Building permits — Rural Municipality of Connaught No. 457, Saskatchewan
Do I need a building permit? What does it cost?
In the Rural Municipality of Connaught No. 457, Saskatchewan, building permit rules are set by Building Bylaw GOVSK 1-2024, verified 2026-09-27. Permit required for: Work (as defined in s. 3) must not commence before a permit is issued. Permit fees: Sum of permit administration fee, plan review/field inspection/enforcement fees, deposit if required, and SAMA fees. Fees set in: a fee bylaw or agreement between the provider of building official services and the local authority.
Building Bylaw GOVSK 1-2024
adopted bylaw
permit required for
Work (as defined in s. 3) must not commence before a permit is issued.
s. 6(6); s. 3 'work'
fee basis
Sum of permit administration fee, plan review/field inspection/enforcement fees, deposit if required, and SAMA fees.
s. 6(7)
fees location
a fee bylaw or agreement between the provider of building official services and the local authority
s. 6(7)(a)-(b)
authority
local authority or the building official
s. 6(3)
scout note
Adopted building bylaw of the RM of Connaught No. 457 (GOVSK 1-2024) administering the Construction Codes Act and National Building Code.