $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 $7.5 By-Law Vehicles $54.0 $99.0 $99.0 $99.0 $99.0 $144.0 $144.0 $144.0 $144.0 $144.0 $144.0 $144.0 $145.0 $145.0 $145.0 Total ($000) $296.9 $341.9 $341.9 $341.9 $341.9 $386.9 $386.9 $386.9 $386.9 $386.9 $386.9 $386.9 $387.9 $387.9 $387.9 Average SERVICE LEVEL ($/pop & emp) Service Level Buildings $10.91 $10.75 $10.59 $10.51 $10.43 $10.35 $10.27 $10.19 $9.91 $9.64 $9.37 $9.11 $8.86 $8.62 $8.43 $9.86 Land $2.43 $2.40 $2.36 $2.34 $2.32 $2.31 $2.29 $2.27 $2.21 $2.15 $2.09 $2.03 $1.97 $1.92 $1.88 $2.20 Furniture & Equipment $0.43 $0.42 $0.41 $0.41 $0.41 $0.40 $0.40 $0.40 $0.39 $0.38 $0.37 $0.35 $0.35 $0.34 $0.33 $0.38 By-Law Vehicles $3.06 $5.53 $5.45 $5.41 $5.36 $7.74 $7.68 $7.62 $7.41 $7.21 $7.01 $6.81 $6.67 $6.49 $6.35 $6.39 Total ($/pop + emp) $16.83 $19.10 $18.81 $18.67 $18.53 $20.80 $20.65 $20.48 $19.92 $19.37 $18.83 $18.31 $17.85 $17.37 $17.00 $18.83 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE BY-LAW ENFORCEMENT 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $18.83 Population and Employment Growth 2024 - 2033 4,253 Maximum Allowable Funding Envelope $80,088 Appendix B | 116 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 5.0 BY-LAW ENFORCEMENT 5.1 Negative Reserve Fund Balance 5.1.1 Recovery of Negative Reserve Fund Balance 2024 124,509 $ - $ 124,509 $ 0% - $ 124,509 $ - $ 80,088 $ 44,421 $ Subtotal 124,509 $ - $ 124,509 $ - $ 124,509 $ - $ 80,088 $ 44,421 $ 5.2 Vehicles & Equipment 5.2.1 By-Law Vehicle 2028 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ - $ 50,000 $ 5.2.2 Equipment for additional officer 2028 5,000 $ - $ 5,000 $ 0% - $ 5,000 $ - $ - $ 5,000 $ 5.2.3 By-Law Vehicle 2033 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ - $ 50,000 $ 5.2.4 Equipment for additional officer 2033 5,000 $ - $ 5,000 $ 0% - $ 5,000 $ - $ - $ 5,000 $ 5.2.5 Various Equipment Various 15,000 $ - $ 15,000 $ 0% - $ 15,000 $ - $ - $ 15,000 $ Subtotal Vehicles & Equipment 125,000 $ - $ 125,000 $ - $ 125,000 $ - $ - $ 125,000 $ TOTAL BY-LAW ENFORCEMENT 249,509 $ - $ 249,509 $ - $ 249,509 $ - $ 80,088 $ 169,421 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 95% $76,331 2024 - 2033 Net Funding Envelope $80,088 10-Year Growth Population in New Units 5,587 Unadjusted Development Charge Per Capita $13.66 Uncommitted Reserve Fund Balance Balance as at December 31, 2023 -$124,509 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 5% $3,757 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $0.17 APPENDIX B.5 TABLE B.5-2 TOWN OF THE BLUE MOUNTAINS DEVELOPMENT-RELATED CAPITAL PROGRAM BY-LAW ENFORCEMENT DC Eligible Costs Appendix B | 117 Appendix B.6 Solid Waste Management Appendix B | 118 Appendix B.6 - Solid Waste Management As of January 1, 2016, the Development Charges Act permits the inclusion of capital costs associated with all waste management operations with the exception of incineration and landfill activities. These shares of facilities, land, vehicles and equipment have been removed from the development charges calculation. Table B.6-1 2009-2023 Historical Service Levels The Town of The Blue Mountains provides a variety of waste-related services at the processing sites, including diversion, landfill and processing. As landfills are ineligible under the DCA, shares have been removed from the identified capital assets to account for the portion of each item in the inventory that relates to landfill operations. These shares were reviewed and determined in consultation with Town staff. The total eligible size of the Townʼs solid waste buildings amounts to 1,361 square feet, valued at $823,600. The land related to the eligible portions of buildings total 1.63 hectares, valued at $2.34 million. Of the vehicles and equipment used to provide Solid Waste services to the Town, a total of nine represent the share of vehicles related to the eligible operations of diversion, collection and processing. The replacement costs of these vehicles total $1.97 million. The total value of the inventory of capital assets for Solid Waste in 2023 was $5.13 million, resulting in a 15-year historical average service level of $254.57 per population and employment. The historical service level, multiplied by the 10-year population and employment growth, results in a 10-year maximum allowable funding envelope of $1.08 million (4,253 X $254.57 per population and employment). Appendix B | 119 Table B.6-2 2024 - 2033 Development-Related Capital Program and Calculation of the Development Charges The 10-year development-related capital plan for Solid Waste Management includes provisions for a scale house and scale, a collection truck, organic recycling bins, and organics processing equipment for a total of $1.10 million. No grants, subsidies or other recoveries are identified and as such, the total is carried forward to the net municipal costs. A total benefit to existing share of $360,000 has been identified for the proposed scale house and scale ($185,000) and organics processing equipment ($175,000) and is removed from the calculation. A portion of the costs, approximately $305,747, will be funded by available reserve funds. The total 2024-2033 development related cost of $434,253 is allocated 95%, or $413,881, to the residential sector. The remaining 5%, or $20,372, is allocated to non-residential development. This yields a development charge of $74.08 per capita and $0.93 per square metre. The following table summarizes the calculation of the Solid Waste development charge. 15-year Hist. Service Level per Pop & Emp Total Net DC Recoverable $/capita $/m2 $254.57 $1,100,000 $434,253 $74.08 $0.93 Development-Related Capital Program Development Charge SOLID WASTE MANAGEMENT SUMMARY 2024 - 2033 Calculated Appendix B | 120 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS SOLID WASTE MANAGEMENT BUILDINGS (1) UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Solid Waste Ops 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 2,500 $385 Less: Non-DC Eligible Waste Functions (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) (1,675) $385 Scale House 100 100 100 100 100 100 100 100 100 100 100 100 100 101 102 $385 Less: Non-DC Eligible Waste Functions (67) (67) (67) (67) (67) (67) (67) (67) (67) (67) (67) (67) (67) (67) (67) $385 Compost Pad 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $300,000 Solid Waste Office Space in Town Hall 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 $385 Total (sq.ft.) 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,359 1,360 1,361 Total ($000) $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $823.2 $823.6 (1) 33% of the identified assets relate to DC eligible waste diversion services. LAND UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Waste Receiving Area 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 4.86 $1,430,000 Less: Non-DC Eligible Waste Functions (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) (3.26) $1,430,000 Solid Waste Office Space in Town Hall 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 $1,430,000 Total (ha) 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 Total ($000) $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 (1) 33% of the identified assets relate to DC eligible waste diversion services VEHICLES & EQUIPMENT UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Light Duty Pick-up Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 2 3 $45,000 Less: Non-DC Eligible Waste Functions (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (1.34) (2.01) $45,000 Large Equipment 1 1 1 1 1 1 1 1 1 1 1 1 1 2 3 $220,000 Less: Non-DC Eligible Waste Functions (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (1.34) (2.01) $220,000 Contractor Pick-Up 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $45,000 Less: Non-DC Eligible Waste Functions - - - - - - - - - - - - - - - $45,000 Contractor Trucks 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $330,000 Less: Non-DC Eligible Waste Functions - - - - - - - - - - - - - - - $330,000 Scales 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $30,000 Less: Non-DC Eligible Waste Functions (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) (0.67) $30,000 RTV - - - - - - - - - - - 1 1 1 1 $20,000 Less: Non-DC Eligible Waste Functions - - - - - - - - - - - (0.67) (0.67) (0.67) (0.67) $20,000 Total (#) 7 7 7 7 7 7 7 7 7 7 7 7 7 8 9 Total ($000) $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,799.0 $1,799.0 $1,886.4 $1,973.9 (1) 33% of the identified assets relate to DC eligible waste diversion services. # of Vehicles & Equipment APPENDIX B.6 TABLE B.6-1 # of Square Feet # of Hectares Appendix B | 121 APPENDIX B.6 TABLE B.6-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS SOLID WASTE MANAGEMENT 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 Historical Employment 3,339 3,337 3,335 3,432 3,531 3,633 3,738 3,847 4,010 4,179 4,353 4,534 4,720 4,863 4,891 Total Historical Population & Employment 17,638 17,901 18,173 18,313 18,455 18,597 18,739 18,887 19,425 19,979 20,547 21,132 21,730 22,333 22,822 INVENTORY SUMMARY ($000) Buildings (1) $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $822.8 $823.2 $823.6 Land $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 $2,336.3 Vehicles & Equipment $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,792.4 $1,799.0 $1,799.0 $1,886.4 $1,973.9 Total ($000) $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,951.5 $4,958.1 $4,958.1 $5,045.9 $5,133.8 Average SERVICE LEVEL ($/pop & emp) Service Level Buildings (1) $46.65 $45.97 $45.28 $44.93 $44.59 $44.25 $43.91 $43.57 $42.36 $41.19 $40.05 $38.94 $37.87 $36.86 $36.09 $42.17 Land $132.46 $130.51 $128.56 $127.58 $126.60 $125.63 $124.68 $123.70 $120.27 $116.94 $113.71 $110.56 $107.52 $104.61 $102.37 $119.71 Vehicles & Equipment $101.62 $100.13 $98.63 $97.87 $97.12 $96.38 $95.65 $94.90 $92.27 $89.71 $87.23 $85.13 $82.79 $84.47 $86.49 $92.69 Total ($/pop + emp) $280.73 $276.61 $272.47 $270.38 $268.30 $266.25 $264.24 $262.16 $254.90 $247.84 $240.99 $234.62 $228.17 $225.94 $224.95 $254.57 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE SOLID WASTE MANAGEMENT 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $254.57 Net Population and Employment Growth 2024 - 2033 4,253 Maximum Allowable Funding Envelope $1,082,736 Appendix B | 122 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 6.0 SOLID WASTE MANAGEMENT 6.1 Land, Buildings and Facilities 6.1.1 Scale House and Scale 2025 370,000 $ - $ 370,000 $ 50% 185,000 $ 185,000 $ 185,000 $ - $ - $ Subtotal Land, Buildings and Facilities 370,000 $ - $ 370,000 $ 185,000 $ 185,000 $ 185,000 $ - $ - $ 6.2 Fleet & Equipment 6.2.1 Collection Truck 2025 300,000 $ - $ 300,000 $ 0% - $ 300,000 $ - $ 300,000 $ - $ 6.2.2 Organic Recycling Bins for New Households Various 80,000 $ - $ 80,000 $ 0% - $ 80,000 $ - $ 80,000 $ - $ Subtotal Fleet & Equipment 380,000 $ - $ 380,000 $ - $ 380,000 $ - $ 380,000 $ - $ 6.3 Other Equipment 6.3.1 Organics Processing Equipment 2025 350,000 $ - $ 350,000 $ 50% 175,000 $ 175,000 $ 120,747 $ 54,253 $ - $ Subtotal Other Equipment 350,000 $ - $ 350,000 $ 175,000 $ 175,000 $ 120,747 $ 54,253 $ - $ TOTAL SOLID WASTE MANAGEMENT 1,100,000 $ - $ 1,100,000 $ 360,000 $ 740,000 $ 305,747 $ 434,253 $ - $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 95% $413,881 2024 - 2033 Net Funding Envelope $1,082,736 10-Year Growth Population in New Units 5,587 Unadjusted Development Charge Per Capita $74.08 Uncommitted Reserve Fund Balance Balance as at December 31, 2023 $305,747 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 5% $20,372 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $0.93 TOWN OF THE BLUE MOUNTAINS DEVELOPMENT-RELATED CAPITAL PROGRAM SOLID WASTE MANAGEMENT DC Eligible Costs APPENDIX B.6 TABLE B.6-2 Appendix B | 123 Appendix B.7 Development Related Studies Appendix B | 124 Appendix B.7 - Development Related Studies As of December 13, 2023, the Minister of Municipal Affairs and Housing has indicated a review of the removal of development-related studies from recovery under the DCA. Table B.7-1 2024 - 2033 Development-Related Capital Program and Calculation of the Development Charges As shown on Table B.7-1, the 2024-2033 development-related gross cost for General Government is $1.57 million. Development-related studies, such as Development Charges updates, Craigleith Community Parkland, Official Plan updates, Zoning By-law updates, and other planning studies have been included. A recovery of $125,062 in past commitments is also included in the capital program for recovery through DCs. Recognizing that not all studies under this service are entirely necessitated by new development in the Town, benefit to existing shares have been identified and reduced from the net municipal costs. In total, the benefit to existing shares amount to $611,550 and this amount will not be recovered through development charges. The remaining amount of $962,412 is eligible for development charges funding in the 10-year planning period. This amount is included in the development charge calculation and is allocated 95%, or $917,263 to the residential sector and 5%, or $45,149 to the non-residential sector based on shares of 10-year growth in net population and employment. The resulting per capita charge is $164.18. The non-residential charge is $2.05 per square metre. The following table summarizes the calculation of the Development -Related Studies development charge. Appendix B | 125 Total Net DC Recoverable $/capita $/m2 $1,573,962 $962,412 $164.18 $2.05 DEVELOPMENT RELATED STUDIES 2024 - 2033 Calculated Development-Related Capital Program Development Charge Appendix B | 126 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 7.0 DEVELOPMENT RELATED STUDIES 7.1 Negative Reserve Fund Balance 7.1.1 Recovery of Negative Reserve Fund Balance 2025 125,062 $ - $ 125,062 $ 0% - $ 125,062 $ - $ 125,062 $ $ Subtotal Negative Reserve Fund Balance 125,062 $ - $ 125,062 $ - $ 125,062 $ - $ 125,062 $ - $ 7.2 Development-Related Studies 7.2.1 Official Plan Update 2024 100,400 $ - $ 100,400 $ 50% 50,200 $ 50,200 $ - $ 50,200 $ - $ 7.2.2 Natural Heritage Study 2024 107,500 $ - $ 107,500 $ 50% 53,750 $ 53,750 $ - $ 53,750 $ - $ 7.2.3 Craigleith Community Parkland 2024 75,000 $ - $ 75,000 $ 0% - $ 75,000 $ - $ 75,000 $ - $ 7.2.4 Zoning By-law Update 2025 57,400 $ - $ 57,400 $ 50% 28,700 $ 28,700 $ - $ 28,700 $ - $ 7.2.5 Development Charge Background Study 2024 75,400 $ - $ 75,400 $ 0% - $ 75,400 $ - $ 75,400 $ - $ 7.2.6 Development Charge Background Study 2033 75,400 $ - $ 75,400 $ 0% - $ 75,400 $ - $ 75,400 $ - $ 7.2.7 Official Plan Update 2029 100,400 $ - $ 100,400 $ 50% 50,200 $ 50,200 $ - $ 50,200 $ - $ 7.2.8 Zoning By-law Update 2030 57,400 $ - $ 57,400 $ 50% 28,700 $ 28,700 $ - $ 28,700 $ - $ 7.2.9 Provision for Additional Studies Various 800,000 $ - $ 800,000 $ 50% 400,000 $ 400,000 $ - $ 400,000 $ $ Subtotal Development-Related Studies 1,448,900 $ - $ 1,448,900 $ 611,550 $ 837,350 $ - $ 837,350 $ - $ TOTAL DEVELOPMENT RELATED STUDIES 1,573,962 $ - $ 1,573,962 $ 611,550 $ 962,412 $ - $ 962,412 $ - $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 95% $917,263 Uncommitted Reserve Fund Balance 10-Year Growth Population in New Units 5,587 Balance as at December 31, 2023 -$125,062 Unadjusted Development Charge Per Capita $164.18 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 5% $45,149 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $2.05 DEVELOPMENT RELATED STUDIES DC Eligible Costs APPENDIX B.7 TABLE B.7-1 TOWN OF THE BLUE MOUNTAINS DEVELOPMENT-RELATED CAPITAL PROGRAM Appendix B | 127 Appendix C Services Related to a Highway Technical Appendix Appendix C | 128 Appendix C - Engineering Infrastructure Services Related to a Highway This appendix provides the detailed analysis undertaken to establish the development charges rates for the Services Related to a Highway: Public Works and Roads and Related service category in the Town of The Blue Mountains. This service category includes the road network, streetlights, intersection improvements, traffic signalization, storm drainage (within the ROW), sidewalks, facilities, fleet and equipment and other related structures. The capital planning and management of all transportation infrastructure in the Town of The Blue Mountains is carried out by the Infrastructure and Public Works department. The structure of the Public Works table follows the description provided in Appendix B. Details on the tables included for Roads and Related service are included in Appendix C.2 below. Appendix C | 129 Appendix C.1 Services Related to a Highway: Public Works Appendix C | 130 Appendix C.1 - Services Related to a Highway: Public Works The Town of The Blue Mountains Public Works Department is responsible for the operation and maintenance of Town infrastructure. Also included in this category is Town-wide fleet as relate to the eligible services under section 2(4) of the DCA but excluding those listed under other service inventories. Table C.1-1 2009-2023 Historical Service Levels The 15-year historical inventory of capital assets for Public Works includes 15,160 square feet of building space with a replacement value of $5.89 million. The 3.06 hectares of land associated with the Public Works buildings are valued at $4.38 million, furniture and equipment amount to $227,400, and the 25 vehicles in the municipal fleet add an additional $5.76 million to the value of the capital assets. The total value of the Public Works capital infrastructure is estimated to be $16.26 million. The 15-year historical average service level is $787.32 per population and employment and this, multiplied by the 10-year forecast population and employment growth (4,253), results in a maximum allowable funding envelope of $3.35 million. Table C.1-2 2024 - 2033 Development-Related Capital Program and Calculation of the Unadjusted Development Charges The Public Works capital program relates largely to the provision of new building space for public works operations in the Town. A new public works facility for $8.27 million is anticipated in 2025. A new snow storage facility in 2025 ($455,000) and a new satellite office in 2027 ($2.18 million) are also included in the capital program. A provision of $1.50 million is also included for new vehicles and equipment. Appendix C | 131 Altogether, the Public Works capital program totals $12.40 million. No grants, subsidies or required discounts are identified for this service. A share of $2.07 million is identified as providing benefit to existing development related to the proposed Public Works Facility. Available DC reserve funds total $333,920 and will be used to fund a portion of the capital program. Additionally, $6.65 million has been identified as other development related costs, and will be considered for funding from other sources including in subsequent development charges studies. After these adjustments, the DC costs eligible for recovery over the 2024 to 2033 planning period amount to $3.35 million and are allocated 95%, or $3.19 million, against new residential development, and 5%, or $157,092, against non-residential development. This yields an unadjusted development charge of $571.24 per capita and $7.15 per square metre. The following table summarizes the calculation of the Public Works development charge. 15-year Hist. Service Level per Pop & Emp Total Net DC Recoverable $/capita $/m2 $787.32 $12,395,000 $3,348,626 $571.24 $7.15 Development-Related Capital Program Development Charge 2024 - 2033 Calculated SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS SUMMARY Appendix C | 132 APPENDIX C.1 TABLE C.1-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS BUILDINGS # of Square Feet UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/sq.ft.) Public Works Facility (Old Ravenna) #1 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 2,700 $500 Public Works Facility (New Ravenna) #2 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 $500 Public Works Facility (Storage Ravenna) #3 1,800 1,800 1,800 1,800 1,800 1,800 2,820 2,820 2,820 2,820 2,820 2,820 2,820 2,820 2,820 $290 Public Works Facility (Sand Dome) #4 (Town Share) 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 2,400 $290 Portable Office - Trailer 960 960 960 960 960 960 800 800 800 800 800 800 800 800 800 $140 Portable Office - Trailer - - - - 360 360 360 360 360 360 360 360 360 360 360 $140 Public Works Space in Town Hall - - 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 $500 Storage trailer / Lock Up - - - - - - 480 480 480 480 480 480 480 480 480 $140 Total (sq.ft.) 12,360 12,360 13,460 13,460 13,820 13,820 15,160 15,160 15,160 15,160 15,160 15,160 15,160 15,160 15,160 Total ($000) $4,952.4 $4,952.4 $5,502.4 $5,502.4 $5,552.8 $5,552.8 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 LAND # of Hectares UNIT COST Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/ha) Public Works Facility Ravenna 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 $1,430,000 County Public Works Facility (Sand Dome, shared) 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 $1,430,000 Storage Pad (50% of total) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 $1,430,000 Snow Storage (prev. school site) (10% of total site) 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 $1,430,000 Public Works Space in Town Hall 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 $1,430,000 Total (ha) 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 Total ($000) $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 FURNITURE & EQUIPMENT Total Value of Furniture & Equipment ($) Facility Name 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Furniture & Equipment for Facilities ($15 per sq.ft.) $185,400 $185,400 $201,900 $201,900 $207,300 $207,300 $227,400 $227,400 $227,400 $227,400 $227,400 $227,400 $227,400 $227,400 $227,400 Total ($000) $185.4 $185.4 $201.9 $201.9 $207.3 $207.3 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 Appendix C | 133 APPENDIX C.1 TABLE C.1-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS MUNICIPAL FLEET # of Fleet UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Tractor and Attachments 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $500,000 Graders 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 $460,000 Back-hoes 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $175,000 Light Duty Vehicles 4 4 4 4 5 5 4 4 5 5 5 5 5 5 5 $45,000 Heavy Duty Vehicles 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 $60,000 Plows 6 6 6 6 6 4 4 4 5 5 8 8 8 8 8 $325,000 Brush Chipper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $95,000 Grader Rollers - - - - - - - 1 2 2 2 2 2 2 2 $25,000 Sidewalk Plows (Contracted) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 $250,000 Total (#) 21 21 21 21 22 20 19 20 23 23 25 25 25 25 25 Total ($000) $5,075.0 $5,075.0 $5,075.0 $5,075.0 $5,120.0 $4,470.0 $4,425.0 $4,450.0 $4,845.0 $4,845.0 $5,760.0 $5,760.0 $5,760.0 $5,760.0 $5,760.0 Appendix C | 134 APPENDIX C.1 TABLE C.1-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 Historical Employment 3,339 3,337 3,335 3,432 3,531 3,633 3,738 3,847 4,010 4,179 4,353 4,534 4,720 4,863 4,891 Total Historical Population & Employment 17,638 17,901 18,173 18,313 18,455 18,597 18,739 18,887 19,425 19,979 20,547 21,132 21,730 22,333 22,822 INVENTORY SUMMARY ($000) Buildings $4,952.4 $4,952.4 $5,502.4 $5,502.4 $5,552.8 $5,552.8 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 $5,893.4 Land $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 $4,375.8 Furniture & Equipment $185.4 $185.4 $201.9 $201.9 $207.3 $207.3 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 $227.4 Municipal Fleet $5,075.0 $5,075.0 $5,075.0 $5,075.0 $5,120.0 $4,470.0 $4,425.0 $4,450.0 $4,845.0 $4,845.0 $5,760.0 $5,760.0 $5,760.0 $5,760.0 $5,760.0 Total ($000) $14,588.6 $14,588.6 $15,155.1 $15,155.1 $15,255.9 $14,605.9 $14,921.6 $14,946.6 $15,341.6 $15,341.6 $16,256.6 $16,256.6 $16,256.6 $16,256.6 $16,256.6 Average SERVICE LEVEL ($/pop & emp) Service Level Buildings $280.78 $276.65 $302.79 $300.46 $300.88 $298.59 $314.50 $312.03 $303.39 $294.98 $286.83 $278.88 $271.21 $263.88 $258.24 $289.61 Land $248.09 $244.44 $240.79 $238.95 $237.11 $235.30 $233.51 $231.68 $225.26 $219.02 $212.97 $207.07 $201.37 $195.93 $191.74 $224.22 Furniture & Equipment $10.51 $10.36 $11.11 $11.02 $11.23 $11.15 $12.14 $12.04 $11.71 $11.38 $11.07 $10.76 $10.46 $10.18 $9.96 $11.01 Municipal Fleet $287.73 $283.50 $279.27 $277.13 $277.43 $240.36 $236.14 $235.61 $249.42 $242.51 $280.34 $272.57 $265.07 $257.91 $252.39 $262.49 Total ($/pop & emp) $827.11 $814.96 $833.96 $827.56 $826.65 $785.39 $796.29 $791.36 $789.78 $767.89 $791.21 $769.28 $748.13 $727.91 $712.33 $787.32 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS 15-Year Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $787.32 Population and Employment Growth 2024 - 2033 4,253 Maximum Allowable Funding Envelope $3,348,626 Appendix C | 135 Gross Grants/ Net Ineligible Costs Total Project Description Timing Project Subsidies/Other Municipal BTE Replacement DC Eligible Available 2024- Other Dev. Cost Recoveries Cost % & BTE Shares Costs DC Reserves 2033 Related 1.0 SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS 1.1 Buildings and Facilities 1.1.1 Public Works Facility 2025 8,265,000 $ - $ 8,265,000 $ 25% 2,066,250 $ 6,198,750 $ 333,920 $ 2,523,626 $ 3,341,204 $ 1.1.2 Snow Storage Facility 2025 455,000 $ - $ 455,000 $ 0% - $ 455,000 $ - $ - $ 455,000 $ 1.1.3 Satellite Office (3,000 sq ft) 2027 2,175,000 $ - $ 2,175,000 $ 0% - $ 2,175,000 $ - $ - $ 2,175,000 $ Subtotal Buildings and Facilities 10,895,000 $ - $ 10,895,000 $ 2,066,250 $ 8,828,750 $ 333,920 $ 2,523,626 $ 5,971,204 $ 1.2 Fleet and Equipment 1.2.1 Snow Plow 2025 475,000 $ - $ 475,000 $ 0% - $ 475,000 $ - $ 475,000 $ - $ 1.2.2 Small Equipment 2025 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ 50,000 $ - $ 1.2.3 Large Equipment 2024 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ 150,000 $ - $ 1.2.4 Large Equipment 2024 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ 150,000 $ - $ 1.2.5 Large Equipment 2024 150,000 $ - $ 150,000 $ 0% - $ 150,000 $ - $ - $ 150,000 $ 1.2.6 Snow Plow 2029 475,000 $ - $ 475,000 $ 0% - $ 475,000 $ - $ - $ 475,000 $ 1.2.7 Small Equipment 2029 50,000 $ - $ 50,000 $ 0% - $ 50,000 $ - $ - $ 50,000 $ Subtotal Fleet and Equipment 1,500,000 $ - $ 1,500,000 $ - $ 1,500,000 $ - $ 825,000 $ 675,000 $ TOTAL SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS 12,395,000 $ - $ 12,395,000 $ 2,066,250 $ 10,328,750 $ 333,920 $ 3,348,626 $ 6,646,204 $ Residential Development Charge Calculation Residential Share of 2024 - 2033 DC Eligible Costs 95% $3,191,534 2024 - 2033 Net Funding Envelope $3,348,626 10-Year Growth Population in New Units 5,587 Unadjusted Development Charge Per Capita $571.24 Uncommitted Reserve Fund Balance Balance as at December 31, 2023 $333,920 Non-Residential Development Charge Calculation Non-Residential Share of 2024 - 2033 DC Eligible Costs 5% $157,092 10-Year Growth in Square Metres 21,973 Unadjusted Development Charge Per Square Metre $7.15 DC Eligible Costs DEVELOPMENT-RELATED CAPITAL PROGRAM SERVICES RELATED TO A HIGHWAY: PUBLIC WORKS TOWN OF THE BLUE MOUNTAINS TABLE C.1-2 APPENDIX C.1 Appendix C | 136 Appendix C.2 Services Related to a Highway: Roads and Related Appendix C | 137 Appendix C.2 - Services Related to a Highway: Roads and Related The development-related Roads and Related infrastructure projects are required to service the demands of new development up to the build-out of the Town to approximately 7,390 units and 1,453 employees. This forecast is discussed in more detail in Appendix A. Tables C.2-1 to C.2-4 provide details of the projects included in the Town- wide Roads and Related engineering infrastructure development charges calculation. The content of the tables is as follows: Table C.2-1 2009-2023 Historical Service Levels Table C.2-2 Roads and Related Capital Program - 2024 to Build-out Table C.2-3 Allocation of Capital Program and Determination of DC Recoverable Share Table C.2-4 Summary of Town-wide Residential and Non-Residential Development Charges Table C.2-1 2009-2023 Historical Service Levels Table C.2-1 demonstrates that the Townʼs current