Building permits — Raymore, Saskatchewan

Do I need a building permit? What does it cost?

In the Town of Raymore, Saskatchewan, building permit rules are set by Building Bylaw No. 03-2022, verified 2026-09-27. Permit required for: Work within local authority; buildings greater than 10 m2; retaining walls greater than 600 mm differential grade on non-agricultural lands. Exemptions: Accessory buildings not greater than 10 m2 (no hazard, no sleeping accommodations); decks under 600 mm on residential land; farm buildings meeting definition. Permit fees: Determined by local authority; may include administration fee, deposit, SAMA fee, service fee, applicable taxes.

Building Bylaw No. 03-2022 adopted bylaw
permit required for Work within local authority; buildings greater than 10 m2; retaining walls greater than 600 mm differential grade on non-agricultural lands. s. 6(1)(b), s. 4(2), s. 7(2)
exemptions Accessory buildings not greater than 10 m2 (no hazard, no sleeping accommodations); decks under 600 mm on residential land; farm buildings meeting definition. s. 4(4), s. 4(5), s. 6(3)
fee basis Determined by local authority; may include administration fee, deposit, SAMA fee, service fee, applicable taxes. s. 5(1)
fees location building officials' schedules s. 3(13), s. 5(1)(a)
authority Building Official and local authority s. 8(5), s. 11(1)
scout note

Town of Raymore building bylaw (administration and enforcement of construction codes).

Machine-readable: building-permits.json · Official website: http://raymore.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities