Schedules B & H to the Fees and Charges By-law (Building Department Services; Sewage System)

Trent Lakes, Ontario · summary & facts

This is the exact embedded text of the captured official document. Snapshot 69f007cac937 · verified 2026-09-25 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Schedule B to the Fees and Charges By-law Building Department Services Schedule B Building Permit - Residential Group 'C' New Residential Construction $1.54 perft2 (Finished/Heated Area) (minimum $2,464.00) Residential Addition (Finished/Heated $1.54 per ft2 Area) (minimum $847.00) Residential Construction/ Addition $0.91 per ft2 (Unfinished/Unheated Area) (minimum $455.00) Deck (Uncovered) $0.42 per ft2 (minimum $287.70) Finished Basement/Walkout $0.83 per ft2 (Finished/Heated Area) (minimum $581.00) Demolition $164.47 Building Permits - All Groups Basic Renovation/Change of Use $0 .41 per ft2 (Interior Layout Changes Only) (minimum $287.00) Extensive Renovation (Life Safety $0.83 per ft2 System/HVAC/Fire Separation) (minimum $581.00) Solar Project (Roof-top) $5.76 per panel (minimum $288.00) Tents (Single or Group< 2422 ft2) $164.47 Engineered Tents (Single or Groupa $0.19 per ft2 2422 ft2) Miscellaneous Projects (Plumbing, $287.83 Woodstove, Trailer, etc.) 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 01-4335-1961 Building Permits - Non-Residential Group 'A', 'B', 'D', 'E' & 'F' Group 'A' & 'B' Construction/Addition $1.90 perft2 01-4335-1961 (Finished/Heated Area) (minimum $2,660.00) Group 'D & 'E' Construction/Addition $1.76 per ft2 01-4335-1961 (Finished/Heated Area) (minimum $2,288.00) Group 'F' Construction/Addition $1.64 per ft2 01-4335-1961 (Finished/Heated Area) (minimum $1,968.00) Accessory Structure/Farm Building $0.99 per ft2 01-4335-1961 (Unfinished/Unheated Area) (minimum $7 42.50) Demolition $0.39 per ft2 01-4335-1961 (minimum $408.34) Administrative Fees Building Permit Renewal $209.54 per year 01-4335-1966 Transfer of Permit $164.47 01-4335-1961 Inspection of any Stage of Construction $164.47 per 01-4335-1961 more than twice inspection Extra Plans Review (Revised Drawinqs) $164.47 per hour 01-4335-1961 Projects or Items not covered elsewhere As determined by 01-4335-1961 in this Schedule CBO (minimum $164.47) Alternative Solution $164.47 per hour 01-4335-1961 Note: All areas are based on the definition of "gross area" in the OBC *Taxes not included in the fees and charges. Please add applicable taxes where necessary. Schedule B to the Fees and Charges By-law Administrative Penalties (Building Without a Permit or Inspection) Investigation -Accessory Structure $157.15 01-4335-1962 Issue Order -Accessory Structure $523.84 01-4335-1962 Annual Review - Accessory Structure $314.30 01-4335-1962 Investigation -Residential Structure $471.46 01-4335-1962 Issue Order -Residential Structure $995.30 01-4335-1962 Annual Review -Residential Structure $471.46 01-4335-1962 Investigation -Non-Residential $785.76 01-4335-1962 Structure Issue Order-Non-Residential Structure $1,309.60 01-4335-1962 Annual Review -Non-Residential $785.76 01-4335-1962 Structure Construction, Demolition or Change of Equal to 100% of the 01-4335-1962 Use Without a Permit - Additional Fee amount calculated as the regular permit fee (shall not exceed $5,000.00) Building By-law B2024-045 *Taxes not included in the fees and charges. Please add applicable taxes where necessary. Schedule H to the Fees and Charges By-law Sewage System Schedule H Sewage System Building Permits Class 4 Sewage System - New::; 4,500 $1,000.00 L/day Class 4 Sewage System - New> 4,500 $1,450.00 L/day andK 10,000 L/day Class 4 Sewage System - Tank $500.00 Replacement Only Class 5 Sewage System (Holding Tank) $1,000.00 Class 3 Sewage System (Cesspool) $500.00 Class 2 Sewage System (Greywater $500.00 System) Trench Bed repair or extension ::; 16 m $500.00 Filter Bed repair, replacement or extension $500.00 ofK 6 m Administrative Fees Transfer of Permit to New Owner $375.00 Existing System Inspection $500.00 Rezoning or Minor Variance Comments $200.00 Severance or Subdivision Comments - $300.00 First Lot Severance or Subdivision Comments - $150.00 Each Additional Lot Severance or Subdivision Re-inspection - $300.00 First Lot Severance or Subdivision Re-inspection - $150.00 Each Additional Lot Permit Review $300.00 Amendment to Sewage Permit $250.00 Field Consultation Fee $350.00 Copies of Archived Permits $35.00 File Search $125.00 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1991 01-4335-1992 01-4335-1992 01-4335-1992 01-4335-1992 01-4335-1992 01-4335-1991 01-4335-1991 01-4335-1991 01-4325-1821 01-4325-1821 *Taxes not included in the fees and charges. Please add applicable taxes where necessary.