Building permits — Tudor and Cashel, Ontario

Do I need a building permit? What does it cost?

In the Township of Tudor and Cashel, Ontario, building permit rules are set by Tudor and Cashel By-law 2025-15, Building Permit Fees Amendment, verified 2026-10-26. Permit fees: Fees in Schedule "A" are per sq. ft. per floor, fixed amounts, or value-based; minimum building permit fee applies. Fees set in: Schedule "A" of By-Law 2012-06. Fines: Double fees; minimum $400.00.

Tudor and Cashel By-law 2025-15, Building Permit Fees Amendment adopted bylaw
permit required for Residential buildings, demolition, farm/commercial/industrial, garages/decks/porches/accessory detached buildings, renovations, change of use, plumbing, wood burning stoves/chimneys, swimming pools, solar panels, sewage systems, towers/wind turbines/walls. Schedule "A"
fee basis Fees in Schedule "A" are per sq. ft. per floor, fixed amounts, or value-based; minimum building permit fee applies. Schedule "A"
fees location Schedule "A" of By-Law 2012-06 s. 1
fine range Double fees; minimum $400.00 Double fees- minimum of $400.00
scout note

Building permit fees from April 1, 2025: residential/seasonal $1.40/sq ft per floor ($1.10/sq ft of foundation area); garages, decks and accessory $0.75/sq ft; farm/commercial/industrial $0.60/sq ft; renovations $250 + 2% of value; minimum $250 (under $50,000) or $800; demolition and change of use $250; plumbing $150 + $12/fixture; no-permit work double fees.

By-Laws & By-Law Enforcement (department page)

Department page that should list the Township's by-laws including any Building By-law; every fetch attempt returned a Cloudflare sg-captcha challenge shell instead of real content.

Machine-readable: building-permits.json · Official website: http://www.tudorandcashel.com/ · Last verified 2026-10-26 · Building permits across Ontario · Building permits in other municipalities