road infrastructure comprises approximately 225 kilometres of arterial, collectors, and local roads, which are valued at $321.11 million. The total value of bridges and culverts in the Town amounts to $74.63 million. The three traffic signals and are valued at $341,000 and sidewalks total $6.57 million. Finally, 1,057 streetlights total $6.41 million. The total inventory of capital assets for Roads and Related services has a replacement value of $409.06 million. This produces a 15-year historical Appendix C | 138 service level of $21,570.40 per capita and employee. The resulting maximum allowable funding envelope is $344.82 million, which is brought forward to the development charge calculation. Table C.2-2 2024 - Build-Out Capital Program The development-related capital program for transportation infrastructure was developed by HDR Inc. in consultation with Town staff and Hemson Consulting. The projects identified in the capital program are required to service the demands of new development between 2024 and build-out, subject to annual capital budget reviews. The entire capital program is related to development Town-wide and has been allocated to development as such. The total gross cost of the Roads and Related capital program is $205.38 million and provides for the undertaking of various road reconstructions, urbanizations, new road lengths, and various engineering studies. Table C.2- 2 shows all costs included in each capital project in order to reach the total gross cost to be brought forward to the development charges calculation. Table C.2-3 Allocation of Capital Program and Determination of DC Recoverable Share Table C.2-3 illustrates the determination of the development charge Town- wide. The entire $205.38 million capital program will not be fully recovered from future development charges and $29.08 million is identified as a local service component. Approximately $26.59 million has been identified as a benefit to existing share. A further share of $40.90 million is removed from the DC eligible portion as it relates to costs Town-wide and in Thornbury West not anticipated to be built-out within the planning horizon. As such, the DC eligible portion is reduced to $100.54 million. This amount is then brought forward to the development charges calculations. Appendix C | 139 Table C.2-4 Summary of Town-wide Residential and Non-Residential Development Charges Table C.2-4 displays the calculation of the Town-wide residential and non- residential development charges. Of the $100.54 million eligible share, an additional $12.95 million is recovered from existing DC reserve fund balance. The result is a development-related and development charges recoverable share of the capital program of $87.58 million. The development-related cost has been allocated 91% ($79.62 million) to new residential development and 9% ($7.96 million) to new non-residential development. The allocation of costs is based on projected changes in population and employment growth over the planning period. This results in a residential development charge of $5,478.84 per capita and a non-residential charge of $68.57 per square metre. These charges will be levied on all development occurring within the Town of The Blue Mountains. The Roads and Related capital program has been calculated using an average cost method (i.e. the analysis is not cash-flowed) as it is anticipated that the Roads program can be undertaken at approximately the same timing and rate as anticipated development. If a particular development requires a road project to be undertaken at an earlier time then anticipated by the Town, or the Town has insufficient monies in the DC reserve, it may be necessary for the Town and the developer to examine alternative front- end financing arrangements. The following is a summary of the Town-wide Roads and Related calculated development charges rates: Appendix C | 140 Total Net DC Recoverable $/capita $/m2 $198,035,280 $87,584,734 $5,478.84 $68.57 Development Charge Calculated TOWN-WIDE ROADS AND RELATED SUMMARY 2024-Build-Out Development-Related Capital Program Appendix C | 141 APPENDIX C.2 TABLE C.2-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED ROADS UNIT COST Type of Road 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/km) Arterial - Urban - 2 Lane 2.1 2.1 2.1 2.1 2.1 2.1 2.1 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 $3,740,000 Arterial - Urban - 3 Lane 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 $4,051,300 Collectors - Urban - 2 Lane 5.0 5.0 5.0 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 $3,132,800 Collectors - Urban - 3 Lane 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 $3,349,500 Collectors - Rural - 2 Lane 5.1 5.1 5.1 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 $1,897,500 Collectors - Rural - 3 Lane 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 $2,200,000 Collectors - Rural - 4 Lane 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 $2,538,800 Local - Urban - 2 Lane 15.4 15.4 16.2 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3 $0 Local - Rural - 2 Lane - Asphalt 51.2 51.2 51.2 38.6 38.6 38.6 38.6 38.6 38.6 38.6 38.6 38.6 38.6 38.6 38.6 $1,897,500 Local - Rural - 2 Lane - Surface Treatment 55.6 55.6 55.6 46.9 46.9 46.9 46.9 46.9 46.9 46.9 46.9 46.9 46.9 46.9 46.9 $1,584,000 Local - Rural - 2 Lane - Gravel 126.3 126.3 126.3 117.9 117.9 117.9 117.9 117.9 117.9 117.9 117.9 117.9 117.9 117.9 117.9 $1,250,700 Local - Rural - 2 Lane - Earth 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 $0 Total (km) 262.2 262.2 263.0 224.8 224.8 224.7 224.7 224.7 224.7 224.7 224.7 224.7 224.7 224.7 224.7 Total ($000) $379,519.4 $379,519.4 $379,519.4 $321,253.0 $321,253.0 $320,984.7 $320,984.7 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 BRIDGES & CULVERTS Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Structures/Culverts >3m span $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 $67,109,000 Culverts 1.2m to 3.0m Span $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 $7,523,204 Total ($000) $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 # of Kilometres Total Value of Bridges & Culverts ($) Appendix C | 142 APPENDIX C.2 TABLE C.2-1 TOWN OF THE BLUE MOUNTAINS INVENTORY OF CAPITAL ASSETS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED TRAFFIC SIGNALS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Signalized Intersections 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 $220,000 Cross-walk Signals 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 $60,500 Total (#) 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 Total ($000) $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $341.0 $341.0 $341.0 $341.0 SIDEWALKS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/m) Sidewalks 25,463 25,463 25,463 25,463 26,028 26,028.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 $244 Total (m) 25,463.0 25,463.0 25,463.0 25,463.0 26,028.0 26,028.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 26,915.0 Total ($000) $6,218.1 $6,218.1 $6,218.1 $6,218.1 $6,356.0 $6,356.0 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 STREETLIGHTS UNIT COST Description 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 ($/unit) Cobra on utility owned pole 426 426 426 426 426 426 426 426 448 448 423 423 423 423 423 $1,925 Cobra on municipal owned pole 135 135 135 137 137 137 140 140 141 141 145 145 145 145 145 $7,590 Decorative Luminaire on municipal pole 360 382 382 396 396 396 403 403 403 403 489 489 489 489 489 $9,185 Total (#) 921 943 943 959 959 959 969 969 992 992 1,057 1,057 1,057 1,057 1,057 Total ($000) $5,151.3 $5,353.4 $5,353.4 $5,497.1 $5,497.1 $5,497.1 $5,584.2 $5,584.2 $5,634.1 $5,634.1 $6,406.3 $6,406.3 $6,406.3 $6,406.3 $6,406.3 # of Traffic Signals # of Linear Metres # of Streetlights Appendix C | 143 APPENDIX C.2 TABLE C.2-1 TOWN OF THE BLUE MOUNTAINS CALCULATION OF SERVICE LEVELS SERVICES RELATED TO A HIGHWAY: ROADS & RELATED 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Historical Population 14,299 14,564 14,838 14,881 14,924 14,964 15,001 15,040 15,415 15,800 16,194 16,599 17,010 17,471 17,931 Historical Employment 3,339 3,337 3,335 3,432 3,531 3,633 3,738 3,847 4,010 4,179 4,353 4,534 4,720 4,863 4,891 Total Historical Population & Employment 17,638 17,901 18,173 18,313 18,455 18,597 18,739 18,887 19,425 19,979 20,547 21,132 21,730 22,333 22,822 INVENTORY SUMMARY ($000) Roads $379,519.4 $379,519.4 $379,519.4 $321,253.0 $321,253.0 $320,984.7 $320,984.7 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 $321,109.3 Bridges & Culverts $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 $74,632.2 Traffic Signals $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $280.5 $341.0 $341.0 $341.0 $341.0 Sidewalks $6,218.1 $6,218.1 $6,218.1 $6,218.1 $6,356.0 $6,356.0 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 $6,572.6 Streetlights $5,151.3 $5,353.4 $5,353.4 $5,497.1 $5,497.1 $5,497.1 $5,584.2 $5,584.2 $5,634.1 $5,634.1 $6,406.3 $6,406.3 $6,406.3 $6,406.3 $6,406.3 Total ($000) $465,801.5 $466,003.5 $466,003.5 $407,880.9 $408,018.8 $407,750.6 $408,054.3 $408,178.8 $408,228.7 $408,228.7 $409,000.9 $409,061.4 $409,061.4 $409,061.4 $409,061.4 Average SERVICE LEVEL ($/pop & emp) Service Level Roads $21,517.14 $21,201.02 $20,884.27 $17,542.34 $17,407.37 $17,260.03 $17,129.23 $17,001.45 $16,530.57 $16,072.45 $15,628.36 $15,195.30 $14,777.38 $14,378.06 $14,070.28 $17,106.35 Bridges & Culverts $4,231.33 $4,169.16 $4,106.88 $4,075.37 $4,044.01 $4,013.13 $3,982.72 $3,951.48 $3,842.04 $3,735.56 $3,632.34 $3,531.69 $3,434.56 $3,341.75 $3,270.21 $3,824.15 Traffic Signals $15.90 $15.67 $15.44 $15.32 $15.20 $15.08 $14.97 $14.85 $14.44 $14.04 $13.65 $16.14 $15.69 $15.27 $14.94 $15.11 Sidewalks $352.54 $347.36 $342.17 $339.54 $344.41 $341.78 $350.75 $348.00 $338.36 $328.98 $319.89 $311.03 $302.47 $294.30 $288.00 $329.97 Streetlights $292.06 $299.05 $294.59 $300.18 $297.87 $295.59 $298.00 $295.66 $290.04 $282.01 $311.79 $303.15 $294.82 $286.85 $280.71 $294.82 Total ($/capita & emp) $26,408.97 $26,032.26 $25,643.34 $22,272.75 $22,108.85 $21,925.61 $21,775.67 $21,611.43 $21,015.45 $20,433.04 $19,906.04 $19,357.31 $18,824.91 $18,316.23 $17,924.15 $21,570.40 TOWN OF THE BLUE MOUNTAINS CALCULATION OF MAXIMUM ALLOWABLE SERVICES RELATED TO A HIGHWAY: ROADS & RELATED Build-out Funding Envelope Calculation 15 Year Average Service Level 2009 - 2023 $21,570.40 Population and Employment Growth 2024 - Build-out 15,986 Maximum Allowable Funding Envelope $344,824,414 Appendix C | 144 APPENDIX C.2 TABLE C.2-2 TOWN OF THE BLUE MOUNTAINS ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT Length (km) # Lanes Surface Type Cross- Section Improvement Type Road Width (m) Shoulder Width (m) Pedestrian Route Streetlight Street Tree BM Road Cost ($1000's/km) Road Cost Pedestrian Route Cost Streetlight Cost Street Tree Cost Stormwater Manageme nt (5%) Total Cost AREA 1 - CRAIGLEITH 1373 Arrowhead Road Highway 26 Margaret Drive 0.73 2 asphalt rural RSS 8.5 - W SSL T $4,341 $3,168,930 $323,390 $326,310 $102,200 $158,447 $465,400 GEO $4,544,677 1392 Lakeshore Road West Chamonix Crescent St Moritz Crescent 0.16 2 asphalt rural RSS 8.5 - S SSL T $4,341 $694,560 $66,240 $71,520 $22,400 $34,728 $0 $0 $889,448 1393 Lakeshore Road West Aspen Way Chamonix Crescent 0.15 2 asphalt rural RSS 8.5 - S SSL T $4,341 $651,150 $62,100 $67,050 $21,000 $32,558 $0 $0 $833,858 1408/1409 Lakeshore Road East Grey Road 19 Highway 26 1.27 2 asphalt rural RSS 8.5 - S SSL T $4,341 $5,513,070 $525,780 $567,690 $177,800 $275,654 $0 $0 $7,059,994 1418 Brophy's Lane Highway 26 Brophy's Lane (450m North) 0.45 2 gravel rural RSS 8.5 - W SSL T $4,341 $1,953,450 $199,350 $201,150 $63,000 $97,673 $0 $0 $2,514,623 1419 Brophy's Lane West Limit Brophy's Lane 0.21 2 gravel rural RSS 8.5 - W SSL T $4,341 $911,610 $93,030 $93,870 $29,400 $45,581 $0 $0 $1,173,491 1416 Brophy's Lane Brophy's Lane Brophy's Lane 0.05 2 gravel rural RSS 8.5 - W SSL T $4,341 $217,050 $22,150 $22,350 $7,000 $10,853 $0 $0 $279,403 1415 Brophy's Lane Brophy's Lane Longpoint Road 0.79 2 gravel rural RSS 8.5 - W SSL T $4,341 $3,429,390 $349,970 $353,130 $110,600 $171,470 $0 $0 $4,414,560 1438 Craigmore Crescent Grey Road 19 Tyrolean Lane 0.25 2 asphalt rural RSS 8.5 - S SSL T $4,341 $1,085,250 $103,500 $111,750 $35,000 $54,263 $0 $0 $1,389,763 1439 Tyrolean Lane Craigmore Crescent Arlberg Crescent 0.22 2 asphalt rural RSS 8.5 - S SSL T $4,341 $955,020 $91,080 $98,340 $30,800 $47,751 $0 $0 $1,222,991 1440 Tyrolean Lane Arlberg Crescent 0.288 km E of Arlberg Crescent 0.29 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,258,890 $120,060 $129,630 $40,600 $62,945 $0 $0 $1,612,125 1441 Tyrolean Lane 0.288 km E of Arlberg Crescent Kandahar Lane 0.21 2 asphalt rural RSS 8.5 - S SSL T $4,341 $911,610 $86,940 $93,870 $29,400 $45,581 $0 $0 $1,167,401 1442 Kandahar Lane Farm Gate Road Grey Road 19 0.15 2 asphalt rural RSS 8.5 - S SSL T $4,341 $651,150 $62,100 $67,050 $21,000 $32,558 $0 $0 $833,858 1443 Kandahar Lane Arlberg Crescent Kelly's Way 0.18 2 asphalt rural RSS 8.5 - S SSL T $4,341 $781,380 $74,520 $80,460 $25,200 $39,069 $0 $0 $1,000,629 1444 Kandahar Lane Tyrolean Lane Arlberg Crescent 0.21 2 asphalt rural RSS 8.5 - S SSL T $4,341 $911,610 $86,940 $93,870 $29,400 $45,581 $0 $0 $1,167,401 1480 Drakes Path Grey Road 19 Wintergreen Place 0.40 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,736,400 $165,600 $178,800 $56,000 $86,820 $0 $0 $2,223,620 1486 Wintergreen Place Jozo Weider Boulevard Drakes Path 0.20 2 asphalt urban RSS 8.5 - S SSL T $4,341 $868,200 $82,800 $89,400 $28,000 $0 $0 $0 $1,068,400 1483 Jozo Weider Blvd 55m S of Fairway Court Gord Canning Drive 0.26 2 asphalt rural RSS 8.5 - 2S SSL T $4,341 $1,128,660 $215,280 $116,220 $36,400 $56,433 $0 $0 $1,552,993 1484 Jozo Weider Blvd Gord Canning Drive Grey Road 19 0.25 2 asphalt rural RSS 8.5 - 2S SSL T $4,341 $1,085,250 $207,000 $111,750 $35,000 $54,263 $31,000 INT $1,524,263 1990 Monterra Road Grey Road 19 Brooker Boulevard 0.10 2 asphalt rural 0 0 0 W 0 0 $0 $0 $44,300 $0 $0 $0 $0 $0 $44,300 1991 Monterra Road Brooker Boulevard Grand Cyprus Lane 0.60 2 asphalt rural 0 0 0 W 0 0 $0 $0 $265,800 $0 $0 $0 $0 $0 $265,800 1992 Monterra Road Grand Cypress Lane Grey Road 21 0.79 2 asphalt rural 0 0 0 W 0 0 $0 $0 $349,970 $0 $0 $0 $0 $0 $349,970 1374 Arrowhead Road Alta Road Margaret Drive 0.28 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $125,160 $0 $0 $0 $0 $125,160 1939 Arrowhead Road Alta Road Alpine Springs Court 0.21 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $93,870 $0 $0 $0 $0 $93,870 1940 Arrowhead Road Alpine Springs Court Arrowhead Crescent 0.26 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $116,220 $0 $0 $0 $0 $116,220 1941 Arrowhead Road Arrowhead Crescent Arrowhead Crescent 0.19 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $84,930 $0 $0 $0 $0 $84,930 1942 Arrowhead Road Arrowhead Crescent Arrowhead Road 0.15 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $67,050 $0 $0 $0 $0 $67,050 1943 Sleepy Hollow Road Arrowhead Road Craigleith Road 0.15 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $67,050 $0 $0 $0 $0 $67,050 1960 Craigleith Road Sleepy Hollow Road Wyandot Court 0.22 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $98,340 $0 $0 $0 $0 $98,340 1961 Craigleith Road Wyandot Court Craigleith Walk 0.41 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $183,270 $0 $0 $0 $0 $183,270 1400 Craigleith Road Craigleith Walk Ski Trail Drive 0.44 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $196,680 $0 $0 $0 $0 $196,680 1401 Craigleith Road Ski Trail Drive Grey Road 19 0.27 2 asphalt urban 0 0 0 0 SSL 0 $0 $0 $0 $120,690 $0 $0 $0 $0 $120,690 $0 AREA 2 - CAMPERDOWN 1920 Clark Street Hoffman St Grey Road 2 0.31 2 asphalt rural REC 7 - S SSL 0 $3,114 $965,340 $128,340 $138,570 $0 $0 $232,700 INT $1,464,950 1921 Clark Street Arthur Taylor Lane Hoffman St 0.87 2 asphalt rural REC 7 - S SSL 0 $3,114 $2,709,180 $360,180 $388,890 $0 $0 $0 $0 $3,458,250 1919 Clark Street Arthur Taylor Lane Forest Ave 0.31 2 asphalt rural 0 0 - S SSL 0 $0 $0 $128,340 $138,570 $0 $0 $0 $0 $266,910 1918 Clark Street Forest Ave Jubilee Drive 0.22 2 asphalt rural 0 0 - S SSL 0 $0 $0 $91,080 $98,340 $0 $0 $0 $0 $189,420 1917 Clark Street Jubilee Drive William St 0.19 2 asphalt rural 0 0 - S SSL 0 $0 $0 $78,660 $84,930 $0 $0 $0 $0 $163,590 1356 Old Lakeshore Road Camperdown Road East End 1.23 2 gravel rural RSS 8.5 - W SSL T $4,341 $5,339,430 $544,890 $549,810 $172,200 $266,972 $0 $0 $6,873,302 1369 Hidden Lake Road James St Highway 26 0.27 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,172,070 $111,780 $120,690 $37,800 $58,604 $0 $0 $1,500,944 1370 Hidden Lake Road James St 600m south west 0.60 2 gravel rural RSS 8.5 - S SSL T $4,341 $2,604,600 $248,400 $268,200 $84,000 $130,230 $0 $0 $3,335,430 Road Section ID Road Name From To Improvement Costs Special Cost Existing Conditions Recommended Improvements Appendix C | 145 APPENDIX C.2 TABLE C.2-2 TOWN OF THE BLUE MOUNTAINS ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT Length (km) # Lanes Surface Type Cross- Section Improvement Type Road Width (m) Shoulder Width (m) Pedestrian Route Streetlight Street Tree BM Road Cost ($1000's/km) Road Cost Pedestrian Route Cost Streetlight Cost Street Tree Cost Stormwater Manageme nt (5%) Total Cost Road Section ID Road Name From To Improvement Costs Special Cost Existing Conditions Recommended Improvements AREA 3 - CASTLE GLEN 1062 12th Side Road 4th Line 3rd Line 1.37 1.5 gravel rural REC 7 1.5 P 0 0 $3,114 $4,266,180 $0 $0 $0 $0 $0 $0 $4,266,180 1064 12th Side Road 3rd Line Mission Road 2.07 1.5 gravel rural REC 7 1.5 P 0 0 $3,114 $6,445,980 $0 $0 $0 $0 $0 $0 $6,445,980 1066 12th Side Road Mission Road Grey Road 19 2.12 2 gravel rural REC 7 1.5 P 0 0 $3,114 $6,601,680 $0 $0 $0 $0 $1,085,900 STR $7,687,580 1254 4th Line Grey Road 19 12th Side Road 1.85 2 gravel rural REC 7 1.5 P 0 0 $3,114 $5,760,900 $0 $0 $0 $0 $0 $0 $5,760,900 1256 4th Line 12th Side Road Grey Road 119 1.85 2 gravel rural REC 7 1.5 P 0 0 $3,114 $5,760,900 $0 $0 $0 $0 $0 $0 $5,760,900 1272 2nd Line Grey Road 19 970m South 0.97 2 gravel rural REC 7 1.5 P 0 0 $3,114 $3,020,580 $0 $0 $0 $0 $176,300 GEO $3,196,880 1270 2nd Line Seasonal 970m South GR 19 6th Sideroad 1.08 2 gravel rural REC 7 1.5 P 0 0 $3,114 $3,363,120 $0 $0 $0 $0 $0 $0 $3,363,120 1264 3rd Line Grey Road 19 340m S of Grey Road 19 0.97 2 gravel rural REC 7 1.5 P 0 0 $3,114 $3,020,580 $0 $0 $0 $0 $0 $0 $3,020,580 n/a 3rd Line (unopened) 340m S of Grey Road 19 640m N of 6th Sideroad 0.87 0 none unopened REC 7 1.5 P 0 0 $3,114 $2,709,180 $0 $0 $0 $0 $0 $0 $2,709,180 1262 3rd Line Grey Road 19 640m N of 6th Sideroad 0.64 2 gravel rural REC 7 1.5 P 0 0 $3,114 $1,992,960 $0 $0 $0 $0 $0 $0 $1,992,960 AREA 6 - LORA BAY 1300 Christie Beach Road Highway 26 39th Side Road 0.70 2 surface tr. rural RSS 8.5 0 S & B SSL T $4,341 $3,038,700 $444,500 $312,900 $98,000 $151,935 $0 $0 $4,046,035 1302 Christie Beach Road 39th Side Road Sunset Blvd 0.79 2 surface tr. rural RSS 8.5 0 S & B SSL T $4,341 $3,429,390 $501,650 $353,130 $110,600 $171,470 $0 $0 $4,566,240 1306 39th Side Road Christie Beach Road Sunset Blvd 1.1 2 surface tr. rural RSS 8.5 0 S & B SSL T $4,341 $4,775,100 $698,500 $491,700 $154,000 $238,755 $0 $0 $6,358,055 1313 10th Line High Bluff Lane Highway 26 0.22 2 gravel rural RSS 8.5 0 S & B SSL T $4,341 $955,020 $139,700 $98,340 $30,800 $47,751 $0 $0 $1,271,611 1314 10th Line Lake Drive High Bluff Lane 0.34 2 gravel rural RSS 8.5 0 S & B SSL T $4,341 $1,475,940 $215,900 $151,980 $47,600 $73,797 $0 $0 $1,965,217 AREA 9 - THORNBURY EAST - ARTERIAL ROADS 1902 King Street East Mill Street McAuley Street South 0.22 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $1,071,400 $202,400 $0 $0 $0 $0 $0 $1,273,800 1901 King Street East McAuley Street South Elgin Street 0.22 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $1,071,400 $202,400 $0 $0 $0 $0 $0 $1,273,800 1900 King Street East Elgin Street Wellington Street 0.22 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $1,071,400 $202,400 $0 $0 $0 $0 $0 $1,273,800 1889 King Street East Wellington Street Gray Street 0.22 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $1,071,400 $202,400 $0 $0 $0 $0 $0 $1,273,800 1888 King Street East Grey Street 79m East of Gray Street 0.08 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $389,600 $73,600 $0 $0 $0 $0 $0 $463,200 1904 Bridge St Bruce Street Hester Street 0.05 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $243,500 $46,000 $0 $0 $0 $0 $0 $289,500 1905 Bridge St 65m East Hester Street Mill Street 0.13 2 asphalt urban RSS 11 - 2WS 0 0 $4,870 $633,100 $119,600 $0 $0 $0 $0 $0 $752,700 Appendix C | 146 APPENDIX C.2 TABLE C.2-2 TOWN OF THE BLUE MOUNTAINS ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT Length (km) # Lanes Surface Type Cross- Section Improvement Type Road Width (m) Shoulder Width (m) Pedestrian Route Streetlight Street Tree BM Road Cost ($1000's/km) Road Cost Pedestrian Route Cost Streetlight Cost Street Tree Cost Stormwater Manageme nt (5%) Total Cost Road Section ID Road Name From To Improvement Costs Special Cost Existing Conditions Recommended Improvements AREA 9 - THORNBURY EAST - LOCAL ROADS None AREA 10 - THORNBURY WEST - COLLECTOR ROADS 1923 Peel Street South Alfred Street West Alice Street West 0.27 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,172,070 $111,780 $120,690 $37,800 $58,604 $0 $0 $1,500,944 1924 Peel Street South Alice Street West Baring Street 0.15 2 gravel rural RSS 8.5 - S SSL T $4,341 $651,150 $62,100 $67,050 $21,000 $32,558 $0 $0 $833,858 1925 Peel Street South Baring Street Arthur Street West 0.18 2 asphalt rural RSS 8.5 - S SSL T $4,341 $781,380 $74,520 $80,460 $25,200 $39,069 $0 $0 $1,000,629 1319 Peel Street North Highway 26 High Bluff Lane 0.13 2 gravel rural RSS 7.5 - MT SSL T $4,129 $536,770 $57,590 $58,110 $18,200 $26,839 $0 $0 $697,509 1320 Peel Street North High Bluff Lane Cameron Street 0.37 2 gravel rural RSS 7.5 - MT SSL T $4,129 $1,527,730 $163,910 $165,390 $51,800 $76,387 $0 $0 $1,985,217 1796 Victoria Street South Duncan Street West Warbler Way 0.22 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $955,020 $91,080 $98,340 $30,800 $47,751 $31,000 BH $1,253,991 4174 Victoria Street South Warbler Way Napier 0.20 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $868,200 $82,800 $89,400 $28,000 $43,410 $28,200 BH $1,140,010 1797 Victoria Street South Napier Street West Pyatt Ave 0.16 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $694,560 $66,240 $71,520 $22,400 $34,728 $22,600 BH $912,048 1798 Victoria Street South Pyatt Ave Thorncroft Court 0.09 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $390,690 $37,260 $40,230 $12,600 $19,535 $12,700 BH $513,015 1799 Victoria Street South Thorncroft Court Ashbury Court 0.11 2 asphalt rural RSS 8.5 - S SSL T $4,341 $477,510 $45,540 $49,170 $15,400 $23,876 $15,500 BH $626,996 4181 Victoria Street South Ashbury Court Victoria Street South 0.07 2 asphalt rural RSS 8.5 - S SSL T $4,341 $303,870 $28,980 $31,290 $9,800 $15,194 $9,900 BH $399,034 1800 Victoria Street South Alfred Street West Alice Street West 0.22 2 asphalt rural RSS 8.5 - S SSL T $4,341 $955,020 $91,080 $98,340 $30,800 $47,751 $31,000 BH $1,253,991 1801 Victoria Street South Alice Street West Louisa Street West 0.22 2 asphalt rural RSS 8.5 - S SSL T $4,341 $955,020 $91,080 $98,340 $30,800 $47,751 $31,000 BH $1,253,991 1802 Victoria Street South Louisa Street West Beaver Street South 0.07 2 asphalt rural RSS 8.5 - S SSL T $4,341 $303,870 $28,980 $31,290 $9,800 $15,194 $31,000 BH $420,134 1821 Duncan Street West Victoria Street South Bruce Street South 0.45 2 asphalt rural RSS 8.5 - S SSL T $4,341 $1,953,450 $186,300 $201,150 $63,000 $97,673 $0 $0 $2,501,573 1822 Duncan Street West Bruce Street South Russell Street East 0.05 2 asphalt rural RSS 8.5 - S SSL T $4,341 $217,050 $20,700 $22,350 $7,000 $10,853 $0 $0 $277,953 1210 10th Line Duncan Street West Russel Street 0.46 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,996,860 $190,440 $205,620 $64,400 $99,843 $0 $0 $2,557,163 1211 10th Line Albert Street Duncan Street West 0.13 2 gravel rural RSS 8.5 - S SSL T $4,341 $564,330 $53,820 $58,110 $18,200 $28,217 $1,085,900 STR $1,808,577 1212 10th Line 33rd Sideroad Albert Street 0.40 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,736,400 $165,600 $178,800 $56,000 $86,820 $0 $0 $2,223,620 1213 10th Line Peel Street South Beaver Street South 0.62 2 asphalt rural RSS 8.5 - S SSL T $4,341 $2,691,420 $256,680 $277,140 $86,800 $134,571 $0 $0 $3,446,611 1214 10th Line Grey Road 113 Peel Street South 0.15 2 asphalt rural RSS 8.5 - S SSL T $4,341 $651,150 $62,100 $67,050 $21,000 $32,558 $0 $0 $833,858 1820 Duncan Street West 10th Line Victoria Street South 0.34 2 asphalt rural RSS 8.5 - S SSL T $4,341 $1,475,940 $140,760 $151,980 $47,600 $73,797 $0 $0 $1,890,077 1823 Napier Street West Beaver Street South Albert Street 0.25 2 asphalt rural RSS 8.5 - S SSL T $4,341 $1,085,250 $103,500 $111,750 $35,000 $54,263 $0 $0 $1,389,763 1824 Napier Street West Albert Street Victoria Street South 0.44 2 asphalt rural RSS 8.5 - S SSL T $4,341 $1,910,040 $182,160 $196,680 $61,600 $95,502 $0 $0 $2,445,982 1825 Napier Street West Victoria Street South Orchard Drive 0.28 2 asphalt rural RSS 8.5 - S SSL T $4,341 $1,215,480 $115,920 $125,160 $39,200 $60,774 $0 $0 $1,556,534 1826 Napier Street West Bruce Street South Orchard Drive 0.17 2 asphalt rural RSS 8.5 - S SSL T $4,341 $737,970 $70,380 $75,990 $23,800 $36,899 $0 $0 $945,039 Appendix C | 147 APPENDIX C.2 TABLE C.2-2 TOWN OF THE BLUE MOUNTAINS ROADS AND RELATED CAPITAL PROGRAM 2024 - BUILD OUT Length (km) # Lanes Surface Type Cross- Section Improvement Type Road Width (m) Shoulder Width (m) Pedestrian Route Streetlight Street Tree BM Road Cost ($1000's/km) Road Cost Pedestrian Route Cost Streetlight Cost Street Tree Cost Stormwater Manageme nt (5%) Total Cost Road Section ID Road Name From To Improvement Costs Special Cost Existing Conditions Recommended Improvements AREA 10 - THORNBURY WEST - LOCAL ROADS 1805 Lansdowne Street South Alice Street West Louisa Street West 0.22 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $955,020 $91,080 $98,340 $30,800 $47,751 $0 $0 $1,222,991 1806 Lansdowne Street South Louisa Street West Arthur Street West 0.12 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $520,920 $49,680 $53,640 $16,800 $26,046 $0 $0 $667,086 1810 Albert Street 10th Line Napier Street West 0.33 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,432,530 $136,620 $147,510 $46,200 $71,627 $0 $0 $1,834,487 1812 Albert Street Napier Street West Albert Street 0.34 2 gravel rural RSS 8.5 - S SSL T $4,341 $1,475,940 $140,760 $151,980 $47,600 $73,797 $0 $0 $1,890,077 1814 Albert Street Beaver Street South Alfred Street West 0.09 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $390,690 $37,260 $40,230 $12,600 $19,535 $0 $0 $500,315 1854 Beaver Street South Victoria Street South Louisa Street West 0.09 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $390,690 $37,260 $40,230 $12,600 $19,535 $0 $0 $500,315 1853 Beaver Street South Louisa Street West Alice St West 0.28 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $1,215,480 $115,920 $125,160 $39,200 $60,774 $0 $0 $1,556,534 1833 Beaver Street South 10th Line Napier Street West 0.07 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $303,870 $28,980 $31,290 $9,800 $15,194 $0 $0 $389,134 1834 Beaver Street South Napier Street West Albert Street 0.41 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $1,779,810 $169,740 $183,270 $57,400 $88,991 $0 $0 $2,279,211 2460 Alfred St West Victoria Street South Beaver Street South 0.37 2 asphalt rural 0 8.5 - S SSL 0 $0 $0 $153,180 $165,390 $0 $0 $0 $0 $318,570 1840 Alice Street West Peel Street South Baring Street 0.08 1 asphalt rural RSS 8.5 - S SSL T $4,341 $347,280 $33,120 $35,760 $11,200 $17,364 $0 $0 $444,724 1842 Alice Street West Baring Street Lansdowne Street South 0.66 2 surface tr. rural RSS 8.5 - S SSL T $4,341 $2,865,060 $273,240 $295,020 $92,400 $143,253 $0 $0 $3,668,973 1844 Alice Street West Beaver Street South Victoria Street South 0.22 2 asphalt rural RSS 8.5 - S SSL T $4,341 $955,020 $91,080 $98,340 $30,800 $47,751 $0 $0 $1,222,991 1857 Louisa Street West Beaver Street South Victoria Street South 0.06 1.5 asphalt rural RSS 8.5 - S SSL T $4,341 $260,460 $24,840 $26,820 $8,400 $13,023 $0 $0 $333,543 AREA 10 - THORNBURY WEST - ARTERIAL ROADS 2012 Arthur Street West Peel Street West Lansdowne Street 0.57 2 asphalt rural RSS 11 - 2WS SSL 0 $4,870 $2,775,900 $524,400 $254,790 $0 $138,795 $0 $0 $3,693,885 PROPOSED ACTIVE TRANSPORTATION PROJECTS n/a Active Transportation Network (TMP) 159.3 0 0 0 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $24,639,000 $0 $24,639,000 TOTAL $145,348,130 $12,827,080 $11,742,690 $2,919,000 $4,615,578 $27,929,100 $205,381,578 Appendix C | 148 APPENDIX C.2 TABLE C.2-3 TOWN OF THE BLUE MOUNTAINS Post-Period Length (km) Surface Type Cross- Section Surface Type & Cross Section Benefit AREA 1 - CRAIGLEITH 1373 Arrowhead Road Highway 26 Margaret Drive 0.73 asphalt rural asphalt-rural $4,544,677 $0 $0 $454,468 $0 $4,090,209 1392 Lakeshore Road West Chamonix Crescent St Moritz Crescent 0.16 asphalt rural asphalt-rural $889,448 $889,448 $0 $0 $0 $0 1393 Lakeshore Road West Aspen Way Chamonix Crescent 0.15 asphalt rural asphalt-rural $833,858 $833,858 $0 $0 $0 $0 1408/1409 Lakeshore Road East Grey Road 19 Highway 26 1.27 asphalt rural asphalt-rural $7,059,994 $0 $0 $705,999 $0 $6,353,994 1418 Brophy's Lane Highway 26 Brophy's Lane (450m North) 0.45 gravel rural asphalt-rural $2,514,623 $2,514,623 $0 $0 $0 $0 1419 Brophy's Lane West Limit Brophy's Lane 0.21 gravel rural asphalt-rural $1,173,491 $1,173,491 $0 $0 $0 $0 1416 Brophy's Lane Brophy's Lane Brophy's Lane 0.05 gravel rural asphalt-rural $279,403 $279,403 $0 $0 $0 $0 1415 Brophy's Lane Brophy's Lane Longpoint Road 0.79 gravel rural asphalt-rural $4,414,560 $4,414,560 $0 $0 $0 $0 1438 Craigmore Crescent Grey Road 19 Tyrolean Lane 0.25 asphalt rural asphalt-rural $1,389,763 $0 $0 $138,976 $0 $1,250,786 1439 Tyrolean Lane Craigmore Crescent Arlberg Crescent 0.22 asphalt rural asphalt-rural $1,222,991 $0 $0 $122,299 $0 $1,100,692 1440 Tyrolean Lane Arlberg Crescent 0.288 km E of Arlberg Crescent 0.29 gravel rural gravel-rural $1,612,125 $0 $0 $161,212 $0 $1,450,912 1441 Tyrolean Lane 0.288 km E of Arlberg Crescent Kandahar Lane 0.21 asphalt rural asphalt-rural $1,167,401 $0 $0 $116,740 $0 $1,050,660 1442 Kandahar Lane Farm Gate Road Grey Road 19 0.15 asphalt rural asphalt-rural $833,858 $0 $0 $83,386 $0 $750,472 1443 Kandahar Lane Arlberg Crescent Kelly's Way 0.18 asphalt rural asphalt-rural $1,000,629 $0 $0 $100,063 $0 $900,566 1444 Kandahar Lane Tyrolean Lane Arlberg Crescent 0.21 asphalt rural asphalt-rural $1,167,401 $0 $0 $116,740 $0 $1,050,660 1480 Drakes Path Grey Road 19 Wintergreen Place 0.40 gravel rural asphalt-urban $2,223,620 $0 $0 $222,362 $0 $2,001,258 1486 Wintergreen Place Jozo Weider Boulevard Drakes Path 0.20 asphalt urban asphalt-urban $1,068,400 $0 $0 $106,840 $0 $961,560 1483 Jozo Weider Blvd 55m S of Fairway Court Gord Canning Drive 0.26 asphalt rural asphalt-rural $1,552,993 $0 $465,898 $108,710 $0 $978,386 1484 Jozo Weider Blvd Gord Canning Drive Grey Road 19 0.25 asphalt rural asphalt-rural $1,524,263 $0 $457,279 $106,698 $0 $960,285 1990 Monterra Road Grey Road 19 Brooker Boulevard 0.10 asphalt rural asphalt-rural $44,300 $0 $0 $33,225 $0 $11,075 1991 Monterra Road Brooker Boulevard Grand Cyprus Lane 0.60 asphalt rural asphalt-rural $265,800 $0 $0 $199,350 $0 $66,450 1992 Monterra Road Grand Cypress Lane Grey Road 21 0.79 asphalt rural asphalt-rural $349,970 $0 $0 $262,478 $0 $87,493 1943 Sleepy Hollow Road Arrowhead Road Craigleith Road 0.15 asphalt urban asphalt-urban $67,050 $0 $0 $50,288 $0 $16,763 1960 Craigleith Road Sleepy Hollow Road Wyandot Court 0.22 asphalt urban asphalt-urban $98,340 $0 $0 $73,755 $0 $24,585 1961 Craigleith Road Wyandot Court Craigleith Walk 0.41 asphalt urban asphalt-urban $183,270 $0 $0 $137,453 $0 $45,818 1400 Craigleith Road Craigleith Walk Ski Trail Drive 0.44 asphalt urban asphalt-urban $196,680 $0 $0 $147,510 $0 $49,170 1401 Craigleith Road Ski Trail Drive Grey Road 19 0.27 asphalt urban asphalt-urban $120,690 $0 $0 $90,518 $0 $30,173 subtotal $37,799,592 $10,105,381 $923,177 $3,539,068 $0 $23,231,966 Net Growth Related Existing Conditions Benefit to Existing Share1 Current Agreements Local Service Component Road Section ID Road Name From To Total Improvement Cost Appendix C | 149 APPENDIX C.2 TABLE C.2-3 TOWN OF THE BLUE MOUNTAINS Post-Period Length (km) Surface Type Cross- Section Surface Type & Cross Section Benefit Net Growth Related Existing Conditions Benefit to Existing Share1 Current Agreements Local Service Component Road Section ID Road Name From To Total Improvement Cost AREA 2 - CAMPERDOWN 1920 Clark Street Hoffman St Grey Road 2 0.31 asphalt rural asphalt-rural $1,464,950 $0 $0 $219,743 $0 $1,245,208 1921 Clark Street Arthur Taylor Lane Hoffman St 0.87 asphalt rural asphalt-rural $3,458,250 $0 $0 $518,738 $0 $2,939,513 1919 Clark Street Arthur Taylor Lane Forest Ave 0.31 asphalt rural asphalt-rural $266,910 $0 $0 $40,037 $0 $226,874 1918 Clark Street Forest Ave Jubilee Drive 0.22 asphalt rural asphalt-rural $189,420 $0 $0 $28,413 $0 $161,007 1917 Clark Street Jubilee Drive William St 0.19 asphalt rural asphalt-rural $163,590 $0 $0 $24,539 $0 $139,052 1356 Old Lakeshore Road Camperdown Road East End 1.23 gravel rural gravel-rural $6,873,302 $0 $0 $343,665 $0 $6,529,636 1369 Hidden Lake Road James St Highway 26 0.27 gravel rural gravel-rural $1,500,944 $1,500,944 $0 $0 $0 $0 1370 Hidden Lake Road James St 600m south west 0.6 gravel rural gravel-rural $3,335,430 $3,335,430 $0 $0 $0 $0 subtotal $17,252,795 $4,836,374 $0 $1,175,133 $0 $11,241,288 AREA 3 - CASTLE GLEN 1062 12th Side Road 4th Line 3rd Line 1.37 gravel rural gravel-rural $4,266,180 $0 $0 $213,309 $0 $4,052,871 1064 12th Side Road 3rd Line Mission Road 2.07 gravel rural gravel-rural $6,445,980 $6,445,980 $0 $0 $0 $0 1066 12th Side Road Mission Road Grey Road 19 2.12 gravel rural gravel-rural $7,687,580 $7,687,580 $0 $0 $0 $0 1254 4th Line Grey Road 19 12th Side Road 1.85 gravel rural gravel-rural $5,760,900 $0 $0 $288,045 $0 $5,472,855 1256 4th Line 12th Side Road Grey Road 119 1.85 gravel rural gravel-rural $5,760,900 $0 $0 $288,045 $0 $5,472,855 1272 2nd Line Grey Road 19 970m South 0.97 gravel rural gravel-rural $3,196,880 $0 $0 $159,844 $0 $3,037,036 1270 2nd Line Seasonal 970m South GR 19 6th Sideroad 1.08 gravel rural gravel-rural $3,363,120 $0 $0 $168,156 $3,194,964 $0 1264 3rd Line Grey Road 19 340m S of Grey Road 19 0.97 gravel rural gravel-rural $3,020,580 $0 $0 $151,029 $0 $2,869,551 n/a 3rd Line (unopened) 340m S of Grey Road 19 640m N of 6th Sideroad 0.87 none unopened gravel-rural $2,709,180 $0 $0 $135,459 $0 $2,573,721 1262 3rd Line Grey Road 19 640m N of 6th Sideroad 0.64 gravel rural gravel-rural $1,992,960 $0 $0 $99,648 $1,893,312 $0 subtotal $44,204,260 $14,133,560 $0 $1,503,535 $5,088,276 $23,478,889 AREA 6 - LORA BAY 1300 Christie Beach Road Highway 26 39th Side Road 0.70 surface tr. rural surface tr. rural $4,046,035 $0 $0 $404,604 $0 $3,641,432 1302 Christie Beach Road 39th Side Road Sunset Blvd 0.79 surface tr. rural surface tr. rural $4,566,240 $0 $0 $456,624 $0 $4,109,616 1306 39th Side Road Christie Beach Road Sunset Blvd 1.10 surface tr. rural surface tr. rural $6,358,055 $0 $0 $321,969 $0 $6,036,086 1313 10th Line High Bluff Lane Highway 26 0.22 gravel rural gravel-rural $1,271,611 $0 $0 $127,161 $0 $1,144,450 1314 10th Line Lake Drive High Bluff Lane 0.34 gravel rural gravel-rural $1,965,217 $0 $0 $196,522 $0 $1,768,695 subtotal $18,207,158 $0 $0 $1,506,879 $0 $16,700,278 Appendix C | 150 APPENDIX C.2 TABLE C.2-3 TOWN OF THE BLUE MOUNTAINS Post-Period Length (km) Surface Type Cross- Section Surface Type & Cross Section Benefit Net Growth Related Existing Conditions Benefit to Existing Share1 Current Agreements Local Service Component Road Section ID Road Name From To Total Improvement Cost AREA 9 - THORNBURY EAST - ARTERIAL ROADS 1902 King Street East Mill Street McAuley Street South 0.22 asphalt urban asphalt-urban $1,273,800 $0 $0 $849,115 $0 $424,685 1901 King Street East McAuley Street South Elgin Street 0.22 asphalt urban asphalt-urban $1,273,800 $0 $0 $849,115 $0 $424,685 1900 King Street East Elgin Street Wellington Street 0.22 asphalt urban asphalt-urban $1,273,800 $0 $0 $849,115 $0 $424,685 1889 King Street East Wellington Street Gray Street 0.22 asphalt urban asphalt-urban $1,273,800 $0 $0 $849,115 $0 $424,685 1888 King Street East Grey Street 79m East of Gray Street 0.08 asphalt urban asphalt-urban $463,200 $0 $0 $308,769 $0 $154,431 1904 Bridge St Bruce Street Hester Street 0.05 asphalt urban asphalt-urban $289,500 $0 $0 $192,981 $0 $96,519 1905 Bridge St 65m East Hester Street Mill Street 0.13 asphalt urban asphalt-urban $752,700 $0 $0 $501,750 $0 $250,950 subtotal $6,600,600 $0 $0 $4,399,960 $0 $2,200,640 AREA 9 - THORNBURY EAST - LOCAL ROADS subtotal $0 $0 $0 $0 $0 $0 AREA 10 - THORNBURY WEST - COLLECTOR ROADS 1923 Peel Street South Alfred Street West Alice Street West 0.27 gravel rural gravel-rural $1,500,944 $0 $0 $150,094 $1,350,849 $0 1924 Peel Street South Alice Street West Baring Street 0.15 gravel rural gravel-rural $833,858 $0 $0 $83,386 $750,472 $0 1925 Peel Street South Baring Street Arthur Street West 0.18 asphalt rural asphalt-rural $1,000,629 $0 $0 $100,063 $900,566 $0 1319 Peel Street North Highway 26 High Bluff Lane 0.13 gravel rural gravel-rural $697,509 $0 $0 $69,751 $0 $627,758 1320 Peel Street North High Bluff Lane Cameron Street 0.37 gravel rural gravel-rural $1,985,217 $0 $0 $198,522 $0 $1,786,695 1796 Victoria Street South Duncan Street West Warbler Way 0.22 surface tr. rural surface tr. rural $1,253,991 $0 $0 $125,399 $0 $1,128,592 4174 Victoria Street South Warbler Way Napier 0.20 surface tr. rural surface tr. rural $1,140,010 $0 $0 $114,001 $0 $1,026,009 1797 Victoria Street South Napier Street West Pyatt Ave 0.16 surface tr. rural surface tr. rural $912,048 $0 $0 $91,205 $0 $820,843 1798 Victoria Street South Pyatt Ave Thorncroft Court 0.09 surface tr. rural surface tr. rural $513,015 $0 $0 $51,301 $0 $461,713 1799 Victoria Street South Thorncroft Court Ashbury Court 0.11 asphalt rural asphalt-rural $626,996 $0 $0 $62,700 $0 $564,296 4181 Victoria Street South Ashbury Court Victoria Street South 0.07 asphalt rural asphalt-rural $399,034 $0 $0 $39,903 $0 $359,130 1821 Duncan Street West Victoria Street South Bruce Street South 0.45 asphalt rural asphalt-rural $2,501,573 $0 $0 $250,157 $0 $2,251,415 1822 Duncan Street West Bruce Street South Russell Street East 0.05 asphalt rural asphalt-rural $277,953 $0 $0 $27,795 $0 $250,157 1210 10th Line Duncan Street West Russel Street 0.46 gravel rural asphalt-rural $2,557,163 $0 $0 $255,716 $2,301,447 $0 1211 10th Line Albert Street Duncan Street West 0.13 gravel rural asphalt-rural $1,808,577 $0 $0 $180,858 $1,627,719 $0 1212 10th Line 33rd Sideroad Albert Street 0.40 gravel rural asphalt-rural $2,223,620 $0 $0 $222,362 $2,001,258 $0 1213 10th Line Peel Street South Beaver Street South 0.62 asphalt rural asphalt-rural $3,446,611 $0 $0 $344,661 $3,101,950 $0 1214 10th Line Grey Road 113 Peel Street South 0.15 asphalt rural asphalt-rural $833,858 $0 $0 $83,386 $750,472 $0 1820 Duncan Street West 10th Line Victoria Street South 0.34 asphalt rural asphalt-rural $1,890,077 $0 $0 $189,008 $1,701,069 $0 1823 Napier Street West Beaver Street South Albert Street 0.25 asphalt rural asphalt-rural $1,389,763 $0 $0 $138,976 $1,250,786 $0 1824 Napier Street West Albert Street Victoria Street South 0.44 asphalt rural asphalt-rural $2,445,982 $0 $0 $244,598 $1,163,591 $1,037,793 1825 Napier Street West Victoria Street South Orchard Drive 0.28 asphalt rural asphalt-rural $1,556,534 $0 $0 $155,653 $0 $1,400,881 1826 Napier Street West Bruce Street South Orchard Drive 0.17 asphalt rural asphalt-rural $945,039 $0 $0 $94,504 $0 $850,535 subtotal $32,739,995 $0 $0 $3,273,999 $16,900,179 $12,565,816 Appendix C | 151 APPENDIX C.2 TABLE C.2-3 TOWN OF THE BLUE MOUNTAINS Post-Period Length (km) Surface Type Cross- Section Surface Type & Cross Section Benefit Net Growth Related Existing Conditions Benefit to Existing Share1 Current Agreements Local Service Component Road Section ID Road Name From To Total Improvement Cost AREA 10 - THORNBURY WEST - LOCAL ROADS 1805 Lansdowne Street South Alice Street West Louisa Street West 0.22 surface tr. rural surface tr. rural $1,222,991 $0 $0 $122,299 $0 $1,100,692 1806 Lansdowne Street South Louisa Street West Arthur Street West 0.12 surface tr. rural surface tr. rural $667,086 $0 $0 $66,709 $0 $600,377 1810 Albert Street 10th Line Napier Street West 0.33 gravel rural gravel-rural $1,834,487 $0 $0 $183,449 $1,651,038 $0 1812 Albert Street Napier Street West Albert Street 0.34 gravel rural gravel-rural $1,890,077 $0 $0 $189,008 $1,701,069 $0 1814 Albert Street Beaver Street South Alfred Street West 0.09 surface tr. rural surface tr. rural $500,315 $0 $0 $50,031 $450,283 $0 1833 Beaver Street South 10th Line Napier Street West 0.07 surface tr. rural surface tr. rural $389,134 $0 $0 $38,913 $350,220 $0 1834 Beaver Street South Napier Street West Albert Street 0.41 surface tr. rural surface tr. rural $2,279,211 $0 $0 $227,921 $2,051,289 $0 1840 Alice Street West Peel Street South Baring Street 0.08 asphalt rural surface tr. rural $444,724 $0 $0 $44,472 $400,252 $0 1842 Alice Street West Baring Street Lansdowne Street South 0.66 surface tr. rural surface tr. rural $3,668,973 $0 $0 $366,897 $3,302,076 $0 subtotal $12,896,996 $0 $0 $1,289,700 $9,906,227 $1,701,069 AREA 10 - THORNBURY WEST - ARTERIAL ROADS 2012 Arthur Street West Peel Street West Lansdowne Street 0.57 asphalt rural asphalt-rural $3,693,885 $0 $0 $2,462,590 $0 $1,231,295 subtotal $3,693,885 $0 $0 $2,462,590 $0 $1,231,295 PROPOSED ACTIVE TRANSPORTATION PROJECTS n/a Active Transportation Network (TMP) - Town Roads $11,730,000 $0 $0 $3,543,634 $0 $8,186,366 0 Active Transportation Network (TMP) - County Roads $12,910,000 $0 $0 $3,900,112 $9,009,888 $0 subtotal $24,640,000 $0 $0 $7,443,745 $9,009,888 $8,186,366 TOTAL TOWN-WIDE $198,035,280 $29,075,314 $923,177 $26,594,610 $40,904,570 $100,537,609 Appendix C | 152 Town-wide Population in New Units Growth 14,533 Employment Growth 1,453 Ultimate Growth in Square Meters 116,095 Total Total Local Benefit Prior Growth Post Net Capital Improvement Service Current to Existing (Available Period Costs After Cost Component Agreements Share DC Reserves) Benefit Discounts ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Town-wide Roads Projects $198,035.28 $29,075.31 $923.18 $26,594.61 $12,952.88 $40,904.57 $87,584.73 90.9% $79,623.98 9.1% $7,960.75 Total $198,035.28 $29,075.31 $923.18 $26,594.61 $12,952.88 $40,904.57 $87,584.73 $79,623.98 $7,960.75 Development Charge Per Capita $5,478.84 Development Charge Per Square Metre of GFA $68.57 Development-Related Capital Program Residential Non-Residential Share Share APPENDIX C.2 TABLE C.2-4 TOWN OF THE BLUE MOUNTAINS TOWN-WIDE ROADS AND RELATED SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES Appendix C | 153 Appendix D Water and Wastewater Services Technical Appendix Appendix D | 154 Appendix D - Water and Wastewater Services Technical Appendix Overview of Servicing Areas The Town of The Blue Mountains Water Services administers, operates and maintains the municipal water treatment and distribution systems within the Town. Town-wide water supply and treatment services are provided through the Thornbury Water Treatment Plant. The functions of Wastewater Services are the treatment of wastewater generated by the Town and are provided at the Craigleith and Thornbury sewage treatment plants. The development- related capital program for water and wastewater infrastructure was developed by HDR Inc. in consultation with Town staff and Hemson Consulting. To note, the subtotal costs were largely provided by HDR Inc. and the components like construction works, legal, engineering, design, contingency shares were carried forward from the 2019 DC Study but have not been individually reviewed. This appendix provides an outline of the water and wastewater development-related capital projects the Town will require in order to meet the servicing needs of new residential and non-residential development. This includes both Town-wide and area-specific supply, treatment and distribution. There are nine distinct service areas in the Town: 1. Craigleith 2. Castle Glen 3. Osler 4. Thornbury East 5. Thornbury West 6. Clarksburg 7. Lora Bay 8. Camperdown 9. Swiss Meadows Appendix D | 155 It should be noted that developments occurring within the Swiss Meadows service area do not receive municipal water or wastewater servicing. Therefore, for the purposes of the area-specific development charge calculations, only the capital programs for the first eight service areas have been analysed. Area-Specific Cost Recovery Keeping with past practices in which the Town levies its Water and Wastewater DC, the Town will continue to calculate and levy both residential and non-residential charges on an area-specific basis. The area-specific cost recovery approach is used to calculate development charges for both residential and non-residential water and wastewater rates. Each area-specific charge accounts for costs associated with: water supply, sewage treatment, water distribution and sewage collection. The Townʼs water supply development-related capital costs have been allocated to development in all service areas, thus establishing a uniform water supply cost. The sewage treatment cost components have been allocated to the areas serviced by the Townʼs two sewage treatment plants: Craigleith Sewage Treatment Plant - Craigleith - Castle Glen - Osler Thornbury Sewage Treatment Plant - Camperdown - Lora Bay - Clarksburg - Thornbury East - Thornbury West Appendix D | 156 The two other cost components of the water and sewer infrastructure to be calculated and recovered on a service area basis include: - water distribution systems costs, including water mains, booster pumping and storage - sewer collection systems costs, including collectors, forcemains and pumping The capital programs are designed to accommodate build-out of the service areas based on known applications and potential for additional development as permitted under the Townʼs Official Plan and various amendments. The development charge rates have been calculated based on the servicing capacity of each of the specific projects. The servicing capacity of the works is identified in the various tables included in this appendix. The use of servicing capacity in the development charge calculations ensures that, should servicing capacity differ from projected growth, development does not pay for any excess capacity that may be generated by the works. The approach also provides that any servicing shortages will be met by the Town construction projects at a similar or higher cost. The Town is committed to an ongoing program of monitoring water and sewer system capacities and will consider development charge rate adjustments as required. Area-Specific Capital Programs and DC Rate Calculations Tables D.1-D.23 display the capital programs and resulting development charges for the various service areas. The tables display the details of the projects, anticipated timing, total costs and the allocation of the DC eligible costs to the residential and non-residential sectors. The analysis takes into consideration the uncommitted development charge reserve fund balance under the "Prior Growth" column. The tables also provide the calculation of the equivalent unit development charge rates. Appendix D | 157 Tables D.1-D.2: Water Supply and Treatment Capital Program and Calculated Rates Tables D.3-D.5: Sewage Treatment Capital Program and Calculated Rates Tables D.6-D.7: Craigleith Area-Specific Water and Sewer Capital Program and Rates Tables D.8-D.9: Castle Glen Area-Specific Water and Sewer Capital Program and Rates Tables D.10-D.11: Osler Area-Specific Water and Sewer Capital Program and Rates Tables D.12-D.13: Thornbury East Area-Specific Water and Sewer Capital Program and Rates Tables D.14-D.15: Thornbury West Area-Specific Water and Sewer Capital Program and Rates Tables D.16-D.17: Clarksburg Area-Specific Water and Sewer Capital Program and Rates Tables D.18-D.21: Lora Bay Area-Specific Water and Sewer Capital Programs and Rates Tables D.22-D.23: Camperdown Area-Specific Water and Sewer Capital Programs and Rates Pursuant to Paragraph 8, Item 5, of Ontario Regulation 82/98, the development-related capital program contained herein includes credits or potential credits for a number of projects. The costs of these works are fully reflected in development-related capital forecasts in order to recoup the costs from other benefitting owners. The monies will be used to meet any legitimate credit requests. Appendix D | 158 Town-wide Water and Wastewater DC Rates Water Supply and Treatment As shown in Table D.2, the cost of providing water services in the Town is extensive; the Town-wide development-related capital program for the water system is $29.27 million to service growth to build-out of the Townʼs currently designated lands. The program provides for works associated with providing additional water supply (estimated at the time of DC Study to be a share of the Town of Collingwoodʼs capacity), operations building, consolidated environmental assessments and other study updates. Of this $29.27 million, $331,060 of replacement or non-growth related costs and $58,190 in benefit to existing shares. The remaining DC eligible share of $28.88 million for Town-wide water supply and treatment is allocated to the residential and non-residential sectors based on shares of population and employment growth. A share of 81%, or $23.43 million is allocated to the residential sector, resulting in a charge of $1,615.01 per capita. The remainder, $5.45 million is allocated to the non-residential sector, yielding a charge of $46.98 per square metre. Additional area-specific charges are calculated and then added together with the uniform water supply and treatment costs for a total water services charge to be applied to new development in each service area. Residential charges are calculated based on unit type. Non-residential charges are calculated as a charge per square metre of new non-residential GFA. It should be noted that the "net costs" shown on each of the service area capital programs are not entirely recoverable against future development charges. Unserviced lots that will connect into the water system in the future will pay a capital connection fee, equivalent to that of the DC water rate. Appendix D | 159 Town-wide Wastewater Treatment As shown in Tables D.3, D.4 and D.5, the cost of providing wastewater services in the Town is also extensive; the Town-wide development-related capital program for the wastewater system is $121.77 million to service growth to build-out of the Townʼs currently designated lands. The program provides for works related to both the Craigleith and Thornbury Sewage Treatment Plants. After removing the replacement or non-growth shares, and considering available reserve fund balances, the cost of the wastewater services forecast is reduced to $5.64 million for the Craigleith STP and $25.15 million for the Thornbury STP, which is brought forward to the development charges calculation. The net municipal cost of the sanitary sewers, sewage treatment plants, and forcemains are then allocated to the residential and non-residential sector based on shares of population and employment growth. The resulting development charges associated with the Craigleith Sewage Treatment Plant are $542.06 per capita and $6.67 per square metre. The Thornbury Sewage Treatment Plant yields development charges of $4,485.89 per capita and $64.56 per square metre. Additional area-specific charges are calculated and added together with the uniform treatment costs for a total wastewater services charge to be applied to new development in each service area. Summary of Calculated Area-Specific Development Charges The following tables provide a summary of the area-specific water and wastewater charges as well as the total applicable charge to each area including both area-specific and Town-wide uniform rates. Appendix D | 160 Summary of Area-Specific Rate Calculations Summary of A rea-Sp ecific Resid ential R ate Calcu lations fo r Single & Se mi Detache d Unit s Summary of A rea-Sp ecific Resid entia l Rate Ca lculations for Rows, Other Mul tiples and H otels U nits Summary of A rea-Sp ecific Resid entia l Rate Ca lculations for Apart ment Units Appendix D | 161 Summary of Total DC Rates by Service Area The following table provides a summary of the applicable development charges, including Town-wide and area-specific charges, for each service area. Summary of A rea-Sp ecific Non-R eside ntial Rat e Calculat ions per s quare metr e Summary of To tal DC Rat es both reside ntial a nd non- residen tial by Ser vice Ar ea incl uding T own-wid e and a rea-s pecific charges . Appendix D | 162 Land Acquisition Construction Works Town Project Management Legal, C of A, Advertising, Misc. Engineering Contingencies Sub-Total Net Growth- Related Share 2% 1% 15% 15% Additional water Supply Collingwood Share (10%) - $ 27,000,000 $ - $ - $ 1,000,000 $ - $ 28,000,000 $ - $ - $ 28,000,000 $ Water Operations Operations Building (215 m2) - $ 497,831 $ 9,957 $ 4,978 $ 74,675 $ 74,675 $ 662,115 $ 331,058 $ 58,193 $ 272,864 $ Total Water Operations - $ 497,831 $ 9,957 $ 4,978 $ 74,675 $ 74,675 $ 662,115 $ 331,058 $ 58,193 $ 272,864 $ Environmental Assessments Environmental Assessments & Updates - $ - $ 12,240 $ - $ - $ - $ 612,002 $ - $ - $ 612,002 $ Total Water-Related Studies - $ - $ 12,240 $ - $ - $ - $ 612,002 $ - $ - $ 612,002 $ Total Water Supply & Treatment - $ 27,497,831 $ 22,197 $ 4,978 $ 1,074,675 $ 74,675 $ 29,274,118 $ 331,058 $ 58,193 $ 28,884,866 $ Development-Related Capital Forecast Replacement/ Non-Growth Share Benefit to Existing Unserviced Units Share Water Supply & Treatment APPENDIX D TABLE D.1 TOWN OF THE BLUE MOUNTAINS WATER SUPPLY AND TREATMENT CAPITAL PROGRAM TOWN-WIDE WATER SUPPLY AND TREATMENT Appendix D | 163 APPENDIX D TABLE D.2 Residential Growth - Population in New Units 14,508 Residential - Existing Unserviced Population 1,284 Total Residential 15,792 Employment Growth 1,453 Ultimate Growth in Square Meters 116,095 Flows from Development m3 % Residential 7,181 81.1% Non-Residential 1,672 18.9% Total 8,853 100% Total Water Supply Replacement/ Benefit Prior Growth Post Period Net Capital Total Grants and Non-Growth to Existing (Available Allocation Costs After Cost Subsidies Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 CRAIGLEITH Water Supply $28,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $28,000.00 81.1% $22,712.73 18.9% $5,287.27 Water Operations - Capital $662.12 $0.00 $331.06 $58.19 $0.00 $0.00 $272.86 81.1% $221.34 18.9% $51.53 Environmental Assessments $612.00 $0.00 $0.00 $0.00 $0.00 $0.00 $612.00 81.1% $496.44 18.9% $115.57 TOTAL CRAIGLEITH $29,274.12 $0.00 $331.06 $58.19 $0.00 $0.00 $28,884.87 $23,430.51 $5,454.36 Charge Per Capita $1,615.01 Charge Per Square Metre of GFA $46.98 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER SUPPLY 2024 TO BUILD-OUT Development-Related Capital Forecast Residential Non-Residential Share Share Appendix D | 164 Cumulative Capacity (m³/day) Studies Land Acquisition Construction Works Town Project Management Legal, C of A, Advertising, Misc. Engineering Contingencies Sub-Total Post Period Allocation Net Growth- Related Share 2% 1% 20% 15% Sewage Treatment Craigleith Sewage Treatment Plant Stage III 11,473 - $ 1,234,456 $ 25,647,058 $ 512,941 $ 256,471 $ 5,129,412 $ 3,847,059 $ 36,627,396 $ - $ - $ 31,479,902 $ 5,147,495 $ Total Sewage Treatment - $ 1,234,456 $ 25,647,058 $ 512,941 $ 256,471 $ 5,129,412 $ 3,847,059 $ 36,627,396 $ - $ - $ 31,479,902 $ 5,147,495 $ Total - $ 1,234,456 $ 25,647,058 $ 512,941 $ 256,471 $ 5,129,412 $ 3,847,059 $ 36,627,396 $ - $ - $ 31,479,902 $ 5,147,495 $ Cumulative Capacity (m³/day) Studies Land Acquisition Construction Works Town Project Management Legal, C of