| billing basis | metered | Schedule "A"; Schedule "B" |
| water rate | 2024: Minimum charge - first 2,000 gallons $41.75/month; 2,001 to 10,000 gallons $5.20/1000 gL; 10,001 to 25,000 gallons $7.51/1000 gL; 25,001 to 38,000 gallons $11.30/1000 gL; over 38,000 gallons $15.15/1000 gL. 2025: Minimum charge - first 2,000 gallons $43.85/month; 2,001 to 10,000 gallons $5.45/1000 gL; 10,001 to 25,000 gallons $7.85/1000 gL; 25,001 to 38,000 gallons $11.80/1000 gL; over 38,000 gallons $16.20/1000 gL. | Schedule "A" |
| water fixed charge | Minimum charge - first 2,000 gallons: $41.75/month (2024); $43.85/month (2025) | Schedule "A" |
| sewer rate | 2024: Minimum charge - first 7,300 gallons $40.62/month; over 7,300 gallons $1.50/1000 gL. 2025: Minimum charge - first 7,300 gallons $42.65/month; over 7,300 gallons $1.60/1000 gL. | Schedule "B" |
| billing period | monthly | s. 3.6 |
scout note
2025 water: $43.85/month minimum (first 2,000 gal), then $5.45/1000 gal (2,001-10,000), $7.85 (10,001-25,000), $11.80 (25,001-38,000), $16.20 over 38,000; infrastructure fee $10/month; septic dump $32/m3; sewer per Schedule B; billed monthly. 2024 rates also listed.