Building permits — Borden-Carleton, Prince Edward Island
Do I need a building permit? What does it cost?
In the Town of Borden-Carleton, Prince Edward Island, building permit rules are set by Town of Borden-Carleton Fees and Charges Bylaw 2018-01 and 1 other bylaw, verified 2026-10-18. Permit required for: Dwelling or other structure, additions, accessory building, demolition, moving/change of use, decks, pools & fences, special permit use. Permit fees: Fixed fees by permit type; late filing or starting without permit doubles fees. Fees set in: Schedule "A" of this bylaw.
Town of Borden-Carleton Fees and Charges Bylaw 2018-01
adopted bylaw
permit required for
Dwelling or other structure, additions, accessory building, demolition, moving/change of use, decks, pools & fences, special permit use
Schedule "A", item 1
fee basis
Fixed fees by permit type; late filing or starting without permit doubles fees
Schedule "A", item 1
fees location
Schedule "A" of this bylaw
s. 3.2
fine range
Doubling of fees charged
Schedule "A", item 1
scout note
Fees bylaw whose Schedule A lists development/building permit fees, e.g. $150 for a dwelling or other structure excluding accessory building, payable before starting the project.
Town of Borden-Carleton Zoning and Development Bylaw 04-15
adopted bylaw
paving patios/sidewalks; fences under 6 ft; clothes lines; gardens; routine maintenance; crops; landscape/ornamental/play structures under 64 sq ft; dog houses/runs; renovations not changing shape/volume/units/use; street right-of-way utilities
s. 2.4.2
fees location
Appendix C
s. 2.5(a)
authority
Development Officer; Authority Having Jurisdiction
s. 2.3; s. 2.14
scout note
Zoning and Development Bylaw that also contains building permit provisions: s.2.6 Building Permit (valid 12 months), s.16.3 building permit fees per Schedule B, change-of-use permits, s.16.6 permits not valid until fee paid, s.16.17 no building permit in a subdivision until requirements met.