A, Advertising, Misc. Engineering Contingencies Sub-Total Post Period Allocation Net Growth- Related Share 2% 1% 15% 15% Sewage Treatment Thornbury Sewage Treatment Plant Phase 1 (Outstanding Debt) 3,580 - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Phase 1A - Actuals & Tender (incl. neg. reserve) 5,330 - $ - $ 29,000,000 $ 29,000,000 $ 4,335,919 $ 11,313,724 $ - $ 13,350,357 $ New Effluent Outfall - Need to Phase 1A Capacity - $ - $ 14,500,000 $ 1,500,000 $ 16,000,000 $ - $ 3,931,498 $ 9,462,261 $ 2,606,240 $ Phase 1B (Tertiary Treatment) 7,080 - $ - $ 9,498,618 $ 189,972 $ 94,986 $ 1,424,793 $ 1,424,793 $ 12,633,162 $ - $ - $ 3,438,071 $ 9,195,090 $ Phase 2 (+Secondary Treatment) 10,080 - $ - $ 18,997,235 $ 379,945 $ 189,972 $ 2,849,585 $ 2,849,585 $ 25,266,323 $ - $ - $ 25,266,323 $ - $ Phase 3B (Expand Capacity) 13,080 - $ - $ 1,688,643 $ 33,773 $ 16,886 $ 253,296 $ 253,296 $ 2,245,895 $ - $ - $ 2,245,895 $ - $ Total Sewage Treatment - $ - $ 73,684,496 $ 603,690 $ 301,845 $ 4,527,674 $ 6,027,674 $ 85,145,380 $ 4,335,919 $ 15,245,222 $ 40,412,551 $ 25,151,688 $ Total - $ - $ 73,684,496 $ 603,690 $ 301,845 $ 4,527,674 $ 6,027,674 $ 85,145,380 $ 4,335,919 $ 15,245,222 $ 40,412,551 $ 25,151,688 $ Development-Related Costs (2024 - Build-Out) Prior Growth Benefit to Existing Unserviced Units Share Thornbury Sewage Treatment Services APPENDIX D TABLE D.3 TOWN OF THE BLUE MOUNTAINS SEWAGE TREATMENT PLANT CAPITAL PROGRAM SEWAGE TREATMENT COSTS Development-Related Costs (2024 - Build-Out) Replacement/ Non-Growth Share Benefit to Existing Unserviced Units Share Craigleith Sewage Treatment Services Appendix D | 165 APPENDIX D TABLE D.4 Residential Growth - Population in New Units 9,483 Residential - Existing Unserviced Population (reflected in BTE) 1,706 Total Residential 11,189 Employment Growth 947 Ultimate Growth in Square Meters 75,665 Flows from Development m3 % Residential 3,082 91.1% Non-Residential 303 8.9% Total 3,385 100% Total Craigleith Sewage Treatment Plant Replacement/ Benefit Prior Growth Post Period Net Capital (Serves: Craigleith, Castle Glen & Osler) Total Grants and Non-Growth to Existing (Available Allocation Costs After Cost Subsidies Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 CRAIGLEITH SEWAGE TREATMENT PLANT Total Sewage Treatment $36,627.40 $0.00 $0.00 $0.00 $0.00 $31,479.90 $5,147.49 91.1% $4,687.20 8.9% $460.30 Recovery of Negative Reserve $592.34 $0.00 $0.00 $94.66 $0.00 $0.00 $497.68 91.1% $453.18 8.9% $44.50 TOTAL CRAIGLEITH SEWAGE TREATMENT PLANT $37,219.73 $0.00 $0.00 $94.66 $0.00 $31,479.90 $5,645.18 $5,140.37 $504.80 Charge Per Capita $542.06 Charge Per Square Metre of GFA $6.67 Development-Related Capital Forecast Residential Non-Residential Share Share 2024 TO BUILD-OUT TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES CRAIGLEITH SEWAGE TREATMENT PLANT Appendix D | 166 APPENDIX D TABLE D.5 Residential Growth - Population in New Units 5,025 Residential - Existing Unserviced Population (reflected in BTE) 1,911 Total Residential 6,936 Employment Growth 506 Ultimate Growth in Square Meters 40,429 Flows from Development m3 Residential 1,910 89.6% Non-Residential 221 10.4% Total 2,131 Total THORNBURY SEWAGE TREATMENT PLANT Replacement/ Benefit Prior Growth Post Period Net Capital Total Grants and Non-Growth to Existing (Available Allocation Costs After Cost Subsidies Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 THORNBURY SEWAGE TREATMENT PLANT Total Sewage Treatment $85,145.38 $0.00 $0.00 $15,245.22 $4,335.92 $40,412.55 $25,151.69 89.6% $22,541.59 10.4% $2,610.10 $85,145.38 $0.00 $0.00 $15,245.22 $4,335.92 $40,412.55 $25,151.69 $22,541.59 $2,610.10 Charge Per Capita $4,485.89 Charge Per Square Metre of GFA $64.56 (Serves: Camperdown, Swiss Meadows, Lora Bay, Clarksburg, Thornbury East and West) Residential Non-Residential Share Share Development-Related Capital Forecast TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES THORNBURY SEWAGE TREATMENT PLANT 2024 TO BUILD-OUT Appendix D | 167 APPENDIX D TABLE D.6 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM CRAIGLEITH SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Castle Glen Share Osler Share Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 10% 2% Craigleith Water Distribution Feeder Main From Thornbury Water Treatment Plant to Arrowhead Booster Pumping Station PVC 450/350mm 10,700 $1,734 18,548,525 $ 278,228 $ 2,782,279 $ 1,854,852 $ 370,970 $ - $ 23,834,854 $ (3,953,483) $ 19,881,371 $ 6,853,627 $ 292,612 $ - $ 12,735,131 $ Arrowhead Rd/Craigleith Rd/Grey Rd 19/Happy Valley Rd Arrowhead BPS Happy Valley Reservoir PVC 350mm 4,369 $1,579 6,898,716 $ 103,481 $ 1,034,807 $ 689,872 $ 137,974 $ - $ 8,864,850 $ (1,458,255) $ 7,406,595 $ - $ - $ - $ 7,406,595 $ Grey Road 19 Mountain Drive 6th Street PVC 300mm 1,846 $1,738 3,207,577 $ 48,114 $ 481,136 $ 320,758 $ 64,152 $ - $ 4,121,736 $ (684,907) $ 3,436,829 $ 1,184,765 $ 50,583 $ - $ 2,201,481 $ Subtotal Craigleith Water Distribution 28,654,817 $ 429,822 $ 4,298,223 $ 2,865,482 $ 573,096 $ - $ 36,821,441 $ (6,096,646) $ 30,724,795 $ 8,038,392 $ 343,195 $ - $ 22,343,208 $ Craigleith Water Storage and Pumping Arrowhead Water Booster Pumping Station Expansion Phase 1 1,321,722 $ 19,826 $ 198,258 $ 132,172 $ 26,434 $ - $ 1,698,413 $ - $ 1,698,413 $ 585,487 $ 24,997 $ - $ 1,087,929 $ Arrowhead Water Booster Pumping Station Expansion Phase 2 2,220,493 $ 33,307 $ 333,074 $ 222,049 $ 44,410 $ - $ 2,853,334 $ - $ 2,853,334 $ 983,619 $ 41,995 $ - $ 1,827,720 $ Subtotal Craigleith Water Storage and Pumping 3,542,215 $ 53,133 $ 531,332 $ 354,222 $ 70,844 $ - $ 4,551,747 $ - $ 4,551,747 $ 1,569,106 $ 66,992 $ - $ 2,915,649 $ Total Craigleith Water Projects 32,197,032 $ 482,955 $ 4,829,555 $ 3,219,703 $ 643,941 $ - $ 41,373,187 $ (6,096,646) $ 35,276,542 $ 9,607,497 $ 410,187 $ - $ 25,258,857 $ Development-Related Costs (2024 - Build-Out) Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Revised Sub- Total Castle Glen Share Osler Share Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Craigleith Wastewater Collection Long Point Road Highway 26 Brophy's Lane (WWTP) PVC 525mm 525 $1,610 845,276 $ 12,679 $ 126,791 $ 126,791 $ 16,906 $ - $ 1,128,444 $ (191,238) $ 937,206 $ 292,037 $ 12,468 $ - $ 632,701 $ Grey Rd 19 Grey Rd 19 310m North PVC 375mm 310 $1,632 505,934 $ 7,589 $ 75,890 $ 75,890 $ 10,119 $ - $ 675,422 $ (111,742) $ 563,680 $ 175,645 $ 7,499 $ - $ 380,536 $ Grey Road 19 Mountain Drive 6th Street PVC 375mm 1,846 $1,528 2,820,391 $ 42,306 $ 423,059 $ 423,059 $ 56,408 $ - $ 3,765,222 $ (642,405) $ 3,122,818 $ 973,082 $ 41,545 $ - $ 2,108,190 $ Subtotal Craigleith Wastewater Collection 4,171,601 $ 62,574 $ 625,740 $ 625,740 $ 83,432 $ - $ 5,569,088 $ (945,385) $ 4,623,704 $ 1,440,764 $ 61,513 $ - $ 3,121,427 $ Craigleith Wastewater Pump Stations Main Wastewater Pumping Station: Stage II (Additional Pump), 100HP 93 l/s 525,724 $ 7,886 $ 78,859 $ 78,859 $ 10,514 $ - $ 701,842 $ - $ 701,842 $ - $ - $ - $ 701,842 $ Main Wastewater Pumping Station: Stage III (Replace existing pumps) 108l/s 1,051,449 $ 15,772 $ 157,717 $ 157,717 $ 21,029 $ - $ 1,403,685 $ - $ 1,403,685 $ - $ - $ - $ 1,403,685 $ Craigleith Wastewater Treatment Plant Lowlift Sewage Pumping Station 224 l/s 5,152,101 $ 77,282 $ 772,815 $ 772,815 $ 103,042 $ - $ 6,878,055 $ - $ 6,878,055 $ 2,143,228 $ 91,504 $ - $ 4,643,322 $ Subtotal Craigleith Wastewater Pump Stations 6,729,275 $ 100,939 $ 1,009,391 $ 1,009,391 $ 134,585 $ - $ 8,983,582 $ - $ 8,983,582 $ 2,143,228 $ 91,504 $ - $ 6,748,849 $ Total Craigleith Wastewater Projects 10,900,876 $ 163,513 $ 1,635,131 $ 1,635,131 $ 218,018 $ - $ 14,552,670 $ (945,385) $ 13,607,285 $ 3,583,992 $ 153,017 $ - $ 9,870,276 $ Less: Shared Works Less: Shared Works Appendix D | 168 Water: Residential Growth - Population in New Units 4,969 Residential - Pop Existing Unserviced Units 87 Total Residential 5,056 Wastewater: Residential Growth - Population in New Units 4,969 Residential - Pop Existing Unserviced Units 1,365 Total Residential 6,334 Employment Growth 601 Ultimate Growth in Square Meters 48,020 Total Craigleith Service Area Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing (Available Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Craigleith Water Distribution $30,724.79 $0.00 $8,381.59 $0.00 $4,859.59 $17,483.61 90.9% $15,894.49 9.1% $1,589.12 Craigleith Water Storage and Pumping $4,551.75 $0.00 $1,636.10 $0.00 $719.93 $2,195.72 90.9% $1,996.15 9.1% $199.57 Total Water Projects $35,276.54 $0.00 $10,017.68 $0.00 $5,579.52 $19,679.34 $17,890.64 $1,788.69 Charge Per Capita $3,538.83 Charge Per Square Metre of GFA $37.25 Wastewater Projects Craigleith Wastewater Collection $4,623.70 $0.00 $1,502.28 $0.00 $190.48 $2,930.95 90.9% $2,664.55 9.1% $266.40 Craigleith Wastewater Pump Stations $8,983.58 $0.00 $2,234.73 $0.00 $0.00 $6,748.85 90.9% $6,135.43 9.1% $613.42 Total Wastewater Projects $13,607.29 $0.00 $3,737.01 $0.00 $190.48 $9,679.80 $8,799.98 $879.82 Charge Per Capita $1,389.37 Charge Per Square Metre of GFA $18.32 Charge Per Capita Water Water Storage and Pumping $3,538.83 $7,886 $7,078 $5,308 Distribution and Pumping $37.25 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $4,976.59 $11,090 $9,954 $7,465 Total Water Services $56.83 Wastewater Wastewater Collection and Pumping $1,389.37 $3,096 $2,779 $2,084 Collection and Pumping $18.32 Treatment $3,300.17 $7,354 $6,600 $4,950 Treatment $43.17 Total Wastewater Services $4,689.54 $10,450 $9,379 $7,034 Total Wastewater Services $61.49 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Apartments Non-Residential: Craigleith Service Area Charge per Square Metre Residential: Craigleith Service Area Development-Related Capital Forecast Residential Non-Residential Share Share Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples APPENDIX D TABLE D.7 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES CRAIGLEITH SERVICE AREA WATER AND WASTEWATER SERVICING Appendix D | 169 APPENDIX D TABLE D.8 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM CASTLE GLEN SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works: Osler Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Castle Glen Water Distribution Grey Road 19 6th Street Osler Bluff Road/Grey Road 19 PVC 300mm 1,273 $1,580 2,011,167 $ 30,168 $ 301,675 $ 301,675 $ 40,223 $ - $ 2,684,908 $ (441,183) $ 2,243,724 $ 91,872 $ - $ 2,151,852 $ Grey Road 19 Osler Bluff Road/Grey Road 19 Water Reervoir west of 3rd Line PVC 300mm 5,634 $1,485 8,363,951 $ 125,459 $ 1,254,593 $ 1,254,593 $ 167,279 $ - $ 11,165,874 $ (1,955,858) $ 9,210,016 $ - $ - $ 9,210,016 $ Subtotal Castle Glen Water Distribution 10,375,118 $ 155,627 $ 1,556,268 $ 1,556,268 $ 207,502 $ - $ 13,850,782 $ (2,397,041) $ 11,453,740 $ 91,872 $ - $ 11,361,868 $ Castle Glen Water Storage and Pumping Reservoir 2800m3 5,046,956 $ 75,704 $ 757,043 $ 757,043 $ 100,939 $ - $ 6,737,686 $ - $ 6,737,686 $ - $ - $ 6,737,686 $ Pumping Station to Service Castle Glen Reservoir 4000m3/d 5,257,246 $ 78,859 $ 788,587 $ 788,587 $ 105,145 $ - $ 7,018,423 $ - $ 7,018,423 $ - $ - $ 7,018,423 $ Pumping Station to Service Castle Glen 5000m3/d 6,126,179 $ 91,893 $ 918,927 $ 918,927 $ 122,524 $ - $ 8,178,449 $ - $ 8,178,449 $ - $ - $ 8,178,449 $ Subtotal Castle Glen Water Storage and Pumping 16,430,381 $ 246,456 $ 2,464,557 $ 2,464,557 $ 328,608 $ - $ 21,934,558 $ - $ 21,934,558 $ - $ - $ 21,934,558 $ Castle Glen Share of Craigleith Water Distribution Share of Craigleith Water Distribution - $ - $ - $ - $ - $ - $ 8,038,392 $ - $ 8,038,392 $ - $ - $ 8,038,392 $ Subtotal Castle Glen Share of Craigleith Water Distribution - $ - $ - $ - $ - $ - $ 8,038,392 $ - $ 8,038,392 $ - $ - $ 8,038,392 $ Castle Glen Share of Craigleith Water Storage and Pumping Share of Craigleith Water Booster Pumping Station Expansion - $ - $ - $ - $ - $ - $ 1,569,106 $ - $ 1,569,106 $ - $ - $ 1,569,106 $ Subtotal Castle Glen Share of Craigleith Water Storage and Pumping - $ - $ - $ - $ - $ - $ 1,569,106 $ - $ 1,569,106 $ - $ - $ 1,569,106 $ Total Castle Glen Water Projects 26,805,498 $ 402,082 $ 4,020,825 $ 4,020,825 $ 536,110 $ - $ 45,392,837 $ (2,397,041) $ 42,995,796 $ 91,872 $ - $ 42,903,924 $ - $ Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works: Osler Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Castle Glen Wastewater Collection Grey Road 19 6th Street Osler Bluff Road/Grey Road 19 PVC 375mm 1,273 $1,487 1,893,270 $ 28,399 $ 283,991 $ 283,991 $ 37,865 $ - $ 2,527,516 $ (420,034) $ 2,107,482 $ 86,294 $ - $ 2,021,188 $ Grey Road 19 Grey Road 19 Osler Bluff Road/2nd Line PVC 250mm 2,950 $1,360 4,013,024 $ 60,195 $ 601,954 $ 601,954 $ 80,260 $ - $ 5,357,387 $ (885,331) $ 4,472,056 $ - $ - $ 4,472,056 $ Subtotal Castle Glen Wastewater Collection 5,906,294 $ 88,594 $ 885,944 $ 885,944 $ 118,126 $ - $ 7,884,903 $ (1,305,365) $ 6,579,538 $ 86,294 $ - $ 6,493,245 $ Castle Glen Share of Craigleith Wastewater Collection Share of Craigleith Wastewater Collection - $ - $ - $ - $ - $ - $ 1,440,764 $ - $ 1,440,764 $ - $ - $ 1,440,764 $ Subtotal Castle Glen Share of Craigleith Wastewater Collection - $ - $ - $ - $ - $ - $ 1,440,764 $ - $ 1,440,764 $ - $ - $ 1,440,764 $ Castle Glen Share of Craigleith Wastewater Pump Stations Craigleith Wastewater Treatment Plant Lowlift Sewage Pumping Station - $ - $ - $ - $ - $ - $ 2,143,228 $ - $ 2,143,228 $ - $ - $ 2,143,228 $ Subtotal Castle Glen Share of Craigleith Wastewater Pump Stations - $ - $ - $ - $ - $ - $ 2,143,228 $ - $ 2,143,228 $ - $ - $ 2,143,228 $ Other Wastewater Projects Environmental Assessment Update - $ - $ - $ - $ - $ - $ 54,400 $ - $ 54,400 $ - $ - $ 54,400 $ Subtotal Other Wastewater Projects - $ - $ - $ - $ - $ - $ 54,400 $ - $ 54,400 $ - $ - $ 54,400 $ Total Castle Glen Wastewater Projects 5,906,294 $ 88,594 $ 885,944 $ 885,944 $ 118,126 $ - $ 11,523,296 $ (1,305,365) $ 10,217,931 $ 86,294 $ - $ 10,131,637 $ Appendix D | 170 Water & Wastewater: Residential Growth - Population in New Units 4,497 Residential - Pop Existing Unserviced Units 173 Total Residential 4,670 Employment Growth 314 Ultimate Growth in Square Meters 25,089 Total Castle Glen Service Area Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing (Available Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Castle Glen Water Distribution $11,453.74 $0.00 $91.87 $0.00 $0.00 $11,361.87 90.9% $10,329.16 9.1% $1,032.70 Castle Glen Water Storage and Pumping $21,934.56 $0.00 $0.00 $0.00 $0.00 $21,934.56 90.9% $19,940.88 9.1% $1,993.68 Castle Glen Share of Craigleith Water Distribution $8,038.39 $0.00 $0.00 $0.00 $0.00 $8,038.39 90.9% $7,307.77 9.1% $730.63 Castle Glen Share of Craigleith Water Storage and Pumping $1,569.11 $0.00 $0.00 $0.00 $0.00 $1,569.11 90.9% $1,426.49 9.1% $142.62 Total Water Projects $42,995.80 $0.00 $91.87 $0.00 $0.00 $42,903.92 $39,004.30 $3,899.62 Charge Per Capita $8,351.99 Charge Per Square Metre of GFA $155.43 Wastewater Projects Castle Glen Wastewater Collection $6,579.54 $0.00 $86.29 $0.00 -$287.53 $6,780.77 90.9% $6,164.46 9.1% $616.32 Castle Glen Share of Craigleith Wastewater Collection $1,440.76 $0.00 $0.00 $0.00 $0.00 $1,440.76 90.9% $1,309.81 9.1% $130.95 Castle Glen Share of Craigleith Wastewater Pump Stations $2,143.23 $0.00 $0.00 $0.00 $0.00 $2,143.23 90.9% $1,948.43 9.1% $194.80 Other Wastewater Projects $54.40 $0.00 $0.00 $0.00 $0.00 $54.40 90.9% $49.46 9.1% $4.94 Total Wastewater Projects $10,217.93 $0.00 $86.29 $0.00 -$287.53 $10,419.17 $9,472.15 $947.02 Charge Per Capita $2,028.27 Charge Per Square Metre of GFA $37.75 Charge Per Capita Water Water Distribution and Pumping $8,351.99 $18,612 $16,704 $12,528 Distribution and Pumping $155.43 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $9,789.75 $21,816 $19,580 $14,685 Total Water Services $175.01 Wastewater Wastewater Collection and Pumping $2,028.27 $4,520 $4,057 $3,042 Collection and Pumping $37.75 Treatment $3,300.17 $7,354 $6,600 $4,950 Treatment $43.17 Total Wastewater Services $5,328.44 $11,874 $10,657 $7,992 Total Wastewater Services $80.92 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Residential: Castle Glen Service Area Non-Residential: Castle Glen Service Area Development-Related Capital Forecast Residential Non-Residential Share Share Charge per Square Metre Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples Apartments CASTLE GLEN SERVICE AREA APPENDIX D TABLE D.9 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING Appendix D | 171 APPENDIX D TABLE D.10 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM OSLER SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 12% 10% 2% Osler Water Distribution TOBM/Clearview Townline Grey Road 19 Poplar Sideroad PVC 250mm 595 $705 938,299 $ 14,074 $ 112,596 $ 93,830 $ 18,766 $ - $ 1,177,565 $ (206,380) $ 971,185 $ - $ - $ 971,185 $ Poplar Sideroad TOBM/Clearview Townline West End of Road PVC 200mm 768 $655 1,034,102 $ 15,512 $ 124,092 $ 103,410 $ 20,682 $ - $ 1,297,798 $ (249,835) $ 1,047,963 $ - $ - $ 1,047,963 $ TOBM/Clearview Townline Poplar Sideroad Shaw's Road PVC 200mm 235 $655 346,051 $ 5,191 $ 41,526 $ 34,605 $ 6,921 $ - $ 434,294 $ (78,438) $ 355,856 $ - $ - $ 355,856 $ TOBM/Clearview Townline Shaw's Road Valley Road PVC 200mm 277 $655 392,172 $ 5,883 $ 47,061 $ 39,217 $ 7,843 $ - $ 492,176 $ (90,793) $ 401,383 $ - $ - $ 401,383 $ TOBM/Clearview Townline Valley Road Orchard Place PVC 200mm 219 $655 314,387 $ 4,716 $ 37,726 $ 31,439 $ 6,288 $ - $ 394,556 $ (74,470) $ 320,086 $ - $ - $ 320,086 $ Subtotal Osler Water Distribution 3,025,012 $ 45,375 $ 363,001 $ 302,501 $ 60,500 $ - $ 3,796,390 $ (699,916) $ 3,096,474 $ - $ - $ 3,096,474 $ Osler Share of Craigleith Water Distribution Share of Craigleith Water Distribution - $ - $ - $ - $ - $ - $ 343,195 $ - $ 343,195 $ - $ - $ 343,195 $ Subtotal Osler Share of Craigleith Water Distribution - $ - $ - $ - $ - $ - $ 343,195 $ - $ 343,195 $ - $ - $ 343,195 $ Osler Share of Craigleith Water Storage and Pumping Share of Craigleith Water Booster Pumping Station Expansion - $ - $ - $ - $ - $ - $ 66,992 $ - $ 66,992 $ - $ - $ 66,992 $ Subtotal Osler Share of Craigleith Water Storage and Pumping - $ - $ - $ - $ - $ - $ 66,992 $ - $ 66,992 $ - $ - $ 66,992 $ Other Water Projects Environmental Assessment Update - $ - $ - $ - $ 1,333 $ 66,667 $ 68,000 $ - $ 68,000 $ - $ - $ 68,000 $ Subtotal Other Water Projects - $ - $ - $ - $ 1,333 $ 66,667 $ 68,000 $ - $ 68,000 $ - $ - $ 68,000 $ Total Osler Water Projects 3,025,012 $ 45,375 $ 363,001 $ 302,501 $ 61,834 $ 66,667 $ 4,274,578 $ (699,916) $ 3,574,662 $ - $ - $ 3,574,662 $ 0 -$ Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works: Clearview Township Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 12% 10% 2% Osler Wastewater Collection TOBM/Clearview Townline Grey Road 19 Poplar Sideroad PVC 200mm 595 $690 842,880 $ 12,643 $ 101,146 $ 84,288 $ 16,858 $ - $ 1,057,815 $ (178,169) $ 879,646 $ - $ - $ 879,646 $ Poplar Sideroad TOBM/Clearview Townline West End of Road PVC 200mm 768 $690 1,080,003 $ 16,200 $ 129,600 $ 108,000 $ 21,600 $ - $ 1,355,404 $ (225,505) $ 1,129,899 $ - $ - $ 1,129,899 $ TOBM/Clearview Townline Poplar Sideroad Shaw's Road PVC 200mm 235 $690 355,074 $ 5,326 $ 42,609 $ 35,507 $ 7,101 $ - $ 445,618 $ (72,102) $ 373,515 $ - $ - $ 373,515 $ TOBM/Clearview Townline Shaw's Road Valley Road PVC 200mm 277 $690 401,895 $ 6,028 $ 48,227 $ 40,189 $ 8,038 $ - $ 504,378 $ (83,869) $ 420,509 $ - $ - $ 420,509 $ TOBM/Clearview Townline Valley Road Orchard Place PVC 200mm 219 $690 339,567 $ 5,094 $ 40,748 $ 33,957 $ 6,791 $ - $ 426,156 $ (68,358) $ 357,798 $ - $ - $ 357,798 $ Subtotal Osler Wastewater Collection 3,019,419 $ 45,291 $ 362,330 $ 301,942 $ 60,388 $ - $ 3,789,371 $ (628,004) $ 3,161,367 $ - $ - $ 3,161,367 $ Osler Share of Craigleith Wastewater Collection Share of Craigleith Wastewater Collection - $ - $ - $ - $ - $ - $ 61,513 $ - $ 61,513 $ - $ - $ 61,513 $ Subtotal Osler Share of Craigleith Wastewater Collection - $ - $ - $ - $ - $ - $ 61,513 $ - $ 61,513 $ - $ - $ 61,513 $ Osler Share of Craigleith Wastewater Pump Stations Craigleith Wastewater Treatment Plant Lowlift Sewage Pumping Station - $ - $ - $ - $ - $ - $ 91,504 $ - $ 91,504 $ - $ - $ 91,504 $ Subtotal Osler Share of Craigleith Wastewater Pump Stations - $ - $ - $ - $ - $ - $ 91,504 $ - $ 91,504 $ - $ - $ 91,504 $ Other Wastewater Projects Environmental Assessment Update - $ - $ - $ - $ 667 $ 33,333 $ 34,000 $ - $ 34,000 $ - $ - $ 34,000 $ Subtotal Other Wastewater Projects - $ - $ - $ - $ 667 $ 33,333 $ 34,000 $ - $ 34,000 $ - $ - $ 34,000 $ Total Osler Wastewater Projects 3,019,419 $ 45,291 $ 362,330 $ 301,942 $ 61,055 $ 33,333 $ 3,976,388 $ (628,004) $ 3,348,384 $ - $ - $ 3,348,384 $ Appendix D | 172 Water & Wastewater: Residential Growth - Population in New Units 9 Residential - Pop Existing Unserviced Units 165 Total Residential 174 Employment Growth 32 Ultimate Growth in Square Meters 2,557 Total Osler Service Area Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing (Available Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Osler Water Distribution $3,096.47 $0.00 $0.00 $0.00 $4.04 $3,092.43 80.0% $2,473.95 20.0% $618.49 Osler Water Storage and Pumping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 80.0% $0.00 20.0% $0.00 Osler Share of Craigleith Water Distribution $343.20 $0.00 $0.00 $0.00 $0.00 $343.20 80.0% $274.56 20.0% $68.64 Osler Share of Craigleith Water Storage and Pumping $66.99 $0.00 $0.00 $0.00 $0.00 $66.99 80.0% $53.59 20.0% $13.40 Other Water Projects $68.00 $0.00 $0.00 $0.00 $0.00 $68.00 80.0% $54.40 20.0% $13.60 Total Water Projects $3,574.66 $0.00 $0.00 $0.00 $4.04 $3,570.62 $2,856.50 $714.12 Charge Per Capita $16,398.51 Charge Per Square Metre of GFA $279.30 Wastewater Projects Osler Wastewater Collection $3,161.37 $0.00 $0.00 $0.00 ($286.00) $3,447.37 80.0% $2,757.90 20.0% $689.47 Osler Share of Craigleith Wastewater Collection $61.51 $0.00 $0.00 $0.00 $0.00 $61.51 80.0% $49.21 20.0% $12.30 Osler Share of Craigleith Wastewater Pump Stations $91.50 $0.00 $0.00 $0.00 $0.00 $91.50 80.0% $73.20 20.0% $18.30 Other Wastewater Projects $34.00 $0.00 $0.00 $0.00 $0.00 $34.00 80.0% $27.20 20.0% $6.80 Total Wastewater Projects $3,348.38 $0.00 $0.00 $0.00 ($286.00) $3,634.39 $2,907.51 $726.88 Charge Per Capita $16,691.37 Development Charge Per Square Metre of GFA $284.29 Charge Per Capita Water Water Distribution and Pumping $16,398.51 $36,542 $32,797 $24,598 Distribution and Pumping $279.30 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $17,836.27 $39,746 $35,673 $26,755 Total Water Services $298.88 Wastewater Wastewater Collection and Pumping $16,691.37 $37,195 $33,383 $25,037 Collection and Pumping $284.29 Treatment $3,300.17 $7,354 $6,600 $4,950 Treatment $43.17 Total Wastewater Services $19,991.54 $44,549 $39,983 $29,987 Total Wastewater Services $327.46 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 OSLER SERVICE AREA APPENDIX D TABLE D.11 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING Residential: Osler Service Area Non-Residential: Osler Service Area Development-Related Capital Forecast Residential Non-Residential Share Share Charge per Square Metre Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples Apartments Appendix D | 173 APPENDIX D TABLE D.12 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM THORNBURY EAST SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Thornbury West Share Lora Bay Share Clarksburg Share Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Thornbury East Water Storage and Pumping Thornbury Water Reservoir Debt 779,031 $ - $ - $ - $ - $ - $ 779,031 $ - $ 779,031 $ 634,925 $ - $ - $ - $ 144,107 $ Subtotal Thornbury East Water Storage and Pumping 779,031 $ - $ - $ - $ - $ - $ 779,031 $ - $ 779,031 $ 634,925 $ - $ - $ - $ 144,107 $ Total Thornbury East Water Projects 779,031 $ - $ - $ - $ - $ - $ 779,031 $ - $ 779,031 $ 634,925 $ - $ - $ - $ 144,107 $ Development-Related Costs (2024 - Build-Out) Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Thornbury West Share Lora Bay Share Clarksburg Share Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Thornbury East Wastewater Collection Forcemain Mill St SPS Thornbury WWTP HDPE 300 1,350 $450 1,925,143 $ 28,877 $ 288,772 $ 288,772 $ 38,503 $ - $ 2,570,066 $ (396,341) $ 2,173,726 $ 633,187 $ 1,028,113 $ 370,121 $ - $ 142,304 $ Uprades to Mill St /Bay St Sewage Pumping Station Phase 1 1,587,093 $ 23,806 $ 238,064 $ 238,064 $ 31,742 $ - $ 2,118,769 $ - $ 2,118,769 $ 617,179 $ 1,002,121 $ 360,763 $ - $ 138,706 $ Uprades to Mill St /Bay St Sewage Pumping Station Phase 2 119,032 $ 1,785 $ 17,855 $ 17,855 $ 2,381 $ - $ 158,908 $ - $ 158,908 $ 46,288 $ 75,159 $ 27,057 $ - $ 10,403 $ Subtotal Thornbury East Wastewater Collection 3,631,268 $ 54,469 $ 544,690 $ 544,690 $ 72,625 $ - $ 4,847,743 $ (396,341) $ 4,451,403 $ 1,296,655 $ 2,105,393 $ 757,942 $ - $ 291,413 $ Total Thornbury East Wastewater Projects 3,631,268 $ 54,469 $ 544,690 $ 544,690 $ 72,625 $ - $ 4,847,743 $ (792,682) $ 4,451,403 $ 1,296,655 $ 2,105,393 $ 757,942 $ - $ 291,413 $ Less Shared Works: Less Shared Works: Appendix D | 174 Water: Residential Growth - Population in New Units 278 Residential - Pop Existing Unserviced Units 10 Total Residential 288 Wastewater: Residential Growth - Population in New Units 278 Residential - Pop Existing Unserviced Units 41 Total Residential 319 Employment Growth 30 Ultimate Growth in Square Meters 2,397 Total Thornbury East Service Area Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing (Available Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Thornbury East Water Storage and Pumping $779.03 $0.00 $634.92 $0.00 ($334.88) $478.98 90.9% $435.45 9.1% $43.54 Total Water Projects $779.03 $0.00 $634.92 $0.00 ($334.88) $478.98 $435.45 $43.54 Charge Per Capita $1,512.85 Charge Per Square Metre of GFA $18.16 Wastewater Projects Thornbury East Wastewater Collection $4,451.40 $0.00 $4,159.99 $0.00 ($105.79) $397.20 90.9% $361.10 9.1% $36.10 Total Wastewater Projects $4,451.40 $0.00 $4,159.99 $0.00 ($105.79) $397.20 $361.10 $36.10 Charge Per Capita $1,130.92 Charge Per Square Metre of GFA $15.06 Charge Per Capita Water Water Storage and Pumping $1,512.85 $3,371 $3,026 $2,269 Distribution and Pumping $18.16 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $2,950.61 $6,575 $5,902 $4,426 Total Water Services $37.74 Wastewater Wastewater Collection and Pumping $1,130.92 $2,520 $2,262 $1,696 Collection and Pumping $15.06 Treatment $10,792.91 $24,051 $21,586 $16,189 Treatment $178.31 Total Wastewater Services $11,923.83 $26,571 $23,848 $17,885 Total Wastewater Services $193.37 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Residential: Thornbury East Service Area Non-Residential: Thornbury East Service Area Development-Related Capital Forecast Residential Non-Residential Share Share Charge per Square Metre Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples Apartments THORNBURY EAST SERVICE AREA APPENDIX D TABLE D.13 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING Appendix D | 175 APPENDIX D TABLE D.14 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM THORNBURY WEST SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works Benefit to Existing Unserviced Units Share Post-Period Costs Net Growth- Related Share 1.5% 15% 15% 2% Thornbury West Water Distribution Peel Street South 10th Line Alfred Street West PVC 250mm 71 $1,950 138,450 $ 2,077 $ 20,768 $ 20,768 $ 2,769 $ - $ 184,831 $ (26,517) $ 158,314 $ - $ - $ 158,314 $ - $ Peel Street South Alfred Street West Alice Street West PVC 250mm 270 $1,691 456,586 $ 6,849 $ 68,488 $ 68,488 $ 9,132 $ - $ 609,542 $ (131,984) $ 477,558 $ - $ - $ 477,558 $ - $ Peel Street South Alice Street West Baring Street PVC 250mm 150 $1,983 297,429 $ 4,461 $ 44,614 $ 44,614 $ 5,949 $ - $ 397,068 $ (75,219) $ 321,849 $ - $ - $ 321,849 $ - $ Peel Street South Baring Street Arthur Street West PVC 250mm 180 $1,808 325,490 $ 4,882 $ 48,823 $ 48,823 $ 6,510 $ - $ 434,529 $ (87,989) $ 346,540 $ - $ - $ 346,540 $ - $ Lansdowne Street South Alice Street Louisa Street PVC 150mm 220 $1,458 320,844 $ 4,813 $ 48,127 $ 48,127 $ 6,417 $ - $ 428,327 $ (103,485) $ 324,842 $ - $ - $ - $ 324,842 $ Lansdowne Street South Louisa Street Arthur Street West PVC 150mm 120 $1,762 211,431 $ 3,171 $ 31,715 $ 31,715 $ 4,229 $ - $ 282,261 $ (59,228) $ 223,033 $ - $ - $ - $ 223,033 $ Beaver Street South 10th Line Napier Street PVC 150mm 70 $1,547 108,279 $ 1,624 $ 16,242 $ 16,242 $ 2,166 $ - $ 144,552 $ (33,933) $ 110,619 $ - $ - $ 110,619 $ - $ Beaver Street South Napier Street Albert Street PVC 150mm 410 $1,323 542,248 $ 8,134 $ 81,337 $ 81,337 $ 10,845 $ - $ 723,901 $ (188,810) $ 535,091 $ - $ - $ 535,091 $ - $ Alice Street West Lansdowne Street Baring Street PVC 250mm 664 $1,526 1,013,288 $ 15,199 $ 151,993 $ 151,993 $ 20,266 $ - $ 1,352,739 $ (322,434) $ 1,030,305 $ - $ - $ - $ 1,030,305 $ Alice Street West Baring Street Peel Street PVC 250mm 84 $1,808 151,900 $ 2,278 $ 22,785 $ 22,785 $ 3,038 $ - $ 202,786 $ (42,255) $ 160,531 $ - $ - $ - $ 160,531 $ Alfred Street Albert Street Peel Street PVC 200mm 676 $1,260 851,658 $ 12,775 $ 127,749 $ 127,749 $ 17,033 $ - $ 1,136,964 $ (219,130) $ 917,834 $ - $ - $ - $ 917,834 $ Alfred Street 50m East of Beaver Street Beaver Street PVC 200mm 50 $1,844 92,182 $ 1,383 $ 13,827 $ 13,827 $ 1,844 $ - $ 123,063 $ (18,885) $ 104,178 $ - $ - $ - $ 104,178 $ Alfred Street Albert Street Beaver Street PVC 200mm 70 $2,023 141,593 $ 2,124 $ 21,239 $ 21,239 $ 2,832 $ - $ 189,026 $ (25,049) $ 163,977 $ - $ - $ - $ 163,977 $ Baring Street Peel Street Alice Street West PVC 150mm 113 $1,515 171,214 $ 2,568 $ 25,682 $ 25,682 $ 3,424 $ - $ 228,571 $ (40,359) $ 188,212 $ - $ - $ - $ 188,212 $ Baring Street Alice Street West Alfred Street West PVC 150mm 221 $1,343 296,757 $ 4,451 $ 44,513 $ 44,513 $ 5,935 $ - $ 396,170 $ (75,033) $ 321,137 $ - $ - $ - $ 321,137 $ Baring Street (unopened) Alfred Street West 10th Line Road PVC 150mm 336 $1,277 429,201 $ 6,438 $ 64,380 $ 64,380 $ 8,584 $ - $ 572,984 $ (111,676) $ 461,308 $ - $ - $ - $ 461,308 $ Albert Street Napier Street West Beaver Street South PVC 150mm 338 $1,321 446,482 $ 6,697 $ 66,972 $ 66,972 $ 8,930 $ - $ 596,054 $ (154,840) $ 441,214 $ - $ - $ 441,214 $ - $ Albert Street Beaver Street South Alfred Street West PVC 150mm 88 $1,400 123,167 $ 1,848 $ 18,475 $ 18,475 $ 2,463 $ - $ 164,428 $ (41,031) $ 123,397 $ - $ - $ 123,397 $ - $ Albert Street Napier Street West 10th Line Road PVC 150mm 329 $1,337 439,718 $ 6,596 $ 65,958 $ 65,958 $ 8,794 $ - $ 587,023 $ (151,292) $ 435,731 $ - $ - $ 435,731 $ - $ Napier Street West Beaver Street South Albert Street PVC 150mm 248 $1,289 319,757 $ 4,796 $ 47,963 $ 47,963 $ 6,395 $ - $ 426,875 $ (114,526) $ 312,349 $ - $ - $ 312,349 $ - $ Napier Street West Albert Street Victoria Street PVC 150mm 437 $1,313 573,877 $ 8,608 $ 86,082 $ 86,082 $ 11,478 $ - $ 766,126 $ (200,208) $ 565,918 $ - $ - $ 282,959 $ 282,959 $ 10th Line Road Peel Street Beaver Street PVC 250mm 615 $1,571 966,172 $ 14,493 $ 144,926 $ 144,926 $ 19,323 $ - $ 1,289,840 $ (301,577) $ 988,263 $ - $ - $ 988,263 $ - $ 10th Line Road Beaver Street South Albert Street PVC 250mm 404 $1,533 619,360 $ 9,290 $ 92,904 $ 92,904 $ 12,387 $ - $ 826,845 $ (200,392) $ 626,453 $ - $ - $ 626,453 $ - $ 10th Line Road Albert Street Duncan Street West PVC 250mm 134 $1,687 226,071 $ 3,391 $ 33,911 $ 33,911 $ 4,521 $ - $ 301,805 $ (68,408) $ 233,397 $ - $ - $ 233,397 $ - $ 10th Line Road Duncan Street West Russell Street PVC 250mm 820 $1,573 1,289,921 $ 19,349 $ 193,488 $ 193,488 $ 25,798 $ - $ 1,722,044 $ (350,417) $ 1,371,627 $ - $ - $ 1,371,627 $ - $ Duncan Street 10th Line Road Victoria Street PVC 250mm 336 $1,626 546,239 $ 8,194 $ 81,936 $ 81,936 $ 10,925 $ - $ 729,229 $ (164,947) $ 564,282 $ - $ - $ 564,282 $ - $ Subtotal Thornbury West Water Distribution 11,099,313 $ 166,490 $ 1,664,897 $ 1,664,897 $ 221,986 $ - $ 14,817,583 $ (3,309,622) $ 11,507,961 $ - $ - $ 7,329,646 $ 4,178,316 $ Thornbury West Water Storage Upgrading of Elevated Tank in Thornbury (3,000 total current capacity of 740) 2260m3 7,505,443 $ 112,582 $ 1,125,816 $ 1,125,816 $ 150,109 $ - $ 10,019,766 $ - $ 10,019,766 $ - $ - $ - $ 10,019,766 $ Subtotal Thornbury West Water Storage 7,505,443 $ 112,582 $ 1,125,816 $ 1,125,816 $ 150,109 $ - $ 10,019,766 $ - $ 10,019,766 $ - $ - $ - $ 10,019,766 $ Thornbury West Share of Thornbury East Reservoir Debt Thornbury West Share of Thornbury East Reservoir Debt - $ - $ - $ - $ - $ - $ 634,925 $ - $ 634,925 $ - $ - $ - $ 634,925 $ Subtotal Thornbury West Share of Thornbury East Reservoir Debt - $ - $ - $ - $ - $ - $ 634,925 $ - $ 634,925 $ - $ - $ - $ 634,925 $ Total Thornbury West Water Projects 18,604,756 $ 279,071 $ 2,790,713 $ 2,790,713 $ 372,095 $ - $ (3,309,622) $ 22,162,652 $ - $ - $ 7,329,646 $ 14,833,006 $ Appendix D | 176 APPENDIX D TABLE D.14 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM THORNBURY WEST SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works: Lora Bay Benefit to Existing Unserviced Units Share Post-Period Costs Net Growth- Related Share 1.5% 15% 15% 2% Thornbury West Wastewater Collection Peel Street South 10th Line Alfred Street West PVC 200mm 71 $2,052 145,707 $ 2,186 $ 21,856 $ 21,856 $ 2,914 $ - $ 194,519 $ (28,243) $ 166,276 $ - $ - $ 166,276 $ - $ Peel Street South Alfred Street West Alice Street West PVC 200mm 270 $1,374 370,888 $ 5,563 $ 55,633 $ 55,633 $ 7,418 $ - $ 495,136 $ (114,121) $ 381,015 $ - $ - $ 381,015 $ - $ Peel Street South Alice Street West Baring Street PVC 200mm 150 $1,656 248,397 $ 3,726 $ 37,260 $ 37,260 $ 4,968 $ - $ 331,610 $ (68,231) $ 263,379 $ - $ - $ 263,379 $ - $ Peel Street South Baring Street Arthur Street West PVC 200mm 180 $1,548 278,580 $ 4,179 $ 41,787 $ 41,787 $ 5,572 $ - $ 371,904 $ (79,516) $ 292,388 $ - $ - $ 292,388 $ - $ Lansdowne Street South Alice Street West Louisa Street West PVC 200mm 220 $1,455 320,105 $ 4,802 $ 48,016 $ 48,016 $ 6,402 $ - $ 427,340 $ (95,314) $ 332,026 $ - $ - $ 332,026 $ - $ Lansdowne Street South Louisa Street Arthur Street West PVC 200mm 120 $1,833 219,973 $ 3,300 $ 32,996 $ 32,996 $ 4,399 $ - $ 293,664 $ (57,699) $ 235,965 $ - $ - $ 235,965 $ - $ Beaver Street South 10th Line Napier Street West PVC 200mm 70 $2,069 144,820 $ 2,172 $ 21,723 $ 21,723 $ 2,896 $ - $ 193,335 $ (38,140) $ 155,195 $ - $ - $ 155,195 $ - $ Beaver Street South Napier Street West Albert Street PVC 200mm 410 $1,362 558,482 $ 8,377 $ 83,772 $ 83,772 $ 11,170 $ - $ 745,574 $ (167,534) $ 578,040 $ - $ - $ 578,040 $ - $ Alice Street West 400m East of Baring Street Baring Street PVC 200mm 400 $1,314 525,572 $ 7,884 $ 78,836 $ 78,836 $ 10,511 $ - $ 701,639 $ (163,773) $ 537,866 $ - $ - $ - $ 537,866 $ Minto Street (unopened) Highway 26 Alice Street PVC 300mm 290 $1,435 416,182 $ 6,243 $ 62,427 $ 62,427 $ 8,324 $ - $ 555,603 $ (93,918) $ 461,685 $ - $ - $ - $ 461,685 $ Minto Street (unopened) Alice Street Alfred Street PVC 250mm 220 $1,516 333,425 $ 5,001 $ 50,014 $ 50,014 $ 6,668 $ - $ 445,122 $ (71,131) $ 373,991 $ - $ - $ - $ 373,991 $ Alfred Street 200m East of Beaver Street Beaver Street South PVC 250mm 200 $1,553 310,565 $ 4,658 $ 46,585 $ 46,585 $ 6,211 $ - $ 414,604 $ (65,003) $ 349,601 $ - $ - $ - $ 349,601 $ Alfred Street Albert Street Minto Street (unopened) PVC 250mm 225 $1,498 337,063 $ 5,056 $ 50,559 $ 50,559 $ 6,741 $ - $ 449,979 $ (71,967) $ 378,012 $ - $ - $ - $ 378,012 $ Alfred Street 150m East of Peel Street Peel Street South PVC 200mm 150 $1,656 248,397 $ 3,726 $ 37,260 $ 37,260 $ 4,968 $ - $ 331,610 $ (49,370) $ 282,240 $ - $ - $ - $ 282,240 $ Baring Street Peel Street South Alice Street PVC 200mm 113 $1,663 187,963 $ 2,819 $ 28,194 $ 28,194 $ 3,759 $ - $ 250,931 $ (39,475) $ 211,456 $ - $ - $ - $ 211,456 $ Baring Street Alice Street West 120m south of Alice Street PVC 200mm 120 $1,630 195,604 $ 2,934 $ 29,341 $ 29,341 $ 3,912 $ - $ 261,131 $ (41,347) $ 219,784 $ - $ - $ - $ 219,784 $ Baring Street (unopened) Alfred Street 10th Line PVC 200mm 315 $1,397 440,173 $ 6,603 $ 66,026 $ 66,026 $ 8,803 $ - $ 587,631 $ (94,567) $ 493,064 $ - $ - $ - $ 493,064 $ Albert Street Napier Street West Beaver Street South PVC 250mm 338 $1,426 482,061 $ 7,231 $ 72,309 $ 72,309 $ 9,641 $ - $ 643,551 $ (145,073) $ 498,478 $ - $ - $ 498,478 $ - $ Albert Street Beaver Street South Alfred Street West PVC 250mm 88 $1,913 168,322 $ 2,525 $ 25,248 $ 25,248 $ 3,366 $ - $ 224,710 $ (46,335) $ 178,375 $ - $ - $ 178,375 $ - $ Albert Street Napier Street West 10th Line PVC 200mm 329 $1,377 452,978 $ 6,795 $ 67,947 $ 67,947 $ 9,060 $ - $ 604,725 $ (136,314) $ 468,411 $ - $ - $ 468,411 $ - $ Napier Street West Victoria Street South Albert Street PVC 200mm 437 $1,345 587,765 $ 8,816 $ 88,165 $ 88,165 $ 11,755 $ - $ 784,666 $ (178,442) $ 606,224 $ - $ - $ 303,112 $ 303,112 $ Napier Street West Albert Street Beaver Street South PVC 200mm 248 $1,405 348,515 $ 5,228 $ 52,277 $ 52,277 $ 6,970 $ - $ 465,267 $ (105,846) $ 359,421 $ - $ - $ 359,421 $ - $ Victoria Street South Napier Street West Pyatt Ave PVC 250mm 155 $2,936 455,031 $ 6,825 $ 68,255 $ 68,255 $ 9,101 $ - $ 607,467 $ (175,458) $ 432,009 $ - $ - $ - $ 432,009 $ Victoria Street South Pyatt Ave Thorncroft Court PVC 250mm 93 $3,039 282,585 $ 4,239 $ 42,388 $ 42,388 $ 5,652 $ - $ 377,251 $ (89,442) $ 287,809 $ - $ - $ - $ 287,809 $ Victoria Street South Thorncroft Court Alfred Street West PVC 250mm 180 $2,806 504,993 $ 7,575 $ 75,749 $ 75,749 $ 10,100 $ - $ 674,166 $ (185,254) $ 488,912 $ - $ - $ - $ 488,912 $ Victoria Street South Napier Street West Duncan Street West PVC 200mm 419 $2,695 1,129,046 $ 16,936 $ 169,357 $ 169,357 $ 22,581 $ - $ 1,507,276 $ (438,845) $ 1,068,431 $ - $ - $ - $ 1,068,431 $ 10th Line Road Peel Street South 50m SE of Baring Street (unopene PVC 200mm 420 $1,358 570,542 $ 8,558 $ 85,581 $ 85,581 $ 11,411 $ - $ 761,673 $ (172,048) $ 589,625 $ - $ - $ 589,625 $ - $ 10th Line Road Beaver Street South Albert Street PVC 200mm 404 $1,372 554,204 $ 8,313 $ 83,131 $ 83,131 $ 11,084 $ - $ 739,863 $ (166,030) $ 573,833 $ - $ - $ 573,833 $ - $ 10th Line Road Albert Street Duncan Street West PVC 200mm 134 $1,563 209,450 $ 3,142 $ 31,418 $ 31,418 $ 4,189 $ - $ 279,616 $ (62,213) $ 217,403 $ - $ - $ 217,403 $ - $ 10th Line Road Duncan Street West 200m South of Duncan Street PVC 200mm 200 $1,623 324,520 $ 4,868 $ 48,678 $ 48,678 $ 6,490 $ - $ 433,234 $ (87,791) $ 345,443 $ - $ - $ 345,443 $ - $ Duncan Street West 10th Line Road 275m East of 10th Line Road PVC 200mm 275 $1,365 375,321 $ 5,630 $ 56,298 $ 56,298 $ 7,506 $ - $ 501,053 $ (116,002) $ 385,051 $ - $ - $ 385,051 $ $ Subtotal Thornbury West Wastewater Collection 11,727,228 $ 175,908 $ 1,759,084 $ 1,759,084 $ 234,545 $ - $ 15,655,850 $ (3,444,443) $ 12,211,407 $ - $ - $ 6,323,436 $ 5,887,971 $ Thornbury West Trunk Sewer Works Huron Street Elma Street North 25 m east Bruce Street PVC 600mm 247 $2,935 724,825 $ 10,872 $ 108,724 $ 108,724 $ 14,496 $ - $ 967,641 $ (191,153) $ 776,488 $ 480,538 $ - $ - $ 295,950 $ Huron Street Victoria Elma Street North PVC 600mm 222 $3,117 691,957 $ 10,379 $ 103,793 $ 103,793 $ 13,839 $ - $ 923,762 $ (202,571) $ 721,191 $ 446,317 $ - $ - $ 274,874 $ Subtotal Thornbury West Trunk Sewer Works 1,416,781 $ 21,252 $ 212,517 $ 212,517 $ 28,336 $ - $ 1,891,403 $ (393,724) $ 1,497,679 $ 926,854 $ - $ - $ 570,824 $ Thornbury West Share of Thornbury East Wastewater Collection Share of Thornbury East Wastewater Collection - $ - $ - $ - $ - $ - $ 1,296,655 $ - $ 1,296,655 $ - $ - $ - $ 1,296,655 $ Subtotal Thornbury West Share of Thornbury East Wastewater Collection - $ - $ - $ - $ - $ - $ 1,296,655 $ - $ 1,296,655 $ - $ - $ - $ 1,296,655 $ Total Thornbury West Wastewater Projects 13,144,010 $ 197,160 $ 1,971,601 $ 1,971,601 $ 262,880 $ - $ (3,838,167) $ 15,005,741 $ 926,854 $ - $ 6,323,436 $ 7,755,450 $ Appendix D | 177 Water: Residential Growth - Population in New Units 1,507 Residential - Pop Existing Unserviced Units 73 Total Residential 1,580 Wastewater: Residential Growth - Population in New Units 1,507 Residential - Pop Existing Unserviced Units 230 Total Residential 1,737 Employment Growth 133 Ultimate Growth in Square Meters 10,627 Total Thornbury West Service Area Benefit Benefit Prior Growth Post-Period Net Capital Total Grants and to Other to Existing (Available Benefit Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Thornbury West Water Distribution $11,507.96 $0.00 $0.00 $0.00 ($3,023.95) $7,329.65 $7,202.27 90.9% $6,547.64 9.1% $654.63 Thornbury West Water Storage $10,019.77 $0.00 $0.00 $0.00 $0.00 $0.00 $10,019.77 90.9% $9,109.05 9.1% $910.72 Thornbury West Share of Thornbury East Reservoir Debt $634.92 $0.00 $0.00 $0.00 $0.00 $0.00 $634.92 90.9% $577.22 9.1% $57.71 Total Water Projects $22,162.65 $0.00 $0.00 $0.00 ($3,023.95) $7,329.65 $17,856.96 $16,233.91 $1,623.06 Charge Per Capita $10,276.16 Charge Per Square Metre of GFA $152.73 Wastewater Projects Thornbury West Wastewater Collection $12,211.41 $0.00 $0.00 $0.00 ($3,551.08) $6,323.44 $9,439.05 90.9% $8,581.12 9.1% $857.93 Thornbury West Trunk Sewer Works $1,497.68 $0.00 $926.85 $0.00 $0.00 $0.00 $570.82 90.9% $518.94 9.1% $51.88 Thornbury West Share of Thornbury East Wastewater Collection $1,296.65 $0.00 $0.00 $0.00 $0.00 $0.00 $1,296.65 90.9% $1,178.80 9.1% $117.86 Total Wastewater Projects $15,005.74 $0.00 $926.85 $0.00 ($3,551.08) $6,323.44 $11,306.53 $10,278.86 $1,027.67 Charge Per Capita $5,917.29 Charge Per Square Metre of GFA $96.71 Charge Per Capita Water Water Distribution and Pumping $10,276.16 $22,899 $20,552 $15,414 Distribution and Pumping $152.73 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $11,713.92 $26,103 $23,428 $17,571 Total Water Services $172.31 Wastewater Wastewater Collection and Pumping $5,917.29 $13,186 $11,835 $8,876 Collection and Pumping $96.71 Treatment $10,792.91 $24,051 $21,586 $16,189 Treatment $178.31 Total Wastewater Services $16,710.20 $37,237 $33,421 $25,065 Total Wastewater Services $275.02 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Residential: Thornbury West Service Area Non-Residential: Thornbury West Service Area Development-Related Capital Forecast Residential Non-Residential Share Share Charge per Square Metre Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples Apartments THORNBURY WEST SERVICE AREA APPENDIX D TABLE D.15 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING Appendix D | 178 APPENDIX D TABLE D.16 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM CLARKSBURG SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Clarksburg Water Distribution Marsh St (CR 13) Russel St Clark St PVC 300mm 635 1,104,124 $ 16,562 $ 165,619 $ 165,619 $ 22,082 $ 100,000 $ 1,574,005 $ (236,634) $ 1,337,371 $ - $ - $ 1,337,371 $ Clark St Marsh St CR 2 PVC 300 mm 2,125 3,517,145 $ 52,757 $ 527,572 $ 527,572 $ 70,343 $ - $ 4,695,389 $ (1,074,384) $ 3,621,005 $ - $ - $ 3,621,005 $ Marsh St (CR 13) Clark St Matilda St PVC 250 mm 840 $1,672 1,404,493 $ 21,067 $ 210,674 $ 210,674 $ 28,090 $ - $ 1,874,998 $ (313,808) $ 1,561,190 $ - $ - $ 1,561,190 $ CR 13 10th Line 200m south PVC 200 mm 200 $1,408 281,590 $ 4,224 $ 42,239 $ 42,239 $ 5,632 $ - $ 375,923 $ (69,529) $ 306,395 $ - $ - $ 306,395 $ Matilda St (CR 13) Marsh St 10th Line PVC 200 mm 545 $1,336 728,115 $ 10,922 $ 109,217 $ 109,217 $ 14,562 $ - $ 972,033 $ (191,517) $ 780,516 $ - $ - $ 780,516 $ Subtotal Clarksburg Water Distribution 7,035,467 $ 105,532 $ 1,055,320 $ 1,055,320 $ 140,709 $ 100,000 $ 9,492,349 $ (1,885,871) $ 7,606,477 $ - $ - $ 7,606,477 $ Total Clarksburg Water Projects 7,035,467 $ 105,532 $ 1,055,320 $ 1,055,320 $ 140,709 $ 100,000 $ 9,492,349 $ (1,885,871) $ 7,606,477 $ - $ - $ 7,606,477 $ Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Clarksburg Wastewater Collection Clark St Marsh St CR 2 PVC 200 mm 2,125 $1,312 2,787,755 $ 41,816 $ 418,163 $ 418,163 $ 55,755 $ - $ 3,721,653 $ (846,984) $ 2,874,669 $ - $ - $ 2,874,669 $ Marsh St (CR 13) Clark St Matilda St PVC 200 mm 840 $1,365 1,146,380 $ 17,196 $ 171,957 $ 171,957 $ 22,928 $ - $ 1,530,417 $ (259,183) $ 1,271,234 $ - $ - $ 1,271,234 $ Matilda St (CR 13) Marsh St 10th Line PVC 200 mm 545 $1,411 769,258 $ 11,539 $ 115,389 $ 115,389 $ 15,385 $ - $ 1,026,959 $ (174,186) $ 852,773 $ - $ - $ 852,773 $ CR 13 10th Line 200m south PVC 200 mm 200 $1,551 310,119 $ 4,652 $ 46,518 $ 46,518 $ 6,202 $ - $ 414,009 $ (66,199) $ 347,810 $ - $ - $ 347,810 $ Marsh St (CR 13) Clark St George St PVC 200 mm 135 $2,027 273,667 $ 4,105 $ 41,050 $ 41,050 $ 5,473 $ - $ 365,345 $ (57,024) $ 308,321 $ - $ - $ 308,321 $ George St Marsh St Mary St SPS PVC 200 mm 135 $1,558 210,337 $ 3,155 $ 31,550 $ 31,550 $ 4,207 $ - $ 280,799 $ (45,359) $ 235,441 $ - $ - $ 235,441 $ Subtotal Clarksburg Wastewater Collection 5,497,515 $ 82,463 $ 824,627 $ 824,627 $ 109,950 $ - $ 7,339,183 $ (1,448,935) $ 5,890,247 $ - $ - $ 5,890,247 $ Clarksburg Pumping Stations and Forcemains HDPE 150 mm 620 $1,555 963,809 $ 14,457 $ 144,571 $ 144,571 $ 19,276 $ 100,000 $ 1,386,685 $ (178,885) $ 1,207,800 $ - $ - $ 1,207,800 $ Sewage Pumping Station 1,785,480 $ 26,782 $ 267,822 $ 267,822 $ 35,710 $ - $ 2,383,615 $ - $ 2,383,615 $ - $ - $ 2,383,615 $ Subtotal Clarksburg Pumping Stations and Forcemains 2,749,289 $ 41,239 $ 412,393 $ 412,393 $ 54,986 $ 100,000 $ 3,770,301 $ (178,885) $ 3,591,416 $ - $ - $ 3,591,416 $ Clarksburg Share of Thornbury East Wastewater Collection Share of Thornbury East Wastewater Collection - $ - $ - $ - $ - $ - $ 143,443 $ - $ 143,443 $ - $ - $ 143,443 $ Subtotal Clarksburg Share of Thornbury East Wastewater Collection - $ - $ - $ - $ - $ - $ 143,443 $ - $ 143,443 $ - $ - $ 143,443 $ Total Thornbury West Wastewater Projects 8,246,804 $ 123,702 $ 1,237,021 $ 1,237,021 $ 164,936 $ 100,000 $ 11,252,926 $ (1,627,820) $ 9,625,106 $ - $ - $ 9,625,106 $ Forcemain From Mary St SPS to Russell St via George St and Marsh St Appendix D | 179 Water: Residential Growth - Population in New Units 401 Residential - Pop Existing Unserviced Units 484 Total Residential 885 Wastewater: Residential Growth - Population in New Units 401 Residential - Pop Existing Unserviced Units 623 Total Residential 1,024 Employment Growth 39 Ultimate Growth in Square Meters 3,116 Total Clarksburg Service Area Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing (Available Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Clarksburg Water Distribution $7,606.48 $0.00 $0.00 $0.00 $35.11 $7,571.37 90.9% $6,883.19 9.1% $688.18 Total Water Projects $7,606.48 $0.00 $0.00 $0.00 $35.11 $7,571.37 $6,883.19 $688.18 Charge Per Capita $7,779.57 Charge Per Square Metre of GFA $220.85 Wastewater Projects Clarksburg Wastewater Collection $5,890.25 $0.00 $0.00 $0.00 ($547.86) $6,438.10 90.9% $5,852.93 9.1% $585.17 Clarksburg Pumping Stations and Forcemains $3,591.42 $0.00 $0.00 $0.00 $0.00 $3,591.42 90.9% $3,264.98 9.1% $326.43 Clarksburg Other Sewer Works $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Clarksburg Share of Thornbury East Wastewater Collection $143.44 $0.00 $0.00 $0.00 $0.00 $143.44 90.9% $130.41 9.1% $13.04 Total Wastewater Projects $9,625.11 $0.00 $0.00 $0.00 ($547.86) $10,172.96 $9,248.32 $924.64 Charge Per Capita $9,028.00 Charge Per Square Metre of GFA $296.73 Charge Per Capita Water Water Distribution and Pumping $7,779.57 $17,336 $15,559 $11,669 Distribution and Pumping $220.85 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $9,217.33 $20,540 $18,435 $13,826 Total Water Services $240.43 Wastewater Wastewater Collection and Pumping $9,028.00 $20,118 $18,056 $13,542 Collection and Pumping $296.73 Treatment $10,792.91 $24,051 $21,586 $16,189 Treatment $178.31 Total Wastewater Services $19,820.91 $44,169 $39,642 $29,731 Total Wastewater Services $475.04 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Residential: Clarksburg Service Area Non-Residential: Clarksburg Service Area Development-Related Capital Forecast Residential Non-Residential Share Share Charge per Square Metre Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples Apartments CLARKSBURG SERVICE AREA APPENDIX D TABLE D.17 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING Appendix D | 180 APPENDIX D TABLE D.18 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM LORA BAY SERVICE AREA Development-Related Costs (2024 - Build-Out) Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Subtotal LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Service Area 1 Ineligible Shraes Service Area 2 Service Area 3 1.5% 15% 15% 2% Lora Bay Water Distribution Sunset Boulevard West Christie Beach Road 39th Sideroad PVC 200mm 1,415 $1,245 1,761,001 $ 26,415 $ 264,150 $ 264,150 $ 35,220 $ - $ 2,350,937 $ (461,873) $ 1,889,063 $ 1,889,063 $ 1,057,875 $ - $ - $ 39th Sideroad Christie Beach Road Sunset Boulevard PVC 200mm 1,102 $1,271 1,401,153 $ 21,017 $ 210,173 $ 210,173 $ 28,023 $ - $ 1,870,539 $ (499,220) $ 1,371,319 $ 1,371,319 $ 383,969 $ - $ - $ Christie Beach Road 39th Sideroad Sunset Boulevard PVC 200mm 790 $1,223 966,083 $ 14,491 $ 144,912 $ 144,912 $ 19,322 $ - $ 1,289,721 $ (355,384) $ 934,337 $ 934,337 $ 523,229 $ - $ - $ Christie Beach Road 39th Sideroad Arthur Street PVC 300mm 500 $1,566 782,938 $ 11,744 $ 117,441 $ 117,441 $ 15,659 $ - $ 1,045,223 $ (239,626) $ 805,596 $ 805,596 $ - $ - $ - $ Meaford TOBM Townline Hwy 26 100m south of Hwy 26 PVC 300mm 100 $1,241 124,054 $ 1,861 $ 18,608 $ 18,608 $ 2,481 $ 65,000 $ 230,612 $ (37,778) $ 192,834 $ 192,834 $ - $ - $ $ Subtotal Lora Bay Water Distribution 5,035,229 $ 75,528 $ 755,284 $ 755,284 $ 100,705 $ 65,000 $ 6,787,031 $ (1,593,882) $ 5,193,150 $ 5,193,150 $ 1,965,073 $ - $ - $ Lora Bay Water Storage and Pumping Lora Bay Booster Pump Station 6,729,275 $ 100,939 $ 1,009,391 $ 1,009,391 $ 134,585 $ - $ 8,983,582 $ - $ 8,983,582 $ 8,508,789 $ - $ 87,462 $ 387,331 $ Subtotal Lora Bay Water Storage and Pumping 6,729,275 $ 100,939 $ 1,009,391 $ 1,009,391 $ 134,585 $ - $ 8,983,582 $ - $ 8,983,582 $ 8,508,789 $ - $ 87,462 $ 387,331 $ Total Lora Bay Water Projects 11,764,504 $ 176,468 $ 1,764,676 $ 1,764,676 $ 235,290 $ 65,000 $ 15,770,613 $ (1,593,882) $ 14,176,731 $ 13,701,938 $ 1,965,073 $ 87,462 $ 387,331 $ Development-Related Costs (2024 - Build-Out) Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Subtotal LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Service Area 1 Ineligible Shraes Service Area 2 Service Area 3 1.5% 15% 15% 2% Lora Bay Wastewater Collection Sunset Boulevard West Christie Beach Road 39th Sideroad PVC 200mm 1,415 $1,315 1,860,206 $ 27,903 $ 279,031 $ 279,031 $ 37,204 $ - $ 2,483,375 $ (410,466) $ 2,072,909 $ 2,072,909 $ 849,893 $ - $ - $ 39th Sideroad Christie Beach Road Sunset Boulevard PVC 200mm 1,102 $1,334 1,470,478 $ 22,057 $ 220,572 $ 220,572 $ 29,410 $ - $ 1,963,088 $ (452,199) $ 1,510,890 $ 1,510,890 $ 664,791 $ - $ $ Subtotal Lora Bay Wastewater Collection 3,330,684 $ 49,960 $ 499,603 $ 499,603 $ 66,614 $ - $ 4,446,463 $ (862,664) $ 3,583,799 $ 3,583,799 $ 1,514,684 $ - $ - $ Lora Bay Share of Thornbury West Wastewater Works Share of Thornbury West Wastewater Works - $ - $ - $ - $ - $ - $ 926,854 $ - $ 926,854 $ 806,805 $ - $ 35,897 $ 84,152 $ Subtotal Lora Bay Share of Thornbury West Wastewater Works - $ - $ - $ - $ - $ - $ 926,854 $ - $ 926,854 $ 806,805 $ - $ 35,897 $ 84,152 $ Lora Bay Share of Thornbury East Wastewater Collection Share of Thornbury East Wastewater Collection - $ - $ - $ - $ - $ - $ 2,105,393 $ - $ 2,105,393 $ 1,832,695 $ - $ 81,542 $ 191,156 $ Subtotal Lora Bay Share of Thornbury East Wastewater Collection - $ - $ - $ - $ - $ - $ 2,105,393 $ - $ 2,105,393 $ 1,832,695 $ - $ 81,542 $ 191,156 $ Lora Bay Pumping Stations and Forcemains Christie Beach Sewage Pump Station and Forcemain (Sunset West ) 11.5 L/s 1,785,480 $ 26,782 $ 267,822 $ 267,822 $ 35,710 $ - $ 2,383,615 $ - $ 2,383,615 $ 2,383,615 $ 977,282 $ - $ $ Subtotal Lora Bay Pumping Stations and Forcemains 1,785,480 $ 26,782 $ 267,822 $ 267,822 $ 35,710 $ - $ 2,383,615 $ - $ 2,383,615 $ 2,383,615 $ 977,282 $ - $ - $ Total Lora Bay Wastewater Projects 5,116,164 $ 76,742 $ 767,425 $ 767,425 $ 102,323 $ - $ 9,862,326 $ (862,664) $ 8,999,661 $ 8,606,913 $ 2,491,966 $ 117,439 $ 275,309 $ Lora Bay Shared Works Lora Bay Shared Works Appendix D | 181 Water: Residential Growth - Population in New Units 1,870 Residential - Pop Existing Unserviced Units 226 Total Residential 2,096 Wastewater: Residential Growth - Population in New Units 1,870 Residential - Pop Existing Unserviced Units 244 Total Residential 2,114 Employment Growth 193 Ultimate Growth in Square Meters 15,439 Total Lora Bay - Service Area 1 Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing Post Period (Available Costs After Cost Subsidies Service Areas Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Lora Bay Water Distribution $5,193.15 $0.00 $0.00 $771.99 $1,193.08 ($456.80) $3,684.88 90.9% $3,349.95 9.1% $334.93 Lora Bay Water Storage and Pumping $8,508.79 $0.00 $0.00 $0.00 $0.00 $0.00 $8,508.79 90.9% $7,735.41 9.1% $773.38 Other Water Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Completed Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Total Water Projects $13,701.94 $0.00 $0.00 $771.99 $1,193.08 ($456.80) $12,193.66 $11,085.36 $1,108.31 Charge Per Capita $5,288.35 Charge Per Square Metre of GFA $71.79 Wastewater Projects Lora Bay Wastewater Collection $3,583.80 $0.00 $0.00 $849.89 $664.79 $158.24 $1,910.88 90.9% $1,737.19 9.1% $173.68 Lora Bay Share of Thornbury West Wastewater Works $806.80 $0.00 $0.00 $0.00 $0.00 $0.00 $806.80 90.9% $733.47 9.1% $73.33 Lora Bay Share of Thornbury East Wastewater Collection $1,832.69 $0.00 $0.00 $0.00 $0.00 $0.00 $1,832.69 90.9% $1,666.12 9.1% $166.58 Lora Bay Pumping Stations and Forcemains $2,383.62 $0.00 $0.00 $977.28 $0.00 $0.00 $1,406.33 90.9% $1,278.51 9.1% $127.82 Other Wastewater Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Completed Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Total Wastewater Projects $8,606.91 $0.00 $0.00 $1,827.17 $664.79 $158.24 $5,956.71 $5,415.29 $541.42 Charge Per Capita $2,561.77 Charge Per Square Metre of GFA $35.07 Charge Per Capita Water Water Distribution and Pumping $5,288.35 $11,785 $10,577 $7,933 Distribution and Pumping $71.79 Supply and Treatment $1,615.01 $3,599 $3,230 $2,423 Supply and Treatment $46.98 Total Water Services $6,903.36 $15,384 $13,807 $10,356 Total Water Services $118.77 Wastewater Wastewater Collection and Pumping $2,561.77 $5,709 $5,124 $3,843 Collection and Pumping $35.07 Treatment $4,485.89 $9,996 $8,972 $6,729 Treatment $64.56 Total Wastewater Services $7,047.66 $15,705 $14,096 $10,572 Total Wastewater Services $99.63 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Residential: Lora Bay - Service Area 1 Non-Residential: Lora Bay - Service Area 1 Single & Semi- Detached Rows and Other Multiples Apartments Charge per Square Metre APPENDIX D TABLE D.19 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING LORA BAY - SERVICE AREA 1 Development-Related Capital Forecast Residential Non-Residential Share Share Charge By Size of Unit (1) Appendix D | 182 Water: Residential Growth - Population in New Units 21 Residential - Pop Existing Unserviced Units - Total Residential 21 Wastewater: Residential Growth - Population in New Units 21 Residential - Pop Existing Unserviced Units 92 Total Residential 113 Employment Growth 2 Ultimate Growth in Square Meters 173 Total Lora Bay - Service Area 2 Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing Post Period (Available Costs After Cost Subsidies Service Areas Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Lora Bay Water Distribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Lora Bay Water Storage and Pumping $87.46 $0.00 $0.00 $0.00 $0.00 ($5.13) $92.59 90.9% $84.17 9.1% $8.42 Other Water Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Completed Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Total Water Projects $87.46 $0.00 $0.00 $0.00 $0.00 ($5.13) $92.59 $84.17 $8.42 Charge Per Capita $4,009.32 Charge Per Square Metre of GFA $48.55 Wastewater Projects Lora Bay Wastewater Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Lora Bay Share of Thornbury West Wastewater Works $35.90 $0.00 $0.00 $0.00 $0.00 $1.78 $34.12 90.9% $31.02 9.1% $3.10 Lora Bay Share of Thornbury East Wastewater Collection $81.54 $0.00 $0.00 $0.00 $0.00 $0.00 $81.54 90.9% $74.13 9.1% $7.41 Lora Bay Pumping Stations and Forcemains $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Other Wastewater Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Completed Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Total Wastewater Projects $117.44 $0.00 $0.00 $0.00 $0.00 $1.78 $115.66 $105.15 $10.51 Charge