Building permits — Rural Municipality of Antler No. 61, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Antler No. 61, Saskatchewan, building permit rules are set by Building Bylaw No. 5-2022, verified 2026-09-27. Exemptions: Farm buildings meeting definition, but residential occupancies cannot be exempt. Permit fees: Value of construction, as established by local authority/building official; permit deposit $100. Administered by: Building Official and local authority.

Building Bylaw No. 5-2022 adopted bylaw
permit required for Work, including construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy of a building, must not commence before a permit is issued. s. 3; s. 6(6)
exemptions Farm buildings meeting definition, but residential occupancies cannot be exempt. s. 5(5)
fee basis Value of construction, as established by local authority/building official; permit deposit $100. s. 6(7); s. 6(10)
authority Building Official and local authority. s. 6(2); s. 6(3)
scout note

Bylaw No. 5-2022 respecting buildings, administering and enforcing the building code within the RM of Antler No. 61.

Machine-readable: building-permits.json · Official website: https://www.rmofantler.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities