| permit required for | change use; commence development; structural alterations; construct/replace structure or deck; water/sewer connection; underground installation; excavation pit; move/demolish structure; construct highway; dump fill; subdivide/consolidate; fence over 4 ft. | s. 4.1(1) |
| exemptions | paving patios/sidewalks; fences under 4 ft; clotheslines, poles, radio/TV antennae (except satellite dishes over 24"); gardens; crops; landscaping/ornamental structures under 64 sq ft; routine maintenance. | s. 4.1(2) |
| fee basis | application fee in accordance with a fee schedule which the Council shall establish | s. 4.2(2) |
| fees location | fee schedule established by Council | s. 4.2(2) |
| authority | Development Officer | s. 1.4 |
| fine range | first/subsequent offence: fine not exceeding $2,000.00; continuing offence: not exceeding $400.00 per day | s. 16.2 |
scout note
No separate building bylaw. Development Bylaw says no building may be erected or altered without a development permit; has a Building Permits section (none issued in a subdivision until approval conditions met) and Canadian building code compliance. Adoption date not stated.