Per Capita $927.05 Charge Per Square Metre of GFA $60.65 Charge By Size of Unit (1) Charge Per Capita Water Water Distribution and Pumping $4,009.32 $8,934 $8,019 $6,014 Distribution and Pumping $48.55 Supply and Treatment $1,615.01 $3,599 $3,230 $2,423 Supply and Treatment $19.58 Total Water Services $5,624.33 $12,533 $11,249 $8,437 Total Water Services $68.13 Wastewater Wastewater Collection and Pumping $927.05 $2,066 $1,854 $1,391 Collection and Pumping $60.65 Treatment $4,485.89 $9,996 $8,972 $6,729 Treatment $178.31 Total Wastewater Services $5,412.94 $12,062 $10,826 $8,120 Total Wastewater Services $238.96 (1) Based on an Occupancy Factor of: 2.23 2.00 1.50 Charge per Square Metre Residential: Lora Bay - Service Area 2 Non-Residential: Lora Bay - Service Area 2 Single & Semi- Detached / Non- Permenant Rows and Other Multiples Apartments Share Share APPENDIX D TABLE D.20 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING LORA BAY - SERVICE AREA 2 Development-Related Capital Forecast Residential Non-Residential Appendix D | 183 Water: Residential Growth - Population in New Units 93 Residential - Pop Existing Unserviced Units - Total Residential 93 Wastewater: Residential Growth - Population in New Units 93 Residential - Pop Existing Unserviced Units 159 Total Residential 252 Employment Growth 10 Ultimate Growth in Square Meters 768 Total Lora Bay - Service Area 3 Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing Post Period (Available Costs After Cost Subsidies Service Areas Share Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) ($000) % $000 % $000 Water Projects Lora Bay Water Distribution $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Lora Bay Water Storage and Pumping $387.33 $0.00 $0.00 $0.00 $0.00 ($22.71) $410.04 90.9% $372.77 9.1% $37.27 Other Water Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Completed Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Total Water Projects $387.33 $0.00 $0.00 $0.00 $0.00 ($22.71) $410.04 $372.77 $37.27 Charge Per Capita $4,009.32 Charge Per Square Metre of GFA $48.55 Wastewater Projects Lora Bay Wastewater Collection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Lora Bay Share of Thornbury West Wastewater Works $84.15 $0.00 $0.00 $0.00 $0.00 $7.87 $76.28 90.9% $69.35 9.1% $6.93 Lora Bay Share of Thornbury East Wastewater Collection $191.16 $0.00 $0.00 $0.00 $0.00 $0.00 $191.16 90.9% $173.78 9.1% $17.37 Lora Bay Pumping Stations and Forcemains $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Other Wastewater Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Completed Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 90.9% $0.00 9.1% $0.00 Total Wastewater Projects $275.31 $0.00 $0.00 $0.00 $0.00 $7.87 $267.44 $243.13 $24.31 Charge Per Capita $963.78 Charge Per Square Metre of GFA $31.67 Charge Per Capita Water Water Distribution and Pumping $4,009.32 $8,934 $8,019 $6,014 Distribution and Pumping $48.55 Supply and Treatment $1,615.01 $3,599 $3,230 $2,423 Supply and Treatment $19.58 Total Water Services $5,624.33 $12,533 $11,249 $8,437 Total Water Services $68.13 Wastewater Wastewater Collection and Pumping $963.78 $2,148 $1,928 $1,446 Collection and Pumping $31.67 Treatment $4,485.89 $9,996 $8,972 $6,729 Treatment $178.31 Total Wastewater Services $5,449.67 $12,144 $10,900 $8,175 Total Wastewater Services $209.98 (1) Based on an Equivalent Factor of: 2.23 2.00 1.50 Share Share Charge per Square Metre Residential: Lora Bay - Service Area 3 Non-Residential: Lora Bay - Service Area 3 Charge By Size of Unit (1) Single & Semi- Detached / Non- Permenant Rows and Other Multiples Apartments Residential Non-Residential APPENDIX D TABLE D.21 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING LORA BAY - SERVICE AREA 3 Development-Related Capital Forecast Appendix D | 184 APPENDIX D TABLE D.22 TOWN OF THE BLUE MOUNTAINS WATER AND WASTEWATER CAPITAL PROGRAM CAMPERDOWN SERVICE AREA Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Camperdown Water Distribution and Storage Camperdown Road Watermain - $ - $ - $ - $ - $ - $ 6,354,304 $ (591,713) $ 5,762,591 $ - $ 245,257 $ 5,517,334 $ Camperdown Reservoir Including Water Booster Pumping Station - $ - $ - $ - $ - $ - $ 12,389,813 $ - $ 12,389,813 $ - $ 1,292,507 $ 11,097,306 $ Subtotal Camperdown Water Distribution and Storage - $ - $ - $ - $ - $ - $ 18,744,117 $ (591,713) $ 18,152,404 $ - $ 1,537,764 $ 16,614,640 $ Total Camperdown Water Projects - $ - $ - $ - $ - $ - $ 18,744,117 $ (591,713) $ 18,152,404 $ - $ 1,537,764 $ 16,614,640 $ Development-Related Costs (2024 - Build-Out) Less: Less: Road Name From To Type Size Length Cost / Metre Construction Works Legal, C of A, Advertising, Misc. Engineering, Design & Contract Admin. Contingencies Town Project Management Special Costs Sub-Total LESS: Costs Accounted for in Roads Projects & Ashpahlt Assumptions Revised Sub- Total Shared Works Benefit to Existing Unserviced Units Share Net Growth- Related Share 1.5% 15% 15% 2% Camperdown Wastewater Collection Old Lakeshore Road Camperdown Rd Private Rd 200mm 1,225 $1,736 2,126,229 $ 31,893 $ 318,934 $ 318,934 $ 42,525 $ - $ 2,838,516 $ (654,338) $ 2,184,178 $ - $ - $ 2,184,178 $ Camperdown Road Related Sewer Works - $ - $ - $ - $ - $ - $ 163,262 $ - $ 163,262 $ - $ 54,961 $ 108,301 $ Delphi PS, Lakeshore PS and Sewer Trunks - $ - $ - $ - $ - $ - $ 16,080,359 $ - $ 16,080,359 $ - $ 3,274,391 $ 12,805,968 $ Subtotal Camperdown Wastewater Collection 2,126,229 $ 31,893 $ 318,934 $ 318,934 $ 42,525 $ - $ 19,082,137 $ (654,338) $ 18,427,799 $ - $ 3,329,352 $ 15,098,447 $ Total Camperdown Wastewater Projects 2,126,229 $ 31,893 $ 318,934 $ 318,934 $ 42,525 $ - $ 19,082,137 $ (654,338) $ 18,427,799 $ - $ 3,329,352 $ 15,098,447 $ Notes: 1) The Camperdown water distribution and wastewater collection projects have been completed and have been largely financing by developers in the Camperdown service area. The service provision agreement between the Town and the Camperdown developers provides for the payment of development charge credits based on the cost of the works shown above and the benefitting units and resulting rates shown on Table 23. Appendix D | 185 Equivalent Units to Be Serviced by Works2 Water: Existing Fronting Units 699 Existing Non-Fronting Units 11 Growth 1,068 Total 1,778 Development Charge Related Units 1,068 Wastewater: Existing Fronting Units 158 Existing Non-Fronting Units 351 Growth 1,003 Total 1,512 Development Charge Related Units 1,003 Employment Growth 99 Ultimate Growth in Square Meters 7,910 Total Camperdown Service Area Benefit Benefit Prior Growth Net Capital Total Grants and to Other to Existing (Available Costs After Cost Subsidies Service Areas Share DC Reserves) Discount ($000) ($000) ($000) ($000) ($000) ($000) Water Projects Camperdown Water Distribution and Storage $18,152.40 $0.00 $0.00 $1,537.76 $25.53 $16,589.11 Other Camperdown Water Projects $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Water Projects $18,152.40 $0.00 $0.00 $1,537.76 $25.53 $16,589.11 Charge Per Capita $15,532.87 Charge Per Square Metre of GFA $104.86 Wastewater Projects Camperdown Wastewater Collection $18,427.80 $0.00 $0.00 $3,329.35 $642.91 $14,455.54 Total Wastewater Projects $18,427.80 $0.00 $0.00 $3,329.35 $642.91 $14,455.54 Charge Per Capita $14,412.30 Charge Per Square Metre of GFA $91.37 Notes: 1) The Camperdown water distribution and wastewater collection projects have been completed and have been largely financing by developers in the Camperdown service area. 2) The service provision agreement between the Town and the Camperdown developers provides for the payment of development charge credits based on the cost of the works set out on Table 22, the benefitting units shown below, and the resulting rates calculated above. 3) The non-residential charge allocation is based on a 5% allocation of the net growth-related costs and assumed additional gfa of: 7,910 Charge Per Capita Water Water Distribution and Pumping $15,532.87 $15,533 $15,533 $15,533 Distribution and Pumping $104.86 Supply and Treatment $1,437.76 $3,204 $2,876 $2,157 Supply and Treatment $19.58 Total Water Services $16,970.63 $18,737 $18,409 $17,690 Total Water Services $124.44 Wastewater Wastewater Collection and Pumping $14,412.30 $14,412 $14,412 $14,412 Collection and Pumping $91.37 Treatment $10,792.91 $24,051 $21,586 $16,189 Treatment $178.31 Total Wastewater Services $25,205.21 $38,463 $35,998 $30,601 Total Wastewater Services $269.68 (1) Based on a PPU Factor of: 2.23 2.00 1.50 Note: As per Camperdown Developer Group Agreement, Water Distribution and Wastewater Collection and Treatment charges do not change between dwelling units CAMPERDOWN SERVICE AREA APPENDIX D TABLE D.23 TOWN OF THE BLUE MOUNTAINS SUMMARY OF RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT CHARGES WATER AND WASTEWATER SERVICING1 Residential: Camperdown Service Area Non-Residential: Camperdown Service Area Development-Related Capital Forecast Residential Non-Residential $/capita $/m2 Charge per Square Metre Charge Charge3 Charge By Size of Unit (1) Single & Semi- Detached Rows and Other Multiples Apartments Appendix D | 186 Appendix E Reserve Fund Balances Appendix E | 187 Appendix E - Development Charges Reserve Funds Uncommitted Balances The Development Charges Act requires that a reserve fund be established for each service for which development charges are collected. Table E.1 presents the uncommitted reserve fund balances that are available to help fund the growth-related net capital costs identified in this study. The opening balances of the development charges reserve funds as of December 31, 2023, are shown. As shown on Table E.1, the December 31, 2023, total reserve fund balance was approximately $99,818. General Government (now referred to as Development Related Studies) included in the capital program and rate calculation in anticipation of the passing of Bill 185, Cutting Red Tape to Build More Homes Act, 2024 which will permit for the collection of DCs for development-related capital costs. The application of each of the balances in each of the reserve funds is discussed in the appendix section related to each service. The reserve funds are assigned to projects in the initial years of the capital program for the services in which the reserves are a positive balance. This has the effect of reducing and deferring capital costs brought forward to the development charge calculation and the cash flow analysis. Where there is a negative balance, the amount is brought forward to the DC capital forecast for recovery through future development charges. Appendix E | 188 APPENDIX E TABLE E.1 TOWN OF THE BLUE MOUNTAINS DEVELOPMENT CHARGE RESERVE FUND BALANCE BY ACCOUNT YEAR ENDING DECEMBER 31, 2023 Reserve Fund Service Balance as at Dec. 31, 2023 Library $3,095,581 General Government* ($125,062) Fire and Rescue $811,908 Police $35,353 Parks and Recreation $3,492,497 By-Law ($124,509) Solid Waste Management $305,747 Public Works $333,920 Roads and Related Area $12,952,875 Water Supply $3,937,416 Clarksburg Water $35,109 Thornbury East Water ($334,877) Thornbury West Water ($3,023,954) Craigleith Water $5,579,522 Camperdown Water $25,533 Osler Water $4,043 Lora Bay Water ($484,640) Thornbury West Sewer ($3,551,079) Thornbury East Sewer ($105,789) Camperdown Sewer $642,908 Lora Bay Sewer $167,883 Craigleith Sewer $190,478 Clarksburg Sewer ($547,857) Osler Sewer ($286,003) Sewer - Castle Glen ($287,530) Thornbury Sewer Capacity ($22,047,318) Craigleith Sewer Capacity ($592,338) Total Development Charge Reserves $99,818 Appendix E | 189 Appendix F Cost of Growth Appendix F | 190 Appendix F - Cost of Growth Asset Management Plan The DCA requires that municipalities complete an Asset Management Plan before passing a development charges by-law. A key function of the Asset Management Plan, as required by the legislation, is to demonstrate that all assets funded under the development charges by- law are financially sustainable over their full life cycle. Asset Types A summary of the future municipal-owned assets and estimated useful life assumptions for eligible DC services considered as part of the study are outlined in Table F.1 and F.2. Although all capital assets considered in the study have been identified, not all assets necessitate future replacement or ongoing maintenance activities. The exception and the justification is as follows: - Some of the works identified may represent one-time expenditures and may be temporary in nature. Therefore, the assets would not be required to be replaced and no ongoing operation and maintenance costs exist. Such assets are identified as "not a long-term asset" in the table. - Some projects do not relate to the emplacement of a tangible capital asset - some examples include the acquisition of land or the undertaking of environmental assessments or other development- related studies. These projects/costs do not necessarily require future replacement or ongoing maintenance. Such projects are identified as "not infrastructure" in the table. Appendix F | 191 It should be noted that the capital cost estimates prepared for each of the projects identified in this section include grouped costs of various individual elements, which, as a stand-alone item, may have its own useful life (ex. New buildings include: HVAC, structural elements, roof, etc.). Accordingly, the average useful life assumptions noted below are applicable to all project components. Table F.1 - Summary of Municipal Assets Considered General Services Capital Project Description Estimated Useful Life (Years) Recovery of Negative DC Reserve Fund Balances Not a Long-Term Asset Land acquisition Not Infrastructure Studies / Design etc. Not Infrastructure Debenture Payments Not Infrastructure Buildings and Facilities 40 years Library Collection Materials 7 years Fire Mobile Training Unit 15 years Fire Services Equipment 11 years Park Development General 20 years Parks Facilities (Courts) 10 years Parks Trail Development 20 years Parks Playground Equipment 15 years Parks Large Equipment 7 years Public Works Equipment 7 years Paved Parking Lots 25 years By-law Vehicles & Equipment 7 years Solid Waste Collection Trucks 7 years Organic Recycling Bins 10 years Organics Processing Equipment 10 years Appendix F | 192 Table F.2 - Summary of Municipal Assets Considered Engineered Services Capital Project Description Estimated Useful Life (Years) Environmental Assessment Studies Not Infrastructure Buildings and Facilities 40 years Roads 30 years Active Transportation 20 years Water Supply Plants 50 years Pumping and Storage Stations 50 years Linear Infrastructure 99 years No annual provisions have been identified for Development-Related Studies as they are not infrastructure and therefore have no long-term financial requirements. Annual Provision When assets require rehabilitation or are due for replacement, the source of funds is limited to reserves or contributions from operating. Capital expenditures to carry out the rehabilitation and replacement of aging infrastructure are not growth-related and are therefore not eligible for funding through development charge revenues or other developer contributions. Based on the information obtained from Town staff regarding useful life assumptions and the capital cost of acquiring and/or emplacing each asset, a provision for infrastructure replacement has been calculated for both the Town-wide general and engineered services. Provisions for infrastructure replacement are initially calculated for each asset based on their useful life and the anticipated cost of replacement. The aggregate of all individual provisions form the required annual capital provision. In calculating the annual provisions, assumptions are made to account for inflation (2.0 per cent) and interest (3.5 per cent). Appendix F | 193 Consistent with the requirements of the DCA, assets that are proposed to be funded under the DC By-law have been included in the analysis. As a result, the total calculated annual provision for development charge related infrastructure has been netted down to consider the replacement of existing infrastructure or benefit-to-existing development. However, for reference, the annual replacement provisions associated with the non-development charge funded costs, including costs related to benefit-to-existing and post-period benefit have also been calculated. Table F.3 provides an overview of the capital provisions required to replace the capital infrastructure proposed to be funded under the development charges by-law for both General and Engineered Services. As shown in Table F.3, by 2034, the Town will need to fund an additional $1.29 million per annum in order to properly fund the full life-cycle costs of the new general services assets related to the General Services supported under the DC By-law. In contrast, for engineered services which have a longer benefiting period to build-out, the calculated annual provision for DC the assets supported under the proposed Development Charges By-law is $3.55 million and $4.13 million for Roads and Related and Water and Wastewater assets, respectively. Appendix F | 194 Summary of Asset Management Requirements for General Appendix F | 195 Financial Sustainability of the Program Future Revenue Growth The calculated annual funding provision should be considered within the context of the Townʼs projected growth. Over the next 10 years (to 2033) the Town is projected to increase by approximately 3,050 households, which represents a 39% increase over the existing base. Over the longer-term planning horizon to build-out, the Town will add approximately 7,390 households. In addition, the Town will also add roughly 275 new employees that will result in approximately 21,973 square metres of additional non-residential building space. Over the longer planning period to build-out the Town will add an additional 1,453 employees that will be accommodated in 116,095 square metres of new non-residential building space. This growth will have the effect of increasing the overall assessment base and additional user fee and charges revenues to offset the capital asset provisions required to replace the infrastructure proposed to be funded under the proposed Development Charges By-law. Long-Term Capital and Operating Impact Analysis As shown in Table F.4, by 2033, the Townʼs net operating costs are estimated to increase by $7.32 million for property tax supported services. Increases in net operating costs will be experienced as new facilities such as community centres are opened. Water and Wastewater operating impacts are assumed to be funded from water and wastewater rates and are not included in the analysis. Tables F.5 and F.6 summarize the components of the development- related capital forecast that will require funding from non-DC sources. Appendix F | 196 In total, $5.58 million and $49.46 million will need to be financed from non-DC sources over the 2024-2033 and 2024-Build-out planning periods respectively. In addition, $137.32 million in interim DC financing related to post-period shares of projects may be required or these costs may be recovered from other growth funding tools. Council is made aware of these factors so that they understand the operating and capital costs that will not be covered by DCs as it adopts the development-related capital forecast set out in the study. Assets Are Deemed to be Financially Sustainable It is anticipated that new assets identified through the 2024 DC Background Study process will be incorporated into the Townʼs ongoing asset management plan analyses. The calculated annual provisions identified are considered to be financially sustainable as it is expected that the increased capital asset management requirements can be absorbed by the tax and user base over the long-term. Appendix F | 197 Estimated net opera ting cost of the proposed development-related capital program for tax s upported assets by category in $202 4 by 2033. Appendix F | 198 Summarizes the comp onents of the development- related capital forecast that will require fu nding fr om non- DC sources for General Services . Appendix F | 199 Summarizes the comp onents of the development- related capital forecast that will require fu nding from non-DC so urces for En gineered Service s. Appendix F | 200 Appendix G 2024-29 DC By-Law Appendix F | 201 Page 1 of 21 The Corporation of the Town of The Blue Mountains By-Law Number 2024 - 29 Being a By-law to establish Development Charges for the Corporation of the Town of The Blue Mountains WHEREAS subsection 2(1) of the Development Charges Act, 1997, c. 27 (hereinafter called "the Act") provides that the council of a municipality may pass By-laws for the imposition of development charges against land for increased capital costs required because of the needs for services arising from development in the area to which the by-law applies; AND WHEREAS the Council of The Corporation of the Town of The Blue Mountains ("Town of The Blue Mountains ") has given Notice in accordance with Section 12 of the Act, of its intention to pass a by-law under Section 2 of the said Act; AND WHEREAS the Council of the Town of The Blue Mountains has heard all persons who applied to be heard no matter whether in objection to, or in support of, the development charge proposal at a public meeting held on March 12, 2024; AND WHEREAS the Council of the Town of The Blue Mountains had before it a report entitled Development Charges Background Study dated February 2, 2024 (the "Study") prepared by Hemson Consulting Ltd., wherein it is indicated that the development of any land within the Town of The Blue Mountains will increase the need for services as defined herein; AND WHEREAS copies of the Study were made available on February 2, 2024 and copies of the proposed development charges by-law were made available on February 26, 2024 to the public in accordance with Section 12 of the Act; AND WHEREAS the Council of the Town of The Blue Mountains on March 12, 2024 approved the Study, dated February 2, 2024, in which certain recommendations were made relating to the establishment of a development charge policy for the Town of The Blue Mountains pursuant to the Act; AND WHEREAS by resolution adopted by Council of The Corporation of the Town of The Blue Mountains on March 12, 2024, Council determined that the increase in the need for services attributable to the anticipated development as contemplated in the Study dated February 2, 2024, as amended, including any capital costs, will be met by updating the capital budget and forecast for the Town of The Blue Mountains, where appropriate; AND WHEREAS by resolution adopted by Council on March 12, 2024, Council approved the Study, as amended, and determined that no further public meetings were required under Section 12 of the Act; AND WHEREAS by resolution adopted by Council of The Corporation of the Town of The Blue Mountains on March 12, 2024, Council determined that the future excess capacity identified in the Study, as amended, dated February 2, 2024, shall be paid for by the development charges contemplated in the said Study, or other similar charges; AND WHEREAS the Council of the Town of The Blue Mountains has given consideration of the use of more than one development charge by-law to reflect different needs for services in different areas, also known as area rating or area specific development charges, and has determined that for the services, and associated infrastructure proposed to be funded by development charges under this by-law, that it is fair and reasonable that the charges be calculated on an area-specific and Town-wide uniform basis; Page 2 of 21 AND WHEREAS the Study dated February 2, 2024, as amended, includes an Asset Management Plan that deals with all assets whose capital costs are intended to be funded under the development charge by-law and that such assets are considered to be financially sustainable over their full life-cycle; AND WHEREAS the Council of the Town of The Blue Mountains will give consideration to incorporate the Asset Management Plan outlined in the Study, as amended, within the Town of The Blue Mountains' ongoing practices and current and/or future corporate Asset Management Strategies. Now Therefore Council of The Corporation of the Town of The Blue Mountains hereby enacts as follows: Definitions 1. In this By-law, "Act" means the Development Charges Act, 1997, S.O. 1997, c.27; "agricultural use" means lands, buildings, or structures, excluding any portion thereof used as a dwelling unit, used, designed or intended to be used for the purpose of a bona fide farming operation including, but not limited to, animal husbandry, bee keeping, dairying, fallow, field crops, fish farming, forestry, fruit farming, horticulture, livestock, market gardening, pasturage, poultry keeping, the growing, raising, packing, treating, storing, and sale of produce produced on the premises, and other activities customarily carried on in the field of agriculture, including the cultivation of cannabis; "air-supported structure" means an air supported structure as defined in the Building Code Act; "apartment" means any dwelling unit within a building containing more than three dwelling units where the units are connected by an interior corridor, and includes a "commercial resort unit", "hotel" or "motel" unit; "board" means a board of education, public school board, secondary school board, Catholic school board, Protestant school board, or a board as defined in Subsection 1(1) of the Education Act, R.S.O. 1990, c.E.2, as amended; "building or structure" means a structure occupying an area greater than ten square metres consisting of a wall, roof, and floor or any of them or a structural system serving the function thereof including an air-supported structure, excluding a farm building; "Building Code Act" means the Building Code Act, S.O. 1992, c.23, as amended, and all Regulations thereto including the Ontario Building Code, 1997, as amended; "cannabis production facility" means the use of land, buildings or structures for the processing, testing, destruction, packaging and shipping of cannabis and for the purposes of the by-law is defined as a non-residential use; "class" means a grouping of services combined to create a single service for the purposes of this By-law and as provided in Section 7 of the Development Charges Act. "commercial conference centre meeting space use" means land, buildings or structures used, designed or intended to be used for commercial meetings such as civic, educational, political, religious and social functions including convention centre and facility meeting space; "commercial maintenance facility use" means ski lift facilities, service and maintenance facility related to a ski resort or service and maintenance facility related to a golf course. This use shall be considered a commercial use; Page 3 of 21 "commercial recreational facility use" means land, buildings or structures used, designed or intended to be used for commercial indoor recreational use excluding institutional public hall use. This use shall be considered a commercial use; "commercial restaurant use" means land, buildings or structures used, designed or intended to be used for the purpose of offering food or beverages for sale to the public for consumption and includes such uses as a restaurant, drive-in restaurant, drive-thru restaurant, take-out restaurant, dining room, lunch room, bake shop, cafeteria, coffee shop, ice cream parlour, snack bar, or tavern including related storage. This use shall be considered a commercial use; "commercial other use" means land, buildings or structures used, designed, or intended to be used for the purpose of an office, buying, selling, leasing and renting articles, commodities, goods, merchandise, substances or wares, including related storage or the supplying of services as distinguished form such uses as manufacturing or assembling of goods including all non-residential uses not otherwise defined and excluding commercial conference centre meeting space use, commercial maintenance facility use, and commercial restaurant use. This use shall be considered a commercial use; "commercial resort unit" means one room or a group of rooms in a building used or designed or intended to be used by one or more persons, as a single commercial accommodation unit within a commercial resort unit complex (i) in which food preparation and sanitary facilities are provided for the exclusive use of such person or persons; (ii) which has a private entrance from a common hallway or entrance either inside or outside the building; (iii) which is part of a rental or lease management program which consists of a minimum of ten such units in one building or group of buildings; (iv) which is not used or designated as a principal residence; and (v) which has been established to provide accommodation for gain or profit; "commercial resort unit with separate designated lock off unit" means a commercial resort unit having a single adjacent room or suite with a shared door in the common wall between the main part of the unit and the adjacent room or suite, with a private entrance from the common hallway or entrance either inside or outside the building for each of the main part of the unit and the adjacent room or suite, with each of the main part of the unit and the adjacent room or suite designated as separate condominium units in accordance with a declaration and description, and where the gross floor area of the adjacent room or suite does not exceed 46.5 square metres; "Council" means the Council of The Corporation of the Town of The Blue Mountains; "development" means any use or proposed use in respect of land that requires one or more of the actions referred to in Section 7 of this By-law, including the construction, erection or placing of one or more buildings or structures on land or the making of an addition or alteration to a building or structure that has the effect of increasing the size or usability thereof, and includes redevelopment; "development charge" means a charge imposed pursuant to this By-law; "dwelling unit" means one or more habitable rooms designed or intended to be used together as a single and separate housekeeping unit by one or more persons, containing its own culinary facilities, or facilities for the installation of cooking equipment, and sanitary facilities, including a commercial resort unit and a commercial resort unit with separate designated lock off unit; "farm building" means a farm building as defined in the Building Code Act; "floor" includes a paved, concrete, wooden, gravel, or dirt floor; "grade" means the average level of proposed or finished ground adjoining a building or structure at all exterior walls; Page 4 of 21 "gross floor area" means the sum total of the total areas of all floors in a building, structure, or dwelling unit whether at, above, or below-grade, measured between the exterior faces of the exterior walls of the building or structure or from the centre line of a common wall separating two uses, or from the outside edge of a floor where the outside edge of the floor does not meet an exterior or common wall, and: (a) includes the floor area of a mezzanine and air-supported structure and the space occupied by interior walls partitions; (b) excludes any parts of the building or structure used for the parking and loading of vehicles; (c) excludes the floor area of a hallway directly adjacent to a Commercial Resort Unit, a hotel unit or a motel unit; and (d) where a building or structure does not have any walls, the gross floor area of the building or structure shall be the total of the area of all floors, including the ground floor, that are directly beneath the roof of the building or structure; "hotel unit" means one or more habitable rooms used, designed or intended to be used as a sleeping accommodation unit by one or more persons, and may be used by the travelling or vacationing public or for recreational purposes, but not containing its own culinary facilities and for the purposes of the by-law is defined as an apartment; "industrial other use" shall have the same meaning as the term "existing industrial building" in Ont. Reg. 82/98 made under the Act excluding intensive industrial use; "institutional development" means development of a building or structure intended for use: (i) As a long-term care home within the meaning of Subsection 2 (1) of the Long- Term Care Homes Act, 2007; (ii) As a retirement home within the meaning of Subsection 2 (1) of the Retirement Homes Act, 2010; (iii) By any of the following post-secondary institutions for the objects of the institution: 1. A university in Ontario that receives direct, regular, and ongoing operating funding from the Government of Ontario, 2. A college or university federated or affiliated with a university described in subclause (1), or 3. An Indigenous Institute prescribed for the purposes of Section 6 of the Indigenous Institutes Act, 2017; (iv) As a memorial home, clubhouse, or athletic grounds by an Ontario branch of the Royal Canadian Legion; or (v) As a hospice to provide end of life care. "institutional public hall use" means land, buildings or structures used, designed or intended to be used for a non-commercial meetings and recreation including arena or community centre; "institutional other use" means land, buildings or structures used, designed or intended to be used for a non-commercial purpose by any organization, group, or association for religious, charitable, education, health or welfare purposes excluding institutional public hall use and institutional church use; Page 5 of 21 "intensive industrial use" shall have the same meaning as the term "existing industrial building" in Ont. Reg. 82/98 made under the Act where the use, due to the nature of its operation or materials used therein, would be considered obnoxious by reason of or emissions such as smoke, noise, dust, fumes, odours, or vibrations; "local board" means municipal service board, municipal business corporation, transportation commission, public library board, board of health, police services board, planning board, or any other board, commission, committee, body or local authority established or exercising any power under any general or special act with respect to the affairs or purposes of the Town, but excluding a board, a conservation authority, any municipal business corporation not deemed to be a local board under O. Reg. 168/03 made under the Municipal Act, 2001, S. O. 2001, c.25, and any corporation created under the Electricity Act, 1998, S. O. 1998, c. 15, Sch. "A"; "mezzanine" means a mezzanine as defined in the Building Code Act; "motel unit" means one or more habitable rooms used, designed or intended to be used as a sleeping accommodation unit by one or more persons, and may be used by the travelling or vacationing public or for recreational purposes, but not containing its own culinary facilities, and for the purposes of the by-law is defined as an apartment; "non-profit housing development" means the development of a building or structure intended for use as a residential premises (including emergency transitional housing) and developed by, (a) a corporation to which the Not-for-Profit Corporations Act, 2010 applies, that is in good standing under that Act and whose primary object is to provide housing, (b) a corporation without share capital to which the Canada Not-for-profit Corporations Act applies, that is in good standing under that Act and whose primary object is to provide housing, or (c) a non-profit housing co-operative that is in good standing under the Co-operative Corporations Act. 2022, c. 21, Sched. 3, s. 4. "non-residential use" means land, buildings or structures or portions thereof used, designed or intended to be used for a purpose other than for residential use; "Ontario Building Code" means the Building Code Act, 1992, S.O. 1992, c.23 as amended or superseded; "other multiple" mean residential buildings not including single detached dwellings, semi- detached dwellings or apartment dwellings; "owner" means the owner of land or any person authorized by such owner to make one or more applications described in Section 7 of this By-law for the development of such land; "place of worship" means land, buildings or structures used, designed, or intended to be used for a place of worship or for the purpose of a cemetery or burial ground and exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended; "Planning Act" means the Planning Act, R.S.O. 1990, c. P.13, as amended or superseded; "private ski club lodge use" means base lodge associated with a private ski club resort that does not provide night skiing; "protracted" means in relation to a temporary building or structure the persistence of its construction, erection, placement on land, alteration or of an addition to it for a continuous period exceeding eight months; Page 6 of 21 "Public Works" includes, but is not limited to, lands, buildings, structures, equipment and fleet; "redevelopment" means the construction, erection or placing of one or more buildings or structures on land where all or part of a building or structure has previously been demolished on such land, changing the use of a building or structure from residential to non-residential or from non-residential to residential or changing a building or structure from one type of residential development to another or from one type of non-residential development to another; "rental housing" means development of a building or structure with four or more dwelling units all of which are intended for use as rented residential premises; "residential use" means land, buildings or structures or portions thereof used, designed or intended to be used for human habitation as a home, residence or living accommodation for one or more individuals and includes commercial resort units, hotel or motel units; "Roads & Related Services" include, but are not limited to, land, bridges, culverts, structures, drainage ditches, highways, roadways, sidewalks, signal lights, storm sewers and street lights; "Sanitary Sewage System" means all land, buildings, structures, works, facilities and things related to sanitary sewer services including, but not limited to, all works for the collection, transmission, treatment, and disposal of sewage; "semi-detached dwellings" mean a residential building divided vertically into dwelling units each of which has a separate entrance and access at grade; "services" means services designated in this By-law including Schedule B to this By-law or in agreement under Section 44 of the Act, or both; "Service Area" means lands in one of Service Areas 1 to 12 as shown on Schedule "A" to this By-law being Service Area 1 Craigleith, 2 Castle Glen, 3 Osler, 4 Thornbury Easy, 5 Thornbury West, 6 Clarksburg, 7 Lora Bay SA1, 8 Lora Bay SA2, 9 Lora Bay SA3, 10 Camperdown and 11 Swiss Meadows; "Service Area 12" means all lands in the geographic area of the Town of The Blue Mountains that are not located in Service Area 1 to 11 inclusive as shown on Schedule "A" to this By-law; "single detached dwellings" mean residential buildings, each of which contain a single dwelling unit, that are not attached to other buildings; "temporary building or structure" means a building or structure constructed or erected or placed on land for a continuous period not exceeding eight months, or an addition or alteration to a building or structure that has the effect of increasing the gross floor area thereof for a continuous period not exceeding eight months; "Town" means the Corporation of the Town of The Blue Mountains, including the former Town of Thornbury and the former Township of Collingwood; "Waterworks System" means all land, buildings, structures, works, facilities and things related to water services including, but not limited to, all works for the production, treatment, storage, supply, transmission and distribution of water. Rules 2. For the purpose of complying with Section 6 of the Act: Page 7 of 21 (a) the area to which this By-law applies shall be the area described in Section 3 of this By-law; (b) the rules developed under paragraph 9 of Subsection 5(1) of the Act for determining if a development charge is payable in any particular case and for determining the amount of the charge shall be as set forth in Sections 4 through 17, inclusive, and Section 27 of this By-law; (c) the exemptions, partial exemptions and credits provided for by such rules shall be the exemptions, partial exemptions and credits set forth in Sections 18 through 22, inclusive, of this By-law, the indexing of charges shall be in accordance with Section 15 of this By-law, and there shall be no phasing in of development charges as provided in Subsection 16(1) of this By-law; and (d) the redevelopment of land shall be in accordance with the rules set forth in Section 22 of this By-law. Lands Affected 3. This By-law applies to all lands in the geographic area of the Town, whether or not the land is exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended. In addition to this By-law, lands in the Town may also be subject to area-specific development charges by-laws. Designation of Services 4. It is hereby declared by Council that all development within the area to which this By- law applies will increase the need for services. 5. The development charge applicable to a development as determined under this By- law shall apply without regard to the services required or used by an individual development. 6. Development charges shall be imposed for the following categories of services (refer to Schedules B and C) to pay for the increased capital costs required because of increased needs for services arising from development: (a) Public Library Services; (a) Fire Services; (b) Police Department Services; (c) Parks & Recreation Services; (d) By-law Enforcement Services; (e) Solid Waste Management Services; (f) Development Related Studies, subject to paragraph 28 of this By-law; (g) Services Related to a Highway: Public Works; (h) Services Related to a Highway: Roads & Related Services; (i) Waterworks System; and (j) Sanitary Sewage System. Page 8 of 21 Approvals for Development 7. Development charges shall be imposed against all lands, buildings or structures within the area to which this By-law applies if the development of such lands, buildings or structures requires any of the following approvals: (a) the passing of a zoning by-law or of an amendment to a zoning by-law under Section 34 of the Planning Act; (b) the approval of a minor variance under Section 45 of the Planning Act, R.S.O. 1990, c. C.26, as amended, or Section 9 of the Condominium Act, 1998, S. O. 1998, C. 19, as amended, or its predecessor Act (c) a conveyance of land to which a by-law passed under Subsection 50(7) of the Planning Act applies; (d) the approval of a plan of subdivision under Section 51 of the Planning Act; (e) a consent under Section 53 of the Planning Act; (f) the approval of a description under Section 50 of the Condominium Act; or (g) the issuing of a permit under the Building Code Act, 1992 in relation to a building or structure. 8. No more than one development charge under this by-law for each service designated in Section 6 shall be imposed upon any lands, buildings or structures to which this By-law applies even though two or more of the actions described in Section 7 are required before the lands, buildings or structures can be developed. 9. Notwithstanding Section 8 and Section 13, if two or more of the actions described in Section 7 occur at different times, additional development charges shall be imposed in respect of any increased or additional development permitted by that action. 10. Where a development requires an approval described in Section 7 after the issuance of a building permit and no development charge has been paid, then the development charge shall be paid prior to the granting of the approval required under Section 7. 11. If a development does not require a building permit but does require one or more of the approvals described in Section 7, then the development charge shall nonetheless be payable in respect of any increased or additional development permitted by such approval required for the increased or additional development being granted. 12. Nothing in this By-law prevents Council from requiring, as a condition of an agreement under Section 51 or Section 53 of the Planning Act, that the owner, at his or her own expense, install such local services related to a plan of subdivision or within the area to which the plan relates, as Council may require in accordance with the local service policies of the Town in effect at the time, or that the owner pay for local connections to storm drainage facilities installed at the owner's expense, or administrative, processing, or inspection fees. Basis for Calculation of Development Charges 13. The development charge with respect to the development of any land, buildings or structures shall be calculated as follows: (1) in the case of residential development, or the residential portion of a mixed-use development, based upon the number and type of dwelling units and the Service Area in which the development occurs; (2) in the case of non-residential development, or the non-residential portion of a mixed- Page 9 of 21 use development, based upon the gross floor area of such development, the Service Area in which the development occurs, and the type of development; and, (3) in the case of a type of development not described above, based upon the number and type of units and/or gross floor area portions of such development and the Service Area in which the development occurs. Amount of Development Charges 14. The amount of the development charge shall be imposed as follows: (1) the development charges described in Schedules C-1, C-2 and C-3 to this By- law shall be imposed on residential development of lands, buildings or structures, including a dwelling unit accessory to a non-residential use and, in the case of a mixed- use building or structure, on the residential component of the mixed-use building or structure, calculated for each dwelling unit by type; (2) the development charges described in Schedule D to this By-law shall be imposed on the non-residential development of land, buildings, or structures and, in the case of a mixed- use building or structure, on the non-residential portion of the mixed-use building or structure, and calculated on the gross floor area of the non-residential use; and, (3) in the case of a type of development not described above, the development charges described in Schedules C-1, C-2 and C-3 and D, as the case may be, shall be imposed on the portions of the development. Indexing of Development Charges 15. The development charges imposed pursuant to this By-law may be adjusted annually without amendment to this By-law, commencing January 1, 2025 and on January 1 of each year thereafter, in accordance with the most recently available Statistics Canada Quarterly, Construction Price Statistics. Phasing, Timing of Calculation and Payment 16. (1) The development charges set out in this By-law are not subject to phasing in and are payable in full, subject to the exemptions and credits herein, from the date this By-law comes into force. (2) Subject to Subsection (3), Subsection (4), Section 21, and Section 22, the development charge shall be calculated as of and shall be payable on the date the first building permit is issued in relation to a building or structure on land to which the development charge applies. (3) Notwithstanding Subsection (2) the Town-wide Roads & Related Services, , Sanitary Sewage System, and Waterworks System services components of the development charges for residential developments that require approval of a plan of subdivision under Section 51 of the Planning Act or a consent under Section 53 of the Planning Act and for which a subdivision agreement or consent agreement is executed by the owner shall be calculated and shall be payable immediately upon the owner executing the agreement, pursuant to Section 26 of the Act. The terms of such agreement shall then prevail over the other provisions of this section. (4) If at the time of issuance of a building permit or permits for any development for which payments have been made pursuant to subsection 16(2) and subsection 16(3), the total number and type of dwelling units for which building permits have been and are being issued, or the gross floor area used or intended to be used for a non-residential purpose for which building permits have been and are being issued, Page 10 of 21 is greater than that used for the calculation and payment referred to in subsection (1), an additional payment shall be required and shall be calculated by multiplying the applicable charge shown in Schedules C-1, C-2 and C-3 or D, by: (a) in the case of residential development, the difference between the number and type of dwelling units for which building permits have been and are being issued and the number and type of dwelling units for which payments have been made pursuant to subsection 16(2), subsection 16(3) and this subsection; and (b) in the case of non-residential development, the difference between the gross floor area used or intended to be used for a non-residential purpose for which building permits have been and are being issued and the gross floor area used or intended to be used for a non-residential purpose for which payments have been made pursuant to subsection 16(2), subsection 16(3) and this subsection. (5) Subject to subsection 16(7), if, following the issuance of all building permits for all development in a subdivision or for all development on a block within that subdivision that had been intended for future development and for which payments have been made pursuant to subsection 16(2) and subsection 16(3), the total number and type of dwelling units for which building permits have been issued, or the gross floor area used or intended to be used for a non-residential purpose for which building permits have been issued, is less than that used for the calculation and payment referred to in subsection 16(2) and subsection 16(3), a refund shall become payable by the Town to the person who originally made the payment referred to in subsection 16(2) and subsection 16(3) which refund shall be calculated by multiplying the applicable development charge in effect at the time such payments were made by: (a) in the case of residential development, the difference between the number of dwelling units by type for which payments were made pursuant to subsection 16(2) and subsection 16(3) and the number of dwelling units by type for which building permits were issued; and (b) in the case of non-residential development, the difference between the gross floor area used or intended to be used for a non-residential purpose for which payments were made pursuant to subsection 16(2) and subsection 16(3) and the gross floor area used or intended to be used for a non-residential purpose for which building permits were issued. (6) Subsections 16(4) and 16(5) shall apply with necessary modifications to a development for which development charges have been paid pursuant to a condition of consent or pursuant to an agreement respecting same. (7) Notwithstanding subsections 16(1) to 16(6), the Town may require and where so required an owner shall enter into an agreement, including the provision of security for the owner's obligations under the agreement, pursuant to section 27 of the Act and, without limiting the generality of the foregoing, such an agreement may require the early payment of the development charges hereunder. The terms of such agreement shall then prevail over the provisions of this By-law. (8) Any refunds payable pursuant to subsections 16(5) and 16(6) shall be calculated and paid without interest. (9) Notwithstanding subsections 16(1) to 16(6), development charges for rental housing and institutional developments in accordance with Section 26.1 of the Development Charges Act, 1997, are due inclusive of interest established from the date the development charge would have been payable in accordance with section 26 of the Development Charges Act, 1997, in 6 equal annual payments beginning on the date that is the earlier of: Page 11 of 21 a. the date of the issuance of a permit under the Building Code Act, 1992 authorizing occupation of the building; and b. the date the building is first occupied. and continuing on the following five anniversaries of that date. (10) Where the development of land results from the approval of a site plan or zoning by- law amendment application received on or after January 1, 2020, and the approval of the application occurred within two years of building permit issuance, the development charges under subsection 16(2) shall be calculated on the rates set out in Schedule B on the date of the planning application, including interest. Where both planning applications apply, development charges under subsection 16(2) shall be calculated on the rates in effect on the day of the later planning application, including interest. This paragraph will apply in accordance with the legislation, subject to amendment. Payment by Money or the Provision of Services 17. (1) Payment of development charges shall be by cash or by cheque. (2) In the alternative to payment by the means provided in Subsection (1), the Town may, by an agreement entered into with the owner under Section 38 of the Act, accept the provision of services in full or partial satisfaction of the development charge otherwise payable provided that: (a) if the Town and the owner cannot agree as to the reasonable cost of the work performed, the reasonable cost of the work shall be determined by the Town's Treasurer; and (b) if the credit exceeds the amount of the charge for the service to which the work relates, (i) the excess amount shall not be credited against the charge for any other service, unless the Town has so agreed in an agreement under Section 38 of the Act; and (ii) in no event shall the Town be required to make a cash payment to the credit holder. (3) Nothing in this By-law prevents Council from requiring, as a condition of any approval given under the Planning Act that the owner, at the owner's expense, installs such local services as Council may require in accordance with the local service policies of the Town in effect at the time. Statutory Exemptions Rules for Exemption Relating to the Creation of Additional Dwelling Units 18. (1) Exemptions will be provided in accordance with section 2 of the Act for additional residential units subject to changes to legislation. Rules for Exemption Relating to Non-Profit Housing (2) As defined and exempt by the Act, development charges will not be payable for non- profit housing. Rules for Exemption Relating to Colleges and Universities (3) Land, buildings or structures that are exempt from taxation under the enabling legislation of a college established under the Ontario Colleges of Applied Arts and Page 12 of 21 Technology Act, 2002, and used for the purposes set out under such enabling legislation; (4) Land, buildings or structures owned by a university that receives regular and ongoing operating funds from the Government of Ontario for the purposes of post-secondary education. Rules for Exemption Relating to Inclusionary Zoning (5) Inclusionary zoning residential units in respect of residential units that are affordable housing units as defined by the Act required to be included in a development or redevelopment pursuant to a by-law passed under section 34 of the Planning Act to give effect to the policies described in subsection 16 (4) of that Act. 2022, c. 21, Sched. 3, s. 4 . Rules for Exemption Relating to Municipalities (6) Land, buildings or structures owned by and used for the purposes of a municipality and exempt from taxation under Section 3 of the Assessment Act, R.S.O. 1990, c.A.31, as amended; (7) Lands, buildings or structures owned by and used for the purposes of a board and exempt from taxation under Section 3 of the Assessment Act, Rules for Exemption Relating to Industrial Enlargement 19. (1) If a development includes the enlargement of the gross floor area of an existing industrial building, the amount of the development charge that is payable is the following: (a) if the gross floor area is enlarged by 50 per cent or less, the amount of the development charge in respect of the enlargement is zero; and (b) if the gross floor area is enlarged by more than 50 per cent, development charges are payable on the amount by which the enlargement exceeds 50 per cent of the gross floor area before the enlargement. (2) For the purpose of this Section only the terms "gross floor area" and "existing industrial building" shall have the same meaning as those terms have in Ont. Reg 82/98 made under the Act. (3) In this Section, for greater certainty in applying the exemption herein: (a) the gross floor area of an existing industrial building shall be determined as of the date this By-law comes into force; and (b) the gross floor area of an existing industrial building is enlarged where there is a bona fide increase in the size of the existing building and the enlarged area is attached to existing industrial building and is used for or in connection with an industrial purpose as set out in Subsection 1(1) of O. Reg. 82/98. Without limiting the generality of the foregoing, the exemption in this Section shall not apply where the enlarged area is attached to the existing industrial building by means only of a tunnel, bridge, canopy, corridor or other passageway, or through a shared below grade connection such as a service tunnel, foundation, footing or a parking facility. (4) For the purpose of interpreting the definition of "existing industrial building" contained in O. Reg. 82/98, regard shall be had for the classification of the lands in question pursuant to the Assessment Act, R. S. O. 1990, c. A.31, as amended, and in particular: whether the lands fall within a tax class such that taxes on the Page 13 of 21 land are payable at an industrial rate; and, whether more than 50% of the gross floor area of the building or structure on the land has an industrial property code for assessment purposes. Categories of Non-Statutory Exempt Uses 20. The following categories of uses are hereby designated as being exempt from the payment of development charges: (1) buildings or structures used as public hospitals governed by the Public Hospitals Act, R.S.O. 1990, c.P.40, as amended; (2) land, buildings or structures used for place of worship use and exempt from taxation under the Assessment Act, R.S.O. 1990, c.A.31, as amended; and (3) land, buildings or structures for agricultural use which do not receive municipal sanitary sewer or water supply services. Temporary Buildings or Structures 22. (1) Subject to Subsections (2) and (3), temporary buildings or structure shall be exempt from the payment of development charges. (2) In the event that a temporary building or structure becomes protracted, it shall be deemed not to be nor ever to have been a temporary building or structure, and the development charges required to be paid under this By-law shall become payable on the date the temporary building or structure becomes protracted. (3) Prior to the Town issuing a building permit for a temporary building or structure, the Town may require an owner to enter into an agreement, including the provision of security for the owner's obligation under the agreement, pursuant to Section 27 of the Act providing for all or part of the development charge required by Subsection (2) to be paid after it would otherwise be payable. The terms of such agreement shall then prevail over the provisions of this By-law. Rules for the Redevelopment of Land 23. (1) Despite any other provision of this By-law, where as a result of the redevelopment of land, a building or structure existing on the same land has been demolished in order to facilitate redevelopment, or converted from one principal use to another principal use on the same land, the development charges otherwise payable with respect to such redevelopment shall be reduced by the following amounts: (a) in the case of a residential building or structure, an amount equivalent to the applicable development charge for the Residential Type of the existing dwelling that has been or will be demolished or converted to another principal use; or (b) in the case of a non-residential building or structure, an amount calculated by multiplying the applicable development charge by the Gross Floor Area that has been or will be demolished or converted to another principal use; or (c) in the case of a mixed-use building or structure, by an amount calculated by the residential unit type for the existing residential use portion and by gross floor area for the non-residential use portion, of the unit that has been or will be demolished or converted to another principal use. (2) The amount of any reduction or credit permitted shall not exceed, in total, the Page 14 of 21 amount of the development charges otherwise payable with respect to the re- development. (3) Any reduction or credit applicable hereunder shall only apply provided that a building permit for the redevelopment has been issued within five (5) years of the date of the issuance of a permit for the demolition of any building or structure on the same lands. (4) If the lands are unserviced at the time it is demolished, water or wastewater development charges will not be credited. Water or wastewater development charges (or the equivalent) will be due upon servicing. (5) For greater certainty, and without limiting the generality of the foregoing, no credit shall be allowed where the demolished building or structure or part thereof prior to the demolition or conversion would have been exempt from the payment of development charges pursuant to this By-law (e.g. temporary structures). Rules with Respect to Existing Agreements 24. If there is a conflict between this By-law and an agreement made between the Town and the owner or former owner of land before the coming into force of this By- law and the owner or former owner of the land agreed to pay all or a portion of a charge related to development under the agreement with respect to the land or provided services in lieu of payment, then the provisions of the agreement prevail over the By- law to the extent of the conflict. The extent of the conflict shall be determined on a service by service basis. Notwithstanding the allocation of total development charges within an existing agreement, the development charges may be reallocated by the Town to services set out in this By-law. Reserve Funds 25. (1) Development charge payments received by the Town pursuant to this By-law shall be maintained in a separate reserve fund or funds for each service to which the development charge relates and shall be spent only for the capital costs determined under paragraphs 2 to 8 of Subsection 5(1) of the Act. (2) Notwithstanding anything herein to the contrary, the Town may borrow money from a reserve fund and repay the amount used plus interest at a rate not less than the Bank of Canada rate updated on the first business day of every January, April, July, and October. Interest 26. The Town shall pay interest on a refund under Subsection 18(3) and Subsection 25(2) of the Act at a rate equal to the Bank of Canada rate on the date this By-law comes into force. Front Ending Agreements 27. The Town may enter into agreements under Section 44 of the Act. Schedules 28. The following Schedules to this By-law form an integral part of this By-law. Schedule A Service Area Boundaries Schedule B Designated Services Page 15 of 21 Schedule C Development Charges per Residential Dwelling Unit Schedule D Development Charges per Square Metre of Non-Residential Gross Floor Area By-law Registration 29. A certified copy of this By-law may be registered in the by-law register in the Land Registry Office against all land in the Town and may be registered against title to any land to which this By-law applies. Date By-law Effective 30. This By-law comes into force and effect from and after date of its enactment. Date By-law Expires 31. This By-law expires ten years after the date on which it comes into force unless repealed at an earlier date by Council. Repeal 32. By-law No.2019-17 is hereby repealed effective on the date this By-law comes into force. Headings for Reference Only 33. The headings inserted in this By-law are for convenience of reference only and shall not affect the construction or interpretation of this By-law. Severability 34. If, for any reason, any provision, Section, Subsection or paragraph of this By-law is held invalid, it is hereby declared to be the intention of Council that all the remainder of this By-law shall continue in full force and effect until repealed, re- enacted or amended, in whole or in part or dealt with in any other way. And further that this By-law shall come into force and take effect upon the enactment thereof. Enacted and passed this 15th day of April, 2024 "Original Signed" Andrea Matrosovs, Mayor "Original Signed" Corrina Giles, Clerk THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024- 29 Schedule A Page 16 of 21 THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024 - 29 Schedule B Designated Services Categories of Services 1. Public Library 2. Fire Services 3. Police Department 4. Parks and Recreation 5. By-law Enforcement 6. Solid Waste Management 7. Development Related Studies 8. Services Related to a Highway: Public Works 9. Services Related to a Highway: Roads and Related Services 10. Waterworks System 11. Sanitary Sewage System Page 17 of 21 Page 18 of 21 THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024 - 29 Schedule C-1 DEVELOPMENT CHARGES FOR "SINGLE AND SEMI-DETACHED" DWELLING UNITS Municipal Service Service Area Parks & By-law Solid Waste Public Roads Sanitary Sub-Total Development Total Recreation Enforcement Management Works* & Related* Sewer Charge Rel. Studies** Charge 1. Craigleith $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $11,485 $4,304 $38,061 $366 $38,427 2. Castle Glen $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $22,210 $5,728 $50,211 $366 $50,577 3. Osler $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $40,141 $38,403 $100,817 $366 $101,183 4. Thornbury East $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $6,970 $12,516 $41,759 $366 $42,125 5. Thornbury West $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $26,498 $23,182 $71,953 $366 $72,319 6. Clarksburg $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $20,935 $30,114 $73,322 $366 $73,688 7. Lora Bay - SA1 $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $15,384 $15,705 $53,362 $366 $53,728 8. Lora Bay - SA2 $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $12,533 $12,062 $46,868 $366 $47,234 9. Lora Bay - SA3 $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $12,533 $12,144 $46,950 $366 $47,316 10. Camperdown $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $19,132 $24,408 $65,813 $366 $66,179 11. Swiss Meadows $1,082 $1,687 $129 $5,698 $30 $165 $1,273 $12,209 $0 $0 $22,273 $366 $22,639 * Services Related to a Highway ** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act. Library Fire Water Police Page 19 of 21 THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024 - 29 Schedule C-2 DEVELOPMENT CHARGES FOR "OTHER MULTIPLES" DWELLING UNITS Municipal Service Service Area Parks & By-law Solid Waste Public Roads Sanitary Sub-Total Development Total Recreation Enforcement Management Works* & Related* Sewer Charge Rel. Studies** Charge 1. Craigleith $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $10,308 $3,863 $34,161 $328 $34,489 2. Castle Glen $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $19,934 $5,141 $45,065 $328 $45,393 3. Osler $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $36,027 $34,467 $90,484 $328 $90,812 4. Thornbury East $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $6,256 $11,234 $37,480 $328 $37,808 5. Thornbury West $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $23,782 $20,806 $64,579 $328 $64,907 6. Clarksburg $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $18,789 $27,028 $65,807 $328 $66,135 7. Lora Bay - SA1 $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $13,807 $14,096 $47,892 $328 $48,220 8. Lora Bay - SA2 $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $11,249 $10,826 $42,065 $328 $42,393 9. Lora Bay - SA3 $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $11,249 $10,899 $42,138 $328 $42,466 10. Camperdown $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $18,763 $23,384 $62,136 $328 $62,464 11. Swiss Meadows $971 $1,514 $115 $5,114 $27 $148 $1,142 $10,958 $0 $0 $19,989 $328 $20,317 * Services Related to a Highway ** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act. Library Fire Police Water Page 20 of 21 THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024 - 29 Schedule C-3 DEVELOPMENT CHARGES FOR "APARTMENT" DWELLING UNITS Municipal Service Service Area Parks & By-law Solid Waste Public Roads Sanitary Sub-Total Development Total Recreation Enforcement Management Works* & Related* Sewer Charge Rel. Studies** Charge 1. Craigleith $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $7,731 $2,897 $25,621 $246 $25,867 2. Castle Glen $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $14,950 $3,855 $33,799 $246 $34,045 3. Osler $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $27,020 $25,850 $67,863 $246 $68,109 4. Thornbury East $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $4,692 $8,425 $28,110 $246 $28,356 5. Thornbury West $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $17,837 $15,605 $48,434 $246 $48,680 6. Clarksburg $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $14,092 $20,271 $49,355 $246 $49,601 7. Lora Bay - SA1 $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $10,356 $10,572 $35,919 $246 $36,165 8. Lora Bay - SA2 $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $8,436 $8,119 $31,549 $246 $31,795 9. Lora Bay - SA3 $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $8,436 $8,175 $31,604 $246 $31,850 10. Camperdown $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $17,956 $21,141 $54,088 $246 $54,334 11. Swiss Meadows $728 $1,135 $87 $3,835 $20 $111 $857 $8,218 $0 $0 $14,991 $246 $15,237 * Services Related to a Highway ** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act. Library Fire Police Water Page 21 of 21 THE CORPORATION OF THE TOWN OF THE BLUE MOUNTAINS By-law No. 2024 - 29 Schedule D DEVELOPMENT CHARGES PER SQUARE METRE OF NON-RESIDENTIAL GROSS FLOOR AREA Municipal Service Service Area Parks & By-law Solid Waste Public Roads Sanitary Sub-Total Development Total Recreation Enforcement Management Works* & Related* Sewer Charge Rel. Studies** Charge 1. Craigleith $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $84.23 $24.99 $196.23 $2.05 $198.28 2. Castle Glen $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $202.41 $44.42 $333.84 $2.05 $335.89 3. Osler $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $326.28 $290.96 $704.25 $2.05 $706.30 4. Thornbury East $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $65.14 $79.62 $231.77 $2.05 $233.82 5. Thornbury West $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $199.71 $161.27 $447.99 $2.05 $450.04 6. Clarksburg $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $267.83 $361.29 $716.13 $2.05 $718.18 7. Lora Bay - SA1 $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $118.77 $99.63 $305.41 $2.05 $307.46 8. Lora Bay - SA2 $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $95.53 $125.21 $307.75 $2.05 $309.80 9. Lora Bay - SA3 $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $95.53 $96.23 $278.77 $2.05 $280.82 10. Camperdown $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $151.84 $155.93 $394.78 $2.05 $396.83 11. Swiss Meadows $0.00 $9.47 $0.72 $0.00 $0.17 $0.93 $7.15 $68.57 $0.00 $0.00 $87.01 $2.05 $89.06 * Services Related to a Highway ** Class of services of Development Related Studies to be in effect immediately upon amendment to the Act. Library Fire Police Water Appendix H Local Service Definitions Appendix H | 223 Appendix H - Local Service Definitions General Policy Guidelines on Development Charge and Local Service funding for Town Related Works The following guidelines set out in general terms the size and nature of engineered infrastructure that is included in the Town of The Blue Mountains 2024 Development Charges Study. For a project to be eligible to be funded completely or in part by development charges, the following will apply: 1. The project will be identified in the most current Town of The Blue Mountains Development Charges Study. 2. If any infrastructure does not add any additional capacity over and above the capacity requirement for that development, these projects are assumed to be the sole responsibility of the developer. 3. Infrastructure that provides servicing or capacity for more than one development is not necessarily fully or partially funded from development charges. If a project is considered fully or partially local in nature, the Town will require the benefiting land owners to fund the works directly. The following policy guidelines are general principles by which staff will be guided in considering development applications. However, each application will be considered on its own merits having regard to, among other factors, the nature, type and location of the development in any existing development and proposed development in its surrounding area these policy guidelines, the location and type of services required and their relationship Appendix H | 224 to the proposed development and to existing and proposed development in the area, and subsection 59(2) of the Development Charges Act, 1997 These local service policy guidelines are subject to review and amendment by the Town which may be independent of an amendment or update to the Townʼs development charge by-laws. The detailed engineering requirements for all work and/or development are governed by the Town of The Blue Mountains, or if not specified in the Official Plan, by the approved detailed engineering standards. "Local service" funding is being specifically considered for the services of: 1. Roads and Related Services 2. Water Services 3. Wastewater Services 4. Parkland Development i. Roads and Related a) Arterial Roads: New arterial roads and arterial road improvements are included as part of road costing funded through DCs. Only the oversizing component would be recovered through DCs and local road equivalent costs are considered to be a local service. b) Collector Roads: The local component of a collector road internal to a development is a direct developer responsibility under s.59 of the DCA as a local service. The oversized share of a collector road internal to a development is development charge recoverable. Collector roads external to a development are a local service if the works are within the area to which the plan relates and therefore a direct developer Appendix H | 225 responsibility under s.59 of the DCA. Otherwise, the works are included in the DC calculation to the extent permitted under s.5(1) of the DCA. c) Local Roads: Local roads, within a development are local services and a direct developer responsibility under s.59 of the DCA. d) Additional Works: Traffic Signals and Intersection Improvements due to development and development-related traffic increases are to be included in the DC calculations, as part of the arterial, collector and local road components. e) Subdivision/Site Entrances and Related: Entrances and all related costs (including, but not limited to: signalization, turn lanes, utilities and extensions, etc.), no matter the class of road, are a local service and a direct developer responsibility under s.59 of the DCA. f) Streetlights: Streetlights internal to a development or site are a direct developer responsibility through local service provisions (s.59 of the DCA). Streetlights external to a development but related to the subject lands are a direct developer responsibility through local service provisions (s.59 of the DCA). New streetlights in other areas related to development are included in the DC calculation to the extent permitted under s.5(1) of the DCA. g) Sidewalks: Sidewalks internal to a development or site are a direct developer responsibility through local service provisions (s.59 of the DCA). Sidewalks external to a development but required and related to the subject lands are a direct developer responsibility through local service provisions (s.59 of the DCA). Appendix H | 226 New sidewalks in other areas related to development are included in the DC calculation to the extent permitted under s.5(1) of the DCA. h) Bike or Transit Lanes: Bike or transit lanes, where requested, internal to a development or site are a direct developer responsibility through local service provisions (s.59 of the DCA). Bike or transit lanes external to a development but required and related to the subject lands are a direct developer responsibility through local service provisions (s.59 of the DCA). New bike or transit lanes in other areas related to development are included in the DC calculation to the extent permitted under s.5(1) of the DCA. i) Noise Abatement Measures: Noise abatement measures internal to a development are a direct developer responsibility through local service provisions (s.59 of the DCA). Noise abatement measures external to a development but required and related to, or mitigate impacts from, the development of the subject lands, are a direct developer responsibility through local service provisions (s.59 of the DCA). j) Street Tree Planting: Street tree planting, as required by Municipal Standards, is considered a local area service and a direct responsibility of the developer. k) Land Acquisition for Road Allowances: Land acquisition for planned road allowances within development lands is a dedication under the Planning Act provisions. Land acquisition for planned road allowances outside of development lands, and that is not a dedication under the Planning Act , is included in the DC calculation to the extent permitted under s.5(1) of the DCA. Appendix H | 227 Additional land acquisition for bridges or grade separations (beyond normal dedication requirements) is included in the DC calculation, to the extent in which it is eligible and identified, if applicable, in the Development Charges Background Study. For further clarification, all improvements to a road to facilitate development are considered local services and are to be paid by the developer unless they fall into one of the following categories: The improvement is designated as required for traffic flow improvement for an area greater than the development, is defined as a road improvement required by the Town, and is identified through the Class Environmental Assessment process or a Town Transportation Study. Such an improvement would be listed in the Development Charges Background Study. The improvement is designated as required by Town Staff to serve a greater area than the development and is identified in the capital forecast and is listed in the Development Charges Background Study. ii. Water Services All water supply, storage, treatment facilities and booster pumping stations may be included in the development charge calculation. Watermains within the development that are larger than 300mm are to be included in the development charge calculation. The amount of cost contribution for watermains within a development shall be calculated using tendered unit prices and shall be the difference between the cost of the actual pipe diameter and the cost of a 300mm pipe diameter including a 12% engineering fee. Only watermain and valves will be included in the calculation. Any costs related to the depth of pipe are the responsibility of the developer. Water mains within the development that are 300mm and under are deemed to be a local service and are a direct funding responsibility of the developer. Appendix H | 228 Connections to trunk mains and pumping stations to service specific areas are to be a direct developer responsibility. Trunk watermains, generally outside the development area, identified by a Class Environmental Assessment, Servicing Study or by Town Staff will be included in the development charge calculation. iii. Wastewater Services All sanitary sewage treatment facilities are to be included in the development charge calculation. Major sanitary trunk sewers, external to the development, and major pumping stations serving more than one development are to be included in the development charge calculation. These services will be identified through a Class Environmental Assessment, Servicing Study or by Town staff. Sewer collectors within the development that are 450 mm and under are deemed to be a local service and are a direct funding responsibility of the developer. Sanitary sewers within the development that are larger than 450mm that also service upstream properties will have cost sharing calculated on the tendered unit prices and shall be the difference between the cost of the actual pipe diameter and the cost of a 450mm pipe including a 12% engineering fee. All other appurtenances with respect to oversizing and any costs related to the depth of pipe are the responsibility of the developer. Connections to collectors and pumping stations to service specific areas are to be a direct developer responsibility. Sewage pumping stations within the development or local pumping stations serving a small localized area are deemed to be a local service and are a direct funding responsibility of the developer or developers on a flow area or proportional basis, or by agreement between the developers. Appendix H | 229 Upgrades to, or the construction of permanent pumping stations that are required as a result of an approved serviceability study that service more than one developer, will be funded under one of the following possible approaches: a) Through a development cost sharing agreement amongst the benefiting land owners. This is the Townʼs preferred approach; or b) Through a Town facilitated developer cost sharing arrangement, such as an area-specific development charge or other similar mechanism. Under this approach, the Town will require one or more of the benefitting land owners to front-end finance the cost of the works. iv. Parkland Development For the purpose of parkland development, local service includes the requirement for the owner to undertake preparation of a conceptual park plan including proposed grading to demonstrate that the proposed park size, configuration and topography will allow for the construction of park facilities to the satisfaction of the Town. The municipality also requires the owner to dedicate parkland or provide cash-in-lieu, consistent with the Planning Act provisions. All of these costs are deemed a direct responsibility of the owner and have not been included in the development charge calculation. With respect to other parkland development costs, the municipal policy is to include all other components of parkland development in the DC calculation, including detailed design and contract administration, finished grading, sodding, park furniture, electrical, water, sanitary sewer, signage, plant material, walkways, play courts, parking lots, sports fields, playground equipment, water play equipment, recreational trails, park shelters and lighting. Appendix H | 230 a) Recreational Trails: The costs of the following items shall be the direct developer responsibility as a local service a. All costs associated with any recreational trails to be constructed within the development (as incorporated in Section D6 of the Official Plan); and b. Rough grading and any associated infrastructure (bridges and abutments, guard and hand rails, retaining walls) of all recreational trails and multi-use paths that are considered part of the Townʼs Public Walkways Network (as incorporated in Section D6 of the Official Plan) within the development. The costs of new trails/walkways in other areas related to development shall be paid through DCs. b) Parkland: The costs for parkland development as set out in the relevant development agreement shall be the direct developerʼs responsibility as a local service. The costs of the following items shall be paid through DCs: a. All costs associated with program facilities and non-local parkland in addition to all associated site works beyond the base parkland development. Appendix H | 231